ML16165A329: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:1 NRR-PMDAPEm Resource From: Saba, Farideh Sent: Monday, June 13, 2016 10:07 AM To:Williams, Gordon Robert (grwilliams1@tva.gov); Hess, Thomas A (tahess@tva.gov);
{{#Wiki_filter:NRR-PMDAPEm Resource From:                             Saba, Farideh Sent:                             Monday, June 13, 2016 10:07 AM To:                               Williams, Gordon Robert (grwilliams1@tva.gov); Hess, Thomas A (tahess@tva.gov);
Wells, Russell Douglas Cc: Hon, Andrew; Schaaf, Robert; Cumblidge, Stephe n; Orf, Tracy; Schrull, Edward Dustin (edschrull@tva.gov); Clayton, Beverly
Wells, Russell Douglas Cc:                               Hon, Andrew; Schaaf, Robert; Cumblidge, Stephen; Orf, Tracy; Schrull, Edward Dustin (edschrull@tva.gov); Clayton, Beverly


==Subject:==
==Subject:==
Browns Ferry 1, 2, and 3, Sequoyah 1 an d 2, and Watts Bar 1 and 2 - Request for Approval for Use of Alternate Calibration Block Reflector Requirements 16-PDI-5 (MF7754-MF7760)
Browns Ferry 1, 2, and 3, Sequoyah 1 and 2, and Watts Bar 1 and 2 - Request for Approval for Use of Alternate Calibration Block Reflector Requirements 16-PDI-5 (MF7754-MF7760)
Importance:HighGordon, Tom, and Russell, By letter dated May 27, 2016, (Agencywide Document s Access and Management System (ADAMS) Accession No. ML16151A010), Tennessee Valley Authority (the licensee) submitted a request for use of an alternate to Calibration Block Reflector Requirements (16-PDI-5) at TVA Nuclear Plants (Browns Ferry, Units 1, 2, and 3; Sequoyah Units 1 and 2; and Watts Bar Units 1 and 2). The proposed alternative would provide relief from the requirements of the 2001 Edition through 2003 Addenda and the 2007 Edition through 2008 Addenda of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI, Mandatory Appendix III, Subsubarticle III-3430, "Calibration Reflectors," including Mandatory Appendix III, Supplement 1, Paragraph (b)(3).
Importance:                       High Gordon, Tom, and Russell, By letter dated May 27, 2016, (Agencywide Documents Access and Management System (ADAMS) Accession No. ML16151A010), Tennessee Valley Authority (the licensee) submitted a request for use of an alternate to Calibration Block Reflector Requirements (16-PDI-5) at TVA Nuclear Plants (Browns Ferry, Units 1, 2, and 3; Sequoyah Units 1 and 2; and Watts Bar Units 1 and 2). The proposed alternative would provide relief from the requirements of the 2001 Edition through 2003 Addenda and the 2007 Edition through 2008 Addenda of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI, Mandatory Appendix III, Subsubarticle III-3430, Calibration Reflectors, including Mandatory Appendix III, Supplement 1, Paragraph (b)(3).
 
The purpose of this letter is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this relief request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the relief request has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
The purpose of this letter is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staff's acceptance review of this relief request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to a llow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the relief request has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the  
Pursuant to Sections 50.55a(a)(z)(1) of Title 10 of the Code of Federal Regulations (10 CFR), the licensee shall demonstrate that the proposed alternatives would provide an acceptable level of quality and safety.
 
The NRC staff has reviewed your relief request and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. You will be advised of any further information needed to support the NRC staffs detailed technical review by separate correspondence.
plant.
 
Pursuant to Sections 50.55a(a)(z)(1) of Title 10 of the Code of Federal Regulations (10 CFR), the licensee shall demonstrate that the proposed alternatives would provide an acceptable level of quality and safety.  
 
The NRC staff has reviewed your relief request and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that  
 
impact the NRC staff's ability to complete the detailed te chnical review are identified despite completion of an adequate acceptance review. You will be advised of any further information needed to support the NRC staff's detailed technical review by separate correspondence.
If you have any questions, please contact me at (301) 415 1447 or via an email at farideh.saba@nrc.gov.
If you have any questions, please contact me at (301) 415 1447 or via an email at farideh.saba@nrc.gov.
: Thanks,  
: Thanks, Farideh Farideh E. Saba, P.E.
Senior Project Manager 1


Farideh  Farideh E. Saba, P.E. Senior Project Manager 2NRC/ADRO/NRR/DORL 301-415-1447 Mail Stop O-8G9A Farideh.Saba@NRC.GOV
NRC/ADRO/NRR/DORL 301-415-1447 Mail Stop O-8G9A Farideh.Saba@NRC.GOV 2


Hearing Identifier: NRR_PMDA Email Number: 2896   Mail Envelope Properties   (Farideh.Saba@nrc.gov20160613100600)
Hearing Identifier:     NRR_PMDA Email Number:           2896 Mail Envelope Properties       (Farideh.Saba@nrc.gov20160613100600)


==Subject:==
==Subject:==
Browns Ferry 1, 2, and 3, Sequoyah 1 and 2, and Watts Bar 1 and 2 - Request for Approval for Use of Alternate Calibration Block Reflector Requirements 16-PDI-5 (MF7754-MF7760) Sent Date:   6/13/2016 10:06:36 AM Received Date: 6/13/2016 10:06:00 AM From:   Saba, Farideh Created By:   Farideh.Saba@nrc.gov Recipients:     "Hon, Andrew" <Andrew.Hon@nrc.gov> Tracking Status: None "Schaaf, Robert" <Robert.Schaaf@nrc.gov> Tracking Status: None "Cumblidge, Stephen" <Stephen.Cumblidge@nrc.gov>
Browns Ferry 1, 2, and 3, Sequoyah 1 and 2, and Watts Bar 1 and 2 - Request for Approval for Use of Alternate Calibration Block Reflector Requirements 16-PDI-5 (MF7754-MF7760)
Tracking Status: None "Orf, Tracy" <Tracy.Orf@nrc.gov> Tracking Status: None "Schrull, Edward Dustin (edschrull@tva.gov)" <edschrull@tva.gov> Tracking Status: None "Clayton, Beverly" <Beverly.Clayton@nrc.gov>
Sent Date:               6/13/2016 10:06:36 AM Received Date:           6/13/2016 10:06:00 AM From:                   Saba, Farideh Created By:             Farideh.Saba@nrc.gov Recipients:
Tracking Status: None "Williams, Gordon Robert (grwilliams1@tva.gov)" <grwilliams1@tva.gov> Tracking Status: None "Hess, Thomas A (tahess@tva.gov)" <tahess@tva.gov> Tracking Status: None "Wells, Russell Douglas" <rdwells0@tva.gov> Tracking Status: None Post Office:     Files     Size     Date & Time MESSAGE   2658     6/13/2016 10:06:00 AM
"Hon, Andrew" <Andrew.Hon@nrc.gov>
 
Tracking Status: None "Schaaf, Robert" <Robert.Schaaf@nrc.gov>
Options Priority:     High   Return Notification:   No   Reply Requested:   Yes   Sensitivity:     Normal Expiration Date:     Recipients Received:   ZZZ}}
Tracking Status: None "Cumblidge, Stephen" <Stephen.Cumblidge@nrc.gov>
Tracking Status: None "Orf, Tracy" <Tracy.Orf@nrc.gov>
Tracking Status: None "Schrull, Edward Dustin (edschrull@tva.gov)" <edschrull@tva.gov>
Tracking Status: None "Clayton, Beverly" <Beverly.Clayton@nrc.gov>
Tracking Status: None "Williams, Gordon Robert (grwilliams1@tva.gov)" <grwilliams1@tva.gov>
Tracking Status: None "Hess, Thomas A (tahess@tva.gov)" <tahess@tva.gov>
Tracking Status: None "Wells, Russell Douglas" <rdwells0@tva.gov>
Tracking Status: None Post Office:
Files                           Size                       Date & Time MESSAGE                         2658                       6/13/2016 10:06:00 AM Options Priority:                       High Return Notification:             No Reply Requested:                 Yes Sensitivity:                     Normal Expiration Date:
Recipients Received:             ZZZ}}

Revision as of 17:59, 30 October 2019

Request for Approval for Use of Alternate Calibration Block Reflector Requirements 16-PDI-5 (MF7754-MF7760)
ML16165A329
Person / Time
Site: Browns Ferry, Watts Bar, Sequoyah  Tennessee Valley Authority icon.png
Issue date: 06/13/2016
From: Farideh Saba
Plant Licensing Branch II
To: Gerald Williams
Tennessee Valley Authority
References
MF7754, MF7755, MF7756, MF7757, MF7758, MF7759, MF7760
Download: ML16165A329 (3)


Text

NRR-PMDAPEm Resource From: Saba, Farideh Sent: Monday, June 13, 2016 10:07 AM To: Williams, Gordon Robert (grwilliams1@tva.gov); Hess, Thomas A (tahess@tva.gov);

Wells, Russell Douglas Cc: Hon, Andrew; Schaaf, Robert; Cumblidge, Stephen; Orf, Tracy; Schrull, Edward Dustin (edschrull@tva.gov); Clayton, Beverly

Subject:

Browns Ferry 1, 2, and 3, Sequoyah 1 and 2, and Watts Bar 1 and 2 - Request for Approval for Use of Alternate Calibration Block Reflector Requirements 16-PDI-5 (MF7754-MF7760)

Importance: High Gordon, Tom, and Russell, By letter dated May 27, 2016, (Agencywide Documents Access and Management System (ADAMS) Accession No. ML16151A010), Tennessee Valley Authority (the licensee) submitted a request for use of an alternate to Calibration Block Reflector Requirements (16-PDI-5) at TVA Nuclear Plants (Browns Ferry, Units 1, 2, and 3; Sequoyah Units 1 and 2; and Watts Bar Units 1 and 2). The proposed alternative would provide relief from the requirements of the 2001 Edition through 2003 Addenda and the 2007 Edition through 2008 Addenda of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI, Mandatory Appendix III, Subsubarticle III-3430, Calibration Reflectors, including Mandatory Appendix III, Supplement 1, Paragraph (b)(3).

The purpose of this letter is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this relief request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the relief request has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

Pursuant to Sections 50.55a(a)(z)(1) of Title 10 of the Code of Federal Regulations (10 CFR), the licensee shall demonstrate that the proposed alternatives would provide an acceptable level of quality and safety.

The NRC staff has reviewed your relief request and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. You will be advised of any further information needed to support the NRC staffs detailed technical review by separate correspondence.

If you have any questions, please contact me at (301) 415 1447 or via an email at farideh.saba@nrc.gov.

Thanks, Farideh Farideh E. Saba, P.E.

Senior Project Manager 1

NRC/ADRO/NRR/DORL 301-415-1447 Mail Stop O-8G9A Farideh.Saba@NRC.GOV 2

Hearing Identifier: NRR_PMDA Email Number: 2896 Mail Envelope Properties (Farideh.Saba@nrc.gov20160613100600)

Subject:

Browns Ferry 1, 2, and 3, Sequoyah 1 and 2, and Watts Bar 1 and 2 - Request for Approval for Use of Alternate Calibration Block Reflector Requirements 16-PDI-5 (MF7754-MF7760)

Sent Date: 6/13/2016 10:06:36 AM Received Date: 6/13/2016 10:06:00 AM From: Saba, Farideh Created By: Farideh.Saba@nrc.gov Recipients:

"Hon, Andrew" <Andrew.Hon@nrc.gov>

Tracking Status: None "Schaaf, Robert" <Robert.Schaaf@nrc.gov>

Tracking Status: None "Cumblidge, Stephen" <Stephen.Cumblidge@nrc.gov>

Tracking Status: None "Orf, Tracy" <Tracy.Orf@nrc.gov>

Tracking Status: None "Schrull, Edward Dustin (edschrull@tva.gov)" <edschrull@tva.gov>

Tracking Status: None "Clayton, Beverly" <Beverly.Clayton@nrc.gov>

Tracking Status: None "Williams, Gordon Robert (grwilliams1@tva.gov)" <grwilliams1@tva.gov>

Tracking Status: None "Hess, Thomas A (tahess@tva.gov)" <tahess@tva.gov>

Tracking Status: None "Wells, Russell Douglas" <rdwells0@tva.gov>

Tracking Status: None Post Office:

Files Size Date & Time MESSAGE 2658 6/13/2016 10:06:00 AM Options Priority: High Return Notification: No Reply Requested: Yes Sensitivity: Normal Expiration Date:

Recipients Received: ZZZ