ML17300A954: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:R REGULA.Y INFORMATION DIBTRIBUTI YSTEM (RIDB)ACFESSH3N NHR: 8707060332 DQC.DATE: 87/06/2'P NOTARIZED:
{{#Wiki_filter:R REGULA.       Y INFORMATION       DIBTRIBUTI         YSTEM (RIDB)
NQ DOCKET 8 FACIL: STN-50-528 Palo Verde Nuclear Stationi Unit 1I Arizona Pub li 0500052$AUTH.NAME AUTHOR AFF IL I AT I QN HAYNESI J.G.Arizona Nuclear Poeer Prospect (formerly Ari zona Public Sere REC IP.NAME REC I P I ENT AFF I L I AT I QN Document Control Branch (Document Control Desk)56 GM-
ACFESSH3N NHR:   8707060332           DQC. DATE: 87/06/2'P       NOTARIZED: NQ           DOCKET 8 FACIL: STN-50-528 Palo Verde Nuclear Stationi                 Unit 1I Arizona Pub li 0500052$
AUTH. NAME             AUTHOR AFF ILI AT I QN HAYNESI J. G.         Arizona Nuclear Poeer Prospect (formerly Ari zona Public Sere REC IP. NAME           REC I P I ENT AFF I L I AT I QN Document Control Branch (Document Control Desk)


==SUBJECT:==
==SUBJECT:==
Foreards"Reload Analysis Rept Palo Verde Nuclear Generating Station Unit 1 Cgcle 2." DISTRIBUTION CODE: IEEBD COPIES RECEIVED: LTR j ENCL g SIZE: I 4 (TITLE: Startup Report/Refueling Report (per Tech Specs)NOTES: Standardi zed p lant.M.Davi si NRR: 1Cg.05000528 REC IP TENT ID CODE/NAME PD5 LA LICITRAr E CQP IES LTTR ENCL 1 0 2 2 REC IP I ENT ID CODE/NAME PD5 PD DAVISI M COPIES LTTR ENCL INTERNAL: ACRB NRR/PMAS/ILRH RES DEPY GI RGN2/DRSS/FPRPH 5 5 i ADV 02 GN5 FILE Oi 1 1 i 1 EXTERNAL: LPDR NBIC 1 1 1 1 NRC PDR 1 1 NOTES: i TOTAL NUMBER OF CQPIEB REQUIRED: LTTR 21 ENCL 20  
Foreards "Reload Analysis Rept Palo Verde Nuclear Generating 56 GM-Station Unit 1 Cgcle 2. "
DISTRIBUTION CODE:       IEEBD     COPIES RECEIVED: LTR TITLE: Startup Report/Refueling Report (per Tech Specs)
NOTES: Standardi   zed   p lant. M. Davi si NRR: 1Cg.
j    ENCL  g  SIZE:    I 4 (
05000528 REC IP TENT             CQP IES              REC IP I ENT        COPIES ID CODE/NAME             LTTR ENCL           ID CODE/NAME         LTTR ENCL PD5 LA                      1      0        PD5 PD LICITRAr E                  2      2        DAVISI M INTERNAL: ACRB                           5      5                    ADV        1    1 NRR/PMAS/ILRH RES DEPY GI                                           FILE 02      i    1 GN5            Oi RGN2/DRSS/FPRPH                     i EXTERNAL: LPDR                           1     1       NRC PDR                  1     1 NBIC                        1     1 NOTES:
i TOTAL NUMBER OF CQPIEB REQUIRED:             LTTR     21   ENCL     20


Arizona Nuclear Power Project P.o.BOX 52034~PHOENIX, ARIZONA 85072-2034
Arizona Nuclear Power Project P.o. BOX 52034 ~ PHOENIX, ARIZONA 85072-2034
'tune 29, 1987 161-6821-JCH/LM U.S.Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C.20555  
                                                              'tune 29, 1987 161-6821-JCH/LM U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555


==Subject:==
==Subject:==
Palo Verde Nuclear Generating Station (PVNGS)Unit 1 Docket No.STN 50-528 (License NPF-41)Submittal of the Reload Analysis Report for Unit 1 Cycle 2 File: 87-B-056-026
Palo Verde Nuclear Generating Station (PVNGS)
Unit 1 Docket No. STN 50-528 (License NPF-41)
Submittal of the Reload Analysis Report for Unit 1 Cycle 2 File:   87-B-056-026


==Dear Sir:==
==Dear Sir:==
Attached is a copy of the Unit 1 Cycle 2 Reload Analysis Report (RAR)for your use while reviewing the Technical Specification Amendments relating to Unit 1 Cycle 2.If there are any que'stions, please contact Hx'.N.F.Quinn, at (602)371-4087.Very truly yours, jg diyg~~J.G.Haynes Vice President Nuclear Production JGH/LJM/ls cc: 0.M.E.E.G.M.J.B.E.A.A.C.R.P.De Michele Van Brunt, Jr.Knighton Hartin Licitra (w/a)Gehr Zimmerman 87070b0332 870~PDR ADOCK 05000MS P PDR}}
 
Attached   is a copy of the Unit 1 Cycle 2 Reload Analysis Report (RAR) for your use while reviewing the Technical Specification Amendments relating to Unit 1 Cycle 2.
If there   are any que'stions,     please contact     Hx'. N. F.     Quinn, at (602) 371-4087.
Very   truly yours, jg         diyg~~
J. G. Haynes Vice President Nuclear Production JGH/LJM/ls cc: 0. M. De  Michele E. E. Van  Brunt, Jr.
G. M. Knighton J. B. Hartin E. A. Licitra      (w/a)
A. C. Gehr R. P. Zimmerman 87070b0332 ADOCK 870~
05000MS PDR P                     PDR}}

Revision as of 10:28, 29 October 2019

Forwards Reload Analysis Rept for Palo Verde Nuclear Generating Station Unit 1 Cycle 2, for Use in Reviewing Tech Spec Amends Re Cycle 2
ML17300A954
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 06/29/1987
From: Haynes J
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
Shared Package
ML17300A955 List:
References
161-00321-JGH-L, 161-321-JGH-L, TAC-65691, NUDOCS 8707060332
Download: ML17300A954 (3)


Text

R REGULA. Y INFORMATION DIBTRIBUTI YSTEM (RIDB)

ACFESSH3N NHR: 8707060332 DQC. DATE: 87/06/2'P NOTARIZED: NQ DOCKET 8 FACIL: STN-50-528 Palo Verde Nuclear Stationi Unit 1I Arizona Pub li 0500052$

AUTH. NAME AUTHOR AFF ILI AT I QN HAYNESI J. G. Arizona Nuclear Poeer Prospect (formerly Ari zona Public Sere REC IP. NAME REC I P I ENT AFF I L I AT I QN Document Control Branch (Document Control Desk)

SUBJECT:

Foreards "Reload Analysis Rept Palo Verde Nuclear Generating 56 GM-Station Unit 1 Cgcle 2. "

DISTRIBUTION CODE: IEEBD COPIES RECEIVED: LTR TITLE: Startup Report/Refueling Report (per Tech Specs)

NOTES: Standardi zed p lant. M. Davi si NRR: 1Cg.

j ENCL g SIZE: I 4 (

05000528 REC IP TENT CQP IES REC IP I ENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD5 LA 1 0 PD5 PD LICITRAr E 2 2 DAVISI M INTERNAL: ACRB 5 5 ADV 1 1 NRR/PMAS/ILRH RES DEPY GI FILE 02 i 1 GN5 Oi RGN2/DRSS/FPRPH i EXTERNAL: LPDR 1 1 NRC PDR 1 1 NBIC 1 1 NOTES:

i TOTAL NUMBER OF CQPIEB REQUIRED: LTTR 21 ENCL 20

Arizona Nuclear Power Project P.o. BOX 52034 ~ PHOENIX, ARIZONA 85072-2034

'tune 29, 1987 161-6821-JCH/LM U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Unit 1 Docket No. STN 50-528 (License NPF-41)

Submittal of the Reload Analysis Report for Unit 1 Cycle 2 File: 87-B-056-026

Dear Sir:

Attached is a copy of the Unit 1 Cycle 2 Reload Analysis Report (RAR) for your use while reviewing the Technical Specification Amendments relating to Unit 1 Cycle 2.

If there are any que'stions, please contact Hx'. N. F. Quinn, at (602) 371-4087.

Very truly yours, jg diyg~~

J. G. Haynes Vice President Nuclear Production JGH/LJM/ls cc: 0. M. De Michele E. E. Van Brunt, Jr.

G. M. Knighton J. B. Hartin E. A. Licitra (w/a)

A. C. Gehr R. P. Zimmerman 87070b0332 ADOCK 870~

05000MS PDR P PDR