{{#Wiki_filter:CATEGORY 1 REGULAT INFORMATION DISTRIBUTION"TEM (RIDS,)-'k--.:>>>>>>FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina AUTH.NAME AUTHOR AFFILIATION ROGERSIS.Carolina Power&Light Co.CLARK,B.H.
{{#Wiki_filter:CATEGORY 1 REGULAT     INFORMATION DISTRIBUTION           "TEM (RIDS,)
Carolina Power&Light Co.RECIP.NAME RECIPIENT AFFILIATION DOCKET I 05000400 t for May 1997 for Shearon Harris SIZE: NOTES:Application for permit renewal filed.
-'k --.: >> >>>>Harris Nuclear FACIL:50-400 Shearon                         Power   Plant, Unit 1, Carolina DOCKET 05000400 I
AUTH. NAME         AUTHOR   AFFILIATION ROGERSIS.           Carolina Power     &   Light Co.
CLARK,B.H.         Carolina Power     &   Light Co.
RECIP.NAME         RECIPIENT AFFILIATION


==SUBJECT:==
==SUBJECT:==
Monthl Unit.W/970616 ltr.DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR i ENCL TITLE: Monthly Operating Report (per Tech Specs)05000400 RECIPIENT ID CODE/NAME PD2-1 PD INTERNAL: ACRS CENTER~BB~PAB EXTERNAL: LITCO BRYCETJ H NRC PDR COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME ROONEY,V AEOD/SPD/RRAB NRR/DRPM/PECB RGN2 NOAC COPIES LTTR ENCL 1 1 1 1 1 1 1.1 1 1 NOTE TO ALL"RZDS" RECIPIENTS:
Monthl                   t for  May 1997    for Shearon  Harris Unit   .W/970616   ltr.
PLEASE HELP US TO REDUCE'WASTE!
DISTRIBUTION CODE: IE24D       COPIES RECEIVED:LTR         i ENCL       SIZE:
CONTACT THE DOCUMENT CONTROL DESK4 ROOM OWFN SD-5(EXT.415-2083)TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!TOTAL NUMBER OF COPIES REQUIRED: LTTR 11 ENCL 11 1 0 P~I Carolina Power&Light Company Harris Nuclear Plant PO Box 165 New Hill NC 27562 AN I t6 sy7 United States Nuclear Regulatory Commission ATTENTION:
TITLE: Monthly Operating Report (per Tech Specs)
Document Control Desk Washington, DC 20555 Serial: HNP-97-126 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO.50-400/LICENSE NO.NPF-63 MONTHLY OPERATING, REPORT  
NOTES:Application for permit renewal          filed.                              05000400 RECIPIENT           COPIES              RECIPIENT          COPIES ID CODE/NAME         LTTR ENCL          ID CODE/NAME        LTTR ENCL PD2-1 PD                 1     1       ROONEY,V                1     1 INTERNAL: ACRS                      1     1       AEOD/SPD/RRAB           1      1 CENTER            1    1      NRR/DRPM/PECB           1     1
            ~BB~PAB                1     1       RGN2                    1. 1 EXTERNAL: LITCO BRYCETJ    H        1     1      NOAC                    1    1 NRC PDR                  1     1 NOTE TO ALL "RZDS" RECIPIENTS:
PLEASE HELP US TO REDUCE'WASTE! CONTACT THE DOCUMENT CONTROL DESK4 ROOM OWFN SD-5(EXT. 415-2083) TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED: LTTR             11   ENCL   11
 
1 0   P ~
I
 
Carolina Power & Light Company Harris Nuclear Plant PO Box 165 New Hill NC 27562 AN     I t6 sy7 United States Nuclear Regulatory Commission                                   Serial: HNP-97-126 ATTENTION: Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO. 50-400/LICENSE NO. NPF-63 MONTHLYOPERATING, REPORT


==Dear Sir or Madam:==
==Dear Sir or Madam:==
In accordance with Carolina Power&Light Company's Harris Nuclear Plant Technical Specification 6.9.1.5, the report of operating statistics and shutdown experience for the month of May 1997 is provided..Sincerely, B.H.Clark Plant General Manager Harris Plant MV Enclosure c: Mr.J.B.Brady-NRC Senior Resident Inspector Mr.L.A.Reyes-NRC Regional Administrator Mr.V.Rooney-NRC Project Manager 9706240094 97053i PDR ADQCK;,,'05000400 R'''PDR State Road 1134 New Hill NC  
 
~-5'I Enclosure to Serial HNP-97-126 Sheet 1 of 3 CPSL CO.RUN DATE 06/03/97 RUN TXME 07:44:43 PLANT PERFORMANCE DATA SYSTEM OPERATING DATA REPORT HARRIS UNIT 1 PAGE 1 RPD36-000 OPERATXNG STATUS DOCKET NO.050-400 COMPLETED BY SHEILA ROGERS TELEPHONE (919)362-2573 NOTES 1.UNIT NAME: HARRIS UNIT 1 2.REPORTING PERZOD: MAY 97 3.LICENSED THERMAL POWER (MWT): 2775 4.NAMEPLATE RATING (GROSS MWE): 950.9 5.DESIGN ELECTRICAL RATING (NET MWE): 900.0 6.MAX DEPENDABLE CAPACITY (GROSS MWE): 920.0 l 7.MAX DEPENDABLE CAPACITY (NET MWE): 860.0 8.IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7)SINCE LAST REPORT, GIVE REASONS: 9.POWER LEVEL TO WHXCH RESTRICTED XF ANY (NET MWE): 10.REASONS FOR RESTRICTION IF ANY: THIS MONTH YR TO DATE CUMUL ATIVE 11: HOURS IN REPORTING PERIOD 12.NUMBER OF HOURS REACTOR CRITICAL 13.REACTOR RESERVE SHUTDOWN HRS 14.HOURS GENERATOR ON LXNE 15.UNIT RESERVE SHUTDOWN HOURS , 16.GROSS THERMAL ENERGY GEN.(MWH)17.GROSS ELEC.ENERGY GEN (MWH)18.NET ELEC.ENERGY GENERATED (MWH)19.UNIT SERVICE FACTOR 20.UNIT AVAILABlLITY FACTOR 21.UNIT CAP.FACTOR (USING MDC NET)22.UNIT CAP.FACTOR (USING DER NET)23.UNIT FORCED OUTAGE RATE 24.SHUTDOWNS SCHED.OVER NEXT 6 MONTHS 744.00.00.00.00.00.00.00-8467.00.00.00-1.32-1.26.00 (TYPE, DATE, 3623.00 2223.79.00 2210.13.00 6099787.44 1 2050566.00 1911320.00 61.00 61.00 61.34 58.62 2.14 AND DURATION OF EACH): 88392.00 73489.90.00 72767.79.00 94984120.70 64917818.00 60536059.00 82.32 82.32 79.63 76.10 3.29 Unit remains shutdown for Refueling Outage 7.25.IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP: June 7, 1997 26.UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
In accordance with Carolina Power & Light Company's Harris Nuclear Plant Technical Specification 6.9.1.5, the report of operating statistics and shutdown experience for the month of May 1997 is provided.
FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 1.16-9  
                                                    .
~0 A 4 k Enclosure to Serial: HNP-97-126 Sheet2of3 CP&L CO.PLANT PERFORMANCE DATA SYSTEM RUN DATE 06/03/97 APPENDIX B-AVERAGE DAILY POWER LEVEL RUN TIME 07:44:42 HARRIS UNIT 1 PAGE 1 RPD39-000 1997 DAY AVG.DAILY POWER LEVEL (MWE-NET)DOCKET NO.050-400 COMPLETED BY SHEILA ROGERS TELEPHONE (919)362-2573 DAY AVG.DAILY POWER LEVEL (MWE"NET)10 12 13 15-10-10-10-10-12 17 18 19 20 21 22 23 25 26 27 28 29 30 31-12-12-10-10-10"15-15-13-26 Enclosure to Serial: HNP-97-126
Sincerely, B. H. Clark Plant General Manager Harris Plant MV Enclosure c:       Mr. J. B. Brady - NRC Senior Resident Inspector Mr. L. A. Reyes - NRC Regional Administrator Mr. V. Rooney - NRC Project Manager R            '''
.'heet 3of3 is'NIT NAME: Harris DATE: 03/05/97 COMPLETED BY: S.G.Rogers TELEPHONE:
9706240094 97053i PDR     ADQCK;,,'05000400 PDR State Road 1134   New Hill NC
(919)362-2573 REPORT MONTH UNIT Sl IUTDO'tVNS AND POPOVER REDUCTION NUMBER DATE TYPE I DURATION (HOURS)REASON 2 METHOD OF SHUTTING DOWN REACTOR 3 LICENSEE EVENT REPORT g SYSTEM CODE 4 COMPONENT CODES CAUSE AND CORRECTIVE ACTION TO PREVENT RECURRENCE 97404 970501 744.0 N/A Plant remains oNine for Refueling Outage 7.I F: Forced S: Scheduled 2 Reason: A-Equipment Failure (Explain)B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training 8: License Examination F-Administrative G4)perational Error (Explain)Hither (Explain)3 Method: I-Manual 2-Manual Scram 3-Automatic Scram 4 continued 5-Reduced Load 6-Other 4 Exhibit G-Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER)File (NUREG-0161) 5 Exhibit I-Same Source}}
 
  ~ -5
'I
 
Enclosure to Serial HNP-97-126 Sheet 1 of 3 CPSL CO.                   PLANT PERFORMANCE DATA SYSTEM                PAGE        1 RUN DATE 06/03/97               OPERATING DATA REPORT                    RPD36-000 RUN TXME 07:44:43                 HARRIS UNIT 1 DOCKET NO. 050-400 COMPLETED BY SHEILA ROGERS OPERATXNG STATUS                                      TELEPHONE (919) 362-2573
: 1. UNIT NAME: HARRIS UNIT 1                       NOTES
: 2. REPORTING PERZOD: MAY         97
: 3. LICENSED THERMAL POWER (MWT): 2775
: 4. NAMEPLATE RATING (GROSS MWE): 950.9
: 5. DESIGN ELECTRICAL RATING (NET MWE): 900.0
: 6. MAX DEPENDABLE CAPACITY (GROSS MWE): 920.0 l
: 7. MAX DEPENDABLE CAPACITY (NET MWE):     860.0
: 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST       REPORT, GIVE REASONS:
: 9. POWER LEVEL TO WHXCH RESTRICTED XF ANY (NET MWE):
: 10. REASONS FOR RESTRICTION IF ANY:
THIS             YR TO                   CUMUL MONTH              DATE                   ATIVE 11: HOURS IN REPORTING PERIOD                   744.00          3623.00                88392.00
: 12. NUMBER OF HOURS REACTOR CRITICAL                 .00          2223.79                73489.90
: 13. REACTOR RESERVE SHUTDOWN HRS                     .00                .00                    .00
: 14. HOURS GENERATOR ON LXNE                         .00          2210.13                72767.79
: 15. UNIT RESERVE SHUTDOWN HOURS                     .00                .00                    .00
, 16. GROSS THERMAL ENERGY GEN. (MWH)                 .00      6099787.44          1 94984120.70
: 17. GROSS ELEC. ENERGY GEN (MWH)                     .00      2050566.00            64917818.00
: 18. NET ELEC. ENERGY GENERATED (MWH)         -8467.00        1911320.00            60536059.00
: 19. UNIT SERVICE FACTOR                             .00            61.00                    82.32
: 20. UNIT AVAILABlLITYFACTOR                          .00            61.00                    82.32
: 21. UNIT CAP. FACTOR (USING MDC NET)             -1.32            61.34                    79.63
: 22. UNIT CAP. FACTOR (USING DER NET)             -1.26            58.62                    76.10
: 23. UNIT FORCED OUTAGE RATE                         .00              2.14                    3.29
: 24. SHUTDOWNS SCHED. OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
Unit remains shutdown for Refueling Outage 7.
: 25. IF SHUTDOWN AT END OF REPORT   PERIOD, ESTIMATED DATE OF START UP: June 7, 1997
: 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORECAST       ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 1.16   9
 
    ~ 0 A
k 4
 
Enclosure to Serial: HNP-97-126 Sheet2of3 CP&L CO.                   PLANT PERFORMANCE DATA SYSTEM                 PAGE      1 RUN DATE 06/03/97     APPENDIX B AVERAGE DAILY POWER LEVEL           RPD39-000 RUN TIME 07:44:42                 HARRIS UNIT 1 DOCKET NO. 050-400 COMPLETED BY SHEILA ROGERS TELEPHONE (919)362-2573 1997 DAY  AVG. DAILY POWER LEVEL            DAY   AVG. DAILY POWER LEVEL (MWE-NET)                                (MWE"NET) 17                -12 18                -12 19                -10 20 21 22
                  -10                    23                 -10
                                                            -10
                  -10                   25                "15 10                                        26                -15 27 12                                        28                -13 13                -10                    29 30                -26 15                -10                    31
                  -12
 
Enclosure to Serial: HNP-97-126 .
3of3          'heet UNIT Sl IUTDO'tVNS AND POPOVER REDUCTION                                                          is'NIT NAME:     Harris DATE:         03/05/97 COMPLETED BY: S. G. Rogers TELEPHONE:     (919) 362-2573 REPORT MONTH CAUSE AND CORRECTIVE METHOD OF        LICENSEE                                      ACTION TO DURATION                      SHUTTING DOWN        EVENT        SYSTEM    COMPONENT      PREVENT RECURRENCE NUMBER       DATE         TYPE   I       (HOURS)         REASON 2       REACTOR 3         REPORT g       CODE 4     CODES 97404       970501                         744.0                                             N/A                               Plant remains oNine     for Refueling Outage 7.
I                           2                                                              3                              4 F: Forced                     Reason:                                                        Method:                        Exhibit G-Instructions S: Scheduled                 A-Equipment Failure (Explain)                                   I-Manual                        for Preparation of Data B-Maintenance or Test                                           2-Manual Scram                  Entry Sheets for Licensee Event C-Refueling                                                     3-Automatic Scram              Report (LER) File D-Regulatory Restriction                                       4 continued                    (NUREG-0161)
E-Operator Training 8: License Examination                     5-Reduced Load F-Administrative                                               6-Other                        5 G4)perational Error (Explain)                                                                   Exhibit I - Same Source Hither (Explain)}}

Revision as of 04:51, 22 October 2019

Monthly Operating Rept for May 1997 for Shearon Harris NPP, Unit 1.W/970616 Ltr
ML18012A813
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 05/31/1997
From: Brooke Clark, Shannon Rogers
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
HPN-97-126, NUDOCS 9706240094
Download: ML18012A813 (8)


Text

CATEGORY 1 REGULAT INFORMATION DISTRIBUTION "TEM (RIDS,)

-'k --.: >> >>>>Harris Nuclear FACIL:50-400 Shearon Power Plant, Unit 1, Carolina DOCKET 05000400 I

AUTH. NAME AUTHOR AFFILIATION ROGERSIS. Carolina Power & Light Co.

CLARK,B.H. Carolina Power & Light Co.

RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthl t for May 1997 for Shearon Harris Unit .W/970616 ltr.

DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR i ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:Application for permit renewal filed. 05000400 RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-1 PD 1 1 ROONEY,V 1 1 INTERNAL: ACRS 1 1 AEOD/SPD/RRAB 1 1 CENTER 1 1 NRR/DRPM/PECB 1 1

~BB~PAB 1 1 RGN2 1. 1 EXTERNAL: LITCO BRYCETJ H 1 1 NOAC 1 1 NRC PDR 1 1 NOTE TO ALL "RZDS" RECIPIENTS:

PLEASE HELP US TO REDUCE'WASTE! CONTACT THE DOCUMENT CONTROL DESK4 ROOM OWFN SD-5(EXT. 415-2083) TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 11 ENCL 11

1 0 P ~

I

Carolina Power & Light Company Harris Nuclear Plant PO Box 165 New Hill NC 27562 AN I t6 sy7 United States Nuclear Regulatory Commission Serial: HNP-97-126 ATTENTION: Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO. 50-400/LICENSE NO. NPF-63 MONTHLYOPERATING, REPORT

Dear Sir or Madam:

In accordance with Carolina Power & Light Company's Harris Nuclear Plant Technical Specification 6.9.1.5, the report of operating statistics and shutdown experience for the month of May 1997 is provided.

.

Sincerely, B. H. Clark Plant General Manager Harris Plant MV Enclosure c: Mr. J. B. Brady - NRC Senior Resident Inspector Mr. L. A. Reyes - NRC Regional Administrator Mr. V. Rooney - NRC Project Manager R

9706240094 97053i PDR ADQCK;,,'05000400 PDR State Road 1134 New Hill NC

~ -5

'I

Enclosure to Serial HNP-97-126 Sheet 1 of 3 CPSL CO. PLANT PERFORMANCE DATA SYSTEM PAGE 1 RUN DATE 06/03/97 OPERATING DATA REPORT RPD36-000 RUN TXME 07:44:43 HARRIS UNIT 1 DOCKET NO. 050-400 COMPLETED BY SHEILA ROGERS OPERATXNG STATUS TELEPHONE (919) 362-2573

1. UNIT NAME: HARRIS UNIT 1 NOTES
2. REPORTING PERZOD: MAY 97
3. LICENSED THERMAL POWER (MWT): 2775
4. NAMEPLATE RATING (GROSS MWE): 950.9
5. DESIGN ELECTRICAL RATING (NET MWE): 900.0
6. MAX DEPENDABLE CAPACITY (GROSS MWE): 920.0 l
7. MAX DEPENDABLE CAPACITY (NET MWE): 860.0
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS:
9. POWER LEVEL TO WHXCH RESTRICTED XF ANY (NET MWE):
10. REASONS FOR RESTRICTION IF ANY:

THIS YR TO CUMUL MONTH DATE ATIVE 11: HOURS IN REPORTING PERIOD 744.00 3623.00 88392.00

12. NUMBER OF HOURS REACTOR CRITICAL .00 2223.79 73489.90
13. REACTOR RESERVE SHUTDOWN HRS .00 .00 .00
14. HOURS GENERATOR ON LXNE .00 2210.13 72767.79
15. UNIT RESERVE SHUTDOWN HOURS .00 .00 .00

, 16. GROSS THERMAL ENERGY GEN. (MWH) .00 6099787.44 1 94984120.70

17. GROSS ELEC. ENERGY GEN (MWH) .00 2050566.00 64917818.00
18. NET ELEC. ENERGY GENERATED (MWH) -8467.00 1911320.00 60536059.00
19. UNIT SERVICE FACTOR .00 61.00 82.32
20. UNIT AVAILABlLITYFACTOR .00 61.00 82.32
21. UNIT CAP. FACTOR (USING MDC NET) -1.32 61.34 79.63
22. UNIT CAP. FACTOR (USING DER NET) -1.26 58.62 76.10
23. UNIT FORCED OUTAGE RATE .00 2.14 3.29
24. SHUTDOWNS SCHED. OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):

Unit remains shutdown for Refueling Outage 7.

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP: June 7, 1997
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 1.16 9

~ 0 A

k 4

Enclosure to Serial: HNP-97-126 Sheet2of3 CP&L CO. PLANT PERFORMANCE DATA SYSTEM PAGE 1 RUN DATE 06/03/97 APPENDIX B AVERAGE DAILY POWER LEVEL RPD39-000 RUN TIME 07:44:42 HARRIS UNIT 1 DOCKET NO. 050-400 COMPLETED BY SHEILA ROGERS TELEPHONE (919)362-2573 1997 DAY AVG. DAILY POWER LEVEL DAY AVG. DAILY POWER LEVEL (MWE-NET) (MWE"NET) 17 -12 18 -12 19 -10 20 21 22

-10 23 -10

-10

-10 25 "15 10 26 -15 27 12 28 -13 13 -10 29 30 -26 15 -10 31

-12

Enclosure to Serial: HNP-97-126 .

3of3 'heet UNIT Sl IUTDO'tVNS AND POPOVER REDUCTION is'NIT NAME: Harris DATE: 03/05/97 COMPLETED BY: S. G. Rogers TELEPHONE: (919) 362-2573 REPORT MONTH CAUSE AND CORRECTIVE METHOD OF LICENSEE ACTION TO DURATION SHUTTING DOWN EVENT SYSTEM COMPONENT PREVENT RECURRENCE NUMBER DATE TYPE I (HOURS) REASON 2 REACTOR 3 REPORT g CODE 4 CODES 97404 970501 744.0 N/A Plant remains oNine for Refueling Outage 7.

I 2 3 4 F: Forced Reason: Method: Exhibit G-Instructions S: Scheduled A-Equipment Failure (Explain) I-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee Event C-Refueling 3-Automatic Scram Report (LER) File D-Regulatory Restriction 4 continued (NUREG-0161)

E-Operator Training 8: License Examination 5-Reduced Load F-Administrative 6-Other 5 G4)perational Error (Explain) Exhibit I - Same Source Hither (Explain)