{{#Wiki_filter:December 1, 2016  
{{#Wiki_filter:UNITED STATES
 
                            NUCLEAR REGULATORY COMMISSION
Mr. Robert S. Bement  
                                                REGION IV
Executive Vice President Nuclear/  
                                            1600 E. LAMAR BLVD
                                        ARLINGTON, TX 76011-4511
                                          December 1, 2016
Mr. Robert S. Bement
Executive Vice President Nuclear/
  Chief Nuclear Officer
Mail Station 7602
Arizona Public Service Company
P. O. Box 52034
Phoenix, AZ 85072-2034
SUBJECT: PALO VERDE NUCLEAR GENERATING STATION, UNITS 1, 2, AND 3 -
                NOTIFICATION OF EVALUATIONS OF CHANGES, TESTS, AND
                EXPERIMENTS, AND PERMANENT PLANT MODIFICATIONS
                INSPECTION (05000528/2017007; 05000529/2017007; AND 05000530/2017007)
                AND REQUEST FOR INFORMATION
Dear Mr. Bement:
The purpose of this letter is to notify you that U.S. Nuclear Regulatory Commission (NRC)
staff will conduct the baseline inspection of changes, tests, experiments, and permanent
plant modifications at your Palo Verde Nuclear Generating Station, Units 1, 2, and 3, from
February 27, 2017, to March 3, 2017. The inspection will consist of three reactor inspectors
from the NRCs Region IV office for one on-site week. The inspection will be conducted in
accordance with NRC Inspection Procedure 71111.17T, Evaluations of Changes, Tests, and
Experiments and Permanent Plant Modifications.
Experience has shown that this inspection is resource intensive for both the NRC inspectors
and your staff. In order to minimize the impact to your on-site resources and to ensure a
productive inspection, we have enclosed a request for documents needed for this inspection.
Please note that the documents are requested to be provided by February 15, 2017. Upon
review of these documents, the inspectors will select additional documentation for review upon
arrival. It is important that all of these documents are up-to-date and complete in order to
minimize the number of additional documents requested during the preparation and/or the
on-site portions of the inspection.
We have discussed the schedule for these inspection activities with your staff. If there are any
questions about this inspection or the material requested, please contact the lead inspector,
James Drake, by telephone at 817-200-1558 or by e-mail at James.Drake@nrc.gov.


  Chief Nuclear Officer
R. Bement                                        -2-
This letter does not contain new or amended information collection requirements subject
to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information
collection requirements were approved by the Office of Management and Budget, control
number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to
respond to, a request for information or an information collection requirement unless the
requesting document displays a currently valid Office of Management and Budget control
number.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice and Procedure, a copy of
this letter and its enclosure will be available electronically for public inspection in the NRC Public
Document Room or from the Publicly Available Records (PARS) component of NRC's document
system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-
rm/adams.html (the Public Electronic Reading Room).
                                                  Sincerely,
                                                  /RA/
                                                  Thomas R. Farnholtz, Chief
                                                  Engineering Branch 1
                                                  Division of Reactor Safety
Docket Nos. 50-528, 50-529, 50-530
License Nos. NPF-41, NPF-51, NPF-74
Enclosure:
Request for Information
cc: Electronic Distribution


Mail Station 7602
Arizona Public Service Company P. O. Box 52034
Phoenix, AZ 85072-2034


   
  ML16336A832
SUBJECT: PALO VERDE NUCLEAR GENERATING STATION, UNITS 1, 2, AND 3 - NOTIFICATION OF EVALUATIONS OF CHANGES, TESTS, AND EXPERIMENTS, AND PERMANENT PLANT MODIFICATIONS  
  SUNSI Review              ADAMS            Publicly Available      Non-Sensitive    Keyword:
INSPECTION (05000528/2017007; 05000529/2017007; AND 05000530/2017007)  
By: JDrake                    Yes  No      Non-Publicly Available  Sensitive        NRC-002
AND REQUEST FOR INFORMATION  
OFFICE        SRI/DRS      C/DRP/D        C/EB1
NAME          JDrake        GMiller        TFarnholtz
Dear Mr. Bement:
SIGNATURE /RA/              /RA/            /RA/
The purpose of this letter is to notify you that U.S. Nuclear Regulatory Commission (NRC)  
DATE          11/30/16      12/1/16        12/1/16
staff will conduct the baseline inspection of changes, tests, experiments, and permanent plant modifications at your Palo Verde Nuclear Generating Station, Units 1, 2, and 3, from February 27, 2017, to March 3, 2017. The inspection will consist of three reactor inspectors from the NRC's Region IV office for one on-site week. The inspection will be conducted in accordance with NRC Inspection Procedure 71111.17T, "Evaluations of Changes, Tests, and
                                       
Experiments and Permanent Plant Modifications.
Letter to Robert S. Bement from Thomas R. Farnholtz, dated December 1, 2016
SUBJECT: PALO VERDE NUCLEAR GENERATING STATION, UNITS 1, 2, AND 3 -
              NOTIFICATION OF EVALUATIONS OF CHANGES, TESTS, AND
              EXPERIMENTS, AND PERMANENT PLANT MODIFICATIONS
              INSPECTION (05000528/2017007; 05000529/2017007; AND 05000530/2017007)
              AND REQUEST FOR INFORMATION
Electronic distribution by RIV:
Regional Administrator (Kriss.Kennedy@nrc.gov)
Deputy Regional Administrator (Scott.Morris@nrc.gov)
DRP Director (Troy.Pruett@nrc.gov)
DRP Deputy Director (Ryan.Lantz@nrc.gov)
DRS Director (Anton.Vegel@nrc.gov)
DRS Deputy Director (Jeff.Clark@nrc.gov)
Senior Resident Inspector (Charles.Peabody@nrc.gov)
Resident Inspector (David.You@nrc.gov)
Resident Inspector (Dustin.Reinert@nrc.gov)
PV Administrative Assistant (Yvonne.Dubay@nrc.gov)
Branch Chief, DRP/D (Geoffrey.Miller@nrc.gov)
Senior Project Engineer, DRP/D (John.Dixon@nrc.gov)
Project Engineer, DRP/D (Brian.Parks@nrc.gov)
Project Engineer, DRP/D (Jan.Tice@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov)
Project Manager (Siva.Lingam@nrc.gov)
Team Leader, DRS/IPAT (Thomas.Hipschman@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
ACES (R4Enforcement.Resource@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov)
Project Engineer, DRS/IPAT (Eduardo.Uribe@nrc.gov)
Senior Congressional Affairs Officer (Jenny.Weil@nrc.gov)
RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)
RIV/ETA: OEDO (Jeremy.Bowen@nrc.gov)
RIV RSLO (Bill.Maier@nrc.gov)


                                      Request for Information
Experience has shown that this
  Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications
inspection is resource intens
                                              Inspection
ive for both the NRC inspectors and your staff.  In order to minimize the impact to your on-site resources and to ensure a productive inspection, we have enclosed a request for documents needed for this inspection.
                    Palo Verde Nuclear Generating Station, Units 1, 2, and 3
Please note that the documents are requested to be provided by February 15, 2017. Upon review of these documents, the inspectors will select additional documentation for review upon arrival. It is important that all of these documents are up-to-date and complete in order to minimize the number of additional documents requested during the preparation and/or the  on-site portions of the inspection.  
Inspection Report:              05000528/2017007, 05000529/2017007, and 05000530/2017007
Inspection Dates:              February 27, 2017 to March 3, 2017
We have discussed the schedule for these inspection activities with your staff. If there are any  
Inspection Procedure:          IP 71111.17T, Evaluations of Changes, Tests, and Experiments
questions about this inspection or the material requested, please contact the lead inspector,  
                                and Permanent Plant Modifications
James Drake, by telephone at 817-200-1558 or
Lead Inspector:                James Drake, Senior Reactor Inspector
by e-mail at James.Drake@nrc.gov.  
Information Requested for the In-Office Preparation Week
  UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 1600 E. LAMAR BLVD ARLINGTON, TX 76011-4511 
The following information should be provided to the Region IV office in hard copy or electronic
R. Bement - 2 -
format or via CERTREC (preferred) by February 15, 2017, to the attention of Jim Drake. We
  This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, control
request that you categorize the documents in your response with the numbered list below. If
number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to
only hard copies of the requested documents are available or if the electronic format is too
respond to, a request for information or an information collection requirement unless the
large, please inform the lead inspector and provide the documents on the first day of the on-site
requesting document displays a currently valid Office of Management and Budget control
inspection. Also, the inspectors will select specific items from the information requested below
and request from your staff additional documents needed during the on-site inspection week.
We ask that the specific items requested be available and ready for review on the first day of
inspection. If you have any questions regarding this information request, please contact the
lead inspector as soon as possible.
    1. Procedure(s) for conducting 10 CFR 50.59 screenings and evaluations.
    2. A list with descriptions of all 10 CFR 50.59 screenings (or equivalent) of fully
        implemented changes, tests, and experiments performed since the last triennial
        modification inspection that did not result in an evaluation.
    3. A list with descriptions of all 10 CFR 50.59 evaluations of fully implemented changes,
        tests, and experiments performed since the last triennial modification inspection that did
        not result in an application for a license amendment.
    4. A list with descriptions of all corrective action documents related to 10 CFR 50.59
        screenings and evaluations since the last triennial modification inspection.
    5. A list of personnel qualified to prepare 10 CFR 50.59 screenings and/or evaluations,
        including qualification dates.
    6. A list of personnel qualified to review and approve 10 CFR 50.59 screenings and/or
        evaluations, including qualification dates.
    7. Procedure(s) for implementing permanent plant modifications.
                                                                                  Enclosure


number.  In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice and Procedure," a copy of
     8. A list with descriptions of all permanent plant modifications fully implemented since the
 
        last triennial modification inspection.
this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS).  ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). 
    9. A list with descriptions of all corrective action documents related to permanent plant
Sincerely,    /RA/     Thomas R. Farnholtz, Chief  Engineering Branch 1
        modifications fully implemented since the last triennial modification inspection.
Division of Reactor Safety
    10. Current revisions of the Technical Specifications and bases and the Updated Final
Docket Nos. 50-528, 50-529, 50-530 License Nos. NPF-41, NPF-51, NPF-74
        Safety Analysis Report.
 
    11. A copy of the most recent audits/self-assessments performed of the 10 CFR 50.59 and
        permanent plant modification programs.
Enclosure: 
    12. A copy of the most recent submittal of the report containing a brief description of any
 
        changes, tests, and experiments, including a summary of the evaluation of each,
Request for Information
        required by 10 CFR 50.59(d)(2).
cc:  Electronic Distribution
    13. A list of systems and system designators and a set of one-line (i.e., simplified) system
 
        diagrams.
 
Note: Descriptions should be brief, but of sufficient detail to ensure that inspectors can
 
      determine the safety and/or risk significance of the screenings, evaluations, and
  ML16336A832  SUNSI Review By:  JDrake
      modifications.
ADAMS  Yes    No  Publicly Available  Non-Publicly Available  Non-Sensitive  Sensitive Keyword: NRC-002 OFFICE SRI/DRS C/DRP/D C/EB1    NAME JDrake GMiller TFarnholtz    SIGNATURE /RA/ /RA/ /RA/    DATE 11/30/16 12/1/16 12/1/16     
Note: For this inspection, permanent plant modifications include permanent plant changes,
Letter to Robert S. Bement from Thomas R. Farnholtz, dated December 1, 2016
      design changes, set point changes, procedure changes, equivalency evaluations,
 
      suitability analyses, calculations, and commercial grade dedications.
SUBJECT: PALO VERDE NUCLEAR GENERATING STATION, UNITS 1, 2, AND 3 -  NOTIFICATION OF EVALUATIONS OF CHANGES, TESTS, AND EXPERIMENTS, AND PERMANENT PLANT MODIFICATIONS
Lead Inspector Contact Information:
INSPECTION (05000528/2017007; 05000529/2017007; AND 05000530/2017007)
James Drake
AND REQUEST FOR INFORMATION
Senior Reactor Inspector
Electronic distribution by RIV: Regional Administrator (Kriss.Kennedy@nrc.gov) Deputy Regional Administrator (Scott.Morris@nrc.gov)
817-200-1558
DRP Director (Troy.Pruett@nrc.gov)
James.Drake@nrc.gov
DRP Deputy Director (Ryan.Lantz@nrc.gov) DRS Director (Anton.Vegel@nrc.gov) DRS Deputy Director (Jeff.Clark@nrc.gov) 
Mailing Address:
Senior Resident Inspector (Charles.Peabody@nrc.gov)
U.S. NRC, Region IV
 
ATTN: James Drake
Resident Inspector (David.You@nrc.gov)
1600 East Lamar Blvd.
Resident Inspector (Dustin.Reinert@nrc.gov) PV Administrative Assistant (Yvonne.Dubay@nrc.gov)
Arlington, TX 76011-4125
Branch Chief, DRP/D (Geoffrey.Miller@nrc.gov)
                                              -2-
Senior Project Engineer, DRP/D (John.Dixon@nrc.gov)
Project Engineer, DRP/D (Brian.Parks@nrc.gov)
Project Engineer, DRP/D (Jan.Tice@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov)
Project Manager (Siva.Lingam@nrc.gov)
Team Leader, DRS/IPAT (Thomas.Hipschman@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
 
ACES (R4Enforcement.Resource@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov) Project Engineer, DRS/IPAT (Eduardo.Uribe@nrc.gov) Senior Congressional Affairs Officer (Jenny.Weil@nrc.gov)
RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)
RIV/ETA: OEDO (Jeremy.Bowen@nrc.gov)
 
RIV RSLO (Bill.Maier@nrc.gov)
 
 
 
  Enclosure
Request for Information
Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications
Inspection Palo Verde Nuclear Generating Station, Units 1, 2, and 3
 
Inspection Report:  05000528/2017007, 05000529/2017007, and 05000530/2017007
 
Inspection Dates:  February 27, 2017 to March 3, 2017
Inspection Procedure: IP 71111.17T, "Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications"
Lead Inspector:  James Drake, Senior Reactor Inspector 
Information Requested for the In-Office Preparation Week
  The following information should be provided to the Region IV office in hard copy or electronic format or via CERTREC (preferred) by February 15, 2017, to the attention of Jim Drake.  We request that you categorize the documents in your response with the numbered list below.  If
only hard copies of the requested documents are available or if the electronic format is too
large, please inform the lead inspector and provide the documents on the first day of the on-site
inspection.  Also, the inspectors will select specific items from the information requested below and request from your staff additional documents needed during the on-site inspection week.  We ask that the specific items requested be available and ready for review on the first day of inspection.  If you have any questions regarding this information request, please contact the
lead inspector as soon as possible.
 
1. Procedure(s) for conducting 10 CFR 50.59 screenings and evaluations.
2. A list with descriptions of all 10 CFR 50.59 screenings (or equivalent) of fully implemented changes, tests, and experiments performed since the last triennial modification inspection that did not result in an evaluation. 
3. A list with descriptions of all 10 CFR 50.59 evaluations of fully implemented changes, tests, and experiments performed since the last triennial modification inspection that did not result in an application for a license amendment. 
4. A list with descriptions of all corrective action documents related to 10 CFR 50.59 screenings and evaluations since the last triennial modification inspection. 
5. A list of personnel qualified to prepare 10 CFR 50.59 screenings and/or evaluations, including qualification dates.
6. A list of personnel qualified to review and approve 10 CFR 50.59 screenings and/or evaluations, including qualification dates.
7. Procedure(s) for implementing permanent plant modifications.
 
  - 2 -  8. A list with descriptions of all permanent plant modifications fully implemented since the last triennial modification inspection.
9. A list with descriptions of all corrective action documents related to permanent plant modifications fully implemented since the last triennial modification inspection.
10. Current revisions of the Technical Specifications and bases and the Updated Final Safety Analysis Report.  
11. A copy of the most recent audits/self-assessments performed of the 10 CFR 50.59 and permanent plant modification programs.  
12. A copy of the most recent submittal of the report containing a brief description of any changes, tests, and experiments, including a summary of the evaluation of each, required by 10 CFR 50.59(d)(2).  
13. A list of systems and system designators and a set of one-line (i.e., simplified) system  
diagrams.  
Note: Descriptions should be brief, but of sufficient detail to ensure that inspectors can determine the safety and/or risk significance of the screenings, evaluations, and  
modifications.  
Note: For this inspection, permanent plant modifications include permanent plant changes, design changes, set point changes, procedure changes, equivalency evaluations, suitability analyses, calculations, and commercial grade dedications.  
Lead Inspector Contact Information:  
James Drake
Senior Reactor Inspector  
 
817-200-1558  
 
James.Drake@nrc.gov  
 
Mailing Address:  
 
U.S. NRC, Region IV  
ATTN: James Drake 1600 East Lamar Blvd.  
Arlington, TX 76011-4125
}}
}}

Revision as of 11:23, 30 October 2019

Notification of Evaluations of Changes, Tests, and Experiments, & Permanent Plant Modifications Inspection (05000528/2017007; 05000529/2017007; and 05000530/2017007) & Request for Information
ML16336A832
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 12/01/2016
From: Thomas Farnholtz
Region 4 Engineering Branch 1
To: Bement R
Arizona Public Service Co
References
IR 2017007
Download: ML16336A832 (6)


See also: IR 05000528/2017007

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION IV

1600 E. LAMAR BLVD

ARLINGTON, TX 76011-4511

December 1, 2016

Mr. Robert S. Bement

Executive Vice President Nuclear/

Chief Nuclear Officer

Mail Station 7602

Arizona Public Service Company

P. O. Box 52034

Phoenix, AZ 85072-2034

SUBJECT: PALO VERDE NUCLEAR GENERATING STATION, UNITS 1, 2, AND 3 -

NOTIFICATION OF EVALUATIONS OF CHANGES, TESTS, AND

EXPERIMENTS, AND PERMANENT PLANT MODIFICATIONS

INSPECTION (05000528/2017007; 05000529/2017007; AND 05000530/2017007)

AND REQUEST FOR INFORMATION

Dear Mr. Bement:

The purpose of this letter is to notify you that U.S. Nuclear Regulatory Commission (NRC)

staff will conduct the baseline inspection of changes, tests, experiments, and permanent

plant modifications at your Palo Verde Nuclear Generating Station, Units 1, 2, and 3, from

February 27, 2017, to March 3, 2017. The inspection will consist of three reactor inspectors

from the NRCs Region IV office for one on-site week. The inspection will be conducted in

accordance with NRC Inspection Procedure 71111.17T, Evaluations of Changes, Tests, and

Experiments and Permanent Plant Modifications.

Experience has shown that this inspection is resource intensive for both the NRC inspectors

and your staff. In order to minimize the impact to your on-site resources and to ensure a

productive inspection, we have enclosed a request for documents needed for this inspection.

Please note that the documents are requested to be provided by February 15, 2017. Upon

review of these documents, the inspectors will select additional documentation for review upon

arrival. It is important that all of these documents are up-to-date and complete in order to

minimize the number of additional documents requested during the preparation and/or the

on-site portions of the inspection.

We have discussed the schedule for these inspection activities with your staff. If there are any

questions about this inspection or the material requested, please contact the lead inspector,

James Drake, by telephone at 817-200-1558 or by e-mail at James.Drake@nrc.gov.

R. Bement -2-

This letter does not contain new or amended information collection requirements subject

to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information

collection requirements were approved by the Office of Management and Budget, control

number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to

respond to, a request for information or an information collection requirement unless the

requesting document displays a currently valid Office of Management and Budget control

number.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice and Procedure, a copy of

this letter and its enclosure will be available electronically for public inspection in the NRC Public

Document Room or from the Publicly Available Records (PARS) component of NRC's document

system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-

rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Thomas R. Farnholtz, Chief

Engineering Branch 1

Division of Reactor Safety

Docket Nos. 50-528, 50-529, 50-530

License Nos. NPF-41, NPF-51, NPF-74

Enclosure:

Request for Information

cc: Electronic Distribution

ML16336A832

SUNSI Review ADAMS Publicly Available Non-Sensitive Keyword:

By: JDrake Yes No Non-Publicly Available Sensitive NRC-002

OFFICE SRI/DRS C/DRP/D C/EB1

NAME JDrake GMiller TFarnholtz

SIGNATURE /RA/ /RA/ /RA/

DATE 11/30/16 12/1/16 12/1/16

Letter to Robert S. Bement from Thomas R. Farnholtz, dated December 1, 2016

SUBJECT: PALO VERDE NUCLEAR GENERATING STATION, UNITS 1, 2, AND 3 -

NOTIFICATION OF EVALUATIONS OF CHANGES, TESTS, AND

EXPERIMENTS, AND PERMANENT PLANT MODIFICATIONS

INSPECTION (05000528/2017007; 05000529/2017007; AND 05000530/2017007)

AND REQUEST FOR INFORMATION

Electronic distribution by RIV:

Regional Administrator (Kriss.Kennedy@nrc.gov)

Deputy Regional Administrator (Scott.Morris@nrc.gov)

DRP Director (Troy.Pruett@nrc.gov)

DRP Deputy Director (Ryan.Lantz@nrc.gov)

DRS Director (Anton.Vegel@nrc.gov)

DRS Deputy Director (Jeff.Clark@nrc.gov)

Senior Resident Inspector (Charles.Peabody@nrc.gov)

Resident Inspector (David.You@nrc.gov)

Resident Inspector (Dustin.Reinert@nrc.gov)

PV Administrative Assistant (Yvonne.Dubay@nrc.gov)

Branch Chief, DRP/D (Geoffrey.Miller@nrc.gov)

Senior Project Engineer, DRP/D (John.Dixon@nrc.gov)

Project Engineer, DRP/D (Brian.Parks@nrc.gov)

Project Engineer, DRP/D (Jan.Tice@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Project Manager (Siva.Lingam@nrc.gov)

Team Leader, DRS/IPAT (Thomas.Hipschman@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

ACES (R4Enforcement.Resource@nrc.gov)

Regional Counsel (Karla.Fuller@nrc.gov)

Project Engineer, DRS/IPAT (Eduardo.Uribe@nrc.gov)

Senior Congressional Affairs Officer (Jenny.Weil@nrc.gov)

RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)

RIV/ETA: OEDO (Jeremy.Bowen@nrc.gov)

RIV RSLO (Bill.Maier@nrc.gov)

Request for Information

Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications

Inspection

Palo Verde Nuclear Generating Station, Units 1, 2, and 3

Inspection Report: 05000528/2017007, 05000529/2017007, and 05000530/2017007

Inspection Dates: February 27, 2017 to March 3, 2017

Inspection Procedure: IP 71111.17T, Evaluations of Changes, Tests, and Experiments

and Permanent Plant Modifications

Lead Inspector: James Drake, Senior Reactor Inspector

Information Requested for the In-Office Preparation Week

The following information should be provided to the Region IV office in hard copy or electronic

format or via CERTREC (preferred) by February 15, 2017, to the attention of Jim Drake. We

request that you categorize the documents in your response with the numbered list below. If

only hard copies of the requested documents are available or if the electronic format is too

large, please inform the lead inspector and provide the documents on the first day of the on-site

inspection. Also, the inspectors will select specific items from the information requested below

and request from your staff additional documents needed during the on-site inspection week.

We ask that the specific items requested be available and ready for review on the first day of

inspection. If you have any questions regarding this information request, please contact the

lead inspector as soon as possible.

1. Procedure(s) for conducting 10 CFR 50.59 screenings and evaluations.

2. A list with descriptions of all 10 CFR 50.59 screenings (or equivalent) of fully

implemented changes, tests, and experiments performed since the last triennial

modification inspection that did not result in an evaluation.

3. A list with descriptions of all 10 CFR 50.59 evaluations of fully implemented changes,

tests, and experiments performed since the last triennial modification inspection that did

not result in an application for a license amendment.

4. A list with descriptions of all corrective action documents related to 10 CFR 50.59

screenings and evaluations since the last triennial modification inspection.

5. A list of personnel qualified to prepare 10 CFR 50.59 screenings and/or evaluations,

including qualification dates.

6. A list of personnel qualified to review and approve 10 CFR 50.59 screenings and/or

evaluations, including qualification dates.

7. Procedure(s) for implementing permanent plant modifications.

Enclosure

8. A list with descriptions of all permanent plant modifications fully implemented since the

last triennial modification inspection.

9. A list with descriptions of all corrective action documents related to permanent plant

modifications fully implemented since the last triennial modification inspection.

10. Current revisions of the Technical Specifications and bases and the Updated Final

Safety Analysis Report.

11. A copy of the most recent audits/self-assessments performed of the 10 CFR 50.59 and

permanent plant modification programs.

12. A copy of the most recent submittal of the report containing a brief description of any

changes, tests, and experiments, including a summary of the evaluation of each,

required by 10 CFR 50.59(d)(2).

13. A list of systems and system designators and a set of one-line (i.e., simplified) system

diagrams.

Note: Descriptions should be brief, but of sufficient detail to ensure that inspectors can

determine the safety and/or risk significance of the screenings, evaluations, and

modifications.

Note: For this inspection, permanent plant modifications include permanent plant changes,

design changes, set point changes, procedure changes, equivalency evaluations,

suitability analyses, calculations, and commercial grade dedications.

Lead Inspector Contact Information:

James Drake

Senior Reactor Inspector

817-200-1558

James.Drake@nrc.gov

Mailing Address:

U.S. NRC, Region IV

ATTN: James Drake

1600 East Lamar Blvd.

Arlington, TX 76011-4125

-2-