ML18044A720: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
| Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:I -* consumers | {{#Wiki_filter:I -* | ||
*Power company General. Offices: 212 West Michigan Avenue, Jackson, Michigan 49201 | consumers | ||
* Area Code 517 788-0550 | *Power company General. Offices: 212 West Michigan Avenue, Jackson, Michigan 49201 | ||
* Area Code 517 788-0550 | |||
As stated in Reference (A), it is intended that the information contained in this report be for the training of reactor plant operators and the revision of our emergency procedures if our review indicates that any revisions .to our procedures would be beneficial. | _______:___~pril l ,___l9_80_____________ _ | ||
It is our intention, unless otherwise informed, to proceed with the use of this l'.'eport in order to meet the schedule requirements listed in Reference (C). David P Hoffman Nuclear Licensing Administrator CC DGEisenhut, USNRC Director JGKeppler, USNRC | Director, Nuclear Reactor Regulation Att Mr Dennis L Ziemann, Chief Operating Reactors Branch No 2 US Nuclear Regulatory Commission Washington, DC. 20555 DOCKET 50-255 - LICENSE DPR PALISADES PLANT - CEN-128, RESPONSE OF COMBUSTION ENGINEERING NUCLEAR STEAM SUPPLY SYSTEM TO TRANSIENTS AND ACCIDENTS Reference (A) transmitted the subject report on behalf of the C-E Owners Group in response to the requirements listed in References (B), (C), and (D) *. The purpose of this letter is to inform the Commission that this r-eport is appli-cable to Consumers Power Company's Palisades Plant and constitutes .our response to the short-term analysis and emergency procedure guidelines requirements of Section 2.1.9(c) of NUREG-0578. | ||
As stated in Reference (A), it is intended that the information contained in this report be us~d for the training of reactor plant operators and the revision of our emergency procedures if our review indicates that any revisions .to our procedures would be beneficial. | |||
It is our intention, unless otherwise informed, to proceed with the use of this l'.'eport in order to meet the schedule requirements listed in Reference (C). | |||
David P Hoffman Nuclear Licensing Administrator CC DGEisenhut, USNRC Director JGKeppler, USNRC | |||
==References:== | ==References:== | ||
(A) C-E Owners Group letter from G E Liebler to D G Eisenhut dated April 1, 1980. (B) NRC letter from Dr D F Ross, Jr dated September 2, 1979. (C) NRC letter from D G Eisenhut "To All Operating Nuclear* Power Plants" dated September 13, 1979. (D) NRC letter from H R Denton "To All Operating Nuclear Power Plants" dated October 30, 1979. p 8004080 2}} | (A) C-E Owners Group letter from G E Liebler to D G Eisenhut dated April 1, 1980. | ||
(B) NRC letter from Dr D F Ross, Jr dated September 2, 1979. | |||
(C) NRC letter from D G Eisenhut "To All Operating Nuclear* | |||
Power Plants" dated September 13, 1979. | |||
(D) NRC letter from H R Denton "To All Operating Nuclear Power Plants" dated October 30, 1979. | |||
p 8004080 2 ~2.}} | |||
Revision as of 20:59, 21 October 2019
| ML18044A720 | |
| Person / Time | |
|---|---|
| Site: | Palisades |
| Issue date: | 04/01/1980 |
| From: | Hoffman D CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.) |
| To: | Ziemann D Office of Nuclear Reactor Regulation |
| References | |
| RTR-NUREG-0578, RTR-NUREG-578 NUDOCS 8004080232 | |
| Download: ML18044A720 (1) | |
Text
I -*
consumers
- Area Code 517 788-0550
_______:___~pril l ,___l9_80_____________ _
Director, Nuclear Reactor Regulation Att Mr Dennis L Ziemann, Chief Operating Reactors Branch No 2 US Nuclear Regulatory Commission Washington, DC. 20555 DOCKET 50-255 - LICENSE DPR PALISADES PLANT - CEN-128, RESPONSE OF COMBUSTION ENGINEERING NUCLEAR STEAM SUPPLY SYSTEM TO TRANSIENTS AND ACCIDENTS Reference (A) transmitted the subject report on behalf of the C-E Owners Group in response to the requirements listed in References (B), (C), and (D) *. The purpose of this letter is to inform the Commission that this r-eport is appli-cable to Consumers Power Company's Palisades Plant and constitutes .our response to the short-term analysis and emergency procedure guidelines requirements of Section 2.1.9(c) of NUREG-0578.
As stated in Reference (A), it is intended that the information contained in this report be us~d for the training of reactor plant operators and the revision of our emergency procedures if our review indicates that any revisions .to our procedures would be beneficial.
It is our intention, unless otherwise informed, to proceed with the use of this l'.'eport in order to meet the schedule requirements listed in Reference (C).
David P Hoffman Nuclear Licensing Administrator CC DGEisenhut, USNRC Director JGKeppler, USNRC
References:
(A) C-E Owners Group letter from G E Liebler to D G Eisenhut dated April 1, 1980.
(B) NRC letter from Dr D F Ross, Jr dated September 2, 1979.
(C) NRC letter from D G Eisenhut "To All Operating Nuclear*
Power Plants" dated September 13, 1979.
(D) NRC letter from H R Denton "To All Operating Nuclear Power Plants" dated October 30, 1979.
p 8004080 2 ~2.