{{#Wiki_filter:.erick W. Schneider  
{{#Wiki_filter:.erick W. Schneider Vice President Public Service Electric and Gas Company 80 Park Place Newark, N.J. 07101 201/430-7373 Production
Vice President  
* August 19, 1980 Mr. Boyce H. Grier, Director Off ice of Inspection and Enforcement Region 1 U.S. Nuclear Regulatory Commission 631 Park Avenue King of -Prussia, PA , 19406 Attention:
Public Service Electric and Gas Company 80 Park Place Newark, N.J. 07101 201/430-7373  
Mr. Eldon J. Brunner, Chief Reactor Operations and Nuclear Support Branch Gentlemen:
Production  
COMBINED NRC INSPECTION 50-272/80-14 AND 50-311/80-10 SALEM GENERATING STATION, UNITS NOS. l AND 2 We have reviewed the report of your inspection conducted by Dr. L. H. Bettenhausen during the period June 18-20, 1980. Our response to the two items of noncompliance identified in Appendix A of your report is as follows: Item 1, Infraction 10 CFR 55, Appendix A, Requalification Programs for Licensed Operators of Production and Utilization Facilities, states, in part, "3. On-the-job training.
* August 19, 1980 Mr. Boyce H. Grier, Director Off ice of Inspection  
The requalification program shall include on-the-job train;i,ng so that:" "3c. Each licensed operator and senior operator is cognizant of facility design  
and Enforcement  
**. " Contrary to the above, no evidence was found that all licensed operators and senior operators review facility design changes nor is there a system in place to insure these reviews occur.* Reply to Item 1 1. -A formal procedure was being developed to address this area; however, for a while we had to postpone completion of this procedure due to a more pressing priority.
Region 1 U.S. Nuclear Regulatory  
80101000(,/
Commission  
Boyce H. Grier, Dir. 8-19-80 work has resumed on the training procedure.*
631 Park Avenue King of -Prussia, PA , 19406 Attention:  
Design change information will be transmitted to the Training group via an updated computer printout and through distribution of the SORC minutes. The training group will evaluate each design change and issue a written explanation to each licensed operator or conduct formal classroom training as appropriate.
Mr. Eldon J. Brunner, Chief Reactor Operations  
Design change information is presently being transmitted to the licensed operators by issuance of a This action will continue until the procedure is approved and implemented.
and Nuclear Support Branch Gentlemen:  
: 3. The approval and implementation of the training procedure will prevent recurrence of this item. 4. Date for full compliance is September 30, 1980. Item .2 Deficiency Salem Generating Station Training Procedure 10, Revision 2, NRC "Licensed Operator Requalificatl.on Program", paragraph IV quires an individual training folder maintained for each licensed operator and senior operator.
COMBINED NRC INSPECTION  
These folders shall contain, in part, records. of simulator training received.
50-272/80-14  
The 12 October 1979 letter from Mr. H. J. Midura to Mr. Paul Collins of Operator Licensing Branch, NRC, indicated that simulator training would still be required as part of the Unit 1 modified requalification program. Contrary to the above, no record of simulator training, other than reactivity manipulations, was found in the records of either the three licensed operators or the *four senior operators reviewed.
AND 50-311/80-10  
Reply to Item 2 1. The NRC has, in the past, expressed concern as to the method used to evaluate operator response to simulated accidents.
SALEM GENERATING  
In response, PSE&G requested the various simulator tors in other utilities to evaluate our operators ance during simulator training at those utilities.
STATION, UNITS NOS. l AND 2 We have reviewed the report of your inspection  
These instructors have been reluctant to evaluate operators ployed by another utility, unless an acceptance criteria is established.
conducted  
: 2. The training group is developing a formal means of ating operator response on the simulator.
by Dr. L. H. Bettenhausen  
A check list will be utilized to document this evaluation.
during the period June 18-20, 1980. Our response to the two items of noncompliance  
The completed check lists will remain in the individual's training folder. 3. The completion of the Salem simulator will allow more fective evaluation of the performance of our operators.   
identified  
.. Boyce H. Grier, Director 4. The formal*. procedure and check list will be established by October 15, 1980. If you have any further questions with regard to this we will be pleased to discuss them with.you.
in Appendix A of your report is as follows: Item 1, Infraction  
cc Director, Office of Inspection and Enforcement NRC Washington, DC 20555}}
10 CFR 55, Appendix A, Requalification  
Programs for Licensed Operators  
of Production  
and Utilization  
Facilities, states, in part, "3. On-the-job  
training.  
The requalification  
program shall include on-the-job  
train;i,ng  
so that:" "3c. Each licensed operator and senior operator is cognizant  
of facility design  
**. " Contrary to the above, no evidence was found that all licensed operators  
and senior operators  
review facility design changes nor is there a system in place to insure these reviews occur.* Reply to Item 1 1. -A formal procedure  
was being developed  
to address this area; however, for a while we had to postpone completion  
of this procedure  
due to a more pressing priority.  
80101000(,/
Boyce H. Grier, Dir. -2 -8-19-80 work has resumed on the training procedure.*  
Design change information  
will be transmitted  
to the Training group via an updated computer printout and through distribution  
of the SORC minutes. The training group will evaluate each design change and issue a written explanation  
to each licensed operator or conduct formal classroom  
training as appropriate.  
Design change information  
is presently  
being transmitted  
to the licensed operators  
by issuance of a  
This action will continue until the procedure  
is approved and implemented.  
3. The approval and implementation  
of the training procedure  
will prevent recurrence  
of this item. 4. Date for full compliance  
is September  
30, 1980. Item .2 Deficiency  
Salem Generating  
Station Training Procedure  
10, Revision 2, NRC "Licensed  
Operator Requalificatl.on  
Program", paragraph  
IV quires an individual  
training folder maintained  
for each licensed operator and senior operator.  
These folders shall contain, in part, records. of simulator  
training received.  
The 12 October 1979 letter from Mr. H. J. Midura to Mr. Paul Collins of Operator Licensing  
Branch, NRC, indicated  
that simulator  
training would still be required as part of the Unit 1 modified requalification  
program. Contrary to the above, no record of simulator  
training, other than reactivity  
manipulations, was found in the records of either the three licensed operators  
or the *four senior operators  
reviewed.  
Reply to Item 2 1. The NRC has, in the past, expressed  
concern as to the method used to evaluate operator response to simulated  
accidents.  
In response, PSE&G requested  
the various simulator tors in other utilities  
to evaluate our operators ance during simulator  
training at those utilities.  
These instructors  
have been reluctant  
to evaluate operators ployed by another utility, unless an acceptance  
criteria is established.  
2. The training group is developing  
a formal means of ating operator response on the simulator.  
A check list will be utilized to document this evaluation.  
The completed  
check lists will remain in the individual's  
training folder. 3. The completion  
of the Salem simulator  
will allow more fective evaluation  
of the performance  
of our operators.   
.. Boyce H. Grier, Director -3 -4. The formal*. procedure  
and check list will be established  
by October 15, 1980. If you have any further questions  
with regard to this  
we will be pleased to discuss them with.you.  
cc Director, Office of Inspection  
and Enforcement  
NRC Washington, DC 20555
}}

Revision as of 21:08, 31 July 2019

Responds to NRC 800729 Ltr Re Violations Noted in IE Insp Repts 50-272/80-14 & 50-311/80-10.Corrective Actions: Training Group Is Developing Formal Means of Evaluating Operator Response on Simulator
ML18082B310
Person / Time
Site: Salem  PSEG icon.png
Issue date: 08/19/1980
From: Schneider F
Public Service Enterprise Group
To: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML18082B309 List:
References
NUDOCS 8010100061
Download: ML18082B310 (3)


Text

.erick W. Schneider Vice President Public Service Electric and Gas Company 80 Park Place Newark, N.J. 07101 201/430-7373 Production

  • August 19, 1980 Mr. Boyce H. Grier, Director Off ice of Inspection and Enforcement Region 1 U.S. Nuclear Regulatory Commission 631 Park Avenue King of -Prussia, PA , 19406 Attention:

Mr. Eldon J. Brunner, Chief Reactor Operations and Nuclear Support Branch Gentlemen:

COMBINED NRC INSPECTION 50-272/80-14 AND 50-311/80-10 SALEM GENERATING STATION, UNITS NOS. l AND 2 We have reviewed the report of your inspection conducted by Dr. L. H. Bettenhausen during the period June 18-20, 1980. Our response to the two items of noncompliance identified in Appendix A of your report is as follows: Item 1, Infraction 10 CFR 55, Appendix A, Requalification Programs for Licensed Operators of Production and Utilization Facilities, states, in part, "3. On-the-job training.

The requalification program shall include on-the-job train;i,ng so that:" "3c. Each licensed operator and senior operator is cognizant of facility design

    • . " Contrary to the above, no evidence was found that all licensed operators and senior operators review facility design changes nor is there a system in place to insure these reviews occur.* Reply to Item 1 1. -A formal procedure was being developed to address this area; however, for a while we had to postpone completion of this procedure due to a more pressing priority.

80101000(,/

Boyce H. Grier, Dir. 8-19-80 work has resumed on the training procedure.*

Design change information will be transmitted to the Training group via an updated computer printout and through distribution of the SORC minutes. The training group will evaluate each design change and issue a written explanation to each licensed operator or conduct formal classroom training as appropriate.

Design change information is presently being transmitted to the licensed operators by issuance of a This action will continue until the procedure is approved and implemented.

3. The approval and implementation of the training procedure will prevent recurrence of this item. 4. Date for full compliance is September 30, 1980. Item .2 Deficiency Salem Generating Station Training Procedure 10, Revision 2, NRC "Licensed Operator Requalificatl.on Program", paragraph IV quires an individual training folder maintained for each licensed operator and senior operator.

These folders shall contain, in part, records. of simulator training received.

The 12 October 1979 letter from Mr. H. J. Midura to Mr. Paul Collins of Operator Licensing Branch, NRC, indicated that simulator training would still be required as part of the Unit 1 modified requalification program. Contrary to the above, no record of simulator training, other than reactivity manipulations, was found in the records of either the three licensed operators or the *four senior operators reviewed.

Reply to Item 2 1. The NRC has, in the past, expressed concern as to the method used to evaluate operator response to simulated accidents.

In response, PSE&G requested the various simulator tors in other utilities to evaluate our operators ance during simulator training at those utilities.

These instructors have been reluctant to evaluate operators ployed by another utility, unless an acceptance criteria is established.

2. The training group is developing a formal means of ating operator response on the simulator.

A check list will be utilized to document this evaluation.

The completed check lists will remain in the individual's training folder. 3. The completion of the Salem simulator will allow more fective evaluation of the performance of our operators.

.. Boyce H. Grier, Director 4. The formal*. procedure and check list will be established by October 15, 1980. If you have any further questions with regard to this we will be pleased to discuss them with.you.

cc Director, Office of Inspection and Enforcement NRC Washington, DC 20555