IR 05000327/2017407: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 3: Line 3:
| issue date = 10/10/2017
| issue date = 10/10/2017
| title = NRC Security Inspection Report 05000327/2017407 and 05000328/2017407; Preliminary Greater than Green Finding
| title = NRC Security Inspection Report 05000327/2017407 and 05000328/2017407; Preliminary Greater than Green Finding
| author name = Gody A T
| author name = Gody A
| author affiliation = NRC/RGN-II/DRS
| author affiliation = NRC/RGN-II/DRS
| addressee name = Shea J W
| addressee name = Shea J
| addressee affiliation = Tennessee Valley Authority
| addressee affiliation = Tennessee Valley Authority
| docket = 05000327, 05000328
| docket = 05000327, 05000328
Line 19: Line 19:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 October 10, 2017  
{{#Wiki_filter:October 10, 2017


EA-17-164
==SUBJECT:==
 
SEQUOYAH NUCLEAR PLANT - NRC SECURITY INSPECTION REPORT 05000327/2017407 AND 05000328/2017407; PRELIMINARY GREATER THAN GREEN FINDING
Mr. Joseph Vice President, Nuclear Regulatory Affairs and Support Services Tennessee Valley Authority
 
1101 Market Street, EB 9W
 
Chattanooga, TN 37402-2801 SUBJECT: SEQUOYAH NUCLEAR PLANT - NRC SECURITY INSPECTION REPORT 05000327/2017407 AND 05000328/2017407; PRELIMINARY GREATER THAN GREEN FINDING


==Dear Mr. Shea:==
==Dear Mr. Shea:==

Revision as of 23:48, 18 June 2019

NRC Security Inspection Report 05000327/2017407 and 05000328/2017407; Preliminary Greater than Green Finding
ML17284A033
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 10/10/2017
From: Gody A
Division of Reactor Safety II
To: James Shea
Tennessee Valley Authority
References
EA-17-164 IR 2017407
Download: ML17284A033 (4)


Text

October 10, 2017

SUBJECT:

SEQUOYAH NUCLEAR PLANT - NRC SECURITY INSPECTION REPORT 05000327/2017407 AND 05000328/2017407; PRELIMINARY GREATER THAN GREEN FINDING

Dear Mr. Shea:

The enclosed report documents a finding with an associated apparent violation that the NRC has preliminarily determined to have greater than very low security significance. We assessed the significance of the finding using the Baseline Security Significance Determination Process (BSSDP) and readily available information. The deficiency was promptly corrected or compensated for, and actions were initiated to restore compliance with applicable physical protection and security requirements within the scope of this inspection before the inspectors left the area. We are considering escalated enforcement for the apparent violation consistent with our Enforcement Policy, which can be found at https://www.nrc.gov/about-nrc/regulatory/enforcement/enforce-pol.html

. Because we have not made a final determination, no notice of violation is being issued at this time. Please be aware that further NRC review may prompt us to modify the number and characterization of the apparent violation.

We intend to issue our final significance determination and enforcement decision, in writing, within 90 days from the date of this letter.

The NRC's significance determination process (SDP) is designed to encourage an open dialogue between your staff and the NRC; however, neither the dialogue nor the written information you provide should affect the timeliness of our final determination.

Before we make a final decision, you may choose to communicate your position on the facts and assumptions used to arrive at the finding and assess its significance by either (1) attending and presenting at a regulatory conference or (2) submitting your position in writing. The focus of a regulatory conference is to discuss the significance of the finding. Written responses should reference the inspection report number and enforcement action number associated with this letter in the subject line.

If you request a regulatory conference, it should be held within 40 days of your receipt of this letter. Please provide information you would like us to consider or discuss with you at least 10 days prior to any scheduled conference. If you choose to attend a regulatory conference, it will be closed for public observation. If you decide to submit only a written response, it should be sent to the NRC within 40 days of your receipt of this letter. If you choose not to request a regulatory conference or to submit a written response, you will not be allowed to appeal the NRC's final significance determination.

Please contact Binoy Desai at 404-997-4519, in writing, within seven days from the issue date of this letter to notify the NRC of your intentions. If we have not heard from you within seven days, we will continue with our significance determination and enforcement decision.

This letter will be made available for public inspection and copying at https://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, "Public Inspections, Exemptions, Requests for Withholding."

However, the enclosed report contains Security-Related Information, so the enclosed report will not be made publically available in accordance with 10 CFR 2.390(d)(1). If you choose to provide a response that contains Security-Related Information, please mark your entire response "Security-Related Information-Withhold from public disclosure under 10 CFR 2.390" in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii).

Sincerely,

/RA/

Anthony T. Gody, Director Division of Reactor Safety Docket Nos. 50-327 and 50-328 License Nos. DPR-77 and DPR-79 Enclosure:

Preliminary Significance Determination and Apparent Violation (OUO)

cc: (See page 3) cc: Ms. Erin K. Henderson Senior Manager, Fleet Regulatory Operations Tennessee Valley Authority

1101 Market Street, LP 5A-C

Chattanooga, TN 37402-2801 Mr. Matthew Rasmussen Plant Manager, Sequoyah Nuclear Plant Tennessee Valley Authority P.O. Box 2000, POB 2A-SQN Soddy Daisy, TN 37384-2000 Mr. D. G. Dimopoulos Director, Plant Support Sequoyah Nuclear Plant Tennessee Valley Authority P.O. Box 2000, OPS 4A-SQN Soddy Daisy, TN 37384-2000

Mr. Michael W. McBrearty Manager, Site Licensing Sequoyah Nuclear Plant Tennessee Valley Authority P.O. Box 2000, OPS 4A-SQN Soddy Daisy, TN 37384-2000

Mr. F. E. Marcussen Director, Nuclear Security Tennessee Valley Authority 1101 Market Street, LP 1A Chattanooga, TN 37402-2801

Mr. Brian E. Brigman

Senior Manager, Site Security Sequoyah Nuclear Plant Tennessee Valley Authority P.O. Box 2000, MPB 1A-SQN Soddy Daisy, TN 37384-2000

SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRS/PSB2 RII:DRS/PSB2 RII:DRP/B6 RII: EICS RII:DRS/PSB2 RII: DRS SIGNATURE JXJ5 BBD AJB3 MXK7 BBD ATG NAME J. Justice B. Desai A. Blamey M. Kowal B. Desai A. Gody DATE 10/ 1 /2017 10/ 1/2017 9/ 28 /2017 9/ 28 /2017 10/ 1 /2017 10/ 10 /2017 E-MAIL COPY YES NO YES NO YES NO YES NO YES NO YES NO