ML15105A224: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:April 15, 20 1 5    A d mini s tr a t i v e Ju d g e Paul S. Ryerson
{{#Wiki_filter:April 15, 2015 Administrative Judge                                Administrative Judge Paul S. Ryerson, Chair                              Dr. Gary S. Arnold Atomic Safety and Licensing Board Panel              Atomic Safety and Licensing Board Panel Mail Stop - T-3 F23                                 Mail Stop - T-3 F23 U.S. Nuclear Regulatory Commission                  U.S. Nuclear Regulatory Commission Washington, DC 20555-0001                            Washington, DC 20555-0001 Administrative Judge Nicholas G. Trikouros Atomic Safety and Licensing Board Panel Mail Stop - T-3 F23 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 In the Matter of Pacific Gas and Electric Company (Diablo Canyon Nuclear Power Plant, Units 1 and
, Ch a ir A t o m i c S a f e t y and L i ce n s i ng B oa r d P anel M a i l S t op - T-3 F23 U.S. N uc l ear R e g u l a t o r y Co mm i ss i on W a s h i ng t on, D C 2055 5-0 001 A d mini s tr a t i v e Ju d g e Dr. Gary S. Arnold A t o m i c S a f e t y and L i ce n s i ng B oa r d P anel M a i l S t op - T-3 F23 U.S. N uc l ear R e g u l a t o r y Co mm i ss i on W a s h i ng t on, D C 2055 5-0 001  A d mini s tr a t i v e Ju d g e Nicho la s G. T r i k ou r os A t o m i c S a f e t y and L i ce n s i ng B oa r d P anel M a i l S t op - T-3 F23 U.S. N uc l ear R e g u l a t o r y Co mm i ss i on W a s h i ng t on, D C 2055 5-0 001 
: 2) Docket Nos. 50-275-LR and 50-323-LR


I n t he M a tter o f P ac i f i c G as and El e c tr i c C o m pany (Di ab l o C an y on N uc l ear P o w er Pl an t , Uni t s 1 and 2) D oc k e t N o s. 5 0-275-LR and 50-32 3-LR  D ear A d m i n i s t r a t i v e Ju d g e s: I n acc o rdance w i t h t he B oa r d's N o v e mber 19, 2 0 12 R e v ised Schedu li ng Or d e r and S ec t i on 2.1203 and S ec t i on 2.3 36, t he NR C s t a f f i s p r o v i d i ng n o t i ce that i t h a s up d a t ed t he he a r i ng f il e for t h i s p roceed i n g and h as m ade i t a v a il ab l e t o t h e pa r t ies. For any m e m b er o f t he pub li c that wishes t o inspe c t t he h e a r i ng f ile, t he S t a ff has c r ea t ed a sepa r a t e f o lder i n t he a g enc y's El ec tr on i c H ea r i n g D o cket (EHD) ass o c i a t ed w i t h t h i s p roceed i n g e n t i t l ed "Di ab l o C an y on H ea r i ng F il e ," and i f any docu m en t s a r e p roduced f o r t h i s pe r i o d , t he upd a t ed docu m e n t s , a l o n g wi t h an i ndex li s t i ng t he docu m en ts, w i ll be pub lished i n t h a t f o l de r. Respec t f u ll y S ub m i tt e d ,  S i gned (e l ec tron i c a ll y) by  Joseph A. Lindell Counsel for NR C S t a f f U.S. Nu c lear R e g u la t o r y Co mm i ss io n O f f i ce o f t he G ene r al Counsel M a i l S t op - O-15 D 21 W a s h i ng ton, D C 20555 T e lephone: (301) 41 5-1474 E-m a il:  joseph.lindell
==Dear Administrative Judges:==
@n r c.g ov D a t e o f s i g na t u re: April 15, 20 1 5 UN I T E D S T A T E S O F A M ER ICA NUCLEA R RE GULA T OR Y C O M M I SS IO N  BE F O R E T H E A T O M I C SA F E T Y AN D L ICENSING B O AR D    I n t he M a tter o f ) ) PAC I F I C G A S AN D E L E C T R I C C O M PAN Y ) 5 0-27 5-L R/ 5 0-3 5 2 3-LR ) (Di ab l o C an y on N uc l ear P o w er Pl an t , ) U n i t s 1 and 2) ) 


CER T I F I CA T E O F SERV I CE  P u rsuant t o 10 C.F.R. § 2.305 (r e v ised) I h e r eby ce rt i f y that cop i es o f t he f o r e g o ing  "APRIL 2015 HE A R I N G F ILE UPD A T E L E T TER," d a t ed April 15, 201 5, ha v e been se r v ed upon t he El ec t r o n i c I n f o r m a t i on E xcha n ge, t he NRC's E-filin g S y s t e m , i n t he abo ve cap t i oned p r oceed ing, t h i s 1 5 t h day o f April, 20 1 5. /S i gne d (e l e c t ro n i ca l ly) by/ Joseph A. Lindell Counsel for NR C S t a f f U.S. Nu c lear R e g u la t o r y Co mm i ss io n O f f i ce o f t he G ene r al Counsel M a i l S t op - O-15 D 21 W a s h i ng ton, D C 20555 T e lephone: (301) 41 5-1474 E-m a il: joseph.lindell
In accordance with the Boards November 19, 2012 Revised Scheduling Order and Section 2.1203 and Section 2.336, the NRC staff is providing notice that it has updated the hearing file for this proceeding and has made it available to the parties. For any member of the public that wishes to inspect the hearing file, the Staff has created a separate folder in the agencys Electronic Hearing Docket (EHD) associated with this proceeding entitled Diablo Canyon Hearing File, and if any documents are produced for this period, the updated documents, along with an index listing the documents, will be published in that folder.
@n r c.g ov D a t e o f s i g na t u re: April 15, 20 1 5}}
Respectfully Submitted, Signed (electronically) by Joseph A. Lindell Counsel for NRC Staff U.S. Nuclear Regulatory Commission Office of the General Counsel Mail Stop - O-15D21 Washington, DC 20555 Telephone: (301) 415-1474 E-mail: joseph.lindell@nrc.gov Date of signature: April 15, 2015
 
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of                                    )
                                                    )
PACIFIC GAS AND ELECTRIC COMPANY                    )        50-275-LR/ 50-3523-LR
                                                    )
(Diablo Canyon Nuclear Power Plant,                )
Units 1 and 2)                                      )
CERTIFICATE OF SERVICE Pursuant to 10 C.F.R. § 2.305 (revised) I hereby certify that copies of the foregoing APRIL 2015 HEARING FILE UPDATE LETTER, dated April 15, 2015, have been served upon the Electronic Information Exchange, the NRCs E-filing System, in the above captioned proceeding, this 15th day of April, 2015.
                                                    /Signed (electronically) by/
Joseph A. Lindell Counsel for NRC Staff U.S. Nuclear Regulatory Commission Office of the General Counsel Mail Stop - O-15D21 Washington, DC 20555 Telephone: (301) 415-1474 E-mail: joseph.lindell@nrc.gov Date of signature: April 15, 2015}}

Latest revision as of 12:58, 31 October 2019

April 2015 Hearing File Update
ML15105A224
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 04/15/2015
From: Lindell J
NRC/OGC
To: Gary Arnold, Paul Ryerson, Nicholas Trikouros
Atomic Safety and Licensing Board Panel
SECY RAS
References
50-275-LR, 50-323-LR, ASLBP 10-900-01-LR-BD01, RAS 27517
Download: ML15105A224 (2)


Text

April 15, 2015 Administrative Judge Administrative Judge Paul S. Ryerson, Chair Dr. Gary S. Arnold Atomic Safety and Licensing Board Panel Atomic Safety and Licensing Board Panel Mail Stop - T-3 F23 Mail Stop - T-3 F23 U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Washington, DC 20555-0001 Administrative Judge Nicholas G. Trikouros Atomic Safety and Licensing Board Panel Mail Stop - T-3 F23 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 In the Matter of Pacific Gas and Electric Company (Diablo Canyon Nuclear Power Plant, Units 1 and

2) Docket Nos. 50-275-LR and 50-323-LR

Dear Administrative Judges:

In accordance with the Boards November 19, 2012 Revised Scheduling Order and Section 2.1203 and Section 2.336, the NRC staff is providing notice that it has updated the hearing file for this proceeding and has made it available to the parties. For any member of the public that wishes to inspect the hearing file, the Staff has created a separate folder in the agencys Electronic Hearing Docket (EHD) associated with this proceeding entitled Diablo Canyon Hearing File, and if any documents are produced for this period, the updated documents, along with an index listing the documents, will be published in that folder.

Respectfully Submitted, Signed (electronically) by Joseph A. Lindell Counsel for NRC Staff U.S. Nuclear Regulatory Commission Office of the General Counsel Mail Stop - O-15D21 Washington, DC 20555 Telephone: (301) 415-1474 E-mail: joseph.lindell@nrc.gov Date of signature: April 15, 2015

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of )

)

PACIFIC GAS AND ELECTRIC COMPANY ) 50-275-LR/ 50-3523-LR

)

(Diablo Canyon Nuclear Power Plant, )

Units 1 and 2) )

CERTIFICATE OF SERVICE Pursuant to 10 C.F.R. § 2.305 (revised) I hereby certify that copies of the foregoing APRIL 2015 HEARING FILE UPDATE LETTER, dated April 15, 2015, have been served upon the Electronic Information Exchange, the NRCs E-filing System, in the above captioned proceeding, this 15th day of April, 2015.

/Signed (electronically) by/

Joseph A. Lindell Counsel for NRC Staff U.S. Nuclear Regulatory Commission Office of the General Counsel Mail Stop - O-15D21 Washington, DC 20555 Telephone: (301) 415-1474 E-mail: joseph.lindell@nrc.gov Date of signature: April 15, 2015