ML19064B304: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:Tennessee Valley Authority , Post Offi c e Box 2000 , De c atur , Alabama 35609-2 000 March 5, 2019 10 CFR 50.4 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001  
{{#Wiki_filter:Tennessee Valley Authority , Post Office Box 2000 , Decatur, Alabama 35609-2000 March 5, 2019 10 CFR 50.4 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Browns Ferry Nuclear Plant, Unit 2 Renewed Facility Operating License No. DPR-52 NRC Docket No. 50-260


==Subject:==
==Subject:==
Browns F erry Nuclear Plant, Unit 2 Renewed Facility Operating License No. DPR-52 NRC Docket No. 50-260 Browns Ferry Nuclear Plant, Unit 2 Core Operating Limits Report for Cycle 21 Operation, Revision O In accordance with the requirements of Technical Specification (TS) 5.6.5.d, the Tennessee Valley Authority is submitting the Browns Ferry Nuclear Plant (BFN), Unit 2 , Cycle 21, Core Operating Limits Report (COLR). Revision O of the Unit 2 COLR includes all Modes of operation (Modes 1 through 5). There are no new commitments contained in this letter. If you have any questions please contact M. W. Oliver at (256) 729-7874. D. L. Hughes Site Vice President  
Browns Ferry Nuclear Plant, Unit 2 Core Operating Limits Report for Cycle 21 Operation, Revision O In accordance with the requirements of Technical Specification (TS) 5.6.5.d, the Tennessee Valley Authority is submitting the Browns Ferry Nuclear Plant (BFN),
Unit 2, Cycle 21, Core Operating Limits Report (COLR). Revision O of the Unit 2 COLR includes all Modes of operation (Modes 1 through 5).
There are no new commitments contained in this letter. If you have any questions please contact M. W. Oliver at (256) 729-7874.
D. L. Hughes Site Vice President


==Enclosure:==
==Enclosure:==
Core Operating Limits Report, (120% OL TP), for Cycle 21 Operation , TVA-COLR-BF2C21, Revision 0 cc: (w/ Enclosure)
Core Operating Limits Report, (120% OLTP), for Cycle 21 Operation ,
NRC Regional Administrator  
TVA-COLR-BF2C21, Revision 0 cc: (w/ Enclosure)
-Region II NRC Senior Resident Inspector  
NRC Regional Administrator - Region II NRC Senior Resident Inspector - Browns Ferry Nuclear Plant NRC Project Manager - Browns Ferry Nuclear Plant
-Browns Ferry Nuclear Plant NRC Project Manager -Browns Ferry Nuclear Plant Enclosure Tennessee Valley Authority Browns Ferry Nuclear Plant Unit 2 Core Operating Limits Report, (120% OLTP), for Cycle 21 Operation, TVA-COLR-BF2C21, Revision 0 (See Attached)
USlNPG Reactor Engineering and Fuels -BWRFE 1101 Market Street , Chattanooga , TN 37402 Browns Ferry Unit 2 Cycle 21 Core Operating Limits Report, 120°/o OL TP TV A-COLR-BF2C21 Revision O (Final) (Re vi sion Log , Page v) February 2019 EDMS L94 190211 800 QA Document BFE-4400 , Revision 0 Prepared c;'=l,.,_
LL V Date: ;:(_,/ 1.:2., o2 6 lo/ T. W. Eichenberg, Sr. Specialist Verified:
Date: :.:s?t5".
Mitchell , Engineer Approved:~ Date: 2/zs/1~ W. B. Bird, Manager , BWR Fuel Engineering Reviewed: Date: z/i5/ir D. D. Coffey, Manage r, Reactor Engineering Approved: Chairman, PORC~ Approved: c. VUNt.J Plant Manag\ Date: o ;J... J;..-, }l'j Date: ____;: 3 1)...:....1 µ( 1_.!0, __
EDMS: L94 190211 800 N PG Reactor Engineering and Fuels
- BWRFE 1101 Market Street, Chattanooga TN 37402 Date:  February 12, 2019  Browns Ferry Unit 2 Cycle 21  Page ii Core Operating Limits Report
, 120% OLTP    TVA-COLR-BF 2 C 21, Revision 0 (Final) Table of Contents Total Number of Pages
= 47 (including review cover sheet
) List of Tables
................................
................................
................................
................................
. iii List of Figures ................................
................................
................................
..............................
iv Revision Log
................................
................................
................................
................................
. v Nomenclature
................................
................................
................................
...............................
vi References
................................
................................
................................
................................
.. viii 1 Introduction
................................
................................
................................
..........................
1 1.1 Purpose ................................
................................
................................
.........................
1 1.2 Scope ................................
................................
................................
............................
1 1.3 Fuel Loading
................................
................................
................................
..................
1 1.4 Acceptability
................................
................................
................................
..................
2 2 APLHGR Limits
................................
................................
................................
....................
3 2.1 Rated Power and Flow Limit:  APLHGRRATED ................................
................................
3 2.2 Off-Rated Power Dependent Limit:  APLHGR P ................................
.............................
3 2.2.1 Startup without Feedwater Heaters
................................
................................
....... 3 2.3 Off-Rated Flow Dependent Limit:  APLHGR F ................................
................................
3 2.4 Single Loop Operation Limit:  APLHGRSLO ................................
................................
.... 3 2.5 Equipment Out
-Of-Service Corrections
................................
................................
......... 6 3 LHGR Limits
................................
................................
................................
.........................
7 3.1 Rated Power and Flow Limit:  LHGRRATED ................................
................................
..... 7 3.2 Off-Rated Power Dependent Limit:  LHGR P ................................
................................
.. 7 3.2.1 Startup without Feedwater Heaters
................................
................................
....... 7 3.3 Off-Rated Flow Dependent Limit:  LHGR F ................................
................................
..... 8 3.4 Equipment Out
-Of-Service Corrections
................................
................................
......... 8 4 OLMCPR Limits
................................
................................
................................
.................
19 4.1 Flow Dependent MCPR Limit:
MCPR F ................................
................................
....... 19 4.2 Power Dependent MCPR Limit:
MCPR P ................................
................................
.... 19 4.2.1 Startup without Feedwater Heaters ................................
................................
..... 19 4.2.2 Scram Speed Dependent Limits (TSSS vs. NSS vs. OSS)
................................
. 20 4.2.3 Exposure Dependent Limits
................................
................................
................
20 4.2.4 Equipment Out
-Of-Service (EOOS) Option s ................................
.......................
21 4.2.5 Single-Loop-Operation (SLO) Limits
................................
................................
... 21 4.2.6 Below Pbypass Limits
................................
................................
.........................
21 5 Oscillation Power Range Monitor (OPRM) Setpoint
................................
..........................
33 6 APRM Flow Biased Rod Block Trip Setti ngs ................................
................................
...... 34 7 Rod Block Monitor (RBM) Trip Setpoints and Operability
................................
..................
35 8 Shutdown Margin Limit
................................
................................
................................
....... 37 EDMS: L94 190211 800 N PG Reactor Engineering and Fuels
- BWRFE 1101 Market Street, Chattanooga TN 37402 Date:  February 12, 2019  Browns Ferry Unit 2 Cycle 21  Page iii Core Operating Limits Report
, 120% OLTP    TVA-COLR-BF 2 C 21, Revision 0 (Final) List of Tables Nuclear Fuel Types
................................
................................
................................
...................
2 Startup Feedwater Temperature Basis
................................
................................
.........................
7 Nominal Scram Time Basis
................................
................................
................................
......... 20 MCPR P Limits for All Fuel Types: Optimum Scram Time Basis
................................
..............
23 MCPR P Limits for All Fuel Types: Nominal Scram Time Basis
................................
...............
24 MCPR P Limits for All Fuel Types: Technical Specification Scram Time Basis
........................
26 Startup Operation MCPR P Limits for Table 3.1 Temperature Range 1 for All Fuel Types: Nominal Scram Time Basis
................................
................................
................................
..... 28 Startup Operation MCPR P Limits for Table 3.1 Temperature Range 2 for All Fuel Types: Nominal Scram Time Basis
................................
................................
................................
..... 29 Startup Operation MCPR P Limits for Table 3.1 Temperature Range 1 for All Fuel Types: Technical Specification Scram Time Basis
................................
................................
.............
30 Startup Operation MCPR P Limits for Table 3.1 Temperature Range 2 for All Fuel Types: Technical Specification Scram Time Basis
................................
................................
.............
31 MCPR P Limits for All Fuel Types:  Single Loop Operation for All Scram Times
......................
32 OPRM Setpoint Range
................................
................................
................................
............
33 OPRM Successive Confirmation Count Setpoint
................................
................................
........ 33 Analytical RBM Trip Setpoints
................................
................................
................................
. 35 RBM Setpoint Applicability
................................
................................
................................
..........
35 Control Rod Withdrawal Error Results
................................
................................
........................
36 EDMS: L94 190211 800 N PG Reactor Engineering and Fuels
- BWRFE 1101 Market Street, Chattanooga TN 37402 Date:  February 12, 2019  Browns Ferry Unit 2 Cycle 21  Page iv Core Operating Limits Report
, 120% OLTP    TVA-COLR-BF 2 C 21, Revision 0 (Final) List of Figures APLHGRRATED for ATRIUM
-10XM Fu el ................................
................................
.........................
4 APLHGRRATED for ATRIUM
-11 Fuel ................................
................................
...............................
5 LHGRRATED for ATRIUM
-10XM Fuel ................................
................................
..............................
9 LHGRRATED for ATRIUM
-11 Fuel ................................
................................
................................
. 10 Base Operation LHGRFAC P for ATRIUM
-10XM Fuel ................................
................................
. 11 Base Operation LHGRFAC P for ATRIUM
-11 Fuel ................................
................................
...... 12 LHGRFAC F for ATRIUM
-10XM Fuel ................................
................................
...........................
13 LHGRFAC F for ATRIUM
-11 Fue l ................................
................................
................................
14 Startup Operation LHGRFAC P for ATRI UM-10XM Fuel: Table 3.1 Temperature Range 1
........ 15 Startup Operation LHGRFAC P for ATRIUM
-10XM Fuel: Table 3.1 Temperature Range 2
........ 16 Startup Operation LHGRFAC P for ATRIUM
-11 Fuel: Table 3.1 Temperature Rang e 1 ..............
17 Startup Operation LHGRFAC P for ATRIUM
-11 Fuel: Table 3.1 Temperature Range 2
..............
18 MCPR F for All Fuel Types
................................
................................
................................
...........
22 EDMS: L94 190211 800 N PG Reactor Engineering and Fuels
- BWRFE 1101 Market Street, Chattanooga TN 37402 Date:  February 12, 2019  Browns Ferry Unit 2 Cycle 21  Page v Core Operating Limits Report
, 120% OLTP    TVA-COLR-BF 2 C 21, Revision 0 (Final) Revision Log Number Page Description 0-R0 All New docume nt.
EDMS: L94 190211 800 N PG Reactor Engineering and Fuels
- BWRFE 1101 Market Street, Chattanooga TN 37402 Date:  February 12, 2019  Browns Ferry Unit 2 Cycle 21  Page vi Core Operating Limits Report
, 120% OLTP    TVA-COLR-BF 2 C 21, Revision 0 (Final) Nomenclature APLHGR Average Planar LHGR APRM  Average Power Range Monitor AREVA NP Vendor (Framatome, Siemens)
BOC  Beginning of Cycle BSP  Backup Stability Protection BWR  Boiling Water Reactor CAVEX Core Average Exposure C D  Coast Down CMSS  Cor e Monitoring System Software COLR  Core Operating Limits Report CPR  Critical Power Ratio CRWE  Control Rod Withdrawal Error CSDM  Cold SDM DIVOM Delta CPR over Initial CPR vs. Oscillation Magnitude EOC  End of Cycle EOC LB End-of-Cycle Licensing Basis EOOS  Equipment OOS FFTR  Final Feedwater Temperature Reduction FFWTR Final Feedwater Temperature Reduction FHOOS Feedwater Heaters OOS ft  Foot:  English unit of measure for length


GNF  Vendor (General Electric, Global Nuclear Fuels)
Enclosure Tennessee Valley Authority Browns Ferry Nuclear Plant Unit 2 Core Operating Limits Report, (120% OLTP), for Cycle 21 Operation, TVA-COLR-BF2C21, Revision 0 (See Attached)
GWd  Giga Watt Day


HTSP  High TSP  ICA  Interim Corrective Action ICF  Increased Core Flow (beyond rated)
EDMS L94 190211 800 QA Document BFE-4400, Revision 0 USlNPG Reactor Engineering and Fuels - BWRFE 1101 Market Street, Chattanooga , TN 37402 Browns Ferry Unit 2 Cycle 21 Core Operating Limits Report, 120°/o OL TP TVA-COLR-BF2C21                          Revision O (Final)
IS  In-Service kW  kilo watt: SI unit of measure for power.
(Revi sion Log , Page v)
LCO  License Condition of Operation LFWH  Loss of Feedwater Heating LHGRFAC LHGR Multiplier (Power or Flow dependent)
February 2019 Prepared    c;'=l,.,_      LLV T. W. Eichenberg, Sr. Specialist Date: ;:(_,/            1.:2., o2 6 lo/
LPRM  Low Power Range Monitor LRNB  Generator Load Reject, No Bypass
Verified:                                                Date:
:.:s?t5". Mitchell, Engineer Approved: ~ Date:                                                  2/zs/1~
W . B. Bird, Manager, BWR Fuel Engineering Reviewed :      ~                                        Date:  z/i5/ir D. D. Coffey, Manager, Reactor Engineering Approved :  ~a~Chairman, PORC~
Date:  o ;J... J;..-, }l'j Approved :                                      c. VUNt.J Date: ____;:31 )...:....
1 µ(1_.!0,_ _
Plant Manag\


MAPFAC MAPLHGR multiplier (Power or Flow dependent)
EDMS: L94 190211 800 Reactor Engineering and Fuels - BWRFE Date: February 12, 2019 NPG                        1101 Market Street, Chattanooga TN 37402 Table of Contents Total Number of Pages = 47 (including review cover sheet)
MCPR  Minimum CPR
List of Tables.................................................................................................................................iii List of Figures .............................................................................................................................. iv Revision Log ................................................................................................................................. v Nomenclature ............................................................................................................................... vi References.................................................................................................................................. viii 1      Introduction .......................................................................................................................... 1 1.1        Purpose ......................................................................................................................... 1 1.2        Scope ............................................................................................................................ 1 1.3        Fuel Loading.................................................................................................................. 1 1.4        Acceptability .................................................................................................................. 2 2      APLHGR Limits .................................................................................................................... 3 2.1        Rated Power and Flow Limit: APLHGRRATED ................................................................ 3 2.2        Off-Rated Power Dependent Limit: APLHGRP ............................................................. 3 2.2.1            Startup without Feedwater Heaters ....................................................................... 3 2.3        Off-Rated Flow Dependent Limit: APLHGRF ................................................................ 3 2.4        Single Loop Operation Limit: APLHGRSLO.................................................................... 3 2.5        Equipment Out-Of-Service Corrections ......................................................................... 6 3      LHGR Limits ......................................................................................................................... 7 3.1        Rated Power and Flow Limit: LHGRRATED..................................................................... 7 3.2        Off-Rated Power Dependent Limit: LHGRP .................................................................. 7 3.2.1            Startup without Feedwater Heaters ....................................................................... 7 3.3        Off-Rated Flow Dependent Limit: LHGRF..................................................................... 8 3.4        Equipment Out-Of-Service Corrections ......................................................................... 8 4      OLMCPR Limits ................................................................................................................. 19 4.1        Flow Dependent MCPR Limit: MCPRF ....................................................................... 19 4.2        Power Dependent MCPR Limit: MCPRP .................................................................... 19 4.2.1            Startup without Feedwater Heaters ..................................................................... 19 4.2.2            Scram Speed Dependent Limits (TSSS vs. NSS vs. OSS) ................................. 20 4.2.3            Exposure Dependent Limits ................................................................................ 20 4.2.4            Equipment Out-Of-Service (EOOS) Options ....................................................... 21 4.2.5            Single-Loop-Operation (SLO) Limits ................................................................... 21 4.2.6            Below Pbypass Limits ......................................................................................... 21 5      Oscillation Power Range Monitor (OPRM) Setpoint .......................................................... 33 6      APRM Flow Biased Rod Block Trip Settings ...................................................................... 34 7      Rod Block Monitor (RBM) Trip Setpoints and Operability .................................................. 35 8      Shutdown Margin Limit....................................................................................................... 37 Browns Ferry Unit 2 Cycle 21                                                                                                              Page ii Core Operating Limits Report, 120% OLTP                                                                    TVA-COLR-BF2C21, Revision 0 (Final)


EDMS: L94 190211 800 N PG Reactor Engineering and Fuels
EDMS: L94 190211 800 Reactor Engineering and Fuels - BWRFE Date: February 12, 2019 NPG              1101 Market Street, Chattanooga TN 37402 List of Tables Nuclear Fuel Types ................................................................................................................... 2 Startup Feedwater Temperature Basis ......................................................................................... 7 Nominal Scram Time Basis ......................................................................................................... 20 MCPRP Limits for All Fuel Types: Optimum Scram Time Basis .............................................. 23 MCPRP Limits for All Fuel Types: Nominal Scram Time Basis ............................................... 24 MCPRP Limits for All Fuel Types: Technical Specification Scram Time Basis ........................ 26 Startup Operation MCPRP Limits for Table 3.1 Temperature Range 1 for All Fuel Types:
- BWRFE 1101 Market Street, Chattanooga TN 37402 Date: February 12, 2019  Browns Ferry Unit 2 Cycle 21 Page vii Core Operating Limits Report
Nominal Scram Time Basis ..................................................................................................... 28 Startup Operation MCPRP Limits for Table 3.1 Temperature Range 2 for All Fuel Types:
, 120% OLTP     TVA-COLR-BF 2 C 21, Revision 0 (Final) MSR V  Moisture Separator Reheater Valve MSR VOOS MSR V OOS MTU  Metric Ton Uranium MWd/MTU Mega Watt Day p er Metric Ton Uranium NEOC  Near EOC NRC  United States Nuclear Regulatory Commission NSS  Nominal Scram Speed NTSP  Nominal TSP
Nominal Scram Time Basis ..................................................................................................... 29 Startup Operation MCPRP Limits for Table 3.1 Temperature Range 1 for All Fuel Types:
Technical Specification Scram Time Basis ............................................................................. 30 Startup Operation MCPRP Limits for Table 3.1 Temperature Range 2 for All Fuel Types:
Technical Specification Scram Time Basis ............................................................................. 31 MCPRP Limits for All Fuel Types: Single Loop Operation for All Scram Times ...................... 32 OPRM Setpoint Range ............................................................................................................ 33 OPRM Successive Confirmation Count Setpoint ........................................................................ 33 Analytical RBM Trip Setpoints ................................................................................................. 35 RBM Setpoint Applicability .......................................................................................................... 35 Control Rod Withdrawal Error Results ........................................................................................ 36 Browns Ferry Unit 2 Cycle 21                                                                                                     Page iii Core Operating Limits Report, 120% OLTP                                                           TVA-COLR-BF2C21, Revision 0 (Final)


OLMCPR MCPR Operating Limit OOS  Out-Of-Service OPRM  Oscillation Power Range Monitor OSS  Optimum Scram Speed PBDA  Period Based Detection Algorithm Pbypass Power , below which TSV Position and TCV Fast Closure Scrams are Bypassed PLU  Power Load Unbalance PLUOOS PLU OOS PRNM  Power Range Neutron Monitor RBM  Rod Block Monitor RCPOOS Recirculation Pump OOS (SLO) RPS  Reactor Protection System RPT  Recirculation Pump Trip RPTOOS RPT OOS SDM  Shutdown Margin SLMCPR MCPR Safety Limit SLO  Single Loop Operation TBV  Turbine Bypass Valve TBVIS  TBV IS TBVOOS Turbine Bypass Valves OOS TIP  Transversing In
EDMS: L94 190211 800 Reactor Engineering and Fuels - BWRFE Date: February 12, 2019 NPG              1101 Market Street, Chattanooga TN 37402 List of Figures APLHGRRATED for ATRIUM-10XM Fuel ......................................................................................... 4 APLHGRRATED for ATRIUM-11 Fuel ............................................................................................... 5 LHGRRATED for ATRIUM-10XM Fuel .............................................................................................. 9 LHGRRATED for ATRIUM-11 Fuel ................................................................................................. 10 Base Operation LHGRFACP for ATRIUM-10XM Fuel ................................................................. 11 Base Operation LHGRFACP for ATRIUM-11 Fuel ...................................................................... 12 LHGRFACF for ATRIUM-10XM Fuel ........................................................................................... 13 LHGRFACF for ATRIUM-11 Fuel ................................................................................................ 14 Startup Operation LHGRFACP for ATRIUM-10XM Fuel: Table 3.1 Temperature Range 1 ........ 15 Startup Operation LHGRFACP for ATRIUM-10XM Fuel: Table 3.1 Temperature Range 2 ........ 16 Startup Operation LHGRFACP for ATRIUM-11 Fuel: Table 3.1 Temperature Range 1.............. 17 Startup Operation LHGRFACP for ATRIUM-11 Fuel: Table 3.1 Temperature Range 2.............. 18 MCPRF for All Fuel Types ........................................................................................................... 22 Browns Ferry Unit 2 Cycle 21                                                                                                    Page iv Core Operating Limits Report, 120% OLTP                                                          TVA-COLR-BF2C21, Revision 0 (Final)
-core Probe TIPOOS TIP OOS T LO  Two Loop Operation TSP  Trip Setpoint TSSS  Technical Specification Scram Speed TVA Tennessee Valley Authority


EDMS: L94 190211 800 N PG Reactor Engineering and Fuels
EDMS: L94 190211 800 Reactor Engineering and Fuels - BWRFE Date: February 12, 2019 NPG                    1101 Market Street, Chattanooga TN 37402 Revision Log Number            Page                                      Description 0-R0            All      New document.
- BWRFE 1101 Market Street, Chattanooga TN 37402 Date:  February 12, 2019  Browns Ferry Unit 2 Cycle 21 Page viii Core Operating Limits Report
Browns Ferry Unit 2 Cycle 21                                                                                     Page v Core Operating Limits Report, 120% OLTP                                               TVA-COLR-BF2C21, Revision 0 (Final)
, 120% OLTP     TVA-COLR-BF 2 C 21, Revision 0 (Final) References
: 1. ANP-3 7 37, Revision 0 , Browns Ferry Unit 2 Cycle 2 1 Reload Analysis , Framatome, Inc., December 201 8. 2. ANP-3031P, Revision 3 , Mechanical Design Report for Browns Ferry Unit s 1, 2, and 3 ATRIUM-10 Fuel Assemblies, AREVA NP, Inc., May 20 14. 3. ANP-3150P, Revision 4 , Mechanical Design Report for Browns Ferry ATRIUM 10XM Fuel Assemblies, AREVA Inc., November 2017
. 4. ANP-3 706 P, Revision 0 , Browns Ferry Unit 2 Cycle 2 1 Plant Parameters Document , Framatome Inc., June 201 8. 5. BFE-4 xxx, Revision 0, Browns Ferry Unit 2 Cycle 2 1 In Core Shuffle, Calculation File, Tennessee Valley Authority, February 201 9. Methodology References
: 6. XN-NF-81-58(P)(A) Revision 2 and Supplements 1 and 2, RODEX2 Fuel Rod Thermal-Mechanical Response Evaluation Model, Exxon Nuclear Company, March 1984.
: 7. XN-NF-85-67(P)(A) Revision 1, Generic Mechanical Design for Exxon Nuclear Jet Pump BWR Reload Fuel, Exxon Nuclear Company, Septemb er 1986. 8. EMF-85-74(P) Revision 0 Supplement 1(P)(A) and Supplement 2(P)(A), RODEX2A (BWR) Fuel Rod Thermal-Mechanical Evaluation Model, Siemens Power Corporation, February 1998.
: 9. ANF-89-98(P)(A) Revision 1 and Supplement 1, Generic Mechanical Design Criteria for BWR Fuel Designs, Advanced Nuclear Fuels Corporation, May 1995.
: 10. XN-NF-80-19(P)(A) Volume 1 and Supplements 1 and 2, Exxon Nuclear Methodology for Boiling Water Reactors
- Neutronic Methods for Design and Analysis , Exxon Nuclear Company, March 1983.
: 11. XN-NF-80-19(P)(A) Volume 4 Revision 1, Exxon Nuclear Methodology for Boiling Water Reactors: Application of the ENC Methodology to BWR Reloads , Exxon Nuclear Company, June 1986.
: 12. EMF-2158(P)(A) Revision 0, Siemens Power Corporation Methodology for Boiling Water Reactors: Evaluation and Validation of CASMO
-4/MICROBURN
-B2, Siemens Power Corporation, October 1999.
: 13. XN-NF-80-19(P)(A) Volume 3 Revision 2, Exxon Nuclear Methodology for Boiling Water Reactors, THERMEX: Thermal Limits Methodology Summary Description, Exxon Nuclear Company, January 1987.
: 14. XN-NF-84-105(P)(A) Volume 1 and Volume 1 Supplements 1 and 2, XCOBRA-T: A Computer Code for BWR Transient Thermal
-Hydraulic Core Analysis, Exxon Nuclear Company, February 1987.


EDMS: L94 190211 800 N PG Reactor Engineering and Fuels
EDMS: L94 190211 800 Reactor Engineering and Fuels - BWRFE Date: February 12, 2019 NPG                    1101 Market Street, Chattanooga TN 37402 Nomenclature APLHGR                Average Planar LHGR APRM                  Average Power Range Monitor AREVA NP              Vendor (Framatome, Siemens)
- BWRFE 1101 Market Street, Chattanooga TN 37402 Date:  February 12, 2019  Browns Ferry Unit 2 Cycle 21  Page ix Core Operating Limits Report
BOC                    Beginning of Cycle BSP                    Backup Stability Protection BWR                    Boiling Water Reactor CAVEX                  Core Average Exposure CD                    Coast Down CMSS                  Core Monitoring System Software COLR                  Core Operating Limits Report CPR                    Critical Power Ratio CRWE                  Control Rod Withdrawal Error CSDM                  Cold SDM DIVOM                  Delta CPR over Initial CPR vs. Oscillation Magnitude EOC                    End of Cycle EOCLB                  End-of-Cycle Licensing Basis EOOS                  Equipment OOS FFTR                  Final Feedwater Temperature Reduction FFWTR                  Final Feedwater Temperature Reduction FHOOS                  Feedwater Heaters OOS ft                    Foot: English unit of measure for length GNF                    Vendor (General Electric, Global Nuclear Fuels)
, 120% OLTP    TVA-COLR-BF 2 C 21, Revision 0 (Final) 15. ANP-10307PA, Revision 0, AREVA MCPR Safety Limit Methodology for Boiling Water Reactors, AREVA NP Inc., June 2011.
GWd                    Giga Watt Day HTSP                  High TSP ICA                    Interim Corrective Action ICF                    Increased Core Flow (beyond rated)
: 16. ANF-913(P)(A) Volume 1 Revision 1 and Volume 1 Supplements 2, 3 and 4, COTRANSA2: A Computer Program for Boiling Water Reactor Transient Analyses, Advanced Nuclear Fuels Corporation, August 1990.
IS                    In-Service kW                    kilo watt: SI unit of measure for power.
: 17. ANF-1358(P)(A) Revision 3 , The Loss of Feedwater Heating Transient in Boiling Water Reactors, Advanced Nuclear Fuels Corporation, September 2005. 18. EMF-2209(P)(A) Revision 3, SPCB Critical Power Correlation , AREVA NP Inc., September 2009.
LCO                    License Condition of Operation LFWH                  Loss of Feedwater Heating LHGRFAC                LHGR Multiplier (Power or Flow dependent)
: 19. EM F-2361(P)(A) Revision 0, EXEM BWR-2000 ECCS Evaluation Model , Framatome ANP Inc., May 2001, as supplemented by the site specific approval in NRC safety evaluation dated February 15, 2013 and July 31 , 201 4. 20. EMF-2292(P)(A) Revision 0, ATRIUMŽ-10: Appendix K Spray Heat Transfer Coefficients, Siemens Power Corporation, September 2000.
LPRM                  Low Power Range Monitor LRNB                  Generator Load Reject, No Bypass MAPFAC                MAPLHGR multiplier (Power or Flow dependent)
: 21. EMF-CC-074(P)(A), Volume 4, Revision 0, BWR Stability Analysis:  Assessment of STAIF with Input from MICROBURN
MCPR                  Minimum CPR Browns Ferry Unit 2 Cycle 21                                                                                    Page vi Core Operating Limits Report, 120% OLTP                                                TVA-COLR-BF2C21, Revision 0 (Final)
-B2, Siemens Power Corporation, August 2000. 22. BAW-10255(P)(A), Revisio n 2, Cycle-Specific DIVOM Methodology Using the RAMONA5-FA Code , AREVA NP Inc., May 2008.
: 23. BAW-10247PA, Revision 0, Realistic Thermal
-Mechanical Fuel Rod Methodology for Boiling Water Reactors, AREVA NP Inc., April 2008.
: 24. ANP-10298PA, Revision 0, ACE/ATRIUM 10XM Critical Power Correlation , AREVA NP Inc., March 2010.
: 25. ANP-3140(P), Revision 0, Browns Ferry Units 1, 2, and 3 Improved K
-factor Model for ACE/ATRIUM 10XM Critical Power Correlation, AREVA NP Inc., August 2012. PRNM Setpoint References
: 26. EDQ2092900118, R27, Setpoint and Scaling Calculation for Neutron Monitoring & Recirculation Flow Loops, Calculation File, Tennessee Valley Authority, November 16, 2017. 27. Task T0500, Revision 0, Neutron Monitoring System, Project Task Report, GE Hitachi Nuclear Energy, April 2015. 28. Task T0506, Revision 2, TS Instrument Setpoints, Project Task Report, Tennessee Valley Authority, July 201
: 5. 29. NEDC-32433P, Maximum Extended Load Line Limit and ARTS Improvement Program Analyses for Browns Ferry Nuclear Plant Unit 1, 2, and 3, GE Nuclear Energy, April 1995.


EDMS: L94 190211 800 N PG Reactor Engineering and Fuels
EDMS: L94 190211 800 Reactor Engineering and Fuels - BWRFE Date: February 12, 2019 NPG                  1101 Market Street, Chattanooga TN 37402 MSRV                  Moisture Separator Reheater Valve MSRVOOS                MSRV OOS MTU                    Metric Ton Uranium MWd/MTU                Mega Watt Day per Metric Ton Uranium NEOC                  Near EOC NRC                    United States Nuclear Regulatory Commission NSS                    Nominal Scram Speed NTSP                  Nominal TSP OLMCPR                MCPR Operating Limit OOS                    Out-Of-Service OPRM                  Oscillation Power Range Monitor OSS                    Optimum Scram Speed PBDA                  Period Based Detection Algorithm Pbypass                Power, below which TSV Position and TCV Fast Closure Scrams are Bypassed PLU                    Power Load Unbalance PLUOOS                PLU OOS PRNM                  Power Range Neutron Monitor RBM                    Rod Block Monitor RCPOOS                Recirculation Pump OOS (SLO)
- BWRFE 1101 Market Street, Chattanooga TN 37402 Date:  February 12, 2019  Browns Ferry Unit 2 Cycle 21 Page x Core Operating Limits Report
RPS                    Reactor Protection System RPT                    Recirculation Pump Trip RPTOOS                RPT OOS SDM                    Shutdown Margin SLMCPR                MCPR Safety Limit SLO                    Single Loop Operation TBV                    Turbine Bypass Valve TBVIS                  TBV IS TBVOOS                Turbine Bypass Valves OOS TIP                    Transversing In-core Probe TIPOOS                TIP OOS TLO                    Two Loop Operation TSP                    Trip Setpoint TSSS                  Technical Specification Scram Speed TVA                    Tennessee Valley Authority Browns Ferry Unit 2 Cycle 21                                                                                 Page vii Core Operating Limits Report, 120% OLTP                                             TVA-COLR-BF2C21, Revision 0 (Final)
, 120% OLTP     TVA-COLR-BF 2 C 21, Revision 0 (Final) 30. NEDO-32465-A, Licensing Topical Report
- Reactor Stability Detect and Suppress Solutions Licensing Basis Methodology for Reload Applications, GE Nuclear Energy, August 199
: 6.     


EDMS: L94 190211 800 N PG Reactor Engineering and Fuels
EDMS: L94 190211 800 Reactor Engineering and Fuels - BWRFE Date: February 12, 2019 NPG              1101 Market Street, Chattanooga TN 37402 References
- BWRFE 1101 Market Street, Chattanooga TN 37402 Date: February 12, 2019 Browns Ferry Unit 2 Cycle 21 Page 1 Core Operating Limits Report
: 1.        ANP-3737, Revision 0, Browns Ferry Unit 2 Cycle 21 Reload Analysis, Framatome, Inc., December 2018.
, 120% OLTP     TVA-COLR-BF 2 C 21, Revision 0 (Final) 1 Introduction In anticipation of cycle startup, it is necessary to describe the expected limits of operation.
: 2.        ANP-3031P, Revision 3, Mechanical Design Report for Browns Ferry Units 1, 2, and 3 ATRIUM-10 Fuel Assemblies, AREVA NP, Inc., May 2014.
1.1 Purpose The primary purpose of this document is to satisfy requirements identified by unit technical specification section 5.6.5. This document may be provided, upon final approval, to the NRC
: 3.        ANP-3150P, Revision 4, Mechanical Design Report for Browns Ferry ATRIUM 10XM Fuel Assemblies, AREVA Inc., November 2017.
. 1.2 Scope This document will discuss the following areas:
: 4.        ANP-3706P, Revision 0, Browns Ferry Unit 2 Cycle 21 Plant Parameters Document, Framatome Inc., June 2018.
: 5.        BFE-4xxx, Revision 0, Browns Ferry Unit 2 Cycle 21 In Core Shuffle, Calculation File, Tennessee Valley Authority, February 2019.
Methodology References
: 6.        XN-NF-81-58(P)(A) Revision 2 and Supplements 1 and 2, RODEX2 Fuel Rod Thermal-Mechanical Response Evaluation Model, Exxon Nuclear Company, March 1984.
: 7.        XN-NF-85-67(P)(A) Revision 1, Generic Mechanical Design for Exxon Nuclear Jet Pump BWR Reload Fuel, Exxon Nuclear Company, September 1986.
: 8.        EMF-85-74(P) Revision 0 Supplement 1(P)(A) and Supplement 2(P)(A), RODEX2A (BWR) Fuel Rod Thermal-Mechanical Evaluation Model, Siemens Power Corporation, February 1998.
: 9.        ANF-89-98(P)(A) Revision 1 and Supplement 1, Generic Mechanical Design Criteria for BWR Fuel Designs, Advanced Nuclear Fuels Corporation, May 1995.
: 10.      XN-NF-80-19(P)(A) Volume 1 and Supplements 1 and 2, Exxon Nuclear Methodology for Boiling Water Reactors - Neutronic Methods for Design and Analysis, Exxon Nuclear Company, March 1983.
: 11.      XN-NF-80-19(P)(A) Volume 4 Revision 1, Exxon Nuclear Methodology for Boiling Water Reactors: Application of the ENC Methodology to BWR Reloads, Exxon Nuclear Company, June 1986.
: 12.      EMF-2158(P)(A) Revision 0, Siemens Power Corporation Methodology for Boiling Water Reactors: Evaluation and Validation of CASMO-4/MICROBURN-B2, Siemens Power Corporation, October 1999.
: 13.      XN-NF-80-19(P)(A) Volume 3 Revision 2, Exxon Nuclear Methodology for Boiling Water Reactors, THERMEX: Thermal Limits Methodology Summary Description, Exxon Nuclear Company, January 1987.
: 14.      XN-NF-84-105(P)(A) Volume 1 and Volume 1 Supplements 1 and 2, XCOBRA-T: A Computer Code for BWR Transient Thermal-Hydraulic Core Analysis, Exxon Nuclear Company, February 1987.
Browns Ferry Unit 2 Cycle 21                                                                              Page viii Core Operating Limits Report, 120% OLTP                                          TVA-COLR-BF2C21, Revision 0 (Final)
 
EDMS: L94 190211 800 Reactor Engineering and Fuels - BWRFE Date: February 12, 2019 NPG              1101 Market Street, Chattanooga TN 37402
: 15.      ANP-10307PA, Revision 0, AREVA MCPR Safety Limit Methodology for Boiling Water Reactors, AREVA NP Inc., June 2011.
: 16.      ANF-913(P)(A) Volume 1 Revision 1 and Volume 1 Supplements 2, 3 and 4, COTRANSA2: A Computer Program for Boiling Water Reactor Transient Analyses, Advanced Nuclear Fuels Corporation, August 1990.
: 17.      ANF-1358(P)(A) Revision 3, The Loss of Feedwater Heating Transient in Boiling Water Reactors, Advanced Nuclear Fuels Corporation, September 2005.
: 18.      EMF-2209(P)(A) Revision 3, SPCB Critical Power Correlation, AREVA NP Inc.,
September 2009.
: 19.      EMF-2361(P)(A) Revision 0, EXEM BWR-2000 ECCS Evaluation Model, Framatome ANP Inc., May 2001, as supplemented by the site specific approval in NRC safety evaluation dated February 15, 2013 and July 31, 2014.
: 20.      EMF-2292(P)(A) Revision 0, ATRIUM'-10: Appendix K Spray Heat Transfer Coefficients, Siemens Power Corporation, September 2000.
: 21.      EMF-CC-074(P)(A), Volume 4, Revision 0, BWR Stability Analysis: Assessment of STAIF with Input from MICROBURN-B2, Siemens Power Corporation, August 2000.
: 22.      BAW-10255(P)(A), Revision 2, Cycle-Specific DIVOM Methodology Using the RAMONA5-FA Code, AREVA NP Inc., May 2008.
: 23.      BAW-10247PA, Revision 0, Realistic Thermal-Mechanical Fuel Rod Methodology for Boiling Water Reactors, AREVA NP Inc., April 2008.
: 24.      ANP-10298PA, Revision 0, ACE/ATRIUM 10XM Critical Power Correlation, AREVA NP Inc., March 2010.
: 25.      ANP-3140(P), Revision 0, Browns Ferry Units 1, 2, and 3 Improved K-factor Model for ACE/ATRIUM 10XM Critical Power Correlation, AREVA NP Inc.,
August 2012.
PRNM Setpoint References
: 26.      EDQ2092900118, R27, Setpoint and Scaling Calculation for Neutron Monitoring &
Recirculation Flow Loops, Calculation File, Tennessee Valley Authority, November 16, 2017.
: 27.      Task T0500, Revision 0, Neutron Monitoring System, Project Task Report, GE Hitachi Nuclear Energy, April 2015.
: 28.      Task T0506, Revision 2, TS Instrument Setpoints, Project Task Report, Tennessee Valley Authority, July 2015.
: 29.      NEDC-32433P, Maximum Extended Load Line Limit and ARTS Improvement Program Analyses for Browns Ferry Nuclear Plant Unit 1, 2, and 3, GE Nuclear Energy, April 1995.
Browns Ferry Unit 2 Cycle 21                                                                               Page ix Core Operating Limits Report, 120% OLTP                                           TVA-COLR-BF2C21, Revision 0 (Final)
 
EDMS: L94 190211 800 Reactor Engineering and Fuels - BWRFE Date: February 12, 2019 NPG              1101 Market Street, Chattanooga TN 37402
: 30.      NEDO-32465-A, Licensing Topical Report - Reactor Stability Detect and Suppress Solutions Licensing Basis Methodology for Reload Applications, GE Nuclear Energy, August 1996.
Browns Ferry Unit 2 Cycle 21                                                                               Page x Core Operating Limits Report, 120% OLTP                                          TVA-COLR-BF2C21, Revision 0 (Final)
 
EDMS: L94 190211 800 Reactor Engineering and Fuels - BWRFE Date: February 12, 2019 NPG              1101 Market Street, Chattanooga TN 37402 1 Introduction In anticipation of cycle startup, it is necessary to describe the expected limits of operation.
1.1     Purpose The primary purpose of this document is to satisfy requirements identified by unit technical specification section 5.6.5. This document may be provided, upon final approval, to the NRC.
1.2     Scope This document will discuss the following areas:
Average Planar Linear Heat Generation Rate (APLHGR) Limit (Technical Specifications 3.2.1 and 3.7.5)
Average Planar Linear Heat Generation Rate (APLHGR) Limit (Technical Specifications 3.2.1 and 3.7.5)
Applicability: Mode 1,  23% RTP (Technical Specifications definition of RTP)
Applicability: Mode 1,  23% RTP (Technical Specifications definition of RTP)
Linear Heat Generation Rate (LHGR) Limit (Technical Specification 3.2.3, 3.3.4.1, and 3.7.5)
Linear Heat Generation Rate (LHGR) Limit (Technical Specification 3.2.3, 3.3.4.1, and 3.7.5)
Applicability: Mode 1,  23% RTP (Technical Specifications definition of RTP)
Applicability: Mode 1,  23% RTP (Technical Specifications definition of RTP)
Minimum Critical Power Ratio Operating Limit (OLMCPR)   (Technical Specifications 3.2.2, 3.3.4.1, 3.7.5 and Table 3.3.2.1
Minimum Critical Power Ratio Operating Limit (OLMCPR)
-1) Applicability: Mode 1,  23% RTP (Technical Specifications definition of RTP)
(Technical Specifications 3.2.2, 3.3.4.1, 3.7.5 and Table 3.3.2.1-1)
Applicability: Mode 1,  23% RTP (Technical Specifications definition of RTP)
Oscillation Power Range Monitor (OPRM) Setpoint (Technical Specification Table 3.3.1.1)
Oscillation Power Range Monitor (OPRM) Setpoint (Technical Specification Table 3.3.1.1)
Applicability: Mode 1,  (as specified in Technical Specifications Table 3.3.1.1
Applicability: Mode 1,  (as specified in Technical Specifications Table 3.3.1.1-1)
-1) Average Power Range Monitor (APRM) Flow Biased Rod Block Trip Setting (Technical Requirements Manual Section 5.3.1 and Table 3.3.4
Average Power Range Monitor (APRM) Flow Biased Rod Block Trip Setting (Technical Requirements Manual Section 5.3.1 and Table 3.3.4-1)
-1) Applicability: Mode 1,  (as specified in Technical Requirements Manual s Table 3.3.4
Applicability: Mode 1,  (as specified in Technical Requirements Manuals Table 3.3.4-1)
-1) Rod Block Monitor (RBM) Trip Setpoints and Operability (Technical Specification Table 3.3.2.1
Rod Block Monitor (RBM) Trip Setpoints and Operability (Technical Specification Table 3.3.2.1-1)
-1) Applicability: Mode 1,  % RTP as specified in Table 3.3.2.1
Applicability: Mode 1,  % RTP as specified in Table 3.3.2.1-1 (TS definition of RTP)
-1 (TS definition of RTP)
Shutdown Margin (SDM) Limit (Technical Specification 3.1.1)
Shutdown Margin (SDM) Limit (Technical Specification 3.1.1)
Applicability: All Mode s 1.3 Fuel Loading The core will contain fresh and exposed ATRIUM-10 XM, as well as a limited number of ATRIUM-11 lead fuel assemblies. Nuclear fuel types used in the core loading are shown in Table 1.1. The core shuffle and final loading were explicitly evaluated for BOC cold shutdown margin performance as documented per Reference
Applicability: All Modes 1.3     Fuel Loading The core will contain fresh and exposed ATRIUM-10XM, as well as a limited number of ATRIUM-11 lead fuel assemblies. Nuclear fuel types used in the core loading are shown in Table 1.1. The core shuffle and final loading were explicitly evaluated for BOC cold shutdown margin performance as documented per Reference 5.
: 5.
Browns Ferry Unit 2 Cycle 21                                                                               Page 1 Core Operating Limits Report, 120% OLTP                                           TVA-COLR-BF2C21, Revision 0 (Final)
EDMS: L94 190211 800 N PG Reactor Engineering and Fuels
 
- BWRFE 1101 Market Street, Chattanooga TN 37402 Date:  February 12, 2019  Browns Ferry Unit 2 Cycle 21 Page 2 Core Operating Limits Report
EDMS: L94 190211 800 Reactor Engineering and Fuels - BWRFE Date: February 12, 2019 NPG                          1101 Market Street, Chattanooga TN 37402 Table 1.1 Nuclear Fuel Types
, 120% OLTP     TVA-COLR-BF 2 C 21, Revision 0 (Final) Table 1.1   Nuclear Fuel Types
* Nuclear Original         Number of           Fuel Type             Fuel Names Fuel Description                              Cycle          Assemblies            (NFT)               (Range)
* Fuel Description Original Cycle  Number of Assemblies Nuclear Fuel Type (NFT) Fuel Names (Range) ATRIUM 10XM XMLC-3904B-15GV80-FBF 19 93 15 FBF401-FBF572 ATRIUM 10XM XMLC
ATRIUM 10XM XMLC-3904B-15GV80-FBF                                   19                 93               15             FBF401-FBF572 ATRIUM 10XM XMLC-4035B-13GV80-FBF                                   19                 58               16             FBF573-FBF652 ATRIUM 11 A11-3693B-13GV80-FBF                                       19                   6               17             FBF653-FBF660 ATRIUM 10XM XMLC-4102B-11GV70-FBG-B                                 20                 48               18             FBG701-FBG748 ATRIUM 10XM XMLC-4062B-13GV80-FBG-C                                 20                 151                19             FBG749-FBG900 ATRIUM 10XM XMLC-3948B-13GV70-FBG-B                                 20                 88               20             FBG901-FBG988 ATRIUM-10XM XMLC-4087B-15GV80-FBH                                    21                176                21             FBH001-FBH176 ATRIUM-10XM XMLC-4036B-15GV80-FBH                                    21                 88               22             FBH177-FBH264 ATRIUM-10XM XMLC-4093B-10GV80-FBh                                    21                 56               23             FBH265-FBH320 1.4     Acceptability Limits discussed in this document were generated based on NRC approved methodologies per References 6 through 25.
-40 35B-13GV80-FBF 19 58 16 FBF573-FBF652 ATRIUM 11 A11
-3693B-13GV80-FBF 19 6 17 FBF653-FBF660 ATRIUM 10XM XMLC
-4102B-11GV70-FBG-B 20 48 18 FBG701-FBG748 ATRIUM 10XM XMLC-4062B-13GV80-FBG-C 20 15 1 19 FBG749-FBG900 ATRIUM 10XM XMLC
-3948B-13GV70-FBG-B 20 88 20 FBG901-FBG988 ATRIUM-10XM XMLC-408 7 B-1 5 GV 8 0-F B H 21 1 76 2 1 F BH 001-F BH 1 76 ATRIUM-10XM XMLC-4036 B-1 5 GV 8 0-F BH 21 88 22 F BH 1 77-F BH 2 6 4 ATRIUM-10XM XMLC-409 3 B-1 0 GV 8 0-F B h 21 56 23 F BH 2 65-F BH 32 0  1.4 Acceptability Limits discussed in this document were generated based on NRC approved methodologies per References 6 through 25.
* The table identifies the expected fuel type breakdown in anticipation of final core loading. The final composition of the core depends upon uncertainties during the outage such as discovering a failed fuel bundle, or other bundle damage. Minor core loading changes, due to unforeseen events, will conform to the safety and monitoring requirements identified in this document.
* The table identifies the expected fuel type breakdown in anticipation of final core loading. The final composition of the core depends upon uncertainties during the outage such as discovering a failed fuel bundle, or other bundle damage. Minor core loading changes, due to unforeseen events, will conform to the safety and monitoring requirements identified in this document.
Browns Ferry Unit 2 Cycle 21                                                                                                              Page 2 Core Operating Limits Report, 120% OLTP                                                                      TVA-COLR-BF2C21, Revision 0 (Final)


EDMS: L94 190211 800 N PG Reactor Engineering and Fuels
EDMS: L94 190211 800 Reactor Engineering and Fuels - BWRFE Date: February 12, 2019 NPG                    1101 Market Street, Chattanooga TN 37402 2 APLHGR Limits (Technical Specifications 3.2.1 & 3.7.5)
- BWRFE 1101 Market Street, Chattanooga TN 37402 Date:  February 12, 2019  Browns Ferry Unit 2 Cycle 21  Page 3 Core Operating Limits Report
, 120% OLTP    TVA-COLR-BF 2 C 21, Revision 0 (Final) 2 APLHGR Limits (Technical Specifications 3.2.1 & 3.7.5)
The APLHGR limit is determined by adjusting the rated power APLHGR limit for off-rated power, off-rated flow, and SLO conditions. The most limiting of these is then used as follows:
The APLHGR limit is determined by adjusting the rated power APLHGR limit for off-rated power, off-rated flow, and SLO conditions. The most limiting of these is then used as follows:
APLHGR limit = MIN ( APLHGR P , APLHGR F, APLHGRSLO )   where: APLHGR P off-rated power APLHGR limit [APLHGRRATED
APLHGR limit = MIN ( APLHGRP , APLHGRF, APLHGRSLO )
* MAPFAC P] APLHGR F off-rated flow APLHGR limit
where:
[APLHGRRATED
APLHGRP                off-rated power APLHGR limit               [APLHGRRATED
* MAPFAC F] APLHGRSLO SLO APLHGR limit
* MAPFACP]
[APLHGRRATED
APLHGRF                off-rated flow APLHGR limit                 [APLHGRRATED
* MAPFACF]
APLHGRSLO             SLO APLHGR limit                           [APLHGRRATED
* SLO Multiplier]
* SLO Multiplier]
2.1 Rated Power and Flow Limit: APLHGRRATED The rated conditions APLHGR for all fuel are identified per Reference 1. The rated conditions APLHGR for ATRIUM
2.1     Rated Power and Flow Limit: APLHGRRATED The rated conditions APLHGR for all fuel are identified per Reference 1. The rated conditions APLHGR for ATRIUM-10XM fuel are shown in Figure 2.1. The rated conditions APLHGR for ATRIUM-11 are shown in Figure 2.2.
-10 XM fuel are shown in Figure 2.1. The rated conditions APLHGR for ATRIUM-1 1 are shown in Figure 2.2. 2.2 Off-Rated Power Dependent Limit: APLHGR P Reference 1 does not specify a power dependent APLHGR. Therefore, MAPFAC P is set to a value of 1.0. 2.2.1 Startup without Feedwater Heaters There is a range of operation during startup when the feedwater heaters are not placed into service until after the unit has reach ed a significant operating power level. No additional power dependent limitation is required.
2.2     Off-Rated Power Dependent Limit: APLHGRP Reference 1 does not specify a power dependent APLHGR. Therefore, MAPFACP is set to a value of 1.0.
2.3 Off-Rated Flow Dependent Limit: APLHGR F Reference 1 does not specify a flow dependent APLHGR. Therefore, MAPFAC F is set to a value of 1.0. 2.4 Single Loop Operation Limit: APLHGRSLO The single loop operation multiplier for ATRIUM
2.2.1 Startup without Feedwater Heaters There is a range of operation during startup when the feedwater heaters are not placed into service until after the unit has reached a significant operating power level. No additional power dependent limitation is required.
-10 and ATRIUM
2.3     Off-Rated Flow Dependent Limit: APLHGRF Reference 1 does not specify a flow dependent APLHGR. Therefore, MAPFACF is set to a value of 1.0.
-10XM fuel is 0.85, per Reference
2.4     Single Loop Operation Limit: APLHGRSLO The single loop operation multiplier for ATRIUM-10 and ATRIUM-10XM fuel is 0.85, per Reference 1.
: 1.
Browns Ferry Unit 2 Cycle 21                                                                                     Page 3 Core Operating Limits Report, 120% OLTP                                                 TVA-COLR-BF2C21, Revision 0 (Final)
EDMS: L94 190211 800 N PG Reactor Engineering and Fuels
 
- BWRFE 1101 Market Street, Chattanooga TN 37402 Date:  February 12, 2019  Browns Ferry Unit 2 Cycle 21 Page 4 Core Operating Limits Report
EDMS: L94 190211 800 Reactor Engineering and Fuels - BWRFE Date: February 12, 2019 NPG              1101 Market Street, Chattanooga TN 37402 15 12 9
, 120% OLTP     TVA-COLR-BF 2 C 21, Revision 0 (Final) 0 3 6 9 12 15 0 20 40 60 80APLHGR (kW/ft)Planar Average Exposure (GWd/MTU)
APLHGR (kW/ft) 6 3
Planar Avg.APLHGRExposureLimit(GWd/MTU)(kW/ft)0.013.015.013.067.07.6 Figure 2.1   APLHGRRATED for ATRIUM
0 0          20                    40                      60                      80 Planar Average Exposure (GWd/MTU)
-10 XM Fuel EDMS: L94 190211 800 N PG Reactor Engineering and Fuels
Planar Avg.         APLHGR Exposure            Limit (GWd/MTU)           (kW/ft) 0.0            13.0 15.0              13.0 67.0              7.6 Figure 2.1 APLHGRRATED for ATRIUM-10XM Fuel Browns Ferry Unit 2 Cycle 21                                                                                                 Page 4 Core Operating Limits Report, 120% OLTP                                                           TVA-COLR-BF2C21, Revision 0 (Final)
- BWRFE 1101 Market Street, Chattanooga TN 37402 Date:  February 12, 2019  Browns Ferry Unit 2 Cycle 21 Page 5 Core Operating Limits Report
 
, 120% OLTP     TVA-COLR-BF 2 C 21, Revision 0 (Final) 0 3 6 9 12 15 0 20 40 60 80APLHGR (kW/ft)Planar Average Exposure (GWd/MTU)
EDMS: L94 190211 800 Reactor Engineering and Fuels - BWRFE Date: February 12, 2019 NPG              1101 Market Street, Chattanooga TN 37402 15 12 9
Planar Avg.APLHGRExposureLimit(GWd/MTU)(kW/ft)0.0 1010.0 1067.05.9 Figure 2.2   APLHGRRATED fo r ATRIUM-1 1 Fuel EDMS: L94 190211 800 N PG Reactor Engineering and Fuels
APLHGR (kW/ft) 6 3
- BWRFE 1101 Market Street, Chattanooga TN 37402 Date:  February 12, 2019  Browns Ferry Unit 2 Cycle 21 Page 6 Core Operating Limits Report
0 0          20                    40                      60                      80 Planar Average Exposure (GWd/MTU)
, 120% OLTP     TVA-COLR-BF 2 C 21, Revision 0 (Final) 2.5 Equipment Out
Planar Avg.         APLHGR Exposure            Limit (GWd/MTU)           (kW/ft) 0.0               10 10.0               10 67.0              5.9 Figure 2.2 APLHGRRATED for ATRIUM-11 Fuel Browns Ferry Unit 2 Cycle 21                                                                                                 Page 5 Core Operating Limits Report, 120% OLTP                                                           TVA-COLR-BF2C21, Revision 0 (Final)
-Of-Service Corrections The limit s shown in Figure 2.1 and Figure 2.2 are applicable for operation with all equipment In
 
-Service as well as the following Equipment Out
EDMS: L94 190211 800 Reactor Engineering and Fuels - BWRFE Date: February 12, 2019 NPG                      1101 Market Street, Chattanooga TN 37402 2.5       Equipment Out-Of-Service Corrections The limits shown in Figure 2.1 and Figure 2.2 are applicable for operation with all equipment In-Service as well as the following Equipment Out-Of-Service (EOOS) options; including combinations of the options.
-Of-Service (EOOS) options; including combinations of the options.
In-Service                             All equipment In-Service
In-Service   All equipment In
* RPTOOS                                 EOC-Recirculation Pump Trip Out-Of-Service TBVOOS                                 Turbine Bypass Valve(s) Out-Of-Service PLUOOS                                 Power Load Unbalance Out-Of-Service FHOOS (or FFWTR)                       Feedwater Heaters Out-Of-Service or Final Feedwater Temperature Reduction RCPOOS                                 One Recirculation Pump Out-Of-Service
-Service* RPTOOS   EOC-Recirculation Pump Trip Out
-Of-Service TBVOOS   Turbine Bypass Valve(s) Out-Of-Service PLUOOS   Power Load Unbalance Out
-Of-Service FHOOS (or FFWTR)
Feedwater Heaters Out
-Of-Service or Final Feedwater Temperature Reduction RCPOOS   One Recirculation Pump Out
-Of-Service
* All equipment service conditions assume 1 SRVOOS.
* All equipment service conditions assume 1 SRVOOS.
Browns Ferry Unit 2 Cycle 21                                                                                        Page 6 Core Operating Limits Report, 120% OLTP                                                  TVA-COLR-BF2C21, Revision 0 (Final)


EDMS: L94 190211 800 N PG Reactor Engineering and Fuels
EDMS: L94 190211 800 Reactor Engineering and Fuels - BWRFE Date: February 12, 2019 NPG                      1101 Market Street, Chattanooga TN 37402 3 LHGR Limits (Technical Specification 3.2.3, 3.3.4.1, & 3.7.5)
- BWRFE 1101 Market Street, Chattanooga TN 37402 Date:  February 12, 2019  Browns Ferry Unit 2 Cycle 21  Page 7 Core Operating Limits Report
The LHGR limit is determined by adjusting the rated power LHGR limit for off-rated power and off-rated flow conditions. The most limiting of these is then used as follows:
, 120% OLTP    TVA-COLR-BF 2 C 21, Revision 0 (Final) 3 LHGR Limits (Technical Specification 3.2.3, 3.3.4.1, & 3.7.5)
LHGR limit = MIN ( LHGRP, LHGRF )
The LHGR limit is determined by adjusting the rated power LHGR limit for off
where:
-rated power and off-rated flow conditions. The most limiting of these is then used as follows:
LHGRP                  off-rated power LHGR limit                   [LHGRRATED
LHGR limit = MIN ( LHGR P, LHGR F )   where: LHGR P  off-rated power LHGR limit
* LHGRFACP]
[LHGRRATED
LHGRF                  off-rated flow LHGR limit                     [LHGRRATED
* LHGRFAC P] LHGR F  off-rated flow LHGR limit
* LHGRFACF]
[LHGRRATED
3.1     Rated Power and Flow Limit: LHGRRATED The rated conditions LHGR for all fuel are identified per Reference 1. The rated conditions LHGR for ATRIUM-10XM are shown in Figure 3.1. The rated conditions LHGR for ATRIUM-11 fuel is shown in Figure 3.2. The LHGR limit is consistent with References 2 and 3.
* LHGRFAC F] 3.1 Rated Power and Flow Limit: LHGRRATED The rated conditions LHGR for all fuel are identified per Reference
3.2     Off-Rated Power Dependent Limit: LHGRP LHGR limits are adjusted for off-rated power conditions using the LHGRFACP multiplier provided in Reference 1. The multiplier is split into two sub cases: turbine bypass valves in and out-of-service. The base case multipliers are shown in Figure 3.3 and Figure 3.4.
: 1. The rated conditions LHGR for ATRIUM
3.2.1 Startup without Feedwater Heaters There is a range of operation during startup when the feedwater heaters are not placed into service until after the unit has reached a significant operating power level. Additional limits are shown in Figure 3.7 through Figure 3.10, based on temperature conditions identified in Table 3.1.
-10 XM are shown in Figure 3.1. The rated conditions LHGR for ATRIUM
Table 3.1 Startup Feedwater Temperature Basis Temperature Power              Range 1                Range 2
-1 1 fuel is shown in Figure 3.2. The LHGR limit is consistent with References 2 and 3. 3.2 Off-Rated Power Dependent Limit: LHGR P LHGR limits are adjusted for off
(% Rated)               (°F)                 (°F) 23                  155.0                150.0 30                  162.0                157.0 40                  172.0                167.0 50                  182.0                177.0 Browns Ferry Unit 2 Cycle 21                                                                                        Page 7 Core Operating Limits Report, 120% OLTP                                                  TVA-COLR-BF2C21, Revision 0 (Final)
-rated power conditions using the LHGRFAC P multiplier provided in Reference
: 1. The multiplier is split into two sub cases: turbine b y pass valves in and out-of-service. The base case multipliers are shown in Figure 3.3 and Figure 3.4. 3.2.1 Startup without Feedwater Heaters There is a range of operation during startup when the feedwater heaters are not placed into service until after the unit has reach ed a significant operating power level. Additional limits are shown i n Figure 3.7 through Figure 3.10 , based on temperature conditions identified in Table 3.1. Table 3.1   Startup Feedwater Temperature Basis PowerRange 1Range 2(% Rated)(°F)(°F)23155.0150.0 30162.0157.0 40172.0167.0 50182.0177.0Temperature


EDMS: L94 190211 800 N PG Reactor Engineering and Fuels
EDMS: L94 190211 800 Reactor Engineering and Fuels - BWRFE Date: February 12, 2019 NPG                      1101 Market Street, Chattanooga TN 37402 3.3     Off-Rated Flow Dependent Limit: LHGRF LHGR limits are adjusted for off-rated flow conditions using the LHGRFACF multiplier provided in Reference 1. Multipliers are shown in Figure 3.5 through Figure 3.6.
- BWRFE 1101 Market Street, Chattanooga TN 37402 Date:  February 12, 2019  Browns Ferry Unit 2 Cycle 21  Page 8 Core Operating Limits Report
3.4     Equipment Out-Of-Service Corrections The limits shown in Figure 3.1 and Figure 3.2 are applicable for operation with all equipment In-Service as well as the following Equipment Out-Of-Service (EOOS) options; including combinations of the options.
, 120% OLTP    TVA-COLR-BF 2 C 21, Revision 0 (Final) 3.3 Off-Rated Flow Dependent Limit: LHGR F LHGR limits are adjusted for off
* In-Service                             All equipment In-Service RPTOOS                                 EOC-Recirculation Pump Trip Out-Of-Service TBVOOS                                 Turbine Bypass Valve(s) Out-Of-Service PLUOOS                                 Power Load Unbalance Out-Of-Service FHOOS (or FFWTR)                       Feedwater Heaters Out-Of-Service or Final Feedwater Temperature Reduction RCPOOS                                 One Recirculation Pump Out-Of-Service Off-rated power corrections shown in Figure 3.3 and Figure 3.4 are dependent on operation of the Turbine Bypass Valve system. For this reason, separate limits are to be applied for TBVIS or TBVOOS operation. The limits have no dependency on RPTOOS, PLUOOS, FHOOS/FFWTR, or SLO.
-rated flow conditions using the LHGRFAC F multiplier provided in Reference
Off-rated flow corrections shown in Figure 3.5 and Figure 3.6 are bounding for all EOOS conditions.
: 1. Multiplier s are shown in Figure 3.5 through Figure 3.6. 3.4 Equipment Out
Off-rated power corrections shown in Figure 3.7 through Figure 3.10 are also dependent on operation of the Turbine Bypass Valve system. In this case, limits support FHOOS operation during startup. These limits have no dependency on RPTOOS, PLUOOS, or SLO.
-Of-Service Corrections The limit s shown in Figure 3.1 and Figure 3.2 are applicable for operation with all equipment In
-Service as well as the following Equipment Out
-Of-Service (EOOS) options; including combinations of the options.
* In-Service   All equipment In
-Service RPTOOS   EOC-Recirculation Pump Trip Out
-Of-Service TBVOOS   Turbine Bypass Valve(s) Out
-Of-Service PLUOOS   Power Load Unbalance Out
-Of-Service FHOOS (or FFWTR)
Feedwater Heaters Out
-Of-Service or Final Feedwater Temperature Reduction RCPOOS   One Recirculation Pump Out
-Of-Service O ff-rated power corrections shown in Figure 3.3 and Figure 3.4 are dependent on operation of the Turbine Bypass Valve system. For this reason, separate limits are to be applied for TBVIS or TBVOOS operation. The limits have no dependency on RPTOOS, PLUOOS, FHOOS/FFWTR, or SLO. Off-rated flow corrections shown in Figure 3.5 and Figure 3.6 are bounding for all EOOS conditions.
Of f-rated power corrections shown in Figure 3.7 through Figure 3.10 are also dependent on operation of the Turbine Bypass Valve system. In this case, limits support FHOOS operation during startup. The se limits have no dependency on RPTOOS, PLUOOS, or SLO.
* All equipment service conditions assume 1 SRVOOS.
* All equipment service conditions assume 1 SRVOOS.
Browns Ferry Unit 2 Cycle 21                                                                                        Page 8 Core Operating Limits Report, 120% OLTP                                                  TVA-COLR-BF2C21, Revision 0 (Final)
EDMS: L94 190211 800 Reactor Engineering and Fuels - BWRFE Date: February 12, 2019 NPG            1101 Market Street, Chattanooga TN 37402 15 12 9
LHGR (kW/ft) 6 3
0 0        20                    40                  60                    80 Pellet Exposure (GWd/MTU)
Pellet            LHGR Exposure            Limit (GWd/MTU)          (kW/ft) 0.0            14.1 18.9              14.1 74.4              7.4 Figure 3.1 LHGRRATED for ATRIUM-10XM Fuel Browns Ferry Unit 2 Cycle 21                                                                                          Page 9 Core Operating Limits Report, 120% OLTP                                                    TVA-COLR-BF2C21, Revision 0 (Final)
EDMS: L94 190211 800 Reactor Engineering and Fuels - BWRFE Date: February 12, 2019 NPG            1101 Market Street, Chattanooga TN 37402 15 12 9
LHGR (kW/ft) 6 3
0 0          20                    40                  60                    80 Pellet Exposure (GWd/MTU)
Pellet            LHGR Exposure            Limit (GWd/MTU)          (kW/ft) 0.0            12.2 18.9              12.2 74.4              6.4 Figure 3.2 LHGRRATED for ATRIUM-11 Fuel Browns Ferry Unit 2 Cycle 21                                                                                          Page 10 Core Operating Limits Report, 120% OLTP                                                    TVA-COLR-BF2C21, Revision 0 (Final)
EDMS: L94 190211 800 Reactor Engineering and Fuels - BWRFE Date: February 12, 2019 NPG                        1101 Market Street, Chattanooga TN 37402 1.10 1.00 0.90 Turbine Bypass Valve In-Service, TBVIS 0.80 0.70 LHGRFACP Turbine Bypass Valve Out-of-Service, TBVOOS 0.60 TBVIS,  50% Core Flow 0.50 TBVOOS,  50% Core Flow TBVIS, > 50% Core Flow 0.40          TBVOOS, > 50% Core Flow 0.30 0.20 20        30        40            50        60      70        80          90        100        110 Core Power (% Rated)
Turb ine Bypass In-Service            Turb ine Bypass Out-of-Service Core                                  Core Power        LHGRFACP                Power            LHGRFACP
(% Rated)                                (% Rated) 100.0        1.00                      100.0        1.00 26.0        0.62                        26.0        0.61 Core Flow > 50% Rated                    Core Flow > 50% Rated 26.0        0.45                        26.0        0.38 23.0        0.42                        23.0        0.35 Core Flow  50% Rated                    Core Flow  50% Rated 26.0        0.48                        26.0        0.48 23.0        0.45                        23.0        0.43 Figure 3.3 Base Operation LHGRFACP for ATRIUM-10XM Fuel (Independent of other EOOS conditions)
Browns Ferry Unit 2 Cycle 21                                                                                                Page 11 Core Operating Limits Report, 120% OLTP                                                            TVA-COLR-BF2C21, Revision 0 (Final)
EDMS: L94 190211 800 Reactor Engineering and Fuels - BWRFE Date: February 12, 2019 NPG                      1101 Market Street, Chattanooga TN 37402 1.10 1.00 0.90 Turbine Bypass Valve In-Service, TBVIS 0.80 0.70 LHGRFACP Turbine Bypass Valve Out-of-Service, TBVOOS 0.60 0.50          TBVIS,  50% Core Flow TBVOOS,  50% Core Flow TBVIS, > 50% Core Flow 0.40          TBVOOS, > 50% Core Flow 0.30 0.20 20      30        40          50        60        70          80      90        100        110 Core Power (% Rated)
Turb ine Bypass In-Service                Turb ine Bypass Out-of-Service Core                                        Core Power          LHGRFACP                    Power          LHGRFACP
(% Rated)                                  (% Rated) 100.0        1.00                        100.0        1.00 26.0        0.62                          26.0        0.61 Core Flow > 50% Rated                      Core Flow > 50% Rated 26.0        0.45                          26.0        0.38 23.0        0.42                          23.0        0.35 Core Flow  50% Rated                      Core Flow  50% Rated 26.0        0.48                          26.0        0.48 23.0        0.45                          23.0        0.43 Figure 3.4 Base Operation LHGRFACP for ATRIUM-11 Fuel (Independent of other EOOS conditions)
Browns Ferry Unit 2 Cycle 21                                                                                              Page 12 Core Operating Limits Report, 120% OLTP                                                          TVA-COLR-BF2C21, Revision 0 (Final)
EDMS: L94 190211 800 Reactor Engineering and Fuels - BWRFE Date: February 12, 2019 NPG                  1101 Market Street, Chattanooga TN 37402 1.10 1.05 1.00 0.95 0.90 LHGRFACF 0.85 0.80 0.75 0.70 0.65 0.60 25    35        45        55        65        75        85        95        105 Core Flow (% Rated)
Core Flow          LHGRFACF
(% Rated) 0.0              0.63 30.0            0.63 76.6            1.00 107.0            1.00 Figure 3.5 LHGRFACF for ATRIUM-10XM Fuel (Values bound all EOOS conditions)
(107.0% maximum core flow line is used to support 105% rated flow operation, ICF)
Browns Ferry Unit 2 Cycle 21                                                                                        Page 13 Core Operating Limits Report, 120% OLTP                                                  TVA-COLR-BF2C21, Revision 0 (Final)
EDMS: L94 190211 800 Reactor Engineering and Fuels - BWRFE Date: February 12, 2019 NPG                  1101 Market Street, Chattanooga TN 37402 1.10 1.05 1.00 0.95 0.90 LHGRFACF 0.85 0.80 0.75 0.70 0.65 0.60 25    35        45        55        65        75        85        95        105 Core Flow (% Rated)
Core Flow          LHGRFACF
(% Rated) 0.0              0.66 30.0            0.66 73.7            1.00 107.0            1.00 Figure 3.6 LHGRFACF for ATRIUM-11 Fuel (Values bound all EOOS conditions)
(107.0% maximum core flow line is used to support 105% rated flow operation, ICF)
Browns Ferry Unit 2 Cycle 21                                                                                        Page 14 Core Operating Limits Report, 120% OLTP                                                  TVA-COLR-BF2C21, Revision 0 (Final)
EDMS: L94 190211 800 Reactor Engineering and Fuels - BWRFE Date: February 12, 2019 NPG                      1101 Market Street, Chattanooga TN 37402 1.10 1.00 0.90 0.80          Turbine Bypass Valve In-Service, TBVIS 0.70 LHGRFACP Turbine Bypass Valve Out-of-Service, TBVOOS 0.60 0.50 TBVIS,  50% Core Flow 0.40          TBVOOS,  50% Core Flow TBVIS, > 50% Core Flow TBVOOS, > 50% Core Flow 0.30 0.20 20    30        40        50        60        70          80      90        100        110 Core Power (% Rated)
Turb ine Bypass In-Service              Turb ine Bypass Out-of-Service Core                                      Core Power          LHGRFACP                  Power            LHGRFACP
(% Rated)                                (% Rated) 100.0        1.00                        100.0        1.00 26.0        0.51                        26.0        0.51 Core Flow > 50% Rated                    Core Flow > 50% Rated 26.0        0.39                        26.0        0.34 23.0        0.36                        23.0        0.31 Core Flow  50% Rated                    Core Flow  50% Rated 26.0        0.41                        26.0        0.41 23.0        0.41                        23.0        0.39 Figure 3.7 Startup Operation LHGRFACP for ATRIUM-10XM Fuel:
Table 3.1 Temperature Range 1 (no Feedwater heating during startup)
(Limits valid at and below 50% power)
Browns Ferry Unit 2 Cycle 21                                                                                            Page 15 Core Operating Limits Report, 120% OLTP                                                        TVA-COLR-BF2C21, Revision 0 (Final)
EDMS: L94 190211 800 Reactor Engineering and Fuels - BWRFE Date: February 12, 2019 NPG                      1101 Market Street, Chattanooga TN 37402 1.10 1.00 0.90 0.80          Turbine Bypass Valve In-Service, TBVIS 0.70 LHGRFACP                                                Turbine Bypass Valve Out-of-Service, TBVOOS 0.60 0.50 TBVIS,  50% Core Flow 0.40          TBVOOS,  50% Core Flow TBVIS, > 50% Core Flow TBVOOS, > 50% Core Flow 0.30 0.20 20    30          40        50        60        70        80        90        100        110 Core Power (% Rated)
Turbine Bypass In-Service                Turbine Bypass Out-of-Service Core                                        Core Power            LHGRFACP                  Power            LHGRFACP
(% Rated)                                    (% Rated) 100.0          1.00                          100.0          1.00 26.0          0.51                          26.0          0.51 Core Flow > 50% Rated                        Core Flow > 50% Rated 26.0          0.39                          26.0          0.34 23.0          0.35                          23.0          0.30 Core Flow  50% Rated                        Core Flow  50% Rated 26.0          0.41                          26.0          0.41 23.0          0.40                          23.0          0.38 Figure 3.8 Startup Operation LHGRFACP for ATRIUM-10XM Fuel:
Table 3.1 Temperature Range 2 (no Feedwater heating during startup)
(Limits valid at and below 50% power)
Browns Ferry Unit 2 Cycle 21                                                                                            Page 16 Core Operating Limits Report, 120% OLTP                                                        TVA-COLR-BF2C21, Revision 0 (Final)
EDMS: L94 190211 800 Reactor Engineering and Fuels - BWRFE Date: February 12, 2019 NPG                        1101 Market Street, Chattanooga TN 37402 1.10 1.00 0.90 0.80            Turbine Bypass Valve In-Service, TBVIS 0.70 LHGRFACP Turbine Bypass Valve Out-of-Service, TBVOOS 0.60 0.50 TBVIS,  50% Core Flow 0.40          TBVOOS,  50% Core Flow TBVIS, > 50% Core Flow TBVOOS, > 50% Core Flow 0.30 0.20 20      30        40            50        60        70          80      90        100        110 Core Power (% Rated)
Turb ine Bypass In-Service                Turb ine Bypass Out-of-Service Core                                        Core Power          LHGRFACP                    Power          LHGRFACP
(% Rated)                                  (% Rated) 100.0        1.00                          100.0        1.00 26.0        0.51                          26.0        0.51 Core Flow > 50% Rated                      Core Flow > 50% Rated 26.0        0.39                          26.0        0.34 23.0        0.36                          23.0        0.31 Core Flow  50% Rated                      Core Flow  50% Rated 26.0        0.41                          26.0        0.41 23.0        0.41                          23.0        0.39 Figure 3.9 Startup Operation LHGRFACP for ATRIUM-11 Fuel:
Table 3.1 Temperature Range 1 (no Feedwater heating during startup)
(Limits valid at and below 50% power)
Browns Ferry Unit 2 Cycle 21                                                                                                Page 17 Core Operating Limits Report, 120% OLTP                                                            TVA-COLR-BF2C21, Revision 0 (Final)


EDMS: L94 190211 800 N PG Reactor Engineering and Fuels
EDMS: L94 190211 800 Reactor Engineering and Fuels - BWRFE Date: February 12, 2019 NPG                        1101 Market Street, Chattanooga TN 37402 1.10 1.00 0.90 0.80          Turbine Bypass Valve In-Service, TBVIS 0.70 LHGRFACP Turbine Bypass Valve Out-of-Service, TBVOOS 0.60 0.50 TBVIS,  50% Core Flow 0.40          TBVOOS, 50% Core Flow TBVIS, > 50% Core Flow TBVOOS, > 50% Core Flow 0.30 0.20 20      30         40           50       60       70         80       90        100        110 Core Power (% Rated)
- BWRFE 1101 Market Street, Chattanooga TN 37402 Date: February 12, 2019 Browns Ferry Unit 2 Cycle 21  Page 9 Core Operating Limits Report
Turb ine Bypass In-Service              Turb ine Bypass Out-of-Service Core                                       Core Power          LHGRFACP                    Power          LHGRFACP
, 120% OLTP    TVA-COLR-BF 2 C 21, Revision 0 (Final)  0 3 6 9 12 15 0 20 40 60 80LHGR (kW/ft)Pellet Exposure (GWd/MTU)
(% Rated)                                 (% Rated) 100.0        1.00                         100.0        1.00 26.0        0.51                          26.0        0.51 Core Flow > 50% Rated                      Core Flow > 50% Rated 26.0         0.39                          26.0        0.34 23.0         0.35                         23.0         0.30 Core Flow  50% Rated                     Core Flow 50% Rated 26.0         0.41                          26.0        0.41 23.0        0.40                         23.0        0.38 Figure 3.10 Startup Operation LHGRFACP for ATRIUM-11 Fuel:
PelletLHGRExposureLimit(GWd/MTU)(kW/ft)0.014.118.914.174.47.4 Figure 3.1  LHGRRATED for ATRIUM
Table 3.1 Temperature Range 2 (no Feedwater heating during startup)
-10 XM Fuel EDMS: L94 190211 800 N PG Reactor Engineering and Fuels
(Limits valid at and below 50% power)
- BWRFE 1101 Market Street, Chattanooga TN 37402 Date:  February 12, 2019  Browns Ferry Unit 2 Cycle 21  Page 10 Core Operating Limits Report
Browns Ferry Unit 2 Cycle 21                                                                                               Page 18 Core Operating Limits Report, 120% OLTP                                                           TVA-COLR-BF2C21, Revision 0 (Final)
, 120% OLTP    TVA-COLR-BF 2 C 21, Revision 0 (Final)  0 3 6 9 12 15 0 20 40 60 80LHGR (kW/ft)Pellet Exposure (GWd/MTU)
 
PelletLHGRExposureLimit(GWd/MTU)(kW/ft)0.012.218.912.274.46.4 Figure 3.2  LHGRRATED for ATRIUM
EDMS: L94 190211 800 Reactor Engineering and Fuels - BWRFE Date: February 12, 2019 NPG                    1101 Market Street, Chattanooga TN 37402 4 OLMCPR Limits (Technical Specification 3.2.2, 3.3.4.1, & 3.7.5)
-1 1 Fuel EDMS: L94 190211 800 N PG Reactor Engineering and Fuels
OLMCPR is calculated to be the most limiting of the flow or power dependent values OLMCPR limit = MAX ( MCPRF , MCPRP )
- BWRFE 1101 Market Street, Chattanooga TN 37402 Date:  February 12, 2019  Browns Ferry Unit 2 Cycle 21  Page 11 Core Operating Limits Report
where:
, 120% OLTP    TVA-COLR-BF 2 C 21, Revision 0 (Final)  0.200.300.400.500.600.700.800.901.001.10 20 30 40 50 60 70 80 90100110LHGRFAC PCore Power (% Rated)Turbine Bypass Valve Out
MCPRF            core flow-dependent MCPR limit MCPRP            power-dependent MCPR limit 4.1     Flow Dependent MCPR Limit: MCPRF MCPRF limits are dependent upon core flow (% of Rated), and the max core flow limit, (Rated or Increased Core Flow, ICF). MCPRF limits are shown in Figure 4.1, per Reference 1. Limits are valid for all EOOS combinations. No adjustment is required for SLO conditions.
-of-Service, TBVOOSTurbine Bypass Valve In
4.2     Power Dependent MCPR Limit: MCPRP MCPRP limits are dependent upon:
-Service, TBVISTBVIS> 50% Core FlowTBVOOS, > 50% Core Flow           CoreCorePowerLHGRFAC PPowerLHGRFAC P(% Rated)(% Rated)100.01.00100.01.0026.00.6226.00.6126.00.4526.00.3823.00.4223.00.3526.00.4826.00.4823.00.4523.00.43Turbine Bypass In-ServiceTurbine Bypass Out-of-ServiceCore Flow > 50% RatedCore Flow > 50% Rated Figure 3.3  Base Operati on LHGRFAC P for ATRIUM
-10 XM Fuel (Independent of other EOOS conditions
)
EDMS: L94 190211 800 N PG Reactor Engineering and Fuels
- BWRFE 1101 Market Street, Chattanooga TN 37402 Date:  February 12, 2019  Browns Ferry Unit 2 Cycle 21  Page 12 Core Operating Limits Report
, 120% OLTP    TVA-COLR-BF 2 C 21, Revision 0 (Final)  0.200.300.400.500.600.700.800.901.001.10 20 30 40 50 60 70 80 90100110LHGRFAC PCore Power (% Rated)Turbine Bypass Valve Out
-of-Service, TBVOOSTurbine Bypass Valve In
-Service, TBVISTBVIS,  > 50% Core FlowTBVOOS, > 50% Core Flow      CoreCorePowerLHGRFAC PPowerLHGRFAC P(% Rated)(% Rated)100.01.00100.01.0026.00.6226.00.6126.00.4526.00.3823.00.4223.00.3526.00.4826.00.4823.00.4523.00.43Turbine Bypass In-ServiceTurbine Bypass Out-of-ServiceCore Flow > 50% RatedCore Flow > 50% Rated Figure 3.4  Base Operation LHGRFAC P for ATRIUM-1 1 Fuel (Independent of other EOOS conditions
)
EDMS: L94 190211 800 N PG Reactor Engineering and Fuels
- BWRFE 1101 Market Street, Chattanooga TN 37402 Date:  February 12, 2019  Browns Ferry Unit 2 Cycle 21  Page 13 Core Operating Limits Report
, 120% OLTP    TVA-COLR-BF 2 C 21, Revision 0 (Final)  0.600.650.700.750.800.850.900.951.001.051.10 25 35 45 55 65 75 85 95105LHGRFAC FCore Flow (% Rated)
CoreFlowLHGRFAC F(% Rated)0.00.6330.00.6376.61.00107.01.00 Figure 3.5  LHGRFAC F for ATRIUM
-10 XM Fuel (Values bound all EOOS conditions
)  (107.0% maximum core flow line is used to support 105% rated flow operation, ICF
)
EDMS: L94 190211 800 N PG Reactor Engineering and Fuels
- BWRFE 1101 Market Street, Chattanooga TN 37402 Date:  February 12, 2019  Browns Ferry Unit 2 Cycle 21  Page 14 Core Operating Limits Report
, 120% OLTP    TVA-COLR-BF 2 C 21, Revision 0 (Final)  0.600.650.700.750.800.850.900.951.001.051.10 25 35 45 55 65 75 85 95105LHGRFAC FCore Flow (% Rated)
CoreFlowLHGRFAC F(% Rated)0.00.6630.00.6673.71.00107.01.00 Figure 3.6  LHGRFAC F for ATRIUM-1 1 Fuel (Values bound all EOOS conditions
)  (107.0% maximum core flow line is used to support 105% rated flow operation, ICF
)
EDMS: L94 190211 800 N PG Reactor Engineering and Fuels
- BWRFE 1101 Market Street, Chattanooga TN 37402 Date:  February 12, 2019  Browns Ferry Unit 2 Cycle 21  Page 15 Core Operating Limits Report
, 120% OLTP    TVA-COLR-BF 2 C 21, Revision 0 (Final)  0.200.300.400.500.600.700.800.901.001.10 20 30 40 50 60 70 80 90100110LHGRFAC PCore Power (% Rated)Turbine Bypass Valve Out
-of-Service, TBVOOSTurbine Bypass Valve In
-Service, TBVISTBVIS,  > 50% Core FlowTBVOOS, > 50% Core Flow     CoreCorePowerLHGRFAC PPowerLHGRFAC P(% Rated)(% Rated)100.01.00100.01.0026.00.5126.00.5126.00.3926.00.3423.00.3623.00.3126.00.4126.00.4123.00.4123.00.39Turbine Bypass In-ServiceTurbine Bypass Out-of-ServiceCore Flow > 50% RatedCore Flow > 50% Rated Figure 3.7  Startup Operation LHGRFAC P for ATRIUM
-10 XM Fuel: Table 3.1 Temperature Range 1 (no Feedwater hea ting during startup
) (Limits valid at and below 50% power)
EDMS: L94 190211 800 N PG Reactor Engineering and Fuels
- BWRFE 1101 Market Street, Chattanooga TN 37402 Date:  February 12, 2019  Browns Ferry Unit 2 Cycle 21  Page 16 Core Operating Limits Report
, 120% OLTP    TVA-COLR-BF 2 C 21, Revision 0 (Final)  0.200.300.400.500.600.700.800.901.001.10 20 30 40 50 60 70 80 90100110LHGRFAC PCore Power (% Rated)Turbine Bypass Valve Out
-of-Service, TBVOOSTurbine Bypass Valve In
-Service, TBVISTBVIS,  > 50% Core FlowTBVOOS, > 50% Core Flow      CoreCorePowerLHGRFAC PPowerLHGRFAC P(% Rated)(% Rated)100.01.00100.01.0026.00.5126.00.5126.00.3926.00.3423.00.3523.00.3026.00.4126.00.4123.00.4023.00.38Turbine Bypass In-ServiceTurbine Bypass Out-of-ServiceCore Flow > 50% RatedCore Flow > 50% Rated Figure 3.Startup Operation LHGRFAC P for ATRIUM
-10 XM Fuel: Table 3.1 Temperature Range 2 (no Feedwater hea ting during startup
) (Limits valid at and below 50% power)
EDMS: L94 190211 800 N PG Reactor Engineering and Fuels
- BWRFE 1101 Market Street, Chattanooga TN 37402 Date:  February 12, 2019  Browns Ferry Unit 2 Cycle 21 Page 17 Core Operating Limits Report
, 120% OLTP     TVA-COLR-BF 2 C 21, Revision 0 (Final) 0.200.300.400.500.600.700.800.901.001.10 20 30 40 50 60 70 80 90100110LHGRFAC PCore Power (% Rated)Turbine Bypass Valve Out
-of-Service, TBVOOSTurbine Bypass Valve In
-Service, TBVISTBVIS,  > 50% Core FlowTBVOOS, > 50% Core Flow      CoreCorePowerLHGRFAC PPowerLHGRFAC P(% Rated)(% Rated)100.01.00100.01.0026.00.5126.00.5126.00.3926.00.3423.00.3623.00.3126.00.4126.00.4123.00.4123.00.39Turbine Bypass In-ServiceTurbine Bypass Out-of-ServiceCore Flow > 50% RatedCore Flow > 50% Rated Figure 3.9  Startup Operation LHGRFAC P for ATRIUM
-1 1 Fuel: Table 3.1 Temperature Range 1 (no Feedwater heating during startup
) (Limits valid at and below 50% power)
EDMS: L94 190211 800 N PG Reactor Engineering and Fuels
- BWRFE 1101 Market Street, Chattanooga TN 37402 Date: February 12, 2019 Browns Ferry Unit 2 Cycle 21  Page 18 Core Operating Limits Report
, 120% OLTP    TVA-COLR-BF 2 C 21, Revision 0 (Final)  0.200.300.400.500.600.700.800.901.001.10 20 30 40 50 60 70 80 90100110LHGRFAC PCore Power (% Rated)Turbine Bypass Valve Out
-of-Service, TBVOOSTurbine Bypass Valve In
-Service, TBVISTBVIS,  > 50% Core FlowTBVOOS, > 50% Core Flow      CoreCorePowerLHGRFAC PPowerLHGRFAC P(% Rated)(% Rated)100.01.00100.01.0026.00.5126.00.5126.00.3926.00.3423.00.3523.00.3026.00.4126.00.4123.00.4023.00.38Turbine Bypass In-ServiceTurbine Bypass Out-of-ServiceCore Flow > 50% RatedCore Flow > 50% Rated Figure 3.10  Startup Operation LHGRFAC P for ATRIUM-1 1 Fuel: Table 3.1 Temperature Range 2 (no Feedwater heating during startup
) (Limits valid at and below 50% power)
EDMS: L94 190211 800 N PG Reactor Engineering and Fuels
- BWRFE 1101 Market Street, Chattanooga TN 37402 Date:  February 12, 2019  Browns Ferry Unit 2 Cycle 21  Page 19 Core Operating Limits Report
, 120% OLTP    TVA-COLR-BF 2 C 21, Revision 0 (Final) 4 OLMCPR Limits (Technical Specification 3.2.2, 3.3.4.1, & 3.7.5)
OLMCPR is calculated to be the most limiting of the flow or power dependent values OLMCPR limit = MAX ( MCPR F , MCPR P )   where:   MCPR F core flow-dependent MCPR limit MCPR P power-dependent MCPR limit 4.1 Flow Dependent MCPR Limit: MCPR F MCPR F limits are dependent upon core flow (% of Rated), and the max core flow limit, (Rated or Increased Core Flow, ICF). MCPR F limits are shown in Figure 4.1, per Reference
: 1. Limits are valid for all EOOS combinations. No adjustment is required for SLO conditions.
4.2 Power Dependent MCPR Limit:
MCPR P MCPR P limits are dependent upon:
Core Power Level (% of Rated)
Core Power Level (% of Rated)
Technical Specification Scram Speed (TSS S), Nominal Scram Speed (NSS), or Optimum Scram Speed (OSS)
Technical Specification Scram Speed (TSSS), Nominal Scram Speed (NSS), or Optimum Scram Speed (OSS)
Cycle Operating Exposure (NEOC, EOC, and CD  
Cycle Operating Exposure (NEOC, EOC, and CD - as defined in this section)
- as defined in this section)
Equipment Out-Of-Service Options Two or Single recirculation Loop Operation (TLO vs. SLO)
Equipment Out
The MCPRP limits are provided in Table 4.2 through Table 4.9, where each table contains the limits for all fuel types and EOOS options (for a specified scram speed and exposure range).
-Of-Service Options Two or Single recirculation Loop Operation (TLO vs. SLO)
The CMSS determines MCPRP limits, from these tables, based on linear interpolation between the specified powers.
The MCPR P limits are provided in Table 4.2 through Table 4.9 , where each table contains the limits for all fuel types and EOOS options (for a specified scram speed and exposure range).
4.2.1 Startup without Feedwater Heaters There is a range of operation during startup when the feedwater heaters are not placed into service until after the unit has reached a significant operating power level. Additional power dependent limits are shown in Table 4.5 through Table 4.8 based on temperature conditions identified in Table 3.1.
The CMSS determines MCPR P limits, from these tables, based on linear interpolation between the specified powers.
Browns Ferry Unit 2 Cycle 21                                                                                   Page 19 Core Operating Limits Report, 120% OLTP                                               TVA-COLR-BF2C21, Revision 0 (Final)
4.2.1 Startup without Feedwater Heaters There is a range of operation during startup when the feedwater heaters are not placed into service until after the unit has reach ed a significant operating power level. Additional power dependent limits are shown in Table 4.5 through Table 4.8 based on temperature conditions identified in Table 3.1.
 
EDMS: L94 190211 800 N PG Reactor Engineering and Fuels
EDMS: L94 190211 800 Reactor Engineering and Fuels - BWRFE Date: February 12, 2019 NPG                          1101 Market Street, Chattanooga TN 37402 4.2.2     Scram Speed Dependent Limits (TSSS vs. NSS vs. OSS)
- BWRFE 1101 Market Street, Chattanooga TN 37402 Date:  February 12, 2019  Browns Ferry Unit 2 Cycle 21 Page 20 Core Operating Limits Report
MCPRP limits are provided for three different sets of assumed scram speeds. The Technical Specification Scram Speed (TSSS) MCPRP limits are applicable at all times, as long as the scram time surveillance demonstrates the times in Technical Specification Table 3.1.4-1 are met. Both Nominal Scram Speeds (NSS) and/or Optimum Scram Speeds (OSS) may be used, as long as the scram time surveillance demonstrates Table 4.1 times are applicable.
, 120% OLTP     TVA-COLR-BF 2 C 21, Revision 0 (Final) 4.2.2 Scram Speed Dependent Limits (TSSS vs. NSS vs. OSS) MCPR P limits are provided for three different sets of assumed scram speeds. The Technical Specification Scram Speed (TSSS) MCPR P limits are applicable at all times, as long as the scram time surveillance demonstrates the times in Technical Specification Table 3.1.4
* Table 4.1 Nominal Scram Time Basis Notch                  Nominal              Optimum Position            Scram Timing          Scram Timing (index)                 (seconds)             (seconds) 46                        0.420                  0.380 36                        0.980                  0.875 26                        1.600                  1.465 6                      2.900                  2.900 In demonstrating compliance with the NSS and/or OSS scram time basis, surveillance requirements from Technical Specification 3.1.4 apply; accepting the definition of SLOW rods should conform to scram speeds shown in Table 4.1. If conformance is not demonstrated, TSSS based MCPRP limits are applied.
-1 are met. Both Nominal Scram Speeds (NSS) and/or Optimum Scram Speeds (OSS) may be used
, as long as the scram time surveillance demonstrates Table 4.1 times are applicable.
*Table 4.1   Nominal Scram Time Basis NotchNominalOptimumPositionScram TimingScram Timing(index)(seconds)(seconds)460.4200.380 360.9800.875 261.6001.465 62.9002.900 In demonstrating compliance with the NSS and/or OSS scram time basis, surveillance requirements from Technical Specification 3.1.4 apply; accepting the definition of SLOW rods should conform to scram speeds shown in Table 4.1. If conformance is not demonstra ted, TSSS based MCPR P limits are applied.
On initial cycle startup, TSSS limits are used until the successful completion of scram timing confirms NSS and/or OSS based limits are applicable.
On initial cycle startup, TSSS limits are used until the successful completion of scram timing confirms NSS and/or OSS based limits are applicable.
4.2.3 Exposure Dependent Limits Exposures are tracked on a Core Average Exposure basis (CAVEX, not Cycle Exposure). Higher exposure MCPR P limits are always more limiting and may be used for any Core Average Exposure up to the ending exposure. Per Reference 1, MCPR P limits are provided for the following exposure ranges: BOC to NEOC NEOC corresponds to 29,305.7 MWd / MTU BOC to EOC LB  EOC LB corresponds to 34,273.7 MWd / MTU BOC to End of Coast End of Coast 35,998.1 MWd / MTU NEOC refers to a Near EOC exposure point.
4.2.3     Exposure Dependent Limits Exposures are tracked on a Core Average Exposure basis (CAVEX, not Cycle Exposure).
* Reference 1 analysis results are based on information identified in Reference
Higher exposure MCPRP limits are always more limiting and may be used for any Core Average Exposure up to the ending exposure. Per Reference 1, MCPRP limits are provided for the following exposure ranges:
: 4. f Drop out times consistent with method used to perform actual timing measurements (i.e., including pickup/dropout effects).
BOC to NEOC                                 NEOC corresponds to                         29,305.7 MWd / MTU BOC to EOCLB                                EOCLB corresponds to                       34,273.7 MWd / MTU BOC to End of Coast                         End of Coast                               35,998.1 MWd / MTU NEOC refers to a Near EOC exposure point.
* Reference 1 analysis results are based on information identified in Reference 4.
Drop out times consistent with method used to perform actual timing measurements (i.e., including pickup/dropout effects).
Browns Ferry Unit 2 Cycle 21                                                                                                    Page 20 Core Operating Limits Report, 120% OLTP                                                                  TVA-COLR-BF2C21, Revision 0 (Final)
 
EDMS: L94 190211 800 Reactor Engineering and Fuels - BWRFE Date: February 12, 2019 NPG                        1101 Market Street, Chattanooga TN 37402 The EOCLB exposure point is not the true End-Of-Cycle exposure. Instead it corresponds to a licensing exposure window exceeding expected end-of-full-power-life.
The End of Coast exposure point represents a licensing exposure point exceeding the expected end-of-cycle exposure including cycle extension options.
4.2.4      Equipment Out-Of-Service (EOOS) Options EOOS options
* covered by MCPRP limits are given by the following:
In-Service                                          All equipment In-Service RPTOOS                                              EOC-Recirculation Pump Trip Out-Of-Service TBVOOS                                              Turbine Bypass Valve(s) Out-Of-Service RPTOOS+TBVOOS                                      Combined RPTOOS and TBVOOS PLUOOS                                              Power Load Unbalance Out-Of-Service PLUOOS+RPTOOS                                      Combined PLUOOS and RPTOOS PLUOOS+TBVOOS                                      Combined PLUOOS and TBVOOS PLUOOS+TBVOOS+RPTOOS                                Combined PLUOOS, RPTOOS, and TBVOOS FHOOS (or FFWTR)                                    Feedwater Heaters Out-Of-Service (or Final Feedwater Temperature Reduction)
RCPOOS                                              One Recirculation Pump Out-Of-Service For exposure ranges up to NEOC and EOCLB, additional combinations of MCPRP limits are also provided including FHOOS. The coast down exposure range assumes application of FFWTR. FHOOS based MCPRP limits for the coast down exposure are redundant because the temperature setdown assumption is identical with FFWTR.
4.2.5      Single-Loop-Operation (SLO) Limits When operating in RCPOOS conditions, MCPRp limits are constructed differently from the normal operating RCP conditions. The limiting event for RCPOOS is a pump seizure scenario, which sets the upper bound for allowed core power and flow . This event is not impacted by scram time assumptions. Specific MCPRP limits are shown in Table 4.9.
4.2.6      Below Pbypass Limits Below Pbypass (26% rated power), MCPRP limits depend upon core flow. One set of MCPRP limits applies for core flow above 50% of rated; a second set applies if the core flow is less than or equal to 50% rated.
* All equipment service conditions assume 1 SRVOOS.
RCPOOS limits are only valid up to 43.75% rated core power, 50% rated core flow, and an active recirculation drive flow of 17.73 Mlbm/hr.
Browns Ferry Unit 2 Cycle 21                                                                                                        Page 21 Core Operating Limits Report, 120% OLTP                                                                TVA-COLR-BF2C21, Revision 0 (Final)
 
EDMS: L94 190211 800 Reactor Engineering and Fuels - BWRFE Date: February 12, 2019 NPG                        1101 Market Street, Chattanooga TN 37402 2.00 1.80 1.60 MCPRF 1.40 1.20 1.00 30        40          50          60        70          80          90      100          110 Core Flow (% Rated)
Core Flow            MCPRF
(% Rated) 30.0            1.58 84.0            1.34 107.0            1.34 Figure 4.1 MCPRF for All Fuel Types (Values bound all EOOS conditions)
(107.0% maximum core flow line is used to support 105% rated flow operation, ICF)
Browns Ferry Unit 2 Cycle 21                                                                                            Page 22 Core Operating Limits Report, 120% OLTP                                                      TVA-COLR-BF2C21, Revision 0 (Final)
 
EDMS: L94 190211 800 Reactor Engineering and Fuels - BWRFE Date: February 12, 2019 NPG                        1101 Market Street, Chattanooga TN 37402 Table 4.2 MCPRP Limits for All Fuel Types: Optimum Scram Time Basis
* ATRIUM-10XM                                  ATRIUM-11 BOC          BOC            BOC            BOC          BOC        BOC Pow er              to            to        to End of        to            to    to End of Operating Condition        (% of rated)      NEOC          EOCLB          Coast        NEOC          EOCLB      Coast 100            1.37          1.39          1.41          1.36          1.42        1.43 90            1.42          1.43          1.46          1.42          1.45        1.47 65            1.59          1.59          1.63          1.58          1.58        1.64 50            1.68          1.68          1.75          1.73          1.73        1.81 50            1.81          1.81          1.81          1.91          1.91        1.91 Base Case                    40            1.88          1.88          1.91          1.99          1.99        2.03 26            2.30          2.30          2.42          2.51          2.51        2.66 26 at > 50%F        2.54          2.54          2.65          2.68          2.68        2.81 23 at > 50%F        2.69          2.69          2.81          2.93          2.93        3.05 26 at  50%F        2.42          2.42          2.51          2.63          2.63        2.72 23 at  50%F        2.55          2.55          2.67          2.93          2.93        3.05 100            1.41          1.41            ---          1.40          1.43        ---
90            1.46          1.46            ---          1.45          1.47        ---
65            1.63          1.63            ---          1.64          1.64        ---
50            1.75          1.75            ---          1.81          1.81        ---
50            1.81          1.81            ---          1.91          1.91        ---
FHOOS                        40            1.91          1.91            ---          2.03          2.03        ---
26            2.42          2.42            ---          2.66          2.66        ---
26 at > 50%F        2.65          2.65            ---          2.81          2.81        ---
23 at > 50%F        2.81          2.81            ---          3.05          3.05        ---
26 at  50%F        2.51          2.51            ---          2.72          2.72        ---
23 at  50%F        2.67          2.67            ---          3.05          3.05        ---
* All limits, including Base Case, support RPTOOS operation; operation is supported for any combination of 1 MSRVOOS, up to 2 TIPOOS (or the equivalent number of TIP channels), and up to 50% of the LPRMs out-of-service.
FFWTR/FHOOS is supported for the BOC to End of Coast limits.
Browns Ferry Unit 2 Cycle 21                                                                                                      Page 23 Core Operating Limits Report, 120% OLTP                                                                TVA-COLR-BF2C21, Revision 0 (Final)


EDMS: L94 190211 800 N PG Reactor Engineering and Fuels
EDMS: L94 190211 800 Reactor Engineering and Fuels - BWRFE Date: February 12, 2019 NPG                          1101 Market Street, Chattanooga TN 37402 Table 4.3 MCPRP Limits for All Fuel Types: Nominal Scram Time Basis
- BWRFE 1101 Market Street, Chattanooga TN 37402 Date: February 12, 2019  Browns Ferry Unit 2 Cycle 21  Page 21 Core Operating Limits Report
* ATRIUM-10XM                        ATRIUM-11 BOC        BOC        BOC        BOC        BOC        BOC Pow er          to        to      to End of        to        to    to End of Operating Condition    (% of rated)    NEOC      EOCLB        Coast      NEOC      EOCLB      Coast 100          1.40      1.41        1.44        1.40      1.43        1.45 90          1.45      1.46        1.49        1.45      1.47        1.49 65          1.61      1.61        1.66        1.61      1.61        1.67 50           1.71      1.71        1.77        1.76      1.76        1.84 50           1.81      1.81        1.81        1.92      1.92        1.92 Base Case            40          1.88      1.88        1.94        2.00      2.00        2.06 26          2.33      2.33        2.45        2.55      2.55        2.69 26 at > 50%F       2.54      2.54        2.65        2.68      2.68        2.81 23 at > 50%F      2.69      2.69        2.81        2.93      2.93        3.05 26 at 50%F      2.42      2.42        2.51        2.63      2.63        2.72 23 at 50%F      2.55      2.55        2.67        2.93      2.93        3.05 100          1.43     1.44        1.46        1.45      1.49        1.49 90          1.48      1.49        1.52        1.49      1.52        1.54 65          1.64      1.64         1.69        1.65      1.65        1.69 50          1.73      1.73        1.78        1.78      1.78        1.85 50          1.81     1.81        1.81        1.92      1.92        1.92 TBVOOS                40          1.88      1.88        1.94        2.00      2.00        2.06 26          2.33      2.33        2.45        2.55      2.55        2.69 26 at > 50%F      3.11      3.11        3.23        3.28      3.28        3.38 23 at > 50%F      3.35      3.35        3.47        3.57      3.57        3.69 26 at  50%F      2.78      2.78        2.90        3.04      3.04        3.16 23 at  50%F      3.04      3.04        3.18        3.32      3.32        3.56 100          1.44      1.44          ---       1.43      1.45        ---
, 120% OLTP    TVA-COLR-BF 2 C 21, Revision 0 (Final) The EOC LB exposure point is not the true End
90          1.49      1.49          ---       1.48      1.49        ---
-Of-Cycle exposure. Instead it corresponds to a licensing exposure window exceeding expected end
65          1.66      1.66          ---       1.67      1.67        ---
-of-full-power-li fe. The End of Coast exposure point represents a licensing exposure point exceeding the expected end-of-cycle exposure including cycle extension options.
50          1.77      1.77          ---       1.84      1.84        ---
4.2.4 Equipment Out
50          1.81      1.81         ---       1.92      1.92        ---
-Of-Service (EOOS) Options EOOS options
FHOOS                40          1.94      1.94          ---       2.06      2.06        ---
* covered by MCPR P limits are given by the following:  In-Service    All equipment In
26          2.45      2.45          ---       2.69      2.69        ---
-Service  RPTOOS    EOC-Recirculation Pump Trip Out
26 at > 50%F      2.65      2.65         ---       2.81      2.81         ---
-Of-Service  TBVOOS    Turbine Bypass Valve(s) Out
23 at > 50%F      2.81      2.81         ---       3.05      3.05         ---
-Of-Service  RPTOOS+TBVOOS Combined RPTOOS and TBVOOS PLUOOS    Power Load Unbalance Out
26 at  50%F      2.51      2.51         ---       2.72      2.72         ---
-Of-Service  PLUOOS+RPTOOS  Combined PLUOOS and RPTOOS PLUOOS+TBVOOS Combined PLUOOS and TBVOOS PLUOOS+TBVOOS+RPTOOS Combined PLUOOS, RPTOOS, and TBVOOS FHOOS (or FFWTR)
23 at  50%F      2.67      2.67         ---       3.05      3.05         ---
Feedwater Heaters Out
100          1.40      1.41        1.44        1.40      1.44        1.45 90          1.45      1.46        1.49        1.45      1.47        1.49 65          1.73      1.73        1.73        1.83      1.83        1.83 50            ---      ---          ---        ---        ---        ---
-Of-Service (or Final Feedwater Temperature Reduction)
50          1.81      1.81        1.81        1.92      1.92        1.92 PLUOOS                40          1.88      1.88        1.94        2.00      2.00        2.06 26          2.33      2.33        2.45        2.55      2.55        2.69 26 at > 50%F      2.54      2.54        2.65        2.68      2.68        2.81 23 at > 50%F      2.69      2.69        2.81        2.93      2.93        3.05 26 at  50%F      2.42      2.42        2.51        2.63      2.63        2.72 23 at  50%F      2.55      2.55        2.67        2.93      2.93        3.05
RCPOOS    One Recirculation Pump Out
* All limits, including Base Case, support RPTOOS operation; operation is supported for any combination of 1 MSRVOOS, up to 2 TIPOOS (or the equivalent number of TIP channels), and up to 50% of the LPRMs out-of-service.
-Of-Service For exposure ranges up to NEOC and EOC LB, additional combinations of MCPR P limits are also provided including FHOOS. The coast down exposure range assumes application of FFWTR. FHOOS based MCPR P limits for the coast down exposure are redundant because the temperature setdown assumption is identical with FFWTR.
FFWTR and FHOOS assume the same value of temperature drop. Consequently, FHOOS limits are not provided for BOC to End of COAST due to redundancy. Thermal limits for the BOC to End of COAST exposure applicability window are developed to conservatively bound FHOOS limits for earlier exposure applicability windows.
4.2.5 Single-Loop-Operation (SLO) Limits When operating in RCPOOS conditions, MCPRp limits are constructed differently from the normal operating RCP conditions. The limiting event for RCPOOS is a pump seizure scenario, which sets the upper bound for allowed core power and flow
Browns Ferry Unit 2 Cycle 21                                                                                                      Page 24 Core Operating Limits Report, 120% OLTP                                                                  TVA-COLR-BF2C21, Revision 0 (Final)
: f. This event is not impacted by scram time assumptions. Specific MCPR P limits are shown in Table 4.9. 4.2.6 Below Pbypass Limit s Below Pbypass (26% rated power), MCPR P limits depend upon core flow. One set of MCPR P limits applies for core flow above 50% of rated; a second set applies if the core flow is less than or equal to 50% rated.
* All equipment service conditions assume 1 SRVOOS
. f RCPOOS limits are only valid up to 43.75% rated core power, 50% rated core flow, and an active recirculation drive flow of 17.73 Mlb m/hr.
EDMS: L94 190211 800 N PG Reactor Engineering and Fuels
- BWRFE 1101 Market Street, Chattanooga TN 37402 Date:  February 12, 2019  Browns Ferry Unit 2 Cycle 21  Page 22 Core Operating Limits Report
, 120% OLTP    TVA-COLR-BF 2 C 21, Revision 0 (Final)  1.001.201.401.601.802.00 30 40 50 60 70 80 90100110MCPR FCore Flow (% Rated)
CoreFlowMCPR F(% Rated)30.01.5884.01.34107.01.34 Figure 4.1  MCPR F for All Fuel Types (Values bound all EOOS conditions
)  (107.0% maximum core flow line is used to support 105% rated flow operation, ICF
)
EDMS: L94 190211 800 N PG Reactor Engineering and Fuels
- BWRFE 1101 Market Street, Chattanooga TN 37402 Date:  February 12, 2019  Browns Ferry Unit 2 Cycle 21 Page 23 Core Operating Limits Report
, 120% OLTP    TVA-COLR-BF 2 C 21, Revision 0 (Final)  Table 4.2  MCPR P Limits for All Fuel Types
: Optimum Scram Time Basis
* BOCBOCBOCBOCBOCBOCPower to toto End of to toto End of(% of rated)NEOCEOCLBCoastNEOCEOCLBCoast 1001.371.391.411.361.421.43 901.421.431.461.421.451.47 651.591.591.631.581.581.64 501.681.681.751.731.731.81 501.811.811.811.911.911.91 401.881.881.911.991.992.03 262.302.302.422.512.512.6626 at > 50%F2.542.542.652.682.682.8123 at > 50%F2.692.692.812.932.933.052.422.422.512.632.632.722.552.552.672.932.933.05 1001.411.41---1.401.43---901.461.46---1.451.47---651.631.63---1.641.64---501.751.75---1.811.81---501.811.81---1.911.91---401.911.91---2.032.03---262.422.42---2.662.66---26 at > 50%F2.652.65---2.812.81---23 at > 50%F2.812.81---3.053.05---2.512.51---2.722.72---2.672.67---3.053.05---ATRIUM-11Operating ConditionBase CaseFHOOSATRIUM-10XM
* All limits, including "Base Case," support RPTOOS operation; operation is supported for any combination of 1 MSRVOOS, up to 2 TIPOOS (or the equivalent number of TIP channels), and up to 50% of the LPRMs out
-of-service. FFWTR/FHOOS is supported for the BOC to End of Coast limits.


EDMS: L94 190211 800 N PG Reactor Engineering and Fuels
EDMS: L94 190211 800 Reactor Engineering and Fuels - BWRFE Date: February 12, 2019 NPG                          1101 Market Street, Chattanooga TN 37402 Table 4.3 MCPRP Limits for All Fuel Types: Nominal Scram Time Basis (continued)
- BWRFE 1101 Market Street, Chattanooga TN 37402 Date: February 12, 2019  Browns Ferry Unit 2 Cycle 21  Page 24 Core Operating Limits Report
* ATRIUM-10XM                        ATRIUM-11 BOC      BOC          BOC        BOC        BOC        BOC Pow er          to        to        to End of      to        to    to End of Operating Condition      (% of rated)   NEOC      EOCLB        Coast      NEOC      EOCLB        Coast 100          1.46      1.46          ---      1.47      1.49        ---
, 120% OLTP    TVA-COLR-BF 2 C 21, Revision 0 (Final) Table 4.3  MCPR P Limits for All Fuel Types
90          1.52      1.52          ---      1.52      1.54        ---
: Nominal Scram Time Basis
65          1.69      1.69          ---      1.69      1.69        ---
* BOCBOCBOCBOCBOCBOCPower to toto End of to toto End of(% of rated)NEOCEOCLBCoastNEOCEOCLBCoast 1001.401.411.441.401.431.45 901.451.461.491.451.471.49 651.611.611.661.611.611.67 501.711.711.771.761.761.84 501.811.811.811.921.921.92 401.881.881.942.002.002.06 262.332.332.452.552.552.6926 at > 50%F2.542.542.652.682.682.8123 at > 50%F2.692.692.812.932.933.052.422.422.512.632.632.722.552.552.672.932.933.05 1001.431.441.461.451.491.49 901.481.491.521.491.521.54 651.641.641.691.651.651.69 501.731.731.781.781.781.85 501.811.811.811.921.921.92 401.881.881.942.002.002.06 262.332.332.452.552.552.6926 at > 50%F3.113.113.233.283.283.3823 at > 50%F3.353.353.473.573.573.692.782.782.903.043.043.163.043.043.183.323.323.56 1001.441.44---1.431.45---901.491.49---1.481.49---651.661.66---1.671.67---501.771.77---1.841.84---501.811.81---1.921.92---401.941.94---2.062.06---262.452.45---2.692.69---26 at > 50%F2.652.65---2.812.81---23 at > 50%F2.812.81---3.053.05---2.512.51---2.722.72---2.672.67---3.053.05---1001.401.411.441.401.441.45 901.451.461.491.451.471.49 651.731.731.731.831.831.83 50------------------501.811.811.811.921.921.92 401.881.881.942.002.002.06 262.332.332.452.552.552.6926 at > 50%F2.542.542.652.682.682.8123 at > 50%F2.692.692.812.932.933.052.422.422.512.632.632.722.552.552.672.932.933.05ATRIUM-10XMATRIUM-11Operating ConditionBase CaseTBVOOSFHOOSPLUOOS
50          1.78      1.78          ---      1.85      1.85        ---
* All limits, including "Base Case," support RPTOOS operation; operation is supported for any combination of 1 MSRVOOS, up to 2 TIPOOS (or the equivalent number of TIP channels), and up to 50% of the LPRMs out
50          1.81      1.81          ---      1.92      1.92        ---
-of-service. FFWTR and FHOOS assume the same value of temperature drop.
TBVOOS 40          1.94      1.94          ---      2.06      2.06        ---
Consequently, FHOOS limits are not provided for BOC to End of COAST due to redundancy. Thermal limits for the "BOC to End of COAST" exposure applicability window are developed to conservatively bound FHOOS limits for earlier exposure applicability windows.
FHOOS 26          2.45      2.45          ---      2.69      2.69        ---
EDMS: L94 190211 800 N PG Reactor Engineering and Fuels
26 at > 50%F      3.23      3.23          ---      3.38      3.38        ---
- BWRFE 1101 Market Street, Chattanooga TN 37402 Date:  February 12, 2019  Browns Ferry Unit 2 Cycle 21 Page 25 Core Operating Limits Report
23 at > 50%F      3.47      3.47          ---      3.69      3.69        ---
, 120% OLTP     TVA-COLR-BF 2 C 21, Revision 0 (Final) Table 4.3  MCPR P Limits for All Fuel Types
26 at 50%F      2.90      2.90          ---      3.16      3.16        ---
: Nominal Scram Time Basis (conti nued)* BOCBOCBOCBOCBOCBOCPower to toto End of to toto End of(% of rated)NEOCEOCLBCoastNEOCEOCLBCoast 1001.461.46---1.471.49---901.521.52---1.521.54---651.691.69---1.691.69---501.781.78---1.851.85---501.811.81---1.921.92---401.941.94---2.062.06---262.452.45---2.692.69---26 at > 50%F3.233.23---3.383.38---23 at > 50%F3.473.47---3.693.69---2.902.90---3.163.16---3.183.18---3.563.56---1001.431.441.461.451.491.49 901.481.491.521.491.521.54 651.731.731.731.831.831.83 50------------------501.811.811.811.921.921.92 401.881.881.942.002.002.06 262.332.332.452.552.552.6926 at > 50%F3.113.113.233.283.283.3823 at > 50%F3.353.353.473.573.573.692.782.782.903.043.043.163.043.043.183.323.323.56 1001.441.44---1.431.45---901.491.49---1.481.49---651.731.73---1.831.83---50------------------501.811.81---1.921.92---401.941.94---2.062.06---262.452.45---2.692.69---26 at > 50%F2.652.65---2.812.81---23 at > 50%F2.812.81---3.053.05---2.512.51---2.722.72---2.672.67---3.053.05---1001.461.46---1.471.49---901.521.52---1.521.54---651.731.73---1.831.83---50------------------501.811.81---1.921.92---401.941.94---2.062.06---262.452.45---2.692.69---26 at > 50%F3.233.23---3.383.38---23 at > 50%F3.473.47---3.693.69---2.902.90---3.163.16---3.183.18---3.563.56---ATRIUM-10XMATRIUM-11TBVOOS FHOOSTBVOOS PLUOOSFHOOS PLUOOSTBVOOS FHOOS PLUOOSOperating Condition
23 at  50%F      3.18      3.18          ---      3.56      3.56        ---
* All limits, including "Base Case," support RPTOOS operation; operation is supported for any combination of 1 MSRVOOS, up to 2 TIPOOS (or the equivalent number of TIP channels), and up to 50% of the LPRMs out
100          1.43      1.44          1.46      1.45      1.49        1.49 90          1.48      1.49          1.52      1.49       1.52        1.54 65          1.73      1.73          1.73      1.83      1.83        1.83 50          ---      ---          ---        ---        ---        ---
-of-service. FFWTR and FHOOS assume the same value of temperature drop. Consequently, FHOOS limits are not provided for BOC to End of COAST due to redundancy. Thermal limits for the "BOC to End of COAST" exposure applicability window are developed to conservatively bound FHOOS limits for earlier exposure applicability windows
50          1.81      1.81          1.81      1.92      1.92        1.92 TBVOOS 40          1.88      1.88          1.94      2.00      2.00        2.06 PLUOOS 26          2.33      2.33          2.45      2.55      2.55        2.69 26 at > 50%F      3.11      3.11          3.23      3.28      3.28        3.38 23 at > 50%F      3.35      3.35          3.47      3.57      3.57        3.69 26 at  50%F      2.78      2.78          2.90      3.04      3.04        3.16 23 at  50%F      3.04      3.04          3.18      3.32      3.32        3.56 100          1.44      1.44           ---       1.43      1.45         ---
.
90          1.49      1.49           ---       1.48      1.49         ---
EDMS: L94 190211 800 N PG Reactor Engineering and Fuels
65          1.73      1.73          ---       1.83      1.83        ---
- BWRFE 1101 Market Street, Chattanooga TN 37402 Date:  February 12, 2019  Browns Ferry Unit 2 Cycle 21  Page 26 Core Operating Limits Report
50          ---       ---           ---       ---       ---         ---
, 120% OLTP    TVA-COLR-BF 2 C 21, Revision 0 (Final)  Table 4.4  MCPR P Limits for All Fuel Types
50          1.81      1.81          ---       1.92      1.92        ---
: Technical Specification Scram Time Basis
FHOOS 40          1.94      1.94          ---       2.06      2.06        ---
* BOCBOCBOCBOCBOCBOCPower to toto End of to toto End of(% of rated)NEOCEOCLBCoastNEOCEOCLBCoast 1001.431.431.471.431.451.46 901.481.481.521.471.491.51 651.631.631.681.641.641.70 501.731.731.801.791.791.86 501.821.821.821.931.931.93 401.891.891.962.012.012.08 262.352.352.472.572.572.7226 at > 50%F2.542.542.652.682.682.8123 at > 50%F2.692.692.812.932.933.052.422.422.512.632.632.722.552.552.672.932.933.05 1001.461.471.491.481.511.51 901.511.511.541.521.541.56 651.661.661.711.671.671.72 501.751.751.811.811.811.88 501.821.821.821.931.931.93 401.891.891.962.012.012.09 262.362.362.472.572.572.7226 at > 50%F3.113.113.233.283.283.3823 at > 50%F3.353.353.473.573.573.692.782.782.903.043.043.163.043.043.183.323.323.56 1001.471.47---1.451.46---901.521.52---1.511.51---651.681.68---1.701.70---501.801.80---1.861.86---501.821.82---1.931.93---401.961.96---2.082.08---262.472.47---2.722.72---26 at > 50%F2.652.65---2.812.81---23 at > 50%F2.812.81---3.053.05---2.512.51---2.722.72---2.672.67---3.053.05---1001.431.431.471.431.451.49 901.481.481.521.471.491.51 651.741.741.741.841.841.84 50------------------501.821.821.821.931.931.93 401.891.891.962.012.012.08 262.352.352.472.572.572.7226 at > 50%F2.542.542.652.682.682.8123 at > 50%F2.692.692.812.932.933.052.422.422.512.632.632.722.552.552.672.932.933.05ATRIUM-10XMATRIUM-11Operating ConditionBase CaseTBVOOSFHOOSPLUOOS
PLUOOS 26          2.45      2.45          ---       2.69      2.69        ---
* All limits, including "Base Case," support RPTOOS operation; operation is supported for any combination of 1 MSRVOOS, up to 2 TIPOOS (or the equivalent number of TIP channels), and up to 50% of the LPRMs out
26 at > 50%F      2.65      2.65          ---       2.81      2.81        ---
-of-service. FFWTR and FHOOS assume the same value of temperature drop. Consequently, FHOOS limits are not provided for BOC to End of COAST due to redundancy. Thermal limits for the "BOC to End of COAST" exposure applicability window are developed to conservatively bound FHOOS limits for earlier exposure applicability windows.
23 at > 50%F      2.81      2.81          ---       3.05      3.05         ---
26 at  50%F      2.51      2.51          ---      2.72      2.72        ---
23 at  50%F      2.67      2.67          ---      3.05      3.05        ---
100          1.46      1.46          ---      1.47      1.49         ---
90          1.52      1.52          ---       1.52      1.54        ---
65          1.73      1.73          ---       1.83      1.83        ---
50          ---      ---          ---       ---        ---        ---
TBVOOS                50          1.81      1.81          ---      1.92      1.92         ---
FHOOS                  40          1.94      1.94          ---      2.06      2.06         ---
PLUOOS                26          2.45      2.45          ---      2.69      2.69        ---
26 at > 50%F      3.23      3.23          ---      3.38      3.38        ---
23 at > 50%F      3.47      3.47          ---      3.69      3.69        ---
26 at  50%F      2.90      2.90          ---      3.16      3.16        ---
23 at  50%F      3.18      3.18          ---      3.56      3.56        ---
* All limits, including Base Case, support RPTOOS operation; operation is supported for any combination of 1 MSRVOOS, up to 2 TIPOOS (or the equivalent number of TIP channels), and up to 50% of the LPRMs out-of-service.
FFWTR and FHOOS assume the same value of temperature drop. Consequently, FHOOS limits are not provided for BOC to End of COAST due to redundancy. Thermal limits for the BOC to End of COAST exposure applicability window are developed to conservatively bound FHOOS limits for earlier exposure applicability windows.
Browns Ferry Unit 2 Cycle 21                                                                                                     Page 25 Core Operating Limits Report, 120% OLTP                                                                   TVA-COLR-BF2C21, Revision 0 (Final)


EDMS: L94 190211 800 N PG Reactor Engineering and Fuels
EDMS: L94 190211 800 Reactor Engineering and Fuels - BWRFE Date: February 12, 2019 NPG                        1101 Market Street, Chattanooga TN 37402 Table 4.4 MCPRP Limits for All Fuel Types: Technical Specification Scram Time Basis
- BWRFE 1101 Market Street, Chattanooga TN 37402 Date:  February 12, 2019  Browns Ferry Unit 2 Cycle 21  Page 27 Core Operating Limits Report
* ATRIUM-10XM                              ATRIUM-11 BOC        BOC          BOC          BOC          BOC        BOC Pow er          to          to        to End of         to          to      to End of Operating Condition      (% of rated)     NEOC      EOCLB          Coast        NEOC      EOCLB        Coast 100            1.43        1.43          1.47        1.43        1.45        1.46 90            1.48        1.48          1.52        1.47        1.49         1.51 65            1.63        1.63          1.68        1.64        1.64        1.70 50            1.73        1.73          1.80        1.79        1.79        1.86 50            1.82        1.82          1.82         1.93        1.93        1.93 Base Case              40            1.89        1.89          1.96         2.01        2.01        2.08 26            2.35        2.35          2.47         2.57        2.57        2.72 26 at > 50%F        2.54        2.54          2.65        2.68        2.68        2.81 23 at > 50%F        2.69        2.69          2.81        2.93        2.93        3.05 26 at  50%F        2.42        2.42          2.51        2.63        2.63        2.72 23 at  50%F        2.55        2.55          2.67        2.93        2.93        3.05 100            1.46        1.47          1.49        1.48        1.51        1.51 90            1.51        1.51         1.54        1.52        1.54        1.56 65            1.66        1.66          1.71        1.67        1.67        1.72 50            1.75        1.75          1.81        1.81        1.81        1.88 50           1.82        1.82          1.82        1.93        1.93        1.93 TBVOOS                  40            1.89        1.89          1.96        2.01        2.01        2.09 26            2.36        2.36          2.47        2.57        2.57        2.72 26 at > 50%F        3.11        3.11          3.23        3.28        3.28        3.38 23 at > 50%F        3.35        3.35          3.47        3.57        3.57        3.69 26 at  50%F        2.78        2.78          2.90        3.04        3.04        3.16 23 at  50%F        3.04        3.04          3.18        3.32        3.32        3.56 100            1.47        1.47           ---         1.45        1.46         ---
, 120% OLTP    TVA-COLR-BF 2 C 21, Revision 0 (Final)  Table 4.4 MCPR P Limits for All Fuel Types
90            1.52        1.52           ---         1.51        1.51         ---
: Technical Specification Scram Time Basis (continued)* BOCBOCBOCBOCBOCBOCPower to toto End of to toto End of(% of rated)NEOCEOCLBCoastNEOCEOCLBCoast 1001.491.49---1.501.51---901.541.54---1.551.56---651.711.71---1.721.72---501.811.81---1.881.88---501.821.82---1.931.93---401.961.96---2.092.09---262.472.47---2.722.72---26 at > 50%F3.233.23---3.383.38---23 at > 50%F3.473.47---3.693.69---2.902.90---3.163.16---3.183.18---3.563.56---1001.461.471.491.481.511.51 901.511.511.541.521.541.56 651.741.741.741.841.841.84 50------------------501.821.821.821.931.931.93 401.891.891.962.012.012.09 262.362.362.472.572.572.7226 at > 50%F3.113.113.233.283.283.3823 at > 50%F3.353.353.473.573.573.692.782.782.903.043.043.163.043.043.183.323.323.56 1001.471.47---1.451.46---901.521.52---1.511.51---651.741.74---1.841.84---50------------------501.821.82---1.931.93---401.961.96---2.082.08---262.472.47---2.722.72---26 at > 50%F2.652.65---2.812.81---23 at > 50%F2.812.81---3.053.05---2.512.51---2.722.72---2.672.67---3.053.05---1001.491.49---1.501.51---901.541.54---1.551.56---651.741.74---1.841.84---50------------------501.821.82---1.931.93---401.961.96---2.092.09---262.472.47---2.722.72---26 at > 50%F3.233.23---3.383.38---23 at > 50%F3.473.47---3.693.69---2.902.90---3.163.16---3.183.18---3.563.56---ATRIUM-10XMATRIUM-11TBVOOS FHOOSTBVOOS PLUOOSFHOOS PLUOOSTBVOOS FHOOS PLUOOSOperating Condition
65            1.68        1.68          ---         1.70        1.70          ---
* All limits, including "Base Case," support RPTOOS operation; operation is supported for any combination of 1 MSRVOOS, up to 2 TIPOOS (or the equivalent number of TIP channels), and up to 50% of the LPRMs out
50           1.80        1.80          ---         1.86        1.86          ---
-of-service. FFWTR and FHOOS assume the same value of temperature drop. Consequently, FHOOS limits are not provided for BOC to End of COAST due to redundancy. Thermal limits for the "BOC to End of COAST" exposure applicability window are developed to conservatively bound FHOOS limits for earlier exposure applicability windows.
50            1.82        1.82           ---         1.93        1.93         ---
FHOOS                  40            1.96        1.96           ---         2.08        2.08         ---
26            2.47        2.47           ---         2.72        2.72         ---
26 at > 50%F        2.65        2.65           ---         2.81        2.81         ---
23 at > 50%F        2.81        2.81           ---         3.05        3.05         ---
26 at  50%F        2.51        2.51           ---         2.72        2.72         ---
23 at  50%F        2.67        2.67           ---         3.05        3.05         ---
100            1.43        1.43          1.47        1.43        1.45        1.49 90            1.48        1.48          1.52        1.47        1.49        1.51 65            1.74        1.74          1.74         1.84        1.84        1.84 50             ---         ---           ---         ---         ---         ---
50            1.82        1.82          1.82         1.93        1.93        1.93 PLUOOS                  40            1.89        1.89          1.96         2.01        2.01        2.08 26            2.35        2.35          2.47         2.57        2.57        2.72 26 at > 50%F        2.54        2.54          2.65        2.68        2.68        2.81 23 at > 50%F        2.69        2.69          2.81        2.93        2.93        3.05 26 at  50%F        2.42        2.42          2.51        2.63        2.63        2.72 23 at  50%F        2.55        2.55          2.67        2.93        2.93        3.05
* All limits, including Base Case, support RPTOOS operation; operation is supported for any combination of 1 MSRVOOS, up to 2 TIPOOS (or the equivalent number of TIP channels), and up to 50% of the LPRMs out-of-service.
FFWTR and FHOOS assume the same value of temperature drop. Consequently, FHOOS limits are not provided for BOC to End of COAST due to redundancy. Thermal limits for the BOC to End of COAST exposure applicability window are developed to conservatively bound FHOOS limits for earlier exposure applicability windows.
Browns Ferry Unit 2 Cycle 21                                                                                                      Page 26 Core Operating Limits Report, 120% OLTP                                                                TVA-COLR-BF2C21, Revision 0 (Final)


EDMS: L94 190211 800 N PG Reactor Engineering and Fuels
EDMS: L94 190211 800 Reactor Engineering and Fuels - BWRFE Date: February 12, 2019 NPG                        1101 Market Street, Chattanooga TN 37402 Table 4.4 MCPRP Limits for All Fuel Types: Technical Specification Scram Time Basis (continued)
- BWRFE 1101 Market Street, Chattanooga TN 37402 DateFebruary 12, 2019  Browns Ferry Unit 2 Cycle 21 Page 28 Core Operating Limits Report
* ATRIUM-10XM                          ATRIUM-11 BOC        BOC          BOC        BOC        BOC        BOC Pow er          to        to        to End of      to          to    to End of Operating Condition      (% of rated)    NEOC      EOCLB        Coast      NEOC      EOCLB        Coast 100          1.49      1.49          ---      1.50        1.51        ---
, 120% OLTP     TVA-COLR-BF 2 C 21, Revision 0 (Final) Table 4.5 Startup Operation MCPR P Limits for Table 3.1 Temperature Range 1 for All Fuel Types
90          1.54      1.54          ---      1.55        1.56        ---
: Nominal Scram Time Basis
65          1.71      1.71          ---      1.72        1.72        ---
* BOCBOCBOCBOCBOCBOCPower to toto End of to toto End of(% of rated)NEOCEOCLBCoastNEOCEOCLBCoast 1001.441.441.441.431.451.45 901.491.491.491.481.491.49 651.731.731.731.831.831.83 50------------------501.931.931.932.022.022.02 402.162.162.162.292.292.29 262.772.772.773.073.073.0726 at > 50%F3.063.063.063.123.123.1223 at > 50%F3.153.153.153.423.423.422.792.792.793.073.073.073.013.013.013.373.373.37 1001.461.461.461.471.491.49 901.521.521.521.521.541.54 651.731.731.731.831.831.83 50------------------501.931.931.932.022.022.02 402.162.162.162.292.292.29 262.772.772.773.073.073.0726 at > 50%F3.553.553.553.603.603.6023 at > 50%F3.713.713.714.004.004.003.143.143.143.393.393.393.453.453.453.893.893.89ATRIUM-11Operating ConditionTBVISTBVOOSATRIUM-10XM
50          1.81      1.81          ---      1.88        1.88        ---
* Limits support RPTOOS operation; operation is supported for any combination of 1 MSRVOOS, up to 2 TIPOOS (or the equivalent number of TIP channels), and up to 50% of the LPRMs out
50          1.82      1.82          ---      1.93        1.93        ---
-of-service. Limits are applicable for all other EOOS scenarios, apart from TBV.
TBVOOS 40          1.96      1.96          ---      2.09        2.09        ---
FHOOS 26          2.47      2.47          ---      2.72        2.72        ---
26 at > 50%F      3.23      3.23          ---      3.38        3.38        ---
23 at > 50%F      3.47      3.47          ---      3.69        3.69        ---
26 at  50%F      2.90      2.90          ---      3.16        3.16        ---
23 at 50%F      3.18      3.18          ---      3.56        3.56        ---
100          1.46      1.47          1.49      1.48        1.51        1.51 90          1.51      1.51          1.54      1.52        1.54        1.56 65          1.74      1.74          1.74      1.84        1.84        1.84 50          ---        ---          ---        ---        ---        ---
50          1.82      1.82          1.82      1.93        1.93        1.93 TBVOOS 40          1.89      1.89          1.96      2.01        2.01        2.09 PLUOOS 26          2.36      2.36          2.47      2.57        2.57        2.72 26 at > 50%F      3.11      3.11          3.23      3.28        3.28        3.38 23 at > 50%F      3.35      3.35          3.47      3.57        3.57        3.69 26 at  50%F      2.78      2.78          2.90      3.04        3.04        3.16 23 at  50%F      3.04      3.04          3.18      3.32        3.32        3.56 100          1.47      1.47          ---      1.45        1.46        ---
90          1.52      1.52          ---      1.51        1.51        ---
65          1.74      1.74          ---      1.84        1.84        ---
50          ---        ---          ---        ---        ---        ---
50          1.82      1.82          ---      1.93        1.93        ---
FHOOS 40          1.96      1.96          ---      2.08        2.08        ---
PLUOOS 26          2.47      2.47          ---      2.72        2.72        ---
26 at > 50%F      2.65      2.65          ---      2.81        2.81        ---
23 at > 50%F      2.81      2.81          ---      3.05        3.05        ---
26 at  50%F      2.51      2.51          ---      2.72        2.72        ---
23 at  50%F      2.67      2.67          ---      3.05        3.05        ---
100          1.49      1.49          ---      1.50        1.51        ---
90          1.54      1.54          ---      1.55        1.56        ---
65          1.74      1.74          ---      1.84        1.84        ---
50          ---        ---          ---        ---        ---        ---
TBVOOS                  50          1.82      1.82          ---      1.93        1.93        ---
FHOOS                  40          1.96      1.96          ---      2.09        2.09        ---
PLUOOS                  26          2.47      2.47          ---      2.72        2.72        ---
26 at > 50%F      3.23      3.23          ---      3.38        3.38        ---
23 at > 50%F      3.47      3.47          ---      3.69        3.69        ---
26 at  50%F      2.90      2.90          ---      3.16        3.16        ---
23 at  50%F      3.18      3.18          ---      3.56        3.56        ---
* All limits, including Base Case, support RPTOOS operation; operation is supported for any combination of 1 MSRVOOS, up to 2 TIPOOS (or the equivalent number of TIP channels), and up to 50% of the LPRMs out-of-service.
FFWTR and FHOOS assume the same value of temperature drop. Consequently, FHOOS limits are not provided for BOC to End of COAST due to redundancy. Thermal limits for the BOC to End of COAST exposure applicability window are developed to conservatively bound FHOOS limits for earlier exposure applicability windows.
Browns Ferry Unit 2 Cycle 21                                                                                                     Page 27 Core Operating Limits Report, 120% OLTP                                                                 TVA-COLR-BF2C21, Revision 0 (Final)
 
EDMS: L94 190211 800 Reactor Engineering and Fuels - BWRFE Date: February 12, 2019 NPG                          1101 Market Street, Chattanooga TN 37402 Table 4.5 Startup Operation MCPRP Limits for Table 3.1 Temperature Range 1 for All Fuel Types: Nominal Scram Time Basis
* ATRIUM-10XM                        ATRIUM-11 BOC        BOC        BOC      BOC          BOC          BOC Pow er            to          to    to End of     to          to      to End of Operating Condition          (% of rated)     NEOC        EOCLB      Coast    NEOC        EOCLB        Coast 100            1.44        1.44      1.44      1.43        1.45        1.45 90            1.49        1.49      1.49      1.48        1.49        1.49 65            1.73        1.73      1.73      1.83        1.83        1.83 50             ---         ---       ---       ---         ---         ---
50            1.93        1.93      1.93      2.02        2.02        2.02 TBVIS                      40            2.16        2.16      2.16      2.29        2.29        2.29 26            2.77        2.77      2.77      3.07        3.07        3.07 26 at > 50%F        3.06        3.06      3.06      3.12        3.12        3.12 23 at > 50%F        3.15        3.15      3.15      3.42        3.42        3.42 26 at  50%F        2.79        2.79      2.79      3.07        3.07        3.07 23 at  50%F        3.01        3.01      3.01      3.37        3.37        3.37 100            1.46        1.46      1.46      1.47        1.49        1.49 90            1.52        1.52      1.52      1.52        1.54        1.54 65            1.73        1.73      1.73      1.83        1.83        1.83 50             ---         ---       ---       ---         ---         ---
50            1.93        1.93      1.93      2.02        2.02        2.02 TBVOOS                      40            2.16        2.16      2.16      2.29        2.29        2.29 26            2.77        2.77      2.77      3.07        3.07        3.07 26 at > 50%F        3.55        3.55      3.55      3.60        3.60        3.60 23 at > 50%F        3.71        3.71      3.71      4.00        4.00        4.00 26 at  50%F        3.14        3.14      3.14      3.39        3.39        3.39 23 at  50%F        3.45        3.45      3.45      3.89        3.89        3.89
* Limits support RPTOOS operation; operation is supported for any combination of 1 MSRVOOS, up to 2 TIPOOS (or the equivalent number of TIP channels), and up to 50% of the LPRMs out-of-service.
Limits are applicable for all other EOOS scenarios, apart from TBV.
Limits are only valid up to 50% rated core power.
Limits are only valid up to 50% rated core power.
Browns Ferry Unit 2 Cycle 21                                                                                                  Page 28 Core Operating Limits Report, 120% OLTP                                                            TVA-COLR-BF2C21, Revision 0 (Final)


EDMS: L94 190211 800 N PG Reactor Engineering and Fuels
EDMS: L94 190211 800 Reactor Engineering and Fuels - BWRFE Date: February 12, 2019 NPG                          1101 Market Street, Chattanooga TN 37402 Table 4.6 Startup Operation MCPRP Limits for Table 3.1 Temperature Range 2 for All Fuel Types: Nominal Scram Time Basis
- BWRFE 1101 Market Street, Chattanooga TN 37402 Date:  February 12, 2019  Browns Ferry Unit 2 Cycle 21  Page 29 Core Operating Limits Report
* ATRIUM-10XM                        ATRIUM-11 BOC        BOC        BOC      BOC          BOC          BOC Pow er            to          to    to End of     to          to      to End of Operating Condition          (% of rated)     NEOC        EOCLB      Coast    NEOC        EOCLB        Coast 100            1.44        1.44      1.44      1.43        1.45        1.45 90            1.49        1.49      1.49      1.48        1.49        1.49 65            1.73        1.73      1.73      1.83        1.83        1.83 50             ---         ---       ---       ---         ---         ---
, 120% OLTP    TVA-COLR-BF 2 C 21, Revision 0 (Final)  Table 4.6 Startup Operation MCPR P Limits for Table 3.1 Temperature Range 2 for All Fuel Types
50            1.94        1.94      1.94      2.02        2.02        2.02 TBVIS                      40            2.17        2.17      2.17      2.30        2.30        2.30 26            2.79        2.79      2.79      3.09        3.09        3.09 26 at > 50%F        3.09        3.09      3.09      3.14        3.14        3.14 23 at > 50%F        3.17        3.17      3.17      3.44        3.44        3.44 26 at  50%F        2.81        2.81      2.81      3.09        3.09        3.09 23 at  50%F        3.03        3.03      3.03      3.39        3.39        3.39 100            1.46        1.46      1.46      1.47        1.49        1.49 90            1.52        1.52      1.52      1.52        1.54        1.54 65            1.73        1.73      1.73      1.83        1.83        1.83 50             ---         ---       ---       ---         ---         ---
: Nominal Scram Time Basis
50            1.94        1.94      1.94      2.02        2.02        2.02 TBVOOS                      40            2.17        2.17      2.17      2.30        2.30        2.30 26            2.79        2.79      2.79      3.09        3.09        3.09 26 at > 50%F        3.58        3.58      3.58      3.62        3.62        3.62 23 at > 50%F        3.73        3.73      3.73      4.02        4.02        4.02 26 at  50%F        3.15        3.15      3.15      3.40        3.40        3.40 23 at  50%F        3.46        3.46      3.46      3.90        3.90        3.90
* BOCBOCBOCBOCBOCBOCPower to toto End of to toto End of(% of rated)NEOCEOCLBCoastNEOCEOCLBCoast 1001.441.441.441.431.451.45 901.491.491.491.481.491.49 651.731.731.731.831.831.83 50------------------501.941.941.942.022.022.02 402.172.172.172.302.302.30 262.792.792.793.093.093.0926 at > 50%F3.093.093.093.143.143.1423 at > 50%F3.173.173.173.443.443.442.812.812.813.093.093.093.033.033.033.393.393.39 1001.461.461.461.471.491.49 901.521.521.521.521.541.54 651.731.731.731.831.831.83 50------------------501.941.941.942.022.022.02 402.172.172.172.302.302.30 262.792.792.793.093.093.0926 at > 50%F3.583.583.583.623.623.6223 at > 50%F3.733.733.734.024.024.023.153.153.153.403.403.403.463.463.463.903.903.90ATRIUM-11Operating ConditionTBVISTBVOOSATRIUM-10XM
* Limits support RPTOOS operation; operation is supported for any combination of 1 MSRVOOS, up to 2 TIPOOS (or the equivalent number of TIP channels), and up to 50% of the LPRMs out-of-service.
* Limits support RPTOOS operation; operation is supported for any combination of 1 MSRVOOS, up to 2 TIPOOS (or the equivalent number of TIP channels), and up to 50% of the LPRMs out
Limits are applicable for all other EOOS scenarios, apart from TBV.
-of-service. Limits are applicable for all other EOOS scenarios, apart from TBV.
Limits are only valid up to 50% rated core power.
Limits are only valid up to 50% rated core power.
Browns Ferry Unit 2 Cycle 21                                                                                                  Page 29 Core Operating Limits Report, 120% OLTP                                                            TVA-COLR-BF2C21, Revision 0 (Final)


EDMS: L94 190211 800 N PG Reactor Engineering and Fuels
EDMS: L94 190211 800 Reactor Engineering and Fuels - BWRFE Date: February 12, 2019 NPG                          1101 Market Street, Chattanooga TN 37402 Table 4.7 Startup Operation MCPRP Limits for Table 3.1 Temperature Range 1 for All Fuel Types: Technical Specification Scram Time Basis
- BWRFE 1101 Market Street, Chattanooga TN 37402 Date:  February 12, 2019  Browns Ferry Unit 2 Cycle 21  Page 30 Core Operating Limits Report
* ATRIUM-10XM                        ATRIUM-11 BOC        BOC        BOC      BOC          BOC          BOC Pow er            to          to    to End of     to          to      to End of Operating Condition          (% of rated)     NEOC        EOCLB      Coast    NEOC        EOCLB        Coast 100            1.47        1.47      1.47      1.45        1.46        1.49 90            1.52        1.52      1.52      1.51        1.51        1.51 65            1.74        1.74      1.74      1.84        1.84        1.84 50             ---         ---       ---       ---         ---         ---
, 120% OLTP    TVA-COLR-BF 2 C 21, Revision 0 (Final)  Table 4.7 Startup Operation MCPR P Limits for Table 3.1 Temperature Range 1 for All Fuel Types: Technical Specification Scram Time Basis
50            1.96        1.96      1.96      2.04        2.04        2.04 TBVIS                      40            2.18        2.18      2.18      2.32        2.32        2.32 26            2.79        2.79      2.79      3.10        3.10        3.10 26 at > 50%F        3.06        3.06      3.06      3.12        3.12        3.12 23 at > 50%F        3.15        3.15      3.15      3.42        3.42        3.42 26 at  50%F        2.79        2.79      2.79      3.10        3.10        3.10 23 at  50%F        3.01        3.01      3.01      3.40        3.40        3.40 100            1.49        1.49      1.49      1.50        1.51        1.51 90            1.54        1.54      1.54      1.55        1.56        1.56 65            1.74        1.74      1.74      1.84        1.84        1.84 50             ---         ---       ---       ---         ---         ---
* BOCBOCBOCBOCBOCBOCPower to toto End of to toto End of(% of rated)NEOCEOCLBCoastNEOCEOCLBCoast 1001.471.471.471.451.461.49 901.521.521.521.511.511.51 651.741.741.741.841.841.84 50------------------501.961.961.962.042.042.04 402.182.182.182.322.322.32 262.792.792.793.103.103.1026 at > 50%F3.063.063.063.123.123.1223 at > 50%F3.153.153.153.423.423.422.792.792.793.103.103.103.013.013.013.403.403.40 1001.491.491.491.501.511.51 901.541.541.541.551.561.56 651.741.741.741.841.841.84 50------------------501.961.961.962.052.052.05 402.182.182.182.322.322.32 262.792.792.793.103.103.1026 at > 50%F3.553.553.553.603.603.6023 at > 50%F3.713.713.714.004.004.003.143.143.143.393.393.393.453.453.453.893.893.89ATRIUM-11Operating ConditionTBVISTBVOOSATRIUM-10XM
50            1.96        1.96      1.96      2.05        2.05        2.05 TBVOOS                      40            2.18        2.18      2.18      2.32        2.32        2.32 26            2.79        2.79      2.79      3.10        3.10        3.10 26 at > 50%F        3.55        3.55      3.55      3.60        3.60        3.60 23 at > 50%F        3.71        3.71      3.71      4.00        4.00        4.00 26 at  50%F        3.14        3.14      3.14      3.39        3.39        3.39 23 at  50%F        3.45        3.45      3.45      3.89        3.89        3.89
* Limits support RPTOOS operation; operation is supported for any combination of 1 MSRVOOS, up to 2 TIPOOS (or the equivalent number of TIP channels), and up to 50% of the LPRMs out
* Limits support RPTOOS operation; operation is supported for any combination of 1 MSRVOOS, up to 2 TIPOOS (or the equivalent number of TIP channels), and up to 50% of the LPRMs out-of-service.
-of-service. Limits are applicable for all other EOOS scenarios, apart from TBV.
Limits are applicable for all other EOOS scenarios, apart from TBV.
Limits are only valid up to 50% rated core power.
Limits are only valid up to 50% rated core power.
Browns Ferry Unit 2 Cycle 21                                                                                                  Page 30 Core Operating Limits Report, 120% OLTP                                                            TVA-COLR-BF2C21, Revision 0 (Final)


EDMS: L94 190211 800 N PG Reactor Engineering and Fuels
EDMS: L94 190211 800 Reactor Engineering and Fuels - BWRFE Date: February 12, 2019 NPG                          1101 Market Street, Chattanooga TN 37402 Table 4.8 Startup Operation MCPRP Limits for Table 3.1 Temperature Range 2 for All Fuel Types: Technical Specification Scram Time Basis
- BWRFE 1101 Market Street, Chattanooga TN 37402 Date:  February 12, 2019  Browns Ferry Unit 2 Cycle 21  Page 31 Core Operating Limits Report
* ATRIUM-10XM                        ATRIUM-11 BOC        BOC        BOC      BOC          BOC          BOC Pow er            to          to    to End of     to          to      to End of Operating Condition          (% of rated)     NEOC        EOCLB      Coast    NEOC        EOCLB        Coast 100            1.47        1.47      1.47      1.45        1.46        1.49 90            1.52        1.52      1.52      1.51        1.51        1.51 65            1.74        1.74      1.74      1.84        1.84        1.84 50             ---         ---       ---       ---         ---         ---
, 120% OLTP    TVA-COLR-BF 2 C 21, Revision 0 (Final)  Table 4.8 Startup Operation MCPR P Limits for Table 3.1 Temperature Range 2 for All Fuel Types: Technical Specification Scram Time Basis
50            1.96        1.96      1.96      2.05        2.05        2.05 TBVIS                      40            2.19        2.19      2.19      2.33        2.33        2.33 26            2.81        2.81      2.81      3.12        3.12        3.12 26 at > 50%F        3.09        3.09      3.09      3.14        3.14        3.14 23 at > 50%F        3.17        3.17      3.17      3.44        3.44        3.44 26 at  50%F        2.81        2.81      2.81      3.12        3.12        3.12 23 at  50%F        3.03        3.03      3.03      3.42        3.42        3.42 100            1.49        1.49      1.49      1.50        1.51        1.51 90            1.54        1.54      1.54      1.55        1.56        1.56 65            1.74        1.74      1.74      1.84        1.84        1.84 50             ---         ---       ---       ---         ---         ---
* BOCBOCBOCBOCBOCBOCPower to toto End of to toto End of(% of rated)NEOCEOCLBCoastNEOCEOCLBCoast 1001.471.471.471.451.461.49 901.521.521.521.511.511.51 651.741.741.741.841.841.84 50------------------501.961.961.962.052.052.05 402.192.192.192.332.332.33 262.812.812.813.123.123.1226 at > 50%F3.093.093.093.143.143.1423 at > 50%F3.173.173.173.443.443.442.812.812.813.123.123.123.033.033.033.423.423.42 1001.491.491.491.501.511.51 901.541.541.541.551.561.56 651.741.741.741.841.841.84 50------------------501.961.961.962.052.052.05 402.192.192.192.332.332.33 262.812.812.813.123.123.1226 at > 50%F3.583.583.583.623.623.6223 at > 50%F3.733.733.734.024.024.023.153.153.153.403.403.403.463.463.463.903.903.90ATRIUM-11Operating ConditionTBVISTBVOOSATRIUM-10XM
50            1.96        1.96      1.96      2.05        2.05        2.05 TBVOOS                      40            2.19        2.19      2.19      2.33        2.33        2.33 26            2.81        2.81      2.81      3.12        3.12        3.12 26 at > 50%F        3.58        3.58      3.58      3.62        3.62        3.62 23 at > 50%F        3.73        3.73      3.73      4.02        4.02        4.02 26 at  50%F        3.15        3.15      3.15      3.40        3.40        3.40 23 at  50%F        3.46        3.46      3.46      3.90        3.90        3.90
* Limits support RPTOOS operation; operation is supported for any combination of 1 MSRVOOS, up to 2 TIPOOS (or the equivalent number of TIP channels), and up to 50% of the LPRMs out
* Limits support RPTOOS operation; operation is supported for any combination of 1 MSRVOOS, up to 2 TIPOOS (or the equivalent number of TIP channels), and up to 50% of the LPRMs out-of-service.
-of-service. Limits are applicable for all other EOOS scenarios, apart from TBV.
Limits are applicable for all other EOOS scenarios, apart from TBV.
Limits are only valid up to 50% rated core power.
Limits are only valid up to 50% rated core power.
Browns Ferry Unit 2 Cycle 21                                                                                                  Page 31 Core Operating Limits Report, 120% OLTP                                                            TVA-COLR-BF2C21, Revision 0 (Final)


EDMS: L94 190211 800 N PG Reactor Engineering and Fuels
EDMS: L94 190211 800 Reactor Engineering and Fuels - BWRFE Date: February 12, 2019 NPG                        1101 Market Street, Chattanooga TN 37402 Table 4.9 MCPRP Limits for All Fuel Types: Single Loop Operation for All Scram Times
- BWRFE 1101 Market Street, Chattanooga TN 37402 Date:  February 12, 2019  Browns Ferry Unit 2 Cycle 21  Page 32 Core Operating Limits Report
* Pow er                All Cycle Exposures Operating Condition        (% of rated)       ATRIUM-10XM        ATRIUM-11 100                2.00              2.05 43.75                2.00              2.05 40                2.00              2.10 RCPOOS                    26                2.49              2.74 FHOOS              26 at > 50%F            2.67              2.83 23 at > 50%F            2.83              3.07 26 at  50%F            2.53              2.74 23 at  50%F            2.69              3.07 100                2.00              2.05 43.75                2.00              2.05 RCPOOS                    40                2.00              2.11 TBVOOS                    26                2.49              2.74 PLUOOS              26 at > 50%F            3.25              3.40 FHOOS              23 at > 50%F            3.49              3.71 26 at  50%F            2.92              3.18 23 at  50%F            3.20              3.58 100                2.12              2.24 43.75                2.12              2.24 40                2.20              2.34 RCPOOS 26                2.81              3.12 TBVOOS 26 at > 50%F            3.57              3.62 FHOOS1 23 at > 50%F            3.73              4.02 26 at  50%F            3.16              3.41 23 at  50%F            3.47              3.91 100                2.13              2.25 43.75                2.13              2.25 40                2.21              2.35 RCPOOS 26                2.83              3.14 TBVOOS 26 at > 50%F            3.60              3.64 FHOOS2 23 at > 50%F            3.75              4.04 26 at  50%F            3.17              3.42 23 at  50%F            3.48              3.92
, 120% OLTP    TVA-COLR-BF 2 C 21, Revision 0 (Final)  Table 4.9 MCPR P Limits for All Fuel Types: Single Loop Operation for All Scram Times
* All limits, including Base Case, support RPTOOS operation; operation is supported for any combination of 1 MSRVOOS, up to 2 TIPOOS (or the equivalent number of TIP channels), and up to 50% of the LPRMs out-of-service.
* Power(% of rated)ATRIUM-10XMATRIUM-11 1002.002.0543.752.002.05 402.002.10 262.492.7426 at > 50%F2.672.8323 at > 50%F2.833.072.532.742.693.07 1002.002.0543.752.002.05 402.002.11 262.492.7426 at > 50%F3.253.4023 at > 50%F3.493.712.923.183.203.58 1002.122.2443.752.122.24 402.202.34 262.813.1226 at > 50%F3.573.6223 at > 50%F3.734.023.163.413.473.91 1002.132.2543.752.132.25 402.212.35 262.833.1426 at > 50%F3.603.6423 at > 50%F3.754.043.173.423.483.92RCPOOS TBVOOS FHOOS2All Cycle ExposuresOperating ConditionRCPOOS FHOOSRCPOOS TBVOOS PLUOOS FHOOSRCPOOS TBVOOS FHOOS1
FFWTR and FHOOS assume the same value of temperature drop.
* All limits, including "Base Case," support RPTOOS operation; operation is supported for any combination of 1 MSRVOOS, up to 2 TIPOOS (or the equivalent number of TIP channels), and up to 50% of the LPRMs out
-of-servic e. FFWTR and FHOOS assume the same value of temperature drop.
RCPOOS limits are only valid up to 50% rated core power, 50% rated core flow, and an active recirculation drive flow of 17.73 Mlbm/hr.
RCPOOS limits are only valid up to 50% rated core power, 50% rated core flow, and an active recirculation drive flow of 17.73 Mlbm/hr.
Browns Ferry Unit 2 Cycle 21                                                                                                        Page 32 Core Operating Limits Report, 120% OLTP                                                                  TVA-COLR-BF2C21, Revision 0 (Final)
EDMS: L94 190211 800 Reactor Engineering and Fuels - BWRFE Date: February 12, 2019 NPG                            1101 Market Street, Chattanooga TN 37402 5      Oscillation Power Range Monitor (OPRM) Setpoint (Technical Specification 3.3.1.1)
Technical Specification Table 3.3.1.1-1, Function 2f, identifies the OPRM upscale function.
Instrument setpoints are established, such that the reactor will be tripped before an oscillation can grow to the point where the SLMCPR is exceeded. An Option III stability analysis is performed for each reload core to determine allowable OLMCPRs as a function of OPRM setpoint. Analyses consider both steady state startup operation, and the case of a two recirculation pump trip from rated power.
The resulting stability based OLMCPRs are reported in Reference 1. The OPRM setpoint (sometimes referred to as the Amplitude Trip, Sp) is selected, such that required margin to the SLMCPR is provided without stability being a limiting event. Analyses are based on cycle specific DIVOM analyses performed per Reference 22. The calculated OLMCPRs are shown in Table 5.1. Review of results shown in COLR Table 4.2 indicates an OPRM setpoint of 1.14 may be used. The successive confirmation count (sometimes referred to as Np) is provided in Table 5.2, per Reference 30.
Table 5.1 OPRM Setpoint Range
* Table 5.2 OPRM Successive Confirmation Count Setpoint OPRM                OLMCPR                OLMCPR Count          OPRM Setpoint                  (SS)                (2PT)
Setpoint 1.05                    1.15                1.07 6              1.04 1.06                    1.17                1.08 1.07                    1.19                1.10                                  8              1.05 1.08                    1.20                1.12 10            1.07 1.09                    1.22                1.14 12            1.09 1.10                    1.24                1.16 1.11                    1.26                1.17                                  14            1.11 1.12                    1.28                1.19                                  16            1.14 1.13                    1.30                1.21 18            1.18 1.14                    1.33                1.23 1.15                    1.35                1.25                                  20            1.24
* Extrapolation beyond a setpoint of 1.15 is not allowed Browns Ferry Unit 2 Cycle 21                                                                                              Page 33 Core Operating Limits Report, 120% OLTP                                                            TVA-COLR-BF2C21, Revision 0 (Final)


EDMS: L94 190211 800 N PG Reactor Engineering and Fuels
EDMS: L94 190211 800 Reactor Engineering and Fuels - BWRFE Date: February 12, 2019 NPG                    1101 Market Street, Chattanooga TN 37402 6 APRM Flow Biased Rod Block Trip Settings (Technical Requirements Manual Section 5.3.1 and Table 3.3.4-1)
- BWRFE 1101 Market Street, Chattanooga TN 37402 Date: February 12, 2019 Browns Ferry Unit 2 Cycle 21  Page 33 Core Operating Limits Report
The APRM rod block trip setting is based upon References 26 & 28, and is defined by the following:
, 120% OLTP    TVA-COLR-BF 2 C 21, Revision 0 (Final) 5  Oscillation Power Range Monitor (OPRM) Setpoint (Technical Specification 3.3.1.1)
SRB (0.55(W-W) + 60.5%)                               Allowable Value SRB (0.55(W-W) + 58.5%)                               Nominal Trip Setpoint (NTSP) where:
Technical Specification Table 3.3.1.1
SRB         =         Rod Block setting in percent of rated thermal power (3952 MWt)
-1, Function 2f, identifies the OPRM upscale function. Instrument setpoints are established
W           =         Loop recirculation flow rate in percent of rated W           =         Difference between two-loop and single-loop effective recirculation flow at the same core flow (W=0.0 for two-loop operation)
, such that the reactor will be tripped before an oscillation can grow to the point where the SLMCPR is exceeded. An Option III stability analysis is performed for each reload core to determine allowable OLMCPR's as a function of OPRM setpoint. Analyses consider both steady state startup operation, and the case of a two recirculation pump trip from rated power.
The APRM rod block trip setting is clamped at a maximum allowable value of 115%
The resulting stability based OLMCPR's are reported in Reference
(corresponding to a NTSP of 113%).
: 1. The OPRM setpoin t (sometimes referred to as the Amplitude Trip, S p) is selected
Browns Ferry Unit 2 Cycle 21                                                                                  Page 34 Core Operating Limits Report, 120% OLTP                                                TVA-COLR-BF2C21, Revision 0 (Final)
, such that required margin to the SLMCPR is provided without stability being a limiting event. Analyses are based on cycle specific DIVOM analyses performed per Reference
: 22. The calculated OLMCPR's are shown in Table 5.1. Review of results shown in COLR Table 4.2 indicates an OPRM setpoint of 1.1 4 may be used. The successive confirmation count (sometimes referred to as N p) is provided in Table 5.2, per Reference 30. Table 5.1  OPRM Setpoint Range* Table 5.2  OPRM Successive Confirmation Count Setpoint OPRMOLMCPROLMCPRSetpoint (SS)(2PT)1.051.151.071.061.171.081.071.191.101.081.201.121.091.221.141.101.241.161.111.261.171.121.281.191.131.301.211.141.331.231.151.351.25                        Count 61.04 81.05 101.07 121.09 141.11 161.14 181.18 201.24OPRMSetpoint
* Extrapolation beyond a setpoint of 1.15 is not allowed EDMS: L94 190211 800 N PG Reactor Engineering and Fuels
- BWRFE 1101 Market Street, Chattanooga TN 37402 Date:  February 12, 2019  Browns Ferry Unit 2 Cycle 21  Page 34 Core Operating Limits Report
, 120% OLTP    TVA-COLR-BF 2 C 21, Revision 0 (Final) 6 APRM Flow Biased Rod Block Trip Settings (Technical Requirements Manual Section 5.3.1 and Table 3.3.4-1) The APRM rod block trip setting is based upon References 26 & 28, and is defined by the following:
SRB     (0.55 (W-W) + 60.5%) Allowable Value SRB     (0.55 (W-W) + 58.5%) Nominal Trip Setpoint (NTSP) where: SRB = Rod Block setting in percent of rated thermal power (3952 MW t) W = Loop recirculation flow rate in percent of rated W = Difference between two
-loop and single
-loop effective recirculation flow at the same core flow (W=0.0 for two
-loop operation)
The APRM rod block trip setting is clamped at a maximum allowable value of 115% (corresponding to a NTSP of 113%).


EDMS: L94 190211 800 N PG Reactor Engineering and Fuels
EDMS: L94 190211 800 Reactor Engineering and Fuels - BWRFE Date: February 12, 2019 NPG                          1101 Market Street, Chattanooga TN 37402 7 Rod Block Monitor (RBM) Trip Setpoints and Operability (Technical Specification Table 3.3.2.1-1)
- BWRFE 1101 Market Street, Chattanooga TN 37402 Date:  February 12, 2019  Browns Ferry Unit 2 Cycle 21  Page 35 Core Operating Limits Report
The RBM trip setpoints and applicable power ranges, based on References 26 & 27, are shown in Table 7.1. Setpoints are based on an HTSP, unfiltered analytical limit of 114%. Unfiltered setpoints are consistent with a nominal RBM filter setting of 0.0 seconds; filtered setpoints are consistent with a nominal RBM filter setting less than 0.5 seconds. Cycle specific CRWE analyses of OLMCPR are documented in Reference 1, superseding values reported in References 26, 27, and 29.
, 120% OLTP    TVA-COLR-BF 2 C 21, Revision 0 (Final) 7 Rod Block Monitor (RBM) Trip Setpoints and Operability (Technical Specification Tabl e 3.3.2.1-1) The RBM trip setpoints and applicable power ranges, based on References 26 & 27, are shown in Table 7.1. Setpoints are based on an HTSP, unfiltered analytical limit of 11 4%. Unfiltered setpoints are consistent with a nominal RBM filter setting of 0.0 seconds; filtered setpoints are consistent with a nominal RBM filter setting less than 0.5 seconds. Cycle specific CRWE analyses of OLMCPR are documented in Reference 1 , superseding values reported in References 26 , 27 , and 29. Table 7.1   Analytical RBM Trip Setpoints
Table 7.1 Analytical RBM Trip Setpoints
* RBM Trip Setpoint Allowable Value (AV) Nominal Trip Setpoint (NTSP) LPSP 27% 25% IPSP 62% 60% HPSP 82% 80% LTSP - unfiltered
* Allowable              Nominal Trip RBM                               Value                Setpoint Trip Setpoint                           (AV)                 (NTSP)
  - filtered 12 1.7% 12 0.7% 12 0.0% 11 9.0% ITSP - unfiltered - filtered 11 6.7% 11 5.7% 11 5.0% 11 4.0% HTSP - unfiltered
LPSP                                     27%                   25%
  - filtered 11 1.7% 11 0.9% 11 0.0% 1 09.2% DTSP 90% 92% As a result of cycle specific CRWE analyses, RBM setpoints in Technical Specification Table 3.3.2.1-1 are applicable as shown in Table 7.2. Cycle specific setpoint analysis results are shown in Table 7.3, per Reference
IPSP                                     62%                   60%
: 1. Table 7.2   RBM Setpoint Applicability Thermal Power
HPSP                                     82%                   80%
(% Rated) Applicable MCPRf Notes from Table 3.3.2.1
LTSP - unfiltered                     121.7%                 120.0%
-1 Comment > 27% and < 90%
                                          - filtered                    120.7%                 119.0%
< 1.66 (a), (b), (f), (h) two loop operation < 1.7 0 (a), (b), (f), (h) single loop operation 90% < 1.36 (g) two loop operation
ITSP     - unfiltered                 116.7%                 115.0%
* Values are considered maximums. Using lower values, due to RBM system hardware/software limitations, is conservative, and acceptable. MCPR values shown correspond with, (support), SLMPCR values identified in Reference
                                          - filtered                    115.7%                 114.0%
: 1. Greater than 90% rated power is not attainable in single loop operation.
HTSP - unfiltered                     111.7%                 110.0%
                                          - filtered                    110.9%                 109.2%
DTSP                                     90%                   92%
As a result of cycle specific CRWE analyses, RBM setpoints in Technical Specification Table 3.3.2.1-1 are applicable as shown in Table 7.2. Cycle specific setpoint analysis results are shown in Table 7.3, per Reference 1.
Table 7.2 RBM Setpoint Applicability Thermal Power                       Applicable                Notes from
(% Rated)                         MCPR                Table 3.3.2.1-1             Comment
                                                        < 1.66               (a), (b), (f), (h)     two loop operation
            > 27% and < 90%
                                                        < 1.70              (a), (b), (f), (h)     single loop operation 90%                                     < 1.36                     (g)             two loop operation
* Values are considered maximums. Using lower values, due to RBM system hardware/software limitations, is conservative, and acceptable.
MCPR values shown correspond with, (support), SLMPCR values identified in Reference 1.
Greater than 90% rated power is not attainable in single loop operation.
Browns Ferry Unit 2 Cycle 21                                                                                                    Page 35 Core Operating Limits Report, 120% OLTP                                                              TVA-COLR-BF2C21, Revision 0 (Final)


EDMS: L94 190211 800 N PG Reactor Engineering and Fuels
EDMS: L94 190211 800 Reactor Engineering and Fuels - BWRFE Date: February 12, 2019 NPG                    1101 Market Street, Chattanooga TN 37402 Table 7.3 Control Rod Withdrawal Error Results RBM                        CRWE HTSP Analytical Limit            OLMCPR Unfiltered 107                          1.29 111                          1.32 114                          1.33 117                          1.34 Results, compared against the base case OLMCPR results of Table 4.2, indicate SLMCPR remains protected for RBM inoperable conditions (i.e., 114% unblocked).
- BWRFE 1101 Market Street, Chattanooga TN 37402 Date:  February 12, 2019  Browns Ferry Unit 2 Cycle 21  Page 36 Core Operating Limits Report
Browns Ferry Unit 2 Cycle 21                                                                                  Page 36 Core Operating Limits Report, 120% OLTP                                                TVA-COLR-BF2C21, Revision 0 (Final)
, 120% OLTP    TVA-COLR-BF 2 C 21, Revision 0 (Final)  Table 7.3   Control Rod Withdrawal Error Results RBMCRWEHTSP Analytical LimitOLMCPRUnfiltered 1071.29 1111.32 1141.33 1171.34 Results, compared against the base case OLMCPR results of Table 4.2, indicate SLMCPR remains protected for RBM inoperable conditions (i.e., 11 4% unblocked).


EDMS: L94 190211 800 N PG Reactor Engineering and Fuels
EDMS: L94 190211 800 Reactor Engineering and Fuels - BWRFE Date: February 12, 2019 NPG              1101 Market Street, Chattanooga TN 37402 8 Shutdown Margin Limit (Technical Specification 3.1.1)
- BWRFE 1101 Market Street, Chattanooga TN 37402 Date:  February 12, 2019  Browns Ferry Unit 2 Cycle 21  Page 37 Core Operating Limits Report
Assuming the strongest OPERABLE control blade is fully withdrawn, and all other OPERABLE control blades are fully inserted, the core shall be sub-critical and meet the following minimum shutdown margin:
, 120% OLTP    TVA-COLR-BF 2 C 21, Revision 0 (Final) 8 Shutdown Margin Limit (Technical Specification 3.1.1)
SDM     > 0.38% dk/k Browns Ferry Unit 2 Cycle 21                                                                              Page 37 Core Operating Limits Report, 120% OLTP                                          TVA-COLR-BF2C21, Revision 0 (Final)}}
Assuming the strongest OPERABLE control blade is fully withdrawn, and all other OPERABLE control blades are fully inserted, the core shall be sub
-critical and meet the following minimum shutdown margin:
SDM > 0.38% dk/k}}

Revision as of 23:30, 19 October 2019

Core Operating Limits Report for Cycle 21 Operation, Revision O
ML19064B304
Person / Time
Site: Browns Ferry Tennessee Valley Authority icon.png
Issue date: 03/05/2019
From: Hughes D
Tennessee Valley Authority
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML19064B304 (49)


Text

Tennessee Valley Authority , Post Office Box 2000 , Decatur, Alabama 35609-2000 March 5, 2019 10 CFR 50.4 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Browns Ferry Nuclear Plant, Unit 2 Renewed Facility Operating License No. DPR-52 NRC Docket No. 50-260

Subject:

Browns Ferry Nuclear Plant, Unit 2 Core Operating Limits Report for Cycle 21 Operation, Revision O In accordance with the requirements of Technical Specification (TS) 5.6.5.d, the Tennessee Valley Authority is submitting the Browns Ferry Nuclear Plant (BFN),

Unit 2, Cycle 21, Core Operating Limits Report (COLR). Revision O of the Unit 2 COLR includes all Modes of operation (Modes 1 through 5).

There are no new commitments contained in this letter. If you have any questions please contact M. W. Oliver at (256) 729-7874.

D. L. Hughes Site Vice President

Enclosure:

Core Operating Limits Report, (120% OLTP), for Cycle 21 Operation ,

TVA-COLR-BF2C21, Revision 0 cc: (w/ Enclosure)

NRC Regional Administrator - Region II NRC Senior Resident Inspector - Browns Ferry Nuclear Plant NRC Project Manager - Browns Ferry Nuclear Plant

Enclosure Tennessee Valley Authority Browns Ferry Nuclear Plant Unit 2 Core Operating Limits Report, (120% OLTP), for Cycle 21 Operation, TVA-COLR-BF2C21, Revision 0 (See Attached)

EDMS L94 190211 800 QA Document BFE-4400, Revision 0 USlNPG Reactor Engineering and Fuels - BWRFE 1101 Market Street, Chattanooga , TN 37402 Browns Ferry Unit 2 Cycle 21 Core Operating Limits Report, 120°/o OL TP TVA-COLR-BF2C21 Revision O (Final)

(Revi sion Log , Page v)

February 2019 Prepared c;'=l,.,_ LLV T. W. Eichenberg, Sr. Specialist Date: ;:(_,/ 1.:2., o2 6 lo/

Verified: Date:

.:s?t5". Mitchell, Engineer Approved: ~ Date: 2/zs/1~

W . B. Bird, Manager, BWR Fuel Engineering Reviewed : ~ Date: z/i5/ir D. D. Coffey, Manager, Reactor Engineering Approved : ~a~Chairman, PORC~

Date: o ;J... J;..-, }l'j Approved : c. VUNt.J Date: ____;:31 )...:....

1 µ(1_.!0,_ _

Plant Manag\

EDMS: L94 190211 800 Reactor Engineering and Fuels - BWRFE Date: February 12, 2019 NPG 1101 Market Street, Chattanooga TN 37402 Table of Contents Total Number of Pages = 47 (including review cover sheet)

List of Tables.................................................................................................................................iii List of Figures .............................................................................................................................. iv Revision Log ................................................................................................................................. v Nomenclature ............................................................................................................................... vi References.................................................................................................................................. viii 1 Introduction .......................................................................................................................... 1 1.1 Purpose ......................................................................................................................... 1 1.2 Scope ............................................................................................................................ 1 1.3 Fuel Loading.................................................................................................................. 1 1.4 Acceptability .................................................................................................................. 2 2 APLHGR Limits .................................................................................................................... 3 2.1 Rated Power and Flow Limit: APLHGRRATED ................................................................ 3 2.2 Off-Rated Power Dependent Limit: APLHGRP ............................................................. 3 2.2.1 Startup without Feedwater Heaters ....................................................................... 3 2.3 Off-Rated Flow Dependent Limit: APLHGRF ................................................................ 3 2.4 Single Loop Operation Limit: APLHGRSLO.................................................................... 3 2.5 Equipment Out-Of-Service Corrections ......................................................................... 6 3 LHGR Limits ......................................................................................................................... 7 3.1 Rated Power and Flow Limit: LHGRRATED..................................................................... 7 3.2 Off-Rated Power Dependent Limit: LHGRP .................................................................. 7 3.2.1 Startup without Feedwater Heaters ....................................................................... 7 3.3 Off-Rated Flow Dependent Limit: LHGRF..................................................................... 8 3.4 Equipment Out-Of-Service Corrections ......................................................................... 8 4 OLMCPR Limits ................................................................................................................. 19 4.1 Flow Dependent MCPR Limit: MCPRF ....................................................................... 19 4.2 Power Dependent MCPR Limit: MCPRP .................................................................... 19 4.2.1 Startup without Feedwater Heaters ..................................................................... 19 4.2.2 Scram Speed Dependent Limits (TSSS vs. NSS vs. OSS) ................................. 20 4.2.3 Exposure Dependent Limits ................................................................................ 20 4.2.4 Equipment Out-Of-Service (EOOS) Options ....................................................... 21 4.2.5 Single-Loop-Operation (SLO) Limits ................................................................... 21 4.2.6 Below Pbypass Limits ......................................................................................... 21 5 Oscillation Power Range Monitor (OPRM) Setpoint .......................................................... 33 6 APRM Flow Biased Rod Block Trip Settings ...................................................................... 34 7 Rod Block Monitor (RBM) Trip Setpoints and Operability .................................................. 35 8 Shutdown Margin Limit....................................................................................................... 37 Browns Ferry Unit 2 Cycle 21 Page ii Core Operating Limits Report, 120% OLTP TVA-COLR-BF2C21, Revision 0 (Final)

EDMS: L94 190211 800 Reactor Engineering and Fuels - BWRFE Date: February 12, 2019 NPG 1101 Market Street, Chattanooga TN 37402 List of Tables Nuclear Fuel Types ................................................................................................................... 2 Startup Feedwater Temperature Basis ......................................................................................... 7 Nominal Scram Time Basis ......................................................................................................... 20 MCPRP Limits for All Fuel Types: Optimum Scram Time Basis .............................................. 23 MCPRP Limits for All Fuel Types: Nominal Scram Time Basis ............................................... 24 MCPRP Limits for All Fuel Types: Technical Specification Scram Time Basis ........................ 26 Startup Operation MCPRP Limits for Table 3.1 Temperature Range 1 for All Fuel Types:

Nominal Scram Time Basis ..................................................................................................... 28 Startup Operation MCPRP Limits for Table 3.1 Temperature Range 2 for All Fuel Types:

Nominal Scram Time Basis ..................................................................................................... 29 Startup Operation MCPRP Limits for Table 3.1 Temperature Range 1 for All Fuel Types:

Technical Specification Scram Time Basis ............................................................................. 30 Startup Operation MCPRP Limits for Table 3.1 Temperature Range 2 for All Fuel Types:

Technical Specification Scram Time Basis ............................................................................. 31 MCPRP Limits for All Fuel Types: Single Loop Operation for All Scram Times ...................... 32 OPRM Setpoint Range ............................................................................................................ 33 OPRM Successive Confirmation Count Setpoint ........................................................................ 33 Analytical RBM Trip Setpoints ................................................................................................. 35 RBM Setpoint Applicability .......................................................................................................... 35 Control Rod Withdrawal Error Results ........................................................................................ 36 Browns Ferry Unit 2 Cycle 21 Page iii Core Operating Limits Report, 120% OLTP TVA-COLR-BF2C21, Revision 0 (Final)

EDMS: L94 190211 800 Reactor Engineering and Fuels - BWRFE Date: February 12, 2019 NPG 1101 Market Street, Chattanooga TN 37402 List of Figures APLHGRRATED for ATRIUM-10XM Fuel ......................................................................................... 4 APLHGRRATED for ATRIUM-11 Fuel ............................................................................................... 5 LHGRRATED for ATRIUM-10XM Fuel .............................................................................................. 9 LHGRRATED for ATRIUM-11 Fuel ................................................................................................. 10 Base Operation LHGRFACP for ATRIUM-10XM Fuel ................................................................. 11 Base Operation LHGRFACP for ATRIUM-11 Fuel ...................................................................... 12 LHGRFACF for ATRIUM-10XM Fuel ........................................................................................... 13 LHGRFACF for ATRIUM-11 Fuel ................................................................................................ 14 Startup Operation LHGRFACP for ATRIUM-10XM Fuel: Table 3.1 Temperature Range 1 ........ 15 Startup Operation LHGRFACP for ATRIUM-10XM Fuel: Table 3.1 Temperature Range 2 ........ 16 Startup Operation LHGRFACP for ATRIUM-11 Fuel: Table 3.1 Temperature Range 1.............. 17 Startup Operation LHGRFACP for ATRIUM-11 Fuel: Table 3.1 Temperature Range 2.............. 18 MCPRF for All Fuel Types ........................................................................................................... 22 Browns Ferry Unit 2 Cycle 21 Page iv Core Operating Limits Report, 120% OLTP TVA-COLR-BF2C21, Revision 0 (Final)

EDMS: L94 190211 800 Reactor Engineering and Fuels - BWRFE Date: February 12, 2019 NPG 1101 Market Street, Chattanooga TN 37402 Revision Log Number Page Description 0-R0 All New document.

Browns Ferry Unit 2 Cycle 21 Page v Core Operating Limits Report, 120% OLTP TVA-COLR-BF2C21, Revision 0 (Final)

EDMS: L94 190211 800 Reactor Engineering and Fuels - BWRFE Date: February 12, 2019 NPG 1101 Market Street, Chattanooga TN 37402 Nomenclature APLHGR Average Planar LHGR APRM Average Power Range Monitor AREVA NP Vendor (Framatome, Siemens)

BOC Beginning of Cycle BSP Backup Stability Protection BWR Boiling Water Reactor CAVEX Core Average Exposure CD Coast Down CMSS Core Monitoring System Software COLR Core Operating Limits Report CPR Critical Power Ratio CRWE Control Rod Withdrawal Error CSDM Cold SDM DIVOM Delta CPR over Initial CPR vs. Oscillation Magnitude EOC End of Cycle EOCLB End-of-Cycle Licensing Basis EOOS Equipment OOS FFTR Final Feedwater Temperature Reduction FFWTR Final Feedwater Temperature Reduction FHOOS Feedwater Heaters OOS ft Foot: English unit of measure for length GNF Vendor (General Electric, Global Nuclear Fuels)

GWd Giga Watt Day HTSP High TSP ICA Interim Corrective Action ICF Increased Core Flow (beyond rated)

IS In-Service kW kilo watt: SI unit of measure for power.

LCO License Condition of Operation LFWH Loss of Feedwater Heating LHGRFAC LHGR Multiplier (Power or Flow dependent)

LPRM Low Power Range Monitor LRNB Generator Load Reject, No Bypass MAPFAC MAPLHGR multiplier (Power or Flow dependent)

MCPR Minimum CPR Browns Ferry Unit 2 Cycle 21 Page vi Core Operating Limits Report, 120% OLTP TVA-COLR-BF2C21, Revision 0 (Final)

EDMS: L94 190211 800 Reactor Engineering and Fuels - BWRFE Date: February 12, 2019 NPG 1101 Market Street, Chattanooga TN 37402 MSRV Moisture Separator Reheater Valve MSRVOOS MSRV OOS MTU Metric Ton Uranium MWd/MTU Mega Watt Day per Metric Ton Uranium NEOC Near EOC NRC United States Nuclear Regulatory Commission NSS Nominal Scram Speed NTSP Nominal TSP OLMCPR MCPR Operating Limit OOS Out-Of-Service OPRM Oscillation Power Range Monitor OSS Optimum Scram Speed PBDA Period Based Detection Algorithm Pbypass Power, below which TSV Position and TCV Fast Closure Scrams are Bypassed PLU Power Load Unbalance PLUOOS PLU OOS PRNM Power Range Neutron Monitor RBM Rod Block Monitor RCPOOS Recirculation Pump OOS (SLO)

RPS Reactor Protection System RPT Recirculation Pump Trip RPTOOS RPT OOS SDM Shutdown Margin SLMCPR MCPR Safety Limit SLO Single Loop Operation TBV Turbine Bypass Valve TBVIS TBV IS TBVOOS Turbine Bypass Valves OOS TIP Transversing In-core Probe TIPOOS TIP OOS TLO Two Loop Operation TSP Trip Setpoint TSSS Technical Specification Scram Speed TVA Tennessee Valley Authority Browns Ferry Unit 2 Cycle 21 Page vii Core Operating Limits Report, 120% OLTP TVA-COLR-BF2C21, Revision 0 (Final)

EDMS: L94 190211 800 Reactor Engineering and Fuels - BWRFE Date: February 12, 2019 NPG 1101 Market Street, Chattanooga TN 37402 References

1. ANP-3737, Revision 0, Browns Ferry Unit 2 Cycle 21 Reload Analysis, Framatome, Inc., December 2018.
2. ANP-3031P, Revision 3, Mechanical Design Report for Browns Ferry Units 1, 2, and 3 ATRIUM-10 Fuel Assemblies, AREVA NP, Inc., May 2014.
3. ANP-3150P, Revision 4, Mechanical Design Report for Browns Ferry ATRIUM 10XM Fuel Assemblies, AREVA Inc., November 2017.
4. ANP-3706P, Revision 0, Browns Ferry Unit 2 Cycle 21 Plant Parameters Document, Framatome Inc., June 2018.
5. BFE-4xxx, Revision 0, Browns Ferry Unit 2 Cycle 21 In Core Shuffle, Calculation File, Tennessee Valley Authority, February 2019.

Methodology References

6. XN-NF-81-58(P)(A) Revision 2 and Supplements 1 and 2, RODEX2 Fuel Rod Thermal-Mechanical Response Evaluation Model, Exxon Nuclear Company, March 1984.
7. XN-NF-85-67(P)(A) Revision 1, Generic Mechanical Design for Exxon Nuclear Jet Pump BWR Reload Fuel, Exxon Nuclear Company, September 1986.
8. EMF-85-74(P) Revision 0 Supplement 1(P)(A) and Supplement 2(P)(A), RODEX2A (BWR) Fuel Rod Thermal-Mechanical Evaluation Model, Siemens Power Corporation, February 1998.
9. ANF-89-98(P)(A) Revision 1 and Supplement 1, Generic Mechanical Design Criteria for BWR Fuel Designs, Advanced Nuclear Fuels Corporation, May 1995.
10. XN-NF-80-19(P)(A) Volume 1 and Supplements 1 and 2, Exxon Nuclear Methodology for Boiling Water Reactors - Neutronic Methods for Design and Analysis, Exxon Nuclear Company, March 1983.
11. XN-NF-80-19(P)(A) Volume 4 Revision 1, Exxon Nuclear Methodology for Boiling Water Reactors: Application of the ENC Methodology to BWR Reloads, Exxon Nuclear Company, June 1986.
12. EMF-2158(P)(A) Revision 0, Siemens Power Corporation Methodology for Boiling Water Reactors: Evaluation and Validation of CASMO-4/MICROBURN-B2, Siemens Power Corporation, October 1999.
13. XN-NF-80-19(P)(A) Volume 3 Revision 2, Exxon Nuclear Methodology for Boiling Water Reactors, THERMEX: Thermal Limits Methodology Summary Description, Exxon Nuclear Company, January 1987.
14. XN-NF-84-105(P)(A) Volume 1 and Volume 1 Supplements 1 and 2, XCOBRA-T: A Computer Code for BWR Transient Thermal-Hydraulic Core Analysis, Exxon Nuclear Company, February 1987.

Browns Ferry Unit 2 Cycle 21 Page viii Core Operating Limits Report, 120% OLTP TVA-COLR-BF2C21, Revision 0 (Final)

EDMS: L94 190211 800 Reactor Engineering and Fuels - BWRFE Date: February 12, 2019 NPG 1101 Market Street, Chattanooga TN 37402

15. ANP-10307PA, Revision 0, AREVA MCPR Safety Limit Methodology for Boiling Water Reactors, AREVA NP Inc., June 2011.
16. ANF-913(P)(A) Volume 1 Revision 1 and Volume 1 Supplements 2, 3 and 4, COTRANSA2: A Computer Program for Boiling Water Reactor Transient Analyses, Advanced Nuclear Fuels Corporation, August 1990.
17. ANF-1358(P)(A) Revision 3, The Loss of Feedwater Heating Transient in Boiling Water Reactors, Advanced Nuclear Fuels Corporation, September 2005.
18. EMF-2209(P)(A) Revision 3, SPCB Critical Power Correlation, AREVA NP Inc.,

September 2009.

19. EMF-2361(P)(A) Revision 0, EXEM BWR-2000 ECCS Evaluation Model, Framatome ANP Inc., May 2001, as supplemented by the site specific approval in NRC safety evaluation dated February 15, 2013 and July 31, 2014.
20. EMF-2292(P)(A) Revision 0, ATRIUM'-10: Appendix K Spray Heat Transfer Coefficients, Siemens Power Corporation, September 2000.
21. EMF-CC-074(P)(A), Volume 4, Revision 0, BWR Stability Analysis: Assessment of STAIF with Input from MICROBURN-B2, Siemens Power Corporation, August 2000.
22. BAW-10255(P)(A), Revision 2, Cycle-Specific DIVOM Methodology Using the RAMONA5-FA Code, AREVA NP Inc., May 2008.
23. BAW-10247PA, Revision 0, Realistic Thermal-Mechanical Fuel Rod Methodology for Boiling Water Reactors, AREVA NP Inc., April 2008.
24. ANP-10298PA, Revision 0, ACE/ATRIUM 10XM Critical Power Correlation, AREVA NP Inc., March 2010.
25. ANP-3140(P), Revision 0, Browns Ferry Units 1, 2, and 3 Improved K-factor Model for ACE/ATRIUM 10XM Critical Power Correlation, AREVA NP Inc.,

August 2012.

PRNM Setpoint References

26. EDQ2092900118, R27, Setpoint and Scaling Calculation for Neutron Monitoring &

Recirculation Flow Loops, Calculation File, Tennessee Valley Authority, November 16, 2017.

27. Task T0500, Revision 0, Neutron Monitoring System, Project Task Report, GE Hitachi Nuclear Energy, April 2015.
28. Task T0506, Revision 2, TS Instrument Setpoints, Project Task Report, Tennessee Valley Authority, July 2015.
29. NEDC-32433P, Maximum Extended Load Line Limit and ARTS Improvement Program Analyses for Browns Ferry Nuclear Plant Unit 1, 2, and 3, GE Nuclear Energy, April 1995.

Browns Ferry Unit 2 Cycle 21 Page ix Core Operating Limits Report, 120% OLTP TVA-COLR-BF2C21, Revision 0 (Final)

EDMS: L94 190211 800 Reactor Engineering and Fuels - BWRFE Date: February 12, 2019 NPG 1101 Market Street, Chattanooga TN 37402

30. NEDO-32465-A, Licensing Topical Report - Reactor Stability Detect and Suppress Solutions Licensing Basis Methodology for Reload Applications, GE Nuclear Energy, August 1996.

Browns Ferry Unit 2 Cycle 21 Page x Core Operating Limits Report, 120% OLTP TVA-COLR-BF2C21, Revision 0 (Final)

EDMS: L94 190211 800 Reactor Engineering and Fuels - BWRFE Date: February 12, 2019 NPG 1101 Market Street, Chattanooga TN 37402 1 Introduction In anticipation of cycle startup, it is necessary to describe the expected limits of operation.

1.1 Purpose The primary purpose of this document is to satisfy requirements identified by unit technical specification section 5.6.5. This document may be provided, upon final approval, to the NRC.

1.2 Scope This document will discuss the following areas:

Average Planar Linear Heat Generation Rate (APLHGR) Limit (Technical Specifications 3.2.1 and 3.7.5)

Applicability: Mode 1, 23% RTP (Technical Specifications definition of RTP)

Linear Heat Generation Rate (LHGR) Limit (Technical Specification 3.2.3, 3.3.4.1, and 3.7.5)

Applicability: Mode 1, 23% RTP (Technical Specifications definition of RTP)

Minimum Critical Power Ratio Operating Limit (OLMCPR)

(Technical Specifications 3.2.2, 3.3.4.1, 3.7.5 and Table 3.3.2.1-1)

Applicability: Mode 1, 23% RTP (Technical Specifications definition of RTP)

Oscillation Power Range Monitor (OPRM) Setpoint (Technical Specification Table 3.3.1.1)

Applicability: Mode 1, (as specified in Technical Specifications Table 3.3.1.1-1)

Average Power Range Monitor (APRM) Flow Biased Rod Block Trip Setting (Technical Requirements Manual Section 5.3.1 and Table 3.3.4-1)

Applicability: Mode 1, (as specified in Technical Requirements Manuals Table 3.3.4-1)

Rod Block Monitor (RBM) Trip Setpoints and Operability (Technical Specification Table 3.3.2.1-1)

Applicability: Mode 1,  % RTP as specified in Table 3.3.2.1-1 (TS definition of RTP)

Shutdown Margin (SDM) Limit (Technical Specification 3.1.1)

Applicability: All Modes 1.3 Fuel Loading The core will contain fresh and exposed ATRIUM-10XM, as well as a limited number of ATRIUM-11 lead fuel assemblies. Nuclear fuel types used in the core loading are shown in Table 1.1. The core shuffle and final loading were explicitly evaluated for BOC cold shutdown margin performance as documented per Reference 5.

Browns Ferry Unit 2 Cycle 21 Page 1 Core Operating Limits Report, 120% OLTP TVA-COLR-BF2C21, Revision 0 (Final)

EDMS: L94 190211 800 Reactor Engineering and Fuels - BWRFE Date: February 12, 2019 NPG 1101 Market Street, Chattanooga TN 37402 Table 1.1 Nuclear Fuel Types

  • Nuclear Original Number of Fuel Type Fuel Names Fuel Description Cycle Assemblies (NFT) (Range)

ATRIUM 10XM XMLC-3904B-15GV80-FBF 19 93 15 FBF401-FBF572 ATRIUM 10XM XMLC-4035B-13GV80-FBF 19 58 16 FBF573-FBF652 ATRIUM 11 A11-3693B-13GV80-FBF 19 6 17 FBF653-FBF660 ATRIUM 10XM XMLC-4102B-11GV70-FBG-B 20 48 18 FBG701-FBG748 ATRIUM 10XM XMLC-4062B-13GV80-FBG-C 20 151 19 FBG749-FBG900 ATRIUM 10XM XMLC-3948B-13GV70-FBG-B 20 88 20 FBG901-FBG988 ATRIUM-10XM XMLC-4087B-15GV80-FBH 21 176 21 FBH001-FBH176 ATRIUM-10XM XMLC-4036B-15GV80-FBH 21 88 22 FBH177-FBH264 ATRIUM-10XM XMLC-4093B-10GV80-FBh 21 56 23 FBH265-FBH320 1.4 Acceptability Limits discussed in this document were generated based on NRC approved methodologies per References 6 through 25.

  • The table identifies the expected fuel type breakdown in anticipation of final core loading. The final composition of the core depends upon uncertainties during the outage such as discovering a failed fuel bundle, or other bundle damage. Minor core loading changes, due to unforeseen events, will conform to the safety and monitoring requirements identified in this document.

Browns Ferry Unit 2 Cycle 21 Page 2 Core Operating Limits Report, 120% OLTP TVA-COLR-BF2C21, Revision 0 (Final)

EDMS: L94 190211 800 Reactor Engineering and Fuels - BWRFE Date: February 12, 2019 NPG 1101 Market Street, Chattanooga TN 37402 2 APLHGR Limits (Technical Specifications 3.2.1 & 3.7.5)

The APLHGR limit is determined by adjusting the rated power APLHGR limit for off-rated power, off-rated flow, and SLO conditions. The most limiting of these is then used as follows:

APLHGR limit = MIN ( APLHGRP , APLHGRF, APLHGRSLO )

where:

APLHGRP off-rated power APLHGR limit [APLHGRRATED

  • MAPFACP]

APLHGRF off-rated flow APLHGR limit [APLHGRRATED

  • MAPFACF]

APLHGRSLO SLO APLHGR limit [APLHGRRATED

  • SLO Multiplier]

2.1 Rated Power and Flow Limit: APLHGRRATED The rated conditions APLHGR for all fuel are identified per Reference 1. The rated conditions APLHGR for ATRIUM-10XM fuel are shown in Figure 2.1. The rated conditions APLHGR for ATRIUM-11 are shown in Figure 2.2.

2.2 Off-Rated Power Dependent Limit: APLHGRP Reference 1 does not specify a power dependent APLHGR. Therefore, MAPFACP is set to a value of 1.0.

2.2.1 Startup without Feedwater Heaters There is a range of operation during startup when the feedwater heaters are not placed into service until after the unit has reached a significant operating power level. No additional power dependent limitation is required.

2.3 Off-Rated Flow Dependent Limit: APLHGRF Reference 1 does not specify a flow dependent APLHGR. Therefore, MAPFACF is set to a value of 1.0.

2.4 Single Loop Operation Limit: APLHGRSLO The single loop operation multiplier for ATRIUM-10 and ATRIUM-10XM fuel is 0.85, per Reference 1.

Browns Ferry Unit 2 Cycle 21 Page 3 Core Operating Limits Report, 120% OLTP TVA-COLR-BF2C21, Revision 0 (Final)

EDMS: L94 190211 800 Reactor Engineering and Fuels - BWRFE Date: February 12, 2019 NPG 1101 Market Street, Chattanooga TN 37402 15 12 9

APLHGR (kW/ft) 6 3

0 0 20 40 60 80 Planar Average Exposure (GWd/MTU)

Planar Avg. APLHGR Exposure Limit (GWd/MTU) (kW/ft) 0.0 13.0 15.0 13.0 67.0 7.6 Figure 2.1 APLHGRRATED for ATRIUM-10XM Fuel Browns Ferry Unit 2 Cycle 21 Page 4 Core Operating Limits Report, 120% OLTP TVA-COLR-BF2C21, Revision 0 (Final)

EDMS: L94 190211 800 Reactor Engineering and Fuels - BWRFE Date: February 12, 2019 NPG 1101 Market Street, Chattanooga TN 37402 15 12 9

APLHGR (kW/ft) 6 3

0 0 20 40 60 80 Planar Average Exposure (GWd/MTU)

Planar Avg. APLHGR Exposure Limit (GWd/MTU) (kW/ft) 0.0 10 10.0 10 67.0 5.9 Figure 2.2 APLHGRRATED for ATRIUM-11 Fuel Browns Ferry Unit 2 Cycle 21 Page 5 Core Operating Limits Report, 120% OLTP TVA-COLR-BF2C21, Revision 0 (Final)

EDMS: L94 190211 800 Reactor Engineering and Fuels - BWRFE Date: February 12, 2019 NPG 1101 Market Street, Chattanooga TN 37402 2.5 Equipment Out-Of-Service Corrections The limits shown in Figure 2.1 and Figure 2.2 are applicable for operation with all equipment In-Service as well as the following Equipment Out-Of-Service (EOOS) options; including combinations of the options.

In-Service All equipment In-Service

  • All equipment service conditions assume 1 SRVOOS.

Browns Ferry Unit 2 Cycle 21 Page 6 Core Operating Limits Report, 120% OLTP TVA-COLR-BF2C21, Revision 0 (Final)

EDMS: L94 190211 800 Reactor Engineering and Fuels - BWRFE Date: February 12, 2019 NPG 1101 Market Street, Chattanooga TN 37402 3 LHGR Limits (Technical Specification 3.2.3, 3.3.4.1, & 3.7.5)

The LHGR limit is determined by adjusting the rated power LHGR limit for off-rated power and off-rated flow conditions. The most limiting of these is then used as follows:

LHGR limit = MIN ( LHGRP, LHGRF )

where:

LHGRP off-rated power LHGR limit [LHGRRATED

  • LHGRFACP]

LHGRF off-rated flow LHGR limit [LHGRRATED

  • LHGRFACF]

3.1 Rated Power and Flow Limit: LHGRRATED The rated conditions LHGR for all fuel are identified per Reference 1. The rated conditions LHGR for ATRIUM-10XM are shown in Figure 3.1. The rated conditions LHGR for ATRIUM-11 fuel is shown in Figure 3.2. The LHGR limit is consistent with References 2 and 3.

3.2 Off-Rated Power Dependent Limit: LHGRP LHGR limits are adjusted for off-rated power conditions using the LHGRFACP multiplier provided in Reference 1. The multiplier is split into two sub cases: turbine bypass valves in and out-of-service. The base case multipliers are shown in Figure 3.3 and Figure 3.4.

3.2.1 Startup without Feedwater Heaters There is a range of operation during startup when the feedwater heaters are not placed into service until after the unit has reached a significant operating power level. Additional limits are shown in Figure 3.7 through Figure 3.10, based on temperature conditions identified in Table 3.1.

Table 3.1 Startup Feedwater Temperature Basis Temperature Power Range 1 Range 2

(% Rated) (°F) (°F) 23 155.0 150.0 30 162.0 157.0 40 172.0 167.0 50 182.0 177.0 Browns Ferry Unit 2 Cycle 21 Page 7 Core Operating Limits Report, 120% OLTP TVA-COLR-BF2C21, Revision 0 (Final)

EDMS: L94 190211 800 Reactor Engineering and Fuels - BWRFE Date: February 12, 2019 NPG 1101 Market Street, Chattanooga TN 37402 3.3 Off-Rated Flow Dependent Limit: LHGRF LHGR limits are adjusted for off-rated flow conditions using the LHGRFACF multiplier provided in Reference 1. Multipliers are shown in Figure 3.5 through Figure 3.6.

3.4 Equipment Out-Of-Service Corrections The limits shown in Figure 3.1 and Figure 3.2 are applicable for operation with all equipment In-Service as well as the following Equipment Out-Of-Service (EOOS) options; including combinations of the options.

  • In-Service All equipment In-Service RPTOOS EOC-Recirculation Pump Trip Out-Of-Service TBVOOS Turbine Bypass Valve(s) Out-Of-Service PLUOOS Power Load Unbalance Out-Of-Service FHOOS (or FFWTR) Feedwater Heaters Out-Of-Service or Final Feedwater Temperature Reduction RCPOOS One Recirculation Pump Out-Of-Service Off-rated power corrections shown in Figure 3.3 and Figure 3.4 are dependent on operation of the Turbine Bypass Valve system. For this reason, separate limits are to be applied for TBVIS or TBVOOS operation. The limits have no dependency on RPTOOS, PLUOOS, FHOOS/FFWTR, or SLO.

Off-rated flow corrections shown in Figure 3.5 and Figure 3.6 are bounding for all EOOS conditions.

Off-rated power corrections shown in Figure 3.7 through Figure 3.10 are also dependent on operation of the Turbine Bypass Valve system. In this case, limits support FHOOS operation during startup. These limits have no dependency on RPTOOS, PLUOOS, or SLO.

  • All equipment service conditions assume 1 SRVOOS.

Browns Ferry Unit 2 Cycle 21 Page 8 Core Operating Limits Report, 120% OLTP TVA-COLR-BF2C21, Revision 0 (Final)

EDMS: L94 190211 800 Reactor Engineering and Fuels - BWRFE Date: February 12, 2019 NPG 1101 Market Street, Chattanooga TN 37402 15 12 9

LHGR (kW/ft) 6 3

0 0 20 40 60 80 Pellet Exposure (GWd/MTU)

Pellet LHGR Exposure Limit (GWd/MTU) (kW/ft) 0.0 14.1 18.9 14.1 74.4 7.4 Figure 3.1 LHGRRATED for ATRIUM-10XM Fuel Browns Ferry Unit 2 Cycle 21 Page 9 Core Operating Limits Report, 120% OLTP TVA-COLR-BF2C21, Revision 0 (Final)

EDMS: L94 190211 800 Reactor Engineering and Fuels - BWRFE Date: February 12, 2019 NPG 1101 Market Street, Chattanooga TN 37402 15 12 9

LHGR (kW/ft) 6 3

0 0 20 40 60 80 Pellet Exposure (GWd/MTU)

Pellet LHGR Exposure Limit (GWd/MTU) (kW/ft) 0.0 12.2 18.9 12.2 74.4 6.4 Figure 3.2 LHGRRATED for ATRIUM-11 Fuel Browns Ferry Unit 2 Cycle 21 Page 10 Core Operating Limits Report, 120% OLTP TVA-COLR-BF2C21, Revision 0 (Final)

EDMS: L94 190211 800 Reactor Engineering and Fuels - BWRFE Date: February 12, 2019 NPG 1101 Market Street, Chattanooga TN 37402 1.10 1.00 0.90 Turbine Bypass Valve In-Service, TBVIS 0.80 0.70 LHGRFACP Turbine Bypass Valve Out-of-Service, TBVOOS 0.60 TBVIS, 50% Core Flow 0.50 TBVOOS, 50% Core Flow TBVIS, > 50% Core Flow 0.40 TBVOOS, > 50% Core Flow 0.30 0.20 20 30 40 50 60 70 80 90 100 110 Core Power (% Rated)

Turb ine Bypass In-Service Turb ine Bypass Out-of-Service Core Core Power LHGRFACP Power LHGRFACP

(% Rated) (% Rated) 100.0 1.00 100.0 1.00 26.0 0.62 26.0 0.61 Core Flow > 50% Rated Core Flow > 50% Rated 26.0 0.45 26.0 0.38 23.0 0.42 23.0 0.35 Core Flow 50% Rated Core Flow 50% Rated 26.0 0.48 26.0 0.48 23.0 0.45 23.0 0.43 Figure 3.3 Base Operation LHGRFACP for ATRIUM-10XM Fuel (Independent of other EOOS conditions)

Browns Ferry Unit 2 Cycle 21 Page 11 Core Operating Limits Report, 120% OLTP TVA-COLR-BF2C21, Revision 0 (Final)

EDMS: L94 190211 800 Reactor Engineering and Fuels - BWRFE Date: February 12, 2019 NPG 1101 Market Street, Chattanooga TN 37402 1.10 1.00 0.90 Turbine Bypass Valve In-Service, TBVIS 0.80 0.70 LHGRFACP Turbine Bypass Valve Out-of-Service, TBVOOS 0.60 0.50 TBVIS, 50% Core Flow TBVOOS, 50% Core Flow TBVIS, > 50% Core Flow 0.40 TBVOOS, > 50% Core Flow 0.30 0.20 20 30 40 50 60 70 80 90 100 110 Core Power (% Rated)

Turb ine Bypass In-Service Turb ine Bypass Out-of-Service Core Core Power LHGRFACP Power LHGRFACP

(% Rated) (% Rated) 100.0 1.00 100.0 1.00 26.0 0.62 26.0 0.61 Core Flow > 50% Rated Core Flow > 50% Rated 26.0 0.45 26.0 0.38 23.0 0.42 23.0 0.35 Core Flow 50% Rated Core Flow 50% Rated 26.0 0.48 26.0 0.48 23.0 0.45 23.0 0.43 Figure 3.4 Base Operation LHGRFACP for ATRIUM-11 Fuel (Independent of other EOOS conditions)

Browns Ferry Unit 2 Cycle 21 Page 12 Core Operating Limits Report, 120% OLTP TVA-COLR-BF2C21, Revision 0 (Final)

EDMS: L94 190211 800 Reactor Engineering and Fuels - BWRFE Date: February 12, 2019 NPG 1101 Market Street, Chattanooga TN 37402 1.10 1.05 1.00 0.95 0.90 LHGRFACF 0.85 0.80 0.75 0.70 0.65 0.60 25 35 45 55 65 75 85 95 105 Core Flow (% Rated)

Core Flow LHGRFACF

(% Rated) 0.0 0.63 30.0 0.63 76.6 1.00 107.0 1.00 Figure 3.5 LHGRFACF for ATRIUM-10XM Fuel (Values bound all EOOS conditions)

(107.0% maximum core flow line is used to support 105% rated flow operation, ICF)

Browns Ferry Unit 2 Cycle 21 Page 13 Core Operating Limits Report, 120% OLTP TVA-COLR-BF2C21, Revision 0 (Final)

EDMS: L94 190211 800 Reactor Engineering and Fuels - BWRFE Date: February 12, 2019 NPG 1101 Market Street, Chattanooga TN 37402 1.10 1.05 1.00 0.95 0.90 LHGRFACF 0.85 0.80 0.75 0.70 0.65 0.60 25 35 45 55 65 75 85 95 105 Core Flow (% Rated)

Core Flow LHGRFACF

(% Rated) 0.0 0.66 30.0 0.66 73.7 1.00 107.0 1.00 Figure 3.6 LHGRFACF for ATRIUM-11 Fuel (Values bound all EOOS conditions)

(107.0% maximum core flow line is used to support 105% rated flow operation, ICF)

Browns Ferry Unit 2 Cycle 21 Page 14 Core Operating Limits Report, 120% OLTP TVA-COLR-BF2C21, Revision 0 (Final)

EDMS: L94 190211 800 Reactor Engineering and Fuels - BWRFE Date: February 12, 2019 NPG 1101 Market Street, Chattanooga TN 37402 1.10 1.00 0.90 0.80 Turbine Bypass Valve In-Service, TBVIS 0.70 LHGRFACP Turbine Bypass Valve Out-of-Service, TBVOOS 0.60 0.50 TBVIS, 50% Core Flow 0.40 TBVOOS, 50% Core Flow TBVIS, > 50% Core Flow TBVOOS, > 50% Core Flow 0.30 0.20 20 30 40 50 60 70 80 90 100 110 Core Power (% Rated)

Turb ine Bypass In-Service Turb ine Bypass Out-of-Service Core Core Power LHGRFACP Power LHGRFACP

(% Rated) (% Rated) 100.0 1.00 100.0 1.00 26.0 0.51 26.0 0.51 Core Flow > 50% Rated Core Flow > 50% Rated 26.0 0.39 26.0 0.34 23.0 0.36 23.0 0.31 Core Flow 50% Rated Core Flow 50% Rated 26.0 0.41 26.0 0.41 23.0 0.41 23.0 0.39 Figure 3.7 Startup Operation LHGRFACP for ATRIUM-10XM Fuel:

Table 3.1 Temperature Range 1 (no Feedwater heating during startup)

(Limits valid at and below 50% power)

Browns Ferry Unit 2 Cycle 21 Page 15 Core Operating Limits Report, 120% OLTP TVA-COLR-BF2C21, Revision 0 (Final)

EDMS: L94 190211 800 Reactor Engineering and Fuels - BWRFE Date: February 12, 2019 NPG 1101 Market Street, Chattanooga TN 37402 1.10 1.00 0.90 0.80 Turbine Bypass Valve In-Service, TBVIS 0.70 LHGRFACP Turbine Bypass Valve Out-of-Service, TBVOOS 0.60 0.50 TBVIS, 50% Core Flow 0.40 TBVOOS, 50% Core Flow TBVIS, > 50% Core Flow TBVOOS, > 50% Core Flow 0.30 0.20 20 30 40 50 60 70 80 90 100 110 Core Power (% Rated)

Turbine Bypass In-Service Turbine Bypass Out-of-Service Core Core Power LHGRFACP Power LHGRFACP

(% Rated) (% Rated) 100.0 1.00 100.0 1.00 26.0 0.51 26.0 0.51 Core Flow > 50% Rated Core Flow > 50% Rated 26.0 0.39 26.0 0.34 23.0 0.35 23.0 0.30 Core Flow 50% Rated Core Flow 50% Rated 26.0 0.41 26.0 0.41 23.0 0.40 23.0 0.38 Figure 3.8 Startup Operation LHGRFACP for ATRIUM-10XM Fuel:

Table 3.1 Temperature Range 2 (no Feedwater heating during startup)

(Limits valid at and below 50% power)

Browns Ferry Unit 2 Cycle 21 Page 16 Core Operating Limits Report, 120% OLTP TVA-COLR-BF2C21, Revision 0 (Final)

EDMS: L94 190211 800 Reactor Engineering and Fuels - BWRFE Date: February 12, 2019 NPG 1101 Market Street, Chattanooga TN 37402 1.10 1.00 0.90 0.80 Turbine Bypass Valve In-Service, TBVIS 0.70 LHGRFACP Turbine Bypass Valve Out-of-Service, TBVOOS 0.60 0.50 TBVIS, 50% Core Flow 0.40 TBVOOS, 50% Core Flow TBVIS, > 50% Core Flow TBVOOS, > 50% Core Flow 0.30 0.20 20 30 40 50 60 70 80 90 100 110 Core Power (% Rated)

Turb ine Bypass In-Service Turb ine Bypass Out-of-Service Core Core Power LHGRFACP Power LHGRFACP

(% Rated) (% Rated) 100.0 1.00 100.0 1.00 26.0 0.51 26.0 0.51 Core Flow > 50% Rated Core Flow > 50% Rated 26.0 0.39 26.0 0.34 23.0 0.36 23.0 0.31 Core Flow 50% Rated Core Flow 50% Rated 26.0 0.41 26.0 0.41 23.0 0.41 23.0 0.39 Figure 3.9 Startup Operation LHGRFACP for ATRIUM-11 Fuel:

Table 3.1 Temperature Range 1 (no Feedwater heating during startup)

(Limits valid at and below 50% power)

Browns Ferry Unit 2 Cycle 21 Page 17 Core Operating Limits Report, 120% OLTP TVA-COLR-BF2C21, Revision 0 (Final)

EDMS: L94 190211 800 Reactor Engineering and Fuels - BWRFE Date: February 12, 2019 NPG 1101 Market Street, Chattanooga TN 37402 1.10 1.00 0.90 0.80 Turbine Bypass Valve In-Service, TBVIS 0.70 LHGRFACP Turbine Bypass Valve Out-of-Service, TBVOOS 0.60 0.50 TBVIS, 50% Core Flow 0.40 TBVOOS, 50% Core Flow TBVIS, > 50% Core Flow TBVOOS, > 50% Core Flow 0.30 0.20 20 30 40 50 60 70 80 90 100 110 Core Power (% Rated)

Turb ine Bypass In-Service Turb ine Bypass Out-of-Service Core Core Power LHGRFACP Power LHGRFACP

(% Rated) (% Rated) 100.0 1.00 100.0 1.00 26.0 0.51 26.0 0.51 Core Flow > 50% Rated Core Flow > 50% Rated 26.0 0.39 26.0 0.34 23.0 0.35 23.0 0.30 Core Flow 50% Rated Core Flow 50% Rated 26.0 0.41 26.0 0.41 23.0 0.40 23.0 0.38 Figure 3.10 Startup Operation LHGRFACP for ATRIUM-11 Fuel:

Table 3.1 Temperature Range 2 (no Feedwater heating during startup)

(Limits valid at and below 50% power)

Browns Ferry Unit 2 Cycle 21 Page 18 Core Operating Limits Report, 120% OLTP TVA-COLR-BF2C21, Revision 0 (Final)

EDMS: L94 190211 800 Reactor Engineering and Fuels - BWRFE Date: February 12, 2019 NPG 1101 Market Street, Chattanooga TN 37402 4 OLMCPR Limits (Technical Specification 3.2.2, 3.3.4.1, & 3.7.5)

OLMCPR is calculated to be the most limiting of the flow or power dependent values OLMCPR limit = MAX ( MCPRF , MCPRP )

where:

MCPRF core flow-dependent MCPR limit MCPRP power-dependent MCPR limit 4.1 Flow Dependent MCPR Limit: MCPRF MCPRF limits are dependent upon core flow (% of Rated), and the max core flow limit, (Rated or Increased Core Flow, ICF). MCPRF limits are shown in Figure 4.1, per Reference 1. Limits are valid for all EOOS combinations. No adjustment is required for SLO conditions.

4.2 Power Dependent MCPR Limit: MCPRP MCPRP limits are dependent upon:

Core Power Level (% of Rated)

Technical Specification Scram Speed (TSSS), Nominal Scram Speed (NSS), or Optimum Scram Speed (OSS)

Cycle Operating Exposure (NEOC, EOC, and CD - as defined in this section)

Equipment Out-Of-Service Options Two or Single recirculation Loop Operation (TLO vs. SLO)

The MCPRP limits are provided in Table 4.2 through Table 4.9, where each table contains the limits for all fuel types and EOOS options (for a specified scram speed and exposure range).

The CMSS determines MCPRP limits, from these tables, based on linear interpolation between the specified powers.

4.2.1 Startup without Feedwater Heaters There is a range of operation during startup when the feedwater heaters are not placed into service until after the unit has reached a significant operating power level. Additional power dependent limits are shown in Table 4.5 through Table 4.8 based on temperature conditions identified in Table 3.1.

Browns Ferry Unit 2 Cycle 21 Page 19 Core Operating Limits Report, 120% OLTP TVA-COLR-BF2C21, Revision 0 (Final)

EDMS: L94 190211 800 Reactor Engineering and Fuels - BWRFE Date: February 12, 2019 NPG 1101 Market Street, Chattanooga TN 37402 4.2.2 Scram Speed Dependent Limits (TSSS vs. NSS vs. OSS)

MCPRP limits are provided for three different sets of assumed scram speeds. The Technical Specification Scram Speed (TSSS) MCPRP limits are applicable at all times, as long as the scram time surveillance demonstrates the times in Technical Specification Table 3.1.4-1 are met. Both Nominal Scram Speeds (NSS) and/or Optimum Scram Speeds (OSS) may be used, as long as the scram time surveillance demonstrates Table 4.1 times are applicable.

  • Table 4.1 Nominal Scram Time Basis Notch Nominal Optimum Position Scram Timing Scram Timing (index) (seconds) (seconds) 46 0.420 0.380 36 0.980 0.875 26 1.600 1.465 6 2.900 2.900 In demonstrating compliance with the NSS and/or OSS scram time basis, surveillance requirements from Technical Specification 3.1.4 apply; accepting the definition of SLOW rods should conform to scram speeds shown in Table 4.1. If conformance is not demonstrated, TSSS based MCPRP limits are applied.

On initial cycle startup, TSSS limits are used until the successful completion of scram timing confirms NSS and/or OSS based limits are applicable.

4.2.3 Exposure Dependent Limits Exposures are tracked on a Core Average Exposure basis (CAVEX, not Cycle Exposure).

Higher exposure MCPRP limits are always more limiting and may be used for any Core Average Exposure up to the ending exposure. Per Reference 1, MCPRP limits are provided for the following exposure ranges:

BOC to NEOC NEOC corresponds to 29,305.7 MWd / MTU BOC to EOCLB EOCLB corresponds to 34,273.7 MWd / MTU BOC to End of Coast End of Coast 35,998.1 MWd / MTU NEOC refers to a Near EOC exposure point.

  • Reference 1 analysis results are based on information identified in Reference 4.

Drop out times consistent with method used to perform actual timing measurements (i.e., including pickup/dropout effects).

Browns Ferry Unit 2 Cycle 21 Page 20 Core Operating Limits Report, 120% OLTP TVA-COLR-BF2C21, Revision 0 (Final)

EDMS: L94 190211 800 Reactor Engineering and Fuels - BWRFE Date: February 12, 2019 NPG 1101 Market Street, Chattanooga TN 37402 The EOCLB exposure point is not the true End-Of-Cycle exposure. Instead it corresponds to a licensing exposure window exceeding expected end-of-full-power-life.

The End of Coast exposure point represents a licensing exposure point exceeding the expected end-of-cycle exposure including cycle extension options.

4.2.4 Equipment Out-Of-Service (EOOS) Options EOOS options

  • covered by MCPRP limits are given by the following:

In-Service All equipment In-Service RPTOOS EOC-Recirculation Pump Trip Out-Of-Service TBVOOS Turbine Bypass Valve(s) Out-Of-Service RPTOOS+TBVOOS Combined RPTOOS and TBVOOS PLUOOS Power Load Unbalance Out-Of-Service PLUOOS+RPTOOS Combined PLUOOS and RPTOOS PLUOOS+TBVOOS Combined PLUOOS and TBVOOS PLUOOS+TBVOOS+RPTOOS Combined PLUOOS, RPTOOS, and TBVOOS FHOOS (or FFWTR) Feedwater Heaters Out-Of-Service (or Final Feedwater Temperature Reduction)

RCPOOS One Recirculation Pump Out-Of-Service For exposure ranges up to NEOC and EOCLB, additional combinations of MCPRP limits are also provided including FHOOS. The coast down exposure range assumes application of FFWTR. FHOOS based MCPRP limits for the coast down exposure are redundant because the temperature setdown assumption is identical with FFWTR.

4.2.5 Single-Loop-Operation (SLO) Limits When operating in RCPOOS conditions, MCPRp limits are constructed differently from the normal operating RCP conditions. The limiting event for RCPOOS is a pump seizure scenario, which sets the upper bound for allowed core power and flow . This event is not impacted by scram time assumptions. Specific MCPRP limits are shown in Table 4.9.

4.2.6 Below Pbypass Limits Below Pbypass (26% rated power), MCPRP limits depend upon core flow. One set of MCPRP limits applies for core flow above 50% of rated; a second set applies if the core flow is less than or equal to 50% rated.

  • All equipment service conditions assume 1 SRVOOS.

RCPOOS limits are only valid up to 43.75% rated core power, 50% rated core flow, and an active recirculation drive flow of 17.73 Mlbm/hr.

Browns Ferry Unit 2 Cycle 21 Page 21 Core Operating Limits Report, 120% OLTP TVA-COLR-BF2C21, Revision 0 (Final)

EDMS: L94 190211 800 Reactor Engineering and Fuels - BWRFE Date: February 12, 2019 NPG 1101 Market Street, Chattanooga TN 37402 2.00 1.80 1.60 MCPRF 1.40 1.20 1.00 30 40 50 60 70 80 90 100 110 Core Flow (% Rated)

Core Flow MCPRF

(% Rated) 30.0 1.58 84.0 1.34 107.0 1.34 Figure 4.1 MCPRF for All Fuel Types (Values bound all EOOS conditions)

(107.0% maximum core flow line is used to support 105% rated flow operation, ICF)

Browns Ferry Unit 2 Cycle 21 Page 22 Core Operating Limits Report, 120% OLTP TVA-COLR-BF2C21, Revision 0 (Final)

EDMS: L94 190211 800 Reactor Engineering and Fuels - BWRFE Date: February 12, 2019 NPG 1101 Market Street, Chattanooga TN 37402 Table 4.2 MCPRP Limits for All Fuel Types: Optimum Scram Time Basis

  • ATRIUM-10XM ATRIUM-11 BOC BOC BOC BOC BOC BOC Pow er to to to End of to to to End of Operating Condition (% of rated) NEOC EOCLB Coast NEOC EOCLB Coast 100 1.37 1.39 1.41 1.36 1.42 1.43 90 1.42 1.43 1.46 1.42 1.45 1.47 65 1.59 1.59 1.63 1.58 1.58 1.64 50 1.68 1.68 1.75 1.73 1.73 1.81 50 1.81 1.81 1.81 1.91 1.91 1.91 Base Case 40 1.88 1.88 1.91 1.99 1.99 2.03 26 2.30 2.30 2.42 2.51 2.51 2.66 26 at > 50%F 2.54 2.54 2.65 2.68 2.68 2.81 23 at > 50%F 2.69 2.69 2.81 2.93 2.93 3.05 26 at 50%F 2.42 2.42 2.51 2.63 2.63 2.72 23 at 50%F 2.55 2.55 2.67 2.93 2.93 3.05 100 1.41 1.41 --- 1.40 1.43 ---

90 1.46 1.46 --- 1.45 1.47 ---

65 1.63 1.63 --- 1.64 1.64 ---

50 1.75 1.75 --- 1.81 1.81 ---

50 1.81 1.81 --- 1.91 1.91 ---

FHOOS 40 1.91 1.91 --- 2.03 2.03 ---

26 2.42 2.42 --- 2.66 2.66 ---

26 at > 50%F 2.65 2.65 --- 2.81 2.81 ---

23 at > 50%F 2.81 2.81 --- 3.05 3.05 ---

26 at 50%F 2.51 2.51 --- 2.72 2.72 ---

23 at 50%F 2.67 2.67 --- 3.05 3.05 ---

  • All limits, including Base Case, support RPTOOS operation; operation is supported for any combination of 1 MSRVOOS, up to 2 TIPOOS (or the equivalent number of TIP channels), and up to 50% of the LPRMs out-of-service.

FFWTR/FHOOS is supported for the BOC to End of Coast limits.

Browns Ferry Unit 2 Cycle 21 Page 23 Core Operating Limits Report, 120% OLTP TVA-COLR-BF2C21, Revision 0 (Final)

EDMS: L94 190211 800 Reactor Engineering and Fuels - BWRFE Date: February 12, 2019 NPG 1101 Market Street, Chattanooga TN 37402 Table 4.3 MCPRP Limits for All Fuel Types: Nominal Scram Time Basis

  • ATRIUM-10XM ATRIUM-11 BOC BOC BOC BOC BOC BOC Pow er to to to End of to to to End of Operating Condition (% of rated) NEOC EOCLB Coast NEOC EOCLB Coast 100 1.40 1.41 1.44 1.40 1.43 1.45 90 1.45 1.46 1.49 1.45 1.47 1.49 65 1.61 1.61 1.66 1.61 1.61 1.67 50 1.71 1.71 1.77 1.76 1.76 1.84 50 1.81 1.81 1.81 1.92 1.92 1.92 Base Case 40 1.88 1.88 1.94 2.00 2.00 2.06 26 2.33 2.33 2.45 2.55 2.55 2.69 26 at > 50%F 2.54 2.54 2.65 2.68 2.68 2.81 23 at > 50%F 2.69 2.69 2.81 2.93 2.93 3.05 26 at 50%F 2.42 2.42 2.51 2.63 2.63 2.72 23 at 50%F 2.55 2.55 2.67 2.93 2.93 3.05 100 1.43 1.44 1.46 1.45 1.49 1.49 90 1.48 1.49 1.52 1.49 1.52 1.54 65 1.64 1.64 1.69 1.65 1.65 1.69 50 1.73 1.73 1.78 1.78 1.78 1.85 50 1.81 1.81 1.81 1.92 1.92 1.92 TBVOOS 40 1.88 1.88 1.94 2.00 2.00 2.06 26 2.33 2.33 2.45 2.55 2.55 2.69 26 at > 50%F 3.11 3.11 3.23 3.28 3.28 3.38 23 at > 50%F 3.35 3.35 3.47 3.57 3.57 3.69 26 at 50%F 2.78 2.78 2.90 3.04 3.04 3.16 23 at 50%F 3.04 3.04 3.18 3.32 3.32 3.56 100 1.44 1.44 --- 1.43 1.45 ---

90 1.49 1.49 --- 1.48 1.49 ---

65 1.66 1.66 --- 1.67 1.67 ---

50 1.77 1.77 --- 1.84 1.84 ---

50 1.81 1.81 --- 1.92 1.92 ---

FHOOS 40 1.94 1.94 --- 2.06 2.06 ---

26 2.45 2.45 --- 2.69 2.69 ---

26 at > 50%F 2.65 2.65 --- 2.81 2.81 ---

23 at > 50%F 2.81 2.81 --- 3.05 3.05 ---

26 at 50%F 2.51 2.51 --- 2.72 2.72 ---

23 at 50%F 2.67 2.67 --- 3.05 3.05 ---

100 1.40 1.41 1.44 1.40 1.44 1.45 90 1.45 1.46 1.49 1.45 1.47 1.49 65 1.73 1.73 1.73 1.83 1.83 1.83 50 --- --- --- --- --- ---

50 1.81 1.81 1.81 1.92 1.92 1.92 PLUOOS 40 1.88 1.88 1.94 2.00 2.00 2.06 26 2.33 2.33 2.45 2.55 2.55 2.69 26 at > 50%F 2.54 2.54 2.65 2.68 2.68 2.81 23 at > 50%F 2.69 2.69 2.81 2.93 2.93 3.05 26 at 50%F 2.42 2.42 2.51 2.63 2.63 2.72 23 at 50%F 2.55 2.55 2.67 2.93 2.93 3.05

  • All limits, including Base Case, support RPTOOS operation; operation is supported for any combination of 1 MSRVOOS, up to 2 TIPOOS (or the equivalent number of TIP channels), and up to 50% of the LPRMs out-of-service.

FFWTR and FHOOS assume the same value of temperature drop. Consequently, FHOOS limits are not provided for BOC to End of COAST due to redundancy. Thermal limits for the BOC to End of COAST exposure applicability window are developed to conservatively bound FHOOS limits for earlier exposure applicability windows.

Browns Ferry Unit 2 Cycle 21 Page 24 Core Operating Limits Report, 120% OLTP TVA-COLR-BF2C21, Revision 0 (Final)

EDMS: L94 190211 800 Reactor Engineering and Fuels - BWRFE Date: February 12, 2019 NPG 1101 Market Street, Chattanooga TN 37402 Table 4.3 MCPRP Limits for All Fuel Types: Nominal Scram Time Basis (continued)

  • ATRIUM-10XM ATRIUM-11 BOC BOC BOC BOC BOC BOC Pow er to to to End of to to to End of Operating Condition (% of rated) NEOC EOCLB Coast NEOC EOCLB Coast 100 1.46 1.46 --- 1.47 1.49 ---

90 1.52 1.52 --- 1.52 1.54 ---

65 1.69 1.69 --- 1.69 1.69 ---

50 1.78 1.78 --- 1.85 1.85 ---

50 1.81 1.81 --- 1.92 1.92 ---

TBVOOS 40 1.94 1.94 --- 2.06 2.06 ---

FHOOS 26 2.45 2.45 --- 2.69 2.69 ---

26 at > 50%F 3.23 3.23 --- 3.38 3.38 ---

23 at > 50%F 3.47 3.47 --- 3.69 3.69 ---

26 at 50%F 2.90 2.90 --- 3.16 3.16 ---

23 at 50%F 3.18 3.18 --- 3.56 3.56 ---

100 1.43 1.44 1.46 1.45 1.49 1.49 90 1.48 1.49 1.52 1.49 1.52 1.54 65 1.73 1.73 1.73 1.83 1.83 1.83 50 --- --- --- --- --- ---

50 1.81 1.81 1.81 1.92 1.92 1.92 TBVOOS 40 1.88 1.88 1.94 2.00 2.00 2.06 PLUOOS 26 2.33 2.33 2.45 2.55 2.55 2.69 26 at > 50%F 3.11 3.11 3.23 3.28 3.28 3.38 23 at > 50%F 3.35 3.35 3.47 3.57 3.57 3.69 26 at 50%F 2.78 2.78 2.90 3.04 3.04 3.16 23 at 50%F 3.04 3.04 3.18 3.32 3.32 3.56 100 1.44 1.44 --- 1.43 1.45 ---

90 1.49 1.49 --- 1.48 1.49 ---

65 1.73 1.73 --- 1.83 1.83 ---

50 --- --- --- --- --- ---

50 1.81 1.81 --- 1.92 1.92 ---

FHOOS 40 1.94 1.94 --- 2.06 2.06 ---

PLUOOS 26 2.45 2.45 --- 2.69 2.69 ---

26 at > 50%F 2.65 2.65 --- 2.81 2.81 ---

23 at > 50%F 2.81 2.81 --- 3.05 3.05 ---

26 at 50%F 2.51 2.51 --- 2.72 2.72 ---

23 at 50%F 2.67 2.67 --- 3.05 3.05 ---

100 1.46 1.46 --- 1.47 1.49 ---

90 1.52 1.52 --- 1.52 1.54 ---

65 1.73 1.73 --- 1.83 1.83 ---

50 --- --- --- --- --- ---

TBVOOS 50 1.81 1.81 --- 1.92 1.92 ---

FHOOS 40 1.94 1.94 --- 2.06 2.06 ---

PLUOOS 26 2.45 2.45 --- 2.69 2.69 ---

26 at > 50%F 3.23 3.23 --- 3.38 3.38 ---

23 at > 50%F 3.47 3.47 --- 3.69 3.69 ---

26 at 50%F 2.90 2.90 --- 3.16 3.16 ---

23 at 50%F 3.18 3.18 --- 3.56 3.56 ---

  • All limits, including Base Case, support RPTOOS operation; operation is supported for any combination of 1 MSRVOOS, up to 2 TIPOOS (or the equivalent number of TIP channels), and up to 50% of the LPRMs out-of-service.

FFWTR and FHOOS assume the same value of temperature drop. Consequently, FHOOS limits are not provided for BOC to End of COAST due to redundancy. Thermal limits for the BOC to End of COAST exposure applicability window are developed to conservatively bound FHOOS limits for earlier exposure applicability windows.

Browns Ferry Unit 2 Cycle 21 Page 25 Core Operating Limits Report, 120% OLTP TVA-COLR-BF2C21, Revision 0 (Final)

EDMS: L94 190211 800 Reactor Engineering and Fuels - BWRFE Date: February 12, 2019 NPG 1101 Market Street, Chattanooga TN 37402 Table 4.4 MCPRP Limits for All Fuel Types: Technical Specification Scram Time Basis

  • ATRIUM-10XM ATRIUM-11 BOC BOC BOC BOC BOC BOC Pow er to to to End of to to to End of Operating Condition (% of rated) NEOC EOCLB Coast NEOC EOCLB Coast 100 1.43 1.43 1.47 1.43 1.45 1.46 90 1.48 1.48 1.52 1.47 1.49 1.51 65 1.63 1.63 1.68 1.64 1.64 1.70 50 1.73 1.73 1.80 1.79 1.79 1.86 50 1.82 1.82 1.82 1.93 1.93 1.93 Base Case 40 1.89 1.89 1.96 2.01 2.01 2.08 26 2.35 2.35 2.47 2.57 2.57 2.72 26 at > 50%F 2.54 2.54 2.65 2.68 2.68 2.81 23 at > 50%F 2.69 2.69 2.81 2.93 2.93 3.05 26 at 50%F 2.42 2.42 2.51 2.63 2.63 2.72 23 at 50%F 2.55 2.55 2.67 2.93 2.93 3.05 100 1.46 1.47 1.49 1.48 1.51 1.51 90 1.51 1.51 1.54 1.52 1.54 1.56 65 1.66 1.66 1.71 1.67 1.67 1.72 50 1.75 1.75 1.81 1.81 1.81 1.88 50 1.82 1.82 1.82 1.93 1.93 1.93 TBVOOS 40 1.89 1.89 1.96 2.01 2.01 2.09 26 2.36 2.36 2.47 2.57 2.57 2.72 26 at > 50%F 3.11 3.11 3.23 3.28 3.28 3.38 23 at > 50%F 3.35 3.35 3.47 3.57 3.57 3.69 26 at 50%F 2.78 2.78 2.90 3.04 3.04 3.16 23 at 50%F 3.04 3.04 3.18 3.32 3.32 3.56 100 1.47 1.47 --- 1.45 1.46 ---

90 1.52 1.52 --- 1.51 1.51 ---

65 1.68 1.68 --- 1.70 1.70 ---

50 1.80 1.80 --- 1.86 1.86 ---

50 1.82 1.82 --- 1.93 1.93 ---

FHOOS 40 1.96 1.96 --- 2.08 2.08 ---

26 2.47 2.47 --- 2.72 2.72 ---

26 at > 50%F 2.65 2.65 --- 2.81 2.81 ---

23 at > 50%F 2.81 2.81 --- 3.05 3.05 ---

26 at 50%F 2.51 2.51 --- 2.72 2.72 ---

23 at 50%F 2.67 2.67 --- 3.05 3.05 ---

100 1.43 1.43 1.47 1.43 1.45 1.49 90 1.48 1.48 1.52 1.47 1.49 1.51 65 1.74 1.74 1.74 1.84 1.84 1.84 50 --- --- --- --- --- ---

50 1.82 1.82 1.82 1.93 1.93 1.93 PLUOOS 40 1.89 1.89 1.96 2.01 2.01 2.08 26 2.35 2.35 2.47 2.57 2.57 2.72 26 at > 50%F 2.54 2.54 2.65 2.68 2.68 2.81 23 at > 50%F 2.69 2.69 2.81 2.93 2.93 3.05 26 at 50%F 2.42 2.42 2.51 2.63 2.63 2.72 23 at 50%F 2.55 2.55 2.67 2.93 2.93 3.05

  • All limits, including Base Case, support RPTOOS operation; operation is supported for any combination of 1 MSRVOOS, up to 2 TIPOOS (or the equivalent number of TIP channels), and up to 50% of the LPRMs out-of-service.

FFWTR and FHOOS assume the same value of temperature drop. Consequently, FHOOS limits are not provided for BOC to End of COAST due to redundancy. Thermal limits for the BOC to End of COAST exposure applicability window are developed to conservatively bound FHOOS limits for earlier exposure applicability windows.

Browns Ferry Unit 2 Cycle 21 Page 26 Core Operating Limits Report, 120% OLTP TVA-COLR-BF2C21, Revision 0 (Final)

EDMS: L94 190211 800 Reactor Engineering and Fuels - BWRFE Date: February 12, 2019 NPG 1101 Market Street, Chattanooga TN 37402 Table 4.4 MCPRP Limits for All Fuel Types: Technical Specification Scram Time Basis (continued)

  • ATRIUM-10XM ATRIUM-11 BOC BOC BOC BOC BOC BOC Pow er to to to End of to to to End of Operating Condition (% of rated) NEOC EOCLB Coast NEOC EOCLB Coast 100 1.49 1.49 --- 1.50 1.51 ---

90 1.54 1.54 --- 1.55 1.56 ---

65 1.71 1.71 --- 1.72 1.72 ---

50 1.81 1.81 --- 1.88 1.88 ---

50 1.82 1.82 --- 1.93 1.93 ---

TBVOOS 40 1.96 1.96 --- 2.09 2.09 ---

FHOOS 26 2.47 2.47 --- 2.72 2.72 ---

26 at > 50%F 3.23 3.23 --- 3.38 3.38 ---

23 at > 50%F 3.47 3.47 --- 3.69 3.69 ---

26 at 50%F 2.90 2.90 --- 3.16 3.16 ---

23 at 50%F 3.18 3.18 --- 3.56 3.56 ---

100 1.46 1.47 1.49 1.48 1.51 1.51 90 1.51 1.51 1.54 1.52 1.54 1.56 65 1.74 1.74 1.74 1.84 1.84 1.84 50 --- --- --- --- --- ---

50 1.82 1.82 1.82 1.93 1.93 1.93 TBVOOS 40 1.89 1.89 1.96 2.01 2.01 2.09 PLUOOS 26 2.36 2.36 2.47 2.57 2.57 2.72 26 at > 50%F 3.11 3.11 3.23 3.28 3.28 3.38 23 at > 50%F 3.35 3.35 3.47 3.57 3.57 3.69 26 at 50%F 2.78 2.78 2.90 3.04 3.04 3.16 23 at 50%F 3.04 3.04 3.18 3.32 3.32 3.56 100 1.47 1.47 --- 1.45 1.46 ---

90 1.52 1.52 --- 1.51 1.51 ---

65 1.74 1.74 --- 1.84 1.84 ---

50 --- --- --- --- --- ---

50 1.82 1.82 --- 1.93 1.93 ---

FHOOS 40 1.96 1.96 --- 2.08 2.08 ---

PLUOOS 26 2.47 2.47 --- 2.72 2.72 ---

26 at > 50%F 2.65 2.65 --- 2.81 2.81 ---

23 at > 50%F 2.81 2.81 --- 3.05 3.05 ---

26 at 50%F 2.51 2.51 --- 2.72 2.72 ---

23 at 50%F 2.67 2.67 --- 3.05 3.05 ---

100 1.49 1.49 --- 1.50 1.51 ---

90 1.54 1.54 --- 1.55 1.56 ---

65 1.74 1.74 --- 1.84 1.84 ---

50 --- --- --- --- --- ---

TBVOOS 50 1.82 1.82 --- 1.93 1.93 ---

FHOOS 40 1.96 1.96 --- 2.09 2.09 ---

PLUOOS 26 2.47 2.47 --- 2.72 2.72 ---

26 at > 50%F 3.23 3.23 --- 3.38 3.38 ---

23 at > 50%F 3.47 3.47 --- 3.69 3.69 ---

26 at 50%F 2.90 2.90 --- 3.16 3.16 ---

23 at 50%F 3.18 3.18 --- 3.56 3.56 ---

  • All limits, including Base Case, support RPTOOS operation; operation is supported for any combination of 1 MSRVOOS, up to 2 TIPOOS (or the equivalent number of TIP channels), and up to 50% of the LPRMs out-of-service.

FFWTR and FHOOS assume the same value of temperature drop. Consequently, FHOOS limits are not provided for BOC to End of COAST due to redundancy. Thermal limits for the BOC to End of COAST exposure applicability window are developed to conservatively bound FHOOS limits for earlier exposure applicability windows.

Browns Ferry Unit 2 Cycle 21 Page 27 Core Operating Limits Report, 120% OLTP TVA-COLR-BF2C21, Revision 0 (Final)

EDMS: L94 190211 800 Reactor Engineering and Fuels - BWRFE Date: February 12, 2019 NPG 1101 Market Street, Chattanooga TN 37402 Table 4.5 Startup Operation MCPRP Limits for Table 3.1 Temperature Range 1 for All Fuel Types: Nominal Scram Time Basis

  • ATRIUM-10XM ATRIUM-11 BOC BOC BOC BOC BOC BOC Pow er to to to End of to to to End of Operating Condition (% of rated) NEOC EOCLB Coast NEOC EOCLB Coast 100 1.44 1.44 1.44 1.43 1.45 1.45 90 1.49 1.49 1.49 1.48 1.49 1.49 65 1.73 1.73 1.73 1.83 1.83 1.83 50 --- --- --- --- --- ---

50 1.93 1.93 1.93 2.02 2.02 2.02 TBVIS 40 2.16 2.16 2.16 2.29 2.29 2.29 26 2.77 2.77 2.77 3.07 3.07 3.07 26 at > 50%F 3.06 3.06 3.06 3.12 3.12 3.12 23 at > 50%F 3.15 3.15 3.15 3.42 3.42 3.42 26 at 50%F 2.79 2.79 2.79 3.07 3.07 3.07 23 at 50%F 3.01 3.01 3.01 3.37 3.37 3.37 100 1.46 1.46 1.46 1.47 1.49 1.49 90 1.52 1.52 1.52 1.52 1.54 1.54 65 1.73 1.73 1.73 1.83 1.83 1.83 50 --- --- --- --- --- ---

50 1.93 1.93 1.93 2.02 2.02 2.02 TBVOOS 40 2.16 2.16 2.16 2.29 2.29 2.29 26 2.77 2.77 2.77 3.07 3.07 3.07 26 at > 50%F 3.55 3.55 3.55 3.60 3.60 3.60 23 at > 50%F 3.71 3.71 3.71 4.00 4.00 4.00 26 at 50%F 3.14 3.14 3.14 3.39 3.39 3.39 23 at 50%F 3.45 3.45 3.45 3.89 3.89 3.89

  • Limits support RPTOOS operation; operation is supported for any combination of 1 MSRVOOS, up to 2 TIPOOS (or the equivalent number of TIP channels), and up to 50% of the LPRMs out-of-service.

Limits are applicable for all other EOOS scenarios, apart from TBV.

Limits are only valid up to 50% rated core power.

Browns Ferry Unit 2 Cycle 21 Page 28 Core Operating Limits Report, 120% OLTP TVA-COLR-BF2C21, Revision 0 (Final)

EDMS: L94 190211 800 Reactor Engineering and Fuels - BWRFE Date: February 12, 2019 NPG 1101 Market Street, Chattanooga TN 37402 Table 4.6 Startup Operation MCPRP Limits for Table 3.1 Temperature Range 2 for All Fuel Types: Nominal Scram Time Basis

  • ATRIUM-10XM ATRIUM-11 BOC BOC BOC BOC BOC BOC Pow er to to to End of to to to End of Operating Condition (% of rated) NEOC EOCLB Coast NEOC EOCLB Coast 100 1.44 1.44 1.44 1.43 1.45 1.45 90 1.49 1.49 1.49 1.48 1.49 1.49 65 1.73 1.73 1.73 1.83 1.83 1.83 50 --- --- --- --- --- ---

50 1.94 1.94 1.94 2.02 2.02 2.02 TBVIS 40 2.17 2.17 2.17 2.30 2.30 2.30 26 2.79 2.79 2.79 3.09 3.09 3.09 26 at > 50%F 3.09 3.09 3.09 3.14 3.14 3.14 23 at > 50%F 3.17 3.17 3.17 3.44 3.44 3.44 26 at 50%F 2.81 2.81 2.81 3.09 3.09 3.09 23 at 50%F 3.03 3.03 3.03 3.39 3.39 3.39 100 1.46 1.46 1.46 1.47 1.49 1.49 90 1.52 1.52 1.52 1.52 1.54 1.54 65 1.73 1.73 1.73 1.83 1.83 1.83 50 --- --- --- --- --- ---

50 1.94 1.94 1.94 2.02 2.02 2.02 TBVOOS 40 2.17 2.17 2.17 2.30 2.30 2.30 26 2.79 2.79 2.79 3.09 3.09 3.09 26 at > 50%F 3.58 3.58 3.58 3.62 3.62 3.62 23 at > 50%F 3.73 3.73 3.73 4.02 4.02 4.02 26 at 50%F 3.15 3.15 3.15 3.40 3.40 3.40 23 at 50%F 3.46 3.46 3.46 3.90 3.90 3.90

  • Limits support RPTOOS operation; operation is supported for any combination of 1 MSRVOOS, up to 2 TIPOOS (or the equivalent number of TIP channels), and up to 50% of the LPRMs out-of-service.

Limits are applicable for all other EOOS scenarios, apart from TBV.

Limits are only valid up to 50% rated core power.

Browns Ferry Unit 2 Cycle 21 Page 29 Core Operating Limits Report, 120% OLTP TVA-COLR-BF2C21, Revision 0 (Final)

EDMS: L94 190211 800 Reactor Engineering and Fuels - BWRFE Date: February 12, 2019 NPG 1101 Market Street, Chattanooga TN 37402 Table 4.7 Startup Operation MCPRP Limits for Table 3.1 Temperature Range 1 for All Fuel Types: Technical Specification Scram Time Basis

  • ATRIUM-10XM ATRIUM-11 BOC BOC BOC BOC BOC BOC Pow er to to to End of to to to End of Operating Condition (% of rated) NEOC EOCLB Coast NEOC EOCLB Coast 100 1.47 1.47 1.47 1.45 1.46 1.49 90 1.52 1.52 1.52 1.51 1.51 1.51 65 1.74 1.74 1.74 1.84 1.84 1.84 50 --- --- --- --- --- ---

50 1.96 1.96 1.96 2.04 2.04 2.04 TBVIS 40 2.18 2.18 2.18 2.32 2.32 2.32 26 2.79 2.79 2.79 3.10 3.10 3.10 26 at > 50%F 3.06 3.06 3.06 3.12 3.12 3.12 23 at > 50%F 3.15 3.15 3.15 3.42 3.42 3.42 26 at 50%F 2.79 2.79 2.79 3.10 3.10 3.10 23 at 50%F 3.01 3.01 3.01 3.40 3.40 3.40 100 1.49 1.49 1.49 1.50 1.51 1.51 90 1.54 1.54 1.54 1.55 1.56 1.56 65 1.74 1.74 1.74 1.84 1.84 1.84 50 --- --- --- --- --- ---

50 1.96 1.96 1.96 2.05 2.05 2.05 TBVOOS 40 2.18 2.18 2.18 2.32 2.32 2.32 26 2.79 2.79 2.79 3.10 3.10 3.10 26 at > 50%F 3.55 3.55 3.55 3.60 3.60 3.60 23 at > 50%F 3.71 3.71 3.71 4.00 4.00 4.00 26 at 50%F 3.14 3.14 3.14 3.39 3.39 3.39 23 at 50%F 3.45 3.45 3.45 3.89 3.89 3.89

  • Limits support RPTOOS operation; operation is supported for any combination of 1 MSRVOOS, up to 2 TIPOOS (or the equivalent number of TIP channels), and up to 50% of the LPRMs out-of-service.

Limits are applicable for all other EOOS scenarios, apart from TBV.

Limits are only valid up to 50% rated core power.

Browns Ferry Unit 2 Cycle 21 Page 30 Core Operating Limits Report, 120% OLTP TVA-COLR-BF2C21, Revision 0 (Final)

EDMS: L94 190211 800 Reactor Engineering and Fuels - BWRFE Date: February 12, 2019 NPG 1101 Market Street, Chattanooga TN 37402 Table 4.8 Startup Operation MCPRP Limits for Table 3.1 Temperature Range 2 for All Fuel Types: Technical Specification Scram Time Basis

  • ATRIUM-10XM ATRIUM-11 BOC BOC BOC BOC BOC BOC Pow er to to to End of to to to End of Operating Condition (% of rated) NEOC EOCLB Coast NEOC EOCLB Coast 100 1.47 1.47 1.47 1.45 1.46 1.49 90 1.52 1.52 1.52 1.51 1.51 1.51 65 1.74 1.74 1.74 1.84 1.84 1.84 50 --- --- --- --- --- ---

50 1.96 1.96 1.96 2.05 2.05 2.05 TBVIS 40 2.19 2.19 2.19 2.33 2.33 2.33 26 2.81 2.81 2.81 3.12 3.12 3.12 26 at > 50%F 3.09 3.09 3.09 3.14 3.14 3.14 23 at > 50%F 3.17 3.17 3.17 3.44 3.44 3.44 26 at 50%F 2.81 2.81 2.81 3.12 3.12 3.12 23 at 50%F 3.03 3.03 3.03 3.42 3.42 3.42 100 1.49 1.49 1.49 1.50 1.51 1.51 90 1.54 1.54 1.54 1.55 1.56 1.56 65 1.74 1.74 1.74 1.84 1.84 1.84 50 --- --- --- --- --- ---

50 1.96 1.96 1.96 2.05 2.05 2.05 TBVOOS 40 2.19 2.19 2.19 2.33 2.33 2.33 26 2.81 2.81 2.81 3.12 3.12 3.12 26 at > 50%F 3.58 3.58 3.58 3.62 3.62 3.62 23 at > 50%F 3.73 3.73 3.73 4.02 4.02 4.02 26 at 50%F 3.15 3.15 3.15 3.40 3.40 3.40 23 at 50%F 3.46 3.46 3.46 3.90 3.90 3.90

  • Limits support RPTOOS operation; operation is supported for any combination of 1 MSRVOOS, up to 2 TIPOOS (or the equivalent number of TIP channels), and up to 50% of the LPRMs out-of-service.

Limits are applicable for all other EOOS scenarios, apart from TBV.

Limits are only valid up to 50% rated core power.

Browns Ferry Unit 2 Cycle 21 Page 31 Core Operating Limits Report, 120% OLTP TVA-COLR-BF2C21, Revision 0 (Final)

EDMS: L94 190211 800 Reactor Engineering and Fuels - BWRFE Date: February 12, 2019 NPG 1101 Market Street, Chattanooga TN 37402 Table 4.9 MCPRP Limits for All Fuel Types: Single Loop Operation for All Scram Times

  • Pow er All Cycle Exposures Operating Condition (% of rated) ATRIUM-10XM ATRIUM-11 100 2.00 2.05 43.75 2.00 2.05 40 2.00 2.10 RCPOOS 26 2.49 2.74 FHOOS 26 at > 50%F 2.67 2.83 23 at > 50%F 2.83 3.07 26 at 50%F 2.53 2.74 23 at 50%F 2.69 3.07 100 2.00 2.05 43.75 2.00 2.05 RCPOOS 40 2.00 2.11 TBVOOS 26 2.49 2.74 PLUOOS 26 at > 50%F 3.25 3.40 FHOOS 23 at > 50%F 3.49 3.71 26 at 50%F 2.92 3.18 23 at 50%F 3.20 3.58 100 2.12 2.24 43.75 2.12 2.24 40 2.20 2.34 RCPOOS 26 2.81 3.12 TBVOOS 26 at > 50%F 3.57 3.62 FHOOS1 23 at > 50%F 3.73 4.02 26 at 50%F 3.16 3.41 23 at 50%F 3.47 3.91 100 2.13 2.25 43.75 2.13 2.25 40 2.21 2.35 RCPOOS 26 2.83 3.14 TBVOOS 26 at > 50%F 3.60 3.64 FHOOS2 23 at > 50%F 3.75 4.04 26 at 50%F 3.17 3.42 23 at 50%F 3.48 3.92
  • All limits, including Base Case, support RPTOOS operation; operation is supported for any combination of 1 MSRVOOS, up to 2 TIPOOS (or the equivalent number of TIP channels), and up to 50% of the LPRMs out-of-service.

FFWTR and FHOOS assume the same value of temperature drop.

RCPOOS limits are only valid up to 50% rated core power, 50% rated core flow, and an active recirculation drive flow of 17.73 Mlbm/hr.

Browns Ferry Unit 2 Cycle 21 Page 32 Core Operating Limits Report, 120% OLTP TVA-COLR-BF2C21, Revision 0 (Final)

EDMS: L94 190211 800 Reactor Engineering and Fuels - BWRFE Date: February 12, 2019 NPG 1101 Market Street, Chattanooga TN 37402 5 Oscillation Power Range Monitor (OPRM) Setpoint (Technical Specification 3.3.1.1)

Technical Specification Table 3.3.1.1-1, Function 2f, identifies the OPRM upscale function.

Instrument setpoints are established, such that the reactor will be tripped before an oscillation can grow to the point where the SLMCPR is exceeded. An Option III stability analysis is performed for each reload core to determine allowable OLMCPRs as a function of OPRM setpoint. Analyses consider both steady state startup operation, and the case of a two recirculation pump trip from rated power.

The resulting stability based OLMCPRs are reported in Reference 1. The OPRM setpoint (sometimes referred to as the Amplitude Trip, Sp) is selected, such that required margin to the SLMCPR is provided without stability being a limiting event. Analyses are based on cycle specific DIVOM analyses performed per Reference 22. The calculated OLMCPRs are shown in Table 5.1. Review of results shown in COLR Table 4.2 indicates an OPRM setpoint of 1.14 may be used. The successive confirmation count (sometimes referred to as Np) is provided in Table 5.2, per Reference 30.

Table 5.1 OPRM Setpoint Range

Setpoint 1.05 1.15 1.07 6 1.04 1.06 1.17 1.08 1.07 1.19 1.10 8 1.05 1.08 1.20 1.12 10 1.07 1.09 1.22 1.14 12 1.09 1.10 1.24 1.16 1.11 1.26 1.17 14 1.11 1.12 1.28 1.19 16 1.14 1.13 1.30 1.21 18 1.18 1.14 1.33 1.23 1.15 1.35 1.25 20 1.24

  • Extrapolation beyond a setpoint of 1.15 is not allowed Browns Ferry Unit 2 Cycle 21 Page 33 Core Operating Limits Report, 120% OLTP TVA-COLR-BF2C21, Revision 0 (Final)

EDMS: L94 190211 800 Reactor Engineering and Fuels - BWRFE Date: February 12, 2019 NPG 1101 Market Street, Chattanooga TN 37402 6 APRM Flow Biased Rod Block Trip Settings (Technical Requirements Manual Section 5.3.1 and Table 3.3.4-1)

The APRM rod block trip setting is based upon References 26 & 28, and is defined by the following:

SRB (0.55(W-W) + 60.5%) Allowable Value SRB (0.55(W-W) + 58.5%) Nominal Trip Setpoint (NTSP) where:

SRB = Rod Block setting in percent of rated thermal power (3952 MWt)

W = Loop recirculation flow rate in percent of rated W = Difference between two-loop and single-loop effective recirculation flow at the same core flow (W=0.0 for two-loop operation)

The APRM rod block trip setting is clamped at a maximum allowable value of 115%

(corresponding to a NTSP of 113%).

Browns Ferry Unit 2 Cycle 21 Page 34 Core Operating Limits Report, 120% OLTP TVA-COLR-BF2C21, Revision 0 (Final)

EDMS: L94 190211 800 Reactor Engineering and Fuels - BWRFE Date: February 12, 2019 NPG 1101 Market Street, Chattanooga TN 37402 7 Rod Block Monitor (RBM) Trip Setpoints and Operability (Technical Specification Table 3.3.2.1-1)

The RBM trip setpoints and applicable power ranges, based on References 26 & 27, are shown in Table 7.1. Setpoints are based on an HTSP, unfiltered analytical limit of 114%. Unfiltered setpoints are consistent with a nominal RBM filter setting of 0.0 seconds; filtered setpoints are consistent with a nominal RBM filter setting less than 0.5 seconds. Cycle specific CRWE analyses of OLMCPR are documented in Reference 1, superseding values reported in References 26, 27, and 29.

Table 7.1 Analytical RBM Trip Setpoints

  • Allowable Nominal Trip RBM Value Setpoint Trip Setpoint (AV) (NTSP)

LPSP 27% 25%

IPSP 62% 60%

HPSP 82% 80%

LTSP - unfiltered 121.7% 120.0%

- filtered 120.7% 119.0%

ITSP - unfiltered 116.7% 115.0%

- filtered 115.7% 114.0%

HTSP - unfiltered 111.7% 110.0%

- filtered 110.9% 109.2%

DTSP 90% 92%

As a result of cycle specific CRWE analyses, RBM setpoints in Technical Specification Table 3.3.2.1-1 are applicable as shown in Table 7.2. Cycle specific setpoint analysis results are shown in Table 7.3, per Reference 1.

Table 7.2 RBM Setpoint Applicability Thermal Power Applicable Notes from

(% Rated) MCPR Table 3.3.2.1-1 Comment

< 1.66 (a), (b), (f), (h) two loop operation

> 27% and < 90%

< 1.70 (a), (b), (f), (h) single loop operation 90% < 1.36 (g) two loop operation

  • Values are considered maximums. Using lower values, due to RBM system hardware/software limitations, is conservative, and acceptable.

MCPR values shown correspond with, (support), SLMPCR values identified in Reference 1.

Greater than 90% rated power is not attainable in single loop operation.

Browns Ferry Unit 2 Cycle 21 Page 35 Core Operating Limits Report, 120% OLTP TVA-COLR-BF2C21, Revision 0 (Final)

EDMS: L94 190211 800 Reactor Engineering and Fuels - BWRFE Date: February 12, 2019 NPG 1101 Market Street, Chattanooga TN 37402 Table 7.3 Control Rod Withdrawal Error Results RBM CRWE HTSP Analytical Limit OLMCPR Unfiltered 107 1.29 111 1.32 114 1.33 117 1.34 Results, compared against the base case OLMCPR results of Table 4.2, indicate SLMCPR remains protected for RBM inoperable conditions (i.e., 114% unblocked).

Browns Ferry Unit 2 Cycle 21 Page 36 Core Operating Limits Report, 120% OLTP TVA-COLR-BF2C21, Revision 0 (Final)

EDMS: L94 190211 800 Reactor Engineering and Fuels - BWRFE Date: February 12, 2019 NPG 1101 Market Street, Chattanooga TN 37402 8 Shutdown Margin Limit (Technical Specification 3.1.1)

Assuming the strongest OPERABLE control blade is fully withdrawn, and all other OPERABLE control blades are fully inserted, the core shall be sub-critical and meet the following minimum shutdown margin:

SDM > 0.38% dk/k Browns Ferry Unit 2 Cycle 21 Page 37 Core Operating Limits Report, 120% OLTP TVA-COLR-BF2C21, Revision 0 (Final)