{{#Wiki_filter:Richard M. Eckert Senior Vice President Public Service Electric and Gas Company 80 Park Place Newark, N.J. 07101 201/430-8096 Energy Supply and Engineering September 5, 1980 Mr. Oarrell G. Eisenhut, Director Division of Licensing U.S. Nuclear Regulatory Commission Washington, DC 20555  
{{#Wiki_filter:Richard M. Eckert             Public Service Electric and Gas Company 80 Park Place Newark, N.J. 07101 201/430-8096 Senior Vice President Energy Supply and Engineering                             September 5, 1980 Mr. Oarrell G. Eisenhut, Director Division of Licensing U.S. Nuclear Regulatory Commission Washington, DC 20555


==Dear Mr. Eisenhut:==
==Dear Mr. Eisenhut:==


LOW POWER TEST PROGRAM LICENSED OPERATOR TRAINING SALEM GENERATING STATION UNITS 1 AND 2 DOCKET NOS. 50-272 AND 50-311 A Low Power Test Program No. 2 for the purpose of filling the requirements Generating Station, Unit SRO licensed individuals tion of the following:
LOW POWER TEST PROGRAM LICENSED OPERATOR TRAINING SALEM GENERATING STATION UNITS 1 AND 2 DOCKET NOS. 50-272 AND 50-311 A Low Power Test Program             (LPTP) has been conducted on Salem Unit No. 2 for the purpose of            training licensed operators and ful-filling the requirements            Safety Evaluation Report, Salem Nuclear Generating Station, Unit            2, NUREG-0517 Supplement 4. All RO and SRO licensed individuals            have received training with the excep-tion of the following:
J. Driscoll c. Connor L. Fry J. Starcevich R. Macwatters (LPTP) has been conducted on Salem Unit training licensed operators and Safety Evaluation Report, Salem Nuclear 2, NUREG-0517 Supplement
J. Driscoll                          Chief Engineer - Salem
: 4. All RO and have received training with the excep-Chief Engineer -Salem Station Planning Engineer Station Operating Engineer Shift Supervisor
: c. Connor                            Station Planning Engineer L. Fry                              Station Operating Engineer J. Starcevich                        Shift Supervisor
* Senior Shift Supervisor With the exception of Macwatters, who was on vacation, the four other individuals were not trained due to the unit being taken to Mode 5 on August 29, 1980, due to leakage from a control rod drive mechanism vent. Our present plan is to keep the unit in Mode 5 to perform installation work on fire protection dampers until such time as a full power license is imminent.
* R. Macwatters                        Senior Shift Supervisor With the exception of Macwatters, who was on vacation, the four other individuals were not trained due to the unit being taken to Mode 5 on August 29, 1980, due to leakage from a control rod drive mechanism vent. Our present plan is to keep the unit in Mode 5 to perform installation work on fire protection dampers until such time as a full power license is imminent. We, hereby, commit to perform the LPTP training for these five individuals prior to Unit 2 exceeding 5% rated power.
We, hereby, commit to perform the LPTP training for these five individuals prior to Unit 2 exceeding 5% rated power. If you have any questions concerning this matter, please feel free to contact us. Sincerely, 800911*032..3 v}}
If you have any questions concerning this matter, please feel free to contact us.
Sincerely, 800911*032..3 v}}

Revision as of 14:09, 21 October 2019

Notifies That All Reactor Operators & Senior Reactor Operators Received Low Power Test Program Training.Lists Operators Not Trained Because Unit Taken to Mode 5 Operation on 800805 Due to Control Rod Drive Mechanism Vent Leakage
ML18082B116
Person / Time
Site: Salem  PSEG icon.png
Issue date: 09/05/1980
From: Eckert R
Public Service Enterprise Group
To: Eisenhut D
Office of Nuclear Reactor Regulation
References
NUDOCS 8009110323
Download: ML18082B116 (1)


Text

Richard M. Eckert Public Service Electric and Gas Company 80 Park Place Newark, N.J. 07101 201/430-8096 Senior Vice President Energy Supply and Engineering September 5, 1980 Mr. Oarrell G. Eisenhut, Director Division of Licensing U.S. Nuclear Regulatory Commission Washington, DC 20555

Dear Mr. Eisenhut:

LOW POWER TEST PROGRAM LICENSED OPERATOR TRAINING SALEM GENERATING STATION UNITS 1 AND 2 DOCKET NOS. 50-272 AND 50-311 A Low Power Test Program (LPTP) has been conducted on Salem Unit No. 2 for the purpose of training licensed operators and ful-filling the requirements Safety Evaluation Report, Salem Nuclear Generating Station, Unit 2, NUREG-0517 Supplement 4. All RO and SRO licensed individuals have received training with the excep-tion of the following:

J. Driscoll Chief Engineer - Salem

c. Connor Station Planning Engineer L. Fry Station Operating Engineer J. Starcevich Shift Supervisor
  • R. Macwatters Senior Shift Supervisor With the exception of Macwatters, who was on vacation, the four other individuals were not trained due to the unit being taken to Mode 5 on August 29, 1980, due to leakage from a control rod drive mechanism vent. Our present plan is to keep the unit in Mode 5 to perform installation work on fire protection dampers until such time as a full power license is imminent. We, hereby, commit to perform the LPTP training for these five individuals prior to Unit 2 exceeding 5% rated power.

If you have any questions concerning this matter, please feel free to contact us.

Sincerely, 800911*032..3 v