ML15112B123: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:April 30, 2015  
{{#Wiki_filter:April 30, 2015 Mr. Scott P. Murray, Manager Licensing & Liabilities Global Nuclear Fuel-Americas 3901 Castle Hayne Road P.O. Box 780 - M/C K-84 Wilmington, NC 28401
 
Mr. Scott P. Murray, Manager Licensing & Liabilities Global Nuclear Fuel-Americas 3901 Castle Hayne Road P.O. Box 780 - M/C K-84  
 
Wilmington, NC 28401  


==SUBJECT:==
==SUBJECT:==
GENERAL ELECTRIC COMPANY PARENT GUARANTEE OF FUNDS FOR DECOMMISSIONING, ANNUAL FINANCIAL TEST (TECHNICAL ASSIGNMENT CONTROL NUMBER L33372)  
GENERAL ELECTRIC COMPANY PARENT GUARANTEE OF FUNDS FOR DECOMMISSIONING, ANNUAL FINANCIAL TEST (TECHNICAL ASSIGNMENT CONTROL NUMBER L33372)


==Dear Mr. Murray:==
==Dear Mr. Murray:==


The U.S. Nuclear Regulatory Commission (NRC) reviewed your documents relating to financial assurance for the General Electric Company, submitted by letter dated March 17, 2015. This financial assurance documentation addresses decommissioning financial assurance for the Global Nuclear Fuel - America's Fuel Manufacturi ng facility, the Reuter-Stokes facility, the Vallecitos Nuclear Center, and the Morris Operations facility.
The U.S. Nuclear Regulatory Commission (NRC) reviewed your documents relating to financial assurance for the General Electric Company, submitted by letter dated March 17, 2015. This financial assurance documentation addresses decommissioning financial assurance for the Global Nuclear Fuel - Americas Fuel Manufacturing facility, the Reuter-Stokes facility, the Vallecitos Nuclear Center, and the Morris Operations facility.
The NRC staff reviewed the documents for conformance to NRC's regulations and NUREG-1757, Volume 3, "Consolidated NMSS Decommissioning Guidance: Financial Assurance, Recordkeeping, and Timeliness.The documents submitted were found acceptable in accordance with NUREG-1757, Volume 3, Appendix A.8. The licensees comply with Appendix A, "Criteria Relating to Use of Financial Tests and Parent-Company Guarantees for Providing Reasonable Assurance of Funds for Decommissioning" of Title 10 of the Code of Federal Regulations (10 CFR), Part 30; therefore, the parent company guarantee is acceptable financial assurance for decommissioning. To continue utilizing the parent-company guarantee, General Electric must repeat passage of the financial test within 90 days after the close of each succeeding fiscal year as required by 10 CFR, Part 30, Appendix A, Section C.1.
The NRC staff reviewed the documents for conformance to NRCs regulations and NUREG-1757, Volume 3, Consolidated NMSS Decommissioning Guidance: Financial Assurance, Recordkeeping, and Timeliness. The documents submitted were found acceptable in accordance with NUREG-1757, Volume 3, Appendix A.8. The licensees comply with Appendix A, Criteria Relating to Use of Financial Tests and Parent-Company Guarantees for Providing Reasonable Assurance of Funds for Decommissioning of Title 10 of the Code of Federal Regulations (10 CFR), Part 30; therefore, the parent company guarantee is acceptable financial assurance for decommissioning. To continue utilizing the parent-company guarantee, General Electric must repeat passage of the financial test within 90 days after the close of each succeeding fiscal year as required by 10 CFR, Part 30, Appendix A, Section C.1.
In accordance with 10 CFR 2.390 of the NRC's "Agency Rules of Practice and Procedure," a copy of this letter will be available electroni cally for public inspection in the NRC Public Document Room or from the Publicly Av ailable Records component of NRC's document system, Agencywide Documents Access and M anagement System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).  
In accordance with 10 CFR 2.390 of the NRCs Agency Rules of Practice and Procedure, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of NRCs document system, Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
 
Technical Assignment Control number L33372 is considered closed.
If you have any questions regarding this matter, I can be reached at (301) 415-7918 or via e-mail at Tyrone.naquin@nrc.gov.        Sincerely,        /RA/  Tyrone D. Naquin, Project Manager Fuel Manufacturing Branch Division of Fuel Cycle Safety, Safeguards, and Environmental Review
 
Office of Nuclear Material Safety
 
and Safeguards
 
Dockets:
70-1113 50-73 72-1
 
70-2872 50-70 70-754


50-18 50-183 Licenses:
S. Murray                                    Technical Assignment Control number L33372 is considered closed.
SNM-1097 TR-1 SNM-2500 SNM-1826 DR-10 DPR-1 R-33 SNM-960  
If you have any questions regarding this matter, I can be reached at (301) 415-7918 or via e-mail at Tyrone.naquin@nrc.gov.
Sincerely,
                                            /RA/
Tyrone D. Naquin, Project Manager Fuel Manufacturing Branch Division of Fuel Cycle Safety, Safeguards, and Environmental Review Office of Nuclear Material Safety and Safeguards Dockets:
70-1113 50-73 72-1 70-2872 50-70 70-754 50-18 50-183 Licenses:
SNM-1097 TR-1 SNM-2500 SNM-1826 DR-10 DPR-1 R-33 SNM-960


ML15112B123 Package No. ML15112B132 OFFICE NMSS/FCSE/FMBNMSS/FCSE NMSS/FCSE/FMB NAME TNaquin TBrockington RJohnson DATE 04/30 /2015 04/29/2015 04/30/2015}}
ML15112B123 Package No. ML15112B132 OFFICE NMSS/FCSE/FMB              NMSS/FCSE             NMSS/FCSE/FMB NAME           TNaquin           TBrockington               RJohnson DATE       04/30 /2015           04/29/2015                 04/30/2015}}

Revision as of 12:43, 31 October 2019

General Electric Company Parent Guarantee of Funds for Decommissioning, Annual Financial Test (TAC L33372)
ML15112B123
Person / Time
Site: Vallecitos Nuclear Center, 07000754, 07001113, 07002872, 07200001, Vallecitos
Issue date: 04/30/2015
From: Ty Naquin
Fuel Manufacturing Branch
To: Murray S
Global Nuclear Fuel
Naquin T
References
TAC L33372
Download: ML15112B123 (3)


Text

April 30, 2015 Mr. Scott P. Murray, Manager Licensing & Liabilities Global Nuclear Fuel-Americas 3901 Castle Hayne Road P.O. Box 780 - M/C K-84 Wilmington, NC 28401

SUBJECT:

GENERAL ELECTRIC COMPANY PARENT GUARANTEE OF FUNDS FOR DECOMMISSIONING, ANNUAL FINANCIAL TEST (TECHNICAL ASSIGNMENT CONTROL NUMBER L33372)

Dear Mr. Murray:

The U.S. Nuclear Regulatory Commission (NRC) reviewed your documents relating to financial assurance for the General Electric Company, submitted by letter dated March 17, 2015. This financial assurance documentation addresses decommissioning financial assurance for the Global Nuclear Fuel - Americas Fuel Manufacturing facility, the Reuter-Stokes facility, the Vallecitos Nuclear Center, and the Morris Operations facility.

The NRC staff reviewed the documents for conformance to NRCs regulations and NUREG-1757, Volume 3, Consolidated NMSS Decommissioning Guidance: Financial Assurance, Recordkeeping, and Timeliness. The documents submitted were found acceptable in accordance with NUREG-1757, Volume 3, Appendix A.8. The licensees comply with Appendix A, Criteria Relating to Use of Financial Tests and Parent-Company Guarantees for Providing Reasonable Assurance of Funds for Decommissioning of Title 10 of the Code of Federal Regulations (10 CFR), Part 30; therefore, the parent company guarantee is acceptable financial assurance for decommissioning. To continue utilizing the parent-company guarantee, General Electric must repeat passage of the financial test within 90 days after the close of each succeeding fiscal year as required by 10 CFR, Part 30, Appendix A, Section C.1.

In accordance with 10 CFR 2.390 of the NRCs Agency Rules of Practice and Procedure, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of NRCs document system, Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

S. Murray Technical Assignment Control number L33372 is considered closed.

If you have any questions regarding this matter, I can be reached at (301) 415-7918 or via e-mail at Tyrone.naquin@nrc.gov.

Sincerely,

/RA/

Tyrone D. Naquin, Project Manager Fuel Manufacturing Branch Division of Fuel Cycle Safety, Safeguards, and Environmental Review Office of Nuclear Material Safety and Safeguards Dockets:

70-1113 50-73 72-1 70-2872 50-70 70-754 50-18 50-183 Licenses:

SNM-1097 TR-1 SNM-2500 SNM-1826 DR-10 DPR-1 R-33 SNM-960

ML15112B123 Package No. ML15112B132 OFFICE NMSS/FCSE/FMB NMSS/FCSE NMSS/FCSE/FMB NAME TNaquin TBrockington RJohnson DATE 04/30 /2015 04/29/2015 04/30/2015