ML13338A535: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:DRAFT DRAFT REQUEST FOR ADDITIONAL INFORMATION PROPOSED REVISION TO REACTOR VESSEL SURVEILLANCE CAPSULE WITHDRAWAL SCHEDULES FIRSTENERGY NUCLEAR OPERATING COMPANY BEAVER VALLEY POWER STATION, UNITS 1 AND 2 DOCKET NOS. 50-334 AND 50-412 By letter dated May 28, 2013, 1 First Energy Nuclear Operating Company (FENOC, the licensee) submitted a request to revise the reactor vessel (RV) surveillance capsule withdrawal schedules for the Beaver Valley Power Station, Units 1 and 2 (BVPS-1 and BVPS-2). In order to complete its review, the staff requires additional information.  
{{#Wiki_filter:DRAFT REQUEST FOR ADDITIONAL INFORMATION PROPOSED REVISION TO REACTOR VESSEL SURVEILLANCE CAPSULE WITHDRAWAL SCHEDULES FIRSTENERGY NUCLEAR OPERATING COMPANY BEAVER VALLEY POWER STATION, UNITS 1 AND 2 DOCKET NOS. 50-334 AND 50-412 By letter dated May 28, 2013,1 First Energy Nuclear Operating Company (FENOC, the licensee) submitted a request to revise the reactor vessel (RV) surveillance capsule withdrawal schedules for the Beaver Valley Power Station, Units 1 and 2 (BVPS-1 and BVPS-2). In order to complete its review, the staff requires additional information.
 
Appendix H to 10 CFR Part 50 states, Each capsule withdrawal and the test results must be the subject of a summary technical report to be submitted, as specified in § 50.4, within one year of the date of capsule withdrawal, unless an extension is granted by the Director, Office of Nuclear Reactor Regulation. Electric Power Research Institutes Materials Reliability Program:
Appendix H to 10 CFR Part 50 states, "Each capsule withdrawal and the test results must be the subject of a summary technical report to be submitted, as specified in § 50.4, within one year of the date of capsule withdrawal, unless an extension is granted by the Director, Office of Nuclear Reactor Regulation.Electric Power Research Institute's "Materials Reliability Program:
Coordinated PWR Reactor Vessel Surveillance Program (CRVSP) Guidelines (MRP-326) dated December 2011,2 states that BVPS-1 Capsule X is planned to be withdrawn at a fluence of 5.01 x 1019 n/cm2 in 2013.
Coordinated PWR Reactor Vessel Surveillance Program (CRVSP) Guidelines (MRP-326)"
 
dated December 2011, 2 states that BVPS-1 Capsule X "is planned to be withdrawn at a fluence of 5.01 x 10 19 n/cm 2 in 2013".  
 
RAI #1:
RAI #1:
Provide the withdrawal date for BVPS-1 Capsule X.  
Provide the withdrawal date for BVPS-1 Capsule X.
 
1 Agencywide Documents Access Management System (ADAMS) Accession No. ML13151A058 2
1 Agencywide Documents Access Management System (ADAMS) Accession No. ML13151A058 2 ADAMS Accession Nos. ML12040A314 and ML12040A315}}
ADAMS Accession Nos. ML12040A314 and ML12040A315 DRAFT}}

Revision as of 10:43, 4 November 2019

Draft RAIs in Support of the Capsule Withdrawal Schedule Change for BVPS Units 1 and 2
ML13338A535
Person / Time
Site: Beaver Valley
Issue date: 12/04/2013
From: Jeffrey Whited
Plant Licensing Branch 1
To:
Whited J
References
Download: ML13338A535 (1)


Text

DRAFT REQUEST FOR ADDITIONAL INFORMATION PROPOSED REVISION TO REACTOR VESSEL SURVEILLANCE CAPSULE WITHDRAWAL SCHEDULES FIRSTENERGY NUCLEAR OPERATING COMPANY BEAVER VALLEY POWER STATION, UNITS 1 AND 2 DOCKET NOS. 50-334 AND 50-412 By letter dated May 28, 2013,1 First Energy Nuclear Operating Company (FENOC, the licensee) submitted a request to revise the reactor vessel (RV) surveillance capsule withdrawal schedules for the Beaver Valley Power Station, Units 1 and 2 (BVPS-1 and BVPS-2). In order to complete its review, the staff requires additional information.

Appendix H to 10 CFR Part 50 states, Each capsule withdrawal and the test results must be the subject of a summary technical report to be submitted, as specified in § 50.4, within one year of the date of capsule withdrawal, unless an extension is granted by the Director, Office of Nuclear Reactor Regulation. Electric Power Research Institutes Materials Reliability Program:

Coordinated PWR Reactor Vessel Surveillance Program (CRVSP) Guidelines (MRP-326) dated December 2011,2 states that BVPS-1 Capsule X is planned to be withdrawn at a fluence of 5.01 x 1019 n/cm2 in 2013.

RAI #1:

Provide the withdrawal date for BVPS-1 Capsule X.

1 Agencywide Documents Access Management System (ADAMS) Accession No. ML13151A058 2

ADAMS Accession Nos. ML12040A314 and ML12040A315 DRAFT