ML18012A813: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
| Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:CATEGORY 1 REGULAT INFORMATION DISTRIBUTION"TEM (RIDS,)-'k--.:>>>>>>FACIL:50-400 Shearon | {{#Wiki_filter:CATEGORY 1 REGULAT INFORMATION DISTRIBUTION "TEM (RIDS,) | ||
Carolina Power&Light Co.RECIP.NAME RECIPIENT AFFILIATION | -'k --.: >> >>>>Harris Nuclear FACIL:50-400 Shearon Power Plant, Unit 1, Carolina DOCKET 05000400 I | ||
AUTH. NAME AUTHOR AFFILIATION ROGERSIS. Carolina Power & Light Co. | |||
CLARK,B.H. Carolina Power & Light Co. | |||
RECIP.NAME RECIPIENT AFFILIATION | |||
==SUBJECT:== | ==SUBJECT:== | ||
Monthl Unit.W/970616 ltr.DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR i ENCL TITLE: Monthly Operating Report (per Tech Specs)05000400 RECIPIENT ID CODE/NAME PD2-1 PD | Monthl t for May 1997 for Shearon Harris Unit .W/970616 ltr. | ||
PLEASE HELP US TO REDUCE'WASTE! | DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR i ENCL SIZE: | ||
CONTACT THE DOCUMENT CONTROL DESK4 ROOM OWFN SD-5(EXT.415-2083)TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!TOTAL NUMBER OF COPIES REQUIRED: LTTR 11 ENCL 11 1 0 P~I Carolina Power&Light Company Harris Nuclear Plant PO Box 165 New Hill NC 27562 AN I t6 sy7 United States Nuclear Regulatory Commission ATTENTION: | TITLE: Monthly Operating Report (per Tech Specs) | ||
Document Control Desk Washington, DC 20555 | NOTES:Application for permit renewal filed. 05000400 RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-1 PD 1 1 ROONEY,V 1 1 INTERNAL: ACRS 1 1 AEOD/SPD/RRAB 1 1 CENTER 1 1 NRR/DRPM/PECB 1 1 | ||
~BB~PAB 1 1 RGN2 1. 1 EXTERNAL: LITCO BRYCETJ H 1 1 NOAC 1 1 NRC PDR 1 1 NOTE TO ALL "RZDS" RECIPIENTS: | |||
PLEASE HELP US TO REDUCE'WASTE! CONTACT THE DOCUMENT CONTROL DESK4 ROOM OWFN SD-5(EXT. 415-2083) TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED! | |||
TOTAL NUMBER OF COPIES REQUIRED: LTTR 11 ENCL 11 | |||
1 0 P ~ | |||
I | |||
Carolina Power & Light Company Harris Nuclear Plant PO Box 165 New Hill NC 27562 AN I t6 sy7 United States Nuclear Regulatory Commission Serial: HNP-97-126 ATTENTION: Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO. 50-400/LICENSE NO. NPF-63 MONTHLYOPERATING, REPORT | |||
==Dear Sir or Madam:== | ==Dear Sir or Madam:== | ||
In accordance with Carolina Power&Light Company's Harris Nuclear Plant Technical Specification 6.9.1.5, the report of operating statistics and shutdown experience for the month of May 1997 is provided..Sincerely, B.H.Clark Plant General Manager Harris Plant MV Enclosure c: Mr.J.B.Brady-NRC Senior Resident Inspector Mr.L.A.Reyes-NRC Regional Administrator Mr.V.Rooney-NRC Project Manager 9706240094 97053i PDR ADQCK;,,'05000400 | |||
~-5'I Enclosure to Serial HNP-97-126 Sheet 1 of 3 CPSL CO.RUN DATE 06/03/97 RUN TXME 07:44:43 | In accordance with Carolina Power & Light Company's Harris Nuclear Plant Technical Specification 6.9.1.5, the report of operating statistics and shutdown experience for the month of May 1997 is provided. | ||
FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 1.16 | . | ||
~0 A 4 | Sincerely, B. H. Clark Plant General Manager Harris Plant MV Enclosure c: Mr. J. B. Brady - NRC Senior Resident Inspector Mr. L. A. Reyes - NRC Regional Administrator Mr. V. Rooney - NRC Project Manager R ''' | ||
9706240094 97053i PDR ADQCK;,,'05000400 PDR State Road 1134 New Hill NC | |||
(919)362-2573 REPORT MONTH | |||
~ -5 | |||
'I | |||
Enclosure to Serial HNP-97-126 Sheet 1 of 3 CPSL CO. PLANT PERFORMANCE DATA SYSTEM PAGE 1 RUN DATE 06/03/97 OPERATING DATA REPORT RPD36-000 RUN TXME 07:44:43 HARRIS UNIT 1 DOCKET NO. 050-400 COMPLETED BY SHEILA ROGERS OPERATXNG STATUS TELEPHONE (919) 362-2573 | |||
: 1. UNIT NAME: HARRIS UNIT 1 NOTES | |||
: 2. REPORTING PERZOD: MAY 97 | |||
: 3. LICENSED THERMAL POWER (MWT): 2775 | |||
: 4. NAMEPLATE RATING (GROSS MWE): 950.9 | |||
: 5. DESIGN ELECTRICAL RATING (NET MWE): 900.0 | |||
: 6. MAX DEPENDABLE CAPACITY (GROSS MWE): 920.0 l | |||
: 7. MAX DEPENDABLE CAPACITY (NET MWE): 860.0 | |||
: 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS: | |||
: 9. POWER LEVEL TO WHXCH RESTRICTED XF ANY (NET MWE): | |||
: 10. REASONS FOR RESTRICTION IF ANY: | |||
THIS YR TO CUMUL MONTH DATE ATIVE 11: HOURS IN REPORTING PERIOD 744.00 3623.00 88392.00 | |||
: 12. NUMBER OF HOURS REACTOR CRITICAL .00 2223.79 73489.90 | |||
: 13. REACTOR RESERVE SHUTDOWN HRS .00 .00 .00 | |||
: 14. HOURS GENERATOR ON LXNE .00 2210.13 72767.79 | |||
: 15. UNIT RESERVE SHUTDOWN HOURS .00 .00 .00 | |||
, 16. GROSS THERMAL ENERGY GEN. (MWH) .00 6099787.44 1 94984120.70 | |||
: 17. GROSS ELEC. ENERGY GEN (MWH) .00 2050566.00 64917818.00 | |||
: 18. NET ELEC. ENERGY GENERATED (MWH) -8467.00 1911320.00 60536059.00 | |||
: 19. UNIT SERVICE FACTOR .00 61.00 82.32 | |||
: 20. UNIT AVAILABlLITYFACTOR .00 61.00 82.32 | |||
: 21. UNIT CAP. FACTOR (USING MDC NET) -1.32 61.34 79.63 | |||
: 22. UNIT CAP. FACTOR (USING DER NET) -1.26 58.62 76.10 | |||
: 23. UNIT FORCED OUTAGE RATE .00 2.14 3.29 | |||
: 24. SHUTDOWNS SCHED. OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH): | |||
Unit remains shutdown for Refueling Outage 7. | |||
: 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP: June 7, 1997 | |||
: 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 1.16 9 | |||
~ 0 A | |||
k 4 | |||
Enclosure to Serial: HNP-97-126 Sheet2of3 CP&L CO. PLANT PERFORMANCE DATA SYSTEM PAGE 1 RUN DATE 06/03/97 APPENDIX B AVERAGE DAILY POWER LEVEL RPD39-000 RUN TIME 07:44:42 HARRIS UNIT 1 DOCKET NO. 050-400 COMPLETED BY SHEILA ROGERS TELEPHONE (919)362-2573 1997 DAY AVG. DAILY POWER LEVEL DAY AVG. DAILY POWER LEVEL (MWE-NET) (MWE"NET) 17 -12 18 -12 19 -10 20 21 22 | |||
-10 23 -10 | |||
-10 | |||
-10 25 "15 10 26 -15 27 12 28 -13 13 -10 29 30 -26 15 -10 31 | |||
-12 | |||
Enclosure to Serial: HNP-97-126 . | |||
3of3 'heet UNIT Sl IUTDO'tVNS AND POPOVER REDUCTION is'NIT NAME: Harris DATE: 03/05/97 COMPLETED BY: S. G. Rogers TELEPHONE: (919) 362-2573 REPORT MONTH CAUSE AND CORRECTIVE METHOD OF LICENSEE ACTION TO DURATION SHUTTING DOWN EVENT SYSTEM COMPONENT PREVENT RECURRENCE NUMBER DATE TYPE I (HOURS) REASON 2 REACTOR 3 REPORT g CODE 4 CODES 97404 970501 744.0 N/A Plant remains oNine for Refueling Outage 7. | |||
I 2 3 4 F: Forced Reason: Method: Exhibit G-Instructions S: Scheduled A-Equipment Failure (Explain) I-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee Event C-Refueling 3-Automatic Scram Report (LER) File D-Regulatory Restriction 4 continued (NUREG-0161) | |||
E-Operator Training 8: License Examination 5-Reduced Load F-Administrative 6-Other 5 G4)perational Error (Explain) Exhibit I - Same Source Hither (Explain)}} | |||
Revision as of 04:51, 22 October 2019
| ML18012A813 | |
| Person / Time | |
|---|---|
| Site: | Harris |
| Issue date: | 05/31/1997 |
| From: | Brooke Clark, Shannon Rogers CAROLINA POWER & LIGHT CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| HPN-97-126, NUDOCS 9706240094 | |
| Download: ML18012A813 (8) | |
Text
CATEGORY 1 REGULAT INFORMATION DISTRIBUTION "TEM (RIDS,)
-'k --.: >> >>>>Harris Nuclear FACIL:50-400 Shearon Power Plant, Unit 1, Carolina DOCKET 05000400 I
AUTH. NAME AUTHOR AFFILIATION ROGERSIS. Carolina Power & Light Co.
CLARK,B.H. Carolina Power & Light Co.
RECIP.NAME RECIPIENT AFFILIATION
SUBJECT:
Monthl t for May 1997 for Shearon Harris Unit .W/970616 ltr.
DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR i ENCL SIZE:
TITLE: Monthly Operating Report (per Tech Specs)
NOTES:Application for permit renewal filed. 05000400 RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-1 PD 1 1 ROONEY,V 1 1 INTERNAL: ACRS 1 1 AEOD/SPD/RRAB 1 1 CENTER 1 1 NRR/DRPM/PECB 1 1
~BB~PAB 1 1 RGN2 1. 1 EXTERNAL: LITCO BRYCETJ H 1 1 NOAC 1 1 NRC PDR 1 1 NOTE TO ALL "RZDS" RECIPIENTS:
PLEASE HELP US TO REDUCE'WASTE! CONTACT THE DOCUMENT CONTROL DESK4 ROOM OWFN SD-5(EXT. 415-2083) TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED: LTTR 11 ENCL 11
1 0 P ~
I
Carolina Power & Light Company Harris Nuclear Plant PO Box 165 New Hill NC 27562 AN I t6 sy7 United States Nuclear Regulatory Commission Serial: HNP-97-126 ATTENTION: Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO. 50-400/LICENSE NO. NPF-63 MONTHLYOPERATING, REPORT
Dear Sir or Madam:
In accordance with Carolina Power & Light Company's Harris Nuclear Plant Technical Specification 6.9.1.5, the report of operating statistics and shutdown experience for the month of May 1997 is provided.
.
Sincerely, B. H. Clark Plant General Manager Harris Plant MV Enclosure c: Mr. J. B. Brady - NRC Senior Resident Inspector Mr. L. A. Reyes - NRC Regional Administrator Mr. V. Rooney - NRC Project Manager R
9706240094 97053i PDR ADQCK;,,'05000400 PDR State Road 1134 New Hill NC
~ -5
'I
Enclosure to Serial HNP-97-126 Sheet 1 of 3 CPSL CO. PLANT PERFORMANCE DATA SYSTEM PAGE 1 RUN DATE 06/03/97 OPERATING DATA REPORT RPD36-000 RUN TXME 07:44:43 HARRIS UNIT 1 DOCKET NO. 050-400 COMPLETED BY SHEILA ROGERS OPERATXNG STATUS TELEPHONE (919) 362-2573
- 1. UNIT NAME: HARRIS UNIT 1 NOTES
- 2. REPORTING PERZOD: MAY 97
- 3. LICENSED THERMAL POWER (MWT): 2775
- 4. NAMEPLATE RATING (GROSS MWE): 950.9
- 5. DESIGN ELECTRICAL RATING (NET MWE): 900.0
- 6. MAX DEPENDABLE CAPACITY (GROSS MWE): 920.0 l
- 7. MAX DEPENDABLE CAPACITY (NET MWE): 860.0
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS:
- 9. POWER LEVEL TO WHXCH RESTRICTED XF ANY (NET MWE):
- 10. REASONS FOR RESTRICTION IF ANY:
THIS YR TO CUMUL MONTH DATE ATIVE 11: HOURS IN REPORTING PERIOD 744.00 3623.00 88392.00
- 12. NUMBER OF HOURS REACTOR CRITICAL .00 2223.79 73489.90
- 13. REACTOR RESERVE SHUTDOWN HRS .00 .00 .00
- 14. HOURS GENERATOR ON LXNE .00 2210.13 72767.79
- 15. UNIT RESERVE SHUTDOWN HOURS .00 .00 .00
, 16. GROSS THERMAL ENERGY GEN. (MWH) .00 6099787.44 1 94984120.70
- 17. GROSS ELEC. ENERGY GEN (MWH) .00 2050566.00 64917818.00
- 18. NET ELEC. ENERGY GENERATED (MWH) -8467.00 1911320.00 60536059.00
- 19. UNIT SERVICE FACTOR .00 61.00 82.32
- 20. UNIT AVAILABlLITYFACTOR .00 61.00 82.32
- 22. UNIT CAP. FACTOR (USING DER NET) -1.26 58.62 76.10
- 23. UNIT FORCED OUTAGE RATE .00 2.14 3.29
- 24. SHUTDOWNS SCHED. OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
Unit remains shutdown for Refueling Outage 7.
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP: June 7, 1997
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 1.16 9
~ 0 A
k 4
Enclosure to Serial: HNP-97-126 Sheet2of3 CP&L CO. PLANT PERFORMANCE DATA SYSTEM PAGE 1 RUN DATE 06/03/97 APPENDIX B AVERAGE DAILY POWER LEVEL RPD39-000 RUN TIME 07:44:42 HARRIS UNIT 1 DOCKET NO. 050-400 COMPLETED BY SHEILA ROGERS TELEPHONE (919)362-2573 1997 DAY AVG. DAILY POWER LEVEL DAY AVG. DAILY POWER LEVEL (MWE-NET) (MWE"NET) 17 -12 18 -12 19 -10 20 21 22
-10 23 -10
-10
-10 25 "15 10 26 -15 27 12 28 -13 13 -10 29 30 -26 15 -10 31
-12
Enclosure to Serial: HNP-97-126 .
3of3 'heet UNIT Sl IUTDO'tVNS AND POPOVER REDUCTION is'NIT NAME: Harris DATE: 03/05/97 COMPLETED BY: S. G. Rogers TELEPHONE: (919) 362-2573 REPORT MONTH CAUSE AND CORRECTIVE METHOD OF LICENSEE ACTION TO DURATION SHUTTING DOWN EVENT SYSTEM COMPONENT PREVENT RECURRENCE NUMBER DATE TYPE I (HOURS) REASON 2 REACTOR 3 REPORT g CODE 4 CODES 97404 970501 744.0 N/A Plant remains oNine for Refueling Outage 7.
I 2 3 4 F: Forced Reason: Method: Exhibit G-Instructions S: Scheduled A-Equipment Failure (Explain) I-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee Event C-Refueling 3-Automatic Scram Report (LER) File D-Regulatory Restriction 4 continued (NUREG-0161)
E-Operator Training 8: License Examination 5-Reduced Load F-Administrative 6-Other 5 G4)perational Error (Explain) Exhibit I - Same Source Hither (Explain)