ML17339A365: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:REGULATORY I NATION DISTRIBUTION SYST (BIDS)ACCESSION NBR~7912070127 DOC~DATE 79/1 1/29 NOTARIZED NO DOCKET FACIL:50-250 Turkey Point Plant~Unit 3R Florida Power and Light C 50-251 Turkey Point Plantr Unit 4i-Florida Power and Light C 05000251 AUTH'AME AUTHOR AFFILIATION UHRIGeR~ED Florida Power 8 Light Co, RECIP~NAME RECIPIENT AFFILIATION SCHPIENCERRA
{{#Wiki_filter:REGULATORY   I       NATION DISTRIBUTION SYST           (BIDS)
~Operating Reactors Branch 1 S UBJECT: Notifies that info requested by NRC 790S28i0927 8 1023 ltrs re containment venting 8, purge during normal operation will be submitted on 791213~DISTRISUTION CODE: A0348 COPIES RECEIVED:LTR ENCL, LAA SIZE: TITLE: Conte,inment Purging N PC~'W~WW&&%&www~tow&Ww&&~w~w&w RECIPIENT COPIES ID CODE/NAME'~TTR EN L ACTION: " 05 BC OP.M~7 RECIPIENT ID CODE/NAME COPIES LTTR ENCL>INTERNAL!'
ACCESSION NBR ~ 7912070127             DOC ~ DATE   79/1 1/29 NOTARIZED NO                 DOCKET FACIL:50-250 Turkey Point Plant~ Unit 3R Florida Power and Light                       C 50-251 Turkey Point Plantr Unit 4i- Florida Power and Light                 C   05000251 AUTH'AME                 AUTHOR AFFILIATION UHRIGeR ~ ED             Florida Power 8 Light Co, RECIP ~ NAME           RECIPIENT AFFILIATION SCHPIENCERRA     ~         Operating Reactors Branch           1 S UBJECT:     Notifies that info requested           by NRC 790S28i0927   8 1023 ltrs re containment   venting     8, purge during normal operation       will be   submitted   on 791213   ~
12 I8E 15 CORE PERF BR 18 REAC SFTY BR 20 EEB 22 BR INKMAN E.REEVES EXTERNALS 03 LPDR 25 ACRS 1 2 1 1.1 1 1 16 1 02 NRC PDR 14 TA/EDO 17 ENGR BR 19 PLANT SYS BR 21 EFLT TRT SYS 23 D SHUM 00 NSIC 1 1 1 1 TOTAL, NUMBER OF COPIES REQUIRED'TTR 39 ENCL 0 t'II~e'I'g s~e (I'i H h k I Ht'<<8f r'i Mf'f Iran
DISTRISUTION CODE: A0348           COPIES RECEIVED:LTR           ENCL, LAA   SIZE:
.BOX 529100, MIAMI, FL 33152~yelp>>==.,:.=~/i~...~5~
TITLE: Conte,inment Purging N   PC '
I FLORIDA POWER&LIGHT COMPANY Office of Nuclear Reactor Regulation Attention:
          ~
Mr.A.Schwencer, Chief Operating Reactors Branch 81 Division of Operating Reactors U.S.Nuclear Regulatory Commission Washington, D.C.20555
W~WW&&%&www~tow&Ww&&~w~w&w RECIPIENT         COPIES                RECIPIENT            COPIES ID CODE/NAME   '~TTR       EN           ID CODE/NAME        LTTR ENCL>
ACTION:
              "
05 BC   OP. M~       7 L
INTERNAL!'                               1              02 NRC PDR 12 I8E                   2              14 TA/EDO                1 15 CORE PERF BR         1              17 ENGR BR              1 18 REAC SFTY BR         1.             19 PLANT SYS BR 20 EEB                  1              21 EFLT TRT SYS         1 22 BR INKMAN            1              23 D SHUM             1 E. REEVES            1 EXTERNALS 03 LPDR                                        00 NSIC 25 ACRS                16      1 TOTAL, NUMBER OF COPIES         REQUIRED'TTR           39   ENCL


==Dear Mr.Schwencer:==
0 t'
                                                ~ e 'I II
                                  'g s ~
e                (I
                          'i                H h
k I
Ht
'<<8f r'i Mf 'f Iran


November 29, 1979 L-79-331 Re: Turkey Point Units 3 8 4 Docket Nos.50-250 8 50-251 Containment Pur e  
                                                                      . BOX 529100, MIAMI,FL 33152
                                                                                            ~yelp>>
                                                                                            ==.,:.=
                                                                                            ~/i~...~5~
I FLORIDA POWER & LIGHT COMPANY November 29, 1979 L-79-331 Office of Nuclear Reactor Regulation Attention: Mr. A. Schwencer, Chief Operating Reactors Branch 81 Division of Operating Reactors U. S. Nuclear Regulatory Commission Washington, D. C. 20555
 
==Dear Mr. Schwencer:==
 
Re:   Turkey Point Units 3 8 4 Docket Nos. 50-250 8 50-251 Containment Pur e


==References:==
==References:==
 
(1)   NRC letter dated August 28, 1979 from A. Schwencer to R. E. Uhrig (applicable to Docket Nos. 50-250     8 50-251)
(1)NRC letter dated August 28, 1979 from A.Schwencer to R.E.Uhrig (applicable to Docket Nos.50-250 8 50-251)(2)NRC letter dated September 27, 1979 from Darrell G.Eisenhut to All Light Water Reactors (3)NRC letter dated October 23, 1979 from A.Schwencer to R.E.Uhri a licable to Docket Nos.50-250 8 50-251 The referenced letters requested information and commitments regarding contain-ment venting and purging during normal operation.
(2)   NRC letter   dated September 27, 1979 from Darrell   G. Eisenhut to All Light Water Reactors (3)   NRC letter   dated October 23, 1979 from A. Schwencer to R. E. Uhri   a licable to Docket Nos. 50-250 8 50-251 The referenced letters requested information and commitments regarding contain-ment venting and purging during normal         operation. We are expediting resolution of this issue with our       NSSS vendor, architect engineer, and purge valve manu-facturer.
We are expediting resolution of this issue with our NSSS vendor, architect engineer, and purge valve manu-facturer.Rather than fragment our efforts by providing a separate response to each of the referenced letters, we would prefer to respond with a single report in December.Consequently, we have scheduled December.13, 1979 as the due date for submittal of'combined response to References (1)through (3).Please call if you have additional questions on this subject.Very truly yours, Robert E.Uhrig Vice President Advanced Systems 8 Technology REU/MAS/cph cc: Mr.J.P.O'Reilly, Region II Harold Reis, Esquire PoZN g/o vozsoro/~'.~PEOPLE...SERVING PEOPLE}}
Rather than fragment our efforts by providing a separate response to each of the referenced letters, we would prefer to respond with a single report in December. Consequently, we have scheduled December .13, 1979 as the due date for submittal of' combined response to References (1) through (3).
Please   call if you   have additional questions   on this subject.
Very truly yours, Robert E. Uhrig Vice President Advanced Systems   8   Technology REU/MAS/cph cc:   Mr. J. P. O'Reilly,   Region   II                                               PoZN Harold Reis, Esquire g/o vozsoro PEOPLE...
                                                                                          /~'.~
SERVING PEOPLE}}

Revision as of 10:29, 22 October 2019

Notifies That Info Requested by NRC 790828,0927 & 1023 Ltrs Re Containment Venting & Purge During Normal Operation Will Be Submitted on 791213
ML17339A365
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 11/29/1979
From: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
To: Schwencer A
Office of Nuclear Reactor Regulation
References
L-79-331, NUDOCS 7912070127
Download: ML17339A365 (3)


Text

REGULATORY I NATION DISTRIBUTION SYST (BIDS)

ACCESSION NBR ~ 7912070127 DOC ~ DATE 79/1 1/29 NOTARIZED NO DOCKET FACIL:50-250 Turkey Point Plant~ Unit 3R Florida Power and Light C 50-251 Turkey Point Plantr Unit 4i- Florida Power and Light C 05000251 AUTH'AME AUTHOR AFFILIATION UHRIGeR ~ ED Florida Power 8 Light Co, RECIP ~ NAME RECIPIENT AFFILIATION SCHPIENCERRA ~ Operating Reactors Branch 1 S UBJECT: Notifies that info requested by NRC 790S28i0927 8 1023 ltrs re containment venting 8, purge during normal operation will be submitted on 791213 ~

DISTRISUTION CODE: A0348 COPIES RECEIVED:LTR ENCL, LAA SIZE:

TITLE: Conte,inment Purging N PC '

~

W~WW&&%&www~tow&Ww&&~w~w&w RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME '~TTR EN ID CODE/NAME LTTR ENCL>

ACTION:

"

05 BC OP. M~ 7 L

INTERNAL!' 1 02 NRC PDR 12 I8E 2 14 TA/EDO 1 15 CORE PERF BR 1 17 ENGR BR 1 18 REAC SFTY BR 1. 19 PLANT SYS BR 20 EEB 1 21 EFLT TRT SYS 1 22 BR INKMAN 1 23 D SHUM 1 E. REEVES 1 EXTERNALS 03 LPDR 00 NSIC 25 ACRS 16 1 TOTAL, NUMBER OF COPIES REQUIRED'TTR 39 ENCL

0 t'

~ e 'I II

'g s ~

e (I

'i H h

k I

Ht

'<<8f r'i Mf 'f Iran

. BOX 529100, MIAMI,FL 33152

~yelp>>

=.,:.

~/i~...~5~

I FLORIDA POWER & LIGHT COMPANY November 29, 1979 L-79-331 Office of Nuclear Reactor Regulation Attention: Mr. A. Schwencer, Chief Operating Reactors Branch 81 Division of Operating Reactors U. S. Nuclear Regulatory Commission Washington, D. C. 20555

Dear Mr. Schwencer:

Re: Turkey Point Units 3 8 4 Docket Nos. 50-250 8 50-251 Containment Pur e

References:

(1) NRC letter dated August 28, 1979 from A. Schwencer to R. E. Uhrig (applicable to Docket Nos. 50-250 8 50-251)

(2) NRC letter dated September 27, 1979 from Darrell G. Eisenhut to All Light Water Reactors (3) NRC letter dated October 23, 1979 from A. Schwencer to R. E. Uhri a licable to Docket Nos. 50-250 8 50-251 The referenced letters requested information and commitments regarding contain-ment venting and purging during normal operation. We are expediting resolution of this issue with our NSSS vendor, architect engineer, and purge valve manu-facturer.

Rather than fragment our efforts by providing a separate response to each of the referenced letters, we would prefer to respond with a single report in December. Consequently, we have scheduled December .13, 1979 as the due date for submittal of' combined response to References (1) through (3).

Please call if you have additional questions on this subject.

Very truly yours, Robert E. Uhrig Vice President Advanced Systems 8 Technology REU/MAS/cph cc: Mr. J. P. O'Reilly, Region II PoZN Harold Reis, Esquire g/o vozsoro PEOPLE...

/~'.~

SERVING PEOPLE