IR 05000219/2017404: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
| Line 3: | Line 3: | ||
| issue date = 08/15/2017 | | issue date = 08/15/2017 | ||
| title = Problem Identification and Resolution Cyber Security Inspection Report 05000219/2017404 (Cover Letter) | | title = Problem Identification and Resolution Cyber Security Inspection Report 05000219/2017404 (Cover Letter) | ||
| author name = Dentel G | | author name = Dentel G | ||
| author affiliation = NRC/RGN-I/DRS/EB2 | | author affiliation = NRC/RGN-I/DRS/EB2 | ||
| addressee name = Hanson B | | addressee name = Hanson B | ||
| addressee affiliation = Exelon Generation Co, LLC, Exelon Nuclear | | addressee affiliation = Exelon Generation Co, LLC, Exelon Nuclear | ||
| docket = 05000219 | | docket = 05000219 | ||
| license number = DPR-016 | | license number = DPR-016 | ||
| contact person = Dentel G | | contact person = Dentel G | ||
| document report number = IR 2017404 | | document report number = IR 2017404 | ||
| document type = Letter | | document type = Letter | ||
| Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:August 15, 2017 | ||
==SUBJECT:== | |||
OYSTER CREEK NUCLEAR GENERATING STATION | |||
- PROBLEM IDENTIFICATION AND RESOLUTION CYBER SECURITY INSPECTION REPORT 05000 219/201 7 404 | - PROBLEM IDENTIFICATION AND RESOLUTION CYBER SECURITY INSPECTION REPORT 05000 219/201 7 404 | ||
| Line 35: | Line 35: | ||
This finding was also determined to be a violation of NRC requirements. | This finding was also determined to be a violation of NRC requirements. | ||
However, because of its very low safety significance, and because it was entered into your corrective action program, the NRC is treating this finding as a non | However, because of its very low safety significance, and because it was entered into your corrective action program, the NRC is treating this finding as a non-cited violation (NCV), consistent with Section 2.3.2.a of the NRC Enforcement Policy. | ||
-cited violation (NCV), consistent with Section 2.3.2.a of the NRC Enforcement Policy. | |||
This finding had a cross-cutting aspect in the area of Problem Identification and Resolution, Resolution, because Exelon failed to implement timely and adequate corrective actions | This finding had a cross-cutting aspect in the area of Problem Identification and Resolution, Resolution, because Exelon failed to implement timely and adequate corrective actions | ||
. [P.3] Enclosure transmitted herewith contains Sensitive, Unclassified Non | . [P.3] Enclosure transmitted herewith contains Sensitive, Unclassified Non-Safeguards Information. When separated from the Enclosure the transmittal document is decontrolled | ||
-Safeguards Information. When separated from the Enclosure the transmittal document is decontrolled | |||
. If you contest any NCV in this report, you should provide a written response within 30 days of the date of this inspection report, with the basis for your denial, to the U. S. Nuclear Regulatory Commission, ATTN: | . If you contest any NCV in this report, you should provide a written response within 30 days of the date of this inspection report, with the basis for your denial, to the U. S. Nuclear Regulatory Commission, ATTN: | ||
Document Control Desk, Washington D.C. 20555 | Document Control Desk, Washington D.C. 20555-0001; with copies to the Regional Administrator, Region I; the Director, Office of Enforcement; and the NRC's Senior Resident Inspector at Oyster Creek. | ||
-0001; with copies to the Regional Administrator, Region I; the Director, Office of Enforcement; and the NRC's Senior Resident Inspector at Oyster Creek. | |||
In addition, if you disagree with the cross | In addition, if you disagree with the cross-cutting aspect assigned to any finding in this report, you should provide a written response within 30 days of the date of this inspection report, with the basis for your disagreement, to the Regional Administrator, Region I, and the NRC | ||
-cutting aspect assigned to any finding in this report, you should provide a written response within 30 days of the date of this inspection report, with the basis for your disagreement, to the Regional Administrator, Region I, and the NRC | |||
's Senior Resident Inspector at Oyster Creek. | 's Senior Resident Inspector at Oyster Creek. | ||
This letter will be made available for public inspection and copying at http://www.nrc.gov/reading | This letter will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC | ||
-rm/adams.html and at the NRC | 's Public Document Room in accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding." However, the enclosed report contains Security-Related Information, so the enclosed report will not be made publically available in accordance with 10 CFR 2.390(d)(1). If you choose to provide a response that contains Security-Related Information, please mark your entire response "Security-Related Information-Withhold from public disclosure under 10 CFR 2.390" in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii). | ||
's Public Document Room in accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding." However, the enclosed report contains Security | |||
-Related Information, so the enclosed report will not be made publically available in accordance with 10 CFR 2.390(d)(1). If you choose to provide a response that contains Security | |||
-Related Information, please mark your entire response "Security | |||
-Related Information | |||
-Withhold from public disclosure under 10 CFR 2.390" in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii). | |||
Sincerely, | Sincerely, | ||
Revision as of 06:29, 19 June 2019
| ML17228A063 | |
| Person / Time | |
|---|---|
| Site: | Oyster Creek |
| Issue date: | 08/15/2017 |
| From: | Glenn Dentel Engineering Region 1 Branch 2 |
| To: | Bryan Hanson Exelon Generation Co, Exelon Nuclear |
| Dentel G | |
| References | |
| IR 2017404 | |
| Download: ML17228A063 (3) | |
Text
August 15, 2017
SUBJECT:
OYSTER CREEK NUCLEAR GENERATING STATION
- PROBLEM IDENTIFICATION AND RESOLUTION CYBER SECURITY INSPECTION REPORT 05000 219/201 7 404
Dear Mr. Hanson:
On July 1 4 , 201 7, the U.S. Nuclear Regulatory Commission (NRC) completed a cyber security related Problem Identification and Resolution inspection at the Oyster Creek Nuclear Generating Station (OCNGS)
. The inspection covered one or more of the key attributes of the Security cornerstone of the NRC's Reactor Oversight Process. The enclosed inspection report documents the inspection results, which were discussed on July 14, 2017, with Mr. Tim Moore ,
Site Vice President, and other members of your staff.
The inspection examined activities conducted under your license as they relate to safety and compliance with the Commission's rules and regulations, and with the conditions of your license. The inspector reviewed selected procedures and records, observed activities, and interviewed station personnel.
Based on the results of this inspection, one finding of very low safety significance (Green) was identified.
This finding was also determined to be a violation of NRC requirements.
However, because of its very low safety significance, and because it was entered into your corrective action program, the NRC is treating this finding as a non-cited violation (NCV), consistent with Section 2.3.2.a of the NRC Enforcement Policy.
This finding had a cross-cutting aspect in the area of Problem Identification and Resolution, Resolution, because Exelon failed to implement timely and adequate corrective actions
. [P.3] Enclosure transmitted herewith contains Sensitive, Unclassified Non-Safeguards Information. When separated from the Enclosure the transmittal document is decontrolled
. If you contest any NCV in this report, you should provide a written response within 30 days of the date of this inspection report, with the basis for your denial, to the U. S. Nuclear Regulatory Commission, ATTN:
Document Control Desk, Washington D.C. 20555-0001; with copies to the Regional Administrator, Region I; the Director, Office of Enforcement; and the NRC's Senior Resident Inspector at Oyster Creek.
In addition, if you disagree with the cross-cutting aspect assigned to any finding in this report, you should provide a written response within 30 days of the date of this inspection report, with the basis for your disagreement, to the Regional Administrator, Region I, and the NRC
's Senior Resident Inspector at Oyster Creek.
This letter will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC
's Public Document Room in accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding." However, the enclosed report contains Security-Related Information, so the enclosed report will not be made publically available in accordance with 10 CFR 2.390(d)(1). If you choose to provide a response that contains Security-Related Information, please mark your entire response "Security-Related Information-Withhold from public disclosure under 10 CFR 2.390" in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii).
Sincerely,
/RA/ Glenn T. Dentel, Chief Engineering Branch 2 Division of Reactor Safety
Docket No. 50-219 License No
. DPR-1 6 Nonpublic Enclosure:
Inspection Report 05000219/2017404 w/Attachment: Supplementa ry Information cc w/encl:
w/OUO RPT TKeenan, Security Manager PBaldauf, Director, NJ Dept. of Environmental Protection
ML17228A063 (Coverletter) ADAMS ACCESSION NUMBER: ML17228A028 (Coverletter w/Rpt Cover Letter SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available Cover Letter w/Enclosure SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RI/DRS RI/DRP RI/DRS NAME JRady/JR SKennedy/SK GDentel/GD DATE 8/03/2017 8/08/17 8/15/17