| Line 9: | Line 9: | ||
| docket = 05000325, 05000324 | | docket = 05000325, 05000324 | ||
| license number = DPR-062, DPR-071 | | license number = DPR-062, DPR-071 | ||
| contact person = Galvin D, 415-6256 | | contact person = Galvin D J, 415-6256 | ||
| case reference number = CAC MF9905, CAC MF9906, EPID L-2017-LLA-0242 | | case reference number = CAC MF9905, CAC MF9906, EPID L-2017-LLA-0242 | ||
| document type = Letter, Technical Specification, Amendment | | document type = Letter, Technical Specification, Amendment | ||
Revision as of 07:12, 14 June 2019
| ML18298A078 | |
| Person / Time | |
|---|---|
| Site: | Brunswick |
| Issue date: | 12/03/2018 |
| From: | Dennis Galvin Plant Licensing Branch II |
| To: | William Gideon Duke Energy Progress |
| Galvin D J, 415-6256 | |
| References | |
| CAC MF9905, CAC MF9906, EPID L-2017-LLA-0242 | |
| Download: ML18298A078 (7) | |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, 0.C. 20555-0001 December 3, 2018 Mr. William R. Gideon, Vice President Brunswick Steam Electric Plant Duke Energy Progress, LLC 8470 River Rd., SE (M/C BNP001) Southport, NC 28461
SUBJECT:
BRUNSWICK STEAM ELECTRIC PLANT, UNITS 1 AND 2 -2ND CORRECTION TO ISSUANCE OF AMENDMENTS TO ADOPT TECHNICAL SPECIFICATIONS TASK FORCE {TSTF} TRAVELER TSTF-542, REVISION 2, "REACTOR PRESSURE VESSEL WATER INVENTORY CONTROL" (CAC NOS. MF9905 AND MF9906; EPID L-2017-LLA-0242)
Dear Mr. Gideon:
By letter dated April 13, 2018 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML 18039A444), the U.S. Nuclear Regulatory Commission (NRC) issued Amendment Nos. 283 and 311 to Renewed Facility Operating License (RFOL) Nos. DPR-71 and DPR-62 for the Brunswick Steam Electric Plant (Brunswick), Units 1 and 2, respectively.
The amendments were in response to the application from Duke Energy Progress, LLC (Duke Energy) dated June 29, 2017 (ADAMS Accession No. ML 17180A538), as supplemented by letters dated January 4 and 23, 2018 (ADAMS Accession Nos. ML 18004A045 and ML 18023A432, respectively).
The amendments adopted Technical Specifications Task Force (TSTF) Traveler TSTF-542, Revision 2, "Reactor Pressure Vessel Water Inventory Control," and replaced the existing requirements in the technical specifications
{TSs) related to operations with a potential for draining the reactor vessel with revised TSs providing an alternative for reactor pressure vessel water inventory control. A correction letter for Amendment Nos. 283 and 311 was issued on May 23, 2018 (ADAMS Accession No. ML 18137A143).
Based on a recent discussion with Duke Energy staff, the NRC staff was informed of an additional error introduced by Amendment 283. The NRC staff identified an additional error in Amendment 311 following further review. The following errors are being corrected:
Brunswick Unit 1, Amendment 283, TS Page 3.3-48a, LCO [Limiting Condition for Operation]
3.3.5.3:
- The LCO references Table 3.3.5.2-1 instead of Table 3.3.5.3-1.
The NRC staff notes that TS 3.3.5.3 is a new TS introduced in Amendment Nos. 283 and 311. Brunswick Unit 2, Amendment 311, TS Page 3.5-10:
- An "S" was included before "ACTIONS" to read as "SACTIONS" It appears that these errors were introduced by the camera-ready TS pages provided by Duke Energy prior to issuance of the amendment.
The camera ready pages were not consistent with the changes proposed in Enclosures 2 and 3 of Duke Energy's letter dated June 29, 2017. The corrected pages are enclosed.
W. Gideon If you have any questions regarding this matter, please contact me at (301) 415-8480.
Docket Nos. 50-325 and 50-324
Enclosures:
- 1. Corrected TS Page to RFOL DPR-71 for Amendment No. 283 2. Corrected TS Page to RFOL DPR-62 for Amendment No. 311 cc: Listserv Sincerely, Dennis Galvin, Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation CORRECTION TO LICENSE AMENDMENT NO. 283 BRUNSWICK STEAM ELECTRIC STATION, UNIT 1 RENEWED FACILITY OPERATING LICENSE NO. DPR-71 DOCKET NO. 50-325 Replace the following page of the Appendix A Technical Specifications with the attached revised page. The revised page is identified by amendment number and contains marginal lines indicating the areas of change. Remove 3.3-48a Insert 3.3-48a Enclosure 1
3.3 INSTRUMENTATION RPV Water Inventory Control Instrumentation 3.3.5.3 3.3.5.3 Reactor Pressure Vessel (RPV) Water Inventory Control Instrumentation LCO 3.3.5.3 The RPV Water Inventory Control instrumentation for each Function in Table 3.3.5.3-1 shall be OPERABLE.
APPLICABILITY:
According to Table 3.3.5.3-1.
ACTIONS -----------------------------------------------------------NOTE-----------------------------------------------------------
Separate Condition entry is allowed for each channel. COMPLETION CONDITION REQUIRED ACTION TIME A. One or more channels A.1 Enter the Condition Immediately inoperable.
referenced in Table 3.3.5.3-1 for the channel. B. As required by Required B.1 Declare associated Immediately Action A.1 and referenced in penetration flow path(s) Table 3.3.5.3-1.
incapable of automatic isolation.
AND B.2 Calculate DRAIN TIME. Immediately C. As required by Required C.1 Place channel in trip. 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> Action A.1 and referenced in Table 3.3.5.3-1. (continued)
Brunswick Unit 1 3.3-48a Amendment No. 283 CORRECTION TO LICENSE AMENDMENT NO. 311 BRUNSWICK STEAM ELECTRIC STATION, UNIT 2 RENEWED FACILITY OPERATING LICENSE NO. DPR-62 DOCKET NO. 50-324 Replace the following page of the Appendix A Technical Specifications with the attached revised page. The revised page is identified by amendment number and contains marginal lines indicating the areas of change. Remove 3.5-10 Insert 3.5-10 Enclosure 2
RPV Water Inventory Control 3.5.2 ACTIONS CONDITION REQUIRED ACTION D. (continued)
D.3 Initiate action to isolate each secondary containment penetration flow path or verify it can be manually isolated from the control room. AND D.4 Initiate action to verify one standby gas treatment subsystem is capable of being placed in operation.
E. Required Action and E.1 Initiate action to restore associated Completion Time DRAIN TIME to 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />. of Condition C or D not met. OR DRAIN TIME < 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. SURVEILLANCE REQUIREMENTS SURVEILLANCE SR 3.5.2.1 SR 3.5.2.2 Brunswick Unit 2 Verify DRAIN TIME 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />. Verify, for a required low pressure coolant injection (LPCI) subsystem, the suppression pool water level is -31 inches. 3.5-10 COMPLETION TIME Immediately Immediately Immediately FREQUENCY In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program (continued)
Amendment No. 311 W. Gideon
SUBJECT:
BRUNSWICK STEAM ELECTRIC PLANT, UNITS 1 AND 2 -2ND CORRECTION TO ISSUANCE OF AMENDMENTS TO ADOPT TECHNICAL SPECIFICATIONS TASK FORCE (TSTF) TRAVELER TSTF-542, REVISION 2, "REACTOR PRESSURE VESSEL WATER INVENTORY CONTROL" (CAC NOS. MF9905 AND MF9906; EPID L-2017-LLA-0242)
DATED DECEMBER 3, 2018 DISTRIBUTION:
PUBLIC RidsACRS_MailCTR Resource RidsNrrDorlLpl2-2 Resource RidsRgn3MailCenter Resource RidsNrrPMBrunswick Resource RidsNrrLABClayton Resource ADAMS Accession No.: ML 18298A078 OFFICE NRR/DORL/LPL2-2/PM NRR/D0RL/LPL2-2/LA NRR/D0RL/LPL2-2/BC NAME DGalvin BClayton UShoop DATE 10/29/2018 10/26/2018 12/3/2018 OFFICIAL RECORD COPY NRR/D0RL/LPL2-2/PM DGalvin 12/3/2018