ML17339A365: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
| Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:REGULATORY I NATION DISTRIBUTION SYST (BIDS)ACCESSION NBR~7912070127 DOC~DATE 79/1 1/29 NOTARIZED NO DOCKET FACIL:50-250 Turkey Point Plant~Unit 3R Florida Power and Light C 50-251 Turkey Point Plantr Unit 4i-Florida Power and Light C 05000251 AUTH'AME AUTHOR AFFILIATION UHRIGeR~ED Florida Power 8 Light Co, RECIP~NAME RECIPIENT AFFILIATION SCHPIENCERRA | {{#Wiki_filter:REGULATORY I NATION DISTRIBUTION SYST (BIDS) | ||
~Operating Reactors Branch 1 S UBJECT: Notifies that info requested by NRC 790S28i0927 8 1023 ltrs re containment venting 8, purge during normal operation will be submitted on 791213~DISTRISUTION CODE: A0348 COPIES RECEIVED:LTR ENCL, LAA SIZE: TITLE: Conte,inment Purging N PC~ | ACCESSION NBR ~ 7912070127 DOC ~ DATE 79/1 1/29 NOTARIZED NO DOCKET FACIL:50-250 Turkey Point Plant~ Unit 3R Florida Power and Light C 50-251 Turkey Point Plantr Unit 4i- Florida Power and Light C 05000251 AUTH'AME AUTHOR AFFILIATION UHRIGeR ~ ED Florida Power 8 Light Co, RECIP ~ NAME RECIPIENT AFFILIATION SCHPIENCERRA ~ Operating Reactors Branch 1 S UBJECT: Notifies that info requested by NRC 790S28i0927 8 1023 ltrs re containment venting 8, purge during normal operation will be submitted on 791213 ~ | ||
12 I8E 15 CORE PERF BR 18 REAC SFTY BR | DISTRISUTION CODE: A0348 COPIES RECEIVED:LTR ENCL, LAA SIZE: | ||
TITLE: Conte,inment Purging N PC ' | |||
~ | |||
W~WW&&%&www~tow&Ww&&~w~w&w RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME '~TTR EN ID CODE/NAME LTTR ENCL> | |||
ACTION: | |||
" | |||
05 BC OP. M~ 7 L | |||
INTERNAL!' 1 02 NRC PDR 12 I8E 2 14 TA/EDO 1 15 CORE PERF BR 1 17 ENGR BR 1 18 REAC SFTY BR 1. 19 PLANT SYS BR 20 EEB 1 21 EFLT TRT SYS 1 22 BR INKMAN 1 23 D SHUM 1 E. REEVES 1 EXTERNALS 03 LPDR 00 NSIC 25 ACRS 16 1 TOTAL, NUMBER OF COPIES REQUIRED'TTR 39 ENCL | |||
0 t' | |||
~ e 'I II | |||
'g s ~ | |||
e (I | |||
'i H h | |||
k I | |||
Ht | |||
'<<8f r'i Mf 'f Iran | |||
November 29, 1979 L-79-331 Re: Turkey Point Units 3 8 4 Docket Nos.50-250 8 50-251 Containment Pur e | . BOX 529100, MIAMI,FL 33152 | ||
~yelp>> | |||
==.,:.= | |||
~/i~...~5~ | |||
I FLORIDA POWER & LIGHT COMPANY November 29, 1979 L-79-331 Office of Nuclear Reactor Regulation Attention: Mr. A. Schwencer, Chief Operating Reactors Branch 81 Division of Operating Reactors U. S. Nuclear Regulatory Commission Washington, D. C. 20555 | |||
==Dear Mr. Schwencer:== | |||
Re: Turkey Point Units 3 8 4 Docket Nos. 50-250 8 50-251 Containment Pur e | |||
==References:== | ==References:== | ||
(1) NRC letter dated August 28, 1979 from A. Schwencer to R. E. Uhrig (applicable to Docket Nos. 50-250 8 50-251) | |||
(1)NRC letter dated August 28, 1979 from A.Schwencer to R.E.Uhrig (applicable to Docket Nos.50-250 8 50-251)(2)NRC letter dated September 27, 1979 from Darrell G.Eisenhut to All Light Water Reactors (3)NRC letter dated October 23, 1979 from A.Schwencer to R.E.Uhri a licable to Docket Nos.50-250 8 50-251 The referenced letters requested information and commitments regarding contain-ment venting and purging during normal operation. | (2) NRC letter dated September 27, 1979 from Darrell G. Eisenhut to All Light Water Reactors (3) NRC letter dated October 23, 1979 from A. Schwencer to R. E. Uhri a licable to Docket Nos. 50-250 8 50-251 The referenced letters requested information and commitments regarding contain-ment venting and purging during normal operation. We are expediting resolution of this issue with our NSSS vendor, architect engineer, and purge valve manu-facturer. | ||
We are expediting resolution of this issue with our NSSS vendor, architect engineer, and purge valve manu-facturer.Rather than fragment our efforts by providing a separate response to each of the referenced letters, we would prefer to respond with a single report in December.Consequently, we have scheduled December.13, 1979 as the due date for submittal of'combined response to References (1)through (3).Please call if you have additional questions on this subject.Very truly yours, Robert E.Uhrig Vice President Advanced Systems 8 Technology REU/MAS/cph cc: Mr.J.P.O'Reilly, Region II Harold Reis, Esquire | Rather than fragment our efforts by providing a separate response to each of the referenced letters, we would prefer to respond with a single report in December. Consequently, we have scheduled December .13, 1979 as the due date for submittal of' combined response to References (1) through (3). | ||
Please call if you have additional questions on this subject. | |||
Very truly yours, Robert E. Uhrig Vice President Advanced Systems 8 Technology REU/MAS/cph cc: Mr. J. P. O'Reilly, Region II PoZN Harold Reis, Esquire g/o vozsoro PEOPLE... | |||
/~'.~ | |||
SERVING PEOPLE}} | |||
Revision as of 10:29, 22 October 2019
| ML17339A365 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 11/29/1979 |
| From: | Robert E. Uhrig FLORIDA POWER & LIGHT CO. |
| To: | Schwencer A Office of Nuclear Reactor Regulation |
| References | |
| L-79-331, NUDOCS 7912070127 | |
| Download: ML17339A365 (3) | |
Text
REGULATORY I NATION DISTRIBUTION SYST (BIDS)
ACCESSION NBR ~ 7912070127 DOC ~ DATE 79/1 1/29 NOTARIZED NO DOCKET FACIL:50-250 Turkey Point Plant~ Unit 3R Florida Power and Light C 50-251 Turkey Point Plantr Unit 4i- Florida Power and Light C 05000251 AUTH'AME AUTHOR AFFILIATION UHRIGeR ~ ED Florida Power 8 Light Co, RECIP ~ NAME RECIPIENT AFFILIATION SCHPIENCERRA ~ Operating Reactors Branch 1 S UBJECT: Notifies that info requested by NRC 790S28i0927 8 1023 ltrs re containment venting 8, purge during normal operation will be submitted on 791213 ~
DISTRISUTION CODE: A0348 COPIES RECEIVED:LTR ENCL, LAA SIZE:
TITLE: Conte,inment Purging N PC '
~
W~WW&&%&www~tow&Ww&&~w~w&w RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME '~TTR EN ID CODE/NAME LTTR ENCL>
ACTION:
"
05 BC OP. M~ 7 L
INTERNAL!' 1 02 NRC PDR 12 I8E 2 14 TA/EDO 1 15 CORE PERF BR 1 17 ENGR BR 1 18 REAC SFTY BR 1. 19 PLANT SYS BR 20 EEB 1 21 EFLT TRT SYS 1 22 BR INKMAN 1 23 D SHUM 1 E. REEVES 1 EXTERNALS 03 LPDR 00 NSIC 25 ACRS 16 1 TOTAL, NUMBER OF COPIES REQUIRED'TTR 39 ENCL
0 t'
~ e 'I II
'g s ~
e (I
'i H h
k I
Ht
'<<8f r'i Mf 'f Iran
. BOX 529100, MIAMI,FL 33152
~yelp>>
=.,:.
~/i~...~5~
I FLORIDA POWER & LIGHT COMPANY November 29, 1979 L-79-331 Office of Nuclear Reactor Regulation Attention: Mr. A. Schwencer, Chief Operating Reactors Branch 81 Division of Operating Reactors U. S. Nuclear Regulatory Commission Washington, D. C. 20555
Dear Mr. Schwencer:
Re: Turkey Point Units 3 8 4 Docket Nos. 50-250 8 50-251 Containment Pur e
References:
(1) NRC letter dated August 28, 1979 from A. Schwencer to R. E. Uhrig (applicable to Docket Nos. 50-250 8 50-251)
(2) NRC letter dated September 27, 1979 from Darrell G. Eisenhut to All Light Water Reactors (3) NRC letter dated October 23, 1979 from A. Schwencer to R. E. Uhri a licable to Docket Nos. 50-250 8 50-251 The referenced letters requested information and commitments regarding contain-ment venting and purging during normal operation. We are expediting resolution of this issue with our NSSS vendor, architect engineer, and purge valve manu-facturer.
Rather than fragment our efforts by providing a separate response to each of the referenced letters, we would prefer to respond with a single report in December. Consequently, we have scheduled December .13, 1979 as the due date for submittal of' combined response to References (1) through (3).
Please call if you have additional questions on this subject.
Very truly yours, Robert E. Uhrig Vice President Advanced Systems 8 Technology REU/MAS/cph cc: Mr. J. P. O'Reilly, Region II PoZN Harold Reis, Esquire g/o vozsoro PEOPLE...
/~'.~
SERVING PEOPLE