ML17333A852: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
| Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:CATEGORY 1 REGULATOEZNFORMATZON DZSTRZBUTZON TEM (RZDS)ACCESSION NBR:9704160012 DOC.DATE: 97/03/31 NOTARIZED: | {{#Wiki_filter:CATEGORY 1 REGULATOEZNFORMATZON DZSTRZBUTZON TEM (RZDS) | ||
NO DOCKET FACIL:50-'315 Donald C.Cook Nuclear Power Plant, Unit 1, Indiana M 05000315 AUT'A.NAYiE | ACCESSION NBR:9704160012 DOC.DATE: 97/03/31 NOTARIZED: NO DOCKET FACIL:50-'315 Donald C. Cook Nuclear Power Plant, Unit 1, Indiana M 05000315 AUT'A.NAYiE .. AUTHOR AFFILIATION MINOR,J.W. American Electric Power Co., Inc. | ||
..AUTHOR AFFILIATION MINOR,J.W. | RUSSOFM.E.'merican Electric Power Co., Inc. | ||
American Electric Power Co., Inc.RUSSOFM.E.'merican Electric Power Co., Inc.SAMPSON',J.R. | SAMPSON',J.R. ~ American Electric Power Co., Inc. | ||
~American Electric Power Co., Inc.RECIP.NAME RECIPIENT AFFILIATION | RECIP.NAME RECIPIENT AFFILIATION | ||
==SUBJECT:== | ==SUBJECT:== | ||
Monthly operating rept for Mar 1997 for DC Cook Nuclear Plant Unit 1.W/970402 ltr.DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE: TITLE: Monthly Operating Report (per Tech Specs)NOTES: | Monthly operating rept for Mar 1997 for DC Cook Nuclear Plant Unit 1.W/970402 ltr. A DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE: | ||
PLEASE HELP US TO REDUCE WASTE.TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)ON EXTENSION 41S-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 10 ENCL 10 L J J Indiana Michigan Power Company Cook Nudear Plant One Cook Place Bridgman, MI 491 06 U.S.Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C.20555 April 2, 1997 Gentlemen, Pursuant to the requirements of Donald C.Cook Nuclear Plant Unit 1 Technical Specification 6.9.1.10, the attached Monthly Operating Report for the month of March 1997 is submitted. | TITLE: Monthly Operating Report (per Tech Specs) T NOTES: | ||
Sincerely, J.R.Sampson Plant Manager/mr,, Attachment | RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD3-3 PD 1 1 HICKMAN,J 1 1 INTERNAL: AEOD/SPD/RRAB 1 1 FILE CENTER 1 1 NRR/DRPM/PECB 1 1 1 1 OC/DBA/PA'D'OAC RGN3 1 1 EXTERNAL: LITCO BR'ZCE,J H 1 1 1 1 NRC PDR 1 1 D | ||
0 U | |||
E N | |||
NOTE TO ALL "RIDS" RECIPIENTS: | |||
PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 41S-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 10 ENCL 10 | |||
- | |||
L J | |||
J | |||
Indiana Michigan Power Company Cook Nudear Plant One Cook Place Bridgman, MI 491 06 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 April 2, 1997 Gentlemen, Pursuant to the requirements of Donald C. Cook Nuclear Plant Unit 1 Technical Specification 6.9.1.10, the attached Monthly Operating Report for the month of March 1997 is submitted. | |||
Sincerely, J.R. Sampson Plant Manager | |||
/mr,, | |||
Attachment NRC Region III D.R. Hahn R.C. Callen S. Hamming INPO Records Center ANI Nuclear Engineering Department E.E. Fitzpatrick A.A. Blind P.A. Barrett S.J. Brewer D.W. Paul J.A. Kobyra D.L. Noble W.H. Schalk D.G. Turner B.L. Bartlett M.E. Ru sso | |||
>502 53 9704i600i2 97033i LLIl'3IOtLIltIllIOllnllLtltl3LLtNIl PDR ADQCK 050003i5 R PDR | |||
N.R.C. OPERATING DATA REPORT DOCKET NO. 50 - 315 DATE Apr. 2, 1997 COMPLETED BY JW Minor TELEPHONE 616-465-5901 OPERATING STATUS Notes: | |||
: 1. Unit Name D. C Cook Unit 1 | |||
: 2. Reporting Period Mar-97 | |||
: 3. Licensed Thermal Power (MWt) 3250 | |||
: 4. Name Plate Rating (Gross MWe) 1152 | |||
: 5. Design Electrical Rating (Net MWe) 1020 | |||
: 6. Maximum Dependable Capacity (GROSS MWe) 1056 | |||
: 7. Maximum Dependable Capacity (Net MWe) 1000 | |||
: 8. If Changes Occur in Capacity Ratings (Items no. 3 through 7) Since Last Report Give Reasons: | |||
: 9. Power Level To Which Restricted, If Any (Net MWe): | |||
: 10. Reasons For Restrictions, If Any: | |||
This Month Year-to-Date Cumulative | |||
: 11. Hours in Reporting Period 744.0 2160.0 195024.0 | |||
: 12. No. of Hrs. Reactor Was Critical 3.2 1419.2 148006.5 | |||
: 13. Reactor Reserve Shutdow'n Hours 0.0 0.0 463.0 | |||
: 14. Hours Generator on Line 3.0 1419.0 145620.8 | |||
: 15. Unit Reserve Shutdown Hours 0.0 0.0 321.0 | |||
: 16. Gross Thermal Energy Gen. (MWH) 1544.4 4270359.4 430075156.4 | |||
: 17. Gross Electrical Energy Gen. (MWH) 500.0 1414580.0 139714490.0 | |||
: 18. Net Electrical Energy Gen. (MWH) 418.0 1362895.0 134414256.0 | |||
: 19. Unit Service Factor 0.4 65.7 .75.5 | |||
: 20. Unit Availability Factor 0.4 65.7 75.5 | |||
: 21. Unit Capacity Factor (MDC Net) 0.1 63.1 68.7 | |||
: 22. Unit Capacity Factor (DER Net) 0.1 61.9 67.0 | |||
: 23. Unit Forced Outage Rate 0.0 0.0 5.9 | |||
: 24. Shutdowns Scheduled over Next Six Months (Type, Date, and Duration): None | |||
: 25. If Shut Down At End of Report Period, Estimated Date of Startup: A ril 14 1997 | |||
: 26. Units in Test Status (Prior to Commercial Operation): | |||
Forecast Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION | |||
DOCKET NO. 50-315 UNIT NAME D.C. Cook Unit1 DATE Apr. 2, 1997 COMPLETED BY JW Minor TELEPHONE 616-465-5901 AVERAGE DAILYPOWER LEVEL (MWe-Net) | |||
MARCH 1997 DAY AVERAGE DAILY DAY AVERAGE DAILY POWER LEVEL POWER LEVEL 3/1/97 17 3/17/97 0 3/2/97 0 3/1 8/97 0 3/3/97 0 3/1 9/97 0 3/4/97 0' 3/20/97 0 3/5/97 3/21/97 0 3/6/97 0 3/22/97 0 3/7/97 0 3/23/97 0 3/8/97 0 3/24/97 0 3/9/97 0 3/25/97 0 3/1 0/97 0 3/26/97 0 3/11/97 0 3/27/97 0 3/12/97 0 3/28/97 0 3/13/97 0 3/29/97 0 3/14/97 0 3/30/97 0 3/15/97 0 3/31/97 0 3/16/97 0 | |||
DOCKET NO. 50- 315 UNIT NAME D.C. Cook Unit 1 DATE Apr. 2, 1997 COMPLETED BY ME Russo TELEPHONE 616-697-5100 PAGE 1 of1 MONTHLYOPERATING ACTIVITIES - MARCH 1997 HIGHLIGHTS The unit entered this reporting period in Mode 1 at 30% RTP and reducing power in preparation for the cycle 15 to 16 maintenance and refueling outage. | |||
Commenced cycle 15 to 16 maintenance and refueling outage March 1, 1997 at 0312 following a manual trip of the reactor. Outage activities continued this entire period. | |||
The unit exited this reporting period in Mode 6 with Reactor core reload complete. | |||
There were no challenges to the pressurizer safety valves or power operated relief valves. | |||
Gross electrical generation for the month of March was 500 MWh. | |||
DETAILS 03-01-97 0300 Manually tripped Main Turbine Generator. | |||
0312 Manually tripped Reactor to commence cycle 15 to 16 maintenance and refueling outage. Entered Reactor Mode 3. | |||
2035 Entered Reactor Mode 4. | |||
03-02-97 0825 Entered Reactor Mode 5. | |||
03-08-97 0303 Entered Reactor Mode 6. | |||
03-11-97 1345 Commenced Reactor fuel off-load core alterations. | |||
03-13-97 2310 Core alterations complete. All fuel off-loaded to the Spent Fuel Pool. | |||
03-29-97 1543 Commenced Reactor refueling core alterations. | |||
03-31-97 1527 Core alterations complete. | |||
r | |||
DOCKET NO. 50- 315 UNIT NAME D.C. Cook Unit.1 DATE Apr. 2, 1997 COMPLETED BY ME Russo " | |||
TELEPHONE 616-697-5100 PAGE 1 of1 UNIT SHUTDOWNS AND POWER REDUCTIONS - MARCH 1997 METHOD OF SHUTTING LICENSEE DURATION DOWN EVENT 'YSTEM COMPONENT CAUSE AND CORRECTIVE ACTION NO. DATE TYPE" HOURS REASON2 REACTOR3 REPORT NO. CODE4 CODE5 TO PREVENT RECURRENCE 330 030197 S 740.8 B,C N/A N/A N/A The Reactor was manually tripped for commencement of the cycle 15 to 16 maintenance and refueling outage on 030197 at 0312. | |||
1 2 3 4 5 F: Forced Reason: Method: Exhibit G - Instructions Exhibit I: Same Source S: Scheduled A: Equipment Failure (Explain) 1: Manual for preparation of data B: Maintenance or Test 2: Manual Scram entry sheets for Licensee C: Refueling 3: Automatic Scram Event Report (LER) File D: Regulatory Restriction 4: Other (Explain) (NUREG 0161) | |||
E: Operator Training and License Examination F: Administrative G: Operational Error (Explain) | |||
H: Other (Explain)}} | |||
Revision as of 12:10, 22 October 2019
| ML17333A852 | |
| Person / Time | |
|---|---|
| Site: | Cook |
| Issue date: | 03/31/1997 |
| From: | Minor J, Russo M, Sampson J AMERICAN ELECTRIC POWER CO., INC. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NUDOCS 9704160012 | |
| Download: ML17333A852 (7) | |
Text
CATEGORY 1 REGULATOEZNFORMATZON DZSTRZBUTZON TEM (RZDS)
ACCESSION NBR:9704160012 DOC.DATE: 97/03/31 NOTARIZED: NO DOCKET FACIL:50-'315 Donald C. Cook Nuclear Power Plant, Unit 1, Indiana M 05000315 AUT'A.NAYiE .. AUTHOR AFFILIATION MINOR,J.W. American Electric Power Co., Inc.
RUSSOFM.E.'merican Electric Power Co., Inc.
SAMPSON',J.R. ~ American Electric Power Co., Inc.
RECIP.NAME RECIPIENT AFFILIATION
SUBJECT:
Monthly operating rept for Mar 1997 for DC Cook Nuclear Plant Unit 1.W/970402 ltr. A DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: Monthly Operating Report (per Tech Specs) T NOTES:
RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD3-3 PD 1 1 HICKMAN,J 1 1 INTERNAL: AEOD/SPD/RRAB 1 1 FILE CENTER 1 1 NRR/DRPM/PECB 1 1 1 1 OC/DBA/PA'D'OAC RGN3 1 1 EXTERNAL: LITCO BR'ZCE,J H 1 1 1 1 NRC PDR 1 1 D
0 U
E N
NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 41S-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 10 ENCL 10
L J
J
Indiana Michigan Power Company Cook Nudear Plant One Cook Place Bridgman, MI 491 06 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 April 2, 1997 Gentlemen, Pursuant to the requirements of Donald C. Cook Nuclear Plant Unit 1 Technical Specification 6.9.1.10, the attached Monthly Operating Report for the month of March 1997 is submitted.
Sincerely, J.R. Sampson Plant Manager
/mr,,
Attachment NRC Region III D.R. Hahn R.C. Callen S. Hamming INPO Records Center ANI Nuclear Engineering Department E.E. Fitzpatrick A.A. Blind P.A. Barrett S.J. Brewer D.W. Paul J.A. Kobyra D.L. Noble W.H. Schalk D.G. Turner B.L. Bartlett M.E. Ru sso
>502 53 9704i600i2 97033i LLIl'3IOtLIltIllIOllnllLtltl3LLtNIl PDR ADQCK 050003i5 R PDR
N.R.C. OPERATING DATA REPORT DOCKET NO. 50 - 315 DATE Apr. 2, 1997 COMPLETED BY JW Minor TELEPHONE 616-465-5901 OPERATING STATUS Notes:
- 1. Unit Name D. C Cook Unit 1
- 2. Reporting Period Mar-97
- 3. Licensed Thermal Power (MWt) 3250
- 4. Name Plate Rating (Gross MWe) 1152
- 5. Design Electrical Rating (Net MWe) 1020
- 6. Maximum Dependable Capacity (GROSS MWe) 1056
- 7. Maximum Dependable Capacity (Net MWe) 1000
- 8. If Changes Occur in Capacity Ratings (Items no. 3 through 7) Since Last Report Give Reasons:
- 9. Power Level To Which Restricted, If Any (Net MWe):
- 10. Reasons For Restrictions, If Any:
This Month Year-to-Date Cumulative
- 11. Hours in Reporting Period 744.0 2160.0 195024.0
- 12. No. of Hrs. Reactor Was Critical 3.2 1419.2 148006.5
- 13. Reactor Reserve Shutdow'n Hours 0.0 0.0 463.0
- 14. Hours Generator on Line 3.0 1419.0 145620.8
- 15. Unit Reserve Shutdown Hours 0.0 0.0 321.0
- 16. Gross Thermal Energy Gen. (MWH) 1544.4 4270359.4 430075156.4
- 17. Gross Electrical Energy Gen. (MWH) 500.0 1414580.0 139714490.0
- 18. Net Electrical Energy Gen. (MWH) 418.0 1362895.0 134414256.0
- 19. Unit Service Factor 0.4 65.7 .75.5
- 20. Unit Availability Factor 0.4 65.7 75.5
- 21. Unit Capacity Factor (MDC Net) 0.1 63.1 68.7
- 22. Unit Capacity Factor (DER Net) 0.1 61.9 67.0
- 23. Unit Forced Outage Rate 0.0 0.0 5.9
- 24. Shutdowns Scheduled over Next Six Months (Type, Date, and Duration): None
- 25. If Shut Down At End of Report Period, Estimated Date of Startup: A ril 14 1997
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION
DOCKET NO. 50-315 UNIT NAME D.C. Cook Unit1 DATE Apr. 2, 1997 COMPLETED BY JW Minor TELEPHONE 616-465-5901 AVERAGE DAILYPOWER LEVEL (MWe-Net)
MARCH 1997 DAY AVERAGE DAILY DAY AVERAGE DAILY POWER LEVEL POWER LEVEL 3/1/97 17 3/17/97 0 3/2/97 0 3/1 8/97 0 3/3/97 0 3/1 9/97 0 3/4/97 0' 3/20/97 0 3/5/97 3/21/97 0 3/6/97 0 3/22/97 0 3/7/97 0 3/23/97 0 3/8/97 0 3/24/97 0 3/9/97 0 3/25/97 0 3/1 0/97 0 3/26/97 0 3/11/97 0 3/27/97 0 3/12/97 0 3/28/97 0 3/13/97 0 3/29/97 0 3/14/97 0 3/30/97 0 3/15/97 0 3/31/97 0 3/16/97 0
DOCKET NO. 50- 315 UNIT NAME D.C. Cook Unit 1 DATE Apr. 2, 1997 COMPLETED BY ME Russo TELEPHONE 616-697-5100 PAGE 1 of1 MONTHLYOPERATING ACTIVITIES - MARCH 1997 HIGHLIGHTS The unit entered this reporting period in Mode 1 at 30% RTP and reducing power in preparation for the cycle 15 to 16 maintenance and refueling outage.
Commenced cycle 15 to 16 maintenance and refueling outage March 1, 1997 at 0312 following a manual trip of the reactor. Outage activities continued this entire period.
The unit exited this reporting period in Mode 6 with Reactor core reload complete.
There were no challenges to the pressurizer safety valves or power operated relief valves.
Gross electrical generation for the month of March was 500 MWh.
DETAILS 03-01-97 0300 Manually tripped Main Turbine Generator.
0312 Manually tripped Reactor to commence cycle 15 to 16 maintenance and refueling outage. Entered Reactor Mode 3.
2035 Entered Reactor Mode 4.
03-02-97 0825 Entered Reactor Mode 5.
03-08-97 0303 Entered Reactor Mode 6.
03-11-97 1345 Commenced Reactor fuel off-load core alterations.
03-13-97 2310 Core alterations complete. All fuel off-loaded to the Spent Fuel Pool.
03-29-97 1543 Commenced Reactor refueling core alterations.
03-31-97 1527 Core alterations complete.
r
DOCKET NO. 50- 315 UNIT NAME D.C. Cook Unit.1 DATE Apr. 2, 1997 COMPLETED BY ME Russo "
TELEPHONE 616-697-5100 PAGE 1 of1 UNIT SHUTDOWNS AND POWER REDUCTIONS - MARCH 1997 METHOD OF SHUTTING LICENSEE DURATION DOWN EVENT 'YSTEM COMPONENT CAUSE AND CORRECTIVE ACTION NO. DATE TYPE" HOURS REASON2 REACTOR3 REPORT NO. CODE4 CODE5 TO PREVENT RECURRENCE 330 030197 S 740.8 B,C N/A N/A N/A The Reactor was manually tripped for commencement of the cycle 15 to 16 maintenance and refueling outage on 030197 at 0312.
1 2 3 4 5 F: Forced Reason: Method: Exhibit G - Instructions Exhibit I: Same Source S: Scheduled A: Equipment Failure (Explain) 1: Manual for preparation of data B: Maintenance or Test 2: Manual Scram entry sheets for Licensee C: Refueling 3: Automatic Scram Event Report (LER) File D: Regulatory Restriction 4: Other (Explain) (NUREG 0161)
E: Operator Training and License Examination F: Administrative G: Operational Error (Explain)
H: Other (Explain)