{{#Wiki_filter:}} | {{#Wiki_filter:George A. Lippard Vice President, Nuclear Operations 803.345.4810 A SCANA COMPANY July 23, 2018 RC-18-0085 Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555 | ||
==Dear Sir / Madam:== | |||
==Subject:== | |||
VIRGIL C. SUMMER NUCLEAR STATION (VCSNS), UNIT 1 DOCKET NO. 50-395 OPERATING LICENSE NO. NPF-12 NOTIFICATION OF AN INTENDED CHANGE TO A COMMITMENT MADE IN RC-17-0126 | |||
==References:== | |||
: 1. George A. Lippard, VCSNS, letter to U. S. Nuclear Regulatory Commission "Reply to a Notice of Violation" RC-17-0126 dated September 6, 2017 | |||
[ML17249A663] | |||
South Carolina Electric & Gas Company (SCE&G), acting for itself and as an agent for South Carolina Public Service Authority, is providing notification of an intended change to a commitment made in RC-17-0126. Attachment 1 details the Basis for the Commitment Change and Attachment 2 provides the Commitment. | |||
The Reactor Coolant Pump Oil Collection System will be in full compliance with the requirements of NFPA 805 with the completion of Modules E1, M1, M2, M3, M4, and M5 of ECR 50909. | |||
This letter contains no new regulatory commitments. The revised commitment is listed in of this submittal. | |||
If you have any questions about this submittal, please contact Mr. Michael S. Moore, Manager, Nuclear Licensing, at (803) 345-4752. | |||
WHK/GAL/wm V. C. Summer Nuclear Station | |||
* P. 0. Box 88 | |||
* Jenkinsville, South Carolina | |||
* 29065 | |||
* F (803) 941-9776 | |||
* www.sceg.com | |||
Document Control Desk CR-18-01888 RC-18-0085 Page 2 of 2 Attachments: | |||
Attachment 1 - Basis for the Commitment Change Attachment 2 - Commitment c: J. E. Addison K. M. Sutton W. K. Kissam S. A. Williams J. B. Archie NRC Resident Inspector J. H. Hamilton NSRC G. J. Lindamood RTS (CR-18-01888) | |||
W. M. Cherry File (815.01) | |||
C. Haney PRSF (RC-18-0085) | |||
Document Control Desk CR-18-01888 RC-18-0085 Page 1 of 2 VIRGIL C. SUMMER NUCLEAR STATION (VCSNS) Unit 1 DOCKET NO. 50-395 OPERATING LICENSE NO. NPF-12 ATTACHMENT 1 Basis for the Commitment Change | |||
Document Control Desk CR-18-01888 RC-18-0085 Page 2 of 2 | |||
: 1. Notification VCSNS intends to revise the commitment made in RC-17-0126, Attachment II, Commitments, so that it reads "The Reactor Coolant Pump Oil Collection System will be in full compliance with the requirements of NFPA 805 with the implementation of Modules E1, M1, M2, M3, M4, and M5 of ECR 50909." | |||
: 2. Basis for the Change The original commitment incorrectly indicates that the completion of ECR 50909 is required for the Reactor Coolant Pump Oil Collection System to be in full compliance with NFPA 805. Full compliance will be achieved with the implementation of the Modules E1, M1, M2, M3, M4, and M5 of ECR 50909. Module M6, of ECR 50909, is not required to achieve full compliance with NFPA 805. | |||
Module Module Description NFPA 805 Compliance E1 Installation of electrical connectors at Reactor Yes Coolant Pumps A/B/C Oil Lift Pump Enclosures M1 Oil Lift Pump Enclosures (removal of existing Yes enclosures and installation of new enclosures) | |||
M2 Modification to Oil Cooler Drain Line Yes M3 Fill and Drain Line (modification to fabricate new Oil Yes Fill and Drain Pan, remove existing Oil Fill and Drain Pan, and install existing hose connections and clamps to new Oil Fill and Drain Pan) | |||
M4 Upper Level Alarm Enclosure re-work and repair Yes M5 Installation of Exhaust Ductwork Oil Collection Yes M6 Modification of Reactor Building Spray Exhaust No Ductwork to limit RB Spray discharge from entering RCP motors | |||
Document Control Desk CR-18-01888 RC-18-0085 Page 1 of 2 VIRGIL C. SUMMER NUCLEAR STATION (VCSNS) Unit 1 DOCKET NO. 50-395 OPERATING LICENSE NO. NPF-12 ATTACHMENT 2 Commitment | |||
Document Control Desk CR-18-01888 RC-18-0085 Page 2 of 2 The following table identifies the action committed to by SCE&G, VCSNS in Reference 1 of this document as revised by this commitment change notification. Any other statements in this submittal are provided for information purposes and are not considered to be commitments. | |||
Please direct questions regarding these commitments to Mr. Michael S. Moore, Manager, Nuclear Licensing, (803) 345-4752. | |||
Commitment Due Date/Event The Reactor Coolant Pump Oil Collection System will be in full compliance with the requirements of NFPA 805 Close of Breaker ending with the implementation of Modules E1, M1, M2, M3, M4, RF24 and M5 of ECR 50909.}} | |||
Revision as of 19:49, 20 October 2019
| ML18205A631 | |
| Person / Time | |
|---|---|
| Site: | Summer |
| Issue date: | 07/23/2018 |
| From: | Lippard G South Carolina Electric & Gas Co |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| RC-18-0085 | |
| Download: ML18205A631 (6) | |
Text
George A. Lippard Vice President, Nuclear Operations 803.345.4810 A SCANA COMPANY July 23, 2018 RC-18-0085 Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555
Dear Sir / Madam:
Subject:
VIRGIL C. SUMMER NUCLEAR STATION (VCSNS), UNIT 1 DOCKET NO. 50-395 OPERATING LICENSE NO. NPF-12 NOTIFICATION OF AN INTENDED CHANGE TO A COMMITMENT MADE IN RC-17-0126
References:
- 1. George A. Lippard, VCSNS, letter to U. S. Nuclear Regulatory Commission "Reply to a Notice of Violation" RC-17-0126 dated September 6, 2017
[ML17249A663]
South Carolina Electric & Gas Company (SCE&G), acting for itself and as an agent for South Carolina Public Service Authority, is providing notification of an intended change to a commitment made in RC-17-0126. Attachment 1 details the Basis for the Commitment Change and Attachment 2 provides the Commitment.
The Reactor Coolant Pump Oil Collection System will be in full compliance with the requirements of NFPA 805 with the completion of Modules E1, M1, M2, M3, M4, and M5 of ECR 50909.
This letter contains no new regulatory commitments. The revised commitment is listed in of this submittal.
If you have any questions about this submittal, please contact Mr. Michael S. Moore, Manager, Nuclear Licensing, at (803) 345-4752.
WHK/GAL/wm V. C. Summer Nuclear Station
- P. 0. Box 88
- Jenkinsville, South Carolina
- 29065
- F (803) 941-9776
- www.sceg.com
Document Control Desk CR-18-01888 RC-18-0085 Page 2 of 2 Attachments:
Attachment 1 - Basis for the Commitment Change Attachment 2 - Commitment c: J. E. Addison K. M. Sutton W. K. Kissam S. A. Williams J. B. Archie NRC Resident Inspector J. H. Hamilton NSRC G. J. Lindamood RTS (CR-18-01888)
W. M. Cherry File (815.01)
C. Haney PRSF (RC-18-0085)
Document Control Desk CR-18-01888 RC-18-0085 Page 1 of 2 VIRGIL C. SUMMER NUCLEAR STATION (VCSNS) Unit 1 DOCKET NO. 50-395 OPERATING LICENSE NO. NPF-12 ATTACHMENT 1 Basis for the Commitment Change
Document Control Desk CR-18-01888 RC-18-0085 Page 2 of 2
- 1. Notification VCSNS intends to revise the commitment made in RC-17-0126, Attachment II, Commitments, so that it reads "The Reactor Coolant Pump Oil Collection System will be in full compliance with the requirements of NFPA 805 with the implementation of Modules E1, M1, M2, M3, M4, and M5 of ECR 50909."
- 2. Basis for the Change The original commitment incorrectly indicates that the completion of ECR 50909 is required for the Reactor Coolant Pump Oil Collection System to be in full compliance with NFPA 805. Full compliance will be achieved with the implementation of the Modules E1, M1, M2, M3, M4, and M5 of ECR 50909. Module M6, of ECR 50909, is not required to achieve full compliance with NFPA 805.
Module Module Description NFPA 805 Compliance E1 Installation of electrical connectors at Reactor Yes Coolant Pumps A/B/C Oil Lift Pump Enclosures M1 Oil Lift Pump Enclosures (removal of existing Yes enclosures and installation of new enclosures)
M2 Modification to Oil Cooler Drain Line Yes M3 Fill and Drain Line (modification to fabricate new Oil Yes Fill and Drain Pan, remove existing Oil Fill and Drain Pan, and install existing hose connections and clamps to new Oil Fill and Drain Pan)
M4 Upper Level Alarm Enclosure re-work and repair Yes M5 Installation of Exhaust Ductwork Oil Collection Yes M6 Modification of Reactor Building Spray Exhaust No Ductwork to limit RB Spray discharge from entering RCP motors
Document Control Desk CR-18-01888 RC-18-0085 Page 1 of 2 VIRGIL C. SUMMER NUCLEAR STATION (VCSNS) Unit 1 DOCKET NO. 50-395 OPERATING LICENSE NO. NPF-12 ATTACHMENT 2 Commitment
Document Control Desk CR-18-01888 RC-18-0085 Page 2 of 2 The following table identifies the action committed to by SCE&G, VCSNS in Reference 1 of this document as revised by this commitment change notification. Any other statements in this submittal are provided for information purposes and are not considered to be commitments.
Please direct questions regarding these commitments to Mr. Michael S. Moore, Manager, Nuclear Licensing, (803) 345-4752.
Commitment Due Date/Event The Reactor Coolant Pump Oil Collection System will be in full compliance with the requirements of NFPA 805 Close of Breaker ending with the implementation of Modules E1, M1, M2, M3, M4, RF24 and M5 of ECR 50909.