{{#Wiki_filter:V NIAGARA U MOHAWK Niagara Mohawk Power Corporation 300 Erie Boulevard West Syracuse, New York 13202 Nine Mile Point Nuclear Power Station THIRD INSERVICE INSPECTION INTERVAL TEN-YEAR INSERVICE INSPECTION PLAN AND SCHEDULE Prepared For Nine Mile Point Nuclear Power Station P.O.Box 63 Lycoming, New York 13093 Commercial Service Date: NRC Docket Number: Document Number: Revision Number: 0 December 26, 1969 50-220 NMP1-ISI-003-1 0 Date: October 15, 1999 Prepared by: NMP1-ISI Program Manager Approved by':/O l~Approved by: Glenn R.erkins-Supervisor ASME Sectio XI Programs r/WIJ iam Yae er-Bra ch Manager, Engineerin Services OCR<<~woigl~g Ilgwu'is 5<iHi)i~Z I
{{#Wiki_filter:V NIAGARA U MOHAWK Niagara Mohawk Power Corporation 300 Erie Boulevard West Syracuse, New York 13202 Nine Mile Point Nuclear Power Station THIRD INSERVICE INSPECTION INTERVAL TEN-YEAR INSERVICE INSPECTION PLAN AND SCHEDULE Prepared For Nine Mile Point Nuclear Power Station P.O. Box 63 Lycoming, New York 13093 Commercial Service Date:                 December 26, 1969 NRC Docket Number:                       50-220 Document Number:                         NMP1-ISI-003-1 0 Revision Number: 0                        Date: October 15, 1999 Prepared by:                                         /O l~
N Y NIAGARA 4 MOHAWK NINE MILE POINT NUCLEAR POWER STATION NMP1-ISI-003-1 0 THIRD INSERVICE INSPECTION INTERVAL Rev.0 TEN-YEAR INSERVICE INSPECTION PLAN AND SCHEDULE Date: October 15, 1999 Table of Contents Record of Revision.Abstract.TABLE OF CONTENTS 1.0 Introduction
NMP1 - ISI Program Manager Approved by':
.1.1 Inspection Interval 1.2 Inspection Periods.1.3 Applicable Documents 1.4 Applicable Code Edition and Addenda 7..7..7..7 102.1 2.2 2.3 2.4 2.5 2.6 2.7 2.8 2.9 Class 1 Systems/Components Class 2 Systems/Components
Glenn R. erkins -Supervisor ASME Sectio     XI Programs Approved by:
.Class 3 Systems/Components
WIJ iam Yae er - Bra ch Manager, Engineerin r/
.Class 1, 2, 3 Component Supports Substitute Examinations Nondestructive Examinations Weld/Support Location Maps Ultrasonic Calibration Blocks..Weld Identification 2.0 Development of Inspection Plan......~.......~...........
Services OCR     <<~woigl
12 12 12 12 12 12 13 13 13 3..0 Records~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~1 6 3.1 3.2 3.3 General 3.1.1 Scheduled Examination Tables........
                                              ~g Ilgwu
3.1.1 Inspection Zones.3.1.3 Code Item Classification 3.1.4 Inspection/Examination Table Contents..Final Reports ISI Summary Report.16 16 16 16 16 17 17 File: NMP1ISIPL.wpd 0
                                                            'is 5 <iHi)i~Z
hl V NIAGARA H U MOHAWK NINE MILE POINT NUCLEAR POWER STATION NMP1-ISI-003-1 0 THIRD INSERVICE INSPECTION INTERVAL Rev.0 TEN-YEAR INSERVICE INSPECTION PLAN AND SCHEDULE Date: October 15, 1999 TABLE OF CONTENTS-Continued 4.0 Class 1 Tables.~..~19 00.0 01.0 31.0 32.0 33.0 36.0 37.0 38.0 39.0 40.0 42.1 44.1 Reactor Pressure Vessel Main Steam.Feedwater System.Reactor Recirculation System..Reactor Clean Up Reactor Instrumentation Reactor Drain 8 Vent..Reactor Shutdown Cooling Emergency Condenser System Reactor Core Spray System.Liquid Poison System Control Rod Drive System...........
1thru 83..........
84thru90........91 thru 97.98thru130.......131 thru 135.......136 thru 137........138 thru 143........144 thru 147........148 thru156.......157thru171
.....~..172 thru 173........174 thru 177 5.0 Class 2 Tables~..~~~~~~~~~~~~~20 02.0 Main Steam System.03.0 Main Steam System.39.0 Emergency Condenser System.44.2 Control Rod Drive System..80.0 Reactor Containment Spray System.81.0 Reactor Core Spray System 93.0 Reactor Containment Spray System.6.0 Class 3 Tables......177thru179
.....180 thru 181......182 thru 196......197 thru 198......199 thru 210 211 thru 222 223 thru 225 21 38.0 Shutdown Cooling Water System 39.0 Emergency Condenser System.54.0 Spent Fuel Pool Cooling System 57.0 Spent Fuel Pool Cooling System 70.0'eactor Building Closed Loop Cooling System 72.0 Emergency Service Water System 93.0 Reactor Containment Spray System APPENDICES 226 thru 226 227 thru 223 228 thru 235 236 thru 236 237 thru 242 243 thru 244 245 thru 248 A B C D E Acceptance Criteria Nondestructive Examination Procedure Listing Ultrasonic Calibration Blocks Class 1, 2, and 3 Weld/Support Location Maps ASME Code Cases..22 24 26 33 38 File: NMP1ISIPL.wpd 0
El 1 N1AGARA H U MOHAWK NINE MILE POINT NUCLEAR POWER STATION THIRD INSERVICE INSPECTION INTERVAL TEN-YEAR INSERVICE INSPECTION PLAN AND SCHEDULE NMP1-ISI-003-10 Rev.0 Date: October 15, 1999 TABLE OF CONTENTS-Continued LIST OF FIGURES 2-1 Tee Weld ID 2-2 Elbow weld ID 2-3 Reducer weld ID 3-1 Inservice Inspection Schedule.LIST OF TABLES 14 14 15 18 1-2 A-1 A-2 A-3 A-4 NMP1 Inservice Inspection Periods Class 1 Acceptance Standards Class 2 Acceptance Standards............
Class 3 Acceptance Standards Component Support Acceptance Standards.7 22....23 23 23 File: NMP1ISIPL.wpd I
N V NIAGARA 4 MOHAWK NINE MILE POINT NUCLEAR POWER STATION NMP1-ISI-003-1 0 THIRD INSERVICE INSPECTION INTERVAL Rev.0 TEN-YEAR INSERVICE INSPECTION PLAN AND SCHEDULE Date: October 15, 1999 REVISION No.DATE RECORD OF REVISION',":;,'FFECTED'PAGES 0 October 15, 1999 Entire Document Ten-Year Inservice Inspection Plan and Schedule for the 3" Ten Year Inservice Inspection Interval e File: NMP1ISIPL.wpd


N Y NIAGARA Lf MOHAWK NINE MILE POINT NUCLEAR POWER STATION N MP1-ISI-003-10 THIRD INSERVICE INSPECTION INTERVAL Rev.0 TEN-YEAR INSERVICE INSPECTION PLAN AND SCHEDULE Date: October 15, 1999 ABSTRACT This document provides the Third Interval Ten-Year Inservice Inspection Plan and Schedule for Nine Mile Point Nuclear Power Station, Unit 1.The Schedule identifies those components and/or systems (including supports)which are classified Quality Group A, B and C (ASME Code Class 1, 2, and 3, and have been selected for nondestructive examination, as set forth in the ASME Boiler and Pressure Vessel Code, Section XI, 1989 Edition, no Addenda, to the extent practical within the limitations of design, geometry and materials of construction of the components as stated in 10 CFR 50.55a (b)(2).Where an examination required by Section XI is determined to be impractical, the basis for this determination is included in the Nine Mile Point Insetvice Inspection Program, in the form of a Request for Relief.Tables for each system subject to examination are included within this document, and provides Code classification, Code examination category, Code item number, component identification and description, examination method, and where within the Third Ten-Year Inspection Interval and period the component is scheduled to be performed.
I NINE MILE POINT                                               NMP1-ISI-003-1 0 Y NIAGARA                                  NUCLEAR POWER STATION N 4 MOHAWK THIRD INSERVICE INSPECTION INTERVAL                                       Rev.         0 TEN-YEAR INSERVICE INSPECTION                                       Date:       October 15, 1999 PLAN AND SCHEDULE TABLE OF CONTENTS Table of Contents Record of Revision    .
File: NMP1ISIPL.wpd  
Abstract  .
1.0      Introduction      .                                                                                                    7 1.1    Inspection      Interval                                                                                 .. 7 1.2    Inspection      Periods .                                                                                .. 7 1.3    Applicable        Documents                                                                                .. 7 1.4    Applicable        Code Edition and Addenda                                                                    10 2.0      Development of Inspection Plan             ...... ~....... ~...........
2.1    Class 1 Systems/Components                                                                                    12 2.2    Class 2 Systems/Components .                                                                                  12 2.3    Class 3 Systems/Components .                                                                                  12 2.4    Class 1, 2, 3 Component Supports                                                                              12 2.5    Substitute Examinations                                                                                        12 2.6    Nondestructive Examinations                                                                                    12 2.7    Weld/Support Location Maps                                                                                    13 2.8    Ultrasonic Calibration Blocks ..                                                                               13 2.9    Weld Identification                                                                                            13 3..0    Records        ~ ~ ~ ~ ~      ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~    1 6 3.1    General                                                                                                        16 3.1.1        Scheduled Examination Tables........                                                              16 3.1.1        Inspection Zones .                                                                                16 3.1.3 Code Item Classification                                                                                16 3.1.4        Inspection/Examination Table Contents                  ..                                        16 3.2    Final Reports                                                                                                  17 3.3      ISI Summary Report .                                                                                           17 File: NMP1ISIPL.wpd


El Y NlAGARA H U MOHAWK NINE MILE POINT NUCLEAR POWER STATION NMP1-ISI-003-10 THIRD INSERVICE INSPECTION INTERVAL Rev.0 TEN>>YEAR INSERVICE INSPECTION PLAN AND SCHEDULE Date: October 15, 1999  
0 NINE MILE POINT               NMP1-ISI-003-1 0 hl V NIAGARA                                NUCLEAR POWER STATION H U MOHAWK THIRD INSERVICE INSPECTION INTERVAL Rev.       0 TEN-YEAR INSERVICE INSPECTION   Date:     October 15, 1999 PLAN AND SCHEDULE TABLE OF CONTENTS - Continued 4.0    Class  1  Tables .  ~ .. ~                                                      19 00.0      Reactor Pressure Vessel                  ........... 1thru 83 01.0      Main Steam .                            .......... 84thru90 31.0      Feedwater System .                          ........ 91 thru 97 32.0      Reactor Recirculation System    ..                    . 98thru130 33.0      Reactor Clean Up                          ....... 131 thru 135 36.0      Reactor Instrumentation                  ....... 136 thru 137 37.0      Reactor Drain 8 Vent ..                  ........ 138 thru 143 38.0      Reactor Shutdown Cooling                ........ 144 thru 147 39.0      Emergency Condenser System              ........ 148 thru156 40.0      Reactor Core Spray System .              ....... 157thru171 42.1      Liquid Poison System                    ..... .. 172 thru 173
                                                                            ~
44.1      Control Rod Drive System                ........ 174 thru 177 5.0    Class 2 Tables    ~  ..                              ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~  20 02.0      Main Steam System .                        ......        177thru179 03.0      Main Steam System .                          .....      180  thru    181 39.0      Emergency Condenser System .              ......        182  thru    196 44.2      Control Rod Drive System ..                ......        197  thru    198 80.0      Reactor Containment Spray System    .      ......        199  thru    210 81.0      Reactor Core Spray System                              211 thru      222 93.0      Reactor Containment Spray System    .                  223 thru      225 6.0    Class 3 Tables                                                                    21 38.0      Shutdown Cooling Water System                          226    thru    226 39.0      Emergency Condenser System .                            227    thru    223 54.0      Spent Fuel Pool Cooling System                          228    thru    235 57.0      Spent Fuel Pool Cooling System                          236    thru    236 70.0  'eactor Building Closed Loop Cooling System                237    thru    242 72.0      Emergency Service Water System                          243    thru    244 93.0      Reactor Containment Spray System                        245    thru    248 APPENDICES A      Acceptance Criteria                                                              22 B      Nondestructive Examination Procedure Listing                                      24 C      Ultrasonic Calibration Blocks                                                    26 D      Class 1, 2, and 3 Weld/Support Location Maps                                      33 E      ASME Code Cases ..                                                                38 File: NMP1ISIPL.wpd


==1.0 INTRODUCTION==
0 NINE MILE POINT              NMP1-ISI-003-10 El 1 N1AGARA                          NUCLEAR POWER STATION H U MOHAWK THIRD INSERVICE INSPECTION INTERVAL Rev. 0 TEN-YEAR INSERVICE INSPECTION  Date:  October 15, 1999 PLAN AND SCHEDULE TABLE OF CONTENTS - Continued LIST OF FIGURES 2-1    Tee Weld ID                                                        14 2-2    Elbow weld ID                                                      14 2-3    Reducer weld ID                                                    15 3-1    Inservice Inspection Schedule .                                    18 LIST OF TABLES 1-2    NMP1 Inservice Inspection Periods                                    7 A-1    Class 1 Acceptance Standards                                        22 A-2 A-3 Class 2 Acceptance Standards    ............                  .... 23 Class 3 Acceptance Standards                                        23 A-4    Component Support Acceptance Standards    .                        23 File: NMP1ISIPL.wpd


This document details the Third Interval, Ten-Year Inservice Inspection Plan and schedule for selected components, welds, supports, bolting, pump casings, valve bodies, and reactor pressure vessel internals for the Nine Mile Point Nuclear Power Station, Unit 1.Niagara Mohawk Power Corporation (NMPC), is the Owner of Record.The Commercial Service Date for the Nine Mile Point Nuclear Power Station, Unit 1 is December 26, 1969.1.1 Inspection Interval The Third Inservice Inspection Interval becomes effective on December 26, 1999 and is scheduled to end on December 25, 2009.1.2 Inspection Periods The Third lnservice Inspection Interval is divided into three successive inspection periods as determined by calendar years of plant service within the inspection interval.Identified below are the period dates for the third inspection interval as defined by Inspection Program NBN In accordance with IWB-2412(b) the inspection period specified below may be decreased or extended by as much as 1 year to enable inspection to coincide with NMP1's plant outages.TABLE 1-2 NMP1 INSERVICE INSPECTION PERIODS INSPECTION PERIODS PERIOD START DATES PERIOD END'DATES REFUEL OUTAGE REFUEL OUTAGE YEAR December 26, 1999 December 25, 2002 December 25, 2002 December 26, 2006 December 26, 2006 December 25, 2009 RFO-16 RFO-17 RFO-18 RFO-19 2001 2003 2005 2007*The plant operating license is currently scheduled to expire on August 22, 2009.1.3 Applicable Documents The Third Inservice Inspection Program for Quality Group A, B, and C (ASME Code Class 1, 2 and 3), systems and components (including their supports)was developed after giving due consideration to the following documents and subject to the limitations and modifications listed File: NMP1ISIPL.wpd  
I NINE MILE POINT                          NMP1-ISI-003-1 0 V NIAGARA                        NUCLEAR POWER STATION N 4 MOHAWK THIRD INSERVICE INSPECTION INTERVAL            Rev. 0 TEN-YEAR INSERVICE INSPECTION                Date:  October 15, 1999 PLAN AND SCHEDULE RECORD OF REVISION', ": ;
REVISION          DATE          , 'FFECTED No.                             'PAGES 0      October 15, 1999         Entire    Ten-Year Inservice Inspection Plan and Document    Schedule for the 3" Ten Year Inservice Inspection Interval e
File: NMP1ISIPL.wpd


H V NIAGARA H V MOHAWK NINE MILE POINT NUCLEAR POWER STATION THIRD INSERVICE INSPECTION INTERVAL TEN-YEAR INSERVICE INSPECTION PLAN AND SCHEDULE NMP1-ISI-003-10 Rev.0 Date: October 15, 1999 in 10 CFR 50.55a(b), and to the extent practical within the limitations of design, geometry and materials of construction.
NINE MILE POINT                             N MP1-ISI-003-10 Y NIAGARA                                NUCLEAR POWER STATION N Lf MOHAWK THIRD INSERVICE INSPECTION INTERVAL                   Rev. 0 TEN-YEAR INSERVICE INSPECTION                     Date:   October 15, 1999 PLAN AND SCHEDULE ABSTRACT This document provides the Third Interval Ten-Year Inservice Inspection Plan and Schedule for Nine Mile Point Nuclear Power Station, Unit 1.
Specific areas within this document where these document are used in the preparation of this program are addressed within the area affected.Code of Federal Regulations 10 CFR 50.55(a)Code of Federal Regulations; Federal Register, Volume 64, Number 183, dated September 22, 1999, amendment to the regulation.
The Schedule identifies those components and/or systems (including supports) which are classified Quality Group A, B and C (ASME Code Class 1, 2, and 3, and have been selected for nondestructive examination, as set forth in the ASME Boiler and Pressure Vessel Code, Section XI, 1989 Edition, no Addenda, to the extent practical within the limitations of design, geometry and materials of construction of the components as stated in 10 CFR 50.55a (b)(2).
ASME Code Editions and Addenda ASME Boiler and Pressure Vessel Code, Sections V, 1989 Edition,"Nondestructive Examination"ASME Boiler and Pressure Vessel Code, Section XI, 1989 Edition,"Rules for Inservice Inspection of Nuclear Power Plant Components" ASME Boiler and Pressure Vessel Code, Section XI, 1992 Edition through the 1992 Addenda,"Rules for Inservice Inspection of Nuclear Power Plant Components", Subsections IWE and IWL.USNRC Regulatory Guides The following list of Regulatory Guides are applicable to the Nine Mile Point Nuclear Power Station Third Inservice Inspection Program: 1.26 Quality Group Classifications and Standards for Water-Steam, and Radioactive-Waste-Containing Components of Nuclear Power Plants, Revision 2, June 1975.1.65 Materials and Inspections for Reactor Vessel Closure Studs, dated October 1973, Regulatory Position C.4.b.1.84 Design and Fabrication Code Case Acceptability ASME Section III, Division 1, Latest Revision.1.85 Material Code Case Acceptability ASME Section III, Division 1, Latest Revision.1.147 Inservice Inspection Code Case Acceptability ASME Section XI, Division 1, Revision 12..NMP1 Specific Documents Nine Mile Point Unit 1 Updated Final Safety Analysis Report, Sections 1, 5, 7, 9, 12 File: NMP1ISIPL.wpd 0
Where an examination required by Section XI is determined to be impractical, the basis for this determination is included in the Nine Mile Point Insetvice Inspection Program, in the form of a Request for Relief.
N Y NIAGARA U MOHAWK NINE MILE POINT NUCLEAR POWER STATION THIRD INSERVICE INSPECTION INTERVAL TEN-YEAR INSERVICE INSPECTION PLAN AND SCHEDULE NMP1-ISI-003-10 Rev.0 Date: October 15, 1999 and 16.Nine Mile Point Unit 1 Technical Specifications, USNRC Docket number 50-220, Sections 3.6 and 4.6.USNRC NUREGS/SRP's USNRC NUREG 0313, Technical Report on Material Selection and Processing Guidelines for BWR Coolant Pressure Boundary Piping, Revision 2.USNRC NUREG 0619, BWR Feedwater Nozzle and CRD Return Lines.USNRC Bulletins 82-03 Stress Corrosion Cracking in Thick-Wall, Large-Diameter, Stainless Steel, Recirculation System Piping at BWR Plants, Revision 1, October 28, 1982.USNRC Generic Letters 88-01 USNRC Position on IGSCC in BWR Austenitic Stainless Steel Piping, January 25, 1988.88-01 NRC Position on Intergranular Stress Corrosion Cracking (IGSCC)in BWR Austenitic Stainless Steel Piping, Supplement 1, February 4, 1992.81-11 Feedwater and Control Rod Drive Nozzle Cracking, 90-05 Guidance for Performing Temporary Non-Code Repairs to ASME (ISI)Code Class 1, 2 and 3 Piping and Components, June 15, 1990.90-09 Alternative Requirements for Snubber Visual Inspection Intervals and Corrective Actions, December 11, 1990.94-03 Intergranular Stress Corrosion Cracking (IGSCC)of Core Shroud in Boiling Water Reactors, February 1, 1995.98-05 Boiling Water Reactor Licensees Use of the BWRVIP 05 Report to Request Relief rom Augmented Examination Requirements on Reactor Pressure Vessel Circumferential Shell Welds, December 10, 1998.Additional References or Commitments Requirements of the complete BWRVIP implementation criteria for the Third Ten Year Inservice Inspection Interval is currently under development.
Tables for each system subject to examination are included within this document, and provides Code classification, Code examination category, Code item number, component identification and description, examination method, and where within the Third Ten-Year Inspection Interval and period the component is scheduled to be performed.
Upon completion of this process the applicable information will be incorporated within ISI Program.General Information pertaining to BWRVIPs implementation is contained in the ISI Program NMP1-ISI-003, Section 6.0 Titled Augmented Examinations.
File: NMP1ISIPL.wpd
File: NMP1ISIPL.wpd 0
N Y NIAGARA U MOHAWK NINE MILE POINT NUCLEAR POWER STATION THIRD INSERVICE INSPECTION INTERVAL TEN-YEAR INSERVICE INSPECTION PLAN AND SCHEDULE NMP1-ISI-003-10 Rev.0 Date: October 15, 1999 USNRC Informational Notices 89-79 Degraded Coatings and Corrosion of Steel Containment Vessels, December 1, 1989.ASME Code Cases Code Cases approved through Regulatory Guide 1.147 may be proposed for revision to the inspection plan.Specific Code Cases used in the preparation of this document are identified below.N-460 N-491-1 N-509 N-524 Alternative Examination Coverage for Class 1 and Class 2 Welds, Section XI, Division 1.RG 1.147, Rev.12 Alternative Rules for Examination of Class 1, 2, 3 and MC Component Supports of Light Water Cooled Power Plants, Section XI, Division 1.RG 1.147, Rev.12.Alternative Rules for the Selection and Examination of Class 1, 2 and 3 Integrally Welded Attachments, Section XI, Division 1.RG 1.147, Rev.12.Alternative Examination Requirements for Longitudinal Welds in Class 1 and 2 Piping Section XI, Division 1.RG 1.147, Rev.12.Note: See Appendix E"Code Cases" of the 10 Year Inspection Plan for a complete listing applicable Code Cases.1.4 Applicable Code Editions and Addenda 1.4.1 Third Inspection Interval Pursuant to Title 10, Part 50, Section 55a(g)(4), of the Code of Federal Regulations, the Inservice Inspection requirements applicable to nondestructive examination and system pressure testing for the Third Inservice Inspection Interval are based on the rules set forth in the 1989 Edition, no Addenda of Section XI, that was endorsed twelve months prior to the start of the Third Inspection Interval.1.4.2 Subsequent Code Editions and Addenda As permitted by 10 CFR 50.55a(g)(4)(iv), the NMPC may elect to meet the requirements set forth in subsequent Editions and Addenda of Section XI that are incorporated by reference into 10 CFR 50.55a(b)(2), subject to the applicable limitations and modification and subject to USNRC approval.File: NMP1ISIPL.wpd Ol El V NIAGARA Il U MOHAWK NINE MILE POINT NUCLEAR POWER STATION N MP1-ISI-003-10 THIRD INSERVICE INSPECTION INTERVAL Rev.0 TEN-YEAR INSERVICE INSPECTION PLAN AND SCHEDULE Date: October 15, 1999 Portions of Editions and Addenda may also be used provided that all related requirements to the respective Editions and Addenda are met.NMPC intends to continually evaluate and apply, as appropriate, changes in adopted Code Editions and Addenda which provide the continuing assurance of the quality and safety of pressure retaining components and systems.File: NMP1ISIPL.wpd 0
El Y NIAGARA a U MOHAWK NINE MILE POINT NUCLEAR POWER STATION NMP1-Isl-003-1 0 THIRD INSERVICE INSPECTION INTERVAL Rev.0 TEN-YEAR INSERVICE INSPECTION PLAN AND SCHEDULE Date: October 15, 1999 2.0~DEVELOPMENT OF INSPECTION PLAN This document provides the component schedule for inservice nondestructive examinations to be performed over the Third Ten-Year Inservice Inspection Interval on Class 1, 2 and 3 components and their supports of the Niagara Mohawk Power Corporation (NMPC), Nine Mile Point Nuclear Power Station (NMP1).Component and/or system selected for nondestructive examination are scheduled in accordance with the requirements of Section XI, to the extent practical.
2.1 CLASS 1 SYSTEMS/COMPONENTS The Class 1 system boundaries subject to examination were developed based upon the requirements of 10 CFR 50.2(v)and NMPC NMP1-FSAR.
The Class 1 components and systems (including supports)selected for examination are identified in Section 4.0 of this document.2.2 CLASS 2 SYSTEMS/COMPONENTS The Class 2 system boundaries subject to examination were developed based upon the requirements of Regulatory Guide 1.26 and the NMPC NMP1-FSAR.
The Class 2 components and systems (including supports)selected for examination are identified in Section 5.0 of this document.2.3 CLASS 3 SYSTEMS/COMPONENTS The Class 3 system boundaries subject to examination were developed based upon the requirements of Regulatory Guide 1.26, and the NMPC NMP1-FSAR.
The Class 3 components and systems (including supports)selected for examination are identified in Section 6.0 of this document.2.4 CLASS 1, CLASS 2 AND CLASS 3 COMPONENT SUPPORTS-IWF Component supports selected for examination shall be the supports of those components that are required to be examined under IWB, IWC and IWD, and are included within Sections 4.0, 5.0 and 6.0 as applicable.
2.5 SUBSTITUTE EXAMINATIONS NMPC may substitute components scheduled in this Document for others not previously scheduled when the original selection was part of the additional piping weld selection.
This substitution may be done due to such conditions as limited physical access, high radiation levels, inaccessibility etc.Such changes will be noted in the Summary Report Submittal.
Specific examinations that are required, and can not be completed within the periodfinterval will be identified within the Summary Report Submittal, and may be the subject of a request for relief.2.6 NONDESTRUCTIVE EXAMINATIONS Nondestructive examinations will be performed in accordance with established Niagara File: NMP1ISIPL.wpd  


N Y NIAGARA kJ MOHAWK NINE MILE POINT NUCLEAR POWER STATION NMP1-ISI-003-1 0 THIRD INSERVICE INSPECTION INTERVAL Rev.0 TEN-YEAR INSERVICE INSPECTION PLAN AND SCHEDULE Date: October 15, 1999 Mohawk Power Corporation (NMPC)nondestructive examination procedures and/or NMPC approved vendor procedures which conform to the requirements of the NMPC Quality Assurance Program and the applicable sections of the ASME Boiler and Pressure Vessel Code.NMPC approved vendor NDE Procedures will be identified as required, (example, Automated UT of RPV).2.7 WELD/SUPPORT LOCATION MAPS Weld/Support location maps Listing indicating components, areas, weld locations, and other information pertinent to the performance of the inservice Nondestructive examinations are contained in Appendix C.2.8 ULTRASONIC CALIBRATION BLOCKS Ultrasonic calibration blocks for each component subject to volumetric examination are maintained at the plant site.A listing of applicable ultrasonic calibration blocks is included in Appendix B.2.9 WELD IDENTIFICATION Longitudinal welds in Class 2 piping and pipe fittings do not receive unique identification numbers from the spool fabricators.
NINE MILE POINT                                   NMP1-ISI-003-10 El Y NlAGARA                              NUCLEAR POWER STATION H U MOHAWK THIRD INSERVICE INSPECTION INTERVAL                     Rev. 0 TEN>>YEAR INSERVICE INSPECTION                       Date:   October 15, 1999 PLAN AND SCHEDULE
All longitudinal pipe welds intersecting any of the selected circumferential welds will also be examined.As an alternate to Table IWB-2500-1, ASME Code Case N-524,"Alternative Examination Requirements for Longitudinal Welds in Class 1 Piping Section XI, Division 1", shall be used as defined below: (A)When only a surface examination is required, examination of longitudinal piping welds is not required beyond those portions of the welds within the examination boundaries of intersecting circumferential welds.(B)When both surface and volumetric examinations are required, examination of longitudinal piping welds is not required beyond those portions of the welds within the examination boundaries of intersecting circumferential welds providing the following requirements are met.(1)Where longitudinal welds are specified and locations are known, examination requirements shall be met for both transverse and parallel flaws at the intersection of the welds and for that length of longitudinal weld within the circumferential weld examination volume;(2)Where longitudinal welds are specified but locations are unknown, or the existence of longitudinal welds is uncertain, the examination requirements shall be met for both transverse and parallel flaws within the entire examination volume of intersecting circumferential welds.File: NMP1ISIPL.wpd


El Y NIAGARA H U MOHAWK NINE MILE POINT NUCLEAR POWER STATION NMP1-ISI-003-1 0 THIRD INSERVICE INSPECTION INTERVAL Rev.0 TEN-YEAR INSERVICE INSPECTION PLAN AND SCHEDULE Date: October 15, 1999 Since Class 2 longitudinal welds are required to be examined from the intersecting circumferential weld, they were given unique identification numbers as denoted below.Fittings: Longitudinal welds in fittings are identified by adding letter A, B, or C, (1, 2, or 3), as applicable, to the I.D.for the reference weld.The reference weld is defined as the first circumferential weld encountered when entering the fitting on the direction of the flow.The following figure shows the convention for identifying which weld in a welded fitting receives a particular letter designation.
==1.0   INTRODUCTION==
Tee Case 1: Three welds located as shown in Figure 2-1.Tee Case 2: If only one weld Figure 2-1 TEE weld ID exists it is identified by the letter A or 1.Figure 2-1 Tee Weld ID Elbow Case 1: Two welds located as shown in Figure 2-2, one located on the inside radius and the other on the outside radius.Elbow Case 2: If only one weld exists it is identified by the letter A or 1.Figure 2-2 Elbow weld ID File: NMP1ISIPL.wpd 0
 
N V NlAGARA U MOHAWK NINE MILE POINT NUCLEAR POWER STATION THIRD INSERVICE INSPECTION INTERVAL TEN-YEAR INSERVICE INSPECTION PLAN AND SCHEDULE NMP1-ISI-003-1 0 Rev.0 Date: October 15, 1999 Elbow Case 3: If two welds exist in locations other than Case 1, Weld A or 1 is the first weld encountered when moving clockwise from the reference weld datum while looking in the direction of flow.The other weld is identified by B or 2.Reducer Case 1: If only one weld exists it is identified by the letter A or 1.Reducer Case 2: If two welds exist, weld A or 1 is the first weld encountered when moving clockwise from the reference weld datum while looking in the direction of flow.The other weld is identified by B or 2.See Figure 2-3.Figure 2-3 Reducer weld ID Piping: Longitudinal piping welds are not assigned a specific weld identification number.They are identified by reference to the intersecting circumferential weld first encountered when entering the seamed pipe in the direction of flow.File: NIVIP1ISIPL.wpd 0
This document details the Third Interval, Ten-Year Inservice Inspection Plan and schedule for selected components, welds, supports, bolting, pump casings, valve bodies, and reactor pressure vessel internals for the Nine Mile Point Nuclear Power Station, Unit 1.
N Y NlAGARA U MOHAWK NINE MILE POINT NUCLEAR POWER STATION NMP1-ISI-003-1 0 THIRD INSERVICE INSPECTION INTERVAL Rev.0 TEN-YEAR INSERVICE INSPECTION PLAN AND SCHEDULE Date: October 15, 1999 3.0 RECORDS 3.1 General Records and Reports of Inservice Inspection activities (such as Programs, Plans, Schedules, calibration, examination procedures, examination results, reports, equipment and personnel certifications, corrective actions taken or recommended will be developed and maintained in accordance with IWA-6000 of the ASME Boiler and Pressure Vessel Code, Section XI.3.1.1 SCHEDULED EXAMINATION TABLES The Scheduled Examination Tables for Inservice examinations of major components of Niagara Mohawk Power Corporation, Nine Mile Point Nuclear Power Station will be in a format similar to Figure 3-1.3.1.2 INSPECTION ZONES Areas subject to examination have been divided into systems.Each system is defined by a weld/support location map which identifies and locates all welds, supports, and other examination areas subject to and/or selected for examination within each system.3.1.3 CODE ITEM CLASSIFICATION For the sake of continuity and clarity, all items to which a Code Category and Code Item Number can be applied are identified.
Niagara Mohawk Power Corporation (NMPC), is the Owner of Record.
3.1.4 INSPECTION/EXAMINATION TABLE CONTENTS The Inservice Inspection/Examination Tables provide the following information:
The Commercial Service Date for the Nine Mile Point Nuclear Power Station, Unit 1 is December 26, 1969.
ASME SECTION XI ITEM NUMBER-Listed in this column is the appropriate item number from Table IWB-2500-1, IWC-2500-1, IWD-2500-1 or IWF-2500-1, as applicable, of the ASME Boiler 8.Pressure Vessel Code, Section XI.COMPONENT IDENTIFICATION
1.1      Inspection Interval The Third Inservice Inspection Interval becomes effective on December 26, 1999 and is scheduled to end on December 25, 2009.
-The examination area identification is the unique component or weld identification number.This number also appears on the applicable ISI Weld/Support Location Map.COMPONENT DESCRIPTION
1.2      Inspection Periods The Third lnservice Inspection Interval is divided into three successive inspection periods as determined by calendar years of plant service within the inspection interval. Identified below are the period dates for the third inspection interval as defined by Inspection Program NBN In accordance with IWB-2412(b) the inspection period specified below may be decreased or extended by as much as      1 year to enable inspection to coincide with NMP1's plant outages.
-The examination area description is a brief description of the component or, in the case of a weld, the parts being joined.CODE EXAMINATION CATEGORY-Listed in this column are the appropriate examination categories from Tables IWB-2500-1, IWC-2500-1, IWD-2500-1 or IWF-2500-1, as applicable, of the ASME Boiler 8 Pressure Vessel Code, Section XI.CODE EXAMINATION METHODS-Listed in this column are the appropriate nondestructive examination method(s)to be used for each component or item subject File: NMP1ISIPL.wpd 0
TABLE 1-2 NMP1 INSERVICE INSPECTION PERIODS INSPECTION          PERIOD START              PERIOD END            REFUEL        REFUEL PERIODS              DATES                    'DATES              OUTAGE        OUTAGE YEAR December 26, 1999        December 25, 2002          RFO-16        2001 December 25, 2002        December 26, 2006          RFO-17        2003 RFO-18        2005 December 26, 2006        December 25, 2009          RFO-19        2007
El Y NIAGARA H U MOHAlhlK NINE MILE POINT NUCLEAR POWER STATION THIRD INSERVICE INSPECTION INTERVAL TEN-YEAR INSERVICE INSPECTION PLAN AND SCHEDULE NMP1-ISI-003-10 Rev.0 Date: October 15, 1999 to examination, if applicable.
* The plant operating license is currently scheduled to expire on August 22, 2009.
ISI INTERVAL-Identified in this column are numbers 1, 2, and 3.Each number signitying an inspection period.The current inspection interval relating to this Table is number 3.Within each column a system of codes are entered to define the status of each component or item.For the purpose of providing Tables of components or areas selected for examination during the interval an (X)will be placed on the applicable row.Each row is defined by period, depending on where the (X)is placed, will determine when that item is scheduled to be examined within the interval and period.Additional codes are used to provide a status of examinations conducted during a given period in time.Additional codes such as those identified in Figure 3-1 may also be used.REMARKS-This column identifies examination note(s)and/or instruction applicable to a particular item.3.2 FINAL REPORTS Following the completion of the Inservice Inspection Activity, NMPC shall prepare a Inservice Inspection Final Report.The Final Report will be tiled at the Nine Mile Point site Document Control Center.Final Examination Report Tables are included as part of the Final Report along with any additional records and reports in order to provide a documentation of the complete examination activity.This report shall be made available for review by the Enforcement and Regulatory Authority having jurisdiction at the plant side.3.3 INSERVICE INSPECTION
1.3    Applicable Documents The Third Inservice Inspection Program for Quality Group A, B, and C (ASME Code Class 1, 2 and 3), systems and components (including their supports) was developed after giving due consideration to the following documents and subject to the limitations and modifications listed File: NMP1ISIPL.wpd
 
NINE MILE POINT                                NMP1-ISI-003-10 H V NIAGARA                              NUCLEAR POWER STATION H V MOHAWK THIRD INSERVICE INSPECTION INTERVAL                    Rev.     0 TEN-YEAR INSERVICE INSPECTION                      Date:   October 15, 1999 PLAN AND SCHEDULE in 10 CFR 50.55a(b), and to the extent practical within the limitations of design, geometry and materials of construction. Specific areas within this document where these document are used in the preparation of this program are addressed within the area affected.
Code of Federal Regulations 10 CFR 50.55(a) Code of Federal Regulations; Federal Register, Volume 64, Number 183, dated September 22, 1999, amendment to the regulation.
ASME Code Editions and Addenda ASME Boiler and Pressure Vessel Code, Sections V, 1989 Edition, "Nondestructive Examination" ASME Boiler and Pressure Vessel Code, Section XI, 1989 Edition, "Rules for Inservice Inspection of Nuclear Power Plant Components" ASME Boiler and Pressure Vessel Code, Section XI, 1992 Edition through the 1992 Addenda, "Rules for Inservice Inspection of Nuclear Power Plant Components",
Subsections IWE and IWL.
USNRC Regulatory Guides The following list of Regulatory Guides are applicable to the Nine Mile Point Nuclear Power Station Third Inservice Inspection Program:
1.26    Quality Group Classifications and Standards for Water-Steam, and Radioactive-Waste-Containing Components of Nuclear Power Plants, Revision 2, June 1975.
1.65    Materials and Inspections for Reactor Vessel Closure Studs, dated October 1973, Regulatory Position C.4.b.
1.84    Design and Fabrication Code Case Acceptability ASME Section III, Division 1, Latest Revision.
1.85      Material Code Case Acceptability ASME Section III, Division 1, Latest Revision.
1.147    Inservice Inspection Code Case Acceptability ASME Section XI, Division 1, Revision 12..
NMP1 Specific Documents Nine Mile Point Unit    1 Updated Final Safety Analysis Report, Sections 1, 5, 7, 9, 12 File: NMP1ISIPL.wpd
 
0 NINE MILE POINT                               NMP1-ISI-003-10 Y NIAGARA                          NUCLEAR POWER STATION N U MOHAWK THIRD INSERVICE INSPECTION INTERVAL                   Rev. 0 TEN-YEAR INSERVICE INSPECTION                     Date: October 15, 1999 PLAN AND SCHEDULE and 16.
Nine Mile Point Unit    1 Technical Specifications, USNRC Docket number 50-220, Sections 3.6 and 4.6.
USNRC NUREGS/SRP's USNRC NUREG 0313, Technical Report on Material Selection and Processing Guidelines for BWR Coolant Pressure Boundary Piping, Revision 2.
USNRC NUREG 0619, BWR Feedwater Nozzle and CRD Return Lines.
USNRC Bulletins 82-03    Stress Corrosion Cracking in Thick-Wall, Large-Diameter, Stainless Steel, Recirculation System Piping at BWR Plants, Revision 1, October 28, 1982.
USNRC Generic Letters 88-01    USNRC Position on IGSCC in BWR Austenitic Stainless Steel Piping, January 25, 1988.
88-01    NRC Position on Intergranular Stress Corrosion Cracking (IGSCC) in BWR Austenitic Stainless Steel Piping, Supplement 1, February 4, 1992.
81-11    Feedwater and Control Rod Drive Nozzle Cracking, 90-05    Guidance for Performing Temporary Non-Code Repairs to ASME (ISI) Code Class 1, 2 and 3 Piping and Components, June 15, 1990.
90-09    Alternative Requirements for Snubber Visual Inspection Intervals and Corrective Actions, December 11, 1990.
94-03    Intergranular Stress Corrosion Cracking (IGSCC) of Core Shroud in Boiling Water Reactors, February 1, 1995.
98-05    Boiling Water Reactor Licensees Use of the BWRVIP 05 Report to Request Relief rom Augmented Examination Requirements on Reactor Pressure Vessel Circumferential Shell Welds, December 10, 1998.
Additional References or Commitments Requirements of the complete BWRVIP implementation criteria for the Third Ten Year Inservice Inspection Interval is currently under development. Upon completion of this process the applicable information will be incorporated within ISI Program. General Information pertaining to BWRVIPs implementation is contained in the ISI Program NMP1-ISI-003, Section 6.0 Titled Augmented Examinations.
File: NMP1ISIPL.wpd
 
0 NINE MILE POINT                                NMP1-ISI-003-10 Y NIAGARA                              NUCLEAR POWER STATION N U MOHAWK THIRD INSERVICE INSPECTION INTERVAL                    Rev.      0 TEN-YEAR INSERVICE INSPECTION                      Date:    October 15, 1999 PLAN AND SCHEDULE USNRC Informational Notices 89-79    Degraded Coatings and Corrosion of Steel Containment Vessels, December 1, 1989.
ASME Code Cases Code Cases approved through Regulatory Guide 1.147 may be proposed for revision to the inspection plan. Specific Code Cases used in the preparation of this document are identified below.
N-460              Alternative Examination Coverage for Class      1  and Class 2 Welds, Section XI, Division 1. RG 1.147, Rev. 12 N-491-1            Alternative Rules for Examination of Class 1, 2, 3 and MC Component Supports of Light Water Cooled Power Plants, Section XI, Division 1.
RG 1.147, Rev. 12.
N-509              Alternative Rules for the Selection and Examination of Class 1, 2 and 3 Integrally Welded Attachments, Section XI, Division 1. RG 1.147, Rev. 12.
N-524              Alternative Examination Requirements for Longitudinal Welds in Class 1 and 2 Piping Section XI, Division 1. RG 1.147, Rev. 12.
Note:    See Appendix E "Code Cases" of the 10 Year Inspection Plan for a complete listing applicable Code Cases.
1.4    Applicable Code Editions and Addenda 1.4.1  Third Inspection Interval Pursuant to Title 10, Part 50, Section 55a(g)(4), of the Code of Federal Regulations, the Inservice Inspection requirements applicable to nondestructive examination and system pressure testing for the Third Inservice Inspection Interval are based on the rules set forth in the 1989 Edition, no Addenda of Section XI, that was endorsed twelve months prior to the start of the Third Inspection Interval.
1.4.2  Subsequent Code Editions and Addenda As permitted by 10 CFR 50.55a(g)(4)(iv), the NMPC may elect to meet the requirements set forth in subsequent Editions and Addenda of Section XI that are incorporated by reference into 10 CFR 50.55a(b)(2), subject to the applicable limitations and modification and subject to USNRC approval.
File: NMP1ISIPL.wpd
 
Ol NINE MILE POINT                              N MP1-ISI-003-10 El V NIAGARA                        NUCLEAR POWER STATION IlU MOHAWK                  THIRD INSERVICE INSPECTION INTERVAL                  Rev. 0 TEN-YEAR INSERVICE INSPECTION                    Date:  October 15, 1999 PLAN AND SCHEDULE Portions of Editions and Addenda may also be used provided that all related requirements to the respective Editions and Addenda are met. NMPC intends to continually evaluate and apply, as appropriate, changes in adopted Code Editions and Addenda which provide the continuing assurance of the quality and safety of pressure retaining components and systems.
File: NMP1ISIPL.wpd
 
0 NINE MILE POINT                              NMP1-Isl-003-1 0 El Y NIAGARA                                NUCLEAR POWER STATION a U MOHAWK THIRD INSERVICE INSPECTION INTERVAL                Rev.      0 TEN-YEAR INSERVICE INSPECTION                    Date:    October 15, 1999 PLAN AND SCHEDULE 2.0  ~  DEVELOPMENT OF INSPECTION PLAN This document provides the component schedule for inservice nondestructive examinations to be performed over the Third Ten-Year Inservice Inspection Interval on Class 1, 2 and 3 components and their supports of the Niagara Mohawk Power Corporation (NMPC), Nine Mile Point Nuclear Power Station (NMP1). Component and/or system selected for nondestructive examination are scheduled in accordance with the requirements of Section XI, to the extent practical.
2.1 CLASS    1  SYSTEMS/COMPONENTS The Class 1 system boundaries subject to examination were developed based upon the requirements of 10 CFR 50.2(v) and NMPC NMP1-FSAR. The Class 1 components and systems (including supports) selected for examination are identified in Section 4.0 of this document.
2.2 CLASS 2 SYSTEMS/COMPONENTS The Class 2 system boundaries subject to examination were developed based upon the requirements of Regulatory Guide 1.26 and the NMPC NMP1-FSAR. The Class 2 components and systems (including supports) selected for examination are identified in Section 5.0 of this document.
2.3 CLASS 3 SYSTEMS/COMPONENTS The Class 3 system boundaries subject to examination were developed based upon the requirements of Regulatory Guide 1.26, and the NMPC NMP1-FSAR. The Class 3 components and systems (including supports) selected for examination are identified in Section 6.0 of this document.
2.4      CLASS 1, CLASS 2 AND CLASS 3 COMPONENT SUPPORTS - IWF Component supports selected for examination shall be the supports of those components that are required to be examined under IWB, IWC and IWD, and are included within Sections 4.0, 5.0 and 6.0 as applicable.
2.5      SUBSTITUTE EXAMINATIONS NMPC may substitute components scheduled in this Document for others not previously scheduled when the original selection was part of the additional piping weld selection. This substitution may be done due to such conditions as limited physical access, high radiation levels, inaccessibility etc. Such changes will be noted in the Summary Report Submittal.
Specific examinations that are required, and can not be completed within the periodfinterval will be identified within the Summary Report Submittal, and may be the subject of a request for relief.
2.6      NONDESTRUCTIVE EXAMINATIONS Nondestructive examinations will be performed in accordance with established Niagara File: NMP1ISIPL.wpd
 
NINE MILE POINT                                NMP1-ISI-003-1 0 Y NIAGARA                              NUCLEAR POWER STATION N kJ MOHAWK THIRD INSERVICE INSPECTION INTERVAL                    Rev. 0 TEN-YEAR INSERVICE INSPECTION                        Date:    October 15, 1999 PLAN AND SCHEDULE Mohawk Power Corporation (NMPC) nondestructive examination procedures and/or NMPC approved vendor procedures which conform to the requirements of the NMPC Quality Assurance Program and the applicable sections of the ASME Boiler and Pressure Vessel Code. NMPC approved vendor NDE Procedures will be identified as required, (example, Automated UT of RPV).
2.7    WELD/SUPPORT LOCATION MAPS Weld/Support location maps Listing indicating components, areas, weld locations, and other information pertinent to the performance of the inservice Nondestructive examinations are contained in Appendix C.
2.8    ULTRASONIC CALIBRATIONBLOCKS Ultrasonic calibration blocks for each component subject to volumetric examination are maintained at the plant site. A listing of applicable ultrasonic calibration blocks is included in Appendix B.
2.9    WELD IDENTIFICATION Longitudinal welds in Class 2 piping and pipe fittings do not receive unique identification numbers from the spool fabricators. All longitudinal pipe welds intersecting any of the selected circumferential welds will also be examined. As an alternate to Table IWB-2500-1, ASME Code Case N-524, "Alternative Examination Requirements for Longitudinal Welds in Class 1 Piping Section XI, Division 1", shall be used as defined below:
(A)    When only a surface examination is required, examination of longitudinal piping welds is not required beyond those portions of the welds within the examination boundaries of intersecting circumferential welds.
(B)    When both surface and volumetric examinations are required, examination of longitudinal piping welds is not required beyond those portions of the welds within the examination boundaries of intersecting circumferential welds providing the following requirements are met.
(1)      Where longitudinal welds are specified and locations are known, examination requirements shall be met for both transverse and parallel flaws at the intersection of the welds and for that length of longitudinal weld within the circumferential weld examination volume; (2)      Where longitudinal welds are specified but locations are unknown, or the existence of longitudinal welds is uncertain, the examination requirements shall be met for both transverse and parallel flaws within the entire examination volume of intersecting circumferential welds.
File: NMP1ISIPL.wpd
 
NINE MILE POINT                                  NMP1-ISI-003-1 0 El Y NIAGARA                                NUCLEAR POWER STATION H U MOHAWK THIRD INSERVICE INSPECTION INTERVAL                      Rev. 0 TEN-YEAR INSERVICE INSPECTION                        Date:    October 15, 1999 PLAN AND SCHEDULE Since Class 2 longitudinal welds are required to be examined from the intersecting circumferential weld, they were given unique identification numbers as denoted below.
Fittings:          Longitudinal welds in fittings are identified by adding letter A, B, or C, (1, 2, or 3), as applicable, to the I.D. for the reference weld. The reference weld is defined as the first circumferential weld encountered when entering the fitting on the direction of the flow.
The following figure shows the convention for identifying which weld in a welded fitting receives a particular letter designation.
Tee Case 1: Three welds located as shown in Figure 2-1.
Tee Case 2: If only one weld Figure 2-1 TEE weld ID exists it is identified by the letter A or 1.
Figure 2-1 Tee Weld ID Elbow Case 1: Two welds located as shown in Figure 2-2, one located on the inside radius and the other on the outside radius.
Elbow Case 2: If only one weld exists it is identified by the letter A or 1.
Figure 2-2 Elbow weld ID File: NMP1ISIPL.wpd
 
0 NINE MILE POINT                              NMP1-ISI-003-1 0 V NlAGARA                                NUCLEAR POWER STATION N U MOHAWK THIRD INSERVICE INSPECTION INTERVAL                  Rev.      0 TEN-YEAR INSERVICE INSPECTION                    Date:    October 15, 1999 PLAN AND SCHEDULE Elbow Case 3: If two welds exist in locations other than Case 1, Weld A or 1 is the first weld encountered when moving clockwise from the reference weld datum while looking in the direction of flow. The other weld is identified by B or 2.
Reducer Case 1: If only one weld exists it is identified by the letter A or 1.
Reducer Case 2: If two welds exist, weld A or 1 is the first weld encountered when moving clockwise from the reference weld datum while looking in the direction of flow. The other weld is identified by B or 2. See Figure 2-3.
Figure 2-3 Reducer weld ID Piping: Longitudinal piping welds are not assigned a specific weld identification number. They are identified by reference to the intersecting circumferential weld first encountered when entering the seamed pipe in the direction of flow.
File: NIVIP1ISIPL.wpd
 
0 NINE MILE POINT                                NMP1-ISI-003-1 0 Y NlAGARA                              NUCLEAR POWER STATION N U MOHAWK THIRD INSERVICE INSPECTION INTERVAL                    Rev. 0 TEN-YEAR INSERVICE INSPECTION                      Date:  October 15, 1999 PLAN AND SCHEDULE 3.0    RECORDS 3.1    General Records and Reports of Inservice Inspection activities (such as Programs, Plans, Schedules, calibration, examination procedures, examination results, reports, equipment and personnel certifications, corrective actions taken or recommended will be developed and maintained in accordance with IWA-6000 of the ASME Boiler and Pressure Vessel Code, Section XI.
3.1.1    SCHEDULED EXAMINATIONTABLES The Scheduled Examination Tables for Inservice examinations of major components of Niagara Mohawk Power Corporation, Nine Mile Point Nuclear Power Station will be in a format similar to Figure 3-1.
3.1.2    INSPECTION ZONES Areas subject to examination have been divided into systems. Each system is defined by a weld/support location map which identifies and locates all welds, supports, and other examination areas subject to and/or selected for examination within each system.
3.1.3    CODE ITEM CLASSIFICATION For the sake of continuity and clarity, all items to which a Code Category and Code Item Number can be applied are identified.
3.1.4    INSPECTION/EXAMINATIONTABLE CONTENTS The Inservice Inspection/Examination Tables provide the following information:
ASME SECTION XI ITEM NUMBER - Listed in this column is the appropriate item number from Table IWB-2500-1, IWC-2500-1, IWD-2500-1 or IWF-2500-1, as applicable, of the ASME Boiler 8. Pressure Vessel Code, Section XI.
COMPONENT IDENTIFICATION- The examination area identification is the unique component or weld identification number. This number also appears on the applicable ISI Weld/Support Location Map.
COMPONENT DESCRIPTION - The examination area description is a brief description of the component or, in the case of a weld, the parts being joined.
CODE EXAMINATION CATEGORY - Listed in this column are the appropriate examination categories from Tables IWB-2500-1, IWC-2500-1, IWD-2500-1 or IWF-2500-1, as applicable, of the ASME Boiler 8 Pressure Vessel Code, Section XI.
CODE EXAMINATION METHODS - Listed in this column are the appropriate nondestructive examination method(s) to be used for each component or item subject File: NMP1ISIPL.wpd
 
0 NINE MILE POINT                              NMP1-ISI-003-10 El Y NIAGARA                            NUCLEAR POWER STATION H U MOHAlhlK THIRD INSERVICE INSPECTION INTERVAL                  Rev.      0 TEN-YEAR INSERVICE INSPECTION                    Date:    October 15, 1999 PLAN AND SCHEDULE to examination, if applicable.
ISI INTERVAL - Identified in this column are numbers 1, 2, and 3. Each number signitying an inspection period. The current inspection interval relating to this Table is number 3. Within each column a system of codes are entered to define the status of each component or item. For the purpose of providing Tables of components or areas selected for examination during the interval an (X) will be placed on the applicable row. Each row is defined by period, depending on where the (X) is placed, will determine when that item is scheduled to be examined within the interval and period. Additional codes are used to provide a status of examinations conducted during a given period in time. Additional codes such as those identified in Figure 3-1 may also be used.
REMARKS - This column identifies examination note(s) and/or instruction applicable to a particular item.
3.2   FINAL REPORTS Following the completion of the Inservice Inspection Activity, NMPC shall prepare a Inservice Inspection Final Report. The Final Report will be tiled at the Nine Mile Point site Document Control Center. Final Examination Report Tables are included as part of the Final Report along with any additional records and reports in order to provide a documentation of the complete examination activity.
This report shall be made available for review by the Enforcement and Regulatory Authority having jurisdiction at the plant side.
3.3   INSERVICE INSPECTION  


==SUMMARY==
==SUMMARY==
REPORT Following the units return to service, NMPC shall prepare a Summary Report of the ISI activity.The Summary Report shall be filed with the Nuclear Regulatory Commission as required by Section XI and/or Code Case N-532.File: NMP1ISIPL.wpd  
REPORT Following the units return to service, NMPC shall prepare a Summary Report of the ISI activity.
The Summary Report shall be filed with the Nuclear Regulatory Commission as required by Section XI and/or Code Case N-532.
File: NMP1ISIPL.wpd


hl Y NlAGARA H U MOHAWK NINE MILE POINT NUCLEAR POWER STATION THIRD INSERVICE INSPECTION INTERVAL TEN-YEAR INSERVICE INSPECTION PLAN AND SCHEDULE NMP1-ISI-003-10 Rev.0 Date: October 15, 1999 DATE: (A)Rev.(8)System (D)Summary Examination Area Number Identiiicatlon ASME Sec.XI Categy Item No Nine Mlle Point Nuclear Plant unit 1 Inservlce Inspection Long Term Plan Class X Section XI Scheduled Components INSPECTION INTERVAI PLAN STATUS NDE First Second Third Meth Period Period Period-OUTAGE-1234 1234 1234 Page (C)Instructions
NINE MILE POINT                                NMP1-ISI-003-10 hl Y NlAGARA                                 NUCLEAR POWER STATION H U MOHAWK THIRD INSERVICE INSPECTION INTERVAL                     Rev. 0 TEN-YEAR INSERVICE INSPECTION                         Date: October 15, 1999 PLAN AND SCHEDULE DATE:   (A)                                   Nine Mlle Point Nuclear Plant unit 1                     Page  (C)
" Calibration Blocks-DRAWING NUM8ER: (E), LINE NO.(F)(G)(I)(J)(H)(K)(L)--.---------(K)(M)(A)(B)(C)(D)))6)(I)(J)(H)(K)(L)(M)Denotes the date of the inspection plan table Denotes the current revision number of the plan Identifies the page number of the table Identifies the System applicable to this table Denotes the applicable Drawing number for this table Identifies the applicable Line for this table Denotes the Summary Number Denotes the component or weld identification number Denotes the ASME Code Category Denotes the ASME Code Item Number Denotes the NDE Method to be used for the examination Shows when an item was examined or is scheduled to be examined.Any interval can be shown separately.
Inservlce Inspection Long Term Plan Rev.    (8)                              Class X Section XI Scheduled Components System  (D)
X-Scheduled P-Partial C-Completed E-Expanded Scope A-Augmented B-Baseline Denotes specific instruction applicable to the item FIGURE 3-1 lnservice Inspection Plan (also known as Long Term Plan)File: NMP1ISIPL.wpd
INSPECTION INTERVAI PLAN STATUS Summary     Examination Area      ASME Number     Identiiicatlon        Sec. XI Categy Item No NDE Meth


N Y NIAGARA kJ MOHAWK NINE MILE POINT NUCLEAR POWER STATION NMP1-ISI-003-1 0 THIRD INSERVICE INSPECTION INTERVAL Rev.0 TEN-YEAR INSERVICE INSPECTION PLAN AND SCHEDULE Date: October 15, 1999 4.0 CLASS 1 INSERVICE INSPECTION PLAN TABLES This section contains the Long Term Ten-Year Inservice Inspection Examination Tables for nondestructive examinations of selected systems and components for the Second Inservice Inspection Interval.00.0 01.0 31.0 32.0 33.0 36.0 37.0 38.0 39.0 40.0 42.1 44.1 Reactor Pressure Vessel Main Steam Feedwater System Reactor Recirculation System Reactor Clean Up Reactor Instrumentation
First Period Second Period OUTAGE Third Period Instructions
.Reactor Drain 8 Vent.Reactor Shutdown Cooling.Emergency Condenser System Reactor Core Spray System..Liquid Poison System.Control Rod Drive System.1 thru 83 84 thM 90.91 thru97....98thru130 131 thru 135 136 thru 137 138 thru 143 144 thru 147 148 thru 156 157 thru 171 172 thru 173 174 thru 177 File: NMP1 ISIPL.wpd  
                                                                                      " Calibration Blocks-1234    1234      1234 DRAWING NUM8ER: (E),        LINE NO. (F)
(G)        (I)              (J)  (H)      (K)                (L)--. - -  - - - - - (K)(M)
(A)    Denotes the date of the inspection plan table (B)    Denotes the current revision number of the plan (C)    Identifies the page number of the table (D)    Identifies the System applicable to this table
    )  Denotes the applicable Drawing number for this table
  )    Identifies the applicable Line for this table
: 6)    Denotes the Summary Number (I)    Denotes the component or weld identification number (J)    Denotes the ASME Code Category (H)    Denotes the ASME Code Item Number (K)    Denotes the NDE Method to be used for the examination (L)    Shows when an item was examined or is scheduled to be examined. Any interval can be shown separately.
X - Scheduled                    P - Partial
              -
C Completed                      E - Expanded Scope A - Augmented                    B - Baseline (M)    Denotes specific instruction applicable to the item FIGURE 3-1 lnservice Inspection Plan (also known as Long Term Plan)
File: NMP1ISIPL.wpd


DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PIANT UNIT 1 ZNSERVZCE INSPECTION TEN-YEAR PLAN CZASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 1 J Welds NUMBER: 00.0  
NINE MILE POINT                          NMP1-ISI-003-1 0 Y NIAGARA                            NUCLEAR POWER STATION N kJ MOHAWK THIRD INSERVICE INSPECTION INTERVAL              Rev. 0 TEN-YEAR INSERVICE INSPECTION                Date:  October 15, 1999 PLAN AND SCHEDULE 4.0  CLASS  1 INSERVICE INSPECTION PLAN TABLES This section contains the Long Term Ten-Year Inservice Inspection Examination Tables for nondestructive examinations of selected systems and components for the Second Inservice Inspection Interval.
00.0        Reactor Pressure Vessel                                                              1 thru 83 01.0        Main Steam                                                                          84 thM 90 31.0        Feedwater System                                                                  . 91 thru97 32.0        Reactor Recirculation System                                                .... 98thru130 33.0        Reactor Clean Up                                                                131 thru 135 36.0        Reactor Instrumentation  .                                                      136 thru 137 37.0        Reactor Drain 8 Vent  .                                                        138 thru 143 38.0        Reactor Shutdown Cooling    .                                                    144 thru 147 39.0        Emergency Condenser System                                                      148 thru 156 40.0        Reactor Core Spray System    ..                                                157 thru 171 42.1        Liquid Poison System  .                                                          172 thru 173 44.1        Control Rod Drive System    .                                                    174 thru 177 File: NMP1 ISIPL.wpd
 
DATE: 10/15/99                             NINE MILE POINT NUCLEAR PIANT UNIT 1                           PAGE: 1 REVISION:        0                          ZNSERVZCE INSPECTION TEN-YEAR PLAN CZASS 1 SECTION XZ SCHEDULED COMPONENTS J Welds NUMBER:   00.0 INSPECTION INTERVAL                      PIAN STATUS            PRESERVICE YEAR AS ME                FIRST        SECOND      THIRD SEC. XZ              PERIOD      PERIOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER ZDENTZFZCATZON INSPECTION INTERVAL AS ME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD PIAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR INSTRUCTIONS
EXAMINATION AREA         CATEGY      NDE                OUTAGE                          INSTRUCTIONS NUMBER     ZDENTZFZCATZON           ITEM NO   METH     1 2 3 4 1   2 3 4   1 2 3 4 + +CALIBRATION BLOCK*+
++CALIBRATION BLOCK*+Control Rod Drive Housings (REF.DWG.NO.28A)002610 DRV-44-XXXX(NC02)
Control Rod Drive Housings   (REF. DWG. NO. 28A) 002610   DRV-44-XXXX(NC02)         NCTS       UT                                           Prior to and after each CRDH Upper- J Weld &   503783
NCTS UT CRDH Upper-J Weld&503783 Roll Area 3 X---X X--X Prior to and after each Roll Repair Drives to be determined later+*LATER**002620 DRV 44-XXXX(NC02)
                                                            - - -                            Roll Repair Drives to Roll                                        3 X           X   X - -   X Area                                                                          be determined   later
NCTS UT CRDH to Upper-J Weld 503783 X---X X--X Examine (2)previously roll-repaired CRDH, only if made availablc thru norm drive maint., 1" above s below upper-J veld, Drives to bc dctermincd during each outage~+LATER*w 630 DRV-44-XXXX(NC02)
                                                                                              +*LATER**
NCTS UT CRDH Roll Repair 503783 Region X---X X--X Examine (2)previously rolled areas to include volume of base material of 1" above C beld roll band, only if made availablc thru norm drive maint., Drives to bc determined during 1*LATER*4 0
002620   DRV 44-XXXX(NC02)       NCTS         UT                                           Examine (2)    previously CRDH   to Upper-J Weld   503783                                                   roll-repaired    CRDH, only
DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 ZNSERVZCE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XI SCHEDULED COMPONENTS PAGE: 2 ure Head Nuts NUMBER: 00.0  
                                                            - - -           - -
X           X   X        X if made   availablc thru norm   drive maint., 1" above s below upper-J veld, Drives to bc dctermincd during each outage ~+LATER*w 630   DRV-44-XXXX(NC02)       NCTS         UT                                           Examine (2)    previously CRDH   Roll Repair       503783                                                     rolled areas to include X   - - -   X   X - -   X Region                                                                              volume of base material of 1" above C beld roll band, only   if made availablc thru norm drive maint., Drives to bc determined     during 1
* LATER* 4
 
0 DATE: 10/15/99                           NINE MILE POINT NUCLEAR PLANT UNIT 1                           PAGE: 2 REVISION:        0                        ZNSERVZCE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XI SCHEDULED COMPONENTS ure Head Nuts NUMBER: 00.0 INSPECTION INTERVAL                    PLAN STATUS            PRESERVICE YEAR FIRST        SECOND      THIRD SEC. XZ              PERIOD        PERIOD      PERZOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERZOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR INSTRUCTIONS
EXAMINATION AREA         CATEGY    NDE                  OUTAGE                          INSTRUCTIONS NUMBER     IDENTIFICATION           ITEM NO   METH   1 2 3 4   1   2 3 4   1 2 3 4 ++CALIBRATION BLOCK**
++CALIBRATION BLOCK**00.0 RPV (REF.DWG.NO.28A)002700 CH-01-N B-G-1 VT-1+AN/A**Closure Head Flange B6.10 Nuts X 002800 CH-02-N B-G-1 VT-1*~N/A+*Closure Head Flange B6.10 Nuts 3 X 002900 CH-03-N B-G-1*AN/A%1 Closure Head Flange B6.10 Nuts 3 X 003000 CH-04-N B-G-1 a 1N/Aa a Closure Head Flange B6.10 Nuts 3 X 003100 CH-05-N B-G-1 VT-1 Closure Head Flange B6.10 Nuts 3 X 003200 CH-06-N B-G-1 VT-1~~N/A~~Closure Head Flange B6.10 Nuts 3 X 003300 CH-07-N B-G-1 VT-1 aaN/Aaa Closure Head Flange B6.10 Nuts 3 X 003400 CH-08-N B-G-1 VT-1~+N/A**Closure Head Flange B6.10 Nuts 3 X  
: 00. 0 RPV (REF. DWG. NO. 28A) 002700     CH-01-N                 B-G-1     VT-1                                           +AN/A**
Closure Head Flange     B6.10 Nuts                                         X 002800   CH-02-N                 B-G-1     VT-1                                           *~N/A+*
Closure Head Flange     B6.10 3 X Nuts 002900     CH-03-N                 B-G-1                                                     *AN/A%1 Closure Head Flange     B6.10 3 X Nuts 003000   CH-04-N                   B-G-1                                                     a 1N/Aa a Closure Head Flange       B6.10 3 X Nuts 003100   CH-05-N                   B-G-1     VT-1 Closure Head Flange       B6.10 3 X Nuts 003200   CH-06-N                   B-G-1     VT-1                                           ~~N/A~~
Closure Head Flange       B6.10 3 X Nuts 003300   CH-07-N                   B-G-1     VT-1                                           aaN/Aaa Closure Head Flange       B6.10 3 X Nuts 003400   CH-08-N                   B-G-1     VT-1                                           ~+N/A**
Closure Head Flange       B6.10 Nuts                                       3 X


DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 INSERVZCE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XI SCHEDULED COMPONENTS PAGE: 3 ura Head Nuts NUMBER: 00.0  
DATE: 10/15/99                             NINE MILE POINT NUCLEAR PLANT UNIT 1                         PAGE: 3 REVISION:        0                            INSERVZCE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XI SCHEDULED COMPONENTS ura Head Nuts NUMBER: 00.0 INSPECTION INTERVAL                      PLAN STATUS            PRESERVICE YEAR ASME                FIRST        SECOND      THIRD SEC. XZ              PERIOD        PERZOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTZFZCATZON INSPECTION INTERVAL ASME SEC.XZ CATEGY NDE ITEM NO METH PLAN STATUS FIRST PERIOD SECOND PERZOD THIRD PERIOD-OUTAGE 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR INSTRUCTIONS
EXAMINATION AREA         CATEGY      NDE                - OUTAGE                        INSTRUCTIONS NUMBER     IDENTZFZCATZON           ITEM NO     METH   1 2 3 4   1   2 3 4   1 2 3 4 +*CALIBRATION BLOCK**
+*CALIBRATION BLOCK**003500 CH-09-N Closure Head Flange Nuts B-G-1 B6.10 3 X++N/A++003600 CH-10-N Closure Head Flange Nuts BG1 B6.10 3 X**N/A~~003700 CH-11-N Closure Head Flange Nuts B-G-1 B6.10 3 X**N/A**003800 CH-12-N Closuro Head Flange Nuts B G 1 B6.10 3 X**N/A*~003900 CH-13-N Closure Head Flange Nuts B-G-1 B6.10 X*AN/A1*004000 CH-14-N Closure Head Flange Nuts B" G-1 B6.10 3 X f f N/A*%004100 CH-15-N Closure Head Flange'uts B"G-1 B6.10 3 X*aN/Aas 004200 CH-16 N B-0" 1 VT 1**N/A++Closure Head Flange B6~10 Nuts 3 X  
003500   CH-09-N                   B-G-1                                                       ++N/A++
Closure Head Flange       B6. 10 3 X Nuts 003600    CH-10-N                  BG1                                                        **N/A~~
Closure Head Flange      B6. 10 3 X Nuts 003700     CH-11-N                   B-G-1                                                       **N/A**
Closure Head Flange      B6.10 3 X Nuts 003800     CH-12-N                   B G 1                                                       **N/A*~
Closuro Head Flange      B6.10 3 X Nuts 003900     CH-13-N                   B-G-1                                                       *AN/A1*
Closure Head Flange      B6. 10 Nuts                                            X 004000   CH-14-N                   B"G-1                                                       ffN/A*%
Closure Head Flange        B6. 10 3 X Nuts 004100   CH-15-N                   B"G-1                                                     *aN/Aas Closure Head Flange        B6.10
                                'uts                  3 X 004200   CH-16 N                   B-0"1       VT 1                                           **N/A++
Closure Head Flange       B6 10
                                        ~
3 X Nuts


DATE: 10/15/99 REVZSZON: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 ZNSERVICE INSPECTION TEN-YEAR PZAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 4 ure Head Nuts NUMBER: 00.0  
DATE: 10/15/99                             NINE MILE POINT NUCLEAR PLANT UNIT 1                           PAGE: 4 REVZSZON:        0                          ZNSERVICE INSPECTION TEN-YEAR PZAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS ure Head Nuts NUMBER:   00.0 INSPECTION INTERVAL                      PLAN STATUS            PRESERVICE YEAR ASME                FIRST        SECOND      THIRD SEC. XI            PERIOD        PERIOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL ASME SEC.XI CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR INSTRUCTIONS e iCALIBRATION BLOCK**004300 CH-17-N B-G-1 VT-1 Closure Head Flange B6.10 Nuts 3 X 004400 CH 18-N Closure Head Flange Nuts B G 1 B6.10 VT 1 3 X aeN/As*004500 CH-19-N I Closure Head Flange Nuts B-G-1 B6.10 3 X tkN/At 1 004600 CH-20-N Closure Head Flange Nuts B-G-1 B6.10 VT-1 3 X e*N/A*a 004700 CH-21-N Closure Head Flange Nuts B-G-1 B6.10 3 X eaN/A+a 004800 CH-22-N B-G-1 VT-1**N/A*%Closure Head Flange B6.10 Nuts 3 X 004900 CH 23-N Closure Head Flange Nuts B G-1 B6.10 3 X*~N/A~~005000 CH-24-N B-G-1 VT-1**N/A~~Closure Head Flange B6 F 10 Nuts 3 X  
EXAMINATION AREA         CATEGY      NDE                  OUTAGE                          INSTRUCTIONS NUMBER     IDENTIFICATION           ITEM NO     METH   1 2 3 4   1   2 3 4   1 2 3 4 e iCALIBRATION BLOCK**
004300     CH-17-N                 B-G-1       VT-1 Closure Head Flange     B6.10 3 X Nuts 004400     CH 18-N                 B G 1       VT 1                                             aeN/As*
Closure Head Flange      B6. 10 3 X Nuts 004500     CH-19-N                 B-G-1                                                       tkN/At1 I
Closure Head Flange      B6. 10 3 X Nuts 004600     CH-20-N                   B-G-1       VT-1                                             e*N/A*a Closure Head Flange      B6. 10 3 X Nuts 004700     CH-21-N                   B-G-1                                                       eaN/A+a Closure Head Flange      B6.10 Nuts                                        3 X 004800     CH-22-N                   B-G-1       VT-1                                           **N/A*%
Closure Head Flange       B6.10 3 X Nuts 004900     CH 23-N                 B G-1                                                       *~N/A~~
Closure Head Flange      B6.10 Nuts                                        3              X 005000     CH-24-N                 B-G-1       VT-1                                           **N/A~~
Closure Head Flange     B6 10 F
Nuts                                       3             X


DATE: 10/15/99 REVISZON: 0 NINE MILE POZNT NUCLEAR PLANT UNIT 1 ZNSERVZCE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XI SCHEDULED COMPONENTS PAGE: 5 ure Head Nuts NUMBER: 00.0  
DATE: 10/15/99                               NINE MILE POZNT NUCLEAR PLANT UNIT 1                           PAGE: 5 REVISZON:        0                            ZNSERVZCE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XI SCHEDULED COMPONENTS ure Head Nuts NUMBER:   00. 0 INSPECTION INTERVAL                        PLAN STATUS            PRESERVZCE YEAR ASME                FIRST        SECOND      THIRD SEC. XZ              PERIOD        PERIOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVZCE YEAR INSTRUCTIONS y yCALIBRATION BLOCKt a 005100 CH-25-N Closure Head Flange Nuts B-G-1 B6.10 VT-1 3 X**N/A4*005200 CH-26-N Closure Head Flange Nuts B-G-1 B6.10 VT 1 3 X 4 4N/Af*005300 CH-27-N Closure Head Flange Nuts B G 1 B6.10 3 X asN/AP+005400 CH-28-N Closure Head Flange Nuts B-G-1 B6.10 VT 1 3 X**N/A**005500 CH-29-N Closure Head Flange Nuts B-G-1 B6.10 VT-1 3 X aaN/Ass 005600 CH-30-N Closure Head Flange Nuts B-G-1 B6.10 3 X**N/As*005700 CH-31-N Closure Head Flange'uts B G-1 B6.10 VT-1 3 X 1*'N/A*0 005800 CH-32-N Closure Head Flange Nuts B-G-1 B6.10 3 X  
EXAMINATION AREA           CATEGY      NDE                  OUTAGE                          INSTRUCTIONS NUMBER     IDENTIFICATION             ITEM NO   METH     1 2 3 4   1   2 3 4   1 2 3 4 y yCALIBRATION BLOCKt a 005100   CH-25-N                   B-G-1       VT-1                                           **N/A4*
Closure Head Flange        B6. 10 3              X Nuts 005200     CH-26-N                   B-G-1       VT 1                                           4 4N/Af
* Closure Head Flange        B6. 10 3              X Nuts 005300     CH-27-N                   B  G 1                                                      asN/AP+
Closure Head Flange       B6. 10 3               X Nuts 005400     CH-28-N                   B-G-1       VT 1                                           **N/A**
Closure Head Flange        B6. 10 3              X Nuts 005500     CH-29-N                   B-G-1       VT-1                                           aaN/Ass Closure Head Flange        B6. 10 3              X Nuts 005600   CH-30-N                     B-G-1                                                       **N/As*
Closure Head Flange        B6.10 3              X Nuts 005700   CH-31-N                     B G-1       VT-1                                           1 *'N/A*0 Closure Head Flange        B6. 10
                                'uts                  3              X 005800   CH-32-N                     B-G-1 Closure Head Flange        B6.10 3               X Nuts


DATE: 10/15/99 REVISION: 0 NINE MZLE POINT NUCLEAR PLANT UNIT 1 ZNSERVICE INSPECTION TEN-YEAR PLAN CZASS 1 SECTION XI SCHEDULED COMPONENTS PAGE: 6 urc Head Nuts NUMBER: 00.0  
DATE: 10/15/99                             NINE MZLE POINT NUCLEAR PLANT UNIT 1                           PAGE: 6 REVISION:        0                          ZNSERVICE INSPECTION TEN-YEAR PLAN CZASS 1 SECTION   XI SCHEDULED COMPONENTS urc Head Nuts NUMBER:   00.0 INSPECTION INTERVAZ                      PLAN STATUS            PRESERVZCE YEAR ASME                  FIRST        SECOND      THIRD SEC. XZ                PERIOD        PERIOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER ZDENTIFZCATION INSPECTION INTERVAZ ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVZCE YEAR INSTRUCTIONS
EXAMINATION AREA         CATEGY      NDE                  OUTAGE                        INSTRUCTIONS NUMBER     ZDENTIFZCATION           ITEM   NO   METH   1 2 3 4   1   2 3 4   1 2 3 4 +~CALIBRATION BLOCK**
+~CALIBRATION BLOCK**005900 CH-33-N Closure Head Flange Nuts B-G-1 B6.10 VT-1 3 X**N/A~~006000 CH-34 N Closure Head Flange Nuts B-G-1 B6.10 3 X*~N/A~+006100 CH-35-N Closure Head Flange Nuts B-G"1 B6.10 3 X**N/A*I 006200 CH 36"N Closure Head Flange Nuts B-G-1 B6.10 3 X~~N/A~*006300 CH-37-N Closure Head Flange Nuts B-G-1 B6.10 3 X a*N/Aa*006400 CH-38-N Closure Head Flange Nuts B-G-1 B6.10 VT-1 X~~N/A~~006500 CH-39-N Closure Head Flange Nuts B-G" 1 B6.10 3 X*~N/A++006600 CH-40 N B G 1 VT-1**N/A*+Closure Head Flange B6.10 Nuts 3 X  
005900   CH-33-N                 B-G-1       VT-1                                           **N/A~~
Closure Head Flange      B6. 10 3              X Nuts 006000     CH-34 N                 B-G-1                                                       *~N/A~+
Closure Head Flange      B6.10 3              X Nuts 006100     CH-35-N                 B-G"1                                                       **N/A*I Closure Head Flange      B6. 10 3              X Nuts 006200     CH 36"N                 B-G-1                                                       ~~N/A~*
Closure Head Flange      B6. 10 3              X Nuts 006300     CH-37-N                 B-G-1                                                       a*N/Aa*
Closure Head Flange      B6. 10 3              X Nuts 006400   CH-38-N                   B-G-1       VT-1                                           ~~N/A~~
Closure Head Flange      B6.10 Nuts                                                        X 006500   CH-39-N                   B-G"1                                                       *~N/A++
Closure Head Flange      B6. 10 3              X Nuts 006600   CH-40   N                 B G 1       VT-1                                           **N/A*+
Closure Head Flange       B6.10 3               X Nuts


DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 ZNSERVZCE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 7 ure Head Nuts l~NUMBER: 00.0  
DATE: 10/15/99                               NINE MILE POINT NUCLEAR PLANT UNIT 1                           PAGE: 7 REVISION:          0                          ZNSERVZCE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS ure Head Nuts NUMBER: l~ 00. 0 INSPECTION INTERVAL                        PLAN STATUS            PRESERVICE YEAR ASME                FIRST        SECOND        THIRD SEC. XI            PERIOD        PERIOD        PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATZON AREA NUMBER IDENTIFICATION INSPECTION INTERVAL ASME SEC.XI CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR INSTRUCTIONS
EXAMINATZON AREA           CATEGY      NDE                OUTAGE                          INSTRUCTIONS NUMBER     IDENTIFICATION             ITEM NO   METH     1 2 3 4   1   2 3 4   1 2 3 4 **CALIBRATIONBLOCK~*
**CALIBRATION BLOCK~*006700 CH-41"N Closure Head Flange Nuts B-G-1 B6.10 3 X ttN/Af*006800 CH-42-N Closure Head Flange Nuts B G-1 B6.10 3 X*iN/Af4 006900 CH-43-N Closure Head Flange Nuts B G 1 B6.10 3 X+sN/A@a 007000 CH-44-N Closure Head Flange Nuts B-G 1 B6.10 3 X**N/A*+007100 CH 45-N Closure Head Flange Nu ts B-G-1 B6.10 3 X**N/A*%007200 CH-46-N Closure Head Flange Nuts B-G-1 B6.10 3 X**N/A~*007300 CH-47-'N Closure Head Flange'uts B-G-1 B6.10 VT 1 3 X j*N/A1*007400 CH-48-N Closure Head Flange Nuts B-G-l B6.10 3 X%AN/A*1  
006700     CH-41 "N                   B-G-1                                                       ttN/Af*
Closure Head Flange        B6. 10 3             X Nuts 006800     CH-42-N                   B G-1                                                       *iN/Af4 Closure Head Flange        B6.10 3             X Nuts 006900     CH-43-N                   B G 1                                                       +sN/A@a Closure Head Flange        B6. 10 3              X Nuts 007000     CH-44-N                   B-G 1                                                       **N/A*+
Closure Head Flange        B6. 10 3                            X Nuts 007100     CH   45-N                 B-G-1                                                       **N/A*%
Closure Head Flange        B6. 10 3                            X Nu ts 007200   CH-46-N                     B-G-1                                                       **N/A~*
Closure Head Flange        B6.10 3                            X Nuts 007300   CH-47-'N                   B-G-1       VT 1                                           j*N/A1*
Closure Head Flange        B6.10
                                'uts                  3                            X 007400   CH-48-N                     B-G-l                                                       %AN/A*1 Closure Head Flange        B6. 10 3                            X Nuts


DATE: 10/15/99 REVISION: 0 NZNE MILE POZNT NUCLEAR PIANT UNIT 1 I INSERVZCE INSPECTION TEN YEAR PLAN CLASS 1 SECTION XI SCHEDULED COMPONENTS PAGE: 8 urc Head Nuts NUMBER: 00.0  
DATE: 10/15/99                             NZNE MILE POZNT NUCLEAR PIANT UNIT 1                           PAGE: 8 I
REVISION:        0                          INSERVZCE INSPECTION TEN YEAR PLAN CLASS 1 SECTION XI SCHEDULED COMPONENTS urc Head Nuts NUMBER:   00.0 INSPECTION ZNTERVAI                      PLAN STATUS            PRESERVZCE YEAR ASME                FIRST        SECOND        THIRD SEC. XI            PERIOD        PERIOD        PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION ZNTERVAI ASME SEC.XI CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1-2 3 4 PRESERVZCE YEAR INSTRUCTIONS
EXAMINATION AREA         CATEGY      NDE                  OUTAGE                          INSTRUCTIONS NUMBER     IDENTIFICATION           ITEM NO     METH   1 2 3 4   1   2 3 4   1-2   3 4 <<*CALIBRATION BLOCK**
<<*CALIBRATION BLOCK**007500 CH"49-N Closure Head Flange Nuts B-G"1 B6.10 VT-1 3 X~~N/A~+007600 CH-50-N Closure Head Flango Nuts B-G-1 B6.10 3 X+*N/A+*007700 CH-51-N Closure Head Flange Nuts B-G-1 B6.10 3 X f iN/A*1 007800 CH-52-N Closure Head Flange Nuts B G-1 B6.10 VT 1 3 X*+N/A~~007900 CH-53-N Closure Head Flange Nuts B-G-1 B6.10 3 X f4N/A4*008000 CH-54-N Closure Head Flange Nuts B-G-1 B6.10 VT-1 3 X**N/A~~008100 CH-55-N Closure Head Flange Nuts B"G-1 B6.10 VT-1 3 X t*N/A**008200 CH-56-N B-G-1 VT 1++N/A~+Closure Head Flange B6.10 Nuts 3 X  
007500   CH"49-N                 B-G"1       VT-1                                             ~~N/A~+
Closure Head Flange      B6. 10 3                            X Nuts 007600     CH-50-N                 B-G-1                                                         +*N/A+*
Closure Head Flango      B6. 10 3                            X Nuts 007700     CH-51-N                 B-G-1                                                       f iN/A*1 Closure Head Flange      B6. 10 3                            X Nuts 007800     CH-52-N                 B G-1       VT 1                                             *+N/A~~
Closure Head Flange      B6. 10 3                            X Nuts 007900     CH-53-N                 B-G-1                                                       f4N/A4*
Closure Head Flange      B6. 10 3                             X Nuts 008000   CH-54-N                   B-G-1       VT-1                                             **N/A~~
Closure Head Flange      B6. 10 3                            X Nuts 008100   CH-55-N                   B"G-1       VT-1                                             t*N/A**
Closure Head Flange      B6. 10 3                            X Nuts 008200   CH-56-N                   B-G-1       VT 1                                           ++N/A~+
Closure Head Flange       B6. 10 3                             X Nuts


DATE: 10/15/99 REVISION: 0 NINE MILE POZNT NUCLEAR PLANT UNIT 1 ZNSERVICE INSPECTION TEN-YEAR PZAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 9 ure Head Nuts NUMBER: 00.0  
DATE: 10/15/99                               NINE MILE POZNT NUCLEAR PLANT UNIT 1                         PAGE: 9 REVISION:        0                            ZNSERVICE INSPECTION TEN-YEAR PZAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS ure Head Nuts NUMBER:   00.0 INSPECTION INTERVAL                        PIAN STATUS            PRESERVZCE YEAR ASME                  FIRST        SECOND        THIRD SEC. XZ                PERIOD      PERIOD        PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD PIAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVZCE YEAR INSTRUCTIONS
EXAMINATION AREA           CATEGY      NDE                OUTAGE                          INSTRUCTIONS NUMBER     IDENTIFICATION             ITEM NO     METH   1 2 3 4 1   2 3 4   1 2 3 4 ++CALIBRATION BLOCK*~
++CALIBRATION BLOCK*~008300 CH-57-N Closure Head Flange Nuts B-G-1 B6.10 VT 1 3 X++N/A++008400 CH-58-N Closure Head Flange Nuts B-G 1 B6.10 3 X 4*N/At 1 008500 CH-59-N Closure Head Flange Nuts B-G-1 B6.10 VT-1 3 X~1N/Al*008600 CH-60"N Closure Head Flange Nuts B-G-1 B6.10 3 X**N/A**008700 CH-61-N Closure Head Flange Nuts B-G-1 B6.10 3 X~*N/A**008800 CH-62 N Closure Head Flange Nuts B-G-1 B6.10 3 X 4%N/At 1 008900 CH-63-N Closure Head Flange'uts B-G-1 B6.10 3 X+*N/A~~009000 CH 64 N Closuro Head Flange Nuts B-G-1 B6.10 VT 1 3 X*IN/A**  
008300   CH-57-N                   B-G-1       VT 1                                           ++N/A++
Closure Head Flange        B6. 10 3                          X Nuts 008400     CH-58-N                   B-G   1                                                     4*N/At1 Closure Head Flange        B6.10 3                           X Nuts 008500     CH-59-N                   B-G-1       VT-1                                           ~1N/Al*
Closure Head Flange        B6. 10 3                            X Nuts 008600     CH-60"N                   B-G-1                                                       **N/A**
Closure Head Flange        B6. 10 3                            X Nuts 008700     CH-61-N                   B-G-1                                                       ~*N/A**
Closure Head Flange        B6. 10 3                            X Nuts 008800   CH-62   N                   B-G-1                                                       4 %N/At 1 Closure Head Flange        B6. 10 3                            X Nuts 008900   CH-63-N                     B-G-1                                                       +*N/A~~
Closure Head Flange        B6. 10
                                'uts                    3                            X 009000   CH 64 N                     B-G-1       VT 1                                           *IN/A**
Closuro Head Flange        B6. 10 3                            X Nuts


DATE: 10/15/99 REVZSZON: 0 NINE MILE POINT NUCLEAR PLANT UNZT 1 V INSERVZCE INSPECTION TEN-YEAR PIAN CLASS 1 SECTION XI SCHEDULED COMPONENTS PAGE: 10 urc Head Studs NUMBER: 00.0  
DATE: 10/15/99                             NINE MILE POINT NUCLEAR PLANT UNZT 1 V
PAGE: 10 REVZSZON:        0                          INSERVZCE INSPECTION TEN-YEAR PIAN CLASS 1 SECTION   XI SCHEDULED COMPONENTS urc Head Studs NUMBER:   00.0 INSPECTZON ZNTERVAL                      PLAN STATUS            PRESERVICE YEAR FIRST        SECOND      THIRD SEC. XZ                PERIOD        PERIOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTZON ZNTERVAL SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR INSTRUCTIONS
EXAMINATION AREA         CATEGY        NDE                OUTAGE                            INSTRUCTIONS NUMBER     IDENTIFICATION           ITEM NO     METH   1 2 3 4   1   2 3 4   1 2 3 4 ~ +CALIBRATION BLOCK**
~+CALIBRATION BLOCK**00.0 RPV (REF.DWG.NO.28A)009100 CH" 01-B B-G-1 UT Closure Head Flange B6.20 MT Studs 3 X Rcg.Guide 1.65, Surface exam when removed~+6.25-RPV-STUD+*
: 00. 0 RPV (REF. DWG. NO. 28A) 009100     CH" 01-B                 B-G-1         UT                                             Rcg. Guide 1.65, Surface Closure Head Flange      B6.20        MT                                            exam when removed 3 X Studs                                                                                ~ + 6. 25-RPV-STUD+*
009200 CH 02 B B-G 1 UT Closure Head Flange B6.20 MT 3 X Studs Rcg.Guide 1.65, Surface exam when removed**6.25-RPV-STUD**
009200     CH 02 B                 B-G 1         UT                                             Rcg. Guide 1.65, Surface Closure Head Flange      B6.20        MT                                            exam when removed 3 X Studs                                                                                **6.25-RPV-STUD**
009300 CH-03-B Closure Head Flange Studs B-G-1 UT B6.20 3 X Rcg.Guide 1.65, MT exam when removed~~6.25-RPV-STUD**
009300     CH-03-B                 B-G-1         UT                                             Rcg. Guide 1.65, MT exam Closure Head Flange      B6.20                                                        when removed 3 X Studs                                                                                ~~6.25-RPV-STUD**
009400 CH-04 B B-G-1 Closure Head Flange B6.20 Studs MT 3 X Rcg.Guide 1.65,Surface exam when removed*+6.25-RPV-STUD*+
009400     CH-04 B                   B-G-1                                                       Rcg. Guide 1.65,Surface Closure Head Flange      B6. 20        MT                                            exam when removed 3 X Studs                                                                                  *+6.25-RPV-STUD*+
009500 CH-05-B Closure Head Flange Studs B-G-1 UT B6.20 MT 3 X Rcg.Guide 1.65,Surface exam when removed~~6.25-RPV-STUD**
009500     CH-05-B                   B-G-1       UT                                             Rcg. Guide 1.65,Surface Closure Head Flange      B6.20        MT                                            exam when removed 3 X Studs                                                                                ~~6.25-RPV-STUD**
009600 CH 06 B B-G-1 UT Closure Head Flange B6 20 MT 3 X Studs Reg.Guide 1.65,Surface exam when removed~~6.25-RPV-STUD**
009600     CH 06 B                 B-G-1       UT                                             Reg. Guide 1.65,Surface Closure Head Flange      B6 20        MT                                            exam when removed 3 X Studs                                                                                ~~6.25-RPV-STUD**
009700 CH"07-B Closure Head Flange Studs B-G-1 UT B6.20 MT 3 X Rcg.Guide 1.65;Surface exam when removed**6.25 RPV-STUD+~
009700   CH"07-B                   B-G-1       UT                                             Rcg. Guide 1.65; Surface Closure Head Flange        B6.20        MT                                            exam when removed 3 X Studs                                                                                  **6.25     RPV-STUD+~
009800 CH-08-B Closure Head Flango Studs B-G-1 B6.20 3 X Rcg.Guide 1.65, MT when removed++6.25-RPV STUD++  
009800   CH-08-B                   B-G-1                                                       Rcg. Guide 1.65, MT when Closure Head Flango        B6.20                                                      removed 3 X Studs                                                                                  ++6.25-RPV STUD++


DATE: 10/15/99 REVISION: 0 NINE MZLE POINT NUCLEAR PLAIiT UNIT 1 INSERVICE INSPECTION TEN-YEAR PLAN CIASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 11 ure Head Studs NUMBER: 00.0  
DATE: 10/15/99                             NINE MZLE POINT NUCLEAR PLAIiT UNIT 1                         PAGE: 11 REVISION:        0                          INSERVICE INSPECTION TEN-YEAR PLAN CIASS 1 SECTION XZ SCHEDULED COMPONENTS ure Head Studs NUMBER:   00. 0 INSPECTION INTERVAL                    PLAN STATUS            PRESERVZCE YEAR ASME                FIRST        SECOND      THIRD SEC. XI              PERIOD      PERIOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL ASME SEC.XI CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVZCE YEAR INSTRUCTIONS
EXAMINATION AREA         CATEGY      NDE                OUTAGE                          INSTRUCTIONS NUMBER     IDENTIFICATION           ITEM NO     METH   1 2 3 4 1   2 3 4   1 2 3 4 ~ ~CALIBRATION BLOCK~*
~~CALIBRATION BLOCK~*009900 CH-09"B B-G-1 UT Closure Head Flange B6~20 MT 3 X Studs Rcg.Guide 1.65, MT when removed~~6.25 RPV-STUD++
009900     CH-09"B                 B-G-1       UT                                           Rcg. Guide 1.65, MT when Closure Head Flange      B6 20
010000 CH-10-B Closure Head Flange Studs B G-1 B6.20 MT 3 X Rcg.Guide 1.65,MT when removed~+NMP-6.25-RPV-STUD**
                                        ~      MT                                            removed 3 X                                    ~~6.25 RPV-STUD++
010100 CH-11-B B-G-1 UT Closure Head Flange B6.20 MT Studs 3 X Rcg.Guide 1.65, MT when removed*~6.25 RPV-STUD+*
Studs 010000     CH-10-B                 B G-1                                                     Rcg. Guide 1.65,MT when Closure Head Flange      B6. 20      MT                                            removed 3 X Studs                                                                              ~ +NMP-6. 25-RPV-STUD**
010200 CH-12-B Closure Head Flange Studs B-G-1 UT B6.20 MT 3 X Reg.Guide 1.65,MT exam when removed**6.25 RPV STUD++010300 CH-13"B Closure Head Flange Studs B-G-1 UT B6.20 MT 3 X Rcg.Guide 1.65,MT exam when rcmovcd*~6.25"RPV-STUD**
010100     CH-11-B                 B-G-1       UT                                           Rcg. Guide 1.65,   MT when Closure Head Flange      B6.20      MT                                            removed 3 X Studs                                                                              *~6.25 RPV-STUD+*
010400 CH-14-B Closure Head Flange Studs BG1 B6.20 MT 3 X Rcg.Guide 1.65, MT exam when removed~~6.25 RPV-STUD**
010200     CH-12-B                 B-G-1       UT                                           Reg. Guide 1.65,MT exam Closure Head Flange      B6.20      MT                                            when removed 3 X Studs                                                                              **6.25   RPV STUD++
010500 CH-15-B Closure Head Flange Studs B"G-l UT B6.20 3 X Rcg.Guide 1.65, MTexam when rcmovcd++6.25"RPV-STUD*~
010300     CH-13 "B                 B-G-1       UT                                           Rcg. Guide 1.65,MT exam Closure Head Flange      B6.20      MT                                            when rcmovcd 3 X Studs                                                                              *~6.25"RPV-STUD**
010600 CH-16-B Closure Head Flange Studs B-G"1 B6.20 MT 3 X Rcg.Guido 1.65, MT exam when removed*+6.25-RPV STUD*~  
010400   CH-14-B                   BG1                                                       Rcg. Guide 1.65, MT exam Closure Head Flange      B6. 20      MT                                            when removed 3 X Studs                                                                              ~~6.25 RPV-STUD**
010500   CH-15-B                   B "G-l     UT                                           Rcg. Guide 1.65, MTexam Closure Head Flange      B6.20                                                    when rcmovcd 3 X Studs                                                                              ++6.25"RPV-STUD*~
010600   CH-16-B                   B-G"1                                                     Rcg. Guido 1.65, MT exam Closure Head Flange      B6.20      MT                                            when removed 3 X Studs                                                                              *+6.25-RPV STUD*~


DATE: 10/15/99 REVISION: 0 NINE MILE POZNT NUCLEAR PLANT UNIT 1 ZNSERVZCE INSPECTZON TEN-YEAR PLAN CZASS 1 SECTION XI SCHEDULED COMPONENTS PAGE: 12 urc Head Studs NUMBER: 00.0  
DATE: 10/15/99                               NINE MILE POZNT NUCLEAR PLANT UNIT 1                             PAGE: 12 REVISION:        0                              ZNSERVZCE INSPECTZON TEN-YEAR PLAN CZASS 1 SECTION   XI SCHEDULED COMPONENTS urc Head Studs NUMBER:   00. 0 INSPECTION INTERVAL                          PLAN STATUS            PRESERVICE YEAR ASME                  FIRST        SECOND      THIRD SEC. XI              PERIOD        PERIOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMZNATZON AREA NUMBER IDENTIFICATION INSPECTION INTERVAL ASME SEC.XI CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR INSTRUCTIONS
EXAMZNATZON AREA           CATEGY      NDE                  OUTAGE                          INSTRUCTIONS NUMBER     IDENTIFICATION             ITEM   NO   METH   1 2 3 4   1   2 3 4   1 2 3 4 ~ +CALIBRATION BLOCX>> ~
~+CALIBRATION BLOCX>>~010700 CH-17-B Closure Head Flange Studs B-G-1 UT B6.20 MT 3 X Rcg.Guide 1.65, MT eaxm when removed+*6.25-RPV STUD~~010800 CH-18-B Closure Head Flange Studs B-G-1 UT B6.20 MT 3 X Rcg.Guide 1.65, MT exam when removed~~6.25-RPV-STUD~~
010700   CH-17-B                     B-G-1       UT                                             Rcg. Guide 1.65, MT eaxm Closure Head Flange        B6.20        MT                                            when removed 3 X Studs                                                                                    +*6.25-RPV STUD~~
010900 CH-19-B Closure Head Flango Studs B-G-1 UT B6.20 MT Reg.Guide 1.65,MT exam when removed**NMP-6.25-RPV-STUD**
010800     CH-18-B                     B-G-1       UT                                             Rcg. Guide 1.65, MT exam Closure Head Flange        B6.20        MT                                            when removed 3 X Studs                                                                                  ~~6.25-RPV-STUD~~
011000 CH-20-B Closure Head Flange Studs B-G 1 B6.20 MT 3 X Rcg.Guido 1.65,MT exam when removed**NMP 6.25 RPV-STUD++
010900     CH-19-B                     B-G-1       UT                                             Reg. Guide 1.65,MT exam Closure Head Flango        B6. 20      MT                                            when removed Studs                                                                                  **NMP-6.25-RPV-STUD**
011100 CH-21-B Closure Head Flange Studs B-G-1 UT B6.20 3 X Rcg.Guide 1.65, MT exam when removed~~NMP-6.25-RPV-STUD~*
011000     CH-20-B                     B-G 1                                                       Rcg. Guido 1.65,MT exam Closure Head Flange        B6.20        MT                                            when removed 3 X Studs                                                                                  **NMP 6. 25 RPV-STUD++
011200 CH-22-B Closure Head Flange Studs B-G-1 UT B6.20 3 X Rcg.Guide 1.65, MT exam when removed+~6.25-RPV"STUD**
011100     CH-21-B                     B-G-1       UT                                             Rcg. Guide 1.65,   MT exam Closure Head Flange        B6.20                                                      when removed 3 X Studs                                                                                  ~ ~NMP-6. 25-RPV-STUD~*
011300 CH-23-B Closure Head Flange'tuds B-G-1 UT B6.20 3 X Rcg.Guide 1.65,MT exam when removed**NMP 6.25-RPV-STUD+
011200     CH-22-B                     B-G-1       UT                                             Rcg. Guide 1.65,   MT exam Closure Head Flange          B6. 20                                                      when removed 3 X Studs                                                                                  +~6.25-RPV"STUD**
+011400 CH-24-B Closuro Hoad Flange Studs B-G-1 UT B6.20 MT 3 X Reg.Guide 1.65, MT exam when removed+*NMP-6.25-RPV-STUD**  
011300   CH-23-B                     B-G-1       UT                                             Rcg. Guide 1.65,MT exam Closure Head Flange          B6.20                                                      when removed 3              X
                                'tuds
                                                                                                  **NMP 6. 25-RPV-STUD+ +
011400   CH-24-B                     B-G-1       UT                                             Reg. Guide 1.65, MT exam Closuro Hoad Flange          B6. 20      MT                                            when removed 3              X Studs                                                                                    +*NMP-6. 25-RPV-STUD**


DATE: 10/15/99 REVISION: 0 NZNE MILE POINT NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION TEN-YEAR PZAN CLASS 1 SECTION XI SCHEDULED COMPONENTS PAGE: 13 ure Head Studs NUMBER: 00.0  
DATE: 10/15/99                             NZNE MILE POINT NUCLEAR PLANT UNIT 1                             PAGE: 13 REVISION:        0                          INSERVICE INSPECTION TEN-YEAR PZAN CLASS 1 SECTION XI SCHEDULED COMPONENTS ure Head Studs NUMBER: 00.0 INSPECTION INTERVAL                      PLAN STATUS            PRESERVZCE YEAR ASME                FIRST        SECOND      THIRD SEC. XZ              PERIOD        PERIOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVZCE YEAR INSTRUCTIONS
EXAMINATION AREA         CATEGY      NDE                  OUTAGE                          INSTRUCTIONS NUMBER     IDENTIFICATION           ITEM NO     METH   1 2 3 4   1   2 3 4   1 2 3 4 ~~CALIBRATION BLOCX**
~~CALIBRATION BLOCX**011500 CH-25-B B-G-1 UT Closure Head Flange B6.20 MT 3 X Studs Reg.Guide 1.65,MT exam when r~~~NMP-6.25-RPV-STVD**
011500   CH-25-B Closure Head Flange Studs B-G-1 B6.20 UT MT 3             X when  r~
011600 CH-26-B B-G 1 VT Closure Head Flange B6.20 MT 3 X Studs Rcg.Guide 1.65, MT when removed~+NMP-6.25-RPV-STUD~
Reg. Guide 1.65,MT exam
+011700 CH-27-B Closure Head Flange Studs B-G-1 UT B6.20 MT 3'I Rcg.Guide 1.65, MT exam when rcmovcd~~NMP"6.25-RPV-STVD**
                                                                                              ~ ~NMP-6 . 25-RPV-STVD**
011800 CH" 28-B Closure Head Flango Studs B-G-1 B6.20 MT 3 X Rcg.Guide 1.65, MT exam when rcmovcd~~NMP-6.25-RPV-STUD~~
011600     CH-26-B                 B-G 1       VT                                             Rcg. Guide 1.65,    MT when Closure Head Flange     B6.20       MT                                             removed 3               X Studs                                                                               ~ +NMP-6. 25-RPV-STUD~ +
011900 CH-29-B Closuro Head Flange Studs BG1 VT B6.20 MT 3 Reg.Guide 1.65, MT exam when rcmovcd~+6.25-RPV-STUD~~
                                                                                                  'I 011700     CH-27-B                 B-G-1       UT                                             Rcg. Guide 1.65, MT exam Closure Head Flange      B6.20      MT                                            when rcmovcd 3
012000 CH-30-B Closure Head Flange Studs B-G-1 UT B6.20 MT 3 X Rcg.Guido 1.65, MT exam when removed++6.25-RPV STUD~+012100 CH-31-B Closure Head Flange Studs B-G-1 UT B6.20 MT 3 X Rcg.Guide 1.65, MT exam when removed~+6.25-RPV STUD~~012200 CH-32-B Closure Head Flange Studs B-G 1 VT B6.20 MT 3 X Rcg.Guido 1.65, MT exam when rcmovcd**6.25 RPV-STUD++  
Studs                                                                              ~~NMP"6.25-RPV-STVD**
011800     CH" 28-B                 B-G-1                                                     Rcg. Guide 1.65,     MT exam Closure Head Flango      B6.20      MT                                            when rcmovcd 3              X Studs                                                                              ~ ~NMP-6. 25-RPV-STUD~~
011900     CH-29-B                 BG1         VT                                             Reg. Guide 1.65, MT exam Closuro Head Flange      B6.20      MT                                            when rcmovcd 3
Studs                                                                              ~+6.25-RPV-STUD~~
012000   CH-30-B                   B-G-1       UT                                             Rcg. Guido 1.65, MT exam Closure Head Flange      B6. 20      MT                                            when removed 3              X Studs                                                                              ++6.25-RPV STUD~+
012100   CH-31-B                   B-G-1       UT                                             Rcg. Guide 1.65, MT exam Closure Head Flange      B6.20      MT                                            when removed 3              X Studs                                                                                ~+6.25-RPV STUD~~
012200   CH-32-B                   B-G 1     VT                                             Rcg. Guido 1.65,     MT exam Closure Head Flange      B6.20      MT                                            when rcmovcd 3              X Studs                                                                                **6.25   RPV-STUD++


DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION TEN"YEAR PLAN CLASS 1 SECTION XI SCHEDULED COMPONENTS PAGE: 14 urc Head Studs NUMBER: 00.0  
DATE: 10/15/99                             NINE MILE POINT NUCLEAR PLANT UNIT 1                           PAGE: 14 REVISION:        0                          INSERVICE INSPECTION TEN"YEAR PLAN CLASS 1 SECTION XI SCHEDULED COMPONENTS urc Head Studs NUMBER:   00. 0 INSPECTION INTERVAL                      PLAN STATUS            PRESERVICE YEAR ASME                  FIRST        SECOND      THIRD SEC. XZ                PERIOD        PERIOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR INSTRUCTIONS
EXAMINATION AREA         CATEGY      NDE                  OUTAGE                          INSTRUCTIONS NUMBER     IDENTIFICATION           ITEM NO     METH   1 2 3 4   1   2 3 4   1 2 3 4 ~ ~CALIBRATION BLOCK~*
~~CALIBRATION BLOCK~*012300 CH-33-B B-G 1 UT Closure Head Flange B6.20 3 X Studs Reg.Guide 1.65, MT exam when rcmovcd~~6.25"RPV-STUD*~
012300   CH-33-B                 B-G   1       UT                                           Reg. Guide 1.65, MT exam Closure Head Flange      B6.20                                                      when rcmovcd 3              X Studs                                                                                ~~6.25"RPV-STUD*~
012400 CH-34-B B-G-1 UT Closure Head Flange B6~20 MT 3 X Studs Reg.Guide 1.65, MT exam when removed**6'5-RPV-STUD**
012400   CH-34-B                 B-G-1       UT                                             Reg. Guide 1.65,   MT exam Closure Head Flange      B6 20
012500 CH-35-B Closure Head Flange Studs B-G-l UT B6.20 MT 3 X Reg.Guide 1.65, MT exam when removed~+6.25-RPV-STUD++
                                      ~        MT                                            when removed 3              X Studs                                                                                **6'5-RPV-STUD**
012600 CH 36-B Closure Head Flange Studs B-G-1 B6.20 3 X Rcg.Guide 1.65,MT exam when rcmovcd+*6.25 RPV STUD++012700 CH-37-B Closure Head Flange Studs B-G-1 B6.20 X Reg.Guide 1.65,MT exam when removed*~6.25 RPV-STUD~~
012500     CH-35-B                 B-G-l       UT                                             Reg. Guide 1.65, MT exam Closure Head Flange      B6. 20      MT                                            when removed 3              X Studs                                                                                ~+6.25-RPV-STUD++
012800 CH-38-B B-G-1 UT Closure Head Flange B6.20 MT 3 X Studs Reg.Guide 1.65,MT exam when rcmovcd~~6.25-RPV-STUD~~
012600     CH 36-B                 B-G-1                                                       Rcg. Guide 1.65,MT exam Closure Head Flange      B6.20                                                      when rcmovcd 3              X Studs                                                                                +*6.25   RPV STUD++
012900 CH-39-B Closure Head Flange Studs B" G-1 UT B6.20 MT 3 X Reg.Guide 1.65, MT exam when removed~*6.25-RPV-STUD**
012700   CH-37-B                   B-G-1                                                       Reg. Guide 1.65,MT exam Closure Head Flange      B6.20                                                      when removed Studs                                                        X                        *~6.25   RPV-STUD~~
013000 CH 40 B B-G-1 Closure Head Flange B6.20 Studs 3 X Rcg.Guide 1.65,MT exam when rcmovcd~+6.25-RPV STUD**  
012800   CH-38-B                   B-G-1       UT                                             Reg. Guide 1.65,MT exam Closure Head Flange      B6.20        MT                                            when rcmovcd 3              X Studs                                                                                ~~6.25-RPV-STUD~~
012900   CH-39-B                   B"G-1       UT                                             Reg. Guide 1.65, MT exam Closure Head Flange      B6. 20      MT                                            when removed Studs                                        3              X                        ~*6.25-RPV-STUD**
013000   CH 40 B                   B-G-1                                                       Rcg. Guide 1.65,MT exam Closure Head Flange      B6. 20                                                      when rcmovcd 3              X Studs                                                                                ~+6.25-RPV STUD**


DATE: 10/15/99 REVISION: 0 NZNE MILE POINT NUCLEAR PLANT UNIT 1 ZNSERVICE INSPECTION TEN YEAR PLAN CLASS 1 SECTION XI SCHEDULED COMPONENTS PAGE: 15 ure Head Studs NUMBER: 00.0  
DATE: 10/15/99                             NZNE MILE POINT NUCLEAR PLANT UNIT 1                           PAGE: 15 REVISION:        0                          ZNSERVICE INSPECTION TEN YEAR PLAN CLASS 1 SECTION XI SCHEDULED COMPONENTS ure Head Studs NUMBER:   00. 0 INSPECTION ZNTERVAI                      PIAN STATUS              PRESERVZCE YEAR ASME                FIRST        SECOND        THIRD SEC. XZ              PERIOD        PERIOD        PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION ZNTERVAI ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD PIAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVZCE YEAR INSTRUCTIONS
EXAMINATION AREA         CATEGY      NDE                OUTAGE                            INSTRUCTIONS NUMBER     IDENTIFICATION           ITEM NO     METH   1 2 3 4   1   2 3 4   1 2 3 4 **CALIBRATIONBLOCK**
**CALIBRATION BLOCK**013100 CH-41-B Closure Head Flange Studs B-G-1 UT B6.20 3 X Reg.Guide 1.65, MT exam when removed a+6.25 RPV STUD*a 013200 CH-42-B B-G 1 UT Closure Head Flange B6.20 MT 3 X Studs Rcg.Guide 1.65, MT exam when removed~~6.25-RPV-STUD+~
013100     CH-41-B                 B-G-1       UT                                               Reg. Guide 1.65,   MT exam Closure Head Flange      B6.20                                                        when removed 3            X Studs                                                                                a+6.25 RPV STUD*a 013200     CH-42-B                 B-G 1       UT                                               Rcg. Guide 1.65, MT exam Closure Head Flange      B6.20      MT                                              when removed 3              X Studs                                                                                ~~6.25-RPV-STUD+~
013300 CH-43-B Closure Head Flange Studs B-G-1 B6.20 3 X Reg.Guide 1.65, MT exam when removed**6.25-RPV-STUD+*
013300     CH-43-B                 B-G-1                                                       Reg. Guide 1.65, MT exam Closure Head Flange      B6. 20                                                      when removed 3              X Studs                                                                                **6.25-RPV-STUD+*
013400 CH-44-B B-G-1 UT Closure Head Flange B6~20 MT Studs X Reg.Guide 1.65,MT exam when removed*+6~25-RPV-STUD*+
013400     CH-44-B                 B-G-1       UT                                             Reg. Guide 1.65,MT exam Closure Head Flange      B6 20
013500 CH-45-B B-G-1 UT Closure Head Flange B6.20 MT 3 Studs X Reg.Guide 1.65, MT exam when removed~~6.25-RPV-STUD**
                                      ~        MT                                              when removed Studs                                                                    X            *+6 25-RPV-STUD*+
013600 CH-46"B Closure Head Flange Studs B-G-1 UT B6.20 MT 3 X Reg.Guide 1.65, MT exam when removed~*6.25-RPV-STUD**
                                                                                                    ~
013700 CH-47-B Closure Head Flange Studs B-G-1 B6.20 3 X Reg.Guide 1.65,MT exam when removed~~6.25-RPV-STUD**
013500     CH-45-B                 B-G-1       UT                                             Reg. Guide 1.65, MT exam Closure Head Flange      B6.20      MT                                              when removed 3                            X Studs                                                                                ~~6.25-RPV-STUD**
013800 CH-48-B Closure Head Flange Studs B-G-1 UT B6.20 MT 3 X Reg.Guide 1.65, MT exam when removed~~6.25-RPV-STUD**  
013600   CH-46"B                   B-G-1       UT                                             Reg. Guide 1.65, MT exam Closure Head Flange      B6.20      MT                                              when removed 3                            X Studs                                                                                ~*6.25-RPV-STUD**
013700   CH-47-B                   B-G-1                                                       Reg. Guide 1.65,MT exam Closure Head Flange      B6.20                                                      when removed 3                            X Studs                                                                                ~~6.25-RPV-STUD**
013800   CH-48-B                   B-G-1       UT                                             Reg. Guide 1. 65,   MT Closure Head Flange      B6.20      MT                                             exam when removed 3                            X Studs                                                                                ~~6.25-RPV-STUD**


DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PIANT UNIT 1 ZNSERVZCE ZNSPECTZON TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 16 ure Head Studs NUMBER: 00.0  
DATE: 10/15/99                             NINE MILE POINT NUCLEAR PIANT UNIT 1                             PAGE: 16 REVISION:        0                            ZNSERVZCE ZNSPECTZON TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS ure Head Studs NUMBER:   00. 0 INSPECTION INTERVAL                      PLAN STATUS            PRESERVICE YEAR ASME                                SECOND      THIRD SEC. XZ                PERIOD      PERIOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL ASME SEC.XZ CATEGY NDE ITEM NO METH'IRST PERIOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR INSTRUCTIONS
EXAMINATION AREA         CATEGY METH'IRST NDE                OUTAGE                         INSTRUCTIONS NUMBER    IDENTIFICATION          ITEM    NO            1 2 3 4 1   2 3 4   1 2 3 4 ~ ~CALIBRATION BLOCK~~
~~CALIBRATION BLOCK~~013900 CH 49 B B-G-1 UT Closure Head Flange B6.20 MT 3 Studs X Reg.Guide 1.65, MT exam when removed++6.25 RPV-STUD++
013900     CH 49 B                 B-G-1         UT                                           Reg. Guide 1.65,     MT exam Closure Head Flange      B6. 20        MT                                            when removed 3                          X          ++6.25 RPV-STUD++
014000 CH-50-B B"G" 1 UT Closure Head Flange B6~20 MT Studs 3 X Rcg.Guide 1.65, MT exam when removed++6.25 RPV-STUD++
Studs 014000     CH-50-B                 B"G"1         UT                                           Rcg. Guide 1.65, MT exam Closure Head Flange      B6 ~ 20      MT                                            when removed 3                            X Studs                                                                                ++6.25 RPV-STUD++
014100 CH-51-B B-G-1 UT Closure Head Flange B6.20 MT 3 Studs Rcg.Guide 1.65, MT exam when removed~~6.25-RPV-STUD*~
014100     CH-51-B                 B-G-1         UT                                           Rcg. Guide 1.65, MT exam Closure Head Flange      B6.20        MT                                            when removed 3
014200 CH-52-B Closure Head Flange Studs B-G-1 B6.20 MT 3 Reg.Guide 1.65, MT exam when removed~~NMP-6.25-RPV-STUD~
Studs                                                                                ~~6.25-RPV-STUD*~
~014300 CH-53-B Closure Head Flange Studs B-G 1 B6.20 MT 3 X Reg.Guide 1.65, MT exam when removed++NMP-6.25 RPV STUD*t 014400 CH-54-B Closure Head Flange Studs B-G-1 UT B6.20 MT 3 X Rcg.Guide 1.65, MT exam when removed~~6.25 RPV-STUD~~
014200     CH-52-B                 B-G-1                                                       Reg. Guide 1.65,     MT Closure Head Flange      B6.20        MT                                           exam when removed 3
014500 CH-55-B B-G-1 UT Closure Head Flange'6~20 Studs 3 X Rcg.Guide 1.65, MT exam when removed~~NMP" 6.25-RPV-STUD+~
Studs                                                                                ~ ~NMP-6. 25-RPV-STUD~ ~
014600 CH"56-B B-G-1 UT Closure Head Flange B6~20 MT 3 Studs Rcg.Guide 1.65, MT exam when rcmovcd~~NMP-6.25-RPV-STUD*>>  
014300     CH-53-B                 B-G   1                                                     Reg. Guide 1.65, MT exam Closure Head Flange      B6.20        MT                                            when removed 3                            X Studs                                                                                ++NMP-6.25 RPV STUD*t 014400     CH-54-B                 B-G-1         UT                                           Rcg. Guide 1.65, MT exam Closure Head Flange      B6.20        MT                                            when removed 3                            X Studs                                                                                ~~6.25 RPV-STUD~~
014500   CH-55-B Closure Head Flange Studs
                                '6  B-G-1
                                      ~ 20 UT 3                           X Rcg. Guide 1.65, MT exam when removed
                                                                                                ~~NMP" 6. 25-RPV-STUD+~
014600   CH"56-B                   B-G-1         UT                                           Rcg. Guide 1.65, MT exam Closure Head Flange      B6 20
                                      ~          MT                                            when rcmovcd 3
Studs                                                                                ~~NMP-6.25-RPV-STUD*>>


DATE: 10/15/99 REVZSZON: 0 NINE MILE POINT NUCLEAR PLANT UNZT 1 INSERVZCE INSPECTION TEN-YEAR PIAN CLASS 1 SECTION XI SCHEDULED COMPONENTS PAGE: 17 urc Head Studs NUMBER: 00.0  
DATE: 10/15/99                               NINE MILE POINT NUCLEAR PLANT UNZT 1                           PAGE: 17 REVZSZON:        0                            INSERVZCE INSPECTION TEN-YEAR PIAN CLASS 1 SECTION XI SCHEDULED COMPONENTS urc Head Studs NUMBER:   00. 0 INSPECTION INTERVAL                        PLAN STATUS            PRESERVICE YEAR ASME                FIRST        SECOND      THIRD SEC. XZ              PERIOD        PERZOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER ZDENTIFZCATION INSPECTION INTERVAL ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERZOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR INSTRUCTIONS
EXAMINATION AREA           CATEGY    NDE                  OUTAGE                          INSTRUCTIONS NUMBER     ZDENTIFZCATION             ITEM NO   METH   1 2 3 4   1   2 3 4   1 2 3 4 ~~CALIBRATION BLOCK~~
~~CALIBRATION BLOCK~~014700 CH-57-B BG1 UT Closure Head Flange B6 20 3 Studs Reg.Guide 1.65, MT exam when removed~~NMP-6.25-RPV-STUD~*
014700     CH-57-B                     BG1         UT                                           Reg. Guide 1.65, MT exam Closure Head Flange        B6 20                                                    when removed 3
014800 CH-58-B Closure Head Flange Studs B G 1 UT B6.20 MT 3 X Rcg.Guide 1.65, MT exam when removed~~NMP-6.25-RPV-STUD~
Studs                                                                                ~~NMP-6.25-RPV-STUD~*
~014900 CH-59-B B-G-1 UT Closure Head Flange B6.20 MT 3 Studs Reg.Guide 1.65, MT exam when removed+*6~25-RPV-STUD+*
014800     CH-58-B                     B G 1       UT                                           Rcg. Guide 1.65,     MT Closure Head Flange        B6.20      MT                                           exam when removed 3                            X Studs                                                                                ~ ~NMP-6. 25-RPV-STUD~ ~
015000 CH-60-B Closure Head Flange Studs B-G-l B6.20 3 Rcg.Guide 1.65, MT exam when removed~~NMP-6.25-RPV-STUD~*
014900     CH-59-B                     B-G-1       UT                                           Reg. Guide 1.65, MT exam Closure Head Flange        B6.20      MT                                            when removed 3                                        +*6 25-RPV-STUD+*
015100 CH-61-B BG1 Closure Head Flange B6.20 Studs 3 X Rcg.Guide 1.65, MT exam when removed aaNMP-6.25-RPV STUDa~015200 CH-62-B B-G-1 UT Closure Head Flange B6.20 MT 3 Studs Rcg.Guide 1.65, MT exam when removed**NMP-6.25-RPV STUDY'015300 CH-63-B Closure Head Flange'tuds B-G-1 B6.20 3 Rcg.Guide 1.65, MT exam when removed~~NMP-6.25-RPV-STUD**
Studs                                                                                    ~
015400 CH-64-B Closure Head Flange Studs B-G-1 UT B6.20 MT 3 X Rcg.Guide 1.65, MT exam when removed~*6.25-RPV-STUD~~  
015000     CH-60-B                     B-G-l                                                     Rcg. Guide 1.65, MT exam Closure Head Flange        B6.20                                                    when removed 3
Studs                                                                                ~~NMP-6.25-RPV-STUD~*
015100     CH-61-B                     BG1                                                       Rcg. Guide 1.65, MT exam Closure Head Flange        B6.20                                                    when removed 3                            X Studs                                                                                aaNMP-6.25-RPV STUDa ~
015200     CH-62-B                     B-G-1     UT                                             Rcg. Guide 1.65, MT Closure Head Flange        B6.20      MT                                            exam when removed 3
Studs                                                                                **NMP-6.25-RPV STUDY' 015300     CH-63-B                     B-G-1                                                     Rcg. Guide 1.65, MT exam Closure Head Flange          B6.20                                                    when removed 3
                                'tuds
                                                                                                ~~NMP-6.25-RPV-STUD**
015400   CH-64-B                     B-G-1     UT                                             Rcg. Guide 1.65,   MT exam Closure Head Flange          B6.20      MT                                            when removed 3                            X Studs                                                                                  ~*6. 25-RPV-STUD~~


DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION TEN-YEAR PLAN CIASS 1 SECTION XI SCHEDULED COMPONENTS PAGE: 18 ure Head Studs NUMBER: 00.0  
DATE: 10/15/99                           NINE MILE POINT NUCLEAR PLANT UNIT 1                         PAGE: 18 REVISION:        0                        INSERVICE INSPECTION TEN-YEAR PLAN CIASS 1 SECTION XI SCHEDULED COMPONENTS ure Head Studs NUMBER: 00. 0 INSPECTION INTERVAL                    PIAN STATUS            PRESERVICE YEAR ASME                FIRST        SECOND      THIRD SEC. XZ              PERIOD      PERIOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTZPZCATZON INSPECTION INTERVAL ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD PIAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR INSTRUCTIONS
EXAMINATION AREA         CATEGY    NDE                OUTAGE                          INSTRUCTIONS NUMBER   IDENTZPZCATZON           ITEM NO   METH   1 2 3 4 1   2 3 4   1 2 3 4 +'~CALIBRATION BLOCK++
+'~CALIBRATION BLOCK++015500 CH-XX-B B-G-1 MT Closure Head Plangc B6.30 Studs 3 X---X X Per RG 1.65, a minimum of 4 studs vill be examLncd each period for a total of 12.**N/A*~  
015500   CH-XX-B                 B-G-1     MT                                           Per  RG  1.65, a minimum Closure Head Plangc     B6.30                                                   of  4  studs vill be Studs                                   3 X   - - -   X             X         examLncd each period for a total of 12. **N/A*~


DATE: 10/15/99 REVISION: 0 NZNE MILE POINT NUCLEAR PLANT UNIT 1 INSERVZCE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 19 ure Head Washcrs NUMBER: 00.0  
DATE: 10/15/99                           NZNE MILE POINT NUCLEAR PLANT UNIT 1                         PAGE: 19 REVISION:        0                        INSERVZCE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS ure Head Washcrs NUMBER:   00.0 INSPECTION INTERVAL                      PLAN STATUS            PRESERVZCE YEAR ASME                FIRST        SECOND      THIRD SEC. XI            PERIOD        PERIOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL ASME SEC.XI CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVZCE YEAR INSTRUCTIONS
EXAMINATION AREA       CATEGY      NDE                OUTAGE                        INSTRUCTIONS NUMBER     IDENTIFICATION         ITEM NO     METH   1 2 3 4   1   2 3 4   1 2 3 4 **CALIBRATIONBLOCK**
**CALIBRATION BLOCK**00.0 RPV (REF.DWG.NO.28)015600 RV-01-TA B-G 1 VT-1 Reactor Vessel Flange B6.50 Washer 3 X 015700 RV-01-TB BG-1VT1 Reactor Vcsscl Flange B6~50 Washer 3 X 015800 RV-02" TA B-G 1 VT 1 Reactor Vessel Flange B6 F 50 Washer 3 X 015900 RV-02"TB B-G-1 VT-1 Reactor Vessel Flange B6.50 Washer 3 X 016000 RV-03-TA B-G-1 VT-1 Reactor Vcsscl Flange B6 F 50 Washer 3 X 016100 RV-03-TB B-G"1 Reactor Vcsscl Flange B6~50 Washer 3 X 016200 RV-04 TA B-G-1 VT-1 Reactor Vcsscl Flange B6~50 Washer 3 X 016300 RV-04 TB B-G-1 Reactor Vcsscl Flange B6.50 Washer 3 X  
: 00. 0 RPV (REF. DWG. NO. 28) 015600     RV-01-TA               B-G 1       VT-1 Reactor Vessel Flange   B6.50 3 X Washer 015700     RV-01-TB               BG-1VT1 Reactor Vcsscl Flange   B6 50~
3 X Washer 015800     RV-02"TA               B-G 1       VT 1 Reactor Vessel Flange   B6 50 F
3 X Washer 015900     RV-02"TB               B-G-1       VT-1 Reactor Vessel Flange   B6.50 3 X Washer 016000     RV-03-TA               B-G-1       VT-1 Reactor Vcsscl Flange   B6 50 F
3 X Washer 016100   RV TB               B-G"1 Reactor Vcsscl Flange   B6 50
                                      ~
3 X Washer 016200   RV-04 TA                 B-G-1       VT-1 Reactor Vcsscl Flange   B6 50
                                      ~
3 X Washer 016300   RV-04 TB                 B-G-1 Reactor Vcsscl Flange   B6.50 3 X Washer


DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PZANT UNIT 1 N.INSERVZCE INSPECTION TEN-YEAR PIAN CLASS 1 SECTION XI SCHEDULED COMPONENTS PAGE: 20 ure Head Washers NUMBER: 00.0  
DATE: 10/15/99                           NINE MILE POINT NUCLEAR PZANT UNIT 1                           PAGE: 20 N.
REVISION:        0                          INSERVZCE INSPECTION TEN-YEAR PIAN CLASS 1 SECTION   XI SCHEDULED COMPONENTS ure Head Washers NUMBER: 00.0 INSPECTION INTERVAL                        PLAN STATUS            PRESERVICE YEAR ASME                  FIRST        SECOND      THIRD SEC. XZ                PERIOD        PERIOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR INSTRUCTIONS
EXAMINATION AREA       CATEGY        NDE                  OUTAGE                        INSTRUCTIONS NUMBER     IDENTIFICATION         ITEM NO       METH   1 2 3 4   1   2 3 4   1 2 3 4 **CALIBRATIONBLOCK~ ~
**CALIBRATION BLOCK~~016400 RV-05-TA BG1VT1 Reactor Vessel Flange B6.50 Washer 3 X 016500 RV-05-TB B G-l VT-1 Reactor Vessel Flange B6~50 Washer 3 X 016600 RV-06-TA B-G-1 Reactor Vessel Flange B6.50 Washer 3 X 016700 RV-06-TB B-G-1 Reactor Vessel Flange B6~50 Washer 3 X 016800 RV-07-TA B G-1 VT-1 Reactor Vessel Flange B6~50 Washer 3 X 016900 RV-07-TB B-G-1 Reactor Vessel Flange B6.50 Washer 3 X 017000 RV-08-TA B-G 1 VT 1 Reactor Vessel Flange B6 50 Washer 3 X 017100 RV-08-TB B-G-1 VT-1 Reactor Vessel Flange B6~50 Washer X  
016400     RV-05-TA               BG1VT1 Reactor Vessel Flange   B6.50 3 X Washer 016500     RV-05-TB               B G-l       VT-1 Reactor Vessel Flange   B6 50~
3 X Washer 016600     RV-06-TA               B-G-1 Reactor Vessel Flange   B6. 50 3 X Washer 016700     RV-06-TB               B-G-1 Reactor Vessel Flange   B6 50
                                      ~
3 X Washer 016800     RV-07-TA               B G-1       VT-1 Reactor Vessel Flange   B6 50
                                      ~
3 X Washer 016900   RV-07-TB                 B-G-1 Reactor Vessel Flange   B6.50 3 X Washer 017000   RV-08-TA                 B-G 1       VT 1 Reactor Vessel Flange   B6 50 3 X Washer 017100   RV-08-TB                 B-G-1       VT-1 Reactor Vessel Flange   B6 50
                                      ~
Washer                                         X


DATE: 10/15/99 REVISION: 0 NZNE MILE POINT NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 21 ure Head Washcrs NUMBER: 00.0  
DATE: 10/15/99                           NZNE MILE POINT NUCLEAR PLANT UNIT 1                         PAGE: 21 REVISION:        0                        INSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS ure Head Washcrs NUMBER: 00.0 INSPECTION INTERVAL                      PLAN STATUS            PRESERVICE YEAR ASME                FIRST        SECOND      THIRD SEC. XZ              PERIOD        PERIOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL ASME SEC.XZ CATEGY NDE ITEM NO METH PLAN STATUS FIRST PERIOD THIRD PERIOD SECOND PERIOD OUTAGE 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR ZNSTRUCTIONS
EXAMINATION AREA       CATEGY      NDE                OUTAGE                        ZNSTRUCTIONS NUMBER     IDENTIFICATION         ITEM NO     METH   1 2 3 4   1   2 3 4   1 2 3 4 ~~CALIBRATION BLOCK~~
~~CALIBRATION BLOCK~~017200 RV-09-TA B-G 1 VT-1 Reactor Vcsscl Flange B6~50 Washer X 017300 RV-09-TB B G 1 VT 1 Reactor Vessel Flange Washer 3 X 017400 RV-10"TA B-G-1 VT-1 Reactor Vessel Flange B6.50 Washer 3 X 017500 RV-10 TB B-G-1 Reactor Vessel Flange B6.50 washer VT 1 3 X 017600 RV-11-TA B"G 1 VT-1 Reactor Vcsscl Flange B6.50 Washer 3 X 017700 RV-11-TB B-G-1 VT-1 Reactor Vessel Flange B6.50 Washer 3 X 017800 RV-12-TA B-G-1 Reactor Vessel Flange B6.50 Washer 3 X 017900 RV-12-TB B-G-1 VT 1 Reactor Vcsscl Flange B6.50 Washer 3 X  
017200     RV TA               B-G 1       VT-1 Reactor Vcsscl Flange   B6 50
                                      ~
X Washer 017300     RV-09-TB               B G 1       VT 1 Reactor Vessel Flange 3 X Washer 017400     RV-10 "TA               B-G-1       VT-1 Reactor Vessel Flange   B6.50 3 X Washer 017500     RV-10 TB               B-G-1      VT 1 Reactor Vessel Flange   B6.50 3 X washer 017600     RV-11-TA               B"G 1     VT-1 Reactor Vcsscl Flange   B6.50 3 X Washer 017700     RV-11-TB               B-G-1       VT-1 Reactor Vessel Flange   B6.50 3 X Washer 017800     RV-12-TA               B-G-1 Reactor Vessel Flange   B6.50 3 X Washer 017900   RV-12-TB                 B-G-1       VT 1 Reactor Vcsscl Flange   B6.50 3 X Washer


DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 ZNSERVZCE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 22 ure Head Washers NUMBER: 00.0  
DATE: 10/15/99                             NINE MILE POINT NUCLEAR PLANT UNIT 1                         PAGE: 22 REVISION:        0                          ZNSERVZCE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS ure Head Washers NUMBER: 00.0 INSPECTION ZNTERVAZ                      PIJN STATUS            PRESERVZCE YEAR ASME                  FIRST        SECOND      THIRD SEC. XI            PERIOD        PERIOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION ZNTERVAZ ASME SEC.XI CATEGY NDE ITEM NO METH FIRST PERIOD PIJN STATUS SECOND PERIOD-OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVZCE YEAR INSTRUCTIONS
EXAMINATION AREA       CATEGY      NDE                -OUTAGE                        INSTRUCTIONS NUMBER     IDENTIFICATION         ITEM NO     METH     1 2 3 4   1   2 3 4   1 2 3 4 ~*CALIBRATION BLOCK**
~*CALIBRATION BLOCK**018000 RV-13-TA B-G-1 VT-1 Reactor Vessel Flange B6.50 Washer 3 X 018100 RV-13-TB BG1 Reactor Vessel Flange B6~50 Washer 3 X 018200 RV-14-TA B-G-1 Reactor Vessel Flange B6.50 Washer 3 X 018300 RV-14 TB B G-1 VT 1 Reactor Vessel Flange B6 F 50 Washer 3 X 018400 RV-15-TA B-G-1 VT-1 Reactor Vcsscl Flange B6.50 Washer 3 X 018500 RV-15 TB B-G-1 VT 1 Reactor Vessel Flange B6.50 washer 3 X 018600 RV-16-TA B-G-1 VT-1 Reactor Vcsscl Flange Washer 3 X 018700 RV-16-TB BG1VT1 Reactor Vessel Flange B6~50 Washer 3 X  
018000     RV-13-TA               B-G-1       VT-1 Reactor Vessel Flange   B6.50 3 X Washer 018100     RV-13-TB               BG1 Reactor Vessel Flange   B6 50
                                      ~
3 X Washer 018200     RV-14-TA               B-G-1 Reactor Vessel Flange   B6.50 3 X Washer 018300     RV-14 TB               B G-1       VT 1 Reactor Vessel Flange   B6 50 F
3 X Washer 018400     RV-15-TA               B-G-1       VT-1 Reactor Vcsscl Flange   B6.50 3 X Washer 018500   RV-15 TB                 B-G-1       VT 1 Reactor Vessel Flange   B6.50 3 X washer 018600   RV-16-TA                 B-G-1       VT-1 Reactor Vcsscl Flange 3 X Washer 018700   RV-16-TB                 BG1VT1 Reactor Vessel Flange   B6 ~ 50 3 X Washer


DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION TEN-YEAR PIAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 23 ure Head Washers NUMBER: 00.0  
DATE: 10/15/99                           NINE MILE POINT NUCLEAR PLANT UNIT 1                         PAGE: 23 REVISION:        0                        INSERVICE INSPECTION TEN-YEAR PIAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS ure Head Washers NUMBER: 00.0 INSPECTION INTERVAL                      PLAN STATUS            PRESERVZCE YEAR FIRST        SECOND      THIRD SEC. XZ              PERIOD        PERIOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD-OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVZCE YEAR INSTRUCTIONS
EXAMINATION AREA       CATEGY      NDE                -OUTAGE                        INSTRUCTIONS NUMBER     IDENTIFICATION         ITEM NO     METH   1 2 3 4   1   2 3 4   1 2 3 4 ++CALIBRATION BLOCK>>~
++CALIBRATION BLOCK>>~018800 RV-17-TA B-G-l VT-1 Reactor Vessel Flange B6~50 Washer 3 X 018900 RV-17-TB B-G-1 Reactor Vessel Flange B6.50 Washer 3 X 019000 RV 18-TA B-G-1 Reactor Vessel Flange B6.50 Washer 3 X 019100 RV-18-TB B-G-1 Reactor Vessel Flange B6 F 50 Washer 3 X 019200 RV-19-TA B-G-1 VT-1 Reactor Vessel Flange B6.50 Washer 3 X 019300 RV-19-TB B G 1 VT 1 Reactor Vessel Flange B6~50 Washer 3 X 019400 RV-20-TA B-G-l Reactor Vessel Flange B6.50 Washer 3 X 019500 RV-20-TB B-G-1 Reactor Vessel Flange B6~50 Washer 3 X  
018800     RV-17-TA               B-G-l       VT-1 Reactor Vessel Flange   B6 50~
3 X Washer 018900     RV-17-TB               B-G-1 Reactor Vessel Flange   B6.50 3 X Washer 019000     RV 18-TA               B-G-1 Reactor Vessel Flange   B6.50 3 X Washer 019100     RV-18-TB               B-G-1 Reactor Vessel Flange   B6 50 F
3 X Washer 019200     RV-19-TA               B-G-1       VT-1 Reactor Vessel Flange   B6.50 3 X Washer 019300     RV-19-TB               B G 1       VT 1 Reactor Vessel Flange   B6 50
                                      ~
3 X Washer 019400     RV TA               B-G-l Reactor Vessel Flange   B6.50 3 X Washer 019500   RV-20-TB                 B-G-1 Reactor Vessel Flange   B6 50
                                      ~
3 X Washer


DATE: 10/15/99 REVISION: 0 NINE MZLE POZNT NUCLEAR PLANT UNIT 1 ZNSERVZCE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 24 ure Head Washers NUMBER: 00.0 INSPECTION INTERVAL PIAN STATUS PRESERVICE YEAR  
DATE: 10/15/99                           NINE MZLE POZNT NUCLEAR PLANT UNIT 1                       PAGE: 24 REVISION:        0                        ZNSERVZCE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS ure Head Washers NUMBER: 00.0 INSPECTION INTERVAL                   PIAN STATUS           PRESERVICE YEAR ASME                FIRST        SECOND      THIRD SEC. XI            PERIOD      PERIOD      PERIOD


==SUMMARY==
==SUMMARY==
NUMBER EXAMINATION AREA IDENTIFICATION ASME SEC.XI CATEGY ITEM NO NDE METH FIRST PERIOD SECOND PERIOD THIRD PERIOD OUTAGE 1 2 3 4 1 2 3 4 1 2 3 4 INSTRUCTIONS
EXAMINATION AREA       CATEGY    NDE                OUTAGE                        INSTRUCTIONS NUMBER    IDENTIFICATION         ITEM NO   METH     1 2 3 4 1   2 3 4   1 2 3 4 ~*CALIBRATION BLOCK+*
~*CALIBRATION BLOCK+*019600 RV-21-TA B-G-1 VT-1 Reactor Vessel Flange B6~50 Washer 3 X 019700 RV-21-TB B-G-1 Reactor Vcsscl Flange B6 F 50 Washer 3 X 019800 RV-22-TA B"G-1 VT-1 Reactor Vessel Flange B6.50 Washer 3 X 019900 RV-22-TB Reactor Vcsscl Flange Washer B-G-1 B6.50 3 X 020000 RV-23-TA Reactor Vessel Flange Washer B-G-1 B6.50 VT-1 3 X 020100 RV-23-TB B-G-1 Reactor Vessel Flange B6.50 Washer'3 X 020200 RV 24 TA B-G-1 VT-1 Reactor Vessel Flange B6.50 Washer 3 X 020300 RV-24-TB B-G"1 VT-1 Reactor Vessel Flange B6.50 Washer 3 X  
019600     RV-21-TA               B-G-1     VT-1 Reactor Vessel Flange   B6 50
                                      ~
3 X Washer 019700     RV-21-TB               B-G-1 Reactor Vcsscl Flange   B6 50 F
3 X Washer 019800     RV-22-TA               B"G-1     VT-1 Reactor Vessel Flange   B6.50 3 X Washer 019900     RV-22-TB               B-G-1 Reactor Vcsscl Flange  B6.50 3 X Washer 020000     RV-23-TA               B-G-1     VT-1 Reactor Vessel Flange  B6.50 3             X Washer 020100   RV-23-TB                 B-G-1 Reactor Vessel Flange   B6.50 3              X Washer
            '
020200   RV 24 TA                 B-G-1     VT-1 Reactor Vessel Flange   B6.50 3             X Washer 020300   RV-24-TB                 B-G"1     VT-1 Reactor Vessel Flange   B6.50 3             X Washer


DATE: 10/15/99 REVISION: 0 NINE MIIE POINT NUCLEAR PLANT UNIT 1 ZNSERVICE INSPECTION TEN-YEAR PLAN CIASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 25 ure Head Washers NUMBER: 00.0  
DATE: 10/15/99                           NINE MIIE POINT NUCLEAR PLANT UNIT 1                       PAGE: 25 REVISION:        0                        ZNSERVICE INSPECTION TEN-YEAR PLAN CIASS 1 SECTION XZ SCHEDULED COMPONENTS ure Head Washers NUMBER: 00.0 INSPECTION INTERVAL                    PLAN STATUS            PRESERVZCE YEAR ASME                FIRST        SECOND      THIRD SEC. XZ              PERIOD      PERIOD      PERZOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERZOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVZCE YEAR INSTRUCTIONS
EXAMINATION AREA       CATEGY    NDE                OUTAGE                        INSTRUCTIONS NUMBER     IDENTIFICATION         ITEM NO   METH     1 2 3 4 1   2 3 4   1 2 3 4 ~*CALIBRATION BLOCK*~
~*CALIBRATION BLOCK*~020400 RV-25-TA B-G-1 VT-1 Reactor Vessel Flange B6 F 50 Washer 3 X 020500 RV-25-TB BG1 Reactor Vessel Flange B6.50 Washer 3 X 020600 RV-26-TA B-G-1 VT 1 Reactor Vessel Flange B6.50 Washer 3 X 020700 RV-26-TB B-G-1 Reactor Vessel Flange B6 F 50 Washer 3 X 020800 RV-27-TA Reactor Vessel Flange Washer B-G-1 VT 1 3 X 020900 RV-27-TB B-G-1 VT 1 Reactor Vcsscl Flange B6.50 Washer 3 X 021000 RV-28-TA B-G-1 Reactor Vcsscl Flange B6.50 Washer VT 1 3 X 021100 RV-28-TB B-G-1 Reactor Vessel Flange B6.50 Washer VT-1 3 X  
020400     RV-25-TA               B-G-1     VT-1 Reactor Vessel Flange   B6 50 F
3             X Washer 020500     RV-25-TB               BG1 Reactor Vessel Flange   B6.50 3             X Washer 020600     RV-26-TA               B-G-1     VT 1 Reactor Vessel Flange   B6.50 3             X Washer 020700     RV-26-TB               B-G-1 Reactor Vessel Flange   B6 50 F
3             X Washer 020800     RV-27-TA               B-G-1     VT 1 Reactor Vessel Flange 3             X Washer 020900     RV-27-TB               B-G-1     VT 1 Reactor Vcsscl Flange   B6.50 3             X Washer 021000     RV-28-TA               B-G-1      VT 1 Reactor Vcsscl Flange   B6.50 3             X Washer 021100     RV-28-TB               B-G-1      VT-1 Reactor Vessel Flange   B6.50 3             X Washer


DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PIANT UNIT 1 ZNSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 26 urc Head Washcrs NUMBER: 00.0  
DATE: 10/15/99                           NINE MILE POINT NUCLEAR PIANT UNIT 1                       PAGE: 26 REVISION:        0                        ZNSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS urc Head Washcrs NUMBER: 00.0 ZNSPECTION INTERVAL                    PLAN STATUS            PRESERVZCE YEAR ASME                FZRST        SECOND      THIRD SEC. XZ              PERIOD      PERIOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION ZNSPECTION INTERVAL ASME SEC.XZ CATEGY NDE ITEM NO METH FZRST PERIOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVZCE YEAR INSTRUCTIONS
EXAMINATION AREA       CATEGY      NDE                OUTAGE                        INSTRUCTIONS NUMBER     IDENTIFICATION         ITEM NO   METH     1 2 3 4 1   2 3 4   1 2 3 4 *~CALIBRATION BLOCK**
*~CALIBRATION BLOCK**021200 RV-29-TA B-G-1 Reactor Vessel Flange B6.50 Washer 3 X 021300 RV-29-TB B"G-1 Reactor Vessel Flange B6.50 Washer 3 X 021400 RV-30-TA B-G-1 Roactor Vcsscl Flango B6.50 Washer 3 X 021500 RV-30-TB Reactor Vessel Flange Washer B-G-1 B6.50 3 X 021600 RV" 31-TA Reactor Vessel Flange Washer B-G-1 B6.50 3 X 021700 RV-31-TB B-G-1 VT-1 Reactor Vessel Flange B6.50 Washer 3 X 021800 RV-32-TA B"G-1 Reactor Vessel Flange B6.50 Washer VT 1 3 X 021900 RV-32-TB B-G-1 Reactor Vessel Flange B6.50 Washer 3 X  
021200     RV-29-TA               B-G-1 Reactor Vessel Flange   B6.50 3             X Washer 021300     RV-29-TB               B"G-1 Reactor Vessel Flange   B6.50 3             X Washer 021400     RV-30-TA               B-G-1 Roactor Vcsscl Flango   B6.50 3             X Washer 021500     RV-30-TB               B-G-1 Reactor Vessel Flange  B6.50 3             X Washer 021600     RV"31- TA               B-G-1 Reactor Vessel Flange  B6.50 3             X Washer 021700   RV-31-TB                 B-G-1       VT-1 Reactor Vessel Flange   B6.50 3             X Washer 021800   RV-32-TA                 B "G-1      VT 1 Reactor Vessel Flange   B6.50 3             X Washer 021900   RV-32-TB                 B-G-1 Reactor Vessel Flange   B6.50 3             X Washer


DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 27 urc Head Washers NUMBER: 00.0  
DATE: 10/15/99                             NINE MILE POINT NUCLEAR PLANT UNIT 1                         PAGE: 27 REVISION:        0                          INSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS urc Head Washers NUMBER: 00.0 INSPECTION INTERVAL                      PLAN STATUS            PRESERVICE YEAR ASME                  FIRST        SECOND      THIRD SEC. XZ                PERZOD        PERIOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL ASME SEC.XZ CATE GY NDE ITEM NO METH FIRST PERZOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR INSTRUCTIONS
EXAMINATION AREA       CATE GY     NDE                 OUTAGE                        INSTRUCTIONS NUMBER    IDENTIFICATION          ITEM NO     METH   1 2 3 4   1   2 3 4   1 2 3 4 +*CALIBRATION BLOCK**
+*CALIBRATION BLOCK**022000 RV-33-TA B-G-1 Reactor Vessel Flange B6~50 Washer 3 X 022100 RV-33-TB B-G-1 VT 1 Reactor Vessel Flange B6.50 Washer 3 X 022200 RV-34-TA B G 1 Reactor Vessel Flange B6~50 Washer 3 X 022300 RV 34 TB B-G 1 Reactor Vessel Flange B6.50 Washer 3 X 022400 RV-35-TA Reactor Vessel Flange Washer B-G 1 B6.50 3 X 022500 RV-35-TB B-G-1 Reactor Vcsscl Flange B6.50 Washer 3 X 022600 RV-36-TA B-G-1 VT"1 Reactor Vcsscl Flange B6.50 Washer 3 X 022700 RV-36-TB B-G-1 VT-1 Reactor Vessel Flange B6.50 Washer 3 X  
022000     RV-33-TA               B-G-1 Reactor Vessel Flange   B6 ~ 50 3             X Washer 022100     RV-33-TB               B-G-1       VT 1 Reactor Vessel Flange   B6.50 3             X Washer 022200     RV-34-TA               B G 1 Reactor Vessel Flange   B6 50
                                      ~
3             X Washer 022300     RV 34 TB               B-G   1 Reactor Vessel Flange   B6.50 3             X Washer 022400     RV-35-TA               B-G 1 Reactor Vessel Flange  B6. 50 3             X Washer 022500     RV-35-TB               B-G-1 Reactor Vcsscl Flange   B6.50 3             X Washer 022600     RV-36-TA               B-G-1       VT"1 Reactor Vcsscl Flange   B6.50 3             X Washer 022700   RV-36-TB                 B-G-1       VT-1 Reactor Vessel Flange   B6.50 3             X Washer


DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 ZNSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COHPONENTS PAGE: 28 ure Head Washers NUMBER: 00.0 SUHHARY EXAHINATZON AREA NUMBER IDENTIFICATION INSPECTION INTERVAL ASME SEC.XI CATEGY ITEH NO FIRST PERIOD PLAN STATUS SECOND PERIOD THIRD PERIOD OUTAGE 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVZCE YEAR INSTRUCTIONS
DATE: 10/15/99                             NINE MILE POINT NUCLEAR PLANT UNIT 1                         PAGE: 28 REVISION:        0                            ZNSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COHPONENTS ure Head Washers NUMBER: 00.0 INSPECTION INTERVAL                       PLAN STATUS            PRESERVZCE YEAR ASME                   FIRST        SECOND      THIRD SEC. XI             PERIOD       PERIOD       PERIOD SUHHARY    EXAHINATZON AREA        CATEGY                            OUTAGE                       INSTRUCTIONS NUMBER      IDENTIFICATION          ITEH    NO            1 2 3 4 1   2 3 4   1 2 3 4 ~*CALIBRATION BLOCK~ ~
~*CALIBRATION BLOCK~~022800 RV-37-TA B G 1 Reactor Vessel Flange B6.50 Washer 3 X 022900 RV-37-TB B-G-1 VT-1 Reactor Vessel Flange B6.50 Washer 3 X 023000 RV-38-TA B-G-1 Reactor Vessel Flange B6.50 Washer VT-1 3 X 023100 RV-38-TB B"G-1 Reactor Vessel Flange B6.50 Washer 3 X 023200 RV 39 TA B-G-1 Reactor Vessel Flange B6.50 Washer 3 X 023300 RV-39-TB B-G-1 Reactor Vessel Flange B6~50 Washer 3 X 023400 RV-40-TA B G 1 Reactor Vcsscl Flange B6.50 Washer 3 X 023500 RV-40-TB B-G-1 Reactor Vessel Flange B6.50 Washer 3 X  
022800     RV-37-TA               B G 1 Reactor Vessel Flange   B6.50 3             X Washer 022900     RV-37-TB               B-G-1         VT-1 Reactor Vessel Flange   B6.50 3             X Washer 023000     RV-38-TA               B-G-1        VT-1 Reactor Vessel Flange   B6.50 3             X Washer 023100     RV-38-TB               B"G-1 Reactor Vessel Flange   B6.50 3             X Washer 023200     RV 39 TA               B-G-1 Reactor Vessel Flange   B6.50 3             X Washer 023300     RV-39-TB               B-G-1 Reactor Vessel Flange   B6 ~ 50 3             X Washer 023400     RV-40-TA               B G 1 Reactor Vcsscl Flange   B6.50 3             X Washer 023500     RV-40-TB               B-G-1 Reactor Vessel Flange   B6.50 3             X Washer


DATE: 10/15/99 REVISION: 0 NINE MILE POZNT NUCLEAR PIANT UNIT 1 ZNSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 29 ure Head Washers NUMBER: 00.0  
DATE: 10/15/99                           NINE MILE POZNT NUCLEAR PIANT UNIT 1                       PAGE: 29 REVISION:        0                          ZNSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS ure Head Washers NUMBER: 00.0 INSPECTION INTERVAL                    PLAN STATUS            PRESERVZCE YEAR ASME                FIRST        SECOND      THZRD SEC. XI            PERIOD      PERIOD      PERZOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL ASME SEC.XI CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD THZRD PERZOD OUTAGE 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVZCE YEAR INSTRUCTIONS
EXAMINATION AREA       CATEGY      NDE                OUTAGE                        INSTRUCTIONS NUMBER     IDENTIFICATION         ITEM NO   METH     1 2 3 4 1   2 3 4   1 2 3 4 ~~CALIBRATION BLOCK~~
~~CALIBRATION BLOCK~~023600 RV-41-TA BG1 VT-1 Reactor Vessel Flange B6.50 Washer X 023700 RV-41-TB B-G-1 Reactor Vcsscl Flange B6.50 Washer 3 X 023800 RV-42-TA B-G-1 Reactor Vessel Flange B6.50 Washer 3 X 023900 RV-42-TB B-G-1 Reactor Vcsscl Flange B6.50 Washer 3 X 024000 RV 43 TA B-G" 1 VT-1 Reactor Vessel Flange B6~50 Washor 3 X 024100 RV-43-TB B-G-1 VT-1 Reactor Vessel Flange B6.50 Washer 3 X 024200 RV-44-TA B G 1 Reactor Vessel Flange B6 F 50 Washer 3 X 024300 RV-44-TB B-0" 1 VT-1 Reactor Vcssol Flange B6~50 Washer 3 X  
023600     RV-41-TA               BG1         VT-1 Reactor Vessel Flange   B6.50 X
Washer 023700     RV TB               B-G-1 Reactor Vcsscl Flange   B6.50 3             X Washer 023800     RV-42-TA               B-G-1 Reactor Vessel Flange   B6.50 3             X Washer 023900     RV-42-TB               B-G-1 Reactor Vcsscl Flange   B6.50 3             X Washer 024000     RV 43 TA               B-G"1       VT-1 Reactor Vessel Flange   B6 50
                                      ~
3             X Washor 024100     RV-43-TB               B-G-1       VT-1 Reactor Vessel Flange   B6.50 3             X Washer 024200     RV-44-TA               B G 1 Reactor Vessel Flange   B6 50 F
3                           X Washer 024300     RV-44-TB               B-0" 1     VT-1 Reactor Vcssol Flange   B6 50
                                      ~
3                           X Washer


DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 ZNSERVZCE INSPECTION TEN-YEAR PLAN CZASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 30 urc Head Washcrs NUMBER: 00.0  
DATE: 10/15/99                           NINE MILE POINT NUCLEAR PLANT UNIT 1                         PAGE: 30 REVISION:        0                        ZNSERVZCE INSPECTION TEN-YEAR PLAN CZASS 1 SECTION XZ SCHEDULED COMPONENTS urc Head Washcrs NUMBER: 00.0 INSPECTION INTERVAL                    PIAN STATUS            PRESERVZCE YEAR ASME                FIRST        SECOND      THIRD SEC. XI            PERZOD      PERIOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL ASME SEC.XI CATEGY NDE ITEM NO METH FIRST PERZOD PIAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVZCE YEAR INSTRUCTIONS
EXAMINATION AREA       CATEGY    NDE                OUTAGE                        INSTRUCTIONS NUMBER     IDENTIFICATION         ITEM NO   METH     1 2 3 4 1   2 3 4   1 2 3 4 ~ +CALIBRATION BLOCK*'~
~+CALIBRATION BLOCK*'~024400 RV 45 TA BG1 Reactor Vessel Flange B6~50 Washer 3 X 024500 RV-45-TB B-G-1 Reactor Vcsscl Flange B6.50 Washer 3 X 024600 RV-46-TA B-G-1 VT-1+*N/A++Reactor Vessel Flange B6~50 Washer 3 X 024700 RV-46-TB B G-1**N/A*+Reactor Vcsscl Flange B6~50 Washer 3 X 024800 RV-47-TA B-G-1 Reactor Vcsscl Flange B6 F 50 Washer 3 X 024900 RV-47-TB B-G-1 VT 1 Reactor Vcsscl Flange B6.50 Washer 3 X 025000 RV-48-TA B-G 1 Reactor Vessel Flangh B6.50 Washer 3 X 025100 RV-48-TB B-G-1 VT-1 Roactor Vcsscl Flange B6.50 Washer 3 X  
024400     RV 45 TA               BG1 Reactor Vessel Flange   B6 50
                                      ~
3                           X Washer 024500     RV-45-TB               B-G-1 Reactor Vcsscl Flange   B6.50 3                           X Washer 024600     RV-46-TA               B-G-1     VT-1                                           +*N/A++
Reactor Vessel Flange   B6 50
                                      ~
3                           X Washer 024700     RV-46-TB               B G-1                                                     **N/A*+
Reactor Vcsscl Flange   B6 50
                                      ~
3                           X Washer 024800     RV-47-TA               B-G-1 Reactor Vcsscl Flange   B6 50 F
3                           X Washer 024900     RV-47-TB               B-G-1     VT 1 Reactor Vcsscl Flange   B6.50 3                           X Washer 025000     RV-48-TA               B-G 1 Reactor Vessel Flangh   B6.50 3                           X Washer 025100     RV-48-TB               B-G-1     VT-1 Roactor Vcsscl Flange   B6.50 3                           X Washer


DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 ZNSERVZCE ZNSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 31 ure Head Washers NUMBER: 00.0  
DATE: 10/15/99                             NINE MILE POINT NUCLEAR PLANT UNIT 1                         PAGE: 31 REVISION:        0                            ZNSERVZCE ZNSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS ure Head Washers NUMBER: 00.0 INSPECTION INTERVAL                      PLAN STATUS            PRESERVZCE YEAR ASME                  FIRST        SECOND      THIRD SEC. XZ                PERIOD      PERIOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER ZDENTZFZCATZON INSPECTION INTERVAL ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVZCE YEAR INSTRUCTIONS
EXAMINATION AREA       CATEGY        NDE                OUTAGE                        INSTRUCTIONS NUMBER     ZDENTZFZCATZON         ITEM   NO   METH   1 2 3 4 1   2 3 4   1 2 3 4 ++CALIBRATION BLOCK~~
++CALIBRATION BLOCK~~025200 RV-49"TA B-G-1 Reactor Vcsscl Flange B6.50 Washer 3 X 025300 RV-49-TB B-G-1 VT 1 Reactor Vessel Flange B6.50 Washer 3 025400 RV-50-TA B G-l Reactor Vcsscl Flange B6~50 Washer 3 X 025500 RV-50-TB B-G-l VT-1 Reactor Vessel Flange B6.50 Washer 3 X 025600 RV-51-TA B-G-1 VT 1+*N/A**Reactor Vessel Flange B6.50 Washer 3 X 025700 RV-51-TB B-G-1 VT-1*~N/A*~Reactor Vessel Flange B6.50 Washer 3 X 025800 RV-52-TA B-G"1 Reactor Vcsscl Flange B6.50 Washer 3 X**N/A%*025900 RV 52 TB B-G-1 Reactor Vessel Flange B6.50 Washer 3 X~*N/A**
025200     RV-49"TA               B-G-1 Reactor Vcsscl Flange   B6.50 3                           X Washer 025300     RV-49-TB               B-G-1         VT 1 Reactor Vessel Flange   B6.50 3
Washer 025400     RV-50-TA               B G-l Reactor Vcsscl Flange   B6 ~ 50 3                           X Washer 025500     RV-50-TB               B-G-l         VT-1 Reactor Vessel Flange   B6.50 3                           X Washer 025600     RV-51-TA               B-G-1         VT 1                                           +*N/A**
Reactor Vessel Flange   B6.50 3                           X Washer 025700     RV-51-TB               B-G-1         VT-1                                           *~N/A*~
Reactor Vessel Flange   B6.50 3                           X Washer 025800     RV-52-TA               B-G "1                                                       **N/A%*
Reactor Vcsscl Flange   B6.50 3                           X Washer 025900     RV 52 TB               B-G-1                                                       ~*N/A**
Reactor Vessel Flange   B6.50 3                           X Washer


DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 ZNSERVICE INSPECTION TEN-YEAR PIAN CIASS 1 SECTION XI SCHEDULED COMPONENTS PAGE: 32 ure Head Washers NUMBER: 00.0  
DATE: 10/15/99                           NINE MILE POINT NUCLEAR PLANT UNIT 1                           PAGE: 32 REVISION:        0                          ZNSERVICE INSPECTION TEN-YEAR PIAN CIASS 1 SECTION XI SCHEDULED COMPONENTS ure Head Washers NUMBER: 00.0 INSPECTION INTERVAL                      PLAN STATUS            PRESERVICE YEAR ASME                  FIRST        SECOND      THIRD SEC. XZ                PERIOD        PERIOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION 026000 RV-53-TA INSPECTION INTERVAL ASME SEC.XZ CATEGY NDE ITEM NO METH B-G-1 FIRST PERIOD PLAN STATUS SECOND PERIOD-OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR INSTRUCTIONS
EXAMINATION AREA       CATEGY      NDE                -OUTAGE                          INSTRUCTIONS NUMBER     IDENTIFICATION         ITEM   NO   METH     1 2 3 4   1   2 3 4   1 2 3 4 *~CALIBRATION BLOCKi~
*~CALIBRATION BLOCKi~eaN/Aaa Reactor Vessel Flange B6.50 Washer 3 X 026100 RV-53-TB B-G-l Reactor Vessel Flange B6.50 Washer VT-1 3 X++N/A*+026200 RV-54-TA B-G-1++N/PPa Reactor Vcsscl Flange B6.50 Washer 3 X 026300 RV-54-TB B G 1**N/A*~Reactor Vessel Flange B6~50 Washer 3 X 026400 RV-55-TA B"G"1 Reactor Vessel Flange B6.50 Washer 3 X ktN/Akk 026500 RV-55-TB BG1 VT-1~iN/A+*Reactor Vessel Flange B6.50 Washer 3 X 026600 RV-56-TA B-G-1 Reactor Vessel Flange B6.50 Washer 3 X*tN/Aft 026700 RV-56-TB B" G-1 Reactor Vessel Flange B6.50 Washer VT-1 3 X*ON/A**  
026000    RV-53-TA                B-G-1                                                        eaN/Aaa Reactor Vessel Flange   B6.50 3                             X Washer 026100     RV-53-TB               B-G-l       VT-1                                           ++N/A*+
Reactor Vessel Flange  B6.50 3                            X Washer 026200     RV-54-TA               B-G-1                                                       ++N/PPa Reactor Vcsscl Flange   B6.50 3                             X Washer 026300     RV-54-TB               B G 1                                                       **N/A*~
Reactor Vessel Flange   B6 50
                                      ~
3                             X Washer 026400     RV-55-TA               B"G"1                                                       ktN/Akk Reactor Vessel Flange   B6.50 3                             X Washer 026500     RV-55-TB               BG1         VT-1                                           ~iN/A+*
Reactor Vessel Flange   B6. 50 3                             X Washer 026600     RV-56-TA               B-G-1                                                       *tN/Aft Reactor Vessel Flange   B6.50 3                             X Washer 026700     RV-56-TB               B"G-1       VT-1                                           *ON/A**
Reactor Vessel Flange  B6. 50 3                            X Washer


DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 33 ure Head Washcrs NUMBER: 00.0  
DATE: 10/15/99                           NINE MILE POINT NUCLEAR PLANT UNIT 1                         PAGE: 33 REVISION:        0                        INSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS ure Head Washcrs NUMBER:   00.0 INSPECTION INTERVAL                    PLAN STATUS            PRE SERVICE YEAR ASME                FIRST        SECOND      THIRD SEC. XI            PERIOD        PERIOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMZNATZON AREA NUMBER IDENTIFICATION INSPECTION INTERVAL ASME SEC.XI CATEGY NDE ZTEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD-OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRE SERVICE YEAR ZNSTRUCTIONS yqCALIBRATZON BLOCKte 026800 RV-57-TA B-G-1 VT-1~*N/A~*Reactor Vessel Flange B6~50 Washer 3 X 026900 RV-57-TB B-G-1 4kN/Ak*Reactor Vessel Flange B6.50 Washer 3 X 027000 RV-58"TA B-G-1 VT-1~+N/A~~Reactor Vessel Flange B6.50 Washer 3 X 027100 RV-58-TB B-G-1**N/A~~Reactor Vcsscl Flange B6.50 Washer 3 X 027200 RV-59-TA B-G-1*+N/A**Reactor Vessel Flange B6~50 Washer 3 X 027300 RV-59-TB B-G-1**N/A**Reactor Vessel Flange B6~50 Washer 3 X 027400 RV-60-TA B"G-1 VT-1 Reactor Vcsscl Flange B6.50 Washer 3 X**N/Aaa 027500 RV-60-TB B-G-1 VT 1**N/A**Reactor Vessel Flange B6.50 Washer 3 X  
EXAMZNATZON AREA         CATEGY    NDE                -OUTAGE                          ZNSTRUCTIONS NUMBER     IDENTIFICATION           ZTEM NO   METH   1 2 3 4   1   2 3 4   1 2 3 4 yqCALIBRATZON BLOCKte 026800     RV-57-TA               B-G-1     VT-1                                           ~*N/A~*
Reactor Vessel Flange   B6 50
                                      ~
3                             X Washer 026900     RV-57-TB               B-G-1                                                     4kN/Ak*
Reactor Vessel Flange   B6.50 3                             X Washer 027000   RV-58"TA                 B-G-1     VT-1                                           ~+N/A~~
Reactor Vessel Flange   B6.50 3                             X Washer 027100   RV-58-TB                 B-G-1                                                     **N/A~~
Reactor Vcsscl Flange   B6.50 3                             X Washer 027200   RV-59-TA                 B-G-1                                                     *+N/A**
Reactor Vessel Flange   B6 50
                                      ~
3                             X Washer 027300   RV-59-TB                 B-G-1                                                     **N/A**
Reactor Vessel Flange   B6 50
                                      ~
3                             X Washer 027400   RV-60-TA                 B"G-1     VT-1                                           **N/Aaa Reactor Vcsscl Flange   B6.50 3                             X Washer 027500   RV-60-TB                 B-G-1     VT 1                                           **N/A**
Reactor Vessel Flange   B6.50 3                             X Washer


DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 ZNSERVZCE ZNSPECTION TEN-YEAR PLAN CLASS 1 SECTION XI SCHEDULED COMPONENTS PAGE: 34 urc Head Washers NUMBER: 00.0  
DATE: 10/15/99                             NINE MILE POINT NUCLEAR PLANT UNIT 1                         PAGE: 34 REVISION:        0                          ZNSERVZCE ZNSPECTION TEN-YEAR PLAN CLASS 1 SECTION XI SCHEDULED COMPONENTS urc Head Washers NUMBER: 00.0 INSPECTION INTERVAL                      PLAN STATUS            PRESERVICE YEAR ASME                  FIRST        SECOND      THIRD SEC. XZ                PERIOD        PERIOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTZFZCATION INSPECTION INTERVAL ASME SEC.XZ CATEGY NDE ZTEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR INSTRUCTIONS
EXAMINATION AREA       CATEGY      NDE                  OUTAGE                        INSTRUCTIONS NUMBER     IDENTZFZCATION         ZTEM NO     METH     1 2 3 4   1   2 3 4   1 2 3 4 **CALIBRATIONBLOCK~i 027600     RV-61-TA               B G-1       VT-1                                            ION/A*f Reactor Vessel Flange   B6 ~ 50 3                           X Washer 027700     RV-61-TB               B-G-1       VT-1                                           **N/A+~
**CALIBRATION BLOCK~i 027600 RV-61-TA B G-1 Reactor Vessel Flange B6~50 Washer VT-1 3 X ION/A*f 027700 RV-61-TB B-G-1 VT-1**N/A+~Reactor Vcsscl Flange B6.50 Washer 3 X 027800 RV-62-TA B-G"1 VT-1**N/A*%Reactor Vessel Flange B6 F 50 Washer 3 X 027900 RV 62 TB B-G-1**N/A**Reactor Vessel Flange B6.50 Washer 3 X 028000 RV-63-TA B-G-1~~N/A~~Reactor Vcsscl Flange B6.50 Washer 3 X 028100 RV-63-TB B-G 1 VT-1 Reactor Vessel Flange B6.50 Washer 3 X*AN/A**028200 RV-64-TA BG-1 VT 1 Reactor Vessel Flange B6~50 Washer 3 X**N/Af*028300 RV-64 TB B-G-1 VT-1*AN/AOt Reactor Vcsscl Flange B6.50 Washer 3 X  
Reactor Vcsscl Flange   B6. 50 3                             X Washer 027800     RV-62-TA               B-G"1       VT-1                                           **N/A*%
Reactor Vessel Flange   B6 50 F
3                             X Washer 027900     RV 62 TB               B-G-1                                                       **N/A**
Reactor Vessel Flange   B6.50 3                             X Washer 028000     RV-63-TA               B-G-1                                                       ~~N/A~~
Reactor Vcsscl Flange   B6.50 3                             X Washer 028100   RV-63-TB                 B-G   1     VT-1                                           *AN/A**
Reactor Vessel Flange   B6.50 3                             X Washer 028200   RV-64-TA                 BG-1         VT 1                                           **N/Af*
Reactor Vessel Flange   B6 ~ 50 3                             X Washer 028300   RV-64 TB                 B-G-1       VT-1                                           *AN/AOt Reactor Vcsscl Flange   B6.50 3                             X Washer


DATE: 10/15/99 REVISION: 0 NZNE HIIE POINT NUCLEAR PLANT UNIT 1 ZNSERVZCE INSPECTION TEN"YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COHPONENTS PAGE: 35 rol Rod Drive Housings NUMBER: 00.0 INSPECTION INTERVAL PIAN STATUS PRESERVICE YEAR  
DATE: 10/15/99                             NZNE HIIE POINT NUCLEAR PLANT UNIT 1                           PAGE: 35 REVISION:        0                          ZNSERVZCE INSPECTION TEN"YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COHPONENTS rol Rod Drive Housings NUMBER:   00.0 INSPECTION INTERVAL                     PIAN STATUS             PRESERVICE YEAR ASHE                FIRST        SECOND      THIRD SEC. XZ              PERIOD        PERIOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAHINATZON AREA NUMBER IDENTIFICATION ASHE SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 INSTRUCTIONS
EXAHINATZON AREA         CATEGY    NDE                  OUTAGE                          INSTRUCTIONS NUMBER     IDENTIFICATION           ITEM NO   METH     1   2 3 4   1   2 3 4   1 2 3 4 + ~CALIBRATION BLOCK**
+~CALIBRATION BLOCK**00.0 RPV (REF.DWG.NO.28A)041300 CRD XX-X Capscrcws (8)8 ()B-G 2 B7.80 X---X X--X Only when disassembled, To be identified as disassembled during each outage~~N/A+~041400 NCTS503783 1 AZZSRDH NOTS VT-2 CRDH Exterior e Rx 503783 Bottom Head 3 X---X X--X All CRD Housings, CRD pcn.leakage req'd during RFO a Maint 4 Mid-cycle shutdown when drywcll De-inerted.
: 00. 0 RPV (REF. DWG. NO. 28A) 041300     CRD   XX-X               B-G 2                                                      Only when disassembled, Capscrcws   (8) 8 (     B7.80
0 1 N/A**041500 RV-CRD-Rl B" 0 Examine outer 180 CRD Housing-to-Flange B14.10 weld 3 degrccs of circufercnce pcr RR-ISZ-9**N/A*+041600 RV-CRD-RS B 0 Examine outer 180 CRD Housing-to-Flange B14.10 weld 3 X degrees of circumfcrencc pcr RR-ZSI-9 i~N/Ai+041700 RV-CRD-Sl B-0 Examine outcr 180 CRD Housing-to-Flange B14.10 weld 3 X degrees of circumfcrencc per RR-ZSI-9**N/A~~041800 RV" CRD-S3 B-0 Examine outer 180 CRD Housing-to-Flange B14.10 weld 3 X degrccs of circumference per RR-ISZ-9*~N/A**041900 RV-CRD-T3 B-0 Examine outer 180 CRD Housing-to-Flange B14.10 weld 3 dcgrccs of circumference pcr RR-ISZ-9~~N/A+~  
                                                            - - -           - -
To be   identified   as X            X    X        X          disassembled during each
          )
outage ~~N/A+~
041400     NCTS503783 1 AZZSRDH     NOTS       VT-2                                           All CRD  Housings, CRD CRDH Exterior e Rx       503783                                                     pcn. leakage req'd 3 X   - - -   X   X - -   X Bottom Head                                                                          during RFO a Maint 4 Mid-cycle shutdown     when drywcll De-inerted.
0 1 N/A**
041500     RV-CRD-Rl                 B"0                                                       Examine   outer 180 CRD Housing-to-Flange   B14.10                                                     degrccs of circufercnce 3
weld                                                                                pcr RR-ISZ-9 **N/A*+
041600     RV-CRD-RS                 B 0                                                       Examine   outer 180 CRD Housing-to-Flange   B14. 10                                                   degrees of circumfcrencc 3              X weld                                                                                pcr RR-ZSI-9 i~N/Ai+
041700   RV-CRD-Sl                 B-0                                                       Examine   outcr 180 CRD   Housing-to-Flange   B14. 10                                                   degrees of circumfcrencc 3 X weld                                                                                  per RR-ZSI-9 **N/A~~
041800   RV"CRD-S3                 B-0                                                       Examine   outer 180 CRD   Housing-to-Flange   B14.10                                                     degrccs of circumference 3              X weld                                                                                  per RR-ISZ-9 *~N/A**
041900   RV-CRD-T3                 B-0                                                       Examine   outer 180 CRD   Housing-to-Flange   B14.10                                                     dcgrccs of circumference 3
weld                                                                                  pcr RR-ISZ-9   ~~N/A+~


DATE: 10/15/99 REVZSZON: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 ZNSERVZCE INSPECTION TEN-YEAR PIAN CIASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 36 rol Rod Drive Housings NUMBER: 00.0 INSPECTION INTERVAL PIAN STATUS PRESERVICE YEAR  
DATE: 10/15/99                             NINE MILE POINT NUCLEAR PLANT UNIT 1                         PAGE: 36 REVZSZON:        0                          ZNSERVZCE INSPECTION TEN-YEAR PIAN CIASS 1 SECTION XZ SCHEDULED COMPONENTS rol Rod   Drive Housings NUMBER:   00. 0 INSPECTION INTERVAL                     PIAN STATUS           PRESERVICE YEAR ASME                FIRST        SECOND      THIRD SEC. XZ              PERIOD        PERIOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATZON AREA NUMBER IDENTIFICATION 042000 RV-CRD-T7 ASME SEC.XZ CATEGY NDE ITEM NO METH B-0 FIRST PERIOD SECOND PERIOD-OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 INSTRUCTIONS
EXAMINATZON AREA         CATEGY    NDE                -OUTAGE                          INSTRUCTIONS NUMBER     IDENTIFICATION           ITEM NO   METH   1 2 3 4   1   2 3 4   1 2 3 4 ~+CAIIBRATZON BLOCK**
~+CAIIBRATZON BLOCK**Examine outer 180 CRD Housing-to-Flange B14.10 weld degrees of circumfcrcncc pcr RR-ZSZ-9~~N/A~*042100 RV CRD U2 B-0 Examine outer 180 CRD Housing-to-Flange B14.10 weld 3 X dcgrecs of circumference pcr RR-ISI-9*~N/A~~042200 RV-CRD-U6 B-0 Examine outer 180 CRD Housing-to-Flange B14.10 weld 3 X dcgrecs of circumfcrcnce pcr RR-ZSZ-9*~N/A~~  
042000    RV-CRD-T7                B-0                                                      Examine outer 180 CRD Housing-to-Flange   B14.10                                                   degrees of circumfcrcncc weld                                                                              pcr RR-ZSZ-9 ~~N/A~*
042100     RV CRD U2               B-0                                                       Examine outer 180 CRD Housing-to-Flange   B14. 10                                                   dcgrecs of circumference 3                            X weld                                                                              pcr RR-ISI-9 *~N/A~~
042200     RV-CRD-U6               B-0                                                       Examine outer 180 CRD Housing-to-Flange   B14. 10                                                   dcgrecs of circumfcrcnce 3 X weld                                                                              pcr RR-ZSZ-9 *~N/A~~


DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 ZNSERVZCE INSPECTION TEN-YEAR PIAN CLASS 1 SECTION XI SCHEDULED COMPONENTS PAGE: 37 tor Vassal Flange NUMBER: 00.0  
DATE: 10/15/99                             NINE MILE POINT NUCLEAR PLANT UNIT 1                           PAGE: 37 REVISION:        0                          ZNSERVZCE INSPECTION TEN-YEAR PIAN CLASS 1 SECTION XI SCHEDULED COMPONENTS tor Vassal Flange NUMBER:   00. 0 INSPECTION INTERVAL                      PLAN STATUS            PRESERVZCE YEAR ASME                FIRST        SECOND      THIRD SEC. XI            PERIOD        PERIOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMZNATZON AREA NUMSER IDENTIFICATION INSPECTION INTERVAL ASME SEC.XI CATEGY NDE ZTEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVZCE YEAR ZNSTRUCTZONS
EXAMZNATZON AREA         CATEGY      NDE                  OUTAGE                        ZNSTRUCTZONS NUMSER     IDENTIFICATION           ZTEM NO   METH     1 2 3 4   1   2 3 4   1 2 3 4 **CALIBRATIONBLOCK**
**CALIBRATION BLOCK**00.0 RPV (REF.DWG.NO.28)042300 RV-01-L B-G-1 UT Reactor Vessel Threads B6.40 in Flange 3 X Only when disassembled.
: 00. 0 RPV (REF. DWG. NO. 28) 042300     RV-01-L                 B-G-1       UT                                             Only when disassembled.
**Pl LF 1*a 042400 RV-01-T Reactor Vessel Bushings in Flange B"G-1 B6.50 VT-1 3 X Only when disassembled.
Reactor Vessel Threads B6.40                                                       **Pl LF 1*a 3 X in Flange 042400     RV-01-T                 B"G-1       VT-1                                           Only when disassembled.
**N/A*~042500 RV 02-L B-G-1 Reactor Vessel Threads B6.40 in Flange 3 X Only when disassembled.
Reactor Vessel          B6.50                                                      **N/A*~
**Pl-LF-lai 042600 RV-02-T Reactor Vessel Bushings in Flange B-G-1 B6.50 3 X Only when disassembled.
3 X Bushings in Flange 042500     RV 02-L                 B-G-1                                                     Only when disassembled.
++N/A++042700 RV-03-L B-G-1 UT Reactor Vcsscl Threads B6.40 in Flange 3 X Only when disassembled.
Reactor Vessel Threads B6.40                                                       **Pl-LF-lai 3 X in Flange 042600     RV-02-T                 B-G-1                                                     Only when disassembled.
**Pl LF 1++042800 RV-03-T Reactor Vessel Bushings in Flange B-G-1 B6.50 3 X Only when disassembled.
Reactor Vessel          B6. 50                                                    ++N/A++
44N/A4 l 042900 RV-04-L B-G-l UT Reactor Vessel Threads B6.40 in Flange 3 X Only when disassembled.
3 X Bushings in Flange 042700     RV-03-L                 B-G-1       UT                                             Only when disassembled.
**Pl LF 1**043000 RV-04-T Reactor Vessel Bushings in Flange B-G-1 B6.50 3 X Only when disasscmblcd.
Reactor Vcsscl Threads   B6.40                                                     **Pl LF 1++
F DATE: 10/15/99 REVISZON: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 ZNSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XI SCHEDULED COMPONENTS PAGE: 38 tor Vessel Flange NUMBER: 00.0  
3 X in Flange 042800     RV-03-T                 B-G-1                                                     Only when disassembled.
Reactor Vessel          B6.50                                                      44N/A4 l 3 X Bushings in Flange 042900     RV-04-L                 B-G-l       UT                                             Only when disassembled.
Reactor Vessel Threads B6.40                                                       **Pl LF 1**
3 X in Flange 043000   RV-04-T                   B-G-1                                                     Only when disasscmblcd.
Reactor Vessel            B6.50 3 X Bushings in Flange
 
F DATE: 10/15/99                             NINE MILE POINT NUCLEAR PLANT UNIT 1                           PAGE: 38 REVISZON:        0                          ZNSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XI SCHEDULED COMPONENTS tor Vessel Flange NUMBER: 00. 0 INSPECTION INTERVAL                      PLAN STATUS            PRESERVZCE YEAR ASME                  FIRST        SECOND      THIRD SEC. XI            PERIOD        PERIOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL ASME SEC.XI CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVZCE YEAR INSTRUCTIONS a yCALIBRATION BLOCKt s 043100 RV-05-L B-G-1 UT Reactor Vessel Threads B6.40 in Flange 3 X Only when disassembled.
EXAMINATION AREA       CATEGY      NDE                  OUTAGE                          INSTRUCTIONS NUMBER     IDENTIFICATION         ITEM NO     METH     1 2 3 4   1   2 3 4   1 2 3 4 a yCALIBRATION BLOCKt s 043100     RV-05-L                 B-G-1       UT                                             Only when disassembled.
tfP]LF]1l 043200 RV 05 T Reactor Vessel Bushings in Flange B-G-1 B6.50 VT"1 3 X Only when disassembled.
Reactor Vessel Threads B6.40                                                       tfP] LF ]1l 3 X in Flange 043200     RV 05 T                 B-G-1       VT"1                                           Only when disassembled.
~*N/A**043300 RV-06-L B-G-l UT Reactor Vessel Threads B6.40 in Flange 3 X Only when disassembled.
Reactor Vessel          B6.50                                                      ~*N/A**
**Pl-LF-I~~
3 X Bushings in Flange 043300     RV-06-L                 B-G-l       UT                                             Only when disassembled.
043400 RV-06-T Reactor Vessel Bushings in Flange B-G-l B6.50 VT-1 3 X Only when disassembled.
Reactor Vessel Threads B6.40                                                       **Pl-LF-I~~
+~N/A~~043500 RV-07-L B-G-1 UT Reactor Vessel Threads B6.40 in Flange 3 X Only when disasscmblcd.
3 X in Flange 043400     RV-06-T                 B-G-l       VT-1                                           Only when disassembled.
+~Pl-LF-I++
Reactor Vessel          B6.50                                                      +~N/A~~
043600 RV-07-T Reactor Vcsscl Bushings in Flange B-G-1 B6.50 3 X Only when disassembled.
3 X Bushings in Flange 043500     RV-07-L                 B-G-1       UT                                             Only when disasscmblcd.
**N/A**043700 RV-08-L B G 1 UT Reactor Vessel Threads B6.40 in Flange 3 X Only when disassembled.
Reactor Vessel Threads B6.40                                                       +~Pl-LF-I++
*~Pl-LF-1**043800 RV-08 T Reactor Vessel Bushings in Flange B G-1 B6.50 3 X Only when disassembled.
3 X in Flange 043600     RV-07-T                 B-G-1                                                       Only when disassembled.
*AN/AJ*  
Reactor Vcsscl          B6. 50                                                      **N/A**
3 X Bushings in Flange 043700     RV-08-L                 B G   1     UT                                             Only when disassembled.
Reactor Vessel Threads B6.40                                                       *~ Pl-LF-1**
3 X in Flange 043800     RV-08 T                 B G-1                                                       Only when disassembled.
Reactor Vessel          B6.50                                                      *AN/AJ*
3 X Bushings in Flange


DATE: 10/15/99 REVISION: 0 NZNE MILE POINT NUCLEAR PLANT UNIT 1 ZNSERVICE INSPECTION TEN YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 39 tor Vessel Flange NUMBER: 00.0  
DATE: 10/15/99                           NZNE MILE POINT NUCLEAR PLANT UNIT 1                           PAGE: 39 REVISION:        0                        ZNSERVICE INSPECTION TEN YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS tor Vessel Flange NUMBER: 00.0 INSPECTION ZNTERVAL                    PLAN STATUS            PRESERVZCE YEAR ASME                FIRST        SECOND      THIRD SEC. XZ              PERIOD        PERIOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION ZNTERVAL ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVZCE YEAR ZNSTRUCTZONS w wCALZBRATION BLOCK*s 043900 RV-09-L B-G-1 UT Reactor Vessel Threads B6.40 in Flange 3 X Only when disassembled.
EXAMINATION AREA       CATEGY    NDE                OUTAGE                            ZNSTRUCTZONS NUMBER     IDENTIFICATION         ITEM NO   METH     1 2 3 4   1   2 3 4   1 2 3 4 w wCALZBRATION BLOCK*s 043900     RV-09-L                 B-G-1     UT                                             Only when disassembled.
eePZ LF Zaa 044000 RV-09-T Reactor Vessel Bushings in Flange B-G-1 B6.50 3 X Only when disassembled.
Reactor Vessel Threads B6.40                                                     eePZ LF Zaa 3 X in Flange 044000     RV-09-T                 B-G-1                                                     Only when disassembled.
*1'N/A**044100 RV-10-L B-G-1 UT Reactor Vcsscl Threads B6.40 in Flange 3 X Only when disassembled.
Reactor Vessel          B6.50
*~Pl-LF-l~~
* 1 'N/A**
044200 RV-10-T Reactor Vessel Bushings in Flange B-G-l B6.50 VT-1 3 X Only when disassembled., 044300 RV-11-I B G-1 UT Reactor Vessel Threads B6 40 in Flange 3 X Only when disassembled.
3 X Bushings in Flange 044100     RV-10-L                 B-G-1     UT                                             Only when disassembled.
+*Pl LF-I++044400 RV-11-T Reactor Vessel Bushings in Flange B-G-1 B6.50 VT 1 3 X Only when disassembled.
Reactor Vcsscl Threads B6.40                                                     *~Pl-LF-l~~
%AN/A%*044500 RV-12-L B-G-1 UT Reactor Vessel Threads B6.40 in Flange 3 X Only when disassembled.
3 X in Flange 044200     RV-10-T                 B-G-l     VT-1                                           Only when disassembled.,
<<*Pl-LF-I**
Reactor Vessel          B6.50 3 X Bushings in Flange 044300     RV-11-I                 B G-1     UT                                             Only when disassembled.
044600 RV-12-T Reactor Vessel Bushings in Flange B-G-1 B6.50 VT-1 3 X Only when disassembled.
Reactor Vessel Threads B6 40                                                     +*Pl LF-I++
*ON/A**  
3 X in Flange 044400     RV-11-T                 B-G-1     VT 1                                           Only when disassembled.
Reactor Vessel          B6.50                                                    %AN/A%*
3 X Bushings in Flange 044500     RV-12-L                 B-G-1     UT                                             Only when disassembled.
Reactor Vessel Threads B6.40                                                       <<*Pl-LF-I**
3 X in Flange 044600   RV-12-T                 B-G-1     VT-1                                           Only when disassembled.
Reactor Vessel          B6.50                                                    *ON/A**
3 X Bushings in Flange


DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 ZNSERVICE INSPECTION TEN-YEAR PLAN CZASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 40 tor Vessel Flange NUMBER: 00.0  
DATE: 10/15/99                           NINE MILE POINT NUCLEAR PLANT UNIT 1                             PAGE: 40 REVISION:        0                          ZNSERVICE INSPECTION TEN-YEAR PLAN CZASS 1 SECTION XZ SCHEDULED COMPONENTS tor Vessel Flange NUMBER: 00. 0 ZNSPECTZON INTERVAL                      PLAN STATUS              PRESERVICE YEAR ASME                FIRST        SECOND      THIRD SEC. XZ              PERIOD        PERIOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER ZDENTZFZCATZON ZNSPECTZON INTERVAL ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD-OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR INSTRUCTIONS
EXAMINATION AREA       CATEGY      NDE                -OUTAGE                            INSTRUCTIONS NUMBER     ZDENTZFZCATZON         ITEM NO   METH     1 2 3 4   1   2 3 4   1 2 3 4   *~CALIBRATION BLOCK**
*~CALIBRATION BLOCK**044700 RV-13-L B-G-1 UT Reactor Vessel Threads B6.40 in Flange 3 X Only when disassembled.
044700     RV-13-L                 B-G-1       UT                                             Only when disassembled.
~~PI-LF-I~*
Reactor Vessel Threads B6.40                                                       ~~PI-LF-I~*
044800 RV-13-T Reactor Vessel Bushings in Flange B-G-1 B6.50 VT-1 3 X Only when disassembled.
3 X in Flange 044800     RV-13-T                 B-G-1       VT-1                                           Only when disassembled.
'+N/A~+044900 RV-14-L B-G-l UT Reactor Vcsscl Threads B6.40 in Flange 3 X Only when disassembled.
Reactor Vessel          B6.50                                                      '
~~Pl-LF-1+~045000 RV-14-T Reactor Vessel Bushings in Flange B-G-1 B6.50 3 X Only when disasscmblcd.
                                                                                                +N/A~+
~~N/A~~045100 RV-15-L B"G-1 UT Reactor Vcsscl Threads B6.40 in Flange 3 X Only when disassembled.
3 X Bushings in Flange 044900     RV-14-L                 B-G-l       UT                                             Only when disassembled.
41P]IF 1*4 045200 RV-15 T Reactor Vessel Bushings in Flange B-G-1 B6.50 VT-1 3 X Only when disassembled.
Reactor Vcsscl Threads B6.40                                                       ~~ Pl-LF-1+ ~
ttN/A4*045300 RV-16-L B-G-1 UT Reactor Vcsscl Threads B6.40 in Flange 3 X Only when disassembled.
3 X in Flange 045000     RV-14-T                 B-G-1                                                     Only when disasscmblcd.
**Pl-Z,F-1**
Reactor Vessel          B6. 50                                                    ~~N/A~~
045400 RV-16-T Reactor Vessel Bushings in Flange B G-1 B6.50 3 X Only when disassembled.
3 X Bushings in Flange 045100     RV-15-L                 B"G-1       UT                                             Only when disassembled.
**N/A~~
Reactor Vcsscl Threads B6.40                                                     41P]   IF 1*4 3 X in Flange 045200     RV-15 T                 B-G-1       VT-1                                           Only when disassembled.
a DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 ZNSERVZCE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 41 tor Vessel Flange NUHBER: 00.0 SUHHARY EXAHZNATZON AREA NUHBER IDENTIFICATION INSPECTION ZNTERVAZ ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERZOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVZCE YEAR ZNSTRUCTIONS
Reactor Vessel          B6. 50                                                    ttN/A4*
~~CALIBRATION BLOCX~~045500 RV-17-L B-G-1 Reactor Vcsscl Threads B6.40 in Flange X Only when disassembled.
3 X Bushings in Flange 045300     RV-16-L                 B-G-1       UT                                             Only when disassembled.
++Pl-LF-1*~
Reactor Vcsscl Threads B6.40                                                       **Pl-Z,F-1**
045600 RV-17-T Reactor Vassal Bushings in Flange B-G 1 B6.50 3 X Only when disassembled.
3 X in Flange 045400     RV-16-T                 B G-1                                                     Only when disassembled.
*~N/A~~045700 RV 18 L B-G 1 UT Reactor Vessel Threads B6.40 in Flange 3 X Only when disassembled.
Reactor Vessel         B6. 50                                                    **N/A~~
*~PI-LF-1*~
3 X Bushings in Flange
045800 RV-18-T Reactor Vessel Bushings in Flango B-G-1 B6.50 VT-1 3 X Only when disasscmblcd.
~*N/A**045900 RV 19 L B G-1 UT Reactor Vcsscl Threads B6.40 in Flange 3 X Only when disasscmblcd.
**Pl LF-1**046000 RV-19-T Reactor Vessel Bushings in Flange BG1 B6.50 3 X Only when disasscmblcd.
046100 RV-20-L B-G 1 UT Reactor Vessel Thrca'ds B6.40 in Flange 3 X Only when disassembled.
++Pl-LF-I++
046200 RV-20-T Reactor Vcsscl Bushings in Flango B-G-1 B6.50 VT"1 3 X Only when disasscmblcd.


DATE: 10/15/99 REVZSZON: 0 NZNE MILE POINT NUCLEAR PLANT UNIT 1 ZNSERVZCE INSPECTION TEN-YEAR PIAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 42 tor Vessel Flange NUMBER: 00.0  
a DATE: 10/15/99                           NINE MILE POINT NUCLEAR PLANT UNIT 1                        PAGE: 41 REVISION:        0                        ZNSERVZCE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS tor Vessel Flange NUHBER: 00. 0 INSPECTION ZNTERVAZ                      PLAN STATUS            PRESERVZCE YEAR ASME                FIRST        SECOND      THIRD SEC. XZ              PERIOD        PERIOD      PERZOD SUHHARY    EXAHZNATZON AREA        CATEGY      NDE                OUTAGE                          ZNSTRUCTIONS NUHBER      IDENTIFICATION          ITEM NO    METH    1  2  3  4  1  2  3  4  1  2  3  4 ~ ~CALIBRATION BLOCX~ ~
045500    RV-17-L                B-G-1                                                      Only when disassembled.
Reactor Vcsscl Threads B6.40                                                      ++Pl-LF-1*~
X in Flange 045600    RV-17-T                B-G 1                                                      Only when disassembled.
Reactor Vassal          B6.50                                                      *~N/A~~
3 X Bushings in Flange 045700    RV 18  L                B-G 1      UT                                            Only when disassembled.
Reactor Vessel Threads B6.40                                                      *~PI-LF-1*~
3 X in Flange 045800    RV T                B-G-1      VT-1                                          Only when disasscmblcd.
Reactor Vessel          B6.50                                                      ~*N/A**
3 X Bushings in Flango 045900    RV 19 L                B G-1      UT                                            Only when disasscmblcd.
Reactor Vcsscl Threads B6.40                                                      **Pl LF-1**
3 X in Flange 046000    RV-19-T                BG1                                                        Only when disasscmblcd.
Reactor Vessel          B6. 50 3 X Bushings in Flange 046100    RV-20-L                  B-G 1      UT                                            Only when disassembled.
Reactor Vessel Thrca'ds B6.40                                                      ++Pl-LF-I++
3 X in Flange 046200    RV-20-T                  B-G-1      VT"1                                          Only when disasscmblcd.
Reactor Vcsscl          B6. 50 3 X Bushings in Flango
 
DATE:  10/15/99                            NZNE MILE POINT NUCLEAR PLANT UNIT 1                         PAGE: 42 REVZSZON:        0                          ZNSERVZCE INSPECTION TEN-YEAR PIAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS tor Vessel Flange NUMBER: 00. 0 INSPECTION INTERVAL                      PLAN STATUS            PRESERVICE YEAR ASME                FIRST        SECOND      THIRD SEC. XZ              PERIOD        PERIOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMZNATZON AREA NUMBER IDENTIFICATION INSPECTION INTERVAL ASME SEC.XZ CATEGY NDE ZTEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR INSTRUCTIONS
EXAMZNATZON AREA       CATEGY      NDE                OUTAGE                        INSTRUCTIONS NUMBER     IDENTIFICATION         ZTEM NO     METH   1 2 3 4   1   2 3 4   1 2 3 4 **CALIBRATIONBLOCK**
**CALIBRATION BLOCK**046300 RV-21-L B-G-1 Reactor Vessel Threads B6.40 in Flange 3 X Only when disassembled.
046300     RV-21-L                 B-G-1                                                     Only when disassembled.
ttP]LF]tt 046400 RV-21-T Reactor Vcsscl Bushings in Flange B-G-1 B6.50 VT-1 3 X Only when disassembled.
Reactor Vessel Threads B6.40                                                       ttP] LF ]tt 3 X in Flange 046400     RV-21-T                 B-G-1       VT-1                                           Only when disassembled.
046500 RV-22-L B-G-1 UT Reactor Vessel Threads B6.40 in Flange 3 X Only when disasscmblcd.
Reactor Vcsscl          B6.50 3 X Bushings in Flange 046500     RV-22-L                 B-G-1       UT                                             Only when disasscmblcd.
~~Pl-LF-1*~
Reactor Vessel Threads B6.40                                                       ~~Pl-LF-1*~
046600 RV-22-T Reactor Vessel Bushings in Flange BG1 B6.50 3 X Only when disasscmblcd.
3 X in Flange 046600     RV-22-T                 BG1                                                       Only when disasscmblcd.
**N/A~~046700 RV-23-L B G-1 UT Reactor Vessel Threads B6.40 in Flange 3 X Only when disassembled.
Reactor Vessel          B6.50                                                      **N/A~~
+*Pl-LF-1*~
3 X Bushings in Flange 046700     RV-23-L                 B G-1       UT                                             Only when disassembled.
046800 RV-23-T Reactor Vessel Bushings in Flange B-G" 1 B6.50 3 X Only when disassembled.
Reactor Vessel Threads B6.40                                                       +*Pl-LF-1*~
046900 RV 24-L B-G-1 UT Reactor Vcsscl Threads B6.40 in Flange 3 X Only when disasscmblcd.
3              X in Flange 046800     RV-23-T                 B-G"1                                                     Only when disassembled.
**Pi-LF-1~*
Reactor Vessel          B6. 50 3             X Bushings in Flange 046900     RV 24-L                 B-G-1       UT                                             Only when disasscmblcd.
047000 RV-24-T Reactor Vcsscl Bushings in Flange B G-1 B6.50 3 X Only when disassembled.
Reactor Vcsscl Threads B6.40                                                       **Pi-LF-1~*
0 4'I DATE: 10/15/99 REVISION: 0 NINE MILE POZNT NUCLEAR PLANT UNIT 1 ZNSERVZCE INSPECTION TEN-YEAR PZAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 43 tor Vessel Flange NUMBER: 00.0  
3              X in Flange 047000     RV-24-T                 B G-1                                                     Only when disassembled.
Reactor Vcsscl          B6.50 3             X Bushings in Flange
 
0 4 'I
 
DATE: 10/15/99                           NINE MILE POZNT NUCLEAR PLANT UNIT 1                         PAGE: 43 REVISION:        0                        ZNSERVZCE INSPECTION TEN-YEAR PZAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS tor Vessel   Flange NUMBER:   00. 0 INSPECTION INTERVAL                    PLAN STATUS            PRESERVZCE YEAR ASME                FIRST        SECOND      THIRD SEC. XZ              PERIOD      PERIOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTZFICATZON INSPECTION INTERVAL ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVZCE YEAR INSTRUCTIONS
EXAMINATION AREA       CATEGY      NDE                OUTAGE                        INSTRUCTIONS NUMBER     IDENTZFICATZON         ITEM NO   METH     1 2 3 4 1   2 3 4   1 2 3 4 ~ ~CALIBRATION BLOCK~ ~
~~CALIBRATION BLOCK~~047100 RV-25-L B-G-1 Reactor Vessel Threads B6 40 in Flange 3 X Only when disassembled.
047100     RV-25-L                 B-G-1                                                     Only when disassembled.
~+Pl-LF-I**
Reactor Vessel Threads B6 40                                                     ~+Pl-LF-I**
047200 RV-25 T Reactor Vessel Bushings in Flange B-G-l B6.50 3 X Only when disasscmblcd.
3              X in Flange 047200     RV-25 T                 B-G-l                                                     Only when disasscmblcd.
047300 RV-26-L B-G-1 UT Reactor Vessel Threads B6.40 in Flange 3 X Only when disassembled.
Reactor Vessel          B6.50 3             X Bushings in Flange 047300     RV-26-L                 B-G-1       UT                                           Only when disassembled.
*~PI-LF-I+
Reactor Vessel Threads B6.40                                                     *~PI-LF-I+~
~047400 RV 26 T Reactor Vessel Bushings in Flange B-G"1 B6.50 3 X Only when disassembled.
3              X in  Flange 047400     RV 26 T                 B-G"1                                                     Only when disassembled.
047500 RV-27-L B-G-1 UT Reactor Vessel Threads B6.40 in Flange 3 X Only when disassembled.
Reactor Vessel          B6. 50 3             X Bushings in Flange 047500     RV-27-L                 B-G-1       UT                                           Only when disassembled.
~*Pi-LF-I~+
Reactor Vessel Threads B6.40                                                     ~*Pi-LF-I~+
047600 RV-27-T Reactor Vessel Bushings in Flange B-G 1 B6.50 3 X Only when disassembled.
3              X in Flange 047600     RV-27-T                 B-G 1                                                     Only when disassembled.
047700 RV 28-L B-G-1 UT Reactor Vessel Threads B6.40 in Flange 3 X Only when disassembled.
Reactor Vessel          B6.50 3             X Bushings in Flange 047700     RV 28-L               B-G-1       UT                                           Only when disassembled.
**Pl-LF-I++
Reactor Vessel Threads B6.40                                                     **Pl-LF-I++
047800 RV-28-T Reactor Vessel Bushings in Flange B-G-1 B6.50 3 X Only when disassembled.
3              X in Flange 047800   RV-28-T                 B-G-1                                                     Only when disassembled.
lq DATE: 10/15/99 REVISION: 0 NINE MILE POZNT NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION TEN-YEAR PLAN CZASS 1 SECTION XI SCHEDULED COMPONENTS PAGE: 44 tor Vessel Flange NUMBER: 00.0  
Reactor Vessel          B6. 50 3             X Bushings in Flange
 
lq DATE: 10/15/99                           NINE MILE POZNT NUCLEAR PLANT UNIT 1                             PAGE: 44 REVISION:        0                        INSERVICE INSPECTION TEN-YEAR PLAN CZASS 1 SECTION XI SCHEDULED COMPONENTS tor Vessel Flange NUMBER: 00.0 ZNSPECTION INTERVAL                    PLAN STATUS            PRESERVICE YEAR ASME                FIRST        SECOND      THZRD SEC. XZ              PERZOD        PERZOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION ZNSPECTION INTERVAL ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERZOD PLAN STATUS SECOND PERZOD THZRD PERIOD---OUTAGE--
EXAMINATION AREA       CATEGY ITEM NO NDE            ---OUTAGE--                         ZNSTRUCTZONS NUMBER      IDENTIFICATION                    METH    1 2 3   4 1   2 3 4   1 2 3 4 1 rCALIBRATION BLOCK+ ~
1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR ZNSTRUCTZONS 1 rCALIBRATION BLOCK+~047900 RV-29-L B-G-1 UT Reactor Vessel Threads B6.40 in Flange 3 X Only when disassembled.
047900     RV-29-L                 B-G-1       UT                                           Only when disassembled.
0IP]LF]**048000 RV 29 T Reactor Vessel Bushings in Flange B-G-1 VT-1 B6.50 3 X Only when disassembled.
Reactor Vessel Threads B6.40                                                     0IP] LF ]**
~+N/A++048100 RV-30-L B-G-l UT Reactor Vessel Threads B6.40 in Flange 3 X Only when disasscmblcd.
3              X in Flange 048000     RV 29 T                 B-G-1     VT-1                                           Only when disassembled.
~~Pl-LF-1~~048200 RV-30-T Reactor Vcsscl Bushings in Flange B G-1 B6.50 3 X Only when disasscmblcd.
Reactor Vessel          B6.50                                                    ~+N/A++
*'~N/A~*048300 RV-31-L B-G-l UT Reactor Vessel Threads B6.40 in Flange 3 X Only when disassembled.
3              X Bushings in Flange 048100     RV-30-L                 B-G-l     UT                                             Only when disasscmblcd.
~~Pl-LF-1~~
Reactor Vessel Threads B6.40                                                     ~ ~ Pl-LF-1 ~ ~
048400 RV-31-T Reactor Vessel Bushings in Flange B G"1 B6.50 3 X Only when disassembled.
3              X in Flange 048200     RV-30-T                 B G-1                                                     Only when disasscmblcd.
1 O'/A1 0 048500 RV-32-L B-G-l UT Reactor Vessel Threads B6.40 in Flange 3 X Only when disassembled.
Reactor Vcsscl          B6.50                                                    *'~N/A~*
~~Pl-LF-I**
3              X Bushings in Flange 048300     RV-31-L                 B-G-l     UT                                             Only when disassembled.
048600 RV-32-T Reactor Vessel Bushings in Flange B G-1 B6.50 3 X Only when disassembled.
Reactor Vessel Threads B6.40                                                     ~~Pl-LF-1~~
*IN/A4*  
3              X in Flange 048400     RV-31-T                 B G"1                                                     Only when disassembled.
Reactor Vessel          B6.50                                                    1 O'/A1 0 3              X Bushings in Flange 048500     RV-32-L                 B-G-l     UT                                             Only when disassembled.
Reactor Vessel Threads B6.40                                                     ~~Pl-LF-I**
3              X in Flange 048600     RV-32-T                 B G-1                                                     Only when disassembled.
Reactor Vessel          B6.50                                                    *IN/A4*
3              X Bushings in Flange


DATE: 10/15/99 REVZSZON: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 ZNSERVICE ZNSPECTZON TEN-YEAR PIAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 45 tor Vessel Flange NUMBER: 00.0  
DATE: 10/15/99                             NINE MILE POINT NUCLEAR PLANT UNIT 1                           PAGE: 45 REVZSZON:        0                            ZNSERVICE ZNSPECTZON TEN-YEAR PIAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS tor Vessel Flange NUMBER: 00.0 INSPECTION INTERVAL                      PLAN STATUS            PRESERVICE YEAR ASME                  FIRST        SECOND      THIRD SEC. XI              PERZOD      PERIOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL ASME SEC.XI CATEGY NDE ITEM NO METH FIRST PERZOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR INSTRUCTIONS
EXAMINATION AREA       CATEGY        NDE                OUTAGE                          INSTRUCTIONS NUMBER     IDENTIFICATION         ITEM NO     METH   1   2 3 4 1   2 3 4   1 2 3 4 ~~CALIBRATION BLOCK*~
~~CALIBRATION BLOCK*~048700 RV-33-L B-G-1 UT Reactor Vcsscl Threads B6.40 in Flange 3 X Only when disassembled.
048700     RV-33-L                 B-G-1         UT                                           Only when disassembled.
a+PI-LF-Iae 048800 RV"33-T Reactor Vessel Bushings in Flange B-G-l B6.50 3 X Only when disassembled.
Reactor Vcsscl Threads B6.40                                                       a+PI-LF-Iae 3              X in Flange 048800     RV"33-T                 B-G-l                                                       Only when disassembled.
4 1N/A**048900 RV-34-L B-G"1 UT Reactor Vessel Threads B6.40 in Flange 3 X Only when disasscmblcd.
Reactor Vessel          B6.50                                                      4 1N/A**
~+Pl-LF-1~+049000 RV 34 T Reactor Vcsscl Bushings in Flange B G'1 B6.50 3 X Only when disassembled.
3              X Bushings in Flange 048900     RV-34-L                 B-G"1         UT                                           Only when disasscmblcd.
**N/Af*049100 RV-35-L B-G-1 UT Reactor Vessel Threads B6.40 in Flange 3 X Only when disassembled.
Reactor Vessel Threads B6.40                                                       ~ +Pl-LF-1 ~ +
*+Pl-LF-I++
3              X in Flange 049000     RV 34 T                 B G   '1                                                   Only when disassembled.
049200 RV-35-T Reactor Vessel Bushings in Flange BG1 B6.50 3 X Only when disassembled.
Reactor Vcsscl          B6. 50                                                      **N/Af*
l*N/A1 1 049300 RV-36-L BG1UT Reactor Vessel Threads B6.40 in Flange 3 X Only when disasscmblcd.
3              X Bushings in Flange 049100     RV-35-L                 B-G-1         UT                                           Only when disassembled.
aaPI LF 1**049400 RV-36-T Reactor Vessel Bushings in Flange B-G-1 B6.50 3 X Only when disasscmblcd.
Reactor Vessel Threads B6.40                                                       *+Pl-LF-I++
t 1N/Ak*  
3              X in Flange 049200     RV-35-T                 BG1                                                         Only when disassembled.
Reactor Vessel          B6. 50                                                      l*N/A11 3              X Bushings in Flange 049300     RV-36-L                 BG1UT                                                       Only when disasscmblcd.
Reactor Vessel Threads B6.40                                                         aaPI LF 1**
3              X in Flange 049400   RV-36-T                 B-G-1                                                       Only when disasscmblcd.
Reactor Vessel          B6.50                                                      t 1N/Ak*
3              X Bushings in Flange


DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 ZNSERVZCE INSPECTION TEN-YEAR PZAN CZASS 1 SECTION XI SCHEDULED COMPONENTS PAGE: 46 tor Vcsscl Flange NUMBER: 00.0  
DATE: 10/15/99                           NINE MILE POINT NUCLEAR PLANT UNIT 1                             PAGE: 46 REVISION:        0                        ZNSERVZCE INSPECTION TEN-YEAR PZAN CZASS 1 SECTION XI SCHEDULED COMPONENTS tor Vcsscl   Flange NUMBER:   00. 0 ZNSPECTZON ZNTERVAL                      PLAN STATUS            PRESERVICE YEAR ASME                FIRST        SECOND      THIRD SEC. XZ              PERIOD        PERIOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTZFZCATZON ZNSPECTZON ZNTERVAL ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR INSTRUCTIONS
EXAMINATION AREA       CATEGY      NDE                  OUTAGE                          INSTRUCTIONS NUMBER     IDENTZFZCATZON         ITEM NO   METH     1 2 3 4   1   2 3 4   1 2 3 4 + +CALIBRATION   BLOCK+ +
++CALIBRATION BLOCK++049500 RV-37-L B-G-l Reactor Vessel Threads B6.40 in Flange 3----X Only when disassembled.
049500     RV-37-L                 B-G-l                                                     Only when disassembled.
~+Pl-LF-1~~049600 RV-37-T Reactor Vessel Bushings in Flange B-G-l B6.50 3 X Only when disassembled.
Reactor Vessel Threads B6.40                                                       ~+ Pl-LF-1 ~ ~
~kN/Af4 049700 RV-38-L B-G-1 UT Reactor Vessel Threads B6.40 in Flange X Only when disassembled.
in Flange                                  3 - - - -      X 049600     RV-37-T                 B-G-l                                                     Only when disassembled.
~~Pl-LF-l~~
Reactor Vessel          B6.50                                                      ~kN/Af4 3              X Bushings in Flange 049700     RV-38-L                 B-G-1       UT                                             Only when disassembled.
049800 RV-38-T Reactor Vcsscl Bushings in Flange B-G-1 B6.50 3 X Only when disassembled
Reactor Vessel Threads B6.40                                                       ~~Pl-LF-l~~
~~N/A+*049900 RV-39-L B-G-1 UT Reactor Vcsscl Threads B6.40 in Flange 3 X Only when disassembled.
in Flange                                                X 049800     RV-38-T                 B-G-1                                                     Only when disassembled Reactor Vcsscl          B6. 50                                                     ~~N/A+*
~~Pl-LF-I**
3              X Bushings in Flange 049900     RV-39-L                 B-G-1       UT                                             Only when disassembled.
050000 RV-39-T Reactor Vessel Bushings in Flange B-G-1 B6.50 VT-1 3 X Only when disassembled.
Reactor Vcsscl Threads B6.40                                                       ~~Pl-LF-I**
*+N/A+*050100 RV-40-L B G-l UT Reactor Vessel Threads B6.40 in Flange 3 X Only when disassembled.
3              X in Flange 050000     RV-39-T                 B-G-1       VT-1                                           Only when disassembled.
**Pl-LF-1*~
Reactor Vessel          B6.50                                                      *+N/A+*
050200 RV-40-T Reactor Vessel Bushings in Flange B G 1 B6.50 3 X Only when disassembled.
3              X Bushings in Flange 050100   RV-40-L                 B G-l       UT                                             Only when disassembled.
k4N/A*4  
Reactor Vessel Threads B6.40                                                       **Pl-LF-1*~
3              X in Flange 050200   RV-40-T                 B G 1                                                     Only when disassembled.
Reactor Vessel          B6.50                                                      k4N/A*4 3              X Bushings in Flange


DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 ZNSERVICE INSPECTION TEN-YEAR PIAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 47 tor Vessel Flange NUMBER: 00.0  
DATE: 10/15/99                           NINE MILE POINT NUCLEAR PLANT UNIT 1                         PAGE: 47 REVISION:        0                          ZNSERVICE INSPECTION TEN-YEAR PIAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS tor Vessel Flange NUMBER: 00. 0 INSPECTION INTERVAL                      PLAN STATUS            PRESERVZCE YEAR ASME                FIRST        SECOND      THIRD SEC. XZ              PERIOD        PERIOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL ASME SEC.XZ CATEGY NDE ZTEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVZCE YEAR INSTRUCTIONS
EXAMINATION AREA       CATEGY      NDE                OUTAGE                          INSTRUCTIONS NUMBER     IDENTIFICATION         ZTEM NO   METH     1 2 3 4   1   2 3 4   1 2 3 4 ~~CALIBRATION BLOCK~~
~~CALIBRATION BLOCK~~050300 RV-41-L B-G 1 Reactor Vessel Threads B6.40 in Flange 3 X Only when disassembled.
050300     RV-41-L                 B-G 1                                                     Only when disassembled.
++Pl-LF-1~~
Reactor Vessel Threads B6.40                                                       ++Pl-LF-1~~
050400 RV-41-T Reactor Vessel Bushings in Flange B-G-1 B6.50 3 X Only when disassembled.
3              X in Flange 050400     RV-41-T                 B-G-1                                                     Only when disassembled.
+AN/A+a 050500 RV-42-L B-G-1 UT Reactor Vcsscl Threads B6.40 in Flange 3-"--X Only when disassembled.
Reactor Vessel          B6.50                                                      +AN/A+a 3              X Bushings in Flange 050500     RV-42-L                 B-G-1       UT                                             Only when disassembled.
**Pl-LF-1**
Reactor Vcsscl Threads B6.40                                                     **Pl-LF-1**
050600 RV 42 T Reactor Vessel Bushings in Flange B G-1 B6.50 3 X Only when disassembled.
in Flange                                3  - " - -    X 050600     RV 42 T                 B G-1                                                     Only when disassembled.
t*N/A*4 050700 RV-43-I B-G-1 UT Reactor Vessel Threads B6.40 in Flange 3 X Only when disasscmblcd.
Reactor Vessel          B6. 50                                                    t*N/A*4 3              X Bushings in Flange 050700     RV-43-I                 B-G-1       UT                                             Only when disasscmblcd.
++Pl-LF-1*~, 050800 RV 43 T Reactor Vessel Bushings in Flange B-G-1 B6.50 VT-1 3 X Only when disasscmblcd.
Reactor Vessel Threads B6.40                                                       + +Pl-LF-1*~,
1 O'/A**050900 RV-44-L B G-1 UT Reactor Vessel Threads B6.40 in Flange 3 X Only when disassembled.
3              X in Flange 050800     RV 43 T                 B-G-1       VT-1                                           Only when disasscmblcd.
**Pl-I,F-1**
Reactor Vessel          B6.50                                                      1 O'/A**
051000 RV-44-T Reactor Vessel Bushings in Flange B-G-1 B6.50 3 X Only when disasscmblcd.
3              X Bushings in Flange 050900   RV-44-L                 B G-1       UT                                             Only when disassembled.
*~N/A~~
Reactor Vessel Threads B6.40                                                       **Pl-I,F-1**
4 DATE: 10/15/99 REVISION: 0 NINE MZLE POINT NUCLEAR PLANT UNIT 1 INSERVZCE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 48 tor Vessel Flange NUMBER: 00.0  
3 in Flange                                                              X 051000   RV-44-T                 B-G-1                                                     Only when disasscmblcd.
Reactor Vessel          B6. 50                                                    *~N/A~~
3                            X Bushings in Flange
 
4 DATE: 10/15/99                           NINE MZLE POINT NUCLEAR PLANT UNIT 1                           PAGE: 48 REVISION:        0                        INSERVZCE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS tor Vessel Flange NUMBER: 00. 0 INSPECTION INTERVAL                    PLAN STATUS            PRESERVICE YEAR ASME                FIRST        SECOND      THIRD SEC. XZ              PERZOD      PERIOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER ZDENTZFZCATZON INSPECTION INTERVAL ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERZOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR INSTRUCTIONS
EXAMINATION AREA       CATEGY    NDE                OUTAGE                          INSTRUCTIONS NUMBER     ZDENTZFZCATZON         ITEM NO   METH   1 2 3 4 1   2 3 4   1 2 3 4 *+CALIBRATIONBLOCK~+
*+CALIBRATION BLOCK~+051100 RV-45-L B-G-l Reactor Vessel Threads B6.40 in Flange 3 X Only when disassembled.
051100     RV-45-L                 B-G-l                                                   Only when disassembled.
aaP1 IF 051200 RV-45-T Reactor Vessel Bushings in Flange B-G-l B6.50 VT-1 3 X Only when disassembled.
Reactor Vessel Threads B6.40                                                     aaP1  IF 3                            X in Flange 051200     RV-45-T                 B-G-l       VT-1                                         Only when disassembled.
**N/A+i 051300 RV-46-L BG1UT Reactor Vessel Threads B6.40 in Flange 3 X Only when disassembled.
Reactor Vessel          B6.50                                                    **N/A+i 3                            X Bushings in Flange 051300     RV-46-L                 BG1UT                                                   Only when disassembled.
~+Pl-LF-1~~051400 RV-46-T Reactor Vessel Bushings in Flange B-G-1 B6.50 3 X Only when disassembled.
Reactor Vessel Threads B6.40                                                     ~+ Pl-LF-1 ~ ~
~+N/A++051500 RV-47-L B-G-1 Reactor Vessel Threads B6.40 in Flange 3 X Only when disassembled.
3                            X in Flange 051400     RV-46-T                 B-G-1                                                   Only when disassembled.
*~PI-LF-l~~
Reactor Vessel          B6.50                                                    ~+N/A++
051600 RV-47-T Reactor Vessel Bushings in Flange B-G-1 B6.50 3 X Only when disassembled.
3                            X Bushings in Flange 051500     RV-47-L                 B-G-1                                                   Only when disassembled.
f 4N/Al t 051700 RV-48-L B-G-1 UT Reactor Vessel Threads B6.40 in Flange 3 X Only when disassembled.
Reactor Vessel Threads B6.40                                                   *~PI-LF-l~~
**Pl-I F-1**051800 RV-48-T Reactor Vessel Bushings in Flange B-G-1 B6.50 3 X Only when disasscmblcd.
3                            X in Flange 051600     RV-47-T                 B-G-1                                                   Only when disassembled.
~~N/Ai~
Reactor Vessel          B6.50                                                    f 4N/Alt 3                            X Bushings in Flange 051700     RV-48-L                 B-G-1     UT                                           Only when disassembled.
0~},
Reactor Vessel Threads B6.40                                                     **Pl-IF-1**
DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PIANT UNIT 1 INSERVICE INSPECTION TEN-YEAR PIAN CZASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 49 tor Vcsscl Flange NUMBER: 00.0  
3                            X in Flange 051800   RV-48-T                 B-G-1                                                   Only when disasscmblcd.
Reactor Vessel          B6.50                                                    ~~N/Ai~
3                            X Bushings in Flange
 
0
~ },
 
DATE: 10/15/99                           NINE MILE POINT NUCLEAR PIANT UNIT 1                         PAGE: 49 REVISION:        0                          INSERVICE INSPECTION TEN-YEAR PIAN CZASS 1 SECTION XZ SCHEDULED COMPONENTS tor Vcsscl Flange NUMBER: 00.0 INSPECTION INTERVAL                    PIAN STATUS            PRESERVZCE YEAR ASME                FIRST        SECOND      THIRD SEC. XZ              PERIOD      PERZOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD PIAN STATUS SECOND PERZOD THIRD PERIOD OUTAGE 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVZCE YEAR INSTRUCTIONS
EXAMINATION AREA       CATEGY      NDE                OUTAGE                        INSTRUCTIONS NUMBER     IDENTIFICATION         ITEM NO     METH   1 2 3 4 1   2 3 4   1 2 3 4 ++CALIBRATION BLOCK+*
++CALIBRATION BLOCK+*051900 RV-49-L B-G-l UT Reactor Vessel Threads B6.40 in Flange 3 X Only when disassembled.
051900     RV-49-L                 B-G-l       UT                                           Only when disassembled.
toPI LF Itf 052000 RV-49-T Reactor Vessel Bushings in Flango B-G-1 B6.50 3 X Only when disassembled.
Reactor Vessel Threads B6.40 3
**N/A*~052100 RV-50-L B-G-1 UT Reactor Vessel Threads B6.40 in Flange 3 X Only when disassembled.
toPI LF Itf in Flange                                                              X 052000     RV-49-T                 B-G-1                                                     Only when disassembled.
**Pl-LF-1*~
Reactor Vessel          B6.50                                                    **N/A*~
052200 RV-50-T Reactor Vessel Bushings in Flange B-G-1 B6.50 3 X Only when disassembled.
3                            X Bushings in Flango 052100     RV-50-L                 B-G-1       UT                                           Only when disassembled.
*iN/A*%052300 RV-51-L B-G-1 UT Reactor vcsscl Threads B6.40 in Flange 3 X Only when disassembled.
Reactor Vessel Threads B6.40                                                     **Pl-LF-1*~
+*Pl-LF-1**
3                            X in Flange 052200     RV-50-T                 B-G-1                                                     Only when disassembled.
052400 RV-51-T Reactor Vcsscl Bushings in Flange B"G 1 B6.50 3 X Only when disassembled.
Reactor Vessel          B6.50                                                    *iN/A*%
+*N/A*+052500 RV-52-L B" G-1 UT Reactor Vessel Threads B6.40 in Flange 3 X Only when disassembled.
3                            X Bushings in Flange 052300     RV-51-L                 B-G-1       UT                                           Only when disassembled.
**Pl-LF-1**
Reactor vcsscl Threads B6.40                                                     +*Pl-LF-1**
052600 RV-52-T Reactor Vessel Bushings in Flange B-G-1 86.50 3 X Only when disassembled.
3                            X in Flange 052400     RV-51-T                 B"G 1                                                   Only when disassembled.
**N/A**  
Reactor Vcsscl          B6.50                                                    +*N/A*+
3                            X Bushings in Flange 052500     RV-52-L                 B"G-1       UT                                           Only when disassembled.
Reactor Vessel Threads B6.40                                                     **Pl-LF-1**
3                            X in Flange 052600   RV-52-T                 B-G-1                                                     Only when disassembled.
Reactor Vessel          86.50                                                    **N/A**
3                            X Bushings in Flange


DATE: 10/15/99 REVISION: 0 NZNE MILE POINT NUCLEAR PLANT UNIT 1~INSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 50 tor Vessel Flange NUMBER: 00.0  
DATE: 10/15/99                           NZNE MILE POINT NUCLEAR PLANT UNIT 1                         PAGE: 50 REVISION:        0                        ~ INSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS tor Vessel Flange NUMBER: 00. 0 ZNSPECTION ZNTERVAL                      PZAN STATUS            PRESERVICE YEAR I
ASME                  FIRST        SECOND      THIRD SEC. XZ                PERIOD      PERIOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION ZNSPECTION ZNTERVAL ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD PZAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR I INSTRUCTIONS
EXAMINATION AREA       CATEGY      NDE                OUTAGE                        INSTRUCTIONS NUMBER     IDENTIFICATION         ITEM NO     METH   1 2 3 4 1   2 3 4   1 2 3 4 ~*CALIBRATION BLOCK**
~*CALIBRATION BLOCK**052700 RV-53-L B-G-1 Reactor Vessel Threads B6.40 in Flange 3 X Only when disassembled.
052700     RV-53-L                 B-G-1                                                     Only when disassembled.
4%PI LF Ilt 052800 RV-53-T Reactor Vessel Bushings in Flange B-G-1 B6.50 3 X Only when disassembled.
Reactor Vessel Threads B6.40 3
~~N/A++052900 RV-54-L B-G-1 UT Reactor Vcsscl Threads B6.40 in Flange 3 X Only when disassembled.
4%PI LF Ilt X
~~PI-LF-I++
in Flange 052800     RV-53-T                 B-G-1                                                     Only when disassembled.
053000 RV-54-T Reactor Vessel Bushings in Flange B-G-1 B6.50 3 Only when disassembled.
Reactor Vessel          B6.50                                                      ~~N/A++
*ON/A*%053100 RV 55 L B-G-1 UT Reactor Vessel Threads B6.40 in Flange 3 X Only when disasscmblcd.
3                            X Bushings in Flange 052900     RV-54-L                 B-G-1       UT                                           Only when disassembled.
++Pl-LF-1~~
Reactor Vcsscl Threads B6.40                                                       ~~PI-LF-I++
053200 RV-55-T Reactor Vessel Bushings in Flange B-G-1 B6.50 3 X Only when disassembled.
3                            X in Flange 053000     RV-54-T                 B-G-1                                                     Only when disassembled.
++N/A++053300 RV-56-L B-G-l UT Reactor Vcsscl Threads B6 40 in Flange 3 X Only when disassembled.
Reactor Vessel          B6.50                                                      *ON/A*%
**Pl-LF-1**
3 Bushings in Flange 053100     RV 55 L                 B-G-1       UT                                           Only when disasscmblcd.
053400 RV 56 T Reactor Vessel Bushings in Flange B"G 1 B6.50 3 X Only when disassembled.
Reactor Vessel Threads B6.40                                                       ++Pl-LF-1~~
*ON/At 1
3                            X in Flange 053200     RV-55-T                 B-G-1                                                     Only when disassembled.
Reactor Vessel          B6.50                                                      ++N/A++
3                            X Bushings in Flange 053300     RV-56-L                 B-G-l       UT                                           Only when disassembled.
Reactor Vcsscl Threads B6 40                                                     **Pl-LF-1**
3                            X in Flange 053400     RV 56 T                 B"G 1                                                     Only when disassembled.
Reactor Vessel          B6.50                                                      *ON/At1 3                            X Bushings in Flange


DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 ZNSERVZCE INSPECTION TEN-YEAR PIAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 51 tor Vessel Flange NUMBER: 00.0  
DATE: 10/15/99                           NINE MILE POINT NUCLEAR PLANT UNIT 1                             PAGE: 51 REVISION:        0                        ZNSERVZCE INSPECTION TEN-YEAR PIAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS tor Vessel   Flange NUMBER:   00.0 INSPECTZON INTERVAL                      PLAN STATUS            PRESERVZCE YEAR FIRST        SECOND      THIRD SEC. XZ              PERIOD        PERZOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTZON INTERVAL SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERZOD THIRD PERIOD OUTAGE 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVZCE YEAR INSTRUCTIONS t t CALIBRATION BLOCKt t 053500 RV-57-L BG1UT Reactor Vessel Threads B6.40 in Flange 3 X Only when disassembled."t Pl-IF-I t~053600 RV-57-T Reactor Vessel Bushings in Flange B-G-1 B6.50 3 X Only when disasscmblcd.
EXAMINATION AREA       CATEGY      NDE                OUTAGE                            INSTRUCTIONS NUMBER     IDENTIFICATION         ITEM NO     METH   1 2 3 4   1   2 3 4   1 2 3 4 t t CALIBRATION BLOCKtt 053500     RV-57-L               BG1UT                                                     Only when disassembled.
*'tN/A't 053700 RV-58-L B-G-1 UT Reactor Vessel Threads B6.40 in Flange 3 X Only when disasscmblcd.
Reactor Vessel Threads B6.40                                                       "tPl -IF-It ~
t*Pl-LF-ltt 053800 RV 58 T Reactor Vcsscl Bushings in Flange B G-1 B6.50 3 X Only when disassembled.
3                            X in Flange 053600   RV-57-T                 B-G-1                                                     Only when disasscmblcd.
*tN/A**053900 RV"59-L B-G-1 UT Reactor Vessel Threads B6.40 in Flange 3 X Only when disassembled.
Reactor Vessel          B6. 50                                                    *'tN/A' t 3                            X Bushings in Flange 053700   RV-58-L                 B-G-1       UT                                             Only when disasscmblcd.
t t Pl-LF-1 t t 054000 RV-59-T Reactor Vessel Bushings in Flange BG1 B6.50 VT 1 3 X Only when disassembled.
Reactor Vessel Threads B6.40                                                       t*Pl-LF-ltt 3                            X in Flange 053800   RV 58 T                 B G-1                                                     Only when disassembled.
ttN/Att 054100 RV 60-L B-G-1 UT Reactor Vcsscl Threads B6.40 in Flange 3 X Only when disassembled.
Reactor Vcsscl          B6.50                                                      *tN/A**
ttpl-LF-ltt 054200 RV-60-T Reactor Vessel Bushings in Flange B-G-1 B6.50 VT 1 3 X Only when disasscmblcd.
3                            X Bushings in Flange 053900   RV"59-L                 B-G-1       UT                                             Only when disassembled.
t tN/At 1
Reactor Vessel Threads B6.40                                                       t t Pl-LF-1 t t 3                            X in Flange 054000   RV-59-T                 BG1         VT 1                                           Only when disassembled.
Reactor Vessel          B6. 50                                                    ttN/Att 3                            X Bushings in Flange 054100   RV   60-L               B-G-1       UT                                             Only when disassembled.
Reactor Vcsscl Threads B6.40                                                       ttpl-LF-ltt 3                            X in Flange 054200   RV-60-T                 B-G-1       VT 1                                           Only when disasscmblcd.
Reactor Vessel          B6.50                                                      t tN/At1 3                            X Bushings in Flange


DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNZT 1 ZNSERVICE INSPECTION TEN-YEAR PLAN CZASS 1 SECTION XI SCHEDULED COMPONENTS PAGE: 52 tor Vcsscl Flange NUMBER: 00.0  
DATE:   10/15/99                           NINE MILE POINT NUCLEAR PLANT UNZT 1                         PAGE: 52 REVISION:        0                          ZNSERVICE INSPECTION TEN-YEAR PLAN CZASS 1 SECTION XI SCHEDULED COMPONENTS tor Vcsscl   Flange NUMBER:   00.0 ZNSPECTION INTERVAL                      PIAN STATUS            PRESERVZCE YEAR ASME                FIRST        SECOND      THIRD SEC. XZ              PERZOD        PERZOD      PERZOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER ZDENTZFZCATION ZNSPECTION INTERVAL ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERZOD PIAN STATUS SECOND PERZOD OUTAGE THIRD PERZOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVZCE YEAR INSTRUCTIONS
EXAMINATION AREA       CATEGY      NDE                  OUTAGE                        INSTRUCTIONS NUMBER       ZDENTZFZCATION         ITEM NO   METH     1 2 3 4   1   2 3 4   1 2 3 4 ++CALIBRATION BLOCK~'~
++CALIBRATION BLOCK~'~054300 RV-61-L B-.G-1 Reactor Vessel Threads B6.40 in Flange 3 X Only when disassembled.
054300     RV-61-L                 B-.G-1                                                     Only when disassembled.
i*Pl-LF-1~~
Reactor Vessel Threads B6.40                                                       i*Pl-LF-1~~
054400 RV-61-T Reactor Vessel Bushings in Flange B-G 1 B6.50 3 X Only when disassembled.
3                            X in Flange 054400     RV-61-T                 B-G 1                                                     Only when disassembled.
*+N/A+*054500 RV-62-L B-G-1 UT Reactor Vcsscl Threads B6~40 in Flange 3 X Only when disassembled.
Reactor Vessel          B6.50                                                      *+N/A+*
~~PI-LF-I~~
3                            X Bushings in Flange 054500     RV-62-L                 B-G-1       UT                                             Only when disassembled.
054600 RV-62-T Reactor Vessel Bushings in Flange B-G-1 B6.50 VT-1 3 X Only when disasscmblcd.
Reactor Vcsscl Threads B6 40
~~N/A~~'*W 054700 RV-63-L B-G-1 UT Reactor Vessel Threads B6.40 in Flange 3 X Only when disassembled.
                                      ~                                                      ~~PI-LF-I~~
++PI-LF-1*~
3                            X in Flange 054600     RV-62-T                 B-G-1       VT-1                                           Only when disasscmblcd.
054800 RV-63-T Reactor Vcsscl Bushings in Flange B-G"1 B6.50 3 X Only when disassembled.
Reactor Vessel          B6.50                                                      ~~N/A~~
054900 RV 64-L B-G-1 UT Reactor Vessel Threads B6.40 in Flange 3 X Only when disassembled.
3                            X Bushings in Flange
**PI-LF-I**
      '*       W 054700     RV-63-L                 B-G-1       UT                                             Only when disassembled.
055000 RV-64-T Reactor Vessel Bushings in Flange B-G-1 B6.50 3 X Only when disassembled tAN/Atf  
Reactor Vessel Threads B6.40                                                       ++PI-LF-1*~
3                            X in Flange 054800     RV-63-T                 B-G"1                                                     Only when disassembled.
Reactor Vcsscl          B6.50 3                             X Bushings in Flange 054900     RV 64-L                 B-G-1       UT                                             Only when disassembled.
Reactor Vessel Threads B6.40                                                       **PI-LF-I**
3                            X in Flange 055000     RV-64-T                 B-G-1                                                     Only when disassembled Reactor Vessel          B6.50                                                     tAN/Atf 3                            X Bushings in Flange


DATE: 10/15/99 REVZSION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 ZNSERVICE ZNSPECTION TEN-YEAR PLAN CLASS 1 SECTION XI SCHEDULED COMPONENTS PAGE: 53 tor Vcsscl Interior NUMBER: 00.0  
DATE: 10/15/99                           NINE MILE POINT NUCLEAR PLANT UNIT 1                           PAGE: 53 REVZSION:        0                        ZNSERVICE ZNSPECTION TEN-YEAR PLAN CLASS 1 SECTION XI SCHEDULED COMPONENTS tor Vcsscl Interior NUMBER: 00. 0 ZNSPECTION INTERVAL                    PLAN STATUS            PRESERVICE YEAR FIRST        SECOND      THIRD SEC. XZ              PERZOD        PERIOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION ZNSPECTION INTERVAL SEC.XZ CATEGY NDE ITEM NO METH FIRST PERZOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR INSTRUCTIONS
EXAMINATION AREA       CATEGY    NDE                  OUTAGE                        INSTRUCTIONS NUMBER     IDENTIFICATION         ITEM NO   METH     1 2 3 4   1   2 3 4   1 2 3 4 **CALIBRATION BLOCK**
**CALIBRATION BLOCK**RPV (REF.DWG.NO.28A)056100 HS B-N-2 Shroud Support skirt B13.40 H8 Weld VT-3 3 X UT*USNRC GL94-03, USNRC SER 3/24/99 RFO16 scope to be defined, EVT1 top surface 6 Locations of prior indications; UT to be determined.
RPV (REF. DWG. NO. 28A) 056100     HS                     B-N-2                                                     USNRC  GL94-03,  USNRC SER Shroud Support skirt   B13.40     VT-3                                           3/24/99   RFO16 scope to 3 X H8 Weld                            UT*                                            be defined, EVT1 top surface   6 Locations of prior indications;   UT   to be determined.   **LATER**
**LATER**056200 H9 B-N-2 EVT1 Shroud Support Skirt B13.40 H9 Weld Scope to be dcfincd, BWRVZP-38 Exam 0 to 180 degrees~~N/A~~056300 H9 B N 2 EVT1 Shroud Support Skirt B13.40 H9 Weld 3 X Scope to bc dcfincd, BWRVZP-38 Exam 180 to 360 dcgrccs~~N/A**056400 H9-166 B"N-2 Shroud Support Skirt B13.40 H9 Weld Repair Anch VT-3 3 X USNRC GL94-03, USNRC SER 3/24/99 RF016 scope to bc defined, EVT1 top surface of shroud support skirt to RPV H9 weld ad)accnt to TIEROD-RXVE-166.
056200     H9                     B-N-2     EVT1                                           Scope  to be dcfincd, Shroud Support Skirt   B13.40                                                   BWRVZP-38 Exam 0   to 180 H9 Weld                                                                          degrees   ~~N/A~~
for a min.26" ad)accnt to two togg~~N/A~~056500 H9-270 B-N-2 EVT1 Shroud Support Skirt B13.40 VT-3 H9 Wold Repair Anch USNRC GL94"03, USNRC SER 3/24/99 RFO16 scope to bc dcfincd, EVT1 top surface of shroud support skirt to RPV H9 weld ad)accnt to TIEROD-RXVE-270 foc a min.26" ad)accnt to two toggl~~N/A~~  
056300     H9                     B N 2     EVT1                                           Scope  to bc dcfincd, Shroud Support Skirt   B13.40                                                   BWRVZP-38 Exam 180   to 3                            X H9 Weld                                                                          360 dcgrccs ~~N/A**
056400     H9-166                 B"N-2                                                     USNRC  GL94-03,  USNRC SER Shroud Support Skirt   B13.40     VT-3                                           3/24/99 RF016 scope to 3 X H9 Weld Repair Anch                                                              bc defined, EVT1 top surface of shroud support skirt to RPV H9 weld ad)accnt to TIEROD-RXVE-166. for a min. 26" ad)accnt to two togg ~~N/A~~
056500     H9-270                 B-N-2     EVT1                                           USNRC  GL94"03,  USNRC SER Shroud Support Skirt   B13.40     VT-3                                           3/24/99 RFO16 scope to H9 Wold Repair Anch                                                              bc dcfincd, EVT1 top surface of shroud support skirt to RPV H9 weld ad)accnt to TIEROD-RXVE-270 foc a min. 26" ad)accnt to two toggl ~~N/A~~


DATE: 10/15/99 REVISION: 0 NZNE MILE POINT NUCLEAR PLANT UNIT 1 ZNSERVICE ZNSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 54 tor Vessel Interior NUMBER: 00.0  
DATE: 10/15/99                           NZNE MILE POINT NUCLEAR PLANT UNIT 1                           PAGE: 54 REVISION:        0                        ZNSERVICE ZNSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS tor Vessel   Interior NUMBER:   00. 0 INSPECTION INTERVAL                    PIAN STATUS            PRESERVICE YEAR ASME                FIRST        SECOND      THIRD SEC. XZ              PERIOD        PERIOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMZNATZON AREA NUMBER IDENTIFICATION INSPECTION INTERVAL ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD PIAN STATUS SECOND PERIOD THIRD PERIOD-OUTAGE 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR INSTRUCTIONS
EXAMZNATZON AREA       CATEGY    NDE                -OUTAGE                          INSTRUCTIONS NUMBER     IDENTIFICATION         ITEM NO   METH     1 2 3 4   1   2 3 4   1 2 3 4 ~+CALIBRATION BLOCK~+
~+CALIBRATION BLOCK~+056600 H9-350 B-N-2 EVT1 Shroud Support Skirt B13.40 VT-3 H9 Weld Repair Anch USNRC GL94-03, USNRC SER 3/24/99 RF016 scope to be defined, EVT1 top surface of shroud support skirt to RPV H9 weld ad)accnt to TIEROD-RXVE-350 for 26" adjacent to two toggles..~~N/A*~056700 H9-90 B"N"2 EVT1 Shroud Support Skirt B13.40 VT-3 H9 Weld Repair Anch 3 X USNRC GL94"03, USNRC SER 3/24/99 RFO16 scopo to be defined, EVT1 of top surface of shroud support skirt to RPV H9 wold ad)accnt to TIEROD-RXVE-90 for a min.of 26" adjacent to two~~N/A~~056900 RV-01-Z Stcam Dryer Drain Cracking SZL 474 X---X---X Once every inspection period~~N/A~~057000 RV 01 I Stcam Dryer B" N-1 B13.10 3 X---X---X Once cvcry inspection period~~N/A~~057100 RV-02-I Stcam Separator B-N-1 VT-3 B13.10 3 X---X---X Once every inspection period~~N/A~~057200 RV-05-I Fccdwatcr Sparger NUREG 0619 VT 3 3 X Exam required cvcry four outages, commencing in RF08, (1981), Examine flow holes a welds in sparger arms 6 tees and FW nozzle~~N/AP~  
056600     H9-350                 B-N-2     EVT1                                           USNRC  GL94-03,  USNRC SER Shroud Support Skirt   B13.40     VT-3                                           3/24/99 RF016 scope to H9 Weld Repair Anch                                                              be defined, EVT1 top surface of shroud support skirt to RPV H9 weld ad)accnt to TIEROD-RXVE-350     for 26" adjacent to two toggles..   ~~N/A*~
056700     H9-90                   B"N"2     EVT1                                           USNRC  GL94"03,  USNRC SER Shroud Support Skirt   B13.40     VT-3                                           3/24/99 RFO16 scopo to 3 X H9 Weld Repair Anch                                                              be defined, EVT1 of top surface of shroud support skirt to RPV H9 wold ad)accnt to TIEROD-RXVE-90   for a min. of 26" adjacent to two ~~N/A~~
056900     RV-01-Z                 SZL                                                      Once  every inspection Stcam Dryer Drain       474                                                      period  ~~N/A~~
Cracking                                   X   - - -   X   - - -     X 057000     RV 01 I               B"N-1                                                     Once cvcry inspection Stcam Dryer            B13.10                                                   period ~~N/A~~
3 X   - - -   X   - - -     X 057100     RV-02-I                 B-N-1     VT-3                                           Once  every inspection Stcam Separator        B13. 10                                                   period  ~~N/A~~
3 X   - - -   X   - - -     X 057200     RV-05-I                 NUREG     VT 3                                           Exam required cvcry four Fccdwatcr Sparger      0619                                                      outages,   commencing in 3                            X RF08,   (1981),   Examine flow holes   a welds in sparger arms 6 tees and FW nozzle ~~N/AP~


DATE: 10/15/99 REVISION: 0 NINE MZLE POINT NUCLEAR PZANT UNIT 1 INSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 55 tor Vessel Interior NUMBER: 00.0  
DATE: 10/15/99                           NINE MZLE POINT NUCLEAR PZANT UNIT 1                           PAGE: 55 REVISION:        0                        INSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS tor Vessel Interior NUMBER:   00.0 INSPECTION INTERVAL                    PIAN STATUS            PRESERVICE YEAR ASME                FIRST        SECOND      THIRD SEC. XI            PERIOD        PERZOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL ASME SEC.XI CATEGY NDE ITEM NO METH FIRST PERIOD PIAN STATUS SECOND PERZOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR INSTRUCTIONS
EXAMINATION AREA         CATEGY    NDE                OUTAGE                          INSTRUCTIONS NUMBER     IDENTIFICATION           ITEM NO   METH   1 2 3 4   1   2 3 4   1 2 3 4 +*CALIBRATION BLOCK**
+*CALIBRATION BLOCK**057300 RV-06-I Core Spray Sparger BNRVI P VT-3 Examine pcr Memo 18 NMP1-M99-018.
057300     RV-06-I                 BNRVIP    VT-3                                           Examine pcr Memo Core Spray Sparger      18                                                       NMP1-M99-018. + +N/A+ ~
++N/A+~3 X---X X--X 057400 RV-07-I Core Spray Lines BWRVZP VT 1 18 3 X---X X--X Examine per Memo NMP1-M99-018.
3 X   - - -   X   X - -   X 057400     RV-07-I                 BWRVZP     VT 1                                           Examine per Memo Core Spray Lines        18                                                        NMP1-M99-018. ~*N/A~~
~*N/A~~057500 RV-08-Z B-N-2 VT-1 Dryer Support Brackets B13.20 (bcltlino) 3 X Examine once pcr interval*+N/A+*057600 RV-09-Z Feedvater Sparger Brackets (bcltline)
3 X  - - -    X    X  - -    X 057500     RV-08-Z                 B-N-2     VT-1                                           Examine once pcr Dryer Support Brackets B13.20                                                     interval *+N/A+*
B-N-2 B13.20 VT 1 3 X Examine once pcr interval++N/A++00 RV-10-I Guide Rod Support Brackets (bcltlinc)
3 X (bcltlino) 057600     RV-09-Z                 B-N-2     VT 1                                           Examine once   pcr Feedvater Sparger        B13. 20                                                  interval   ++N/A++
B-N-2 VT-1 B13.20 3 X Examine once per interval++N/A**057800 RV-11-I Upper Survicllancc Specimen Holder B-N-2 VT-1 B13.20 3 X hei tlinc, Examine once pcr interval*~N/A*+057900 RV-12-Z Lower Survicllancc Specimen Holder B-N-2 VT-1 B13.20 3 X bcltlinc, Examine once pcr interval+~N/A+~058000 RV-13-I Upper Ccrc Grid B-N-2 VT-3 B13.40 3 X Examine once pcr Znspection Interval*fN/A*0 058100 RV-13-I Upper Core Grid SZL 554 3 X RFO-16 scope to bc defined..+~N/A++  
3              X Brackets (bcltline) 00   RV-10-I                 B-N-2     VT-1                                           Examine once per Guide Rod Support        B13.20                                                   interval ++N/A**
3              X Brackets  (bcltlinc) 057800     RV-11-I                 B-N-2     VT-1                                           hei tlinc, Examine once Upper Survicllancc      B13. 20                                                  pcr interval *~N/A*+
3                            X Specimen Holder 057900     RV-12-Z                 B-N-2     VT-1                                           bcltlinc,   Examine once Lower Survicllancc      B13.20                                                    pcr interval   +~N/A+~
3                            X Specimen Holder 058000     RV-13-I                 B-N-2     VT-3                                           Examine once  pcr Upper Ccrc Grid          B13.40                                                   Znspection Interval 3 X
                                                                                              *fN/A*0 058100   RV-13-I                   SZL                                                       RFO-16 scope to bc Upper Core Grid          554                                                      defined.. +~N/A++
3 X


DATE: 10/15/99 REVZSZON: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 ZNSERVZCE ZNSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 56 tor Vessel Interior NUMBER: 00.0  
DATE: 10/15/99                             NINE MILE POINT NUCLEAR PLANT UNIT 1                           PAGE: 56 REVZSZON:        0                          ZNSERVZCE ZNSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS tor Vessel Interior NUMBER:   00.0 INSPECTION INTERVAL                      PLAN STATUS            PRESERVZCE YEAR ASME                FIRST        SECOND      THIRD SEC. XZ              PERIOD        PERIOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATZON AREA NUMBER IDENTIFICATION INSPECTION INTERVAL ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD-OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVZCE YEAR INSTRUCTIONS
EXAMINATZON AREA         CATEGY    NDE                -OUTAGE                          INSTRUCTIONS NUMBER     IDENTIFICATION           ITEM NO   METH   1 2 3 4   1   2 3 4   1 2 3 4 ~ +CALIBRATION BLOCK**
~+CALIBRATION BLOCK**058300 RV-14-I Core Shroud B-N-2 B13.40 VT 3 Examine accessible surface's each interval.X%*N/At 0 058400 RV-15-Z B-N-2 VT-3 Core Shroud Support B13.40 Ring 3 X Examine once pcr Inspection Interval aaN/A*t 059000 SZL409-ZDTC1245 SZL IRM Incorc Dry Tube 409R1 4 Assembly 3 X X EVT1 every other even numbcrcd outage++N/A~~059900 SZI 409-IDTC3645 SIL IRM Zncoro Dry Tube 409R1 Assembly EVT1 3 X X EVT1 cvcry other even numbcrcd outage++N/A++060100 Shroud Head Bolts B-N-2 VT-3 Shroud Head Bolts (36)B13.40 UT 3 X UT cxams to bc identified later pending final results of BWR Owner's Group.~~LATER~~060200 Skirt-166 Shroud Support Skirt Surface B-N-2 EVT1 B13.40 3 X USNRC GL94-03, USNRC SER 3/24/99, EVT1 top surface of inconel srd.sprt.skirt where accessible around intcrfacc of lower stablizcr sprt.pedestal to conical sprt.8 166 dcg ticrod~+N/A~~  
058300     RV-14-I                   B-N-2     VT 3                                           Examine accessible Core Shroud              B13.40                                                    surface's each interval.
X         %*N/At0 058400     RV-15-Z                   B-N-2     VT-3                                           Examine once  pcr Core Shroud Support       B13.40                                                   Inspection Interval 3             X                         aaN/A*t Ring 059000     SZL409-ZDTC1245           SZL                                                       EVT1  every other even IRM Incorc Dry Tube     409R1                                                     numbcrcd outage ++N/A~~
4 3 X                X Assembly 059900     SZI 409-IDTC3645         SIL       EVT1                                          EVT1  cvcry other even IRM Zncoro Dry Tube       409R1                                                     numbcrcd outage ++N/A++
3 X                X Assembly 060100     Shroud Head Bolts         B-N-2     VT-3                                           UT cxams  to bc Shroud Head Bolts (36) B13.40       UT                                             identified later   pending 3 X final results of   BWR Owner's Group. ~~LATER~~
060200     Skirt-166                 B-N-2     EVT1                                           USNRC   GL94-03, USNRC SER Shroud Support  Skirt    B13.40                                                    3/24/99, EVT1 top 3 X Surface                                                                            surface of inconel srd.
sprt. skirt   where accessible around intcrfacc of lower stablizcr sprt. pedestal to conical sprt. 8 166 dcg ticrod ~+N/A~~


DATE: 10/15/99 REVZ SION: 0 NINE HYLE POINT NUCLEAR PLANT UNIT 1 INSERVZCE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XI SCHEDULED COHPONENTS PAGE: 57 tor Vessel Interior NUMBER: 00.0  
DATE: 10/15/99                           NINE HYLE POINT NUCLEAR PLANT UNIT 1                           PAGE: 57 REVZ SION:        0                        INSERVZCE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XI SCHEDULED COHPONENTS tor Vessel Interior NUMBER:   00.0 INSPECTION INTERVAL                    PLAN STATUS            PRESERVZCE YEAR ASME                FZRST        SECOND      THIRD SEC. XZ              PERIOD        PERIOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAHINATZON AREA NUHBER ZDENTZFZCATZON INSPECTION INTERVAL ASME SEC.XZ CATEGY NDE ITEM NO METH FZRST PERIOD PLAN STATUS SECOND PERIOD-OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVZCE YEAR ZNSTRUCTIONS
EXAHINATZON AREA       CATEGY    NDE                -OUTAGE                          ZNSTRUCTIONS NUHBER       ZDENTZFZCATZON         ITEM NO   METH   1 2 3 4   1   2 3 4   1 2 3 4 +~CALIBRATION BLOCK~~
+~CALIBRATION BLOCK~~060300 Skirt-270 B-N-2 EVT1 Shroud Support Skirt B13.40 Surface 3 X USNRC GL94-03, USNRC SER 3/24/99, EVT1 top surface of inconcl srd.sprt.skirt whcrc accessible around interface of lower stablizer suppt pedestal to conical sprt 6 270 dcg ticrod~~N/A~~060400 Skirt-350 B-N-2 EVT1 Shroud Support Skirt B13.40 Surface 3 X USNRC GL94-03, USNRC SER 3/24/99, EVT1 top surface of inconcl srd.sprt.skirt where accessible around interface of lower stablizcr supt.pcdcstal to conical sprt 6 350 deg tierod<<~N/A**060500 Skirt-90 B-N-2 EVT1 Shroud Support Skirt B13.40 Surface 3 X USNRC GL94 03, USNRC SER 3/24/99, EVT1 top surface of inconcl srd sprt skirt when accessible around interface of lower stablizcr supt pedestal to conical sprt 6 90 dcg ticrod locat**N/A~~060600 Spaccr-RXVE-168 Shroud Stabilizer Assembly (Spacer)B-N-2 VT-3 B13.40 3 X USNRC GL94-03, USNRC SER 3/24/99, BWRVI P rcccommends exam of shroud assembly core plate clamp/spaccr assembly located bctwcen ZD of shroud 6 core support plate 8 168 dcg.11N/Alt  
060300     Skirt-270               B-N-2       EVT1                                         USNRC   GL94-03,   USNRC SER Shroud Support  Skirt  B13.40                                                    3/24/99, EVT1 top 3 X Surface                                                                          surface of inconcl srd.
sprt. skirt whcrc accessible around interface of lower stablizer suppt pedestal to conical sprt 6 270 dcg ticrod ~~N/A~~
060400     Skirt-350               B-N-2       EVT1                                         USNRC   GL94-03,   USNRC SER Shroud Support  Skirt  B13.40                                                    3/24/99, EVT1 top 3 X Surface                                                                          surface of inconcl srd.
sprt. skirt   where accessible around interface of lower stablizcr supt. pcdcstal to conical sprt 6 350 deg tierod <<~N/A**
060500     Skirt-90               B-N-2     EVT1                                           USNRC GL94  03,  USNRC SER Shroud Support Skirt   B13.40                                                   3/24/99, EVT1 top 3 X Surface                                                                          surface of inconcl srd sprt skirt   when accessible around interface of lower stablizcr supt pedestal to conical sprt 6 90 dcg ticrod locat   **N/A~~
060600     Spaccr-RXVE-168         B-N-2     VT-3                                           USNRC GL94-03,   USNRC SER Shroud Stabilizer      B13. 40                                                  3/24/99, BWRVIP 3 X Assembly (Spacer)                                                                  rcccommends   exam   of shroud assembly core plate clamp/spaccr assembly located bctwcen ZD of shroud 6   core support plate   8 168 dcg.
11N/Alt


DATE: 10/15/99 REVISION: 0 NZNE MILE POINT NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 58 tor Vessel Interior NUMBER: 00.0  
DATE: 10/15/99                           NZNE MILE POINT NUCLEAR PLANT UNIT 1                           PAGE: 58 REVISION:        0                        INSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS tor Vessel Interior NUMBER:   00.0 ZNSPECTZON INTERVAL                      PLAN STATUS            PRESERVZCE YEAR ASME                FIRST        SECOND      THIRD SEC. XZ              PERZOD        PERZOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION ZNSPECTZON INTERVAL ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERZOD PLAN STATUS SECOND PERZOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVZCE YEAR INSTRUCTIONS
EXAMINATION AREA       CATEGY      NDE                OUTAGE                          INSTRUCTIONS NUMBER     IDENTIFICATION         ITEM NO     METH   1 2 3 4   1   2 3 4   1 2 3 4 ~ +CALIBRATION BLOCK+ +
~+CALIBRATION BLOCK++060700 Spacer-RXVE-276 Shroud Stabilizer Assembly (Spacer)B-N-2 VT-3 B13.40 3 X USNRC GL94"03, USNRC SER 3/24/99, BWRVIP reccommends exam of shroud assembly coro plate clamp/spaccr assembly located bctwccn ZD of shroud support plate 8 276 deg.~~N/A~~060800 Spacer-RXVE-348 Shroud Stabilizer Assembly (Spaccr)B-N-2 VT-3 B13.40 3 X X USNRC GL94-03, USNRC SER 3/24/99, BWRVIP rcccommcnds exam of shroud assembly core plate clamp/spcccr assembly located between ID of shroud 6 core support plate 8 348 dcg.**N/At*060900 Spaccr-RXVE-96 Shroud Stabilizer Assembly (Spaccr)B-N-2 VT 3 B13.40 3 X---X USNRC GI 94-03, USNRC SER 3/24/99, BWRVIP rcccommcnds exam of shroud assembly core plate clamp/spaccr assembly located bctwccn ZD of shroud 4 core support plate 896 dcg.t4N/Att 061000 Tiorod-RXVE-166 Shroud Stabilizer Assembly (Tic Rod)B-N-2 VT-3 B13.40 3 X---X USNRC GL94-03'SNRC SER 3/24/99, BWRVZP rcccommcndcd
060700     Spacer-RXVE-276       B-N-2       VT-3                                           USNRC   GL94"03, USNRC SER Shroud Stabilizer      B13. 40                                                    3/24/99,   BWRVIP 3 X Assembly (Spacer)                                                                reccommends   exam of shroud assembly coro plate clamp/spaccr assembly located bctwccn ZD of shroud support plate 8 276 deg. ~~N/A~~
**N/A**061100 Ticrod-RXVE-270 Shroud Stabilizer Assembly (Tic Rod)B"N-2 VT-3 B13.40 3 X X USNRC GL94-03, USNRC SER 3/24/99, BWRVIP rcccommcndcd
060800     Spacer-RXVE-348       B-N-2       VT-3                                           USNRC   GL94-03, USNRC SER Shroud Stabilizer      B13.40                                                    3/24/99,   BWRVIP 3 X            X Assembly (Spaccr)                                                                rcccommcnds exam   of shroud assembly core plate clamp/spcccr assembly located between ID of shroud 6 core support plate 8 348 dcg.
**N/A**  
                                                                                            **N/At*
060900     Spaccr-RXVE-96         B-N-2       VT 3                                           USNRC GI 94-03,   USNRC SER Shroud Stabilizer      B13.40                                                    3/24/99,   BWRVIP 3 X  - - -    X Assembly (Spaccr)                                                                rcccommcnds exam   of shroud assembly core plate clamp/spaccr assembly located bctwccn ZD of shroud 4 core support plate 896 dcg.
t4N/Att 061000     Tiorod-RXVE-166       B-N-2       VT-3                                           USNRC   GL94-03'SNRC SER Shroud Stabilizer      B13. 40                                                    3/24/99, BWRVZP Assembly (Tic Rod) 3 X  - - -    X rcccommcndcd **N/A**
061100     Ticrod-RXVE-270       B "N-2     VT-3                                           USNRC   GL94-03, USNRC SER Shroud Stabilizer      B13. 40                                                    3/24/99,   BWRVIP 3 X            X Assembly (Tic Rod)                                                                rcccommcndcd **N/A**


DATE: 10/15/99 REVISION: 0 NINE MILE POZNT NUCLEAR PLANT UNIT 1 ZNSERVICE INSPECTION TEN-YEAR PZAN CLASS 1 SECTION XI SCHEDULED COMPONENTS PAGE: 59 tor Vessel Interior NUHBER: 00.0  
DATE: 10/15/99                           NINE MILE POZNT NUCLEAR PLANT UNIT 1                         PAGE: 59 REVISION:        0                        ZNSERVICE INSPECTION TEN-YEAR PZAN CLASS 1 SECTION XI SCHEDULED COMPONENTS tor Vessel Interior NUHBER:   00.0 INSPECTION INTERVAL                    PLAN STATUS            PRESERVZCE YEAR ASME                FIRST        SECOND      THIRD SEC. XZ              PERIOD        PERIOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAHZNATZON AREA NUMBER ZDENTZPZCATZON INSPECTION INTERVAL ASME SEC.XZ CATEGY NDE ITEH NO HETH FIRST PERIOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVZCE YEAR INSTRUCTZONS
EXAHZNATZON AREA       CATEGY    NDE                  OUTAGE                        INSTRUCTZONS NUMBER     ZDENTZPZCATZON         ITEH NO HETH     1 2 3 4   1   2 3 4   1 2 3 4 **CALIBRATIONBLOCK*n 061200     Tierod-RXVE-350         B-N-2     VT-3                                           USNRC GL94-03, USNRC SER Shroud Stabilizer      B13.40                                                    3/24/99, BWRVIP 3 X            X                                      n*N/A**
**CALIBRATION BLOCK*n 061200 Tierod-RXVE-350 Shroud Stabilizer Assembly (Tic Rod)B-N-2 VT-3 B13.40 3 X X USNRC GL94-03, USNRC SER 3/24/99, BWRVIP reccommended n*N/A**061300 Tierod-RXVE-90 Shroud Stabilizer Assembly (Tic Rod)B-N 2 VT 3 B13.40 X---X USNRC GL94 03, USNRC SER 3/24/99, BWRVIP reccommcnded
Assembly (Tic Rod)                                                                reccommended 061300     Tierod-RXVE-90         B-N 2     VT 3                                           USNRC GL94 03, USNRC SER Shroud Stabilizer      B13. 40                                                  3/24/99, BWRVIP Assembly (Tic Rod)                          X  - - -    X                        reccommcnded   *nN/A*i 061400     Vl                     B-N-2     EVT1                                           USNRC GL94-03, USNRC SER Core Shroud Vertical  B13. 40    UT                                            3/24/99, BWRVZP 3 X            X Wclds                                                                            rcccommondcd EVT1   of ZD/OD, 25% of total length, UT contgcncy only, **LATERnn 00   V10                     B-N-2     EVT1                                           USNRC  GL94-03,  USNRC SER Core Shroud Vertical   B13. 40   UT                                             3/24/99, EVT1 of ID/OD 3 X            X Wclds                                                                            25% of total length, UT contgy only,   BWRVZP roccommendcd *~LATER*i 061600     V11                     B-N-2     EVT1                                           USNRC GL94  03,  USNRC SER Core Shroud Vortical   B13.40     UT                                             3/24/99,  BWRVIP 3 X   - - -     X Wclds                                                                             recommended EVT1 of ID/OD 25% of total length, UT contgy only.
*nN/A*i 061400 Vl CoreShroud Vertical Wclds B-N-2 EVT1 B13.40 UT 3 X X USNRC GL94-03, USNRC SER 3/24/99, BWRVZP rcccommondcd EVT1 of ZD/OD, 25%of total length, UT contgcncy only,**LATERnn 00 V10 B-N-2 EVT1 Core Shroud Vertical B13.40 UT Wclds 3 X X USNRC GL94-03, USNRC SER 3/24/99, EVT1 of ID/OD 25%of total length, UT contgy only, BWRVZP roccommendcd
                                                                                            ~~LATER~~
*~LATER*i 061600 V11 B-N-2 EVT1 Core Shroud Vortical B13.40 UT 3 X---X Wclds USNRC GL94 03, USNRC SER 3/24/99, BWRVIP recommended EVT1 of ID/OD 25%of total length, UT contgy only.~~LATER~~061700 V12 B-N-2 EVT1 Core Shroud Vertical B13.40 UT 3 X X Wclds USNRC GL94-03, USNRC SER 3/24/99, BWRVZP roccommcndod EVTl of ID/OD 25%of total length, UT contgy only~+LATER+~  
061700     V12                     B-N-2     EVT1                                           USNRC  GL94-03,  USNRC SER Core Shroud Vertical   B13.40     UT                                             3/24/99, BWRVZP 3 X            X Wclds                                                                              roccommcndod EVTl of ID/OD 25% of total length, UT contgy only
                                                                                            ~+LATER+~


DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PIANT UNIT 1 ZNSERVZCE INSPECTION TEN YEAR PLAN CLASS 1 SECTION XI SCHEDULED COMPONENTS PAGE: 60 tor Vessel Interior NUMBER: 00.0  
DATE: 10/15/99                         NINE MILE POINT NUCLEAR PIANT UNIT 1                           PAGE: 60 REVISION:        0                        ZNSERVZCE INSPECTION TEN YEAR PLAN CLASS 1 SECTION XI SCHEDULED COMPONENTS tor Vessel Interior NUMBER: 00.0 ZNSPECTZON INTERVAL                    PLAN STATUS            PRESERVZCE YEAR ASME                FIRST        SECOND      THIRD SEC. XZ              PERZOD        PERIOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION ZNSPECTZON INTERVAL ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERZOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVZCE YEAR INSTRUCTIONS
EXAMINATION AREA       CATEGY    NDE                  OUTAGE                          INSTRUCTIONS NUMBER     IDENTIFICATION         ITEM NO   METH     1 2 3 4   1   2 3 4   1 2 3 4 **CALIBRATIONBLOCK~*
**CALIBRATION BLOCK~*061800 V13 B-N-2 EVT1 Core Shroud Vertical B13~40 UT Wclds 3 X---X USNRC GL94 03, USNRC SER 3/24/99, BWRVZP reccommcndcd EVT1 of ZD/OD 25%of total length, UT contgy only.*+LATER+*061900 V14 B-N-2 EVT1 Core Shroud Vertical B13.40 UT 3 X-------X Wclds USNRC GL94-03, USNRC SER 3/24/99, BWRVZP reccommcndcd EVT1 of ID/OD 25%of total length, UT contgy only.%*LATER**062000 V15 B-N-2 Core Shroud Vertical B13.40 Wclds UT 3 X X USNRC GL94-03, USNRC SER 3/24/99, BWRVIP reccommended, EVT11 of ZD/OD 25%of total length, UT contgy only.~~LATER**062100 V16 C B-N-2 EVT1 Core Shroud Vertical B13.40 UT Wclds 3 X X USNRC GL94-03, USNRC SER 3/24/99, BWRVIP reccommcnded, EVT1 of ZD/OD 25%of total length, UT contgy only.~~LATER**062200 V2 B-N-2 EVT1 Core Shroud Vertical B13.40 UT Welds X X USNRC GL94-03, USNRC SER 3/24/99 i BWRVI P reccommcndcd, EVT1 of ZD/OD 225%of total length, UT contgy only.**LATER**  
061800     V13                   B-N-2     EVT1                                           USNRC GL94    03,  USNRC SER Core Shroud Vertical   B13 40
                                      ~     UT
                                                        - - -
3/24/99,   BWRVZP 3 X            X Wclds                                                                            reccommcndcd EVT1     of ZD/OD 25%   of total length,   UT contgy only.
                                                                                            *+LATER+*
061900     V14                   B-N-2     EVT1                                           USNRC  GL94-03,  USNRC SER Core Shroud Vertical   B13.40     UT
                                                        - - -     - - - -                 3/24/99,   BWRVZP 3 X                          X Wclds                                                                            reccommcndcd EVT1 of ID/OD 25% of total length,   UT contgy only.
                                                                                            %*LATER**
062000     V15                   B-N-2                                                     USNRC  GL94-03,  USNRC SER Core Shroud Vertical   B13.40     UT                                             3/24/99,   BWRVIP 3 X                          X Wclds                                                                            reccommended,     EVT11 of ZD/OD 25%   of total length,   UT contgy only.
                                                                                            ~ ~ LATER**
C 062100     V16                   B-N-2     EVT1                                           USNRC  GL94-03,  USNRC SER Core Shroud Vertical   B13.40     UT                                             3/24/99,   BWRVIP 3 X                          X Wclds                                                                            reccommcnded,     EVT1 of ZD/OD 25%   of total length,   UT contgy only.
                                                                                            ~~LATER**
062200     V2                     B-N-2     EVT1                                           USNRC  GL94-03,  USNRC SER Core Shroud Vertical   B13.40     UT                                             3/24/99 i BWRVIP Welds                                      X                          X          reccommcndcd,     EVT1 of ZD/OD 225%   of total length,   UT contgy only.
                                                                                            **LATER**


DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 61 tor Vessel Interior NUMBER: 00.0  
DATE: 10/15/99                           NINE MILE POINT NUCLEAR PLANT UNIT 1                         PAGE: 61 REVISION:        0                        INSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS tor Vessel Interior NUMBER: 00.0 INSPECTION ZNTERVAL                    PIAN STATUS            PRESERVZCE YEAR ASME                FIRST        SECOND      THIRD SEC. XI            PERIOD      PERIOD      PERZOD


==SUMMARY==
==SUMMARY==
EXAMINATZON AREA NUMBER IDENTIFICATION INSPECTION ZNTERVAL ASME SEC.XI CATEGY NDE ITEM NO METH FIRST PERIOD PIAN STATUS SECOND PERIOD OUTAGE THIRD PERZOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVZCE YEAR INSTRUCTIONS
EXAMINATZON AREA       CATEGY    NDE                OUTAGE                        INSTRUCTIONS NUMBER     IDENTIFICATION         ITEM NO   METH   1 2 3 4 1   2 3 4   1 2 3 4 **CALIBRATZONBLOCK~*
**CALIBRATZON BLOCK~*062300 V3 B-N-2 EVT1 Core Shroud Vertical B13.40 UT Welds 3 X X USNRC GL94-03, USNRC SER 3/24/99, BWRVIP reccommcndcd EVT1 of ID/OD 25%of total length, UT contgy only.~~LATER~+062400 V4 B-N-2 EVT1 Core Shroud Vertical B13.40 UT Wclds 3 X X USNRC GL94-03, USNRC SER 3/24/99, BWRVIP reccommcndcd, EVT1 of ID/OD 25%of total length, UT contgy only.++LATER*+062500 V5 B-N-2 EVT1 Coro Shroud Vertical B13.40 Wclds-Ring Support 3 X X USNRC GL94-03, USNRC SER 3/24/99, BWRVZP rcccommended, EVT1 of ZD/OD 25%of total length,~~N/A~*062600 V6 B-N-2 EVT1 Core Shroud Vertical B13.40 Welds-Ring Support 3 X X USNRC GL94-03, USNRC SER 3/24/99, BWRVIP rcccommended, EVT1 of ZD/OD 25%of total length,~~N/A~~062700 V7 B-N-2 EVT1 Core Shroud Vertical B13.40 UT 3 X X Wclds USNRC GL94-03, USNRC SER 3/24/99, BWRVIP reccommended, EVT1 of ID/OD 25%of total length, UT contgy only.ssLATERei  
062300     V3                     B-N-2       EVT1                                         USNRC  GL94-03,  USNRC SER Core Shroud Vertical   B13.40     UT                                           3/24/99, BWRVIP 3 X                          X Welds                                                                            reccommcndcd EVT1 of ID/OD 25% of total length, UT contgy only.
                                                                                            ~~LATER~+
062400     V4                     B-N-2     EVT1                                         USNRC  GL94-03,  USNRC SER Core Shroud Vertical   B13.40     UT                                           3/24/99, BWRVIP 3 X                          X Wclds                                                                            reccommcndcd,   EVT1 of ID/OD 25% of   total length, UT contgy only.
                                                                                            ++LATER*+
062500     V5                     B-N-2     EVT1                                         USNRC GL94-03, USNRC SER Coro Shroud Vertical    B13.40                                                  3/24/99, BWRVZP 3 X                          X Wclds-Ring Support                                                              rcccommended,   EVT1 of ZD/OD 25%   of total length, ~~N/A~*
062600     V6                     B-N-2     EVT1                                         USNRC GL94-03, USNRC SER Core Shroud Vertical    B13.40                                                  3/24/99, BWRVIP 3 X                          X Welds-Ring Support                                                              rcccommended,   EVT1 of ZD/OD 25%   of total length, ~~N/A~~
062700     V7                     B-N-2     EVT1                                         USNRC  GL94-03,  USNRC SER Core Shroud Vertical   B13.40     UT                                           3/24/99, BWRVIP 3 X                          X Wclds                                                                            reccommended,   EVT1 of ID/OD 25% of   total length, UT contgy only.
ssLATERei


DATE: 10/15/99 REVISION: 0 NINE HYLE POINT NUCLEAR PLANT UNIT 1 ZNSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COHPONENTS PAGE: 62 tor Vessel Interior NUMBER: 00.0  
DATE: 10/15/99                         NINE HYLE POINT NUCLEAR PLANT UNIT 1                           PAGE: 62 REVISION:        0                        ZNSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COHPONENTS tor Vessel Interior NUMBER: 00.0 ZNSPECTZON INTERVAL                    PLAN STATUS            PRESERVZCE YEAR FIRST        SECOND      THIRD SEC. XI            PERIOD        PERIOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION ZNSPECTZON INTERVAL SEC.XI CATEGY NDE ZTEH NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD-OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVZCE YEAR INSTRUCTIONS
EXAMINATION AREA       CATEGY    NDE                -OUTAGE                          INSTRUCTIONS NUMBER     IDENTIFICATION         ZTEH NO   METH     1 2 3 4   1   2 3 4   1 2 3 4 ~*CALIBRATION BLOCX**
~*CALIBRATION BLOCX**062800 VS B-N-2 EVT1 Core Shroud Vertical B13.40 UT 3 X Welds X USNRC GL94-03, USNRC SER 3/24/99, BWRVZP reccommcnded, EVT1 of ID/OD 25%of total length, UT contgy only.~~LATER~~062900 V9 B-N-2 EVT1 Core Shroud Vertical B13~40 UT 3 X Welds USNRC GL94-03, USNRC SER 3/24/99, BWRVIP reccommended, EVT1 of ID/OD 25%of total length, UT contgy only.t 1 LATER*4 0
062800   VS                     B-N-2     EVT1                                           USNRC  GL94-03,  USNRC SER Core Shroud Vertical   B13.40     UT                                             3/24/99,   BWRVZP 3 X                          X Welds                                                                            reccommcnded,   EVT1 of ID/OD 25% of   total length,   UT contgy only.
DATE: 10/15/99 REVISION: 0 NINE MZLE POINT NUCLEAR PIANT UNIT 1 INSERVZCE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 63 tor Vessel Nozzles NUMBER: 00.0  
                                                                                          ~~LATER~~
062900   V9                     B-N-2     EVT1                                           USNRC   GL94-03, USNRC SER Core Shroud Vertical  B13 40
                                    ~      UT                                            3/24/99,   BWRVIP 3 X Welds                                                                            reccommended,   EVT1 of ID/OD 25% of   total length,   UT contgy only.
t 1 LATER*4
 
0 DATE: 10/15/99                             NINE MZLE POINT NUCLEAR PIANT UNIT 1                         PAGE: 63 REVISION:        0                          INSERVZCE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS tor Vessel   Nozzles NUMBER:   00. 0 INSPECTION INTERVAL                    PLAN STATUS            PRESERVICE YEAR ASME                FIRST        SECOND      THIRD SEC. XZ              PERIOD      PERZOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTZFZCATZON INSPECTION INTERVAL ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERZOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR INSTRUCTIONS
EXAMINATION AREA           CATEGY    NDE                OUTAGE                        INSTRUCTIONS NUMBER     IDENTZFZCATZON             ITEM NO   METH   1 2 3 4 1   2 3 4   1 2 3 4 ~~CALIBRATION BLOCK~*
~~CALIBRATION BLOCK~*Instrument Nozzles (REF.DWG.NO.14)063000 SIL571-N12 RPV N12 Instr Nozzle-to-Safe End SII VT-2 571 3 X---X X--X VT-2 after vessel flood-up (static prcssure, no hold time)at start of each RFO 4 during System Leakage each RFO.+iN/A~~Safety Valve Nozzles (REF.DWG.NO.28)063100 CH-576-07A-B Nozzle N7N Flange Bolting B"G-2 B7.10 3 X R33~*N/A*+063200 CH-576-07B-B Nozzle N7P Flange Bolting B"G-2 Bj.10 3 X R34~iN/Aii 063300 CH-576-07C-B Nozzle N7R Flange Bolting B-G-2 B7.10 3 X Group R35~*N/A**063400 CH-576-07D-B Nozzle N7S Flange Bolting B-G-2 B7.10 3 X Group R36*~N/A*+063500 CH-576-07E-B Nozzle N7T Flange Bolting B-G-2 VT 1 B7.10 3 X Group R37~~N/A~~063600 CH-576-07F-B Nozzle N7U Flange Bolting B-G-2 B7.10 3 X Group R38~~N/A~~
Instrument Nozzles   (REF. DWG. NO. 14) 063000     SIL571-N12                 SII        VT-2                                        VT-2  after vessel RPV N12   Instr           571                                                      flood-up (static Nozzle-to-Safe End                         3 X   - - -   X   X - -   X prcssure, no hold time) at start of each RFO 4 during System Leakage each RFO. +iN/A~~
0 DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNZT 1 ZNSERVZCE ZNSPECTZON TEN-YEAR PZAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 64 tor Vessel Nozzles NUMBER: 00.0  
Safety Valve Nozzles   (REF. DWG. NO. 28) 063100     CH-576-07A-B             B"G-2                                                     R33 ~*N/A*+
Nozzle  N7N  Flange      B7. 10 3              X Bolting 063200     CH-576-07B-B             B"G-2                                                     R34  ~iN/Aii Nozzle  N7P  Flange      Bj. 10 3             X Bolting 063300     CH-576-07C-B             B-G-2                                                     Group R35 ~*N/A**
Nozzle  N7R  Flange      B7.10 3              X Bolting 063400     CH-576-07D-B             B-G-2                                                     Group R36 *~N/A*+
Nozzle  N7S  Flange      B7.10 3                            X Bolting 063500   CH-576-07E-B               B-G-2       VT 1                                         Group R37 ~~N/A~~
Nozzle N7T Flange          B7. 10 3                            X Bolting 063600   CH-576-07F-B               B-G-2                                                     Group R38 ~~N/A~~
Nozzle    N7U Flange      B7.10 3                            X Bolting
 
0 DATE: 10/15/99                             NINE MILE POINT NUCLEAR PLANT UNZT 1                         PAGE: 64 REVISION:        0                          ZNSERVZCE ZNSPECTZON TEN-YEAR PZAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS tor Vessel Nozzles NUMBER:   00. 0 INSPECTION INTERVAL                    PLAN STATUS            PRESERVICE YEAR ASME                FIRST        SECOND      THIRD SEC. XZ              PERIOD      PERIOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR INSTRUCTIONS
EXAMINATION AREA         CATEGY      NDE                OUTAGE                        INSTRUCTIONS NUMBER     IDENTIFICATION           ITEM NO   METH   1   2 3 4 1   2 3 4   1 2 3 4 +*CALIBRATION BLOCK*~
+*CALIBRATION BLOCK*~063700 CH-576-12A-B Nozzle N7A Flange Bolting B-G-2 B7.10 3 X Group R21+~N/A~~063800 CH-576-12B-B No zlc N7B Flange Bolting B-G-2 B7.10 3 X Group R22~*N/A~~063900 CH-576-12C-B Nozzle N7C Flange Bolting B-G-2 B7.10 3 X Group R23**N/A~*064000 CH-576-12D-B Nozzle N7D Flange Bolting B"G-2 B7.10 3 X Group R24**N/A**064100 CH-576-12E-B No zlc N7E Flange Bolting B G 2 B7.10 X Group R25~+N/A++064200 CH-576-12F-B Nozzle N7F Flange Bolting B-G-2 B7.10 3 X Group R26~~N/A~~064300 CH"576-12G-B B-G-2 VT-1 Group R27~~N/A~~Nozzle N7G Flange B7.10 Bolting 3 X 064400 CH-576-12H-B Nozzle N7H Flange Bolting B-G-2 B7.10 3 X Group R28**N/A~~  
063700     CH-576-12A-B             B-G-2                                                     Group R21 +~N/A~~
Nozzle N7A Flange        B7. 10 3 X Bolting 063800     CH-576-12B-B             B-G-2                                                     Group R22 ~*N/A~~
No  zlc N7B Flange      B7.10 3 X Bolting 063900     CH-576-12C-B             B-G-2                                                     Group R23 **N/A~*
Nozzle  N7C Flange      B7. 10 3 X Bolting 064000     CH-576-12D-B             B"G-2                                                     Group R24 **N/A**
Nozzle  N7D Flange      B7.10 3 X Bolting 064100     CH-576-12E-B             B G 2                                                     Group R25 ~+N/A++
No  zlc N7E Flange      B7. 10 X
Bolting 064200     CH-576-12F-B             B-G-2                                                     Group R26 ~~N/A~~
Nozzle N7F Flange        B7. 10 3              X Bolting 064300   CH"576-12G-B             B-G-2       VT-1                                         Group R27 ~~N/A~~
Nozzle   N7G Flange     B7.10 3                           X Bolting 064400   CH-576-12H-B             B-G-2                                                     Group R28 **N/A~~
Nozzle    N7H Flange      B7.10 3              X Bolting


DATE: 10/15/99 REVZSZON: NINE MILE POINT NUCLEAR PLANT UNIT 1 ZNSERVZCE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 65 tor Vcsscl Nozzlcs NUMBER: 00.0  
DATE: 10/15/99                           NINE MILE POINT NUCLEAR PLANT UNIT 1                         PAGE: 65 REVZSZON:                                  ZNSERVZCE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS tor Vcsscl Nozzlcs NUMBER: 00. 0 INSPECTION ZNTERVAL                    PLAN STATUS            PRESERVZCE YEAR ASME                FIRST        SECOND      THIRD SEC. XZ              PERIOD      PERIOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMZNATZON AREA NUMBER ZDENTZFICATZON INSPECTION ZNTERVAL ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD 0 U T AG E THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVZCE YEAR INSTRUCTZONS
EXAMZNATZON AREA       CATEGY     NDE                 0 U T AG E                     INSTRUCTZONS NUMBER      ZDENTZFICATZON          ITEM NO    METH    1 2 3 4 1   2 3 4   1 2 3 4 ~~CALIBRATION BLOCK~'~
~~CALIBRATION BLOCK~'~064500 CH-576-12 J-B Nozzle N7J Flange Bolting B-G-2 B7.10 3 X Group R29~~N/A**064600 CH-576-12K-B Nozzle N7K Flange Bolting B-G-2 B7.10 3 X Group R30+~N/A++064700 CH-576-12L-B Nozzle N7L Flange Bolting B-G-2 Bj.10 VT-1 3 X Group R31~~N/A~~064800 CH-576-12M-B B-G-2 VT-1 Group R32*+N/A**Nozzle N7M Flange B7.10 Bolting 3 X 064900 RV-WD 011 B-F UT Group R21**LATER**Nozzle N7A-to-Flange B5.10 PT 3 X 065000 RV-WD-Oll SZL Nozzle N7A-to-Flange 455R1S1 3 X Group R21, Inconcl 1S2 butter expansion from nozzle side of weld.**LATERI*065100 RV-WD-012 B-D Group R21,**LATER**Closure Head-to N7A B3.90 Nozzle 3 X 065200 RV-WD-012-IR N7A Nozzle Inner Radius Section B-D B3.100 3 X Group R21,**LATER~~  
064500     CH-576-12 J-B           B-G-2                                                     Group R29 ~~N/A**
Nozzle N7J Flange      B7.10 3                            X Bolting 064600     CH-576-12K-B           B-G-2                                                     Group R30 +~N/A++
Nozzle  N7K Flange      B7.10 3                            X Bolting 064700     CH-576-12L-B           B-G-2       VT-1                                         Group R31 ~~N/A~ ~
Nozzle N7L Flange      Bj. 10 3                            X Bolting 064800     CH-576-12M-B           B-G-2       VT-1                                         Group R32 *+N/A**
Nozzle N7M Flange     B7.10 3                           X Bolting 064900     RV-WD 011               B-F         UT                                           Group R21 **LATER**
Nozzle N7A-to-Flange   B5.10       PT 3 X 065000     RV-WD-Oll               SZL                                                       Group R21, Inconcl 1S2 Nozzle N7A-to-Flange   455R1S1                                                   butter expansion from 3 X nozzle side of weld.
                                                                                            **LATERI*
065100   RV-WD-012               B-D                                                       Group R21, **LATER**
Closure Head-to N7A     B3.90 3 X Nozzle 065200   RV-WD-012-IR             B-D                                                       Group R21, **LATER~~
N7A  Nozzle Inner        B3.100 3 X Radius Section


DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PIANT UNIT 1 INSERVICE INSPECTION TEN-YEAR PLAN CIASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 66 tor Vessel Nozzles z NUMBER: 00.0  
DATE: 10/15/99                           NINE MILE POINT NUCLEAR PIANT UNIT 1                         PAGE: 66 REVISION:        0                        INSERVICE INSPECTION TEN-YEAR PLAN CIASS 1 SECTION XZ SCHEDULED COMPONENTS tor Vessel Nozzles z
NUMBER: 00. 0 INSPECTION INTERVAL                    PZAN STATUS            PRESERVICE YEAR ASME                FIRST        SECOND      THIRD SEC. XZ              PERIOD      PERIOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD PZAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR INSTRUCTIONS ttCALIBRATION BLOCK~'065300 RV WD 013 SIL Nozzle N7B-to-Flange 455R1S1 3 X Group R22, Znconel 182 butter expansion from nozzle side of weld.~~LATER~~065400 RV WD 013 B-F UT GrouP R22++ZATER~~Nozzle N7B-to-Flange B5~10 3 X 065500 RV-WD-014 B-D Group R22,~~IATER~~Closure Head-to-Nozzle B3~90 N7B 3 X 065600 RV"WD" 014-IR Nozzle N7B Znner Radius Section B-D B3.100 3 X Group R22,~~IATER~~065700 RV-WD-015 B-F UT Group R23,~~LATER~~Nozzle N7C-to-Flange B5~10 PT 3 X 065800 RV-WD-015 SZL Nozzle N7C-to-Flange 455R1S1 3 X Group R23, Inconel 182 butter expansion from nozzle side of weld**ZATER**065900 RV WD 016 B-D Group R23,+*ZATER**Closure Head-to-Nozzle B3.90 Njc 3 X 066000 RV-WD-016 ZR Nozzle N7C Inner Radius Section B-D UT B3.100 X Group R23,++LATER~+  
EXAMINATION AREA       CATEGY    NDE                OUTAGE                        INSTRUCTIONS NUMBER     IDENTIFICATION         ITEM NO   METH   1 2 3 4 1   2 3 4   1 2 3 4 ttCALIBRATION BLOCK~'
065300     RV WD 013               SIL                                                     Group R22, Znconel 182 Nozzle N7B-to-Flange   455R1S1                                                 butter expansion from 3                            X          nozzle side of weld.
                                                                                            ~~LATER~~
065400     RV WD 013               B-F       UT                                           GrouP R22 ++ZATER~~
Nozzle N7B-to-Flange   B5 10
                                      ~
3             X 065500     RV-WD-014               B-D                                                     Group R22, ~~IATER~~
Closure Head-to-Nozzle B3 90
                                      ~
3 X N7B 065600     RV"WD"014-IR           B-D                                                     Group R22, ~~IATER~~
Nozzle N7B Znner        B3. 100 3 X Radius Section 065700     RV-WD-015               B-F       UT                                           Group R23, ~~LATER~~
Nozzle N7C-to-Flange   B5 10
                                      ~       PT 3             X 065800     RV-WD-015               SZL                                                     Group R23, Inconel 182 Nozzle N7C-to-Flange   455R1S1                                                 butter expansion from 3                            X nozzle side of weld
                                                                                            **ZATER**
065900     RV WD 016               B-D                                                     Group R23, +*ZATER**
Closure Head-to-Nozzle B3.90 3 X Njc 066000     RV-WD-016 ZR           B-D       UT                                           Group R23, ++LATER~+
Nozzle N7C Inner        B3. 100 X
Radius Section


DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 ZNSERVICE ZNSPECTION TEN-YEAR PZAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 67 tor Vessel Nozzles NUMBER: 00.0  
DATE: 10/15/99                             NINE MILE POINT NUCLEAR PLANT UNIT 1                         PAGE: 67 REVISION:        0                          ZNSERVICE ZNSPECTION TEN-YEAR PZAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS tor Vessel Nozzles NUMBER: 00. 0 INSPECTION INTERVAL                      PLAN STATUS            PRESERVICE YEAR ASME                  FIRST      SECOND      THIRD SEC. XZ                PERZOD      PERIOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERZOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR INSTRUCTIONS ilCALIBRATZON BLOCK>>~066100 RV-WD-017 B-F UT Group R24~~LATER~~Nozzle N7D-to-Flange B5.10 PT 3 X 066200 RV-WD-017 SZL UT Nozzle N7D-to-Flange 455R1S1 3 X Group R24, Inconel 182 butter expansion from nozzle side of weld+~LATER~~066300 RV-WD-018 B"D UT Group R24,~~LATER'Closure Head-to-Nozzle B3~90 N7D 3 X 066400 RV-WD-018-ZR Nozzle N7D Inner Radius Section t 066500 RV-WD-019 B-D UT B3.100 B-F UT 3 X Group R24,**LATER~~Group R25,+~ZATER+~Nozzle N7E-to-Flange B5.10 PT 3 X 066600 RV-WD-019.SZL UT Nozzle N7E-to-Flange 455R1S1 3 X Group R25, Inconel 182 butter expansion from nozzle side of weld.**LATER~*066700 RV"WD-020 B-D Group R25,~~LATER~~Closure Head-to-Noz"lc B3.90 N7E 3 X 066800 RV"WD"020-ZR Nozzle N7E Inner Radius Section B-D B3.100 3 X Group R25,**LATER**n>  
EXAMINATION AREA         CATEGY      NDE                OUTAGE                        INSTRUCTIONS NUMBER     IDENTIFICATION           ITEM NO   METH     1 2 3 4 1   2 3 4   1 2 3 4 ilCALIBRATZON BLOCK>>~
066100     RV-WD-017               B-F         UT                                           Group R24 ~~LATER~~
Nozzle N7D-to-Flange     B5. 10     PT 3                         X 066200     RV-WD-017               SZL         UT                                           Group R24, Inconel 182 Nozzle N7D-to-Flange     455R1S1                                                   butter expansion from 3                          X          nozzle side of weld
                                                                                              +~LATER~~
066300     RV-WD-018               B"D         UT                                           Group R24, ~~LATER' Closure Head-to-Nozzle   B3 90
                                      ~
3 X N7D 066400     RV-WD-018-ZR             B-D        UT                                            Group R24, **LATER~~
Nozzle N7D Inner         B3.100 3 X Radius Section t
066500     RV-WD-019               B-F         UT                                           Group R25, +~ZATER+~
Nozzle N7E-to-Flange     B5.10       PT 3                           X 066600     RV-WD-019             . SZL         UT                                           Group R25, Inconel 182 Nozzle N7E-to-Flange     455R1S1                                                   butter expansion from 3 X nozzle side of weld.
                                                                                              **LATER~*
066700     RV"WD-020               B-D                                                       Group R25, ~~LATER~~
Closure Head-to-Noz"lc B3.90 3 X N7E 066800     RV"WD"020-ZR             B-D                                                       Group R25, **LATER**
Nozzle N7E Inner        B3.100 3 X Radius Section n>


DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 ZNSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 68 or Vessel Nozzles NUMBER: 00.0  
DATE: 10/15/99                             NINE MILE POINT NUCLEAR PLANT UNIT 1                         PAGE: 68 REVISION:        0                          ZNSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS or Vessel Nozzles NUMBER:   00. 0 ZNSPECTZON ZNTERVAL                    PZAN STATUS            PRESERVICE YEAR ASME                FIRST        SECOND      THIRD SEC. XI            PERIOD      PERIOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION ZNSPECTZON ZNTERVAL ASME SEC.XI CATEGY NDE ITEM NO METH FIRST PERIOD PZAN STATUS SECOND PERIOD THIRD PERIOD OUTAGE 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR INSTRUCTIONS
EXAMINATION AREA         CATEGY      NDE                OUTAGE                        INSTRUCTIONS NUMBER     IDENTIFICATION           ITEM NO   METH     1 2 3 4 1   2 3 4   1 2 3 4 >>>>CALIBRATION BLOCK>>>>
>>>>CALIBRATION BLOCK>>>>066900 RV-WD-021 B-F UT Group R26>>>>LATER>>>>
066900     RV-WD-021               B-F         UT                                           Group R26>>>>LATER>>>>
Nozzle N7F-to-Flange B5.10 PT 3 X 067000 RV-WD-021 SIL UT Nozzle N7F-to-Flange 455R1S1 Group R26, Inconel 182 butter expansion from nozzle side of weld**IATER>>*067100 RV-WD-022 B-D UT Closure Head-to-Nozzle B3.90 3 X Group R26,>>>>ZATER*>>067200 RV-WD-022-ZR Nozzle N7F Inner Radius Section B-D UT B3.100 3 X Group R26,**ZATER>>*067300 RV-WD-023 Nozzle N7G-to-Flange B-F UT B5.10 PT 3 X Group R27**ZATER**067400 RV-WD-023 SZL UT Nozzle N7G-to-Flange 455R1S1 3 X Group R27, Inconcl 182 butter expansion from thc nozzle side of weld>>>>LATER>>>>067500 RV-WD-024 B D UT Group R27,**ZATER>>>>Closure Head-to-Nozzle B3.90 N7G 3 X 067600 RV-WD-024-ZR Nozzle N7G Inner Radius Section B-D UT B3.100 3 X Group R27,>>>>LATER>>>>
Nozzle N7F-to-Flange   B5. 10     PT 3                           X 067000     RV-WD-021               SIL         UT                                           Group R26, Inconel 182 Nozzle N7F-to-Flange     455R1S1                                                   butter expansion from nozzle side of weld
0 DATE: 10/15/99 REVISION: 0 NZNE MILE POINT NUCLEAR PIANT UNIT 1 ZNSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 69 tor Vessel Nozzlcs NUMBER: 00.0  
                                                                                            **IATER>>*
067100   RV-WD-022               B-D         UT                                           Group R26, >>>>ZATER*>>
Closure Head-to-Nozzle B3.90 3             X 067200   RV-WD-022-ZR             B-D         UT                                           Group R26, **ZATER>>*
Nozzle N7F Inner        B3. 100 3              X Radius Section 067300   RV-WD-023               B-F        UT                                            Group R27 **ZATER**
Nozzle N7G-to-Flange     B5.10       PT 3                           X 067400   RV-WD-023               SZL         UT                                           Group R27, Inconcl 182 Nozzle N7G-to-Flange     455R1S1                                                   butter expansion from 3                            X thc nozzle side of weld
                                                                                            >>>>LATER>>>>
067500   RV-WD-024               B D         UT                                           Group R27, **ZATER>>>>
Closure Head-to-Nozzle B3. 90 3                           X N7G 067600   RV-WD-024-ZR             B-D         UT                                           Group R27, >>>>LATER>>>>
Nozzle N7G Inner        B3. 100 3                            X Radius Section
 
0 DATE: 10/15/99                             NZNE MILE POINT NUCLEAR PIANT UNIT 1                         PAGE: 69 REVISION:        0                          ZNSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS tor Vessel Nozzlcs NUMBER: 00.0 ZNSPECTZON INTERVAL                      PLAN STATUS            PRESERVICE YEAR ASME                  FIRST        SECOND      THIRD SEC. XI            PERIOD      PERIOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION ZNSPECTZON INTERVAL ASME SEC.XI CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR INSTRUCTIONS
EXAMINATION AREA       CATEGY      NDE                OUTAGE                        INSTRUCTIONS NUMBER     IDENTIFICATION         ITEM NO     METH     1 2 3 4 1   2 3 4   1 2 3 4 ~*CALIBRATION BLOCK~~
~*CALIBRATION BLOCK~~067700 RV-WD"025 B F UT Group R28+~LATER**Nozzle N7H-to-Flange BS.10 PT 3 X 067800 RV-WD-025 SZL Nozzle N7H-to-Flange 455R1S1 3 X Group R28, Znconcl 182 butter expansion from nozzle side of weld**LATER**067900 RV-WD"026 B-D UT Group R28,~~LATER+~Closure Head-to-Nozzle B3.90 N7H 3 X 068000 RV-WD-026-ZR Nozzle N7H Inner Radius Section B-D UT B3.100 3 X Group R28,**LATER~*068100 RV-WD-027 Nozzle N7J-to-Flange B-F UT B5.10 PT 3 X Group R29**LATER++068200 RV-WD"027 SIL UT Nozzle N7J-to-Flange 455R1S1 3 X Group R29, Inconcl 182 butter expansion from nozzle side of weld.~~LATER**068300 RV-WD"028 B D UT Group R29,**LATER+~Closure Head-to-Nozzle B3~90 N7J 3 X 068400 RV-WD-028 IR Nozzle N7J Inner Radius Section B-D B3.100 3 X Group R29,*~LATER~~  
067700     RV-WD"025               B F         UT                                           Group R28 +~LATER**
Nozzle N7H-to-Flange   BS. 10       PT 3                           X 067800     RV-WD-025               SZL                                                       Group R28, Znconcl 182 Nozzle N7H-to-Flange   455R1S1                                                   butter expansion from 3                            X          nozzle side of weld
                                                                                              **LATER**
067900     RV-WD"026               B-D         UT                                           Group R28, ~~LATER+~
Closure Head-to-Nozzle B3. 90 3             X N7H 068000     RV-WD-026-ZR           B-D         UT                                           Group R28, **LATER~*
Nozzle N7H Inner        B3.100 3              X Radius Section 068100     RV-WD-027               B-F          UT                                            Group R29 **LATER++
Nozzle N7J-to-Flange   B5.10       PT 3 X 068200     RV-WD"027               SIL         UT                                           Group R29, Inconcl 182 Nozzle N7J-to-Flange   455R1S1                                                   butter expansion from 3 X nozzle side of weld.
                                                                                              ~~LATER**
068300     RV-WD"028               B D         UT                                           Group R29, **LATER+~
Closure Head-to-Nozzle B3 ~ 90 3                           X N7J 068400   RV-WD-028 IR             B-D                                                       Group R29, *~LATER~~
Nozzle N7J Inner        B3. 100 3                            X Radius Section


DATE: 10/15/99 REVISZON: 0 NINE MILE POINT NUCLEAR PIANT UNIT 1 ZNSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 70 tor Vessel Nozzles z NUMBER: 00.0  
DATE: 10/15/99                           NINE MILE POINT NUCLEAR PIANT UNIT 1                         PAGE: 70 REVISZON:        0                        ZNSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS tor Vessel Nozzles z
NUMBER: 00. 0 INSPECTION INTERVAL                    PIAN STATUS            PRESERVICE YEAR FIRST        SECOND      THIRD SEC. XZ              PERIOD      PERIOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD PIAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR INSTRUCTIONS
EXAMINATION AREA       CATEGY    NDE                OUTAGE                        INSTRUCTIONS NUMBER     IDENTIFICATION         ITEM NO   METH     1 2 3 4 1   2 3 4   1 2 3 4 ~~CALIBRATION BLOCK~~
~~CALIBRATION BLOCK~~068500 RV-WD-029 B-F UT Group R30,~~LATER'*Nozzle N7K-to-Flange B5.10 PT 3 X 068600 RV-WD-029 SZL UT Nozzle N7K-to-Flange 455R1S1 3 X Group R30, Znconcl 182 butter expansion from nozzle siCk of weld.~~LATER++068700 RV-WD-030 B-D Group R30, iiZATER+~Closure Head-to-No zlc B3.90 N7K 3 X 068800 RV-WD-030-ZR Nozzle N7K Inner Radius Section B-D B3.100 3 X Group R30,**LATER~*068900 RV-WD-031 B-F UT Group R32++LATER~i Nozzle N7M-to-Flange B5 10 PT 3 X 069000 RV-WD"031 SIL Nozzle N7M-to-Flange 455R1S1 X Group R32, Znconcl butter expansion from the nozzle side of thc weld~~LATER~~069100 RV-WD-032 B-D Group R32,~PLATER*~Closure Head-to-Noz"lc B3.90 N7M 3 X 069200 RV-WD-032-IR Nozzle N7M Inner Radius Section B-D B3.100 3 X Group R32, i~LATER~~  
068500     RV-WD-029               B-F       UT                                           Group R30, ~~LATER'*
Nozzle N7K-to-Flange   B5.10     PT 3 X 068600     RV-WD-029               SZL       UT                                           Group R30, Znconcl 182 Nozzle N7K-to-Flange   455R1S1                                                 butter expansion from 3 X nozzle siCk of weld.
                                                                                            ~ ~LATER+ +
068700     RV-WD-030               B-D                                                     Group R30, iiZATER+~
Closure Head-to-No zlc B3.90 3                           X N7K 068800     RV-WD-030-ZR           B-D                                                     Group R30, **LATER~*
Nozzle N7K Inner        B3. 100 3                            X Radius Section 068900     RV-WD-031               B-F       UT                                           Group R32 ++LATER~i Nozzle N7M-to-Flange   B5 10     PT 3 X 069000     RV-WD"031               SIL                                                     Group R32, Znconcl Nozzle N7M-to-Flange   455R1S1                                                 butter expansion from X
the nozzle side of thc weld ~~LATER~~
069100     RV-WD-032               B-D                                                     Group R32, ~PLATER*~
Closure Head-to-Noz"lc B3.90 3                           X N7M 069200     RV-WD-032-IR           B-D                                                     Group R32, i~LATER~~
Nozzle N7M Inner        B3.100 3                            X Radius Section


DATE: 10/15/99 REVZSZON: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 ZNSERVZCE INSPECTION TEN-YEAR PLAN CIASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 71 tor Vessel Nozzles NUMBER: 00.0  
DATE: 10/15/99                           NINE MILE POINT NUCLEAR PLANT UNIT 1                           PAGE: 71 REVZSZON:        0                          ZNSERVZCE INSPECTION TEN-YEAR PLAN CIASS 1 SECTION XZ SCHEDULED COMPONENTS tor Vessel Nozzles NUMBER: 00. 0 INSPECTION INTERVAL                      PLAN STATUS            PRESERVICE YEAR ASME                FIRST        SECOND      THIRD SEC. XZ              PERIOD        PERZOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERZOD-OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR INSTRUCTIONS
EXAMINATION AREA       CATEGY      NDE                -OUTAGE                          INSTRUCTIONS NUMBER     IDENTIFICATION         ITEM NO     METH   1 2 3 4   1   2 3 4   1 2 3 4 **CALIBRATIONBLOCK~+
**CALIBRATION BLOCK~+069300 RV-WD-033 B-F UT Group R33+~LATER~+Nozzle N7N-to-Flange B5.10 PT 3 X 069400 RV-WD-033 SZL Nozzle N7N-to-Flange 455R1S1 3 X Group R33, Znconcl 182 butter expansion from nozzle side of weld.~~LATER~*069500 RV-WD-034 B-D UT Group R33,**LATER~~Closure Head-to-Nozzle B3.90 N7N 3 X 069600 RV"WD-034-ZR Nozzle N7N Inner Radius Section B-D UT B3.100 3 X Group R33,*~LATER~~069700 RV-WD-035 B-F UT Group R34*~IATER~~Nozzle N7P-to-Flange BED 10 PT 3 X 069800 RV-WD-035 SZI UT Nozzle N7P-to-Flango 455R1S1 3 R34 , Znconel 182 butter expansion from thc nozzle side of thc weld.+~LATER+*069900 RV-WD-036 B-D UT R34+~LATER~*Closure Head-to-Nozzle B3.90 N7P 3 X 070000 RV-WD-036-ZR Nozzle N7P Inner Radius Section B-D B3.100 3 X R34~~LATER~~  
069300     RV-WD-033               B-F         UT                                             Group R33 +~LATER~+
Nozzle N7N-to-Flange   B5.10       PT 3                             X 069400     RV-WD-033               SZL                                                       Group R33, Znconcl 182 Nozzle N7N-to-Flange   455R1S1                                                   butter expansion from 3                            X          nozzle side of weld.
                                                                                              ~ ~LATER~*
069500     RV-WD-034               B-D         UT                                             Group R33, **LATER~~
Closure Head-to-Nozzle B3.90 3             X N7N 069600     RV"WD-034-ZR           B-D         UT                                             Group R33, *~LATER~~
Nozzle N7N Inner        B3.100 3              X Radius Section 069700     RV-WD-035               B-F         UT                                             Group R34 *~IATER~~
Nozzle N7P-to-Flange   BED 10     PT 3             X 069800     RV-WD-035               SZI         UT                                             R34  , Znconel 182 butter Nozzle N7P-to-Flango   455R1S1                                                   expansion from thc 3
nozzle side of thc weld.
                                                                                              +~LATER+*
069900     RV-WD-036               B-D         UT                                             R34 +~LATER~*
Closure Head-to-Nozzle B3. 90 3             X N7P 070000     RV-WD-036-ZR           B-D                                                       R34 ~~LATER~~
Nozzle N7P Inner        B3.100 3              X Radius Section


DATE: 10/15/99 REVZ S ZON: 0 NINE MILE POINT NUCLEAR PZANT UNIT 1 ZNSERVZCE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 72 tor Vessel Nozzles NUMBER: 00.0  
DATE:   10/15/99                             NINE MILE POINT NUCLEAR PZANT UNIT 1                         PAGE: 72 REVZ S ZON:        0                          ZNSERVZCE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS tor Vessel   Nozzles NUMBER:   00. 0 INSPECTION INTERVAL                      PLAN STATUS            PRESERVZCE YEAR ASME                FIRST        SECOND      THIRD SEC. XZ              PERIOD        PERIOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD THIRD PERIOD OUTAGE 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVZCE YEAR INSTRUCTIONS
EXAMINATION AREA         CATEGY      NDE                OUTAGE                          INSTRUCTIONS NUMBER       IDENTIFICATION           ITEM NO     METH   1 2 3 4   1   2 3 4   1 2 3 4 ++CALIBRATION BLOCK~~
++CALIBRATION BLOCK~~070100 RV-WD-037 B-F UT Group R35,**LATER**Nozzle N7R-to-Flange B5.10 PT 3 X 070200 RV-WD-037 SZL Nozzle N7R-to-Flange 455R1S1 X Group R35, Inconcl 182 butter expansion from thc nozzlo sido of the weld.i*IATERi~070300 RV-WD-038 B-D GrouP R35, 44LATER4~Closure Head-to-Nozzle B3.90 N7R 3 X 070400 RV-WD-038-ZR Nozzlo N7R Inner Radius Section B-D B3.100 3 X Group R35,~iLATERi~070500 RV-WD-039 B-F UT Group R36**IATERii Nozzlo N7S-to-Flange B5.10 3 X 070600 RV-WD-039 SZL Nozzle N7S-to-Flange 455R1S1 3 X Group R36, Inconcl 182 butter expansion from the nozzle side of thc weld.**IATER~~070700 RV-WD-040 B-D Closure Head-to-Nozzle B3.90 N78 3 X Group R36,+~IATERi'70800 RV-WD-040-ZR Nozzle N7S Inner Radius Section B-D B3.100 3 X Group R36,<<~IATER~*  
070100       RV-WD-037               B-F         UT                                             Group R35, **LATER**
Nozzle N7R-to-Flange   B5. 10     PT 3             X 070200       RV-WD-037               SZL                                                       Group R35, Inconcl 182 Nozzle N7R-to-Flange   455R1S1                                                   butter expansion from X          thc nozzlo sido of the weld. i*IATERi~
070300     RV-WD-038               B-D                                                       GrouP R35, 44LATER4~
Closure Head-to-Nozzle B3. 90 3             X N7R 070400     RV-WD-038-ZR             B-D                                                       Group R35, ~iLATERi~
Nozzlo N7R Inner        B3.100 3              X Radius Section 070500     RV-WD-039               B-F         UT                                             Group R36 **IATERii Nozzlo N7S-to-Flange     B5.10 3             X 070600     RV-WD-039               SZL                                                       Group R36, Inconcl 182 Nozzle N7S-to-Flange     455R1S1                                                   butter expansion from 3                            X the nozzle side of thc weld. **IATER~~
070700     RV-WD-040               B-D                                                       Group R36, Closure Head-to-Nozzle B3.90 3                             X N78                                                                                            +~IATERi'70800 RV-WD-040-ZR             B-D                                                       Group R36, <<~IATER~*
Nozzle N7S Inner        B3. 100 3                            X Radius Section


DATE: 10/15/99 REVISION: 0 NINE MZIE POINT NUCLEAR PLANT UNIT 1 ZNSERVZCE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 73 tor Vessel Nozzlcs NUMBER: 00.0  
DATE: 10/15/99                               NINE MZIE POINT NUCLEAR PLANT UNIT 1                           PAGE: 73 REVISION:        0                            ZNSERVZCE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS tor Vessel   Nozzlcs NUMBER:   00. 0 INSPECTION ZNTERVAL                        PLAN STATUS            PRESERVICE YEAR FIRST        SECOND      THIRD SEC. XZ                PERIOD        PERIOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER ZDENTZFICATZON INSPECTION ZNTERVAL SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD-OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR INSTRUCTIONS
EXAMINATION AREA         CATEGY        NDE                -OUTAGE                          INSTRUCTIONS NUMBER     ZDENTZFICATZON           ITEM NO       METH   1 2 3 4   1   2 3 4   1 2 3 4 ++CALIBRATION BLOCK++
++CALIBRATION BLOCK++070900 RV WD 041 B F UT Group R37**LATER~i Nozzle N7T-to-Flange B5~10 PT X 071000 RV-WD-041 SZL Nozzle N7T-to-Flange 455R1S1 3 X Group R37, Inconel N butter expansion from the noz le side of thc weld.**IATER**071100 RV WD-042 B-D Group R37,**LATER+*Closure Head-to-Nozzle B3.90 N7T 3 X 071200 RV-WD-042 ZR No zlc N7T Inner Radius Section B-D B3.100 3 X Group R37,~iLATERi~071300 RV WD 043 No" zle N7U-to-Flange B5.10 PT 3 X Group R38~~IATER*+071400 RV-WD-043 SIL Nozzle N7U-to-Flange 455R1S1 3 X Group R38, Inconcl 182 butter expansion from the nozzle side of the weld.~~IATER~~071500 RV-WD-044 B-D Group R38*PLATER~~Closure Head-to-Nozzle B3~90 N7U 3 X 071600 RV-WD-044-ZR Nozzle N7U Inner Radius Section B-D B3.100 3 X Group R38**LATER**  
070900     RV WD 041             B F           UT                                             Group R37 **LATER~i Nozzle N7T-to-Flange     B5 10
                                        ~         PT X
071000     RV-WD-041               SZL                                                         Group R37, Inconel N
Nozzle N7T-to-Flange     455R1S1                                                     butter expansion from 3 X the noz le side of thc weld. **IATER**
071100     RV WD-042               B-D                                                         Group R37, **LATER+*
Closure Head-to-Nozzle B3. 90 3                             X N7T 071200     RV-WD-042 ZR             B-D                                                          Group R37, ~iLATERi~
No zlc N7T Inner         B3. 100 3                             X Radius Section 071300     RV WD 043                                                                           Group R38 ~~IATER*+
No" zle N7U-to-Flange   B5.10         PT 3 X 071400     RV-WD-043               SIL                                                         Group R38, Inconcl 182 Nozzle N7U-to-Flange     455R1S1                                                     butter expansion from 3 X the nozzle side of the weld. ~ ~IATER~ ~
071500     RV-WD-044               B-D                                                         Group R38
* PLATER~~
Closure Head-to-Nozzle B3   ~ 90 3                             X N7U 071600     RV-WD-044-ZR             B-D                                                         Group R38 **LATER**
Nozzle N7U Inner        B3. 100 3                            X Radius Section


DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 INSERVZCE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XI SCHEDULED COMPONENTS PAGE: 74 tor Vessel Nozzles NUMBER: 00.0  
DATE: 10/15/99                                 NINE MILE POINT NUCLEAR PLANT UNIT 1                           PAGE: 74 REVISION:        0                              INSERVZCE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION   XI SCHEDULED COMPONENTS tor Vessel Nozzles NUMBER:   00. 0 INSPECTION INTERVAL                        PLAN SIATUS            PRESERVICE YEAR ASHE                  FIRST        SECOND      THIRD SEC. XI              PERZOD        PERIOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL ASHE SEC.XI CATEGY NDE ITEH NO METH FIRST PERZOD PLAN SIATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR INSTRUCTIONS
EXAMINATION AREA           CATEGY        NDE                  OUTAGE                        INSTRUCTIONS NUMBER     IDENTIFICATION             ITEH   NO   METH   1 2 3 4   1   2 3 4   1 2 3 4 ~~CALIBRATION BLOCK~*
~~CALIBRATION BLOCK~*6.0" Safety Relief Valve (REF.DWG.NO.28)071700 V-BK-01-119A B-M-2 VT-3 Safety Valve Zntcrior B12.50 Surface X V09, Examine when disassembled
6.0" Safety Relief Valve       (REF. DWG. NO. 28) 071700     V-BK-01-119A               B-M-2         VT-3                                         V09, Examine when Safety Valve Zntcrior       B12.50                                                       disassembled +~N/A~~
+~N/A~~Control Rod Drive Nozzles (REF.DWG.NO.28A)073500 CRD NOEELES B" E VT-2 Partial Penetration B4~12 Wclds 129 CRD Nozzlcs, 25%or 32 required, included in system pressure test program**N/A**Instrumentation Nor zlcs (REF.DWG.NO.28A)073600 INST-NOEELES Incore Flux Honitors B4.13 VT"2 3 X 64 IFH's, 25%or 16 repaired, included in system pressure test program*~N/A**Instrument Worries (REF.DWG.NO.8)073900 SZL571-N13A SZL VT 2 VT-2 after vessel RPV N13A Instr 571 No ic-to-Safe End X---X X--X flood-up (static prcssure, no hold time)at start of each RFO f during System Lcakagc each RFO.~~N/A~*074000 SZL571-N13B SZL VT-2 RPV N13B Instr 571 Nozzle-to-Safe End X---X X--X VT-2 after vessel flood-up (static prcssure, no hold time)at start of each RFO 4 during System Leakage each RFO.**N/A~*  
X Surface Control   Rod Drive Nozzles     (REF. DWG. NO. 28A) 073500     CRD NOEELES                 B"E           VT-2                                         129 CRD Nozzlcs, 25% or Partial Penetration        B4 12
                                          ~                                                        32 required, included in Wclds                                                                                    system pressure test program **N/A**
Instrumentation Nor zlcs     (REF. DWG. NO. 28A) 073600     INST-NOEELES                               VT"2                                         64 IFH's, 25% or 16 Incore Flux Honitors        B4.13                                                        repaired, included in 3                            X          system pressure test program *~N/A**
Instrument Worries     (REF. DWG. NO. 8) 073900   SZL571-N13A                 SZL           VT 2                                           VT-2 after vessel RPV N13A     Instr           571                                                         flood-up (static ic-to-Safe                                   X   - - -     X   X - -   X prcssure, no hold time)
No                End at start of each RFO f during System Lcakagc each RFO. ~~N/A~*
074000   SZL571-N13B                 SZL           VT-2                                          VT-2 after vessel RPV N13B     Instr           571                                                         flood-up (static Nozzle-to-Safe End                                 X   - - -     X   X - -   X prcssure, no hold time) at start of each RFO 4 during System Leakage each RFO. **N/A~*


DATE: 10/15/99 REVISION: 0 NINE MILE POZNT NUCLEAR PLANT UNIT 1 ZNSERVZCE INSPECTION TEN-YEAR PLAN CIASS 1 SECTION XI SCHEDULED COMPONENTS PAGE: 75 tor Vessel Nozzlas NUMBER: 00.0  
DATE: 10/15/99                             NINE MILE POZNT NUCLEAR PLANT UNIT 1                         PAGE: 75 REVISION:        0                          ZNSERVZCE INSPECTION TEN-YEAR PLAN CIASS 1 SECTION XI SCHEDULED COMPONENTS tor Vessel Nozzlas NUMBER:   00. 0 INSPECTION ZNTERVAL                      PLAN STATUS            PRESERVICE YEAR ASME                FZRST        SECOND      THIRD SEC. XI            PERIOD        PERIOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION ZNTERVAL ASME SEC.XI CATEGY NDE ITEM NO METH FZRST PERIOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR INSTRUCTIONS
EXAMINATION AREA           CATEGY    NDE                OUTAGE                          INSTRUCTIONS NUMBER     IDENTIFICATION             ITEM NO   METH   1 2 3 4   1   2 3 4   1 2 3 4 **CALIBRATIONBLOCK+'~
**CALIBRATION BLOCK+'~Znstrumcnt Nozzles (REF.DWG.NO.SA)074100 SZL571-N14A RPV N14A Instr Nozzle-to-Safe End SIL VT-2 571 3 X---X X--X VT-2 after vessel flood-up (static pressure, no hold time)at start of each RFO a during System Lcakagc each RFO.~~N/A~~074200 SIL571-N14B RPV N14B Znstr Nozzle-to-Safe End SZL VT" 2 571 X---X X--X VT-2 after vessel flood-up (static prcssure, no hold time)at start of each RFO a during System Leakage each RFO.~~N/A~+Instrument Nozzles (REF.DWG.NO.SB)00 SZL571-N15A SIL VT-2 RPV N15A Instr 571 Nozzle-to-Safe End X---X X--X VT-2 after vcsscl flood-up (static prcssure, no hold time)at start of each RFO a during System Leakage each RFO.**N/A*~074400 SIL571 N15B RPV N15B Znstr Nozzle-to-Safe End SIL VT-2 571 3 X---X X--X VT-2 after vessel flood-up (static pressure, no hold time)at start of each RFO 6 during System Leakage each RFO.~+N/A~~  
Znstrumcnt Nozzles (REF.     DWG. NO. SA) 074100     SZL571-N14A               SIL        VT-2                                          VT-2  after vessel RPV N14A   Instr           571                                                      flood-up (static Nozzle-to-Safe End                         3 X   - - -   X   X - -   X pressure, no hold time) at start of each RFO a during System Lcakagc each RFO. ~~N/A~~
074200     SIL571-N14B               SZL        VT"2                                          VT-2  after vessel RPV N14B   Znstr           571                                                      flood-up (static Nozzle-to-Safe End                           X   - - -   X   X - -   X prcssure, no hold time) at start of each RFO a during System Leakage each RFO. ~~N/A~+
Instrument Nozzles   (REF. DWG. NO. SB) 00     SZL571-N15A               SIL         VT-2                                         VT-2  after vcsscl RPV N15A   Instr           571
                                                            - - -           - -               flood-up (static X           X   X        X Nozzle-to-Safe End                                                                  prcssure, no hold time) at start of each RFO a during System Leakage each RFO. **N/A*~
074400     SIL571 N15B               SIL        VT-2                                          VT-2 after vessel RPV N15B  Znstr          571                                                       flood-up (static 3 X   - - -   X   X - -   X Nozzle-to-Safe  End                                                                pressure, no hold time) at start of each RFO 6 during System Leakage each RFO. ~+N/A~~


DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PZANT UNIT 1 INSERVZCE INSPECTION TEN YEAR PIAN CLASS 1 SECTION XI SCHEDULED COMPONENTS PAGE: 76 tor Vessel Nozzles NUMBER: 00.0  
DATE: 10/15/99                               NINE MILE POINT NUCLEAR PZANT UNIT 1                         PAGE: 76 REVISION:        0                          INSERVZCE INSPECTION TEN YEAR PIAN CLASS 1 SECTION XI SCHEDULED COMPONENTS tor Vessel Nozzles NUMBER:   00.0 INSPECTION INTERVAL                      PLAN STATUS            PRESERVZCE YEAR ASME                FIRST        SECOND      THIRD SEC. XZ              PERIOD        PERIOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVZCE YEAR INSTRUCTIONS atCALIBRATZON BLOCK+a Instrument Nozzles (REF.DWG.NO.BC)074500 SZL571 N16A RPV N16A Instr Nozzle-to-Safe End SZL VT-2 571 3 X---X X--X VT-2 after vessel flood-up (static pressure, no hold tine)at start of each RFO 6 during System Leakage each RFO.~~N/A~~074600 SZL571-N168 RPV N16B Instr Nozzle-to-Safe End SIL VT 2 571 3 X---X X--X VT-2 after vessel flood-up (static pressure, no hold tine)at start of each RFO a during System Lcakagc each RFO.~*N/A*+Instrument No zlcs (REF.DWG.NO.SD)00 SZL571-N17A SZL VT-2 RPV N17A Instr 571 Nozzle-to-Safe End X---X X--X VT-2 after vessel flood-up (static pressure, no hold time)at start of each RFO C during System Leakage each RFO.**N/A+~074800 SIL571-N17B RPV N17B Instr Nozzle-to-Safe End SZL 571 VT 2 3 X---X X--X VT-2 after vessel flood-up (static prcssure, no hold time)at start of each RFO 6 during System Leakage each RFO.**N/A~~  
EXAMINATION AREA           CATEGY    NDE                  OUTAGE                        INSTRUCTIONS NUMBER     IDENTIFICATION             ITEM NO   METH   1 2 3 4   1   2 3 4   1 2 3 4 atCALIBRATZON BLOCK+a Instrument Nozzles   (REF. DWG. NO. BC) 074500     SZL571 N16A               SZL        VT-2                                          VT-2  after vessel RPV N16A Instr           571                                                      flood-up (static Nozzle-to-Safe End                         3 X   - - -     X   X - -   X pressure, no hold tine) at start of each RFO 6 during System Leakage each RFO. ~~N/A~~
074600     SZL571-N168               SIL        VT 2                                          VT-2  after vessel RPV N16B   Instr           571                                                      flood-up (static Nozzle-to-Safe End                           3 X   - - -     X   X - -   X         pressure, no hold tine) at start of each RFO a during System Lcakagc each RFO. ~*N/A*+
Instrument No zlcs (REF. DWG. NO. SD) 00   SZL571-N17A                 SZL       VT-2                                           VT-2  after vessel RPV N17A   Instr           571                                                       flood-up (static Nozzle-to-Safe End                             X   - - -     X   X - -   X         pressure, no hold time) at start of each RFO C during System Leakage each RFO. **N/A+~
074800   SIL571-N17B                 SZL        VT 2                                          VT-2  after vessel RPV N17B   Instr           571                                                      flood-up (static 3 X   - - -     X   X - -   X Nozzle-to-Safe End                                                                    prcssure, no hold time) at start of each RFO 6 during System Leakage each RFO. **N/A~~


'ATE: 10/15/99 REVI SION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 INSERVZCE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 77 tor Vessel Supports NUMBER: 00.0  
'ATE: 10/15/99                                 NINE MILE POINT NUCLEAR PLANT UNIT 1                           PAGE: 77 REVI SION:        0                            INSERVZCE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS tor Vessel Supports NUMBER:   00.0 ZNSPECTION INTERVAL                        PLAN STATUS            PRESERVICE YEAR ASME                  FIRST        SECOND      THIRD SEC. XZ                PERIOD        PERIOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION ZNSPECTION INTERVAL ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS THIRD PERIOD SECOND PERIOD--OUTAGE--
EXAMINATION AREA         CATEGY       NDE             --OUTAGE--                         INSTRUCTIONS NUMBER      IDENTIFICATION            ITEM NO      METH    1 2 3 4   1   2 3 4   1 2 3 4 4 lCALIBRATION BLOCK~ ~
1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR INSTRUCTIONS 4 lCALIBRATION BLOCK~~Stabilizers (REF.DWG.NO.28)074900 RV-SB-1A F-A VT 3 RPV Stabilizer Strut F1.40 3 X Code Case N-491-1~+N/A+~075000 RV SB-1B RPV Stabilizer Strut F1.40 3 X Code Case N-491-1*AN/Alt 075100 RV SB-2A RPV Stabilizer Strut F1.40 3 Coda Case N-491-1++N/A~+075200 RV-SB-2B F-A VT-3 RPV Stabilizer Strut F1.40 3 X Code Case N 491 1+*N/A+*00 RV-SB-3A F-A VT 3 RPV stabilizer Strut F1.40 3 X Code Case N-491-1~~N/A~*075400 RV-SB-3B RPV Stabilizer Strut Fl~40 VT 3 3 X Code Case N-491-1 aeN/Aee 075500 RV-SB-4A F-A VT" 3 RPV Stabilizer Strut F1.40 3 X Code Case N-491-1+~N/A++075600 RV-SB-4B F-A VT-3 RPV Stabilizer Strut F1.40 3 X Code Casa N-491-1 i*N/A%*Integral Attachments (REF.DWG.NO.2S)075700 RV-SB1-ZA-371/372 B-K MT Stabilizer Integral B10.10 Woldcd Lug 8 22.5 3 X WRA 50%, Examine accessible length of attachment weld., Coda Caso N-509.~*N/A*~  
Stabilizers   (REF. DWG. NO. 28) 074900     RV-SB-1A                 F-A           VT 3                                         Code Case N-491-1 RPV Stabilizer Strut      F1.40                                                        ~+N/A+~
3 X 075000     RV SB-1B                                                                             Code Case N-491-1 RPV Stabilizer Strut    F1.40                                                        *AN/Alt 3 X 075100     RV SB-2A                                                                             Coda Case N-491-1 RPV Stabilizer Strut    F1.40                                                        ++N/A~+
3 075200     RV-SB-2B                 F-A           VT-3                                         Code Case N 491 1 RPV Stabilizer Strut     F1.40                                                       +*N/A+*
3                            X 00     RV-SB-3A                 F-A           VT 3                                           Code Case N-491-1 RPV stabilizer Strut    F1.40                                                        ~~N/A~*
3              X 075400     RV-SB-3B                               VT 3                                           Code Case N-491-1 RPV Stabilizer Strut    Fl  ~ 40                                                    aeN/Aee 3              X 075500     RV-SB-4A                 F-A           VT"3                                           Code Case N-491-1 RPV Stabilizer Strut    F1.40                                                        +~N/A++
3                            X 075600     RV-SB-4B                 F-A           VT-3                                           Code Casa N-491-1 RPV  Stabilizer Strut    F1.40                                                        i*N/A%*
3                            X Integral Attachments   (REF. DWG. NO. 2S) 075700     RV-SB1-ZA-371/372         B-K           MT                                             WRA 50%,  Examine Stabilizer Integral       B10. 10                                                     accessible length of 3              X Woldcd Lug   8 22.5                                                                   attachment weld., Coda Caso N-509. ~*N/A*~


DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 78 tor Vessel Supports NUMBER: 00.0  
DATE: 10/15/99                               NINE MILE POINT NUCLEAR PLANT UNIT 1                           PAGE: 78 REVISION:        0                            INSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS tor Vessel   Supports NUMBER:   00.0 ZNSPECTION INTERVAL                      PLAN STATUS            PRESERVICE YEAR ASME                FIRST        SECOND      THIRD SEC. XZ              PERIOD        PERIOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION ZNSPECTION INTERVAL ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR INSTRUCTIONS
EXAMINATION AREA           CATEGY      NDE                OUTAGE                          INSTRUCTIONS NUMBER     IDENTIFICATION             ITEM NO     METH   1 2 3 4   1   2 3 4   1 2 3 4 +*CALIBRATION BLOCK~~
+*CALIBRATION BLOCK~~075800 RV-SB2-ZA-373/374 B-K MT Stabilircr Integral B10.10 Welded Lug 8 112.5 3 X WRA 50%, Examine accessible length of welded attachment, Code Casa N-509.~~N/A~~Zntcgral Attachments (REF.DWG.NO.28A)076200 RV"WD"356-OD B-K PT SuPport Skirt Integral B10.10 Attachment Weld 100%of attachment weld length, Code Case N-509 3 X aaN/Aaa Support Skirt (REFT DWG.NO.N/A)076300 RPV-NR02 SKT/BLT F-A VT-3 Support Skirt F1.40 3 X+*N/A*+
075800     RV-SB2-ZA-373/374           B-K         MT                                           WRA  50%, Examine Stabilircr Integral         B10. 10                                                   accessible length of 3                            X Welded Lug   8 112.5                                                                 welded attachment, Code Casa N-509. ~~N/A~~
Zntcgral Attachments     (REF. DWG. NO. 28A) 076200     RV"WD"356-OD               B-K         PT                                           100%  of attachment weld SuPport Skirt Integral B10.10                                                         length, Code Case N-509 3 X                                     aaN/Aaa Attachment Weld Support   Skirt (REFT DWG. NO. N/A) 076300     RPV-NR02 SKT/BLT           F-A         VT-3                                           +*N/A*+
Support   Skirt             F1. 40 3                             X


DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PIANT UNIT 1 ZNSERVICE INSPECTION TEN-YEAR PZAN.I CLASS 1 SECTZON XI SCHEDULED COMPONENTS PAGE: 79 tor Vessel Welds NUMBER: 00.0  
DATE: 10/15/99                             NINE MILE POINT NUCLEAR PIANT UNIT 1                             PAGE: 79 REVISION:        0                          ZNSERVICE INSPECTION TEN-YEAR PZAN
                                                                                  .I CLASS 1 SECTZON XI SCHEDULED COMPONENTS tor Vessel Welds NUMBER: 00.0 INSPECTION ZNTERVAL                      PLAN STATUS              PRESERVICE YEAR ASME                  FIRST        SECOND        THIRD SEC. XZ                PERIOD        PERIOD        PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER ZDENTZFICATZON INSPECTION ZNTERVAL ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR ZNSTRUCTZONS
EXAMINATION AREA       CATEGY      NDE                  OUTAGE                          ZNSTRUCTZONS NUMBER     ZDENTZFICATZON         ITEM NO     METH     1 2 3 4   1   2 3 4   1 2 3 4 ~ ~CALIBRATION   BLOCK**
~~CALIBRATION BLOCK**076500 RV-WD-001 B-A UT Closure Head-to-Flange Bl.40 MT Wold Closure Head Wclds (REF.DWG.NO.28)X---X---X Examine 100%of weld length, 1/3 each inspection period**IATER**076600 RV-WD"002 Closure Hcad-Circumferential Weld B-A UT Bl.21 3 X Removable steal insulation platform, 50%CRV achieved, Dollar Plate)+~IATERi i 076700 RV-WD-003 Closure Hcad-Mcridional Weld B-A UT Bl.22 3 X Examine accessible length of weld.**IATER**00 RV-WD-004 Closure Head-Mcridional Weld B-A UT B1.22 3 X Examine accessible length of wold.~~IATER~*076900 RV-WD-005 Closure Head-Mcridional Weld B-A UT B1.22 3 X Examine accessible length of weld~~IATER~~077000 RV-WD-006 Closure Hcad-Meridional Weld B-A UT B1.22 3 Examine accessible length of wold.**LATER~~077100 RV-WD-007 Closure Head-Mcridional Weld B-A UT Bl.22 3 X Examine accessible length of weld.**ZATER~+  
Closure Head Wclds (REF. DWG. NO. 28) 076500     RV-WD-001               B-A         UT                                             Examine 100%    of weld Closure Head-to-Flange Bl. 40       MT                                             length, 1/3 each Wold                                         X - - -     X   - - -     X         inspection period
                                                                                                **IATER**
076600     RV-WD"002               B-A         UT                                             Removable    steal Closure Hcad-          Bl. 21                                                       insulation platform, 50%
3              X Circumferential Weld                                                                CRV achieved, Dollar Plate)   +~ IATERi i 076700     RV-WD-003               B-A         UT                                             Examine accessible Closure Hcad-          Bl. 22                                                       length of weld.
3 X Mcridional Weld                                                                      **IATER**
00   RV-WD-004               B-A         UT                                             Examine accessible Closure Head-          B1.22                                                       length of wold.
3 X Mcridional Weld                                                                      ~~IATER~*
076900     RV-WD-005               B-A         UT                                             Examine accessible Closure Head-          B1.22                                                       length of weld     ~~IATER~~
3              X Mcridional Weld 077000     RV-WD-006               B-A         UT                                             Examine accessible Closure Hcad-          B1.22                                                       length of wold.
3 Meridional Weld                                                                      **LATER~~
077100   RV-WD-007               B-A         UT                                             Examine accessible Closure Head-            Bl . 22                                                     length of weld.
3 X Mcridional Weld                                                                      **ZATER~+


DATE: 10/15/99 REVISION: 0 NZNE MILE POINT NUCLEAR PLANT UNZT 1 ZNSERVZCE ZNSPECTZON TEN-YEAR PZAN CLASS 1 SECTION XI SCHEDULED COMPONENTS PAGE: 80 tor Vessel Welds NUMBER: 00.0  
DATE: 10/15/99                             NZNE MILE POINT NUCLEAR PLANT UNZT 1                           PAGE: 80 REVISION:          0                        ZNSERVZCE ZNSPECTZON TEN-YEAR PZAN CLASS 1 SECTION XI SCHEDULED COMPONENTS tor Vessel     Welds NUMBER:     00.0 INSPECTION INTERVAL                    PIAN STATUS            PRESERVZCE YEAR ASME                FIRST        SECOND      THIRD SEC. XZ              PERIOD        PERIOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD PIAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVZCE YEAR INSTRUCTIONS
EXAMINATION AREA           CATEGY    NDE                  OUTAGE                          INSTRUCTIONS NUMBER       IDENTIFICATION           ITEM NO   METH   1   2 3 4   1   2 3 4   1 2 3 4 **CALIBRATIONBLOCK**
**CALIBRATION BLOCK**077200 RV-WD-008 Closure Head-Meridional Weld B A UT B1.22 3 X Examine accessible length of weld*~IATER~~077300 RV-WD-009 Closure Head-Mcridional Weld B-A UT B1.22 Examine accessible length of weld.3 X+~LATER~~077400 RV-WD-010 Closure Head-Mcridional Weld B"A UT B1.22 3 X Examine accessible length of weld~~LATER~~Shell Wclds (REF.DWG.NO.28)RV-WD-099 B-A AUT Shell-to-Flange weld B1.30 3 X 100%of weld length from thc shell side*~LATER**077600 RV-WD-099 Shell-to-Flange weld Bl~30 3 X 100%of wold length from the seal surface**LATER*+077900 RV-WD-130 B-A AUT Upper Shell Long Weld B1.12 15 3 100%of weld length, and intersection of circumferential weld RV-WD 100*+LATER+*078000 RV-WD 131 B-A Upper Shell Long Weld B1.12 8 135 3 X 100%of weld length and intersection of RV WD 100.+*LATER*+078100 RV-WD-132 B-A AUT Upper Shell Long Weld B1.12 8 255 3 X 100%of weld length and intersecting circumfcrcntial weld RV-WD-100.
077200     RV-WD-008                 B A        UT                                            Examine accessible Closure Head-             B1.22                                                     length of weld   *~IATER~~
~~LATER~~  
3 X Meridional Weld 077300     RV-WD-009                 B-A       UT                                             Examine accessible Closure Head-              B1.22                                                     length of weld.
3 X Mcridional Weld                                                                      + ~LATER~ ~
077400     RV-WD-010                 B"A       UT                                             Examine accessible Closure Head-              B1.22                                                     length of weld   ~~LATER~~
3 X Mcridional Weld Shell Wclds   (REF. DWG. NO. 28)
RV-WD-099                 B-A       AUT                                           100%  of weld length from Shell-to-Flange weld       B1.30                                                     thc shell side *~LATER**
3                            X 077600     RV-WD-099                                                                           100%  of wold length from Shell-to-Flange weld       Bl 30
                                        ~                                                     the seal surface 3 X                                      **LATER*+
077900     RV-WD-130                 B-A       AUT                                           100% of weld length,    and Upper Shell Long Weld     B1.12                                                     intersection of 3
15                                                                              circumferential     weld RV-WD 100 *+LATER+*
078000     RV-WD 131                 B-A                                                       100%  of weld length  and Upper Shell Long Weld     B1.12                                                     intersection of 3                            X 8   135                                                                             RV WD   100. +*LATER*+
078100   RV-WD-132                   B-A       AUT                                           100%  of weld length and Upper Shell Long Weld       B1.12                                                     intersecting 3                            X 8   255                                                                             circumfcrcntial weld RV-WD-100. ~~LATER~~


DATE: 10/15/99 REVISION: 0 NINE MZZE POINT NUCLEAR PLANT UNZT 1 ZNSERVZCE INSPECTION TEN-YEAR PLAN CZASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 81 tor Vassal Welds NUMBER: 00.0  
DATE: 10/15/99                               NINE MZZE POINT NUCLEAR PLANT UNZT 1                           PAGE: 81 REVISION:        0                            ZNSERVZCE INSPECTION TEN-YEAR PLAN CZASS 1 SECTION XZ SCHEDULED COMPONENTS tor Vassal Welds NUMBER: 00.0 INSPECTZON ZNTERVAL                      PLAN STATUS            PRESERVICE YEAR ASME                  FIRST        SECOND      THIRD SEC. XZ                PERIOD        PERIOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTZON ZNTERVAL ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD THIRD PERIOD OUTAGE 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR ZNSTRUCTZONS
EXAMINATION AREA         CATEGY      NDE                OUTAGE                          ZNSTRUCTZONS NUMBER     IDENTIFICATION           ITEM NO     METH     1 2 3 4   1   2 3 4   1 2 3 4 + +CALIBRATION BLOCK>> ~
++CALIBRATION BLOCK>>~078200 RV-WD-133 B-A Upper Intermediate B1.12 Shell Long Weld 8 90 3 X 100%of weld length and intersecting circumferential weld RV-WD-100 C RV-WD-101.
078200     RV-WD-133                 B-A                                                         100%  of weld length and Upper Intermediate       B1.12                                                       intersecting 3                            X Shell Long Weld 8 90                                                                 circumferential weld RV-WD-100   C RV-WD-101.
++IATER~+078300 RV-WD-134 B-A Upper Intermedi ate Bl.12 Shell Long Weld 8 210 3 X 100%of weld length and intcrsccting circumferential weld RV-WD-100 C RV-WD-101.
                                                                                                ++IATER~+
**LATER+~078400 RV-WD-135 B-A Upper Intermediate Bl.12 Shell Long Weld 8 330 3 X 100%of weld length and intcrsccting circumferential weld Rv wD 100 a Rv-wD 101.~+LATER**078700 RV-WD-139 B-A Lower Intcrmediatc B1.12 Shell Long Weld 8 105 3 X 100%of weld length and intersecting circumfcrcntial weld RV-WD-101 4 RV-WD-137.
078300     RV-WD-134                 B-A                                                         100%  of weld length and Upper Intermedi ate       Bl . 12                                                     intcrsccting 3                            X Shell Long Weld 8 210                                                                 circumferential weld RV-WD-100   C RV-WD-101.
+~IATER~+078800 RV-WD 140 B-A Lower Zntcrmcdiatc B1.12 Shell Long Weld 8 225 3 100%of weld length and intersecting circumferential weld RV-WD-101 6 RV-WD-137.
                                                                                                **LATER+~
**LATER**078900 RV-WD-141 B A Lower Intermediate Bl.12 Shell Long Weld 8 345 X 100%of weld length and intersecting circumferential weld RV-WD-101 S RV-WD-137.
078400     RV-WD-135                 B-A                                                         100%  of weld length and Upper Intermediate       Bl. 12                                                     intcrsccting 3                            X Shell Long Weld 8 330                                                                 circumferential weld Rv wD 100 a Rv-wD 101.
**LATER**  
                                                                                                ~+LATER**
078700     RV-WD-139                 B-A                                                         100% of weld length and Lower Intcrmediatc       B1.12                                                       intersecting 3                            X Shell Long Weld 8 105                                                               circumfcrcntial weld RV-WD-101 4 RV-WD-137.
                                                                                                + ~IATER~ +
078800     RV-WD 140                 B-A                                                         100% of weld length and Lower Zntcrmcdiatc       B1.12                                                       intersecting 3
Shell Long Weld 8 225                                                                 circumferential weld RV-WD-101 6 RV-WD-137.
                                                                                                **LATER**
078900     RV-WD-141                 B A                                                         100%  of weld length and Lower Intermediate       Bl. 12                                                     intersecting X
Shell Long Weld 8 345                                                                 circumferential weld RV-WD-101   S RV-WD-137.
                                                                                                **LATER**


DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNZT 1 INSERVICE INSPECTION TEN-YEAR PLAN lI CLASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 82 tor Vessel Wclds NUMBER: 00.0  
DATE: 10/15/99                             NINE MILE POINT NUCLEAR PLANT UNZT 1                         PAGE: 82 REVISION:          0                        INSERVICE INSPECTION TEN-YEAR PLAN lI CLASS 1 SECTION XZ SCHEDULED COMPONENTS tor Vessel Wclds NUMBER:     00. 0 INSPECTZON INTERVAL                    PLAN STATUS            PRESERVICE YEAR FIRST        SECOND      THIRD SEC. XZ              PERIOD      PERIOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTZON INTERVAL SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD-OUTAGE-THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR INSTRUCTIONS
EXAMINATION AREA         CATEGY      NDE                -OUTAGE-                        INSTRUCTIONS NUMBER     IDENTIFICATION         ITEM NO     METH   1 2 3 4 1   2 3 4   1 2 3 4 ~ ~CALIBRATION BLOCK~ +
~~CALIBRATION BLOCK~+079000 RV-WD-142 B-A AUT Lower Shell Long Weld B1.12 8 18 3 X 100%of weld length and intersecting circumf crential weld RV-WD-101 6 RV-WD-137.
079000     RV-WD-142               B-A         AUT                                           100%  of weld length and Lower Shell Long Weld   B1.12                                                     intersecting 3                            X 8   18                                                                             circumf crential weld RV-WD-101 6 RV-WD-137.
*+LATER'~'
                                                                                              *+LATER'~'
079100 RV-WD-143 B-A AUT Lower Shell Long Weld B1.12 138 3 X 100%of weld length and intersecting circumferential weld RV-WD-137 6 RV-WD-138.
079100     RV-WD-143               B-A         AUT                                           100%  of weld length and Lower Shell Long Weld   B1.12                                                     intersecting 3                           X 138                                                                            circumferential weld RV-WD-137 6 RV-WD-138.
*+LATER*+079200 RV-WD-144 B-A AUT Lower Shell Long Weld B1.12 e 258 3 X 100%of weld length and intersecting circumforontial wclds RV-WD 137 6 RV"WD-138.
                                                                                              *+LATER*+
+iLATER+*Bottom Head Wclds (REF.DWG.NO.28A)079300 RV-WD-147 B A UT Bottom Head Dollar B1.21 Plate Circ.Weld 3 Accessible length of weld**LATER*~079400 RV-WD-148 B-A UT Bottom Head Meridional B1.22 Weld 3 X Accessible length of wold+*LATER~~079500 RV-WD-149 B A Bottom Head Meridional B1.22 Weld 3 X Accessible length of weld**LATER'~079600 RV-WD-150 B-A Bottom Head Meridional B1.22 Weld 3 X Acccssiblc length of weld~~LATER**  
079200     RV-WD-144               B-A         AUT                                           100%  of weld length and Lower Shell Long Weld   B1.12                                                     intersecting 3                            X e   258                                                                           circumforontial wclds RV-WD 137 6 RV"WD-138.
                                                                                              +iLATER+*
Bottom Head Wclds (REF. DWG. NO. 28A) 079300     RV-WD-147               B A         UT                                           Accessible length of Bottom Head Dollar       B1.21                                                     weld **LATER*~
3 Plate Circ. Weld 079400   RV-WD-148                 B-A         UT                                           Accessible length of Bottom Head Meridional B1.22                                                       wold +*LATER~~
3                            X Weld 079500   RV-WD-149                 B A                                                       Accessible length of Bottom Head   Meridional B1.22                                                     weld **LATER'~
3                            X Weld 079600   RV-WD-150                 B-A                                                       Acccssiblc length of Bottom Head Meridional B1.22                                                       weld ~~LATER**
3                            X Weld


DATE: 10/15/99 REVISION: 0 NINE MZLE POINT NUCLEAR PLANT UNIT 1 ZNSERVZCE INSPECTION TEN-YEAR PIAN CLASS 1 SECTION XI SCHEDULED COMPONENTS PAGE: 83 tor Vessel Wclds NUMBER: 00.0  
DATE: 10/15/99                           NINE MZLE POINT NUCLEAR PLANT UNIT 1                         PAGE: 83 REVISION:        0                        ZNSERVZCE INSPECTION TEN-YEAR PIAN CLASS 1 SECTION XI SCHEDULED COMPONENTS tor Vessel   Wclds NUMBER:   00.0 INSPECTION INTERVAL                    PLAN STATUS            XRESERVZCE YEAR ASME                FIRST        SECOND      THIRD SEC. XZ              PERIOD        PERIOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER ZDENTIPICATZON INSPECTION INTERVAL ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD THIRD PERIOD OUTAGE 1 2 3 4 1 2 3 4 1 2 3 4 XRESERVZCE YEAR INSTRUCTIONS
EXAMINATION AREA         CATEGY    NDE                  OUTAGE                        INSTRUCTIONS NUMBER     ZDENTIPICATZON           ITEM NO   METH     1 2 3 4   1   2 3 4   1 2 3 4 ~~CALIBRATION BLOCK+~
~~CALIBRATION BLOCK+~079700 RV-WD-151 B A Bottom Head Meridional B1.22 Weld 3 X Accessible length of weld**LATER+a 079800 RV-WD-152 B-A UT Bottom Head Meridional B1.22 Weld 3 X Accessible length of weld**LATER*~079900 RV-WD-153 B A UT Bottom Head Meridional B1.22 Weld 3 X Acccssiblc length of weld+PLATER**080000 RV-WD-154 B-A UT Bottom Head Meridional B1.22 Weld 3 X Accessible length of weld~~LATER++080100 RV-WD-155 B-A UT Bottom Head Meridional B1.22 Weld 3 X Accessible length of weld~*LATER'*080200 RV-WD-156 Bottom Head Meridional B1.22 Weld 3 X Accessible length of weld**LATER*~080300 RV-WD-157 Bottom Head Meridional B1.22 Weld 3 X Accessible length of weld**LATER~~080400 RV WD-158 Bottom Head Meridional B1.22 Weld 3 X Acccssiblc length of weld~*LATER**  
079700     RV-WD-151               B A                                                       Accessible length of Bottom Head Meridional B1.22                                                       weld **LATER+a 3                            X Weld 079800     RV-WD-152               B-A       UT                                             Accessible length of Bottom Head Meridional B1.22                                                     weld **LATER*~
3                            X Weld 079900     RV-WD-153               B A       UT                                             Acccssiblc length of Bottom Head Meridional B1.22                                                     weld +PLATER**
3                            X Weld 080000     RV-WD-154               B-A       UT                                             Accessible length of Bottom Head Meridional B1.22                                                       weld ~~LATER++
3                            X Weld 080100     RV-WD-155               B-A       UT                                             Accessible length of Bottom Head Meridional B1.22                                                       weld ~*LATER'*
3                            X Weld 080200     RV-WD-156                                                                         Accessible length of Bottom Head Meridional B1.22                                                     weld **LATER*~
3                            X Weld 080300     RV-WD-157                                                                         Accessible length of Bottom Head Meridional B1.22                                                       weld **LATER~~
3                            X Weld 080400   RV WD-158                                                                           Acccssiblc length of Bottom Head Meridional B1.22                                                       weld ~*LATER**
3                            X Weld


DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 ZNSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XI SCHEDULED COMPONENTS PAGE: 84 tor Vessel Welds~NUMBER: 00.0  
DATE: 10/15/99                           NINE MILE POINT NUCLEAR PLANT UNIT 1                         PAGE: 84 REVISION:        0                          ZNSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XI SCHEDULED COMPONENTS tor Vessel Welds
  ~ NUMBER: 00.0 INSPECTION INTERVAL                      PLAN STATUS            PRESERVICE YEAR ASME                  FIRST        SECOND      THIRD SEC. XZ                PERIOD        PERIOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR INSTRUCTIONS
EXAMINATION AREA       CATEGY      NDE                  OUTAGE                        INSTRUCTIONS NUMBER     IDENTIFICATION         ITEM NO     METH     1 2 3 4   1   2 3 4   1 2 3 4 ~ ~CALIBRATION BLOCK~ ~
~~CALIBRATION BLOCK~~080500 RV-WD-159 B-A Bottom Head Meridional Bl.22 Weld 3 X Accessible length of weld~~LATER~~080600 RV-WD-160 B-A UT Bottom Head Meridional Bl.22 Weld 3 X Acccssiblc length of weld~~LATER~+080700 RV-WD-161 B-A UT Bottom Head Meridional B1.22 Weld 3 X Accessible length of weld++LATER**080800 RV-WD-162 Bottom Head Circumf crcntial Weld B A UT Bl.21 3 X Accessible length of weld~~LATER~~  
080500     RV-WD-159             B-A                                                         Accessible length of Bottom Head Meridional Bl. 22                                                     weld ~~LATER~~
3                            X Weld 080600     RV-WD-160             B-A         UT                                             Acccssiblc length of Bottom Head Meridional Bl. 22                                                     weld ~~LATER~+
3                            X Weld 080700     RV-WD-161             B-A         UT                                             Accessible length of Bottom Head Meridional B1.22                                                       weld ++LATER**
3                            X Weld 080800     RV-WD-162             B A         UT                                             Accessible length of Bottom Head            Bl . 21                                                     weld ~~LATER~~
3                            X Circumfcrcntial Weld


DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 85 Steam System NUMBER: 01.0  
DATE: 10/15/99                             NINE MILE POINT NUCLEAR PLANT UNIT 1                           PAGE: 85 REVISION:          0                          INSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS Steam System NUMBER: 01 . 0 INSPECTION INTERVAL                      PLAN STATUS            PRESERVZCE YEAR ASME                FIRST        SECOND      THIRD SEC. XI              PERIOD      PERIOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAHZNATZON AREA NUHBER IDENTIFICATION INSPECTION INTERVAL ASME SEC.XI CATEGY NDE ITEH NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVZCE YEAR INSTRUCTIONS
EXAHZNATZON AREA         CATEGY      NDE                OUTAGE                          INSTRUCTIONS NUHBER     IDENTIFICATION           ITEH   NO   METH   1 2 3 4 1   2 3 4   1 2 3 4 +*CALIBRATION BLOCK+*
+*CALIBRATION BLOCK+*24.0" HSB (REF.DWG.NO.2)080900 01-01-VB Globe Valve 01-01 Bolting B-G-2 B7.70 V01, Limited to valve selected under B-M-2 SAN/At+081000 01-01-VBY Globe Valve 01-01 Interior Surface B-M-2 B12.50 3 X V01, Only when disassembled, onc valve in a group of valves.%*N/A+*6.0" HSB Relief (REF.DWG.NO.2)081900 01-07-VB Gate Valve 01-07 Bolting B-G-2 B7.70 3 V02, Limited to valve selected under B-M-2 X 14N/At%000 01-07-VBY Gate Valve 01-07 Interior Surface B-M-2 VT-3 B12.50 X V02, Only when disassembled, one valve in a group of valves.**N/A**6.0" MSB (REF.DWG.NO.2)082700 01-102-A-SVB Relief SV 01-102A Bolting B-G-2 B7,70 3 X V03, 12 Bolts, Limited to valve selected under B-H-2~*N/A**~082800 01-102-A-SVBY B"M-2 Rclicf SV 01-102A B12.50 Interior Surface 3 X V03, Only when disassembled, one valve in a group of valves%*N/A%4 082900 01-102-A-WD-001 Relief SV 01 102A Valve Body Weld B"M-1 UT B12.40 3 X V03, Limited to one valve in a group of valves.~~LATER*~  
: 24. 0" HSB (REF. DWG. NO. 2) 080900     01-01-VB                 B-G-2                                                     V01, Limited to valve Globe Valve 01-01        B7.70                                                      selected under B-M-2 Bolting                                                                              SAN/At+
081000     01-01-VBY                 B-M-2                                                     V01, Only when Globe Valve 01-01        B12.50                                                    disassembled, onc valve 3              X Interior  Surface                                                                  in a group of valves.
                                                                                                  %*N/A+*
6.0"   HSB Relief (REF. DWG. NO. 2) 081900     01-07-VB                 B-G-2                                                     V02, Limited to valve Gate Valve 01-07          B7.70                                                      selected under B-M-2 3              X Bolting                                                                              14N/At%
000     01-07-VBY                 B-M-2       VT-3                                         V02, Only when Gate Valve 01-07          B12.50                                                    disassembled, one valve X                        in a group of valves.
Interior  Surface
                                                                                                  **N/A**
: 6. 0" MSB (REF. DWG. NO. 2) 082700     01-102-A-SVB             B-G-2                                                     V03, 12   Bolts, Limited Relief SV 01-102A        B7,70                                                      to valve selected under 3              X Bolting                                                                              B-H-2 ~*N/A**
~ 082800     01-102-A-SVBY             B"M-2                                                     V03, Only when Rclicf SV 01-102A         B12. 50                                                   disassembled, one valve 3              X Interior Surface                                                                    in a group of valves
                                                                                                  %*N/A%4 082900     01-102-A-WD-001           B "M-1       UT                                           V03, Limited to one Relief  SV 01 102A      B12. 40                                                    valve in a group of 3              X Valve Body Weld                                                                      valves. ~~LATER*~


DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCZEAR PIANT UNIT 1 INSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XI SCHEDULED COMPONENTS PAGE: 86 Steam System NUMBER: 01.0  
DATE: 10/15/99                             NINE MILE POINT NUCZEAR PIANT UNIT 1                         PAGE: 86 REVISION:          0                          INSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XI SCHEDULED COMPONENTS Steam System NUMBER:   01. 0 INSPECTION INTERVAL                      PLAN STATOS            PRESERVZCE YEAR ASME                FIRST        SECOND      THIRD SEC. XI              PERIOD        PERIOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL ASME SEC.XI CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATOS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVZCE YEAR INSTRUCTIONS
EXAMINATION AREA           CATEGY    NDE                  OUTAGE                        INSTRUCTIONS NUMBER     IDENTIFICATION             ITEM NO   METH   1 2 3 4   1   2 3 4   1 2 3 4 *~CALIBRATION BLOCK**
*~CALIBRATION BLOCK**2.0" MSA Vent Line (REF.DWG.NO.2)084900 01-120-VB B-G-2 VT-1 Valve 01-120 Bolting B7.70 3 X 2 Bolts~*N/A~*24.0" MSA (REF.DWG.NO.2)086600 01 MSH 21 WD 001 B-K Integral Attachment B10.20 Lug 1 3 X Code Case N-509, Welded on 3 sides~~N/A~~086700 01-MSH-21-WD-002 B-K Integral Attachment B10.20 Lug 2 3 X Code Case N-509, Welded on 3 sides**N/A~*6800 01-MSH-21 WD 003 B-K PT Integral Attachment B10.20 Lug 3 3 X Code Case N-509, Welded on 3 sides~~N/Ai*086900 01 MSH-21-WD-004 B-K Integral Attachment B10.20 Lug 4 3 X Code Case N-509, Welded on 3 sides~*N/A~~087000 01-MSH-21A Spring Hanger F-A F1.10 VT-3 3 Code Case N-491-1, 4 Integrally Welded Lugs**N/Af 4 087100 01-MSH 21B Spring Hanger Fl.10 VT-3 3 X Code Casa N-491-1++N/A~~
2.0"   MSA Vent Line (REF. DWG. NO. 2) 084900     01-120-VB                 B-G-2       VT-1                                           2 Bolts ~*N/A~*
0 DATE: 10/15/99 REVISION: 0 NZNE MZLE POINT NUCLEAR PIANT UNIT 1 INSERVICE INSPECTION TEN-YEAR PLAN CIASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 87 Stcam System NUMBER: 01.0  
Valve 01-120 Bolting     B7. 70 3               X 24 . 0" MSA (REF. DWG. NO. 2) 086600     01 MSH 21   WD 001       B-K                                                       Code Case N-509, Welded Integral Attachment      B10. 20                                                    on 3 sides ~~N/A~~
3              X Lug    1 086700     01-MSH-21-WD-002         B-K                                                       Code Case N-509, Welded Integral Attachment      B10. 20                                                    on 3 sides **N/A~*
3              X Lug    2 6800     01-MSH-21   WD 003       B-K         PT                                             Code Case N-509, Welded Integral Attachment      B10. 20                                                    on 3 sides ~~N/Ai*
3              X Lug    3 086900     01 MSH-21-WD-004         B-K                                                       Code Case N-509, Welded Integral Attachment      B10. 20                                                    on 3 sides ~*N/A~~
3              X Lug    4 087000     01-MSH-21A               F-A         VT-3                                           Code Case N-491-1, 4 Spring Hanger            F1.10                                                      Integrally Welded Lugs 3
                                                                                                **N/Af4 087100     01-MSH 21B                           VT-3                                           Code Casa N-491-1 Spring Hanger            Fl. 10                                                    ++N/A~~
3                            X
 
0 DATE: 10/15/99                                 NZNE MZLE POINT NUCLEAR PIANT UNIT 1                         PAGE: 87 REVISION:          0                            INSERVICE INSPECTION TEN-YEAR PLAN CIASS 1 SECTION XZ SCHEDULED COMPONENTS Stcam System NUMBER:     01. 0 INSPECTION INTERVAL                      PIAN STATUS            PRESERVICE YEAR ASME                FIRST        SECOND      THIRD SEC. XI            PERIOD      PERIOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL ASME SEC.XI CATEGY NDE ITEM NO METH PIAN STATUS SECOND PERIOD THIRD PERIOD FIRST PERIOD OUTAGE 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR INSTRUCTIONS
EXAMINATION AREA             CATEGY      NDE                OUTAGE                          INSTRUCTIONS NUMBER     IDENTIFICATION               ITEM NO     METH   1 2 3 4 1   2 3 4   1 2 3 4 ~ ~CALIBRATION BLOCK**
~~CALIBRATION BLOCK**24.0" MSB (REF.DWG.NO.2)087600 01-MSH-22A F-A Spring Hanger Fl.10 VT-3 3 X Code Case N-491-1.~~N/A~~24.0" MSA (REF.DWG.NO.2)087800 01-MSH-23 Pipe Stanchion F A Fl.10 VT-3 3 X Code Case N-491-1 saN/A+a 32.0" MSA (REF.DWG.NO.2)088200 01-WD-001 B-D Nozzle N3A-to-Vessel B3.90 3 X Group Rll, 87%CRV, Limitation due to ad)accnt nozzle and Bioshicld.
24 . 0" MSB (REF. DWG. NO. 2) 087600     01-MSH-22A                 F-A         VT-3                                         Code Case N-491-1.
~~IATER++z 00 01-WD 001 IR Nozzle N3A Inner Radius Section B D UT B3.100 3 X Group Rll, 54%CRV, Limitation duc to ad)accnt nozzle and Bioshicld.
Spring Hanger              Fl . 10                                                    ~~N/A~~
~~LATER~~24.0" MSA (REF.DWG.NO.2)088400 01-WD-002 B-J Group Rll,*~LATER~~Nozzle N3A-to-Safe B9.11 End 3 X 088500 01-WD 003 Nozzle N3A Safe End-to-Elbow B-J UT B9.11 MT 3 X Terminal End, Examine 100%of weld length~~NMPI-24-080-CS~~
3 X 24 . 0" MSA (REF. DWG. NO. 2) 087800     01-MSH-23                   F A         VT-3                                         Code Case N-491-1 Pipe Stanchion              Fl. 10                                                    saN/A+a 3                            X
088700 01-WD-006 Branch Connection (24"x2" WOL)B-J MT B9.32 3 X To Vent Line, Examine 100%of weld length a sN/AP a  
: 32. 0"   MSA (REF. DWG. NO. 2) 088200     01-WD-001                   B-D                                                       Group  Rll, 87% CRV, Nozzle N3A-to-Vessel       B3.90                                                     Limitation   due to 3 X ad)accnt nozzle and Bioshicld.   ~ ~IATER+ +
00   01-WD 001 IR               B D         UT                                           Group   Rll, 54% CRV, Nozzle z    N3A Inner        B3. 100                                                    Limitation   duc to 3 X Radius Section                                                                        ad)accnt nozzle and Bioshicld.   ~~LATER~~
24 . 0" MSA (REF. DWG. NO. 2) 088400     01-WD-002                   B-J                                                       Group   Rll, *~LATER~~
Nozzle N3A -to-Safe         B9.11 3 X End 088500     01-WD 003                   B-J         UT                                           Terminal End, Examine Nozzle N3A Safe            B9.11       MT                                           100% of weld length 3 X End-to-Elbow                                                                          ~~NMPI-24-080-CS~~
088700     01-WD-006                   B-J         MT                                           To Vent   Line, Examine Branch Connection          B9.32                                                      100% of weld length 3              X (24"x2" WOL)                                                                          a sN/AP a


DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 INSERVICE ZNSPECTZON TEN YEAR PZAN CIASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 88 Steam System NE NUMBER: 01.0 SUHMARY EXAHINATZON AREA NUMBER IDENTZFZCATZON INSPECTION INTERVAL ASHE SEC.XI CATEGY NDE ITEM NO HETH PZAN STATUS THIRD PERIOD SECOND PERIOD FIRST PERIOD OUTAGE 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR INSTRUCTIONS
DATE: 10/15/99                             NINE MILE POINT NUCLEAR PLANT UNIT 1                         PAGE: 88 REVISION:          0                        INSERVICE ZNSPECTZON TEN YEAR PZAN CIASS 1 SECTION XZ SCHEDULED COMPONENTS Steam System NE NUMBER:     01.0                                                                         PRESERVICE YEAR INSPECTION INTERVAL                     PZAN STATUS ASHE               FIRST        SECOND      THIRD SEC. XI             PERIOD        PERIOD      PERIOD SUHMARY    EXAHINATZON AREA          CATEGY     NDE                 OUTAGE                          INSTRUCTIONS NUMBER      IDENTZFZCATZON            ITEM NO   HETH   1 2 3 4   1   2 3 4   1 2 3 4 **CALIBRATIONBLOCK**
**CALIBRATION BLOCK**089800 01-WD-016 Branch Connection (24"X6" WOL)B-J UT B9.31 HT 3 X Examine 100%of weld length i~NHP1-24-080-CS, NMP1 6-80**090400 01-WD-019 B-J UT Pipo-to-Valvo 01-02 B9.11 HT 3 X Terminal End, High Stross Wold, Examine 100%of weld length+~NMPI-24-080"CS**
089800     01-WD-016                 B-J         UT                                           Examine 100% of weld Branch Connection        B9. 31      HT                                            length i~NHP1-24-080-CS, 3 X                                            6-80 **
090500 01-WD-020 B-J UT Valve 01-02-to-Pipe B9.11 HT 3 X Terminal End, High Stress Weld, Examine 100%of weld length.**NMPI-24-080-CS~*
(24"X6" WOL)                                                                      NMP1 090400     01-WD-019               B-J         UT                                           Terminal End, High Pipo-to-Valvo 01-02     B9. 11       HT                                           Stross Wold, Examine 3                            X          100% of weld length
32.0" HSB (REF.DWG.NO.2)0800 01"WD-033 B-D Nozzle N3B-to-Vessel B3.90 3 X Group R12, 91%CRV Limitation duc to ad)acent nozzle and Bioshicld~*LATER+*090900 01-WD-033-ZR Nozzle N3B Inner Radius Section B-D B3.100 3 X Group R12, 78%CRV Limitation due to ad)accnt nozzlo and Bioshi old**LATER~~24.0" HSB (REF.DWG.NO.2)091000 01 WD-034 B-J MT Nozzle N3B-to-Safe End B9.11 3 X Group R12,*ePIR-l.475-1++091100 01-WD-035 Nozzlo N3B Safe End-to-Elbow B-J UT B9.11 3 X Tarnd.nal End, Examine 100%of wold length.**NHP1-24-080-CSs*  
                                                                                              +~NMPI-24-080"CS**
090500     01-WD-020               B-J         UT                                           Terminal End, High Valve 01-02 -to-Pipe     B9.11       HT                                           Stress Weld, Examine 3              X                        100% of weld length.
                                                                                              **NMPI-24-080-CS~*
: 32. 0" HSB (REF. DWG. NO. 2) 0800     01 "WD-033               B-D                                                       Group R12,    91% CRV Nozzle N3B-to-Vessel     B3.90                                                     Limitation duc to 3                            X          ad)acent nozzle and Bioshicld ~*LATER+*
090900     01-WD-033-ZR             B-D                                                       Group R12,   78% CRV Nozzle N3B Inner        B3.100                                                    Limitation   due to 3                            X Radius Section                                                                      ad)accnt nozzlo and Bioshi old **LATER~~
24 . 0" HSB (REF. DWG. NO. 2) 091000     01 WD-034               B-J         MT                                             Group R12, Nozzle N3B-to-Safe End B9.11                                                       *ePIR-l. 475-1++
3                            X 091100     01-WD-035               B-J         UT                                             Tarnd.nal End, Examine Nozzlo N3B Safe          B9. 11                                                    100% of wold length.
3                            X          **NHP1-24-080-CSs*
End-to-Elbow


DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 ZNSERVZCE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 89 Steam System E NUMBER: 01.0 SUMHARY EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL ASHE SEC.XZ CATEGY NDE ZTEH NO HETH FIRST PERIOD PZAN STATUS SECOND PERZOD OUTAGE THZRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE 1'EAR INSTRUCTIONS
DATE: 10/15/99                                 NINE MILE POINT NUCLEAR PLANT UNIT 1                         PAGE: 89 REVISION:          0                              ZNSERVZCE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS Steam System E NUMBER:   01.0 INSPECTION INTERVAL                     PZAN STATUS            PRESERVICE 1'EAR ASHE                 FIRST        SECOND      THZRD SEC. XZ               PERIOD        PERZOD      PERIOD SUMHARY    EXAMINATION AREA              CATEGY     NDE                 OUTAGE                          INSTRUCTIONS NUMBER      IDENTIFICATION                ZTEH NO     HETH   1 2 3 4   1   2 3 4   1 2 3 4 ~*CALIBRATION BLOCK*+
~*CALIBRATION BLOCK*+2.5" MSB (REP.DWG.NO.2)091600 01-WD-042 Reducer (2.5" x2.0")-to-Pipe B-J HT B9.21 3 X Cont.on sht.2A, Examine 100%of weld length**N/A+a 6.0" HSB (REF.DWG.NO.2)092100 01-WD-046-A Branch Connection-to-Valve 01-08 B-J UT B9.11 HT 3 X Terminal End, High Stress Weld, Examine 100%of weld length.+~NMPZ-6-80-CS~~
: 2. 5"   MSB (REP. DWG. NO. 2) 091600     01-WD-042                     B-J         HT                                             Cont. on sht. 2A, Reducer                      B9. 21                                                    Examine 100% of weld 3            X (2. 5" x2. 0" ) -to-Pipe                                                                length **N/A+a
24.0" MSB (REP.DWG.NO.2)092600 01"WD-048 B-J HT Examine 100%of weld Branch Connection B9.31 UT{24"x6" WOL)length+~PZR-1.219-1, X 94-6007+*6.0" MSB (REF.DWG.NO.2)092700 01-WD"048-A Branch Connection-to-Valve 01-12 B-J UT B9.11 HT 3 X Terminal End, High Stress Weld, Examine 100%of weld length+*NHPZ-6-80-CS~+
: 6. 0"   HSB (REF. DWG. NO. 2) 092100     01-WD-046-A                   B-J         UT                                             Terminal End, High Branch                        B9.11       HT                                             Stress Weld, Examine 3                            X Connection-to-Valve                                                                      100% of weld length.
092800 01-WD-048-B B-J UT Valve 01-12-Plangc B9.11 MT 3 01-102E X Terminal End, High Stress Weld, Examine 100%of wold length**NMP1-6"80-CS~~
01-08                                                                                    +~NMPZ-6-80-CS~~
24.0" MSB (REP.DWG.NO.2)092900 01-WD-050 B"J UT Pipe-to-Valve 01-01 B9.11 3 X Terminal End, High Stress Weld, Examine 100%of weld length**NMP1-24-080-CS~
: 24. 0"   MSB (REP. DWG. NO. 2) 092600     01"WD-048                     B-J         HT                                             Examine 100% of weld Branch Connection             B9.31       UT                                             length +~PZR-1.219-1, X
~  
{24 "x6" WOL)                                                                          94-6007+*
6 . 0" MSB (REF . DWG. NO. 2) 092700     01-WD"048-A                   B-J         UT                                             Terminal End, High Branch                        B9. 11     HT                                             Stress Weld, Examine 3                            X Connection-to-Valve                                                                      100% of weld length 01-12                                                                                    +*NHPZ-6-80-CS~+
092800     01-WD-048-B                   B-J         UT                                             Terminal End, High Valve 01-12 -Plangc           B9.11       MT                                             Stress Weld, Examine 3                             X 01-102E                                                                                 100% of wold length
                                                                                                    **NMP1-6"80-CS~~
: 24. 0"   MSB (REP. DWG. NO. 2) 092900     01-WD-050                     B"J         UT                                             Terminal End, High Pipe-to-Valve 01-01           B9. 11                                                     Stress Weld, Examine 3                            X          100% of weld length
                                                                                                    **NMP1-24-080-CS~ ~


DATE: 10/15/99 REVISZON: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 ZNSERVICE INSPECTION TEN YEAR PIAN CIASS 1 SECTION XI SCHEDULED COMPONENTS PAGE: 90 Steam System NUMBER: 01.0  
DATE: 10/15/99                           NINE MILE POINT NUCLEAR PLANT UNIT 1                         PAGE: 90 REVISZON:        0                          ZNSERVICE INSPECTION TEN YEAR PIAN CIASS 1 SECTION XI SCHEDULED COMPONENTS Steam System NUMBER: 01 . 0                                                                         PRESERVICE YEAR INSPECTION INTERVAL                      PZAN STATUS ASME                FIRST        SECOND      THZRD PERIOD        PERIOD      PERZOD SEC. XZ


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD PZAN STATUS SECOND PERIOD OUTAGE THZRD PERZOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR INSTRUCTIONS
EXAMINATION AREA       CATEGY      NDE                OUTAGE                          INSTRUCTIONS NUMBER     IDENTIFICATION         ITEM NO     METH   1 2 3 4   1   2 3 4   1 2 3 4 **CALIBRATIONBLOCK~~
**CALIBRATION BLOCK~~093000 01-WD-051 B-J UT Valve 01-01-to-Pipe B9.11 MT 3 X Terminal End, High Stress Weld, Examine 100%of weld length.+*NMP1-24-080-CS(P1R-1.219-~~093300 01-WD-448 B-J PT Sock-0-Lct-to-Pipe B9.21 2.0" MSA Vent Linc (REF.DWG.NO.2)3 X Examino 100%of weld length++N/A+*093500 01-WD-450 Elbow-to-Pipe B J B9.21 3 X Examino 100%of weld length~*N/A~~800 01-WD-453 Pipe-to-Valve 01-120 B-J B9.21 3 X Examine 100%of weld length.*~N/A~~2.0" MSA Valve By-Pass Line (REF.DWG.NO.2B)094300 01-WD-454 Pipe-to-Coupling B-J MT B9.40 3 X Examino 100%of weld length.~~N/A++  
093000   01-WD-051               B-J         UT                                             Terminal End, High Valve 01-01-to-Pipe     B9. 11     MT                                             Stress Weld, Examine 3                            X          100% of weld length.
                                                                                            +*NMP1-24-080-CS(
P1R-1. 219-~ ~
2.0"  MSA Vent Linc (REF. DWG. NO. 2) 093300   01-WD-448               B-J         PT                                           Examino 100% of weld Sock-0-Lct -to-Pipe     B9.21                                                     length ++N/A+*
3 X 093500   01-WD-450               B  J                                                      Examino 100% of weld Elbow-to-Pipe           B9. 21                                                   length ~*N/A~~
3 X 800   01-WD-453               B-J                                                      Examine 100% of weld Pipe-to-Valve 01-120     B9. 21                                                   length. *~N/A~~
3                            X 2.0" MSA Valve By-Pass Line (REF. DWG. NO. 2B) 094300   01-WD-454               B-J         MT                                           Examino 100%   of weld Pipe-to-Coupling        B9. 40                                                    length.   ~~N/A++
3              X


DATE: 10/26/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 ZNSERVICE INSPECTION TEN YEAR PLAN CLASS 1 SECTION XI SCHEDULED COMPONENTS PAGE: 91 water System NUMBER: 31.0  
DATE: 10/26/99                               NINE MILE POINT NUCLEAR PLANT UNIT 1                           PAGE: 91 REVISION:          0                          ZNSERVICE INSPECTION TEN YEAR PLAN CLASS 1 SECTION XI SCHEDULED COMPONENTS water System NUMBER: 31 . 0 INSPECTION INTERVAL                      PIAN STATUS            PRESERVZCE YEAR ASME                FIRST        SECOND      THIRD SEC. XZ              PERIOD        PERIOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUHBER ZDENTIFZCATION INSPECTION INTERVAL ASME SEC.XZ CATEGY NDE ITEH NO METH FIRST PERIOD PIAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVZCE YEAR INSTRUCTIONS
**CALIBRATION BLOCK++18.0" FWA (REF.DWG.NO.5)095900 31-01R-FLG Check Valve 31-01R Flange Surface B-G-1 VT-1 B6.220 3 X V04, Limited to valve selected under B-M-2*IN/Ak l 096000 31-01R-VB Check Valve 31-01 Studs (18)BG1 UT B6.210 Limited to valve selected under B-M-2 3 X+*LATER**096100 31-01R-VBY Check Valve 31-01R Interior Surface B-M-2 B12.50 3 X V04, Only when disassembled, one valve among group of valves%IN/A%1 0 31 01R-VNW B-G-1 VT-1 Check Valve 31-01R B6.230 Nuts and Washers V04, Limited to valve selected under B-M-2**N/A*~096700 31-07-VB Gate Valve 31-07 Bolting B-G-2 B7.70 3 X V05, Limited to valve selected under B-M-2.096800 31-07 VBY Gate Valve 31-07 Interior Surface B-H-2 VT-3 B12.50 3 X V05, Only when disassembled, Limited onc valve among group of valves.**N/A**18.0" FWD (REF.DWG.NO.5)098000 31-A2 Anchor F-A Fl.10 VT 3 3 X Code Case N-491-1**N/A~*


DATE: 10/26/99 REVISZON: 0 NZNE MILE POINT NUCLEAR PIANT UNIT 1 INSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 92 ater System ZONE NUMBER: 31.0  
NUHBER EXAMINATION AREA          CATEGY      NDE                  OUTAGE                          INSTRUCTIONS ZDENTIFZCATION            ITEH  NO    METH    1  2  3  4  1  2  3  4  1  2  3  4  **CALIBRATIONBLOCK+ +
: 18. 0"  FWA  (REF. DWG. NO. 5) 095900      31-01R-FLG                B-G-1      VT-1                                            V04, Limited to valve Check Valve 31-01R        B6.220                                                      selected under B-M-2 Flange Surface                                3              X                        *IN/Ak l 096000      31-01R-VB                  BG1        UT                                              Limited to valve Check Valve 31-01          B6. 210                                                    selected under B-M-2 3              X Studs (18)                                                                            +*LATER**
096100      31-01R-VBY                B-M-2                                                      V04, Only when Check Valve 31-01R        B12. 50                                                    disassembled, one valve Interior                                      3              X Surface                                                                  among group of valves
                                                                                                    %IN/A% 1 0    31 01R-VNW                B-G-1      VT-1                                          V04, Limited to valve Check Valve 31-01R          B6.230                                                    selected under B-M-2 Nuts and Washers                                                                      **N/A*~
096700      31-07-VB                    B-G-2                                                      V05,  Limited to valve Gate Valve 31-07            B7.70                                                      selected under B-M-2.
Bolting                                      3 X 096800      31-07 VBY                  B-H-2      VT-3                                          V05, Only when Gate Valve 31-07            B12.50                                                    disassembled,  Limited Interior                                      3 X Surface                                                                  onc valve among group  of valves. **N/A**
: 18. 0"  FWD  (REF. DWG. NO. 5) 098000      31-A2                      F-A        VT 3                                            Code Case N-491-1 Anchor                      Fl . 10                                                    **N/A~*
3 X
 
DATE: 10/26/99                             NZNE MILE POINT NUCLEAR PIANT UNIT 1                         PAGE: 92 REVISZON:        0                          INSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS ater System ZONE NUMBER:   31.0 INSPECTION INTERVAL                      PLAN STATUS            PRESERVZCE YEAR ASME                  FIRST        SECOND      THIRD SEC. XZ                PERIOD      PERIOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVZCE YEAR INSTRUCTIONS t tCALZBRATION BLOCKt t 10.0" FWC{REF.DWG.NO.5)099900 31-HS-A Spring Hanger F-A F1.10 VT 3 3 4 Lugs welded 3 sides, Code Case N-491-1.X**N/Att 100000 31-HS-B Spring Hanger F-A Fl.10 VT 3 3 4 lugs, woldcd 3 sides, Codo Case N-491-1 X**N/At*100100 31-H5-WD-001 B"K MT Zntcgral Attachment B10.20 3 X CRA 90%, Code Case N-509 ttN/A**31-HS-WD-002 B-K MT Integral Attachment B10.20 3 X CRA 90%, Code Case N-509 ttN/At*100300 31"HS-WD-003 B-K MT Integral Attachment B10.20 3 X CRA 90%, 4 Lugs, pipe clamp contacts one side of lug.Code Case N-509*t'N/Att 100400 31-H5 WD-004 B-K MT Integral Attachment B10.20 3 CRA 90%, 4 Lugs, pipe clamp contacts ono side of lug, Codo Case N-509*t'N/A**10 0" FWD{REF.DWG.NO, 5)100500 31-H6 F-A VT 3 Spring Support F1.10 Stanchion 3 X Code Case N 491-1 ttN/A*i  
EXAMINATION AREA         CATEGY      NDE                OUTAGE                        INSTRUCTIONS NUMBER     IDENTIFICATION           ITEM   NO   METH   1 2 3 4 1   2 3 4   1 2 3 4 t tCALZBRATION BLOCKtt
: 10. 0" FWC {REF. DWG. NO. 5) 099900     31-HS-A                 F-A         VT 3                                         4 Lugs welded 3 sides, Spring Hanger            F1.10                                                      Code Case N-491-1.
3                            X         **N/Att 100000     31-HS-B                 F-A         VT 3                                         4 lugs, woldcd 3 sides, Spring Hanger            Fl. 10                                                    Codo Case N-491-1 3                            X         **N/At*
100100     31-H5-WD-001             B"K         MT                                           CRA 90%, Code Case   N-509 Zntcgral Attachment      B10. 20                                                    ttN/A**
3                            X 31-HS-WD-002             B-K         MT                                           CRA 90%, Code Case   N-509 Integral Attachment      B10. 20                                                    ttN/At*
3                            X 100300     31 "HS-WD-003           B-K         MT                                           CRA 90%, 4 Lugs, pipe Integral Attachment      B10. 20                                                    clamp contacts one side 3                            X          of lug. Code Case N-509
                                                                                              *t'N/Att 100400     31-H5 WD-004             B-K         MT                                           CRA 90%, 4 Lugs, pipe Integral Attachment      B10. 20                                                    clamp contacts ono side 3
of lug, Codo Case N-509
                                                                                              *t'N/A**
10 0" FWD {REF. DWG. NO, 5) 100500     31-H6                   F-A         VT 3                                         Code Case N 491-1 Spring Support          F1.10                                                      ttN/A*i 3              X Stanchion


DATE: 10/26/99 REVISION: 0 NINE HILE POINT NUCLEAR PIANT UNIT 1 INSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COHPONENTS PAGE: 93 water System E NUMBER: 31.0  
DATE: 10/26/99                             NINE HILE POINT NUCLEAR PIANT UNIT 1                             PAGE: 93 REVISION:        0                          INSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COHPONENTS water System E NUMBER: 31.0 INSPECTION INTERVAI                    PLAN STATUS            PRESERVICE YEAR ASHE                FIRST        SECOND      THIRD SEC. XI              PERIOD        PERIOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAHINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAI ASHE SEC.XI CATEGY NDE ITEH NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD-OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR INSTRUCTIONS
EXAHINATION AREA           CATEGY    NDE                -OUTAGE                          INSTRUCTIONS NUMBER     IDENTIFICATION           ITEH NO   METH   1 2 3 4   1   2 3 4   1 2 3 4 **CALIBRATIONBLOCK*~
**CALIBRATION BLOCK*~18.0" FWA (REF.DWG.NO.5)101300 31-HS F-A Spring Support F1.10 w/welded stanchion X Code Case N-491-1*AN/A*4 18.0" FWB (REF.DWG.NO.5)101900 31-WD-001 B-J HT Valve 31-02R-to-Valve B9.11 UT Extension 3 X Terminal End, High Stress Weld, Examine 100%of weld length.~~P1R-1.156-1*'~102500 31-WD-015 Pipe-to-Tee B-J UT B9.11 HT 3----X Examine 100%of weld length.~~PIR-1.156-1**
: 18. 0" FWA (REF. DWG. NO. 5) 101300     31-HS                     F-A                                                       Code Case N-491-1 Spring Support            F1.10                                                    *AN/A*4 X
10.0" FWB (REF.DWG.NO.5)103000 31-WD-019 Pipe-to-Nozzle N4B Safe End B-J UT B9.11 HT 3 X Terminal End, Examine 100$of weld length~~PIR-1.156-1*~103100 31-WD-020 B-J UT Group R14,~~LATER~~Safe End-to Nozzle N4B B9.11 HT 3 103300.31-WD-021 B-D Nozzle N4B-to-Vcsscl B3.90 3 X Group R14, 78%CRV Limitation duc to ad)accnt nozzle and Bioshield~~LATER~~103400 31-WD-021 NUREG UT Group R14, Auto UT Nozzle N4B Bore (Zone 0619 3)Gene-Gcris 2000 system~~LATER+~  
w/welded stanchion
: 18. 0" FWB (REF. DWG. NO. 5) 101900     31-WD-001                 B-J         HT                                           Terminal End, High Valve 31-02R-to-Valve     B9.11       UT                                           Stress Weld, Examine 3                            X          100% of weld length.
Extension
                                                                                              ~ ~ P1R-1 . 156-1*'~
102500     31-WD-015                 B-J        UT                                            Examine 100%      of weld Pipe-to-Tee               B9.11       HT                                           length. ~~PIR-1.156-1**
3 - - - -      X
: 10. 0" FWB (REF. DWG. NO. 5) 103000     31-WD-019                 B-J        UT                                            Terminal End, Examine Pipe-to-Nozzle   N4B     B9. 11     HT                                           100$ of weld length 3                            X          ~ ~ PIR-1 . 156-1* ~
Safe End 103100     31-WD-020                 B-J         UT                                           Group R14, ~~LATER~~
Safe End-to Nozzle   N4B B9.11       HT 3
103300   . 31-WD-021                 B-D                                                       Group R14,      78% CRV Nozzle N4B-to-Vcsscl     B3.90                                                     Limitation duc to 3                            X          ad)accnt nozzle and Bioshield     ~~LATER~~
103400     31-WD-021                 NUREG       UT                                           Group R14, Auto UT Nozzle N4B Bore (Zone   0619                                                     Gene-Gcris 2000 system
: 3)                                                                                  ~~LATER+~


DATE: 10/26/99 REVISION: 0 NZNE MILE POINT NUCLEAR PIANT UNIT 1 INSERVICE INSPECTION TEN-YEAR PIAN CIASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 94 water System NUMBER: 31.0 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR  
DATE: 10/26/99                             NZNE MILE POINT NUCLEAR PIANT UNIT 1                           PAGE: 94 REVISION:        0                          INSERVICE INSPECTION TEN-YEAR PIAN CIASS 1 SECTION XZ SCHEDULED COMPONENTS water System NUMBER: 31.0 INSPECTION INTERVAL                     PLAN STATUS             PRESERVICE YEAR ASME                FIRST        SECOND        THIRD SEC. XI            PERIOD      PERIOD        PERZOD


==SUMMARY==
==SUMMARY==
NUMBER EXAMINATION AREA IDENTIFICATION ASME SEC.XI CATEGY NDE ITEM NO METH FIRST PERIOD SECOND PERIOD THIRD PERZOD OUTAGE 1 2 3 4 1 2 3 4 1 2 3 4 INSTRUCTIONS
EXAMINATION AREA         CATEGY     NDE                 OUTAGE                            INSTRUCTIONS NUMBER    IDENTIFICATION            ITEM NO     METH   1 2 3 4 1   2 3 4   1 2 3 4 + +CALIBRATION BLOCK*+
++CALIBRATION BLOCK*+103500 31-WD-021-ZR B D UT Noz.N4B Inner Radius B3 100 Section (zone 1/2)3 , X Group Rli, Auto UT Gene-Gcris 2000 system, Frequency per NUREG 0619, 47%CRV Limitation due to ad)acent nozzle and ioshield.~~LATER~+10.0" FWA (REF.DWG.NO.5)104300 31-WD-028 Pipe" to"Nozzle N4A Safe End B-J UT B9~11 MT 3 X Terminal End*~LATER**104400 31 WD-029 B J UT Safe End-to-Nozzle N4A B9.11 PT 3 X Group R13, 99%CRV Limitation duc to thermocouplc lugs++LATER'~~
103500   31-WD-021-ZR             B D         UT                                            Group    Rli, Auto UT Noz. N4B Inner Radius     B3 100                                                     Gene-Gcris 2000 system, 3                            X Section (zone 1/2)                                                     ,
104600 31"WD-030 B D UT N4A Nozzle-to-Vessel B3.90 3 X Group R13, 94%CRV Limitation due to ad)acent nozzle and Bioshicld,~~IATER~~104700 31-WD-030 NUREG UT N4A Nozzle Bore (Zone 0619 3)3 Group R13, Auto UT Gene-Geris 2000 system**LATER**104800 31-WD-030-ZR B"D N4A Noz.Inner Radius B3.100 Section(zone 1/2)3 X Group R13, 82%CRV, Limitation duc to ad)acent nozzle and Bioshield, Auto UT Gene-Gcris 2000 system , Frequency by NUREG 0619**LATER**  
Frequency per NUREG 0619, 47% CRV Limitation due to ad)acent nozzle and   ioshield.   ~ ~LATER~ +
: 10. 0" FWA (REF. DWG. NO. 5) 104300     31-WD-028                 B-J        UT                                            Terminal End *~LATER**
Pipe" to "Nozzle N4A     B9 11
                                        ~       MT 3                             X Safe End 104400   31 WD-029                 B J         UT                                             Group R13,    99% CRV Safe End-to-Nozzle N4A B9.11           PT                                             Limitation duc to 3                            X thermocouplc lugs
                                                                                                ++LATER'~~
104600   31"WD-030                 B D         UT                                             Group R13,    94% CRV N4A   Nozzle-to-Vessel     B3. 90                                                     Limitation   due   to 3                            X ad)acent nozzle and Bioshicld,   ~~IATER~~
104700   31-WD-030                 NUREG       UT                                            Group R13,    Auto UT N4A   Nozzle Bore (Zone   0619                                                       Gene-Geris 2000 system 3
: 3)                                                                                    **LATER**
104800   31-WD-030-ZR               B"D                                                       Group R13,    82% CRV, N4A Noz. Inner Radius   B3.100                                                     Limitation duc to 3                            X Section(zone 1/2)                                                                     ad)acent nozzle and Bioshield, Auto     UT Gene-Gcris 2000 system       ,
Frequency by NUREG 0619
                                                                                                **LATER**


DATE: 10/26/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 INSERVZCE INSPECTION TEN-YEAR PIAN CZASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 95 water System NUMBER: 31.0 SUHMARY EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL ASHE SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERZOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR INSTRUCTIONS
DATE: 10/26/99                               NINE MILE POINT NUCLEAR PLANT UNIT 1                         PAGE: 95 REVISION:        0                          INSERVZCE INSPECTION TEN-YEAR PIAN CZASS 1 SECTION XZ SCHEDULED COMPONENTS water System NUMBER:   31. 0 INSPECTION INTERVAL                     PLAN STATUS            PRESERVICE YEAR ASHE                 FIRST        SECOND      THIRD SEC. XZ               PERIOD      PERIOD      PERZOD SUHMARY    EXAMINATION AREA          CATEGY     NDE                 OUTAGE                        INSTRUCTIONS NUMBER    IDENTIFICATION            ITEM NO     METH   1 2 3 4 1   2 3 4   1 2 3 4 ++CALIBRATION BLOCK~~
++CALIBRATION BLOCK~~18.0" FWA (REF.DWG.NO.5)10490031-WD-031 B"J MT Valve 31-01-to-Valve B9.11 UT 31-07 Extension Torminal End, High Stress Weld, Examine 100%of weld length.**P1R-1.156-1**18.0" FWB (REF.DWG.NO.5)105500 31-WD"045 Pipe-to-Tcc B-J UT B9.11 3 X Examine 100%of weld length+*PZR-1.156-1~~
18.0" FWA (REF. DWG. NO. 5) 10490031-WD-031                     B"J         MT                                           Torminal End, High Valve 31-01-to-Valve       B9. 11       UT                                           Stress Weld, Examine 31-07 Extension                                                                     100% of weld length.
10.0" FWC (REF.DWG.NO.5)106000 31-WD-049 Pipo-to-Nozzle N4C Safe End B J HT B9.11 3 Torad.nal End, Examine 100%of weld length.++PZR-.75-2++106100 31 WD-050 B-J UT N4C Nozzlo-to-Safe End B9.11 HT 3 X Group R15, 86%CRV, 99%for UT~*PIR-1.156-1*~
                                                                                                **P1R-1. 156-1**
106300 31-WD-051 B D UT N4C Nozzle-to-Vessel B3~90 3 X Group R15, 84%CRV.Limitation duc to ad)acent nozzle and Bioshicld~~ZATERi~106400 31 WD 051 NUREG UT N4C Nozzle Bore (Zone 0619 3)3 X Group R15, Frequency pcr NUREG-0619
: 18. 0" FWB (REF. DWG. NO. 5) 105500     31-WD"045                 B-J         UT                                           Examine 100% of weld Pipe-to-Tcc                B9.11                                                    length +*PZR-1.156-1~~
**LATER+a 106500 31-WD-051-ZR B-D N4C Noz.Inner Radius B3.100 Section (Zones 1/2 3 X Group R15, (Zone 1 4 2)Frequency per NUREG-0619, 86%CRV, Limitation duc to ad)acent nozzle and Bioshield.
3                            X
~~LATER~~  
: 10. 0" FWC (REF. DWG. NO. 5) 106000     31-WD-049                 B  J        HT                                            Torad.nal End, Examine Pipo-to-Nozzle   N4C     B9.11                                                     100% of weld length.
3 Safe End                                                                            ++PZR-. 75-2++
106100   31 WD-050                   B-J         UT                                           Group R15,    86% CRV, 99%
N4C   Nozzlo-to-Safe End B9.11         HT                                           for UT ~*PIR-1.156-1*~
3                            X 106300   31-WD-051                   B D         UT                                           Group R15,    84% CRV.
N4C   Nozzle-to-Vessel     B3 90
                                        ~                                                     Limitation duc to 3                            X ad)acent nozzle and Bioshicld ~~ZATERi~
106400   31   WD 051                 NUREG       UT                                           Group R15,    Frequency N4C   Nozzle Bore (Zone     0619                                                     pcr NUREG-0619 **LATER+a 3                            X 3) 106500   31-WD-051-ZR               B-D                                                       Group R15,  (Zone  1 4 2)
N4C Noz. Inner Radius       B3.100                                                   Frequency per 3                            X Section (Zones 1/2                                                                   NUREG-0619, 86% CRV, Limitation duc to ad)acent nozzle and Bioshield. ~~LATER~~


DATE: 10/26/99 REVISZON: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 ZNSERVZCE INSPECTION TEN-YEAR PIAN CZASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 96 water System ZONE NUMBER: 31.0  
DATE: 10/26/99                               NINE MILE POINT NUCLEAR PLANT UNIT 1                         PAGE: 96 REVISZON:        0                            ZNSERVZCE INSPECTION TEN-YEAR PIAN CZASS 1 SECTION XZ SCHEDULED COMPONENTS water System ZONE NUMBER:   31.0 INSPECTION INTERVAL                      PLAN STATUS            PRESERVICE YEAR ASME                  FIRST        SECOND      THIRD SEC. XZ                PERIOD      PERIOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR INSTRUCTIONS
EXAMINATION AREA         CATEGY      NDE                OUTAGE                        INSTRUCTIONS NUMBER     IDENTIFICATION           ITEM   NO   METH   1 2 3 4 1   2 3 4   1 2 3 4 ~*CALIBRATION BLOCK~ ~
~*CALIBRATION BLOCK~~10.0" FWD (REF.DWG.NO.5)107300 31 WD-058 Pipe-to-Nozzle N4D Safe End B-J B9.11 X Terminal End~*FIR-.75-2~*
: 10. 0" FWD (REF. DWG. NO. 5) 107300     31 WD-058                 B-J                                                        Terminal End Pipe-to-Nozzle   N4D     B9.11                                                     ~*FIR-.75-2~*
107400 31-WD-059 B J UT Group R16,~*LATER++N4D Safe End-to-Nozzle B9.11 3 X 107600 31"WD-060 B-D N4D Nozzle-to-Vessel B3.90 3 X Group R16, 82%CRV Limitation due to Bioshield**IATER*~107700 31-WD-060 N4D Nozzle Bore (Zone 0619 3)3 X Group R16, Frequency per NUREG-0619
X Safe End 107400     31-WD-059                 B J         UT                                           Group R16, ~*LATER++
**N/A~+107800 31-WD" 060-ZR B D N4D Noz.Inner radius B3.100 Section (zones 1/2 3 X Group R16, Zone 1 4 2, 59%CRV Limitation duc to Bioshield, Frcqucncy by NUREG-0619
N4D Safe End-to-Nozzle B9.11 3                           X 107600     31 "WD-060               B-D                                                       Group R16, 82% CRV N4D   Nozzle-to-Vessel     B3. 90                                                     Limitation due to 3                            X          Bioshield **IATER*~
~~LATER~~  
107700   31-WD-060                                                                             Group R16, Frequency per N4D   Nozzle Bore (Zone   0619                                                       NUREG-0619 **N/A~+
3                            X 3) 107800   31-WD" 060-ZR             B D                                                       Group R16, Zone  1 4 2, N4D   Noz. Inner radius   B3.100                                                     59% CRV Limitation duc 3                            X Section (zones 1/2                                                                   to Bioshield, Frcqucncy by NUREG-0619 ~~LATER~~


Page 97 Left Blank Intentionally  
Page 97 Left Blank Intentionally


DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNZT 1 ZNSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XI SCHEDULED COMPONENTS PAGE: 98 tor Recirculation E NUMBER: 32.0 Discharge INSPECTION INTERVAL PIAN STATUS PRESERVICE YEAR
DATE: 10/15/99                               NINE MILE POINT NUCLEAR PLANT UNZT 1                         PAGE: 98 REVISION:        0                            ZNSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XI SCHEDULED COMPONENTS tor Recirculation Discharge E NUMBER:   32.0                                                                             PRESERVICE YEAR INSPECTION INTERVAL                       PIAN STATUS ASME                  FIRST        SECOND      THIRD SEC. XZ                PERIOD        PERIOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 INSTRUCTIONS
EXAMINATION AREA         CATEGY      NDE                  OUTAGE                        INSTRUCTIONS NUMBER     IDENTIFICATION           ITEM NO     METH     1 2 3 4   1   2 3 4   1 2 3 4 ~~CALIBRATION BLOCK~*
~~CALIBRATION BLOCK~*28.0" Discharge 12D (REF.DWG.NO.7)109200 32-12-H4A F-A VT-3 Spring Hanger Fl.10 3 X Removed verify, Code Case N-491-1*~N/A~~109300 32-12-H4B Spring Hanger Fl.10 3 X Removed verify, Code Caso N-491-1~~N/A~+109600 32-13-H4 WD 001 B K PT Integral Attachment B10.20 Lug 28.0" Discharge 13D (REF.DWG.NO.7)3 X (32-13-H-4-A), Code Case N-509**N/A**109700 32-13"H4"WD-002 B-K Integral Attachment B10.20 Lug X (32-13-H-4-A), Code Case N-509**N/A**109800 32-13-H4-WD-003 B K Zntcgral Attachment B10.20 Lug X (32-13-H-4-B), Code Case N-509~*N/A~*109900 32-13-H4-WD-004 B-K Integral Attachment B10.20 Lug 3 X (32-13-H-4-B), Code Case N-509~*N/A~*110000 32-13-H4A Spring Hanger Fl.10 3 X Code Case N-491-1++N/A+*110100 32-13-H4B Spring Hanger Fl.10 3----X Code Case N-491-1**N/A**  
28.0" Discharge 12D (REF. DWG. NO. 7) 109200     32-12-H4A               F-A         VT-3                                           Removed verify, Code Spring Hanger           Fl. 10                                                     Case N-491-1 *~N/A~~
3 X 109300     32-12-H4B                                                                           Removed verify,  Code Spring Hanger           Fl. 10                                                     Caso N-491-1 ~~N/A~+
3 X 28.0" Discharge 13D (REF. DWG. NO. 7) 109600    32-13-H4  WD 001        B K          PT                                            (32-13-H-4-A), Code Case Integral Attachment      B10. 20                                                    N-509 **N/A**
3 X Lug 109700     32-13"H4"WD-002         B-K                                                         (32-13-H-4-A), Code Case Integral Attachment      B10.20                                                      N-509 **N/A**
X Lug 109800     32-13-H4-WD-003         B K                                                         (32-13-H-4-B), Code Case Zntcgral Attachment      B10. 20                                                    N-509 ~*N/A~*
X Lug 109900     32-13-H4-WD-004         B-K                                                         (32-13-H-4-B), Code Case Integral Attachment      B10. 20                                                    N-509 ~*N/A~*
3 X Lug 110000     32-13-H4A                                                                           Code Case N-491-1 Spring Hanger            Fl . 10                                                    ++N/A+*
3              X 110100     32-13-H4B                                                                           Code Case N-491-1 Spring Hanger            Fl. 10                                                      **N/A**
3  - - - -      X


DATE: 10/15/99 REVISION: 0 NINE MZLE POINT NUCLEAR PLANT UNIT 1 ZNSERVZCE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XI SCHEDULED COMPONENTS PAGE: 99 tor Recirculation Discharge ZONE NUMBER: 32.0  
DATE: 10/15/99                             NINE MZLE POINT NUCLEAR PLANT UNIT 1                         PAGE: 99 REVISION:        0                          ZNSERVZCE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XI SCHEDULED COMPONENTS tor Recirculation Discharge ZONE NUMBER:   32.0 ZNSPECTION INTERVAL                      PLAN STATUS            PRESERVICE YEAR ASME                  FIRST        SECOND      THIRD SEC. XZ                PERIOD        PERIOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION ZNSPECTION INTERVAL ASME SEC.XZ CATEGY NDE ITEM NO METH PLAN STATUS THIRD PERIOD SECOND PERIOD FIRST PERIOD OUTAGE 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR INSTRUCTIONS
EXAMINATION AREA         CATEGY      NDE                  OUTAGE                        INSTRUCTIONS NUMBER     IDENTIFICATION           ITEM NO     METH   1 2 3 4   1   2 3 4   1 2 3 4 ~ ~CALIBRATION BLOCK~*
~~CALIBRATION BLOCK~*28.0" Discharge 15D (REF.DWG.NO.7)112000 32-15-H4A F-A VT-3 Spring Hanger Fl.10 3 X Code Case N-491-1*~N/A~*112100 32-15"H4B Spring Hanger F-A Pl.10 3 X Code Case N-491-1+*N/A++113900 32-385-VB B-G-2 VT-1 Valve 32-385 Bolting B'7.70 2.0" Discharge 11D (REF.DWG.NO.7)3 X 2.0" Valve By-pass Linc**N/At 1 2.0" Discharge 12D (REP.DWG.NO.7)000 32-386-VB B-G-2 VT-1 Valve 32-386 Bolting B7.70 3 X 2.0" Valve by-pass linc 2.0" Discharge 13D (REF.DWG.NO.7)114100 32"387 VB B-G-2 VT" 1 Valve 32-387 Bolting B7.70 3 X 2.0" Valve by-pass linc~*N/A*+2.0" Discharge 14D (REP.DWG.NO.7)114200 32-388-VB B-G 2 VT-1 Valve 32-388 Bolting B7.70 3 X 2.0" Valve by-pass line**N/A+~114300 32-389 VB B-G 2 VT 1 Valve 32-389 Bolting B7.70 2.0" Discharge 15D (REF.DWG.NO.7)3 X 2.0" Valve by-pass line%AN/A*t  
28.0" Discharge 15D (REF. DWG. NO. 7) 112000     32-15-H4A               F-A         VT-3                                           Code Case N-491-1 Spring Hanger            Fl. 10                                                      *~N/A~*
3                            X 112100     32-15 "H4B               F-A                                                         Code Case N-491-1 Spring Hanger            Pl. 10                                                      +*N/A++
3                            X 2.0" Discharge  11D (REF. DWG. NO. 7) 113900     32-385-VB               B-G-2       VT-1                                           2.0" Valve By-pass Linc Valve 32-385 Bolting   B'7. 70                                                     **N/At1 3                            X 2.0" Discharge 12D (REP. DWG. NO. 7) 000     32-386-VB               B-G-2       VT-1                                           2.0" Valve by-pass  linc Valve 32-386 Bolting   B7. 70 3                           X 2.0" Discharge 13D (REF. DWG. NO. 7) 114100     32 "387 VB               B-G-2       VT"1                                           2.0" Valve by-pass   linc Valve 32-387 Bolting    B7.70                                                      ~*N/A*+
3              X 2.0" Discharge 14D (REP. DWG. NO. 7) 114200     32-388-VB               B-G 2       VT-1                                           2.0" Valve by-pass line Valve 32-388 Bolting    B7.70                                                      **N/A+~
3              X 2.0" Discharge 15D (REF. DWG. NO. 7) 114300    32-389  VB              B-G 2        VT 1                                          2.0" Valve by-pass line Valve 32-389 Bolting    B7.70                                                      %AN/A*t 3 X


DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 ZNSERVICE INSPECTZON TEN-YEAR PLAN CZASS 1 SECTION XI SCHEDULED COMPONENTS PAGE: 100 or Recirculation Discharge NUMBER: 32.0 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR  
DATE: 10/15/99                             NINE MILE POINT NUCLEAR PLANT UNIT 1                             PAGE: 100 REVISION:        0                          ZNSERVICE INSPECTZON TEN-YEAR PLAN CZASS 1 SECTION XI SCHEDULED COMPONENTS or Recirculation Discharge NUMBER:   32.0 INSPECTION INTERVAL                     PLAN STATUS             PRESERVICE YEAR ASME                FIRST        SECOND      THIRD SEC. XI            PERIOD        PERIOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC.XI CATEGY NDE ITEM NO METH FIRST PERIOD SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 INSTRUCTIONS
EXAMINATION AREA         CATEGY      NDE                OUTAGE                          INSTRUCTIONS NUMBER     IDENTIFICATION           ITEM NO     METH   1 2 3 4   1   2 3 4   1 2 3 4 + +CALIBRATION BLOCK**
++CALIBRATION BLOCK**28.0" Discharge 13D (REF.DWG.NO.7)115000 32-SB-6A Sway Brace F-A Fl.10 3 X Code Case N-491-1*+N/A**115100 32-SB-6B Sway Brace Fl.10 3 X Code Case N-491"1 eaN/Ate 28.0" Discharge 11D (REF.DWG.NO.7)115400 32-WD"017 Pump 11 Discharge-to-Elbow B-J UT B9.11 3 X Terminal End, High Stress Wold, Examine 100%of weld length.~~PSR-Z.2*~
: 28. 0" Discharge 13D (REF. DWG.     NO. 7) 115000   32-SB-6A                 F-A                                                       Code Case N-491-1 Sway Brace                Fl. 10                                                    *+N/A**
00 32-WD"017-Dl Elbow-Long Scam OR B-J UT B9.12 PT 3 X Code Case N-524~*PSR-Z.2~~
3              X 115100   32-SB-6B                                                                             Code Case N-491"1 Sway Brace                Fl. 10                                                    eaN/Ate 3              X 28.0" Discharge   11D (REF. DWG. NO. 7) 115400     32-WD "017               B-J         UT                                           Terminal End, High Pump 11                  B9. 11                                                    Stress Wold, Examine 3              X Discharge-to-Elbow                                                                    100% of weld length.
115700 32"WD-017-D2 Elbow-Long Seam ZR B-J UT B9.12 PT 3 X Code Casa N-524 e t PER-1.2*a 3.0" Dischargo 11D (REF.DWG.NO.7)115900 32-WD-020 Branch Connection-Dccon B-J PT B9.32 3 X**N/A~*116000 32-WD"020-FB 11D Dccon Flango Bolting B-G-2 B7.50 VT"1 3 X Examine in place, when removed or disasscmblcd.
                                                                                                ~~PSR-Z.2*~
*+N/A**  
00   32-WD"017-Dl               B-J          UT                                            Code Case N-524 Elbow-Long Scam   OR       B9.12       PT                                           ~*PSR-Z.2~~
3              X 115700   32"WD-017-D2               B-J          UT                                            Code Casa N-524 Elbow-Long Seam   ZR       B9. 12       PT                                           e t PER-1 . 2*a 3              X 3.0" Dischargo   11D (REF. DWG. NO. 7) 115900   32-WD-020                 B-J         PT                                             **N/A~*
Branch Connection          B9.32 3              X
          -Dccon 116000   32-WD"020-FB               B-G-2       VT"1                                           Examine     in place, when 11D Dccon Flango          B7.50                                                      removed     or disasscmblcd.
3              X Bolting                                                                              *+N/A**


DATE: 10/15/99 REVISION: 0 NINE MZLE POINT NUCLEAR PIANT UNIT 1 ZNSERVZCE INSPECTION TEN-YEAR PLAN CIASS 1 SECTION XZ SCHEDUZED COMPONENTS PAGE: 101 or Recirculation NUMBER: 32.0 Discharge INSPECTION INTERVAL PIAN STATUS PRESERVICE YEAR
DATE: 10/15/99                             NINE MZLE POINT NUCLEAR PIANT UNIT 1                           PAGE: 101 REVISION:        0                          ZNSERVZCE INSPECTION TEN-YEAR PLAN CIASS 1 SECTION XZ SCHEDUZED COMPONENTS or Recirculation Discharge NUMBER:   32. 0                                                                           PRESERVICE YEAR INSPECTION INTERVAL                     PIAN STATUS ASME                FIRST        SECOND      THIRD SEC. XZ              PERIOD        PERIOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 INSTRUCTIONS
EXAMINATION AREA         CATEGY      NDE                OUTAGE                          INSTRUCTIONS NUMBER     IDENTIFICATION           ITEM NO     METH   1 2 3 4   1   2 3 4   1 2 3 4 ~ ~CALIBRATION   BLOCK~ ~
~~CALIBRATION BLOCK~~28.0" Discharge llD (REF.DWG.NO.7)116600 32"WD-022 Pipe-to-Gate Valve 32-380 B-J UT B9.11 PT 3 X Terminal End, High Stress Weld, Examine 100%of weld length.*+PSR-1.2+*116700 32-WD-022 Pipe-to-Gate Valve 32"380 GL A 88-01 3 X+*PSR-1.109-l~~116800 32-WD-022-U Pipe-Long Seam B-J B9.12 3----X Code Case N-524<<~PSR-1.2**2.0" Discharge 11D (REF.DWG.NO.7)32-WD-023 Coupling-to-Pipe B"J PT B9.40 H 3 X**N/A**118000 32-WD-034 Pipe-to-Coupling B J PT B9.40 3 X 4*N/A*1 28.0" Discharge 11D (REF.DWG.NO.7)118100 32-WD-035 Gate Valve 32-380-to-Pipe B-J UT B9.11 PT**PSR-1.2*~118200 32-WD-035 Gate Valve 32-380-to-Pipe GL-A UT 88 01 3 X~*PSR-I.109-1*~119300 32-WD-040 Elhow-to-Pipe GL-A UT 88-01 3 X**PSR-1.109-1)
28.0" Discharge llD (REF. DWG. NO. 7) 116600     32"WD-022               B-J        UT                                            Terminal End, High Pipe-to-Gate Valve       B9. 11       PT                                           Stress Weld, Examine 3            X 32-380                                                                              100% of weld length.
PSR-1.260**  
                                                                                              *+PSR-1 . 2 +*
116700     32-WD-022               GL A                                                         +*PSR-1. 109-l~~
Pipe-to-Gate Valve      88-01 3            X 32"380 116800     32-WD-022-U             B-J                                                       Code Case N-524 Pipe-Long  Seam          B9.12                                                      <<~PSR-1. 2**
3 - - - -      X 2.0" Discharge 11D (REF. DWG. NO. 7) 32-WD-023               B"J        PT                                              **N/A**
Coupling-to-Pipe         B9.40 H                     3             X 118000     32-WD-034               B  J        PT                                              4*N/A*1 Pipe-to-Coupling         B9. 40 3             X 28.0" Discharge 11D (REF. DWG. NO. 7) 118100     32-WD-035               B-J         UT                                               **PSR-1. 2*~
Gate Valve               B9. 11      PT 32-380-to-Pipe 118200    32-WD-035                GL-A       UT                                               ~*PSR-I . 109-1*~
Gate Valve              88 01 3                            X 32-380-to-Pipe 119300     32-WD-040               GL-A       UT                                               **PSR-1.109-1)
Elhow-to-Pipe            88-01                                                      PSR-1 . 260**
3              X


DATE: 10/15/99 REVISZON: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 102 or Recirculation Discharge NUMBER: 32.0 INSPECTION INTERVAL PLAN STATUS PRESERVZCE YEAR  
DATE: 10/15/99                             NINE MILE POINT NUCLEAR PLANT UNIT 1                         PAGE: 102 REVISZON:        0                          INSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS or Recirculation Discharge NUMBER:   32.0 INSPECTION INTERVAL                     PLAN STATUS           PRESERVZCE YEAR ASME                FIRST        SECOND      THIRD SEC. XI            PERIOD        PERIOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTZFZCATZON ASME SEC.XI CATE GY NDE ITEM NO METH FIRST PERIOD SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 INSTRUCTIONS
EXAMINATION AREA         CATE GY     NDE               OUTAGE                          INSTRUCTIONS NUMBER      IDENTZFZCATZON          ITEM NO     METH   1 2 3 4   1   2 3 4   1 2 3 4 +~CALIBRATION BLOCK+~
+~CALIBRATION BLOCK+~119800 32-WD-041 Pipe-to-Nozzle N2A Safe End B-J PT B9.11 UT 3----X Examine 100%of weld length.~~PSR-l.655/1.150-1,PSR-119900 32-WD-041 Pipe-to-Nozzle N2A Safo End GL-A UT 88-01 3 X+*PSR-1.655/1.150**120000 32-WD-041-U Pipe-Long Seam B-J B9.12 3 X Code Case N-524~~PSR-l.2~~120100 32-WD-042 GL A UT Group R06~~LATER~~N2A Nozzle-to-Safe End 88-01 X 120200 32-WD-042 B-F UT Group R06,~~IATER~~NPA Nozzle-to-Safe End B5.10 PT 3 X 120300 32-WD-042 SZL N2A Nozzle-to-Safe End 455R1S1 3 X Group R06, Incolal 182 butter expansion from nozzle side of weld*+ZATER+*120400 32-WD-043 B-D AUT N2A No" zle-to-Vessel B3.90 3 X Group R06, 75%CRV Limitation due to bottom head taper of shell thickness+~N/A**120500 32"WD-043-ZR N2A Nozzle Inner Radius Section B-D AUT B3.100 3 X Group R06, 60%CRV Limitation due to bottom head taper of shell thickness*~N/A+~  
119800     32-WD-041               B-J          PT                                            Examine 100%  of weld Pipe-to-Nozzle N2A     B9. 11       UT                                           length.
3 - - - -     X                         ~~PSR-l. 655/1. 150-1,PSR-Safe End 119900     32-WD-041               GL-A       UT                                             +*PSR-1. 655/1. 150**
Pipe-to-Nozzle  N2A      88-01 3              X Safo End 120000     32-WD-041-U             B-J                                                       Code Case N-524 Pipe-Long  Seam          B9.12                                                      ~~PSR-l. 2~~
3              X 120100     32-WD-042               GL A       UT                                             Group R06 ~~LATER~~
N2A Nozzle-to-Safe End 88-01 X
120200     32-WD-042               B-F         UT                                             Group R06, ~~IATER~~
NPA Nozzle-to-Safe End B5.10         PT 3             X 120300     32-WD-042               SZL                                                       Group R06, Incolal 182 N2A   Nozzle-to-Safe End 455R1S1                                                   butter expansion from 3              X                        nozzle side of weld
                                                                                              *+ZATER+*
120400     32-WD-043               B-D         AUT                                           Group R06,  75% CRV N2A No" zle-to-Vessel     B3. 90                                                     Limitation   due to bottom 3              X                        head taper   of shell thickness +~N/A**
120500   32"WD-043-ZR             B-D         AUT                                           Group R06,   60% CRV N2A  Nozzle Inner        B3.100                                                    Limitation   due to bottom 3              X Radius Section                                                                      head taper   of shell thickness *~N/A+~


DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XI SCHEDULED COMPONENTS PAGE: 103 or Recirculation NUMBER: 32.0 Discharge INSPECTION INTERVAI PLAN STATUS PRESERVZCE YEAR  
DATE: 10/15/99                             NINE MILE POINT NUCLEAR PLANT UNIT 1                             PAGE: 103 REVISION:        0                          INSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XI SCHEDULED COMPONENTS or Recirculation Discharge NUMBER:   32.0 INSPECTION INTERVAI                     PLAN STATUS           PRESERVZCE YEAR ASME                FZRST        SECOND      THIRD SEC. XI            PERIOD        PERIOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATZON AREA NUMBER IDENTIFICATION ASME SEC.XI CATEGY NDE ITEM NO METH FZRST PERIOD SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 ZNSTRUCTIONS
EXAMINATZON AREA         CATEGY      NDE                  OUTAGE                          ZNSTRUCTIONS NUMBER     IDENTIFICATION           ITEM NO     METH   1 2 3 4   1   2 3 4   1 2 3 4 **CALIBRATIONBLOCK~*
**CALIBRATION BLOCK~*28.0" Discharge 12D (REF.DWG.NO.7)120600 32-WD"057 B J PT Pump 12 B9~11 UT Discharge-to-Elbow 3 Terminal End, High Stress Weld, Examine 100%of weld length.**PSR-1.260a m 120800 32-WD-057"Dl Elbow-Long Seam OR B-J PT B9.12 UT 3 X Code Case N-524++PSR-1.260**
28.0" Discharge 12D (REF. DWG. NO. 7) 120600   32-WD"057                 B J         PT                                             Terminal End, High Pump 12                   B9 11
120900 32-WD-057-D2 B-J PT Elbow-Long Seam ZR B9~12 UT 3 X Code Case N-524**PSR-1.260**
                                        ~       UT                                             Stress Weld, Examine 3
3.0" Discharge 12D (REF.DWG.NO.7)00 32 WD 060-FB BG2 Dccon Flange Bolting B7.50 VT-1 3 X Examine in place, when removed or when disasscmblcd.
Discharge-to-Elbow                                                                   100% of weld length.
~*N/A~~2S.O" Discharge 12D (REF.DWG.NO.7)121300 32-WD-061 Elbow-to-Pipe GL-A UT 88"01 3 X~~PER" 1.109-1+~121400 32-WD-061 Elbow-to-Pipe B-J UT B9.11 PT 3 X~~PSR-1.2**121900 32-WD"062 Pipe-to-Gate Valve 32-381 GL-A UT 88-01 3 X~~PSR-1.109-1*+  
                                                                                                **PSR-1. 260a   m 120800     32-WD-057"Dl             B-J        PT                                            Code Case N-524 Elbow-Long Seam   OR     B9.12       UT                                             ++PSR-1.260**
3                            X 120900     32-WD-057-D2             B-J         PT                                             Code Case N-524 Elbow-Long Seam   ZR     B9 12
                                        ~       UT                                             **PSR-1.260**
3                            X 3.0" Discharge   12D (REF. DWG. NO. 7) 00   32 WD 060-FB               BG2         VT-1                                           Examine     in place,   when Dccon Flange  Bolting    B7.50                                                      removed     or when 3              X                        disasscmblcd. ~*N/A~~
2S.O" Discharge 12D (REF.     DWG. NO. 7) 121300   32-WD-061                 GL-A       UT                                             ~ ~ PER" 1 . 109-1 + ~
Elbow-to-Pipe              88 "01 3                            X 121400   32-WD-061                 B-J         UT                                             ~~PSR-1. 2**
Elbow-to-Pipe              B9. 11      PT 3                            X 121900   32-WD"062                 GL-A       UT                                             ~~PSR-1. 109-1*+
Pipe-to-Gate Valve        88-01 3                            X 32-381


DATE: 10/15/99 REVISZON: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 INSERVZCE INSPECTION TEN-YEAR PLAN'ZASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 104 r Recirculation l NUMBER: 32.0 Discharge INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR  
DATE: 10/15/99                           NINE MILE POINT NUCLEAR PLANT UNIT 1                               PAGE: 104 REVISZON:          0                        INSERVZCE INSPECTION TEN-YEAR PLAN 1 SECTION XZ SCHEDULED COMPONENTS
                                                                                'ZASS r   Recirculation Discharge NUMBER:l 32 . 0 INSPECTION INTERVAL                   PLAN STATUS               PRESERVICE YEAR ASME                FIRST        SECOND          THIRD SEC. XZ              PERIOD      PERIOD          PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 ZNSTRUCTZONS
EXAMINATION AREA         CATEGY    NDE                  OUTAGE                            ZNSTRUCTZONS NUMBER       IDENTIFICATION           ITEM NO   METH     1 2 3 4 1   2 3 4       1 2 3 4 + +CALIBRATION BLOCX**
++CALIBRATION BLOCX**2.0" Discharge 12D (REF.DWG.NO.7)122100 32-WD-063 Coupling-to-Pipe B-J PT B9.403 X Examine 100%of weld length.~~N/A~*123200 32-WD-074 Pipo-to-Coupling B-J B9.40 3 X Examino 100%of weld length.~~N/A*~28.0" Discharge 12D (REF.DWG.NO.7)123300 32-WD-075 Gate Valve 32-381-to-Pipe B-J UT B9.11 PT 3 X Examine 100%of weld length.*~PBR-1.109-1**
2.0" Discharge 12D (REF. DWG. NO. 7) 122100     32-WD-063               B-J       PT                                               Examine 100% of weld Coupling-to-Pipe        B9. 40                                                      length. ~~N/A~*
32-WD-075-D Pipe-Long Scam B J B9.12 3 X Code Case N-524.**PBR-1.109-1~~
3                              X 123200     32-WD-074               B-J                                                          Examino 100% of weld Pipo-to-Coupling         B9.40                                                       length. ~~N/A*~
124000 , 32-WD-079 Pipe-to-Elbow GL A UT 88-01 3 X~~PBR-1.260/PSR-1.
3                                X 28.0" Discharge 12D (REF. DWG. NO. 7) 123300     32-WD-075               B-J       UT                                               Examine 100%   of weld Gate Valve              B9. 11    PT                                                length. *~PBR-1.109-1**
109-1*124800 32"WD-081 Pipe-to-Nozzle N2B Safe End B-J UT B9.11 PT 3 X Examine 100%of weld length+~PBR-1.109-1+~
3                                X 32-381-to-Pipe 32-WD-075-D             B J                                                         Code Case N-524.
125000 32-WD-081-U Pipe-Long Weld B-J UT B9.12 FT 3 X Code Case N-524**PBR-1.109-1**
Pipe-Long  Scam          B9.12                                                        **PBR-1.109-1~~
125100 32-WD-082 SIL UT N2B Safe End-to-Nozzle 455R1S1 3 X Group R07, Znconel 182 buttor oxpansion from nozzle sido of weld t1LATERf t
3                                X 124000   , 32-WD-079               GL A      UT Pipe-to-Elbow           88-01                                                       ~ ~PBR-1. 260/PSR-1. 109-1*
3                                X 124800     32 "WD-081               B-J        UT                                                Examine 100% of weld Pipe-to-Nozzle N2B     B9. 11     PT                                               length +~PBR-1.109-1+~
3                                X Safe End 125000     32-WD-081-U             B-J       UT                                               Code Case N-524 Pipe-Long Weld          B9. 12    FT                                                **PBR-1.109-1**
3                                X 125100     32-WD-082               SIL       UT                                               Group R07, Znconel 182 N2B Safe End-to-Nozzle 455R1S1                                                       buttor oxpansion from 3                                X          nozzle sido of weld t1LATERft


DATE: 10/15/99 REVISION: 0 NINE MZIE POINT NUCLEAR PIANT UNZT 1 INSERVICE ZNSPECTZON TEN-YEAR PIAN CZASS 1 SECTION XI SCHEDULED COMPONENTS PAGE: 105 tor Recirculation Discharge NUMBER: 32.0 INSPECTION INTERVAL PIAN STATUS PRESERVICE YEAR  
DATE: 10/15/99                           NINE MZIE POINT NUCLEAR PIANT UNZT 1                           PAGE: 105 REVISION:        0                          INSERVICE ZNSPECTZON TEN-YEAR PIAN CZASS 1 SECTION XI SCHEDULED COMPONENTS tor Recirculation Discharge NUMBER: 32. 0 INSPECTION INTERVAL                     PIAN STATUS             PRESERVICE YEAR ASME                FIRST        SECOND      THIRD SEC. XI            PERIOD        PERIOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC.XI CATEGY NDE ITEM NO METH FIRST PERIOD SECOND PERIOD THIRD PERIOD OUTAGE 1 2 3 4 1 2 3 4 1 2 3 4 INSTRUCTIONS
*~CALIBRATION BLOCK~~125200 32-WD-082 B-F Group R07*~LATER~~N2B Safe End-to-Nozzle B5.10 3 X 125300 32-WD-082 GL-A Group R07+*LATER~~N2B Safe End-to-Nozzle SS-01 3 X 125400 32-WD-083 B-D AUT N2B Nozzle-to<<Vcsscl B3~90 3 X Group R07, 75.4%CRV Limitation duc to bottom head taper of shell weld.**LATER**125500 32-WD-083-IR N2B Nozzle Inner radius Section B-D B3.100 3 X Group R07, 608 CRV Limitation duc to bottom head taper of shell weld.+*LATER~*28.0" Discharge 13D (REF.DWG.NO.7)125600 32"WD-097 B-J UT Pump 13 B9.11 PT Discharge-to-Elbow 3 X Terminal End, High Stress Wold, Examine 100%of weld length**PSR-1.109-1*+125800 32-WD-097-Dl Elbow-Long Scam OR B-J UT B9.12 PT 3 X Formerly LW-032-A, Code Case N-524*~PSR-1.109-1~~
125900 32"WD-097-D2 B-J UT Elbow-Long Seam ZR B9.12 PT 3 X Formerly LW-032-B, Code Caso N-524 saPSR 1.109 la*


DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PIANT UNIT 1 INSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 106 tor Recirculation Discharge NUMBER: 32.0 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR  
NUMBER EXAMINATION AREA        CATEGY    NDE                  OUTAGE                        INSTRUCTIONS IDENTIFICATION          ITEM NO    METH    1  2  3  4  1  2  3  4  1  2  3  4  *~CALIBRATION BLOCK~ ~
125200    32-WD-082                B-F                                                        Group R07 *~LATER~~
N2B Safe End-to-Nozzle B5.10 3                            X 125300    32-WD-082                GL-A                                                      Group R07 +*LATER~~
N2B Safe End-to-Nozzle SS-01 3                            X 125400    32-WD-083                B-D        AUT                                            Group R07, 75.4% CRV N2B Nozzle-to<<Vcsscl    B3 90
                                        ~
Limitation duc to bottom 3                            X head taper of shell weld. **LATER**
125500    32-WD-083-IR            B-D                                                      Group R07, 608 CRV N2B  Nozzle Inner        B3.100                                                    Limitation duc to bottom 3                            X radius Section                                                                      head taper of shell weld. +*LATER~*
28.0" Discharge  13D (REF. DWG. NO. 7) 125600    32"WD-097                B-J        UT                                            Terminal End, High Pump 13                  B9.11      PT                                            Stress Wold, Examine Discharge-to-Elbow                        3 X 100% of weld length
                                                                                              **PSR-1. 109-1*+
125800    32-WD-097-Dl              B-J        UT                                            Formerly LW-032-A, Code Elbow-Long Scam  OR      B9.12      PT                                            Case N-524 3 X
                                                                                              *~PSR-1.109-1~~
125900    32"WD-097-D2            B-J        UT                                            Formerly LW-032-B, Code Elbow-Long Seam  ZR      B9.12      PT                                            Caso N-524 3 X saPSR  1.109  la*
 
DATE: 10/15/99                             NINE MILE POINT NUCLEAR PIANT UNIT 1                         PAGE: 106 REVISION:      0                          INSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS tor Recirculation Discharge NUMBER: 32. 0 INSPECTION INTERVAL                     PLAN STATUS             PRESERVICE YEAR ASME                FIRST        SECOND      THIRD SEC. XZ              PERIOD      PERIOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER ZDENTZFZCATION ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 INSTRUCTIONS
EXAMINATION AREA         CATEGY      NDE                OUTAGE                        INSTRUCTIONS NUMBER     ZDENTZFZCATION           ITEM NO     METH   1 2 3 4 1   2 3 4   1 2 3 4 **CALIBRATIONBLOCK~ ~
**CALIBRATION BLOCK~~2.5" Dischargo 13D (REF.DWG.NO.7)126000 32-WD"099 B-J PT Branch B9.32 Connection-Thermowcll 3 X Examine 1008 of weld length+~N/AP~3.0" Discharge 13D (REF.DWG.NO.7)126200 32-WD-100-FB B-G-2 VT-1 Decon Flange Bolting B7.50 3 X Examine in place, when removed or when disassembled.
2.5" Dischargo 13D (REF. DWG. NO. 7) 126000   32-WD"099               B-J         PT                                           Examine 1008    of weld Branch                   B9.32                                                     length +~N/AP~
~~N/A~+28.0" Discharge 13D (REF.DWG.NO.7)126300 32-WD-101 Pipe-to-Pipe GL-A UT 88-01 X**PBR-1.109-1, PBR-1.260*126800 32-WD-102 Pipe-to-Gate Valve 32-382 GL-A UT 88 01 3 X~~PBR-1.109-1+*
3 X Connection-Thermowcll 3.0" Discharge 13D (REF. DWG. NO. 7) 126200     32-WD-100-FB             B-G-2       VT-1                                         Examine  in place,  when Decon Flange   Bolting   B7.50                                                     removed   or when 3 X disassembled. ~~N/A~+
126900 32-WD-102 Pipe-to-Gate Valve 32-382 B-J B9.11 3 X Terminal End, High Stress Weld, Limitation 588 CRV, Examine 1008 of wold length~~PBR-1.109-1**127000 32-WD-102-U Pipe-Long Seam B-J B9.12 3 X Code Case N-524+*PBR-I.109-1+*  
28.0" Discharge   13D (REF. DWG. NO. 7) 126300   32-WD-101                 GL-A        UT Pipe-to-Pipe             88-01                                                     **PBR-1. 109-1, PBR-1. 260*
X 126800   32-WD-102                 GL-A       UT                                             ~~PBR-1.109-1+*
Pipe-to-Gate Valve       88 01 32-382                                     3                            X 126900    32-WD-102                B-J                                                       Terminal End, High Pipe-to-Gate Valve        B9. 11                                                    Stress Weld, Limitation 3 X 32-382                                                                              588 CRV, Examine 1008     of wold length
                                                                                              ~~PBR-1. 109-1**
127000   32-WD-102-U               B-J                                                       Code Case N-524 Pipe-Long  Seam          B9. 12                                                    +*PBR-I . 109-1 +*
3 X


DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 INSERVZCE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XI SCHEDULED COMPONENTS PAGE: 107 tor Recirculation Discharge NUMBER: 32.0 INSPECTION INTERVAL PIAN STATUS PRESERVZCE YEAR  
DATE: 10/15/99                             NINE MILE POINT NUCLEAR PLANT UNIT 1                           PAGE: 107 REVISION:        0                          INSERVZCE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XI SCHEDULED COMPONENTS tor Recirculation Discharge NUMBER: 32.0 INSPECTION INTERVAL                       PIAN STATUS             PRESERVZCE YEAR ASME                FIRST        SECOND      THIRD SEC. XZ              PERIOD        PERIOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD SECOND PERIOD THIRD PERIOD OUTAGE 1 2 3 4 1 2 3 4 1 2 3 4 INSTRUCTIONS
EXAMINATION AREA         CATEGY      NDE                OUTAGE                          INSTRUCTIONS NUMBER     IDENTIFICATION           ITEM NO     METH   1 2 3 4   1   2 3 4   1 2 3 4 >>>>CALIBRATION BLOCK>>>>
>>>>CALIBRATION BLOCK>>>>2.0" Discharge 13D (REF.DWG.NO.7)127200 32-WD-104 B-J PT Pipe-to-Coupling B9.40 3 X Examine 100$of weld length>>>>N/A>>>>127400 32-WD-106 Pipe-to-Elbow B J PT B9.21 3 X Examine 100%of weld length>>>>N/A>>*127900 32-WD-111 Elbow-to-Pipe B-J PT B9.21 3 X Examine 100%of weld length**N/A**128200 32-WD-114 Pipe-to-Coupling B-J PT B9.40 3 X Examine 100%of weld length**N/A**28.0" Discharge 13D (REF.DWG.NO.7)128400 32-WD-115 Gate Valve 32-382-to-Pipe B"J UT B9.11 PT 3 X Terminal End, High Stross Wold, Examine 100%of weld length>>>>PSR-1.109-1*>>128500 32-WD-115-D Pipo-Long Scam B-J UT B9.12 PT 3 X Formerly LW-034, Codo Caso N-524*>>PSR-1.109-1*>>129000 32-WD-119 Pipe-to-Elbow B J B9.11 3 X<<<<P8R-1.109-1*>>129100 32-WD-119 Pipe-to-Elbow GL-A UT 88-01 3 X>>>>P8R-1.109-1)PSR-1.260<<>>129600 32-WD-120 Elbow-to-Pipo GL-A UT 88 01 3 X>>>>PSR-1.109-1, PSR-1.260>>*  
2.0" Discharge 13D (REF. DWG. NO. 7) 127200     32-WD-104                 B-J         PT                                           Examine 100$ of weld Pipe-to-Coupling         B9. 40                                                     length >>>>N/A>>>>
3                            X 127400     32-WD-106                 B  J        PT                                            Examine 100% of weld Pipe- to-Elbow           B9. 21                                                     length >>>>N/A>>*
3                            X 127900     32-WD-111                 B-J         PT                                           Examine 100%   of weld Elbow-to-Pipe            B9.21                                                      length **N/A**
3                            X 128200     32-WD-114               B-J         PT                                             Examine 100%   of weld Pipe-to-Coupling        B9. 40                                                      length **N/A**
3                            X 28.0" Discharge   13D (REF. DWG. NO. 7) 128400     32-WD-115                 B"J         UT                                             Terminal End, High Gate Valve                B9. 11       PT                                             Stross Wold, Examine 32-382-to-Pipe                              3 X 100% of weld length
                                                                                                >>>>PSR-1 . 109-1*>>
128500     32-WD-115-D               B-J         UT                                             Formerly LW-034, Codo Pipo-Long  Scam          B9. 12      PT                                            Caso N-524 3 X
                                                                                                *>>PSR-1. 109-1*>>
129000     32-WD-119                 B J                                                         <<<<P8R-1. 109-1*>>
Pipe-to-Elbow            B9. 11 3 X 129100     32-WD-119                 GL-A         UT                                               >>>>P8R-1. 109-1)
Pipe-to-Elbow            88-01                                                      PSR-1. 260<<>>
3 X 129600     32-WD-120                 GL-A         UT                                               >>>>PSR-1. 109-1, Elbow-to-Pipo            88 01                                                      PSR-1. 260>>*
3 X


DATE: 10/15/99 REVI S ZON: 0 NINE MILE POINT NUCLEAR PIANT UNIT 1 ZNSERVICE INSPECTION TEN-YEAR PIAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 108 tor Recirculation Discharge ZONE NUMBER: 32.0  
DATE: 10/15/99                             NINE MILE POINT NUCLEAR PIANT UNIT 1                         PAGE: 108 REVIS ZON:        0                        ZNSERVICE INSPECTION TEN-YEAR PIAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS tor Recirculation Discharge ZONE NUMBER:   32.0                                                                           PRESERVICE YEAR INSPECTION INTERVAL                    PZAN STATUS ASME                FIRST        SECOND      THIRD SEC. XZ              PERIOD        PERZOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD PZAN STATUS SECOND PERZOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR INSTRUCTIONS
EXAMINATION AREA         CATEGY    NDE                OUTAGE                          INSTRUCTIONS NUMBER       IDENTIFICATION           ITEM NO   METH     1 2 3 4   1   2 3 4   1 2 3 4 <<<<CAI,ZBRATION BLOCK>>>>
<<<<CAI,ZBRAT ION BLOCK>>>>130000 32-WD-121 B-J UT Pipe-to-Nozzle N2C B9~11 PT X Safe End Examine 100%of weld length>>*PBR-1.109-1**
130000     32-WD-121               B-J       UT                                             Examine 100%  of weld Pipe-to-Nozzle N2C     B9 11
130100 32-WD-121 Pipe-to"Nozzle N2C Safe End GL-A UT 88-01 3 X>><<PBR-1.109-1>>>>130200 32-WD"121-U Pipe-Long Soam B-J B9.12 3 X Code Case N-524<<*PER-1.109-1*>>
                                        ~       PT                                             length >>*PBR-1.109-1**
130300 32-WD-122 B F UT Group ROB,<<>>LATER>>>>N2C Safo End-to-Nozzlo B5~10 3 X 30400 32-WD"122 SIL N2C Safe End-to-Nozzle 455R1S1 3 X Group ROB, Inconcl 182 butter expansion from nozzle side of weld,<<<<LATER>>*130500 32 WD-122 GL-A UT N2C Safe End-to-Nozzle 88-01 X GrouP ROB**ZATER>>>>130600 32-WD-123 B D N2C Nozzle-to-Vessel B3.90 3 X Group ROB, 75.4%CRV**ZATER>>>>130700 32-WD"123-IR N2C Nozzle Innor Radius Section B D B3.100 3 X Group ROB, 82%CRV<<>>LATER*>>  
X Safe End 130100     32-WD-121               GL-A       UT                                             >><<PBR-1. 109-1>>>>
Pipe-to"Nozzle  N2C      88-01 3 X Safe End 130200     32-WD "121-U             B-J                                                       Code Case N-524 Pipe-Long Soam          B9.12                                                    <<*PER-1.109-1*>>
3 X 130300     32-WD-122               B F       UT                                             Group ROB, <<>>LATER>>>>
N2C Safo End-to-Nozzlo B5 10
                                        ~
3 X 30400     32-WD"122               SIL                                                       Group ROB, Inconcl 182 N2C Safe End-to-Nozzle 455R1S1                                                     butter expansion from 3 X nozzle side of weld,
                                                                                              <<<<LATER>>*
130500     32 WD-122               GL-A       UT                                             GrouP  ROB **ZATER>>>>
N2C Safe End-to-Nozzle 88-01 X
130600     32-WD-123               B D                                                       Group ROB, 75.4%  CRV N2C Nozzle-to-Vessel     B3.90                                                     **ZATER>>>>
3 X 130700     32-WD "123-IR           B D                                                       Group ROB,   82% CRV N2C  Nozzle Innor        B3.100                                                    <<>>LATER*>>
3 X Radius Section


DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XI SCHEDULED COMPONENTS PAGE: 109 tor Recirculation E NUMBER: 32.0 Discharge INSPECTION INTERVAL PLAN STATUS PRESERVZCE YEAR
DATE: 10/15/99                           NINE MILE POINT NUCLEAR PLANT UNIT 1                           PAGE: 109 REVISION:        0                        INSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XI SCHEDULED COMPONENTS tor Recirculation Discharge E NUMBER:   32.0                                                                         PRESERVZCE YEAR INSPECTION INTERVAL                     PLAN STATUS ASME                FIRST        SECOND      THIRD SEC. XI            PERIOD        PERIOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC.XI CATEGY NDE ITEM NO METH FIRST PERIOD SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 INSTRUCTIONS
EXAMINATION AREA         CATEGY    NDE                  OUTAGE                          INSTRUCTIONS NUMBER     IDENTIFICATION           ITEM NO   METH   1 2 3 4   1   2 3 4   1 2 3 4 +*CALIBRATIONBLOCK+ +
+*CALIBRATION BLOCK++3.0" Discharge 14D (REF.DWG.NO.7)131400 32-WD-142-FB 14D Dccon Flange Bolting B-G-2 B7.50 VT-1 3 X Examine in place, when removed or when disassembled
: 3. 0" Discharge 14D (REF. DWG. NO. 7) 131400   32-WD-142-FB             B-G-2       VT-1                                         Examine   in place, when 14D Dccon Flange        B7.50                                                    removed   or when 3 X                                    disassembled   *~N/A+~
*~N/A+~2.0" Discharge 14D (REF.DWG.NO.7)132300 32-WD-145 Coupling-to-Pipe B-J PT B9.40 3 X Examine 100%of weld length~~N/A~+133400 32-WD-156 Pipe-to-Coupling B-J B9.40 3 X Examine 1008 of weld length~~N/A+~28.0" Discharge 14D (REF.DWG.NO.7)00 32-WD-157 GL A UT Valve 32-383-to-Pipe 88-01 3 X~'~PSR-1.109-1*+134900 32-WD-163 Pipe-to-Nozzle N2D Safe End B J UT B9.11 PT 3 X Examine 100%of weld length~~PSR-1.109-1**
Bolting 2.0" Discharge 14D (REF. DWG. NO. 7) 132300   32-WD-145               B-J         PT                                           Examine 100%   of weld Coupling-to-Pipe        B9. 40                                                    length   ~~N/A~+
135100 32-WD-163-U Pipe-Long Seam B J UT B9.12 PT 3 X Code Case N-524++PER-1.109-1++
3              X 133400   32-WD-156               B-J                                                      Examine 1008    of weld Pipe-to-Coupling         B9.40                                                     length   ~~N/A+~
135200 32-WD-164 B F UT Group R09~+LATER'+N2D Safe End-to-Nozzle B5.10 X 135300 32-WD-164 SIL N2D Safe End-to-Nozzle 455R1S1 3 X Group R09, Inconcl 182 butter expansion from nozzle side of weld~~LATER~~  
3              X 28.0" Discharge 14D (REF. DWG. NO. 7) 00   32-WD-157               GL A       UT                                             ~'~PSR-1. 109-1*+
Valve 32-383-to-Pipe     88-01 3                           X 134900   32-WD-163               B  J        UT                                            Examine 100%    of weld Pipe-to-Nozzle N2D     B9. 11     PT                                           length   ~~PSR-1.109-1**
3              X Safe End 135100   32-WD-163-U             B  J        UT                                            Code Case N-524 Pipe-Long Seam         B9. 12     PT                                           ++PER-1.109-1++
3              X 135200   32-WD-164               B F         UT                                           Group R09 ~+LATER'+
N2D Safe End-to-Nozzle B5.10 X
135300   32-WD-164               SIL                                                       Group R09, Inconcl 182 N2D Safe End-to-Nozzle 455R1S1                                                   butter expansion from 3              X                        nozzle side of weld
                                                                                              ~ ~LATER~ ~


DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 ZNSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XI SCHEDULED COMPONENTS PAGE: 110 or Recirculation Discharge NUMBER: 32.0 ZNSPECTION INTERVAI PZAN STATUS PRESERVZCE YEAR  
DATE: 10/15/99                             NINE MILE POINT NUCLEAR PLANT UNIT 1                             PAGE: 110 REVISION:        0                          ZNSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XI SCHEDULED COMPONENTS or Recirculation Discharge NUMBER:   32.0 ZNSPECTION INTERVAI                     PZAN STATUS               PRESERVZCE YEAR ASME                FIRST        SECOND      THIRD SEC. XZ              PERIOD        PERIOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMZNATZON AREA NUMBER ZDENTZFICATION ASME SEC.XZ CATEGY NDE ZTEM NO METH FIRST PERIOD SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 INSTRUCTIONS
EXAMZNATZON AREA         CATEGY      NDE                  OUTAGE                            INSTRUCTIONS NUMBER     ZDENTZFICATION           ZTEM NO     METH       2 3             3                    ~+CALIBRATION BLOCK**
~+CALIBRATION BLOCK**135400 32-WD-164 GL-A Group R09,~+LATER~~N2D Safe End-to-Nozzle 88-01 3 X 135500 32-WD-165 B-D N2D Nozzle-to-Vessel B3.90 3 X Group R09, 75.4%CRV Limitation due to bottom" head taper of shell thickness**LATER**135600 32-WD-165-ZR N2D Nozzle Inner Radius Section B-D B3.100 3 X Group R09, 82%CRV Limitation duc to bottom head taper of shell thickness*~LATER*~28.0" Discharge 15D (REF.DWG.NO.7)0 32-WD-181 B-J UT Pump 15 B9.11 PT Discharge-to-Elbow 3 Terminal End, High Stress Weld, Examine 100%of weld length stPSR-1.109 lao 135900 32-WD-181-Dl Elbow-Long Scam B-J B9.12 3 X Formerly LW-OSS-A, Code Case N-524*aPSR 1.109 Zest 136000 32-WD-181-D2 Elbow-Long Scam ZR B-J UT B9.12 PT 3 Formerly LW-058-B, Code Case N-524**P8R-1.109-1*~3.0" Discharge 15D (REF.DWG.NO.7)136300 32-WD-184-FB 15D Decon Flange Bolting B"G-2 B7.50 VT 1 3 X Examine in place, when rcmcnrcd, or when disassembled
1        4   1   2     4   1 2 3 4 135400     32-WD-164               GL-A                                                         Group R09, ~+LATER~~
**N/A*~  
N2D Safe End-to-Nozzle 88-01 3             X 135500     32-WD-165               B-D                                                         Group R09, 75.4% CRV N2D Nozzle-to-Vessel     B3. 90                                                       Limitation due to bottom 3              X                        "
head taper of shell thickness **LATER**
135600     32-WD-165-ZR             B-D                                                         Group R09,   82% CRV N2D Nozzle Inner        B3. 100                                                      Limitation duc to bottom 3              X Radius Section                                                                        head taper of shell thickness   *~LATER*~
28.0" Discharge   15D (REF. DWG. NO. 7) 0   32-WD-181                 B-J         UT                                               Terminal End, High Pump 15                   B9. 11     PT                                               Stress Weld, Examine 3
Discharge-to-Elbow                                                                     100% of weld length stPSR-1.109 lao 135900     32-WD-181-Dl             B-J                                                         Formerly LW-OSS-A, Code Elbow-Long Scam          B9. 12                                                      Case N-524 3                            X            *aPSR 1. 109 Zest 136000     32-WD-181-D2             B-J         UT                                               Formerly LW-058-B, Code Elbow-Long Scam  ZR      B9. 12      PT                                              Case N-524 3
                                                                                                  **P8R-1. 109-1*~
3.0" Discharge 15D (REF. DWG. NO. 7) 136300     32-WD-184-FB             B"G-2       VT 1                                             Examine   in place, when 15D Decon Flange        B7.50                                                        rcmcnrcd, or when 3                            X Bolting                                                                                disassembled   **N/A*~


DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 INSERVZCE INSPECTION TEN YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 111 or Recirculation NUMBER: 32.0 Discharge INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR  
DATE: 10/15/99                             NINE MILE POINT NUCLEAR PLANT UNIT 1                         PAGE: 111 REVISION:        0                          INSERVZCE INSPECTION TEN YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS or Recirculation Discharge NUMBER:   32.0 INSPECTION INTERVAL                     PLAN STATUS             PRESERVICE YEAR ASME                FIRST        SECOND      THIRD SEC. XZ              PERIOD        PERIOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 ZNSTRUCTZONS
EXAMINATION AREA         CATEGY      NDE                OUTAGE                          ZNSTRUCTZONS NUMBER     IDENTIFICATION           ITEM NO     METH   1 2 3 4   1   2 3 4   1 2 3 4 *+CALIBRATION BLOCK**
*+CALIBRATION BLOCK**28.0" Discharge 15D (REF.DWG.NO.7)136700 32"WD-186 B-J UT PiPc-to-Valve 32-384 B9.11 PT 3 Terminal End, High Stress Weld, Examine 100%of weld length~~PER-1.109-1~~
28.0" Discharge 15D (REF. DWG. NO. 7) 136700     32 "WD-186               B-J         UT                                           Terminal End, High PiPc-to-Valve 32-384     B9. 11       PT                                           Stress Weld, Examine 3
136900 32"WD-186-U Pipe-Long Seam B-J B9.12 3 X Code Case N-524~~PSR-1.109-1~~2.0" Discharge 15D (REF.DWG.NO.7)137000 32-WD-187 B-J PT Coupling-to-Pipe B9.'40 3 X Examine 100%of weld length**N/A~*00 32-WD-193 B-J Valve 32-389-to-Pipe B9.21 3 X Examine 100%of weld length+*N/A+~137700 32-WD-194 Pipe-to-Elbow B-J B9.21 3 X Examine 100%of weld length*~N/A~~137800 32-WD-195 Elbow-to-Pipe B-J B9.21 3 X Examine 100%of weld length**N/A**14.0" Discharge 15D (REF.DWG.NO.7)139700 32-WD-204-MT ZNPO UT Mixing Tcc-Base Metal 5-85 3 X---X X--X 100%of base material, each RFO.~*PSR-2.055-1++  
100% of weld length
                                                                                                ~~PER-1.109-1~~
136900     32 "WD-186-U             B-J                                                       Code Case N-524 Pipe-Long  Seam          B9. 12                                                    ~~PSR-1. 109-1~~
3                            X 2.0" Discharge   15D (REF. DWG. NO. 7) 137000     32-WD-187                 B-J         PT                                           Examine 100%  of weld Coupling-to-Pipe         B9.'40                                                     length **N/A~*
3                            X 00   32-WD-193                 B-J                                                       Examine 100% of weld Valve 32-389-to-Pipe       B9.21                                                     length +*N/A+~
3                            X 137700     32-WD-194                 B-J                                                        Examine 100% of weld Pipe-to-Elbow             B9. 21                                                     length *~N/A~~
3                            X 137800   32-WD-195                 B-J                                                        Examine 100%  of weld Elbow-to-Pipe             B9.21                                                     length **N/A**
3                            X 14.0" Discharge   15D (REF. DWG. NO. 7) 139700   32-WD-204-MT               ZNPO       UT                                             100% of base material, Mixing Tcc-Base Metal     5-85                                                       each RFO.
3 X   - - -   X   X - -   X         ~*PSR-2. 055-1 + +


DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 INSERVICE ZNSPECTZON TEN-YEAR PLAN CLASS 1 SECTION XI SCHEDULED COMPONENTS PAGE: 112 tor Recirculation Discharge ZONE NUMBER: 32.0  
DATE: 10/15/99                             NINE MILE POINT NUCLEAR PLANT UNIT 1                           PAGE: 112 REVISION:        0                          INSERVICE ZNSPECTZON TEN-YEAR PLAN CLASS 1 SECTION XI SCHEDULED COMPONENTS tor Recirculation Discharge ZONE NUMBER:   32.0                                                                           PRESERVICE YEAR INSPECTION INTERVAL                      PLAN STATUS ASME                PIRST        SECOND      THIRD SEC. XZ              PERIOD        PERZOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL ASME SEC.XZ CATEGY NDE ITEM NO METH PIRST PERIOD PLAN STATUS SECOND PERZOD THIRD PERIOD OUTAGE 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR INSTRUCTIONS
EXAMINATION AREA         CATEGY      NDE                  OUTAGE                        INSTRUCTIONS NUMBER     IDENTIFICATION           ITEM NO     METH   1 2 3 4   1   2 3 4   1 2 3 4 ~*CALIBRATION BLOCK+~
~*CALIBRATION BLOCK+~28.0" Discharge 15D (REF.DWG.NO.7)141400 32-WD-207 Pipo-to-Nozzle N2E Safe End B-J B9.11 3 X Examine 100%of weld length+*P8R-1.655/1.150-1**141500 32-WD-207"U Pipe-Long Weld B-J B9.12 3 X former LW-064, Code Case N-524~~PSR-I.I09-1+~
28.0" Discharge 15D (REF. DWG. NO. 7) 141400     32-WD-207               B-J                                                        Examine 100%    of weld Pipo-to-Nozzle N2E     B9. 11                                                     length 3                             X Safe End                                                                            + *P8R-1 . 655/1 . 150-1**
141600 32-WD-208 B-F UT N2E Safe End-to-Nozzle B5.10 PT 3 Group R10++LATER~+141700 32-WD"208 SIL t N2E Safe End-to-Nozzle 455R1S1 3 Group R10, Znconel 182 buttor expansion from nozzle sido of weld*+LATER**141800 32 WD-208 N2E Safe End-to-Nozzle 88-01 3 X Group R10,~*LATER~~141900 32-WD 209 B"D N2E Nozzlo-to-Vessel B3.90 3 X Group R10, 74.5%CRV Limitation duc to bottom head taper of shell thickness.
141500     32-WD-207 "U             B-J                                                       former LW-064, Code Case Pipe-Long Weld          B9.12                                                      N-524 ~~PSR-I.I09-1+~
*+IATER**142000 32-WD-209-IR N2E Nozzle Inner Radius Section B-D B3.100 3 X Group R10, 82%CRV Limitation due to bottom head taper of shell thickness.
3                            X 141600     32-WD-208               B-F         UT                                           Group R10 ++LATER~+
*+LATER~*  
N2E Safe End-to-Nozzle B5.10         PT 3
t 141700     32-WD "208               SIL                                                       Group R10, Znconel 182 N2E Safe End-to-Nozzle 455R1S1                                                     buttor expansion from 3
nozzle sido of weld
                                                                                                *+LATER**
141800   32 WD-208                                                                           Group R10, ~*LATER~~
N2E Safe End-to-Nozzle 88-01 3                             X 141900   32-WD 209                 B"D                                                       Group R10, 74.5% CRV N2E Nozzlo-to-Vessel     B3. 90                                                     Limitation duc to bottom 3                            X          head taper of shell thickness. *+IATER**
142000   32-WD-209-IR             B-D                                                       Group R10,     82% CRV N2E  Nozzle Inner        B3. 100                                                    Limitation     due to bottom 3                            X Radius Section                                                                      head taper     of shell thickness.     *+LATER~*


DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 ZNSERVZCE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 113 tor Recirculation Pump NUMBER: 32.0  
DATE: 10/15/99                               NINE MILE POINT NUCLEAR PLANT UNIT 1                           PAGE: 113 REVISION:        0                            ZNSERVZCE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS tor Recirculation   Pump NUMBER:   32.0 INSPECTION INTERVAL                      PLAN STATUS            PRESERVICE YEAR ASME                  FIRST        SECOND      THIRD SEC. XI            PERIOD        PERIOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL ASME SEC.XI CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR INSTRUCTIONS
EXAMINATION AREA           CATEGY      NDE                OUTAGE                          INSTRUCTIONS NUMBER     IDENTIFICATION             ITEM NO     METH   1 2 3 4   1   2 3 4   1 2 3 4 **CALIBRATIONBLOCK e 32-187 (REF. DWG. NO. 7A) 142900   32-187                     F-A         VT 3                                           Code Case N-491-1 Pump 11  Support          Fl . 40                                                      *~N/A~~
**CALIBRATION BLOCK e 32-187 (REF.DWG.NO.7A)142900 32-187 F-A VT 3 Pump 11 Support Fl.40 3 X Code Case N-491-1*~N/A~~143000 32-187-PBB B-G-l VT-1 Pump 11 Busihings (1 B6.200 thru 16)3 X One pump in a group of pumps, only when disassembled.
3            X 143000   32-187-PBB                 B-G-l       VT-1                                           One pump in a group    of Pump 11   Busihings (1     B6.200                                                     pumps, only when 3              X thru  16)                                                                              disassembled.   ~~N/A~~
~~N/A~~143100 32-187-PBN B G-l VT-1 Pump 11 Nuts, (1 thru B6~200 16)3 X Liad.tcd to pump selected under B-L-2, One pump in a group of pumps++N/A++143200 32-187-PBS B-G-1 UT Pump 11 Flange Studs B6.180 (1 thru 16)3 X Limited to pump selected under B-L-2, Onc pump in a group of pumps.++NMP1 2.75-RCP-STUD**
143100     32-187-PBN                 B G-l       VT-1                                           Liad.tcd to pump selected Pump 11   Nuts, (1 thru   B6 ~ 200                                                   under B-L-2, One pump in 3              X
143300 32-187-PBW Pump 11 Washcrs (1 thru 16)B-G-1 B6.200 3 X Limited to pump sclcctcd under B-L-2, One pump among a group of pumps k*N/A%4 143400 32-187-PBY Pump 11 Interior Surface B-L-2 B12.20 VT 3 3 X When disasscmblcd, one pump among a group of pumps~*N/A~*143500 32-187-PFS B-G-1 VT-1 Pump 11 Flange Surface B6.190 3 X Limited to pump selected under B-L-2, Examine 1 in.annular surface oi flange surrounding each stud~*N/A+~  
: 16)                                                                                    a group of pumps ++N/A++
143200   32-187-PBS                 B-G-1       UT                                             Limited to pump selected Pump 11   Flange Studs     B6.180                                                     under B-L-2, Onc pump in 3              X (1  thru  16)                                                                          a group   of pumps.
                                                                                                  ++NMP1   2.75-RCP-STUD**
143300   32-187-PBW                 B-G-1                                                       Limited to   pump sclcctcd Pump 11 Washcrs    (1      B6.200                                                      under B-L-2, One pump 3              X thru 16)                                                                                among a group of pumps k*N/A%4 143400   32-187-PBY                 B-L-2       VT 3                                           When disasscmblcd, one Pump 11    Interior        B12. 20                                                    pump among a group of 3              X Surface                                                                                pumps ~*N/A~*
143500   32-187-PFS                 B-G-1       VT-1                                           Limited to    pump selected Pump 11 Flange Surface B6.190                                                           under B-L-2, Examine     1 3              X in. annular surface oi flange surrounding each stud ~*N/A+~


DATE: 10/15/99 REVI S ZON: 0 NINE MZLE POINT NUCLEAR PZANT UNIT 1 INSERVZCE INSPECTION TEN-YEAR PIAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 114 tor Recirculation Pump NUMBER: 32.0  
DATE: 10/15/99                           NINE MZLE POINT NUCLEAR PZANT UNIT 1                         PAGE: 114 REVIS ZON:        0                        INSERVZCE INSPECTION TEN-YEAR PIAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS tor Recirculation     Pump NUMBER:   32.0 INSPECTION INTERVAL                    PLAN STATUS            PRESERVICE YEAR ASME                PIRST        SECOND      THIRD SEC. XZ              PERIOD      PERIOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL ASME SEC.XZ CATEGY NDE ITEM NO METH PIRST PERIOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR INSTRUCTIONS
**CALIBRATION BLOCK~+143700 32-187-SHB B-G-2 VT-1 Pump 11 Seal Housing B7.60 Bolting (I thru 16)P01, Limited to pump selected under B-L-2, one pump among group of pumps.~~N/A*~


DATE: 10/15/99 REVISION: 0 NZNE MILE POINT NUCLEAR PLANT UNIT 1 INSERVZCE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 115 tor Recirculation Pump 15 NUMBER: 32.0 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR  
NUMBER EXAMINATION AREA        CATEGY    NDE                OUTAGE                        INSTRUCTIONS IDENTIFICATION          ITEM NO    METH    1  2  3  4  1  2  3  4  1  2  3  4 **CALIBRATIONBLOCK~+
143700      32-187-SHB              B-G-2      VT-1                                          P01, Limited to pump Pump 11 Seal Housing    B7.60                                                    selected under B-L-2, Bolting (I thru 16)                                                              one pump among group  of pumps. ~~N/A*~
 
DATE: 10/15/99                             NZNE MILE POINT NUCLEAR PLANT UNIT 1                       PAGE: 115 REVISION:        0                          INSERVZCE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS tor Recirculation   Pump 15 NUMBER:   32. 0 INSPECTION INTERVAL                     PLAN STATUS           PRESERVICE YEAR ASME                FIRST        SECOND      THIRD SEC. XI            PERIOD      PERIOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC.XI CATEGY NDE ITEM NO METH FIRST PERIOD THIRD PERIOD SECOND PERIOD OUTAGE 1 2 3 4 1 2 3 4 1 2 3 4 INSTRUCTIONS
*iCALIBRATION BLOCK+32-191 (REF.DWG.NO.7)148900 32-15-H1 Spring Hanger F A F1.40 3 X Code Case N-491-1**N/A*i


DATE: 10/15/99 REVISZON: 0 NINE MILE POINT NUCLEAR PIANT UNZT 1 INSERVICE INSPECTION TEN YEAR PLAN CLASS 1 SECTION XI SCHEDULED COMPONENTS PAGE: 116 or Recirculation NUMBER: 32.0 Suction INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR  
NUMBER EXAMINATION AREA          CATEGY    NDE                OUTAGE                        INSTRUCTIONS IDENTIFICATION            ITEM NO    METH    1  2  3  4  1  2  3  4  1  2  3  4 *iCALIBRATIONBLOCK+
32-191 (REF. DWG. NO. 7) 148900    32-15-H1                  F A                                                      Code Case N-491-1 Spring Hanger            F1. 40                                                    **N/A*i 3              X
 
DATE: 10/15/99                           NINE MILE POINT NUCLEAR PIANT UNZT 1                         PAGE: 116 REVISZON:        0                        INSERVICE INSPECTION TEN YEAR PLAN CLASS 1 SECTION XI SCHEDULED COMPONENTS or Recirculation Suction NUMBER:   32. 0 INSPECTION INTERVAL                     PLAN STATUS           PRESERVICE YEAR ASME                FIRST        SECOND      THIRD SEC. XZ              PERZOD        PERIOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERZOD SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 INSTRUCTIONS i~CALIBRATION BLOCK~~28.0" Suction 11S (REF.DWG.NO.7)151000 32-11-H3A Spring Hanger F-A Fl.10 VT-3 3 X Code Case N-491-1*AN/A**151100 32-11-H3B Spring Hanger F A F1.10 VT-3 3 X Code Case N-491-1 eaN/A*a 28.0" Suction 12S (REF.DWG.NO.7)151300 32-12-H3-WD-001 B-K PT Integral Welded Lug B10.20 3 X (32-12-H-3-A), Code Case N"509*~N/A~~151400 32-12-H3-WD-002 B-K PT Integral Welded Lug B10.20 3 X (32-12-H-3-A), Code Case N-509**N/A~*1 1500 32-12-H3-WD-003 B"K Integral Welded Lug B10.20 3 X (32-12-H-3-B), Code Case N-509**N/A~*151600 32-12-H3-WD-004 B-K Integral Wcldcd Lug B10.20 3 X (32-12-H-3-B), Code Case N-509~+N/A~*28.0" Suction 14S (REF.DWG.NO.7)153100 32-14-H3A Spring Hanger F A F1.10 3 X Code Case N-491-1 1 O'/A1 t 153200 32-14-H3B Spring Hanger F-A Fl.10 3 X Code Case N-491-1**'N/A**  
EXAMINATION AREA       CATEGY      NDE                OUTAGE                        INSTRUCTIONS NUMBER     IDENTIFICATION         ITEM NO     METH   1 2 3 4   1   2 3 4   1 2 3 4 i~CALIBRATION BLOCK~~
28.0" Suction 11S (REF. DWG. NO. 7) 151000     32-11-H3A               F-A         VT-3                                           Code Case N-491-1 Spring Hanger          Fl. 10                                                    *AN/A**
3              X 151100     32-11-H3B               F A         VT-3                                           Code Case N-491-1 Spring Hanger          F1.10                                                      eaN/A*a 3              X 28.0" Suction 12S (REF. DWG. NO. 7) 151300     32-12-H3-WD-001         B-K         PT                                           (32-12-H-3-A), Code Case Integral Welded Lug    B10.20                                                    N"509 *~N/A~~
3                            X 151400     32-12-H3-WD-002         B-K         PT                                             (32-12-H-3-A), Code Case Integral Welded Lug    B10.20                                                    N-509 **N/A~*
3                            X 1 1500   32-12-H3-WD-003         B"K                                                       (32-12-H-3-B), Code Case Integral Welded Lug    B10.20                                                    N-509 **N/A~*
3                            X 151600     32-12-H3-WD-004         B-K                                                       (32-12-H-3-B), Code Case Integral Wcldcd Lug    B10.20                                                    N-509 ~+N/A~*
3                            X 28.0" Suction 14S (REF. DWG. NO. 7) 153100     32-14-H3A               F A                                                       Code Case N-491-1 Spring Hanger          F1.10                                                      1 O'/A1 t 3                            X 153200   32-14-H3B               F-A                                                       Code Case N-491-1 Spring Hanger            Fl. 10                                                    **'N/A**
3                            X


DATE: 10/15/99 REVISION: 0 NINE HILE POZNT NUCLEAR PIANT UNIT 1 ZNSERVZCE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 117 tor Recirculation Suction ZONE NUHBER: 32.0 SUHHARY EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL ASHE SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR INSTRUCTIONS
DATE: 10/15/99                               NINE HILE POZNT NUCLEAR PIANT UNIT 1                         PAGE: 117 REVISION:        0                            ZNSERVZCE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS tor Recirculation Suction ZONE NUHBER:   32.0           INSPECTION INTERVAL                                               PRESERVICE YEAR PLAN STATUS ASHE                 FIRST        SECOND      THIRD SEC. XZ               PERIOD        PERIOD      PERIOD SUHHARY    EXAMINATION AREA          CATEGY       NDE                 OUTAGE                          INSTRUCTIONS NUMBER      IDENTIFICATION          ITEM NO     METH   1 2 3 4   1   2 3 4   1 2 3 4 >>*CAZ,IBRATZON BLOCK>>>>
>>*CAZ,IBRATZON BLOCK>>>>28.0" Suction 11S (REF.DWG.NO.7)155600 32-375-VB Gate Valve 32-375 Bolting B-G-2 B7.70 3 V06, Limited to valve selected under B-M-2 X>>>>N/A>>*155700 32-375-VBY Gate Valve 32-375 Interior Surface B"H-2 VT-3 B12.50 3 X V06,Only whe'n disassembled, one valvo among group of valves>>*N/A>>>>28.0" Suction 12S (REP.DWG.NO.7)156800 32-SB"3A Sway Brace P-A F1.10 VT-3 3-------X Code Case N-491-1*>>N/A>>>>6900 32-SB-3B Sway Brace F-A F1.10 3 Code Case N-491-1>>>>N/A*>>28.0" Suction 13S (REF.DWG.NO.7)157000 32-SB-5A sway Brace F-A Fl.10 VT-3 3 X Code Case N-491"1>>>>N/A>>*157100 32-SB-5B Sway Brace P-A Fl.10 VT 3 3 X Code Case N-491-1*>>N/A>>>>28.0" Suction 11S (REP.DWG.NO.7)157600 32-WD-001 B D AUT N1A Nozzle-to-Vessel B3.90 3 X Group R01, 65%CRV Limitation duc to lug, ad)acent nozzle and Bioshicld>>>>LATER>>>>  
28.0" Suction 11S (REF. DWG. NO. 7) 155600     32-375-VB               B-G-2                                                       V06, Limited to valve Gate Valve 32-375        B7.70                                                      selected under B-M-2 3            X                         >>>>N/A>>*
Bolting 155700     32-375-VBY               B"H-2       VT-3                                           V06,Only whe'n Gate Valve 32-375        B12.50                                                      disassembled, one valvo 3            X Interior  Surface                                                                    among group of valves
                                                                                                >>*N/A>>>>
28.0" Suction 12S (REP. DWG. NO. 7) 156800     32-SB"3A                 P-A         VT-3                                           Code Case N-491-1 Sway Brace              F1. 10                                                      *>>N/A>>>>
3    - - -    - - - -      X 6900     32-SB-3B                 F-A                                                         Code Case N-491-1 Sway Brace                F1.10                                                      >>>>N/A*>>
3 28.0" Suction 13S (REF. DWG. NO. 7) 157000   32-SB-5A                 F-A         VT-3                                           Code Case N-491"1 sway Brace                Fl . 10                                                    >>>>N/A>>*
3 X 157100   32-SB-5B                 P-A         VT 3                                           Code Case N-491-1 Sway Brace                Fl. 10                                                      *>>N/A>>>>
3 X 28.0" Suction 11S (REP. DWG. NO. 7) 157600   32-WD-001               B D           AUT                                           Group R01,  65% CRV N1A Nozzle-to-Vessel   B3. 90                                                       Limitation duc to lug, 3              X ad)acent nozzle and Bioshicld >>>>LATER>>>>


DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNZT 1 ZNSERVICE INSPECTION TEN-YEAR PLAN CIASS 1 SECTION XI SCHEDULED COMPONENTS PAGE: 118 tor Recirculation Suction NUMBER: 32.0 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR  
DATE: 10/15/99                             NINE MILE POINT NUCLEAR PLANT UNZT 1                             PAGE: 118 REVISION:        0                          ZNSERVICE INSPECTION TEN-YEAR PLAN CIASS 1 SECTION XI SCHEDULED COMPONENTS tor Recirculation Suction NUMBER:   32.0 INSPECTION INTERVAL                     PLAN STATUS             PRESERVICE YEAR ASME                FIRST        SECOND        THZRD SEC. XZ              PERIOD        PERIOD        PERZOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD SECOND PERIOD OUTAGE THZRD PERZOD 1 2 3 4 1 2 3 4 1 2 3 4 INSTRUCTIONS
**CALIBRATION BLOCK*~157700 32-WD-001-IR N1A Nozzle Inner Radius Section B-D B3.100 3 X Group R01, 73%CRV Limitation due to lug, ad)accnt nozzle and Bioshield~iLATER~i 157800 32-WD-002 GL-A UT Group R01+*LATER*~N1A Nozzle-to-Safe End 88-01 3 X 157900 32-WD-002 SIL N1A Nozzle-to-Safe End 455R1S1 X Group R01, Inconcl 182 butter expansion from nozzle side of weld**LATER~*158000 32-WD"002 N1A Nozzle-to-Safe End B5.10 3 X Group R01**LATER~~158200 32 WD-003 Nozzle N1A Safe End-to-Elbow B J B9.11 3 X++PSR 1.2++158300 32-WD-003-Dl Elbow-OR Long Scam B9.12 PT 3 X formerly LW-001-A, Coda Case N-524**PSR-1.2~~
158400 32-WD-003-D2 B-J UT Elbow-IR Long Scam B9.12 PT 3 X formerly LW-001-B, Code Case N-524**PSR 1.2++159400 32 WD 004A-MT ZNPO UT Mixing Tee-Base Metal 5-85 Exams 12.0" Suction 11S (REF.DWG.NO.7)3 X---X X--X UT Only, every rcfucling outage, 100%asc Material+~PSR-2.055-1**


DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNZT 1 INSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 119 tor Recirculation NUMBER: 32.0 Suction INSPECTION INTERVAL PLAN STATUS PRESERVZCE YEAR  
NUMBER EXAMINATION AREA          CATEGY    NDE                  OUTAGE                          INSTRUCTIONS IDENTIFICATION            ITEM NO    METH    1  2  3  4  1  2  3 4    1  2  3  4  **CALIBRATIONBLOCK*~
157700    32-WD-001-IR              B-D                                                        Group R01,  73% CRV N1A Nozzle Inner          B3. 100                                                    Limitation  due to lug, 3              X Radius Section                                                                        ad)accnt nozzle and Bioshield  ~iLATER~i 157800    32-WD-002                  GL-A      UT                                              Group R01 +*LATER*~
N1A  Nozzle-to-Safe End 88-01 3              X 157900    32-WD-002                  SIL                                                        Group R01, Inconcl 182 N1A  Nozzle-to-Safe End    455R1S1                                                    butter expansion from X
nozzle side of weld
                                                                                                  **LATER~*
158000      32-WD"002                                                                            Group R01 **LATER~~
N1A  Nozzle-to-Safe End B5.10 3              X 158200    32 WD-003                  B  J                                                          ++PSR  1.2++
Nozzle N1A Safe            B9. 11 End-to-Elbow                                3              X 158300    32-WD-003-Dl                                                                          formerly LW-001-A,    Coda Elbow-OR Long Scam        B9.12      PT                                              Case N-524 **PSR-1.2~~
3              X 158400    32-WD-003-D2              B-J        UT                                              formerly LW-001-B, Code Elbow-IR Long  Scam      B9. 12      PT                                              Case N-524 **PSR 1.2++
3              X 12.0" Suction  11S  (REF. DWG. NO. 7) 159400    32  WD 004A-MT            ZNPO      UT                                              UT  Only, every rcfucling Mixing Tee -Base Metal 5-85                                                            outage, 100% asc Exams                                        3 X  - - -    X  X  - -    X Material +~PSR-2.055-1**
 
DATE: 10/15/99                             NINE MILE POINT NUCLEAR PLANT UNZT 1                         PAGE: 119 REVISION:        0                          INSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS tor Recirculation Suction NUMBER:   32. 0 INSPECTION INTERVAL                     PLAN STATUS           PRESERVZCE YEAR ASME                FIRST        SECOND      THIRD SEC. XI            PERZOD        PERIOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC.XI CATEGY NDE ITEM NO METH FIRST PERZOD SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 ZNSTRUCTIONS
EXAMINATION AREA         CATEGY      NDE                OUTAGE                          ZNSTRUCTIONS NUMBER     IDENTIFICATION           ITEM NO     METH   1 2 3 4   1   2 3 4   1 2 3 4 +~CALIBRATION BLOCK~~
+~CALIBRATION BLOCK~~28.0" Suction 11S (REF.DWG.NO.7)160800 32-WD-007 Branch Connection B-J UT B9.31 PT 3 X Examine 100%of weld length.~~PSR-1.2~~
28.0" Suction 11S (REF. DWG. NO. 7) 160800   32-WD-007                 B-J         UT                                           Examine 100% of weld Branch Connection        B9.31        PT                                            length. ~~PSR-1.2~~
161800 32-WD-009 Pipe-Valve 32-375 B J B9.11 PT 3 X Terminal End, High Stress Weld, Examine 100%of weld length.*+LATER**161900 32-WD-009-U Pipe-Long Seam B-J UT B9.12 PT 3 X Formerly LW-004, Code Case N-524*~LATER**3.0" Suction 11S (REF.DWG.NO.7)00 32-WD-011-FB B-G 2 11S Decon Flange B7.50 Bolting X Examine in place, when removed, or disassembled.
3              X 161800     32-WD-009                 B  J                                                      Terminal End, High Pipe-Valve 32-375         B9.11       PT                                           Stress Weld, Examine 3              X                        100% of weld length.
~+N/A++28.0" Suction 11S (REF.DWG.NO.7)162500 32-WD-012 Pipe-to-Elbow B-J UT B9.11 PT 3 X Examine 100%of weld length.+~P8R-1.2**
                                                                                                *+LATER**
162700 32-WD-012"Dl Elbow-Long Scam OR B9.12 PT 3 X Code Case N-524~~PSR-I.2~~
161900     32-WD-009-U               B-J         UT                                             Formerly LW-004,   Code Pipe-Long  Seam          B9. 12      PT                                            Case N-524 *~LATER**
162800 32-WD-012-D2 Elbow-Long Seam IR B9.12 PT 3 X Code Case N-524~+PSR-1.2~~
3              X 3.0" Suction   11S (REF. DWG. NO. 7) 00   32-WD-011-FB             B-G 2                                                     Examine  in place,  when 11S Decon Flange         B7.50                                                     removed, or Bolting                                                                  X disassembled. ~+N/A++
162900 32-WD-012-U Pipe-Long Seam B-J UT B9.12 PT 3 X Code Case N-524**PSR-1.2**  
: 28. 0" Suction 11S (REF. DWG. NO. 7) 162500     32-WD-012                 B-J        UT                                            Examine 100%  of weld Pipe-to-Elbow             B9. 11     PT                                             length. +~P8R-1.2**
3              X 162700   32-WD-012"Dl                                                                         Code Case N-524 Elbow-Long Scam   OR     B9.12       PT                                             ~~PSR-I.2~~
3              X 162800   32-WD-012-D2                                                                         Code Case N-524 Elbow-Long Seam IR         B9.12       PT                                             ~+PSR-1.2~~
3              X 162900   32-WD-012-U               B-J         UT                                             Code Case N-524 Pipe-Long  Seam          B9. 12      PT                                            **PSR-1. 2**
3              X


DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PIANT UNIT 1 INSERVZCE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 120 tor Recirculation Suction NUHBER: 32.0 INSPECTZON INTERVAL PLAN STATUS PRESERVZCE YEAR SUHHARY EXAMINATION AREA NUHBER IDENTIFICATION ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 INSTRUCTIONS
DATE: 10/15/99                             NINE MILE POINT NUCLEAR PIANT UNIT 1                           PAGE: 120 REVISION:        0                            INSERVZCE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS tor Recirculation Suction NUHBER: 32.0 INSPECTZON INTERVAL                     PLAN STATUS             PRESERVZCE YEAR ASME                 FIRST        SECOND        THIRD SEC. XZ               PERIOD      PERIOD        PERIOD SUHHARY    EXAMINATION AREA        CATEGY       NDE               OUTAGE                          INSTRUCTIONS NUHBER      IDENTIFICATION            ITEM NO     METH   1 2 3 4 1   2 3 4   1 2 3 4 ~ ~CALIBRATION BLOCK~ ~
~~CALIBRATION BLOCK~~163100 32-WD-015 Elbow-to-Elbow B-J B9.11 3 X Examine 100%of weld length.+~PSR-1.2**
163100     32-WD-015                 B-J                                                        Examine 100% of weld Elbow-to-Elbow           B9. 11                                                     length. +~PSR-1.2**
163500 32-WD-015-Ul B-J UT Elbow>>Long Seam OR B9.12 PT 3 X Formally LW-006-A, Code Casa N-524.~*PSR-1.2~*
3            X 163500     32-WD-015-Ul             B-J         UT                                             Formally LW-006-A,  Code Elbow>>Long Seam OR       B9.12       PT                                             Casa N-524. ~*PSR-1.2~*
163600 32-WD-015-U2 Elbow-Long Scam IR B-J UT B9.12 PT 3 X Formally LW-006-B, Coda Case N-524~+PSR-1.2~*
3            X 163600     32-WD-015-U2             B-J         UT                                             Formally LW-006-B, Coda Elbow-Long Scam IR      B9.12        PT                                            Case N-524 ~+PSR-1.2~*
28.0" Suction 12S (REF.DWG.NO.7)163700 32-WD-044 B-D UT N1B Nozzle-to-Vessel B3.90 3 X Group R02, 65%CRV Limitation duc to Bioshield~+LATER**00 32-WD"044-ZR N1B Nozzle Inner Radius Section B D B3.100 3 X Group R02, 73%CRV Limitation duo to Bioshield**NHP1-GE-7875~~
3            X 28.0" Suction 12S (REF. DWG. NO. 7) 163700     32-WD-044               B-D         UT                                             Group R02,  65% CRV N1B Nozzle-to-Vessel     B3.90                                                       Limitation duc to 3                            X          Bioshield ~+LATER**
163900 32-WD-045 SZL N1B Nozzle-to-Safe End 455R1S1 3 X Group R02, Inconcl 1S2 butter expansion from nozzle side i*LATER*~164000 32-WD-045 N1B Nozzle-to-Safe End B5.10 PT 3 X Group R02, i+LATER++164100 32"WD-045 GL-A UT Group R02,**LATER~*N1B Nozzle-to-Safe End 88-01 3 X 164200 32"WD-046 Nozzle N1B Safe End-to-Elbow B-J B9.11 3 X Examine 100%of weld length,**PSR-1.2~*  
00   32-WD"044-ZR             B D                                                         Group R02,   73% CRV N1B  Nozzle Inner        B3. 100                                                    Limitation   duo to Radius Section                              3                            X          Bioshield
                                                                                                **NHP1-GE-7875~~
163900     32-WD-045                 SZL                                                         Group R02, Inconcl 1S2 N1B Nozzle-to-Safe End   455R1S1                                                     butter expansion from 3                            X nozzle side i*LATER*~
164000     32-WD-045                                                                             Group R02, i+LATER++
N1B Nozzle-to-Safe End B5.10         PT 3                           X 164100     32"WD-045                 GL-A         UT                                             Group R02, **LATER~*
N1B Nozzle-to-Safe End 88-01 3                           X 164200     32"WD-046                 B-J                                                         Examine 100%   of weld Nozzle N1B Safe          B9.11                                                      length, **PSR-1.2~*
3                            X End-to-Elbow


DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PIANT UNIT 1 ZNSERVICE INSPECTION TEN YEAR PLAN CLASS 1 SECTION XI SCHEDULED COMPONENTS PAGE: 121 tor Recirculation E NUMBER: 32.0 Suction INSPECTION ZNTERVAL PLAN STATUS PRESERVZCE YEAR
DATE: 10/15/99                           NINE MILE POINT NUCLEAR PIANT UNIT 1                         PAGE: 121 REVISION:        0                          ZNSERVICE INSPECTION TEN YEAR PLAN CLASS 1 SECTION XI SCHEDULED COMPONENTS tor Recirculation Suction E NUMBER: 32.0                                                                           PRESERVZCE YEAR INSPECTION ZNTERVAL                     PLAN STATUS ASME                FIRST        SECOND      THIRD SEC. XI            PERIOD        PERIOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER ZDENTIFZCATION ASME SEC.XI CATEGY NDE ITEM NO METH FIRST PERIOD SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 INSTRUCTIONS
EXAMINATION AREA         CATEGY      NDE                  OUTAGE                        INSTRUCTIONS NUMBER     ZDENTIFZCATION         ITEM NO   METH     1 2 3 4   1   2   3 4   1 2 3 4 ~+CALIBRATION BLOCK++
~+CALIBRATION BLOCK++164300 32-WD-046 Nozzle N1B Safe End-to-Elbow N/A N/A 3 X---X---X IWB-2420 (b)Exaad.nc flaw growth area next 3 periods.~*PSR-1.2+~
164300   32-WD-046               N/A                                                       IWB-2420 (b) Exaad.nc flaw Nozzle N1B Safe        N/A                                                        growth area next 3 3 X  - - -    X  - - -    X          periods. ~*PSR-1.2+~
164400 32-WD-046 Nozzle N1B Safe End-to-Elbow GL F UT 88-01 3 X---X X--X Examine each refueling outage flaw growth.**P8R-1.260++164500 32-WD-046-Dl B-J UT Elbow-Long Seam OR B9.12 3 X Code Case N-524++PSR-1.260*~
End-to-Elbow 164400   32-WD-046               GL F        UT                                            Examine each  refueling Nozzle N1B Safe         88-01                                                     outage flaw growth.
164600 32-WD-046-D2 B-J UT Elbow-Long Scam ZR B9.12 PT 3 Coda Case N-524**PSR-1.260+*
3 X - - -     X   X   - -   X         **P8R-1. 260++
00 32-WD-049 B-J UT Pipe-to-Gate Valve.B9.11 PT 3 32-376 X Terminal End, High Stress Weld, Examine 100%of weld length*+PSR-1.2+~
End-to-Elbow 164500   32-WD-046-Dl           B-J         UT                                             Code Case N-524 Elbow-Long Seam OR     B9. 12                                                     ++PSR-1.260*~
165700 32-WD-049-U Pipe-Long Scam B J UT B9.12 PT 3 X Code Case N-524++PSR-1.2++
3                            X 164600   32-WD-046-D2           B-J         UT                                             Coda Case N-524 Elbow-Long Scam ZR     B9.12       PT                                             **PSR-1.260+*
165800 32-WD-050 Gate Valve 32-376-to-Pipe B-J B9.11 3 X Tarad.nal End, Limitation 58%CRV,~~PSR-1.2~~
3 00   32-WD-049               B- J       UT                                             Terminal End, High Pipe-to-Gate Valve   . B9. 11     PT                                             Stress Weld, Examine 3                            X          100% of weld length 32-376
165900 32-WD-050 Gate Valve 32-376-to-Pipe N/A N/A 3 X---X---X Re-cxaminc pcr IWB-2420 (b)Flaw growth area next 3 periods, acceptable USNRC TAC No.MA5696..++PSR 1.2*+  
                                                                                            *+PSR-1.2+~
165700   32-WD-049-U             B  J        UT                                            Code Case N-524 Pipe-Long Scam         B9. 12       PT                                           ++PSR-1.2++
3                            X 165800   32-WD-050               B-J                                                       Tarad.nal End, Limitation Gate Valve              B9. 11                                                    58% CRV, ~~PSR-1.2~~
3                            X 32-376-to-Pipe 165900    32-WD-050              N/A                                                       Re-cxaminc pcr Gate Valve              N/A                                                       IWB-2420 (b) Flaw growth 3 X - - -     X   - - -     X area next 3 periods, 32-376-to-Pipe acceptable   USNRC TAC No.
MA5696.   . ++PSR 1.2*+


DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNZT 1 INSERVICE INSPECTION TEN-YEAR PZAN CLASS 1 SECTION XI SCHEDULED COMPONENTS PAGE: 122 tor Recirculation Suction INSPECTION INTERVAL PIAN STATUS PRESERVZCE YEAR  
DATE: 10/15/99                             NINE MILE POINT NUCLEAR PLANT UNZT 1                           PAGE: 122 REVISION:        0                            INSERVICE INSPECTION TEN-YEAR PZAN CLASS 1 SECTION XI SCHEDULED COMPONENTS tor Recirculation Suction INSPECTION INTERVAL                     PIAN STATUS             PRESERVZCE YEAR ASME                FIRST        SECOND      THIRD SEC. XZ              PERIOD        PERIOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTZFZCATION ASME SEC.XZ CATEGY NDE ZTEM NO METH FIRST PERIOD SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 INSTRUCTIONS
**CALIBRATION BLOCK~~166100 32-WD-050"D Pipe-Long Seam B-J B9.12 3 X Code Case N-524+*PSR-1.2**166200 32-WD-051 Branch Connection-Decon B-J PT B9.32 3 X Examine 100&of weld length.+*N/A**3.0" Suction 12S (REF.DWG.NO.7)166300 32-WD-051-FB Dccon Flange Bolting B-G-2 B7.50 3 X Examine in place, when removed or disassembled.
~~N/A+~2.5" Suction 12S (REF.DWG.NO.7)00 32-WD-053 Thcrmowel 1 B-J PT B9.21 3 X Examine 100%of weld length*~N/A~*28.0" Suction 13S (REF.DWG.NO.7)167400 32-WD-084 B-D UT N1C Nozzle-to-Vessel B3.90 3 X Group R03, 65%CRV Limitation due to lug, ad)accnt nozzle and bioshicld**LATER~>>167500 32-WD-084-IR N1C Nozzle Inner Radius Section B-D B3.100 3 X Group R03, 73%CRV Limitation duc to lug, ad)acent nozzle and bioshicld~~NMP1-GE-7875+~
167600 32-WD"085 B-F UT Group R03,~~LATER~*N1C No"zlc-to-Safe End B5.10 PT 3 X


DATE: 10/15/99 REVZSZON: 0 NINE MILE POINT NUCLEAR PIANT UNIT 1 ZNSERVICE INSPECTION TEN-YEAR PIAN CIASS 1 SECTION XI SCHEDULED COMPONENTS PAGE: 123 tor Recirculation Suction NUMBER: 32.0 INSPECTION INTERVAL PLAN STATUS PRESERVZCE YEAR  
NUMBER EXAMINATION AREA          CATEGY      NDE                OUTAGE                        INSTRUCTIONS IDENTZFZCATION            ZTEM NO    METH    1  2  3  4  1  2  3  4  1  2  3  4  **CALIBRATIONBLOCK~ ~
166100    32-WD-050"D              B-J                                                        Code Case N-524 Pipe-Long  Seam          B9.12                                                      +*PSR-1 . 2**
3                            X 166200    32-WD-051                B-J          PT                                            Examine 100&    of weld Branch Connection        B9.32                                                      length. +*N/A**
            -Decon                                      3                            X 3.0" Suction  12S  (REF. DWG. NO. 7) 166300    32-WD-051-FB              B-G-2                                                      Examine    in place, when Dccon Flange  Bolting    B7.50                                                      removed    or disassembled.
3              X                        ~~N/A+~
2.5" Suction  12S (REF. DWG. NO. 7) 00    32-WD-053                  B-J        PT                                            Examine 100% of weld Thcrmowel 1                B9. 21                                                    length *~N/A~*
3                            X 28.0" Suction 13S (REF. DWG. NO. 7) 167400    32-WD-084                  B-D        UT                                            Group R03,    65% CRV N1C  Nozzle-to-Vessel      B3.90                                                      Limitation    due  to lug, 3 X ad)accnt nozzle and bioshicld    **LATER~>>
167500    32-WD-084-IR              B-D                                                        Group R03,    73% CRV N1C  Nozzle Inner          B3.100                                                    Limitation duc to lug, 3 X Radius Section                                                                        ad)acent nozzle and bioshicld
                                                                                                ~~NMP1-GE-7875+~
167600    32-WD"085                B-F          UT                                            Group R03, ~~LATER~*
N1C  No"zlc-to-Safe  End B5.10        PT 3 X
 
DATE: 10/15/99                           NINE MILE POINT NUCLEAR PIANT UNIT 1                         PAGE: 123 REVZSZON:        0                          ZNSERVICE INSPECTION TEN-YEAR PIAN CIASS 1 SECTION XI SCHEDULED COMPONENTS tor Recirculation Suction NUMBER: 32.0 INSPECTION INTERVAL                     PLAN STATUS             PRESERVZCE YEAR ASME                  FIRST        SECOND      THZRD SEC. XI              PERIOD      PERIOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC.XI CATEGY NDE ITEM NO METH FIRST PERIOD SECOND PERIOD THZRD PERIOD------OUTAGE------
1 2 3 4 1 2 3 4 1 2 3 4 INSTRUCTIONS
**CALIBRATZON BLOCK*+167700 32-WD-085 SZL N1C Nozzle-to-Safo End 455R1Sl 3 X Group R03, Inconel 182 butter expansion from nozzle side of weld,*+ZATER**167800 32-WD-085 GL A UT N1C Nozzle-to-Safe End 88-01 3 X Group R03**IATER*~167900 32-WD-086 Nozzle N1C Safe End-to-Elbow B-8 B9.11 3 X Examine 100%of weld length,~~PSR-1.109-1*~
168000 32-WD-086 Nozzle N1C Safe End-to-Elbow N/A N/A 3 X IWB-2420 (b)Examine flaw growth area next 3 periods.~*PSR-1.109-1**
168100 32-WD-086 Nozzle N1C Safe End-to-Elbow GL-F UT 88-01 3 X---X X--X Examine each refueling outage flaw growth.++PSR-1.260, PSR-l.655/1.150-~~168200 32-WD-086-Dl B a7 UT Elbow-Long Seam OR B9.12 PT 3 X Formerly LW-026-A, Code Case N-524**PSR-1.260~~
168300 32-WD-086-D2 B-J UT Elbow-Long Seam IR B9.12 3 X Formerly LW-026-A, Code Case N-524**PSR-1.260~*
169300 32-WD-089 Pipe-to-Valve 32-377 B9.11 PT 3 X Terminal End, High Stress Weld, Examine 100%of weld length~~PSR-1.109-1**


DATE: 10/15/99 REVISION: 0 NINE MZLE POINT NUCLEAR PLANT UNIT 1 ZNSERVZCE INSPECTION TEN YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 124 tor Recirculation Suction ZNSPFCTION INTERVAL PZAN STATUS PRESERVZCE YEAR  
NUMBER EXAMINATION AREA IDENTIFICATION CATEGY ITEM NO NDE METH
                                                          ------OUTAGE------                        INSTRUCTIONS 1  2  3  4  1  2  3  4  1  2  3  4  **CALIBRATZONBLOCK*+
167700    32-WD-085              SZL                                                        Group R03, Inconel 182 N1C Nozzle-to-Safo End 455R1Sl                                                    butter expansion from 3 X nozzle side of weld,
                                                                                              *+ ZATER**
167800    32-WD-085              GL A        UT                                            Group R03 **IATER*~
N1C Nozzle-to-Safe End 88-01 3 X 167900    32-WD-086              B-8                                                        Examine 100% of weld Nozzle N1C Safe        B9. 11                                                    length, ~~PSR-1.109-1*~
3 X End-to-Elbow 168000    32-WD-086              N/A                                                        IWB-2420 (b) Examine  flaw Nozzle N1C Safe        N/A                                                        growth area next 3 3 X End-to-Elbow                                                                      periods. ~*PSR-1.109-1**
168100    32-WD-086              GL-F        UT                                            Examine each  refueling Nozzle N1C Safe          88-01                                                      outage flaw growth.
End-to-Elbow                              3 X    - - -  X    X  - -    X          ++PSR-1. 260, PSR-l. 655/1.
150-~~
168200    32-WD-086-Dl            B  a7      UT                                            Formerly LW-026-A,    Code Elbow-Long Seam  OR      B9.12      PT                                            Case N-524 **PSR-1.260~~
3 X 168300    32-WD-086-D2            B-J        UT                                            Formerly LW-026-A,    Code Elbow-Long Seam IR      B9.12                                                      Case N-524 **PSR-1.260~*
3 X 169300    32-WD-089                                                                          Terminal End, High Pipe-to-Valve 32-377    B9.11      PT                                            Stress Weld, Examine 3 X 100% of weld length
                                                                                              ~~PSR-1.109-1**
 
DATE: 10/15/99                             NINE MZLE POINT NUCLEAR PLANT UNIT 1                           PAGE: 124 REVISION:        0                          ZNSERVZCE INSPECTION TEN YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS tor Recirculation Suction ZNSPFCTION INTERVAL                       PZAN STATUS           PRESERVZCE YEAR ASME                FIRST        SECOND      THIRD SEC. XZ              PERIOD        PERIOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 INSTRUCTIONS yyCALIBRATION BLOCKa~169500 32-WD-089-U Pipe-Long Scam B-J B9.12 3 X Formerly I.W-028, Code Case N-524**PSR-1.109-1**169600 32-WD-090 B-J UT Valve 32-377-to-Pipe B9.11 PT 3 X Terminal End, High Stress Weld, Limitation duc to configuration 58%CRV, Examine 100%of weld length.+*PSR-I.109-1**169800 32-WD-090-D Pipe-Long Seam B-J B9.12 X Formally LW-029, Code Case N-524**P8R-1.109-1*~3.0" Suction 13S (REF.DWG.NO.7)170000 32-WD-091-FB 13S Dccon Flange Bolting~B-G-2 B7.50 X Examine in place, when removed or when disassembled.
EXAMINATION AREA         CATEGY      NDE                OUTAGE                          INSTRUCTIONS NUMBER     IDENTIFICATION           ITEM NO     METH   1 2 3 4   1   2 3 4   1 2 3 4 yyCALIBRATION BLOCKa~
<<*N/A~*28.0" Suction 13S (REF.DWG.NO.7)170100 32-WD-092 Pipe-to-Elbow B-J UT B9.11 3 X**PSR-1..109-1**170200 32-WD-092 Pipe-to-Elbow GL-A UT 88-01 3 X++PSR 1.109-1)PSR-1.260~  
169500     32-WD-089-U               B-J                                                       Formerly I.W-028, Code Pipe-Long  Scam          B9.12                                                      Case N-524 3 X                                      **PSR-1. 109-1**
169600     32-WD-090                 B-J         UT                                             Terminal End, High Valve 32-377-to-Pipe     B9. 11     PT                                             Stress Weld, Limitation 3 X duc to configuration     58%
CRV, Examine 100%     of weld length.
                                                                                                +*PSR-I . 109-1**
169800     32-WD-090-D               B-J                                                       Formally LW-029,     Code Pipe-Long  Seam          B9. 12                                                    Case N-524 X                                    **P8R-1. 109-1*~
3.0" Suction 13S (REF. DWG. NO. 7) 170000     32-WD-091-FB           ~ B-G-2                                                     Examine   in place,   when 13S Dccon Flange          B7.50                                                      removed   or when Bolting                                                                  X          disassembled.     <<*N/A~*
28.0" Suction   13S (REF. DWG. NO. 7) 170100     32-WD-092                 B-J         UT                                               **PSR-1 ..109-1**
Pipe-to-Elbow            B9.11 3 X 170200     32-WD-092                 GL-A        UT Pipe-to-Elbow             88-01                                                     ++PSR 1. 109-1 ) PSR-1. 260~
3 X


DATE: 10/15/99 REVISION: 0 NINE MZIE POZNT NUCLEAR PLANT UNIT 1 ZNSERVICE INSPECTION TEN YEAR PIAN CLASS 1 SECTION XI SCHEDULED COMPONENTS PAGE: 125 tor Recirculation Suction NUMBER: 32.0 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR  
DATE: 10/15/99                           NINE MZIE POZNT NUCLEAR PLANT UNIT 1                           PAGE: 125 REVISION:      0                          ZNSERVICE INSPECTION TEN YEAR PIAN CLASS 1 SECTION   XI SCHEDULED COMPONENTS tor Recirculation Suction NUMBER: 32. 0 INSPECTION INTERVAL                       PLAN STATUS             PRESERVICE YEAR ASME                  FIRST        SECOND      THIRD SEC. XZ                PERIOD        PERIOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD SECOND PERIOD THIRD PERIOD OUTAGE 1 2 3 4 1 2 3 4 1 2 3 4 INSTRUCTIONS
EXAMINATION AREA       CATEGY      NDE                  OUTAGE                        INSTRUCTIONS NUMBER     IDENTIFICATION         ITEM   NO   METH     1 2 3 4   1   2 3 4   1 2 3 4 ~~CALIBRATION BLOCK~~
~~CALIBRATION BLOCK~~28.0" Suction 14S (REF.DWG.NO.7)171300 32-WD-124 B D UT Group R04, 65%CRV N1D Nozzle-to-Vessel B3.90 Limitation duc to Bioshield+<<LATER~>>171400 32-WD-124-IR N1D Nozzle Znner radius Section B D B3.100 3 X Group R04, 73&CRV Limitation duc to Bioshield*+NMP1-GE-7875~+
28.0" Suction 14S (REF. DWG. NO. 7) 171300   32-WD-124               B D         UT                                             Group R04, 65% CRV N1D Nozzle-to-Vessel   B3. 90                                                     Limitation duc to Bioshield + <<LATER~>>
171500 32-WD-125 SII N1D Nozzle-to-Safe End 455R1S1 3 Group R04, Znconel 182 butter expansion from nozzle side of weld~~LATER~*00 32-WD-125 B-F UT Group R04+~LATER~+N1D Nozzle-to-Safe End B5.10 PT 3 X 171700 32-WD-125 GL A UT N1D Nozzle<<to-Safe End 88-01 3 X Group R04~*LATER~~171800 32-WD-126 Nozzle N1D Safe End-to-Elbow B-J B9.11 3 X Examine 100%of weld length,+~PSR-I 109-1~*171900 32-WD-126 Nozzle N1D Safe End-to-Elbow N/A UT N/A 3 X X IWB-2420 (b)Examine flaw growth area next 3 periods.~~P8R-1.109-1*~
171400   32-WD-124-IR           B D                                                         Group R04, 73& CRV N1D Nozzle Znner        B3. 100                                                    Limitation duc   to 3                            X radius Section                                                                      Bioshield
172000 32-WD-126 Nozzle N1D Safe End-to-Elbow GL-F UT 88-01 3 X Examine each rcfucling outage flaw growth.**PSR-1.655/1.150"1~~  
                                                                                              *+NMP1-GE-7875~+
171500     32-WD-125               SII                                                         Group R04, Znconel 182 N1D Nozzle-to-Safe End 455R1S1                                                     butter expansion from 3
nozzle side of weld
                                                                                              ~~LATER~*
00   32-WD-125               B-F         UT                                             Group R04 +~LATER~+
N1D Nozzle-to-Safe End B5.10         PT 3                             X 171700   32-WD-125               GL A         UT                                             Group R04 ~*LATER~~
N1D Nozzle<<to-Safe End 88-01 3                             X 171800   32-WD-126               B-J                                                         Examine 100% of weld Nozzle N1D Safe          B9. 11                                                      length, +~PSR-I 109-1~*
3              X End-to-Elbow 171900   32-WD-126               N/A         UT                                             IWB-2420 (b) Examine flaw Nozzle N1D Safe          N/A                                                        growth area next 3 End-to-Elbow                                3 X            X periods. ~~P8R-1.109-1*~
172000   32-WD-126               GL-F         UT                                             Examine each  rcfucling Nozzle N1D Safe          88-01                                                       outage flaw growth.
3 X End-to-Elbow                                                                        **PSR-1.655/1.150"1~~


DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 ZNSERVZCE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XI SCHEDULED COMPONENTS PAGE: 126 tor Recirculation Suction INSPECTION ZNTERVAL PLAN STATUS PRESERVZCE YEAR  
DATE: 10/15/99                             NINE MILE POINT NUCLEAR PLANT UNIT 1                           PAGE: 126 REVISION:        0                          ZNSERVZCE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XI SCHEDULED COMPONENTS tor Recirculation Suction INSPECTION ZNTERVAL                     PLAN STATUS           PRESERVZCE YEAR ASME                FIRST        SECOND      THIRD SEC. XI            PERIOD        PERIOD      PERZOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC.XI CATEGY NDE ITEM NO METH FIRST PERIOD SECOND PERIOD OUTAGE THIRD PERZOD 1 2 3 4 1 2 3 4 1 2 3 4 INSTRUCTIONS
EXAMINATION AREA         CATEGY      NDE                  OUTAGE                        INSTRUCTIONS NUMBER     IDENTIFICATION           ITEM NO     METH   1 2 3 4   1   2 3 4   1 2 3 4 **CALIBRATZONBLOCK*+
**CALIBRATZON BLOCK*+172100 32-WD-126-Dl B-J UT Elbow-Long Seam OR B9.12 PT 3 X Code Case N-524**PSR-1.109-1+*172200 32"WD-126-D2 Elbow-Long Scam ZR B-J UT B9.12 PT 3 X Code Case N-524~~PSR-1.109-1**14.0" Suction 14S (REF.DWG.NO.7)173200 32-WD-128A Pipe-to-Gate Valve 38-01 GL A UT 88-01 3 X Removablc pipe clamp**PSR-.935-1**
172100     32-WD-126-Dl             B-J         UT                                             Code Case N-524 Elbow-Long Seam OR     B9.12       PT                                             **PSR-1 . 109-1 +*
173300 32-WD-128A Pipe-to-Gate Valve 38-01 B J B9.11 X Terminal End, High Stress Wold, Removablc pipe clamp, Examine 100%of weld length.~+PSR-l.109-l~~173400 32-WD-128A-U Pipe-Long Seam B-J UT B9.12 PT 3 X Code Case N-524~~PSR-1.109-1~~
3              X 172200     32"WD-126-D2             B-J        UT                                            Code Case N-524 Elbow-Long Scam ZR     B9. 12     PT                                             ~ ~PSR-1. 109-1**
28.0" Suction 14S (REF.DWG.NO.7)174300 32-WD-131 B-J UT PiPe-to-Valve 32-378 B9.11 PT 3 X Terminal End, High Stress Weld, Examine 100%of weld length e*PSR 1.109-1*a 174500 32-WD-131-U Pipe-Long Seam B-J B9.12 3 X Rcmovablc pipe clamp, Coda Case N-524*~PSR" 1.109-1**  
3              X 14.0" Suction 14S (REF. DWG. NO. 7) 173200     32-WD-128A               GL A        UT                                            Removablc  pipe clamp Pipe-to-Gate Valve       88-01                                                     **PSR-.935-1**
3              X 38-01 173300     32-WD-128A               B  J                                                      Terminal End, High Pipe-to-Gate Valve       B9. 11                                                     Stress Wold, Removablc X
38-01                                                                              pipe clamp, Examine 100%
of weld length.
                                                                                              ~+PSR-l. 109-l~~
173400     32-WD-128A-U             B-J         UT                                             Code Case N-524 Pipe-Long Seam          B9.12      PT                                            ~~PSR-1.109-1~~
3              X 28.0" Suction 14S (REF. DWG. NO. 7) 174300     32-WD-131               B-J         UT                                             Terminal End, High PiPe-to-Valve 32-378     B9. 11     PT                                             Stress Weld, Examine 3              X                        100% of weld length e*PSR 1.109-1*a 174500     32-WD-131-U             B-J                                                        Rcmovablc pipe clamp, Pipe-Long Seam           B9. 12                                                     Coda Case N-524 3              X                        *~PSR" 1. 109-1**


DATE: 10/15/99 REVISION: 0 NINE MILE POZNT NUCLEAR PIANT UNIT 1 ZNSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XI SCHEDULED COMPONENTS PAGE: 127 or Recirculation Suction NUMBER: 32.0 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR  
DATE: 10/15/99                             NINE MILE POZNT NUCLEAR PIANT UNIT 1                           PAGE: 127 REVISION:        0                          ZNSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XI SCHEDULED COMPONENTS or Recirculation Suction NUMBER:   32. 0 INSPECTION INTERVAL                     PLAN STATUS             PRESERVICE YEAR ASME                FIRST        SECOND      THIRD SEC. XZ              PERIOD        PERIOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD SECOND PERIOD THIRD PERIOD OUTAGE 1 2 3 4 1 2 3 4 1 2 3 4 INSTRUCTIONS
EXAMINATION AREA         CATEGY    NDE                  OUTAGE                          INSTRUCTIONS NUMBER     IDENTIFICATION           ITEM NO   METH   1 2 3 4   1   2 3 4   1 2 3 4 + +CALIBRATION BLOCK**
++CALIBRATION BLOCK**175000 32-WD-133-FB B G-2 Decon Flange Bolting B7.50 3.0" Suction 14S (REF.DWG.NO.7)3 X Examine in place, when removed or when disassembled.
3.0" Suction   14S (REF. DWG. NO. 7) 175000    32-WD-133-FB              B G-2                                                    Examine   in place,   when Decon Flange  Bolting    B7.50                                                    removed   or when 3              X disassembled.   ~ ~N/A~~
~~N/A~~2.5" Suction 14S (REF.DWG.NO.7)175600 32"WD-135 Branch Connection-Thcrmowell B-J PT B9.32 3 X Examine 100%of weld length+~N/A~~28.0" Suction 15S (REF.DWG.NO.7)176300 32-WD-166 N1E Nozzle-to-Vessel B-D AUT B3.90 3 X Group R05, 33.8%CRV Limitation duc to lug, thermocouple and bioshicld*~LATER*~176400 32-WD-166-IR N1E Nozzle Znncr Radius Section B-D B3.100 3 X Group R05, 73%CRV Limitation due to lug, thermocouplc and bioshicld~~ZATER~~176500 32-WD-167 B-F UT N1E Nozzle-to-Safe End B5.10 PT 3 X GrouP R05++LATER~~176600 32-WD-167 SII N1E Nozzle-to-Safe End 455R1S1 3 X Group R05, Znconcl 182 butter expansion from nozzle side of weld*+LATER+~176700 32-WD-167 GL-A UT Group R05~~LATER*~N1E Nozzle-to-Safe End 88-01 3 X  
2.5" Suction   14S (REF. DWG. NO. 7) 175600     32 "WD-135               B-J       PT                                             Examine 100%   of weld Branch Connection-        B9.32                                                    length   +~N/A~~
3              X Thcrmowell 28.0" Suction   15S (REF. DWG. NO. 7) 176300     32-WD-166                 B-D       AUT                                           Group R05, 33.8% CRV N1E  Nozzle-to-Vessel    B3.90                                                    Limitation duc to lug, 3 X thermocouple and bioshicld   *~LATER*~
176400     32-WD-166-IR               B-D                                                       Group R05,   73% CRV N1E  Nozzle Znncr        B3. 100                                                  Limitation   due to lug, 3 X Radius Section                                                                      thermocouplc and bioshicld   ~~ZATER~~
176500     32-WD-167                 B-F       UT                                             GrouP R05 ++LATER~~
N1E Nozzle-to-Safe End B5.10         PT 3 X 176600     32-WD-167                 SII                                                       Group R05, Znconcl 182 N1E Nozzle-to-Safe End   455R1S1                                                   butter expansion from 3 X nozzle side of weld
                                                                                                *+LATER+~
176700     32-WD-167                 GL-A       UT                                             Group R05 ~~LATER*~
N1E Nozzle-to-Safe End 88-01 3 X


DATE: 10/15/99 REVI S ZON: 0 NINE MILE POINT NUCLEAR PIANT UNZT 1 ZNSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 128 tor Recirculation NUMBER: 32.0 Suction INSPECTION INTERVAL PIAN STATUS PRESERVICE YEAR  
DATE: 10/15/99                             NINE MILE POINT NUCLEAR PIANT UNZT 1                         PAGE: 128 REVIS ZON:        0                          ZNSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS tor Recirculation Suction NUMBER:   32. 0 INSPECTION INTERVAL                     PIAN STATUS             PRESERVICE YEAR ASME                FIRST        SECOND      THIRD SEC. XZ              PERIOD      PERIOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC.XZ CATEGY NDE ZTEM NO METH FIRST PERIOD SECOND PERIOD THIRD PERIOD OUTAGE 1 2 3 4 1 2 3 4 1 2 3 4 ZNSTRUCTIONS
EXAMINATION AREA         CATEGY      NDE                OUTAGE                          ZNSTRUCTIONS NUMBER     IDENTIFICATION           ZTEM NO     METH   1 2 3 4 1   2 3 4   1 2 3 4 ~ ~CALIBRATION BLOCK**
~~CALIBRATION BLOCK**176800 32-WD-168 Nozzle N1E Safe End-to-Elbow B-J B9.11 3 X Examine 100%of weld length,++PSR-1.260~~
176800     32-WD-168               B-J                                                       Examine 100% of weld Nozzle N1E Safe        B9.11                                                    length, ++PSR-1.260~~
176900 32-WD-168 Nozzle N1E Safe End-to-Elbow N/A N/A 3 X X---X WB-2420 (b)Examine flaw growth area next 3 periods.**PSR-1.260~*177000 32"WD-168 Nozzle N1E Safe End-to-Elbow GL" F UT 88"01 3 X-X X-X Examine each rcfucling outage flaw growth.stPSR-1.260,PSR-1.655/1.
3                          X End-to-Elbow 176900     32-WD-168               N/A                                                      WB-2420 (b) Examine flaw Nozzle N1E Safe         N/A                                                      growth area next 3 End-to-Elbow                               3 X           X   - - -     X periods. **PSR-1. 260~*
150-~*177100 32-WD-168"Dl B-J Elbow-Long Seam OR B9.12 3 X Formerly LW-051-A, Code Case N-524~*P8R-1.260*~
177000     32 "WD-168               GL"F        UT                                            Examine each  rcfucling Nozzle N1E Safe         88"01                                                    outage flaw growth.
177200 32-WD-168-D2 Elbow-Long Seam ZR B9.12 PT 3 X Formerly IW-051-B, Coda Case N-524++P8R-1.260*~
End-to-Elbow                               3 X   -       X   X     -   X         stPSR-1.260,PSR-1.655/1.
178600 32-WD-171-MT ZNPO UT Mixing Tee Base Metal 5-85 X---X X Base metal scans required each Refueling Outage**PSR-1.109-1*~
150-~*
178SOO 32-WD-171A Reducer-to-Pipe B-J B9.11 3 X Examine 100%of weld length++PSR-1.109-1~*
177100     32-WD-168 "Dl           B-J                                                       Formerly LW-051-A, Code Elbow-Long Seam OR     B9.12                                                     Case N-524 ~*P8R-1.260*~
179000 32 WD-171A-D Pipe-Long Seam B-J UT B9.12 PT 3 X Code Case N-524~+PSR-I.109-1**  
3                            X 177200     32-WD-168-D2                                                                       Formerly IW-051-B, Coda Elbow-Long Seam   ZR     B9. 12     PT                                           Case N-524 ++P8R-1.260*~
3                            X 178600     32-WD-171-MT             ZNPO       UT                                           Base metal scans Mixing Tee Base Metal     5-85                                                     required each Refueling X - - -   X   X Outage **PSR-1.109-1*~
178SOO     32-WD-171A               B-J                                                      Examine 100% of weld Reducer-to-Pipe           B9. 11                                                   length ++PSR-1.109-1~*
3              X 179000     32 WD-171A-D             B-J         UT                                           Code Case N-524 Pipe-Long  Seam          B9. 12      PT                                            ~+PSR-I . 109-1**
3              X


DATE: 10/15/99 REVISION: 0 NINE MILE POZNT NUCLEAR PLANT UNIT 1 ZNSERVZCE ZNSPECTZON TEN-YEAR PZAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 129 tor Recirculation Suction ZONE NUMBER: 32.0  
DATE: 10/15/99                             NINE MILE POZNT NUCLEAR PLANT UNIT 1                           PAGE: 129 REVISION:        0                          ZNSERVZCE ZNSPECTZON TEN-YEAR PZAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS tor Recirculation Suction ZONE NUMBER:   32.0 INSPECTION INTERVAL                      PLAN STATUS            PRESERVZCE YEAR ASME                FIRST        SECOND      THIRD SEC. XI            PERZOD        PERIOD      PERZOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL ASME SEC.XI CATEGY NDE ITEM NO METH FIRST PERZOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERZOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVZCE YEAR INSTRUCTIONS
EXAMINATION AREA         CATEGY      NDE                OUTAGE                          INSTRUCTIONS NUMBER     IDENTIFICATION           ITEM NO     METH   1 2 3 4   1   2 3 4   1 2 3 4 +*CALIBRATION BLOCK*~
+*CALIBRATION BLOCK*~10.0" Suction 15S (REF.DWG.NO.7)179200 32-WD" 171BR GL A UT~*NMP-10-XX1-SS**
10.0" Suction 15S (REF. DWG. NO. 7) 179200     32-WD" 171BR             GL A       UT                                               ~*NMP-10-XX1-SS**
Valve 39-01-to-Reducer 88>>01 3 X 179300 32-WD-171BR B-J Valve 39-01-to-Reducer B9.11 3 X Tcrnd.nal End, High Stress Weld~iNMP-10"XXI-SSi~
Valve 39-01-to-Reducer   88>>01 3                           X 179300     32-WD-171BR             B-J                                                       Tcrnd.nal End, High Valve 39-01-to-Reducer   B9. 11                                                     Stress Weld 3                           X         ~iNMP-10"XXI-SSi~
28.0" Suction 15S (REF.DWG.NO.7)179400 32-WD-172 Limitation duc to Tee-to-Pipo B9.11 3 X fitting configuration, and material 58%CRV.Examine 100%of weld length.~~PSR-1.109-1~~
28.0" Suction 15S (REF. DWG. NO. 7) 179400     32-WD-172                                                                           Limitation duc to Tee-to-Pipo             B9. 11                                                     fitting configuration, 3                            X          and material 58%
179700 32"WD-172-D Pipe-Long Scam B-J B9.12 3 X (CW172, 173), Code Case N-524**P8R-1.109 1**179800 32-WD-172-U Tee-Long Seam B-J UT B9.12 PT 3 X Coda Case N-524*+PSR-l.109-1*+180200 32-WD-174 B-J UT Valve 32-379-to-Pipe B9.11 PT 3 Terminal End, High Stress Weld, Examine 100%of weld length++PSR 1.109 I+*180400 32-WD-174-D Pipe Long Scam B"J B9.12 3 X Code Case N-524+*PER-1.109 1~~  
CRV.Examine 100% of weld length. ~~PSR-1.109-1~~
179700   32"WD-172-D               B-J                                                         (CW172, 173), Code Case Pipe-Long Scam          B9. 12                                                    N-524 **P8R-1. 109 1**
3                            X 179800   32-WD-172-U               B-J         UT                                             Coda Case N-524 Tee - Long Seam          B9. 12      PT                                            *+PSR-l. 109-1*+
3                            X 180200   32-WD-174                 B-J         UT                                             Terminal End, High Valve 32-379-to-Pipe     B9. 11       PT                                           Stress Weld, Examine 3
100% of weld length
                                                                                              ++PSR 1.109 I+*
180400   32-WD-174-D               B"J                                                       Code Case N-524 Pipe Long Scam            B9.12                                                      + *PER-1 . 109 1 ~ ~
3                            X


DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 ZNSERVZCE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 130 tor Recirculation Suction NUMBER: 32.0 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR  
DATE: 10/15/99                           NINE MILE POINT NUCLEAR PLANT UNIT 1                         PAGE: 130 REVISION:        0                        ZNSERVZCE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS tor Recirculation Suction NUMBER:   32. 0 INSPECTION INTERVAL                     PLAN STATUS           PRESERVICE YEAR ASME                FIRST        SECOND      THIRD SEC. XZ              PERIOD        PERIOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC.XZ CATEOY NDE ITEM NO METH FIRST PERIOD SECOND PERIOD THIRD PERIOD-OUTAGE 1 2 3 4 1 2 3 4 1 2 3 4 INSTRUCTIONS
EXAMINATION AREA         CATEOY    NDE                -OUTAGE                          INSTRUCTIONS NUMBER     IDENTIFICATION           ITEM NO   METH     1 2 3 4   1   2 3 4   1 2 3 4 **CALIBRATIONBLOCK*~
**CALIBRATION BLOCK*~3.0" Suction 15S (REF.DWO.NO.7)150600 32-WD-175-FB B-6-2 Decon Flange Bolting BI~50 VT-1 3 X Examine in place, when removed or when disassembled.
3.0" Suction 15S (REF. DWO. NO. 7) 150600   32-WD-175-FB             B-6-2     VT-1                                           Examine in place, when Decon Flange  Bolting    BI 50
*~N/A**  
                                      ~                                                      removed or when 3              X                        disassembled. *~N/A**


DATE: 10/15/99 REVISZON: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 ZNSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTZON XZ SCHEDULED COMPONENTS PAGE 131 r Clean Up NUMBER: 33.0 INSPECTION INTERVAL PLAN STATUS PRESERVZCE YEAR  
DATE: 10/15/99                           NINE MILE POINT NUCLEAR PLANT UNIT 1                         PAGE  131 REVISZON:          0                        ZNSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTZON XZ SCHEDULED COMPONENTS r Clean Up NUMBER: 33. 0 INSPECTION INTERVAL                     PLAN STATUS             PRESERVZCE YEAR ASME                FIRST        SECOND      THIRD SEC. XZ              PERIOD        PERIOD      PERIOD


==SUMMARY==
==SUMMARY==
NUMBER EXAMINATION AREA IDENTIFICATION ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD THIRD PERIOD SECOND PERIOD OUTAGE 1 2 3 4 1 2 3 4 1 2 3 4 ZNSTRUCTIONS
EXAMINATION AREA         CATEGY     NDE                 OUTAGE                          ZNSTRUCTIONS NUMBER      IDENTIFICATION          ITEM NO   METH     1 2 3 4   1   2 3 4   1 2 3 4 *~CALIBRATION BLOCK**
*~CALIBRATION BLOCK**6.0" Line (REF.DWG.NO.20)181900 33 01R VBY B-M-2 VT"3 Valve 33-01R Znterior B12.50 Suriace X V07, Onlc when disassenbled, one valve among group of valves.~~N/A~~182300 33-03-VB Valvo 33-03 Bolting B-G-2 B7.70 3 X V13, Limited to valve sclcctcd under B-M-2.<<*N/A~~182400 33"03-VBY Valve 33-03 Interior Surface B-M"2 VT-3 B12.50 X V13, Only when disassembled, onc valve among group of valves.eaN/Aea 00 33"03-WD-001 B-K PT Valve 33-03 Integral~B10.40 Attachment X Code Case N-509, Examine 100%of wold length+~N/A*+183700 33-WD" 001 Branch Connection B"J PT B9.32 3 X Examine 100%of weld length.**N/A~*183800 33-WD-002 B J UT Pipe-to-Valve 33-02 B9.11 PT 3 Terminal End, High Stress Weld, Limitation duo to fitting configuration 62%CRV, Examine 100%of weld length.**LATER**184000 33-WD-003 Valve 33-02R-to-Pipe B9.11 PT3 Terminal End, High Stress Weld, Limitation duc to fitting configuration 62%CRV, Examine 100%of wold length.*~LATER*~  
6.0" Line (REF. DWG. NO. 20) 181900     33 01R VBY               B-M-2     VT"3                                           V07, Onlc when Valve 33-01R Znterior   B12.50                                                   disassenbled,   one valve X                                      of valves.
Suriace                                                                            among group
                                                                                              ~~N/A~~
182300     33-03-VB                 B-G-2                                                     V13, Limited to valve Valvo 33-03  Bolting    B7.70                                                    sclcctcd under B-M-2.
3              X                        <<*N/A~~
182400     33"03-VBY               B-M"2     VT-3                                           V13, Only when Valve 33-03  Interior    B12.50                                                    disassembled, onc valve X
Surface                                                                            among group of valves.
eaN/Aea 00     33"03-WD-001             B-K       PT                                             Code Case N-509, Examine Valve 33-03 Integral   ~ B10. 40                                                   100% of wold length Attachment                                                              X          +~N/A*+
183700     33-WD" 001               B"J       PT                                             Examine 100%   of weld Branch Connection        B9.32                                                    length. **N/A~*
3 X 183800     33-WD-002                 B J       UT                                             Terminal End, High Pipe-to-Valve 33-02       B9.11     PT                                             Stress Weld, Limitation 3
duo to fitting configuration 62% CRV, Examine 100% of weld length. **LATER**
184000     33-WD-003                                                                           Terminal End, High Valve 33-02R-to-Pipe     B9.11     PT                                            Stress Weld, Limitation 3
duc to fitting configuration 62% CRV, Examine 100% of wold length. *~LATER*~


DATE: 10/15/99 REVZSION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION TEN YEAR PLAN CLASS 1 SECTION XI SCHEDULED COMPONENTS PAGE: 132 or Clean Up NUMBER: 33.0  
DATE: 10/15/99                           NINE MILE POINT NUCLEAR PLANT UNIT 1                           PAGE: 132 REVZSION:        0                          INSERVICE INSPECTION TEN YEAR PLAN CLASS 1 SECTION   XI SCHEDULED COMPONENTS or Clean Up NUMBER:   33. 0 INSPECTION INTERVAL                      PZAN STATUS            PRESERVICE YEAR ASME                PIRST        SECOND      THIRD SEC. XZ                PERZOD        PERIOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL ASME SEC.XZ CATEGY NDE ITEM NO METH PIRST PERZOD PZAN STATUS SECOND PERIOD THIRD PERIOD OUTAGE 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR INSTRUCTIONS
EXAMINATION AREA       CATEGY      NDE                  OUTAGE                        INSTRUCTIONS NUMBER     IDENTIFICATION           ITEM NO   METH   1 2 3 4   1   2 3 4   1 2 3 4 ~*CALIBRATION BLOCK*~
~*CALIBRATION BLOCK*~184300 33-WD-004 Pipe-to-Pipe Bend GL-D 88-01 3 X X 184900 33-WD-014 Pipe-to-Pipe GL-G 88-01 VT-2 X---X X--X Inaccessible, inside Pen X"9, Visual VT-2 each outage for evidence of leakage.+~N/A++185100 33-WD" 015 Pipe-to-Valve 33"04 GL-A 88-01 3 X---X X"-X Znaccossible inside Pen X-9.Visual VT-2 each outage for cvidcnce of leakage.i~N/A~i 185500 33-WD-035 Valvo 33-03-to-Pipe 88-01 VT-2 X---X X--X Znaccossible located inside pen X-154, VT-2 Each Rcfucling Outage for evidence of leakage~*N/A~~185700 33"WD-036 Pipe-to-Elbow GL-G 88-01 X---X X--X Inaccessible located inside pcn X-154, VT-2 Each Rcfucling Outage for evidcncc of leakage~~N/A*+185900 33"WD-046 Pipe-to-Pipe B-J B9.11 3 X Bimettalic weld, Examine 100%of weld length.++IATER+*186000 33"WD-046 Pipe-to-Pipe GL-D UT 88-01 3 X X Bimettalic weld~~LATER~+186300 33-WD-047C1 B-J Pipe-to-Valve 33-01R1 B9.11 3 X Examine 100%of weld length*~PER-.432-2~~  
184300     33-WD-004               GL-D Pipe-to-Pipe Bend       88-01 3 X               X 184900     33-WD-014               GL-G        VT-2                                          Inaccessible,  inside Pen Pipe-to-Pipe           88-01                                                       X"9, Visual VT-2 each X - - -     X   X - -   X outage for evidence of leakage. +~N/A++
185100     33-WD" 015             GL-A                                                        Znaccossible inside Pen Pipe-to-Valve 33"04     88-01                                                       X-9. Visual VT-2 each 3 X   - - -   X   X " -   X         outage for cvidcnce of leakage. i~N/A~i 185500     33-WD-035                           VT-2                                          Znaccossible located Valvo 33-03-to-Pipe     88-01                                                       inside pen X-154, VT-2 X - - -     X   X - -   X         Each Rcfucling Outage for evidence of leakage
                                                                                                ~*N/A~~
185700     33"WD-036               GL-G                                                        Inaccessible located Pipe-to-Elbow           88-01                                                       inside pcn X-154, VT-2 X  - - -     X   X - -   X          Each Rcfucling Outage for evidcncc of leakage
                                                                                                ~~N/A*+
185900     33"WD-046               B-J                                                        Bimettalic weld, Examine Pipe-to-Pipe             B9. 11                                                     100% of weld length.
3              X                        ++IATER+*
186000     33 "WD-046               GL-D        UT                                            Bimettalic weld Pipe-to-Pipe             88-01                                                       ~~LATER~+
3 X                X 186300     33-WD-047C1             B-J                                                         Examine 100% of weld Pipe-to-Valve 33-01R1   B9.11                                                       length *~PER-.432-2~~
3                            X


DATE: 10/15/99 REVISION: 0 NINE MILE POZNT NUCLEAR PLANT UNIT 1 INSERVZCE INSPECTION TEN-YEAR PIAN CLASS 1 SECTION XI SCHEDULED COMPONENTS PAGE: 133 or Clean Up NUMBER: 33.0  
DATE: 10/15/99                             NINE MILE POZNT NUCLEAR PLANT UNIT 1                           PAGE: 133 REVISION:        0                            INSERVZCE INSPECTION TEN-YEAR PIAN CLASS 1 SECTION XI SCHEDULED COMPONENTS or Clean Up NUMBER: 33. 0 INSPECTION INTERVAL                      PLAN STATUS            PRESERVZCE YEAR ASME                FIRST        SECOND      THIRD SEC. XI            PERIOD        PERIOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER ZDENTIFZ CAT ION INSPECTION INTERVAL ASME SEC.XI CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVZCE YEAR INSTRUCTIONS
EXAMINATION AREA         CATEGY       NDE                 OUTAGE                        INSTRUCTIONS NUMBER    ZDENTIFZCATION            ITEM NO     METH   1 2 3 4   1   2 3 4   1 2 3 4 ++CALIBRATION BLOCK*+
++CALIBRATION BLOCK*+186700 33-WD-048C1 B J UT~*PSR-.432-2~*
186700   33-WD-048C1               B J         UT                                             ~*PSR-.432-2~*
Valve 33"01R to Pipe B9.11 PT 3 186900 33-WD"049 Pipe-to-Elbow B-J B9.11 3 X BiMattalic weld, Limited duc to pcrmn't hanger attach.90%CRV, 90%CRA.Exam 100%of weld length.**IATER**1S7000 33-WD-049 Pipe-to-Elbow GL D UT 88 01 3 X X+~LATER~+187500 33-WD-054 Pipe-to-Tcc B J UT B9.11 3 X Examine 100%of weld length+*LATER**187600 33-WD-055 Tee-to-Reducer B-J B9.11 3 X Examine 100%of weld length**LATER**4.0" Line (REF.DWG.NO.20)187700 33-WD-056 Reducer-to-Pipe B J UT B9.11 PT 3 X Examine 100%of weld length.**LATER~~6.0" Line (REF.DWG.NO.20)188200 33-WD-061 Tcc-to-Reducer B-J UT B9.11 PT 3 X Examine 100%of weld length~+IATER~~4.0" Linc (REF.DWG.NO.20)188700 33-WD"066 Pipe-to-Reducer B-J UT B9.11 PT 3----X Examino 100%of weld length'~LATER~~
Valve 33"01R   to Pipe   B9.11       PT 3
186900     33-WD"049                 B-J                                                        BiMattalic weld, Limited Pipe-to-Elbow             B9. 11                                                     duc to pcrmn't hanger 3              X attach. 90% CRV, 90%
CRA. Exam 100% of weld length. **IATER**
1S7000     33-WD-049                 GL D        UT                                              +~LATER~+
Pipe-to-Elbow             88 01 3 X                 X 187500     33-WD-054                 B  J        UT                                            Examine 100% of weld Pipe-to-Tcc               B9. 11                                                     length +*LATER**
3                            X 187600     33-WD-055                 B-J                                                        Examine 100% of weld Tee-to-Reducer           B9. 11                                                     length **LATER**
3                            X 4.0" Line (REF. DWG. NO. 20) 187700     33-WD-056                 B  J        UT                                            Examine 100%  of weld Reducer-to-Pipe           B9. 11       PT                                           length.   **LATER~~
3                            X 6.0" Line (REF. DWG. NO. 20) 188200   33-WD-061                 B-J        UT                                            Examine 100%  of weld Tcc-to-Reducer             B9. 11       PT                                           length ~+IATER~~
3                            X 4.0" Linc   (REF. DWG. NO. 20) 188700   33-WD"066                 B-J        UT                                            Examino 100%  of weld Pipe-to-Reducer           B9. 11     PT                                             length  '
                                                                                                          ~LATER~~
3 - - - -       X


DATE: 10/15/99 REVISION: 0 NZNE MILE POINT NUCLEAR PIANT UNIT 1 INSERVZCE ZNSPECTZON TEN-YEAR PIAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 134 or Clean Up NUMBER: 33.0  
DATE: 10/15/99                             NZNE MILE POINT NUCLEAR PIANT UNIT 1                         PAGE: 134 REVISION:        0                          INSERVZCE ZNSPECTZON TEN-YEAR PIAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS or Clean   Up NUMBER:   33.0 INSPECTION INTERVAL                      PIAN STATUS            PRESERVICE YEAR ASME                FIRST        SECOND      THIRD SEC. XI              PERZOD      PERIOD      PERZOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA IDENTIFICATION INSPECTION INTERVAL ASME SEC.XI CATEGY NDE ITEM NO METH PIAN STATUS THIRD PERZOD SECOND PERIOD FIRST PERZOD OUTAGE 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR INSTRUCTIONS
EXAMINATION AREA         CATEGY     NDE               OUTAGE                          INSTRUCTIONS IDENTIFICATION            ITEM NO   METH     1   2 3 4 1   2 3 4   1 2 3 4 ++CALIBRATION BLOCK~~
++CALIBRATION BLOCK~~6.0" Lino (REF.DWG.NO.20)189900 33.2-6-R5 Seismic Restraint F-A F1.10 3 X Code Case N 491 1, 4 Lugs**N/A~+190000 33.2-6-R5-WD-001 B K PT Integral Attachment B10~20 X Code Case N-509, Examine 100%of wold length*ON/A4*190100 33.2-6"R5-WD-004 B-K Integral Attachment B10.20 3 X Code Caso N-509, Examine 100%of wold length**N/A~*6.0" Line Outside CZV (REF.DWG.NO.C26852-1)00 33-FW-22 GL-E UT Pipe-to-SS Nozzle 88-01 3 X---X Outside CIV, 10%each refueling, weld overlay/Examine once cvcry 2 RFO's.~~SK"JAF-88-006**
6.0" Lino (REF. DWG. NO. 20) 189900     33.2-6-R5                 F-A                                                       Code Case N 491 1,   4 Seismic Restraint        F1.10                                                    Lugs **N/A~+
190300 33-FW-22"R GL-G UT Pipe-to-SS Nozzle 88-01 3 X X Outside CZV, 10%each rcfucling, weld overlay~~8K-JAF-88-006+*
3                            X 190000     33.2-6-R5-WD-001         B K         PT                                           Code Case N-509, Examine Integral Attachment      B10 20
190800 33-FW-35 Elbow-to-Nozzle GL S UT 88 01 3 X---X X Terminal End, Outside CIV, 10%each refueling~~PSR-.432"2**
                                          ~                                                    100% of wold length X                        *ON/A4*
190900 33-FW-36 Nozzle" to-Elbow GL-8 UT 88 01 X---X X--X Terminal End, Outside CIV, 10%each rcfucling~~PSR-.432-2*~
190100     33.2-6"R5-WD-004         B-K                                                       Code Caso N-509, Examine Integral Attachment      B10.20                                                    100% of wold length 3              X                        **N/A~*
191000 33-FW" 37 Elbow-to-Nozzle GL-S UT 88"01 3 X---X X Terminal End, Outside CZV, 10%each refueling~~PSR-.432-2'~*  
6.0" Line Outside CZV (REF. DWG. NO. C26852-1) 00     33-FW-22                 GL-E       UT                                             Outside CIV, 10% each Pipe-to-SS Nozzle       88-01                                                     refueling, weld overlay/
3             X   - - -     X         Examine once cvcry 2 RFO's. ~~SK"JAF-88-006**
190300     33-FW-22"R               GL-G       UT                                             Outside  CZV, 10% each Pipe-to-SS Nozzle         88-01                                                     rcfucling, weld overlay 3              X              X          ~~8K-JAF-88-006+*
190800     33-FW-35                 GL S        UT                                            Terminal End, Outside Elbow-to-Nozzle           88 01                                                     CIV, 10% each refueling 3 X   - - -   X   X                   ~~PSR-.432"2**
190900     33-FW-36                 GL-8        UT                                            Terminal End, Outside Nozzle" to-Elbow         88 01                                                     CIV, 10% each  rcfucling X   - - -   X   X   - -   X         ~~PSR-.432-2*~
191000     33-FW" 37                 GL-S        UT                                            Terminal End, Outside Elbow-to-Nozzle           88 "01                                                     CZV, 10% each  refueling 3 X   - - -   X   X                     ~~PSR-.432-2'~*


DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 ZNSERVICE INSPECTION TEN YEAR PLAN CIASS 1 SECTION XI SCHEDULED COMPONENTS PAGE: 135 tor Clean Up NUMBER: 33.2  
DATE: 10/15/99                             NINE MILE POINT NUCLEAR PLANT UNIT 1                         PAGE: 135 REVISION:        0                          ZNSERVICE INSPECTION TEN YEAR PLAN CIASS 1 SECTION XI SCHEDULED COMPONENTS tor Clean Up NUMBER:   33. 2 INSPECTION INTERVAL                      PLAN STATUS            PRESERVZCE YEAR ASME                FIRST        SECOND      THIRD SEC. XI              PERIOD        PERIOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER ZDENTZFZCATION INSPECTION INTERVAL ASME SEC.XI CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVZCE YEAR INSTRUCTIONS
EXAMINATION AREA         CATEGY      NDE                OUTAGE                        INSTRUCTIONS NUMBER     ZDENTZFZCATION           ITEM NO   METH     1 2 3 4   1   2 3 4   1 2 3 4 ~~CALIBRATION BLOCK~~
~~CALIBRATION BLOCK~~6.0" Line (REF.DWG.NO.20)195100 33-32 F-A VT 3 Pipe Stanchion F1.10 3 X Code Case N-491++N/A+~  
6.0" Line (REF. DWG. NO. 20) 195100     33-32                   F-A         VT 3                                           Code Case N-491 ++N/A+~
Pipe Stanchion          F1. 10 3 X


DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PIANT UNIT 1 INSERVICE INSPECTION TEN YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 136 or Instrumentation NUMBER: 36.0  
DATE: 10/15/99                           NINE MILE POINT NUCLEAR PIANT UNIT 1                           PAGE: 136 REVISION:        0                        INSERVICE INSPECTION TEN YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS or Instrumentation NUMBER:   36. 0                                                                         PRESERVICE YEAR INSPECTION INTERVAL                    PLAN STATUS ASME                FIRST        SECOND      THIRD SEC. XI            PERIOD        PERIOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTZFZCATZON INSPECTION INTERVAL ASME SEC.XI CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR INSTRUCTIONS
EXAMINATION AREA         CATEGY    NDE                OUTAGE                          INSTRUCTIONS NUMBER     IDENTZFZCATZON           ITEM NO   METH   1 2 3 4   1   2 3 4   1 2 3 4 >><<CALIBRATION BLOCK>><<
>><<CALIBRATION BLOCK>><<2.0" Linc (REF.DWG.NO.28)195200 36-WD-1073 N7L Closure Head-to-Nozzle B-D UT B3.90 3 X Group R31,*>>ZATER>>*195300 36-WD-1073-IR N7L Closure Head Nozzle Inner Radiu B-D UT B3.100 3 X Group R31,**ZATER*>>195400 36-WD-1074 N7L Closure Head Nozzle-to-Flange B"F UT B5.10 PT 3 X Group R31>>*LATER*>>
2.0" Linc   (REF. DWG. NO. 28) 195200   36-WD-1073               B-D         UT                                           Group R31, *>>ZATER>>*
500 36"WD"1074 N7L Closure Head Nozzle'-to-Flange SZL UT 455R1S1 3 X Group R31, Znconel 182 butter expansion from nozzlo side of weld.>><<LATER>>'>>2.0" Linc (REF.DWG.NO.8)195800 36-R12-A F-A VT-3 Spring Hanger Fl.10 3 X Code Case N-491-1>>*N/A>>>>196000 36-WD 003 Nozzle N13A-to-Safe End B-F B5.20 3 Group R42, Examine 100%of weld length.*<<N/A<<>>196050 36-WD-003 Nozzle N13A-to-Safe End SIL PT 571 3 X Group R42, Examine 100%of weld length.<<>>N/A>>>>196100 36 WD 004 B J Safe End-to-Coupling B9.21 3 X Terminal End, Examine 100%of weld length.**N/A**  
N7L Closure              B3.90 3                            X Head-to-Nozzle 195300   36-WD-1073-IR           B-D         UT                                           Group R31, **ZATER*>>
N7L Closure Head        B3.100 3                            X Nozzle Inner Radiu 195400   36-WD-1074               B"F         UT                                           Group R31>>*LATER*>>
N7L Closure Head         B5. 10      PT 3                            X Nozzle-to-Flange 500    36 "WD"1074              SZL         UT                                           Group R31, Znconel 182 N7L Closure Head        455R1S1                                                  butter expansion from 3                            X          nozzlo side of weld.
Nozzle'-to-Flange
                                                                                            >> <<LATER>> '>>
2.0" Linc   (REF. DWG. NO. 8) 195800   36-R12-A                 F-A         VT-3                                         Code Case N-491-1 Spring Hanger            Fl. 10                                                    >>*N/A>>>>
3                            X 196000   36-WD 003               B-F                                                      Group R42, Examine 100%
Nozzle N13A-to-Safe     B5.20                                                     of weld length. *<<N/A<<>>
3 End 196050   36-WD-003               SIL         PT                                           Group R42, Examine 100%
Nozzle N13A-to-Safe      571                                                      of weld length.   <<>>N/A>>>>
3                            X End 196100   36 WD 004             B J                                                     Terminal End, Examine Safe End-to-Coupling     B9.21                                                     100% of weld length.
3                            X          **N/A**


DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PIANT UNIT 1 INSERVZCE ZNSPECTZON TEN-YEAR PLAN CLASS 1 SECTION XI SCHEDULED COMPONENTS PAGE: 137 or Instrumentation NUMBER: 36.0  
DATE: 10/15/99                             NINE MILE POINT NUCLEAR PIANT UNIT 1                         PAGE: 137 REVISION:        0                          INSERVZCE ZNSPECTZON TEN-YEAR PLAN CLASS 1 SECTION XI SCHEDULED COMPONENTS or Instrumentation NUMBER: 36.0                                                                           PRESERVZCE YEAR INSPECTION INTERVAL                    PLAN STATUS ASME                FIRST        SECOND      THIRD SEC. XZ              PERIOD        PERIOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVZCE YEAR INSTRUCTIONS
EXAMINATION AREA           CATEGY    NDE                  OUTAGE                        INSTRUCTIONS NUMBER     IDENTIFICATION           ITEM NO   METH   1 2 3 4   1   2 3 4   1 2 3 4 ++CALIBRATION BLOCK++
++CALIBRATION BLOCK++2.0" Linc (REF.DWG.NO.SC)196500 36-WD-924 N16A Nozzle-to-Safe BS.20 End X Group R43, iiN/A++196600 36-WD-924 SZL N16A Nozzle-to-Safe 571 End PT 3 X Group R43, Determine if Aug.Sur/Vol on nozzle and safe cnd is required, SIL 571?s*N/Aaa 196700 36-WD-925 B-J Terminal End Nozzle Safe End-to-Coupling B9.21 3 N16A, Examine 100%of weld length+~N/Ai*00 36-WD-932 B-J Elbow-to<<Coupling
2.0" Linc (REF. DWG. NO. SC) 196500   36-WD-924                                                                           Group R43, iiN/A++
" B9.40 3 X Examine 100%of weld length**N/A**  
N16A Nozzle-to-Safe       BS. 20 X
End 196600   36-WD-924                 SZL                                                       Group R43, Determine  if N16A Nozzle-to-Safe     571         PT                                           Aug. Sur/Vol on nozzle 3                            X End                                                                                and safe cnd is required, SIL 571 ?
s*N/Aaa 196700   36-WD-925                 B-J                                                       Terminal End Nozzle Safe End-to-Coupling     B9. 21                                                   N16A, Examine 100%   of 3                                      weld length +~N/Ai*
00   36-WD-932                 B-J                                                       Examine 100%  of  weld Elbow-to<<Coupling     " B9.40                                                     length **N/A**
3                            X


DATE: 10/15/99 REVISION: NINE MILE POINT NUCLEAR PLANT UNIT 1 ZNSERVZCE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XI SCHEDULED COMPONENTS PAGE: 138 or Drain NUMBER: 37.0  
DATE: 10/15/99                           NINE MILE POINT NUCLEAR PLANT UNIT 1                         PAGE: 138 REVISION:                                  ZNSERVZCE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XI SCHEDULED COMPONENTS or Drain NUMBER: 37. 0                                                                         PRESERVICE YEAR INSPECTION INTERVAL                      PLAN STATUS ASME                FIRST        SECOND      THIRD SEC. XZ              PERIOD        PERIOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR INSTRUCTIONS
EXAMINATION AREA         CATEGY      NDE                  OUTAGE                        INSTRUCTIONS NUMBER     IDENTIFICATION         ITEM NO     METH   1 2 3 4   1   2 3 4   1 2 3 4 ~ +CALIBRATION BLOCK~*
~+CALIBRATION BLOCK~*2.0" Line (REF.DWG.NO.9)197600 37-WD-030 Pipe-to-Elbow B-J PT B9.21 3--X Examine 100%of weld length++N/A+~  
2.0" Line (REF. DWG. NO. 9) 197600   37-WD-030               B-J         PT                                             Examine 100% of weld Pipe-to-Elbow          B9. 21                                                    length ++N/A+~
3 - -          X


DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 INSERVZCE ZNSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 139 or Head Vent NUMBER: 37.0  
DATE: 10/15/99                             NINE MILE POINT NUCLEAR PLANT UNIT 1                           PAGE: 139 REVISION:        0                            INSERVZCE ZNSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS or Head Vent NUMBER: 37.0 INSPECTION ZNTERVAL                      PLAN STATUS            PRESERVZCE YEAR ASME                  FIRST        SECOND      THIRD SEC. XZ                PERIOD      PERIOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION ZNTERVAL ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVZCE YEAR INSTRUCTIONS
EXAMINATION AREA         CATEGY      NDE                OUTAGE                          INSTRUCTIONS NUMBER     IDENTIFICATION           ITEM NO     METH   1 2 3 4 1   2 3 4   1 2 3 4 ~ ~CALIBRATION   BLOCK**
~~CALIBRATION BLOCK**2.0" Line (REF.DWG.NO.9)197800 37-01-VB B-G-2 VT-1 Valve 37-01 Bolting B7.70 3 X~~N/A~~197900 37-02-VB B G-2 4 l N/A**Valve 37-02 Bolting B7.70 3 X 198000 37-06-VB Valve 37-06 Bolting B G-2 B7.70 VT 1 3 X t tN/At 1 198200 37-R11 Spring Hanger F-A Fl.10 3 X Code Case N"491-1**N/A+*0 37-R12 Spring Hanger F A Fl.10 VT-3 3 X Code Case N-491-1 ktN/Atf 4.0" Zine (REF.DWG.NO.9)199100 37-WD-001 B D UT Group R39,~*LATER~~NS Nozzle-to-Head B3.90 3 X 199200 37-WD-001-ZR B-D UT N8 Nozzle Znner Radius Section 3 X Group R39,~+LATER**199300 37-WD-002 B-F UT Nozzle N8-to-Flange BS.10 PT 3 X Group R39, Examine 100%of weld length++IATER++199400 37-WD-002 SZL UT Nozzle NS-to-Flango 455R1S1 3 Inconel 182 Butter Expansion from Nozzle side.~~IATER~+  
2.0" Line   (REF. DWG. NO. 9) 197800     37-01-VB                 B-G-2       VT-1                                           ~~N/A~~
Valve 37-01 Bolting       B7.70 3 X 197900     37-02-VB                 B G-2                                                       4 lN/A**
Valve 37-02 Bolting     B7.70 3 X 198000     37-06-VB                 B G-2        VT 1                                            t tN/At1 Valve 37-06 Bolting       B7. 70 3 X 198200     37-R11                   F-A                                                       Code Case N"491-1 Spring Hanger            Fl. 10                                                    **N/A+*
3 X 0   37-R12                   F A         VT-3                                         Code Case N-491-1 Spring Hanger            Fl . 10                                                    ktN/Atf 3              X 4.0" Zine   (REF. DWG. NO. 9) 199100     37-WD-001                 B D         UT                                           Group R39, ~*LATER~~
NS Nozzle-to-Head       B3.90 3             X 199200     37-WD-001-ZR             B-D         UT                                           Group R39,   ~ +LATER**
N8  Nozzle Znner Radius 3              X Section 199300     37-WD-002                 B-F         UT                                           Group R39, Examine 100%
Nozzle N8-to-Flange       BS. 10       PT                                           of weld length     ++IATER++
3              X 199400     37-WD-002                 SZL         UT                                           Inconel 182 Butter Nozzle NS-to-Flango       455R1S1                                                   Expansion from Nozzle 3
side.   ~ ~IATER~ +


DATE: 10/15/99 REVISZON: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION TEN YEAR PIAN CLASS 1 SECTION XI SCHEDULED COMPONENTS PAGE: 140 or Head Vent NUMBER: 37.0  
DATE: 10/15/99                           NINE MILE POINT NUCLEAR PLANT UNIT 1                         PAGE: 140 REVISZON:        0                          INSERVICE INSPECTION TEN YEAR PIAN CLASS 1 SECTION XI SCHEDULED COMPONENTS or Head Vent NUMBER:   37.0 INSPECTION INTERVAL                      PLAN STATUS            PRESERVZCE YEAR ASME                FIRST        SECOND      THIRD SEC. XZ              PERZOD        PERZOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERZOD PLAN STATUS SECOND PERZOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVZCE YEAR INSTRUCTIONS
EXAMINATION AREA       CATEGY      NDE                  OUTAGE                        INSTRUCTIONS NUMBER     IDENTIFICATION         ITEM NO     METH   1 2 3 4   1   2 3 4   1 2 3 4 >>>>CALIBRATION BLOCK<<>>
>>>>CALIBRATION BLOCK<<>>199500 37-WD-002-FB Flange Bolting B-G-2 B7.50 3 X Examine in place, when removed, or when disassembled.
199500     37-WD-002-FB           B-G-2                                                     Examine in place, when Flange Bolting          B7.50                                                      removed, or when 3 X                                                      >>*N/A*>>
>>*N/A*>>199700 37-WD-003 Flange-to-Rcduccr GL-D UT 88-01 3 X X<<>>4-A396-.337>>>>
disassembled.
199710 37-WD-003 N/A Flange-to-Rcduccr N/A 3 X-"-X X--X VT-2 each outage for cvidcncc of leakage>>>>4-A396-.337>>>>
199700     37-WD-003               GL-D         UT                                             <<>>4-A396-.337>>>>
2.0" Linc (REF.DWG.NO.9)199800 37-WD-004 Rcduccr to Pipe B-J B9.40 3 X Examine 100%of weld length<<<<N/A<<>>200000 37-WD-006 Elbow-to-Pipe B-J B9.21 3 X Examino 100%of weld length>>>>N/A>>>>200100 37-WD-007 Pipe-to-Flange B-J B9.40 3 X Examine 100%of weld length>>*N/A**200200 37-WD-007-FB B-G-2 VT-1 Refueling Platform B7.50 Flange Bolting 3 X Examine in place, when removed, or when disassembled
Flange-to-Rcduccr      88-01 3              X            X 199710     37-WD-003               N/A                                                       VT-2 each outage  for Flange-to-Rcduccr       N/A                                                       cvidcncc of leakage 3 X   - " -     X   X - -   X         >>>>4-A396-.337>>>>
>>>>N/A>>>>200500 37-WD-010 Tcc to Pipo B-J B9.21 3 X Examine 100%of weld length**N/A*>>201000 37-WD-015 Pipe-to-Valvo 37-01B-J B9.40 3 X Terminal End, High Stress Weld, Examine 100%of weld length**N/A**  
2.0" Linc (REF. DWG. NO. 9) 199800     37-WD-004               B-J                                                       Examine 100% of weld Rcduccr to Pipe        B9.40                                                      length <<<<N/A<<>>
3 X 200000     37-WD-006               B-J                                                        Examino 100% of weld Elbow-to-Pipe           B9. 21                                                     length >>>>N/A>>>>
3 X 200100     37-WD-007               B-J                                                        Examine 100%  of weld Pipe-to-Flange         B9.40                                                     length >>*N/A**
3 X 200200     37-WD-007-FB           B-G-2       VT-1                                           Examine  in place,  when Refueling Platform     B7.50                                                     removed, or when 3 X Flange Bolting                                                                    disassembled >>>>N/A>>>>
200500     37-WD-010               B-J                                                       Examine 100%   of weld Tcc to Pipo            B9. 21                                                    length **N/A*>>
3 X 201000     37-WD-015               B-J                                                        Terminal End, High Pipe-to-Valvo 37-01    B9.40                                                     Stress Weld, Examine 3 X 100% of weld length
                                                                                              **N/A**


DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 ZNSERVZCE ZNSPECTZON TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 141 tor Head Vent E NUMBER: 37.0  
DATE: 10/15/99                           NINE MILE POINT NUCLEAR PLANT UNIT 1                         PAGE: 141 REVISION:        0                        ZNSERVZCE ZNSPECTZON TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS tor Head Vent E NUMBER:   37.0 INSPECTION INTERVAL                    PLAN STATUS            PRESERVICE YEAR ASME                FIRST        SECOND      THIRD SEC. XZ              PERIOD        PERIOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER ZDENTIPZCATION 201300 37-WD-018 Tee-to-Pipe INSPECTION INTERVAL ASME SEC.XZ CATEGY NDE, ITEM NO METH B"J B9.21 FIRST PERIOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD X 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR INSTRUCTIONS
EXAMINATION AREA         CATEGY     NDE,               OUTAGE                          INSTRUCTIONS NUMBER      ZDENTIPZCATION          ITEM NO   METH   1 2 3 4   1   2 3 4   1 2 3 4 **CALIBRATIONBLOCK~*
**CALIBRATION BLOCK~*Examine 100%oi'eld length.~+N/A~+201700 37-WD-022 Elbow-to-Pipe B J B9.21 3 X Examine 100%of weld length*~N/A*~202200 37-WD-027 Pipe-to-Valve 37-02 B J B9.40 X Terminal End, High Stress Wclds, Examine 100%of wold length arN/Aaa  
201300    37-WD-018              B"J                                                      Examine 100% oi'eld Tee-to-Pipe              B9.21                                                    length. ~+N/A~+
X 201700     37-WD-022               B  J                                                      Examine 100% of weld Elbow-to-Pipe           B9.21                                                     length *~N/A*~
3 X 202200   37-WD-027               B  J                                                      Terminal End, High Pipe-to-Valve 37-02     B9.40                                                     Stress Wclds, Examine X
100% of wold length arN/Aaa


DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PIANT UNZT 1 INSERVICE INSPECTION TEN YEAR PLAN CLASS 1 SECTION XI SCHEDULED COMPONENTS PAGE: 142 or Drain NUMBER: 37.1  
DATE: 10/15/99                               NINE MILE POINT NUCLEAR PIANT UNZT 1                           PAGE: 142 REVISION:        0                            INSERVICE INSPECTION TEN YEAR PLAN CLASS 1 SECTION XI SCHEDULED COMPONENTS or Drain NUMBER:   37. 1 INSPECTION INTERVAL                      PLAN STATUS            PRESERVICE YEAR ASME                FIRST        SECOND      THZRD SEC. XI            PERIOD        PERIOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER ZDENTZFICATZON INSPECTION INTERVAL ASME SEC.XI CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD OUTAGE THZRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR INSTRUCTIONS
EXAMINATION AREA           CATEGY      NDE                  OUTAGE                          INSTRUCTIONS NUMBER     ZDENTZFICATZON             ITEM NO     METH   1 2 3 4   1   2 3 4   1 2 3 4 ~~CALIBRATION BLOCK~~
~~CALIBRATION BLOCK~~2.0" Linc (REF.DWG.NO.9)202700 37-Hl F-A VT-3 Spring Hanger Fl.10 3 X Code Case N-491-1++N/A+*203100 37-SC-2 Box Restraint Fl.10 3 X Code Casa N-491-1**N/A**203300 37.1"07R-VB B-G-2 VT-1 Valve 37-07R Bolting X Examine in place, when disassembled or when removed.+*N/A~+203400 37.1-37-08R-VB B G 2 Valve 37-08R Bolting B7~70 3 Examine in place, when removed, or when disassembled.
2.0" Linc   (REF. DWG. NO. 9) 202700   37-Hl                     F-A         VT-3                                           Code Case N-491-1 Spring Hanger              Fl . 10                                                      ++N/A+*
++N/A~~203500 37.1-37-10-VB Valve 37-10 Bolting B-G-2 B7.70 VT 1 3 X Examine in place, when removed, or when disassembled
3 X 203100   37-SC-2                                                                               Code Casa N-491-1 Box  Restraint            Fl . 10                                                      **N/A**
+*N/A**203600 37.1-37-11-VB B-G-2 VT-1 Valve 37-11 Bolting B7.70 3 X Examine in place, when removed or when disassembled.
3                            X 203300   37. 1 "07R-VB             B-G-2       VT-1                                           Examine  in place,  when Valve 37-07R   Bolting                                                               disassembled   or when X                                  +*N/A~+
**N/A*+203900 37.1-WD-003 Pipe-to-Valve 37-10 B J B9.40 3 X Terminal End, High Stress Weld, Examine 100%of weld length~*N/A**204500 37.1-WD-009 B J PiPc to-Valve 37 07R B9.40 3 X Terminal End, High Stress Weld, Examine 100%of wold length~~N/A~~  
removed.
203400     37.1-37-08R-VB             B G 2                                                       Examine  in place,  when Valve 37-08R Bolting       B7 ~ 70                                                     removed,   or when 3
disassembled. ++N/A~~
203500   37. 1-37-10-VB             B-G-2       VT 1                                           Examine   in place, when Valve 37-10 Bolting        B7.70                                                      removed,   or when 3                            X          disassembled   +*N/A**
203600   37. 1-37-11-VB             B-G-2       VT-1                                           Examine  in place,  when Valve 37-11 Bolting         B7.70                                                       removed   or when 3              X disassembled.   **N/A*+
203900   37.1-WD-003                 B  J                                                        Terminal End, High Pipe-to-Valve 37-10         B9.40                                                       Stress Weld, Examine 3                            X 100% of weld length
                                                                                                  ~*N/A**
204500   37.1-WD-009                 B J                                                       Terminal End, High PiPc to-Valve 37 07R       B9. 40                                                     Stress Weld, Examine 3                            X 100% of wold length
                                                                                                  ~~N/A~~


DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 ZNSERVZCE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 143 or Drain NUMBER: 37.1  
DATE: 10/15/99                           NINE MILE POINT NUCLEAR PLANT UNIT 1                         PAGE: 143 REVISION:        0                        ZNSERVZCE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS or Drain NUMBER:   37.1 INSPECTION INTERVAL                    PLAN STATUS            PRESERVICE YEAR ASME                FIRST        SECOND      THIRD SEC. XZ              PERIOD      PERZOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERZOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR INSTRUCTIONS
EXAMINATION AREA         CATEGY    NDE                OUTAGE                        INSTRUCTIONS NUMBER     IDENTIFICATION           ITEM NO   METH     1 2 3 4 1   2 3 4   1 2 3 4 ~'iCALIBRATION BLOCK~~
~'iCALIBRATION BLOCK~~204900 37.1-WD-013 Pipe-to-Coupling B-J B9.40 3 X Examine 100%of weld length+iN/Aii 205100 37.1-WD-015 B-J Pipe-to-Valve 37-11 B9.40 X Terminal End, High Stress Weld, Examine 100%of wold length.~~N/A~~205300 37.1-WD-017 B-J Pipe-to-Valve 37-OSR B9.40 3 X Terminal End, High Stress Weld, Examine 100%of wold length.ikN/A%0  
204900     37. 1-WD-013             B-J                                                      Examine 100%  of weld Pipe-to-Coupling         B9.40                                                   length +iN/Aii 3              X 205100     37. 1-WD-015             B-J                                                     Terminal End, High Pipe-to-Valve 37-11     B9.40                                                   Stress Weld, Examine X
100% of wold length.
                                                                                            ~~N/A~~
205300     37. 1-WD-017             B-J                                                     Terminal End, High Pipe-to-Valve 37-OSR   B9.40                                                   Stress Weld, Examine 3                            X 100% of wold length.
ikN/A%0


DATE: 10/15/99 REVISION: 0 NZNE MILE POINT NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION TEN YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 144 or Shutdown Cooling NUMBER: 38.0  
DATE: 10/15/99                             NZNE MILE POINT NUCLEAR PLANT UNIT 1                             PAGE: 144 REVISION:          0                          INSERVICE INSPECTION TEN YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS or Shutdown Cooling NUMBER:   38. 0 INSPECTION INTERVAL                      PIAN STATUS            PRESERV ICE YEAR ASME                FIRST        SECOND      THIRD SEC. XZ              PERIOD        PERIOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAHI NATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL ASME SEC.XZ CATEGY NDE ITEM NO HETH FIRST PERIOD PIAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERV ICE YEAR INSTRUCTIONS
EXAHINATION AREA         CATEGY      NDE                OUTAGE                          INSTRUCTIONS NUMBER     IDENTIFICATION           ITEM NO   HETH   1 2 3 4   1   2 3 4   1 2 3 4 **CALIBRATIONBLOCK~ ~
**CALIBRATION BLOCK~~14.0" SDC Line (REF.DWG.NO.10)205600 38-01-VB B G-2 VT-1 Valve 38-01 Bolting B7.70 3 V07, Limited to valve selcctcd under B-M-2++N/A++205700 38-01-VBY B"H-2 VT-3 Valve 38-01 Interior B12.50 Surf aco 3 X V07, Only when disassembled, One valve among a group of valves.~~N/A~~1 206100 38-12-FLG B-G-1 VT 1 Valve 38-12 Flange B6.220 Surface X Vlo, When connection is disasscmblcd, Examine 1.0" annular surface of flange surrounding each stud.~~N/A~~206200 38-12-NBW Valve 38-12 Nuts, Bushing, Washers B G-1 B6.230 VT 1 3 X V10 (~<<N/A>>~206300 38-12-VB Valve 38-12 Bolting B-G-1 UT B6.210 3 X V10, 16 studs, Examine inplacc, when disasscmblcd, or when removed.+~NM1-2.50-Bl 6-1~+206400 38"12-VBY B-H-2 VT-3 Valve 38-12 Zntcrior B12.50 Surface X V10, Only when disassembled, Onc valve among a group of valves tfN/At*206500 38-12-WD-003 B K Code Case N-509~~N/A~+Valve 38-12 Integral B10.40 Attachment 3 X  
14.0"   SDC Line (REF. DWG. NO. 10) 205600     38-01-VB                 B G-2       VT-1                                           V07, Limited    to valve Valve 38-01 Bolting       B7.70                                                     selcctcd under B-M-2 3                                        ++N/A++
205700     38-01-VBY                 B"H-2       VT-3                                           V07, Only when Valve 38-01   Interior   B12.50                                                     disassembled, One valve 3                            X Surf aco                                                                            among a group of valves.
                                                                                                  ~~N/A~~
1 206100     38-12-FLG                 B-G-1       VT 1                                           Vlo,  When connection is Valve 38-12 Flange       B6.220                                                     disasscmblcd,     Examine Surface                                                                  X          1.0" annular surface of flange surrounding each stud.   ~~N/A~~
206200     38-12-NBW                 B G-1       VT 1                                           V10 ( ~ <<N/A>> ~
Valve 38-12 Nuts,          B6.230 3                            X Bushing, Washers 206300     38-12-VB                   B-G-1       UT                                             V10, 16 studs,     Examine Valve 38-12 Bolting        B6.210                                                    inplacc,   when 3                            X disasscmblcd,     or   when removed.
                                                                                                  + ~NM1-2 . 50-Bl 6-1 ~ +
206400     38 "12-VBY                 B-H-2       VT-3                                           V10, Only when Valve 38-12 Zntcrior       B12.50                                                     disassembled, Onc valve Surface                                                                    X among a group of valves tfN/At*
206500     38-12-WD-003               B K                                                       Code Case N-509 ~~N/A~+
Valve 38-12 Integral       B10.40 3                             X Attachment


DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 ZNSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XI SCHEDULED COMPONENTS PAGE: 145 or Shutdown Cooling NUMBER: 38.0  
DATE: 10/15/99                             NINE MILE POINT NUCLEAR PLANT UNIT 1                         PAGE: 145 REVISION:        0                        ZNSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XI SCHEDULED COMPONENTS or Shutdown Cooling NUMBER:   38. 0                                                                         PRESERVICE YEAR ZNSPECTZON INTERVAL                      PLAN STATUS ASME                FIRST        SECOND      THIRD SEC. XI            PERIOD        PERIOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION ZNSPECTZON INTERVAL ASME SEC.XI CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD THIRD PERIOD OUTAGE 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR INSTRUCTIONS
EXAMINATION AREA         CATEGY      NDE                  OUTAGE                        INSTRUCTIONS NUMBER     IDENTIFICATION         ITEM NO   METH     1 2 3 4   1   2 3 4   1 2 3 4 ~~CALIBRATION BLOCX~~
~~CALIBRATION BLOCX~~207300 38-H1 Spring Hanger F-A Fl.10 3--------X Code Case N-491-1 1 fN/Af i 208100 38-WD-001 Valve 38-01-to-Pipe GL-D UT 88-01 3----X---X Requires 38-H-1 Clamp to be removed.~~PSR-.760~~
207300     38-H1                   F-A                                                       Code Case N-491-1 Spring Hanger          Fl . 10                                                   1 fN/Afi 3 - - - -     - - - -       X 208100     38-WD-001               GL-D       UT                                             Requires 38-H-1 Clamp to Valve 38-01-to-Pipe      88-01                                                      be removed. ~~PSR-.760~~
208200 38-WD-001 B-J UT Valve 38-01-to-Pipe B9.11 PT 3 X Support 38-Hl support clamp is required to bc removed prior to pcrformanco.
3  - -    -  X  - - -    X 208200     38-WD-001               B-J         UT                                             Support 38-Hl support Valve 38-01-to-Pipe     B9. 11     PT                                             clamp is required to bc 3                            X          removed prior to pcrformanco. ~*LATER**
~*LATER**208300 38"WD-002 Pipe-to-Elbow B-J UT B9.11 PT 3 X Examine 100%of weld length~*LATER~+00 38-WD-002 Pipe" to-Elbow GL D UT 88-01 3 X X**LATER**208500 38-WD-002-Dl B-J UT Elbow-hong Seams OR B9.12 3 X Code Case N-524~~LATER++208600 38-WD-002-D2 B-J UT Elbow-Long Seams IR B9~12 PT Code Case N-524**IATER++208800 38-WD-003 Elbow-to-Elbow GL D UT 88-01 3 X X*~LATER~~209400 38-WD"004 Elbow-to-Pipe GL-D UT 88-01 3 X X+~IATER~+209900 38-WD-005 Pipe-to-Elbow GL D UT 88"01 X X**PSR-.760**  
208300     38"WD-002               B-J        UT                                            Examine 100%  of weld Pipe-to-Elbow           B9. 11     PT                                             length   ~*LATER~+
3              X 00     38-WD-002               GL D        UT                                              **LATER**
Pipe" to-Elbow         88-01 3 X           X 208500     38-WD-002-Dl           B-J         UT                                             Code Case N-524 Elbow-hong Seams OR   B9.12                                                     ~~LATER++
3              X 208600     38-WD-002-D2           B-J         UT                                             Code Case N-524 Elbow-Long Seams IR     B9 12
                                      ~       PT                                             **IATER++
208800     38-WD-003               GL D        UT                                              *~LATER~~
Elbow-to-Elbow         88-01 3 X           X 209400     38-WD"004               GL-D        UT                                              +~IATER~+
Elbow-to-Pipe           88-01 3 X           X 209900   38-WD-005               GL D       UT                                               **PSR-.760**
Pipe-to-Elbow            88 "01 X            X


DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 ZNSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 146 r Shutdown Cooling NUMBER: 38.0  
DATE: 10/15/99                           NINE MILE POINT NUCLEAR PLANT UNIT 1                           PAGE: 146 REVISION:        0                          ZNSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS r Shutdown Cooling NUMBER:   38.0 INSPECTION INTERVAL                    PLAN STATUS              PRESERVICE YEAR ASME                FIRST      SECOND      THIRD SEC. XI              PERIOD      PERIOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL ASME SEC.XI CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR INSTRUCTIONS
EXAMINATION AREA         CATEGY    NDE                OUTAGE                            INSTRUCTIONS NUMBER       IDENTIFICATION           ITEM NO   METH     1   2 3 4 1   2 3 4   1 2 3 4   *<<CALIBRATION BLOCK<<<<
*<<CALIBRATION BLOCK<<<<210400 38-WD-006 Elbow-to-Pipe GL-D UT 88-01 3 X X*<<PSR-.760<<<<
210400     38-WD-006               GL-D       UT                                               *<<PSR-.760<<<<
210900 38-WD-007 Pipe-to-Pipe GL-G 88 01 3 X---X X--X Inaccessible inside pen.X-S, Examine area each outage for evidence of leakage.**N/A**211200 38-WD-008 GL-G VT-2 Inaccessible inside Pipe-to-Valve 38-02 88-01 3 X---X X--X pcnctration X-8, Examine each outage for evidence of leakage.**N/A*<<211400 38-WD-087 GL-G Valve 38-12-to-Pipe 88-01 X-"-X X--X Inaccessible inside pen.X-7.Examine area each outage for cvidcncc of leakage.<<<<N/A**211500 38 WD-088 Pipe-to-Pipe GL G 88-01 X---X X--X Inaccessible inside pen.X-7.Examine area each outage for evidence of leakage.<<*N/A<<<<211700 38-WD-089 Pipe-to-Elbow B J B9.11 3 X Examine 100%of weld length*<<LATER<<<<211800 38-WD-089 Pipe-to-Elbow
Elbow-to-Pipe            88-01 3            X            X 210900     38-WD-007               GL-G                                                      Inaccessible inside pen.
'GL-D UT 88-01 3 X X<<<<LATER<<<<212200 38-WD-090 Elbow-to" Pipe GL D UT 88-01 X X'*LATER<<<<
Pipe-to-Pipe             88 01                                                   X-S, Examine area each 3 X   - - -   X   X - -   X outage for evidence of leakage. **N/A**
211200     38-WD-008               GL-G       VT-2                                           Inaccessible inside Pipe-to-Valve 38-02     88-01                                                   pcnctration X-8, Examine 3 X   - - -   X   X -     X each outage     for evidence of leakage. **N/A*<<
211400     38-WD-087               GL-G                                                     Inaccessible inside pen.
Valve 38-12-to-Pipe     88-01                                                     X-7. Examine area each X   - " -   X   X - -   X outage for cvidcncc of leakage. <<<<N/A**
211500     38 WD-088               GL G                                                      Inaccessible inside pen.
Pipe-to-Pipe             88-01                                                     X-7. Examine area each X  - - X X   - -   X outage for evidence of leakage. <<*N/A<<<<
211700     38-WD-089               B  J                                                      Examine 100%    of weld Pipe-to-Elbow           B9.11                                                     length     *<<LATER<<<<
3 X
                                                    '
211800     38-WD-089               GL-D       UT                                               <<<<LATER<<<<
Pipe-to-Elbow            88-01 3 X              X 212200     38-WD-090               GL D        UT                                              '
                                                                                                    *LATER<<<<
Elbow-to" Pipe           88-01 X             X


DATE: 10/15/99 REVISION: 0 NINE HILE POZNT NUCLEAR PLANT UNIT 1 ZNSERVICE ZNSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 147 or Shutdown Cooling NUMBER: 38.0 SUMHARY EXAHI NATION AREA NUHBER IDENTIFICATION INSPECTION INTERVAL ASME SEC.XI CATE GY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR INSTRUCTIONS
DATE: 10/15/99                           NINE HILE POZNT NUCLEAR PLANT UNIT 1                         PAGE: 147 REVISION:        0                        ZNSERVICE ZNSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS or Shutdown Cooling NUMBER:   38. 0 INSPECTION INTERVAL                     PLAN STATUS            PRESERVICE YEAR ASME                 FIRST        SECOND      THIRD SEC. XI             PERIOD        PERIOD      PERIOD SUMHARY    EXAHINATION AREA        CATE GY     NDE                 OUTAGE                        INSTRUCTIONS NUHBER      IDENTIFICATION          ITEM NO   METH     1 2 3 4   1   2 3 4   1 2 3 4 ~+CALIBRATION BLOCK~~
~+CALIBRATION BLOCK~~212700 38"WD-091 Pipe-to-Pipe GL-D UT 88-01 3 X~~PBR-.760~*
212700     38 "WD-091             GL-D       UT                                             ~~PBR-.760~*
212800 38-WD-092 Pipe-to-Pipe GL"D UT 88-01 3 X X+*P8R-.760~*
Pipe- to-Pipe          88-01 3              X 212800     38-WD-092               GL"D       UT                                             +*P8R-.760~*
213100 38-WD-093 Pi pe-to-Elbow GL-D UT 88-01 3 X X**LATER**213500 38-WD-094 GL-D UT+*PBR.760+*Elbow-to-Valve 38-13 88-01 3 X X  
Pipe-to-Pipe            88-01 3              X              X 213100     38-WD-093               GL-D        UT                                              **LATER**
Pi pe-to-Elbow         88-01 3 X                 X 213500     38-WD-094               GL-D       UT                                             +*PBR .760+*
Elbow-to-Valve 38-13   88-01 3             X             X


DATE: 10/15/99 REVISION: 0 NINE HZLE POINT NUCLEAR PZANT UNIT 1 ZNSERVICE INSPECTION TEN YEAR PLAN CLASS 1 SECTION XI SCHEDULED COHPONENTS PAGE: 148 cncy Condenser Return INSPECTION INTERVAL HUHBER: 39.0 PLAN STATUS PRESERVZCE YEAR
DATE: 10/15/99                             NINE HZLE POINT NUCLEAR PZANT UNIT 1                         PAGE: 148 REVISION:        0                          ZNSERVICE INSPECTION TEN YEAR PLAN CLASS 1 SECTION XI SCHEDULED COHPONENTS cncy Condenser Return HUHBER:   39.0                                                                           PRESERVZCE YEAR INSPECTION INTERVAL                      PLAN STATUS ASHE                FIRST        SECOND      THIRD SEC. XI              PERIOD        PERIOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION ASHE SEC.XI CATEGY NDE ITEM NO METH FIRST PERIOD SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 ZNSTRUCTIONS
EXAMINATION AREA         CATEGY      NDE                  OUTAGE                          ZNSTRUCTIONS NUMBER     IDENTIFICATION           ITEM NO     METH   1 2 3 4   1   2 3 4   1 2 3 4 *+CALIBRATIONBLOCK*
*+CALIBRATION BLOCK*10.0" ECC I ine (REF.DWG.NO.11A)213800 39-01R-VB Valve 39-01 Bolting B G-2 B7.70 V15, Limited to valve selected under B-M-2 X~~N/A+~213900 39-01R-VBY BH2 Valve 39-01 Interior B12.50 Surface 3 X V15, Only when disassembled, One valve among a group of valves.1tN/Af*214200 39-03-VB B-G-2 VT-1 Valve 39-03 Bolting B7.70 3 X V12, Limited to valve selected under B-H-2.++N/A**0 39-03-VBY B-H-2 VT-3 Valve 39-03 Interior B12.50 Surface 3 X V12, Only when di.assembled,, One valve among a group of valves.**N/A0f 214600 39-05"VB B-G-2 VT-1 Valve 39-05 Bolting B7.70 3 X V09, Limited to valvo selected under B-M-2%*N/A**214700 39-05-VBY Valve 39-05 Interior Surface B-M-2 VT 3 B12.50 3 X V09, Only when disassembled, Onc valve among a group of valves.esN/Aaa 215200 39-A2 Anchor F-A Fl.10 3 X Code Case N-491-1 tiN/Aft  
10.0" ECC I ine (REF. DWG. NO. 11A) 213800     39-01R-VB               B G-2                                                     V15, Limited   to valve Valve 39-01 Bolting      B7.70                                                      selected under B-M-2 X                                     ~~N/A+~
213900     39-01R-VBY               BH2                                                       V15, Only when Valve 39-01   Interior   B12.50 3 X disassembled,   One valve Surface                                                                            among a group   of valves.
1tN/Af*
214200     39-03-VB                 B-G-2       VT-1                                           V12, Limited  to valve Valve 39-03 Bolting     B7. 70                                                     selected under B-H-2.
3              X                        ++N/A**
0   39-03-VBY               B-H-2       VT-3                                           V12, Only when Valve 39-03   Interior   B12.50                                                     di.assembled,, One valve 3              X Surface                                                                            among a group of valves.
                                                                                              **N/A0f 214600     39-05 "VB               B-G-2       VT-1                                           V09,  Limited to valvo Valve 39-05   Bolting   B7.70                                                     selected under B-M-2 3 X                                    %*N/A**
214700     39-05-VBY               B-M-2       VT 3                                           V09, Only when Valve 39-05  Interior  B12. 50                                                    disassembled, Onc valve 3 X Surface                                                                            among a group of valves.
esN/Aaa 215200     39-A2                   F-A                                                       Code Case N-491-1 Anchor                  Fl. 10                                                    tiN/Aft 3 X


DATE: 10/15/99 REVISION: 0 NZNE MILE POINT NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XI SCHEDULED COMPONENTS PAGE: 149 ency Condenser Return NUMBER: 39.0 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR  
DATE: 10/15/99                             NZNE MILE POINT NUCLEAR PLANT UNIT 1                           PAGE: 149 REVISION:        0                            INSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XI SCHEDULED COMPONENTS ency Condenser Return NUMBER: 39.0 INSPECTION INTERVAL                       PLAN STATUS             PRESERVICE YEAR ASME                  FIRST        SECOND      THIRD SEC. XZ                PERIOD      PERIOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER ZDENTZFZCATION ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 INSTRUCTIONS
EXAMINATION AREA       CATEGY        NDE                OUTAGE                          INSTRUCTIONS NUMBER     ZDENTZFZCATION         ITEM   NO   METH   1 2 3 4 1   2 3 4   1 2 3 4 ~ +CALIBRATION BLOCK**
~+CALIBRATION BLOCK**215300 39-A2-WD-001 Anchor Integral Attachment B-K B10.20 3 X Code Case N-509**N/Ai~215400 39-A2-WD-002 Anchor Integral Attachment B-K PT B10.20 3 X Code Case N-509+*N/A**215900 39-H16 Spring Hanger Fl.10 VT-3 3 X Code Case N-491-1.*AN/Af*217200 39-H9 Spring Hanger Fl.10 VT-3 3 X Code Case N-4 91-1.e*N/A+a 0 39-WD-194 GL-G Valvo 39-05-to-Pipe
215300     39-A2-WD-001             B-K                                                       Code Case N-509   **N/Ai~
.88-01 X---X X Examine each outage for evidence of leakage.*~N/A~~218000 39-WD-194A Pipe-to-Pipe GL-G 88-01 3 X---X X--X Inaccessible inside penetration X-5B, Examine each outage for evidence of leakage*0 N/Al*218400 39-WD-195 Pipe-to-Elbow GL-D UT 88 01 3 X X+*NMP-10 XX1 SS*+218800 39-WD-196 Elbow-to-Pipe GL-D UT 88-01 3 X--X Removal of pipe support clamp 39-HS-12 6 16 required.++NMP 10 XX1-SS**  
Anchor Integral        B10. 20 3 X Attachment 215400     39-A2-WD-002           B-K           PT                                           Code Case N-509 +*N/A**
Anchor Integral        B10. 20 3 X Attachment 215900     39-H16                               VT-3                                         Code Case N-491-1.
Spring Hanger          Fl . 10                                                    *AN/Af*
3                            X 217200     39-H9                                 VT-3                                         Code Case N-4 91-1 .
Spring Hanger          Fl . 10                                                    e*N/A+a 3                            X 0   39-WD-194               GL-G                                                       Examine each outage    for Valvo 39-05-to-Pipe   . 88-01                                                       evidence of leakage.
X - -     X   X                   *~N/A~~
218000     39-WD-194A               GL-G                                                        Inaccessible inside Pipe-to-Pipe             88-01                                                       penetration X-5B, 3 X   - - -   X   X - -   X Examine each outage   for evidence of leakage
* 0 N/Al*
218400     39-WD-195               GL-D         UT                                             +*NMP-10 XX1 SS*+
Pipe-to-Elbow            88 01 3              X            X 218800     39-WD-196               GL-D          UT                                            Removal of pipe support Elbow-to-Pipe           88-01                                                       clamp 39-HS-12 6 16 3              X      - -    X required.
                                                                                                ++NMP 10   XX1-SS**


DATE: 10/15/99 REVZSZON: 0 NINE MILE POINT NUCLEAR PZANT UNIT 1 INSERVICE INSPECTION TEN-YEAR PIAN CIASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 150 eney Condenser Return NUMBER: 39.0 INSPECTION ZNTERVAL PLAN STATUS PRESERVICE YEAR  
DATE: 10/15/99                           NINE MILE POINT NUCLEAR PZANT UNIT 1                           PAGE: 150 REVZSZON:        0                        INSERVICE INSPECTION TEN-YEAR PIAN CIASS 1 SECTION XZ SCHEDULED COMPONENTS eney Condenser Return NUMBER: 39.0 INSPECTION ZNTERVAL                     PLAN STATUS             PRESERVICE YEAR ASME                FIRST        SECOND      THIRD SEC. XZ              PERIOD      PERIOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 INSTRUCTIONS
EXAMINATION AREA       CATEGY    NDE                OUTAGE                          INSTRUCTIONS NUMBER     IDENTIFICATION         ITEM NO   METH     1 2 3 4 1   2 3 4   1 2 3 4 +~CALIBRATION BLOCK+~
+~CALIBRATION BLOCK+~219200 39-WD-197 Pipe-to-Elbow GL D 88-01 3 X X Remove Clamps on 39-HS-12 6 16.~~NMP-10-XXI-SS**
219200     39-WD-197               GL D                                                      Remove Clamps on Pipe-to-Elbow           88-01                                                     39-HS-12 6 16.
219600 39-WD-198 Elbow-to-Pipe GL-D UT 88"01 3----X X~~NMP-10-XX1-SS**
3            X              X          ~ ~NMP-10-XXI-SS**
220000 39-WD-199 Pipe-to-Elbow GL-D UT 88-01 3 X X**NMP-10-XX1 SS**220400 39-WD-200 Elbow-to-Pipe GL-D UT 88-01<<3 X X UT exams every 2 RFO's.*+NMP 10-XX1-SS++
219600     39-WD-198             GL-D       UT                                               ~ ~NMP-10-XX1-SS**
0 39-WD-201 Pipe-to-Elbow GL-D UT 88-01 3 X X UT cxams cvcry 2 RFQ'.221100 39-WD"202 Elbow-to-Pipe GL-D UT 88 01 X----X UT cxams cvry 2 RFO'+*LATER++221600 39"WD-203R Pipe-to-Elbow GL-D UT 88 01 3 X X++NMP-10 XX1-SS**222000 39-WD-204A Pipe-to-Pipe GL-D UT 88-01 3 X---X Sensitized, UT exams cvcry 2 RFO's,~<<NMP-10-XXI-SS>>
Elbow-to-Pipe          88"01 3 - - - -    X              X 220000     39-WD-199             GL-D       UT                                               **NMP-10-XX1 SS**
~222400 39-WD-204R Elbow-to-Pipe GL-D UT 88-01 3 Sensitized, UT cxams every 2 RFO's X X~+NMP-10-XXI-SS"  
Pipe-to-Elbow          88-01 3            X              X
                                                    <<
220400     39-WD-200             GL-D       UT                                             UT exams   every 2 RFO's.
Elbow-to-Pipe          88-01                                                      *+NMP 10-XX1-SS++
3            X              X 0   39-WD-201               GL-D        UT                                            UT cxams  cvcry  2  RFQ'.
Pipe-to-Elbow           88-01 3 X               X 221100     39-WD "202             GL-D       UT                                             UT cxams   cvry 2 RFO '
Elbow-to-Pipe          88 01                                                      +*LATER++
X  - - -  -    X 221600     39 "WD-203R             GL-D       UT                                               ++NMP-10 XX1-SS**
Pipe-to-Elbow          88 01 3             X             X 222000    39-WD-204A              GL-D        UT                                            Sensitized, UT   exams Pipe-to-Pipe            88-01                                                      cvcry 2 RFO's, 3              X    - - -    X          ~ <<NMP-10-XXI-SS>> ~
222400     39-WD-204R             GL-D        UT                                            Sensitized,  UT cxams Elbow-to-Pipe           88-01                                                     every   2 RFO's 3              X             X
                                                                                              ~+NMP-10-XXI-SS"


DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 ZNSERVZCE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 151 cncy Condenser Return NUMBER: 39.0 ZNSPECTZON ZNTERVAL PZAN STATUS PRESERVICE YEAR  
DATE: 10/15/99                           NINE MILE POINT NUCLEAR PLANT UNIT 1                         PAGE: 151 REVISION:        0                        ZNSERVZCE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS cncy Condenser Return NUMBER: 39.0 ZNSPECTZON ZNTERVAL                     PZAN STATUS           PRESERVICE YEAR ASHE                FIRST        SECOND      THIRD SEC. XZ              PERIOD      PERZOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION ASHE SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD SECOND PERZOD THIRD PERIOD------OUTAGE------
1 2 3 4 1 2 3 4 1 2 3 4 INSTRUCTIONS
+~CALIBRATION BLOCK**223200 39-WD-226 Valve 39-06-to-Pipe GL G 88 01 3 X VT-2 exam each RFO for evidence of leakage 4 1N/At*223400 39-WD-226A Pipe-to-Pipe GL-G 88-01 3 X---X X--X Inaccessible inside pen.X-SA, VT-2 exam each RFO for evidence of leakage.++N/A+*223900 39-WD-226B Pipe-to-Pipe GL-D UT 88-01 3 X----X UT exam every 2 RFO's*+LATER**224300 39-WD-227 Pipe-to-Elbow GL D UT 88-01 3 X X UT exam every 2 RFO's**NMP-10-XX1-SS**
224500 39-WD-228 Pipe-to-Elbow GL-D UT 88 01 3 X X UT exam cvcry 2 RFO's++ZATER*+225000 39-WD-229 Pipe-to-Elbow GL-D UT 88 01 3 X X UT exam every 2 RFO's, Rcmove clamps on support 39-H9, HS-9 and 10.**NMP-10-XX1-SS**
225300 39-WD-230 Elbow-to-Pipo GL-D UT 88-01 3 X UT exam every 2 RFO's**NHP-10-XX1-SS**
225800 39-WD-231 Pipe-to-Pipe GL D UT 88-01 3 X X UT exam every 2 RFO's I f LATER*t 226200 39-WD"232 Pipe-to-Elbow GL-D UT 88-01 3 X X UT exam every 2 RFO's+*NHP-10-XX1-SS+*


DATE: 10/15/99 REVISION: 0 NZNE MILE POINT NUCLEAR PLANT UNIT 1 INSERVZCE INSPECTION TEN YEAR PIAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 152 cney Condenser Return NUMBER: 39.0  
NUMBER EXAMINATION AREA IDENTIFICATION CATEGY ITEM NO NDE METH
                                                          ------OUTAGE------                        INSTRUCTIONS 1  2  3  4  1  2  3  4  1  2  3  4 +~CALIBRATION BLOCK**
223200    39-WD-226              GL G                                                      VT-2 exam each    RFO for Valve 39-06-to-Pipe      88 01                                                    evidence of leakage 3 X                                      4 1N/At*
223400    39-WD-226A              GL-G                                                      Inaccessible inside pen.
Pipe-to-Pipe            88-01                                                    X-SA, VT-2 exam each    RFO 3 X    - - -  X    X  - -    X for  evidence  of leakage.
                                                                                              ++N/A+*
223900    39-WD-226B              GL-D      UT                                            UT exam  every  2 RFO's Pipe-to-Pipe            88-01                                                    *+ LATER**
3 X    - - -  -    X 224300    39-WD-227                GL D      UT                                            UT exam  every 2 RFO's Pipe-to-Elbow            88-01                                                    **NMP-10-XX1-SS**
3              X              X 224500    39-WD-228                GL-D      UT                                            UT exam cvcry 2 RFO's Pipe-to-Elbow            88 01                                                    + +ZATER*+
3 X                X 225000    39-WD-229                GL-D      UT                                            UT exam  every  2  RFO's, Pipe-to-Elbow            88 01                                                    Rcmove clamps on    support 3              X              X          39-H9, HS-9 and 10.
                                                                                              **NMP-10-XX1-SS**
225300    39-WD-230                GL-D      UT                                            UT exam  every  2 RFO's Elbow-to-Pipo            88-01                                                    **NHP-10-XX1-SS**
3              X 225800    39-WD-231                GL D      UT                                            UT exam  every  2 RFO's Pipe-to-Pipe              88-01                                                    IfLATER* t 3 X                X 226200    39-WD"232                GL-D      UT                                            UT exam  every 2 RFO's Pipe-to-Elbow            88-01                                                    +*NHP-10-XX1-SS+*
3              X              X
 
DATE: 10/15/99                           NZNE MILE POINT NUCLEAR PLANT UNIT 1                         PAGE: 152 REVISION:        0                        INSERVZCE INSPECTION TEN YEAR PIAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS cney Condenser Return NUMBER:   39.0 INSPECTION ZNTERVAL                      PLAN STATUS            PRESERVZCE YEAR ASHE                FIRST        SECOND      THIRD SEC. XZ              PERIOD        PERIOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAHZNATZON AREA NUMBER ZDENTZFZCATION INSPECTION ZNTERVAL ASHE SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVZCE YEAR INSTRUCTIONS
EXAHZNATZON AREA       CATEGY      NDE                OUTAGE                          INSTRUCTIONS NUMBER     ZDENTZFZCATION         ITEM NO     METH   1 2 3 4   1   2 3 4   1 2 3 4 + +CALIBRATION BLOCX+ +
++CALIBRATION BLOCX++226500 39-WD-233 Elbow-to-Pipe GL D UT 88-01 3 X UT cx~every 2 RFO's**NHP-10-XXZ-SS~~
226500     39-WD-233             GL D         UT                                           UT cx~   every 2 RFO's Elbow-to-Pipe          88-01                                                      **NHP-10-XXZ-SS~~
226900 39-WD-233A Pipe-to-Elbow GL-D UT 88 01 3 X X Sensitized, UT exalts every 2 RFO's**NHP-10-XX1-SS**
3              X 226900     39-WD-233A             GL-D         UT                                           Sensitized, UT exalts Pipe-to-Elbow          88 01                                                      every 2 RFO's 3              X              X          **NHP-10-XX1-SS**
227300 39-WD-234A Pipe-to-Elbow GL-D UT 88" 01 3 X Sensitized
227300     39-WD-234A             GL-D        UT                                            Sensitized Pipe- to-Elbow         88" 01                                                     +'~NHP 10 XX1 SS++
+'~NHP 10 XX1 SS++227800 39-WD-235R Elbow-to-Pipe GL D 88-01 3 X X Sensitized
3              X 227800     39-WD-235R             GL D                                                      Sensitized Elbow-to-Pipe         88-01                                                     ~+NMP-10-XX1-SS**
~+NMP-10-XX1-SS**  
3              X              X


DATE: 10/15/99 REVISZON: 0 NINE HYLE POINT NUCLEAR PIANT UNIT 1 ZNSERVZCE INSPECTZON TEN YEAR PLAN CLASS 1 SECTION XI SCHEDULED COMPONENTS PAGE: 153 cncy Condenser Supply NUMBER: 39.0  
DATE: 10/15/99                             NINE HYLE POINT NUCLEAR PIANT UNIT 1                           PAGE: 153 REVISZON:        0                          ZNSERVZCE INSPECTZON TEN YEAR PLAN CLASS 1 SECTION XI SCHEDULED COMPONENTS cncy Condenser Supply NUMBER:   39.0 INSPECTION INTERVAL                      PLAN STATUS              PRESERVICE YEAR FIRST        SECOND      THIRD SEC. XZ              PERIOD        PERIOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUHBER IDENTIFICATION INSPECTION INTERVAL SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR INSTRUCTIONS
**CALIBRATION BLOCK>>t 229800 39-07R-VB B-G-2 Valve 39-07R Bolting B7.70 10.0" ECC Line (REF.DWG.NO.11)VT 1 3 V16, Limited to valve selected under B-H-2 t*N/A**229900 39-07R-VBY B-M-2 VT 3 Valve 39-07R Interior B12.50 Surface 3 X V16, Only when disassembled, one valve among a group of valves.**N/Att 230500 39-09R-WD-001 Valve 39-09R Body-to-Extension Weld GL-G 88-01 VT-2 VT-2 exam each RFO for cvidcncc of leakage 3 X---X X--X~>>N/Att 0 39"10R-WD-001 Valve 39-10R Body-to-Extension GL-G 88-01 VT 2 3 X---X X VT-2 exam each RFO for cvidcnce of leakage t>>N/A>>*18.0" ECC Nozzlcs (REF.DWG.NO.11)231000 39-WD-001 B-D UT N5A Nozzle-to-Vessel B3.90 3 X Group R17, 65%CRV Limitation duc to ad)accnt nozzle and bioshield t>>LATER**231100 39-WD-001-ZR B D UT NSA Nozzle Incr Radius B3.100 Section 3 X Group R17, 55%CRV limitation due to ad)accnt nozzle and bioshicld**ZATER>>t 231200 39-WD-002 GL-A UT Group R17, t*ZATER>>>>NSA Nozzle-to-Safe End 88-01 3 X


DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 ZNSERVICE INSPECTION TEN-YEAR PZAN CLASS 1 SECTION XI SCHEDULED COMPONENTS PAGE: 154 ency Condenser Supply NUMBER: 39.0  
NUHBER EXAMINATION AREA        CATEGY      NDE                OUTAGE                          INSTRUCTIONS IDENTIFICATION          ITEM NO    METH    1  2  3  4  1  2  3  4  1  2  3  4  **CALIBRATIONBLOCK>> t 10.0"  ECC Line  (REF. DWG. NO. 11) 229800    39-07R-VB                B-G-2      VT 1                                          V16, Limited    to valve Valve 39-07R Bolting      B7.70                                                      selected under B-H-2 3
t*N/A**
229900    39-07R-VBY              B-M-2      VT 3                                          V16, Only when Valve 39-07R  Interior  B12.50                                                    disassembled, one valve 3                            X Surface                                                                              among a group of valves.
                                                                                                **N/Att 230500    39-09R-WD-001            GL-G        VT-2                                          VT-2 exam each    RFO for Valve 39-09R              88-01                                                      cvidcncc of leakage Body-to-Extension Weld                      3 X  - - -    X    X  - -    X          ~ >>N/Att 0    39 "10R-WD-001            GL-G        VT 2                                          VT-2 exam each    RFO for Valve 39-10R              88-01                                                      cvidcnce of leakage Body-to-Extension                          3 X  - - -    X    X                    t>>N/A>>*
18.0"  ECC  Nozzlcs (REF. DWG. NO. 11) 231000    39-WD-001                B-D        UT                                            Group R17,  65% CRV N5A  Nozzle-to-Vessel    B3.90                                                      Limitation duc to 3 X ad)accnt nozzle and bioshield t >>LATER**
231100    39-WD-001-ZR              B D        UT                                            Group R17, 55% CRV NSA  Nozzle Incr Radius B3.100                                                      limitation due to Section                                    3 X ad)accnt nozzle and bioshicld **ZATER>>t 231200    39-WD-002                GL-A        UT                                            Group R17, t*ZATER>>>>
NSA  Nozzle-to-Safe End 88-01 3 X
 
DATE: 10/15/99                             NINE MILE POINT NUCLEAR PLANT UNIT 1                         PAGE: 154 REVISION:        0                          ZNSERVICE INSPECTION TEN-YEAR PZAN CLASS 1 SECTION XI SCHEDULED COMPONENTS ency Condenser Supply NUMBER:   39.0 ZNSPECTZON INTERVAL                      PZAN STATUS            PRESERVZCE YEAR ASME                FIRST        SECOND      THIRD SEC. XZ              PERIOD        PERIOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION ZNSPECTZON INTERVAL ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD PZAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVZCE YEAR INSTRUCTIONS 4*CALIBRATION BLOCK~~10.0" ECC Nozzlcs (REF.DWG.NO.11)231300 39-WD-002 B-F PT Group R17,+~LATER~~N5A Nozzle-to-Safe End B5.10 UT 3 X 231400 39-WD-002 SZL UT NSA Nozzle-to-Safe End 455R1S1 Znconel 182 Butter Expansion from nozzle side of weld.++IATER++10.0" ECC Line (REF.DWG.NO.11)231500 39-WD-003 Nozzle N5A Safe End-to-Pipe B J UT B9.11 PT 3 X Terminal End, High Stress Weld+~LATER~~00 39-WD-003 Nozzle NSA Safe End-to-Pipe GL-A UT 88-01 3 X+*LATER**231900 39-WD-006 Pipe-to-Pipe
EXAMINATION AREA           CATEGY    NDE                  OUTAGE                        INSTRUCTIONS NUMBER       IDENTIFICATION           ITEM NO   METH   1 2 3 4   1   2 3 4   1 2 3 4 4*CALIBRATION BLOCK~~
~~GL-A UT 88-01 3 X~*ZATER*~232700 39-WD-008 Pipe-to-Pipe GL-A UT 88 01 3 X~~LATER~*233100 39 WD-009 GL-A VT-2 Inaccessible inside Pipe-to-Valve 39-09R 88-01 3 X---X X--X penetration X-3A, VT-2 exam each RFO for evidence of leakage,**N/A**233500.39-WD-011 Valve 39-07R-to-Reducer B J UT B9.11 PT 3 X Terminal End, High Stress Weld, Examine 100%of weld length**ZATER**  
10.0" ECC Nozzlcs (REF. DWG. NO. 11) 231300     39-WD-002               B-F         PT                                           Group R17, +~LATER~~
N5A Nozzle-to-Safe End B5.10         UT 3 X 231400     39-WD-002               SZL         UT                                             Znconel 182 Butter NSA Nozzle-to-Safe End   455R1S1                                                   Expansion from nozzle side of weld. ++IATER++
10.0" ECC Line (REF. DWG. NO. 11) 231500     39-WD-003                 B  J      UT                                            Terminal End, High Nozzle N5A Safe           B9. 11     PT                                             Stress Weld +~LATER~~
End-to-Pipe                                3 X 00     39-WD-003                 GL-A       UT                                               +*LATER**
Nozzle NSA Safe          88-01 3 X End-to-Pipe
                                  ~~
231900      39-WD-006                GL-A       UT                                               ~*ZATER*~
Pipe-to-Pipe              88-01 3 X 232700     39-WD-008                 GL-A        UT                                              ~~LATER~*
Pipe-to-Pipe             88 01 3 X 233100     39 WD-009                 GL-A       VT-2                                           Inaccessible inside Pipe-to-Valve 39-09R     88-01                                                     penetration X-3A, VT-2 3 X   - - -     X   X - -   X exam each RFO for evidence of leakage,
                                                                                                **N/A**
233500   . 39-WD-011                 B J         UT                                             Terminal End, High Valve                    B9. 11     PT                                             Stress Weld, Examine 3 X 39-07R-to-Reducer                                                                    100% of weld length
                                                                                                **ZATER**


DATE: 10/15/99 REVISION:=0 NINE MILE POINT NUCLEAR PLANT UNIT 1 ZNSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 155 cncy Condenser Supply NUMBER: 39.0  
DATE: 10/15/99                             NINE MILE POINT NUCLEAR PLANT UNIT 1                         PAGE: 155 REVISION:    =  0                          ZNSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS cncy Condenser Supply NUMBER: 39.0 INSPECTION INTERVAL                      PLAN STATUS            ZRESERVICE YEAR ASME                FIRST        SECOND      THIRD SEC. XI            PERIOD        PERIOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL ASME SEC.XI CATE GY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD THIRD PERIOD OUTAGE 1 2 3 4 1 2 3 4 1 2 3 4 ZRESERVICE YEAR INSTRUCTIONS
EXAMINATION AREA         CATE GY     NDE                 OUTAGE                          INSTRUCTIONS NUMBER    IDENTIFICATION            ITEM NO   METH     1 2 3 4   1   2 3 4   1 2 3 4 <<<<CALIBRATION BLOCK**
<<<<CALIBRATION BLOCK**233800 39-WD-089 B-D UT NSB Nozzle-to-Vessel B3.90 18.0" ECC Nozzles (REF.DWG.NO.11)Group R18, 73%CRV Limitation due to ad)acent nozzle and bioshield**LATER*<<233900 39-WD-089-IR N5B Nozzle Inner Radius Section B-D B3.100 3 X Group R18, 75%CRV Limitation duc to ad)accnt nozzle and bioshield*<<ZATER**234000 39-WD-090 B F UT NSB Nozzle-to-Safe End B5.10 PT 10.0" ECC Nozzles (REF.DWG.NO.11)3 X Group R18, 91.02%CRV*<<LATER<<<<2 4100 39-WD-090 GL-D UT NSB Nozzle-to-Safe End 88-01 3----X---X Group R18, 91.02%CRV<<<<LATER<<<<234200 39-WD-090 SIL NSB Nozzle-to-Safe End 455R1S1 3 X Group R18, Znconcl 182 Butter Expansion from nozzle side of weld<<<<LATER<<<<10.0" ECC Linc (REF.DWG.NO.11)234300 39-WD"091 Nozzle N5B Safe End-to-Pipe B-J UT B9.11 PT 3 X Terminal End, High Stress Weld, Examine 100%of weld length<<*LATER<<<<235500 39-WD-096 Elbow-to-Pipe B-J B9.11 3 X Examine 100%of weld length*<<ZATER<<*  
18.0" ECC Nozzles (REF. DWG. NO. 11) 233800    39-WD-089                B-D        UT                                            Group R18,   73% CRV NSB  Nozzle-to-Vessel    B3.90                                                      Limitation   due to ad)acent nozzle and bioshield   **LATER*<<
233900     39-WD-089-IR             B-D                                                       Group R18,   75% CRV N5B  Nozzle Inner        B3.100                                                    Limitation   duc to 3                            X Radius Section                                                                      ad)accnt nozzle and bioshield   *<<ZATER**
10.0" ECC Nozzles (REF. DWG. NO. 11) 234000    39-WD-090                B F        UT                                            Group R18, 91.02%   CRV NSB  Nozzle-to-Safe End B5.10        PT                                            *<<LATER<<<<
3                            X 2 4100     39-WD-090               GL-D       UT                                             Group R18, 91.02%    CRV NSB Nozzle-to-Safe End 88-01                                                       <<<<LATER<<<<
3 - - - -     X   - - -     X 234200     39-WD-090               SIL                                                       Group R18, Znconcl 182 NSB Nozzle-to-Safe End 455R1S1                                                   Butter Expansion from 3                            X          nozzle side of weld
                                                                                              <<<<LATER<<<<
10.0" ECC Linc (REF. DWG. NO. 11) 234300     39-WD"091               B-J         UT                                             Terminal End, High Nozzle  N5B Safe        B9. 11       PT                                           Stress Weld, Examine 3 X End-to-Pipe                                                                        100% of weld length
                                                                                              <<*LATER<<<<
235500     39-WD-096               B-J                                                        Examine 100%    of weld Elbow-to-Pipe           B9.11                                                     length   *<<ZATER<<*
3 X


DATE: 10/15/99 REVISZON: 0 NINE MILE POZNT NUCLEAR PLANT UNIT 1 ZNSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 156 ency Condenser Supply NUMBER: 39.0  
DATE: 10/15/99                           NINE MILE POZNT NUCLEAR PLANT UNIT 1                         PAGE: 156 REVISZON:        0                        ZNSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS ency Condenser Supply NUMBER: 39. 0 INSPECTION INTERVAL                    PLAN STATUS            PRESERVICE YEAR ASME                FIRST        SECOND      THIRD SEC. XZ              PERIOD        PERIOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD THIRD PERIOD OUTAGE 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR INSTRUCTIONS
EXAMINATION AREA         CATEGY    NDE                OUTAGE                          INSTRUCTIONS NUMBER     IDENTIFICATION         ITEM NO   METH     1 2 3 4   1   2 3 4   1 2 3 4 **CALIBRATIONBLOCK**
**CALIBRATION BLOCK**235900 39-WD-097 GL-A VT-2 exam each RFO for PiPe-to-Valve 39-10R 88-01 evidence of leakage X---X X--X iiN/At 1 236300 39-WD-099 Valve 39-OSR-to-Reducer B-J B9.11 3 X Terminal End, High Stress Weld, Examine 100%of weld length**LATER*~  
235900   39-WD-097               GL-A                                                     VT-2 exam each   RFO for PiPe-to-Valve 39-10R   88-01                                                     evidence of leakage X - - -     X   X   - -   X         iiN/At1 236300   39-WD-099               B-J                                                       Terminal End, High Valve                  B9.11                                                    Stress Weld, Examine 3 X 39-OSR-to-Reducer                                                                100% of weld length
                                                                                            **LATER*~


DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PIANT UNIT 1 ZNSERVZCE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 157 or Core Spray NUMBER: 40.0  
DATE: 10/15/99                             NINE MILE POINT NUCLEAR PIANT UNIT 1                           PAGE: 157 REVISION:        0                          ZNSERVZCE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS or Core Spray NUMBER:   40.0                                                                           IRESERVZCE YEAR INSPECTION INTERVAL                      PLAN STATUS ASME                FIRST          SECOND      THIRD SEC. XI            PERIOD        PERIOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMZNATZON AREA NUMBER IDENTIFICATION INSPECTION INTERVAL ASME SEC.XI CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD THIRD PERIOD-~OUTAGE 1 2 3 4 1 2 3 4 1 2 3 4 IRESERVZCE YEAR INSTRUCTIONS t tCAI.IBRATION BLOCKt t 12.0" CSA (REF.DWG.NO.12)236700 40-01"VB B-G-2 VT-1 Valve 40-01 Bolting B7.70 3 X V14, Limited to valve sclectcd under B-M-2*tN/A**236SOO 40-01-VBY B-M"2 VT-3 Valvo 40-01 Interior B12.50 Surface 3 X V14, Only when disasscmblcd, onc valve among group of valves t*N/Att 237100 40-03-FLG Valve 40-03 Flange Surface B-G-1 VT" 1 B6.220 3 X Vll, Examine 1.0" annular surface of flange surrounding each stud**N/At*00 40 03 NBB B-G-1 VT-1 Valve 40-03 Bushings~B6.230 3 X Vll, Only when disassembled t*N/A**237300 40-03-NBN Valve 40-03 Nuts B G 1 VT 1 B6.230 3 X Vl1, Examine inplacc, when removed or disassembled
EXAMZNATZON AREA         CATEGY      NDE            - ~
**N/A**237400 40-03-NBW Valve 40-03 Washers B-G-l VT-1 B6.230 3 X Vll, Examino inplaco, when rcmovcd or disassembled ttN/A*t 237500 40-03-VB B-G-1 UT Valve 40-03 Bolting B6.210 Vll, Limited to valve sclcctcd under B-M-2 3 X ttLATERtt  
OUTAGE                          INSTRUCTIONS NUMBER     IDENTIFICATION           ITEM NO     METH   1 2 3     4 1   2 3 4   1 2 3 4 t tCAI.IBRATION BLOCKt t
: 12. 0" CSA (REF. DWG. NO. 12) 236700     40-01"VB                 B-G-2       VT-1                                           V14, Limited  to valve Valve 40-01 Bolting     B7.70                                                       sclectcd under B-M-2 3 X                                      *tN/A**
236SOO     40-01-VBY               B-M"2       VT-3                                           V14, Only when Valvo 40-01 Interior   B12.50                                                     disasscmblcd, onc valve 3 X Surface                                                                              among group of valves t*N/Att 237100     40-03-FLG               B-G-1       VT"1                                           Vll, Examine   1.0" Valve 40-03 Flange      B6.220                                                      annular surface of 3 X Surface                                                                              flange surrounding each stud **N/At*
00   40 03 NBB               B-G-1       VT-1                                           Vll,  Only when Valve 40-03 Bushings   ~ B6. 230                                                     disassembled t*N/A**
3 X 237300     40-03-NBN               B G 1       VT 1                                           Vl1, Examine inplacc, Valve 40-03 Nuts        B6.230                                                      when removed or 3 X disassembled **N/A**
237400     40-03-NBW               B-G-l       VT-1                                           Vll, Examino   inplaco, Valve 40-03 Washers      B6.230                                                      when rcmovcd   or 3 X disassembled ttN/A*t 237500     40-03-VB                 B-G-1       UT                                             Vll, Limited to    valve Valve 40-03 Bolting     B6.210                                                     sclcctcd under   B-M-2 3 X                                       ttLATERtt


DATE: 10/15/99 REVISION: 0 NZNE MILE POINT NUCLEAR PLANT UNZT 1 INSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XI SCHEDULED COMPONENTS PAGE: 158 or Core Spray NUMBER: 40.0  
DATE: 10/15/99                               NZNE MILE POINT NUCLEAR PLANT UNZT 1                         PAGE: 158 REVISION:          0                          INSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XI SCHEDULED COMPONENTS or Core Spray NUMBER:   40.0 ZNSPECTZON INTERVAL                      PLAN STATUS              PRESERVZCE YEAR ASME                FIRST        SECOND        THIRD SEC. XZ                PERIOD      PERIOD        PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION ZNSPECTZON INTERVAL ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVZCE YEAR INSTRUCTIONS
EXAMINATION AREA         CATEGY      NDE                OUTAGE                          INSTRUCTIONS NUMBER     IDENTIFICATION           ITEM NO     METH   1 2 3 4 1   2 3 4   1 2 3 4 *+CALIBRATIONBLOCK~*
*+CALIBRATION BLOCK~*237600 40-03-VBY B-M-2 Valve 40-03 Interior B12.50 3 X Surface Vll, Only when disassembled, one valve among group of valves+*N/A*+2.0" CSB (REF.DWG.NO.12)239500 40"20-VB Valve 40-20 Bolting B-G-2 B7.70 X Examine in place, when removed or when disassembled.
237600     40-03-VBY                 B-M-2                                                     Vll, Only  when Valve 40-03   Interior   B12.50                                                     disassembled, one valve Surface                                      3 X among group of valves
**N/A~~12.0" CSA (REF.DWG.NO.12)239600 40-Al F-A Anchor Fl.10 VT-3 3 X Code Case N-491-1++N/A++12.0" CSB (REF.DWG.NO.12)240200 40-H17 Spring Hanger F-A Fl.10 3 X Code Case N-491-1~~N/Ai~240600 40-H21-A F-A VT-3 Constant Spring Hanger F1.10 3 X Code Case N-491-1**N/A~~240700 40"H21-A-WD-001 Integral Attachment B"K B10.20 3 X Code Case N-509++N/A~~240800 40-H21-A-WD-004 Integral Attachment B10.20 PT 3 X Code Case N-509**N/A**240900 40-H21-A-WD-007 B-K PT Integral Attachment B10.20 3 X Code Case N-509+~N/A+a  
                                                                                                  +*N/A*+
: 2. 0" CSB (REF. DWG. NO. 12) 239500     40"20-VB                 B-G-2                                                       Examine in place, when Valve 40-20 Bolting      B7.70                                                      removed or when X
disassembled.   **N/A~~
: 12. 0" CSA (REF. DWG. NO. 12) 239600     40-Al                     F-A         VT-3                                           Code Case N-491-1 Anchor                    Fl . 10                                                    ++N/A++
3              X 12.0"   CSB (REF. DWG. NO. 12) 240200     40-H17                     F-A                                                         Code Case N-491-1 Spring Hanger              Fl . 10                                                    ~~N/Ai~
3              X 240600     40-H21-A                   F-A         VT-3                                           Code Case N-491-1 Constant Spring Hanger F1.10                                                          **N/A~~
3                            X 240700     40"H21-A-WD-001           B"K                                                         Code Case N-509 ++N/A~~
Integral Attachment        B10.20 3                            X 240800     40-H21-A-WD-004                         PT                                             Code Case N-509   **N/A**
Integral Attachment        B10. 20 3                            X 240900     40-H21-A-WD-007           B-K         PT                                             Code Case N-509 +~N/A+a Integral Attachment        B10.20 3                            X


DATE: 10/15/99 REVZSION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 INSERVZCE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 159 J or Cora Spray E NUMBER: 40.0  
DATE: 10/15/99                               NINE MILE POINT NUCLEAR PLANT UNIT 1                         PAGE: 159 REVZSION:          0                          INSERVZCE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS J
or Cora Spray E NUMBER:     40.0                                                                           PRESERVICE YEAR INSPECTION ZNTERVAL                      PLAN STATUS ASME                  FIRST        SECOND      THIRD SEC. XI            PERIOD        PERIOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION ZNTERVAL ASME SEC.XI CATE GY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD THIRD PERIOD OUTAGE 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR INSTRUCTIONS
EXAMINATION AREA         CATE GY       NDE               OUTAGE                          INSTRUCTIONS NUMBER      IDENTIFICATION            ITEM NO     METH   1 2 3 4   1   2 3 4   1 2 3 4 ++CALIBRATION BLOCK**
++CALIBRATION BLOCK**241000 40"H21-A-WD-010 Integral Attachment B K PT B10.20 3 Code Case N-509**N/A*~241100 40-H21-B F A Constant Spring Hangar F1.10 VT 3 3 X Code Case N-491-1 N/Af f 12.0" CSA (REF.DWG.NO.12)241700 40-H54 F-A Spring Support Fl.10 VT 3 3 X Code Case N-491-1**N/At%243100 40-H57-B F-A Constant Weight hanger F1.10 X Code Case N-491-1**N/A+~00 40-WD-001 GL-D UT Valve 40-03-to-Pipe 88-01 3 X UT exams every 2 RFO'*~NMP-12-XXI-SS~
241000     40 "H21-A-WD-010         B K           PT                                           Code Case N-509 **N/A*~
~2.0" CSA (REF.DWG.NO.12)245900 40-WD 002 B-J Branch Connection B9.32 3 X Examine 100%of weld length*~N/A~*6.0" CSA (REF.DWG.NO.12)246100 40-WD-003 Branch Connection GL D UT 88-01 3----X UT exams every 2 RFO's.**PSR-1.5-2~~246300 40-WD-004 Pi pc-to-Elbow GL" D UT 88-01 3 X X UT exams cvcry 2 RFO's.**PSR-.42-2~~
Integral Attachment      B10. 20 3
246500 40-WD-005 Elbow-to-Pipe GL-D UT 88-01 3 X X UT exams cvcry 2 RFO's to the extent practical**PSR".432-2i~  
241100     40-H21-B                 F A           VT 3                                         Code Case N-491-1 Constant Spring Hangar F1.10                                                            N/Aff 3                            X
: 12. 0" CSA (REF. DWG. NO. 12) 241700     40-H54                   F-A           VT 3                                         Code Case N-491-1 Spring Support            Fl . 10                                                    **N/At%
3 X 243100     40-H57-B                 F-A                                                         Code Case N-491-1 Constant Weight hanger F1.10                                                          **N/A+~
X 00     40-WD-001                 GL-D         UT                                           UT exams  every  2 RFO '
Valve 40-03-to-Pipe       88-01                                                       *~NMP-12-XXI-SS~~
3              X
: 2. 0" CSA (REF. DWG. NO. 12) 245900     40-WD 002                 B-J                                                         Examine 100% of weld Branch Connection         B9.32                                                       length *~N/A~*
3              X
: 6. 0" CSA (REF. DWG. NO. 12) 246100     40-WD-003                 GL D         UT                                           UT exams every 2 RFO's.
Branch Connection        88-01                                                      **PSR-1. 5-2~ ~
3  - - - -    X 246300     40-WD-004                 GL"D         UT                                           UT exams cvcry 2 RFO's.
Pi pc- to-Elbow          88-01                                                      **PSR-.42-2~~
3              X              X 246500     40-WD-005                 GL-D         UT                                           UT exams cvcry 2 RFO's Elbow-to-Pipe            88-01                                                      to the extent practical 3              X              X          **PSR".432-2i~


DATE: 10/15/99 REVZSZON: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 ZNSERVICE INSPECTION TEN-YEAR PLAN CIASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 160 or Core Spray NUMBER: 40.0  
DATE: 10/15/99                             NINE MILE POINT NUCLEAR PLANT UNIT 1                             PAGE: 160 REVZSZON:        0                          ZNSERVICE INSPECTION TEN-YEAR PLAN CIASS 1 SECTION XZ SCHEDULED COMPONENTS or Core Spray NUMBER: 40.0 INSPECTION INTERVAL                      PLAN STATUS              PRESERVZCE YEAR ASME                FIRST        SECOND        THIRD SEC. XI              PERIOD      PERIOD        PERIOD


==SUMMARY==
==SUMMARY==
EXAHINATION AREA NUHBER IDENTIFICATION INSPECTION INTERVAL ASME SEC.XI CATEGY NDE ITEM NO HETH FIRST PERIOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVZCE YEAR INSTRUCTIONS
**CALIBRATION BLOCK'>>~246510 40-WD-005 Elbow-to-Pipe N/A N/A VT 2 3 X X X--X VT-2 each outage, for evidence of leakage**PSR-.432-2i~
246700 40-WD-006 Pipe-to-Pipe GL-D UT 88-01 3 X X UT cxams every 2 RFO's.**LATER++246710 40-WD-006 Pipo-to-Pipe N/A N/A VT-2 3 X---X X VT-2 exam each outage for evidence of leakage 246900 40-WD-007 GI-D UT Pipe-to-Valve 40-05 88-01 3 X X UT cxams every 2 RFO's.*~PSR-.432-2**
12.0" CSA (REF.DWG.NO.12)247100 40 WD-008 Pipe-to-Elbow GL-D UT 88-01 3 X X UT exams every 2 RFO's.+*NMP-12-XX1-SS**
247300 40-WD-009 GL"D UT Elbow-to-Valve 40-02 88-01 3 X X UT exams cvcry 2 RFO's**NMP-12-XXI-SS++
247700 40-WD-010A GL-G VT 2 Valve 40-02-to-Pipe 88-01 X-X X Inaccessible inside pen.X-13A, VT-2 exam each RFO for evidence of leakage.**N/A~i 248000 40-WD-011 Pipe-to-Elbow GL-D UT 88-01 3 X X UT exams cvcry 2 RFO's.*~NHP-12-XX1-SS**
248010 40-WD-011 Pipe-to-Elbow N/A N/A 3 X---X X X VT-2 each outage for evidence of leakage~~NHP-12-XX1-SS~
~


DATE: 10/15/99 REVISION: 0 NINE HYLE POINT NUCLEAR PIANT UNIT 1 INSERVICE INSPECTION TEN-.YEAR PIAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 161 tor Core Spray E NUMBER: 40.0 SUHMARY EXAMINATION AREA NUMBER IDENTIFICATION INSPECTZON INTERVAL ASHE SEC.XZ CATEGY NDE ITEM NO HETH FIRST PERIOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVZCE YEAR INSTRUCTIONS
NUHBER EXAHINATION AREA          CATEGY    NDE                OUTAGE                            INSTRUCTIONS IDENTIFICATION            ITEM NO    HETH    1  2  3 4  1  2  3  4    1  2  3  4  **CALIBRATIONBLOCK'>>~
*+CALIBRATION BLOCK~~248300 40-WD-012 Elbow-to-Pipe GL-D 88-01 3----X UT cxams every 2 RFO's.++NHP-12 XX1-SS**248600 40"WD"013 Pipe-to-Pipe GL D UT 88"01 3----X UT exam every 2 RFO's.**NMP-12-XXI-SS'~
246510    40-WD-005                N/A        VT 2                                            VT-2 each outage,    for Elbow-to-Pipe            N/A                                                        evidence of leakage 3 X            X  X  - -    X          **PSR-.432-2i~
+249000 40-WD-014 Pipe-to-Pipe GL D UT 88-01 3----X X UT exams every 2 RFO's.++NMP-12 XX1 SS**249400 40 WD-015 Pipe-to-Elbow GL-D UT 88-01 3 X X UT cxams every 2 RFO's.'~~NMP-12-XX1-SS~
246700    40-WD-006                GL-D      UT                                              UT cxams  every  2 RFO's.
~9700 40-WD-016 Elbow-to-Pipe GL-D 88-01 X UT cxams every 2 RFO's.**NMP-12-XXI-SS+~
Pipe-to-Pipe              88-01                                                      **LATER++
249900 40-WD-017 Pipe-to-Elbow GL-D UT 88-01 X---X UT exams every 2 RFO's.+*NMP-12-XX1-SS**
3              X            X 246710    40-WD-006                N/A        VT-2                                            VT-2 exam each outage Pipo-to-Pipe            N/A                                                          for evidence of leakage 3 X  - - -  X    X 246900    40-WD-007                GI -D      UT                                              UT cxams  every  2 RFO's.
250000 40-WD-018 Elbow-to-Pipo GL D UT 88-01 3----X X UT exam every 2 RFO's.~~NMP-12-XXI-SS~
Pipe-to-Valve 40-05      88-01                                                        *~PSR-.432-2**
~250400 40-WD-020 Pipe to Tcc GL D UT 88-01 3 X X UT exams every 2 RFO's.++NMP-12-XX1-SS*+
3            X              X
250600 40 WD-021 Tcc-to-Pipe GL-D UT 88-01 X---X UT exam every 2 RFO~s.**NHP-12-XXZ-SS**
: 12. 0"  CSA (REF. DWG. NO. 12) 247100    40 WD-008                GL-D        UT                                              UT exams  every 2 RFO's.
250900 40-WD-022 Pipe-to-Elbow GL D UT 88 01 X UT cxams every 2 RFO's.*+NMP 12 XX1 SS+*  
Pipe-to-Elbow            88-01                                                      +*NMP-12-XX1-SS**
3              X              X 247300    40-WD-009                GL"D        UT                                              UT exams  cvcry 2 RFO's Elbow-to-Valve 40-02      88-01                                                      **NMP-12-XXI-SS++
3              X              X 247700    40-WD-010A                GL-G        VT 2                                            Inaccessible inside pen.
Valve 40-02-to-Pipe      88-01                                                      X-13A, VT-2 exam each X      -    X  X RFO  for  evidence of leakage.  **N/A~i 248000    40-WD-011                GL-D        UT                                              UT exams  cvcry 2 RFO's.
Pipe-to-Elbow            88-01                                                      *~NHP-12-XX1-SS**
3              X              X 248010    40-WD-011                N/A                                                          VT-2 each outage    for Pipe- to-Elbow          N/A                                                          evidence of leakage 3 X  - - -    X  X          X
                                                                                                ~~NHP-12-XX1-SS~  ~
 
DATE: 10/15/99                         NINE HYLE POINT NUCLEAR PIANT UNIT 1                           PAGE: 161 REVISION:        0                        INSERVICE INSPECTION TEN-.YEAR PIAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS tor Core Spray E NUMBER: 40.0         INSPECTZON INTERVAL                                             PRESERVZCE YEAR PLAN STATUS ASHE               FIRST        SECOND      THIRD SEC. XZ               PERIOD        PERIOD      PERIOD SUHMARY  EXAMINATION AREA      CATEGY     NDE                 OUTAGE                          INSTRUCTIONS NUMBER    IDENTIFICATION        ITEM NO   HETH   1 2 3 4   1   2 3 4   1 2 3 4 *+CALIBRATION BLOCK~~
248300   40-WD-012             GL-D                                                     UT cxams   every 2 RFO's.
Elbow-to-Pipe          88-01                                                    ++NHP-12 XX1-SS**
3  - - - -      X 248600   40"WD"013             GL D       UT                                           UT exam   every 2 RFO's.
Pipe-to-Pipe          88 "01                                                    **NMP-12-XXI-SS'~+
3  - - - -      X 249000   40-WD-014             GL D       UT                                           UT exams   every   2 RFO's.
Pipe-to-Pipe          88-01                                                    ++NMP-12 XX1 SS**
3 -  - - -    X            X 249400   40 WD-015             GL-D       UT                                           UT cxams   every   2 RFO's.
Pipe-to-Elbow          88-01                                                    '~ ~NMP-12-XX1-SS~ ~
3              X            X 9700   40-WD-016             GL-D                                                     UT cxams   every 2 RFO's.
Elbow-to-Pipe          88-01                                                    **NMP-12-XXI-SS+~
X 249900   40-WD-017             GL-D         UT                                           UT exams   every 2 RFO's.
Pipe-to-Elbow          88-01                                                    +*NMP-12-XX1-SS**
X  - - -    X 250000   40-WD-018             GL D         UT                                           UT exam   every 2   RFO's.
Elbow-to-Pipo          88-01                                                    ~ ~NMP-12-XXI-SS~ ~
3 - - - -      X            X 250400   40-WD-020             GL D       UT                                           UT exams   every   2 RFO's.
Pipe to Tcc            88-01                                                      + +NMP-12-XX1-SS*+
3              X            X 250600   40 WD-021             GL-D       UT                                           UT exam   every 2 RFO~s.
Tcc-to-Pipe            88-01                                                      **NHP-12-XXZ-SS**
X  - - -    X 250900   40-WD-022             GL D       UT                                           UT cxams every 2 RFO's.
Pipe-to-Elbow          88 01                                                      *+NMP 12 XX1 SS+*
X


DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XI SCHEDULED COMPONENTS PAGE: 162 tor Core Spray NUMBER: 40.0  
DATE: 10/15/99                           NINE MILE POINT NUCLEAR PLANT UNIT 1                             PAGE: 162 REVISION:        0                        INSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XI SCHEDULED COMPONENTS tor Core Spray NUMBER: 40.0 ZNSPECTION INTERVAZ                    PLAN STATUS              PRESERVICE YEAR FIRST        SECOND        THIRD SEC. XZ              PERIOD        PERIOD        PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION ZNSPECTION INTERVAZ SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR INSTRUCTIONS
EXAMINATION AREA       CATEGY    NDE                  OUTAGE                            INSTRUCTIONS NUMBER     IDENTIFICATION         ITEM NO   METH   1 2 3 4   1   2 3 4   1 2 3 4 ~~CALIBRATION BLOCK~"
~~CALIBRATION BLOCK~" 251200 40-WD-023 Elbow-to-Pipe GL-D 88-01 3 X X UT exams every 2 RFO's.++NMP 12 XXZ-SS+*251500 40-WD-024 Pipe-to-Valve 40-09 GL-D UT 88-01 3 X UT exams every 2 RFO's.~~NMP-12-XXl-SS~*
251200     40-WD-023               GL-D                                                       UT exams   every 2 RFO's.
251800 40-WD"025 GL D UT Valve 40-09-to-Elbow 88-01 X X UT exams cvcry 2 RFO's.~~NMP"12-XX1-SS**
Elbow-to-Pipe          88-01                                                      ++NMP 12 XXZ-SS+*
252000 40-WD-026 Elbow-to-Pipe GL-D UT 88 01 3 X X UT exams every 2 RFO'st~+NMP-12-XXI-SS**
3              X            X 251500     40-WD-024               GL-D       UT                                             UT exams   every 2 RFO's.
2 2200 40-WD-027 Pipe-to-Tee GL-D UT 88-01 3 X X UT every 2 RFO's~~NMP-12-XX1-SS~~
Pipe-to-Valve 40-09    88-01                                                      ~ ~NMP-12-XXl-SS~*
252500 40-WD-028 GL D UT Tcc-to-Valve 40-01 88-01 3 X X UT exams cvcry 2 RFO's.**NMP-12-XXI-SS~
3              X 251800     40-WD"025               GL D       UT                                              UT exams    cvcry 2 RFO's.
~252800 40-WD-029 GL"D UT Valve 40-01-to-Pipe 88-01 3 X X UT cxams cvcry 2 RFO's.~~NMP-12-XXZ-SS**
Valve 40-09-to-Elbow     88-01                                                     ~~NMP"12-XX1-SS**
253100 40-WD-030 Pipe-to-Tec GL-D UT 88 01 3 X X UT exams every 2 RFO's.~~NMP-12-XX1-SS*~
X            X 252000     40-WD-026               GL-D       UT                                             UT exams   every 2 RFO'st Elbow-to-Pipe          88 01                                                      ~+NMP-12-XXI-SS**
253400 40-WD-031 Tec-to-Pipe GL-D UT 88"01 3 X UT exams every 2 RFO's.**NMP-12-XX1-SS*~
3              X            X 2 2200     40-WD-027               GL-D       UT                                             UT   every 2 RFO's Pipe-to-Tee              88-01                                                      ~~NMP-12-XX1-SS~~
253800 40-WD-032 Pipe-to-Elbow GL-D UT 88-01 3 X X UT cvcry 2 RFO's~~NMP-12-XX1-SS**  
3              X            X 252500     40-WD-028               GL D       UT                                              UT   exams  cvcry  2 RFO's.
Tcc-to-Valve 40-01       88-01                                                     **NMP-12-XXI-SS~~
3              X            X 252800     40-WD-029               GL"D       UT                                              UT cxams    cvcry 2 RFO's.
Valve 40-01-to-Pipe     88-01                                                     ~~NMP-12-XXZ-SS**
3              X            X 253100     40-WD-030               GL-D       UT                                             UT exams   every 2   RFO's.
Pipe-to- Tec            88 01                                                      ~ ~NMP-12-XX1-SS*~
3              X            X 253400     40-WD-031               GL-D       UT                                             UT exams   every 2 RFO's.
Tec-to-Pipe            88 "01                                                      **NMP-12-XX1-SS*~
3              X 253800     40-WD-032               GL-D       UT                                             UT cvcry   2 RFO's Pipe- to-Elbow          88-01                                                      ~ ~NMP-12-XX1-SS**
3              X              X


DATE: 10/15/99 REVISION: 0 NINE MZLE POINT NUCLEAR PLANT UNIT 1 ZNSERVICE ZNSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 163 or Core Spray NUMBER: 40.0 SUHHARY EXAHINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD PIAN STATUS SECOND PERIOD OUTAGE THIRD PERZOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR ZNSTRUCTZONS
DATE: 10/15/99                             NINE MZLE POINT NUCLEAR PLANT UNIT 1                         PAGE: 163 REVISION:        0                            ZNSERVICE ZNSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS or Core Spray NUMBER:   40.0 INSPECTION INTERVAL                     PIAN STATUS            PRESERVICE YEAR ASME                 FIRST        SECOND      THIRD SEC. XZ               PERIOD      PERIOD      PERZOD SUHHARY    EXAHINATION AREA          CATEGY       NDE                 OUTAGE                        ZNSTRUCTZONS NUMBER    IDENTIFICATION            ITEM   NO   METH     1 2 3 4 1   2 3 4   1 2 3 4 ++CALIBRATION BLOCK*~
++CALIBRATION BLOCK*~254100 40-WD-033 Elbow-to-Elbow GL D 88-01 3 X X UT exams every 2 RFO's.~~NHP-12-XXZ-SS~~
254100     40-WD-033                 GL D                                                       UT exams every   2 RFO's.
254300 40"WD"034 Pipe-to-Elbow GL-D UT 88 01 3 X X UT cxams avery 2 RFO's.**NMP-12-XX1-SS~~
Elbow-to-Elbow            88-01                                                      ~~NHP-12-XXZ-SS~~
254400 40-WD"035 Elbow-to-Reducer GL-D UT 88-01 3 X X UT exams cvcry 2 RFO's.*~NHP-12-XX1-SS~
3              X            X 254300     40"WD"034                 GL-D         UT                                           UT cxams avery 2 RFO's.
~6.0" CSA (REF.DWG.NO.12)254600 40-WD"036 Reducer-to-Pipe B-J UT B9.11 PT 3 X Examine 100%of weld length~*LATER*~0 40-WD-036 Rcducor-to-Pipo GL-D UT 88-01 3 X X UT exams every 2 RFO',**PSR-.432-2*~
Pipe- to-Elbow            88 01                                                      **NMP-12-XX1-SS~~
254800 40-WD-038 GL-D UT Nozzle N6A Outcr Safe 88-01 End-to-Elbow 3 X UT exam every, 2 RFO's**PSR-.75-3~*
3              X            X 254400     40-WD"035                 GL-D         UT                                           UT exams cvcry   2 RFO's.
254900 40-WD-038 B J PT Nozzlo N6A Outcr Safe B9.11 UT End-to-Elbow 3 X Terminal End,**PSR-.75-3**
Elbow-to-Reducer          88-01                                                      *~NHP-12-XX1-SS~ ~
255000 40-WD-038A B"J UT Nozzle N6A Znnor Safe B9.11 PT End-to-Outcr Safe 3 X Examine 100%of weld length~*IATER**255100 40-WD-038A GL-D UT Nozzle N6A, Inner Safe 88-01 End-to-Outcr Safe 3 X X UT cxams evory 2 RFO's.~~LATER*~
3              X            X 6.0" CSA (REF. DWG. NO. 12) 254600     40-WD"036                 B-J          UT                                            Examine 100%    of weld Reducer-to-Pipe           B9. 11       PT                                           length ~*LATER*~
3                            X 0   40-WD-036                 GL-D         UT                                           UT exams every   2 RFO ',
Rcducor-to-Pipo          88-01                                                      **PSR-.432-2*~
3              X            X 254800     40-WD-038                 GL-D         UT                                           UT exam every, 2 RFO's Nozzle N6A Outcr Safe    88-01                                                      **PSR-.75-3~*
3              X End-to-Elbow 254900     40-WD-038                 B J         PT                                           Terminal End, Nozzlo N6A Outcr Safe     B9.11       UT                                           **PSR-.75-3**
3              X End-to-Elbow 255000     40-WD-038A               B"J         UT                                           Examine 100% of weld Nozzle N6A Znnor Safe     B9.11       PT                                           length ~*IATER**
3 X End-to-Outcr Safe 255100     40-WD-038A               GL-D         UT                                            UT cxams  evory    2 RFO's.
Nozzle   N6A, Inner Safe   88-01                                                     ~~LATER*~
3              X            X End-to-Outcr Safe


DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 164 or Core Spray NUMBER: 40.0  
DATE: 10/15/99                               NINE MILE POINT NUCLEAR PLANT UNIT 1                           PAGE: 164 REVISION:        0                            INSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS or Core Spray NUMBER:   40.0                                                                             PRESERVICE YEAR INSPECTION INTERVAL                      PLAN STATUS ASME                FIRST        SECOND      THIRD SEC. XI            PERIOD        PERIOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NVMBER IDENTIFICATION INSPECTION INTERVAL ASME SEC.XI CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD-OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR INSTRUCTIONS
EXAMINATION AREA           CATEGY      NDE                -OUTAGE                          INSTRUCTIONS NVMBER     IDENTIFICATION             ITEM   NO   METH   1 2 3 4   1   2 3 4   1 2 3 4 ~ +CALIBRATION BLOCK*~
~+CALIBRATION BLOCK*~255200 40-WD-039 Nozzle N6A-to-Inner Safe End B F BS.10 3 X Group R19, UT 28.4%CRV**LATER**255300 40-WD-039 Nozzle N6A-to-Inner Safe End SZL UT 455R181 Znconel 182 Butter Expansion from nozzle side of weld~~N/A+~255400 40-WD-039 Nozzle N6A-to-Inner Safe End GL D UT 88-01 3----X X UT exams every 2 RFO's.etN/Aee 255500 40-WD-040 B-D VT N6A Nozzle-to-Vessel B3.90 X Group R19, 66%CRV ,Limitation duc to ad)accnt nozzle and bioshiold**IATER+s 255600 40-WD-040-ZR N6A Nozzle Inner Radius Section B-D UT B3.100 3 X Group R19, 66%CRV ,Limitation duc to ad)accnt nozzle and bioshicld~~LATER~~12.0" CSB (REF.DWG.NO.12)255800 40-WD-041 GL-D VT Valve 40-13-to-Pipe 88-01 3 X----X UT exams every 2 RFO's~+LATER~~6.0" CSB (REF.DWG.NO.12)256200 40-WD"043 Branch Connection GL-D UT 88-01 3 X X UT exam every 2 RFO's.~+LATER~~256400 40-WD-043A GL D UT Pipe-to-BR Stub Nozzle 88-01 X--X UT exam cvcry 2 RFO's++LATER*+  
255200   40-WD-039                 B F                                                         Group R19, UT 28.4%     CRV Nozzle N6A-to-Inner      BS. 10                                                      **LATER**
3              X Safe End 255300   40-WD-039                 SZL          UT                                            Znconel 182 Butter Nozzle N6A-to-Inner       455R181                                                     Expansion from nozzle Safe End                                                                              side of weld     ~~N/A+~
255400   40-WD-039                 GL D          UT                                            UT exams    every  2 RFO's.
Nozzle N6A-to-Inner       88-01                                                       etN/Aee 3 - - - -     X             X Safe End 255500   40-WD-040                 B-D           VT                                           Group R19,    66% CRV N6A   Nozzle-to-Vessel   B3.90                                                       ,Limitation duc to X                        ad)accnt nozzle and bioshiold   **IATER+s 255600   40-WD-040-ZR             B-D           UT                                           Group R19,     66% CRV N6A  Nozzle Inner        B3.100                                                      ,Limitation duc to 3              X                        ad)accnt nozzle and Radius Section bioshicld   ~~LATER~~
: 12. 0" CSB (REF. DWG. NO. 12) 255800   40-WD-041                 GL-D         VT                                           UT exams every 2 RFO's Valve 40-13-to-Pipe       88-01                                                       ~ +LATER~ ~
3 X - - -     -   X
: 6. 0" CSB (REF. DWG. NO. 12) 256200   40-WD"043                 GL-D         UT                                           UT exam every   2 RFO's.
Branch Connection        88-01                                                      ~+LATER~~
3 X                X 256400   40-WD-043A               GL D         UT                                           UT exam  cvcry  2 RFO's Pipe-to-BR Stub Nozzle 88-01                                                         ++LATER*+
X        -  -  X


DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNZT 1 ZNSERVZCE INSPECTION TEN-YEAR PLAN CIASS 1 SECTZON XI SCHEDULED COMPONENTS PAGE: 165 or Core Spray NUMBER: 40.0  
DATE: 10/15/99                             NINE MILE POINT NUCLEAR PLANT UNZT 1                         PAGE: 165 REVISION:        0                          ZNSERVZCE INSPECTION TEN-YEAR PLAN CIASS 1 SECTZON XI SCHEDULED COMPONENTS or Core Spray NUMBER:   40.0                                                                           PRESERVICE YEAR INSPECTION ZNTERVAL                      PLAN STATUS ASME                FIRST        SECOND      THIRD SEC. XZ              PERIOD        PERIOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER ZDENTZFZCATION INSPECTION ZNTERVAL ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR INSTRUCTIONS
EXAMINATION AREA         CATEGY      NDE                OUTAGE                          INSTRUCTIONS NUMBER     ZDENTZFZCATION           ITEM NO     METH   1 2 3 4   1   2 3 4   1 2 3 4 >>>>CALIBRATION BLOCK>>>>
>>>>CALIBRATION BLOCK>>>>256600 40-WD-044 Pipe-to-Elbow GL-D 88 01 3 X X UT cxams every 2 RFO's.**LATER>>>>256800 40 WD 045 Elbow-to-Pipe GL-D UT 88-01 3 X X UT cxams every 2 RFO's.>>>>LATER>>*12.0" CSB (REF.DWG.NO.12)257100 40-WD-047 GL D UT Pipe-to-Valve 40-06 88-01 X----X UT cxams every 2 RFO's.>>>>LATER>>>>257300 40-WD-048 Pipe-to-Elbow GL-D UT 88 01 3 X X UT cxams every 2 RFO's**LATER**0 40-WD-049 GL D UT Elbow-to-Valve 40-12 88-01 3 X X UT cxams every 2 RFO's>>>>LATER>>>>257900 40-WD-050A GL G VT-2 VT-2 exam each RFO for Valve 40-12-to-Pipe 88-01 cvidcnco of leakage.X---X X--X>>>>N/A>>~258100 40-WD-051 Pipe-to-Elbow GL-D UT 88-01 X X UT cxams cvcry 2 RFO's>>>>LATER>>>>258110 40-WD-051 Pipe-to-Elbow N/A VT-2 N/A 3 X---X X--X VT-2 each outage for evidence of leakage>>>>IATER>>>>258500 40 WD 052 Elbow-to-Pipe GL-D UT 88-01 3 X X UT cxams every 2 RFO's.**LATER>>>>  
256600     40-WD-044               GL-D                                                       UT cxams every 2 RFO's.
Pipe-to-Elbow            88 01                                                      **LATER>>>>
3 X                X 256800     40 WD 045               GL-D       UT                                             UT cxams every 2 RFO's.
Elbow-to-Pipe            88-01                                                      >>>>LATER>>*
3 X                X
: 12. 0" CSB (REF. DWG. NO. 12) 257100     40-WD-047               GL D       UT                                             UT cxams every 2 RFO's.
Pipe-to-Valve 40-06     88-01                                                     >>>>LATER>>>>
X  - - -    -  X 257300     40-WD-048               GL-D       UT                                             UT cxams every 2 RFO's Pipe-to-Elbow            88 01                                                      **LATER**
3 X                X 0   40-WD-049               GL D       UT                                             UT cxams  every  2 RFO's Elbow-to-Valve 40-12     88-01                                                     >>>>LATER>>>>
3 X                X 257900     40-WD-050A               GL G       VT-2                                           VT-2 exam each   RFO for Valve 40-12-to-Pipe     88-01                                                     cvidcnco of leakage.
X - - -     X   X   - -   X         >>>>N/A>> ~
258100     40-WD-051               GL-D       UT                                             UT cxams cvcry 2 RFO's Pipe-to-Elbow            88-01                                                      >>>>LATER>>>>
X                X 258110     40-WD-051               N/A         VT-2                                           VT-2 each outage  for Pipe-to-Elbow            N/A                                                       evidence of leakage 3 X - - -     X   X   - -   X         >>>>IATER>>>>
258500     40 WD 052               GL-D       UT                                             UT cxams every 2 RFO's.
Elbow-to-Pipe            88-01                                                      **LATER>>>>
3 X                X


DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNZT 1 INSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 166 or Core Spray NVMBER: 40.0  
DATE: 10/15/99                           NINE MILE POINT NUCLEAR PLANT UNZT 1                           PAGE: 166 REVISION:        0                        INSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS or Core Spray NVMBER:   40.0 INSPECTZON INTERVAL                    PLAN STATUS            PRESERVICE YEAR ASME                FIRST        SECOND      THIRD SEC. XZ              PERZOD      PERIOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMZ NATION AREA NVMBER IDENTIFICATION INSPECTZON INTERVAL ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERZOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR INSTRUCTIONS
EXAMZ NATION AREA       CATEGY      NDE                OUTAGE                          INSTRUCTIONS NVMBER     IDENTIFICATION           ITEM NO   METH   1 2 3 4 1   2 3 4   1 2 3 4 *>>CALIBRATION BLOCK>> t 258800     40-WD-053               GL-D                                                     UT cxams     every 2 RFO's.
*>>CALIBRATION BLOCK>>t 258800 40-WD-053 Pipe-to-Elbow GL-D 88-01 3 X--X UT cxams every 2 RFO's.**LATER**259100 40-WD-054 Elbow-to-Pipe GL-D UT 88-01 X X UT exams every 2 RFO's.t>>LATER>>t 259300 40-WD-055 Pipe-to-Elbow GL D VT 88-01 3 X X UT exam every 2 RFO's t*ZATER**259700 40-WD-056 Elbow-to-Pipe GL-D UT 88-01 3 X X UT cxams every 2 RFO's.<<*LATER>>>>2 200 40-WD-058 Pipe-to-Tcc GL-D UT 88-01 3 X X UT exams every 2 RFO'.t t LATER>>t 260500 40-WD-059 GL-D VT Tcc-to-Valve 40-10 88-01 X X UT cxams every 2 RFO's.t>>IATER>>t 260900 40-WD-060 Valve 40-10-to-Pipe GL-D UT 88-01 3 X X UT exams every 2 RFO's.t>>LATER>>t 261200 40-WD-061 Pipe-to-Elbow GL-D UT 88-01 X X UT cvcry 2 RFO's.t>>LATER>>t 261400 40-WD-062 Elbow-to-Pipe GL" D VT 88-01 X X VT every 2 RFO's.t<<LATER>>t 261800 40-WD-063 Pipe-to-Elbow GL-D VT 88-01 3 X X UT exams cvcry 2 RFO's.**LATER>>t  
Pipe-to-Elbow          88-01                                                    **LATER**
3 X        -  -  X 259100   40-WD-054               GL-D       UT                                           UT exams     every 2 RFO's.
Elbow-to-Pipe          88-01                                                    t >>LATER>>t X              X 259300   40-WD-055               GL D       VT                                           UT exam   every   2 RFO's Pipe-to-Elbow          88-01                                                    t*ZATER**
3 X                X 259700     40-WD-056               GL-D       UT                                           UT cxams     every 2 RFO's.
Elbow-to-Pipe          88-01                                                    <<*LATER>>>>
3 X                X 2   200   40-WD-058               GL-D       UT                                           UT exams     every 2 RFO'.
Pipe-to-Tcc            88-01                                                    t t LATER>> t 3 X                X 260500   40-WD-059               GL-D       VT                                           UT cxams    every  2 RFO's.
Tcc-to-Valve 40-10       88-01                                                     t>>IATER>>t X              X 260900   40-WD-060               GL-D       UT                                           UT exams     every 2 RFO's.
Valve 40-10-to-Pipe      88-01                                                    t>>LATER>>t 3 X                X 261200   40-WD-061               GL-D       UT                                           UT   cvcry   2 RFO's.
Pipe- to-Elbow          88-01                                                    t>>LATER>>t X              X 261400   40-WD-062               GL"D       VT                                           VT   every   2 RFO's.
Elbow-to-Pipe            88-01                                                    t<<LATER>>t X              X 261800   40-WD-063               GL-D       VT                                           UT exams     cvcry 2 RFO's.
Pipe-to-Elbow            88-01                                                    **LATER>>t 3 X                X


DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PIANT UNZT 1 INSERVZCE ZNSPECTION TEN YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 167 or Core Spray E NUMBER: 40.0  
DATE: 10/15/99                           NINE MILE POINT NUCLEAR PIANT UNZT 1                               PAGE: 167 REVISION:        0                        INSERVZCE ZNSPECTION TEN YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS or Core Spray E NUMBER: 40.0                                                                         PRESERVZCE YEAR INSPECTION INTERVAL                    PZAN STATUS ASME                FIRST        SECOND      THIRD SEC. XI            PERIOD        PERIOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL ASME SEC.XI CATEGY NDE ITEM NO METH FIRST PERIOD PZAN STATUS SECOND PERIOD THIRD PERIOD OUTAGE 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVZCE YEAR INSTRUCTIONS
EXAMINATION AREA         CATEGY    NDE                OUTAGE                            INSTRUCTIONS NUMBER     IDENTIFICATION         ITEM NO   METH   1 2 3 4   1   2 3 4   1 2 3 4 ~ ~CALIBRATION     BLOCK~ ~
~~CALIBRATION BLOCK~~262200 40-WD-064 Elbow-to-Pipe GL-D 88 01 3 X X UT exams every 2 RFO's.~'~IATER~~262500 40-WD-065 Pipe-to-Elbow GL D UT 88-01 3 X X UT exams every 2 RFO's.**ZATER**263000 40-WD-066 Elbow-to-Pipe GL-D UT 88-01 X X UT cxams every 2 RFO's.~~LATER~~263400 40-WD-067 Pipe-to-Tce GL-D UT 88"01 3 X X UT cvcry 2 RFO's~*LATER**600 40-WD 068 Tce to-Pipe GL-D UT 88-01 3 X X UT exams every 2 RFO's.**IATER1*264000 40-WD-069 GL-D UT Pipe-to-Valve 40-11 88-01 X----X UT exams every 2 RFO's.~~LATER**264300 40-WD-070 GL-D UT Valve 40-11-to-Pipe 88-01 3 X X UT exams every 2 RFO>s.~~ZATER~~264600 40-WD"072 Elbow-to-Pipe GL-D UT 88-01 3 X X UT exams every 2 RFO's.~+IATER++265000 40"WD-073 Pipe-to-Tcc GL-D UT 88-01 X----X UT cxams every 2 RFO's.**IATER**265400 40-WD"074 Tec-to-Pipe GL-D UT 88-01 3 X X UT every 2 RFO's.~~ZATER~~  
262200   40-WD-064               GL-D                                                     UT exams     every   2 RFO's.
                                                                                            ~ '~ IATER~ ~
Elbow-to-Pipe          88 01 3 X                X 262500   40-WD-065               GL D       UT                                           UT exams     every   2 RFO's.
Pipe-to-Elbow          88-01                                                    **ZATER**
3 X                X 263000   40-WD-066               GL-D       UT                                           UT cxams     every   2 RFO's.
Elbow-to-Pipe          88-01                                                    ~~LATER~~
X                X 263400   40-WD-067               GL-D       UT                                           UT   cvcry   2 RFO's Pipe-to-Tce            88"01                                                    ~*LATER**
3 X                X 600   40-WD 068               GL-D       UT                                           UT exams     every   2 RFO's.
Tce to-Pipe            88-01                                                    **IATER1*
3 X                X 264000   40-WD-069               GL-D       UT                                            UT exams      every  2 RFO's.
Pipe-to-Valve 40-11     88-01                                                     ~~LATER**
X - - -     -   X 264300   40-WD-070               GL-D       UT                                           UT exams every 2 RFO>s.
88-01                                                    ~ ~ZATER~ ~
Valve 40-11-to-Pipe 3 X                X 264600   40-WD"072               GL-D       UT                                           UT exams     every   2 RFO's.
Elbow-to-Pipe          88-01                                                    ~+IATER++
3 X                X 265000   40"WD-073               GL-D       UT                                           UT cxams     every   2 RFO's.
Pipe-to-Tcc            88-01                                                      **IATER**
X  - - -      -  X 265400   40-WD"074               GL-D       UT                                           UT     every   2 RFO's.
Tec-to-Pipe            88-01                                                      ~~ZATER~~
3 X                X


DATE: 10/15/99 REVISION: 0 NINE MZI E POINT NUCLEAR PLANT UNIT 1 INSERVZCE INSPECTION TEN-YEAR PLAN CIASS 1 SECTION XZ SCHEDULED COHPONENTS PAGE: 168 or Core Spray NUHBER: 40.0  
DATE: 10/15/99                             NINE MZI E POINT NUCLEAR PLANT UNIT 1                             PAGE: 168 REVISION:          0                        INSERVZCE INSPECTION TEN-YEAR PLAN CIASS 1 SECTION XZ SCHEDULED COHPONENTS or Core Spray NUHBER:     40.0                                                                           PRESERVICE YEAR ZNSPECTION INTERVAL                      PLAN STATUS ASME                FIRST        SECOND      THIRD SEC. XZ              PERZOD        PERIOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION ZNSPECTION INTERVAL ASME SEC.XZ CATEGY NDE ITEH NO HETH FIRST PERZOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR INSTRUCTIONS
EXAMINATION AREA         CATEGY      NDE                  OUTAGE                          INSTRUCTIONS NUMBER     IDENTIFICATION           ITEH NO   HETH     1 2 3 4   1   2 3 4   1 2 3 4 +~CALIBRATION BLOCK*+
+~CALIBRATION BLOCK*+265800 40"WD-075 Pipe-to-Pipe GL-D 88 01 3 X----X UT exams every 2 RFO's.~~LATER*~266100 40-WD-076 Pipe-to-Reducer (12'x6")GL-D VT 88-01 3 X---" X UT axams every 2 RFO's.**LATER++266400 40-WD-077 Reducer (12" x6")to Pipe GL D UT 88-01 3 X----X UT exams every 2 RFO's.~+ZATER++266500 40-WD-077 Reducer (12" x6")-to-Pipe B"J VT B9.11 PT 3 X Examine 100%of weld length~+LATER~~6.0" CSB (REF.DWG.NO.12)266600 40-WD-079 B-J UT Terminal End~*LATER~+Nozzle N6B Outer Safe B9.11 PT End-to-Elbow 3 X 266700 40-WD-079 GL-D VT Nozzle N6B Outcr Safe 88-01 End-to-Elbow 3 X----X Terminal End, UT exam every 2 RFO's.~*LATER~*266800 40-WD-079A GL-D UT Nozzle N6B Inner Safe 88-01 End-to-Outcr Safe 3 X X UT exam every 2 RFO's~~IATER+*266900 40-WD"079A B-J VT Nozzle N6B Znncr Safe B9.11 End-to-Outer Safe 3 X Examine 100%of weld length**ZATER~~
265800     40"WD-075                 GL-D                                                       UT exams     every 2 RFO's.
Pipe-to-Pipe              88 01                                                      ~ ~LATER*~
3 X  - - -    -  X 266100     40-WD-076                 GL-D       VT                                             UT axams     every 2 RFO's.
Pipe-to-Reducer          88-01                                                      **LATER++
3 X  - - -     "  X (12'x6")
266400    40-WD-077                GL D       UT                                             UT exams     every 2 RFO's.
Reducer                  88-01                                                      ~ + ZATER+ +
3 X  - - -     -   X (12" x6" ) to Pipe 266500    40-WD-077                B"J         VT                                             Examine 100%     of weld Reducer                  B9.11      PT                                            length   ~+LATER~~
3                  X (12" x6" ) -to-Pipe
: 6. 0" CSB (REF. DWG. NO. 12) 266600     40-WD-079                 B-J         UT                                             Terminal End     ~*LATER~+
Nozzle N6B Outer Safe     B9.11       PT 3 X End-to-Elbow 266700     40-WD-079                 GL-D       VT                                             Terminal End, UT exam Nozzle N6B Outcr Safe     88-01                                                     every 2 RFO's. ~*LATER~*
End-to-Elbow                               3 X   - - -     -   X 266800     40-WD-079A               GL-D       UT                                            UT exam    every  2 RFO's Nozzle     N6B Inner Safe 88-01                                                     ~~IATER+*
3 X                X End-to-Outcr Safe 266900     40-WD"079A               B-J         VT                                             Examine 100%      of weld Nozzle     N6B Znncr Safe B9.11                                                     length  **ZATER~~
3 X End-to-Outer Safe


DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 ZNSERVZCE INSPECTION TEN YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 169 or Core Spray NUMBER: 40.0  
DATE: 10/15/99                             NINE MILE POINT NUCLEAR PLANT UNIT 1                         PAGE: 169 REVISION:        0                          ZNSERVZCE INSPECTION TEN YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS or Core Spray NUMBER:   40.0 INSPECTION INTERVAL                      PLAN STATUS            PRESERVZCE YEAR ASME                FIRST        SECOND      THIRD SEC. XI            PERIOD        PERZOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER ZDENTZFICATION INSPECTION INTERVAL ASME SEC.XI CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERZOD-OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVZCE YEAR INSTRUCTIONS
EXAMINATION AREA         CATEGY      NDE                -OUTAGE                          INSTRUCTIONS NUMBER     ZDENTZFICATION           ITEM   NO   METH   1 2 3 4   1   2 3 4   1 2 3 4 **CALIBRATIONBLOCK+*
**CALIBRATION BLOCK+*267000 40-WD-080 Nozzle N6B-to-Inner Safe End B-F B5.10 X Group R20, Examine 100%of weld length**LATER**267100 40-WD-080 SIL No" zlc N6B-to-Inner 455R1S1 Safe End 3 X 182 Butter Expansion from nozzle sido of weld.aaLATER+a 267200 40-WD-080 Nozzle N6B-to-Inner Safe End GL-D 88-01 3 X X UT exams cvcry 2 RFO's**LATER+*267300 40-WD-081 B-D N6B Nozzle-to-Vcsscl B3.90 3 X Group R20, 56%CRV ,Limitation due to ad)acent nozzle and bioshield~~NMPI-GE-7.875~~
267000     40-WD-080                 B-F                                                        Group R20, Examine 100%
267400 40-WD-081-ZR N6B Nozzle Znner Radius Section B-D B3.100 3 X Group R20, 54%CRV ,Limitation duc to ad)accnt nozzle and bioshicld+*NMP1 GE 7.875++2.0" CSS (REF.DWG.NO.12)267500 40-23"VB Valve 40-23 Bolting B-G-2 B7.70 3 X Examine in place, when removed or when disasscmblcd
Nozzle N6B-to-Inner       B5. 10                                                     of weld length **LATER**
*~N/A~*267600 40-24-VB Valve 40-24 Bolting B-G-2 B7.70 X Examine in place, when removed or when disassembled
X Safe End 267100     40-WD-080                 SIL                                                       182  Butter Expansion No" zlc N6B-to-Inner     455R1S1                                                   from nozzle sido   of 3 X Safe End                                                                            weld. aaLATER+a 267200     40-WD-080                 GL-D                                                       UT exams cvcry 2 RFO's Nozzle N6B-to-Inner      88-01                                                      **LATER+*
~~N/A~*  
3 X                X Safe End 267300     40-WD-081                 B-D                                                       Group R20,  56% CRV N6B Nozzle-to-Vcsscl     B3. 90                                                     ,Limitation due to 3 X ad)acent nozzle and bioshield
                                                                                                ~~NMPI-GE-7.875~~
267400     40-WD-081-ZR             B-D                                                       Group R20, 54% CRV N6B  Nozzle Znner        B3. 100                                                    ,Limitation duc to 3 X Radius Section                                                                      ad)accnt nozzle and bioshicld
                                                                                                +*NMP1 GE 7.875++
2.0" CSS (REF. DWG. NO. 12) 267500     40-23"VB                 B-G-2                                                     Examine in place,   when Valve 40-23 Bolting        B7.70                                                      removed or when 3              X disasscmblcd *~N/A~*
267600     40-24-VB                 B-G-2                                                     Examine in place,   when Valve 40-24 Bolting        B7.70                                                      removed or when X
disassembled ~~N/A~*


DATE: 10/15/99 REVISION: 0 NZNE MZLE POINT NUCLEAR PIANT UNIT 1 ZNSERVZCE ZNSPECTION TEN YEAR PLAN CIASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 170 or Core Spray NUMBER: 40.1  
DATE: 10/15/99                             NZNE MZLE POINT NUCLEAR PIANT UNIT 1                         PAGE: 170 REVISION:        0                          ZNSERVZCE ZNSPECTION TEN YEAR PLAN CIASS 1 SECTION XZ SCHEDULED COMPONENTS or Core Spray NUMBER:   40. 1 INSPECTION INTERVAL                      PLAN STATUS            PRESERVICE YEAR ASME                FIRST        SECOND      THIRD SEC. XI            PERIOD        PERIOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL ASME SEC.XI CATE GY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR INSTRUCTIONS
EXAMINATION AREA         CATE GY     NDE                 OUTAGE                          INSTRUCTIONS NUMBER      IDENTIFICATION          ITEM NO     METH   1 2 3 4   1   2 3 4   1 2 3 4 ++CALIBRATION BLOCK**
++CALIBRATION BLOCK**267700 40.1-25-VB Valve 40-25 B-G-2 B7.70 Removed Crom schedule as Class 2, and less than 2.0~diameter.*~N/A~*267800 40.1-WD-001 B J*AN/Al 0 Sock-0-let-to-Pipe B9.21 3 X 267900 40.1-WD-002 Pipe-to-Valve 40-19 B-J B9.21 X Terminal End,+*N/A++268600 40.1-WD"009 B-J Terminal End<<*N/A*>>Valve 40-22-to-Pipe B9.21 3 X 0 40.1-WD-011 Tce-to-Pipe B-J B9.21 3 X~+N/A~*268900 40.1-WD-012 B-J Terminal End iiN/A++Pipe-to-Valve 40-23 B9.21 3 X 270300 40.1-WD-026 Tec-to-Pipe B-J B9.21 3 X f*N/A%1 270400 40.1-WD-027 Pipe<<to-Elbov B-J B9.21 3 X+*N/A**271200 40.1-WD-035 Pipe-to-Valve 40-20 B-J B9.21 3 X Tcrmnal End**N/A~~
267700     40. 1-25-VB             B-G-2                                                     Removed Crom schedule   as Valve 40-25              B7.70                                                      Class 2, and less than 2.0~ diameter.   *~N/A~*
267800     40. 1-WD-001             B J                                                       *AN/Al0 Sock-0-let -to-Pipe     B9. 21 3 X 267900     40. 1-WD-002             B-J                                                       Terminal End, +*N/A++
Pipe-to-Valve 40-19      B9.21 X
268600     40.1-WD"009             B-J                                                       Terminal End <<*N/A*>>
Valve 40-22-to-Pipe     B9. 21 3               X 0   40. 1-WD-011             B-J                                                        ~+N/A~*
Tce-to-Pipe             B9. 21 3               X 268900     40. 1-WD-012             B-J                                                       Terminal End iiN/A++
Pipe-to-Valve 40-23     B9.21 3             X 270300     40.1-WD-026             B-J                                                        f*N/A%1 Tec-to-Pipe             B9.21 3                             X 270400     40.1-WD-027             B-J                                                        +*N/A**
Pipe<<to-Elbov           B9. 21 3                             X 271200     40. 1-WD-035             B-J                                                        Tcrmnal End **N/A~~
Pipe-to-Valve 40-20     B9.21 3                             X


DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 ZNSERVICE INSPECTION TEN YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 171 or Core Spray NUMBER: 40.1  
DATE: 10/15/99                               NINE MILE POINT NUCLEAR PLANT UNIT 1                         PAGE: 171 REVISION:          0                          ZNSERVICE INSPECTION TEN YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS or Core Spray NUMBER:     40.1 INSPECTION INTERVAL                      PIAN STATUS            PRESERVZCE YEAR ASME                FIRST        SECOND      THIRD SEC. XZ              PERIOD        PERIOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD PIAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVZCE YEAR INSTRUCTIONS
EXAMINATION AREA           CATEGY      NDE                OUTAGE                        INSTRUCTIONS NUMBER     IDENTIFICATION             ITEM NO   METH     1 2 3 4   1   2 3 4   1 2 3 4 **CALIBRATIONBLOCK**
**CALIBRATION BLOCK**1.0" CSS (REF.DWG.NO.12)271400 40.1 WD 037 B-J PT Terminal End*~N/A~~Pipe-to-Valve 40-24 B9.21 3 271500 40.1-WD-038 B-J PT Terminal End~~N/Ai~Valve 40-24-to-Pipe B9.21 3 X  
1 . 0" CSS   (REF. DWG. NO. 12) 271400     40.1   WD 037             B-J         PT                                             Terminal End *~N/A~~
Pipe-to-Valve 40-24       B9. 21 3
271500   40. 1-WD-038               B-J         PT                                             Terminal End ~~N/Ai~
Valve 40-24 -to-Pipe       B9. 21 3                             X


DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION TEN-YEAR PZAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 172 d Poison NUMBER: 42.1  
DATE: 10/15/99                           NINE MILE POINT NUCLEAR PLANT UNIT 1                           PAGE: 172 REVISION:        0                          INSERVICE INSPECTION TEN-YEAR PZAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS d Poison NUMBER:   42. 1 ZNSPECTZON INTERVAL                      PLAN STATUS            PRESERVZCE YEAR ASME                  FIRST        SECOND      THIRD SEC. XZ                PERIOD      PERIOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION ZNSPECTZON INTERVAL ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD THIRD PERIOD OUTAGE 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVZCE YEAR INSTRUCTIONS
EXAMINATION AREA       CATEGY      NDE                OUTAGE                          INSTRUCTIONS NUMBER     IDENTIFICATION         ITEM   NO   METH   1 2 3 4 1   2 3 4   1 2 3 4 >>*CALIBRATION BLOCK>>>>
>>*CALIBRATION BLOCK>>>>1.5" Liquid Poison Line (REF.DWG.NO.14)271700 42.1-02-VB B-G-2 VT-1 Valve 42.1-02 Bolting B7.70 3 X>>>>N/A>>>>271800 42.1-03-VB B-G-2 VT-1 Valve 42.1-02 Bolting B7.70 3 X**'N/A>>*271900 42.1-R1-A Spring Hanger Fl.10 VT 3 3 X Code Caso N-491-1>>>>N/A>>>>272800 42.1-WD-005 Pipe-to-Elbow B-J B9.21 3 X Examine 100%of weld length**N/A**0 42.1-WD-006 Elbow-to-Pipe B"J PT B9.21 3 X Examine 100%of wold length**N/A>>>>273500 42.1-WD-017 Valve 42.1-02-to-Reducer B-J PT B9.21 3 X Terminal End>>>>N/A>>>>273800 42.1-WD-026 B-J PT Valve 42.1-01-to-Pipe B9.21 3 X Terminal End, Examine 100%of weld length>>>>N/A>>>>274100 42.1-WD-029 Pipe-to-Elbow B-J PT B9.21 3 X Examino 100%of weld length>>>>N/A>>>>274600 42.1-WD-034 SZL Safe End-to-Nozzle N12 571 3 X Augmcnetd UT and PT to dotermincd>>>>IATER>>>>  
1.5" Liquid Poison Line   (REF. DWG. NO. 14) 271700     42. 1-02-VB             B-G-2       VT-1                                           >>>>N/A>>>>
Valve 42. 1-02 Bolting B7. 70 3 X 271800     42. 1-03-VB             B-G-2       VT-1                                           **'N/A>>*
Valve 42.1-02 Bolting   B7.70 3             X 271900     42. 1-R1-A                           VT 3                                         Code Caso N-491-1 Spring Hanger          Fl. 10                                                    >>>>N/A>>>>
3 X 272800     42. 1-WD-005           B-J                                                        Examine 100%  of weld Pipe- to-Elbow         B9. 21                                                     length **N/A**
3                            X 0   42. 1-WD-006           B"J         PT                                           Examine 100% of wold Elbow-to-Pipe          B9. 21                                                    length **N/A>>>>
3 X 273500     42.1-WD-017             B-J         PT                                           Terminal End >>>>N/A>>>>
Valve                    B9. 21 3 X 42.1-02-to-Reducer 273800   42.1-WD-026             B-J         PT                                           Terminal End, Examine Valve 42.1-01-to-Pipe   B9.21                                                     100% of weld length 3 X
                                                                                              >>>>N/A>>>>
274100   42.1-WD-029             B-J         PT                                           Examino 100% of weld Pipe-to-Elbow            B9. 21                                                    length >>>>N/A>>>>
3 X 274600   42. 1-WD-034             SZL                                                       Augmcnetd UT and PT    to Safe End-to-Nozzle N12 571                                                         dotermincd>>>>IATER>>>>
3                            X


DATE: 10/15/99 REVZSZON: 0 NINE MILE POZNT NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION TEN YEAR PLAN I CLASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 173 d Poison NUMBER: 42.1  
DATE: 10/15/99                           NINE MILE POZNT NUCLEAR PLANT UNIT 1                         PAGE: 173 REVZSZON:        0                        INSERVICE INSPECTION TEN YEAR PLAN I       CLASS 1 SECTION XZ SCHEDULED COMPONENTS d Poison NUMBER:   42. 1 INSPECTION INTERVAL                    PLAN STATUS            PRESERVZCE YEAR ASME                FIRST        SECOND      THIRD SEC. XZ              PERZOD        PERIOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERZOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVZCE YEAR INSTRUCTIONS
++CALIBRATION BLOCK~~274700 42.I-WD-034 B-F Safe End-to-Nozzle N12 B5.20 3 X Group R41, Terminal End Examine 100%of weld length~~N/A**274800 X-131 Penetration F-A VT-3 System Anchor Point F1.10 3 X Code Casa N-491-1 1 tN/A1*


DATE: 10/15/99 REVISION: 0 NINE MILE POZNT NUCLEAR PIANT UNIT 1 INSERVZCE INSPECTION TEN-YEAR PZAN CZASS 1 SECTION XI SCHEDULED COMPONENTS PAGE: 174 ol Rod Drive NUMBER: 44.1 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR  
NUMBER EXAMINATION AREA        CATEGY    NDE                OUTAGE                          INSTRUCTIONS IDENTIFICATION          ITEM NO    METH    1  2  3  4  1  2  3  4  1  2  3  4 ++CALIBRATION BLOCK~~
274700    42. I-WD-034            B-F                                                      Group R41, Terminal End Safe End-to-Nozzle N12 B5.20                                                        Examine 100% of weld 3 X length ~~N/A**
274800    X-131 Penetration        F-A        VT-3                                          Code Casa N-491-1 System Anchor Point    F1.10                                                    1 tN/A1*
3              X
 
DATE: 10/15/99                             NINE MILE POZNT NUCLEAR PIANT UNIT 1                         PAGE: 174 REVISION:        0                        INSERVZCE INSPECTION TEN-YEAR PZAN CZASS 1 SECTION XI SCHEDULED COMPONENTS ol Rod   Drive NUMBER:   44. 1 INSPECTION INTERVAL                     PLAN STATUS             PRESERVICE YEAR ASME                FIRST        SECOND      THIRD SEC. XI            PERIOD        PERIOD      PERIOD


==SUMMARY==
==SUMMARY==
NUMBER EXAMINATION AREA IDENTIFICATION ASME SEC.XI CATEGY NDE ZTEM NO METH THIRD PERIOD FIRST PERIOD SECOND PERIOD OUTAGE 1 2 3 4 1 2 3 4 1 2 3 4 ZNSTRUCTZONS
EXAMINATION AREA         CATEGY       NDE                 OUTAGE                        ZNSTRUCTZONS NUMBER    IDENTIFICATION          ZTEM NO     METH   1 2 3 4   1   2 3 4   1 2 3 4 **CALIBRATIONBLOCK**
**CALIBRATION BLOCK**3.0" Control Rod Drive Line (REF.DWG.NO.18)275000 44.1-H1 F-A VT-3 Spring Hanger Fl.10 3 X Code Case N-491-1+*N/A+*275300 44.1-SC-1 Pipe Clamp F-A F1.10 VT-3 3 X Code Casa N-491-1 1tN/Ait 275500 44.1-WD-001 B"J Valve 44-189-to-Pipe B9~21 3 X Terminal End, Examine 100%of wold length**N/A+*275600 44.1-WD-002 Pipe-to-Elbow B-J PT B9.21 3 X Examine 100%of weld length~*N/A**Elbow-to-Pipe B9.21 00 44.1-WD-003 B-J 3 X Examine 100%of weld length.~~N/A**275900 44.1-WD-005 Elbow-to-Pipe B-J B9.21 3 X Examino 100%of wold length.**N/A**276900 44.1-WD-015 Pipe-to-Elbow B-J B9.21 3 X Examine 100%of weld length~+N/A*~277000 44.1-WD-016 B-J PT Terminal End++N/A++Elbow-to-Safe End (N9)B9.21 X 277100 44.1-WD-017 B-F PT N9 Safe End-to-Nozrlc B5~20 3 X Group R40, Examine 100%of weld length~*N/A**277200 44.1-WD-017 N9 Safe End-to-No""lc 0619 3 X Group R40~+ZATER*~
3.0" Control Rod Drive Line   (REF. DWG. NO. 18) 275000     44.1-H1                 F-A         VT-3                                         Code Case N-491-1 Spring Hanger            Fl. 10                                                    +*N/A+*
3                            X 275300   44. 1-SC-1               F-A         VT-3                                           Code Casa N-491-1 Pipe Clamp              F1.10                                                      1tN/Ait 3 X 275500     44.1-WD-001             B"J                                                       Terminal End, Examine Valve 44-189 -to-Pipe   B9 21
                                        ~                                                     100% of wold length 3 X
                                                                                              **N/A+*
275600     44.1-WD-002             B-J         PT                                           Examine 100% of weld Pipe-to-Elbow            B9. 21                                                    length ~*N/A**
3 X 00   44. 1-WD-003             B-J                                                       Examine 100% of weld Elbow-to-Pipe            B9. 21                                                    length. ~~N/A**
3 X 275900   44.1-WD-005               B-J                                                        Examino 100%  of wold Elbow-to-Pipe             B9. 21                                                     length. **N/A**
3 X 276900   44.1-WD-015               B-J                                                        Examine 100% of weld Pipe-to-Elbow             B9.21                                                     length ~+N/A*~
3 X 277000   44.1-WD-016               B-J         PT                                             Terminal End ++N/A++
Elbow-to-Safe End (N9) B9.21 X
277100   44. 1-WD-017             B-F         PT                                             Group R40, Examine 100%
N9   Safe End -to-Nozrlc B5 20
                                      ~                                                       of weld length ~*N/A**
3 X 277200   44.1-WD-017                                                                         Group R40 ~+ZATER*~
N9   Safe End -to-No""lc 0619 3 X


DATE: 10/15/99 REVISION: 0 NINE MZLE POINT NUCLEAR PLANT UNIT 1 ZNSERVICE INSPECTION TEN-YEAR PLAN CZASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 175 ol Rod Drive NUMBER: 44.1  
DATE: 10/15/99                               NINE MZLE POINT NUCLEAR PLANT UNIT 1                           PAGE: 175 REVISION:            0                        ZNSERVICE INSPECTION TEN-YEAR PLAN CZASS 1 SECTION XZ SCHEDULED COMPONENTS ol Rod   Drive NUMBER:     44. 1 INSPECTION INTERVAL                    PLAN STATUS              PRESERVZCE YEAR ASME                PIRST        SECOND        THIRD SEC. XZ              PERIOD      PERIOD        PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER ZDENTIFICATION INSPECTION INTERVAL ASME SEC.XZ CATEGY NDE ITEM NO METH PIRST PERIOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVZCE YEAR INSTRUCTIONS
EXAMINATION AREA           CATEGY      NDE                OUTAGE                          INSTRUCTIONS NUMBER     ZDENTIFICATION             ITEM NO   METH   1 2 3 4 1   2 3 4   1 2 3 4 +~CALIBRATION BLOCK*~
+~CALIBRATION BLOCK*~277300 44.1-WD-017 SZL N9 Safe End-to-Noz lc 455R1S1 3 X Group R40, Inconel 182 Butter Expansion from nozzle side of weld.**LATER**277400 44.1-WD-018 N9 Nozzle-to-Vcssol B-D UT B3.90 3 X Group R40, 63%CRV Limitation duc to bioshicld~+LATER*~277500 44.1"WD-018-IR NUREG UT N9 Nozzle-to-Vessel 0619 RUT X Group R40,~iIATERii 277600 44.1-WD-018-ZR B-D N9 Nozzle Inner Radius B3.100 Section 3 X Group R40, 48%CRV, I imitation due to bioshicld~iLATERi+3.0" Control Rod Drive Line (REF.DWG.NO.19)277800 44.3-12-VB B-G-2 Valvo 44-3-12 Bolting B7.70 VT 1 10 Studs 20 Nuts, Examine in place, when removed or when disassembled
277300     44. 1-WD-017               SZL                                                       Group R40, Inconel 182 N9   Safe End -to-Noz   lc 455R1S1                                                   Butter Expansion from 3 X nozzle side of weld.
**N/A**277900 44.3-13-VB B-G-2 VT-1 Valve 44-3-13 Bolting B7.70 3 X Examine in place, when removed or when disasscmblcd.
                                                                                                  **LATER**
~*N/A~~278000 44.3-189-VB B G-2 VT-1 Valve 44-189 Bolting B7.70 3 X Examine 10 studs and 20 nuts, in place, when removed or when disassembled
277400     44.1-WD-018                 B-D         UT                                           Group R40,   63% CRV N9  Nozzle-to-Vcssol      B3.90                                                    Limitation duc to 3 X bioshicld ~+LATER*~
~~N/A++278100 44.3-WD-093 B-J Terminal End~~N/Ai~Pipe-to-Valve 44-3-12 B9~21 3 X  
277500     44 . 1 "WD-018-IR         NUREG       UT                                           Group R40, ~iIATERii N9   Nozzle-to-Vessel     0619         RUT X
277600     44. 1-WD-018-ZR             B-D                                                       Group R40,    48% CRV, N9   Nozzle Inner Radius B3.100                                                       I imitation due to 3 X Section                                                                                bioshicld   ~iLATERi+
3.0" Control     Rod Drive Line   (REF. DWG. NO. 19) 277800     44.3-12-VB                 B-G-2       VT 1                                          10 Studs 20 Nuts, Valvo 44-3-12 Bolting       B7.70                                                     Examine   in place, when removed   or when disassembled   **N/A**
277900     44.3-13-VB                 B-G-2       VT-1                                           Examine  in place,  when Valve 44-3-13 Bolting       B7. 70                                                     removed   or when 3 X disasscmblcd. ~*N/A~~
278000     44.3-189-VB                 B G-2     VT-1                                           Examine 10 studs and 20 Valve 44-189 Bolting       B7.70                                                     nuts, in place,     when 3                            X removed   or when disassembled ~~N/A++
278100     44. 3-WD-093               B-J                                                       Terminal End ~~N/Ai~
Pipe-to-Valve 44-3-12       B9 21
                                          ~
3                           X


DATE: 10/15/99 REVISION: 0 NINE MZLE POINT NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION TEN YEAR PIAN CIASS 1 SECTION XI SCHEDULED COMPONENTS PAGE: 176 ol Rod Drive NUMBER: 44.3  
DATE: 10/15/99                           NINE MZLE POINT NUCLEAR PLANT UNIT 1                         PAGE: 176 REVISION:        0                        INSERVICE INSPECTION TEN YEAR PIAN CIASS 1 SECTION XI SCHEDULED COMPONENTS ol Rod Drive NUMBER:   44. 3                                                                         PRESERVICE YEAR INSPECTION ZNTERVAL                      PLAN STATUS ASME                FIRST        SECOND      THIRD SEC. XI            PERIOD        PERIOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER ZDENTIFICATZON INSPECTION ZNTERVAL ASME SEC.XI CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR ZNSTRUCTIONS
EXAMINATION AREA         CATEGY      NDE                OUTAGE                          ZNSTRUCTIONS NUMBER     ZDENTIFICATZON         ITEM NO     METH   1 2 3 4   1   2 3 4   1 2 3 4 ~~CALIBRATION BLOCK~*
~~CALIBRATION BLOCK~*278200 44.3-WD"094 B-K PT Valve 44.3-12 Integral B10~40 AttachrN:nt 3 X Code Case N-509~~N/A'~278500 44.3-WD-111 B J Valve 44.3-13-to-Pipe B9.21 X Examfne 100%of weld length~~N/A~+  
278200   44.3-WD"094             B-K         PT                                           Code Case N-509 ~~N/A'~
Valve 44.3-12 Integral B10 40~
3              X AttachrN:nt 278500   44.3-WD-111             B J                                                       Examfne 100%  of weld Valve 44.3-13 -to-Pipe B9.21                                                       length ~~N/A~+
X
 
NINE MILE POINT                            NMP1-ISI-003-10 Y NIAGARA                            NUCLEAR POWER STATION N U MOHAWK THIRD INSERVICE INSPECTION INTERVAL              Rev. 0 TEN-YEAR INSERVICE INSPECTION                Date:  October 15, 1999 PLAN AND SCHEDULE 5.0  CLASS 2 INSERVICE INSPECTION PLAN TABLES This section contains the Long Term Ten-Year Inservice Inspection Examination Tables for nondestructive examinations of selected systems and components for the Second Inservice Inspection Interval.
02.0        Main Steam System                                                                177 thru 179 03.0        Main Steam System                                                              .. 180thru181 39.0        Emergency Condenser System                                                    .. 182 thru 196 44.2        Control Rod Drive System                                                      .. 197 thru198 80.0        Reactor Containment Spray System                                              .. 199 thru 210 81.0        Reactor Core Spray System  ~                                                      211 thru 222 93.0        Reactor Containment Spray System                                                  223 thru 225 File: NMP1ISIPL.wpd


N Y NIAGARA U MOHAWK NINE MILE POINT NUCLEAR POWER STATION NMP1-ISI-003-10 THIRD INSERVICE INSPECTION INTERVAL Rev.0 TEN-YEAR INSERVICE INSPECTION PLAN AND SCHEDULE Date: October 15, 1999 5.0 CLASS 2 INSERVICE INSPECTION PLAN TABLES This section contains the Long Term Ten-Year Inservice Inspection Examination Tables for nondestructive examinations of selected systems and components for the Second Inservice Inspection Interval.02.0 03.0 39.0 44.2 80.0 81.0 93.0 Main Steam System Main Steam System Emergency Condenser System Control Rod Drive System Reactor Containment Spray System Reactor Core Spray System~Reactor Containment Spray System 177 thru 179..180thru181
f, DATE: 10/15/99                               NINE MILE POINT NUCLEAR PLANT UNIT 1                         PAGE: 177 REVISION:        0                          ZNSERVICE INSPECTION TEN-YEAR PLAN CLASS 2 SECTION XZ SCHEDULED COMPONENTS Steam System NUMBER: 02. 0 INSPECTION INTERVAL                        PLAN STATUS            PRESERVZCE YEAR ASME                  FIRST        SECOND      THIRD SEC. XZ                PERIOD        PERIOD      PERIOD
..182 thru 196..197 thru198..199 thru 210 211 thru 222 223 thru 225 File: NMP1ISIPL.wpd f,
DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 ZNSERVICE INSPECTION TEN-YEAR PLAN CLASS 2 SECTION XZ SCHEDULED COMPONENTS PAGE: 177 Steam System NUMBER: 02.0  


==SUMMARY==
==SUMMARY==
EXAMZNATZON AREA NUMBER ZDENTZFZCATZON INSPECTION INTERVAL ASME SEC.XZ CATE GY NDE ZTEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVZCE YEAR INSTRUCTIONS 4*CALIBRATION BLOCK~*18.0" MSA (REF.DWG.NO.3)284000 02-MS-H10 F-A VT-3 Spring Hanger Fl.20 3 X Code Case N-491-1++N/A~*284100 02-MS-Hll Spring Hanger Fl.20 VT 3 3 X Code Case N-491-1 41N/AI4 24.0" MSB (REF.DWG.NO.3)286400 02-SR-1A Seismic Restraint F-A Fl.20 VT-3 3 X Code Case N-491-1~~N/A~*286500 02"SR-1A-WD-001.
1 C C Integral Attachment C3.20 3 X 1-1/4"x 14xl'-4" Lug , Code Case N-509**N/A**286600 02-SR-1A-WD-001.
11 C-C Integral Attachment C3.20 3 X Code Case N-509**N/A**286700 02-SR-1A-WD-001
.13 C-C Integral Attachment C3.20 3 X Code Case N-509+AN/Aee 286800 02-SR-1A-WD-001.15 C-C MT Integral Attachment C3.20 3 X Code case N-509~~N/A~~286900 02-SR-1A-WD-001.3 C C MT Integral Attachment C3.20 3 X Code Case N-509+~N/A~~287000 02-SR-1A-WD-001.5 C-C MT Integral Attachment C3.20 3 X Code Case N-509~+N/A++


DATE: 10/15/99 REVISION: 0 NINE HZLE POZNT NUCLEAR PLANT UNIT 1 INSERVZCE INSPECTION TEN-YEAR PLAN CLASS 2 SECTION XI SCHEDULED COMPONENTS PAGE: 178 Steam System NUHBER: 02.0  
NUMBER EXAMZNATZON AREA          CATE  GY    NDE                  OUTAGE                        INSTRUCTIONS ZDENTZFZCATZON          ZTEM NO      METH    1  2  3            3 4  1  2    4  1  2  3  4  4*CALIBRATION BLOCK~*
: 18. 0" MSA (REF. DWG. NO. 3) 284000      02-MS-H10                F-A          VT-3                                            Code Case N-491-1 Spring Hanger            Fl. 20                                                      ++N/A~*
3              X 284100    02-MS-Hll                              VT 3                                            Code Case N-491-1 Spring Hanger            Fl . 20                                                      41N/AI4 3              X
: 24. 0"  MSB (REF. DWG. NO. 3) 286400    02-SR-1A                  F-A          VT-3                                          Code Case N-491-1 Seismic Restraint        Fl . 20                                                      ~~N/A~*
3            X 286500    02 "SR-1A-WD-001. 1      C C                                                          1-1/4"x 14xl'-4"  Lug ,
Integral Attachment      C3. 20                                                      Code Case N-509  **N/A**
3            X 286600      02-SR-1A-WD-001. 11      C-C                                                          Code Case N-509  **N/A**
Integral Attachment      C3.20 3              X 286700    02-SR-1A-WD-001 . 13      C-C                                                          Code Case N-509 +AN/Aee Integral Attachment      C3.20 3              X 286800    02-SR-1A-WD-001.15        C-C          MT                                            Code case N-509 ~~N/A~~
Integral Attachment      C3. 20 3              X 286900    02-SR-1A-WD-001.3        C C          MT                                              Code Case N-509 +~N/A~~
Integral Attachment      C3. 20 3              X 287000    02-SR-1A-WD-001.5        C-C          MT                                              Code Case N-509 ~+N/A++
Integral Attachment      C3. 20 3              X
 
DATE: 10/15/99                               NINE HZLE POZNT NUCLEAR PLANT UNIT 1                         PAGE: 178 REVISION:          0                          INSERVZCE INSPECTION TEN-YEAR PLAN CLASS 2 SECTION XI SCHEDULED COMPONENTS Steam System NUHBER:   02. 0 INSPECTION INTERVAL                      PLAN STATUS            PRESERVZCE YEAR ASHE                FIRST        SECOND      THIRD SEC. XZ              PERIOD        PERIOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUHBER IDENTIFICATION INSPECTION INTERVAL ASHE SEC.XZ CATEGY NDE ZTEH NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVZCE YEAR INSTRUCTIONS 4 4CALZBRATION BLOCK~~287100 02-SR-1A-WD-001.
EXAMINATION AREA           CATEGY      NDE                OUTAGE                          INSTRUCTIONS NUHBER       IDENTIFICATION           ZTEH NO     METH         3                              4 4CALZBRATION BLOCK~ ~
7 C-C HT Integral Attachment C3.20 3 X Code Case N-509++N/Ai+287200 02-SR-1A-WD-001.
1 2     4   1   2 3 4   1 2 3 4 287100     02-SR-1A-WD-001. 7       C-C         HT                                           Code Case N-509 ++N/Ai+
9 C C MT Zntegral Attachment C3.20 3 X Code Case N-509**N/A**24.0" HSA (REF.DWG.NO.3)290800 02"WD-041 Branch Connection (24"x18" Header)C-F-2 PT C5.81 3 X**N/A%*24.0" HSB (REF.DWG.NO.3)02-WD-073 Tcc-to-Pipe C-F-2 UT C5.51 HT 3 X**NMP1-24-080-CS*~
Integral Attachment      C3.20 3            X 287200     02-SR-1A-WD-001. 9       C C         MT                                           Code Case N-509   **N/A**
293400 02"WD-078 Pipe-to-Elbow C-F-2 UT C5.51 3 X~'~NMP1-24-080-CS~*
Zntegral Attachment      C3.20 3            X
18.0" MSA (REF.DWG.NO.3)294000 02-WD-182 Rct-to-Pipe C" F-2 UT C5.51 3 X~~NMPI-18-.
: 24. 0" HSA (REF. DWG. NO. 3) 290800     02"WD-041                 C-F-2         PT                                             **N/A%*
937-CS-106*~
Branch Connection        C5. 81 3              X (24 "x18" Header)
294100 02-WD-190 C-F-2 UT++NHP1-18-.937-CS-106**
: 24. 0" HSB (REF. DWG. NO. 3) 02-WD-073                 C-F-2       UT                                             **NMP1-24-080-CS*~
Pipe-to-180 dcg Ret C5.51 HT 3 294500 02-WD-329 CF2UT Pipe-to-Turbine Stop C5~51 PT 3 X Valve Terminal End~+NHP1-18-.937-CS-106**  
Tcc-to-Pipe              C5.51        HT 3              X 293400     02"WD-078                 C-F-2       UT                                             ~'~NMP1-24-080-CS~*
Pipe-to-Elbow            C5.51 3              X
: 18. 0" MSA (REF. DWG. NO. 3) 294000     02-WD-182                 C" F-2       UT                                             ~~NMPI-18-. 937-CS-106*~
Rct-to-Pipe                C5. 51 3                            X 294100     02-WD-190                 C-F-2       UT                                             ++NHP1-18-.937-CS-106**
Pipe-to-180 dcg Ret       C5.51       HT 3
294500     02-WD-329                 CF2UT                                                       Terminal End Pipe-to-Turbine Stop       C5 ~ 51     PT                                             ~+NHP1-18-.937-CS-106**
3 X Valve


DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION TEN-YEAR PLAN CLASS 2 SECTION XZ SCHEDULED COMPONENTS PAGE: 179 Steam System NUMBER: 02'.0  
DATE: 10/15/99                             NINE MILE POINT NUCLEAR PLANT UNIT 1                         PAGE: 179 REVISION:        0                          INSERVICE INSPECTION TEN-YEAR PLAN CLASS 2 SECTION XZ SCHEDULED COMPONENTS Steam System NUMBER: 02'.0 INSPECTION INTERVAL                    PLAN STATUS            PRE SERVICE YEAR ASME                FIRST        SECOND      THIRD SEC. XI            PERIOD      PERIOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL ASME SEC.XI CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRE SERVICE YEAR INSTRUCTIONS
**CALIBRATION BLOCK*'~294600 02-WD-330 Pipe-to-Turbine Stop Valve C-F-2 C5.51 3 X Terminal End~~NMP1-18".
937-CS-106**


DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 INSERVZCE INSPECTION TEN-YEAR PLAN CLASS 2 SECTION XZ SCHEDULED COMPONENTS PAGE: 180 Stcam NUMBER: 03.0  
NUMBER EXAMINATION AREA        CATEGY      NDE                OUTAGE                        INSTRUCTIONS IDENTIFICATION          ITEM NO    METH    1  2  3  4  1  2  3  4  1  2  3  4 **CALIBRATIONBLOCK*'~
294600    02-WD-330              C-F-2                                                    Terminal End Pipe-to-Turbine Stop    C5. 51                                                    ~ ~NMP1-18". 937-CS-106**
3 X Valve
 
DATE: 10/15/99                             NINE MILE POINT NUCLEAR PLANT UNIT 1                           PAGE: 180 REVISION:        0                          INSERVZCE INSPECTION TEN-YEAR PLAN CLASS 2 SECTION XZ SCHEDULED COMPONENTS Stcam NUMBER:   03. 0 INSPECTION INTERVAL                      PLAN STATUS            PRESERVICE YEAR ASME                  FIRST        SECOND      THIRD SEC. XZ                PERIOD        PERIOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER ZDENTIFICATION INSPECTION INTERVAL ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR INSTRUCTIONS
EXAMINATION AREA         CATEGY      NDE                OUTAGE                          INSTRUCTIONS NUMBER     ZDENTIFICATION           ITEM NO     METH   1 2 3 4   1   2 3 4   1 2 3 4 ++CALIBRATION BLOCK~*
++CALIBRATION BLOCK~*16.0" MSS (REF.DWG.NO.4)294900 03-H1 Pipe Anchor Fl.20 VT 3 3 X Code Case N-491-1*+N/A+'295000 03-Hl-WD-001.
: 16. 0" MSS (REF. DWG. NO. 4) 294900     03-H1                                 VT 3                                         Code Case N-491-1 Pipe Anchor              Fl . 20                                                    *+N/A+'
1 Integrally Welded Attachment C-C C3.20 3 X Code Case N-509*~N/A+*295100 03-Hl WD-001.2 C C Code Caso N-509~~N/A~~Integrally Welded C3.20 Attachment 3 X 295200 03-H1-WD-001.3 C C Code Case N-509~~N/A~~Integrally Welded C3.20 Attachment 3 X 295300 03-Hl-WD-001.
3 X 295000     03-Hl-WD-001. 1         C-C                                                         Code Case N-509 *~N/A+*
4 C-C Integrally Welded C3.20 Attachment 3 X Coda Case N-509++N/A++295700 03-H3 Rod Hanger F-A F1.20 3 X Coda Case N-491-1 ftN/Att 297800 03-WD-001 Tec-to-Pipe CF2UT C5.51 MT 3 X Examine 100%of weld length~*PZR-I.24-1~~299400 03-WD-020 Pipe-to-Elbow C-F-2 UT C5.51 MT 3 X Examine 100%of weld length*~PZR-1.24-1**  
Integrally Welded        C3.20 3 X Attachment 295100     03-Hl WD-001.2           C C                                                         Code Caso N-509 ~~N/A~~
Integrally   Welded     C3. 20 3 X Attachment 295200     03-H1-WD-001.3           C C                                                         Code Case N-509 ~~N/A~~
Integrally Welded       C3.20 3 X Attachment 295300     03-Hl-WD-001. 4         C-C                                                         Coda Case N-509 ++N/A++
Integrally Welded        C3.20 3 X Attachment 295700     03-H3                   F-A                                                         Coda Case N-491-1 Rod Hanger              F1.20                                                      ftN/Att 3 X 297800     03-WD-001               CF2UT                                                      Examine 100%  of weld Tec-to-Pipe             C5.51       MT                                             length ~ *PZR-I . 24-1 ~ ~
3              X 299400     03-WD-020               C-F-2       UT                                             Examine 100% of weld Pipe-to-Elbow            C5.51        MT                                            length * ~ PZR-1 . 24-1**
3 X


DATE: 10/15/99 REVISION: 0 NINE HZLE POINT NUCLEAR PIANT UNIT 1 ZNSERVICE INSPECTION TEN YEAR PLAN CLASS 2 SECTION XZ SCHEDULED COMPONENTS PAGE: 181 Steam NUMBER: 03.0  
DATE: 10/15/99                             NINE HZLE POINT NUCLEAR PIANT UNIT 1                         PAGE: 181 REVISION:        0                          ZNSERVICE INSPECTION TEN YEAR PLAN CLASS 2 SECTION XZ SCHEDULED COMPONENTS Steam NUMBER:   03. 0 INSPECTION INTERVAL                      PIAN STATUS            PRESERVZCE YEAR ASHE                  FIRST        SECOND      THIRD SEC. XZ                PERIOD      PERIOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAHINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL ASHE SEC.XZ CATEGY NDE ZTEH NO METH FIRST PERIOD PIAN STATUS SECOND PERIOD THIRD PERIOD------OUTAGE------
1 2 3 4 1 2 3 4 1 2 3 4 PRESERVZCE YEAR ZNSTRUCTIONS
++CALIBRATION BLOCK*~299700 03-ND-023 C-F-2 MT Tee-to-Valve Hanifold C5~51 UT 3 X Terminal End, Examine 100%of weld length**NMP ISW 1020 CSiPIR-1.24-1**300800 Valve Manifold 03-1 F-A VT-3 Valve Hanifold 03-1 F1.40 X Tuxbine By-Pass Hanifold, Code Case N-491-1~~N/A~i


DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 ZNSERVZCE INSPECTION TEN"YEAR PLAN CLASS 2 SECTION XZ SCHEDULED COMPONENTS PAGE: 182 ency Condenser NUMBER: 39.0 Heat Exchanger 122 INSPECTION INTERVAL PLAN STATUS PRESERVZCE YEAR  
NUMBER EXAHINATION AREA IDENTIFICATION CATEGY ZTEH NO NDE METH
                                                          ------OUTAGE------                      ZNSTRUCTIONS 1  2  3  4  1  2  3  4  1  2  3  4 ++CALIBRATION BLOCK*~
299700    03-ND-023              C-F-2        MT                                            Terminal End, Examine Tee-to-Valve Hanifold  C5 ~ 51      UT                                            100% of weld length 3                            X          **NMP ISW 1020 CSiPIR-1.
24-1**
300800    Valve Manifold 03-1    F-A          VT-3                                          Tuxbine By-Pass Valve Hanifold 03-1    F1.40                                                      Hanifold, Code Case X          N-491-1 ~~N/A~i
 
DATE: 10/15/99                             NINE MILE POINT NUCLEAR PLANT UNIT 1                         PAGE: 182 REVISION:        0                          ZNSERVZCE INSPECTION TEN"YEAR PLAN CLASS 2 SECTION XZ SCHEDULED COMPONENTS ency Condenser Heat Exchanger 122 NUMBER:   39.0 INSPECTION INTERVAL                     PLAN STATUS           PRESERVZCE YEAR ASME                FIRST        SECOND      THIRD SEC. XI            PERIOD        PERIOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC.XI CATEGY NDE ITEM NO METH FIRST PERIOD SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 INSTRUCTIONS
EXAMINATION AREA         CATEGY      NDE                OUTAGE                          INSTRUCTIONS NUMBER     IDENTIFICATION           ITEM NO     METH   1 2 3 4   1   2 3 4   1 2 3 4 + +CALIBRATION BLOCK*~
++CALIBRATION BLOCK*~EC Heat Exchanger 60-42 (REF.DWG.NO.11)303300 60-42-WD-001 N/A UT Hx 60-42 N/A PT Nozzle-to-Inlet Head This weld was replaced by 60-42-WD-001
EC Heat Exchanger 60-42 (REF. DWG. NO. 11) 303300     60-42-WD-001             N/A         UT                                             This weld was replaced Hx 60-42                 N/A         PT                                             by 60-42-WD-001 Nozzle-to-Inlet  Head                                                              **LATER**
**LATER**303400 60-42-WD-001C1 Hx 60-42 Nozzle-to-Inlet Head C-B C2.21 3 X**IATER**303600 60"42"WD-002C1 Hx 60-42 Inlet Head-to Tube Shcct C-A C1.30 3 X~~LATER~~800 60-42-WD-005C1 Hx 60-42 Tube Sheet-to-Outlet Head C-A C1.30 X 303900 60-42-WD-006C1 Hx 60-42 Outlet Head-Nozzle C-B UT C2.21 PT 3 X~~LATER~~
303400     60-42-WD-001C1           C-B                                                        **IATER**
Hx 60-42                 C2.21 3              X Nozzle-to-Inlet   Head 303600     60"42"WD-002C1           C-A                                                          ~~LATER~~
Hx 60-42   Inlet         C1.30 3              X Head-to Tube Shcct 800     60-42-WD-005C1           C-A Hx 60-42 Tube             C1. 30 X
Sheet-to-Outlet   Head 303900     60-42-WD-006C1           C-B        UT                                              ~~LATER~~
Hx 60-42 Outlet           C2.21       PT 3 X Head-Nozzle


DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 ZNSERVICE INSPECTION TEN YEAR PLAN CLASS 2 SECTION XZ SCHEDULED COMPONENTS PAGE: 183 cncy Condenser Return NUMBER: 39.0 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR  
DATE: 10/15/99                               NINE MILE POINT NUCLEAR PLANT UNIT 1                           PAGE: 183 REVISION:        0                            ZNSERVICE INSPECTION TEN YEAR PLAN CLASS 2 SECTION XZ SCHEDULED COMPONENTS cncy Condenser Return NUMBER:   39.0 INSPECTION INTERVAL                       PLAN STATUS           PRESERVICE YEAR ASME                  FIRST        SECOND      THIRD SEC. XI            PERIOD        PERIOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC.XI CATEGY NDE ITEM NO METH FIRST PERIOD SECOND PERIOD-OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 INSTRUCTZONS
EXAMINATION AREA         CATEGY        NDE                -OUTAGE                          INSTRUCTZONS NUMBER     IDENTIFICATION           ITEM NO       METH   1 2 3 4   1   2 3 4   1 2 3 4 ++CALIBRATION BLOCK++
++CALIBRATION BLOCK++10.0" ECC Line (REF.DWG.NO.11A)305500 39"H2 F A VT-3 Spring Support Fl.20 3 X Code Case N-491-1 i 0 N/Al 0 305600 39-H2-WD"001C1 C-C Integral Attachment C3.20 3 X Code Case N-509**N/A~~305700 39-H2-WD-003C1 C C Code Case N-509~*N/A*~Integral Attachment C3.20 3 X 305800 39-H2"WD-005C1 C-C Integral Attachment C3.20 3 X Code Case N-509+*N/A++0 39-H2-WD-007C1 C C Integral Attachment C3.20 3 X Code Case N-509.~*N/A~i 306000 39-H27 Spring Hanger F A F1.20 VT-3 3 X Code Case N-491-1++N/A+*307300 39-H4 Spring Hanger F1.20 3 X Code Case N-491-1~~N/A~~307400 39-H4-WD-001C1 C-C Code Case N-509+~N/Ai~Integral Attachment C3.20 3 X 307500 39-H4-WD-004C1 C"C Integral Attachment C3.20 3 X Code Case N-509++N/A++307600 39-H4-WD-007C1 C C PT Code Case N-509**N/A**Integral Attachment C3.20 3 X  
10.0" ECC Line (REF. DWG. NO. 11A) 305500     39"H2                   F A           VT-3                                           Code Case N-491-1 Spring Support            Fl . 20                                                    i 0 N/Al0 3                            X 305600     39-H2-WD"001C1           C-C                                                         Code Case N-509 **N/A~~
Integral Attachment      C3.20 3                            X 305700     39-H2-WD-003C1           C C                                                         Code Case N-509 ~*N/A*~
Integral Attachment     C3.20 3                             X 305800     39-H2"WD-005C1           C-C                                                         Code Case N-509 +*N/A++
Integral Attachment      C3.20 3                            X 0     39-H2-WD-007C1           C C                                                         Code Case N-509.~*N/A~i Integral Attachment      C3.20 3                            X 306000     39-H27                   F A           VT-3                                           Code Case N-491-1 Spring Hanger            F1. 20                                                      ++N/A+*
3              X 307300     39-H4                                                                                 Code Case N-491-1 Spring Hanger            F1.20                                                        ~~N/A~~
3                            X 307400     39-H4-WD-001C1           C-C                                                         Code Case N-509 +~N/Ai~
Integral Attachment       C3.20 3                             X 307500     39-H4-WD-004C1           C"C                                                         Code Case N-509 ++N/A++
Integral Attachment      C3.20 3                            X 307600     39-H4-WD-007C1           C C           PT                                             Code Case N-509   **N/A**
Integral Attachment       C3. 20 3                             X


DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION TEN-YEAR PIAN CLASS 2 SECTION XZ SCHEDULED COMPONENTS PAGE: 184 ancy Condenser Return NUMBER: 39.0 INSPECTION INTERVAL PLAN STATUS FRESERVICE YEAR  
DATE: 10/15/99                           NINE MILE POINT NUCLEAR PLANT UNIT 1                         PAGE: 184 REVISION:        0                          INSERVICE INSPECTION TEN-YEAR PIAN CLASS 2 SECTION XZ SCHEDULED COMPONENTS ancy Condenser Return NUMBER: 39. 0 INSPECTION INTERVAL                     PLAN STATUS             FRESERVICE YEAR ASME                FIRST        SECOND      THZRD SEC. XI              PERIOD      PERIOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NVMBER IDENTIFICATION ASME SEC.XI CATEOY NDE ITEM NO METH FIRST PERIOD SECOND PERIOD THZRD PERIOD------OUTAOE------
 
1 2 3 4 1 2 3 4 1 2 3 4 INSTRUCTIONS
NVMBER EXAMINATION AREA IDENTIFICATION CATEOY ITEM NO NDE METH
~+CALIBRATION BLOCK~*307700 39-H4-WD-010C1 Integral Attachment C-C C3.20 3 X Code Case N-509~*N/A~*313500 39-WD-178-D Pipe-Long Seam C-F-1 C5.12 3 X Code Casa N-524**ZATER*~313600 39-WD-178C1 Hx 60-46 Outlet Nozzle-to-Pipe C-F-1 UT C5.11 pT 3 X Examine 100%of weld length~~ZATER~+313800 39"WD-179-D C-F 1 VT Elbow-Long Scam (60 C5.12 pT dcg.LR)3 X Code Casa N-524+~ZATER*~0 39-WD-179-U CF1 Pipe-Long Seam C5.12 3 X Code Casa N-524~*LATER~+314000 39-WD-179C1 Pipe-to-Elbow C-F 1 C5.11 3 X+~LATER*~314500 39-WD-181 Pipe-to-Tcc C-F-1 VT C5.11 PT 3 X Examine 100%of weld length~~ZATER~~314600 39-WD-181-D Pipe>>Long Seam C-F-1 C5.12 3 X Coda Case N-524**IATER**314700 39-WD-181-U Teo-Long Seam C-F-1 VT C5.12 pT 3 X Code Case N-524*+LATER+'~
                                                          ------OUTAOE------                       INSTRUCTIONS 1   2 3 4 1   2 3 4   1 2 3 4 ~+CALIBRATION BLOCK~*
315200 39-WD-183-D Pipe-Long Seam C-F-1 UT C5.12 pT 3 X Code Case N-524*~LATER~~
307700     39-H4-WD-010C1           C-C                                                       Code Case N-509 ~*N/A~*
0 DATE: 10/15/99 REVISION: 0 NINE MII E POINT NUCLEAR PLANT UNIT 1 ZNSERVICE INSPECTION TEN-YEAR PLAN CLASS 2 SECTION XZ SCHEDULED COMPONENTS PAGE: 185 gency Condenser Return E NUMBER: 39.0  
Integral Attachment      C3.20 3                            X 313500     39-WD-178-D             C-F-1                                                     Code Casa N-524 Pipe-Long  Seam        C5. 12                                                      **ZATER*~
3 X 313600     39-WD-178C1             C-F-1       UT                                           Examine 100% of weld Hx 60-46 Outlet        C5. 11      pT                                            length ~~ZATER~+
3 X Nozzle-to-Pipe 313800     39"WD-179-D             C-F 1       VT                                             Code Casa N-524 Elbow-Long Scam (60     C5.12       pT                                           +~ZATER*~
3                            X dcg. LR) 0   39-WD-179-U             CF1                                                       Code Casa N-524 Pipe-Long Seam         C5. 12                                                     ~*LATER~+
3                            X 314000     39-WD-179C1             C-F 1                                                        +~LATER*~
Pipe-to-Elbow           C5. 11 3                             X 314500     39-WD-181               C-F-1       VT                                             Examine 100% of weld Pipe-to-Tcc              C5. 11      PT                                            length ~~ZATER~~
3 X 314600     39-WD-181-D             C-F-1                                                     Coda Case N-524 Pipe>>Long Seam          C5. 12                                                    **IATER**
3 X 314700     39-WD-181-U             C-F-1       VT                                             Code Case N-524 Teo-Long Seam            C5.12      pT                                            *+LATER+'~
3 X 315200     39-WD-183-D             C-F-1       UT                                             Code Case N-524 Pipe-Long  Seam        C5. 12      pT                                            *~LATER~~
3              X
 
0 DATE: 10/15/99                           NINE MIIE POINT NUCLEAR PLANT UNIT 1                           PAGE: 185 REVISION:        0                        ZNSERVICE INSPECTION TEN-YEAR PLAN CLASS 2 SECTION XZ SCHEDULED COMPONENTS gency Condenser Return E NUMBER: 39.0           INSPECTION INTERVAL                                            PRESERVZCE YEAR PLAN STATUS ASME                FIRST        SECOND      THIRD SEC. XI            PERIOD        PERIOD      PERZOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFZCATION INSPECTION INTERVAL ASME SEC.XI CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERZOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVZCE YEAR INSTRUCTIONS
EXAMINATION AREA       CATEGY    NDE                OUTAGE                          INSTRUCTIONS NUMBER     IDENTIFZCATION         ITEM NO   METH   1 2 3 4   1   2 3 4   1 2 3 4 ++CALIBRATION BLOCK*+
++CALIBRATION BLOCK*+315300 39-WD-183-U C-F-1 Elbow-Long Seam (60 C5.12 deg LR)X Code Case N-524*~LATER~*315400 39-WD-183C1 Elbow-to-Pipe C-F" 1 UT CS.11 PT 3----X Examine 100%of weld length+~LATER+~315700 39-WD-184-D C-F-1 Elbow-Long Seam (60deg CS.12 LR)3 X Code Case N-524 1 t LATER'315800 39-WD-184-U Pipe-Long Seam C-F-1 UT CS.12 PT 3 X Code Case N-524**IATER~~900 39-WD-184C1 Pipe-to-Elbow C-F-1 CS.11 3 X Examine 100%of weld length~~ZOSTER~*
315300   39-WD-183-U             C-F-1                                                     Code Case N-524 Elbow-Long Seam (60     C5.12                                                     *~LATER~*
316100 39-WD 185 D Pipe-Long Weld C F 1 C5.12 3 X Code Caso N-524**LATER**316200 39-WD-185C1 Hx 60-45 Nozrlc Outlet-to-Pipe C-F-1 UT C5.11 PT 3 X Examine 100%of weld length**LATER**319300 39-WD-211C1 GL-A UT Pipe-to-Elbow (60dcg 88-01 LR)X Examined 100%of weld length~~LATER**319900 39-WD-213 Pipe-to-Tec C-F-1 UT CS.11 PT 3 X Examine 100%of weld length*~LATER~*  
X deg LR) 315400   39-WD-183C1             C-F" 1     UT                                           Examine 100%   of weld Elbow-to-Pipe          CS. 11      PT                                            length   +~LATER+~
3 - - - -      X 315700   39-WD-184-D             C-F-1                                                     Code Case N-524 1 t LATER' Elbow-Long Seam (60deg CS. 12 3 X LR) 315800   39-WD-184-U             C-F-1       UT                                           Code Case N-524 Pipe-Long  Seam        CS. 12      PT                                            **IATER~~
3 X 900   39-WD-184C1             C-F-1                                                     Examine 100%   of weld Pipe-to-Elbow          CS. 11                                                    length   ~~ZOSTER~*
3 X 316100   39-WD 185 D             C F 1                                                     Code Caso N-524 Pipe-Long Weld          C5.12                                                    **LATER**
3                            X 316200   39-WD-185C1             C-F-1       UT                                           Examine 100% of weld Hx 60-45 Nozrlc        C5. 11      PT                                            length **LATER**
3                            X Outlet-to-Pipe 319300   39-WD-211C1             GL-A       UT                                           Examined 100%    of weld Pipe-to-Elbow (60dcg   88-01                                                     length   ~~LATER**
X LR) 319900   39-WD-213               C-F-1       UT                                           Examine 100%   of weld Pipe-to- Tec            CS. 11      PT                                            length   *~LATER~*
3 X


DATE: 10/15/99 REVZSZON: 0 NINE MZLE POINT NUCLEAR PIANT UNZT 1 ZNSERVICE INSPECTION TEN YEAR PLAN CIASS 2 SECTION XZ SCHEDULED COMPONENTS PAGE: 186 cncy Condcnscr Return INSPECTION INTERVAL PIAN STATUS PRESERVZCE YEAR  
DATE: 10/15/99                           NINE MZLE POINT NUCLEAR PIANT UNZT 1                         PAGE: 186 REVZSZON:        0                        ZNSERVICE INSPECTION TEN YEAR PLAN CIASS 2 SECTION XZ SCHEDULED COMPONENTS cncy Condcnscr Return INSPECTION INTERVAL                     PIAN STATUS           PRESERVZCE YEAR ASME                FIRST        SECOND      THIRD SEC. XZ              PERIOD        PERIOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 INSTRUCTIONS
EXAMINATION AREA       CATEGY      NDE                OUTAGE                          INSTRUCTIONS NUMBER     IDENTIFICATION         ITEM NO   METH     1 2   3 4   1   2 3 4   1 2 3 4 ++CALIBRATION BLOCK~+
++CALIBRATION BLOCK~+320000 39-WD-213-D Tcc-Long Seam C F1 C5.12 3 X Coda Casa N-524~+IATER++320100 39-WD-213-U Pipe-Long Scam CF1 C5.12 3 X Code Casa N-524 111ATERA*321400 39-WD-217-D Pipe-Long Scam C-F-1 UT C5.12 PT 3 X Codo Casa N-524~~LATER**321500 39-WD-217C1 Hx 60-42 No@tie Outlet-to-Pipe C-F-1 C5.11 3 X Examine 100%of weld length~+IATERi~0 39-WD-224-D Pipe-Long Seam C-F-1 UT C5.12 PT 3 X Code Case N-524**LATER**323600 39-WD-224-U Pipe-Long Seam C-F 1 C5.12 3 X Code Case N-524*~LATER~~
320000     39-WD-213-D           C  F1                                                      Coda Casa N-524 Tcc-Long Seam         C5.12                                                     ~+IATER++
3 X 320100     39-WD-213-U           CF1                                                        Code Casa N-524 Pipe-Long Scam         C5. 12                                                     111ATERA*
3 X 321400     39-WD-217-D           C-F-1       UT                                             Codo Casa N-524 Pipe-Long  Scam        C5. 12      PT                                            ~~LATER**
3              X 321500     39-WD-217C1           C-F-1                                                      Examine 100% of weld Hx 60-42 No@tie       C5.11                                                      length ~+IATERi~
3              X Outlet-to-Pipe 0    39-WD-224-D            C-F-1       UT                                            Code Case N-524 Pipe-Long  Seam        C5. 12      PT                                            **LATER**
3                            X 323600    39-WD-224-U            C-F 1                                                      Code Case N-524 Pipe-Long  Seam        C5. 12                                                    *~LATER~~
3                             X
 
DATE: 10/15/99                            NINE MILE POINT NUCLEAR PIANT UNIT 1                          PAGE: 187 REVISION:        0                        INSERVZCE INSPECTION TEN YEAR PLAN CLASS 2 SECTION XZ SCHEDULED COMPONENTS cncy Condenser Supply NUMBER:  39.0 INSPECTION INTERVAL                      PLAN STATUS            PRESERVICE YEAR ASME                FIRST        SECOND      THIRD SEC. XZ              PERIOD        PERIOD      PERIOD SVMMARY    EXAMINATION AREA        CATEGY      NDE                OUTAGE                          INSTRUCTIONS NUMBER    IDENTZFICATZON          ITEM NO    METH    1  2  3  4  1  2  3  4  1  2  3  4 *~CALIBRATION BLOCK~ ~
12.0"  ECC Linc (REF. DWG. NO. 11) 323900    39-WD-012              CF1UT                                                      Examine 100%   of weld Reducer-to-Pipe        CS. 11      PT                                            length **IATER**
3 X 324400    39-WD-014              GL-D        VT                                              **IATER~*
Pipe-to-Pipe            88-01 3 X  - - -    -  X 324700    39"WD-016              GL-D        VT                                              <<~IATER**
Pipe-to-Pipe            88 01 3 X                X 325100    39-WD-017              GL-D        UT                                            UT exam  every  2 RFO's.
Pipe-to-Pipe            88-01                                                      i~ZATER~~
X                X 0    39 WD-020              GL D         UT                                            UT exam  cvcry  2 RFOis.
Pipe-to-Pipe           88-01                                                      +~IATER*~
3 X                X 325900    39-WD-021              C-F 1        VT                                            Examine 100%  of weld Pipe-to-Tee            C5.11        PT                                           length  ~~LATER*~
3                             X 326000    39-WD-021              GL-D        UT                                            UT exam  avery  2 RFO's Pipe-to-Tee            88-01                                                      ~*NMP-12-XXI-SS**
3              X              X 326100    39-WD-021-D              C-F-1       UT                                            Code Case N-524 Tcc-Long Scam            C5.12                                                     ++IATER~~
3                             X 326200    39-WD-021-U              C-F-1      VT                                            Code Case N-524 Pipe-Long  Seam        C5.12        PT                                            **IATER**
3                            X 326300    39-WD-022                C-F-1                                                      Examine 100%  of wold Tcc-to-Pipe              CS. 11      PT                                            length **IATER**
3              X


DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PIANT UNIT 1 INSERVZCE INSPECTION TEN YEAR PLAN CLASS 2 SECTION XZ SCHEDULED COMPONENTS PAGE: 187 cncy Condenser Supply NUMBER: 39.0 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR SVMMARY EXAMINATION AREA NUMBER IDENTZFICATZON ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD SECOND PERIOD THIRD PERIOD OUTAGE 1 2 3 4 1 2 3 4 1 2 3 4 INSTRUCTIONS
0 DATE: 10/15/99                           NINE MIZE POINT NUCLEAR PLANT UNIT 1                           PAGE: 188 REVZSZON:       0                         INSERVICE INSPECTION TEN-YEAR PLAN CLASS 2 SECTION XZ SCHEDULED COMPONENTS gcncy Condenser Supply NUMBER: 39.0 INSPECTION INTERVAL                     PLAN STATUS           PRESERVZCE YEAR ASME                FIRST        SECOND      THIRD SEC. XI            PERIOD        PERIOD      PERIOD
*~CALIBRATION BLOCK~~12.0" ECC Linc (REF.DWG.NO.11)323900 39-WD-012 Reducer-to-Pipe CF1UT CS.11 PT 3 X Examine 100%of weld length**IATER**324400 39-WD-014 Pipe-to-Pipe GL-D VT 88-01 3 X----X**IATER~*324700 39"WD-016 Pipe-to-Pipe GL-D VT 88 01 3 X X<<~IATER**325100 39-WD-017 Pipe-to-Pipe GL-D UT 88-01 X X UT exam every 2 RFO's.i~ZATER~~0 39 WD-020 Pipe-to-Pipe GL D UT 88-01 3 X X UT exam cvcry 2 RFOis.+~IATER*~325900 39-WD-021 Pipe-to-Tee C-F 1 VT C5.11 PT 3 X Examine 100%of weld length~~LATER*~326000 39-WD-021 Pipe-to-Tee GL-D UT 88-01 3 X X UT exam avery 2 RFO's~*NMP-12-XXI-SS**
326100 39-WD-021-D Tcc-Long Scam C-F-1 UT C5.12 3 X Code Case N-524++IATER~~326200 39-WD-021-U Pipe-Long Seam C-F-1 VT C5.12 PT 3 X Code Case N-524**IATER**326300 39-WD-022 Tcc-to-Pipe C-F-1 CS.11 Examine 100%of wold PT length**IATER**3 X 0
DATE: 10/15/99 REVZSZON: 0 NINE MIZE POINT NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION TEN-YEAR PLAN CLASS 2 SECTION XZ SCHEDULED COMPONENTS PAGE: 188 gcncy Condenser Supply NUMBER: 39.0 INSPECTION INTERVAL PLAN STATUS PRESERVZCE YEAR  


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC.XI CATEGY NDE ITEM NO METH FIRST PERIOD SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 ZNSTRUCTIONS
EXAMINATION AREA       CATEGY      NDE                OUTAGE                          ZNSTRUCTIONS NUMBER     IDENTIFICATION         ITEM NO     METH   1 2 3 4   1   2 3 4   1 2 3 4 **CALIBRATIONBLOCK**
**CALIBRATION BLOCK**326400 39-WD-022 Tcc-to-Pipe GL-D 88-01 X X UT exam every 2 RFO's++LATER++326500 39-WD-022-D Pipe-Long Seam C-F-1 UT C5.12 PT 3 X Code Case N-524**LATER*l 326600 39-WD-022-U Tcc-Long Seam C-F-1 C5.12 3 X Code Case N-524**IATER++326700 39-WD-024 Tcc-to-Pipe C-F-1 C5.11 3 X Examine 100%of weld length~~LATER~~326800 39-WD-024 Tcc-to-Pipe GL-D UT 88-01 3 X X UT exam every 2 RFO's**LATER**326900 39-WD-024-U Tcc-Long Seam C-F-1 C5.12 3 X Code Case N-524**ZATER**327000 39"WD-025 Elbow-to-Pipe GL-D UT 88-01 3 X---X UT exam every 2 RFO~s~~LATER~~327100 39-WD-025 Elbow-to-Pipe C-F-1 C5.11 3 X Examine 100%of weld length~+ZATER~~327200 39-WD-025-D Pipe-Long Seam C-F-1 C5.12 3 X Code Case N-524**LATER**327400 39-WD-026 Pipe-to-Pipe GL-D UT 88-01 3 X X UT exam every 2 RFO's++LATER~+  
326400     39-WD-022             GL-D                                                       UT exam every 2 RFO's Tcc-to-Pipe            88-01                                                      ++LATER++
X                X 326500     39-WD-022-D           C-F-1       UT                                           Code Case N-524 Pipe-Long  Seam        C5.12        PT                                            **LATER*l 3              X 326600     39-WD-022-U           C-F-1                                                     Code Case N-524 Tcc-Long  Seam        C5.12                                                      **IATER++
3              X 326700     39-WD-024             C-F-1                                                     Examine 100%   of weld Tcc-to-Pipe            C5. 11                                                    length   ~~LATER~~
3              X 326800     39-WD-024             GL-D       UT                                             UT exam   every 2 RFO's Tcc-to-Pipe            88-01                                                      **LATER**
3 X                X 326900     39-WD-024-U           C-F-1                                                     Code Case N-524 Tcc-Long  Seam        C5. 12                                                    **ZATER**
3              X 327000     39"WD-025             GL-D       UT                                             UT exam every 2 RFO~s Elbow-to-Pipe          88-01                                                      ~~LATER~~
3 X      - -  -    X 327100     39-WD-025             C-F-1                                                     Examine 100%   of weld Elbow-to-Pipe          C5. 11                                                    length   ~+ZATER~~
3              X 327200   39-WD-025-D             C-F-1                                                     Code Case N-524 Pipe-Long  Seam        C5.12                                                      **LATER**
3              X 327400   39-WD-026               GL-D       UT                                             UT exam   every 2 RFO's Pipe-to-Pipe            88-01                                                      + + LATER~ +
3 X                X


DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 ZNSERVICE INSPECTION TEN-YEAR PLAN CLASS 2 SECTION XI SCHEDULED COMPONENTS PAGE: 189 cncy Condenser Supply INSPECTION ZNTERVAL E NUMBER: 39.0 PZAN STATUS PRESERVZCE YEAR
NINE MILE POINT NUCLEAR PLANT UNIT 1                            PAGE: 189 DATE: 10/15/99 REVISION:         0                         ZNSERVICE INSPECTION TEN-YEAR PLAN CLASS 2 SECTION   XI SCHEDULED COMPONENTS cncy Condenser Supply E NUMBER: 39.0                                                                             PRESERVZCE YEAR INSPECTION ZNTERVAL                      PZAN STATUS ASME                FIRST          SECOND      THZRD PERIOD        PERIOD      PERIOD SEC. XZ


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD SECOND PERIOD OUTAGE THZRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 ZNSTRUCTZONS
EXAMINATION AREA         CATEGY    NDE                  OUTAGE                          ZNSTRUCTZONS NUMBER     IDENTIFICATION           ITEM NO   METH     1 2 3 4   1   2 3 4 1 2 3 4 ~*CALIBRATION BLOCK**
~*CALIBRATION BLOCK**327800 39-WD-027 Pipe-to-Pipe GL D UT 88-01 3 X X UT exam cvcry 2 RFO's+~LATER~~328300 39-WD"029-D Elbow-Long Seam C-F-1 UT C5.12 PT 3 X Code Case N-524~*LATER**328400 39-WD-029-U Pipe-Long Seam C-F-1 C5.12 3 X Code Case N-524++LATER*+328500 39-WD-029C1 Pipe-to-Elbow C F1 C5.11 3 X Examine 100%of weld length~~LATER~*800 39-WD-030 Elbow-to-Pipe GL-D UT 88-01 3 X X UT exam every 2 RFO's**LATER*~329200 39-WD-033 N/A Pipe-to 60-46 EC Hx N/A Nozzle Znlct 3 X X UT every 2 RFO's, This weld no longer exists, Thcrcforc ZGSCC Category D no longer applicable.
327800   39-WD-027                 GL D       UT                                             UT exam cvcry 2 RFO's 88-01                                                      +~LATER~~
*+LATER**329700 39-WD-034 Pipe-to-Pipe GL-D UT 88 01 3 X X Examine cvcry 2 RFO's~~ZATER~~330000 39-WD-035 Pipe-to-Pipe GI-D UT 88-01 3 X X UT exam every 2 RFO's+~LATER+*330500 39"WD-037 Pipe-to-Elbow N/A N/A 3 X----X UT exam cvcry 2 RFO's, This weld no longer exists*~LATER**  
Pipe-to-Pipe 3 X                  X 328300   39-WD"029-D               C-F-1       UT                                             Code Case N-524 Elbow-Long Seam          C5. 12      PT                                            ~*LATER**
3                            X 328400   39-WD-029-U               C-F-1                                                     Code Case N-524 C5. 12                                                    ++LATER*+
Pipe-Long  Seam 3                            X 328500   39-WD-029C1               C  F1                                                      Examine 100%    of weld Pipe-to-Elbow             C5.11                                                     length   ~~LATER~*
3                            X 800   39-WD-030                 GL-D       UT                                             UT exam   every 2 RFO's Elbow-to-Pipe              88-01                                                    **LATER*~
3 X                  X 329200   39-WD-033                 N/A                                                       UT  every 2 RFO's, This Pipe-to 60-46   EC Hx     N/A                                                       weld no longer exists, 3                X            X          Thcrcforc ZGSCC Category Nozzle Znlct D   no longer applicable.
                                                                                                *+LATER**
329700   39-WD-034                 GL-D       UT                                             Examine cvcry 2 RFO's
                                                                                                ~ ~ZATER~ ~
Pipe-to-Pipe              88 01 3 X                  X 330000     39-WD-035                 GI-D       UT                                             UT exam   every 2 RFO's Pipe-to-Pipe              88-01                                                      +~LATER+*
3 X                  X 330500     39"WD-037                 N/A                                                        UT exam  cvcry 2 RFO's, Pipe-to-Elbow             N/A                                                       This weld no longer 3 X   - - -     -   X                   exists   *~LATER**


DATE: 10/15/99 REVISION: 0 NZNE MILE POINT NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION TEN YEAR PLAN CLASS 2 SECTION XI SCHEDULED COMPONENTS PAGE: 190 cncy Condenser Supply NUMBER: 39.0 INSPECTION INTERVAL PLAN STATUS PRESERVZCE YEAR  
DATE: 10/15/99                           NZNE MILE POINT NUCLEAR PLANT UNIT 1                         PAGE: 190 REVISION:        0                        INSERVICE INSPECTION TEN YEAR PLAN CLASS 2 SECTION XI SCHEDULED COMPONENTS cncy Condenser Supply NUMBER: 39.0 INSPECTION INTERVAL                       PLAN STATUS             PRESERVZCE YEAR ASME                  FIRST        SECOND      THIRD SEC. XI            PERIOD        PERIOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC.XI CATEGY NDE ITEM NO METH FIRST PERIOD SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 INSTRUCTIONS
EXAMINATION AREA       CATEGY      NDE                  OUTAGE                        INSTRUCTIONS NUMBER     IDENTIFICATION         ITEM NO     METH   1 2 3 4   1   2 3 4   1 2 3 4 **CALIBRATIONBLOCK>>>>
**CALIBRATION BLOCK>>>>330600 39-WD-037-D Elbow-Long Seam C-F-1 CS.12 3 X Code Case N-524>>>>LATER>>>>330700 39-WD-037-U Pipe-Long Scam C-F 1 UT C5.12 PT 3 X Coda Case N-524>>*LATER>>>>330800 39-WD-037C1 Pipe-to-Elbow CF1UT C5.11 3 X Examine 100%of weld length>>*IATER*>>330900 39-WD-037C1 Pipe-to-Elbow GL-A UT 88-01 3 X**LATER>>>>3 000 39-WD-038 Elbow-to-Pipe C-F-1 UT C5.11 PT 3 X Examine 100%of weld length>>>>LATER>>>>331100 39-WD-038 Elbow-to-Pipe GL-D UT 88-01 3 X----X UT exam every 2 RFO's>>*LATER**331300 39-WD-038-U Elbow-Long Scam C" F-1 UT C5.12 PT 3 X Code Case N-524>>>>LATER>>>>331400 39-WD-041 Pipe-to-Hx 60-45 Nozzle Inlet N/A N/A 3 X X UT exam cvcry 2 RFO's, This weld was cut out, ZGSCC Cat.D no longer applies**LATER>>>>331500 39-WD-041 Pipe-to-Hx 60 45 Nozzle Inlet N/A N/A 3 X This weld was cut out, Replaced by 39-WD-041C1
330600     39-WD-037-D           C-F-1                                                       Code Case N-524 Elbow-Long Seam        CS. 12                                                      >>>>LATER>>>>
*>>LATER>>>>  
3                  X 330700     39-WD-037-U           C-F   1     UT                                             Coda Case N-524 Pipe-Long Scam        C5. 12      PT                                            >>*LATER>>>>
3                  X 330800     39-WD-037C1           CF1UT                                                      Examine 100% of weld Pipe-to-Elbow         C5. 11                                                     length >>*IATER*>>
3                  X 330900     39-WD-037C1           GL-A         UT                                               **LATER>>>>
Pipe-to-Elbow          88-01 3                   X 3  000   39-WD-038               C-F-1       UT                                             Examine 100%   of weld Elbow- to-Pipe          C5. 11      PT                                            length >>>>LATER>>>>
3                  X 331100     39-WD-038               GL-D         UT                                             UT exam every 2 RFO's Elbow-to-Pipe          88-01                                                      >>*LATER**
3 X  - - -    -  X 331300     39-WD-038-U             C" F-1       UT                                             Code Case N-524 Elbow-Long Scam        C5. 12      PT                                            >>>>LATER>>>>
3                  X 331400     39-WD-041               N/A                                                        UT exam  cvcry 2 RFO's, Pipe-to-Hx 60-45       N/A                                                         This weld was cut out, 3
Nozzle  Inlet                                            X            X ZGSCC Cat. D no longer applies **LATER>>>>
331500     39-WD-041               N/A                                                        This weld was cut out, Pipe-to-Hx   60 45     N/A                                                         Replaced by 39-WD-041C1 3
Nozzle  Inlet                                                          X          *>>LATER>>>>


DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 ZNSERVICE INSPECTION TEN-YEAR PIAN CLASS 2 SECTION XZ SCHEDULED COMPONENTS PAGE: 191 ency Condenser Supply E NUMBER: 39.0  
DATE: 10/15/99                         NINE MILE POINT NUCLEAR PLANT UNIT 1                         PAGE: 191 REVISION:        0                        ZNSERVICE INSPECTION TEN-YEAR PIAN CLASS 2 SECTION XZ SCHEDULED COMPONENTS ency Condenser Supply E NUMBER: 39.0         INSPECTION INTERVAL                                            PRESERVZCE YEAR PLAN STATUS ASME                  FIRST        SECOND      THIRD PERIOD      PERIOD      PERIOD XI


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL ASME SEC.XI CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD THIRD PERIOD------OUTAGE------
EXAMINATION AREA SEC.
1 2 3 4 1 2 3 4 1 2 3 4 PRESERVZCE YEAR INSTRUCTIONS
CATEGY ITEM NO NDE METH
>><<CALIBRATION BLOCK>>>>331700 39-WD-041C1 Pipe-to-Hx 60-45 Nozzle Inlet C F-1 CS.11 3 X Examine 100%of weld length>>*LATER**331800 39-WD-041C1 Pipe-to-Hx 60-45 Nozzle Inlet GL-A UT 88-01 3 X**LATER>><<331900 39-WD-100 Reducer to-Pipe C-F-1 C5.11 3 X Examine 100%of weld length>>>>ZATER>>>>332000 39-WD-100 Reducer-to-Pipe GL A UT 88-01 3 X**LATER>>>>00 39-WD-102 Pipe-to-Pipe GL-D UT 88-01 3 X X VT exam every 2 RFO's>>*LATER**332800 39-WD" 104 Pipe-to-Pipe GL D VT 88-01 3 X X VT cvcry 2 RFO's>>>>LATER>><<333200 39-WD-105 Pipe-to-Pipe GL-D UT 88-01 3 X X UT exam every 2 RFO's**LATER**333600 39"WD-108 Pipe-to-Pipe GL-D UT 88-01 3 X X UT exam cvcry 2 RFO's**LATER>>>>334000 39-WD-109 Pipe-to-Tec GL-D UT 88-01 3 X X VT exam every 2 RFO's>>>>LATER>><<334300 39"WD-110 Tce-to-Pipe C-F-1 C5.11 3 X Examine 100%of weld length>>>>LATER>>>>  
                                                      ------OUTAGE------                       INSTRUCTIONS
                                                                                          >><<CALIBRATION BLOCK>>>>
NUMBER    IDENTIFICATION                            1   2 3 4 1   2 3 4   1 2 3 4 331700   39-WD-041C1           C  F-1                                                    Examine 100% of weld Pipe-to-Hx 60-45     CS. 11                                                     length >>*LATER**
3                            X Nozzle  Inlet 331800   39-WD-041C1           GL-A        UT                                              **LATER>><<
Pipe-to-Hx 60-45     88-01 3                           X Nozzle  Inlet 331900   39-WD-100             C-F-1                                                     Examine 100%   of weld Reducer to-Pipe      C5. 11                                                    length >>>>ZATER>>>>
3 X 332000   39-WD-100             GL A        UT                                              **LATER>>>>
Reducer-to-Pipe       88-01 3 X 00   39-WD-102             GL-D         UT                                           VT exam   every 2 RFO's Pipe-to-Pipe          88-01                                                      >>*LATER**
3 X                X 332800   39-WD" 104           GL D         VT                                           VT cvcry 2 RFO's Pipe-to-Pipe          88-01                                                      >>>>LATER>><<
3 X                X 333200   39-WD-105             GL-D         UT                                           UT exam   every 2 RFO's Pipe-to-Pipe          88-01                                                      **LATER**
3 X                X 333600   39 "WD-108           GL-D         UT                                           UT exam   cvcry 2 RFO's Pipe-to-Pipe          88-01                                                      **LATER>>>>
3 X                X 334000   39-WD-109             GL-D         UT                                           VT exam every 2 RFO's Pipe-to-Tec          88-01                                                      >>>>LATER>><<
3 X                X 334300   39"WD-110             C-F-1                                                       Examine 100%   of weld Tce-to-Pipe          C5. 11                                                      length >>>>LATER>>>>
3 X


DATE: 10/15/99 REVISION: 0 NINE MILE POZNT NUCLEAR PLANT UNIT 1 ZNSERVZCE INSPECTION TEN-YEAR PLAN CZASS 2 SECTION XI SCHEDULED COMPONENTS PAGE: 192 cncy Condenser Supply ZNSPECTION INTERVAL E NUMBER: 39.0 PZAN STATUS PRESERVICE YEAR
DATE: 10/15/99                         NINE MILE POZNT NUCLEAR PLANT UNIT 1                         PAGE: 192 REVISION:        0                      ZNSERVZCE INSPECTION TEN-YEAR PLAN CZASS 2 SECTION XI SCHEDULED COMPONENTS cncy Condenser Supply E NUMBER: 39.0                                                                         PRESERVICE YEAR ZNSPECTION INTERVAL                    PZAN STATUS ASME                FIRST        SECOND      THIRD SEC. XI            PERIOD        PERIOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFZCATZON ASME SEC.XI CATEGY NDE ITEM NO METH FIRST PERIOD SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 ZNSTRUCI'ZONS
EXAMINATION AREA     CATEGY      NDE                  OUTAGE                        ZNSTRUCI'ZONS NUMBER   IDENTIFZCATZON         ITEM NO   METH   1 2 3 4   1   2 3 4   1 2 3 4 ~*CALIBRATION BLOCK~~
~*CALIBRATION BLOCK~~334400 39-WD-110 Tcc-to-Pipe GL-D UT 88"01 3 X X UT exam every 2 RFO's~+LATER~+334500 39-WD-110-D Pipe-Long Seam C-F-1 C5.12 3 X Coda Case N-524~~ZATER~~334600 39-WD-110-U Tco-Long Scam C-F-1 C5.12 3 X Code Case N-524 4*IATERt*334800 39"WD"112 Tec-to-Elbow GL D UT 88-01 3 X X UT exam cvcry 2 RFO's*OIATER**100 39-WD-113 Elbow-to-Pipe C-F-1 C5.11 X Examine 100%of weld length~~LATER**335200 39-WD-113 Elbow-to-Pipe GL-D UT 88-01 3 X X UT exam every 2 RFO's~~ZATER~~335300 39-WD-113-D Pipe-Long Scam C F-1 C5.12 3 X Code Case N-524**ZATER*~335400 39-WD-113-U Elbow-Long Scam C F-1 C5.12 3 X Code Case N-524~~LATER~~335600 39-WD-114 Pipe-to-Pipe GL-D UT 88-01 3 X X UT exam every 2 RFO's**ZATER*+336000 39-WD-115 Pipe-to-Elbow GL-D UT 88-01 3 X X UT exam cvcry 2 RFO's**LATER+*  
334400   39-WD-110             GL-D       UT                                             UT exam every 2 RFO's Tcc-to-Pipe          88"01                                                    ~+LATER~+
3 X                X 334500   39-WD-110-D           C-F-1                                                     Coda Case N-524 Pipe-Long  Seam      C5. 12                                                    ~~ZATER~~
3 X 334600   39-WD-110-U           C-F-1                                                     Code Case N-524 Tco-Long Scam        C5.12                                                    4*IATERt*
3 X 334800   39"WD"112             GL D       UT                                           UT exam cvcry   2 RFO's Tec-to-Elbow          88-01                                                    *OIATER**
3 X                X 100   39-WD-113             C-F-1                                                     Examine 100%   of weld Elbow-to-Pipe        C5. 11                                                    length ~~LATER**
X 335200   39-WD-113             GL-D       UT                                           UT exam every   2 RFO's Elbow-to-Pipe        88-01                                                    ~ ~ZATER~ ~
3 X                X 335300   39-WD-113-D           C F-1                                                   Code Case N-524 Pipe-Long  Scam      C5. 12                                                    **ZATER*~
3                  X 335400   39-WD-113-U           C F-1                                                   Code Case N-524 Elbow-Long Scam      C5. 12                                                    ~~LATER~~
3                  X 335600   39-WD-114             GL-D       UT                                           UT exam   every 2 RFO's Pipe-to-Pipe          88-01                                                    **ZATER*+
3 X                X 336000   39-WD-115             GL-D       UT                                           UT exam   cvcry 2 RFO's Pipe-to-Elbow        88-01                                                    **LATER+*
3 X                X


DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PZANT UNIT 1 ZNSERVICE ZNSPECTION TEN YEAR PLAN CIASS 2 SECTION XI SCHEDULED COMPONENTS PAGE: 193 ency Condcnscr Supply NUMBER: 39.0  
DATE: 10/15/99                             NINE MILE POINT NUCLEAR PZANT UNIT 1                           PAGE: 193 REVISION:        0                          ZNSERVICE ZNSPECTION TEN YEAR PLAN CIASS 2 SECTION XI SCHEDULED COMPONENTS ency Condcnscr Supply NUMBER:   39.0 INSPECTION INTERVAL                      PLAN STATUS            PRESERVICE YEAR FIRST        SECOND      THIRD SEC. XZ,            PERIOD        PERIOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL SEC.XZ, CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR INSTRUCTIONS
EXAMINATION AREA       CATEGY      NDE                OUTAGE                          INSTRUCTIONS NUMBER     IDENTIFICATION           ITEM NO     METH   1 2 3 4   1   2 3 4   1 2 3 4 +~CALIBRATION BLOCK+~
+~CALIBRATION BLOCK+~336300 39-WD-117 Pipe"to-Elbow N/A N/A 3 X This weld was cut out, Replaced by 39-WD-117C1
336300     39-WD-117               N/A                                                         This weld was cut out, Pipe"to-Elbow          N/A                                                        Replaced by 39-WD-117C1 3                            X          **ZATER**
**ZATER**336400 39-WD-117 Pipe-to-Elbow N/A N/A 3 X X VT exam every 2 RFO's.This weld no longer exists, ZGSCC Cat.D no longer applies**LATER~*336500 39-WD-117-D Elbow-Long Scam C-F-1 UT C5.12 PT 3 X Code Case N-524~~LATER*i 336600 39-WD-117-U Pipe-Long Seam CF1 C5.12 3 X Code Case N-524~+IATER++336700 39-WD-117C1 Pipe-to-Elbow C F-1 C5.11 3 X++LATER+*336800 39-WD-117C1 Pipo-to-Elbow GL-A VT 88-01 3 X~*LATER**337000 39-WD-118 Elbow-to-Pipe GL"D VT 88-01 3 X----X VT every 2 RFO's 4 PLATER**337500 39-WD-121-U Pipe-Long Seam C-F"1 UT C5.12 3 Coda Case N-524*+IATER**337600 39-WD-121C1 Pipe-to Hx 60-42 Nozzle Inlet C F-1 VT C5.11 PT 3 X Examine 100%of weld length i+LATER~i  
336400     39-WD-117               N/A                                                         VT exam   every 2 RFO's.
Pipe-to-Elbow          N/A                                                        This weld no longer 3              X              X exists,   ZGSCC Cat. D no longer applies **LATER~*
336500     39-WD-117-D             C-F-1       UT                                             Code Case N-524 Elbow-Long Scam        C5. 12      PT                                            ~~LATER*i 3                            X 336600     39-WD-117-U             CF1                                                        Code Case N-524 Pipe-Long   Seam       C5. 12                                                     ~+IATER++
3                            X 336700     39-WD-117C1             C  F-1                                                      ++LATER+*
Pipe- to-Elbow         C5. 11 3                             X 336800     39-WD-117C1             GL-A        VT                                              ~*LATER**
Pipo-to-Elbow           88-01 3                             X 337000     39-WD-118               GL"D        VT                                            VT  every  2 RFO's Elbow-to-Pipe           88-01                                                       4 PLATER**
3 X   - - -   -   X 337500     39-WD-121-U             C-F"1       UT                                             Coda Case N-524 Pipe-Long    Seam        C5. 12                                                      *+IATER**
3 337600     39-WD-121C1             C  F-1      VT                                            Examine 100% of weld Pipe-to   Hx 60-42     C5. 11       PT                                             length i+LATER~i 3
Nozzle  Inlet                                                            X


DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PIANT UNIT 1 INSERVICE INSPECTION TEN YEAR PLAN CLASS 2 SECTION XI SCHEDULED COMPONENTS PAGE: 194 cncy Condensor Supply NUMBER: 39.0  
NINE MILE POINT NUCLEAR PIANT UNIT 1                            PAGE: 194 DATE: 10/15/99 REVISION:         0                         INSERVICE INSPECTION TEN YEAR PLAN CLASS 2 SECTION   XI SCHEDULED COMPONENTS cncy Condensor Supply NUMBER: 39. 0                                                                             PRESERVICE YEAR INSPECTION INTERVAL                      PIAN STATUS ASME                  FIRST        SECOND        THIRD PERIOD        PERIOD        PERIOD SEC. XI


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL ASME SEC.XI CATEGY NDE ITEM NO METH FIRST PERIOD PIAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR INSTRUCTZONS
EXAMINATION AREA       CATEGY      NDE                  OUTAGE                          INSTRUCTZONS NUMBER     IDENTIFICATION         ITEM NO     METH     1 2 3 4   1   2 3 4   1   2 3 4 *~CALIBRATION BLOCK~~
*~CALIBRATION BLOCK~~337700 39-WD-121C1 Pipo-to-Hx 60-42 Nozzle Inlet GL-A 88-01 3 X~+LATER*~337800 39-WD-122 Pipe-to-Elbow C-F-1 UT C5.11 PT 3--------X Examine 100%of weld length+'~LATER+*
GL-A                                                          ~+LATER*~
337900 39-WD-122 Pipe-to-Elbow GL-D UT 88-01 3 X X UT exam every 2 RFO's~~LATER**338300 39-WD" 123 Pipe-to-Pipe GL-D UT 88-01 3 X----X UT exam every 2 RFO's**LATER~+0 39-WD-124 Pipe-to-Elbow GL-D UT 88-01 3 X X UT exams every 2 RFO's~~IATER*+339000 39-WD-125 Elbow-to-Pipe C-F-1 C5.11 3 X Examine 100%of weld length~+LATER~+339100 39-WD-125 Elbow-to" Pipe GL-D UT 88 01 PT 3----X X UT every 2 RFO's~~NMP-12-XX1-SS**
337700     39-WD-121C1 Pipo-to-Hx 60-42       88-01 3                             X Nozzle  Inlet 337800     39-WD-122             C-F-1       UT                                             Examine 100%    of weld Pipe- to-Elbow        C5. 11       PT                                             length  +'~LATER+*
339200 39-WD 125-D Pipe-Long Seam C-F-1 C5.12 3 X Coda Case N-524~~LATER~~339300 39-WD-125"U Elbow-hong Scam CF1 CS.12 3 X Codo Case N-524~~LATER*+339600 39-WD-127-D Elbow-Long Scam C-F-1 C5.12 3 X Code Case N-524~~IATER~~  
3 - - - -       - - - -     X 39-WD-122             GL-D         UT                                             UT exam   every 2 RFO's 337900 88-01                                                        ~ ~ LATER**
Pipe- to-Elbow 3 X                X 338300     39-WD" 123             GL-D         UT                                             UT exam   every 2 RFO's Pipe-to-Pipe            88-01                                                      **LATER~+
3 X  - - -      -  X 0   39-WD-124             GL-D         UT                                             UT exams   every   2 RFO's 88-01                                                      ~ ~IATER*+
Pipe-to-Elbow 3 X                  X 339000     39-WD-125               C-F-1                                                       Examine 100%     of weld Elbow-to-Pipe          C5.11                                                      length   ~+LATER~+
3                X 339100     39-WD-125             GL-D       UT                                             UT   every 2 RFO's Elbow-to" Pipe          88 01      PT                                              ~~NMP-12-XX1-SS**
3  - - - -      X            X 339200     39-WD 125-D           C-F-1                                                       Coda Case N-524 Pipe-Long Seam        C5.12                                                        ~~LATER~~
3              X 339300     39-WD-125"U           CF1                                                          Codo Case N-524 Elbow-hong Scam       CS. 12                                                       ~~LATER*+
3              X 339600     39-WD-127-D           C-F-1                                                       Code Case N-524 Elbow-Long Scam        C5. 12                                                      ~~IATER~~
3 X


DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 ZNSERVICE INSPECTION TEN YEAR PLAN CIASS 2 SECTION XZ SCHEDULED COMPONENTS PAGE: 1 95 gcncy Condenser Supply NUMBER: 39.0 INSPECTION INTERVAL PZAN STATUS PRESERVICE YEAR  
DATE: 10/15/99                               NINE MILE POINT NUCLEAR PLANT UNIT 1                           PAGE: 1 95 REVISION:          0                          ZNSERVICE INSPECTION TEN YEAR PLAN CIASS 2 SECTION XZ SCHEDULED COMPONENTS gcncy Condenser Supply NUMBER: 39.0 INSPECTION INTERVAL                       PZAN STATUS             PRESERVICE YEAR ASME                  FIRST        SECOND      THIRD SEC. XZ                PERIOD      PERIOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBFR IDENTIFICATION ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD SECOND PERIOD THIRD PERIOD OUTAGE 1 2 3 4 1 2 3 4 1 2 3 4 INSTRUCTIONS
**CALIBRATION BLOCK~*339700 39-WD" 127-U Elbow-Long Seam C-F"1 C5.12 X Coda Case N-524*~LATER*~339800 39-WD-127C1 Pipe-to-Elbow C-F 1 CS.11 3 X Examine 100%of weld length~~ZATER~~340100 39-WD-128 Elbow-to-Pipe GL-D UT 88"01 3 X X UT cvcry 2 RFO's+*IATER++340500 39-WD-129 Pipe-to-Pipe GL-D UT 88-01 3 X X UT exam every 2 RFO's**LATER*4 12.0" ECC Linc (REF.DWG.NO.11A)0 39-H21 F-A VT-3 Spring Hanger Pl.20 3 X Codo Case N-491-1*AN/A4*341800 39"H22 Spring Hanger F-A F1.20 VT-3 3 X Coda Case N-491-1, 4 Lugs~~N/A~*341900 39-H22-WD-001 C-C Code Case N-509+~N/A**Integral Attachment C3.20 3 X 342000 39-H22-WD-004 Integral Attachment C-C C3.20 3 X Coda Casa N-509**N/A**342100 39-H22-WD-007 C C Code Case N-509++N/A**Integral Attachment C3.20 3 X 342200 39-H22-WD-010 C-C Integral Attachment C3.20 3 X Code Case N-509**N/A~~


DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION TEN-YEAR PLAN CLASS 2 SECTION XI SCHEDULED COMPONENTS PAGE: 196 ency Condenser Supply NUMBER: 39.0 INSPECTZON INTERVAL PLAN STATUS PRESERVZCE YEAR  
NUMBFR EXAMINATION AREA        CATEGY      NDE                OUTAGE                          INSTRUCTIONS IDENTIFICATION          ITEM NO      METH    1  2  3  4  1  2  3  4  1  2  3  4  **CALIBRATIONBLOCK~*
339700      39-WD" 127-U              C-F"1                                                      Coda Case N-524 Elbow-Long Seam          C5.12                                                      *~LATER*~
X 339800      39-WD-127C1              C-F  1                                                      Examine 100%  of weld Pipe-to-Elbow            CS. 11                                                      length  ~~ZATER~~
3 X 340100      39-WD-128                GL-D        UT                                            UT  cvcry 2 RFO's Elbow-to-Pipe            88 "01                                                      +*IATER++
3 X                X 340500      39-WD-129                GL-D        UT                                            UT exam  every  2 RFO's Pipe-to-Pipe              88-01                                                        **LATER*4 3 X                X
: 12. 0"  ECC Linc (REF. DWG. NO. 11A) 0    39-H21                    F-A          VT-3                                          Codo Case N-491-1 Spring Hanger            Pl. 20                                                      *AN/A4*
3 X 341800      39 "H22                  F-A          VT-3                                          Coda Case N-491-1, 4 Spring Hanger              F1. 20                                                      Lugs ~~N/A~*
3 X 341900      39-H22-WD-001              C-C                                                        Code Case N-509 +~N/A**
Integral Attachment        C3.20 3 X 342000      39-H22-WD-004            C-C                                                          Coda Casa N-509    **N/A**
Integral Attachment      C3.20 3 X 342100      39-H22-WD-007            C C                                                          Code Case N-509 ++N/A**
Integral Attachment      C3. 20 3 X 342200    39-H22-WD-010              C-C                                                          Code Case N-509 **N/A~~
Integral Attachment      C3.20 3 X
 
DATE: 10/15/99                         NINE MILE POINT NUCLEAR PLANT UNIT 1                         PAGE: 196 REVISION:        0                      INSERVICE INSPECTION TEN-YEAR PLAN CLASS 2 SECTION XI SCHEDULED COMPONENTS ency Condenser Supply NUMBER: 39.0 INSPECTZON INTERVAL                     PLAN STATUS           PRESERVZCE YEAR FIRST        SECOND      THIRD SEC. XI            PERIOD        PERZOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTZFZCATZON SEC.XI CATEGY NDE ITEM NO METH FIRST PERIOD SECOND PERZOD THIRD PERIOD OUTAGE 1 2 3 4 1 2 3 4 1 2 3 4 ZNSTRUCTIONS e eCALIBRATION BLOCK*a 342300 39-H25 Spring Hanger F A F1.20 VT 3 3 X Code Case N 491 1 l 4N/A1*  
EXAMINATION AREA       CATEGY    NDE                  OUTAGE                        ZNSTRUCTIONS NUMBER   IDENTZFZCATZON         ITEM NO   METH   1 2 3 4   1   2 3 4   1 2 3 4 e eCALIBRATION BLOCK*a 342300   39-H25               F A       VT 3                                           Code Case N 491 1 Spring Hanger        F1.20                                                    l 4N/A1
* 3 X


DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION TEN-YEAR PLAN CLASS 2 SECTION XI SCHEDULED COMPONENTS PAGE: 197 ol Rod Drive NUMBER: 44.2  
DATE: 10/15/99                                 NINE MILE POINT NUCLEAR PLANT UNIT 1                             PAGE: 197 REVISION:          0                            INSERVICE INSPECTION TEN-YEAR PLAN CLASS 2 SECTION XI SCHEDULED COMPONENTS ol Rod Drive NUMBER: 44 . 2 INSPECTION INTERVAL                        PLAN STATUS              PRESERVICE YEAR ASME                  FIRST        SECOND      THIRD SEC. XI              PERIOD      PERIOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL ASME SEC.XI CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR INSTRUCTIONS
++CALIBRATION BLOCK~*10.0" CRD Line (REF.DWG.NO.17)346400 44.2-H2 F-A VT-3 Sway Brace Fl.20 3 X Code Case N-491-1*ON/A**347000 44.2-H9 Spring Hanger Fl~20 3 X Code case N-491-1 t 1N/A1 t 350200 44.2-SB-1 Sway Brace F1.20 3 X Code Case N-491-1**N/A*+350700 44.2-SB-6 Sway Brace F-A Fl.20 3 X Code Casa N 491-1*+N/A+~6.0" CRD Line (REF.DWG.NO.17)352500 44.2-WD-045 Pipe-to<<Cap C-F-2 UT C5.51 PT 3 X Examine 100%of weld length**IATER~~10.0" CRD Zinc (REF.DWG.NO.17)353000 44.2-WD-085 Elbow-to-Reducer C-F-2 MT C5.51 UT 3 Examine 100%of weld length**NMP 1SW-1020-CS, P1R-.6 00-1~~353100 44.2-WD-086 Pipe-to-Elbow C-F-2 UT C5.51 PT 3 X Examine 100%of weld length**LATER~~353600 44.2-WD-092 Pipe-to-Tcc C-F-2 MT CS.51 UT 3 Examine 100%of weld length~+NMP-1SW 1020 CS, P1R-.6 00-1~*


DATE: 10/15/99 REVISION: 0 NINE HZLE POINT NUCLEAR PIANT UNIT 1 ZNSERVICE INSPECTION TEN YEAR PLAN CLASS 2 SECTION XI SCHEDULED COMPONENTS PAGE: 198 ol Rod Drive NUHBER: 44.2 SUHHARY EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL ASME SEC.XI CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD THIRD PERIOD------OUTAGE------
NUMBER EXAMINATION AREA           CATEGY       NDE                 OUTAGE                            INSTRUCTIONS IDENTIFICATION              ITEM NO     METH     1  2  3  4  1  2  3  4  1  2  3  4  ++CALIBRATION BLOCK~*
1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR ZNSTRUCTIONS
10.0"  CRD Line  (REF. DWG. NO. 17) 346400    44.2-H2                    F-A          VT-3                                            Code Case N-491-1 Sway Brace                  Fl. 20                                                        *ON/A**
*+CALIBRATION BLOCK~+8.0" CRD Line (REF.DWG.NO.17)353900 44.2-WD-096 Reducer-to-Elbow C-F-2 UT C5.51 PT 3 X Examine 100%of weld length**LATER**8.0" CRD Line (REF.DWG.NO.17A)357500 44.2-WD"432 C-F-2 UT Pipe-to-Elbow C5.51 PT 3 X Examine 100%of weld length~~LATER~~
3 X 347000      44.2-H9                                                                                  Code case N-491-1 Spring Hanger              Fl  ~ 20                                                      t 1N/A1 t 3 X 350200      44.2-SB-1                                                                                Code Case N-491-1 Sway Brace                F1.20                                                        **N/A*+
3 X 350700      44.2-SB-6                  F-A                                                          Code Casa N 491-1 Sway Brace                Fl . 20                                                      *+N/A+~
3                            X 6.0"   CRD Line (REF. DWG. NO. 17) 352500    44.2-WD-045                C-F-2         UT                                             Examine 100% of weld Pipe-to<<Cap                C5. 51        PT                                              length **IATER~~
3              X 10.0"   CRD Zinc  (REF. DWG. NO. 17) 353000      44.2-WD-085                C-F-2        MT                                            Examine 100%    of weld Elbow-to-Reducer            C5.51        UT                                            length 3
                                                                                                    **NMP 1SW-1020-CS, P1R- . 6 00-1~~
353100      44.2-WD-086                C-F-2         UT                                             Examine 100%    of weld Pipe-to-Elbow             C5.51         PT                                             length    **LATER~~
3 X 353600    44.2-WD-092                C-F-2          MT                                            Examine 100%     of weld Pipe-to-Tcc                CS. 51        UT                                            length 3
                                                                                                    ~+NMP-1SW 1020 CS, P1R-. 6 00-1~*


DATE: 10/15/99 REVISION: 0 NINE MILE POZNT NUCLEAR PLANT UNZT 1 INSERVZCE INSPECTION TEN-YEAR PLAN CLASS 2 SECTION XZ SCHEDULED COMPONENTS PAGE: 199 or Containment Spray NUMBER: 80.0 INSPECTION INTERVAL PLAN STATUS PRESERVZCE YEAR  
DATE: 10/15/99                             NINE HZLE POINT NUCLEAR PIANT UNIT 1                          PAGE: 198 REVISION:         0                         ZNSERVICE INSPECTION TEN YEAR PLAN CLASS 2 SECTION  XI SCHEDULED COMPONENTS ol Rod  Drive NUHBER:    44.2 INSPECTION INTERVAL                      PLAN STATUS            PRESERVICE YEAR ASME                FIRST        SECOND      THIRD SEC. XI              PERIOD        PERIOD      PERIOD SUHHARY NUMBER EXAMINATION AREA IDENTIFICATION CATEGY ITEM NO NDE METH
                                                          ------OUTAGE------                        ZNSTRUCTIONS 1  2  3  4  1  2  3  4  1  2  3  4 *+CALIBRATIONBLOCK~+
8.0"  CRD Line (REF. DWG. NO. 17) 353900    44.2-WD-096              C-F-2      UT                                            Examine 100% of weld Reducer-to-Elbow          C5.51      PT                                            length **LATER**
3 X 8.0"  CRD Line (REF. DWG. NO. 17A) 357500    44.2-WD"432              C-F-2      UT                                            Examine 100%  of weld Pipe-to-Elbow            C5.51      PT                                            length  ~~LATER~~
3                X
 
DATE:  10/15/99                              NINE MILE POZNT NUCLEAR PLANT UNZT 1                         PAGE: 199 REVISION:        0                          INSERVZCE INSPECTION TEN-YEAR PLAN CLASS 2 SECTION XZ SCHEDULED COMPONENTS or Containment Spray NUMBER: 80.0 INSPECTION INTERVAL                       PLAN STATUS             PRESERVZCE YEAR ASME                FIRST        SECOND      THZRD SEC. XZ                PERZOD        PERZOD      PERIOD


==SUMMARY==
==SUMMARY==
NUMBER EXAMINATION AREA IDENTIFICATION ASME SEC.XZ CATEGY NDE ITEM NO METH THZRD PERIOD FIRST PERZOD SECOND PERZOD OUTAGE 1 2 3 4 1 2 3 4 1 2 3 4 INSTRUCTIONS
EXAMINATION AREA         CATEGY       NDE               OUTAGE                          INSTRUCTIONS NUMBER      IDENTIFICATION            ITEM NO     METH   1 2 3 4   1   2 3 4   1 2 3 4 +*CALIBRATION BLOCK+ +
+*CALIBRATION BLOCK++16.0" RCS Line (REF.DWG.NO.15)358000 80-09 ZEB VT-3 CTMT.Spray Suction 96-03 Strainer 3 X---X X Examine strainer for debris every outage.*+N/A+*12.0" RCS Line (REF.DWG.NO.15)358600 80-H12 F A VT-3 Seismic Restraint Fl.20 3 X Code Case N-491-1*+N/A++358700 80-H12-WD-001 C-C MT Integral Attachment C3.20 3 X Code Case N-509~*N/A**80-H12-WD-004 Integral Attachment C C MT C3.20 3 X Code Case N-509~~N/A~~358900 80-H12-WD-007 Integral Attachment C-C MT C3.20 3 X Code Case N-509**N/A~~359000 80-H12-WD-010 C-C Code Case N-509~~N/A~~Integral Attachment C3~20 3 X 359100 80-H14 Spring Hanger F-A F1.20 3 X 4 Lugs, Code Casa N-491-1*+N/A+~359200 80-H14-WD-001 C-C Code Case N-509~~N/A+~Integral Attachment C3.20 3 X 359300 80-H14-WD"004 C-C Zntegral Attachment C3.20 3 X Code Case N-509~*N/A~*  
16.0" RCS Line (REF. DWG. NO. 15) 358000     80-09                     ZEB         VT-3                                         Examine  strainer for CTMT. Spray Suction     96-03                                                     debris every outage.
Strainer                                     3 X - - -   X   X                   *+N/A+*
12.0" RCS Line (REF. DWG. NO. 15) 358600     80-H12                   F A           VT-3                                         Code Case N-491-1 Seismic Restraint        Fl . 20                                                    *+N/A++
3 X 358700     80-H12-WD-001           C-C           MT                                           Code Case N-509 ~*N/A**
Integral Attachment      C3. 20 3 X 80-H12-WD-004             C C           MT                                           Code Case N-509 ~~N/A~~
Integral Attachment      C3.20 3 X 358900     80-H12-WD-007             C-C           MT                                           Code Case N-509 **N/A~~
Integral Attachment      C3.20 3 X 359000     80-H12-WD-010             C-C                                                         Code Case N-509 ~~N/A~~
Integral Attachment       C3 ~ 20 3 X 359100     80-H14                   F-A                                                         4 Lugs, Code Casa Spring Hanger            F1.20                                                      N-491-1 *+N/A+~
3 X 359200     80-H14-WD-001             C-C                                                         Code Case N-509 ~~N/A+~
Integral Attachment       C3.20 3 X 359300     80-H14-WD"004             C-C                                                         Code Case N-509 ~*N/A~*
Zntegral Attachment      C3.20 3 X


DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 ZNSERVZCE INSPECTION TEN-YEAR PLAN CLASS 2 SECTION XZ SCHEDULED COMPONENTS PAGE: 200 tor Containment Spray NUMBER: 80.0  
DATE: 10/15/99                             NINE MILE POINT NUCLEAR PLANT UNIT 1                         PAGE: 200 REVISION:        0                          ZNSERVZCE INSPECTION TEN-YEAR PLAN CLASS 2 SECTION XZ SCHEDULED COMPONENTS tor Containment Spray NUMBER:   80. 0 ZNSPECTZON INTERVAL                    PLAN STATUS            PRESERVICE YEAR ASME                FIRST        SECOND      THIRD SEC. XZ              PERIOD      PERIOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION 359400 80-H14-WD-007 ZNSPECTZON INTERVAL ASME SEC.XZ CATEGY NDE ITEM NO METH C-C MT FIRST PERIOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR INSTRUCTIONS
EXAMINATION AREA         CATEGY      NDE                OUTAGE                        INSTRUCTIONS NUMBER     IDENTIFICATION           ITEM NO   METH     1 2 3 4 1   2 3 4   1 2 3 4 ~~CALIBRATION BLOCK**
~~CALIBRATION BLOCK**Code Case N-509+~N/Aii Integral Attachment C3.20 3 X 359500 80-H14-WD-010 C-C Code Case N-509~*N/A+*Integral Attachment C3.20 3 X 359900 80-H20 Rod Hanger F A F1.20 3 X Code Case N-491-1 f%N/A**360500 80-H46 Rod Hanger F-A Fl.20 3 X Code Case N-491-1++N/A+~360600 80-H46-WD-001 C-C Code Case N-509**N/A**Integral Attachment C3.20 3 X 362800 80-SC-14 Seismic Restraint F1.20 VT-3 3 X Code Case N-491-1 1*N/A*4 362900 80-SC-14-WD-001 C-C Code Case N-509~~N/A~~Integrally Welded Lug C3~20 3 X 363000 80-SC-14-WD-002 C-C Integrally Wcldcd Lug C3.20 3 X Code Case N-509~~N/A~~363100 80-SC-14-WD-003 C-C Integrally Welded Lug C3.20 3 X Code Case N-509~~N/A*~363200 80-SC-14-WD-004 C-C Code Case N-509~~N/A**Integrally Welded Lug C3.20 3 X  
359400    80-H14-WD-007            C-C        MT                                            Code Case N-509 +~N/Aii Integral Attachment     C3.20 3 X 359500     80-H14-WD-010           C-C                                                       Code Case N-509 ~*N/A+*
Integral Attachment     C3.20 3 X 359900     80-H20                   F A                                                       Code Case N-491-1 Rod Hanger              F1.20                                                    f%N/A**
3 X 360500     80-H46                   F-A                                                       Code Case N-491-1 Rod Hanger              Fl. 20                                                    ++N/A+~
3 X 360600     80-H46-WD-001           C-C                                                       Code Case N-509 **N/A**
Integral Attachment     C3. 20 3 X 362800     80-SC-14                             VT-3                                         Code Case N-491-1 Seismic Restraint        F1.20                                                    1*N/A*4 3                            X 362900     80-SC-14-WD-001         C-C                                                       Code Case N-509 ~~N/A~~
Integrally Welded Lug   C3 20
                                      ~
3                           X 363000     80-SC-14-WD-002         C-C                                                       Code Case N-509 ~~N/A~~
Integrally Wcldcd Lug    C3.20 3                            X 363100     80-SC-14-WD-003         C-C                                                       Code Case N-509 ~~N/A*~
Integrally Welded Lug    C3.20 3                            X 363200   80-SC-14-WD-004           C-C                                                       Code Case N-509 ~~N/A**
Integrally Welded Lug   C3.20 3                           X


DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 INSERVZCE INSPECTION TEN-YEAR PLAN CLASS 2 SECTION XZ SCHEDULED COMPONENTS PAGE: 201 tor Containment Spray NUMBER: 80.0  
DATE: 10/15/99                           NINE MILE POINT NUCLEAR PLANT UNIT 1                             PAGE: 201 REVISION:        0                        INSERVZCE INSPECTION TEN-YEAR PLAN CLASS 2 SECTION XZ SCHEDULED COMPONENTS tor Containment Spray NUMBER:   80. 0 INSPECTION INTERVAL                      PLAN STATUS            PRESERVICE YEAR ASME                FIRST        SECOND      THIRD SEC. XZ              PERIOD        PERIOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR INSTRUCTIONS
EXAMINATION AREA       CATEGY      NDE                OUTAGE                          INSTRUCTIONS NUMBER     IDENTIFICATION         ITEM NO     METH   1 2 3 4   1   2 3 4   1 2 3 4 ++CALIBRATION BLOCK*~
++CALIBRATION BLOCK*~363300 80-SC-14-WD-005 C-C Code Case N-509~~N/A~~Integrally Welded Lug C3.20 3 X 363400 80-SC-14-WD-006 C-C Integrally Welded Lug C3.20 3 X Code Case N-509~iN/A++363500 80-SC-14-WD-007 C-C Code Case N-509*+N/A*+Integrally Welded Lug C3.20 3 X 363600 80-SC-14-WD-008 C C Code Case N-509++N/A+<Integrally Welded Lug C3.20 3 X 80 SR 47 Seismic Pipe Restraint F1.20 3 X Code Case N-491-1 0 1M/A1 1 367100 80-88-1 Sway Strut F1.20 VT-3 3 X Code Case N-491-1~~N/A~~367200 80-SS-2 Sway Strut F1.20 VT-3 3 X Code Case N-491-1 t*N/A*I 367800 80-WD-008 Flange-to-Pipe C-F"2 C5.51 3 X Examine 100%of weld length~*LATER~~368300 80-WD-017 Pipe-to-Elhow C-F 2 UT C5.51 MT 3 X Examine 100%of weld length~~LATER~~368400 80-WD-019 Pipe-to-Flange C-F-2 C5.51 3 X Examine 100%of weld length~~IATER~*  
363300   80-SC-14-WD-005         C-C                                                         Code Case N-509 ~~N/A~~
Integrally Welded Lug   C3. 20 3                           X 363400     80-SC-14-WD-006         C-C                                                         Code Case N-509 ~iN/A++
Integrally Welded Lug  C3.20 3                            X 363500     80-SC-14-WD-007         C-C                                                         Code Case N-509 *+N/A*+
Integrally Welded Lug   C3.20 3                             X 363600     80-SC-14-WD-008         C C                                                       Code Case N-509 ++N/A+<
Integrally Welded Lug   C3. 20 3                             X 80 SR 47                                                                           Code Case N-491-1 Seismic Pipe Restraint F1.20                                                        0 1M/A1 1 3 X 367100     80-88-1                             VT-3                                           Code Case N-491-1 Sway  Strut            F1.20                                                      ~~N/A~~
3 X 367200     80-SS-2                             VT-3                                           Code Case N-491-1 Sway  Strut            F1.20                                                      t*N/A*I 3 X 367800     80-WD-008               C-F"2                                                     Examine 100%     of weld Flange-to-Pipe          C5.51                                                      length     ~*LATER~~
3              X 368300   80-WD-017               C-F 2       UT                                             Examine 100%     of weld Pipe-to-Elhow            C5. 51      MT                                            length     ~~LATER~~
3              X 368400   80-WD-019               C-F-2                                                     Examine 100% of weld Pipe-to-Flange          C5.51                                                      length ~~IATER~*
3              X


DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 INSERVZCE INSPECTION TEN-YEAR PLAN CLASS 2 SECTION XZ SCHEDULED COMPONENTS PAGE: 202 tor Containment Spray NUMBER: 80.0  
DATE: 10/15/99                             NINE MILE POINT NUCLEAR PLANT UNIT 1                           PAGE: 202 REVISION:        0                          INSERVZCE INSPECTION TEN-YEAR PLAN CLASS 2 SECTION XZ SCHEDULED COMPONENTS tor Containment Spray NUMBER: 80.0 INSPECTION INTERVAL                      PLAN STATUS            PRESERVICE YEAR ASME                FIRST        SECOND      THIRD SEC. XZ              PERIOD        PERIOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION 369000 80-WD-026 Pipe-to-Elbow INSPECTION INTERVAL ASME SEC.XZ CATEGY NDE ITEM NO METH C-F-2 C5.51 FIRST PERIOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 3 X 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR INSTRUCTIONS
EXAMINATION AREA         CATEGY      NDE                OUTAGE                          INSTRUCTIONS NUMBER     IDENTIFICATION           ITEM NO     METH   1 2 3 4   1   2 3 4   1 2 3 4 ~ ~CALIBRATION BLOCK~ '~
~~CALIBRATION BLOCK~'~Examine 100%of weld length**LATER**370800 80-WD-046 FE-to-Pipe C-F-2 C5.51 3 X Examine 100%of weld length+~ZATER~~372200 80-WD-062 C-F-2 UT Reducer-to-Nozrle C5.51 MT 3 X Examine 100%of weld length~~LATER~~373700 80-WD-082 Pipe-to-Elbow C-F-2 C5.51 3 X Examine 100%of weld length 1tLATERt1 oo 16.0" RCS Linc (REF.DWG.NO.15A)II 80-30 VT-3 IEB 96-03 CTMT.Spray Suction Strainer 3 X---X X--X Examine strainer each outage for debris t*N/A*4 12.0" RCS Linc (REF.DWG.NO.15A)374900 80-H30 Spring Support Fl.20 3 X Code Case N-491-1**N/A*~375000 80-H30-WD-001 C-C Code Case N-509+~N/A~*Integral Attachment C3.20 3 X 375100 80 H30 WD-004 C-C Code Case N-509+iN/A+i Integral Attachment C3.20 3 X 375200 80-H30-WD-007 C-C Integral Attachment C3.20 3 X Code Case N-509+AN/Ate  
369000    80-WD-026                C-F-2                                                      Examine 100% of weld Pipe- to-Elbow            C5. 51                                                    length **LATER**
3            X 370800     80-WD-046                 C-F-2                                                     Examine 100%   of weld FE-to-Pipe                C5. 51                                                    length   +~ZATER~~
3            X 372200     80-WD-062                 C-F-2       UT                                           Examine 100%    of weld Reducer-to-Nozrle         C5. 51       MT                                           length   ~~LATER~~
3              X 373700     80-WD-082                 C-F-2                                                     Examine 100% of weld Pipe-to-Elbow            C5.51                                                      length 1tLATERt1 3              X 16.0" RCS Linc (REF. DWG. NO. 15A)
II oo          80-30 CTMT. Spray Suction IEB 96-03 VT-3                                          Examine    strainer outage for debris each Strainer                                   3 X   - - -   X   X - -   X         t*N/A*4 12.0" RCS Linc (REF. DWG. NO. 15A) 374900     80-H30                                                                               Code Case N-491-1 Spring Support            Fl. 20                                                    **N/A*~
3              X 375000     80-H30-WD-001             C-C                                                       Code Case N-509 +~N/A~*
Integral Attachment       C3.20 3             X 375100   80 H30 WD-004             C-C                                                       Code Case N-509 +iN/A+i Integral Attachment       C3.20 3             X 375200   80-H30-WD-007             C-C                                                       Code Case N-509 +AN/Ate Integral Attachment        C3.20 3              X


DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 INSERVZCE INSPECTION TEN-YEAR PLAN CLASS 2 SECTION XZ SCHEDULED COMPONENTS PAGE: 203 tor Containmcnt Spray NUMBER: 80.0  
DATE: 10/15/99                             NINE MILE POINT NUCLEAR PLANT UNIT 1                         PAGE: 203 REVISION:        0                          INSERVZCE INSPECTION TEN-YEAR PLAN CLASS 2 SECTION XZ SCHEDULED COMPONENTS tor Containmcnt Spray NUMBER:   80.0 INSPECTION INTERVAL                      PLAN STATUS            PRESERVICE YEAR ASME                  FIRST        SECOND      THIRD SEC. XZ                PERIOD        PERIOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR INSTRUCTIONS
EXAMINATION AREA         CATEGY      NDE                OUTAGE                          INSTRUCTIONS NUMBER     IDENTIFICATION         ITEM NO     METH   1 2 3 4   1   2 3 4   1 2 3 4 ~~CALIBRATION BLOCK'~~
~~CALIBRATION BLOCK'~~375300 80-H30-WD-010 C-C MT Code Case N-509+~N/Aii Integral Attachment C3.20 X 375600 80-H34 Spring Hanger F1.20 3 X Code Case N 491 1*~N/A+*375700 80-H34-WD-001 C-C MT Integral Attachment C3.20 3 X Code Case N-509*~N/A~*375800 80-H34-WD-004 C-C MT Code Case N-509**N/A*t Integral Attachment C3.20 3 X 80-H34-WD-007 C-C MT Code Case N-509*wN/A+~Integral Attachment C3.20 3 X 376000 80-H34-WD-010 C-C MT Integral Attachment C3.20 3 X Code Case N-509~+N/A~~376100 80-H36 Spring Hanger F A F1.20 3 X Code Case N 491 1 ktN/A4t 376200 80-H36-WD-001 C-C Code Case N-509*~N/A*~Integral Attachment C3.20 (West Side)3 X 376300 80-H36-WD-002 C-C Code Case N-509~~N/A~~Zntegral Attachment C3.20 (East Side)3 X 376800 80-H59 Spring Hanger F-A Fl.20 VT 3 3 X Code Case N-491-1 1*N/A1*  
375300     80-H30-WD-010           C-C           MT                                           Code Case N-509   +~N/Aii Integral Attachment     C3. 20 X
375600     80-H34                                                                             Code Case N 491 1 Spring Hanger           F1.20                                                       *~N/A+*
3            X 375700     80-H34-WD-001           C-C           MT                                           Code Case N-509 *~N/A~*
Integral Attachment    C3.20 3              X 375800     80-H34-WD-004           C-C           MT                                           Code Case N-509   **N/A*t Integral Attachment     C3. 20 3             X 80-H34-WD-007           C-C           MT                                           Code Case N-509 *wN/A+~
Integral Attachment     C3. 20 3             X 376000     80-H34-WD-010           C-C           MT                                           Code Case N-509 ~+N/A~~
Integral Attachment    C3. 20 3              X 376100     80-H36                 F A                                                         Code Case N 491 1 Spring Hanger          F1. 20                                                      ktN/A4t 3              X 376200     80-H36-WD-001           C-C                                                         Code Case N-509 *~N/A*~
Integral Attachment     C3.20 3              X (West Side) 376300     80-H36-WD-002           C-C                                                         Code Case N-509 ~~N/A~~
Zntegral Attachment     C3.20 3              X (East Side) 376800   80-H59                   F-A         VT 3                                           Code Case N-491-1 Spring Hanger            Fl . 20                                                    1 *N/A1*
3              X


DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION TEN YEAR PLAN CLASS 2 SECTION XI SCHEDULED COMPONENTS PAGE: 204 tor Containment Spray NUMBER: 80.0 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR  
DATE: 10/15/99                             NINE MILE POINT NUCLEAR PLANT UNIT 1                           PAGE: 204 REVISION:        0                          INSERVICE INSPECTION TEN YEAR PLAN CLASS 2 SECTION XI SCHEDULED COMPONENTS tor Containment Spray NUMBER:   80.0 INSPECTION INTERVAL                       PLAN STATUS             PRESERVICE YEAR ASME                  FIRST        SECOND      THIRD SEC. XZ                PERIOD        PERIOD      PERIOD


==SUMMARY==
==SUMMARY==
NUMBER EXAMINATION AREA IDENTZFZCATZON ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 INSTRUCTIONS
EXAMINATION AREA       CATEGY       NDE                 OUTAGE                          INSTRUCTIONS NUMBER      IDENTZFZCATZON          ITEM NO     METH   1 2 3 4   1   2 3 4   1 2 3 4 ~~CALIBRATION BLOCK++
~~CALIBRATION BLOCK++376900 80-H59-WD-001 C C MT Code Case N-509+~N/A~~Integral Attachment C3.20 3 X 377000 80-H60 Spring Hanger F-A Fl.20 VT 3 3 X Code Case N-491-1~~N/A~~377100 80-H60-WD-001 C C Code Case N-509**N/A**Integral Attachment C3.20 3 X 388900 80-WD-144 Pipe-to-Rcduccr C-F-2 UT C5.51 MT 3 X Examine 100%of weld length**P1R-.375-2' 391100 80-WD-169 Valve 80-31-to-Reducer C-F"2 C5.51 3 Terminal End, Examine 100%of weld length~~NMP-ISW-1020-CS
376900     80-H59-WD-001           C C         MT                                             Code Case N-509 +~N/A~~
)PIR-.375-ae 391300 80-WD-171 C-F-2 MT No""le-to-Reducer C5.51 UT 3 X Terminal End, located inside floor grating, Examine 100%of weld length"~NMP-ISW-1020-CS,NMP2-2 0 5%*391400 80-WD-172 C-F-2 UT located inside floor Reducer-to-Pipe C5.51 MT X grating Examine 100%of weld length~~PZR-.375-2++
Integral Attachment     C3. 20 3               X 377000     80-H60                 F-A         VT 3                                           Code Case N-491-1 Spring Hanger          Fl . 20                                                      ~~N/A~~
391800 80-WD-176 Pipe-to-Tcc C-F-2 C5.51 3 X Examine 100%of weld length~~NMP-ZSW-1020-CS)
3              X 377100     80-H60-WD-001           C C                                                         Code Case N-509 **N/A**
P1R.375-~i  
Integral Attachment     C3.20 3               X 388900     80-WD-144               C-F-2       UT                                             Examine 100%   of weld Pipe-to-Rcduccr        C5.51        MT                                            length **P1R-.375-2' 3                            X 391100     80-WD-169               C-F"2                                                       Terminal End, Examine Valve 80-31            C5.51                                                      100% of weld length 3
          -to-Reducer                                                                        ~ ~NMP-ISW-1020-CS
                                                                                                                  )
PIR-.375-ae 391300     80-WD-171               C-F-2       MT                                             Terminal End, located No""le-to-Reducer       C5.51       UT                                             inside floor grating, 3                            X          Examine 100% of weld length
                                                                                              "~NMP-ISW-1020-CS,NMP2-2 0   5%*
391400     80-WD-172               C-F-2       UT                                             located inside floor Reducer-to-Pipe         C5.51       MT                                             grating   Examine 100% of X
weld length
                                                                                              ~~PZR-.375-2++
391800     80-WD-176               C-F-2                                                       Examine 100%   of weld Pipe-to-Tcc            C5.51                                                      length 3                            X          ~~NMP-ZSW-1020-CS)
P1R .375-~i


DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PIANT UNIT 1 ZNSERVZCE INSPECTION TEN-YEAR PLAN CLASS 2 SECTION XI SCHEDULED COHPONENTS PAGE: 205 tor Containmcnt Spray NUMBER: 80.0  
DATE: 10/15/99                               NINE MILE POINT NUCLEAR PIANT UNIT 1                           PAGE: 205 REVISION:        0                            ZNSERVZCE INSPECTION TEN-YEAR PLAN CLASS 2 SECTION XI SCHEDULED COHPONENTS tor Containmcnt Spray NUMBER: 80.0 INSPECTION INTERVAL                      PLAN STATUS            PRESERVICE YEAR ASME                  FIRST        SECOND      THIRD SEC. XI            PERIOD        PERIOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAHZNATION AREA NUHBER IDENTIFICATION INSPECTION INTERVAL ASME SEC.XI CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR INSTRUCTIONS
EXAHZNATION AREA         CATEGY      NDE                  OUTAGE                          INSTRUCTIONS NUHBER     IDENTIFICATION           ITEM NO     METH     1 2 3 4   1   2 3 4   1 2 3 4 +*CALIBRATION BLOCK*'~
+*CALIBRATION BLOCK*'~392000 80-WD-178 Pipe-to-Elbow C-F 2 C5.51 Examine 100%of weld MT length~~PZR-.375-2, NHP-ZSW-1020-C~~
392000     80-WD-178                 C-F 2                                                       Examine 100%   of weld Pipe-to-Elbow            C5.51        MT                                             length ~~PZR-.375-2, NHP-ZSW-1020-C~~
393100 80-WD-194 Elbow-to-Pipe C-F-2 C5.51 3 X Examine 100%of weld length~~PZR-.375-2~~
393100     80-WD-194                 C-F-2                                                       Examine 100% of weld Elbow-to-Pipe            C5.51                                                      length ~~PZR-.375-2~~
16.0" RCS Linc (REF.DWG.NO.15B)393300 80-10 ZEB VT-3 CTHT.Spray Suction 96-03 Strainer Examine strainer each outage for debris 3 X---X X--X r*N/A+a 12.0" RCS Linc (REF.DWG.NO.15B)00 SO-SC-20 F-A VT-3 Seismic Box Restraint Fl~20 3 X 2 Lugs , Coda Case N-491-1~+N/A~~400200 80-SC-20-WD-001 C C Code Case N-509~~N/A+*Integral Attachment, C3.20 3 X 400300 80-SC-20-WD-004 C"C Coda Caso N-509~~N/A~~Integral Attachment C3.20 3 X 400400 80-SC-20-WD-007 C-C MT Integral Attachment C3.20 3 X Coda Caso N-509~~N/A~i 400500 80 SC-20-WD-011 C C MT Integral Attachment C3.20 3 X Code Case N-509~~N/Ai~400600 80-SC"20-WD-015 C-C MT Code Case N-509*~N/A*+Integral Attachment C3.20 3 X  
3                            X 16.0" RCS Linc (REF. DWG. NO. 15B) 393300     80-10                     ZEB         VT-3                                           Examine  strainer  each CTHT. Spray Suction     96-03                                                       outage for debris Strainer                                    3 X   - - -     X   X - -   X         r*N/A+a 12.0" RCS Linc (REF. DWG. NO. 15B) 00   SO-SC-20                 F-A         VT-3                                           2  Lugs , Coda Case Seismic Box Restraint     Fl ~ 20                                                     N-491-1 ~+N/A~~
3              X 400200     80-SC-20-WD-001           C C                                                         Code Case N-509 ~~N/A+*
Integral Attachment,     C3. 20 3               X 400300     80-SC-20-WD-004           C"C                                                         Coda Caso N-509 ~~N/A~~
Integral Attachment       C3.20 3               X 400400   80-SC-20-WD-007           C-C         MT                                             Coda Caso N-509 ~~N/A~i Integral Attachment      C3.20 3              X 400500   80 SC-20-WD-011           C C         MT                                             Code Case N-509 ~~N/Ai~
Integral Attachment        C3. 20 3              X 400600   80-SC"20-WD-015           C-C         MT                                             Code Case N-509 *~N/A*+
Integral Attachment       C3. 20 3               X


DATE: 10/15/99 REVZSZON: 0 NINE MILE POINT NUCLZAR PLANT UNIT 1 ZNSERVZCE ZNSPECTION TEN YEAR PIAN CLASS 2 SECTION XZ SCHEDULED COHPONENTS PAGE: 206 tor Containment Spray NUMBER: 80.0  
DATE: 10/15/99                               NINE MILE POINT NUCLZAR PLANT UNIT 1                             PAGE: 206 REVZSZON:        0                            ZNSERVZCE ZNSPECTION TEN YEAR PIAN CLASS 2 SECTION XZ SCHEDULED COHPONENTS tor Containment   Spray NUMBER:   80. 0 INSPECTZON INTERVAL                      PLAN STATUS            PRESERVICE YEAR AS ME                FIRST        SECOND      THIRD SEC. XZ              PERI OD      PERIOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTZON INTERVAL AS ME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERI OD PLAN STATUS SECOND THIRD PERIOD PERIOD OUTAGE 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR INSTRUCTIONS
EXAMINATION AREA           CATEGY      NDE                OUTAGE                          INSTRUCTIONS NUMBER     IDENTIFICATION             ITEM NO     METH   1 2   3 4 1   2 3 4   1 2 3 4 ~ ~CALIBRATION   BLOCK~ ~
~~CALIBRATION BLOCK~~405200 80-SR-50 F-A VT-3 Seismic Pipe Restraint F1.20 X Code Case N-491-1 a aN/PP t 406500 80-WD-233 Elbow-to-Pipe C-F-2 C5.51 3 X Examine 100%of weld length~~PIR-.375-2~*
405200     80-SR-50                   F-A         VT-3                                           Code Case N-491-1 Seismic Pipe Restraint F1.20                                                          a aN/PP t X
407500 80-WD-245 Elbow-to-Pipe C-F-2 UT C5.51 HT 3 X Examine 100%of weld length~~PIR-.375-2~~
406500     80-WD-233                 C-F-2                                                     Examine 100%     of weld Elbow-to-Pipe              C5.51                                                      length ~~PIR-.375-2~*
408100 80-WD-251 Pipe-to-Reducer C-F-2 C5.51 3 X Examine 100%of weld length~~PIR-.375-2~~
3 X 407500     80-WD-245                 C-F-2       UT                                             Examine 100%     of weld Elbow-to-Pipe              C5. 51      HT                                            length ~~PIR-.375-2~~
80-WD-281 Pipe-to-Tce C-F-2 UT C5.51 HT X Examine 100%of weld length~~PIR-.375-2~~
3 X 408100     80-WD-251                 C-F-2                                                     Examine 100%     of weld Pipe-to-Reducer            C5.51                                                      length ~~PIR-.375-2~~
411400 80-WD-287 Tcc-to-Pipe C-F 2 C5.51 3 X Examine 100%of weld length++PIR-.375-2++
3 X 80-WD-281                 C-F-2       UT                                             Examine 100%     of weld Pipe-to-Tce                C5. 51      HT                                            length ~~PIR-.375-2~~
6.0" RCS Linc (REF.DWG.NO.15B)411500 80"WD-290-A C F-2 MT 6.0~Branch Connection C5.81 3 X Examine 100%of wold length~~N/A~~16.0" RCS Linc (REF.DWG.NO.15C)'412700 80-29 CTMT.Spray Suction Strainer IEB 96-03 Examine strainer Each outage for debris X---X X--X eeN/Aea  
X 411400     80-WD-287                 C-F 2                                                     Examine 100%     of weld Tcc-to-Pipe                C5.51                                                      length ++PIR-.375-2++
3                            X 6.0" RCS Linc (REF. DWG. NO. 15B) 411500     80 "WD-290-A               C F-2       MT                                             Examine 100%    of wold 6.0~ Branch Connection C5.81                                                         length   ~~N/A~~
3 X 16.0" RCS Linc (REF. DWG. NO. 15C)
'412700     80-29                     IEB                                                        Examine    strainer  Each CTMT. Spray Suction       96-03
                                                                - - -            - -              outage   for debris Strainer                                      X           X   X         X         eeN/Aea


DATE: 10/15/99 REVISION: 0 NINE HYLE POINT NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION TEN-YEAR PLAN CLASS 2 SECTION XZ SCHEDULED COMPONENTS PAGE: 207 tor Containment Spray NUMBER: 80.0 SUHHARY EXAHZNATZON AREA NUMBER IDENTIFICATION INSPECTION INTERVAL ASHE SEC.XI CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR INSTRUCTIONS
DATE: 10/15/99                               NINE HYLE POINT NUCLEAR PLANT UNIT 1                         PAGE: 207 REVISION:        0                            INSERVICE INSPECTION TEN-YEAR PLAN CLASS 2 SECTION XZ SCHEDULED COMPONENTS tor Containment Spray NUMBER:   80.0 INSPECTION INTERVAL                     PLAN STATUS            PRESERVICE YEAR ASHE                 FIRST        SECOND      THIRD SEC. XI             PERIOD      PERIOD      PERIOD SUHHARY    EXAHZNATZON AREA          CATEGY       NDE               OUTAGE                        INSTRUCTIONS NUMBER      IDENTIFICATION            ITEM NO     METH   1 2 3 4 1   2 3 4   1 2 3 4 ~~CALIBRATION BLOCKi i 12.0" RCS Line (REF. DWG. NO. 15C) 413200     80-H28                                 VT-3                                         4 Lugs, Code Case Spring Support            Fl. 20                                                    N-491-1 ++N/A**
~~CALIBRATION BLOCKi i 12.0" RCS Line (REF.DWG.NO.15C)413200 80-H28 Spring Support Fl.20 VT-3 3 X 4 Lugs, Code Case N-491-1++N/A**413300 80-H28-WD-001 C-C Code Case N-509~~N/A~*Integral Attachment C3.20 3 X 413400 80-H28-WD-004 C-C Code Case N-509+~N/Ai+Integral Attachment C3.20 3 X 413500 80-H28-WD-007 C-C MT Code Case N-509~*N/A~i Integral Attachment C3.20 3 X 00 80-H28-WD-010 C-C MT Integral Attachment C3.20 3 X Code Case N-509 i~N/A~~419400 80 SS 3 Sway Strut F-A Fl.20 VT"3 3 X Code Case N-491-1 t*N/Atf 419900 80 WD"338 Pipe-to-Flange C-F-2 C5.51 3 X A Examine 100%of wold length~~PIR-.375-2**
3                            X 413300     80-H28-WD-001             C-C                                                       Code Case N-509 ~~N/A~*
422100 8()-WD-363 Pipe-to-Elbow C-F-2 C5.51 3 X Examine 100%of weld length**PZR-.375-2*i 12.0" RCS Line (REF.DWG.NO.15D)427600 80-H88 Spring Support F A Fl.20 VT 3 3 X Code Caso N-491-1*+N/A++  
Integral Attachment       C3.20 3                           X 413400     80-H28-WD-004             C-C                                                       Code Case N-509 +~N/Ai+
Integral Attachment       C3.20 3                           X 413500     80-H28-WD-007             C-C         MT                                           Code Case N-509 ~*N/A~i Integral Attachment       C3. 20 3                           X 00   80-H28-WD-010             C-C         MT                                           Code Case N-509 i~N/A~~
Integral Attachment      C3.20 3                            X 419400     80 SS 3                   F-A         VT"3                                         Code Case N-491-1 Sway  Strut              Fl . 20                                                    t*N/Atf 3                            X A
419900     80 WD"338                 C-F-2                                                     Examine 100% of wold Pipe-to-Flange            C5. 51                                                    length ~~PIR-.375-2**
3 X 422100     8()-WD-363               C-F-2                                                     Examine 100% of weld Pipe-to-Elbow            C5.51                                                      length **PZR-.375-2*i 3 X 12.0" RCS Line (REF. DWG. NO. 15D) 427600     80-H88                   F A         VT 3                                         Code Caso N-491-1 Spring Support            Fl . 20                                                    *+N/A++
3                            X


DATE: 10/15/99 REVISION: NINE MILE POINT NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION TEN-YEAR PLAN CLASS 2 SECTION XI SCHEDULED COHPONENTS PAGE: 208 tor Containmcnt Spray NUMBER: 80.0  
DATE: 10/15/99                             NINE MILE POINT NUCLEAR PLANT UNIT 1                           PAGE: 208 REVISION:                                    INSERVICE INSPECTION TEN-YEAR PLAN CLASS 2 SECTION XI SCHEDULED COHPONENTS tor Containmcnt   Spray NUMBER:   80.0 INSPECTION INTERVAL                      PLAN STATUS            PRESERVZCE YEAR ASME                FIRST        SECOND      THIRD SEC. XZ              PERIOD        PERIOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL ASME SEC.XZ CATEGY NDE ZTEH NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVZCE YEAR INSTRUCTIONS
EXAMINATION AREA           CATEGY      NDE                  OUTAGE                          INSTRUCTIONS NUMBER     IDENTIFICATION           ZTEH NO     METH   1 2 3 4   1   2 3 4   1 2 3 4 '~ +CALIBRATION BLOCK*'~
'~+CALIBRATION BLOCK*'~6.0" RCS Line (REF.DWG.NO.15D)433400 80-SS-15 Sway Strut F-A F1.20 3 X Code Case N-491-1+*N/A**433600 80-88-6 Sway Strut F1.20 3 X Code Case N-491-1 lkN/Aft 433700 80-88-7 Sway Strut F1.20 3 X Code Case N-491-1 eeN/Aea  
6.0" RCS Line (REF. DWG. NO. 15D) 433400   80-SS-15                 F-A                                                       Code Case N-491-1 Sway  Strut              F1.20                                                      +*N/A**
3 X 433600   80-88-6                                                                             Code Case N-491-1 Sway  Strut              F1.20                                                      lkN/Aft 3 X 433700   80-88-7                                                                             Code Case N-491-1 Sway  Strut              F1. 20                                                    eeN/Aea 3 X


DATE: 10/15/99 REVZSION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 INSERVZCE INSPECTION TEN-YEAR PLAN CLASS 2 SECTZON XZ SCHEDULED COMPONENTS PAGE: 209 tor Containment Spray Heat Exchanger 122~NUMBER: 80.0 INSPECTION ZNTERVAL PLAN STATUS PRESERVZCE YEAR  
DATE: 10/15/99                             NINE MILE POINT NUCLEAR PLANT UNIT 1                         PAGE: 209 REVZSION:        0                          INSERVZCE INSPECTION TEN-YEAR PLAN CLASS 2 SECTZON XZ SCHEDULED COMPONENTS tor Containment Spray Heat Exchanger 122
  ~ NUMBER:   80.0 INSPECTION ZNTERVAL                     PLAN STATUS           PRESERVZCE YEAR ASME                  FIRST        SECOND      THIRD SEC. XZ                PERIOD      PERIOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 INSTRUCTIONS
EXAMINATION AREA         CATEGY        NDE                OUTAGE                        INSTRUCTIONS NUMBER     IDENTIFICATION           ITEM   NO   METH   1 2 3 4 1   2 3 4   1 2 3 4 *4CALIBRATION BLOCK**
*4CALIBRATION BLOCK**RCSHE 80-13 (REF.DWG.NO.15A)438500 80-13 F A VT 3 Hx Support F1.40 3 X Coda Casa N-491-1*+N/A++438600 80-13-WD-001 Hx 80-13 Nozzle-to-Vessel C-B MT C2.11 3 H02++N/A++438700 80-13-WD"002 C-C MT Hx 80-13 Integral C3.10 Attachment Inlet 3 X H02, Coda Casa N-509+*N/A*+80-13-WD-004 Hx 80-13 Vessel-to-Noz le C-B MT C2.11 3 X H02 s+N/A+a 439000 80-13-WD-005 Hx 80-13 Tubcshcct-to-Shell Inlet C-A UT C1.30 3 X H02**NMP2-24-.500-CS*i 439100 80-13-WD-006 Hx 80-13 Tubcshcct-to-Shell Outlet C-A UT C1.30 3 X H02~~NMP2-24-.500"CS~+  
RCSHE   80-13 (REF. DWG. NO. 15A) 438500     80-13                   F A           VT 3                                         Coda Casa N-491-1 Hx Support              F1. 40                                                    *+N/A++
3 X 438600     80-13-WD-001             C-B           MT                                           H02 ++N/A++
Hx 80-13                C2. 11 3
Nozzle-to-Vessel 438700     80-13-WD"002             C-C           MT                                           H02, Coda Casa N-509 Hx 80-13 Integral       C3.10                                                     +*N/A*+
3                            X Attachment Inlet 80-13-WD-004             C-B           MT                                           H02 s+N/A+a Hx 80-13                 C2.11 3                            X Vessel-to-Noz le 439000    80-13-WD-005            C-A           UT                                           H02 **NMP2-24-.500-CS*i Hx  80-13               C1.30 3                            X Tubcshcct-to-Shell Inlet 439100    80-13-WD-006            C-A           UT                                           H02 ~~NMP2-24-.500"CS~+
Hx  80-13                C1. 30 3                            X Tubcshcct-to-Shell Outlet


DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION TEN-YEAR PLAN CLASS 2 SECTION XI SCHEDULED COMPONENTS PAGE: 210 tor Containment Spray Pump 121 NUMBER: 80.0 INSPECTION ZNTERVAL PLAN STATUS PRESERVICE YEAR  
DATE: 10/15/99                             NINE MILE POINT NUCLEAR PLANT UNIT 1                         PAGE: 210 REVISION:        0                          INSERVICE INSPECTION TEN-YEAR PLAN CLASS 2 SECTION XI SCHEDULED COMPONENTS tor Containment Spray   Pump 121 NUMBER:   80. 0 INSPECTION ZNTERVAL                     PLAN STATUS           PRESERVICE YEAR ASME                FIRST        SECOND      THIRD SEC. XZ              PERIOD        PERIOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 INSTRUCTIONS
EXAMINATION AREA         CATEGY      NDE                OUTAGE                          INSTRUCTIONS NUMBER     IDENTIFICATION           ITEM NO     METH   1 2 3 4   1   2 3 4   1 2 3 4 ~ ~CALIBRATION BLOCK~ ~
~~CALIBRATION BLOCK~~RCSP 80-03 (REF.DWG.NO.15)442600 80-03 F-A VT-3 Pump Support F1.40 3 X Code Case N-491-1 1tN/At%442900 80-03-WD-003 Pipe-to-Casing C-F-2 MT CS.81 3 X Terminal End~~N/A~~443100 80-03-WD-005 C-G PT 0 lN/A**Upper Head-to-Shaft C6.10 Channel 3 X 443200 80-03-WD-006 Shaf t Channel-to-Shaf t C6.10 Guide 3 X**N/A*t 443300 80-03-WD-007 C"G P03~*N/A~~Upper Casing-to-Head C6.10 X 443400 80-03-WD-008 C-G P03+~N/A**Upper Casing-to-Flange C6.10 3 X 443900 80-03-WD-013 C-G P03 atN/Aas Upper Casing Long Weld C6.10 3 X  
RCSP   80-03 (REF. DWG. NO. 15) 442600     80-03                     F-A         VT-3                                           Code Case N-491-1 Pump  Support            F1. 40                                                    1tN/At%
3 X 442900     80-03-WD-003             C-F-2       MT                                             Terminal End ~~N/A~~
Pipe-to-Casing            CS. 81 3                            X 443100     80-03-WD-005             C-G         PT                                             0 lN/A**
Upper Head-to-Shaft       C6.10 3             X Channel 443200     80-03-WD-006                                                                         **N/A*t t
Shaf Channel-to-Shaf   t C6.10 3             X Guide 443300     80-03-WD-007             C"G                                                       P03 ~*N/A~~
Upper Casing-to-Head     C6.10 X
443400     80-03-WD-008             C-G                                                       P03 +~N/A**
Upper Casing-to-Flange   C6.10 3 X 443900     80-03-WD-013             C-G                                                       P03 atN/Aas Upper Casing Long Weld C6.10 3             X


DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 ZNSERVZCE INSPECTION TEN-YEAR PLAN CLASS 2 SECTION XZ SCHEDULED COHPONENTS PAGE: 211 tor Core Spray NUMBER: 81.0 SUMHARY EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL'SME SEC.XZ CATEGY NDE ITEH NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD THIRD PERIOD------OUTAGE------
DATE: 10/15/99                                 NINE MILE POINT NUCLEAR PLANT UNIT 1                                     PAGE: 211 REVISION:        0                                      ZNSERVZCE INSPECTION TEN-YEAR PLAN CLASS 2 SECTION XZ SCHEDULED COHPONENTS tor Core Spray NUMBER: 81 . 0 INSPECTION     INTERVAL'SME PLAN STATUS            PRESERVICE YEAR FIRST      SECOND      THIRD SEC. XZ                         PERIOD      PERIOD      PERIOD SUMHARY NUMBER EXAMINATION AREA IDENTIFICATION CATEGY ITEH   NO NDE METH
1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR INSTRUCTIONS
                                                                      ------OUTAGE------                         INSTRUCTIONS 1   2 3 4 1   2 3 4   1 2 3 4 +~CALIBRATION BLOCK**
+~CALIBRATION BLOCK**12.0" CS Line (REF.DWG.NO.13)446000 58-SC-1 Pipe Restraint F A Fl.20 3 X Code Case N-491-1 aaN/Ant 446100 58-SC-1-WD-001 C C MT Code Case N-509~~N/Ai~Integral Attachment C3.20 3 X 446200 58-SC-1-WD-002 C-C MT Integral Attachment C3.20 3 X Code Case N-509~~N/A~~446300 58 SC-1-WD-003 C C MT Integral Attachment C3.20 3 X Code Case N-509~~N/A+*00 58-SC-1-WD-004 C-C Integral Attachment C3.20 3 X Code Case N-509~~N/A~+16.0" CS Line (REF.DWG.NO.13)447000 81-05 Suction Strainer IEB 96-03 VT-3 Examine strainer each outage for debris X X X X i IN/AI i 447100 81-06 Suction Strainer ZEB 96-03 VT-3 X---X X--X Examine strainer each outage for debris 1 0'N/AP+447200 81"24 Suction Strainer ZEB 96-03 VT 3 X---X X X Examine strainer each outage for debris++N/A++447300 81-25 Suction Strainer IEB 96-03 VT-3 3 X---X X--X Examine strainer each outage for debris i~N/A~~  
12.0" CS Line (REF. DWG. NO. 13) 446000     58-SC-1                   F A                                                                 Code Case N-491-1 Pipe Restraint            Fl. 20                                                              aaN/Ant 3 X 446100     58-SC-1-WD-001           C C                   MT                                           Code Case N-509 ~~N/Ai~
Integral Attachment       C3.20 3 X 446200     58-SC-1-WD-002           C-C                   MT                                           Code Case N-509 ~~N/A~~
Integral Attachment      C3. 20 3 X 446300     58 SC-1-WD-003           C C                   MT                                           Code Case N-509 ~~N/A+*
Integral Attachment      C3. 20 3 X 00   58-SC-1-WD-004           C-C                                                                 Code Case N-509 ~~N/A~+
Integral Attachment      C3. 20 3 X 16.0" CS Line (REF. DWG. NO. 13) 447000     81-05                     IEB                   VT-3                                         Examine       strainer each Suction Strainer          96-03                                                                outage     for debris X           X   X         X         i IN/AIi 447100     81-06                     ZEB                    VT-3                                          Examine      strainer  each Suction Strainer         96-03
                                                                        - - -         - -
outage     for debris X            X  X        X          1 0 'N/AP +
447200   81"24                     ZEB                    VT 3                                          Examine      strainer  each Suction Strainer           96-03
                                                                        - - -                           outage      for debris X            X   X         X         ++N/A++
447300   81-25                     IEB                    VT-3                                          Examine      strainer  each Suction Strainer           96-03
                                                                        - - -         - -               outage     for debris 3 X            X  X        X          i~N/A~~


DATE: 10/15/99 REVISION: 0 NINE MZLE POINT NUCLEAR PIANT UNIT 1 INSERVZCE INSPECTION TEN-YEAR PLAN CIASS 2 SECTION XZ SCHEDULED COMPONENTS PAGE: 212 tor Core Spray NUMBER: 81.0  
DATE: 10/15/99                                 NINE MZLE POINT NUCLEAR PIANT UNIT 1                         PAGE: 212 REVISION:        0                              INSERVZCE INSPECTION TEN-YEAR PLAN CIASS 2 SECTION XZ SCHEDULED COMPONENTS tor Core Spray NUMBER:   81. 0 INSPECTION INTERVAL                      PLAN STATUS            PRESERVZCE YEAR ASME                  FIRST        SECOND      THIRD SEC. XI              PERZOD      PERIOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL ASME SEC.XI CATEGY NDE ITEM NO METH FIRST PERZOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVZCE YEAR ZNSTRUCTZONS
EXAMINATION AREA           CATEGY      NDE                OUTAGE                        ZNSTRUCTZONS NUMBER     IDENTIFICATION             ITEM NO     METH   1 2 3 4 1   2 3 4   1 2 3 4 *>>CALIBRATION BLOCK>>>>
*>>CALIBRATION BLOCK>>>>12.0" CS Li.nc (REF.DWG.NO.13)453900 81-H10 F-A VT-3 Spring Hanger Fl.20 3 X Coda Case N-491-1*>>N/A**454000 81-H10-WD-001 C-C MT Spring Hanger Integral C3.20 Attachment 3 X Coda Case N-509>>>>N/A>>>>454300 81-H12 Pipe Stanchion F-A F1.20 3 X Code Case N-491-1**N/A**454400 81-H12-WD-001 Pipe Stanchion C-C C3.20 3 X Coda Casa N-509>>>>N/A>>>>00 81 H14 Rod Hanger F1.20 3 X Code Case N 491-1**N/A>>>>454800 81-H15 Rod Hanger Fl.20 VT 3 3 X Code Caso N-491-1**N/A*>>455000 81-H15-WD-001 Rod Hangar Integral Attachment C-C C3.20 3 X Coda Case N-509>>>>N/A>>>>455100 81-H15"WD-002 Rod Hanger Zntcgral Attachment C-C C3.20 3 X Code Case N-509>>>>N/A>>>>455200 81-H15-WD-003 Rod Hanger Integral Attachment C-C C3.20 3 X Code Case N-509>>>>N/A>>>>  
12.0"   CS Li.nc (REF. DWG. NO. 13) 453900     81-H10                     F-A           VT-3                                         Coda Case N-491-1 Spring Hanger              Fl . 20                                                    *>>N/A**
3 X 454000     81-H10-WD-001               C-C           MT                                           Coda Case N-509 >>>>N/A>>>>
Spring Hanger    Integral  C3.20 3 X Attachment 454300     81-H12                     F-A                                                       Code Case N-491-1 Pipe Stanchion              F1.20                                                      **N/A**
3                            X 454400     81-H12-WD-001               C-C                                                       Coda Casa N-509 >>>>N/A>>>>
Pipe Stanchion              C3.20 3                           X 00    81 H14                                                                                Code Case N 491-1 Rod Hanger                  F1.20                                                      **N/A>>>>
3                            X 454800     81-H15                                   VT 3                                         Code Caso N-491-1 Rod Hanger                  Fl. 20                                                    **N/A*>>
3 X 455000     81-H15-WD-001               C-C                                                       Coda Case N-509 >>>>N/A>>>>
Rod Hangar Integral          C3.20 3 X Attachment 455100     81-H15 "WD-002             C-C                                                       Code Case N-509 >>>>N/A>>>>
Rod Hanger Zntcgral          C3.20 3 X Attachment 455200   81-H15-WD-003               C-C                                                       Code Case N-509 >>>>N/A>>>>
Rod Hanger    Integral      C3.20 3 X Attachment


DATE: 10/15/99 REVISION: 0 NZNE MILE POINT NUCLEAR PLANT UNIT 1 ZNSERVICE INSPECTION TEN-YEAR PLAN CLASS 2 SECTION XZ SCHEDULED COMPONENTS PAGE: 213 tor Cora Spray NUMBER: 81.0 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR  
DATE: 10/15/99                             NZNE MILE POINT NUCLEAR PLANT UNIT 1                           PAGE: 213 REVISION:        0                            ZNSERVICE INSPECTION TEN-YEAR PLAN CLASS 2 SECTION XZ SCHEDULED COMPONENTS tor Cora Spray NUMBER: 81 . 0 INSPECTION INTERVAL                       PLAN STATUS             PRESERVICE YEAR ASME                  FIRST        SECOND      THIRD SEC. XI            PERIOD        PERIOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION 455300 81-H15-WD-004 Rod Hanger Integral Attachment ASME SEC.XI CATEGY NDE ITEM NO METH C-C MT C3.20 FIRST PERIOD SECOND PERIOD OUTAGE THIRD PERIOD 3 X 1 2 3 4 1 2 3 4 1 2 3 4 INSTRUCTIONS
EXAMINATION AREA         CATEGY      NDE                OUTAGE                          INSTRUCTIONS NUMBER     IDENTIFICATION           ITEM NO     METH     1 2 3 4   1   2 3 4   1 2 3 4 >>>>CALIBRATION BLOCK>>>>
>>>>CALIBRATION BLOCK>>>>Code Case N-509>>>>N/A**455400 81-H15-WD 005 C-C MT Rod Hanger Integral C3.20 Attachment 3 X Code Case N-509>>>>N/A*>>455500 81-H15-WD-006 C C MT Rod Hanger Zntegral C3.20 Attachment 3 X Code Case N-509>>>>N/A>>~456200 81-H34 Pipe Stanchion F"A F1.20 3 X Code Case N-491-1>>*N/A**456700 81-H34-WD-001 Pipe Stanchion C-C MT C3.20 3 X Code Case N-509>>>>N/A>>>>458700 81"H37 Spring Hanger Fl.20 VT-3 3 X Code Case N-491-1>>>>N/A>>>>458800 81-H37-WD-001 C-C Integral Attachment C3.20 3 X Code Case N-509>>>>N/A>>>>458900 81-H38 Spring Hanger F A Fl.20 3 X CoCk Case N-491-1>>>>'N/A>>>>459000 81-H38-WD-001 C-C Code Case N-509>>>>N/A>>>>Integral Attachment C3.20 3 X  
455300    81-H15-WD-004            C-C          MT                                            Code Case N-509 >>>>N/A**
Rod Hanger Integral      C3.20 3 X Attachment 455400     81-H15-WD 005           C-C         MT                                             Code Case N-509 >>>>N/A*>>
Rod Hanger Integral      C3.20 3 X Attachment 455500     81-H15-WD-006           C C         MT                                             Code Case N-509 >>>>N/A>> ~
Rod Hanger Zntegral      C3.20 3 X Attachment 456200     81-H34                   F"A                                                         Code Case N-491-1 Pipe Stanchion          F1.20                                                      >>*N/A**
3 X 456700     81-H34-WD-001           C-C         MT                                             Code Case N-509 >>>>N/A>>>>
Pipe Stanchion          C3.20 3 X 458700     81"H37                               VT-3                                           Code Case N-491-1 Spring Hanger            Fl . 20                                                    >>>>N/A>>>>
3              X 458800     81-H37-WD-001           C-C                                                         Code Case N-509 >>>>N/A>>>>
Integral Attachment      C3.20 3              X 458900     81-H38                   F A                                                         CoCk Case N-491-1 Spring Hanger            Fl. 20                                                      >>>>'N/A>>>>
3              X 459000     81-H38-WD-001           C-C                                                         Code Case N-509 >>>>N/A>>>>
Integral Attachment     C3.20 3             X


DATE: 10/15/99 REVISION: 0 NZNE MILE POINT NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION TEN-YEAR PLAN CLASS 2 SECTION XZ SCHEDULED COMPONENTS PAGE: 214 tor Core Spray NUMBER: 81.0  
DATE: 10/15/99                                 NZNE MILE POINT NUCLEAR PLANT UNIT 1                         PAGE: 214 REVISION:        0                              INSERVICE INSPECTION TEN-YEAR PLAN CLASS 2 SECTION XZ SCHEDULED COMPONENTS tor Core Spray NUMBER: 81 . 0 INSPECTION INTERVAL                        PLAN STATUS            PRESERVZCE YEAR FIRST        SECOND      THIRD SEC. XZ                  PERIOD      PERIOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER ZDENTZFZCATION INSPECTION INTERVAL SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVZCE YEAR INSTRUCTIONS
EXAMINATION AREA           CATEGY        NDE                OUTAGE                        INSTRUCTIONS NUMBER     ZDENTZFZCATION             ITEM     NO   METH   1 2 3 4 1   2   3 4   1 2 3 4 +*CALIBRATION BLOCK++
+*CALIBRATION BLOCK++460100 81-H5 Pipe Stanchion F-A Fl.20 3 X Code Case N-491-1~~N/A~~460600 81-H5-WD-001 Pipe Stanchion C-C MT C3.20 3 X Code Case N-509+iN/A+~6.0" CS I.ine (REF.DWG.NO.13)460700 81-H50 F"A VT-3 Rod Hanger F1.20 3 X Code Case N-491-1**N/A*~12.0" CS Line (REF.DWG.NO.13)461600 81-Hj F-A VT-3 Spring Hanger Fl.20 3 X Code Case N-491-1+AN/Ass 1700 81-H7-WD-001 C-C Code Case N-509+*N/A~+Spring Hanger Integral C3.20 Attachment 3 X 461800 81-H7-WD-002 C-C Coda Case N-509~~N/A++Spring Hanger Integral C3.20 Attachment 3 X 461900 81-H7-WD-003 C-C Code Case N-509~*N/A**Spring Hanger Integral C3.20 Attachment 3 X 462000 81-H7-WD-004 C C Code Case N-509++N/A++Spring Hanger Zntegral C3.20 Attachment 3 X  
460100     81-H5                       F-A                                                         Code Case N-491-1 Pipe Stanchion              Fl . 20                                                    ~~N/A~~
3                            X 460600     81-H5-WD-001               C-C           MT                                           Code Case N-509 +iN/A+~
Pipe Stanchion              C3.20 3                            X 6.0" CS I.ine (REF. DWG. NO. 13) 460700     81-H50                     F"A           VT-3                                         Code Case N-491-1 Rod Hanger                F1.20                                                        **N/A*~
3              X 12.0" CS Line (REF. DWG. NO. 13) 461600     81-Hj                     F-A           VT-3                                         Code Case N-491-1 Spring Hanger              Fl. 20                                                      +AN/Ass 3                            X 1700     81-H7-WD-001               C-C                                                         Code Case N-509 +*N/A~+
Spring Hanger Integral C3.20 3                           X Attachment 461800     81-H7-WD-002               C-C                                                         Coda Case N-509 ~~N/A++
Spring Hanger   Integral C3.20 3                           X Attachment 461900     81-H7-WD-003               C-C                                                         Code Case N-509 ~*N/A**
Spring Hanger   Integral C3.20 3                           X Attachment 462000     81-H7-WD-004               C C                                                         Code Case N-509 ++N/A++
Spring Hanger Zntegral C3.20 3                           X Attachment


DATE: 10/15/99 REVISZON: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 ZNSERVZCE INSPECTION TEN-YEAR PIAN CLASS 2 SECTION XZ SCHEDULED COMPONENTS PAGE: 215 tor Core Spray NUMBER: 81.0  
DATE: 10/15/99                               NINE MILE POINT NUCLEAR PLANT UNIT 1                         PAGE: 215 REVISZON:        0                            ZNSERVZCE INSPECTION TEN-YEAR PIAN CLASS 2 SECTION XZ SCHEDULED COMPONENTS tor Core Spray NUMBER: 81 . 0 INSPECTION INTERVAL                      PLAN STATUS            PRESERVICE YEAR ASME                FIRST        SECOND      THIRD SEC. XZ              PERIOD        PERIOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR INSTRUCTIONS
EXAMINATION AREA           CATEGY      NDE                OUTAGE                          INSTRUCTIONS NUMBER     IDENTIFICATION             ITEM NO   METH     1 2 3 4   1   2 3 4   1 2 3 4 +~CALIBRATION BLOCK~~
+~CALIBRATION BLOCK~~462100 81-H7-WD-005 C-C MT Code Case N-509**N/A~*Spring Hanger Integral C3.20 Attachment 3 X 462200 81 H7-WD-006 C-C Code Case N-509~~N/A~~Spring Hanger Integral C3.20 Attachment 3 X 462300 81-H7-WD-007 C-C MT Spring Hanger Integral C3.20 Attachment 3 X Code Case N-509~~N/A++462500 81-HB Spring Hanger Fl.20 VT"3 3 X Code Case N-491-1**N/Ak*462600 81-HB-WD-001 C-C MT Code Case N-509~+N/A~i Zntegral Attachment C3.20 3 X 471300 81"SC-21 S~ay Brace F1.20 VT-3 3 X Code Case N-491-1~*N/A~~6.0" CS Line (REF.DWG.NO.13)483200 81-SC-45 Seismic Restraint F-A F1.20 VT 3 3 X Code Case N-491-1 esN/Aas 483300 81-SC-46 Seismic Restraint F1.20 3 X Code Case N-491-1**N/A+*483400 81-SC-47 Seismic Restraint F-A F1.20 VT 3 3 X Code Casa N-491-1 l4N/Af 4
462100     81-H7-WD-005               C-C         MT                                             Code Case N-509 **N/A~*
Spring Hanger   Integral   C3.20 3                             X Attachment 462200     81 H7-WD-006               C-C                                                       Code Case N-509 ~~N/A~~
Spring Hanger Integral C3.20 3                             X Attachment 462300     81-H7-WD-007               C-C         MT                                             Code Case N-509 ~~N/A++
Spring Hanger  Integral  C3.20 3                            X Attachment 462500     81-HB                                 VT"3                                           Code Case N-491-1 Spring Hanger              Fl. 20                                                    **N/Ak*
3                            X 462600     81-HB-WD-001               C-C         MT                                             Code Case N-509 ~+N/A~i Zntegral Attachment       C3.20 3                             X 471300     81 "SC-21                             VT-3                                           Code Case N-491-1 S~ay Brace                F1.20                                                      ~*N/A~~
3 X 6.0" CS Line (REF. DWG. NO. 13) 483200     81-SC-45                 F-A         VT 3                                           Code Case N-491-1 Seismic Restraint        F1. 20                                                      esN/Aas 3                            X 483300     81-SC-46                                                                             Code Case N-491-1 Seismic Restraint        F1.20                                                      **N/A+*
3              X 483400     81-SC-47                 F-A         VT 3                                           Code Casa N-491-1 Seismic Restraint        F1.20                                                      l4N/Af4 3                            X


DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 INSERVZCE INSPECTION TEN YEAR PLAN CLASS 2 SECTION XI SCHEDULED COMPONENTS PAGE: 216 tor Core Spray NUMBER: 81.0  
DATE: 10/15/99                               NINE MILE POINT NUCLEAR PLANT UNIT 1                           PAGE: 216 REVISION:        0                            INSERVZCE INSPECTION TEN YEAR PLAN CLASS 2 SECTION XI SCHEDULED COMPONENTS tor Core Spray NUMBER:   81.0 INSPECTION INTERVAL                    PLAN STATUS            PRESERVZCE YEAR ASME                FIRST        SECOND      THIRD SEC. XI            PERIOD        PERIOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATZON INSPECTION INTERVAL ASME SEC.XI CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVZCE YEAR INSTRUCTIONS
EXAMINATION AREA           CATEGY    NDE                  OUTAGE                          INSTRUCTIONS NUMBER     IDENTIFICATZON             ITEM NO   METH   1 2 3 4   1   2 3 4   1 2 3 4 **CALIBRATIONBLOCK~~
**CALIBRATION BLOCK~~12.0" CS Linc (REF.DWG.NO.13)484700 81 SC-51 Seismic Restraint F-A F1.20 3 X Code Case N-491-1**N/A~~6.0" CS Linc (REF.DWG.NO.13)486100 81-SR-4 Seismic Restraint F1.20 3 X Code Case N-491-1**N/A++14.0" CS Line (REF.DWG.NO.13)487300 81-88-1 Sway Strut F-A F1.20 3 X Code Case N-491-1 saN/Ate 487400 81-SS-1-WD-001 C C Code Case N-509 aeN/Ass Sway Strut Integral C3.20 Attachment 3 X 487700 81-88-11 Sway Strut F1.20 3 X Code Case N-491-1 1*N/A4*6.0" CS Lino (REF.DWG.NO.13)487900 81"88-13 F-A Sway Strut F1.20 VT 3 3 X Code Case N-491-1 f 1N/A*t 14.0" CS Linc (REF.DWG.NO.13)490400 81-SS 8 Sway Strut F-A F1.20 3 X Code Case N-491-1 tf N/A*%490500 81-SS-8"WD-001 Sway Strut Integral Attachment C-C C3.20 3 X Code Case N-509~~N/A~*  
12.0" CS Linc   (REF. DWG. NO. 13) 484700     81 SC-51                   F-A                                                       Code Case N-491-1 Seismic Restraint          F1.20                                                    **N/A~~
3                            X 6.0" CS Linc (REF. DWG. NO. 13) 486100     81-SR-4                                                                               Code Case N-491-1 Seismic Restraint          F1.20                                                    **N/A++
3              X 14.0" CS Line (REF. DWG. NO. 13) 487300     81-88-1                     F-A                                                       Code Case N-491-1 Sway  Strut                F1.20                                                    saN/Ate 3                            X 487400     81-SS-1-WD-001             C C                                                       Code Case N-509 aeN/Ass Sway Strut Integral       C3.20 3                             X Attachment 487700     81-88-11                                                                             Code Case N-491-1 Sway  Strut                F1.20                                                    1*N/A4*
3 X 6.0" CS Lino (REF. DWG. NO. 13) 487900     81"88-13                   F-A       VT 3                                           Code Case N-491-1 Sway  Strut                F1.20                                                    f 1N/A*t 3              X 14.0" CS Linc (REF. DWG. NO. 13) 490400     81-SS 8                     F-A                                                       Code Case N-491-1 Sway  Strut                F1.20                                                    tf N/A*%
3 X 490500   81-SS-8 "WD-001             C-C                                                       Code Case N-509 ~~N/A~*
Sway  Strut Integral        C3.20 3 X Attachment


DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 A ZNSERVZCE INSPECTION TEN YEAR PIAN CIASS 2 SECTION XI SCHEDUZED COMPONENTS PAGE: 217 tor Core Spray NUMBER: 81.0  
DATE: 10/15/99                               NINE MILE POINT NUCLEAR PLANT UNIT 1                             PAGE: 217 A
REVISION:        0                            ZNSERVZCE INSPECTION TEN YEAR PIAN CIASS 2 SECTION XI SCHEDUZED COMPONENTS tor Core Spray NUMBER: 81 . 0 ZNSPECTZON INTERVAL                      PLAN STATUS            PRESERVICE YEAR ASME                  FIRST        SECOND      THIRD SEC. XI            PERIOD        PERIOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAHZNATZON AREA NUMBER ZDENTIFZCATION ZNSPECTZON INTERVAL ASME SEC.XI CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR INSTRUCTIONS
EXAHZNATZON AREA           CATEGY      NDE                OUTAGE                            INSTRUCTIONS NUMBER     ZDENTIFZCATION             ITEM NO     METH   1 2 3 4   1   2 3   4 1 2 3 4 ~ ~CALIBRATION     BLOCK~ ~
~~CALIBRATION BLOCK~~4 91300 81-WD-006 C-F-2 UT Valve 81-01-to-Pipe C5.51 HT 3 X Terminal End, Examine 100%of weld length+~NHP-1 SW-1 020-CS~~492000 81-WD-013 Pipe-to-Elbow C-F 2 C5.51 3 X Examine 100%of weld length~*NMP-1 SW-1020-CS~
4 91300   81-WD-006                 C-F-2       UT                                             Terminal End, Examine Valve 81-01-to-Pipe       C5. 51       HT                                             100% of weld length 3 X                                      + ~ NHP-1 SW-1 020-CS ~ ~
~492200 81-WD-016 Pipe-to-Rcduccr (14x12")C-F-2 C5.51 HT 3 X Examine 100%of wold length~*NMP-1SW-1020-CS**
492000     81-WD-013                 C-F  2                                                    Examine 100%      of weld Pipe-to-Elbow             C5. 51                                                     length 3 X                                       ~ *NMP-1SW-1020-CS~    ~
12.0~CS Linc (REF.DWG.NO.13)493000 81-WD-024 C-F" 2 UT Examine 100%of weld Elbow-to-Pipe C5.51 length**NMP-1SW 1020"CS**16.0" CS I inc (REF.DWG.NO.13)493300 81-WD-028 81-05 STRT-to-Reducer(12"x16 C-F-2 UT C5.51 HT 3 X Examine 100%of weld length+*NMP-ISW-1020-CS+~
492200     81-WD-016                 C-F-2                                                      Examine 100%      of wold Pipe-to-Rcduccr           C5.51       HT                                             length 3 X (14x12")                                                                              ~*NMP-1SW-1020-CS**
12.0" CS Linc (REF.DWG.NO.13)494000 81 WD 035 C-F-2 UT Examine 100%of weld Pipe-to-Reducer C5.51 MT (12" x10")X length~~NMP-1SW-1020-CS*~
12.0~ CS Linc (REF. DWG. NO. 13) 493000     81-WD-024                 C-F" 2       UT                                             Examine 100%     of weld Elbow-to-Pipe             C5.51                                                       length
494500 81-WD-040 Pipe-to-Rcduccr (12" x14")C-F-2 UT C5.51 HT Examine 100%of weld length**NMP-1SW-1020-CS*+  
                                                                                                  **NMP-1SW 1020"CS**
16.0" CS I inc (REF. DWG. NO. 13) 493300     81-WD-028                 C-F-2        UT                                            Examine 100%      of weld 81-05                     C5. 51      HT                                            length 3              X STRT-to-Reducer(12"x16                                                                 +*NMP-ISW-1020-CS+~
12.0" CS Linc (REF. DWG. NO. 13) 494000     81 WD 035                 C-F-2       UT                                             Examine 100%     of weld Pipe-to-Reducer           C5.51       MT                                             length (12" x10")                                                                 X         ~ ~NMP-1SW-1020-CS*~
494500     81-WD-040                 C-F-2       UT                                             Examine 100%     of weld Pipe-to-Rcduccr            C5.51        HT                                            length (12" x14")                                                                            **NMP-1SW-1020-CS*+


DATE: 10/15/99 REVISION: 0 NZNE MILE POINT NUCLEAR PLANT UNIT 1 INSERVZCE INSPECTION TEN-YEAR PIAN CLASS 2 SECTION XI SCHEDULED COMPONENTS PAGE: 218.tor Core Spray NUMBER: 81.0  
DATE: 10/15/99                             NZNE MILE POINT NUCLEAR PLANT UNIT 1                         PAGE: 218 REVISION:          0                          INSERVZCE INSPECTION TEN-YEAR PIAN CLASS 2 SECTION XI SCHEDULED COMPONENTS
    .tor Core Spray NUMBER: 81 . 0 INSPECTION INTERVAL                      PLAN STATUS            PRESERVZCE YEAR ASME                FIRST        SECOND      THIRD SEC. XZ              PERIOD        PERIOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVZCE YEAR INSTRUCTIONS
EXAMINATION AREA         CATEGY      NDE                OUTAGE                        INSTRUCTIONS NUMBER       IDENTIFICATION           ITEM NO     METH   1 2 3 4   1   2 3 4   1 2 3 4 ~~CALZBRATION BLOCK*~
~~CALZBRATION BLOCK*~14.0" CS Linc (REF.DWG.NO.13)494900 81 WD 044 C-F-2 UT Pipe-to-Elbow C5.51 MT 3 X Examine 100%of weld length~+NMP-ISW-1020"CS~~12.0" CS Linc (REF.DWG.NO.13)4 96200 81-WD-058 Pipe-to-Valve 81-37 C-F-2 UT C5.51 3 X Terminal End, Examine 100%of weld length**NMP-ISW-1020-CS*~
14.0" CS Linc (REF. DWG. NO. 13) 494900     81 WD 044               C-F-2       UT                                           Examine 100%  of weld Pipe-to-Elbow             C5.51       MT                                           length 3 X                                     ~ +NMP-ISW-1020 "CS~ ~
496600 81-WD-065 Tcc-to-Flange C-F-2 C5.51 Examine 100%of weld MT length eeNMP 1SW 1020 CS*e 00 81-WD-125 Reducer-to-Flange (14'x12")C-F-2 CS.51 3 X Examine 100%of weld length**NMP-1SW-1020-CS~~
12.0" CS Linc (REF. DWG. NO. 13) 4 96200     81-WD-058                 C-F-2        UT                                            Terminal End, Examine Pipe-to-Valve 81-37       C5. 51                                                     100% of weld length 3              X                        **NMP-ISW-1020-CS*~
501200 81-WD-136 Pipe-to-Reducer (12"x16~)C-F-2 UT C5.51 3 X Examine 100%of weld length~~NMP-1SW-1020-CS~*
496600     81-WD-065                 C-F-2                                                     Examine 100% of weld Tcc-to-Flange            C5.51      MT                                             length eeNMP 1SW 1020 CS*e 00     81-WD-125                 C-F-2                                                      Examine 100%  of weld Reducer-to-Flange         CS. 51                                                    length 3 X (14'x12")                                                                           **NMP-1SW-1020-CS~~
502400 81-WD-149 Pipe-to-Elbow CF2 C5.51 3 X Examine 100%of weld length**NMP-1SW 1020 CS++502600 81 WD 151 C-F-2 UT Reducer-to-Pump 81-50 C5.51 MT 3 X Terminal End, Examine 100%of weld length~~NMP-ISW-1020-CS**  
501200     81-WD-136                 C-F-2       UT                                             Examine 100% of weld Pipe-to-Reducer          C5.51                                                      length 3 X (12"x16~)                                                                            ~ ~NMP-1SW-1020-CS~*
502400     81-WD-149                 CF2                                                        Examine 100%  of  weld Pipe-to-Elbow             C5.51                                                     length 3 X
                                                                                                **NMP-1SW 1020 CS++
502600     81 WD 151               C-F-2       UT                                             Terminal End, Examine Reducer-to-Pump   81-50   C5.51       MT                                             100% of weld length 3              X                        ~~NMP-ISW-1020-CS**


DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 ZNSERVZCE ZNSPECTION TEN-YEAR PIAN CLASS 2 SECTION XZ SCHEDULED COMPONENTS PAGE: 219 tor Core Spray NUMBER: 81.0  
DATE: 10/15/99                               NINE MILE POINT NUCLEAR PLANT UNIT 1                           PAGE: 219 REVISION:        0                            ZNSERVZCE ZNSPECTION TEN-YEAR PIAN CLASS 2 SECTION XZ SCHEDULED COMPONENTS tor Core Spray NUMBER: 81 . 0 INSPECTION INTERVAL                      PIAN STATUS            PRESERVICE YEAR ASHE                  FIRST        SECOND      THIRD SEC. XI                PERZOD      PERIOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATZON INSPECTION INTERVAL ASHE SEC.XI CATEGY NDE ITEH NO METH FIRST PERZOD PIAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR INSTRUCTIONS
EXAMINATION AREA           CATEGY      NDE                OUTAGE                        INSTRUCTIONS NUMBER     IDENTIFICATZON           ITEH   NO   METH   1   2 3 4 1   2 3 4   1 2 3 4 ~ ~CALIBRATION BLOCK*>>
~~CALIBRATION BLOCK*>>14.0" CS Zine (REF.DWG.NO.13)504200 81-WD-167 Elbow-to-Pipe C-F-2 UT CS.51 HT 3----X Examine 100%of weld length~~NMP 1SW 1020-CS~~12.0" CS Linc (REF.DWG.NO.13)504600 81 WD 172 Tee-to-Pipe C-F-2 UT CS.51 HT 3 X Examine 100%of weld length~~NMP-ISW-1020-CS~*
14.0" CS Zine (REF. DWG. NO. 13) 504200     81-WD-167                 C-F-2       UT                                           Examine 100%  of weld Elbow-to-Pipe            CS. 51       HT                                           length 3 - - - -     X                       ~~NMP 1SW 1020-CS~~
506000 81 WD-189 Pipe-to-Reducer C-F-2 UT C5.51 3 Examine 100%of weld length~~NMP-1 SW-1020-CS**  
12.0" CS Linc (REF. DWG. NO. 13) 504600     81 WD 172               C-F-2       UT                                           Examine 100%  of weld Tee-to-Pipe                CS. 51       HT                                           length 3 X
                                                                                                ~~NMP-ISW-1020-CS~*
506000   81 WD-189                 C-F-2       UT                                           Examine 100%   of weld Pipe-to-Reducer          C5.51                                                      length 3                                      ~ ~NMP-1 SW-1020-CS**


DATE: 10/15/99 REVISION: 0 NINE MZLE POINT NUCLEAR PLANT UNIT 1 L INSERVZCE INSPECTION TEN-YEAR PLAN CLASS 2 SECTION XZ SCHEDULED COMPONENTS PAGE: 220 tor Core Spray Pump 121 NUMBER: 81.0 INSPECTION INTERVAL PIAN STATUS PRESERVICE YEAR  
DATE: 10/15/99                             NINE MZLE POINT NUCLEAR PLANT UNIT 1                         PAGE: 220 L
REVISION:        0                          INSERVZCE INSPECTION TEN-YEAR PLAN CLASS 2 SECTION XZ SCHEDULED COMPONENTS tor Core Spray Pump 121 NUMBER: 81 . 0 INSPECTION INTERVAL                     PIAN STATUS           PRESERVICE YEAR ASME                FIRST        SECOND      THZRD SEC. XI            PERIOD        PERIOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC.XI CATEGY NDE ITEM NO METH FIRST PERIOD THZRD PERIOD SECOND PERIOD OUTAGE 1 2 3 4 1 2 3 4 1 2 3 4 INSTRUCTIONS
EXAMINATION AREA         CATEGY      NDE                OUTAGE                          INSTRUCTIONS NUMBER     IDENTIFICATION           ITEM NO     METH   1 2 3 4   1   2 3   4 1 2 3 4 ++CALIBRATION BLOCK~~
++CALIBRATION BLOCK~~CSP 81-03 (REF.DWG.NO.13)511200 81-03-WD-005 Upper Head-to-Shaf t Channel C-G C6.10 3 X P03**N/A**511300 81-03-WD-006 C-G P03**N/A**Shaft Channel-to-Shaf t C6.10 Guide 3 X 511500 81 03 WD"008 C-G P03~*N/A+~Upper Casing-to-Flange C6.10 3 X 512000 81-03-WD-013 C-G Lower Casing Long Weld C6.10 P03+'~N/A++  
CSP 81-03 (REF. DWG. NO. 13) 511200     81-03-WD-005             C-G                                                        P03 **N/A**
Upper Head-to-Shaf t     C6.10 3                             X Channel 511300     81-03-WD-006             C-G                                                       P03 **N/A**
Shaft Channel-to-Shaf t C6.10 3                             X Guide 511500     81 03 WD"008             C-G                                                       P03 ~*N/A+~
Upper Casing-to-Flange   C6. 10 3                             X 512000     81-03-WD-013             C-G                                                       P03 +'~N/A++
Lower Casing Long Weld C6.10


DATE: 10/15/99~REVISION: NINE MILE POZNT NUCLEAR PIANT UNIT 1 INSERVICE INSPECTION TEN-YEAR PLAN CIASS 2 SECTION XZ SCHEDULED COMPONENTS PAGE: 221 tor Core Spray Topping Pump 111 INSPECTION INTERVAL NUMBER: 81.0 PLAN STATUS PRESERVZCE YEAR  
DATE: 10/15/99                           NINE MILE POZNT NUCLEAR PIANT UNIT 1                       PAGE: 221
~ REVISION:                                  INSERVICE INSPECTION TEN-YEAR PLAN CIASS 2 SECTION XZ SCHEDULED COMPONENTS tor Core Spray Topping Pump 111 NUMBER: 81. 0 INSPECTION INTERVAL                    PLAN STATUS           PRESERVZCE YEAR ASME                FIRST        SECOND      THIRD SEC. XI            PERIOD      PERIOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC.XI CATEGY NDE ITEM NO METH FIRST PERIOD SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 INSTRUCTIONS
EXAMINATION AREA         CATEGY    NDE                OUTAGE                        INSTRUCTIONS NUMBER   IDENTIFICATION           ITEM NO   METH   1 2 3 4 1   2 3 4   1 2 3 4 *+CALIBRATION BLOCK+ ~
*+CALIBRATION BLOCK+~CSTP 81-50 (REF.DNG.NO.13)514100 81-50 Purap Support F-A F1.40 3 X Code Case N-491-1+AN/Ant  
CSTP 81-50 (REF. DNG. NO. 13) 514100   81-50                   F-A                                                     Code Case N-491-1 Purap Support          F1.40                                                    +AN/Ant 3 X


DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 ZNSERVICE INSPECTION TEN-YEAR PLAN CLASS 2 SECTION XI SCHEDULED COMPONENTS PAGE: 222 tor Core Spray NUMBER: 81.1  
DATE: 10/15/99                               NINE MILE POINT NUCLEAR PLANT UNIT 1                           PAGE: 222 REVISION:        0                            ZNSERVICE INSPECTION TEN-YEAR PLAN CLASS 2 SECTION   XI SCHEDULED COMPONENTS tor Core Spray NUMBER:   81. 1 INSPECTION INTERVAL                      PLAN STATUS            PRE SERVICE YEAR AS ME                FIRST        SECOND      THIRD SEC. XZ                PERIOD        PERIOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL AS ME SEC.XZ CATEGY NDE ITEH NO HETH FIRST PERIOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRE SERVICE YEAR INSTRUCTIONS
EXAMINATION AREA           CATEGY      NDE                  OUTAGE                          INSTRUCTIONS NUMBER     IDENTIFICATION           ITEH   NO   HETH     1 2 3 4   1   2 3 4   1 2 3 4 ~~CALIBRATION BLOCK*~
~~CALIBRATION BLOCK*~12.0" CS Linc (REF.DWG.NO.13)516200 81.1-WD-023 C-F-2 UT Pipe-to-Flange C5.51 HT 3 Examine 100$of weld length**NHP 1SW-1020-CS++
12.0"   CS Linc (REF. DWG. NO. 13) 516200     81. 1-WD-023             C-F-2       UT                                             Examine 100$  of weld Pipe-to-Flange           C5. 51       HT                                             length 3
517000 81.1-WD-031 Elbow-to Pipe C F-2 C5.51 3 X Examine 100$of weld length*~NHP-1 SW-1020-CS
                                                                                                **NHP 1SW-1020-CS++
~i 518400 81.1-WD-047 Tee-to-Valve 81-30 C-F-2 MT C5.51 UT X Terminal End, Examine 100$of weld length~~NHP-1SW-1020-CS**
517000     81.1-WD-031               C F-2                                                     Examine 100$   of weld Elbow-to Pipe              C5. 51                                                      length 3                            X          *~ NHP-1 SW-1020-CS ~ i 518400     81. 1-WD-047             C-F-2        MT                                            Terminal End, Examine Tee-to-Valve 81-30         C5. 51       UT                                             100$ of weld length X          ~ ~NHP-1SW-1020-CS**
519400 81.1 WD-059 Pipe-to-Tcc C-F 2 CS.51 3 X Examine 100$of weld length*~NHP-ISW-1020-CS~~
519400   81.1 WD-059               C-F 2                                                      Examine 100$  of weld Pipe-to-Tcc               CS. 51                                                     length 3                             X         *~NHP-ISW-1020-CS~~
0 0 DATE: 10/15/99 REVISION: 0 NINE MIZE POINT NUCLEAR PLANT UNIT 1 ZNSERVICE INSPECTION TEN YEAR PZAN CLASS 2 SECTION XZ SCHEDULED COMPONENTS PAGE: 223 tor Containment Spray NUMBER: 93.0  
 
0 0
 
DATE: 10/15/99                             NINE MIZE POINT NUCLEAR PLANT UNIT 1                           PAGE: 223 REVISION:        0                            ZNSERVICE INSPECTION TEN YEAR PZAN CLASS 2 SECTION XZ SCHEDULED COMPONENTS tor Containment Spray NUMBER:   93.0 INSPECTION INTERVAL                        PLAN STATUS            PRESERVICE YEAR ASME                  FIRST        SECOND      THIRD SEC. XI              PERIOD        PERIOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL ASME SEC.XI CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR INSTRUCTIONS
EXAMINATION AREA         CATEGY        NDE                OUTAGE                          INSTRUCTIONS NUMBER     IDENTIFICATION           ITEM   NO   METH     1 2 3 4   1   2 3 4   1 2 3 4 **CALIBRATIONBLOCK+ +
**CALIBRATION BLOCK++12.0" Raw Water Line (REF.DWG.NO.16)521400 93-R23-A Rod Hanger Fl.20 VT-3 X Code Case N-491-1~~N/A~+521800 93-R23-E Rod Hanger F-A Fl.20 3 X Code Case N 491-1**N/A**522000 93-R24-A Anchor F-A Fl.20 VT 3 3 X Code Case N-491-1 eaN/A@a 529600 93"R27"F F-A Dead Weight Support F1.20 3 X Code Case N-491-1~~N/A**00 93"R30 Rod Hanger Fl.20 X Code Case N-491-1 t 1N/A1k 533400 93-SCR-9E F A Seismic Box Restraint Fl~20 3 X Code Case N-491-1++N/A++533500 93-SCR-9E-WD-001 C-C Integral Attachment C3.20 3 X Coda Case N-509+iN/A~+533600 93-SCR-9E-WD-002 C C Code Case N-509+*N/A++Integral Attachment C3.20 3 X 533700 93-SCR-9E-WD-003 C-C Code Case N-509*~N/A*t Integral Attachment C3.20 3 X 533800 93-SCR-9E-WD-004 C-C MT Integral Attachment C3.20 3 X Coda Case N-509**N/A~*
12.0" Raw Water Line (REF. DWG. NO. 16) 521400     93-R23-A                               VT-3                                           Code Case N-491-1 Rod Hanger              Fl. 20                                                      ~~N/A~+
0 0 DATE: 10/15/99 REVISION: 0 NINE HII E POINT NUCLEAR PLANT UNIT 1 INSERVZCE INSPECTION TEN-YEAR PLAN CLASS 2 SECTION XZ SCHEDULED COMPONENTS PAGE: 224 tor Containment Spray NUMBER: 93.0 INSPECTION ZNTERVAL PIAN STATUS PRESERVZCE YEAR SUHMARY NUMBER EXAHINATZON AREA ZDENTIFZCATION ASHE SEC.XI CATEGY NDE ITEH NO METH SECOND PERIOD THIRD PERIOD FIRST PERIOD OUTAGE 1 2 3 4 1 2 3 4 1 2 3 4 INSTRUCTIONS
X 521800     93-R23-E                 F-A                                                         Code Case N 491-1 Rod Hanger              Fl . 20                                                      **N/A**
~+CALIBRATION BLOCK'~533900 93-SCR-9E-WD-005 C-C HT Integral Attachment C3.20 3 X Code Case N-509**N/A~*534000 93-SCR-9E-WD"006 C C HT Code Case N-509*~N/A~*Integral Attachment C3.20 3 X 534100 93-SCR-9E-WD-007 C-C HT Code Case N-509<<N/A4~Integral Attachment C3.20 3 X 534200 93"SCR"9E-WD-008 C-C Integral Attachment C3.20 3 X Code Case N-509~+N/Art 535200 93-SCR-9G Seismic Box Restraint F1.20 VT 3 3 X Code Case N-491-1 a+N/Ate 535300 93-SCR-9G-WD-001 C-C Code Case N-509*~N/A~~Integral Attachment C3.20 3 X 535400 93-SCR-9G-WD-002 C-C Code case N-509++N/A%a Integral Attachment C3.20 3 X 535500 93-SCR-9G-WD-003 C-C Code Case N-509~~N/A~*Integral Attachment C3.20 3 X 535600 93 SCR 9G-WD-004 C-C Code Case N-509<<~N/A**Integral Attachment C3.20 3 X 535700 93-SCR-9G"WD-005 Integral Attachment C-C C3.20 3 X Code Case N-509~~N/A~*
3            X 522000     93-R24-A                 F-A           VT 3                                           Code Case N-491-1 Anchor                  Fl . 20                                                      eaN/A@a 3 X 529600     93"R27"F                 F-A                                                         Code Case N-491-1 Dead Weight Support      F1.20                                                        ~~N/A**
3 X 00   93"R30                                                                               Code Case N-491-1 Rod Hanger              Fl. 20                                                      t 1N/A1k X
533400     93-SCR-9E               F A                                                         Code Case N-491-1 Seismic Box Restraint    Fl 20
                                      ~                                                        ++N/A++
3                            X 533500     93-SCR-9E-WD-001         C-C                                                         Coda Case N-509 +iN/A~+
Integral Attachment      C3.20 3                            X 533600     93-SCR-9E-WD-002         C C                                                         Code Case N-509 +*N/A++
Integral Attachment     C3. 20 3                           X 533700     93-SCR-9E-WD-003         C-C                                                         Code Case N-509 *~N/A*t Integral Attachment     C3.20 3                           X 533800     93-SCR-9E-WD-004         C-C           MT                                             Coda Case N-509 **N/A~*
Integral Attachment     C3.20 3                           X


DATE: 10/15/99 REVISION: 0 NINE MILE POZNT NUCLEAR PIANT UNZT 1 INSERVICE INSPECTION TEN-YEAR PIAN CLASS 2 SECTION XI SCHEDULED COMPONENTS PAGE: 225 tor Containmcnt Spray NUMBER: 93.0 SUMHARY EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR INSTRUCTIONS
0 0
~~CALIBRATION BLOCK~~535800 93-SCR-9G-WD-006 C-C MT Integral Attachment C3.20 3 X Code Case N-509*~N/A~~535900 93-SCR-9G-WD"007 C C MT Code Case N-509~*N/A~i Integral Attachment C3.20 3 X 536000 93-SCR-9G-WD"008 C-C Code Case N-509~*N/A~*Integral Attachment C3.20 3 X 542200 93-WD-055 Valve 93-72-to-Pipe C-F-2 UT C5.51 HT 3 X Examine 100%of weld length**NHP 1SW 1020-CS++~00 93.1-WD-005 Elbow-to-Pipe C-F-2 CS.51 3 ExamLnc 100%of weld length i~PZRP.375-2**
543900 93.1-WD-012 Pipe-to-Elbow C-F-2 UT C5.51 MT 3 Examine 100%of weld length+~NMP-ISW-1020-CS*~
544700 93.1-WD-020 Pipe-to-Elbow C-F-2 C5.51 3 X Examine 100%of weld length~*PZR-.375-2, 94-6007+~544900 93.1-WD-022 Elbow-to-Valve 93-52 C-F-2 HT CS.51 3 X Pipe restraint interfercncc, scan in both directions to achieve 100%CRV.*~94-6007iPZR-.375-2~*
545200 93.1-WD-028 CF2UT Pipe-to-Valve 93-71 C5.51 HT 3 X Examine 100%of weld length*~PZR-.375-2*~


EI T NIAGARA H kJ MOHAWK NINE MILE POINT NUCLEAR POWER STATION NMP1-ISI-003-10 THIRD INSERVICEINSPECTIONINTERVAL Rev.0 TEN-YEAR INSERVICE INSPECTION PLAN AND SCHEDULE Date: October 15, 1999 6.0 CLASS 3 INSERVICE INSPECTION PLAN TABLES This section contains the Long Term Ten-Year Inservice Inspection Examination Tables for nondestructive examinations of selected systems and components for the Second Inservice Inspection Interval.38.0 39.0 54.0 57.0 70.0 72.0 93.0 Shutdown Cooling Water System Emergency Condenser System Spent Fuel Pool Cooling System Spent Fuel Pool Cooling System Reactor Building Closed Loop Cooling System Emergency Service Water System Reactor Containment Spray System 226 thru 226 227 thru 227 228 thru 235 236 thru 236 237 thru 242 243 thru 244 245 thru 248 File: NMP1ISIPL.wpd 0
DATE:  10/15/99                            NINE  HII E POINT NUCLEAR PLANT UNIT 1                          PAGE: 224 REVISION:        0                          INSERVZCE INSPECTION TEN-YEAR PLAN CLASS 2 SECTION XZ SCHEDULED COMPONENTS tor Containment Spray NUMBER:  93.0 INSPECTION ZNTERVAL                        PIAN STATUS            PRESERVZCE YEAR ASHE                    FIRST        SECOND      THIRD SEC. XI                  PERIOD        PERIOD      PERIOD SUHMARY    EXAHINATZON AREA        CATEGY      NDE                  OUTAGE                          INSTRUCTIONS NUMBER      ZDENTIFZCATION          ITEH  NO    METH    1  2  3  4  1  2  3  4  1  2  3  4  ~+CALIBRATION BLOCK' ~
DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNZT 1 INSERVICE INSPECTION TEN YEAR PLAN CLASS 3 SECTION XZ SCHEDULED COMPONENTS PAGE: 226 down Cooling Water Heat Exchanger 11 NUMBER: 38.0 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR  
533900    93-SCR-9E-WD-005        C-C          HT                                              Code Case N-509 **N/A~*
Integral Attachment      C3.20 3                            X 534000    93-SCR-9E-WD"006        C C          HT                                              Code Case N-509 *~N/A~*
Integral Attachment      C3. 20 3                            X 534100    93-SCR-9E-WD-007        C-C          HT                                              Code Case N-509 <<N/A4~
Integral Attachment      C3. 20 3                            X 534200    93"SCR"9E-WD-008        C-C                                                          Code Case N-509 ~+N/Art Integral Attachment      C3.20 3                            X 535200    93-SCR-9G                            VT 3                                            Code Case N-491-1 Seismic Box Restraint    F1.20                                                        a+N/Ate 3              X 535300    93-SCR-9G-WD-001        C-C                                                          Code Case N-509 *~N/A~~
Integral Attachment      C3.20 3              X 535400    93-SCR-9G-WD-002        C-C                                                          Code case N-509 ++N/A%a Integral Attachment      C3.20 3              X 535500    93-SCR-9G-WD-003        C-C                                                          Code Case N-509 ~~N/A~*
Integral Attachment      C3.20 3              X 535600    93 SCR 9G-WD-004        C-C                                                          Code Case N-509 <<~N/A**
Integral Attachment      C3.20 3              X 535700    93-SCR-9G"WD-005        C-C                                                          Code Case N-509 ~~N/A~*
Integral Attachment      C3.20 3              X
 
DATE: 10/15/99                            NINE MILE POZNT NUCLEAR PIANT UNZT 1                          PAGE: 225 REVISION:          0                        INSERVICE INSPECTION TEN-YEAR PIAN CLASS 2 SECTION  XI SCHEDULED COMPONENTS tor Containmcnt Spray NUMBER:    93.0 INSPECTION INTERVAL                      PLAN STATUS            PRESERVICE YEAR ASME                FIRST        SECOND      THIRD SEC. XZ              PERIOD        PERIOD      PERIOD SUMHARY    EXAMINATION AREA        CATEGY      NDE                  OUTAGE                          INSTRUCTIONS NUMBER    IDENTIFICATION          ITEM NO    METH    1  2  3  4  1  2  3  4  1  2  3  4  ~ ~CALIBRATION BLOCK~ ~
535800    93-SCR-9G-WD-006        C-C        MT                                            Code Case N-509 *~N/A~~
Integral Attachment    C3.20 3              X 535900    93-SCR-9G-WD"007        C C        MT                                            Code Case N-509 ~*N/A~i Integral Attachment    C3. 20 3              X 536000    93-SCR-9G-WD"008        C-C                                                        Code Case N-509 ~*N/A~*
Integral Attachment    C3.20 3              X 542200    93-WD-055              C-F-2      UT                                            Examine 100%  of weld Valve 93-72 -to-Pipe    C5.51      HT                                            length 3 X
                                                                                              **NHP 1SW 1020-CS++
    ~00    93. 1-WD-005            C-F-2                                                      ExamLnc 100%  of weld Elbow-to-Pipe          CS. 51                                                    length i~PZRP.375-2**
3 543900    93.1-WD-012            C-F-2      UT                                            Examine 100%  of weld Pipe-to-Elbow          C5.51      MT                                            length 3                                        + ~NMP-ISW-1020-CS*~
544700    93.1-WD-020            C-F-2                                                      Examine 100%  of weld Pipe-to-Elbow          C5.51                                                      length ~*PZR-.375-2, 3                            X          94-6007+~
544900    93. 1-WD-022            C-F-2      HT                                            Pipe  restraint Elbow-to-Valve 93-52    CS. 51                                                    interfercncc, scan in 3                            X both directions to achieve 100% CRV.
                                                                                              *~94-6007iPZR-.375-2~*
545200    93.1-WD-028              CF2UT                                                      Examine 100%  of weld Pipe-to-Valve 93-71      C5.51      HT                                            length *~PZR-.375-2*~
3                            X
 
NINE MILE POINT                             NMP1-ISI-003-10 EI T NIAGARA                            NUCLEAR POWER STATION H kJ MOHAWK THIRD INSERVICEINSPECTIONINTERVAL               Rev. 0 TEN-YEAR INSERVICE INSPECTION                 Date:   October 15, 1999 PLAN AND SCHEDULE 6.0   CLASS 3 INSERVICE INSPECTION PLAN TABLES This section contains the Long Term Ten-Year Inservice Inspection Examination Tables for nondestructive examinations of selected systems and components for the Second Inservice Inspection Interval.
38.0         Shutdown Cooling Water System                                                 226 thru 226 39.0        Emergency Condenser System                                                     227 thru 227 54.0        Spent Fuel Pool Cooling System                                                 228 thru 235 57.0        Spent Fuel Pool Cooling System                                                 236 thru 236 70.0        Reactor Building Closed Loop Cooling System                                   237 thru 242 72.0        Emergency Service Water System                                                 243 thru 244 93.0        Reactor Containment Spray System                                               245 thru 248 File: NMP1ISIPL.wpd
 
0 DATE: 10/15/99                             NINE MILE POINT NUCLEAR PLANT UNZT 1                         PAGE: 226 REVISION:        0                          INSERVICE INSPECTION TEN YEAR PLAN CLASS 3 SECTION XZ SCHEDULED COMPONENTS down Cooling Water Heat Exchanger     11 NUMBER:   38.0 INSPECTION INTERVAL                     PLAN STATUS           PRESERVICE YEAR ASME                FIRST        SECOND      THIRD SEC. XZ              PERZOD        PERIOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERZOD SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 INSTRUCTIONS
EXAMINATION AREA         CATEGY      NDE                OUTAGE                        INSTRUCTIONS NUMBER     IDENTIFICATION           ITEM NO     METH   1 2 3 4   1   2 3 4   1 2 3 4 ++CALIBRATION BLOCK'~+
++CALIBRATION BLOCK'~+SDCW HX 38-129 (REF.DWG.NO.C-26855-C7) 548000 38-129-WD-001 D-A VT-1 SDC Hx Front Support D1.10 3 Code Case N-509, Examine 100%of weld length X~~N/A+~548100 38-129-WD-002 SDC Hx Roar Support D-A D1.10 X Code case N<<509, Examine 100%of weld'ength ttN/Ail SDCW HX 38-135 (REF.DWG.NO.C-26855-C7) 548200 38-SDC-HX-11 SDC Heat Exchanger F1.40 Support 3 X Code Case N-491-1+~N/A~~  
SDCW HX 38-129 (REF. DWG. NO. C-26855-C7) 548000     38-129-WD-001           D-A         VT-1                                           Code Case N-509, Examine SDC Hx Front Support   D1.10                                                     100% of weld length 3                            X         ~~N/A+~
548100     38-129-WD-002           D-A                                                       Code case N<<509, Examine SDC Hx Roar Support      D1. 10                                                    100% of weld'ength X          ttN/Ail SDCW HX 38-135 (REF. DWG. NO. C-26855-C7) 548200     38-SDC-HX-11                                                                       Code Case N-491-1 SDC  Heat Exchanger      F1.40                                                      +~N/A~~
3                            X Support


DATE: 10/15/99 REVISION: 0 NINE MILE POZNT NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION TEN-YEAR PLAN CLASS 3 SECTION XI SCHEDULED COMPONENTS PAGE: 227 gency Condenser Heat Exchanger 122 NUMBER: 39.0 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR  
DATE: 10/15/99                               NINE MILE POZNT NUCLEAR PLANT UNIT 1                       PAGE: 227 REVISION:        0                            INSERVICE INSPECTION TEN-YEAR PLAN CLASS 3 SECTION XI SCHEDULED COMPONENTS gency Condenser Heat Exchanger 122 NUMBER:   39.0 INSPECTION INTERVAL                       PLAN STATUS           PRESERVICE YEAR ASME                  FIRST        SECOND      THIRD SEC. XZ                PERIOD      PERIOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC.XZ CATEGY NDE ITEM NO METH THIRD PERIOD FIRST PERIOD SECOND PERIOD OUTAGE 1 2 3 4 1 2 3 4 1 2 3 4 INSTRUCTIONS i*CALIBRATION BLOCK**ECHE 60-42 (REF.DWG.NO.11A)550100 60-42-WD-007 North Saddle-to-Shell Dl.10 Weld VT 1 3 X Code Case N-509~~N/A~~550200 60-42-WD-008 D-A Code Case N-509~~N/A+*Center Saddle-to-Shell D1.10 Weld 3 X 550300 60-42-WD-009 D-A VT-1 Code Case N-509**N/A**South Saddle-to-Shell Dl.10 Weld 3 X 550400 HX-60-42 Heat Exchanger Support Fl~40 X Code Case N-491"1**N/A*~  
EXAMINATION AREA         CATEGY        NDE                OUTAGE                        INSTRUCTIONS NUMBER     IDENTIFICATION         ITEM NO       METH   1 2 3 4 1   2 3 4   1 2 3 4 i*CALIBRATIONBLOCK**
ECHE 60-42 (REF. DWG. NO. 11A) 550100     60-42-WD-007                         VT 1                                         Code Case N-509 ~~N/A~~
North Saddle-to-Shell    Dl. 10 3                            X Weld 550200     60-42-WD-008           D-A                                                         Code Case N-509 ~~N/A+*
Center Saddle-to-Shell   D1.10 3                           X Weld 550300     60-42-WD-009           D-A           VT-1                                         Code Case N-509 **N/A**
South Saddle-to-Shell   Dl . 10 3                           X Weld 550400   HX-60-42                                                                             Code Case N-491"1 Heat Exchanger Support Fl 40 ~                                                      **N/A*~
X


DATE: 10/15/99 REVISION: 0 NINE MILE POZNT NUCLEAR PLANT UNIT 1 ZNSERVICE INSPECTION TEN-YEAR PLAN CLASS 3 SECTION XI SCHEDULED COMPONENTS PAGE: 228 t Fuel Pool Cooling NUMBER: 54.0  
DATE: 10/15/99                             NINE MILE POZNT NUCLEAR PLANT UNIT 1                           PAGE: 228 REVISION:        0                          ZNSERVICE INSPECTION TEN-YEAR PLAN CLASS 3 SECTION XI SCHEDULED COMPONENTS t Fuel   Pool Cooling NUMBER: 54 . 0 INSPECTION INTERVAL                        PLAN STATUS            PRESERVICE YEAR FIRST          SECOND      THIRD SEC. XI            PERIOD        PERIOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL SEC.XI CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR INSTRUCTIONS
EXAMINATION AREA         CATEGY      NDE                  OUTAGE                          INSTRUCTIONS NUMBER     IDENTIFICATION         ITEM NO     METH     1   2 3 4   1   2 3 4   1 2 3 4 ~~CALIBRATION BLOCK~ ~
~~CALIBRATION BLOCK~~6.0" Spent Fuel Pool Cooling Line (REF.DWG.NO.C-27171-C) 551200 54-R1-B Rod Hanger F A F1.30 3 X Code Case N-491-1 iON/Afk 551600 54-R1"D Rod Hanger F-A F1.30 VT 3 3 X Code Case N-491-1+~N/A++552000 54-R1-H Rod Hanger F A Fl.30 VT-3 3 X Code Case N-491-1*AN/A*~552900 54-Rll-A Pipe Stanchion F-A Fl.30 Includes U-Bolt and protection saddle, Code Case N-491-1~~N/A+~00 54 R13-A Spring Hanger F1.30 3 X Code Case N-491-1~~N/A~+555000 54-R2-BA Rod Hanger F-A F1.30 VT-3 3 X Code Case N-491-1%AN/A**55S100 54-SCR-1E Seismic Box Restraint F1.30 VT-3 3 X Code Case N-491-1~~N/A~+558200 54-SCR" 1E"WD-001 D-A Code Case N-509**N/A**Integrally Welded Lug Dl~20 1 3 X 55S300 54-SCR-1E-WD-002 Integrally Welded Lug D1.20 2 3 X Code Case N-509**N/A~~  
6.0" Spent Fuel Pool Cooling Line       (REF. DWG. NO. C-27171-C) 551200     54-R1-B                 F A                                                         Code Case N-491-1 Rod Hanger              F1. 30                                                      iON/Afk 3              X 551600     54-R1"D                 F-A         VT 3                                           Code Case N-491-1 Rod Hanger              F1.30                                                        +~N/A++
3 X 552000     54-R1-H                 F A         VT-3                                           Code Case N-491-1 Rod Hanger              Fl . 30                                                      *AN/A*~
3              X 552900     54-Rll-A                 F-A                                                         Includes U-Bolt and Pipe Stanchion          Fl. 30                                                      protection saddle,   Code Case N-491-1 ~~N/A+~
00   54 R13-A                                                                             Code Case N-491-1 Spring Hanger            F1. 30                                                      ~~N/A~+
3              X 555000     54-R2-BA                 F-A         VT-3                                           Code Case N-491-1 Rod Hanger              F1.30                                                        %AN/A**
3              X 55S100     54-SCR-1E                             VT-3                                           Code Case N-491-1 Seismic Box  Restraint  F1.30                                                        ~~N/A~+
3              X 558200     54-SCR" 1E"WD-001       D-A                                                         Code Case N-509 **N/A**
Integrally Welded Lug   Dl 20
                                      ~
3             X 1
55S300     54-SCR-1E-WD-002                                                                     Code Case N-509 **N/A~~
Integrally Welded Lug    D1.20 3              X 2


DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 ZNSERVICE INSPECTION TEN-YEAR PLAN CLASS 3 SECTION XZ SCHEDULED COMPONENTS PAGE: 229 t Fuel Pool Cooling NUMBER: 54.0  
DATE: 10/15/99                               NINE MILE POINT NUCLEAR PLANT UNIT 1                           PAGE: 229 REVISION:        0                            ZNSERVICE INSPECTION TEN-YEAR PLAN CLASS 3 SECTION XZ SCHEDULED COMPONENTS t Fuel   Pool Cooling NUMBER: 54 . 0 INSPECTION INTERVAL                        PLAN STATUS            PRESERVZCE YEAR ASME                    FIRST        SECOND      THIRD SEC. XI              PERIOD        PERIOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL ASME SEC.XI CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVZCE YEAR INSTRUCTIONS
EXAMINATION AREA         CATEGY        NDE                  OUTAGE                          INSTRUCTIONS NUMBER       IDENTIFICATION         ITEM NO     METH     1 2 3 4   1   2 3 4   1 2 3 4 ~ ~CALIBRATION BLOCK~*
~~CALIBRATION BLOCK~*558400 54 SCR 1E-WD-003 D-A Code Case N-509~*N/A*~Zntdgrally Welded Lug D1.20 3 3 X 558500 54-SCR-1E-WD-004 D-A VT-1 Integrally Wcldcd Lug Dl.20 3 X Code Case N-509**N/A~*8.0" Spent Fuel Pool Cooling Line (REF.DWG.NO.C-27171-C) 563700 54-SCR-1N Seismic Box Restraint Fl~30 3 X Code Case N-491-1 eaN/Ass 563800 54-SCR-1N-WD-001 D-A Code Case N 509~+N/A++Integrally Welded I.ug D1.20 1 3 X 563900 54-SCR-1N-WD-002 D-A VT-1 Code Case N-509+iN/Aii Integrally Welded Lug D1.20 2 3 X 564000 54"SCR-1N-WD-003 D-A Code Casa N-509~~N/Ai~Integrally Welded Lug D1.20 3 3 X 564100 54"SCR-1N-WD-004 D-A VT-1 Integrally Welded Lug Dl~20 4 3 X Code Case N-509~~N/Ai~  
558400     54 SCR 1E-WD-003         D-A                                                           Code Case N-509 ~*N/A*~
Zntdgrally Welded Lug D1.20 3             X 3
558500     54-SCR-1E-WD-004         D-A           VT-1                                           Code Case N-509 **N/A~*
Integrally  Wcldcd Lug  Dl. 20 3              X 8.0" Spent Fuel Pool Cooling Line       (REF. DWG. NO. C-27171-C) 563700     54-SCR-1N                                                                             Code Case N-491-1 Seismic Box  Restraint  Fl  ~ 30                                                      eaN/Ass 3                            X 563800     54-SCR-1N-WD-001         D-A                                                           Code Case N 509 ~+N/A++
Integrally Welded I.ug D1.20 3                             X 1
563900     54-SCR-1N-WD-002         D-A           VT-1                                           Code Case N-509   +iN/Aii Integrally Welded Lug   D1.20 3                             X 2
564000     54"SCR-1N-WD-003         D-A                                                           Code Casa N-509 ~~N/Ai~
Integrally Welded Lug   D1.20 3                             X 3
564100     54"SCR-1N-WD-004         D-A           VT-1                                           Code Case N-509 ~~N/Ai~
Integrally  Welded Lug  Dl 20
                                      ~
3                            X 4


DATE: 10/15/99 REVISION: 0 NINE HYLE POINT NUCLEAR PLANT UNIT 1 INSERVZCE INSPECTION TEN-YEAR PLAN CLASS 3 SECTION XI SCHEDULED COHPONENTS PAGE: 230 t Fuel Pool Cooling NUMBER: 54.0 SUHHARY EXAHZNATZON AREA NUMBER IDENTIFICATION INSPECTION ZNTERVAL ASME SEC.XZ CATEGY NDE ITEH NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVZCE YEAR INSTRUCTIONS
DATE: 10/15/99                             NINE HYLE POINT NUCLEAR PLANT UNIT 1                             PAGE: 230 REVISION:        0                            INSERVZCE INSPECTION TEN-YEAR PLAN CLASS 3 SECTION XI SCHEDULED COHPONENTS t Fuel   Pool Cooling NUMBER: 54 . 0 INSPECTION ZNTERVAL                       PLAN STATUS            PRESERVZCE YEAR ASME                 FIRST          SECOND      THIRD SEC. XZ               PERIOD        PERIOD      PERIOD SUHHARY    EXAHZNATZON AREA          CATEGY       NDE                 OUTAGE                          INSTRUCTIONS NUMBER      IDENTIFICATION          ITEH   NO   METH   1   2 3 4   1   2 3 4   1 2 3 4 ~ ~CALIBRATION BLOCK~ ~
~~CALIBRATION BLOCK~~567100 54-SCR-3BA F-A Seismic Box Restraint F1.30 3 X 6.0" Spent Fuel Pool Cooling Line (REF.DWG.NO.C-27171-C)
6.0" Spent Fuel Pool Cooling Line       (REF. DWG. NO. C-27171-C) 567100    54-SCR-3BA                F-A                                                          Code Case N-491-1 Seismic Box  Restraint  F1.30                                                        ktN/A%4 3              X 567200     54-SCR-3BA-WD-001                                                                     Code Case N-509 ++N/A~~
Code Case N-491-1 ktN/A%4 567200 54-SCR-3BA-WD-001 Integrally Welded Lug D1.20 1 3 X Code Case N-509++N/A~~567300 54-SCR-3BA-WD-002 Integrally Welded I.ug Dl.20 2 VT 1 3 X Code Case N-509+*N/A**567400 54-SCR" 3BA-WD-003 D A Integrally Welded Lug D1.20 3 3 X Code Case N 509*+N/A++567500 54-SCR-3BA WD 004 D-A Code Case N-509**N/A~*Integrally Woldcd Lug D1.20 4 3 X 567600 54-SCR-3BA-WD-005 D-A VT-1 Code Case N-509*~N/A~~Integrally Welded Lug D1.20 5 3 X 567700 54"SCR-3BA-WD-006 D-A Integrally Welded Lug D1.20 6 VT" 1 3 X Code Case N-509++N/A++567800 54-SCR-3BA-WD-007 Integrally Welded Lug D1.20 7 VT 1 3 X Code Case N-509++N/Ai+  
Integrally  Welded Lug    D1.20 3              X 1
567300     54-SCR-3BA-WD-002                       VT 1                                           Code Case N-509 +*N/A**
Integrally  Welded I.ug  Dl. 20 3              X 2
567400     54-SCR" 3BA-WD-003       D A                                                         Code Case N 509 *+N/A++
Integrally Welded Lug    D1.20 3              X 3
567500     54-SCR-3BA WD 004       D-A                                                         Code Case N-509 **N/A~*
Integrally Woldcd Lug   D1.20 3             X 4
567600     54-SCR-3BA-WD-005         D-A         VT-1                                           Code Case N-509 *~N/A~~
Integrally Welded Lug   D1.20 3             X 5
567700     54"SCR-3BA-WD-006         D-A         VT"1                                           Code Case N-509 ++N/A++
Integrally  Welded Lug    D1.20 3              X 6
567800     54-SCR-3BA-WD-007                     VT 1                                           Code Case N-509 ++N/Ai+
Integrally  Welded Lug    D1.20 3              X 7


DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 ZNSERVICE INSPECTION TEN-YEAR PLAN CLASS 3 SECTION XI SCHEDULED COMPONENTS PAGE: 231 t Fuel Pool Cooling NUMBER: 54.0  
DATE: 10/15/99                             NINE MILE POINT NUCLEAR PLANT UNIT 1                           PAGE: 231 REVISION:        0                          ZNSERVICE INSPECTION TEN-YEAR PLAN CLASS 3 SECTION XI SCHEDULED COMPONENTS t Fuel   Pool Cooling NUMBER: 54 . 0 INSPECTION INTERVAL                      PLAN STATUS            PRESERV ICE YEAR ASME                  FIRST        SECOND      THIRD SEC. XI            PERIOD        PERIOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL ASME SEC.XI CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERV ICE YEAR INSTRUCTIONS
EXAMINATION AREA         CATEGY      NDE                  OUTAGE                        INSTRUCTIONS NUMBER       IDENTIFICATION         ITEM NO   METH     1   2 3 4   1   2 3 4   1 2 3 4 +~CALIBRATION BLOCK~~
+~CALIBRATION BLOCK~~567900 54-SCR-3BA-WD-008 D-A Integrally Welded Lug Dl.20 8 3 X Code Case N-509<<*N/A~~571500 54-SCR-5F F"A Seismic Box Restraint F1.30 3 X 8.0" Spent Fuel Pool Cooling Line (REF.DWG.NO.C-27171-C)
567900     54-SCR-3BA-WD-008       D-A                                                         Code Case N-509 <<*N/A~~
Code Case N-491-1**N/A**571600 54-SCR-5F-WD-001 D-A Code Case N-509~~N/A~~Integrally Welded Lug D1.20 1 3 X 571700 54-SCR-5F-WD-002 D-A Code Case N-509~~N/A~~Integrally Wcldcd Lug D1.20 2 X 571800 54-SCR-5F-WD-003 D-A Code Case N-509~*N/A~i Integrally welded Lug D1.20 3 3 X 571900 54-SCR-5F-WD-004 D-A Code Case N-509~~N/A*~Integrally Welded Lug D1.20 4 3 X  
Integrally  Welded Lug  Dl. 20 3             X 8
8.0" Spent Fuel Pool Cooling Line     (REF. DWG. NO. C-27171-C) 571500    54-SCR-5F                F"A                                                        Code Case N-491-1 Seismic Box Restraint    F1.30                                                      **N/A**
3              X 571600     54-SCR-5F-WD-001         D-A                                                         Code Case N-509 ~~N/A~~
Integrally Welded Lug   D1.20 3             X 1
571700     54-SCR-5F-WD-002         D-A                                                         Code Case N-509 ~~N/A~~
Integrally Wcldcd Lug   D1.20 X
2 571800     54-SCR-5F-WD-003         D-A                                                         Code Case N-509 ~*N/A~i Integrally welded Lug   D1.20 3             X 3
571900     54-SCR-5F-WD-004         D-A                                                         Code Case N-509 ~~N/A*~
Integrally Welded Lug   D1.20 3             X 4


DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION TEN-YEAR PLAN CLASS 3 SECTION XI SCHEDULED COMPONENTS PAGE: 232 t Fuel Pool Cooling Filter 11 NUMBER: 54.0 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR  
DATE: 10/15/99                             NINE MILE POINT NUCLEAR PLANT UNIT 1                       PAGE: 232 REVISION:        0                          INSERVICE INSPECTION TEN-YEAR PLAN CLASS 3 SECTION XI SCHEDULED COMPONENTS t Fuel Pool Cooling Filter 11 NUMBER: 54 . 0 INSPECTION INTERVAL                     PLAN STATUS           PRESERVICE YEAR ASME                FIRST        SECOND      THIRD SEC. XZ              PERIOD      PERIOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 INSTRUCTIONS
EXAMINATION AREA         CATEGY      NDE                OUTAGE                        INSTRUCTIONS NUMBER     IDENTIFICATION           ITEM NO   METH   1 2 3 4 1   2 3 4   1 2 3 4 ~~CALIBRATION BLOCK~>
~~CALIBRATION BLOCK~>SFPCF 54-03 (REF.DWG.NO.C-27171-C) 574800 FP-54-03 F A VT-3 FP Filter 11 Support F1.40 3 X Coda Case N-491-1+~N/A~~  
SFPCF 54-03 (REF. DWG. NO. C-27171-C) 574800   FP-54-03                 F A       VT-3                                         Coda Case N-491-1 FP Filter 11 Support     F1.40                                                   +~N/A~~
3              X


DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 INSERVZCE INSPECTION TEN-YEAR PLAN CLASS 3 SECTION XI SCHEDULED COMPONENTS PAGE: 233 t Fuel Pool Cooling Heat Exchanger 12 NUMBER: 54.0 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR  
DATE: 10/15/99                               NINE MILE POINT NUCLEAR PLANT UNIT 1                         PAGE: 233 REVISION:        0                            INSERVZCE INSPECTION TEN-YEAR PLAN CLASS 3 SECTION XI SCHEDULED COMPONENTS t Fuel   Pool Cooling Heat Exchanger 12 NUMBER: 54 . 0 INSPECTION INTERVAL                       PLAN STATUS           PRESERVICE YEAR ASME                  FIRST        SECOND      THIRD SEC. XI            PERIOD      PERIOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC.XI CATEGY NDE ITEM NO METH FIRST PERIOD SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 INSTRUCTIONS t+CALIBRATION BLOCK**SFPCHE 54-04 (REF.DWG.NO.C-27171-C) 575300 FP 54-04 FP Hx 12 Support Fl.40 3 X Code Case N-491-1 e*N/Ase 575400 FP-54-04-WD-001 FP Hx 12 Front Integral Attachment D A D1.10 3 X Code Case N-509**N/A~*575500 FP-54-04-WD-002 FP Hx 12 Roar Integral D1.10 Attachment 3 X Code Case N-509**N/A*~
EXAMINATION AREA         CATEGY        NDE                OUTAGE                        INSTRUCTIONS NUMBER     IDENTIFICATION           ITEM NO       METH   1 2 3 4 1   2 3 4   1 2 3 4 t +CALIBRATION BLOCK**
E DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 ZNSERVICE INSPECTION TEN-YEAR PLAN CLASS 3 SECTION XI SCHEDULED COMPONENTS PAGE: 234 t Fuel Pool Cooling Pump 11 NUMBER: 54.0 INSPECTION INTERVAL PLAN STATUS PRESERVZCE YEAR  
SFPCHE 54-04 (REF. DWG. NO. C-27171-C) 575300     FP 54-04                                                                             Code Case N-491-1 FP Hx 12 Support         Fl . 40                                                   e*N/Ase 3              X 575400     FP-54-04-WD-001         D A                                                       Code Case N-509 **N/A~*
FP Hx 12  Front          D1. 10 3                            X Integral Attachment 575500   FP-54-04-WD-002                                                                       Code Case N-509 **N/A*~
FP Hx 12 Roar Integral D1.10 3                            X Attachment
 
E DATE: 10/15/99                           NINE MILE POINT NUCLEAR PLANT UNIT 1                       PAGE: 234 REVISION:        0                          ZNSERVICE INSPECTION TEN-YEAR PLAN CLASS 3 SECTION XI SCHEDULED COMPONENTS t Fuel Pool Cooling Pump 11 NUMBER: 54 . 0 INSPECTION INTERVAL                   PLAN STATUS           PRESERVZCE YEAR ASME                FIRST        SECOND      THIRD SEC. XI            PERIOD      PERIOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC.XI CATEGY NDE ITEM NO METH FIRST PERIOD SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 INSTRUCTIONS
EXAMINATION AREA         CATEGY    NDE                OUTAGE                        INSTRUCTIONS NUMBER     IDENTIFICATION           ITEM NO   METH     1 2 3 4 1   2 3 4   1 2 3 4 ~~CALIBRATZON BLOCK**
~~CALIBRATZON BLOCK**SFPCCP 54-01 (REF.DWG.NO.C-27171-C) 575600 FP-54-01 Pump Support F1.40 3 X Code Case N-491-1~+N/A~~  
SFPCCP 54-01 (REF. DWG. NO. C-27171-C) 575600   FP-54-01                                                                         Code Case N-491-1 Pump  Support            F1.40                                                    ~+N/A~~
3                            X


DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 ZNSERVICE INSPECTION TEN-YEAR PLAN CLASS 3 SECTION XZ SCHEDULED COMPONENTS PAGE: 235 t Fuel Pool Cooling Surge Tank NUMBER: 54.0 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR  
DATE: 10/15/99                           NINE MILE POINT NUCLEAR PLANT UNIT 1                         PAGE: 235 REVISION:        0                          ZNSERVICE INSPECTION TEN-YEAR PLAN CLASS 3 SECTION XZ SCHEDULED COMPONENTS t Fuel Pool Cooling Surge Tank NUMBER: 54 . 0 INSPECTION INTERVAL                   PLAN STATUS           PRESERVICE YEAR ASME                FIRST        SECOND      THIRD SEC. XZ              PERZOD      PERIOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERZOD SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 INSTRUCTIONS
EXAMINATION AREA         CATEGY    NDE                OUTAGE                        INSTRUCTIONS NUMBER     IDENTIFICATION           ITEM NO   METH     1 2 3 4 1   2 3 4   1 2 3 4 +*CALIBRATION BLOCK**
+*CALIBRATION BLOCK**SFPCST 54 68 (REF.DWG.NO.C-27171 C)575800 TK-54-68 Surge TK Support F1.40 VT 3 3 X Code Casa N-491-1 aaN/Awe  
SFPCST 54 68 (REF. DWG. NO. C-27171 C) 575800     TK-54-68                           VT 3                                         Code Casa N-491-1 Surge TK Support        F1.40                                                    aaN/Awe 3              X


DATE: 10/15/99 REVISION: NINE MILE POINT NUCLEAR PZANT UNIT 1 INSERVZCE INSPECTION TEN-YEAR PLAN CLASS 3 SECTION XZ SCHEDULED COMPONENTS PAGE: 236 t Fuel Pool Cooling System NUMBER: 57.0 INSPECTION INTERVAL PIAN STATUS PRESERVICE YEAR  
DATE: 10/15/99                             NINE MILE POINT NUCLEAR PZANT UNIT 1                         PAGE: 236 REVISION:                                    INSERVZCE INSPECTION TEN-YEAR PLAN CLASS 3 SECTION XZ SCHEDULED COMPONENTS t Fuel Pool Cooling System NUMBER: 57. 0 INSPECTION INTERVAL                       PIAN STATUS           PRESERVICE YEAR ASME                FIRST          SECOND      THIRD SEC. XZ              PERIOD        PERIOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATZON AREA NUMBER IDENTIFICATION ASME SEC.XZ CATEGY NDE ZTEM NO METH FIRST PERIOD SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 INSTRUCTIONS
EXAMINATZON AREA         CATEGY      NDE                  OUTAGE                        INSTRUCTIONS NUMBER     IDENTIFICATION           ZTEM NO     METH   1 2 3   4   1   2 3 4   1 2 3 4 **CALIBRATIONBLOCK~*
**CALIBRATION BLOCK~*Spent Fuel Pool Cooling Linc (REF.DWG.NO.C-27172-C) 576000 57-R3-C Pipe Stanchion Fl.30 VT 3 X U Bolt, Code Case N 491 1~~N/A++  
Spent Fuel Pool Cooling Linc (REF. DWG. NO. C-27172-C) 576000   57-R3-C                               VT 3                                           U Bolt, Code Case Pipe Stanchion          Fl. 30                                                      N 491 1 ~~N/A++
X


DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 ZNSERVICE INSPECTION TEN-YEAR PLAN CLASS 3 SECTION XI SCHEDULED COMPONENTS PAGE: 237 tor Building Closed Loop Cooling NUMBER: 70.0 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR  
DATE: 10/15/99                               NINE MILE POINT NUCLEAR PLANT UNIT 1                           PAGE: 237 REVISION:        0                            ZNSERVICE INSPECTION TEN-YEAR PLAN CLASS 3 SECTION XI SCHEDULED COMPONENTS tor Building   Closed Loop Cooling NUMBER: 70.0 INSPECTION INTERVAL                       PLAN STATUS             PRESERVICE YEAR ASME                  FIRST        SECOND      THIRD SEC. XI            PERIOD        PERIOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC.XI CATEGY NDE ITEM NO METH FIRST PERIOD SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 INSTRUCTIONS 11CALZBRATZON BLOCK11 RBCLC Line (REF.DWG.NO.C-26855-C) 582900 70-R17-D Rod Hanger F-A F1.30 VT-3 3 X Code Case N-491-1 11N/A11 583200 70-R17-I Rod Hanger Fl.30 VT-3 3 X Code Case N-491-1**N/A1*583700 70-Rl 7-N Rod Hanger F-A Fl.30 VT-3 3 X Code Case N-491-1 11N/A11 584000 70-R19-A Pipe Stanchion F-A Fl.30 3 X Code Case N-491-1 1 1N/A1 1 00 70-R19-B Pipe Stanchion F-A F1.30 3 X Code Case N-491-1*1N/A*1 584200 70-R19-C Pipe Stanchion F-A F1.30 3 X Code Case N-491-1 11N/A11 588400 70 R7 G Rod Hanger F-A Fl.30 3 X Code Case N-491-1 11N/A1 1 588500 70-Rj-H Rod Hanger F-A Fl.30 3 X Code Case N-491-1 11'N/A1*588600 70-R7-I Rod Hanger Fl.30 3 X Code Case N-491-1 11N/A11 590700 70 R9 A Pipe Stanchion F-A F1.30 3 X Code Case N-491-1 1 1N/A1 1  
EXAMINATION AREA         CATEGY      NDE                OUTAGE                          INSTRUCTIONS NUMBER     IDENTIFICATION           ITEM NO     METH     1 2 3 4   1   2 3 4   1 2 3 4 11CALZBRATZON BLOCK11 RBCLC Line   (REF. DWG. NO. C-26855-C) 582900     70-R17-D                 F-A         VT-3                                           Code Case N-491-1 Rod Hanger                F1.30                                                        11N/A11 3                            X 583200     70-R17-I                               VT-3                                           Code Case N-491-1 Rod Hanger                Fl . 30                                                      **N/A1*
3                            X 583700     70-Rl 7-N                 F-A         VT-3                                           Code Case N-491-1 Rod Hanger                Fl. 30                                                      11N/A11 3                            X 584000     70-R19-A                 F-A                                                         Code Case N-491-1 Pipe Stanchion            Fl . 30                                                    1 1N/A1 1 3                            X 00   70-R19-B                 F-A                                                         Code Case N-491-1 Pipe Stanchion            F1.30                                                      *1N/A*1 3                            X 584200     70-R19-C                 F-A                                                         Code Case N-491-1 Pipe Stanchion            F1.30                                                      11N/A11 3                            X 588400     70 R7 G                 F-A                                                         Code Case N-491-1 Rod Hanger                Fl. 30                                                      11N/A1 1 3                            X 588500     70-Rj-H                   F-A                                                         Code Case N-491-1 Rod Hanger                Fl . 30                                                    11'N/A1*
3                            X 588600     70-R7-I                                                                               Code Case N-491-1 Rod Hanger                Fl . 30                                                    11N/A11 3                            X 590700   70 R9 A                   F-A                                                         Code Case N-491-1 Pipe Stanchion            F1. 30                                                      1 1N/A1 1 3              X


DATE: 10/15/99 REVZSZON: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 ZNSERVZCE ZNSPECTZON TEN-YEAR PLAN CLASS 3 SECTION XZ SCHEDULED COMPONENTS PAGE: 238 tor Buf.lding Closed Loop Cooling NUMBER: 70.0 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR  
DATE: 10/15/99                             NINE MILE POINT NUCLEAR PLANT UNIT 1                           PAGE: 238 REVZSZON:        0                          ZNSERVZCE ZNSPECTZON TEN-YEAR PLAN CLASS 3 SECTION XZ SCHEDULED COMPONENTS tor Buf.lding   Closed Loop Cooling NUMBER:   70. 0 INSPECTION INTERVAL                     PLAN STATUS             PRESERVICE YEAR ASME                FIRST        SECOND      THIRD SEC. XI            PERIOD        PERIOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATZON AREA NUMBER ZDENTZFZCATZON ASME SEC.XI CATEGY NDE ITEM NO METH FIRST PERIOD SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 INSTRUCTIONS
EXAMINATZON AREA         CATEGY      NDE                OUTAGE                          INSTRUCTIONS NUMBER     ZDENTZFZCATZON           ITEM NO   METH     1 2 3 4   1   2 3 4   1 2 3 4 ~ ~CALIBRATION BLOCK**
~~CALIBRATION BLOCK**590800 70 R9 A WD 001 Pipe Stanchion D A D1.20 VT-1 3 X Code Case N 509++N/A~~591700 70-R9-F Pipe Stanchion F-A F1.30 VT-3 3 X Code Case N-491-1++N/A++591800 70-R9-F-WD-001 Pipe Stanchion D-A D1.20 VT-1 3 X Code Case N-509 a*N/Ass 592300 70-83 Pipe Stanchion F"A Fl.30 3 X Code Case N-491-1 ssN/A*a70"S3-WD-001 Pipe Stanchion Dl.20 VT" 1 3 X Code Case N-509+~N/A~+594500 70-SC-3 Seismic Box Restraint F1.30 VT 3 3 X Code Case N-491-1 aaN/Att 597200 70-SC-8 F A Seismic Box Restraint F1.30 3 X Code Case N-491-1~~N/A**597300 70-SC-9 F-A Code Case N-491-1 Seismic Pipe Restraint F1.30 3 X aaN/Aea 599900 70 SCR-SA Box Restraint F A F1.30 3 X Code Case N-491-1**N/A**600000 70 SCR SA WD 001 Integral Attachment D-A D1.20 3 X Code Case N-509+~N/A++  
590800     70 R9 A   WD 001         D A       VT-1                                           Code Case N 509 ++N/A~~
Pipe Stanchion            D1.20 3              X 591700     70-R9-F                   F-A         VT-3                                           Code Case N-491-1 Pipe Stanchion            F1.30                                                      ++N/A++
3              X 591800     70-R9-F-WD-001           D-A         VT-1                                           Code Case N-509 a*N/Ass Pipe Stanchion            D1.20 3              X 592300     70-83                     F"A                                                       Code Case N-491-1 Pipe Stanchion            Fl. 30                                                    ssN/A*a 3                            X 70 "S3-WD-001                         VT"1                                           Code Case N-509 +~N/A~+
Pipe Stanchion            Dl. 20 3                            X 594500     70-SC-3                               VT 3                                           Code Case N-491-1 Seismic Box Restraint    F1.30                                                      aaN/Att 3                            X 597200     70-SC-8                   F A                                                       Code Case N-491-1 Seismic Box Restraint    F1.30                                                      ~~N/A**
3              X 597300     70-SC-9                   F-A                                                       Code Case N-491-1 Seismic Pipe Restraint F1.30                                                         aaN/Aea 3              X 599900     70 SCR-SA                 F A                                                       Code Case N-491-1 Box Restraint            F1.30                                                      **N/A**
3                            X 600000     70 SCR SA   WD 001       D-A                                                       Code Case N-509 +~N/A++
Integral Attachment      D1.20 3                            X


DATE: 10/15/99 REVISION: 0 NINE HZLE POINT NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION TEN-YEAR PLAN CLASS 3 SECTION XI SCHEDULED COHPONENTS PAGE: 239 tor Building Closed Loop Cooling NUMBER: 70.0 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR SUHMARY EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC.XI CATEGY NDE ITEM NO METH FIRST PERZOD SECOND PERIOD OUTAGE THIRD PERZOD 1 2 3 4'1 2 3 4 1 2 3 4 INSTRUCTIONS
DATE: 10/15/99                           NINE HZLE POINT NUCLEAR PLANT UNIT 1                           PAGE: 239 REVISION:        0                          INSERVICE INSPECTION TEN-YEAR PLAN CLASS 3 SECTION XI SCHEDULED COHPONENTS tor Building Closed Loop Cooling NUMBER: 70. 0 INSPECTION INTERVAL                     PLAN STATUS           PRESERVICE YEAR ASME                 FIRST        SECOND      THIRD SEC. XI             PERZOD        PERIOD      PERZOD SUHMARY  EXAMINATION AREA        CATEGY     NDE                 OUTAGE                          INSTRUCTIONS NUMBER    IDENTIFICATION          ITEM NO     METH   1 2 3 4 '1   2 3 4   1 2 3 4 ~ ~CALIBRATION BLOCK~*
~~CALIBRATION BLOCK~*600100 70-SCR-BA-WD-002 Integral Attachment D-A D1.20 VT 1 3 X Code Case N-509++N/A++600200 70-SCR-BA-WD-003 Integral Attachment D A D1.20 3 X Code Case N-509 i~N/A~~600300 70-SCR-BA-WD-004 Integral Attachment D-A Dl.20 3 X Coda Case N-509*~N/A*~601800 70-SR-23 Seismic Box Restraint F1.30 3 X A~Code Case N-491-1*I'N/At*70-SR-24 Seismic Box Restraint F1.30 VT-3 3 Code Case N-491-1+AN/Ate 602200 70-SR-27 Seismic Box Restraint F1.30 VT 3 3 X Codo Case N-491-1/AP a  
600100   70-SCR-BA-WD-002       D-A         VT 1                                         Code Case N-509 ++N/A++
Integral Attachment    D1.20 3                            X 600200   70-SCR-BA-WD-003       D A                                                       Code Case N-509 i~N/A~~
Integral Attachment    D1.20 3                            X 600300   70-SCR-BA-WD-004       D-A                                                       Coda Case N-509 *~N/A*~
Integral Attachment    Dl. 20 3                            X A        ~
601800   70-SR-23                                                                           Code Case N-491-1 Seismic Box Restraint  F1.30                                                      *I'N/At*
3                            X 70-SR-24                           VT-3                                           Code Case N-491-1 Seismic Box Restraint  F1.30                                                      +AN/Ate 3
602200   70-SR-27                           VT 3                                           Codo Case N-491-1 Seismic Box Restraint  F1.30                                                          /AP a 3                            X


DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 ZNSERVICE INSPECTION TEN-YEAR PLAN CIASS 3 SECTION XI SCHEDULED COMPONENTS PAGE: 240 tor Building Closed Loop Cooling Heat Exchange NUMBER: 70.0 INSPECTION INTERVAL PLAN STATUS PRESERVZCE YEAR  
DATE: 10/15/99                               NINE MILE POINT NUCLEAR PLANT UNIT 1                         PAGE: 240 REVISION:        0                            ZNSERVICE INSPECTION TEN-YEAR PLAN CIASS 3 SECTION XI SCHEDULED COMPONENTS tor Building Closed     Loop Cooling Heat Exchange NUMBER:   70. 0 INSPECTION INTERVAL                     PLAN STATUS           PRESERVZCE YEAR ASME                FIRST        SECOND      THIRD SEC. XZ              PERIOD        PERIOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 INSTRUCTIONS
EXAMINATION AREA           CATEGY      NDE                OUTAGE                        INSTRUCTIONS NUMBER     IDENTIFICATION             ITEM NO   METH     1 2 3 4   1   2 3 4   1 2 3 4 *+CALIBRATION BLOCK~~
*+CALIBRATION BLOCK~~RBCLCHE 70-13R (REF.DWG.NO.C-26855-C) 603400 70-13R F-A VT-3 RBCLCHE Support Fl.40 3 X Code Case N-491-1~~N/A~~603500 70 13R-WD-001 D-A Code Case N-509~~N/A~~RBCLCHE Front Integral D1.10 Attachment 3 X 603600 70-13R-WD-002 RBCLCHE Rear Integral D1.10 Attachment 3 X Code Case N-509++N/A~~  
RBCLCHE   70-13R (REF. DWG. NO. C-26855-C) 603400   70-13R                     F-A         VT-3                                           Code Case N-491-1 RBCLCHE    Support        Fl. 40                                                    ~~N/A~~
3 X 603500   70 13R-WD-001             D-A                                                       Code Case N-509 ~~N/A~~
RBCLCHE   Front Integral D1.10 3 X Attachment 603600   70-13R-WD-002                                                                         Code Case N-509 ++N/A~~
RBCLCHE    Rear Integral  D1.10 3 X Attachment


DATE: 10/15/99 REVISZON: 0 NINE MILE POZNT NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION TEN-YEAR PLAN CLASS 3 SECTION XZ SCHEDULED COMPONENTS PAGE: 241 tor Building Closed Loop Cooling MU Tank NUMBER: 70.0 INSPECTION INTERVAL PLAN STATUS PRESERVZCE YEAR  
DATE: 10/15/99                             NINE MILE POZNT NUCLEAR PLANT UNIT 1                         PAGE: 241 REVISZON:        0                            INSERVICE INSPECTION TEN-YEAR PLAN CLASS 3 SECTION XZ SCHEDULED COMPONENTS tor Building Closed   Loop Cooling   MU   Tank NUMBER: 70.0 INSPECTION INTERVAL                     PLAN STATUS           PRESERVZCE YEAR ASME                  FIRST      SECOND      THIRD SEC. XZ                PERIOD      PERIOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 INSTRUCTIONS
EXAMINATION AREA         CATEGY      NDE                OUTAGE                        INSTRUCTIONS NUMBER     IDENTIFICATION           ITEM NO     METH     1 2   3 4 1   2 3 4   1 2 3 4 ~~CALIBRATION BLOCK*~
~~CALIBRATION BLOCK*~RBCLC M.U.Tank 71-126 (REF.DNG.NO.C-26855-C) 604300 71-126 F-A VT-3 CLC M.U.Tank Fi.40 3 X Code Case N-491-1 1 4N/A1 4  
RBCLC M.U. Tank 71-126 (REF. DNG. NO. C-26855-C) 604300   71-126                   F-A           VT-3                                         Code Case N-491-1 CLC M.U. Tank           Fi . 40                                                   1 4N/A1 4 3                          X


DATE: 10/15/99 REVZSZON: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION TEN-YEAR PLAN CLASS 3 SECTION XZ SCHEDULED COMPONENTS PAGE: 242 tor Building Closed Loop Cooling Pump NUMBER: 70.0 INSPECTION INTERVAL PLAN STATUS PRESERVZCE YEAR  
DATE: 10/15/99                             NINE MILE POINT NUCLEAR PLANT UNIT 1                           PAGE: 242 REVZSZON:        0                          INSERVICE INSPECTION TEN-YEAR PLAN CLASS 3 SECTION XZ SCHEDULED COMPONENTS tor Building   Closed Loop Cooling   Pump NUMBER: 70 . 0 INSPECTION INTERVAL                     PLAN STATUS           PRESERVZCE YEAR ASME                FIRST        SECOND      THIRD SEC. XZ              PERIOD        PERIOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA IDENTIFICATION ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 INSTRUCTIONS
EXAMINATION AREA           CATEGY     NDE                 OUTAGE                          INSTRUCTIONS IDENTIFICATION            ITEM NO   METH   1 2 3 4   1   2 3 4   1 2 3 4 '~
'~~CALIBRATION BLOCK*+RBCLCP 70-01 (REF.DWG.NO.C-26855-C) 604400 70-01 RBCLC Pump Support F1.40 3 X Coda Case N-491-1 eeN/Ate  
                                                                                                ~CALIBRATION BLOCK*+
RBCLCP 70-01 (REF. DWG. NO. C-26855-C) 604400   70-01                                                                               Coda Case N-491-1 RBCLC Pump  Support      F1.40                                                    eeN/Ate 3                            X


DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 INSERVZCE INSPECTION TEN-YEAR PLAN CLASS 3 SECTION XZ SCHEDULED COMPONENTS PAGE: 243 gency Service Water NUMBER: 72.0  
DATE: 10/15/99                             NINE MILE POINT NUCLEAR PLANT UNIT 1                         PAGE: 243 REVISION:        0                          INSERVZCE INSPECTION TEN-YEAR PLAN CLASS 3 SECTION XZ SCHEDULED COMPONENTS gency Service Water NUMBER: 72.0 ZNSPECTION ZNTERVAL                      PLAN STATUS            PRESERVZCE YEAR ASME                  FIRST        SECOND      THIRD SEC. XZ                PERIOD      PERIOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION ZNSPECTION ZNTERVAL ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVZCE YEAR INSTRUCTIONS
EXAMINATION AREA         CATEGY      NDE                OUTAGE                        INSTRUCTIONS NUMBER     IDENTIFICATION           ITEM   NO   METH   1 2 3 4 1   2 3 4   1 2 3 4 ~~CALIBRATION BLOCK~~
~~CALIBRATION BLOCK~~ESW Line (REF.DWG.NO.F-45235-C) 604700 72-Al Pipe Stanchion F-A F1.30 3 X Code Case N-491-1++N/A++604800 72-Al-WD-001 Pipe Stanchion D-A D1.20 3 Code Case N-509**N/A**604900 72-A2 Pipe Stanchion F-A F1.30 3 X Code Case N-491-1++N/A++605000 72-A2-WD-001 Pipe Stanchion D-A D1.20 VT 1 3 X Code Case N-509~~N/A++00 72-H159 Rod Hanger F1.30 VT-3 3 X Code Case N-491-1@AN/Aea 607600 72-H162 Rod Hanger F1.30 VT-3 3 X Code Case N-491-1+~N/A++607700 72-H163 Rod Hanger Fl.30 3 X Code Case N-491-1*~N/A~*608700 72-SC-4 Seismic Restraint F-A F1.30 3 X Code Case N-491-1 i*N/Af f
ESW Line (REF. DWG. NO. F-45235-C) 604700     72-Al                   F-A                                                       Code Case N-491-1 Pipe Stanchion          F1.30                                                      ++N/A++
3                            X 604800     72-Al-WD-001             D-A                                                       Code Case N-509   **N/A**
Pipe Stanchion          D1.20 3
604900     72-A2                   F-A                                                       Code Case N-491-1 Pipe Stanchion          F1.30                                                      ++N/A++
3                            X 605000     72-A2-WD-001             D-A         VT 1                                         Code Case N-509 ~~N/A++
Pipe Stanchion          D1.20 3                            X 00   72-H159                               VT-3                                         Code Case N-491-1 Rod Hanger              F1.30                                                      @AN/Aea 3 X 607600     72-H162                               VT-3                                         Code Case N-491-1 Rod Hanger              F1.30                                                      +~N/A++
3 X 607700     72-H163                                                                             Code Case N-491-1 Rod Hanger                Fl. 30                                                    *~N/A~*
3 X 608700     72-SC-4                 F-A                                                       Code Case N-491-1 Seismic Restraint        F1.30                                                      i*N/Aff 3              X


DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 INSERVZCE INSPECTION TEN-YEAR PLAN CLASS 3 SECTION XI SCHEDULED COMPONENTS PAGE: 244 gcncy Service Water Pump 11 INSPECTION ZNTERVAI PLAN STATUS PRESERVZCE YEAR  
DATE: 10/15/99                           NINE MILE POINT NUCLEAR PLANT UNIT 1                         PAGE: 244 REVISION:        0                          INSERVZCE INSPECTION TEN-YEAR PLAN CLASS 3 SECTION XI SCHEDULED COMPONENTS gcncy Service Water Pump 11 INSPECTION ZNTERVAI                     PLAN STATUS           PRESERVZCE YEAR ASME                FIRST        SECOND      THIRD SEC. XI            PERIOD        PERIOD      PERZOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC.XI CATEGY NDE ITEM NO METH FIRST PERIOD SECOND PERIOD OUTAGE THIRD PERZOD 1 2 3 4 1 2 3 4 1 2 3 4 INSTRUCTIONS
EXAMINATION AREA         CATEGY      NDE                  OUTAGE                        INSTRUCTIONS NUMBER     IDENTIFICATION         ITEM NO     METH   1 2 3 4   1   2 3   4 1 2 3 4 +~CALIBRATION BLOCK~~
+~CALIBRATION BLOCK~~ESWP 72-04 (REF.DWG.NO.F-45235-C) 613300 72-04 Pump Support F1.40 3 Code Casa N-491-1%AN/APk 1  
ESWP 72-04 (REF. DWG. NO. F-45235-C) 613300   72-04                                                                             Code Casa N-491-1 Pump  Support          F1. 40                                                    %AN/APk 3
1


DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 INSERVZCE INSPECTION TEN-YEAR PLAN CLASS 3 SECTION XZ SCHEDULED COMPONENTS PAGE: 245 tor Containment Spray NUMBER: 93.0  
DATE: 10/15/99                             NINE MILE POINT NUCLEAR PLANT UNIT 1                         PAGE: 245 REVISION:        0                          INSERVZCE INSPECTION TEN-YEAR PLAN CLASS 3 SECTION XZ SCHEDULED COMPONENTS tor Containment Spray NUMBER: 93.0                                                                           PRESERVZCE YEAR INSPECTION ZNTERVAL                      PLAN STATUS ASME                  FIRST        SECOND      THIRD SEC. XI              PERIOD      PERIOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMZNATZON AREA NUMBER IDENTIFICATION INSPECTION ZNTERVAL ASME SEC.XI CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVZCE YEAR INSTRUCTZONS
EXAMZNATZON AREA       CATEGY      NDE                OUTAGE                          INSTRUCTZONS NUMBER     IDENTIFICATION         ITEM NO     METH     1 2 3 4 1   2 3 4   1 2 3 4 >>>>CALIBRATION BLOCK>>>>
>>>>CALIBRATION BLOCK>>>>12.0" Raw Water Linc (REF.DWG.NO.16)613700 93-H3 F A VT-3 Gravity Support Fl.30 I 3 X Code Case N-491-1*>>N/A>>>>613900 93-HS Gravity Support F A F1.30 VT 3 3 X Code Case N-491-1**N/A>>*614100 93-H7 Gravity Support F1.30 3 X Code Case N-491-1**N/A*>>615100 93-R10-A Rod Hanger Fl.30 VT 3 3 X Code Case N-491-1**N/A>>*00 93 Rll A2 Rod Hanger F1.30 VT-3 3 X Code Case N-491-1>>>>N/A>>>>616400 93-R13-B Rod Hanger F-A VT 3 F1.30 3 X Code Case N-491-1>>>>N/A>>>>617500 93-R16-A Pipe Stanchion F-A Fl.30 3 X Code Case N-491-1>>>>N/A>>>>617600 93-R16-A-WD-001 Pipe Stanchion D-A Dl.20 VT-1 3 X Code Case N-509**N/A>>>>617700 93-R16-B Pipe Stanchion F-A F1.30 3 X Code Case N-491-1>>>>'N/A>>>>617900 93-R16-C Pipe Stanchion F-A F1.30 VT-3 3 X Code Case N-491-1**N/A**  
12.0" Raw Water Linc (REF. DWG. NO. 16) 613700     93-H3                   F A           VT-3                                         Code Case N-491-1 Gravity Support        Fl . 30                                    I                *>>N/A>>>>
3 X 613900     93-HS                   F A           VT 3                                         Code Case N-491-1 Gravity Support        F1.30                                                      **N/A>>*
3 X 614100     93-H7                                                                               Code Case N-491-1 Gravity Support        F1.30                                                      **N/A*>>
3 X 615100     93-R10-A                             VT 3                                         Code Case N-491-1 Rod Hanger              Fl . 30                                                    **N/A>>*
3            X 00     93 Rll A2                           VT-3                                           Code Case N-491-1 Rod Hanger              F1.30                                                      >>>>N/A>>>>
3            X 616400     93-R13-B               F-A         VT 3                                           Code Case N-491-1 Rod Hanger              F1.30                                                      >>>>N/A>>>>
3            X 617500     93-R16-A               F-A                                                         Code Case N-491-1 Pipe Stanchion          Fl. 30                                                      >>>>N/A>>>>
3 X 617600     93-R16-A-WD-001         D-A         VT-1                                           Code Case N-509 **N/A>>>>
Pipe Stanchion          Dl . 20 3 X 617700     93-R16-B               F-A                                                         Code Case N-491-1 Pipe Stanchion          F1.30                                                      >>>>'N/A>>>>
3 X 617900     93-R16-C               F-A         VT-3                                           Code Case N-491-1 Pipe Stanchion          F1.30                                                      **N/A**
3 X


DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 ZNSERVICE ZNSPECTION TEN-YEAR PLAN CLASS 3 SECTION XI SCHEDULED COMPONENTS PAGE: 246 tor Containment Spray NUMBER: 93.0  
DATE: 10/15/99                             NINE MILE POINT NUCLEAR PLANT UNIT 1                         PAGE: 246 REVISION:        0                          ZNSERVICE ZNSPECTION TEN-YEAR PLAN CLASS 3 SECTION XI SCHEDULED COMPONENTS tor Containment Spray NUMBER:   93.0 INSPECTION ZNTERVAZ                      PLAN STATUS            PRESERVICE YEAR FIRST        SECOND      THIRD SEC. XI            PERIOD        PERIOD      PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION ZNTERVAZ SEC.XI CATE GY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR INSTRUCTIONS saCALIBRATION BLOCK+t 618000 93 R16-C-WD-001 Pipe Stanchion D-A Dl.20 3 X Code Case N-509~*N/A*~621000 93-R2-C Spring Hanger F-A F1.30 3 X Code Case N-491-1 4 f N/A4 1 621100 93-R2-C"WD-001 Integral Attachment D-A Dl.20 3 X Code Case N-509~~N/A~~628300 93-SCR-10A Seismic Restraint F-A F1.30 3 X Code Case N-491-1*~N/A~~93-SCR 10B Seismic Restraint F-A F1.30 3 X Code Case N-491-1**N/A**637000 93-SCR-4A F"A Seismic Box Restraint F1.30 VT-3 3 X Code Case N-491-1**N/Af f 637100 93-SCR-4A-WD-001 Integral Attachment D-A D1.20 VT-1 3 X Code Case N-509~*N/A~~637200 93-SCR-4A-WD-002 Integral Attachment D1.20 3 X Code Case N-509+~N/A~~637300 93-SCR-4A-WD-003 D-A VT-1 Code Case N-509~*N/A~*Zntcgral Attachment D1.20 3 X 637400 93-SCR-4A-WD-004 D-A VT 1 Code Case N-509+*N/A~~Zntegral Attachment D1.20 3 X  
EXAMINATION AREA         CATE GY     NDE                 OUTAGE                        INSTRUCTIONS NUMBER      IDENTIFICATION          ITEM   NO   METH   1   2 3 4 1   2 3 4   1 2 3 4 saCALIBRATION BLOCK+ t 618000     93 R16-C-WD-001         D-A                                                       Code Case N-509 ~*N/A*~
Pipe Stanchion          Dl. 20 3 X 621000     93-R2-C                 F-A                                                       Code Case N-491-1 Spring Hanger            F1.30                                                      4 fN/A4 1 3 X 621100     93-R2-C"WD-001           D-A                                                       Code Case N-509 ~~N/A~~
Integral Attachment      Dl. 20 3 X 628300     93-SCR-10A               F-A                                                       Code Case N-491-1 Seismic Restraint        F1.30                                                      *~N/A~~
3              X 93-SCR 10B               F-A                                                       Code Case N-491-1 Seismic Restraint        F1.30                                                      **N/A**
3              X 637000     93-SCR-4A               F"A         VT-3                                         Code Case N-491-1 Seismic Box Restraint    F1.30                                                      **N/Aff 3 X 637100     93-SCR-4A-WD-001         D-A         VT-1                                         Code Case N-509 ~*N/A~~
Integral Attachment      D1.20 3 X 637200     93-SCR-4A-WD-002                                                                   Code Case N-509 +~N/A~~
Integral Attachment      D1.20 3 X 637300     93-SCR-4A-WD-003         D-A         VT-1                                         Code Case N-509 ~*N/A~*
Zntcgral Attachment     D1.20 3 X 637400     93-SCR-4A-WD-004         D-A         VT 1                                         Code Case N-509 +*N/A~~
Zntegral Attachment     D1.20 3 X
 
DATE: 10/15/99                              NINE HII E POINT NUCLEAR PLANT UNIT 1                        PAGE: 247 REVISION:        0                          INSERVICE ZNSPECTION TEN YEAR PLAN CLASS 3 SECTION XZ SCHEDULED COMPONENTS tor Containment Spray NUHBER: 93.0 INSPECTION INTERVAI                      PLAN STATUS            PRESERVICE YEAR ASME                  FIRST        SECOND      THIRD SEC. XI              PERIOD      PERIOD      PERIOD SUHHARY    EXAHI NATION AREA        CATEGY      NDE                  OUTAGE                        ZNSTRUCTZONS NUMBER      IDENTIFICATION            ITEM NO    METH    1  2  3  4  1  2  3  4  1  2  3  4  +*CALIBRATION BLOCK+*
642000    93-SCR-7A1                F A        VT-3                                          Code Case N-491-1 Seismic Box  Restraint  F1.30                                                      +*N/A*~
3 X 642100    93-SCR-7A1-WD-001                                                                    Code Case N 509 *+N/A*+
Integral Attachment      Dl. 20 3 X 642200    93-SCR-7A1-WD-002        D-A                                                        Code Case N-509 ++N/A++
Integral Attachment      D1.20 3 X 642300    93 SCR 7A1-WD-003                    VT 1                                          Code Case N-509 ~~N/A~~
Integral Attachment      D1.20 3 X 93-SCR-7A1 "WD-004        D  A        VT-1                                          Code Case N-509 4wN/Aiw Integral Attachment      D1.20 3 X 648000    93-SCR-9A                                                                            Code Case N-491-1 Seismic Box Restraint    F1.30                                                      ~+N/A+~
3 X 648100    93-SCR-9A-WD-001          D-A                                                        Code Case N-509 ~~N/A~+
Integral Attachment      Dl. 20 3 X 648200    93-SCR-9A"WD-002                      VT-1                                          Code Case N-509 +~N/A++
Integral Attachment      D1. 20 3 X 648300    93-SCR-9A-WD-003          D-A                                                        Code Case N-509 ~*N/A**
Integral Attachment        D1.20 3 X 648400    93 SCR-9A-WD-004                      VT-1                                          Code Case N-509 ++N/A~+
Integral Attachment        D1.20 3 X


DATE: 10/15/99 REVISION: 0 NINE HII E POINT NUCLEAR PLANT UNIT 1 INSERVICE ZNSPECTION TEN YEAR PLAN CLASS 3 SECTION XZ SCHEDULED COMPONENTS PAGE: 247 tor Containment Spray NUHBER: 93.0 SUHHARY EXAHI NATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAI ASME SEC.XI CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD THIRD PERIOD OUTAGE 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR ZNSTRUCTZONS
4 DATE: 10/15/99                             NINE MILE POINT NUCLEAR PLANT UNIT 1                       PAGE: 248 REVISION:       0                           INSERVICE INSPECTION TEN-YEAR PZAN CZASS 3 SECTION XZ SCHEDULED COMPONENTS tor Containment Spray   Raw Water Pump 111 NUMBER: 93. 0 INSPECTION INTERVAL                    PLAN STATUS           PRESERVICE YEAR ASME                FIRST        SECOND      THIRD SEC. XZ              PERIOD      PERIOD      PERZOD
+*CALIBRATION BLOCK+*642000 93-SCR-7A1 F A Seismic Box Restraint F1.30 VT-3 3 X Code Case N-491-1+*N/A*~642100 93-SCR-7A1-WD-001 Integral Attachment Dl.20 3 X Code Case N 509*+N/A*+642200 93-SCR-7A1-WD-002 Integral Attachment D-A D1.20 3 X Code Case N-509++N/A++642300 93 SCR 7A1-WD-003 Integral Attachment D1.20 VT 1 3 X Code Case N-509~~N/A~~93-SCR-7A1"WD-004 D A VT-1 Code Case N-509 4wN/Aiw Integral Attachment D1.20 3 X 648000 93-SCR-9A Seismic Box Restraint F1.30 3 X Code Case N-491-1~+N/A+~648100 93-SCR-9A-WD-001 D-A Integral Attachment Dl.20 3 X Code Case N-509~~N/A~+648200 93-SCR-9A"WD-002 Integral Attachment D1.20 VT-1 3 X Code Case N-509+~N/A++648300 93-SCR-9A-WD-003 D-A Code Case N-509~*N/A**Integral Attachment D1.20 3 X 648400 93 SCR-9A-WD-004 Integral Attachment D1.20 VT-1 3 X Code Case N-509++N/A~+
4 DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION TEN-YEAR PZAN CZASS 3 SECTION XZ SCHEDULED COMPONENTS PAGE: 248 tor Containment Spray Raw Water Pump 111 INSPECTION INTERVAL NUMBER: 93.0 PLAN STATUS PRESERVICE YEAR  


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD SECOND PERIOD OUTAGE THIRD PERZOD 1 2 3 4 1 2 3 4 1 2 3 4 INSTRUCTIONS
EXAMINATION AREA           CATEGY    NDE                OUTAGE                        INSTRUCTIONS NUMBER     IDENTIFICATION           ITEM NO   METH   1 2 3 4 1   2 3 4   1 2 3 4 ~*CALIBRATION BLOCK~ ~
~*CALIBRATION BLOCK~~RCSRWP 111 (REF.DWG.NO.16)649500 RWP-111 F-A VT-3 Pump Support F1.40 X Code Case N-491-1~~N/A~+  
RCSRWP 111   (REF. DWG. NO. 16) 649500   RWP-111                   F-A       VT-3                                         Code Case N-491-1 Pump  Support            F1.40                                                    ~~N/A~+
X
 
NINE MILE POINT                                        NMP1-ISI-003-1 0 V NlAGARA                                  NUCLEAR POWER STATION N U MOHAWK THIRD INSERVICE INSPECTION INTERVAL                              Rev.      0 TEN-YEAR INSERVICE INSPECTION                                Date:    October 15, 1999 PLAN AND SCHEDULE APPENDIXA ACCEPTANCE CRITERIA Indications detected by inservice examinations, shall be compared against the acceptance criteria of Section XI as defined in Tables A-1 through A-4.).
                                                              'ABLEA-1 CLASS::1:ACCEPTANCE STANDARDS EXAMINATION:
                            "                ,, COMPONENT;.,OR    PART EXAMINED",-      ,,-:,j-;gg '"ACCEPTANCE STANDARD CATEGORY 8-A                                Welds In Reactor Vessels                                  IW84510 B-B                                  Welds in Other Vessels                                  IW84510 8-D                                  Vessel Nozzle Wolds                                    IW84512 8-E                          Partial Penetration welds In Vessels                          IW84522 B-F, 84                    Dissimilar and Similar Metal Welds In Pl !n                        IW84514 8-G-1                                    Boltln > 2" dia.                                IW8451 5/3517 8-G-2                                    Boltin < 2" dla.                                    IW84517 B-H, 8-K-1          Into ralAttachmentsforPI      in, Valves  Pum s & Vessels                  IW84516 B-L-1, 8-M-1                            Welds In Pum s & Valves                                  IW84518 B-L-2, 8-M-2                        Pum    Casln s & Valvo Bodies                              IW8<519 8-N-1 8-N-2        Interior Surfaces & Internal Components of Reactor Vessels                  IW84520.1 8-N4                                                                                        IW84520.2 B-O                            Control Rod Drive Housln Welds                                IW84523 8-P                              Pressure Rotainin  Bounda                                  IW84522 8-0                                Steam Generator Tubln                                    IW84521 File: NMP1ISIPL.wpd
 
NINE MILE POINT                                      NMP1-ISI-003-1 0 V NIAGARA                                      NUCLEAR POWER STATION N UmomwK THIRD INSERVICE INSPECTION INTERVAL                          Rev.      0 TEN-YEAR INSERVICE INSPECTION                            Date:    October 15, 1999 PLAN AND SCHEDULE TABLE A-2 CLASS 2 ACCEPTANCE STANDARDS EXAMINATION                                                                                  ACCEPTANCE COMPONENT OR PART EXAMINED CATEGORY                                                                                    STANDARD C-A                            Welds In Pressure Vessels                                IWC4510 C-B                              Nozzle Welds In Vessels                                  IWC4511 C-C            Inte raIAttachmentsfor Vessels Pi In    Pum sand Valves                  IWC4512 C-D                                        Boltln                                        IWC4513 C-F-1, C-F-2                              Weids in Pi in                                      IWC4514 Welds In Pum s and Valves                                  IWC4515 C-H                          Pressure Retainln    Com onents                            IWC4516 TABLE AN CLASS 3 ACCEPTANCE STANDARDS EXAMINATION                      COMPONENT OR PART EXAMINED                                  ACCEPTANCE CATEGORY                                                                                    STANDARD D-A                              Pressure Boundary (VT-2)                      "No Leakage 'Mfg. Code &
Inte ral Attachments VTQ                              llcablo Standards D-B                              Pressure Boundary (VT-2)                      "No Leakage    'Mfg. Codo &
Inte ralAttachments VTQ                                llcablo Standards D-C                              Pressure Boundary (VT-2)                        IWA-5250 'Mfg. Code &
Into ral Attachments VTN                          A Ilcablo Standards ASME Section XI Acceptanco Standard in course of preparation.
Defined as no leakago from the pressure boundary, in excess of that which is expected and determined to bo within acceptablo limits, l.e., at valve packing, bolted connections, pump seals, etc.
TABLE A-4 COMPONENT SUPPORT ACCEPTANCE STANDARDS EXAMINATION                    COMPONENT OR PART EXAMINED                                ACCEPTANCE CATEGORY                                                                                  , STANDARD F-A                                      Su    rts                                    IWF-3410 File: NMP1ISIPL.wpd


N V NlAGARA U MOHAWK NINE MILE POINT NUCLEAR POWER STATION NMP1-ISI-003-1 0 THIRD INSERVICE INSPECTION INTERVAL Rev.0 TEN-YEAR INSERVICE INSPECTION PLAN AND SCHEDULE Date: October 15, 1999 APPENDIXA ACCEPTANCE CRITERIA Indications detected by inservice examinations, shall be compared against the acceptance criteria of Section XI as defined in Tables A-1 through A-4.).'ABLE A-1 CLASS::1:ACCEPTANCE STANDARDS EXAMINATION:
NINE MILE POINT                             NMP1-ISI-003-1 0 El Y NIAGARA                        NUCLEAR POWER STATION H kl MOHAWK THIRD INSERVICE INSPECTION INTERVAL                 Rev. 0 TEN-YEAR INSERVICE INSPECTION                   Date:   October 15, 1999 PLAN AND SCHEDULE APPENDIX B NONDESTRUCTIVE EXAMINATIONPROCEDURE LISTING NDEP      REVISION                                      TITLE VT 2.01      Note  1    "ASME XI Visual Examination Procedure" PT 3.00      Note  1   "Li uid Penetrant Examination Procedure" MT 4.00      Note  1    "Ma netic Particle Examination Procedure" RT 5.00      Note  1    "Radio ra hic Examination" UT 6.01      Note  1   "Ultrasonic Linearit Verification" UT 6.04      Note  1   "Ultrasonic Examination of Bolts, Studs, Nuts and Cylindrical Com onents" UT 6.05      Note  1   "Ultrasonic Thickness Measurement" UT 6.06      Note  1   "Ultrasonic IGSCC Sizin Procedure" Manual UT 6.07      Note  1   "Ultrasonic Examination of Nozzle Inner Radii" UT 6.09      Note  1   "Ultrasonic Examination Procedure for RPV Flange Weld and Stud Hole Threads in the RPV Flan e" UT 6.10      Note  1   "S stem Performance Checks" UT 6.13      Note  1    "Ultrasonic Examination of Bi-Metallic Pi in Welds" UT 6.15      Note  1    "Ultrasonic Examination to Determine Water Level" UT 6.16      Note  1    "Ultrasonic Thickness Measurement Utilizin Di ital E ui ment" UT 6.19      Note  1    "Freeze Seal Ultrasonic Examination Procedure for Ferritic Pipe and Fittin s" UT 6.20      Note  1    "Ultrasonic Examination of Reactor CRD Housin s" UT 6.21      Note  1    "Ultrasonic Examination Procedure for Vessel Welds 2" Thick or Less and Associated Nozzle Inner Radius Areas" UT 6.23      Note  1    "Ultrasonic Examination of Ferritic Pi e Welds" UT 6.24      Note  1    "Ultrasonic Examination of Austenitic Pi e Welds" UT 6.25      Note  1   "Strai ht Beam Ultrasonic Examination of Bolts and Studs" File: NMP1ISIPL.wpd
CATEGORY" 8-A B-B 8-D 8-E B-F, 84 8-G-1 8-G-2 B-H, 8-K-1 B-L-1, 8-M-1 B-L-2, 8-M-2 8-N-1 8-N-2 8-N4 B-O 8-P 8-0 ,, COMPONENT;.,OR PART EXAMINED",-,,-:,j-;gg Welds In Reactor Vessels Welds in Other Vessels Vessel Nozzle Wolds Partial Penetration welds In Vessels Dissimilar and Similar Metal Welds In Pl!n Boltln>2" dia.Boltin<2" dla.Into ralAttachmentsforPI in, Valves Pum s&Vessels Welds In Pum s&Valves Pum Casln s&Valvo Bodies Interior Surfaces&Internal Components of Reactor Vessels Control Rod Drive Housln Welds Pressure Rotainin Bounda Steam Generator Tubln'"ACCEPTANCE STANDARD IW 84510 IW84510 IW 84512 IW 84522 IW 84514 IW 8451 5/3517 IW 84517 IW84516 IW 84518 IW 8<519 IW 84520.1 IW 84520.2 IW84523 IW 84522 IW 84521 File: NMP1ISIPL.wpd  


N V NIAGARA UmomwK NINE MILE POINT NUCLEAR POWER STATION NMP1-ISI-003-1 0 THIRD INSERVICE INSPECTION INTERVAL Rev.0 TEN-YEAR INSERVICE INSPECTION PLAN AND SCHEDULE Date: October 15, 1999 TABLE A-2 CLASS 2 ACCEPTANCE STANDARDS EXAMINATION CATEGORY C-A C-B C-C C-D C-F-1, C-F-2 C-H COMPONENT OR PART EXAMINED Welds In Pressure Vessels Nozzle Welds In Vessels Inte raIAttachmentsfor Vessels Pi In Pum sand Valves Boltln Weids in Pi in Welds In Pum s and Valves Pressure Retainln Com onents ACCEPTANCE STANDARD IWC4510 IWC4511 IWC4512 IWC4513 IWC4514 IWC4515 IWC4516 TABLE AN CLASS 3 ACCEPTANCE STANDARDS EXAMINATION CATEGORY D-A D-B D-C COMPONENT OR PART EXAMINED Pressure Boundary (VT-2)Inte ral Attachments VTQ Pressure Boundary (VT-2)Inte ralAttachments VTQ Pressure Boundary (VT-2)Into ral Attachments VTN ACCEPTANCE STANDARD"No Leakage'Mfg.Code&llcablo Standards"No Leakage'Mfg.Codo&llcablo Standards IWA-5250'Mfg.Code&A Ilcablo Standards ASME Section XI Acceptanco Standard in course of preparation.
NINE MILE POINT                         NMP1-ISI-003-10 LI V NIAGARA                                        NUCLEAR POWER STATION a U MOHAWK THIRD INSERVICE INSPECTION INTERVAL               Rev. 0 TEN-YEAR INSERVICE INSPECTION                 Date:   October 15, 1999 PLAN AND SCHEDULE
Defined as no leakago from the pressure boundary, in excess of that which is expected and determined to bo within acceptablo limits, l.e., at valve packing, bolted connections, pump seals, etc.EXAMINATION CATEGORY F-A TABLE A-4 COMPONENT SUPPORT ACCEPTANCE STANDARDS COMPONENT OR PART EXAMINED Su rts ACCEPTANCE
                                              .." ';,",',: AP.P...END)X-:B
, STANDARD IWF-3410 File: NMP1ISIPL.wpd  
        ;;;:::.';-.".';
                        ': NONDESTRUCTIV.E'.EXAMlNATlON;PROCEDU,RE L'ISTING REVlSfON
                                        'P 7.00            Note 1        "Standard Method for Etchin Metals and Allo s" SP 7.01                Note 1        "Hardness Testin of Metals" SP 7.02                Note 1        "Visual Examination of Weldin      0 erations" SP 7.03                Note 1        "Visual Examination of Brazed Joints" SP 7.04                Note 1        "Measurin        Coatin Thickness b Use of Edd Current" SP 7.05                Note 1        "Weld Detection b Use of Edd Currents" ET 8.00                Note 1        "Eddy Current Examination of Nonferromagnetic Heat Exchange Tubing" See controlled copy of NDE Procedures for latest approved revision.
File: NMP1ISIPL.wpd


El Y NIAGARA H kl MOHAWK NINE MILE POINT NUCLEAR POWER STATION THIRD INSERVICE INSPECTION INTERVAL TEN-YEAR INSERVICE INSPECTION PLAN AND SCHEDULE NMP1-ISI-003-1 0 Rev.0 Date: October 15, 1999 APPENDIX B NONDESTRUCTIVE EXAMINATION PROCEDURE LISTING NDEP REVISION TITLE VT 2.01 PT 3.00 MT 4.00 RT 5.00 UT 6.01 UT 6.04 UT 6.05 UT 6.06 UT 6.07 UT 6.09 UT 6.10 UT 6.13 UT 6.15 UT 6.16 UT 6.19 UT 6.20 UT 6.21 UT 6.23 UT 6.24 UT 6.25 Note 1 Note 1 Note 1 Note 1 Note 1 Note 1 Note 1 Note 1 Note 1 Note 1 Note 1 Note 1 Note 1 Note 1 Note 1 Note 1 Note 1 Note 1 Note 1 Note 1"ASME XI Visual Examination Procedure""Li uid Penetrant Examination Procedure""Ma netic Particle Examination Procedure""Radio ra hic Examination""Ultrasonic Linearit Verification""Ultrasonic Examination of Bolts, Studs, Nuts and Cylindrical Com onents""Ultrasonic Thickness Measurement""Ultrasonic IGSCC Sizin Procedure" Manual"Ultrasonic Examination of Nozzle Inner Radii""Ultrasonic Examination Procedure for RPV Flange Weld and Stud Hole Threads in the RPV Flan e""S stem Performance Checks""Ultrasonic Examination of Bi-Metallic Pi in Welds""Ultrasonic Examination to Determine Water Level""Ultrasonic Thickness Measurement Utilizin Di ital E ui ment""Freeze Seal Ultrasonic Examination Procedure for Ferritic Pipe and Fittin s""Ultrasonic Examination of Reactor CRD Housin s""Ultrasonic Examination Procedure for Vessel Welds 2" Thick or Less and Associated Nozzle Inner Radius Areas""Ultrasonic Examination of Ferritic Pi e Welds""Ultrasonic Examination of Austenitic Pi e Welds""Strai ht Beam Ultrasonic Examination of Bolts and Studs" File: NMP1ISIPL.wpd  
NINE MILE POINT                                             NMP1-ISI-003-10 hl Y NIAGARA                          NUCLEAR POWER STATION H U MOHAWK THIRD INSERVICE INSPECTION INTERVAL             Rev.                    0 TEN-YEAR INSERVICE INSPECTION                 Date:                  October 15, 1999 PLAN AND SCHEDULE
                                        -APPENDIX C '.'-
                    '  ': 'ULTRASONIC.'CALIBRATIONBL'GCKS':,'.            '.  ";;,
                            *;  " '.", BL'OCK.;  ':::"'.""':: ':-   .THICKNESS:
                                                                  ";-"            ''ITEMNUMBER,.:,-,
1-2             NMP1-29-SE-1                                1.655/1.1501.151.11 1-3           NMP1-28-2.00-SS                                                              2.055 1-4           NMP-28-1.200-SS                                                              1.109 1-6           NMP1-24-SE-1                                                                1.475 1-7            NMP1-24-080-CS                                                              1.219 1-8            NMP.1-20-1.500-CS                                                              1.63 1-12            NMP1-18-1.375-CS                                                            1.375 1-13           NMP1-18-1.156-CS                                                            1.156 1-14            NMP1-18-.937-CS-106                                                            .937 1-16            NMP-18-120-CS                                                              1.375 1-17            NMP-18-100-CS                                                              1.156 1-21            NMP1-16-120-CS                                                                1.24 1-22            NMP-16-100-CS                                                              1.031 1-23            NMP1-16-.375-CS-106                                                          .375 1-25            NMP1-14-120-CS                                                              1.219 1-28            NMP1-14-XX2-SS                                                                .935 1-29            NMP-14-XX1-SS                                                                .760 1-30            NMP-14-STD-CS                                                                .375 1-32            NMP1-12-1.44-CS-105                                                          1.44 1-33            NMP1-12-.688-SS                                                              .688 1-36            NMP1-12-XX2-SS                                                                .855 1-37            NMP-12-XX1-SS                                                                .720 1-38            NMP-12-STD-CS                                                                .375 File: NMP1ISIPL.wpd


LI V NIAGARA a U MOHAWK NINE MILE POINT NUCLEAR POWER STATION THIRD INSERVICE INSPECTION INTERVAL TEN-YEAR INSERVICE INSPECTION PLAN AND SCHEDULE NMP1-ISI-003-10 Rev.0 Date: October 15, 1999.."';,",',:AP.P...END)X-:B
NINE MILE POINT             NMP1-ISI-003-1 0 El Y NIAGARA                          NUCLEAR POWER STATION H U MOHAWK THIRD INSERVICE INSPECTION INTERVAL Rev. 0 TEN-YEAR INSERVICE INSPECTION   Date:  October 15, 1999 PLAN AND SCHEDULE
;;;:::.';-.".';
                                        'PPENDIX C
': NONDESTRUCTIV.E'.EXAMlNATlON;PROCEDU,RE L'ISTING REVlSfON'P 7.00 SP 7.01 SP 7.02 SP 7.03 SP 7.04 SP 7.05 ET 8.00 Note 1 Note 1 Note 1 Note 1 Note 1 Note 1 Note 1"Standard Method for Etchin Metals and Allo s""Hardness Testin of Metals""Visual Examination of Weldin 0 erations""Visual Examination of Brazed Joints""Measurin Coatin Thickness b Use of Edd Current""Weld Detection b Use of Edd Currents""Eddy Current Examination of Nonferromagnetic Heat Exchange Tubing" See controlled copy of NDE Procedures for latest approved revision.File: NMP1ISIPL.wpd  
                      "- 'UL''FRASONIC:CALIBRATIONBLot:-KS-: "-'- '- .''-    --:-:--:
v ITEM NUMBER                      B LO Q Kg <~~<i< c~,.
                        "'-40 NMP1-10-.594-CS                                .700 1-42            NMP1-10-.522-SS-F2                              ~ 522 1-43            NMP1-10-.500-SS-403                            .500 1-44            NMP1-10-160-SS                                1.141 1-47            NMP1-10-100-CS                                    .75 1-49            NMP1-10-80-CS                                  .600 1-50              NMP-10-XX1-SS                                  .727 1-51              NMP1-10-XX1-SS-358                              .591 1-52              NMP1-1 0-SE-1                                  .900 1-55              NMP1-8-120-CS                                  .720 1-56              NMP1-8-80-CS                                  .495 1-61              NMP1-6.25-RPV-STUD                            2.72 1-62              NMP1-6-.596-SS                                .596 1-64              NMP1-6-160-CS                                  .720 1-65              NMP1-6-80-SS                                  .432 1-66              NMP-6-080-CS                                  .432 1-68              NMP1-6-80-SS-312                              .432 1-69              NMP1-6-SE-2                                      1.5 1-70              NMP1-6-SE-1                                       .75 1-77              NMP1-4-80-CS                                  .337 1-81              NMP1-2.75-RCP-STUD 1-82              NM1-2.50-B16-1 1-83              NM1-2.50-B16-2 1-84              NM1-2.25-B16 File: NMP1ISIPL.wpd


hl Y NIAGARA H U MOHAWK NINE MILE POINT NUCLEAR POWER STATION NMP1-ISI-003-10 THIRD INSERVICE INSPECTION INTERVAL Rev.0 TEN-YEAR INSERVICE INSPECTION PLAN AND SCHEDULE Date: October 15, 1999-APPENDIX C'.'-'': 'ULTRASONIC.'CALIBRATION BL'GCKS':,'.
NINE MILE POINT                 NMP1-ISI-003-10 Y NIAGARA                        NUCLEAR POWER STATION kL MOHAWK THIRD INSERVICE INSPECTION INTERVAL   Rev. 0 TEN-YEAR INSERVICE INSPECTION     Date:   October 15, 1999 PLAN AND SCHEDULE APPENDIX C Uk.TRASONlt CALIBRATIONBLOCKS ITEM NUMBER                  BLOCK                    THICKNESS.
'.";;,''ITEMNUMBER,.:,-,*;"'.", BL'OCK.;':::"'.""'::
1-92        NMP1-FW-1.50-CS-516 1-94        FWMU-N1-P3-8.1-RV 1-96      NMP1-IR-9 1-97      NMP1-IR-7.5 1-98      NMP1-IR-5.5 1-99      NMP1-IR-3.3 1-1 00      NMP1-IR-1.7                                            1.7 1-108      NMP-80XI-N278-ALT-BL1                              10.75 NMP1-SW-1020-CS                                  .1-3.00 1-113      NMP1-SW-304-SS                                  .1-3.00 1-114      NMP1-SW-600-IN                                    .1-1.0 1-128      P8R-1.260                                          1.260 1-130      P8R-.75-1                                             .75 1-133      P8R-.3-1 1-137      PIS-6.25                                            2.72 1-138      PIS-2.5                                              16.7 1-140      P IR-1.5-1                                            1.5 1-143      PIN-6.25                                            1.62 1-146      PIF-1.5C                                              1.5 1-158      NMP1-RPV-4                                          27.0 1-159      NMP1-RPV-1                                          4.60 1-165        NMP-EPRI-CS 1-166        NMP-EPRI-SS 2-1       NMP2-48-3.50-CS                                     3.50 File: NMP1ISIPL.wpd
':-";-".THICKNESS:
1-2 1-3 1-4 1-6 1-7 1-8 1-12 1-13 1-14 1-16 1-17 1-21 1-22 1-23 1-25 1-28 1-29 1-30 1-32 1-33 1-36 1-37 1-38 NMP1-29-SE-1 NMP1-28-2.00-SS NMP-28-1.200-SS NMP1-24-SE-1 NMP1-24-080-CS NMP.1-20-1.500-CS NMP1-18-1.375-CS NMP1-18-1.156-CS NMP1-18-.937-CS-106 NMP-18-120-CS NMP-18-100-CS NMP1-16-120-CS NMP-16-100-CS NMP1-16-.375-CS-106 NMP1-14-120-CS NMP1-14-XX2-SS NMP-14-XX1-SS NMP-14-STD-CS NMP1-12-1.44-CS-105 NMP1-12-.688-SS NMP1-12-XX2-SS NMP-12-XX1-SS NMP-12-STD-CS 1.655/1.1501.151.11 2.055 1.109 1.475 1.219 1.63 1.375 1.156.937 1.375 1.156 1.24 1.031.375 1.219.935.760.375 1.44.688.855.720.375 File: NMP1ISIPL.wpd  


El Y NIAGARA H U MOHAWK NINE MILE POINT NUCLEAR POWER STATION NMP1-ISI-003-1 0 THIRD INSERVICE INSPECTION INTERVAL Rev.0 TEN-YEAR INSERVICE INSPECTION PLAN AND SCHEDULE Date: October 15, 1999'PPENDIX C"-'UL''FRASONIC:CALIBRATION BLot:-KS-:
NINE MILE POINT                 NMP1-ISI-003-1 0 V NIAGARA                    NUCLEAR POWER STATION 4 MOHAWK THIRD INSERVICE INSPECTION INTERVAL   Rev. 0 TEN-YEAR INSERVICE INSPECTION     Date: October 15, 1999 PLAN AND SCHEDULE APPENDlX C ULTRASONlC CAL1BRATION BLOCKS lTEM NUMBER                  BLOCK                  THlCKNESS 2-2        NMP2-30-2.90-CS                                  2.90 2-3        NMP2-28-2.60-CS                                  2.60 2-4        NMP2-28-1.34-CS                                  1.34 2-5        NMP2-27-1.57-CS                                  1.57 2-6        NMP2-26-1.26-CS                                  1.26 2-7        NMP2-25-1 .84-NOZ                                1.84 2-8        NMP2-24-2.469-CS                                2.469 2-9        NMP2-24-2.06-CS                                  2.06 2-10        NMP2-24-1.317-SS                                1.317 2-11        NMP2-24-1.234-SS                                1.234 2-12        NMP2-24-1.219-CS                               1.219 2-13        NMP2-24-1.002-SS                               1.002 2-14        NMP2-24-.500-SS                                 .500 2-15        NMP2-24-.500-CS                                  .500 2-16        NMP2-24-.375-CS                                 .375 2-17        NMP2-20-1.031-SS                               1.031 2-18        NMP2-20-1.031-CS                               1.031 2-19        NMP2-20-.84-SS                                    .84 2-20        NMP2-20-.812-CS                                  .812 2-21        NMP2-20-.594-CS                                 .594 2-22        NMP2-20-.500-CS                                 .500 2-23        NMP2-20-.375-CS                                 .375 2-24        NMP2-20-.375-SS                                  .375 2-25        NMP2-18-.938-CS                                  .938 File: NMP1ISIPL.wpd
"-'-'-.''---:-:--: ITEM NUMBER"'-40 1-42 1-43 1-44 1-47 1-49 1-50 1-51 1-52 1-55 1-56 1-61 1-62 1-64 1-65 1-66 1-68 1-69 1-70 1-77 1-81 1-82 1-83 1-84 v B L O Q Kg<~~<i<c~,.NMP1-10-.594-CS NMP1-10-.522-SS-F2 NMP1-10-.500-SS-403 NMP1-10-160-SS NMP1-10-100-CS NMP1-10-80-CS NMP-10-XX1-SS NMP1-10-XX1-SS-358 NMP1-1 0-SE-1 NMP1-8-120-CS NMP1-8-80-CS NMP1-6.25-RPV-STUD NMP1-6-.596-SS NMP1-6-160-CS NMP1-6-80-SS NMP-6-080-CS NMP1-6-80-SS-312 NMP1-6-SE-2 NMP1-6-SE-1 NMP1-4-80-CS NMP1-2.75-RCP-STUD NM1-2.50-B16-1 NM1-2.50-B16-2 NM1-2.25-B16
.700~522.500 1.141.75.600.727.591.900.720.495 2.72.596.720.432.432.432 1.5.75.337 File: NMP1ISIPL.wpd  


Y NIAGARA kL MOHAWK NINE MILE POINT NUCLEAR POWER STATION THIRD INSERVICE INSPECTION INTERVAL TEN-YEAR INSERVICE INSPECTION PLAN AND SCHEDULE NMP1-ISI-003-10 Rev.0 Date: October 15, 1999 APPENDIX C Uk.TRASONlt CALIBRATION BLOCKS ITEM NUMBER 1-92 1-94 1-96 1-97 1-98 1-99 1-1 00 1-108 1-113 1-114 1-128 1-130 1-133 1-137 1-138 1-140 1-143 1-146 1-158 1-159 1-165 1-166 2-1 BLOCK NMP1-FW-1.50-CS-516 FWMU-N1-P3-8.1-RV NMP1-IR-9 NMP1-IR-7.5 NMP1-IR-5.5 NMP1-IR-3.3 NMP1-IR-1.7 NMP-80XI-N278-ALT-BL1 NMP1-SW-1020-CS NMP1-SW-304-SS NMP1-SW-600-IN P8R-1.260 P8R-.75-1 P8R-.3-1 PIS-6.25 PIS-2.5 P IR-1.5-1 PIN-6.25 PIF-1.5C NMP1-RPV-4 NMP1-RPV-1 NMP-EPRI-CS NMP-EPRI-SS NMP2-48-3.50-CS THICKNESS.
NINE MILE POINT               NMP1-ISI-003-1 0 V NIAGARA                      NUCLEAR POWER STATION U MOHAWK THIRD INSERVICE INSPECTION INTERVAL   Rev. 0 TEN-YEAR INSERVICE INSPECTION     Date: October 15, 1999 PLAN AND SCHEDULE
1.7 10.75.1-3.00.1-3.00.1-1.0 1.260.75 2.72 16.7 1.5 1.62 1.5 27.0 4.60 3.50 File: NMP1ISIPL.wpd  
                                -
APPEND)X C ULTRASONlC CALlBRATlQNBLOCKS 1TEM NUMBER                   BLOCK                THlCKNESS 2-26      NMP2-18-.500-CS                                  .500 2-27      NMP2-18-.375-CS                                  .375 2-28      NMP2-18-.375-SS                                  .375 2-29      NMP2-16-1.031-CS                                1.031 2-30      NMP2-16-.822-SS                                  .822 2-31      NMP2-16-.500-CS                                   .500 2-32      NMP2-16-.375-SS                                  .375 2-33        NMP2-16-.375-CS                                  .375 2-34        NMP2-14-.375-CS                                  .375 2-35        NMP2-12-1.00-SS                                  1.00 2-36        NMP2-12-.844-SS                                  .844 2-37        NMP2-12-.844-CS                                   .844 2-38        NMP2-12-.688-CS                                  .688 2-39        NMP2-12-.688-SS                                  .688 2-40        NMP2-12-.657-SS                                  .657 2-41        NMP2-12-.375-SS                                  .375 2-42        NMP2-12-.375-CS                                  .375 2-43        NMP2-11.625-1.125-CS                          1.125 2-44        NMP2-10-1.00-CS                                 1.00 2-45        NMP2-10-.719-CS                                 .719 2-46        NMP2-10-.594-CS                                  .594 2-47        NMP2-1 0-.365-CS                                .365 2-48        NMP2-9.3-1.77-CS                                1.77 2-49        NMP2-8-.906-CS                                  .906 File: NMP1ISIPL.wpd


V NIAGARA 4 MOHAWK NINE MILE POINT NUCLEAR POWER STATION NMP1-ISI-003-1 0 THIRD INSERVICE INSPECTION INTERVAL Rev.0 TEN-YEAR INSERVICE INSPECTION PLAN AND SCHEDULE Date: October 15, 1999 APPENDlX C ULTRASONlC CAL1BRATION BLOCKS lTEM NUMBER 2-2 2-3 2-4 2-5 2-6 2-7 2-8 2-9 2-10 2-11 2-12 2-13 2-14 2-15 2-16 2-17 2-18 2-19 2-20 2-21 2-22 2-23 2-24 2-25 BLOCK NMP2-30-2.90-CS NMP2-28-2.60-CS NMP2-28-1.34-CS NMP2-27-1.57-CS NMP2-26-1.26-CS NMP2-25-1.84-NOZ NMP2-24-2.469-CS NMP2-24-2.06-CS NMP2-24-1.317-SS NMP2-24-1.234-SS NMP2-24-1.219-CS NMP2-24-1.002-SS NMP2-24-.500-SS NMP2-24-.500-CS NMP2-24-.375-CS NMP2-20-1.031-SS NMP2-20-1.031-CS NMP2-20-.84-SS NMP2-20-.812-CS NMP2-20-.594-CS NMP2-20-.500-CS NMP2-20-.375-CS NMP2-20-.375-SS NMP2-18-.938-CS THlCKNESS 2.90 2.60 1.34 1.57 1.26 1.84 2.469 2.06 1.317 1.234 1.219 1.002.500.500.375 1.031 1.031.84.812.594.500.375.375.938 File: NMP1ISIPL.wpd  
NINE MILE POINT                                           NMP1-ISI-003-1 0 V NIAGARA                                NUCLEAR POWER STATION U MOHAWK THIRD INSERVICE INSPECTION INTERVAL                                 Rev. 0 TEN-YEAR INSERVICE INSPECTION                                   Date: October 15, 1999 PLAN AND SCHEDULE
                                                            '  "'>>', '>> 'w 'w                '*",
PENDIX Q
                  ,',',ULTR'A'SONIC CAL'IBRATION'BLOCKS.
                                                                                ':".'-,.'"'TEM NUMBER ';    . -'.", "..'"".'-".""'":BLOCK 2-50              NMP2-8-.718-CS                                                                    .718 2-51              NMP2-8-.594-CS                                                                    .594 2-52              NMP2-8-.500-CS                                                                    .500 2-53              NMP2-8-.322-SS                                                                    .322 2-54              NMP2-8-.322-CS                                                                    .322 2-55              NMP2-6.3-1.24-CS                                                                  .562 2-57              NMP2-6-.432-CS                                                                   .432 2-58              NMP2-6-.280-CS                                                                   .280 2-59              NMP2-5.8-.365-SS                                                                  .365 2-60              NMP2-5.25-.69-NOZ                                                                   .69 2-61              NMP2-5-.78-CS                                                                       .78 2-62              NMP2-4-.337-SS                                                                   .337 2-63              NMP2-4-.337-SS-182                                                                .337 2-64              NMP2-4-.337-CS                                                                   .337 2-65              NMP2-4-.250-CS                                                                   .250 2-66              NMP2-4-.250-SS                                                                   .250 2-67              NMP2-3.25-23.5-STUD                                                              23.5 2-68              NMP2-2.25-10-STUD                                                                10.0 2-69              NMP2-IR-9-CS                                                                        9.0 2-70              NMP2-IR-7.5-CS                                                                       7.5 2-71              NMP2-IR-4-CS                                                                        4.0 2-72              NMP2-RHS-.75-CS                                                                     .75 2-73              NMP2-RHS-IR-3.75-CS                                                               3.75 2-74              NMP2-FLG-RPV                                                                      38.0 File: NMP1ISIPL.wpd


V NIAGARA U MOHAWK NINE MILE POINT NUCLEAR POWER STATION NMP1-ISI-003-1 0 THIRD INSERVICE INSPECTION INTERVAL Rev.0 TEN-YEAR INSERVICE INSPECTION PLAN AND SCHEDULE Date: October 15, 1999-APPEND)X C ULTRASONlC CALlBRATlQN BLOCKS 1TEM NUMBER 2-26 2-27 2-28 2-29 2-30 2-31 2-32 2-33 2-34 2-35 2-36 2-37 2-38 2-39 2-40 2-41 2-42 2-43 2-44 2-45 2-46 2-47 2-48 2-49 BLOCK NMP2-18-.500-CS NMP2-18-.375-CS NMP2-18-.375-SS NMP2-16-1.031-CS NMP2-16-.822-SS NMP2-16-.500-CS NMP2-16-.375-SS NMP2-16-.375-CS NMP2-14-.375-CS NMP2-12-1.00-SS NMP2-12-.844-SS NMP2-12-.844-CS NMP2-12-.688-CS NMP2-12-.688-SS NMP2-12-.657-SS NMP2-12-.375-SS NMP2-12-.375-CS NMP2-11.625-1.125-CS NMP2-10-1.00-CS NMP2-10-.719-CS NMP2-10-.594-CS NMP2-1 0-.365-CS NMP2-9.3-1.77-CS NMP2-8-.906-CS THlCKNESS.500.375.375 1.031.822.500.375.375.375 1.00.844.844.688.688.657.375.375 1.125 1.00.719.594.365 1.77.906 File: NMP1ISIPL.wpd  
NINE MILE POINT                               NMP1-ISI-003-1 0 Y NIAGARA                        NUCLEAR POWER STATION N @MOHAWK THIRD INSERVICEINSPECTIONINTERVAL                    Rev.     0 TEN-YEAR INSERVICE INSPECTION                     Date:     October 15, 1999 PLAN AND SCHEDULE
                                '," "APPENDIX:C;:; '; ',";,"',:~~," -;:. "."' '  ..."
                                                                                        "
                                                                                          ".-.  ':,,'
ULTRASONIC CALIBRATIONBLOCKS;::,':: '::
                              ': ":i; BLOCK."".                  ".
                                                                    ",THICKNESS,'.69 2-75      NMP2-RPV-STUD-1 2-76      NMP2-RPV-NUT-1                                                      7.125 2-77      NMP2-128-1-RPV                                                        5.25 2-78      NMP2-127-1-RPV                                                        3.18 2-79      NMP2-126-1-RPV                                                        7.90 2-80      NMP2-1 25-1-RPV                                                      6.80 2-81      NMP2-124-1-RPV                                                        6.68 2-82      NMP2-123-1-RPV                                                        8.11 2-900      GE795E254G3 2-84      NMP2-2.24-15.88-STUD                                              15.88 1-95      H JT-6-13-A                                                            .55 File: NMP1ISIPL.wpd


V NIAGARA U MOHAWK NINE MILE POINT NUCLEAR POWER STATION NMP1-ISI-003-1 0 THIRD INSERVICE INSPECTION INTERVAL Rev.0 TEN-YEAR INSERVICE INSPECTION PLAN AND SCHEDULE Date: October 15, 1999 PENDIX Q'"'>>','>>'w'w'*", ,',',ULTR'A'SONIC CAL'IBRATION'BLOCKS.
NINE MILE POINT                       NMP1-ISI-003-10 hl Y NIAGARA                          NUCLEAR POWER STATION H V MOHAWK THIRD INSERVICE INSPECTION INTERVAL         Rev. 0 TEN-YEAR INSERVICE INSPECTION           Date: October 15, 1999 PLAN AND SCHEDULE
':".'-,.'"'TEM NUMBER.';-'.","..'"".'-".""'":BLOCK 2-50 2-51 2-52 2-53 2-54 2-55 2-57 2-58 2-59 2-60 2-61 2-62 2-63 2-64 2-65 2-66 2-67 2-68 2-69 2-70 2-71 2-72 2-73 2-74 NMP2-8-.718-CS NMP2-8-.594-CS NMP2-8-.500-CS NMP2-8-.322-SS NMP2-8-.322-CS NMP2-6.3-1.24-CS NMP2-6-.432-CS NMP2-6-.280-CS NMP2-5.8-.365-SS NMP2-5.25-.69-NOZ NMP2-5-.78-CS NMP2-4-.337-SS NMP2-4-.337-SS-182 NMP2-4-.337-CS NMP2-4-.250-CS NMP2-4-.250-SS NMP2-3.25-23.5-STUD NMP2-2.25-10-STUD NMP2-IR-9-CS NMP2-IR-7.5-CS NMP2-IR-4-CS NMP2-RHS-.75-CS NMP2-RHS-IR-3.75-CS NMP2-FLG-RPV
                                          ,,APPENDIX D CL'ASS 1, 2 and 3 WELDlSUPPORT LOCATION QAPS-DRAWING NUMBER       SYSTEM            TITLE C-26830-C              01              Main Steam C-26831-C              02              Main Steam C-26832-C              03              Main Steam C-27165-C              05              Emergency Condenser Vent C-27165-C            05.1              Emergency Condenser Vent C-27165-C            05.2              Emergency Condenser Vent C-26839-C            31                High Pressure Reactor Feedwater C-26846-C            32                Reactor Recirculation C-26852-C            33                Reactor Clean UP C-26852-C            33.1             Reactor Clean UP C-26839-C            33.2              Reactor Clean UP C-26839-C            33.3              Reactor Clean UP C-26851-C            34                Reactor Head Spray F-45028-C            36                Reactor Instrumentation C-26852-C            37                Reactor Drain C-45060-C            37                Reactor Head Vent C-26852-C            37.1              Reactor Drain C-26847-C            38              Reactor Shutdown Cooling C-26843-C            39              Emergency Condenser C-26844-C            40              Reactor Core Spray C-35682-C              40.1            Reactor Core Spray C-27168-C              41              Liquid Poison C-27168-C              42              Liquid Poison File: NMP1ISIPL.wpd
.718.594.500.322.322.562.432.280.365.69.78.337.337.337.250.250 23.5 10.0 9.0 7.5 4.0.75 3.75 38.0 File: NMP1ISIPL.wpd  


N Y NIAGARA@MOHAWK NINE MILE POINT NUCLEAR POWER STATION NMP1-ISI-003-1 0 THIRD INSERVICEINSPECTIONINTERVAL Rev.0 TEN-YEAR INSERVICE INSPECTION PLAN AND SCHEDULE Date: October 15, 1999',""APPENDIX:
0 NINE MILE POINT                           NMP1-ISI-003-10 El Y NIAGARA                          NUCLEAR POWER STATION H 4 MOHAWK THIRD INSERVICE INSPECTION INTERVAL            Rev. 0 TEN-YEAR INSERVICE INSPECTION               Date: October 15, 1999 PLAN AND SCHEDULE APPENDIX D CLASS 1, 2 and 3 VlELNSUPPORT LOCATION MAPS DRAY/ING NUMBER        SYSTEM          TITLE C-27168-C              42.1            Liquid Poison C-26849-C              44.1            Control Rod Drive Hydraulic C-34124-C              44.2           Control Rod Drive Hydraulic C-27171-C              54              Fuel Pool Cooling C-27178-C              66              Main Steam Line C-26855-C            70              Reactor Building Closed Loop Cooling C-39816-C            70              Closed Loop Cooling C-27179-C            72              Service Water System F-45236-C            72              Service Water System C-26848-C            80              Reactor Containment Spray C-27181-C            80.1             Reactor Containment Spray C-26845-C            81              Reactor Core Spray C-26845-C            81.1             Reactor Core Spray C-27183-C            93              Containment Spray Cooling Raw Water N/A             Weld Map Index 01              Main Steam 2A                    01              Main Steam 2B                    01              Main Steam 02              Main Steam 3A                    02              Main Steam 03              Main Steam Turbine By Pass to Condenser 31              Reactor Feedwater 5A                                    Reactor Feedwater 34              Reactor Head Spray File: NMP1ISIPL.wpd
C;:;';',";,"',:~~,"-;:."."''...""".-.':,,'ULTRASONIC CALIBRATION BLOCKS;::,'::
':: 2-75 2-76 2-77 2-78 2-79 2-80 2-81 2-82 2-900 2-84 1-95': ":i;BLOCK."".NMP2-RPV-STUD-1 NMP2-RPV-NUT-1 NMP2-128-1-RPV NMP2-127-1-RPV NMP2-126-1-RPV NMP2-1 25-1-RPV NMP2-124-1-RPV NMP2-123-1-RPV GE795E254G3 NMP2-2.24-15.88-STUD H JT-6-13-A".",THICKNESS,'.69 7.125 5.25 3.18 7.90 6.80 6.68 8.11 15.88.55 File: NMP1ISIPL.wpd  


hl Y NIAGARA H V MOHAWK NINE MILE POINT NUCLEAR POWER STATION NMP1-ISI-003-10 THIRD INSERVICE INSPECTION INTERVAL Rev.0 TEN-YEAR INSERVICE INSPECTION PLAN AND SCHEDULE Date: October 15, 1999 ,,APPENDIX D CL'ASS 1, 2 and 3 WELDlSUPPORT LOCATION QAPS-DRAWING NUMBER SYSTEM TITLE C-26830-C C-26831-C C-26832-C C-27165-C C-27165-C C-27165-C C-26839-C C-26846-C C-26852-C C-26852-C C-26839-C C-26839-C C-26851-C F-45028-C C-26852-C C-45060-C C-26852-C C-26847-C C-26843-C C-26844-C C-35682-C C-27168-C C-27168-C 01 02 03 05 05.1 05.2 31 32 33 33.1 33.2 33.3 34 36 37 37 37.1 38 39 40 40.1 41 42 Main Steam Main Steam Main Steam Emergency Condenser Vent Emergency Condenser Vent Emergency Condenser Vent High Pressure Reactor Feedwater Reactor Recirculation Reactor Clean UP Reactor Clean UP Reactor Clean UP Reactor Clean UP Reactor Head Spray Reactor Instrumentation Reactor Drain Reactor Head Vent Reactor Drain Reactor Shutdown Cooling Emergency Condenser Reactor Core Spray Reactor Core Spray Liquid Poison Liquid Poison File: NMP1ISIPL.wpd 0
NINE MILE POINT                             NMP1-ISI-003-10 hl Y NIAGARA                              NUCLEAR POWER STATION H U MOHAWK THIRD INSERVICE INSPECTION INTERVAL               Rev. 0 TEN-YEAR INSERVICE INSPECTION                 Date:   October 15, 1999 PLAN AND SCHEDULE
El Y NIAGARA H 4 MOHAWK NINE MILE POINT NUCLEAR POWER STATION NMP1-ISI-003-10 THIRD INSERVICE INSPECTION INTERVAL Rev.0 TEN-YEAR INSERVICE INSPECTION PLAN AND SCHEDULE Date: October 15, 1999 APPENDIX D CLASS 1, 2 and 3 VlELNSUPPORT LOCATION MAPS DRAY/ING NUMBER SYSTEM TITLE C-27168-C C-26849-C C-34124-C C-27171-C C-27178-C C-26855-C C-39816-C C-27179-C F-45236-C C-26848-C C-27181-C C-26845-C C-26845-C C-27183-C 2A 2B 3A 5A 42.1 44.1 44.2 54 66 70 70 72 72 80 80.1 81 81.1 93 N/A 01 01 01 02 02 03 31 34 Liquid Poison Control Rod Drive Hydraulic Control Rod Drive Hydraulic Fuel Pool Cooling Main Steam Line Reactor Building Closed Loop Cooling Closed Loop Cooling Service Water System Service Water System Reactor Containment Spray Reactor Containment Spray Reactor Core Spray Reactor Core Spray Containment Spray Cooling Raw Water Weld Map Index Main Steam Main Steam Main Steam Main Steam Main Steam Main Steam Turbine By Pass to Condenser Reactor Feedwater Reactor Feedwater Reactor Head Spray File: NMP1ISIPL.wpd  
:-'- CLASS 1, 2 an'd,3 WELD/SUPPORT,L'OCATfON IIIIAPS;:      -;
J      F
  .
DRAW!NG":NUMBER,- ;SY'TEM'=,"",''-,.",
32              Reactor Recirculation 7A                        32              Reactor Recirculation 7B                        32              Reactor Recirculation Pump Discharge Instrumentation 7C                        32               Reactor Recirculation Pump Instrumentation 7D                      36                Reactor Recirculation Pump Seal Cavity Instrumentation 36                Reactor Instrumentation Level Protection System 8A                      36               Reactor Instrumentation Level Control Range 8B                      36                Reactor Instrumentation Level Control Range 8C                      36                Reactor Instrumentation Level Protection System 8D                      36                Reactor Instrumentation Wide Range Level 8E                      36                Reactor Instrumentation Seal Leak Detection 8F                      36                Reactor Instrumentation Level Triple Low 8G                      36                Reactor Instrumentation Level Triple Low 8H                      36                Reactor Instrumentation Emergency Condenser Steam 8J                      36                Reactor Instrumentation Emergency Condenser Steam 37, 37.1          Reactor Head Vent and Drain 10                      38                Reactor Shutdown Cooling 10A                      38                Reactor Shutdown Cooling 39              Emergency Condenser Steam Supply 11A                      39              Emergency Condenser Steam Return 11B                      39              Emergency Condenser Drain and Overflow Lines 12                        40, 40.1        Reactor Core Spray 12A                        40,40.1          Reactor Core Spray 13                        80,80.1         Reactor Core Spray File: NMP1ISIPL.wpd


hl Y NIAGARA H U MOHAWK NINE MILE POINT NUCLEAR POWER STATION NMP1-ISI-003-10 THIRD INSERVICE INSPECTION INTERVAL Rev.0 TEN-YEAR INSERVICE INSPECTION PLAN AND SCHEDULE Date: October 15, 1999:-'-CLASS 1, 2 an'd,3 WELD/SUPPORT,L'OCATfON IIIIAPS;:-;J F.DRAW!NG":NUMBER
NINE MILE POINT                         NMP1-ISI-003-1 0 V NlAGARA                                      NUCLEAR POWER STATION N U MOHAWK THIRD INSERVICE INSPECTION INTERVAL           Rev. 0 TEN-YEAR INSERVICE INSPECTION             Date:   October 15, 1999 PLAN AND SCHEDULE
,-7A 7B 7C 7D 8A 8B 8C 8D 8E 8F 8G 8H 8J 10 10A 11A 11B 12 12A 13;SY'TEM'=,"",''-,.", 32 32 32 32 36 36 36 36 36 36 36 36 36 36 36 37, 37.1 38 38 39 39 39 40, 40.1 40,40.1 80,80.1 Reactor Recirculation Reactor Recirculation Reactor Recirculation Pump Discharge Instrumentation Reactor Recirculation Pump Instrumentation Reactor Recirculation Pump Seal Cavity Instrumentation Reactor Instrumentation Level Protection System Reactor Instrumentation Level Control Range Reactor Instrumentation Level Control Range Reactor Instrumentation Level Protection System Reactor Instrumentation Wide Range Level Reactor Instrumentation Seal Leak Detection Reactor Instrumentation Level Triple Low Reactor Instrumentation Level Triple Low Reactor Instrumentation Emergency Condenser Steam Reactor Instrumentation Emergency Condenser Steam Reactor Head Vent and Drain Reactor Shutdown Cooling Reactor Shutdown Cooling Emergency Condenser Steam Supply Emergency Condenser Steam Return Emergency Condenser Drain and Overflow Lines Reactor Core Spray Reactor Core Spray Reactor Core Spray File: NMP1ISIPL.wpd  
            '"" -:" ":;=';"""CLASS"1"2and 3 WELDtSUPPQRT,.:LOCATION MAPS""-"""'"':,"
DRAWING NUMBER, SYSTEM'-'0,80.1 13A                                              Reactor Core Spray 13B                        80,80.1               Reactor Core Spray 13C                        80,80.1               Reactor Core Spray 14                        42.1                   Liquid Poison 15                        80                     Reactor Containment Spray 15A                        80                     Reactor Containment Spray 15B                        80                    Reactor Containment Spray 15C                        80                    Reactor Containment Spray 15D                        80                    Reactor Containment Spray 16                          93,93.1                Reactor Containment Spray 16A                        93,93.1                Reactor Containment Spray 16B                        93,93.1                Reactor Containment Spray 16C                        93,93.1                Reactor Containment Spray 17                          44.2                  Control Rod Drive 17A                        44.2                  Control Rod Drive 18                          44.1                  Control Rod Drive 19                          44.3                  Control Rod Drive 20                          33332333              Reactor Clean Up 21                          27                    Reactor Head Spray 22                          05,05.1,05.2          Emergency Condenser Vent 22A                        05,05.1,05.2          Emergency Condenser Vent 23                        23                    Main Steam Line Drain 24                          66                    Main Steam Power Operated Relief Valve Discharge 24A                        66                    Main Steam Power Operated Relief Valve Discharge File: NMP1ISIPL.wpd


N V NlAGARA U MOHAWK NINE MILE POINT NUCLEAR POWER STATION NMP1-ISI-003-1 0 THIRD INSERVICE INSPECTION INTERVAL Rev.0 TEN-YEAR INSERVICE INSPECTION PLAN AND SCHEDULE Date: October 15, 1999'""-:"":;=';"""CLASS"1"2 and 3 WELDtSUPPQRT,.:LOCATION MAPS""-"""'"':," DRAWING NUMBER, 13A 13B 13C 14 15 15A 15B 15C 15D 16 16A 16B 16C 17 17A 18 19 20 21 22 22A 23 24 24A SYSTEM'-'0,80.1 80,80.1 80,80.1 42.1 80 80 80 80 80 93,93.1 93,93.1 93,93.1 93,93.1 44.2 44.2 44.1 44.3 33332333 27 05,05.1,05.2 05,05.1,05.2 23 66 66 Reactor Core Spray Reactor Core Spray Reactor Core Spray Liquid Poison Reactor Containment Spray Reactor Containment Spray Reactor Containment Spray Reactor Containment Spray Reactor Containment Spray Reactor Containment Spray Reactor Containment Spray Reactor Containment Spray Reactor Containment Spray Control Rod Drive Control Rod Drive Control Rod Drive Control Rod Drive Reactor Clean Up Reactor Head Spray Emergency Condenser Vent Emergency Condenser Vent Main Steam Line Drain Main Steam Power Operated Relief Valve Discharge Main Steam Power Operated Relief Valve Discharge File: NMP1ISIPL.wpd  
NINE MILE POINT                                                                               NMP1-ISI-003-1 0 4Y NIAGARA NUCLEAR POWER STATION MOHAWK THIRD INSERVICE INSPECTION INTERVAL                                                           Rev.                 0 TEN-YEAR INSERVICE INSPECTION                                                             Date:             October 15, 1999 PLAN AND SCHEDULE
          . ': ~';",- "'::, - ":-CLASSi1'2 and'3'-"~VfFL'DISUPPORT LQCATjON'',MAPS:.:::,'; -";"':;i": ':::':--':,9!-"::.
'DRAWING NUMBER'SYSTEM,.'',".;r",,%w TlTL'E:,'
                                                    -           " ';, ',','i'i ',
z '<'P 'ill'qg~P~;, "'j;"l'P,",.;,ii," .i'~! .'""s ',~;> j;", '"~ ', '; ', .'...r.': ~":,.;"".".',
25                              80.1               Reactor Containment Spray 25A                              80.1                Reactor Containment Spray 26                              41,42              Liquid Poison 28                              00.0                Reactor Vessel 28A                              00.0                Reactor Vessel File: NMP1ISIPL.wpd


Y NIAGARA 4 MOHAWK NINE MILE POINT NUCLEAR POWER STATION NMP1-ISI-003-1 0 THIRD INSERVICE INSPECTION INTERVAL Rev.0 TEN-YEAR INSERVICE INSPECTION PLAN AND SCHEDULE Date: October 15, 1999.':~';",-"'::,-":-CLASSi1'2 and'3'-"~VfFL'DISUPPORT LQCATjON'',MAPS:.:::,';
NINE MILE POINT                                 NMP1-ISI-003-1 0 Y NIAGARA                                NUCLEAR POWER STATION N U MOHAWK THIRD INSERVICE INSPECTION INTERVAL                   Rev.     0 TEN-YEAR INSERVICE INSPECTION                       Date:   October 15, 1999 PLAN AND SCHEDULE APPENDIX E ASME CODE CASES The following ASME Code Cases have been reviewed for possible use during the Third Inservice Inspection Interval. Code Cases used during the inspection interval shall be identified with the specific component within the Inspection/ Examination Tables.
-";"':;i":
ASME CODE CASE LISTING CODE CASE      TITLE                                                                    RG 1.147        IMPLEMENTED NUMBER                                                                                  Revision        IN PROGRAM N-236-1      Repair and Replacement of Class MC Vessels, Section XI,                   Rev. 12              No Division 1.
':::':--':,9!-"::.
N-355        Calibration Block for Angle Beam Ultrasonic Examination of                Rev. 12 Large Fittings in accordance with Appendix III-3410, Section XI, Division 1.
'DRAWING NUMBER'SYSTEM,.'',".;r",,%w
N-389-1      Alternative Rules for Repairs, Replacements, or Modifications,             Rev. 12              No Section XI, Division 1 N-416-1      Alternative Pressure Test Requirement for Welded Repairs or              Rev. 12              Yes Installation of Replacement Items by Welding, Class 1, 2 and 3, Section XI, Division 1.
-Tl TL'E:,'"';,',','i'i', z'<'P'ill'qg~P~;,"'j;"l'P,",.;,i i,".i'~!.'""s',~;>j;",'"~',';',.'...r.':~":,.;"".".', 25 25A 26 28 28A 80.1 80.1 41,42 00.0 00.0 Reactor Containment Spray Reactor Containment Spray Liquid Poison Reactor Vessel Reactor Vessel File: NMP1ISIPL.wpd  
N-432        Repair Welding Using Automatic or Machine Gas Tungsten-Arc                Rev. 12              No Welding (GTAW) Temper Bead Technique, Section XI, Division 1.
N-457        Qualification Specimen Notch Location for Ultrasonic                      Rev. 12 Examination of Bolts and Studs, Section XI, Division 1.
N-458-1      Magnetic Particle Examination of Coated Materials, Section XI,             None                No Division 1.
N-460        Alternative Examination Coverage for Class      1 and Class 2            Rev. 12              Yes Welds, Section XI, Division 1 N-461        Alternative Rules For Piping Calibration Block Thickness, Section        Rev. 12              No XI, Division 1 N-472        Use of Digital Readout and Digital Measurement Devises for                Rev. 12              No performing Pump Vibration Testing, Section XI, Division 1.
N-485-1      Eddy Current Examination of Coated Ferritic Surfaces as an                Rev. 12              No alternative to Surface Examination, Section XI, Division 1.
N-490-1 E,           S  t'I Alternative Vision Test Requirements for Nondestructive Division 1 Rev. 12              No File: NMP1ISIPL.wpd


N Y NIAGARA U MOHAWK NINE MILE POINT NUCLEAR POWER STATION THIRD INSERVICE INSPECTION INTERVAL TEN-YEAR INSERVICE INSPECTION PLAN AND SCHEDULE NMP1-ISI-003-1 0 Rev.0 Date: October 15, 1999 APPENDIX E ASME CODE CASES The following ASME Code Cases have been reviewed for possible use during the Third Inservice Inspection Interval.Code Cases used during the inspection interval shall be identified with the specific component within the Inspection/
NINE MILE POINT                         NMP1-ISI-003-10 V NlAGARA                              NUCLEAR POWER STATION U MOHAWK THIRD INSERVICE INSPECTION INTERVAL             Rev. 0 TEN-YEAR INSERVICE INSPECTION               Date: October 15, 1999 PLAN AND SCHEDULE ASME CODE CASE LISTING CODE CASE     TITLE                                                             RG 1.147   IMPLEMENTED NUMBER                                                                          Revision     IN PROGRAM N-491-1     Alternative Rules for Examination of Class 1, 2, 3, and MC          Rev. 12          Yes Component Supports, Section XI, Division N-496-1       Helical Coil Threaded Inserts, Section XI, Division 1             Rev. 12 N-498-1     Alternative Rules for 10-Year System Hydrostatic Testing for        Rev. 12 Class 1, 2 and 3 Systems, Section XI, Division 1 N-504-1     Alternative Rules for Repair of Class 1, 2 and 3 Austenitic        Rev. 12          No Stainless Steel Piping, Section XI, Division 1 N-509      Alternative Rules for the Selection and Examination of Class 1, 2   Rev. 12          Yes and 3 Integrally Welded Attachments, Section XI, Division 1 N-516      Underwater Welding, Section XI, Division 1                         Rev. 12          No Pressure Testing of Containment Penetration Piping, Section XI, Division 1 N-523      Mechanical Clamping Devices for Class 2 and 3 piping, Section       None            No XI, Division 1.
Examination Tables.CODE CASE NUMBER TITLE ASME CODE CASE LISTING RG 1.147 Revision IMPLEMENTED IN PROGRAM N-236-1 N-355 N-389-1 N-416-1 N-432 N-457 N-458-1 N-460 N-461 N-472 N-485-1 N-490-1 Repair and Replacement of Class MC Vessels, Section XI, Division 1.Calibration Block for Angle Beam Ultrasonic Examination of Large Fittings in accordance with Appendix III-3410, Section XI, Division 1.Alternative Rules for Repairs, Replacements, or Modifications, Section XI, Division 1 Alternative Pressure Test Requirement for Welded Repairs or Installation of Replacement Items by Welding, Class 1, 2 and 3, Section XI, Division 1.Repair Welding Using Automatic or Machine Gas Tungsten-Arc Welding (GTAW)Temper Bead Technique, Section XI, Division 1.Qualification Specimen Notch Location for Ultrasonic Examination of Bolts and Studs, Section XI, Division 1.Magnetic Particle Examination of Coated Materials, Section XI, Division 1.Alternative Examination Coverage for Class 1 and Class 2 Welds, Section XI, Division 1 Alternative Rules For Piping Calibration Block Thickness, Section XI, Division 1 Use of Digital Readout and Digital Measurement Devises for performing Pump Vibration Testing, Section XI, Division 1.Eddy Current Examination of Coated Ferritic Surfaces as an alternative to Surface Examination, Section XI, Division 1.Alternative Vision Test Requirements for Nondestructive E, S t'I Division 1 Rev.12 Rev.12 Rev.12 Rev.12 Rev.12 Rev.12 None Rev.12 Rev.12 Rev.12 Rev.12 Rev.12 No No Yes No No Yes No No No No File: NMP1ISIPL.wpd  
N-524      Alternative Examination Requirements for Longitudinal Welds in    Rev. 12          Yes Class 1 and Class 2 Piping, Section XI, Division 1 N-526      Alternative Requirements for Successive Inspection of Class  1      None            Yes and 2 Vessels, Section XI, Division 1 N-532      Alternative Requirements to Repair and Replacement                  None            Yes Documentation Requirements and Inservice Summary Report Preparation and Submission as required by IWA-4000 and IWA-6000, Section XI, Division 1.
N-534        Alternative Requirements for Pneumatic Pressure Testing,             None            No Section XI, Division 1 N-537        Location of Ultrasonic Depth Sizing Flaws, Section XI, Division 1. Rev. 12          No N-554      Alternative Requirements for Reconciliation of Replacement            None            No Items, Section XI, Division 1.
N-573      Transfer of Procedure Qualification Records Between Owners,          None           Yes Section XI, Division 1.
File: NMP1ISIPL.wpd


V NlAGARA U MOHAWK NINE MILE POINT NUCLEAR POWER STATION THIRD INSERVICE INSPECTION INTERVAL TEN-YEAR INSERVICE INSPECTION PLAN AND SCHEDULE NMP1-ISI-003-10 Rev.0 Date: October 15, 1999 CODE CASE TITLE NUMBER ASME CODE CASE LISTING N-491-1 Alternative Rules for Examination of Class 1, 2, 3, and MC Component Supports, Section XI, Division RG 1.147 Revision Rev.12 IMPLEMENTED IN PROGRAM Yes N-496-1 N-498-1 N-504-1 N-509 N-516 N-523 N-524 N-526 N-532 N-534 Helical Coil Threaded Inserts, Section XI, Division 1 Alternative Rules for 10-Year System Hydrostatic Testing for Class 1, 2 and 3 Systems, Section XI, Division 1 Alternative Rules for Repair of Class 1, 2 and 3 Austenitic Stainless Steel Piping, Section XI, Division 1 Alternative Rules for the Selection and Examination of Class 1, 2 and 3 Integrally Welded Attachments, Section XI, Division 1 Underwater Welding, Section XI, Division 1 Pressure Testing of Containment Penetration Piping, Section XI, Division 1 Mechanical Clamping Devices for Class 2 and 3 piping, Section XI, Division 1.Alternative Examination Requirements for Longitudinal Welds in Class 1 and Class 2 Piping, Section XI, Division 1 Alternative Requirements for Successive Inspection of Class 1 and 2 Vessels, Section XI, Division 1 Alternative Requirements to Repair and Replacement Documentation Requirements and Inservice Summary Report Preparation and Submission as required by IWA-4000 and IWA-6000, Section XI, Division 1.Alternative Requirements for Pneumatic Pressure Testing, Section XI, Division 1 Rev.12 Rev.12 Rev.12 Rev.12 Rev.12 None Rev.12 None None None No Yes No No Yes Yes Yes No N-537 Location of Ultrasonic Depth Sizing Flaws, Section XI, Division 1.Rev.12 No N-554 N-573 Alternative Requirements for Reconciliation of Replacement Items, Section XI, Division 1.Transfer of Procedure Qualification Records Between Owners, Section XI, Division 1.None None No Yes File: NMP1ISIPL.wpd  
NINE MILE POINT               NMP1-ISI-003-1 0 V NIAG'AHA                NUCLEAR POWER STATION U MOHAWK THIRD INSERVICE INSPECTION INTERVAL Rev. 0 TEN-YEAR INSERVICE INSPECTION   Date: October 15, 1999 PLAN AND SCHEDULE END OF DOCUMENT File: NMP1ISIPL.wpd


V NIAG'AHA U MOHAWK NINE MILE POINT NUCLEAR POWER STATION NMP1-ISI-003-1 0 THIRD INSERVICE INSPECTION INTERVAL Rev.0 TEN-YEAR INSERVICE INSPECTION PLAN AND SCHEDULE Date: October 15, 1999 END OF DOCUMENTFile: NMP1ISIPL.wpd W1lh''tigl~0 i k'I}}
W1lh'
  'tigl ~
0 i
k
'I}}

Revision as of 03:35, 22 October 2019

Third Inservice Inspection Interval - Ten-Year Inservice Inspection Plan and Schedule
ML18018B053
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 10/15/1999
From:
Niagara Mohawk Power Corp
To:
Office of Nuclear Reactor Regulation
References
Download: ML18018B053 (576)


Text

V NIAGARA U MOHAWK Niagara Mohawk Power Corporation 300 Erie Boulevard West Syracuse, New York 13202 Nine Mile Point Nuclear Power Station THIRD INSERVICE INSPECTION INTERVAL TEN-YEAR INSERVICE INSPECTION PLAN AND SCHEDULE Prepared For Nine Mile Point Nuclear Power Station P.O. Box 63 Lycoming, New York 13093 Commercial Service Date: December 26, 1969 NRC Docket Number: 50-220 Document Number: NMP1-ISI-003-1 0 Revision Number: 0 Date: October 15, 1999 Prepared by: /O l~

NMP1 - ISI Program Manager Approved by':

Glenn R. erkins -Supervisor ASME Sectio XI Programs Approved by:

WIJ iam Yae er - Bra ch Manager, Engineerin r/

Services OCR <<~woigl

~g Ilgwu

'is 5 <iHi)i~Z

I NINE MILE POINT NMP1-ISI-003-1 0 Y NIAGARA NUCLEAR POWER STATION N 4 MOHAWK THIRD INSERVICE INSPECTION INTERVAL Rev. 0 TEN-YEAR INSERVICE INSPECTION Date: October 15, 1999 PLAN AND SCHEDULE TABLE OF CONTENTS Table of Contents Record of Revision .

Abstract .

1.0 Introduction . 7 1.1 Inspection Interval .. 7 1.2 Inspection Periods . .. 7 1.3 Applicable Documents .. 7 1.4 Applicable Code Edition and Addenda 10 2.0 Development of Inspection Plan ...... ~....... ~...........

2.1 Class 1 Systems/Components 12 2.2 Class 2 Systems/Components . 12 2.3 Class 3 Systems/Components . 12 2.4 Class 1, 2, 3 Component Supports 12 2.5 Substitute Examinations 12 2.6 Nondestructive Examinations 12 2.7 Weld/Support Location Maps 13 2.8 Ultrasonic Calibration Blocks .. 13 2.9 Weld Identification 13 3..0 Records ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 1 6 3.1 General 16 3.1.1 Scheduled Examination Tables........ 16 3.1.1 Inspection Zones . 16 3.1.3 Code Item Classification 16 3.1.4 Inspection/Examination Table Contents .. 16 3.2 Final Reports 17 3.3 ISI Summary Report . 17 File: NMP1ISIPL.wpd

0 NINE MILE POINT NMP1-ISI-003-1 0 hl V NIAGARA NUCLEAR POWER STATION H U MOHAWK THIRD INSERVICE INSPECTION INTERVAL Rev. 0 TEN-YEAR INSERVICE INSPECTION Date: October 15, 1999 PLAN AND SCHEDULE TABLE OF CONTENTS - Continued 4.0 Class 1 Tables . ~ .. ~ 19 00.0 Reactor Pressure Vessel ........... 1thru 83 01.0 Main Steam . .......... 84thru90 31.0 Feedwater System . ........ 91 thru 97 32.0 Reactor Recirculation System .. . 98thru130 33.0 Reactor Clean Up ....... 131 thru 135 36.0 Reactor Instrumentation ....... 136 thru 137 37.0 Reactor Drain 8 Vent .. ........ 138 thru 143 38.0 Reactor Shutdown Cooling ........ 144 thru 147 39.0 Emergency Condenser System ........ 148 thru156 40.0 Reactor Core Spray System . ....... 157thru171 42.1 Liquid Poison System ..... .. 172 thru 173

~

44.1 Control Rod Drive System ........ 174 thru 177 5.0 Class 2 Tables ~ .. ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 20 02.0 Main Steam System . ...... 177thru179 03.0 Main Steam System . ..... 180 thru 181 39.0 Emergency Condenser System . ...... 182 thru 196 44.2 Control Rod Drive System .. ...... 197 thru 198 80.0 Reactor Containment Spray System . ...... 199 thru 210 81.0 Reactor Core Spray System 211 thru 222 93.0 Reactor Containment Spray System . 223 thru 225 6.0 Class 3 Tables 21 38.0 Shutdown Cooling Water System 226 thru 226 39.0 Emergency Condenser System . 227 thru 223 54.0 Spent Fuel Pool Cooling System 228 thru 235 57.0 Spent Fuel Pool Cooling System 236 thru 236 70.0 'eactor Building Closed Loop Cooling System 237 thru 242 72.0 Emergency Service Water System 243 thru 244 93.0 Reactor Containment Spray System 245 thru 248 APPENDICES A Acceptance Criteria 22 B Nondestructive Examination Procedure Listing 24 C Ultrasonic Calibration Blocks 26 D Class 1, 2, and 3 Weld/Support Location Maps 33 E ASME Code Cases .. 38 File: NMP1ISIPL.wpd

0 NINE MILE POINT NMP1-ISI-003-10 El 1 N1AGARA NUCLEAR POWER STATION H U MOHAWK THIRD INSERVICE INSPECTION INTERVAL Rev. 0 TEN-YEAR INSERVICE INSPECTION Date: October 15, 1999 PLAN AND SCHEDULE TABLE OF CONTENTS - Continued LIST OF FIGURES 2-1 Tee Weld ID 14 2-2 Elbow weld ID 14 2-3 Reducer weld ID 15 3-1 Inservice Inspection Schedule . 18 LIST OF TABLES 1-2 NMP1 Inservice Inspection Periods 7 A-1 Class 1 Acceptance Standards 22 A-2 A-3 Class 2 Acceptance Standards ............ .... 23 Class 3 Acceptance Standards 23 A-4 Component Support Acceptance Standards . 23 File: NMP1ISIPL.wpd

I NINE MILE POINT NMP1-ISI-003-1 0 V NIAGARA NUCLEAR POWER STATION N 4 MOHAWK THIRD INSERVICE INSPECTION INTERVAL Rev. 0 TEN-YEAR INSERVICE INSPECTION Date: October 15, 1999 PLAN AND SCHEDULE RECORD OF REVISION', ": ;

REVISION DATE , 'FFECTED No. 'PAGES 0 October 15, 1999 Entire Ten-Year Inservice Inspection Plan and Document Schedule for the 3" Ten Year Inservice Inspection Interval e

File: NMP1ISIPL.wpd

NINE MILE POINT N MP1-ISI-003-10 Y NIAGARA NUCLEAR POWER STATION N Lf MOHAWK THIRD INSERVICE INSPECTION INTERVAL Rev. 0 TEN-YEAR INSERVICE INSPECTION Date: October 15, 1999 PLAN AND SCHEDULE ABSTRACT This document provides the Third Interval Ten-Year Inservice Inspection Plan and Schedule for Nine Mile Point Nuclear Power Station, Unit 1.

The Schedule identifies those components and/or systems (including supports) which are classified Quality Group A, B and C (ASME Code Class 1, 2, and 3, and have been selected for nondestructive examination, as set forth in the ASME Boiler and Pressure Vessel Code,Section XI, 1989 Edition, no Addenda, to the extent practical within the limitations of design, geometry and materials of construction of the components as stated in 10 CFR 50.55a (b)(2).

Where an examination required by Section XI is determined to be impractical, the basis for this determination is included in the Nine Mile Point Insetvice Inspection Program, in the form of a Request for Relief.

Tables for each system subject to examination are included within this document, and provides Code classification, Code examination category, Code item number, component identification and description, examination method, and where within the Third Ten-Year Inspection Interval and period the component is scheduled to be performed.

File: NMP1ISIPL.wpd

NINE MILE POINT NMP1-ISI-003-10 El Y NlAGARA NUCLEAR POWER STATION H U MOHAWK THIRD INSERVICE INSPECTION INTERVAL Rev. 0 TEN>>YEAR INSERVICE INSPECTION Date: October 15, 1999 PLAN AND SCHEDULE

1.0 INTRODUCTION

This document details the Third Interval, Ten-Year Inservice Inspection Plan and schedule for selected components, welds, supports, bolting, pump casings, valve bodies, and reactor pressure vessel internals for the Nine Mile Point Nuclear Power Station, Unit 1.

Niagara Mohawk Power Corporation (NMPC), is the Owner of Record.

The Commercial Service Date for the Nine Mile Point Nuclear Power Station, Unit 1 is December 26, 1969.

1.1 Inspection Interval The Third Inservice Inspection Interval becomes effective on December 26, 1999 and is scheduled to end on December 25, 2009.

1.2 Inspection Periods The Third lnservice Inspection Interval is divided into three successive inspection periods as determined by calendar years of plant service within the inspection interval. Identified below are the period dates for the third inspection interval as defined by Inspection Program NBN In accordance with IWB-2412(b) the inspection period specified below may be decreased or extended by as much as 1 year to enable inspection to coincide with NMP1's plant outages.

TABLE 1-2 NMP1 INSERVICE INSPECTION PERIODS INSPECTION PERIOD START PERIOD END REFUEL REFUEL PERIODS DATES 'DATES OUTAGE OUTAGE YEAR December 26, 1999 December 25, 2002 RFO-16 2001 December 25, 2002 December 26, 2006 RFO-17 2003 RFO-18 2005 December 26, 2006 December 25, 2009 RFO-19 2007

  • The plant operating license is currently scheduled to expire on August 22, 2009.

1.3 Applicable Documents The Third Inservice Inspection Program for Quality Group A, B, and C (ASME Code Class 1, 2 and 3), systems and components (including their supports) was developed after giving due consideration to the following documents and subject to the limitations and modifications listed File: NMP1ISIPL.wpd

NINE MILE POINT NMP1-ISI-003-10 H V NIAGARA NUCLEAR POWER STATION H V MOHAWK THIRD INSERVICE INSPECTION INTERVAL Rev. 0 TEN-YEAR INSERVICE INSPECTION Date: October 15, 1999 PLAN AND SCHEDULE in 10 CFR 50.55a(b), and to the extent practical within the limitations of design, geometry and materials of construction. Specific areas within this document where these document are used in the preparation of this program are addressed within the area affected.

Code of Federal Regulations 10 CFR 50.55(a) Code of Federal Regulations; Federal Register, Volume 64, Number 183, dated September 22, 1999, amendment to the regulation.

ASME Code Editions and Addenda ASME Boiler and Pressure Vessel Code, Sections V, 1989 Edition, "Nondestructive Examination" ASME Boiler and Pressure Vessel Code,Section XI, 1989 Edition, "Rules for Inservice Inspection of Nuclear Power Plant Components" ASME Boiler and Pressure Vessel Code,Section XI, 1992 Edition through the 1992 Addenda, "Rules for Inservice Inspection of Nuclear Power Plant Components",

Subsections IWE and IWL.

USNRC Regulatory Guides The following list of Regulatory Guides are applicable to the Nine Mile Point Nuclear Power Station Third Inservice Inspection Program:

1.26 Quality Group Classifications and Standards for Water-Steam, and Radioactive-Waste-Containing Components of Nuclear Power Plants, Revision 2, June 1975.

1.65 Materials and Inspections for Reactor Vessel Closure Studs, dated October 1973, Regulatory Position C.4.b.

1.84 Design and Fabrication Code Case Acceptability ASME Section III, Division 1, Latest Revision.

1.85 Material Code Case Acceptability ASME Section III, Division 1, Latest Revision.

1.147 Inservice Inspection Code Case Acceptability ASME Section XI, Division 1, Revision 12..

NMP1 Specific Documents Nine Mile Point Unit 1 Updated Final Safety Analysis Report, Sections 1, 5, 7, 9, 12 File: NMP1ISIPL.wpd

0 NINE MILE POINT NMP1-ISI-003-10 Y NIAGARA NUCLEAR POWER STATION N U MOHAWK THIRD INSERVICE INSPECTION INTERVAL Rev. 0 TEN-YEAR INSERVICE INSPECTION Date: October 15, 1999 PLAN AND SCHEDULE and 16.

Nine Mile Point Unit 1 Technical Specifications, USNRC Docket number 50-220, Sections 3.6 and 4.6.

USNRC NUREGS/SRP's USNRC NUREG 0313, Technical Report on Material Selection and Processing Guidelines for BWR Coolant Pressure Boundary Piping, Revision 2.

USNRC NUREG 0619, BWR Feedwater Nozzle and CRD Return Lines.

USNRC Bulletins 82-03 Stress Corrosion Cracking in Thick-Wall, Large-Diameter, Stainless Steel, Recirculation System Piping at BWR Plants, Revision 1, October 28, 1982.

USNRC Generic Letters 88-01 USNRC Position on IGSCC in BWR Austenitic Stainless Steel Piping, January 25, 1988.

88-01 NRC Position on Intergranular Stress Corrosion Cracking (IGSCC) in BWR Austenitic Stainless Steel Piping, Supplement 1, February 4, 1992.

81-11 Feedwater and Control Rod Drive Nozzle Cracking, 90-05 Guidance for Performing Temporary Non-Code Repairs to ASME (ISI) Code Class 1, 2 and 3 Piping and Components, June 15, 1990.

90-09 Alternative Requirements for Snubber Visual Inspection Intervals and Corrective Actions, December 11, 1990.

94-03 Intergranular Stress Corrosion Cracking (IGSCC) of Core Shroud in Boiling Water Reactors, February 1, 1995.

98-05 Boiling Water Reactor Licensees Use of the BWRVIP 05 Report to Request Relief rom Augmented Examination Requirements on Reactor Pressure Vessel Circumferential Shell Welds, December 10, 1998.

Additional References or Commitments Requirements of the complete BWRVIP implementation criteria for the Third Ten Year Inservice Inspection Interval is currently under development. Upon completion of this process the applicable information will be incorporated within ISI Program. General Information pertaining to BWRVIPs implementation is contained in the ISI Program NMP1-ISI-003, Section 6.0 Titled Augmented Examinations.

File: NMP1ISIPL.wpd

0 NINE MILE POINT NMP1-ISI-003-10 Y NIAGARA NUCLEAR POWER STATION N U MOHAWK THIRD INSERVICE INSPECTION INTERVAL Rev. 0 TEN-YEAR INSERVICE INSPECTION Date: October 15, 1999 PLAN AND SCHEDULE USNRC Informational Notices 89-79 Degraded Coatings and Corrosion of Steel Containment Vessels, December 1, 1989.

ASME Code Cases Code Cases approved through Regulatory Guide 1.147 may be proposed for revision to the inspection plan. Specific Code Cases used in the preparation of this document are identified below.

N-460 Alternative Examination Coverage for Class 1 and Class 2 Welds,Section XI, Division 1. RG 1.147, Rev. 12 N-491-1 Alternative Rules for Examination of Class 1, 2, 3 and MC Component Supports of Light Water Cooled Power Plants,Section XI, Division 1.

RG 1.147, Rev. 12.

N-509 Alternative Rules for the Selection and Examination of Class 1, 2 and 3 Integrally Welded Attachments,Section XI, Division 1. RG 1.147, Rev. 12.

N-524 Alternative Examination Requirements for Longitudinal Welds in Class 1 and 2 Piping Section XI, Division 1. RG 1.147, Rev. 12.

Note: See Appendix E "Code Cases" of the 10 Year Inspection Plan for a complete listing applicable Code Cases.

1.4 Applicable Code Editions and Addenda 1.4.1 Third Inspection Interval Pursuant to Title 10, Part 50, Section 55a(g)(4), of the Code of Federal Regulations, the Inservice Inspection requirements applicable to nondestructive examination and system pressure testing for the Third Inservice Inspection Interval are based on the rules set forth in the 1989 Edition, no Addenda of Section XI, that was endorsed twelve months prior to the start of the Third Inspection Interval.

1.4.2 Subsequent Code Editions and Addenda As permitted by 10 CFR 50.55a(g)(4)(iv), the NMPC may elect to meet the requirements set forth in subsequent Editions and Addenda of Section XI that are incorporated by reference into 10 CFR 50.55a(b)(2), subject to the applicable limitations and modification and subject to USNRC approval.

File: NMP1ISIPL.wpd

Ol NINE MILE POINT N MP1-ISI-003-10 El V NIAGARA NUCLEAR POWER STATION IlU MOHAWK THIRD INSERVICE INSPECTION INTERVAL Rev. 0 TEN-YEAR INSERVICE INSPECTION Date: October 15, 1999 PLAN AND SCHEDULE Portions of Editions and Addenda may also be used provided that all related requirements to the respective Editions and Addenda are met. NMPC intends to continually evaluate and apply, as appropriate, changes in adopted Code Editions and Addenda which provide the continuing assurance of the quality and safety of pressure retaining components and systems.

File: NMP1ISIPL.wpd

0 NINE MILE POINT NMP1-Isl-003-1 0 El Y NIAGARA NUCLEAR POWER STATION a U MOHAWK THIRD INSERVICE INSPECTION INTERVAL Rev. 0 TEN-YEAR INSERVICE INSPECTION Date: October 15, 1999 PLAN AND SCHEDULE 2.0 ~ DEVELOPMENT OF INSPECTION PLAN This document provides the component schedule for inservice nondestructive examinations to be performed over the Third Ten-Year Inservice Inspection Interval on Class 1, 2 and 3 components and their supports of the Niagara Mohawk Power Corporation (NMPC), Nine Mile Point Nuclear Power Station (NMP1). Component and/or system selected for nondestructive examination are scheduled in accordance with the requirements of Section XI, to the extent practical.

2.1 CLASS 1 SYSTEMS/COMPONENTS The Class 1 system boundaries subject to examination were developed based upon the requirements of 10 CFR 50.2(v) and NMPC NMP1-FSAR. The Class 1 components and systems (including supports) selected for examination are identified in Section 4.0 of this document.

2.2 CLASS 2 SYSTEMS/COMPONENTS The Class 2 system boundaries subject to examination were developed based upon the requirements of Regulatory Guide 1.26 and the NMPC NMP1-FSAR. The Class 2 components and systems (including supports) selected for examination are identified in Section 5.0 of this document.

2.3 CLASS 3 SYSTEMS/COMPONENTS The Class 3 system boundaries subject to examination were developed based upon the requirements of Regulatory Guide 1.26, and the NMPC NMP1-FSAR. The Class 3 components and systems (including supports) selected for examination are identified in Section 6.0 of this document.

2.4 CLASS 1, CLASS 2 AND CLASS 3 COMPONENT SUPPORTS - IWF Component supports selected for examination shall be the supports of those components that are required to be examined under IWB, IWC and IWD, and are included within Sections 4.0, 5.0 and 6.0 as applicable.

2.5 SUBSTITUTE EXAMINATIONS NMPC may substitute components scheduled in this Document for others not previously scheduled when the original selection was part of the additional piping weld selection. This substitution may be done due to such conditions as limited physical access, high radiation levels, inaccessibility etc. Such changes will be noted in the Summary Report Submittal.

Specific examinations that are required, and can not be completed within the periodfinterval will be identified within the Summary Report Submittal, and may be the subject of a request for relief.

2.6 NONDESTRUCTIVE EXAMINATIONS Nondestructive examinations will be performed in accordance with established Niagara File: NMP1ISIPL.wpd

NINE MILE POINT NMP1-ISI-003-1 0 Y NIAGARA NUCLEAR POWER STATION N kJ MOHAWK THIRD INSERVICE INSPECTION INTERVAL Rev. 0 TEN-YEAR INSERVICE INSPECTION Date: October 15, 1999 PLAN AND SCHEDULE Mohawk Power Corporation (NMPC) nondestructive examination procedures and/or NMPC approved vendor procedures which conform to the requirements of the NMPC Quality Assurance Program and the applicable sections of the ASME Boiler and Pressure Vessel Code. NMPC approved vendor NDE Procedures will be identified as required, (example, Automated UT of RPV).

2.7 WELD/SUPPORT LOCATION MAPS Weld/Support location maps Listing indicating components, areas, weld locations, and other information pertinent to the performance of the inservice Nondestructive examinations are contained in Appendix C.

2.8 ULTRASONIC CALIBRATIONBLOCKS Ultrasonic calibration blocks for each component subject to volumetric examination are maintained at the plant site. A listing of applicable ultrasonic calibration blocks is included in Appendix B.

2.9 WELD IDENTIFICATION Longitudinal welds in Class 2 piping and pipe fittings do not receive unique identification numbers from the spool fabricators. All longitudinal pipe welds intersecting any of the selected circumferential welds will also be examined. As an alternate to Table IWB-2500-1, ASME Code Case N-524, "Alternative Examination Requirements for Longitudinal Welds in Class 1 Piping Section XI, Division 1", shall be used as defined below:

(A) When only a surface examination is required, examination of longitudinal piping welds is not required beyond those portions of the welds within the examination boundaries of intersecting circumferential welds.

(B) When both surface and volumetric examinations are required, examination of longitudinal piping welds is not required beyond those portions of the welds within the examination boundaries of intersecting circumferential welds providing the following requirements are met.

(1) Where longitudinal welds are specified and locations are known, examination requirements shall be met for both transverse and parallel flaws at the intersection of the welds and for that length of longitudinal weld within the circumferential weld examination volume; (2) Where longitudinal welds are specified but locations are unknown, or the existence of longitudinal welds is uncertain, the examination requirements shall be met for both transverse and parallel flaws within the entire examination volume of intersecting circumferential welds.

File: NMP1ISIPL.wpd

NINE MILE POINT NMP1-ISI-003-1 0 El Y NIAGARA NUCLEAR POWER STATION H U MOHAWK THIRD INSERVICE INSPECTION INTERVAL Rev. 0 TEN-YEAR INSERVICE INSPECTION Date: October 15, 1999 PLAN AND SCHEDULE Since Class 2 longitudinal welds are required to be examined from the intersecting circumferential weld, they were given unique identification numbers as denoted below.

Fittings: Longitudinal welds in fittings are identified by adding letter A, B, or C, (1, 2, or 3), as applicable, to the I.D. for the reference weld. The reference weld is defined as the first circumferential weld encountered when entering the fitting on the direction of the flow.

The following figure shows the convention for identifying which weld in a welded fitting receives a particular letter designation.

Tee Case 1: Three welds located as shown in Figure 2-1.

Tee Case 2: If only one weld Figure 2-1 TEE weld ID exists it is identified by the letter A or 1.

Figure 2-1 Tee Weld ID Elbow Case 1: Two welds located as shown in Figure 2-2, one located on the inside radius and the other on the outside radius.

Elbow Case 2: If only one weld exists it is identified by the letter A or 1.

Figure 2-2 Elbow weld ID File: NMP1ISIPL.wpd

0 NINE MILE POINT NMP1-ISI-003-1 0 V NlAGARA NUCLEAR POWER STATION N U MOHAWK THIRD INSERVICE INSPECTION INTERVAL Rev. 0 TEN-YEAR INSERVICE INSPECTION Date: October 15, 1999 PLAN AND SCHEDULE Elbow Case 3: If two welds exist in locations other than Case 1, Weld A or 1 is the first weld encountered when moving clockwise from the reference weld datum while looking in the direction of flow. The other weld is identified by B or 2.

Reducer Case 1: If only one weld exists it is identified by the letter A or 1.

Reducer Case 2: If two welds exist, weld A or 1 is the first weld encountered when moving clockwise from the reference weld datum while looking in the direction of flow. The other weld is identified by B or 2. See Figure 2-3.

Figure 2-3 Reducer weld ID Piping: Longitudinal piping welds are not assigned a specific weld identification number. They are identified by reference to the intersecting circumferential weld first encountered when entering the seamed pipe in the direction of flow.

File: NIVIP1ISIPL.wpd

0 NINE MILE POINT NMP1-ISI-003-1 0 Y NlAGARA NUCLEAR POWER STATION N U MOHAWK THIRD INSERVICE INSPECTION INTERVAL Rev. 0 TEN-YEAR INSERVICE INSPECTION Date: October 15, 1999 PLAN AND SCHEDULE 3.0 RECORDS 3.1 General Records and Reports of Inservice Inspection activities (such as Programs, Plans, Schedules, calibration, examination procedures, examination results, reports, equipment and personnel certifications, corrective actions taken or recommended will be developed and maintained in accordance with IWA-6000 of the ASME Boiler and Pressure Vessel Code,Section XI.

3.1.1 SCHEDULED EXAMINATIONTABLES The Scheduled Examination Tables for Inservice examinations of major components of Niagara Mohawk Power Corporation, Nine Mile Point Nuclear Power Station will be in a format similar to Figure 3-1.

3.1.2 INSPECTION ZONES Areas subject to examination have been divided into systems. Each system is defined by a weld/support location map which identifies and locates all welds, supports, and other examination areas subject to and/or selected for examination within each system.

3.1.3 CODE ITEM CLASSIFICATION For the sake of continuity and clarity, all items to which a Code Category and Code Item Number can be applied are identified.

3.1.4 INSPECTION/EXAMINATIONTABLE CONTENTS The Inservice Inspection/Examination Tables provide the following information:

ASME SECTION XI ITEM NUMBER - Listed in this column is the appropriate item number from Table IWB-2500-1, IWC-2500-1, IWD-2500-1 or IWF-2500-1, as applicable, of the ASME Boiler 8. Pressure Vessel Code,Section XI.

COMPONENT IDENTIFICATION- The examination area identification is the unique component or weld identification number. This number also appears on the applicable ISI Weld/Support Location Map.

COMPONENT DESCRIPTION - The examination area description is a brief description of the component or, in the case of a weld, the parts being joined.

CODE EXAMINATION CATEGORY - Listed in this column are the appropriate examination categories from Tables IWB-2500-1, IWC-2500-1, IWD-2500-1 or IWF-2500-1, as applicable, of the ASME Boiler 8 Pressure Vessel Code,Section XI.

CODE EXAMINATION METHODS - Listed in this column are the appropriate nondestructive examination method(s) to be used for each component or item subject File: NMP1ISIPL.wpd

0 NINE MILE POINT NMP1-ISI-003-10 El Y NIAGARA NUCLEAR POWER STATION H U MOHAlhlK THIRD INSERVICE INSPECTION INTERVAL Rev. 0 TEN-YEAR INSERVICE INSPECTION Date: October 15, 1999 PLAN AND SCHEDULE to examination, if applicable.

ISI INTERVAL - Identified in this column are numbers 1, 2, and 3. Each number signitying an inspection period. The current inspection interval relating to this Table is number 3. Within each column a system of codes are entered to define the status of each component or item. For the purpose of providing Tables of components or areas selected for examination during the interval an (X) will be placed on the applicable row. Each row is defined by period, depending on where the (X) is placed, will determine when that item is scheduled to be examined within the interval and period. Additional codes are used to provide a status of examinations conducted during a given period in time. Additional codes such as those identified in Figure 3-1 may also be used.

REMARKS - This column identifies examination note(s) and/or instruction applicable to a particular item.

3.2 FINAL REPORTS Following the completion of the Inservice Inspection Activity, NMPC shall prepare a Inservice Inspection Final Report. The Final Report will be tiled at the Nine Mile Point site Document Control Center. Final Examination Report Tables are included as part of the Final Report along with any additional records and reports in order to provide a documentation of the complete examination activity.

This report shall be made available for review by the Enforcement and Regulatory Authority having jurisdiction at the plant side.

3.3 INSERVICE INSPECTION

SUMMARY

REPORT Following the units return to service, NMPC shall prepare a Summary Report of the ISI activity.

The Summary Report shall be filed with the Nuclear Regulatory Commission as required by Section XI and/or Code Case N-532.

File: NMP1ISIPL.wpd

NINE MILE POINT NMP1-ISI-003-10 hl Y NlAGARA NUCLEAR POWER STATION H U MOHAWK THIRD INSERVICE INSPECTION INTERVAL Rev. 0 TEN-YEAR INSERVICE INSPECTION Date: October 15, 1999 PLAN AND SCHEDULE DATE: (A) Nine Mlle Point Nuclear Plant unit 1 Page (C)

Inservlce Inspection Long Term Plan Rev. (8) Class X Section XI Scheduled Components System (D)

INSPECTION INTERVAI PLAN STATUS Summary Examination Area ASME Number Identiiicatlon Sec. XI Categy Item No NDE Meth

First Period Second Period OUTAGE Third Period Instructions

" Calibration Blocks-1234 1234 1234 DRAWING NUM8ER: (E), LINE NO. (F)

(G) (I) (J) (H) (K) (L)--. - - - - - - - (K)(M)

(A) Denotes the date of the inspection plan table (B) Denotes the current revision number of the plan (C) Identifies the page number of the table (D) Identifies the System applicable to this table

) Denotes the applicable Drawing number for this table

) Identifies the applicable Line for this table

6) Denotes the Summary Number (I) Denotes the component or weld identification number (J) Denotes the ASME Code Category (H) Denotes the ASME Code Item Number (K) Denotes the NDE Method to be used for the examination (L) Shows when an item was examined or is scheduled to be examined. Any interval can be shown separately.

X - Scheduled P - Partial

-

C Completed E - Expanded Scope A - Augmented B - Baseline (M) Denotes specific instruction applicable to the item FIGURE 3-1 lnservice Inspection Plan (also known as Long Term Plan)

File: NMP1ISIPL.wpd

NINE MILE POINT NMP1-ISI-003-1 0 Y NIAGARA NUCLEAR POWER STATION N kJ MOHAWK THIRD INSERVICE INSPECTION INTERVAL Rev. 0 TEN-YEAR INSERVICE INSPECTION Date: October 15, 1999 PLAN AND SCHEDULE 4.0 CLASS 1 INSERVICE INSPECTION PLAN TABLES This section contains the Long Term Ten-Year Inservice Inspection Examination Tables for nondestructive examinations of selected systems and components for the Second Inservice Inspection Interval.

00.0 Reactor Pressure Vessel 1 thru 83 01.0 Main Steam 84 thM 90 31.0 Feedwater System . 91 thru97 32.0 Reactor Recirculation System .... 98thru130 33.0 Reactor Clean Up 131 thru 135 36.0 Reactor Instrumentation . 136 thru 137 37.0 Reactor Drain 8 Vent . 138 thru 143 38.0 Reactor Shutdown Cooling . 144 thru 147 39.0 Emergency Condenser System 148 thru 156 40.0 Reactor Core Spray System .. 157 thru 171 42.1 Liquid Poison System . 172 thru 173 44.1 Control Rod Drive System . 174 thru 177 File: NMP1 ISIPL.wpd

DATE: 10/15/99 NINE MILE POINT NUCLEAR PIANT UNIT 1 PAGE: 1 REVISION: 0 ZNSERVZCE INSPECTION TEN-YEAR PLAN CZASS 1 SECTION XZ SCHEDULED COMPONENTS J Welds NUMBER: 00.0 INSPECTION INTERVAL PIAN STATUS PRESERVICE YEAR AS ME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER ZDENTZFZCATZON ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 + +CALIBRATION BLOCK*+

Control Rod Drive Housings (REF. DWG. NO. 28A) 002610 DRV-44-XXXX(NC02) NCTS UT Prior to and after each CRDH Upper- J Weld & 503783

- - - Roll Repair Drives to Roll 3 X X X - - X Area be determined later

+*LATER**

002620 DRV 44-XXXX(NC02) NCTS UT Examine (2) previously CRDH to Upper-J Weld 503783 roll-repaired CRDH, only

- - - - -

X X X X if made availablc thru norm drive maint., 1" above s below upper-J veld, Drives to bc dctermincd during each outage ~+LATER*w 630 DRV-44-XXXX(NC02) NCTS UT Examine (2) previously CRDH Roll Repair 503783 rolled areas to include X - - - X X - - X Region volume of base material of 1" above C beld roll band, only if made availablc thru norm drive maint., Drives to bc determined during 1

  • LATER* 4

0 DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 2 REVISION: 0 ZNSERVZCE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XI SCHEDULED COMPONENTS ure Head Nuts NUMBER: 00.0 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERZOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ++CALIBRATION BLOCK**

00. 0 RPV (REF. DWG. NO. 28A) 002700 CH-01-N B-G-1 VT-1 +AN/A**

Closure Head Flange B6.10 Nuts X 002800 CH-02-N B-G-1 VT-1 *~N/A+*

Closure Head Flange B6.10 3 X Nuts 002900 CH-03-N B-G-1 *AN/A%1 Closure Head Flange B6.10 3 X Nuts 003000 CH-04-N B-G-1 a 1N/Aa a Closure Head Flange B6.10 3 X Nuts 003100 CH-05-N B-G-1 VT-1 Closure Head Flange B6.10 3 X Nuts 003200 CH-06-N B-G-1 VT-1 ~~N/A~~

Closure Head Flange B6.10 3 X Nuts 003300 CH-07-N B-G-1 VT-1 aaN/Aaa Closure Head Flange B6.10 3 X Nuts 003400 CH-08-N B-G-1 VT-1 ~+N/A**

Closure Head Flange B6.10 Nuts 3 X

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 3 REVISION: 0 INSERVZCE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XI SCHEDULED COMPONENTS ura Head Nuts NUMBER: 00.0 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERZOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE - OUTAGE INSTRUCTIONS NUMBER IDENTZFZCATZON ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 +*CALIBRATION BLOCK**

003500 CH-09-N B-G-1 ++N/A++

Closure Head Flange B6. 10 3 X Nuts 003600 CH-10-N BG1 **N/A~~

Closure Head Flange B6. 10 3 X Nuts 003700 CH-11-N B-G-1 **N/A**

Closure Head Flange B6.10 3 X Nuts 003800 CH-12-N B G 1 **N/A*~

Closuro Head Flange B6.10 3 X Nuts 003900 CH-13-N B-G-1 *AN/A1*

Closure Head Flange B6. 10 Nuts X 004000 CH-14-N B"G-1 ffN/A*%

Closure Head Flange B6. 10 3 X Nuts 004100 CH-15-N B"G-1 *aN/Aas Closure Head Flange B6.10

'uts 3 X 004200 CH-16 N B-0"1 VT 1 **N/A++

Closure Head Flange B6 10

~

3 X Nuts

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 4 REVZSZON: 0 ZNSERVICE INSPECTION TEN-YEAR PZAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS ure Head Nuts NUMBER: 00.0 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR ASME FIRST SECOND THIRD SEC. XI PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 e iCALIBRATION BLOCK**

004300 CH-17-N B-G-1 VT-1 Closure Head Flange B6.10 3 X Nuts 004400 CH 18-N B G 1 VT 1 aeN/As*

Closure Head Flange B6. 10 3 X Nuts 004500 CH-19-N B-G-1 tkN/At1 I

Closure Head Flange B6. 10 3 X Nuts 004600 CH-20-N B-G-1 VT-1 e*N/A*a Closure Head Flange B6. 10 3 X Nuts 004700 CH-21-N B-G-1 eaN/A+a Closure Head Flange B6.10 Nuts 3 X 004800 CH-22-N B-G-1 VT-1 **N/A*%

Closure Head Flange B6.10 3 X Nuts 004900 CH 23-N B G-1 *~N/A~~

Closure Head Flange B6.10 Nuts 3 X 005000 CH-24-N B-G-1 VT-1 **N/A~~

Closure Head Flange B6 10 F

Nuts 3 X

DATE: 10/15/99 NINE MILE POZNT NUCLEAR PLANT UNIT 1 PAGE: 5 REVISZON: 0 ZNSERVZCE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XI SCHEDULED COMPONENTS ure Head Nuts NUMBER: 00. 0 INSPECTION INTERVAL PLAN STATUS PRESERVZCE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 y yCALIBRATION BLOCKt a 005100 CH-25-N B-G-1 VT-1 **N/A4*

Closure Head Flange B6. 10 3 X Nuts 005200 CH-26-N B-G-1 VT 1 4 4N/Af

  • Closure Head Flange B6. 10 3 X Nuts 005300 CH-27-N B G 1 asN/AP+

Closure Head Flange B6. 10 3 X Nuts 005400 CH-28-N B-G-1 VT 1 **N/A**

Closure Head Flange B6. 10 3 X Nuts 005500 CH-29-N B-G-1 VT-1 aaN/Ass Closure Head Flange B6. 10 3 X Nuts 005600 CH-30-N B-G-1 **N/As*

Closure Head Flange B6.10 3 X Nuts 005700 CH-31-N B G-1 VT-1 1 *'N/A*0 Closure Head Flange B6. 10

'uts 3 X 005800 CH-32-N B-G-1 Closure Head Flange B6.10 3 X Nuts

DATE: 10/15/99 NINE MZLE POINT NUCLEAR PLANT UNIT 1 PAGE: 6 REVISION: 0 ZNSERVICE INSPECTION TEN-YEAR PLAN CZASS 1 SECTION XI SCHEDULED COMPONENTS urc Head Nuts NUMBER: 00.0 INSPECTION INTERVAZ PLAN STATUS PRESERVZCE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER ZDENTIFZCATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 +~CALIBRATION BLOCK**

005900 CH-33-N B-G-1 VT-1 **N/A~~

Closure Head Flange B6. 10 3 X Nuts 006000 CH-34 N B-G-1 *~N/A~+

Closure Head Flange B6.10 3 X Nuts 006100 CH-35-N B-G"1 **N/A*I Closure Head Flange B6. 10 3 X Nuts 006200 CH 36"N B-G-1 ~~N/A~*

Closure Head Flange B6. 10 3 X Nuts 006300 CH-37-N B-G-1 a*N/Aa*

Closure Head Flange B6. 10 3 X Nuts 006400 CH-38-N B-G-1 VT-1 ~~N/A~~

Closure Head Flange B6.10 Nuts X 006500 CH-39-N B-G"1 *~N/A++

Closure Head Flange B6. 10 3 X Nuts 006600 CH-40 N B G 1 VT-1 **N/A*+

Closure Head Flange B6.10 3 X Nuts

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 7 REVISION: 0 ZNSERVZCE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS ure Head Nuts NUMBER: l~ 00. 0 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR ASME FIRST SECOND THIRD SEC. XI PERIOD PERIOD PERIOD

SUMMARY

EXAMINATZON AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 **CALIBRATIONBLOCK~*

006700 CH-41 "N B-G-1 ttN/Af*

Closure Head Flange B6. 10 3 X Nuts 006800 CH-42-N B G-1 *iN/Af4 Closure Head Flange B6.10 3 X Nuts 006900 CH-43-N B G 1 +sN/A@a Closure Head Flange B6. 10 3 X Nuts 007000 CH-44-N B-G 1 **N/A*+

Closure Head Flange B6. 10 3 X Nuts 007100 CH 45-N B-G-1 **N/A*%

Closure Head Flange B6. 10 3 X Nu ts 007200 CH-46-N B-G-1 **N/A~*

Closure Head Flange B6.10 3 X Nuts 007300 CH-47-'N B-G-1 VT 1 j*N/A1*

Closure Head Flange B6.10

'uts 3 X 007400 CH-48-N B-G-l %AN/A*1 Closure Head Flange B6. 10 3 X Nuts

DATE: 10/15/99 NZNE MILE POZNT NUCLEAR PIANT UNIT 1 PAGE: 8 I

REVISION: 0 INSERVZCE INSPECTION TEN YEAR PLAN CLASS 1 SECTION XI SCHEDULED COMPONENTS urc Head Nuts NUMBER: 00.0 INSPECTION ZNTERVAI PLAN STATUS PRESERVZCE YEAR ASME FIRST SECOND THIRD SEC. XI PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1-2 3 4 <<*CALIBRATION BLOCK**

007500 CH"49-N B-G"1 VT-1 ~~N/A~+

Closure Head Flange B6. 10 3 X Nuts 007600 CH-50-N B-G-1 +*N/A+*

Closure Head Flango B6. 10 3 X Nuts 007700 CH-51-N B-G-1 f iN/A*1 Closure Head Flange B6. 10 3 X Nuts 007800 CH-52-N B G-1 VT 1 *+N/A~~

Closure Head Flange B6. 10 3 X Nuts 007900 CH-53-N B-G-1 f4N/A4*

Closure Head Flange B6. 10 3 X Nuts 008000 CH-54-N B-G-1 VT-1 **N/A~~

Closure Head Flange B6. 10 3 X Nuts 008100 CH-55-N B"G-1 VT-1 t*N/A**

Closure Head Flange B6. 10 3 X Nuts 008200 CH-56-N B-G-1 VT 1 ++N/A~+

Closure Head Flange B6. 10 3 X Nuts

DATE: 10/15/99 NINE MILE POZNT NUCLEAR PLANT UNIT 1 PAGE: 9 REVISION: 0 ZNSERVICE INSPECTION TEN-YEAR PZAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS ure Head Nuts NUMBER: 00.0 INSPECTION INTERVAL PIAN STATUS PRESERVZCE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ++CALIBRATION BLOCK*~

008300 CH-57-N B-G-1 VT 1 ++N/A++

Closure Head Flange B6. 10 3 X Nuts 008400 CH-58-N B-G 1 4*N/At1 Closure Head Flange B6.10 3 X Nuts 008500 CH-59-N B-G-1 VT-1 ~1N/Al*

Closure Head Flange B6. 10 3 X Nuts 008600 CH-60"N B-G-1 **N/A**

Closure Head Flange B6. 10 3 X Nuts 008700 CH-61-N B-G-1 ~*N/A**

Closure Head Flange B6. 10 3 X Nuts 008800 CH-62 N B-G-1 4 %N/At 1 Closure Head Flange B6. 10 3 X Nuts 008900 CH-63-N B-G-1 +*N/A~~

Closure Head Flange B6. 10

'uts 3 X 009000 CH 64 N B-G-1 VT 1 *IN/A**

Closuro Head Flange B6. 10 3 X Nuts

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNZT 1 V

PAGE: 10 REVZSZON: 0 INSERVZCE INSPECTION TEN-YEAR PIAN CLASS 1 SECTION XI SCHEDULED COMPONENTS urc Head Studs NUMBER: 00.0 INSPECTZON ZNTERVAL PLAN STATUS PRESERVICE YEAR FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ~ +CALIBRATION BLOCK**

00. 0 RPV (REF. DWG. NO. 28A) 009100 CH" 01-B B-G-1 UT Rcg. Guide 1.65, Surface Closure Head Flange B6.20 MT exam when removed 3 X Studs ~ + 6. 25-RPV-STUD+*

009200 CH 02 B B-G 1 UT Rcg. Guide 1.65, Surface Closure Head Flange B6.20 MT exam when removed 3 X Studs **6.25-RPV-STUD**

009300 CH-03-B B-G-1 UT Rcg. Guide 1.65, MT exam Closure Head Flange B6.20 when removed 3 X Studs ~~6.25-RPV-STUD**

009400 CH-04 B B-G-1 Rcg. Guide 1.65,Surface Closure Head Flange B6. 20 MT exam when removed 3 X Studs *+6.25-RPV-STUD*+

009500 CH-05-B B-G-1 UT Rcg. Guide 1.65,Surface Closure Head Flange B6.20 MT exam when removed 3 X Studs ~~6.25-RPV-STUD**

009600 CH 06 B B-G-1 UT Reg. Guide 1.65,Surface Closure Head Flange B6 20 MT exam when removed 3 X Studs ~~6.25-RPV-STUD**

009700 CH"07-B B-G-1 UT Rcg. Guide 1.65; Surface Closure Head Flange B6.20 MT exam when removed 3 X Studs **6.25 RPV-STUD+~

009800 CH-08-B B-G-1 Rcg. Guide 1.65, MT when Closure Head Flango B6.20 removed 3 X Studs ++6.25-RPV STUD++

DATE: 10/15/99 NINE MZLE POINT NUCLEAR PLAIiT UNIT 1 PAGE: 11 REVISION: 0 INSERVICE INSPECTION TEN-YEAR PLAN CIASS 1 SECTION XZ SCHEDULED COMPONENTS ure Head Studs NUMBER: 00. 0 INSPECTION INTERVAL PLAN STATUS PRESERVZCE YEAR ASME FIRST SECOND THIRD SEC. XI PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ~ ~CALIBRATION BLOCK~*

009900 CH-09"B B-G-1 UT Rcg. Guide 1.65, MT when Closure Head Flange B6 20

~ MT removed 3 X ~~6.25 RPV-STUD++

Studs 010000 CH-10-B B G-1 Rcg. Guide 1.65,MT when Closure Head Flange B6. 20 MT removed 3 X Studs ~ +NMP-6. 25-RPV-STUD**

010100 CH-11-B B-G-1 UT Rcg. Guide 1.65, MT when Closure Head Flange B6.20 MT removed 3 X Studs *~6.25 RPV-STUD+*

010200 CH-12-B B-G-1 UT Reg. Guide 1.65,MT exam Closure Head Flange B6.20 MT when removed 3 X Studs **6.25 RPV STUD++

010300 CH-13 "B B-G-1 UT Rcg. Guide 1.65,MT exam Closure Head Flange B6.20 MT when rcmovcd 3 X Studs *~6.25"RPV-STUD**

010400 CH-14-B BG1 Rcg. Guide 1.65, MT exam Closure Head Flange B6. 20 MT when removed 3 X Studs ~~6.25 RPV-STUD**

010500 CH-15-B B "G-l UT Rcg. Guide 1.65, MTexam Closure Head Flange B6.20 when rcmovcd 3 X Studs ++6.25"RPV-STUD*~

010600 CH-16-B B-G"1 Rcg. Guido 1.65, MT exam Closure Head Flange B6.20 MT when removed 3 X Studs *+6.25-RPV STUD*~

DATE: 10/15/99 NINE MILE POZNT NUCLEAR PLANT UNIT 1 PAGE: 12 REVISION: 0 ZNSERVZCE INSPECTZON TEN-YEAR PLAN CZASS 1 SECTION XI SCHEDULED COMPONENTS urc Head Studs NUMBER: 00. 0 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR ASME FIRST SECOND THIRD SEC. XI PERIOD PERIOD PERIOD

SUMMARY

EXAMZNATZON AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ~ +CALIBRATION BLOCX>> ~

010700 CH-17-B B-G-1 UT Rcg. Guide 1.65, MT eaxm Closure Head Flange B6.20 MT when removed 3 X Studs +*6.25-RPV STUD~~

010800 CH-18-B B-G-1 UT Rcg. Guide 1.65, MT exam Closure Head Flange B6.20 MT when removed 3 X Studs ~~6.25-RPV-STUD~~

010900 CH-19-B B-G-1 UT Reg. Guide 1.65,MT exam Closure Head Flango B6. 20 MT when removed Studs **NMP-6.25-RPV-STUD**

011000 CH-20-B B-G 1 Rcg. Guido 1.65,MT exam Closure Head Flange B6.20 MT when removed 3 X Studs **NMP 6. 25 RPV-STUD++

011100 CH-21-B B-G-1 UT Rcg. Guide 1.65, MT exam Closure Head Flange B6.20 when removed 3 X Studs ~ ~NMP-6. 25-RPV-STUD~*

011200 CH-22-B B-G-1 UT Rcg. Guide 1.65, MT exam Closure Head Flange B6. 20 when removed 3 X Studs +~6.25-RPV"STUD**

011300 CH-23-B B-G-1 UT Rcg. Guide 1.65,MT exam Closure Head Flange B6.20 when removed 3 X

'tuds

    • NMP 6. 25-RPV-STUD+ +

011400 CH-24-B B-G-1 UT Reg. Guide 1.65, MT exam Closuro Hoad Flange B6. 20 MT when removed 3 X Studs +*NMP-6. 25-RPV-STUD**

DATE: 10/15/99 NZNE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 13 REVISION: 0 INSERVICE INSPECTION TEN-YEAR PZAN CLASS 1 SECTION XI SCHEDULED COMPONENTS ure Head Studs NUMBER: 00.0 INSPECTION INTERVAL PLAN STATUS PRESERVZCE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ~~CALIBRATION BLOCX**

011500 CH-25-B Closure Head Flange Studs B-G-1 B6.20 UT MT 3 X when r~

Reg. Guide 1.65,MT exam

~ ~NMP-6 . 25-RPV-STVD**

011600 CH-26-B B-G 1 VT Rcg. Guide 1.65, MT when Closure Head Flange B6.20 MT removed 3 X Studs ~ +NMP-6. 25-RPV-STUD~ +

'I 011700 CH-27-B B-G-1 UT Rcg. Guide 1.65, MT exam Closure Head Flange B6.20 MT when rcmovcd 3

Studs ~~NMP"6.25-RPV-STVD**

011800 CH" 28-B B-G-1 Rcg. Guide 1.65, MT exam Closure Head Flango B6.20 MT when rcmovcd 3 X Studs ~ ~NMP-6. 25-RPV-STUD~~

011900 CH-29-B BG1 VT Reg. Guide 1.65, MT exam Closuro Head Flange B6.20 MT when rcmovcd 3

Studs ~+6.25-RPV-STUD~~

012000 CH-30-B B-G-1 UT Rcg. Guido 1.65, MT exam Closure Head Flange B6. 20 MT when removed 3 X Studs ++6.25-RPV STUD~+

012100 CH-31-B B-G-1 UT Rcg. Guide 1.65, MT exam Closure Head Flange B6.20 MT when removed 3 X Studs ~+6.25-RPV STUD~~

012200 CH-32-B B-G 1 VT Rcg. Guido 1.65, MT exam Closure Head Flange B6.20 MT when rcmovcd 3 X Studs **6.25 RPV-STUD++

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 14 REVISION: 0 INSERVICE INSPECTION TEN"YEAR PLAN CLASS 1 SECTION XI SCHEDULED COMPONENTS urc Head Studs NUMBER: 00. 0 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ~ ~CALIBRATION BLOCK~*

012300 CH-33-B B-G 1 UT Reg. Guide 1.65, MT exam Closure Head Flange B6.20 when rcmovcd 3 X Studs ~~6.25"RPV-STUD*~

012400 CH-34-B B-G-1 UT Reg. Guide 1.65, MT exam Closure Head Flange B6 20

~ MT when removed 3 X Studs **6'5-RPV-STUD**

012500 CH-35-B B-G-l UT Reg. Guide 1.65, MT exam Closure Head Flange B6. 20 MT when removed 3 X Studs ~+6.25-RPV-STUD++

012600 CH 36-B B-G-1 Rcg. Guide 1.65,MT exam Closure Head Flange B6.20 when rcmovcd 3 X Studs +*6.25 RPV STUD++

012700 CH-37-B B-G-1 Reg. Guide 1.65,MT exam Closure Head Flange B6.20 when removed Studs X *~6.25 RPV-STUD~~

012800 CH-38-B B-G-1 UT Reg. Guide 1.65,MT exam Closure Head Flange B6.20 MT when rcmovcd 3 X Studs ~~6.25-RPV-STUD~~

012900 CH-39-B B"G-1 UT Reg. Guide 1.65, MT exam Closure Head Flange B6. 20 MT when removed Studs 3 X ~*6.25-RPV-STUD**

013000 CH 40 B B-G-1 Rcg. Guide 1.65,MT exam Closure Head Flange B6. 20 when rcmovcd 3 X Studs ~+6.25-RPV STUD**

DATE: 10/15/99 NZNE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 15 REVISION: 0 ZNSERVICE INSPECTION TEN YEAR PLAN CLASS 1 SECTION XI SCHEDULED COMPONENTS ure Head Studs NUMBER: 00. 0 INSPECTION ZNTERVAI PIAN STATUS PRESERVZCE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 **CALIBRATIONBLOCK**

013100 CH-41-B B-G-1 UT Reg. Guide 1.65, MT exam Closure Head Flange B6.20 when removed 3 X Studs a+6.25 RPV STUD*a 013200 CH-42-B B-G 1 UT Rcg. Guide 1.65, MT exam Closure Head Flange B6.20 MT when removed 3 X Studs ~~6.25-RPV-STUD+~

013300 CH-43-B B-G-1 Reg. Guide 1.65, MT exam Closure Head Flange B6. 20 when removed 3 X Studs **6.25-RPV-STUD+*

013400 CH-44-B B-G-1 UT Reg. Guide 1.65,MT exam Closure Head Flange B6 20

~ MT when removed Studs X *+6 25-RPV-STUD*+

~

013500 CH-45-B B-G-1 UT Reg. Guide 1.65, MT exam Closure Head Flange B6.20 MT when removed 3 X Studs ~~6.25-RPV-STUD**

013600 CH-46"B B-G-1 UT Reg. Guide 1.65, MT exam Closure Head Flange B6.20 MT when removed 3 X Studs ~*6.25-RPV-STUD**

013700 CH-47-B B-G-1 Reg. Guide 1.65,MT exam Closure Head Flange B6.20 when removed 3 X Studs ~~6.25-RPV-STUD**

013800 CH-48-B B-G-1 UT Reg. Guide 1. 65, MT Closure Head Flange B6.20 MT exam when removed 3 X Studs ~~6.25-RPV-STUD**

DATE: 10/15/99 NINE MILE POINT NUCLEAR PIANT UNIT 1 PAGE: 16 REVISION: 0 ZNSERVZCE ZNSPECTZON TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS ure Head Studs NUMBER: 00. 0 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR ASME SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY METH'IRST NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO 1 2 3 4 1 2 3 4 1 2 3 4 ~ ~CALIBRATION BLOCK~~

013900 CH 49 B B-G-1 UT Reg. Guide 1.65, MT exam Closure Head Flange B6. 20 MT when removed 3 X ++6.25 RPV-STUD++

Studs 014000 CH-50-B B"G"1 UT Rcg. Guide 1.65, MT exam Closure Head Flange B6 ~ 20 MT when removed 3 X Studs ++6.25 RPV-STUD++

014100 CH-51-B B-G-1 UT Rcg. Guide 1.65, MT exam Closure Head Flange B6.20 MT when removed 3

Studs ~~6.25-RPV-STUD*~

014200 CH-52-B B-G-1 Reg. Guide 1.65, MT Closure Head Flange B6.20 MT exam when removed 3

Studs ~ ~NMP-6. 25-RPV-STUD~ ~

014300 CH-53-B B-G 1 Reg. Guide 1.65, MT exam Closure Head Flange B6.20 MT when removed 3 X Studs ++NMP-6.25 RPV STUD*t 014400 CH-54-B B-G-1 UT Rcg. Guide 1.65, MT exam Closure Head Flange B6.20 MT when removed 3 X Studs ~~6.25 RPV-STUD~~

014500 CH-55-B Closure Head Flange Studs

'6 B-G-1

~ 20 UT 3 X Rcg. Guide 1.65, MT exam when removed

~~NMP" 6. 25-RPV-STUD+~

014600 CH"56-B B-G-1 UT Rcg. Guide 1.65, MT exam Closure Head Flange B6 20

~ MT when rcmovcd 3

Studs ~~NMP-6.25-RPV-STUD*>>

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNZT 1 PAGE: 17 REVZSZON: 0 INSERVZCE INSPECTION TEN-YEAR PIAN CLASS 1 SECTION XI SCHEDULED COMPONENTS urc Head Studs NUMBER: 00. 0 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERZOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER ZDENTIFZCATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ~~CALIBRATION BLOCK~~

014700 CH-57-B BG1 UT Reg. Guide 1.65, MT exam Closure Head Flange B6 20 when removed 3

Studs ~~NMP-6.25-RPV-STUD~*

014800 CH-58-B B G 1 UT Rcg. Guide 1.65, MT Closure Head Flange B6.20 MT exam when removed 3 X Studs ~ ~NMP-6. 25-RPV-STUD~ ~

014900 CH-59-B B-G-1 UT Reg. Guide 1.65, MT exam Closure Head Flange B6.20 MT when removed 3 +*6 25-RPV-STUD+*

Studs ~

015000 CH-60-B B-G-l Rcg. Guide 1.65, MT exam Closure Head Flange B6.20 when removed 3

Studs ~~NMP-6.25-RPV-STUD~*

015100 CH-61-B BG1 Rcg. Guide 1.65, MT exam Closure Head Flange B6.20 when removed 3 X Studs aaNMP-6.25-RPV STUDa ~

015200 CH-62-B B-G-1 UT Rcg. Guide 1.65, MT Closure Head Flange B6.20 MT exam when removed 3

Studs **NMP-6.25-RPV STUDY' 015300 CH-63-B B-G-1 Rcg. Guide 1.65, MT exam Closure Head Flange B6.20 when removed 3

'tuds

~~NMP-6.25-RPV-STUD**

015400 CH-64-B B-G-1 UT Rcg. Guide 1.65, MT exam Closure Head Flange B6.20 MT when removed 3 X Studs ~*6. 25-RPV-STUD~~

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 18 REVISION: 0 INSERVICE INSPECTION TEN-YEAR PLAN CIASS 1 SECTION XI SCHEDULED COMPONENTS ure Head Studs NUMBER: 00. 0 INSPECTION INTERVAL PIAN STATUS PRESERVICE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTZPZCATZON ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 +'~CALIBRATION BLOCK++

015500 CH-XX-B B-G-1 MT Per RG 1.65, a minimum Closure Head Plangc B6.30 of 4 studs vill be Studs 3 X - - - X X examLncd each period for a total of 12. **N/A*~

DATE: 10/15/99 NZNE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 19 REVISION: 0 INSERVZCE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS ure Head Washcrs NUMBER: 00.0 INSPECTION INTERVAL PLAN STATUS PRESERVZCE YEAR ASME FIRST SECOND THIRD SEC. XI PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 **CALIBRATIONBLOCK**

00. 0 RPV (REF. DWG. NO. 28) 015600 RV-01-TA B-G 1 VT-1 Reactor Vessel Flange B6.50 3 X Washer 015700 RV-01-TB BG-1VT1 Reactor Vcsscl Flange B6 50~

3 X Washer 015800 RV-02"TA B-G 1 VT 1 Reactor Vessel Flange B6 50 F

3 X Washer 015900 RV-02"TB B-G-1 VT-1 Reactor Vessel Flange B6.50 3 X Washer 016000 RV-03-TA B-G-1 VT-1 Reactor Vcsscl Flange B6 50 F

3 X Washer 016100 RV TB B-G"1 Reactor Vcsscl Flange B6 50

~

3 X Washer 016200 RV-04 TA B-G-1 VT-1 Reactor Vcsscl Flange B6 50

~

3 X Washer 016300 RV-04 TB B-G-1 Reactor Vcsscl Flange B6.50 3 X Washer

DATE: 10/15/99 NINE MILE POINT NUCLEAR PZANT UNIT 1 PAGE: 20 N.

REVISION: 0 INSERVZCE INSPECTION TEN-YEAR PIAN CLASS 1 SECTION XI SCHEDULED COMPONENTS ure Head Washers NUMBER: 00.0 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 **CALIBRATIONBLOCK~ ~

016400 RV-05-TA BG1VT1 Reactor Vessel Flange B6.50 3 X Washer 016500 RV-05-TB B G-l VT-1 Reactor Vessel Flange B6 50~

3 X Washer 016600 RV-06-TA B-G-1 Reactor Vessel Flange B6. 50 3 X Washer 016700 RV-06-TB B-G-1 Reactor Vessel Flange B6 50

~

3 X Washer 016800 RV-07-TA B G-1 VT-1 Reactor Vessel Flange B6 50

~

3 X Washer 016900 RV-07-TB B-G-1 Reactor Vessel Flange B6.50 3 X Washer 017000 RV-08-TA B-G 1 VT 1 Reactor Vessel Flange B6 50 3 X Washer 017100 RV-08-TB B-G-1 VT-1 Reactor Vessel Flange B6 50

~

Washer X

DATE: 10/15/99 NZNE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 21 REVISION: 0 INSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS ure Head Washcrs NUMBER: 00.0 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE ZNSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ~~CALIBRATION BLOCK~~

017200 RV TA B-G 1 VT-1 Reactor Vcsscl Flange B6 50

~

X Washer 017300 RV-09-TB B G 1 VT 1 Reactor Vessel Flange 3 X Washer 017400 RV-10 "TA B-G-1 VT-1 Reactor Vessel Flange B6.50 3 X Washer 017500 RV-10 TB B-G-1 VT 1 Reactor Vessel Flange B6.50 3 X washer 017600 RV-11-TA B"G 1 VT-1 Reactor Vcsscl Flange B6.50 3 X Washer 017700 RV-11-TB B-G-1 VT-1 Reactor Vessel Flange B6.50 3 X Washer 017800 RV-12-TA B-G-1 Reactor Vessel Flange B6.50 3 X Washer 017900 RV-12-TB B-G-1 VT 1 Reactor Vcsscl Flange B6.50 3 X Washer

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 22 REVISION: 0 ZNSERVZCE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS ure Head Washers NUMBER: 00.0 INSPECTION ZNTERVAZ PIJN STATUS PRESERVZCE YEAR ASME FIRST SECOND THIRD SEC. XI PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE -OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ~*CALIBRATION BLOCK**

018000 RV-13-TA B-G-1 VT-1 Reactor Vessel Flange B6.50 3 X Washer 018100 RV-13-TB BG1 Reactor Vessel Flange B6 50

~

3 X Washer 018200 RV-14-TA B-G-1 Reactor Vessel Flange B6.50 3 X Washer 018300 RV-14 TB B G-1 VT 1 Reactor Vessel Flange B6 50 F

3 X Washer 018400 RV-15-TA B-G-1 VT-1 Reactor Vcsscl Flange B6.50 3 X Washer 018500 RV-15 TB B-G-1 VT 1 Reactor Vessel Flange B6.50 3 X washer 018600 RV-16-TA B-G-1 VT-1 Reactor Vcsscl Flange 3 X Washer 018700 RV-16-TB BG1VT1 Reactor Vessel Flange B6 ~ 50 3 X Washer

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 23 REVISION: 0 INSERVICE INSPECTION TEN-YEAR PIAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS ure Head Washers NUMBER: 00.0 INSPECTION INTERVAL PLAN STATUS PRESERVZCE YEAR FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE -OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ++CALIBRATION BLOCK>>~

018800 RV-17-TA B-G-l VT-1 Reactor Vessel Flange B6 50~

3 X Washer 018900 RV-17-TB B-G-1 Reactor Vessel Flange B6.50 3 X Washer 019000 RV 18-TA B-G-1 Reactor Vessel Flange B6.50 3 X Washer 019100 RV-18-TB B-G-1 Reactor Vessel Flange B6 50 F

3 X Washer 019200 RV-19-TA B-G-1 VT-1 Reactor Vessel Flange B6.50 3 X Washer 019300 RV-19-TB B G 1 VT 1 Reactor Vessel Flange B6 50

~

3 X Washer 019400 RV TA B-G-l Reactor Vessel Flange B6.50 3 X Washer 019500 RV-20-TB B-G-1 Reactor Vessel Flange B6 50

~

3 X Washer

DATE: 10/15/99 NINE MZLE POZNT NUCLEAR PLANT UNIT 1 PAGE: 24 REVISION: 0 ZNSERVZCE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS ure Head Washers NUMBER: 00.0 INSPECTION INTERVAL PIAN STATUS PRESERVICE YEAR ASME FIRST SECOND THIRD SEC. XI PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ~*CALIBRATION BLOCK+*

019600 RV-21-TA B-G-1 VT-1 Reactor Vessel Flange B6 50

~

3 X Washer 019700 RV-21-TB B-G-1 Reactor Vcsscl Flange B6 50 F

3 X Washer 019800 RV-22-TA B"G-1 VT-1 Reactor Vessel Flange B6.50 3 X Washer 019900 RV-22-TB B-G-1 Reactor Vcsscl Flange B6.50 3 X Washer 020000 RV-23-TA B-G-1 VT-1 Reactor Vessel Flange B6.50 3 X Washer 020100 RV-23-TB B-G-1 Reactor Vessel Flange B6.50 3 X Washer

'

020200 RV 24 TA B-G-1 VT-1 Reactor Vessel Flange B6.50 3 X Washer 020300 RV-24-TB B-G"1 VT-1 Reactor Vessel Flange B6.50 3 X Washer

DATE: 10/15/99 NINE MIIE POINT NUCLEAR PLANT UNIT 1 PAGE: 25 REVISION: 0 ZNSERVICE INSPECTION TEN-YEAR PLAN CIASS 1 SECTION XZ SCHEDULED COMPONENTS ure Head Washers NUMBER: 00.0 INSPECTION INTERVAL PLAN STATUS PRESERVZCE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERZOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ~*CALIBRATION BLOCK*~

020400 RV-25-TA B-G-1 VT-1 Reactor Vessel Flange B6 50 F

3 X Washer 020500 RV-25-TB BG1 Reactor Vessel Flange B6.50 3 X Washer 020600 RV-26-TA B-G-1 VT 1 Reactor Vessel Flange B6.50 3 X Washer 020700 RV-26-TB B-G-1 Reactor Vessel Flange B6 50 F

3 X Washer 020800 RV-27-TA B-G-1 VT 1 Reactor Vessel Flange 3 X Washer 020900 RV-27-TB B-G-1 VT 1 Reactor Vcsscl Flange B6.50 3 X Washer 021000 RV-28-TA B-G-1 VT 1 Reactor Vcsscl Flange B6.50 3 X Washer 021100 RV-28-TB B-G-1 VT-1 Reactor Vessel Flange B6.50 3 X Washer

DATE: 10/15/99 NINE MILE POINT NUCLEAR PIANT UNIT 1 PAGE: 26 REVISION: 0 ZNSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS urc Head Washcrs NUMBER: 00.0 ZNSPECTION INTERVAL PLAN STATUS PRESERVZCE YEAR ASME FZRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 *~CALIBRATION BLOCK**

021200 RV-29-TA B-G-1 Reactor Vessel Flange B6.50 3 X Washer 021300 RV-29-TB B"G-1 Reactor Vessel Flange B6.50 3 X Washer 021400 RV-30-TA B-G-1 Roactor Vcsscl Flango B6.50 3 X Washer 021500 RV-30-TB B-G-1 Reactor Vessel Flange B6.50 3 X Washer 021600 RV"31- TA B-G-1 Reactor Vessel Flange B6.50 3 X Washer 021700 RV-31-TB B-G-1 VT-1 Reactor Vessel Flange B6.50 3 X Washer 021800 RV-32-TA B "G-1 VT 1 Reactor Vessel Flange B6.50 3 X Washer 021900 RV-32-TB B-G-1 Reactor Vessel Flange B6.50 3 X Washer

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 27 REVISION: 0 INSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS urc Head Washers NUMBER: 00.0 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR ASME FIRST SECOND THIRD SEC. XZ PERZOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATE GY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 +*CALIBRATION BLOCK**

022000 RV-33-TA B-G-1 Reactor Vessel Flange B6 ~ 50 3 X Washer 022100 RV-33-TB B-G-1 VT 1 Reactor Vessel Flange B6.50 3 X Washer 022200 RV-34-TA B G 1 Reactor Vessel Flange B6 50

~

3 X Washer 022300 RV 34 TB B-G 1 Reactor Vessel Flange B6.50 3 X Washer 022400 RV-35-TA B-G 1 Reactor Vessel Flange B6. 50 3 X Washer 022500 RV-35-TB B-G-1 Reactor Vcsscl Flange B6.50 3 X Washer 022600 RV-36-TA B-G-1 VT"1 Reactor Vcsscl Flange B6.50 3 X Washer 022700 RV-36-TB B-G-1 VT-1 Reactor Vessel Flange B6.50 3 X Washer

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 28 REVISION: 0 ZNSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COHPONENTS ure Head Washers NUMBER: 00.0 INSPECTION INTERVAL PLAN STATUS PRESERVZCE YEAR ASME FIRST SECOND THIRD SEC. XI PERIOD PERIOD PERIOD SUHHARY EXAHINATZON AREA CATEGY OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEH NO 1 2 3 4 1 2 3 4 1 2 3 4 ~*CALIBRATION BLOCK~ ~

022800 RV-37-TA B G 1 Reactor Vessel Flange B6.50 3 X Washer 022900 RV-37-TB B-G-1 VT-1 Reactor Vessel Flange B6.50 3 X Washer 023000 RV-38-TA B-G-1 VT-1 Reactor Vessel Flange B6.50 3 X Washer 023100 RV-38-TB B"G-1 Reactor Vessel Flange B6.50 3 X Washer 023200 RV 39 TA B-G-1 Reactor Vessel Flange B6.50 3 X Washer 023300 RV-39-TB B-G-1 Reactor Vessel Flange B6 ~ 50 3 X Washer 023400 RV-40-TA B G 1 Reactor Vcsscl Flange B6.50 3 X Washer 023500 RV-40-TB B-G-1 Reactor Vessel Flange B6.50 3 X Washer

DATE: 10/15/99 NINE MILE POZNT NUCLEAR PIANT UNIT 1 PAGE: 29 REVISION: 0 ZNSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS ure Head Washers NUMBER: 00.0 INSPECTION INTERVAL PLAN STATUS PRESERVZCE YEAR ASME FIRST SECOND THZRD SEC. XI PERIOD PERIOD PERZOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ~~CALIBRATION BLOCK~~

023600 RV-41-TA BG1 VT-1 Reactor Vessel Flange B6.50 X

Washer 023700 RV TB B-G-1 Reactor Vcsscl Flange B6.50 3 X Washer 023800 RV-42-TA B-G-1 Reactor Vessel Flange B6.50 3 X Washer 023900 RV-42-TB B-G-1 Reactor Vcsscl Flange B6.50 3 X Washer 024000 RV 43 TA B-G"1 VT-1 Reactor Vessel Flange B6 50

~

3 X Washor 024100 RV-43-TB B-G-1 VT-1 Reactor Vessel Flange B6.50 3 X Washer 024200 RV-44-TA B G 1 Reactor Vessel Flange B6 50 F

3 X Washer 024300 RV-44-TB B-0" 1 VT-1 Reactor Vcssol Flange B6 50

~

3 X Washer

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 30 REVISION: 0 ZNSERVZCE INSPECTION TEN-YEAR PLAN CZASS 1 SECTION XZ SCHEDULED COMPONENTS urc Head Washcrs NUMBER: 00.0 INSPECTION INTERVAL PIAN STATUS PRESERVZCE YEAR ASME FIRST SECOND THIRD SEC. XI PERZOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ~ +CALIBRATION BLOCK*'~

024400 RV 45 TA BG1 Reactor Vessel Flange B6 50

~

3 X Washer 024500 RV-45-TB B-G-1 Reactor Vcsscl Flange B6.50 3 X Washer 024600 RV-46-TA B-G-1 VT-1 +*N/A++

Reactor Vessel Flange B6 50

~

3 X Washer 024700 RV-46-TB B G-1 **N/A*+

Reactor Vcsscl Flange B6 50

~

3 X Washer 024800 RV-47-TA B-G-1 Reactor Vcsscl Flange B6 50 F

3 X Washer 024900 RV-47-TB B-G-1 VT 1 Reactor Vcsscl Flange B6.50 3 X Washer 025000 RV-48-TA B-G 1 Reactor Vessel Flangh B6.50 3 X Washer 025100 RV-48-TB B-G-1 VT-1 Roactor Vcsscl Flange B6.50 3 X Washer

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 31 REVISION: 0 ZNSERVZCE ZNSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS ure Head Washers NUMBER: 00.0 INSPECTION INTERVAL PLAN STATUS PRESERVZCE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER ZDENTZFZCATZON ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ++CALIBRATION BLOCK~~

025200 RV-49"TA B-G-1 Reactor Vcsscl Flange B6.50 3 X Washer 025300 RV-49-TB B-G-1 VT 1 Reactor Vessel Flange B6.50 3

Washer 025400 RV-50-TA B G-l Reactor Vcsscl Flange B6 ~ 50 3 X Washer 025500 RV-50-TB B-G-l VT-1 Reactor Vessel Flange B6.50 3 X Washer 025600 RV-51-TA B-G-1 VT 1 +*N/A**

Reactor Vessel Flange B6.50 3 X Washer 025700 RV-51-TB B-G-1 VT-1 *~N/A*~

Reactor Vessel Flange B6.50 3 X Washer 025800 RV-52-TA B-G "1 **N/A%*

Reactor Vcsscl Flange B6.50 3 X Washer 025900 RV 52 TB B-G-1 ~*N/A**

Reactor Vessel Flange B6.50 3 X Washer

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 32 REVISION: 0 ZNSERVICE INSPECTION TEN-YEAR PIAN CIASS 1 SECTION XI SCHEDULED COMPONENTS ure Head Washers NUMBER: 00.0 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE -OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 *~CALIBRATION BLOCKi~

026000 RV-53-TA B-G-1 eaN/Aaa Reactor Vessel Flange B6.50 3 X Washer 026100 RV-53-TB B-G-l VT-1 ++N/A*+

Reactor Vessel Flange B6.50 3 X Washer 026200 RV-54-TA B-G-1 ++N/PPa Reactor Vcsscl Flange B6.50 3 X Washer 026300 RV-54-TB B G 1 **N/A*~

Reactor Vessel Flange B6 50

~

3 X Washer 026400 RV-55-TA B"G"1 ktN/Akk Reactor Vessel Flange B6.50 3 X Washer 026500 RV-55-TB BG1 VT-1 ~iN/A+*

Reactor Vessel Flange B6. 50 3 X Washer 026600 RV-56-TA B-G-1 *tN/Aft Reactor Vessel Flange B6.50 3 X Washer 026700 RV-56-TB B"G-1 VT-1 *ON/A**

Reactor Vessel Flange B6. 50 3 X Washer

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 33 REVISION: 0 INSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS ure Head Washcrs NUMBER: 00.0 INSPECTION INTERVAL PLAN STATUS PRE SERVICE YEAR ASME FIRST SECOND THIRD SEC. XI PERIOD PERIOD PERIOD

SUMMARY

EXAMZNATZON AREA CATEGY NDE -OUTAGE ZNSTRUCTIONS NUMBER IDENTIFICATION ZTEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 yqCALIBRATZON BLOCKte 026800 RV-57-TA B-G-1 VT-1 ~*N/A~*

Reactor Vessel Flange B6 50

~

3 X Washer 026900 RV-57-TB B-G-1 4kN/Ak*

Reactor Vessel Flange B6.50 3 X Washer 027000 RV-58"TA B-G-1 VT-1 ~+N/A~~

Reactor Vessel Flange B6.50 3 X Washer 027100 RV-58-TB B-G-1 **N/A~~

Reactor Vcsscl Flange B6.50 3 X Washer 027200 RV-59-TA B-G-1 *+N/A**

Reactor Vessel Flange B6 50

~

3 X Washer 027300 RV-59-TB B-G-1 **N/A**

Reactor Vessel Flange B6 50

~

3 X Washer 027400 RV-60-TA B"G-1 VT-1 **N/Aaa Reactor Vcsscl Flange B6.50 3 X Washer 027500 RV-60-TB B-G-1 VT 1 **N/A**

Reactor Vessel Flange B6.50 3 X Washer

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 34 REVISION: 0 ZNSERVZCE ZNSPECTION TEN-YEAR PLAN CLASS 1 SECTION XI SCHEDULED COMPONENTS urc Head Washers NUMBER: 00.0 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTZFZCATION ZTEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 **CALIBRATIONBLOCK~i 027600 RV-61-TA B G-1 VT-1 ION/A*f Reactor Vessel Flange B6 ~ 50 3 X Washer 027700 RV-61-TB B-G-1 VT-1 **N/A+~

Reactor Vcsscl Flange B6. 50 3 X Washer 027800 RV-62-TA B-G"1 VT-1 **N/A*%

Reactor Vessel Flange B6 50 F

3 X Washer 027900 RV 62 TB B-G-1 **N/A**

Reactor Vessel Flange B6.50 3 X Washer 028000 RV-63-TA B-G-1 ~~N/A~~

Reactor Vcsscl Flange B6.50 3 X Washer 028100 RV-63-TB B-G 1 VT-1 *AN/A**

Reactor Vessel Flange B6.50 3 X Washer 028200 RV-64-TA BG-1 VT 1 **N/Af*

Reactor Vessel Flange B6 ~ 50 3 X Washer 028300 RV-64 TB B-G-1 VT-1 *AN/AOt Reactor Vcsscl Flange B6.50 3 X Washer

DATE: 10/15/99 NZNE HIIE POINT NUCLEAR PLANT UNIT 1 PAGE: 35 REVISION: 0 ZNSERVZCE INSPECTION TEN"YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COHPONENTS rol Rod Drive Housings NUMBER: 00.0 INSPECTION INTERVAL PIAN STATUS PRESERVICE YEAR ASHE FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAHINATZON AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 + ~CALIBRATION BLOCK**

00. 0 RPV (REF. DWG. NO. 28A) 041300 CRD XX-X B-G 2 Only when disassembled, Capscrcws (8) 8 ( B7.80

- - - - -

To be identified as X X X X disassembled during each

)

outage ~~N/A+~

041400 NCTS503783 1 AZZSRDH NOTS VT-2 All CRD Housings, CRD CRDH Exterior e Rx 503783 pcn. leakage req'd 3 X - - - X X - - X Bottom Head during RFO a Maint 4 Mid-cycle shutdown when drywcll De-inerted.

0 1 N/A**

041500 RV-CRD-Rl B"0 Examine outer 180 CRD Housing-to-Flange B14.10 degrccs of circufercnce 3

weld pcr RR-ISZ-9 **N/A*+

041600 RV-CRD-RS B 0 Examine outer 180 CRD Housing-to-Flange B14. 10 degrees of circumfcrencc 3 X weld pcr RR-ZSI-9 i~N/Ai+

041700 RV-CRD-Sl B-0 Examine outcr 180 CRD Housing-to-Flange B14. 10 degrees of circumfcrencc 3 X weld per RR-ZSI-9 **N/A~~

041800 RV"CRD-S3 B-0 Examine outer 180 CRD Housing-to-Flange B14.10 degrccs of circumference 3 X weld per RR-ISZ-9 *~N/A**

041900 RV-CRD-T3 B-0 Examine outer 180 CRD Housing-to-Flange B14.10 dcgrccs of circumference 3

weld pcr RR-ISZ-9 ~~N/A+~

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 36 REVZSZON: 0 ZNSERVZCE INSPECTION TEN-YEAR PIAN CIASS 1 SECTION XZ SCHEDULED COMPONENTS rol Rod Drive Housings NUMBER: 00. 0 INSPECTION INTERVAL PIAN STATUS PRESERVICE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMINATZON AREA CATEGY NDE -OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ~+CAIIBRATZON BLOCK**

042000 RV-CRD-T7 B-0 Examine outer 180 CRD Housing-to-Flange B14.10 degrees of circumfcrcncc weld pcr RR-ZSZ-9 ~~N/A~*

042100 RV CRD U2 B-0 Examine outer 180 CRD Housing-to-Flange B14. 10 dcgrecs of circumference 3 X weld pcr RR-ISI-9 *~N/A~~

042200 RV-CRD-U6 B-0 Examine outer 180 CRD Housing-to-Flange B14. 10 dcgrecs of circumfcrcnce 3 X weld pcr RR-ZSZ-9 *~N/A~~

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 37 REVISION: 0 ZNSERVZCE INSPECTION TEN-YEAR PIAN CLASS 1 SECTION XI SCHEDULED COMPONENTS tor Vassal Flange NUMBER: 00. 0 INSPECTION INTERVAL PLAN STATUS PRESERVZCE YEAR ASME FIRST SECOND THIRD SEC. XI PERIOD PERIOD PERIOD

SUMMARY

EXAMZNATZON AREA CATEGY NDE OUTAGE ZNSTRUCTZONS NUMSER IDENTIFICATION ZTEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 **CALIBRATIONBLOCK**

00. 0 RPV (REF. DWG. NO. 28) 042300 RV-01-L B-G-1 UT Only when disassembled.

Reactor Vessel Threads B6.40 **Pl LF 1*a 3 X in Flange 042400 RV-01-T B"G-1 VT-1 Only when disassembled.

Reactor Vessel B6.50 **N/A*~

3 X Bushings in Flange 042500 RV 02-L B-G-1 Only when disassembled.

Reactor Vessel Threads B6.40 **Pl-LF-lai 3 X in Flange 042600 RV-02-T B-G-1 Only when disassembled.

Reactor Vessel B6. 50 ++N/A++

3 X Bushings in Flange 042700 RV-03-L B-G-1 UT Only when disassembled.

Reactor Vcsscl Threads B6.40 **Pl LF 1++

3 X in Flange 042800 RV-03-T B-G-1 Only when disassembled.

Reactor Vessel B6.50 44N/A4 l 3 X Bushings in Flange 042900 RV-04-L B-G-l UT Only when disassembled.

Reactor Vessel Threads B6.40 **Pl LF 1**

3 X in Flange 043000 RV-04-T B-G-1 Only when disasscmblcd.

Reactor Vessel B6.50 3 X Bushings in Flange

F DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 38 REVISZON: 0 ZNSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XI SCHEDULED COMPONENTS tor Vessel Flange NUMBER: 00. 0 INSPECTION INTERVAL PLAN STATUS PRESERVZCE YEAR ASME FIRST SECOND THIRD SEC. XI PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 a yCALIBRATION BLOCKt s 043100 RV-05-L B-G-1 UT Only when disassembled.

Reactor Vessel Threads B6.40 tfP] LF ]1l 3 X in Flange 043200 RV 05 T B-G-1 VT"1 Only when disassembled.

Reactor Vessel B6.50 ~*N/A**

3 X Bushings in Flange 043300 RV-06-L B-G-l UT Only when disassembled.

Reactor Vessel Threads B6.40 **Pl-LF-I~~

3 X in Flange 043400 RV-06-T B-G-l VT-1 Only when disassembled.

Reactor Vessel B6.50 +~N/A~~

3 X Bushings in Flange 043500 RV-07-L B-G-1 UT Only when disasscmblcd.

Reactor Vessel Threads B6.40 +~Pl-LF-I++

3 X in Flange 043600 RV-07-T B-G-1 Only when disassembled.

Reactor Vcsscl B6. 50 **N/A**

3 X Bushings in Flange 043700 RV-08-L B G 1 UT Only when disassembled.

Reactor Vessel Threads B6.40 *~ Pl-LF-1**

3 X in Flange 043800 RV-08 T B G-1 Only when disassembled.

Reactor Vessel B6.50 *AN/AJ*

3 X Bushings in Flange

DATE: 10/15/99 NZNE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 39 REVISION: 0 ZNSERVICE INSPECTION TEN YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS tor Vessel Flange NUMBER: 00.0 INSPECTION ZNTERVAL PLAN STATUS PRESERVZCE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE ZNSTRUCTZONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 w wCALZBRATION BLOCK*s 043900 RV-09-L B-G-1 UT Only when disassembled.

Reactor Vessel Threads B6.40 eePZ LF Zaa 3 X in Flange 044000 RV-09-T B-G-1 Only when disassembled.

Reactor Vessel B6.50

  • 1 'N/A**

3 X Bushings in Flange 044100 RV-10-L B-G-1 UT Only when disassembled.

Reactor Vcsscl Threads B6.40 *~Pl-LF-l~~

3 X in Flange 044200 RV-10-T B-G-l VT-1 Only when disassembled.,

Reactor Vessel B6.50 3 X Bushings in Flange 044300 RV-11-I B G-1 UT Only when disassembled.

Reactor Vessel Threads B6 40 +*Pl LF-I++

3 X in Flange 044400 RV-11-T B-G-1 VT 1 Only when disassembled.

Reactor Vessel B6.50 %AN/A%*

3 X Bushings in Flange 044500 RV-12-L B-G-1 UT Only when disassembled.

Reactor Vessel Threads B6.40 <<*Pl-LF-I**

3 X in Flange 044600 RV-12-T B-G-1 VT-1 Only when disassembled.

Reactor Vessel B6.50 *ON/A**

3 X Bushings in Flange

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 40 REVISION: 0 ZNSERVICE INSPECTION TEN-YEAR PLAN CZASS 1 SECTION XZ SCHEDULED COMPONENTS tor Vessel Flange NUMBER: 00. 0 ZNSPECTZON INTERVAL PLAN STATUS PRESERVICE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE -OUTAGE INSTRUCTIONS NUMBER ZDENTZFZCATZON ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 *~CALIBRATION BLOCK**

044700 RV-13-L B-G-1 UT Only when disassembled.

Reactor Vessel Threads B6.40 ~~PI-LF-I~*

3 X in Flange 044800 RV-13-T B-G-1 VT-1 Only when disassembled.

Reactor Vessel B6.50 '

+N/A~+

3 X Bushings in Flange 044900 RV-14-L B-G-l UT Only when disassembled.

Reactor Vcsscl Threads B6.40 ~~ Pl-LF-1+ ~

3 X in Flange 045000 RV-14-T B-G-1 Only when disasscmblcd.

Reactor Vessel B6. 50 ~~N/A~~

3 X Bushings in Flange 045100 RV-15-L B"G-1 UT Only when disassembled.

Reactor Vcsscl Threads B6.40 41P] IF 1*4 3 X in Flange 045200 RV-15 T B-G-1 VT-1 Only when disassembled.

Reactor Vessel B6. 50 ttN/A4*

3 X Bushings in Flange 045300 RV-16-L B-G-1 UT Only when disassembled.

Reactor Vcsscl Threads B6.40 **Pl-Z,F-1**

3 X in Flange 045400 RV-16-T B G-1 Only when disassembled.

Reactor Vessel B6. 50 **N/A~~

3 X Bushings in Flange

a DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 41 REVISION: 0 ZNSERVZCE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS tor Vessel Flange NUHBER: 00. 0 INSPECTION ZNTERVAZ PLAN STATUS PRESERVZCE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERZOD SUHHARY EXAHZNATZON AREA CATEGY NDE OUTAGE ZNSTRUCTIONS NUHBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ~ ~CALIBRATION BLOCX~ ~

045500 RV-17-L B-G-1 Only when disassembled.

Reactor Vcsscl Threads B6.40 ++Pl-LF-1*~

X in Flange 045600 RV-17-T B-G 1 Only when disassembled.

Reactor Vassal B6.50 *~N/A~~

3 X Bushings in Flange 045700 RV 18 L B-G 1 UT Only when disassembled.

Reactor Vessel Threads B6.40 *~PI-LF-1*~

3 X in Flange 045800 RV T B-G-1 VT-1 Only when disasscmblcd.

Reactor Vessel B6.50 ~*N/A**

3 X Bushings in Flango 045900 RV 19 L B G-1 UT Only when disasscmblcd.

Reactor Vcsscl Threads B6.40 **Pl LF-1**

3 X in Flange 046000 RV-19-T BG1 Only when disasscmblcd.

Reactor Vessel B6. 50 3 X Bushings in Flange 046100 RV-20-L B-G 1 UT Only when disassembled.

Reactor Vessel Thrca'ds B6.40 ++Pl-LF-I++

3 X in Flange 046200 RV-20-T B-G-1 VT"1 Only when disasscmblcd.

Reactor Vcsscl B6. 50 3 X Bushings in Flango

DATE: 10/15/99 NZNE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 42 REVZSZON: 0 ZNSERVZCE INSPECTION TEN-YEAR PIAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS tor Vessel Flange NUMBER: 00. 0 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMZNATZON AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ZTEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 **CALIBRATIONBLOCK**

046300 RV-21-L B-G-1 Only when disassembled.

Reactor Vessel Threads B6.40 ttP] LF ]tt 3 X in Flange 046400 RV-21-T B-G-1 VT-1 Only when disassembled.

Reactor Vcsscl B6.50 3 X Bushings in Flange 046500 RV-22-L B-G-1 UT Only when disasscmblcd.

Reactor Vessel Threads B6.40 ~~Pl-LF-1*~

3 X in Flange 046600 RV-22-T BG1 Only when disasscmblcd.

Reactor Vessel B6.50 **N/A~~

3 X Bushings in Flange 046700 RV-23-L B G-1 UT Only when disassembled.

Reactor Vessel Threads B6.40 +*Pl-LF-1*~

3 X in Flange 046800 RV-23-T B-G"1 Only when disassembled.

Reactor Vessel B6. 50 3 X Bushings in Flange 046900 RV 24-L B-G-1 UT Only when disasscmblcd.

Reactor Vcsscl Threads B6.40 **Pi-LF-1~*

3 X in Flange 047000 RV-24-T B G-1 Only when disassembled.

Reactor Vcsscl B6.50 3 X Bushings in Flange

0 4 'I

DATE: 10/15/99 NINE MILE POZNT NUCLEAR PLANT UNIT 1 PAGE: 43 REVISION: 0 ZNSERVZCE INSPECTION TEN-YEAR PZAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS tor Vessel Flange NUMBER: 00. 0 INSPECTION INTERVAL PLAN STATUS PRESERVZCE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTZFICATZON ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ~ ~CALIBRATION BLOCK~ ~

047100 RV-25-L B-G-1 Only when disassembled.

Reactor Vessel Threads B6 40 ~+Pl-LF-I**

3 X in Flange 047200 RV-25 T B-G-l Only when disasscmblcd.

Reactor Vessel B6.50 3 X Bushings in Flange 047300 RV-26-L B-G-1 UT Only when disassembled.

Reactor Vessel Threads B6.40 *~PI-LF-I+~

3 X in Flange 047400 RV 26 T B-G"1 Only when disassembled.

Reactor Vessel B6. 50 3 X Bushings in Flange 047500 RV-27-L B-G-1 UT Only when disassembled.

Reactor Vessel Threads B6.40 ~*Pi-LF-I~+

3 X in Flange 047600 RV-27-T B-G 1 Only when disassembled.

Reactor Vessel B6.50 3 X Bushings in Flange 047700 RV 28-L B-G-1 UT Only when disassembled.

Reactor Vessel Threads B6.40 **Pl-LF-I++

3 X in Flange 047800 RV-28-T B-G-1 Only when disassembled.

Reactor Vessel B6. 50 3 X Bushings in Flange

lq DATE: 10/15/99 NINE MILE POZNT NUCLEAR PLANT UNIT 1 PAGE: 44 REVISION: 0 INSERVICE INSPECTION TEN-YEAR PLAN CZASS 1 SECTION XI SCHEDULED COMPONENTS tor Vessel Flange NUMBER: 00.0 ZNSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR ASME FIRST SECOND THZRD SEC. XZ PERZOD PERZOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY ITEM NO NDE ---OUTAGE-- ZNSTRUCTZONS NUMBER IDENTIFICATION METH 1 2 3 4 1 2 3 4 1 2 3 4 1 rCALIBRATION BLOCK+ ~

047900 RV-29-L B-G-1 UT Only when disassembled.

Reactor Vessel Threads B6.40 0IP] LF ]**

3 X in Flange 048000 RV 29 T B-G-1 VT-1 Only when disassembled.

Reactor Vessel B6.50 ~+N/A++

3 X Bushings in Flange 048100 RV-30-L B-G-l UT Only when disasscmblcd.

Reactor Vessel Threads B6.40 ~ ~ Pl-LF-1 ~ ~

3 X in Flange 048200 RV-30-T B G-1 Only when disasscmblcd.

Reactor Vcsscl B6.50 *'~N/A~*

3 X Bushings in Flange 048300 RV-31-L B-G-l UT Only when disassembled.

Reactor Vessel Threads B6.40 ~~Pl-LF-1~~

3 X in Flange 048400 RV-31-T B G"1 Only when disassembled.

Reactor Vessel B6.50 1 O'/A1 0 3 X Bushings in Flange 048500 RV-32-L B-G-l UT Only when disassembled.

Reactor Vessel Threads B6.40 ~~Pl-LF-I**

3 X in Flange 048600 RV-32-T B G-1 Only when disassembled.

Reactor Vessel B6.50 *IN/A4*

3 X Bushings in Flange

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 45 REVZSZON: 0 ZNSERVICE ZNSPECTZON TEN-YEAR PIAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS tor Vessel Flange NUMBER: 00.0 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR ASME FIRST SECOND THIRD SEC. XI PERZOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ~~CALIBRATION BLOCK*~

048700 RV-33-L B-G-1 UT Only when disassembled.

Reactor Vcsscl Threads B6.40 a+PI-LF-Iae 3 X in Flange 048800 RV"33-T B-G-l Only when disassembled.

Reactor Vessel B6.50 4 1N/A**

3 X Bushings in Flange 048900 RV-34-L B-G"1 UT Only when disasscmblcd.

Reactor Vessel Threads B6.40 ~ +Pl-LF-1 ~ +

3 X in Flange 049000 RV 34 T B G '1 Only when disassembled.

Reactor Vcsscl B6. 50 **N/Af*

3 X Bushings in Flange 049100 RV-35-L B-G-1 UT Only when disassembled.

Reactor Vessel Threads B6.40 *+Pl-LF-I++

3 X in Flange 049200 RV-35-T BG1 Only when disassembled.

Reactor Vessel B6. 50 l*N/A11 3 X Bushings in Flange 049300 RV-36-L BG1UT Only when disasscmblcd.

Reactor Vessel Threads B6.40 aaPI LF 1**

3 X in Flange 049400 RV-36-T B-G-1 Only when disasscmblcd.

Reactor Vessel B6.50 t 1N/Ak*

3 X Bushings in Flange

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 46 REVISION: 0 ZNSERVZCE INSPECTION TEN-YEAR PZAN CZASS 1 SECTION XI SCHEDULED COMPONENTS tor Vcsscl Flange NUMBER: 00. 0 ZNSPECTZON ZNTERVAL PLAN STATUS PRESERVICE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTZFZCATZON ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 + +CALIBRATION BLOCK+ +

049500 RV-37-L B-G-l Only when disassembled.

Reactor Vessel Threads B6.40 ~+ Pl-LF-1 ~ ~

in Flange 3 - - - - X 049600 RV-37-T B-G-l Only when disassembled.

Reactor Vessel B6.50 ~kN/Af4 3 X Bushings in Flange 049700 RV-38-L B-G-1 UT Only when disassembled.

Reactor Vessel Threads B6.40 ~~Pl-LF-l~~

in Flange X 049800 RV-38-T B-G-1 Only when disassembled Reactor Vcsscl B6. 50 ~~N/A+*

3 X Bushings in Flange 049900 RV-39-L B-G-1 UT Only when disassembled.

Reactor Vcsscl Threads B6.40 ~~Pl-LF-I**

3 X in Flange 050000 RV-39-T B-G-1 VT-1 Only when disassembled.

Reactor Vessel B6.50 *+N/A+*

3 X Bushings in Flange 050100 RV-40-L B G-l UT Only when disassembled.

Reactor Vessel Threads B6.40 **Pl-LF-1*~

3 X in Flange 050200 RV-40-T B G 1 Only when disassembled.

Reactor Vessel B6.50 k4N/A*4 3 X Bushings in Flange

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 47 REVISION: 0 ZNSERVICE INSPECTION TEN-YEAR PIAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS tor Vessel Flange NUMBER: 00. 0 INSPECTION INTERVAL PLAN STATUS PRESERVZCE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ZTEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ~~CALIBRATION BLOCK~~

050300 RV-41-L B-G 1 Only when disassembled.

Reactor Vessel Threads B6.40 ++Pl-LF-1~~

3 X in Flange 050400 RV-41-T B-G-1 Only when disassembled.

Reactor Vessel B6.50 +AN/A+a 3 X Bushings in Flange 050500 RV-42-L B-G-1 UT Only when disassembled.

Reactor Vcsscl Threads B6.40 **Pl-LF-1**

in Flange 3 - " - - X 050600 RV 42 T B G-1 Only when disassembled.

Reactor Vessel B6. 50 t*N/A*4 3 X Bushings in Flange 050700 RV-43-I B-G-1 UT Only when disasscmblcd.

Reactor Vessel Threads B6.40 + +Pl-LF-1*~,

3 X in Flange 050800 RV 43 T B-G-1 VT-1 Only when disasscmblcd.

Reactor Vessel B6.50 1 O'/A**

3 X Bushings in Flange 050900 RV-44-L B G-1 UT Only when disassembled.

Reactor Vessel Threads B6.40 **Pl-I,F-1**

3 in Flange X 051000 RV-44-T B-G-1 Only when disasscmblcd.

Reactor Vessel B6. 50 *~N/A~~

3 X Bushings in Flange

4 DATE: 10/15/99 NINE MZLE POINT NUCLEAR PLANT UNIT 1 PAGE: 48 REVISION: 0 INSERVZCE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS tor Vessel Flange NUMBER: 00. 0 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR ASME FIRST SECOND THIRD SEC. XZ PERZOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER ZDENTZFZCATZON ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 *+CALIBRATIONBLOCK~+

051100 RV-45-L B-G-l Only when disassembled.

Reactor Vessel Threads B6.40 aaP1 IF 3 X in Flange 051200 RV-45-T B-G-l VT-1 Only when disassembled.

Reactor Vessel B6.50 **N/A+i 3 X Bushings in Flange 051300 RV-46-L BG1UT Only when disassembled.

Reactor Vessel Threads B6.40 ~+ Pl-LF-1 ~ ~

3 X in Flange 051400 RV-46-T B-G-1 Only when disassembled.

Reactor Vessel B6.50 ~+N/A++

3 X Bushings in Flange 051500 RV-47-L B-G-1 Only when disassembled.

Reactor Vessel Threads B6.40 *~PI-LF-l~~

3 X in Flange 051600 RV-47-T B-G-1 Only when disassembled.

Reactor Vessel B6.50 f 4N/Alt 3 X Bushings in Flange 051700 RV-48-L B-G-1 UT Only when disassembled.

Reactor Vessel Threads B6.40 **Pl-IF-1**

3 X in Flange 051800 RV-48-T B-G-1 Only when disasscmblcd.

Reactor Vessel B6.50 ~~N/Ai~

3 X Bushings in Flange

0

~ },

DATE: 10/15/99 NINE MILE POINT NUCLEAR PIANT UNIT 1 PAGE: 49 REVISION: 0 INSERVICE INSPECTION TEN-YEAR PIAN CZASS 1 SECTION XZ SCHEDULED COMPONENTS tor Vcsscl Flange NUMBER: 00.0 INSPECTION INTERVAL PIAN STATUS PRESERVZCE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERZOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ++CALIBRATION BLOCK+*

051900 RV-49-L B-G-l UT Only when disassembled.

Reactor Vessel Threads B6.40 3

toPI LF Itf in Flange X 052000 RV-49-T B-G-1 Only when disassembled.

Reactor Vessel B6.50 **N/A*~

3 X Bushings in Flango 052100 RV-50-L B-G-1 UT Only when disassembled.

Reactor Vessel Threads B6.40 **Pl-LF-1*~

3 X in Flange 052200 RV-50-T B-G-1 Only when disassembled.

Reactor Vessel B6.50 *iN/A*%

3 X Bushings in Flange 052300 RV-51-L B-G-1 UT Only when disassembled.

Reactor vcsscl Threads B6.40 +*Pl-LF-1**

3 X in Flange 052400 RV-51-T B"G 1 Only when disassembled.

Reactor Vcsscl B6.50 +*N/A*+

3 X Bushings in Flange 052500 RV-52-L B"G-1 UT Only when disassembled.

Reactor Vessel Threads B6.40 **Pl-LF-1**

3 X in Flange 052600 RV-52-T B-G-1 Only when disassembled.

Reactor Vessel 86.50 **N/A**

3 X Bushings in Flange

DATE: 10/15/99 NZNE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 50 REVISION: 0 ~ INSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS tor Vessel Flange NUMBER: 00. 0 ZNSPECTION ZNTERVAL PZAN STATUS PRESERVICE YEAR I

ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ~*CALIBRATION BLOCK**

052700 RV-53-L B-G-1 Only when disassembled.

Reactor Vessel Threads B6.40 3

4%PI LF Ilt X

in Flange 052800 RV-53-T B-G-1 Only when disassembled.

Reactor Vessel B6.50 ~~N/A++

3 X Bushings in Flange 052900 RV-54-L B-G-1 UT Only when disassembled.

Reactor Vcsscl Threads B6.40 ~~PI-LF-I++

3 X in Flange 053000 RV-54-T B-G-1 Only when disassembled.

Reactor Vessel B6.50 *ON/A*%

3 Bushings in Flange 053100 RV 55 L B-G-1 UT Only when disasscmblcd.

Reactor Vessel Threads B6.40 ++Pl-LF-1~~

3 X in Flange 053200 RV-55-T B-G-1 Only when disassembled.

Reactor Vessel B6.50 ++N/A++

3 X Bushings in Flange 053300 RV-56-L B-G-l UT Only when disassembled.

Reactor Vcsscl Threads B6 40 **Pl-LF-1**

3 X in Flange 053400 RV 56 T B"G 1 Only when disassembled.

Reactor Vessel B6.50 *ON/At1 3 X Bushings in Flange

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 51 REVISION: 0 ZNSERVZCE INSPECTION TEN-YEAR PIAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS tor Vessel Flange NUMBER: 00.0 INSPECTZON INTERVAL PLAN STATUS PRESERVZCE YEAR FIRST SECOND THIRD SEC. XZ PERIOD PERZOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 t t CALIBRATION BLOCKtt 053500 RV-57-L BG1UT Only when disassembled.

Reactor Vessel Threads B6.40 "tPl -IF-It ~

3 X in Flange 053600 RV-57-T B-G-1 Only when disasscmblcd.

Reactor Vessel B6. 50 *'tN/A' t 3 X Bushings in Flange 053700 RV-58-L B-G-1 UT Only when disasscmblcd.

Reactor Vessel Threads B6.40 t*Pl-LF-ltt 3 X in Flange 053800 RV 58 T B G-1 Only when disassembled.

Reactor Vcsscl B6.50 *tN/A**

3 X Bushings in Flange 053900 RV"59-L B-G-1 UT Only when disassembled.

Reactor Vessel Threads B6.40 t t Pl-LF-1 t t 3 X in Flange 054000 RV-59-T BG1 VT 1 Only when disassembled.

Reactor Vessel B6. 50 ttN/Att 3 X Bushings in Flange 054100 RV 60-L B-G-1 UT Only when disassembled.

Reactor Vcsscl Threads B6.40 ttpl-LF-ltt 3 X in Flange 054200 RV-60-T B-G-1 VT 1 Only when disasscmblcd.

Reactor Vessel B6.50 t tN/At1 3 X Bushings in Flange

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNZT 1 PAGE: 52 REVISION: 0 ZNSERVICE INSPECTION TEN-YEAR PLAN CZASS 1 SECTION XI SCHEDULED COMPONENTS tor Vcsscl Flange NUMBER: 00.0 ZNSPECTION INTERVAL PIAN STATUS PRESERVZCE YEAR ASME FIRST SECOND THIRD SEC. XZ PERZOD PERZOD PERZOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER ZDENTZFZCATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ++CALIBRATION BLOCK~'~

054300 RV-61-L B-.G-1 Only when disassembled.

Reactor Vessel Threads B6.40 i*Pl-LF-1~~

3 X in Flange 054400 RV-61-T B-G 1 Only when disassembled.

Reactor Vessel B6.50 *+N/A+*

3 X Bushings in Flange 054500 RV-62-L B-G-1 UT Only when disassembled.

Reactor Vcsscl Threads B6 40

~ ~~PI-LF-I~~

3 X in Flange 054600 RV-62-T B-G-1 VT-1 Only when disasscmblcd.

Reactor Vessel B6.50 ~~N/A~~

3 X Bushings in Flange

'* W 054700 RV-63-L B-G-1 UT Only when disassembled.

Reactor Vessel Threads B6.40 ++PI-LF-1*~

3 X in Flange 054800 RV-63-T B-G"1 Only when disassembled.

Reactor Vcsscl B6.50 3 X Bushings in Flange 054900 RV 64-L B-G-1 UT Only when disassembled.

Reactor Vessel Threads B6.40 **PI-LF-I**

3 X in Flange 055000 RV-64-T B-G-1 Only when disassembled Reactor Vessel B6.50 tAN/Atf 3 X Bushings in Flange

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 53 REVZSION: 0 ZNSERVICE ZNSPECTION TEN-YEAR PLAN CLASS 1 SECTION XI SCHEDULED COMPONENTS tor Vcsscl Interior NUMBER: 00. 0 ZNSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR FIRST SECOND THIRD SEC. XZ PERZOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 **CALIBRATION BLOCK**

RPV (REF. DWG. NO. 28A) 056100 HS B-N-2 USNRC GL94-03, USNRC SER Shroud Support skirt B13.40 VT-3 3/24/99 RFO16 scope to 3 X H8 Weld UT* be defined, EVT1 top surface 6 Locations of prior indications; UT to be determined. **LATER**

056200 H9 B-N-2 EVT1 Scope to be dcfincd, Shroud Support Skirt B13.40 BWRVZP-38 Exam 0 to 180 H9 Weld degrees ~~N/A~~

056300 H9 B N 2 EVT1 Scope to bc dcfincd, Shroud Support Skirt B13.40 BWRVZP-38 Exam 180 to 3 X H9 Weld 360 dcgrccs ~~N/A**

056400 H9-166 B"N-2 USNRC GL94-03, USNRC SER Shroud Support Skirt B13.40 VT-3 3/24/99 RF016 scope to 3 X H9 Weld Repair Anch bc defined, EVT1 top surface of shroud support skirt to RPV H9 weld ad)accnt to TIEROD-RXVE-166. for a min. 26" ad)accnt to two togg ~~N/A~~

056500 H9-270 B-N-2 EVT1 USNRC GL94"03, USNRC SER Shroud Support Skirt B13.40 VT-3 3/24/99 RFO16 scope to H9 Wold Repair Anch bc dcfincd, EVT1 top surface of shroud support skirt to RPV H9 weld ad)accnt to TIEROD-RXVE-270 foc a min. 26" ad)accnt to two toggl ~~N/A~~

DATE: 10/15/99 NZNE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 54 REVISION: 0 ZNSERVICE ZNSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS tor Vessel Interior NUMBER: 00. 0 INSPECTION INTERVAL PIAN STATUS PRESERVICE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMZNATZON AREA CATEGY NDE -OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ~+CALIBRATION BLOCK~+

056600 H9-350 B-N-2 EVT1 USNRC GL94-03, USNRC SER Shroud Support Skirt B13.40 VT-3 3/24/99 RF016 scope to H9 Weld Repair Anch be defined, EVT1 top surface of shroud support skirt to RPV H9 weld ad)accnt to TIEROD-RXVE-350 for 26" adjacent to two toggles.. ~~N/A*~

056700 H9-90 B"N"2 EVT1 USNRC GL94"03, USNRC SER Shroud Support Skirt B13.40 VT-3 3/24/99 RFO16 scopo to 3 X H9 Weld Repair Anch be defined, EVT1 of top surface of shroud support skirt to RPV H9 wold ad)accnt to TIEROD-RXVE-90 for a min. of 26" adjacent to two ~~N/A~~

056900 RV-01-Z SZL Once every inspection Stcam Dryer Drain 474 period ~~N/A~~

Cracking X - - - X - - - X 057000 RV 01 I B"N-1 Once cvcry inspection Stcam Dryer B13.10 period ~~N/A~~

3 X - - - X - - - X 057100 RV-02-I B-N-1 VT-3 Once every inspection Stcam Separator B13. 10 period ~~N/A~~

3 X - - - X - - - X 057200 RV-05-I NUREG VT 3 Exam required cvcry four Fccdwatcr Sparger 0619 outages, commencing in 3 X RF08, (1981), Examine flow holes a welds in sparger arms 6 tees and FW nozzle ~~N/AP~

DATE: 10/15/99 NINE MZLE POINT NUCLEAR PZANT UNIT 1 PAGE: 55 REVISION: 0 INSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS tor Vessel Interior NUMBER: 00.0 INSPECTION INTERVAL PIAN STATUS PRESERVICE YEAR ASME FIRST SECOND THIRD SEC. XI PERIOD PERZOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 +*CALIBRATION BLOCK**

057300 RV-06-I BNRVIP VT-3 Examine pcr Memo Core Spray Sparger 18 NMP1-M99-018. + +N/A+ ~

3 X - - - X X - - X 057400 RV-07-I BWRVZP VT 1 Examine per Memo Core Spray Lines 18 NMP1-M99-018. ~*N/A~~

3 X - - - X X - - X 057500 RV-08-Z B-N-2 VT-1 Examine once pcr Dryer Support Brackets B13.20 interval *+N/A+*

3 X (bcltlino) 057600 RV-09-Z B-N-2 VT 1 Examine once pcr Feedvater Sparger B13. 20 interval ++N/A++

3 X Brackets (bcltline) 00 RV-10-I B-N-2 VT-1 Examine once per Guide Rod Support B13.20 interval ++N/A**

3 X Brackets (bcltlinc) 057800 RV-11-I B-N-2 VT-1 hei tlinc, Examine once Upper Survicllancc B13. 20 pcr interval *~N/A*+

3 X Specimen Holder 057900 RV-12-Z B-N-2 VT-1 bcltlinc, Examine once Lower Survicllancc B13.20 pcr interval +~N/A+~

3 X Specimen Holder 058000 RV-13-I B-N-2 VT-3 Examine once pcr Upper Ccrc Grid B13.40 Znspection Interval 3 X

  • fN/A*0 058100 RV-13-I SZL RFO-16 scope to bc Upper Core Grid 554 defined.. +~N/A++

3 X

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 56 REVZSZON: 0 ZNSERVZCE ZNSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS tor Vessel Interior NUMBER: 00.0 INSPECTION INTERVAL PLAN STATUS PRESERVZCE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMINATZON AREA CATEGY NDE -OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ~ +CALIBRATION BLOCK**

058300 RV-14-I B-N-2 VT 3 Examine accessible Core Shroud B13.40 surface's each interval.

X  %*N/At0 058400 RV-15-Z B-N-2 VT-3 Examine once pcr Core Shroud Support B13.40 Inspection Interval 3 X aaN/A*t Ring 059000 SZL409-ZDTC1245 SZL EVT1 every other even IRM Incorc Dry Tube 409R1 numbcrcd outage ++N/A~~

4 3 X X Assembly 059900 SZI 409-IDTC3645 SIL EVT1 EVT1 cvcry other even IRM Zncoro Dry Tube 409R1 numbcrcd outage ++N/A++

3 X X Assembly 060100 Shroud Head Bolts B-N-2 VT-3 UT cxams to bc Shroud Head Bolts (36) B13.40 UT identified later pending 3 X final results of BWR Owner's Group. ~~LATER~~

060200 Skirt-166 B-N-2 EVT1 USNRC GL94-03, USNRC SER Shroud Support Skirt B13.40 3/24/99, EVT1 top 3 X Surface surface of inconel srd.

sprt. skirt where accessible around intcrfacc of lower stablizcr sprt. pedestal to conical sprt. 8 166 dcg ticrod ~+N/A~~

DATE: 10/15/99 NINE HYLE POINT NUCLEAR PLANT UNIT 1 PAGE: 57 REVZ SION: 0 INSERVZCE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XI SCHEDULED COHPONENTS tor Vessel Interior NUMBER: 00.0 INSPECTION INTERVAL PLAN STATUS PRESERVZCE YEAR ASME FZRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAHINATZON AREA CATEGY NDE -OUTAGE ZNSTRUCTIONS NUHBER ZDENTZFZCATZON ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 +~CALIBRATION BLOCK~~

060300 Skirt-270 B-N-2 EVT1 USNRC GL94-03, USNRC SER Shroud Support Skirt B13.40 3/24/99, EVT1 top 3 X Surface surface of inconcl srd.

sprt. skirt whcrc accessible around interface of lower stablizer suppt pedestal to conical sprt 6 270 dcg ticrod ~~N/A~~

060400 Skirt-350 B-N-2 EVT1 USNRC GL94-03, USNRC SER Shroud Support Skirt B13.40 3/24/99, EVT1 top 3 X Surface surface of inconcl srd.

sprt. skirt where accessible around interface of lower stablizcr supt. pcdcstal to conical sprt 6 350 deg tierod <<~N/A**

060500 Skirt-90 B-N-2 EVT1 USNRC GL94 03, USNRC SER Shroud Support Skirt B13.40 3/24/99, EVT1 top 3 X Surface surface of inconcl srd sprt skirt when accessible around interface of lower stablizcr supt pedestal to conical sprt 6 90 dcg ticrod locat **N/A~~

060600 Spaccr-RXVE-168 B-N-2 VT-3 USNRC GL94-03, USNRC SER Shroud Stabilizer B13. 40 3/24/99, BWRVIP 3 X Assembly (Spacer) rcccommends exam of shroud assembly core plate clamp/spaccr assembly located bctwcen ZD of shroud 6 core support plate 8 168 dcg.

11N/Alt

DATE: 10/15/99 NZNE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 58 REVISION: 0 INSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS tor Vessel Interior NUMBER: 00.0 ZNSPECTZON INTERVAL PLAN STATUS PRESERVZCE YEAR ASME FIRST SECOND THIRD SEC. XZ PERZOD PERZOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ~ +CALIBRATION BLOCK+ +

060700 Spacer-RXVE-276 B-N-2 VT-3 USNRC GL94"03, USNRC SER Shroud Stabilizer B13. 40 3/24/99, BWRVIP 3 X Assembly (Spacer) reccommends exam of shroud assembly coro plate clamp/spaccr assembly located bctwccn ZD of shroud support plate 8 276 deg. ~~N/A~~

060800 Spacer-RXVE-348 B-N-2 VT-3 USNRC GL94-03, USNRC SER Shroud Stabilizer B13.40 3/24/99, BWRVIP 3 X X Assembly (Spaccr) rcccommcnds exam of shroud assembly core plate clamp/spcccr assembly located between ID of shroud 6 core support plate 8 348 dcg.

    • N/At*

060900 Spaccr-RXVE-96 B-N-2 VT 3 USNRC GI 94-03, USNRC SER Shroud Stabilizer B13.40 3/24/99, BWRVIP 3 X - - - X Assembly (Spaccr) rcccommcnds exam of shroud assembly core plate clamp/spaccr assembly located bctwccn ZD of shroud 4 core support plate 896 dcg.

t4N/Att 061000 Tiorod-RXVE-166 B-N-2 VT-3 USNRC GL94-03'SNRC SER Shroud Stabilizer B13. 40 3/24/99, BWRVZP Assembly (Tic Rod) 3 X - - - X rcccommcndcd **N/A**

061100 Ticrod-RXVE-270 B "N-2 VT-3 USNRC GL94-03, USNRC SER Shroud Stabilizer B13. 40 3/24/99, BWRVIP 3 X X Assembly (Tic Rod) rcccommcndcd **N/A**

DATE: 10/15/99 NINE MILE POZNT NUCLEAR PLANT UNIT 1 PAGE: 59 REVISION: 0 ZNSERVICE INSPECTION TEN-YEAR PZAN CLASS 1 SECTION XI SCHEDULED COMPONENTS tor Vessel Interior NUHBER: 00.0 INSPECTION INTERVAL PLAN STATUS PRESERVZCE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAHZNATZON AREA CATEGY NDE OUTAGE INSTRUCTZONS NUMBER ZDENTZPZCATZON ITEH NO HETH 1 2 3 4 1 2 3 4 1 2 3 4 **CALIBRATIONBLOCK*n 061200 Tierod-RXVE-350 B-N-2 VT-3 USNRC GL94-03, USNRC SER Shroud Stabilizer B13.40 3/24/99, BWRVIP 3 X X n*N/A**

Assembly (Tic Rod) reccommended 061300 Tierod-RXVE-90 B-N 2 VT 3 USNRC GL94 03, USNRC SER Shroud Stabilizer B13. 40 3/24/99, BWRVIP Assembly (Tic Rod) X - - - X reccommcnded *nN/A*i 061400 Vl B-N-2 EVT1 USNRC GL94-03, USNRC SER Core Shroud Vertical B13. 40 UT 3/24/99, BWRVZP 3 X X Wclds rcccommondcd EVT1 of ZD/OD, 25% of total length, UT contgcncy only, **LATERnn 00 V10 B-N-2 EVT1 USNRC GL94-03, USNRC SER Core Shroud Vertical B13. 40 UT 3/24/99, EVT1 of ID/OD 3 X X Wclds 25% of total length, UT contgy only, BWRVZP roccommendcd *~LATER*i 061600 V11 B-N-2 EVT1 USNRC GL94 03, USNRC SER Core Shroud Vortical B13.40 UT 3/24/99, BWRVIP 3 X - - - X Wclds recommended EVT1 of ID/OD 25% of total length, UT contgy only.

~~LATER~~

061700 V12 B-N-2 EVT1 USNRC GL94-03, USNRC SER Core Shroud Vertical B13.40 UT 3/24/99, BWRVZP 3 X X Wclds roccommcndod EVTl of ID/OD 25% of total length, UT contgy only

~+LATER+~

DATE: 10/15/99 NINE MILE POINT NUCLEAR PIANT UNIT 1 PAGE: 60 REVISION: 0 ZNSERVZCE INSPECTION TEN YEAR PLAN CLASS 1 SECTION XI SCHEDULED COMPONENTS tor Vessel Interior NUMBER: 00.0 ZNSPECTZON INTERVAL PLAN STATUS PRESERVZCE YEAR ASME FIRST SECOND THIRD SEC. XZ PERZOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 **CALIBRATIONBLOCK~*

061800 V13 B-N-2 EVT1 USNRC GL94 03, USNRC SER Core Shroud Vertical B13 40

~ UT

- - -

3/24/99, BWRVZP 3 X X Wclds reccommcndcd EVT1 of ZD/OD 25% of total length, UT contgy only.

  • +LATER+*

061900 V14 B-N-2 EVT1 USNRC GL94-03, USNRC SER Core Shroud Vertical B13.40 UT

- - - - - - - 3/24/99, BWRVZP 3 X X Wclds reccommcndcd EVT1 of ID/OD 25% of total length, UT contgy only.

%*LATER**

062000 V15 B-N-2 USNRC GL94-03, USNRC SER Core Shroud Vertical B13.40 UT 3/24/99, BWRVIP 3 X X Wclds reccommended, EVT11 of ZD/OD 25% of total length, UT contgy only.

~ ~ LATER**

C 062100 V16 B-N-2 EVT1 USNRC GL94-03, USNRC SER Core Shroud Vertical B13.40 UT 3/24/99, BWRVIP 3 X X Wclds reccommcnded, EVT1 of ZD/OD 25% of total length, UT contgy only.

~~LATER**

062200 V2 B-N-2 EVT1 USNRC GL94-03, USNRC SER Core Shroud Vertical B13.40 UT 3/24/99 i BWRVIP Welds X X reccommcndcd, EVT1 of ZD/OD 225% of total length, UT contgy only.

    • LATER**

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 61 REVISION: 0 INSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS tor Vessel Interior NUMBER: 00.0 INSPECTION ZNTERVAL PIAN STATUS PRESERVZCE YEAR ASME FIRST SECOND THIRD SEC. XI PERIOD PERIOD PERZOD

SUMMARY

EXAMINATZON AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 **CALIBRATZONBLOCK~*

062300 V3 B-N-2 EVT1 USNRC GL94-03, USNRC SER Core Shroud Vertical B13.40 UT 3/24/99, BWRVIP 3 X X Welds reccommcndcd EVT1 of ID/OD 25% of total length, UT contgy only.

~~LATER~+

062400 V4 B-N-2 EVT1 USNRC GL94-03, USNRC SER Core Shroud Vertical B13.40 UT 3/24/99, BWRVIP 3 X X Wclds reccommcndcd, EVT1 of ID/OD 25% of total length, UT contgy only.

++LATER*+

062500 V5 B-N-2 EVT1 USNRC GL94-03, USNRC SER Coro Shroud Vertical B13.40 3/24/99, BWRVZP 3 X X Wclds-Ring Support rcccommended, EVT1 of ZD/OD 25% of total length, ~~N/A~*

062600 V6 B-N-2 EVT1 USNRC GL94-03, USNRC SER Core Shroud Vertical B13.40 3/24/99, BWRVIP 3 X X Welds-Ring Support rcccommended, EVT1 of ZD/OD 25% of total length, ~~N/A~~

062700 V7 B-N-2 EVT1 USNRC GL94-03, USNRC SER Core Shroud Vertical B13.40 UT 3/24/99, BWRVIP 3 X X Wclds reccommended, EVT1 of ID/OD 25% of total length, UT contgy only.

ssLATERei

DATE: 10/15/99 NINE HYLE POINT NUCLEAR PLANT UNIT 1 PAGE: 62 REVISION: 0 ZNSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COHPONENTS tor Vessel Interior NUMBER: 00.0 ZNSPECTZON INTERVAL PLAN STATUS PRESERVZCE YEAR FIRST SECOND THIRD SEC. XI PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE -OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ZTEH NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ~*CALIBRATION BLOCX**

062800 VS B-N-2 EVT1 USNRC GL94-03, USNRC SER Core Shroud Vertical B13.40 UT 3/24/99, BWRVZP 3 X X Welds reccommcnded, EVT1 of ID/OD 25% of total length, UT contgy only.

~~LATER~~

062900 V9 B-N-2 EVT1 USNRC GL94-03, USNRC SER Core Shroud Vertical B13 40

~ UT 3/24/99, BWRVIP 3 X Welds reccommended, EVT1 of ID/OD 25% of total length, UT contgy only.

t 1 LATER*4

0 DATE: 10/15/99 NINE MZLE POINT NUCLEAR PIANT UNIT 1 PAGE: 63 REVISION: 0 INSERVZCE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS tor Vessel Nozzles NUMBER: 00. 0 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERZOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTZFZCATZON ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ~~CALIBRATION BLOCK~*

Instrument Nozzles (REF. DWG. NO. 14) 063000 SIL571-N12 SII VT-2 VT-2 after vessel RPV N12 Instr 571 flood-up (static Nozzle-to-Safe End 3 X - - - X X - - X prcssure, no hold time) at start of each RFO 4 during System Leakage each RFO. +iN/A~~

Safety Valve Nozzles (REF. DWG. NO. 28) 063100 CH-576-07A-B B"G-2 R33 ~*N/A*+

Nozzle N7N Flange B7. 10 3 X Bolting 063200 CH-576-07B-B B"G-2 R34 ~iN/Aii Nozzle N7P Flange Bj. 10 3 X Bolting 063300 CH-576-07C-B B-G-2 Group R35 ~*N/A**

Nozzle N7R Flange B7.10 3 X Bolting 063400 CH-576-07D-B B-G-2 Group R36 *~N/A*+

Nozzle N7S Flange B7.10 3 X Bolting 063500 CH-576-07E-B B-G-2 VT 1 Group R37 ~~N/A~~

Nozzle N7T Flange B7. 10 3 X Bolting 063600 CH-576-07F-B B-G-2 Group R38 ~~N/A~~

Nozzle N7U Flange B7.10 3 X Bolting

0 DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNZT 1 PAGE: 64 REVISION: 0 ZNSERVZCE ZNSPECTZON TEN-YEAR PZAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS tor Vessel Nozzles NUMBER: 00. 0 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 +*CALIBRATION BLOCK*~

063700 CH-576-12A-B B-G-2 Group R21 +~N/A~~

Nozzle N7A Flange B7. 10 3 X Bolting 063800 CH-576-12B-B B-G-2 Group R22 ~*N/A~~

No zlc N7B Flange B7.10 3 X Bolting 063900 CH-576-12C-B B-G-2 Group R23 **N/A~*

Nozzle N7C Flange B7. 10 3 X Bolting 064000 CH-576-12D-B B"G-2 Group R24 **N/A**

Nozzle N7D Flange B7.10 3 X Bolting 064100 CH-576-12E-B B G 2 Group R25 ~+N/A++

No zlc N7E Flange B7. 10 X

Bolting 064200 CH-576-12F-B B-G-2 Group R26 ~~N/A~~

Nozzle N7F Flange B7. 10 3 X Bolting 064300 CH"576-12G-B B-G-2 VT-1 Group R27 ~~N/A~~

Nozzle N7G Flange B7.10 3 X Bolting 064400 CH-576-12H-B B-G-2 Group R28 **N/A~~

Nozzle N7H Flange B7.10 3 X Bolting

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 65 REVZSZON: ZNSERVZCE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS tor Vcsscl Nozzlcs NUMBER: 00. 0 INSPECTION ZNTERVAL PLAN STATUS PRESERVZCE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMZNATZON AREA CATEGY NDE 0 U T AG E INSTRUCTZONS NUMBER ZDENTZFICATZON ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ~~CALIBRATION BLOCK~'~

064500 CH-576-12 J-B B-G-2 Group R29 ~~N/A**

Nozzle N7J Flange B7.10 3 X Bolting 064600 CH-576-12K-B B-G-2 Group R30 +~N/A++

Nozzle N7K Flange B7.10 3 X Bolting 064700 CH-576-12L-B B-G-2 VT-1 Group R31 ~~N/A~ ~

Nozzle N7L Flange Bj. 10 3 X Bolting 064800 CH-576-12M-B B-G-2 VT-1 Group R32 *+N/A**

Nozzle N7M Flange B7.10 3 X Bolting 064900 RV-WD 011 B-F UT Group R21 **LATER**

Nozzle N7A-to-Flange B5.10 PT 3 X 065000 RV-WD-Oll SZL Group R21, Inconcl 1S2 Nozzle N7A-to-Flange 455R1S1 butter expansion from 3 X nozzle side of weld.

    • LATERI*

065100 RV-WD-012 B-D Group R21, **LATER**

Closure Head-to N7A B3.90 3 X Nozzle 065200 RV-WD-012-IR B-D Group R21, **LATER~~

N7A Nozzle Inner B3.100 3 X Radius Section

DATE: 10/15/99 NINE MILE POINT NUCLEAR PIANT UNIT 1 PAGE: 66 REVISION: 0 INSERVICE INSPECTION TEN-YEAR PLAN CIASS 1 SECTION XZ SCHEDULED COMPONENTS tor Vessel Nozzles z

NUMBER: 00. 0 INSPECTION INTERVAL PZAN STATUS PRESERVICE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ttCALIBRATION BLOCK~'

065300 RV WD 013 SIL Group R22, Znconel 182 Nozzle N7B-to-Flange 455R1S1 butter expansion from 3 X nozzle side of weld.

~~LATER~~

065400 RV WD 013 B-F UT GrouP R22 ++ZATER~~

Nozzle N7B-to-Flange B5 10

~

3 X 065500 RV-WD-014 B-D Group R22, ~~IATER~~

Closure Head-to-Nozzle B3 90

~

3 X N7B 065600 RV"WD"014-IR B-D Group R22, ~~IATER~~

Nozzle N7B Znner B3. 100 3 X Radius Section 065700 RV-WD-015 B-F UT Group R23, ~~LATER~~

Nozzle N7C-to-Flange B5 10

~ PT 3 X 065800 RV-WD-015 SZL Group R23, Inconel 182 Nozzle N7C-to-Flange 455R1S1 butter expansion from 3 X nozzle side of weld

    • ZATER**

065900 RV WD 016 B-D Group R23, +*ZATER**

Closure Head-to-Nozzle B3.90 3 X Njc 066000 RV-WD-016 ZR B-D UT Group R23, ++LATER~+

Nozzle N7C Inner B3. 100 X

Radius Section

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 67 REVISION: 0 ZNSERVICE ZNSPECTION TEN-YEAR PZAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS tor Vessel Nozzles NUMBER: 00. 0 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR ASME FIRST SECOND THIRD SEC. XZ PERZOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ilCALIBRATZON BLOCK>>~

066100 RV-WD-017 B-F UT Group R24 ~~LATER~~

Nozzle N7D-to-Flange B5. 10 PT 3 X 066200 RV-WD-017 SZL UT Group R24, Inconel 182 Nozzle N7D-to-Flange 455R1S1 butter expansion from 3 X nozzle side of weld

+~LATER~~

066300 RV-WD-018 B"D UT Group R24, ~~LATER' Closure Head-to-Nozzle B3 90

~

3 X N7D 066400 RV-WD-018-ZR B-D UT Group R24, **LATER~~

Nozzle N7D Inner B3.100 3 X Radius Section t

066500 RV-WD-019 B-F UT Group R25, +~ZATER+~

Nozzle N7E-to-Flange B5.10 PT 3 X 066600 RV-WD-019 . SZL UT Group R25, Inconel 182 Nozzle N7E-to-Flange 455R1S1 butter expansion from 3 X nozzle side of weld.

    • LATER~*

066700 RV"WD-020 B-D Group R25, ~~LATER~~

Closure Head-to-Noz"lc B3.90 3 X N7E 066800 RV"WD"020-ZR B-D Group R25, **LATER**

Nozzle N7E Inner B3.100 3 X Radius Section n>

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 68 REVISION: 0 ZNSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS or Vessel Nozzles NUMBER: 00. 0 ZNSPECTZON ZNTERVAL PZAN STATUS PRESERVICE YEAR ASME FIRST SECOND THIRD SEC. XI PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 >>>>CALIBRATION BLOCK>>>>

066900 RV-WD-021 B-F UT Group R26>>>>LATER>>>>

Nozzle N7F-to-Flange B5. 10 PT 3 X 067000 RV-WD-021 SIL UT Group R26, Inconel 182 Nozzle N7F-to-Flange 455R1S1 butter expansion from nozzle side of weld

    • IATER>>*

067100 RV-WD-022 B-D UT Group R26, >>>>ZATER*>>

Closure Head-to-Nozzle B3.90 3 X 067200 RV-WD-022-ZR B-D UT Group R26, **ZATER>>*

Nozzle N7F Inner B3. 100 3 X Radius Section 067300 RV-WD-023 B-F UT Group R27 **ZATER**

Nozzle N7G-to-Flange B5.10 PT 3 X 067400 RV-WD-023 SZL UT Group R27, Inconcl 182 Nozzle N7G-to-Flange 455R1S1 butter expansion from 3 X thc nozzle side of weld

>>>>LATER>>>>

067500 RV-WD-024 B D UT Group R27, **ZATER>>>>

Closure Head-to-Nozzle B3. 90 3 X N7G 067600 RV-WD-024-ZR B-D UT Group R27, >>>>LATER>>>>

Nozzle N7G Inner B3. 100 3 X Radius Section

0 DATE: 10/15/99 NZNE MILE POINT NUCLEAR PIANT UNIT 1 PAGE: 69 REVISION: 0 ZNSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS tor Vessel Nozzlcs NUMBER: 00.0 ZNSPECTZON INTERVAL PLAN STATUS PRESERVICE YEAR ASME FIRST SECOND THIRD SEC. XI PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ~*CALIBRATION BLOCK~~

067700 RV-WD"025 B F UT Group R28 +~LATER**

Nozzle N7H-to-Flange BS. 10 PT 3 X 067800 RV-WD-025 SZL Group R28, Znconcl 182 Nozzle N7H-to-Flange 455R1S1 butter expansion from 3 X nozzle side of weld

    • LATER**

067900 RV-WD"026 B-D UT Group R28, ~~LATER+~

Closure Head-to-Nozzle B3. 90 3 X N7H 068000 RV-WD-026-ZR B-D UT Group R28, **LATER~*

Nozzle N7H Inner B3.100 3 X Radius Section 068100 RV-WD-027 B-F UT Group R29 **LATER++

Nozzle N7J-to-Flange B5.10 PT 3 X 068200 RV-WD"027 SIL UT Group R29, Inconcl 182 Nozzle N7J-to-Flange 455R1S1 butter expansion from 3 X nozzle side of weld.

~~LATER**

068300 RV-WD"028 B D UT Group R29, **LATER+~

Closure Head-to-Nozzle B3 ~ 90 3 X N7J 068400 RV-WD-028 IR B-D Group R29, *~LATER~~

Nozzle N7J Inner B3. 100 3 X Radius Section

DATE: 10/15/99 NINE MILE POINT NUCLEAR PIANT UNIT 1 PAGE: 70 REVISZON: 0 ZNSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS tor Vessel Nozzles z

NUMBER: 00. 0 INSPECTION INTERVAL PIAN STATUS PRESERVICE YEAR FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ~~CALIBRATION BLOCK~~

068500 RV-WD-029 B-F UT Group R30, ~~LATER'*

Nozzle N7K-to-Flange B5.10 PT 3 X 068600 RV-WD-029 SZL UT Group R30, Znconcl 182 Nozzle N7K-to-Flange 455R1S1 butter expansion from 3 X nozzle siCk of weld.

~ ~LATER+ +

068700 RV-WD-030 B-D Group R30, iiZATER+~

Closure Head-to-No zlc B3.90 3 X N7K 068800 RV-WD-030-ZR B-D Group R30, **LATER~*

Nozzle N7K Inner B3. 100 3 X Radius Section 068900 RV-WD-031 B-F UT Group R32 ++LATER~i Nozzle N7M-to-Flange B5 10 PT 3 X 069000 RV-WD"031 SIL Group R32, Znconcl Nozzle N7M-to-Flange 455R1S1 butter expansion from X

the nozzle side of thc weld ~~LATER~~

069100 RV-WD-032 B-D Group R32, ~PLATER*~

Closure Head-to-Noz"lc B3.90 3 X N7M 069200 RV-WD-032-IR B-D Group R32, i~LATER~~

Nozzle N7M Inner B3.100 3 X Radius Section

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 71 REVZSZON: 0 ZNSERVZCE INSPECTION TEN-YEAR PLAN CIASS 1 SECTION XZ SCHEDULED COMPONENTS tor Vessel Nozzles NUMBER: 00. 0 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERZOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE -OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 **CALIBRATIONBLOCK~+

069300 RV-WD-033 B-F UT Group R33 +~LATER~+

Nozzle N7N-to-Flange B5.10 PT 3 X 069400 RV-WD-033 SZL Group R33, Znconcl 182 Nozzle N7N-to-Flange 455R1S1 butter expansion from 3 X nozzle side of weld.

~ ~LATER~*

069500 RV-WD-034 B-D UT Group R33, **LATER~~

Closure Head-to-Nozzle B3.90 3 X N7N 069600 RV"WD-034-ZR B-D UT Group R33, *~LATER~~

Nozzle N7N Inner B3.100 3 X Radius Section 069700 RV-WD-035 B-F UT Group R34 *~IATER~~

Nozzle N7P-to-Flange BED 10 PT 3 X 069800 RV-WD-035 SZI UT R34 , Znconel 182 butter Nozzle N7P-to-Flango 455R1S1 expansion from thc 3

nozzle side of thc weld.

+~LATER+*

069900 RV-WD-036 B-D UT R34 +~LATER~*

Closure Head-to-Nozzle B3. 90 3 X N7P 070000 RV-WD-036-ZR B-D R34 ~~LATER~~

Nozzle N7P Inner B3.100 3 X Radius Section

DATE: 10/15/99 NINE MILE POINT NUCLEAR PZANT UNIT 1 PAGE: 72 REVZ S ZON: 0 ZNSERVZCE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS tor Vessel Nozzles NUMBER: 00. 0 INSPECTION INTERVAL PLAN STATUS PRESERVZCE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ++CALIBRATION BLOCK~~

070100 RV-WD-037 B-F UT Group R35, **LATER**

Nozzle N7R-to-Flange B5. 10 PT 3 X 070200 RV-WD-037 SZL Group R35, Inconcl 182 Nozzle N7R-to-Flange 455R1S1 butter expansion from X thc nozzlo sido of the weld. i*IATERi~

070300 RV-WD-038 B-D GrouP R35, 44LATER4~

Closure Head-to-Nozzle B3. 90 3 X N7R 070400 RV-WD-038-ZR B-D Group R35, ~iLATERi~

Nozzlo N7R Inner B3.100 3 X Radius Section 070500 RV-WD-039 B-F UT Group R36 **IATERii Nozzlo N7S-to-Flange B5.10 3 X 070600 RV-WD-039 SZL Group R36, Inconcl 182 Nozzle N7S-to-Flange 455R1S1 butter expansion from 3 X the nozzle side of thc weld. **IATER~~

070700 RV-WD-040 B-D Group R36, Closure Head-to-Nozzle B3.90 3 X N78 +~IATERi'70800 RV-WD-040-ZR B-D Group R36, <<~IATER~*

Nozzle N7S Inner B3. 100 3 X Radius Section

DATE: 10/15/99 NINE MZIE POINT NUCLEAR PLANT UNIT 1 PAGE: 73 REVISION: 0 ZNSERVZCE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS tor Vessel Nozzlcs NUMBER: 00. 0 INSPECTION ZNTERVAL PLAN STATUS PRESERVICE YEAR FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE -OUTAGE INSTRUCTIONS NUMBER ZDENTZFICATZON ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ++CALIBRATION BLOCK++

070900 RV WD 041 B F UT Group R37 **LATER~i Nozzle N7T-to-Flange B5 10

~ PT X

071000 RV-WD-041 SZL Group R37, Inconel N

Nozzle N7T-to-Flange 455R1S1 butter expansion from 3 X the noz le side of thc weld. **IATER**

071100 RV WD-042 B-D Group R37, **LATER+*

Closure Head-to-Nozzle B3. 90 3 X N7T 071200 RV-WD-042 ZR B-D Group R37, ~iLATERi~

No zlc N7T Inner B3. 100 3 X Radius Section 071300 RV WD 043 Group R38 ~~IATER*+

No" zle N7U-to-Flange B5.10 PT 3 X 071400 RV-WD-043 SIL Group R38, Inconcl 182 Nozzle N7U-to-Flange 455R1S1 butter expansion from 3 X the nozzle side of the weld. ~ ~IATER~ ~

071500 RV-WD-044 B-D Group R38

  • PLATER~~

Closure Head-to-Nozzle B3 ~ 90 3 X N7U 071600 RV-WD-044-ZR B-D Group R38 **LATER**

Nozzle N7U Inner B3. 100 3 X Radius Section

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 74 REVISION: 0 INSERVZCE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XI SCHEDULED COMPONENTS tor Vessel Nozzles NUMBER: 00. 0 INSPECTION INTERVAL PLAN SIATUS PRESERVICE YEAR ASHE FIRST SECOND THIRD SEC. XI PERZOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEH NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ~~CALIBRATION BLOCK~*

6.0" Safety Relief Valve (REF. DWG. NO. 28) 071700 V-BK-01-119A B-M-2 VT-3 V09, Examine when Safety Valve Zntcrior B12.50 disassembled +~N/A~~

X Surface Control Rod Drive Nozzles (REF. DWG. NO. 28A) 073500 CRD NOEELES B"E VT-2 129 CRD Nozzlcs, 25% or Partial Penetration B4 12

~ 32 required, included in Wclds system pressure test program **N/A**

Instrumentation Nor zlcs (REF. DWG. NO. 28A) 073600 INST-NOEELES VT"2 64 IFH's, 25% or 16 Incore Flux Honitors B4.13 repaired, included in 3 X system pressure test program *~N/A**

Instrument Worries (REF. DWG. NO. 8) 073900 SZL571-N13A SZL VT 2 VT-2 after vessel RPV N13A Instr 571 flood-up (static ic-to-Safe X - - - X X - - X prcssure, no hold time)

No End at start of each RFO f during System Lcakagc each RFO. ~~N/A~*

074000 SZL571-N13B SZL VT-2 VT-2 after vessel RPV N13B Instr 571 flood-up (static Nozzle-to-Safe End X - - - X X - - X prcssure, no hold time) at start of each RFO 4 during System Leakage each RFO. **N/A~*

DATE: 10/15/99 NINE MILE POZNT NUCLEAR PLANT UNIT 1 PAGE: 75 REVISION: 0 ZNSERVZCE INSPECTION TEN-YEAR PLAN CIASS 1 SECTION XI SCHEDULED COMPONENTS tor Vessel Nozzlas NUMBER: 00. 0 INSPECTION ZNTERVAL PLAN STATUS PRESERVICE YEAR ASME FZRST SECOND THIRD SEC. XI PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 **CALIBRATIONBLOCK+'~

Znstrumcnt Nozzles (REF. DWG. NO. SA) 074100 SZL571-N14A SIL VT-2 VT-2 after vessel RPV N14A Instr 571 flood-up (static Nozzle-to-Safe End 3 X - - - X X - - X pressure, no hold time) at start of each RFO a during System Lcakagc each RFO. ~~N/A~~

074200 SIL571-N14B SZL VT"2 VT-2 after vessel RPV N14B Znstr 571 flood-up (static Nozzle-to-Safe End X - - - X X - - X prcssure, no hold time) at start of each RFO a during System Leakage each RFO. ~~N/A~+

Instrument Nozzles (REF. DWG. NO. SB) 00 SZL571-N15A SIL VT-2 VT-2 after vcsscl RPV N15A Instr 571

- - - - - flood-up (static X X X X Nozzle-to-Safe End prcssure, no hold time) at start of each RFO a during System Leakage each RFO. **N/A*~

074400 SIL571 N15B SIL VT-2 VT-2 after vessel RPV N15B Znstr 571 flood-up (static 3 X - - - X X - - X Nozzle-to-Safe End pressure, no hold time) at start of each RFO 6 during System Leakage each RFO. ~+N/A~~

DATE: 10/15/99 NINE MILE POINT NUCLEAR PZANT UNIT 1 PAGE: 76 REVISION: 0 INSERVZCE INSPECTION TEN YEAR PIAN CLASS 1 SECTION XI SCHEDULED COMPONENTS tor Vessel Nozzles NUMBER: 00.0 INSPECTION INTERVAL PLAN STATUS PRESERVZCE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 atCALIBRATZON BLOCK+a Instrument Nozzles (REF. DWG. NO. BC) 074500 SZL571 N16A SZL VT-2 VT-2 after vessel RPV N16A Instr 571 flood-up (static Nozzle-to-Safe End 3 X - - - X X - - X pressure, no hold tine) at start of each RFO 6 during System Leakage each RFO. ~~N/A~~

074600 SZL571-N168 SIL VT 2 VT-2 after vessel RPV N16B Instr 571 flood-up (static Nozzle-to-Safe End 3 X - - - X X - - X pressure, no hold tine) at start of each RFO a during System Lcakagc each RFO. ~*N/A*+

Instrument No zlcs (REF. DWG. NO. SD) 00 SZL571-N17A SZL VT-2 VT-2 after vessel RPV N17A Instr 571 flood-up (static Nozzle-to-Safe End X - - - X X - - X pressure, no hold time) at start of each RFO C during System Leakage each RFO. **N/A+~

074800 SIL571-N17B SZL VT 2 VT-2 after vessel RPV N17B Instr 571 flood-up (static 3 X - - - X X - - X Nozzle-to-Safe End prcssure, no hold time) at start of each RFO 6 during System Leakage each RFO. **N/A~~

'ATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 77 REVI SION: 0 INSERVZCE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS tor Vessel Supports NUMBER: 00.0 ZNSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE --OUTAGE-- INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 4 lCALIBRATION BLOCK~ ~

Stabilizers (REF. DWG. NO. 28) 074900 RV-SB-1A F-A VT 3 Code Case N-491-1 RPV Stabilizer Strut F1.40 ~+N/A+~

3 X 075000 RV SB-1B Code Case N-491-1 RPV Stabilizer Strut F1.40 *AN/Alt 3 X 075100 RV SB-2A Coda Case N-491-1 RPV Stabilizer Strut F1.40 ++N/A~+

3 075200 RV-SB-2B F-A VT-3 Code Case N 491 1 RPV Stabilizer Strut F1.40 +*N/A+*

3 X 00 RV-SB-3A F-A VT 3 Code Case N-491-1 RPV stabilizer Strut F1.40 ~~N/A~*

3 X 075400 RV-SB-3B VT 3 Code Case N-491-1 RPV Stabilizer Strut Fl ~ 40 aeN/Aee 3 X 075500 RV-SB-4A F-A VT"3 Code Case N-491-1 RPV Stabilizer Strut F1.40 +~N/A++

3 X 075600 RV-SB-4B F-A VT-3 Code Casa N-491-1 RPV Stabilizer Strut F1.40 i*N/A%*

3 X Integral Attachments (REF. DWG. NO. 2S) 075700 RV-SB1-ZA-371/372 B-K MT WRA 50%, Examine Stabilizer Integral B10. 10 accessible length of 3 X Woldcd Lug 8 22.5 attachment weld., Coda Caso N-509. ~*N/A*~

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 78 REVISION: 0 INSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS tor Vessel Supports NUMBER: 00.0 ZNSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 +*CALIBRATION BLOCK~~

075800 RV-SB2-ZA-373/374 B-K MT WRA 50%, Examine Stabilircr Integral B10. 10 accessible length of 3 X Welded Lug 8 112.5 welded attachment, Code Casa N-509. ~~N/A~~

Zntcgral Attachments (REF. DWG. NO. 28A) 076200 RV"WD"356-OD B-K PT 100% of attachment weld SuPport Skirt Integral B10.10 length, Code Case N-509 3 X aaN/Aaa Attachment Weld Support Skirt (REFT DWG. NO. N/A) 076300 RPV-NR02 SKT/BLT F-A VT-3 +*N/A*+

Support Skirt F1. 40 3 X

DATE: 10/15/99 NINE MILE POINT NUCLEAR PIANT UNIT 1 PAGE: 79 REVISION: 0 ZNSERVICE INSPECTION TEN-YEAR PZAN

.I CLASS 1 SECTZON XI SCHEDULED COMPONENTS tor Vessel Welds NUMBER: 00.0 INSPECTION ZNTERVAL PLAN STATUS PRESERVICE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE ZNSTRUCTZONS NUMBER ZDENTZFICATZON ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ~ ~CALIBRATION BLOCK**

Closure Head Wclds (REF. DWG. NO. 28) 076500 RV-WD-001 B-A UT Examine 100% of weld Closure Head-to-Flange Bl. 40 MT length, 1/3 each Wold X - - - X - - - X inspection period

    • IATER**

076600 RV-WD"002 B-A UT Removable steal Closure Hcad- Bl. 21 insulation platform, 50%

3 X Circumferential Weld CRV achieved, Dollar Plate) +~ IATERi i 076700 RV-WD-003 B-A UT Examine accessible Closure Hcad- Bl. 22 length of weld.

3 X Mcridional Weld **IATER**

00 RV-WD-004 B-A UT Examine accessible Closure Head- B1.22 length of wold.

3 X Mcridional Weld ~~IATER~*

076900 RV-WD-005 B-A UT Examine accessible Closure Head- B1.22 length of weld ~~IATER~~

3 X Mcridional Weld 077000 RV-WD-006 B-A UT Examine accessible Closure Hcad- B1.22 length of wold.

3 Meridional Weld **LATER~~

077100 RV-WD-007 B-A UT Examine accessible Closure Head- Bl . 22 length of weld.

3 X Mcridional Weld **ZATER~+

DATE: 10/15/99 NZNE MILE POINT NUCLEAR PLANT UNZT 1 PAGE: 80 REVISION: 0 ZNSERVZCE ZNSPECTZON TEN-YEAR PZAN CLASS 1 SECTION XI SCHEDULED COMPONENTS tor Vessel Welds NUMBER: 00.0 INSPECTION INTERVAL PIAN STATUS PRESERVZCE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 **CALIBRATIONBLOCK**

077200 RV-WD-008 B A UT Examine accessible Closure Head- B1.22 length of weld *~IATER~~

3 X Meridional Weld 077300 RV-WD-009 B-A UT Examine accessible Closure Head- B1.22 length of weld.

3 X Mcridional Weld + ~LATER~ ~

077400 RV-WD-010 B"A UT Examine accessible Closure Head- B1.22 length of weld ~~LATER~~

3 X Mcridional Weld Shell Wclds (REF. DWG. NO. 28)

RV-WD-099 B-A AUT 100% of weld length from Shell-to-Flange weld B1.30 thc shell side *~LATER**

3 X 077600 RV-WD-099 100% of wold length from Shell-to-Flange weld Bl 30

~ the seal surface 3 X **LATER*+

077900 RV-WD-130 B-A AUT 100% of weld length, and Upper Shell Long Weld B1.12 intersection of 3

15 circumferential weld RV-WD 100 *+LATER+*

078000 RV-WD 131 B-A 100% of weld length and Upper Shell Long Weld B1.12 intersection of 3 X 8 135 RV WD 100. +*LATER*+

078100 RV-WD-132 B-A AUT 100% of weld length and Upper Shell Long Weld B1.12 intersecting 3 X 8 255 circumfcrcntial weld RV-WD-100. ~~LATER~~

DATE: 10/15/99 NINE MZZE POINT NUCLEAR PLANT UNZT 1 PAGE: 81 REVISION: 0 ZNSERVZCE INSPECTION TEN-YEAR PLAN CZASS 1 SECTION XZ SCHEDULED COMPONENTS tor Vassal Welds NUMBER: 00.0 INSPECTZON ZNTERVAL PLAN STATUS PRESERVICE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE ZNSTRUCTZONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 + +CALIBRATION BLOCK>> ~

078200 RV-WD-133 B-A 100% of weld length and Upper Intermediate B1.12 intersecting 3 X Shell Long Weld 8 90 circumferential weld RV-WD-100 C RV-WD-101.

++IATER~+

078300 RV-WD-134 B-A 100% of weld length and Upper Intermedi ate Bl . 12 intcrsccting 3 X Shell Long Weld 8 210 circumferential weld RV-WD-100 C RV-WD-101.

    • LATER+~

078400 RV-WD-135 B-A 100% of weld length and Upper Intermediate Bl. 12 intcrsccting 3 X Shell Long Weld 8 330 circumferential weld Rv wD 100 a Rv-wD 101.

~+LATER**

078700 RV-WD-139 B-A 100% of weld length and Lower Intcrmediatc B1.12 intersecting 3 X Shell Long Weld 8 105 circumfcrcntial weld RV-WD-101 4 RV-WD-137.

+ ~IATER~ +

078800 RV-WD 140 B-A 100% of weld length and Lower Zntcrmcdiatc B1.12 intersecting 3

Shell Long Weld 8 225 circumferential weld RV-WD-101 6 RV-WD-137.

    • LATER**

078900 RV-WD-141 B A 100% of weld length and Lower Intermediate Bl. 12 intersecting X

Shell Long Weld 8 345 circumferential weld RV-WD-101 S RV-WD-137.

    • LATER**

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNZT 1 PAGE: 82 REVISION: 0 INSERVICE INSPECTION TEN-YEAR PLAN lI CLASS 1 SECTION XZ SCHEDULED COMPONENTS tor Vessel Wclds NUMBER: 00. 0 INSPECTZON INTERVAL PLAN STATUS PRESERVICE YEAR FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE -OUTAGE- INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ~ ~CALIBRATION BLOCK~ +

079000 RV-WD-142 B-A AUT 100% of weld length and Lower Shell Long Weld B1.12 intersecting 3 X 8 18 circumf crential weld RV-WD-101 6 RV-WD-137.

  • +LATER'~'

079100 RV-WD-143 B-A AUT 100% of weld length and Lower Shell Long Weld B1.12 intersecting 3 X 138 circumferential weld RV-WD-137 6 RV-WD-138.

  • +LATER*+

079200 RV-WD-144 B-A AUT 100% of weld length and Lower Shell Long Weld B1.12 intersecting 3 X e 258 circumforontial wclds RV-WD 137 6 RV"WD-138.

+iLATER+*

Bottom Head Wclds (REF. DWG. NO. 28A) 079300 RV-WD-147 B A UT Accessible length of Bottom Head Dollar B1.21 weld **LATER*~

3 Plate Circ. Weld 079400 RV-WD-148 B-A UT Accessible length of Bottom Head Meridional B1.22 wold +*LATER~~

3 X Weld 079500 RV-WD-149 B A Accessible length of Bottom Head Meridional B1.22 weld **LATER'~

3 X Weld 079600 RV-WD-150 B-A Acccssiblc length of Bottom Head Meridional B1.22 weld ~~LATER**

3 X Weld

DATE: 10/15/99 NINE MZLE POINT NUCLEAR PLANT UNIT 1 PAGE: 83 REVISION: 0 ZNSERVZCE INSPECTION TEN-YEAR PIAN CLASS 1 SECTION XI SCHEDULED COMPONENTS tor Vessel Wclds NUMBER: 00.0 INSPECTION INTERVAL PLAN STATUS XRESERVZCE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER ZDENTIPICATZON ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ~~CALIBRATION BLOCK+~

079700 RV-WD-151 B A Accessible length of Bottom Head Meridional B1.22 weld **LATER+a 3 X Weld 079800 RV-WD-152 B-A UT Accessible length of Bottom Head Meridional B1.22 weld **LATER*~

3 X Weld 079900 RV-WD-153 B A UT Acccssiblc length of Bottom Head Meridional B1.22 weld +PLATER**

3 X Weld 080000 RV-WD-154 B-A UT Accessible length of Bottom Head Meridional B1.22 weld ~~LATER++

3 X Weld 080100 RV-WD-155 B-A UT Accessible length of Bottom Head Meridional B1.22 weld ~*LATER'*

3 X Weld 080200 RV-WD-156 Accessible length of Bottom Head Meridional B1.22 weld **LATER*~

3 X Weld 080300 RV-WD-157 Accessible length of Bottom Head Meridional B1.22 weld **LATER~~

3 X Weld 080400 RV WD-158 Acccssiblc length of Bottom Head Meridional B1.22 weld ~*LATER**

3 X Weld

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 84 REVISION: 0 ZNSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XI SCHEDULED COMPONENTS tor Vessel Welds

~ NUMBER: 00.0 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ~ ~CALIBRATION BLOCK~ ~

080500 RV-WD-159 B-A Accessible length of Bottom Head Meridional Bl. 22 weld ~~LATER~~

3 X Weld 080600 RV-WD-160 B-A UT Acccssiblc length of Bottom Head Meridional Bl. 22 weld ~~LATER~+

3 X Weld 080700 RV-WD-161 B-A UT Accessible length of Bottom Head Meridional B1.22 weld ++LATER**

3 X Weld 080800 RV-WD-162 B A UT Accessible length of Bottom Head Bl . 21 weld ~~LATER~~

3 X Circumfcrcntial Weld

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 85 REVISION: 0 INSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS Steam System NUMBER: 01 . 0 INSPECTION INTERVAL PLAN STATUS PRESERVZCE YEAR ASME FIRST SECOND THIRD SEC. XI PERIOD PERIOD PERIOD

SUMMARY

EXAHZNATZON AREA CATEGY NDE OUTAGE INSTRUCTIONS NUHBER IDENTIFICATION ITEH NO METH 1 2 3 4 1 2 3 4 1 2 3 4 +*CALIBRATION BLOCK+*

24. 0" HSB (REF. DWG. NO. 2) 080900 01-01-VB B-G-2 V01, Limited to valve Globe Valve 01-01 B7.70 selected under B-M-2 Bolting SAN/At+

081000 01-01-VBY B-M-2 V01, Only when Globe Valve 01-01 B12.50 disassembled, onc valve 3 X Interior Surface in a group of valves.

%*N/A+*

6.0" HSB Relief (REF. DWG. NO. 2) 081900 01-07-VB B-G-2 V02, Limited to valve Gate Valve 01-07 B7.70 selected under B-M-2 3 X Bolting 14N/At%

000 01-07-VBY B-M-2 VT-3 V02, Only when Gate Valve 01-07 B12.50 disassembled, one valve X in a group of valves.

Interior Surface

    • N/A**
6. 0" MSB (REF. DWG. NO. 2) 082700 01-102-A-SVB B-G-2 V03, 12 Bolts, Limited Relief SV 01-102A B7,70 to valve selected under 3 X Bolting B-H-2 ~*N/A**

~ 082800 01-102-A-SVBY B"M-2 V03, Only when Rclicf SV 01-102A B12. 50 disassembled, one valve 3 X Interior Surface in a group of valves

%*N/A%4 082900 01-102-A-WD-001 B "M-1 UT V03, Limited to one Relief SV 01 102A B12. 40 valve in a group of 3 X Valve Body Weld valves. ~~LATER*~

DATE: 10/15/99 NINE MILE POINT NUCZEAR PIANT UNIT 1 PAGE: 86 REVISION: 0 INSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XI SCHEDULED COMPONENTS Steam System NUMBER: 01. 0 INSPECTION INTERVAL PLAN STATOS PRESERVZCE YEAR ASME FIRST SECOND THIRD SEC. XI PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 *~CALIBRATION BLOCK**

2.0" MSA Vent Line (REF. DWG. NO. 2) 084900 01-120-VB B-G-2 VT-1 2 Bolts ~*N/A~*

Valve 01-120 Bolting B7. 70 3 X 24 . 0" MSA (REF. DWG. NO. 2) 086600 01 MSH 21 WD 001 B-K Code Case N-509, Welded Integral Attachment B10. 20 on 3 sides ~~N/A~~

3 X Lug 1 086700 01-MSH-21-WD-002 B-K Code Case N-509, Welded Integral Attachment B10. 20 on 3 sides **N/A~*

3 X Lug 2 6800 01-MSH-21 WD 003 B-K PT Code Case N-509, Welded Integral Attachment B10. 20 on 3 sides ~~N/Ai*

3 X Lug 3 086900 01 MSH-21-WD-004 B-K Code Case N-509, Welded Integral Attachment B10. 20 on 3 sides ~*N/A~~

3 X Lug 4 087000 01-MSH-21A F-A VT-3 Code Case N-491-1, 4 Spring Hanger F1.10 Integrally Welded Lugs 3

    • N/Af4 087100 01-MSH 21B VT-3 Code Casa N-491-1 Spring Hanger Fl. 10 ++N/A~~

3 X

0 DATE: 10/15/99 NZNE MZLE POINT NUCLEAR PIANT UNIT 1 PAGE: 87 REVISION: 0 INSERVICE INSPECTION TEN-YEAR PLAN CIASS 1 SECTION XZ SCHEDULED COMPONENTS Stcam System NUMBER: 01. 0 INSPECTION INTERVAL PIAN STATUS PRESERVICE YEAR ASME FIRST SECOND THIRD SEC. XI PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ~ ~CALIBRATION BLOCK**

24 . 0" MSB (REF. DWG. NO. 2) 087600 01-MSH-22A F-A VT-3 Code Case N-491-1.

Spring Hanger Fl . 10 ~~N/A~~

3 X 24 . 0" MSA (REF. DWG. NO. 2) 087800 01-MSH-23 F A VT-3 Code Case N-491-1 Pipe Stanchion Fl. 10 saN/A+a 3 X

32. 0" MSA (REF. DWG. NO. 2) 088200 01-WD-001 B-D Group Rll, 87% CRV, Nozzle N3A-to-Vessel B3.90 Limitation due to 3 X ad)accnt nozzle and Bioshicld. ~ ~IATER+ +

00 01-WD 001 IR B D UT Group Rll, 54% CRV, Nozzle z N3A Inner B3. 100 Limitation duc to 3 X Radius Section ad)accnt nozzle and Bioshicld. ~~LATER~~

24 . 0" MSA (REF. DWG. NO. 2) 088400 01-WD-002 B-J Group Rll, *~LATER~~

Nozzle N3A -to-Safe B9.11 3 X End 088500 01-WD 003 B-J UT Terminal End, Examine Nozzle N3A Safe B9.11 MT 100% of weld length 3 X End-to-Elbow ~~NMPI-24-080-CS~~

088700 01-WD-006 B-J MT To Vent Line, Examine Branch Connection B9.32 100% of weld length 3 X (24"x2" WOL) a sN/AP a

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 88 REVISION: 0 INSERVICE ZNSPECTZON TEN YEAR PZAN CIASS 1 SECTION XZ SCHEDULED COMPONENTS Steam System NE NUMBER: 01.0 PRESERVICE YEAR INSPECTION INTERVAL PZAN STATUS ASHE FIRST SECOND THIRD SEC. XI PERIOD PERIOD PERIOD SUHMARY EXAHINATZON AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTZFZCATZON ITEM NO HETH 1 2 3 4 1 2 3 4 1 2 3 4 **CALIBRATIONBLOCK**

089800 01-WD-016 B-J UT Examine 100% of weld Branch Connection B9. 31 HT length i~NHP1-24-080-CS, 3 X 6-80 **

(24"X6" WOL) NMP1 090400 01-WD-019 B-J UT Terminal End, High Pipo-to-Valvo 01-02 B9. 11 HT Stross Wold, Examine 3 X 100% of weld length

+~NMPI-24-080"CS**

090500 01-WD-020 B-J UT Terminal End, High Valve 01-02 -to-Pipe B9.11 HT Stress Weld, Examine 3 X 100% of weld length.

    • NMPI-24-080-CS~*
32. 0" HSB (REF. DWG. NO. 2) 0800 01 "WD-033 B-D Group R12, 91% CRV Nozzle N3B-to-Vessel B3.90 Limitation duc to 3 X ad)acent nozzle and Bioshicld ~*LATER+*

090900 01-WD-033-ZR B-D Group R12, 78% CRV Nozzle N3B Inner B3.100 Limitation due to 3 X Radius Section ad)accnt nozzlo and Bioshi old **LATER~~

24 . 0" HSB (REF. DWG. NO. 2) 091000 01 WD-034 B-J MT Group R12, Nozzle N3B-to-Safe End B9.11 *ePIR-l. 475-1++

3 X 091100 01-WD-035 B-J UT Tarnd.nal End, Examine Nozzlo N3B Safe B9. 11 100% of wold length.

3 X **NHP1-24-080-CSs*

End-to-Elbow

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 89 REVISION: 0 ZNSERVZCE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS Steam System E NUMBER: 01.0 INSPECTION INTERVAL PZAN STATUS PRESERVICE 1'EAR ASHE FIRST SECOND THZRD SEC. XZ PERIOD PERZOD PERIOD SUMHARY EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ZTEH NO HETH 1 2 3 4 1 2 3 4 1 2 3 4 ~*CALIBRATION BLOCK*+

2. 5" MSB (REP. DWG. NO. 2) 091600 01-WD-042 B-J HT Cont. on sht. 2A, Reducer B9. 21 Examine 100% of weld 3 X (2. 5" x2. 0" ) -to-Pipe length **N/A+a
6. 0" HSB (REF. DWG. NO. 2) 092100 01-WD-046-A B-J UT Terminal End, High Branch B9.11 HT Stress Weld, Examine 3 X Connection-to-Valve 100% of weld length.

01-08 +~NMPZ-6-80-CS~~

24. 0" MSB (REP. DWG. NO. 2) 092600 01"WD-048 B-J HT Examine 100% of weld Branch Connection B9.31 UT length +~PZR-1.219-1, X

{24 "x6" WOL) 94-6007+*

6 . 0" MSB (REF . DWG. NO. 2) 092700 01-WD"048-A B-J UT Terminal End, High Branch B9. 11 HT Stress Weld, Examine 3 X Connection-to-Valve 100% of weld length 01-12 +*NHPZ-6-80-CS~+

092800 01-WD-048-B B-J UT Terminal End, High Valve 01-12 -Plangc B9.11 MT Stress Weld, Examine 3 X 01-102E 100% of wold length

    • NMP1-6"80-CS~~
24. 0" MSB (REP. DWG. NO. 2) 092900 01-WD-050 B"J UT Terminal End, High Pipe-to-Valve 01-01 B9. 11 Stress Weld, Examine 3 X 100% of weld length
    • NMP1-24-080-CS~ ~

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 90 REVISZON: 0 ZNSERVICE INSPECTION TEN YEAR PIAN CIASS 1 SECTION XI SCHEDULED COMPONENTS Steam System NUMBER: 01 . 0 PRESERVICE YEAR INSPECTION INTERVAL PZAN STATUS ASME FIRST SECOND THZRD PERIOD PERIOD PERZOD SEC. XZ

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 **CALIBRATIONBLOCK~~

093000 01-WD-051 B-J UT Terminal End, High Valve 01-01-to-Pipe B9. 11 MT Stress Weld, Examine 3 X 100% of weld length.

+*NMP1-24-080-CS(

P1R-1. 219-~ ~

2.0" MSA Vent Linc (REF. DWG. NO. 2) 093300 01-WD-448 B-J PT Examino 100% of weld Sock-0-Lct -to-Pipe B9.21 length ++N/A+*

3 X 093500 01-WD-450 B J Examino 100% of weld Elbow-to-Pipe B9. 21 length ~*N/A~~

3 X 800 01-WD-453 B-J Examine 100% of weld Pipe-to-Valve 01-120 B9. 21 length. *~N/A~~

3 X 2.0" MSA Valve By-Pass Line (REF. DWG. NO. 2B) 094300 01-WD-454 B-J MT Examino 100% of weld Pipe-to-Coupling B9. 40 length. ~~N/A++

3 X

DATE: 10/26/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 91 REVISION: 0 ZNSERVICE INSPECTION TEN YEAR PLAN CLASS 1 SECTION XI SCHEDULED COMPONENTS water System NUMBER: 31 . 0 INSPECTION INTERVAL PIAN STATUS PRESERVZCE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

NUHBER EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS ZDENTIFZCATION ITEH NO METH 1 2 3 4 1 2 3 4 1 2 3 4 **CALIBRATIONBLOCK+ +

18. 0" FWA (REF. DWG. NO. 5) 095900 31-01R-FLG B-G-1 VT-1 V04, Limited to valve Check Valve 31-01R B6.220 selected under B-M-2 Flange Surface 3 X *IN/Ak l 096000 31-01R-VB BG1 UT Limited to valve Check Valve 31-01 B6. 210 selected under B-M-2 3 X Studs (18) +*LATER**

096100 31-01R-VBY B-M-2 V04, Only when Check Valve 31-01R B12. 50 disassembled, one valve Interior 3 X Surface among group of valves

%IN/A% 1 0 31 01R-VNW B-G-1 VT-1 V04, Limited to valve Check Valve 31-01R B6.230 selected under B-M-2 Nuts and Washers **N/A*~

096700 31-07-VB B-G-2 V05, Limited to valve Gate Valve 31-07 B7.70 selected under B-M-2.

Bolting 3 X 096800 31-07 VBY B-H-2 VT-3 V05, Only when Gate Valve 31-07 B12.50 disassembled, Limited Interior 3 X Surface onc valve among group of valves. **N/A**

18. 0" FWD (REF. DWG. NO. 5) 098000 31-A2 F-A VT 3 Code Case N-491-1 Anchor Fl . 10 **N/A~*

3 X

DATE: 10/26/99 NZNE MILE POINT NUCLEAR PIANT UNIT 1 PAGE: 92 REVISZON: 0 INSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS ater System ZONE NUMBER: 31.0 INSPECTION INTERVAL PLAN STATUS PRESERVZCE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 t tCALZBRATION BLOCKtt

10. 0" FWC {REF. DWG. NO. 5) 099900 31-HS-A F-A VT 3 4 Lugs welded 3 sides, Spring Hanger F1.10 Code Case N-491-1.

3 X **N/Att 100000 31-HS-B F-A VT 3 4 lugs, woldcd 3 sides, Spring Hanger Fl. 10 Codo Case N-491-1 3 X **N/At*

100100 31-H5-WD-001 B"K MT CRA 90%, Code Case N-509 Zntcgral Attachment B10. 20 ttN/A**

3 X 31-HS-WD-002 B-K MT CRA 90%, Code Case N-509 Integral Attachment B10. 20 ttN/At*

3 X 100300 31 "HS-WD-003 B-K MT CRA 90%, 4 Lugs, pipe Integral Attachment B10. 20 clamp contacts one side 3 X of lug. Code Case N-509

  • t'N/Att 100400 31-H5 WD-004 B-K MT CRA 90%, 4 Lugs, pipe Integral Attachment B10. 20 clamp contacts ono side 3

of lug, Codo Case N-509

  • t'N/A**

10 0" FWD {REF. DWG. NO, 5) 100500 31-H6 F-A VT 3 Code Case N 491-1 Spring Support F1.10 ttN/A*i 3 X Stanchion

DATE: 10/26/99 NINE HILE POINT NUCLEAR PIANT UNIT 1 PAGE: 93 REVISION: 0 INSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COHPONENTS water System E NUMBER: 31.0 INSPECTION INTERVAI PLAN STATUS PRESERVICE YEAR ASHE FIRST SECOND THIRD SEC. XI PERIOD PERIOD PERIOD

SUMMARY

EXAHINATION AREA CATEGY NDE -OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEH NO METH 1 2 3 4 1 2 3 4 1 2 3 4 **CALIBRATIONBLOCK*~

18. 0" FWA (REF. DWG. NO. 5) 101300 31-HS F-A Code Case N-491-1 Spring Support F1.10 *AN/A*4 X

w/welded stanchion

18. 0" FWB (REF. DWG. NO. 5) 101900 31-WD-001 B-J HT Terminal End, High Valve 31-02R-to-Valve B9.11 UT Stress Weld, Examine 3 X 100% of weld length.

Extension

~ ~ P1R-1 . 156-1*'~

102500 31-WD-015 B-J UT Examine 100% of weld Pipe-to-Tee B9.11 HT length. ~~PIR-1.156-1**

3 - - - - X

10. 0" FWB (REF. DWG. NO. 5) 103000 31-WD-019 B-J UT Terminal End, Examine Pipe-to-Nozzle N4B B9. 11 HT 100$ of weld length 3 X ~ ~ PIR-1 . 156-1* ~

Safe End 103100 31-WD-020 B-J UT Group R14, ~~LATER~~

Safe End-to Nozzle N4B B9.11 HT 3

103300 . 31-WD-021 B-D Group R14, 78% CRV Nozzle N4B-to-Vcsscl B3.90 Limitation duc to 3 X ad)accnt nozzle and Bioshield ~~LATER~~

103400 31-WD-021 NUREG UT Group R14, Auto UT Nozzle N4B Bore (Zone 0619 Gene-Gcris 2000 system

3) ~~LATER+~

DATE: 10/26/99 NZNE MILE POINT NUCLEAR PIANT UNIT 1 PAGE: 94 REVISION: 0 INSERVICE INSPECTION TEN-YEAR PIAN CIASS 1 SECTION XZ SCHEDULED COMPONENTS water System NUMBER: 31.0 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR ASME FIRST SECOND THIRD SEC. XI PERIOD PERIOD PERZOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 + +CALIBRATION BLOCK*+

103500 31-WD-021-ZR B D UT Group Rli, Auto UT Noz. N4B Inner Radius B3 100 Gene-Gcris 2000 system, 3 X Section (zone 1/2) ,

Frequency per NUREG 0619, 47% CRV Limitation due to ad)acent nozzle and ioshield. ~ ~LATER~ +

10. 0" FWA (REF. DWG. NO. 5) 104300 31-WD-028 B-J UT Terminal End *~LATER**

Pipe" to "Nozzle N4A B9 11

~ MT 3 X Safe End 104400 31 WD-029 B J UT Group R13, 99% CRV Safe End-to-Nozzle N4A B9.11 PT Limitation duc to 3 X thermocouplc lugs

++LATER'~~

104600 31"WD-030 B D UT Group R13, 94% CRV N4A Nozzle-to-Vessel B3. 90 Limitation due to 3 X ad)acent nozzle and Bioshicld, ~~IATER~~

104700 31-WD-030 NUREG UT Group R13, Auto UT N4A Nozzle Bore (Zone 0619 Gene-Geris 2000 system 3

3) **LATER**

104800 31-WD-030-ZR B"D Group R13, 82% CRV, N4A Noz. Inner Radius B3.100 Limitation duc to 3 X Section(zone 1/2) ad)acent nozzle and Bioshield, Auto UT Gene-Gcris 2000 system ,

Frequency by NUREG 0619

    • LATER**

DATE: 10/26/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 95 REVISION: 0 INSERVZCE INSPECTION TEN-YEAR PIAN CZASS 1 SECTION XZ SCHEDULED COMPONENTS water System NUMBER: 31. 0 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR ASHE FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERZOD SUHMARY EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ++CALIBRATION BLOCK~~

18.0" FWA (REF. DWG. NO. 5) 10490031-WD-031 B"J MT Torminal End, High Valve 31-01-to-Valve B9. 11 UT Stress Weld, Examine 31-07 Extension 100% of weld length.

    • P1R-1. 156-1**
18. 0" FWB (REF. DWG. NO. 5) 105500 31-WD"045 B-J UT Examine 100% of weld Pipe-to-Tcc B9.11 length +*PZR-1.156-1~~

3 X

10. 0" FWC (REF. DWG. NO. 5) 106000 31-WD-049 B J HT Torad.nal End, Examine Pipo-to-Nozzle N4C B9.11 100% of weld length.

3 Safe End ++PZR-. 75-2++

106100 31 WD-050 B-J UT Group R15, 86% CRV, 99%

N4C Nozzlo-to-Safe End B9.11 HT for UT ~*PIR-1.156-1*~

3 X 106300 31-WD-051 B D UT Group R15, 84% CRV.

N4C Nozzle-to-Vessel B3 90

~ Limitation duc to 3 X ad)acent nozzle and Bioshicld ~~ZATERi~

106400 31 WD 051 NUREG UT Group R15, Frequency N4C Nozzle Bore (Zone 0619 pcr NUREG-0619 **LATER+a 3 X 3) 106500 31-WD-051-ZR B-D Group R15, (Zone 1 4 2)

N4C Noz. Inner Radius B3.100 Frequency per 3 X Section (Zones 1/2 NUREG-0619, 86% CRV, Limitation duc to ad)acent nozzle and Bioshield. ~~LATER~~

DATE: 10/26/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 96 REVISZON: 0 ZNSERVZCE INSPECTION TEN-YEAR PIAN CZASS 1 SECTION XZ SCHEDULED COMPONENTS water System ZONE NUMBER: 31.0 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ~*CALIBRATION BLOCK~ ~

10. 0" FWD (REF. DWG. NO. 5) 107300 31 WD-058 B-J Terminal End Pipe-to-Nozzle N4D B9.11 ~*FIR-.75-2~*

X Safe End 107400 31-WD-059 B J UT Group R16, ~*LATER++

N4D Safe End-to-Nozzle B9.11 3 X 107600 31 "WD-060 B-D Group R16, 82% CRV N4D Nozzle-to-Vessel B3. 90 Limitation due to 3 X Bioshield **IATER*~

107700 31-WD-060 Group R16, Frequency per N4D Nozzle Bore (Zone 0619 NUREG-0619 **N/A~+

3 X 3) 107800 31-WD" 060-ZR B D Group R16, Zone 1 4 2, N4D Noz. Inner radius B3.100 59% CRV Limitation duc 3 X Section (zones 1/2 to Bioshield, Frcqucncy by NUREG-0619 ~~LATER~~

Page 97 Left Blank Intentionally

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNZT 1 PAGE: 98 REVISION: 0 ZNSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XI SCHEDULED COMPONENTS tor Recirculation Discharge E NUMBER: 32.0 PRESERVICE YEAR INSPECTION INTERVAL PIAN STATUS ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ~~CALIBRATION BLOCK~*

28.0" Discharge 12D (REF. DWG. NO. 7) 109200 32-12-H4A F-A VT-3 Removed verify, Code Spring Hanger Fl. 10 Case N-491-1 *~N/A~~

3 X 109300 32-12-H4B Removed verify, Code Spring Hanger Fl. 10 Caso N-491-1 ~~N/A~+

3 X 28.0" Discharge 13D (REF. DWG. NO. 7) 109600 32-13-H4 WD 001 B K PT (32-13-H-4-A), Code Case Integral Attachment B10. 20 N-509 **N/A**

3 X Lug 109700 32-13"H4"WD-002 B-K (32-13-H-4-A), Code Case Integral Attachment B10.20 N-509 **N/A**

X Lug 109800 32-13-H4-WD-003 B K (32-13-H-4-B), Code Case Zntcgral Attachment B10. 20 N-509 ~*N/A~*

X Lug 109900 32-13-H4-WD-004 B-K (32-13-H-4-B), Code Case Integral Attachment B10. 20 N-509 ~*N/A~*

3 X Lug 110000 32-13-H4A Code Case N-491-1 Spring Hanger Fl . 10 ++N/A+*

3 X 110100 32-13-H4B Code Case N-491-1 Spring Hanger Fl. 10 **N/A**

3 - - - - X

DATE: 10/15/99 NINE MZLE POINT NUCLEAR PLANT UNIT 1 PAGE: 99 REVISION: 0 ZNSERVZCE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XI SCHEDULED COMPONENTS tor Recirculation Discharge ZONE NUMBER: 32.0 ZNSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ~ ~CALIBRATION BLOCK~*

28.0" Discharge 15D (REF. DWG. NO. 7) 112000 32-15-H4A F-A VT-3 Code Case N-491-1 Spring Hanger Fl. 10 *~N/A~*

3 X 112100 32-15 "H4B F-A Code Case N-491-1 Spring Hanger Pl. 10 +*N/A++

3 X 2.0" Discharge 11D (REF. DWG. NO. 7) 113900 32-385-VB B-G-2 VT-1 2.0" Valve By-pass Linc Valve 32-385 Bolting B'7. 70 **N/At1 3 X 2.0" Discharge 12D (REP. DWG. NO. 7) 000 32-386-VB B-G-2 VT-1 2.0" Valve by-pass linc Valve 32-386 Bolting B7. 70 3 X 2.0" Discharge 13D (REF. DWG. NO. 7) 114100 32 "387 VB B-G-2 VT"1 2.0" Valve by-pass linc Valve 32-387 Bolting B7.70 ~*N/A*+

3 X 2.0" Discharge 14D (REP. DWG. NO. 7) 114200 32-388-VB B-G 2 VT-1 2.0" Valve by-pass line Valve 32-388 Bolting B7.70 **N/A+~

3 X 2.0" Discharge 15D (REF. DWG. NO. 7) 114300 32-389 VB B-G 2 VT 1 2.0" Valve by-pass line Valve 32-389 Bolting B7.70 %AN/A*t 3 X

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 100 REVISION: 0 ZNSERVICE INSPECTZON TEN-YEAR PLAN CZASS 1 SECTION XI SCHEDULED COMPONENTS or Recirculation Discharge NUMBER: 32.0 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR ASME FIRST SECOND THIRD SEC. XI PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 + +CALIBRATION BLOCK**

28. 0" Discharge 13D (REF. DWG. NO. 7) 115000 32-SB-6A F-A Code Case N-491-1 Sway Brace Fl. 10 *+N/A**

3 X 115100 32-SB-6B Code Case N-491"1 Sway Brace Fl. 10 eaN/Ate 3 X 28.0" Discharge 11D (REF. DWG. NO. 7) 115400 32-WD "017 B-J UT Terminal End, High Pump 11 B9. 11 Stress Wold, Examine 3 X Discharge-to-Elbow 100% of weld length.

~~PSR-Z.2*~

00 32-WD"017-Dl B-J UT Code Case N-524 Elbow-Long Scam OR B9.12 PT ~*PSR-Z.2~~

3 X 115700 32"WD-017-D2 B-J UT Code Casa N-524 Elbow-Long Seam ZR B9. 12 PT e t PER-1 . 2*a 3 X 3.0" Dischargo 11D (REF. DWG. NO. 7) 115900 32-WD-020 B-J PT **N/A~*

Branch Connection B9.32 3 X

-Dccon 116000 32-WD"020-FB B-G-2 VT"1 Examine in place, when 11D Dccon Flango B7.50 removed or disasscmblcd.

3 X Bolting *+N/A**

DATE: 10/15/99 NINE MZLE POINT NUCLEAR PIANT UNIT 1 PAGE: 101 REVISION: 0 ZNSERVZCE INSPECTION TEN-YEAR PLAN CIASS 1 SECTION XZ SCHEDUZED COMPONENTS or Recirculation Discharge NUMBER: 32. 0 PRESERVICE YEAR INSPECTION INTERVAL PIAN STATUS ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ~ ~CALIBRATION BLOCK~ ~

28.0" Discharge llD (REF. DWG. NO. 7) 116600 32"WD-022 B-J UT Terminal End, High Pipe-to-Gate Valve B9. 11 PT Stress Weld, Examine 3 X 32-380 100% of weld length.

  • +PSR-1 . 2 +*

116700 32-WD-022 GL A +*PSR-1. 109-l~~

Pipe-to-Gate Valve 88-01 3 X 32"380 116800 32-WD-022-U B-J Code Case N-524 Pipe-Long Seam B9.12 <<~PSR-1. 2**

3 - - - - X 2.0" Discharge 11D (REF. DWG. NO. 7) 32-WD-023 B"J PT **N/A**

Coupling-to-Pipe B9.40 H 3 X 118000 32-WD-034 B J PT 4*N/A*1 Pipe-to-Coupling B9. 40 3 X 28.0" Discharge 11D (REF. DWG. NO. 7) 118100 32-WD-035 B-J UT **PSR-1. 2*~

Gate Valve B9. 11 PT 32-380-to-Pipe 118200 32-WD-035 GL-A UT ~*PSR-I . 109-1*~

Gate Valve 88 01 3 X 32-380-to-Pipe 119300 32-WD-040 GL-A UT **PSR-1.109-1)

Elhow-to-Pipe 88-01 PSR-1 . 260**

3 X

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 102 REVISZON: 0 INSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS or Recirculation Discharge NUMBER: 32.0 INSPECTION INTERVAL PLAN STATUS PRESERVZCE YEAR ASME FIRST SECOND THIRD SEC. XI PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATE GY NDE OUTAGE INSTRUCTIONS NUMBER IDENTZFZCATZON ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 +~CALIBRATION BLOCK+~

119800 32-WD-041 B-J PT Examine 100% of weld Pipe-to-Nozzle N2A B9. 11 UT length.

3 - - - - X ~~PSR-l. 655/1. 150-1,PSR-Safe End 119900 32-WD-041 GL-A UT +*PSR-1. 655/1. 150**

Pipe-to-Nozzle N2A 88-01 3 X Safo End 120000 32-WD-041-U B-J Code Case N-524 Pipe-Long Seam B9.12 ~~PSR-l. 2~~

3 X 120100 32-WD-042 GL A UT Group R06 ~~LATER~~

N2A Nozzle-to-Safe End 88-01 X

120200 32-WD-042 B-F UT Group R06, ~~IATER~~

NPA Nozzle-to-Safe End B5.10 PT 3 X 120300 32-WD-042 SZL Group R06, Incolal 182 N2A Nozzle-to-Safe End 455R1S1 butter expansion from 3 X nozzle side of weld

  • +ZATER+*

120400 32-WD-043 B-D AUT Group R06, 75% CRV N2A No" zle-to-Vessel B3. 90 Limitation due to bottom 3 X head taper of shell thickness +~N/A**

120500 32"WD-043-ZR B-D AUT Group R06, 60% CRV N2A Nozzle Inner B3.100 Limitation due to bottom 3 X Radius Section head taper of shell thickness *~N/A+~

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 103 REVISION: 0 INSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XI SCHEDULED COMPONENTS or Recirculation Discharge NUMBER: 32.0 INSPECTION INTERVAI PLAN STATUS PRESERVZCE YEAR ASME FZRST SECOND THIRD SEC. XI PERIOD PERIOD PERIOD

SUMMARY

EXAMINATZON AREA CATEGY NDE OUTAGE ZNSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 **CALIBRATIONBLOCK~*

28.0" Discharge 12D (REF. DWG. NO. 7) 120600 32-WD"057 B J PT Terminal End, High Pump 12 B9 11

~ UT Stress Weld, Examine 3

Discharge-to-Elbow 100% of weld length.

3 X 120900 32-WD-057-D2 B-J PT Code Case N-524 Elbow-Long Seam ZR B9 12

~ UT **PSR-1.260**

3 X 3.0" Discharge 12D (REF. DWG. NO. 7) 00 32 WD 060-FB BG2 VT-1 Examine in place, when Dccon Flange Bolting B7.50 removed or when 3 X disasscmblcd. ~*N/A~~

2S.O" Discharge 12D (REF. DWG. NO. 7) 121300 32-WD-061 GL-A UT ~ ~ PER" 1 . 109-1 + ~

Elbow-to-Pipe 88 "01 3 X 121400 32-WD-061 B-J UT ~~PSR-1. 2**

Elbow-to-Pipe B9. 11 PT 3 X 121900 32-WD"062 GL-A UT ~~PSR-1. 109-1*+

Pipe-to-Gate Valve 88-01 3 X 32-381

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 104 REVISZON: 0 INSERVZCE INSPECTION TEN-YEAR PLAN 1 SECTION XZ SCHEDULED COMPONENTS

'ZASS r Recirculation Discharge NUMBER:l 32 . 0 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE ZNSTRUCTZONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 + +CALIBRATION BLOCX**

2.0" Discharge 12D (REF. DWG. NO. 7) 122100 32-WD-063 B-J PT Examine 100% of weld Coupling-to-Pipe B9. 40 length. ~~N/A~*

3 X 123200 32-WD-074 B-J Examino 100% of weld Pipo-to-Coupling B9.40 length. ~~N/A*~

3 X 28.0" Discharge 12D (REF. DWG. NO. 7) 123300 32-WD-075 B-J UT Examine 100% of weld Gate Valve B9. 11 PT length. *~PBR-1.109-1**

3 X 32-381-to-Pipe 32-WD-075-D B J Code Case N-524.

Pipe-Long Scam B9.12 **PBR-1.109-1~~

3 X 124000 , 32-WD-079 GL A UT Pipe-to-Elbow 88-01 ~ ~PBR-1. 260/PSR-1. 109-1*

3 X 124800 32 "WD-081 B-J UT Examine 100% of weld Pipe-to-Nozzle N2B B9. 11 PT length +~PBR-1.109-1+~

3 X Safe End 125000 32-WD-081-U B-J UT Code Case N-524 Pipe-Long Weld B9. 12 FT **PBR-1.109-1**

3 X 125100 32-WD-082 SIL UT Group R07, Znconel 182 N2B Safe End-to-Nozzle 455R1S1 buttor oxpansion from 3 X nozzle sido of weld t1LATERft

DATE: 10/15/99 NINE MZIE POINT NUCLEAR PIANT UNZT 1 PAGE: 105 REVISION: 0 INSERVICE ZNSPECTZON TEN-YEAR PIAN CZASS 1 SECTION XI SCHEDULED COMPONENTS tor Recirculation Discharge NUMBER: 32. 0 INSPECTION INTERVAL PIAN STATUS PRESERVICE YEAR ASME FIRST SECOND THIRD SEC. XI PERIOD PERIOD PERIOD

SUMMARY

NUMBER EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 *~CALIBRATION BLOCK~ ~

125200 32-WD-082 B-F Group R07 *~LATER~~

N2B Safe End-to-Nozzle B5.10 3 X 125300 32-WD-082 GL-A Group R07 +*LATER~~

N2B Safe End-to-Nozzle SS-01 3 X 125400 32-WD-083 B-D AUT Group R07, 75.4% CRV N2B Nozzle-to<<Vcsscl B3 90

~

Limitation duc to bottom 3 X head taper of shell weld. **LATER**

125500 32-WD-083-IR B-D Group R07, 608 CRV N2B Nozzle Inner B3.100 Limitation duc to bottom 3 X radius Section head taper of shell weld. +*LATER~*

28.0" Discharge 13D (REF. DWG. NO. 7) 125600 32"WD-097 B-J UT Terminal End, High Pump 13 B9.11 PT Stress Wold, Examine Discharge-to-Elbow 3 X 100% of weld length

    • PSR-1. 109-1*+

125800 32-WD-097-Dl B-J UT Formerly LW-032-A, Code Elbow-Long Scam OR B9.12 PT Case N-524 3 X

  • ~PSR-1.109-1~~

125900 32"WD-097-D2 B-J UT Formerly LW-032-B, Code Elbow-Long Seam ZR B9.12 PT Caso N-524 3 X saPSR 1.109 la*

DATE: 10/15/99 NINE MILE POINT NUCLEAR PIANT UNIT 1 PAGE: 106 REVISION: 0 INSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS tor Recirculation Discharge NUMBER: 32. 0 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER ZDENTZFZCATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 **CALIBRATIONBLOCK~ ~

2.5" Dischargo 13D (REF. DWG. NO. 7) 126000 32-WD"099 B-J PT Examine 1008 of weld Branch B9.32 length +~N/AP~

3 X Connection-Thermowcll 3.0" Discharge 13D (REF. DWG. NO. 7) 126200 32-WD-100-FB B-G-2 VT-1 Examine in place, when Decon Flange Bolting B7.50 removed or when 3 X disassembled. ~~N/A~+

28.0" Discharge 13D (REF. DWG. NO. 7) 126300 32-WD-101 GL-A UT Pipe-to-Pipe 88-01 **PBR-1. 109-1, PBR-1. 260*

X 126800 32-WD-102 GL-A UT ~~PBR-1.109-1+*

Pipe-to-Gate Valve 88 01 32-382 3 X 126900 32-WD-102 B-J Terminal End, High Pipe-to-Gate Valve B9. 11 Stress Weld, Limitation 3 X 32-382 588 CRV, Examine 1008 of wold length

~~PBR-1. 109-1**

127000 32-WD-102-U B-J Code Case N-524 Pipe-Long Seam B9. 12 +*PBR-I . 109-1 +*

3 X

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 107 REVISION: 0 INSERVZCE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XI SCHEDULED COMPONENTS tor Recirculation Discharge NUMBER: 32.0 INSPECTION INTERVAL PIAN STATUS PRESERVZCE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 >>>>CALIBRATION BLOCK>>>>

2.0" Discharge 13D (REF. DWG. NO. 7) 127200 32-WD-104 B-J PT Examine 100$ of weld Pipe-to-Coupling B9. 40 length >>>>N/A>>>>

3 X 127400 32-WD-106 B J PT Examine 100% of weld Pipe- to-Elbow B9. 21 length >>>>N/A>>*

3 X 127900 32-WD-111 B-J PT Examine 100% of weld Elbow-to-Pipe B9.21 length **N/A**

3 X 128200 32-WD-114 B-J PT Examine 100% of weld Pipe-to-Coupling B9. 40 length **N/A**

3 X 28.0" Discharge 13D (REF. DWG. NO. 7) 128400 32-WD-115 B"J UT Terminal End, High Gate Valve B9. 11 PT Stross Wold, Examine 32-382-to-Pipe 3 X 100% of weld length

>>>>PSR-1 . 109-1*>>

128500 32-WD-115-D B-J UT Formerly LW-034, Codo Pipo-Long Scam B9. 12 PT Caso N-524 3 X

  • >>PSR-1. 109-1*>>

129000 32-WD-119 B J <<<<P8R-1. 109-1*>>

Pipe-to-Elbow B9. 11 3 X 129100 32-WD-119 GL-A UT >>>>P8R-1. 109-1)

Pipe-to-Elbow 88-01 PSR-1. 260<<>>

3 X 129600 32-WD-120 GL-A UT >>>>PSR-1. 109-1, Elbow-to-Pipo 88 01 PSR-1. 260>>*

3 X

DATE: 10/15/99 NINE MILE POINT NUCLEAR PIANT UNIT 1 PAGE: 108 REVIS ZON: 0 ZNSERVICE INSPECTION TEN-YEAR PIAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS tor Recirculation Discharge ZONE NUMBER: 32.0 PRESERVICE YEAR INSPECTION INTERVAL PZAN STATUS ASME FIRST SECOND THIRD SEC. XZ PERIOD PERZOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 <<<<CAI,ZBRATION BLOCK>>>>

130000 32-WD-121 B-J UT Examine 100% of weld Pipe-to-Nozzle N2C B9 11

~ PT length >>*PBR-1.109-1**

X Safe End 130100 32-WD-121 GL-A UT >><<PBR-1. 109-1>>>>

Pipe-to"Nozzle N2C 88-01 3 X Safe End 130200 32-WD "121-U B-J Code Case N-524 Pipe-Long Soam B9.12 <<*PER-1.109-1*>>

3 X 130300 32-WD-122 B F UT Group ROB, <<>>LATER>>>>

N2C Safo End-to-Nozzlo B5 10

~

3 X 30400 32-WD"122 SIL Group ROB, Inconcl 182 N2C Safe End-to-Nozzle 455R1S1 butter expansion from 3 X nozzle side of weld,

<<<<LATER>>*

130500 32 WD-122 GL-A UT GrouP ROB **ZATER>>>>

N2C Safe End-to-Nozzle 88-01 X

130600 32-WD-123 B D Group ROB, 75.4% CRV N2C Nozzle-to-Vessel B3.90 **ZATER>>>>

3 X 130700 32-WD "123-IR B D Group ROB, 82% CRV N2C Nozzle Innor B3.100 <<>>LATER*>>

3 X Radius Section

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 109 REVISION: 0 INSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XI SCHEDULED COMPONENTS tor Recirculation Discharge E NUMBER: 32.0 PRESERVZCE YEAR INSPECTION INTERVAL PLAN STATUS ASME FIRST SECOND THIRD SEC. XI PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 +*CALIBRATIONBLOCK+ +

3. 0" Discharge 14D (REF. DWG. NO. 7) 131400 32-WD-142-FB B-G-2 VT-1 Examine in place, when 14D Dccon Flange B7.50 removed or when 3 X disassembled *~N/A+~

Bolting 2.0" Discharge 14D (REF. DWG. NO. 7) 132300 32-WD-145 B-J PT Examine 100% of weld Coupling-to-Pipe B9. 40 length ~~N/A~+

3 X 133400 32-WD-156 B-J Examine 1008 of weld Pipe-to-Coupling B9.40 length ~~N/A+~

3 X 28.0" Discharge 14D (REF. DWG. NO. 7) 00 32-WD-157 GL A UT ~'~PSR-1. 109-1*+

Valve 32-383-to-Pipe 88-01 3 X 134900 32-WD-163 B J UT Examine 100% of weld Pipe-to-Nozzle N2D B9. 11 PT length ~~PSR-1.109-1**

3 X Safe End 135100 32-WD-163-U B J UT Code Case N-524 Pipe-Long Seam B9. 12 PT ++PER-1.109-1++

3 X 135200 32-WD-164 B F UT Group R09 ~+LATER'+

N2D Safe End-to-Nozzle B5.10 X

135300 32-WD-164 SIL Group R09, Inconcl 182 N2D Safe End-to-Nozzle 455R1S1 butter expansion from 3 X nozzle side of weld

~ ~LATER~ ~

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 110 REVISION: 0 ZNSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XI SCHEDULED COMPONENTS or Recirculation Discharge NUMBER: 32.0 ZNSPECTION INTERVAI PZAN STATUS PRESERVZCE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMZNATZON AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER ZDENTZFICATION ZTEM NO METH 2 3 3 ~+CALIBRATION BLOCK**

1 4 1 2 4 1 2 3 4 135400 32-WD-164 GL-A Group R09, ~+LATER~~

N2D Safe End-to-Nozzle 88-01 3 X 135500 32-WD-165 B-D Group R09, 75.4% CRV N2D Nozzle-to-Vessel B3. 90 Limitation due to bottom 3 X "

head taper of shell thickness **LATER**

135600 32-WD-165-ZR B-D Group R09, 82% CRV N2D Nozzle Inner B3. 100 Limitation duc to bottom 3 X Radius Section head taper of shell thickness *~LATER*~

28.0" Discharge 15D (REF. DWG. NO. 7) 0 32-WD-181 B-J UT Terminal End, High Pump 15 B9. 11 PT Stress Weld, Examine 3

Discharge-to-Elbow 100% of weld length stPSR-1.109 lao 135900 32-WD-181-Dl B-J Formerly LW-OSS-A, Code Elbow-Long Scam B9. 12 Case N-524 3 X *aPSR 1. 109 Zest 136000 32-WD-181-D2 B-J UT Formerly LW-058-B, Code Elbow-Long Scam ZR B9. 12 PT Case N-524 3

    • P8R-1. 109-1*~

3.0" Discharge 15D (REF. DWG. NO. 7) 136300 32-WD-184-FB B"G-2 VT 1 Examine in place, when 15D Decon Flange B7.50 rcmcnrcd, or when 3 X Bolting disassembled **N/A*~

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 111 REVISION: 0 INSERVZCE INSPECTION TEN YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS or Recirculation Discharge NUMBER: 32.0 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE ZNSTRUCTZONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 *+CALIBRATION BLOCK**

28.0" Discharge 15D (REF. DWG. NO. 7) 136700 32 "WD-186 B-J UT Terminal End, High PiPc-to-Valve 32-384 B9. 11 PT Stress Weld, Examine 3

100% of weld length

~~PER-1.109-1~~

136900 32 "WD-186-U B-J Code Case N-524 Pipe-Long Seam B9. 12 ~~PSR-1. 109-1~~

3 X 2.0" Discharge 15D (REF. DWG. NO. 7) 137000 32-WD-187 B-J PT Examine 100% of weld Coupling-to-Pipe B9.'40 length **N/A~*

3 X 00 32-WD-193 B-J Examine 100% of weld Valve 32-389-to-Pipe B9.21 length +*N/A+~

3 X 137700 32-WD-194 B-J Examine 100% of weld Pipe-to-Elbow B9. 21 length *~N/A~~

3 X 137800 32-WD-195 B-J Examine 100% of weld Elbow-to-Pipe B9.21 length **N/A**

3 X 14.0" Discharge 15D (REF. DWG. NO. 7) 139700 32-WD-204-MT ZNPO UT 100% of base material, Mixing Tcc-Base Metal 5-85 each RFO.

3 X - - - X X - - X ~*PSR-2. 055-1 + +

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 112 REVISION: 0 INSERVICE ZNSPECTZON TEN-YEAR PLAN CLASS 1 SECTION XI SCHEDULED COMPONENTS tor Recirculation Discharge ZONE NUMBER: 32.0 PRESERVICE YEAR INSPECTION INTERVAL PLAN STATUS ASME PIRST SECOND THIRD SEC. XZ PERIOD PERZOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ~*CALIBRATION BLOCK+~

28.0" Discharge 15D (REF. DWG. NO. 7) 141400 32-WD-207 B-J Examine 100% of weld Pipo-to-Nozzle N2E B9. 11 length 3 X Safe End + *P8R-1 . 655/1 . 150-1**

141500 32-WD-207 "U B-J former LW-064, Code Case Pipe-Long Weld B9.12 N-524 ~~PSR-I.I09-1+~

3 X 141600 32-WD-208 B-F UT Group R10 ++LATER~+

N2E Safe End-to-Nozzle B5.10 PT 3

t 141700 32-WD "208 SIL Group R10, Znconel 182 N2E Safe End-to-Nozzle 455R1S1 buttor expansion from 3

nozzle sido of weld

  • +LATER**

141800 32 WD-208 Group R10, ~*LATER~~

N2E Safe End-to-Nozzle 88-01 3 X 141900 32-WD 209 B"D Group R10, 74.5% CRV N2E Nozzlo-to-Vessel B3. 90 Limitation duc to bottom 3 X head taper of shell thickness. *+IATER**

142000 32-WD-209-IR B-D Group R10, 82% CRV N2E Nozzle Inner B3. 100 Limitation due to bottom 3 X Radius Section head taper of shell thickness. *+LATER~*

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 113 REVISION: 0 ZNSERVZCE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS tor Recirculation Pump NUMBER: 32.0 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR ASME FIRST SECOND THIRD SEC. XI PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 **CALIBRATIONBLOCK e 32-187 (REF. DWG. NO. 7A) 142900 32-187 F-A VT 3 Code Case N-491-1 Pump 11 Support Fl . 40 *~N/A~~

3 X 143000 32-187-PBB B-G-l VT-1 One pump in a group of Pump 11 Busihings (1 B6.200 pumps, only when 3 X thru 16) disassembled. ~~N/A~~

143100 32-187-PBN B G-l VT-1 Liad.tcd to pump selected Pump 11 Nuts, (1 thru B6 ~ 200 under B-L-2, One pump in 3 X

16) a group of pumps ++N/A++

143200 32-187-PBS B-G-1 UT Limited to pump selected Pump 11 Flange Studs B6.180 under B-L-2, Onc pump in 3 X (1 thru 16) a group of pumps.

++NMP1 2.75-RCP-STUD**

143300 32-187-PBW B-G-1 Limited to pump sclcctcd Pump 11 Washcrs (1 B6.200 under B-L-2, One pump 3 X thru 16) among a group of pumps k*N/A%4 143400 32-187-PBY B-L-2 VT 3 When disasscmblcd, one Pump 11 Interior B12. 20 pump among a group of 3 X Surface pumps ~*N/A~*

143500 32-187-PFS B-G-1 VT-1 Limited to pump selected Pump 11 Flange Surface B6.190 under B-L-2, Examine 1 3 X in. annular surface oi flange surrounding each stud ~*N/A+~

DATE: 10/15/99 NINE MZLE POINT NUCLEAR PZANT UNIT 1 PAGE: 114 REVIS ZON: 0 INSERVZCE INSPECTION TEN-YEAR PIAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS tor Recirculation Pump NUMBER: 32.0 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR ASME PIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

NUMBER EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 **CALIBRATIONBLOCK~+

143700 32-187-SHB B-G-2 VT-1 P01, Limited to pump Pump 11 Seal Housing B7.60 selected under B-L-2, Bolting (I thru 16) one pump among group of pumps. ~~N/A*~

DATE: 10/15/99 NZNE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 115 REVISION: 0 INSERVZCE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS tor Recirculation Pump 15 NUMBER: 32. 0 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR ASME FIRST SECOND THIRD SEC. XI PERIOD PERIOD PERIOD

SUMMARY

NUMBER EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 *iCALIBRATIONBLOCK+

32-191 (REF. DWG. NO. 7) 148900 32-15-H1 F A Code Case N-491-1 Spring Hanger F1. 40 **N/A*i 3 X

DATE: 10/15/99 NINE MILE POINT NUCLEAR PIANT UNZT 1 PAGE: 116 REVISZON: 0 INSERVICE INSPECTION TEN YEAR PLAN CLASS 1 SECTION XI SCHEDULED COMPONENTS or Recirculation Suction NUMBER: 32. 0 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR ASME FIRST SECOND THIRD SEC. XZ PERZOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 i~CALIBRATION BLOCK~~

28.0" Suction 11S (REF. DWG. NO. 7) 151000 32-11-H3A F-A VT-3 Code Case N-491-1 Spring Hanger Fl. 10 *AN/A**

3 X 151100 32-11-H3B F A VT-3 Code Case N-491-1 Spring Hanger F1.10 eaN/A*a 3 X 28.0" Suction 12S (REF. DWG. NO. 7) 151300 32-12-H3-WD-001 B-K PT (32-12-H-3-A), Code Case Integral Welded Lug B10.20 N"509 *~N/A~~

3 X 151400 32-12-H3-WD-002 B-K PT (32-12-H-3-A), Code Case Integral Welded Lug B10.20 N-509 **N/A~*

3 X 1 1500 32-12-H3-WD-003 B"K (32-12-H-3-B), Code Case Integral Welded Lug B10.20 N-509 **N/A~*

3 X 151600 32-12-H3-WD-004 B-K (32-12-H-3-B), Code Case Integral Wcldcd Lug B10.20 N-509 ~+N/A~*

3 X 28.0" Suction 14S (REF. DWG. NO. 7) 153100 32-14-H3A F A Code Case N-491-1 Spring Hanger F1.10 1 O'/A1 t 3 X 153200 32-14-H3B F-A Code Case N-491-1 Spring Hanger Fl. 10 **'N/A**

3 X

DATE: 10/15/99 NINE HILE POZNT NUCLEAR PIANT UNIT 1 PAGE: 117 REVISION: 0 ZNSERVZCE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS tor Recirculation Suction ZONE NUHBER: 32.0 INSPECTION INTERVAL PRESERVICE YEAR PLAN STATUS ASHE FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD SUHHARY EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 >>*CAZ,IBRATZON BLOCK>>>>

28.0" Suction 11S (REF. DWG. NO. 7) 155600 32-375-VB B-G-2 V06, Limited to valve Gate Valve 32-375 B7.70 selected under B-M-2 3 X >>>>N/A>>*

Bolting 155700 32-375-VBY B"H-2 VT-3 V06,Only whe'n Gate Valve 32-375 B12.50 disassembled, one valvo 3 X Interior Surface among group of valves

>>*N/A>>>>

28.0" Suction 12S (REP. DWG. NO. 7) 156800 32-SB"3A P-A VT-3 Code Case N-491-1 Sway Brace F1. 10 *>>N/A>>>>

3 - - - - - - - X 6900 32-SB-3B F-A Code Case N-491-1 Sway Brace F1.10 >>>>N/A*>>

3 28.0" Suction 13S (REF. DWG. NO. 7) 157000 32-SB-5A F-A VT-3 Code Case N-491"1 sway Brace Fl . 10 >>>>N/A>>*

3 X 157100 32-SB-5B P-A VT 3 Code Case N-491-1 Sway Brace Fl. 10 *>>N/A>>>>

3 X 28.0" Suction 11S (REP. DWG. NO. 7) 157600 32-WD-001 B D AUT Group R01, 65% CRV N1A Nozzle-to-Vessel B3. 90 Limitation duc to lug, 3 X ad)acent nozzle and Bioshicld >>>>LATER>>>>

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNZT 1 PAGE: 118 REVISION: 0 ZNSERVICE INSPECTION TEN-YEAR PLAN CIASS 1 SECTION XI SCHEDULED COMPONENTS tor Recirculation Suction NUMBER: 32.0 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR ASME FIRST SECOND THZRD SEC. XZ PERIOD PERIOD PERZOD

SUMMARY

NUMBER EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 **CALIBRATIONBLOCK*~

157700 32-WD-001-IR B-D Group R01, 73% CRV N1A Nozzle Inner B3. 100 Limitation due to lug, 3 X Radius Section ad)accnt nozzle and Bioshield ~iLATER~i 157800 32-WD-002 GL-A UT Group R01 +*LATER*~

N1A Nozzle-to-Safe End 88-01 3 X 157900 32-WD-002 SIL Group R01, Inconcl 182 N1A Nozzle-to-Safe End 455R1S1 butter expansion from X

nozzle side of weld

    • LATER~*

158000 32-WD"002 Group R01 **LATER~~

N1A Nozzle-to-Safe End B5.10 3 X 158200 32 WD-003 B J ++PSR 1.2++

Nozzle N1A Safe B9. 11 End-to-Elbow 3 X 158300 32-WD-003-Dl formerly LW-001-A, Coda Elbow-OR Long Scam B9.12 PT Case N-524 **PSR-1.2~~

3 X 158400 32-WD-003-D2 B-J UT formerly LW-001-B, Code Elbow-IR Long Scam B9. 12 PT Case N-524 **PSR 1.2++

3 X 12.0" Suction 11S (REF. DWG. NO. 7) 159400 32 WD 004A-MT ZNPO UT UT Only, every rcfucling Mixing Tee -Base Metal 5-85 outage, 100% asc Exams 3 X - - - X X - - X Material +~PSR-2.055-1**

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNZT 1 PAGE: 119 REVISION: 0 INSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS tor Recirculation Suction NUMBER: 32. 0 INSPECTION INTERVAL PLAN STATUS PRESERVZCE YEAR ASME FIRST SECOND THIRD SEC. XI PERZOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE ZNSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 +~CALIBRATION BLOCK~~

28.0" Suction 11S (REF. DWG. NO. 7) 160800 32-WD-007 B-J UT Examine 100% of weld Branch Connection B9.31 PT length. ~~PSR-1.2~~

3 X 161800 32-WD-009 B J Terminal End, High Pipe-Valve 32-375 B9.11 PT Stress Weld, Examine 3 X 100% of weld length.

  • +LATER**

161900 32-WD-009-U B-J UT Formerly LW-004, Code Pipe-Long Seam B9. 12 PT Case N-524 *~LATER**

3 X 3.0" Suction 11S (REF. DWG. NO. 7) 00 32-WD-011-FB B-G 2 Examine in place, when 11S Decon Flange B7.50 removed, or Bolting X disassembled. ~+N/A++

28. 0" Suction 11S (REF. DWG. NO. 7) 162500 32-WD-012 B-J UT Examine 100% of weld Pipe-to-Elbow B9. 11 PT length. +~P8R-1.2**

3 X 162700 32-WD-012"Dl Code Case N-524 Elbow-Long Scam OR B9.12 PT ~~PSR-I.2~~

3 X 162800 32-WD-012-D2 Code Case N-524 Elbow-Long Seam IR B9.12 PT ~+PSR-1.2~~

3 X 162900 32-WD-012-U B-J UT Code Case N-524 Pipe-Long Seam B9. 12 PT **PSR-1. 2**

3 X

DATE: 10/15/99 NINE MILE POINT NUCLEAR PIANT UNIT 1 PAGE: 120 REVISION: 0 INSERVZCE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS tor Recirculation Suction NUHBER: 32.0 INSPECTZON INTERVAL PLAN STATUS PRESERVZCE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD SUHHARY EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUHBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ~ ~CALIBRATION BLOCK~ ~

163100 32-WD-015 B-J Examine 100% of weld Elbow-to-Elbow B9. 11 length. +~PSR-1.2**

3 X 163500 32-WD-015-Ul B-J UT Formally LW-006-A, Code Elbow>>Long Seam OR B9.12 PT Casa N-524. ~*PSR-1.2~*

3 X 163600 32-WD-015-U2 B-J UT Formally LW-006-B, Coda Elbow-Long Scam IR B9.12 PT Case N-524 ~+PSR-1.2~*

3 X 28.0" Suction 12S (REF. DWG. NO. 7) 163700 32-WD-044 B-D UT Group R02, 65% CRV N1B Nozzle-to-Vessel B3.90 Limitation duc to 3 X Bioshield ~+LATER**

00 32-WD"044-ZR B D Group R02, 73% CRV N1B Nozzle Inner B3. 100 Limitation duo to Radius Section 3 X Bioshield

    • NHP1-GE-7875~~

163900 32-WD-045 SZL Group R02, Inconcl 1S2 N1B Nozzle-to-Safe End 455R1S1 butter expansion from 3 X nozzle side i*LATER*~

164000 32-WD-045 Group R02, i+LATER++

N1B Nozzle-to-Safe End B5.10 PT 3 X 164100 32"WD-045 GL-A UT Group R02, **LATER~*

N1B Nozzle-to-Safe End 88-01 3 X 164200 32"WD-046 B-J Examine 100% of weld Nozzle N1B Safe B9.11 length, **PSR-1.2~*

3 X End-to-Elbow

DATE: 10/15/99 NINE MILE POINT NUCLEAR PIANT UNIT 1 PAGE: 121 REVISION: 0 ZNSERVICE INSPECTION TEN YEAR PLAN CLASS 1 SECTION XI SCHEDULED COMPONENTS tor Recirculation Suction E NUMBER: 32.0 PRESERVZCE YEAR INSPECTION ZNTERVAL PLAN STATUS ASME FIRST SECOND THIRD SEC. XI PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER ZDENTIFZCATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ~+CALIBRATION BLOCK++

164300 32-WD-046 N/A IWB-2420 (b) Exaad.nc flaw Nozzle N1B Safe N/A growth area next 3 3 X - - - X - - - X periods. ~*PSR-1.2+~

End-to-Elbow 164400 32-WD-046 GL F UT Examine each refueling Nozzle N1B Safe 88-01 outage flaw growth.

3 X - - - X X - - X **P8R-1. 260++

End-to-Elbow 164500 32-WD-046-Dl B-J UT Code Case N-524 Elbow-Long Seam OR B9. 12 ++PSR-1.260*~

3 X 164600 32-WD-046-D2 B-J UT Coda Case N-524 Elbow-Long Scam ZR B9.12 PT **PSR-1.260+*

3 00 32-WD-049 B- J UT Terminal End, High Pipe-to-Gate Valve . B9. 11 PT Stress Weld, Examine 3 X 100% of weld length 32-376

  • +PSR-1.2+~

165700 32-WD-049-U B J UT Code Case N-524 Pipe-Long Scam B9. 12 PT ++PSR-1.2++

3 X 165800 32-WD-050 B-J Tarad.nal End, Limitation Gate Valve B9. 11 58% CRV, ~~PSR-1.2~~

3 X 32-376-to-Pipe 165900 32-WD-050 N/A Re-cxaminc pcr Gate Valve N/A IWB-2420 (b) Flaw growth 3 X - - - X - - - X area next 3 periods, 32-376-to-Pipe acceptable USNRC TAC No.

MA5696. . ++PSR 1.2*+

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNZT 1 PAGE: 122 REVISION: 0 INSERVICE INSPECTION TEN-YEAR PZAN CLASS 1 SECTION XI SCHEDULED COMPONENTS tor Recirculation Suction INSPECTION INTERVAL PIAN STATUS PRESERVZCE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

NUMBER EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS IDENTZFZCATION ZTEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 **CALIBRATIONBLOCK~ ~

166100 32-WD-050"D B-J Code Case N-524 Pipe-Long Seam B9.12 +*PSR-1 . 2**

3 X 166200 32-WD-051 B-J PT Examine 100& of weld Branch Connection B9.32 length. +*N/A**

-Decon 3 X 3.0" Suction 12S (REF. DWG. NO. 7) 166300 32-WD-051-FB B-G-2 Examine in place, when Dccon Flange Bolting B7.50 removed or disassembled.

3 X ~~N/A+~

2.5" Suction 12S (REF. DWG. NO. 7) 00 32-WD-053 B-J PT Examine 100% of weld Thcrmowel 1 B9. 21 length *~N/A~*

3 X 28.0" Suction 13S (REF. DWG. NO. 7) 167400 32-WD-084 B-D UT Group R03, 65% CRV N1C Nozzle-to-Vessel B3.90 Limitation due to lug, 3 X ad)accnt nozzle and bioshicld **LATER~>>

167500 32-WD-084-IR B-D Group R03, 73% CRV N1C Nozzle Inner B3.100 Limitation duc to lug, 3 X Radius Section ad)acent nozzle and bioshicld

~~NMP1-GE-7875+~

167600 32-WD"085 B-F UT Group R03, ~~LATER~*

N1C No"zlc-to-Safe End B5.10 PT 3 X

DATE: 10/15/99 NINE MILE POINT NUCLEAR PIANT UNIT 1 PAGE: 123 REVZSZON: 0 ZNSERVICE INSPECTION TEN-YEAR PIAN CIASS 1 SECTION XI SCHEDULED COMPONENTS tor Recirculation Suction NUMBER: 32.0 INSPECTION INTERVAL PLAN STATUS PRESERVZCE YEAR ASME FIRST SECOND THZRD SEC. XI PERIOD PERIOD PERIOD

SUMMARY

NUMBER EXAMINATION AREA IDENTIFICATION CATEGY ITEM NO NDE METH


OUTAGE------ INSTRUCTIONS 1 2 3 4 1 2 3 4 1 2 3 4 **CALIBRATZONBLOCK*+

167700 32-WD-085 SZL Group R03, Inconel 182 N1C Nozzle-to-Safo End 455R1Sl butter expansion from 3 X nozzle side of weld,

  • + ZATER**

167800 32-WD-085 GL A UT Group R03 **IATER*~

N1C Nozzle-to-Safe End 88-01 3 X 167900 32-WD-086 B-8 Examine 100% of weld Nozzle N1C Safe B9. 11 length, ~~PSR-1.109-1*~

3 X End-to-Elbow 168000 32-WD-086 N/A IWB-2420 (b) Examine flaw Nozzle N1C Safe N/A growth area next 3 3 X End-to-Elbow periods. ~*PSR-1.109-1**

168100 32-WD-086 GL-F UT Examine each refueling Nozzle N1C Safe 88-01 outage flaw growth.

End-to-Elbow 3 X - - - X X - - X ++PSR-1. 260, PSR-l. 655/1.

150-~~

168200 32-WD-086-Dl B a7 UT Formerly LW-026-A, Code Elbow-Long Seam OR B9.12 PT Case N-524 **PSR-1.260~~

3 X 168300 32-WD-086-D2 B-J UT Formerly LW-026-A, Code Elbow-Long Seam IR B9.12 Case N-524 **PSR-1.260~*

3 X 169300 32-WD-089 Terminal End, High Pipe-to-Valve 32-377 B9.11 PT Stress Weld, Examine 3 X 100% of weld length

~~PSR-1.109-1**

DATE: 10/15/99 NINE MZLE POINT NUCLEAR PLANT UNIT 1 PAGE: 124 REVISION: 0 ZNSERVZCE INSPECTION TEN YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS tor Recirculation Suction ZNSPFCTION INTERVAL PZAN STATUS PRESERVZCE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 yyCALIBRATION BLOCKa~

169500 32-WD-089-U B-J Formerly I.W-028, Code Pipe-Long Scam B9.12 Case N-524 3 X **PSR-1. 109-1**

169600 32-WD-090 B-J UT Terminal End, High Valve 32-377-to-Pipe B9. 11 PT Stress Weld, Limitation 3 X duc to configuration 58%

CRV, Examine 100% of weld length.

+*PSR-I . 109-1**

169800 32-WD-090-D B-J Formally LW-029, Code Pipe-Long Seam B9. 12 Case N-524 X **P8R-1. 109-1*~

3.0" Suction 13S (REF. DWG. NO. 7) 170000 32-WD-091-FB ~ B-G-2 Examine in place, when 13S Dccon Flange B7.50 removed or when Bolting X disassembled. <<*N/A~*

28.0" Suction 13S (REF. DWG. NO. 7) 170100 32-WD-092 B-J UT **PSR-1 ..109-1**

Pipe-to-Elbow B9.11 3 X 170200 32-WD-092 GL-A UT Pipe-to-Elbow 88-01 ++PSR 1. 109-1 ) PSR-1. 260~

3 X

DATE: 10/15/99 NINE MZIE POZNT NUCLEAR PLANT UNIT 1 PAGE: 125 REVISION: 0 ZNSERVICE INSPECTION TEN YEAR PIAN CLASS 1 SECTION XI SCHEDULED COMPONENTS tor Recirculation Suction NUMBER: 32. 0 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ~~CALIBRATION BLOCK~~

28.0" Suction 14S (REF. DWG. NO. 7) 171300 32-WD-124 B D UT Group R04, 65% CRV N1D Nozzle-to-Vessel B3. 90 Limitation duc to Bioshield + <<LATER~>>

171400 32-WD-124-IR B D Group R04, 73& CRV N1D Nozzle Znner B3. 100 Limitation duc to 3 X radius Section Bioshield

  • +NMP1-GE-7875~+

171500 32-WD-125 SII Group R04, Znconel 182 N1D Nozzle-to-Safe End 455R1S1 butter expansion from 3

nozzle side of weld

~~LATER~*

00 32-WD-125 B-F UT Group R04 +~LATER~+

N1D Nozzle-to-Safe End B5.10 PT 3 X 171700 32-WD-125 GL A UT Group R04 ~*LATER~~

N1D Nozzle<<to-Safe End 88-01 3 X 171800 32-WD-126 B-J Examine 100% of weld Nozzle N1D Safe B9. 11 length, +~PSR-I 109-1~*

3 X End-to-Elbow 171900 32-WD-126 N/A UT IWB-2420 (b) Examine flaw Nozzle N1D Safe N/A growth area next 3 End-to-Elbow 3 X X periods. ~~P8R-1.109-1*~

172000 32-WD-126 GL-F UT Examine each rcfucling Nozzle N1D Safe 88-01 outage flaw growth.

3 X End-to-Elbow **PSR-1.655/1.150"1~~

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 126 REVISION: 0 ZNSERVZCE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XI SCHEDULED COMPONENTS tor Recirculation Suction INSPECTION ZNTERVAL PLAN STATUS PRESERVZCE YEAR ASME FIRST SECOND THIRD SEC. XI PERIOD PERIOD PERZOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 **CALIBRATZONBLOCK*+

172100 32-WD-126-Dl B-J UT Code Case N-524 Elbow-Long Seam OR B9.12 PT **PSR-1 . 109-1 +*

3 X 172200 32"WD-126-D2 B-J UT Code Case N-524 Elbow-Long Scam ZR B9. 12 PT ~ ~PSR-1. 109-1**

3 X 14.0" Suction 14S (REF. DWG. NO. 7) 173200 32-WD-128A GL A UT Removablc pipe clamp Pipe-to-Gate Valve 88-01 **PSR-.935-1**

3 X 38-01 173300 32-WD-128A B J Terminal End, High Pipe-to-Gate Valve B9. 11 Stress Wold, Removablc X

38-01 pipe clamp, Examine 100%

of weld length.

~+PSR-l. 109-l~~

173400 32-WD-128A-U B-J UT Code Case N-524 Pipe-Long Seam B9.12 PT ~~PSR-1.109-1~~

3 X 28.0" Suction 14S (REF. DWG. NO. 7) 174300 32-WD-131 B-J UT Terminal End, High PiPe-to-Valve 32-378 B9. 11 PT Stress Weld, Examine 3 X 100% of weld length e*PSR 1.109-1*a 174500 32-WD-131-U B-J Rcmovablc pipe clamp, Pipe-Long Seam B9. 12 Coda Case N-524 3 X *~PSR" 1. 109-1**

DATE: 10/15/99 NINE MILE POZNT NUCLEAR PIANT UNIT 1 PAGE: 127 REVISION: 0 ZNSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XI SCHEDULED COMPONENTS or Recirculation Suction NUMBER: 32. 0 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 + +CALIBRATION BLOCK**

3.0" Suction 14S (REF. DWG. NO. 7) 175000 32-WD-133-FB B G-2 Examine in place, when Decon Flange Bolting B7.50 removed or when 3 X disassembled. ~ ~N/A~~

2.5" Suction 14S (REF. DWG. NO. 7) 175600 32 "WD-135 B-J PT Examine 100% of weld Branch Connection- B9.32 length +~N/A~~

3 X Thcrmowell 28.0" Suction 15S (REF. DWG. NO. 7) 176300 32-WD-166 B-D AUT Group R05, 33.8% CRV N1E Nozzle-to-Vessel B3.90 Limitation duc to lug, 3 X thermocouple and bioshicld *~LATER*~

176400 32-WD-166-IR B-D Group R05, 73% CRV N1E Nozzle Znncr B3. 100 Limitation due to lug, 3 X Radius Section thermocouplc and bioshicld ~~ZATER~~

176500 32-WD-167 B-F UT GrouP R05 ++LATER~~

N1E Nozzle-to-Safe End B5.10 PT 3 X 176600 32-WD-167 SII Group R05, Znconcl 182 N1E Nozzle-to-Safe End 455R1S1 butter expansion from 3 X nozzle side of weld

  • +LATER+~

176700 32-WD-167 GL-A UT Group R05 ~~LATER*~

N1E Nozzle-to-Safe End 88-01 3 X

DATE: 10/15/99 NINE MILE POINT NUCLEAR PIANT UNZT 1 PAGE: 128 REVIS ZON: 0 ZNSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS tor Recirculation Suction NUMBER: 32. 0 INSPECTION INTERVAL PIAN STATUS PRESERVICE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE ZNSTRUCTIONS NUMBER IDENTIFICATION ZTEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ~ ~CALIBRATION BLOCK**

176800 32-WD-168 B-J Examine 100% of weld Nozzle N1E Safe B9.11 length, ++PSR-1.260~~

3 X End-to-Elbow 176900 32-WD-168 N/A WB-2420 (b) Examine flaw Nozzle N1E Safe N/A growth area next 3 End-to-Elbow 3 X X - - - X periods. **PSR-1. 260~*

177000 32 "WD-168 GL"F UT Examine each rcfucling Nozzle N1E Safe 88"01 outage flaw growth.

End-to-Elbow 3 X - X X - X stPSR-1.260,PSR-1.655/1.

150-~*

177100 32-WD-168 "Dl B-J Formerly LW-051-A, Code Elbow-Long Seam OR B9.12 Case N-524 ~*P8R-1.260*~

3 X 177200 32-WD-168-D2 Formerly IW-051-B, Coda Elbow-Long Seam ZR B9. 12 PT Case N-524 ++P8R-1.260*~

3 X 178600 32-WD-171-MT ZNPO UT Base metal scans Mixing Tee Base Metal 5-85 required each Refueling X - - - X X Outage **PSR-1.109-1*~

178SOO 32-WD-171A B-J Examine 100% of weld Reducer-to-Pipe B9. 11 length ++PSR-1.109-1~*

3 X 179000 32 WD-171A-D B-J UT Code Case N-524 Pipe-Long Seam B9. 12 PT ~+PSR-I . 109-1**

3 X

DATE: 10/15/99 NINE MILE POZNT NUCLEAR PLANT UNIT 1 PAGE: 129 REVISION: 0 ZNSERVZCE ZNSPECTZON TEN-YEAR PZAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS tor Recirculation Suction ZONE NUMBER: 32.0 INSPECTION INTERVAL PLAN STATUS PRESERVZCE YEAR ASME FIRST SECOND THIRD SEC. XI PERZOD PERIOD PERZOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 +*CALIBRATION BLOCK*~

10.0" Suction 15S (REF. DWG. NO. 7) 179200 32-WD" 171BR GL A UT ~*NMP-10-XX1-SS**

Valve 39-01-to-Reducer 88>>01 3 X 179300 32-WD-171BR B-J Tcrnd.nal End, High Valve 39-01-to-Reducer B9. 11 Stress Weld 3 X ~iNMP-10"XXI-SSi~

28.0" Suction 15S (REF. DWG. NO. 7) 179400 32-WD-172 Limitation duc to Tee-to-Pipo B9. 11 fitting configuration, 3 X and material 58%

CRV.Examine 100% of weld length. ~~PSR-1.109-1~~

179700 32"WD-172-D B-J (CW172, 173), Code Case Pipe-Long Scam B9. 12 N-524 **P8R-1. 109 1**

3 X 179800 32-WD-172-U B-J UT Coda Case N-524 Tee - Long Seam B9. 12 PT *+PSR-l. 109-1*+

3 X 180200 32-WD-174 B-J UT Terminal End, High Valve 32-379-to-Pipe B9. 11 PT Stress Weld, Examine 3

100% of weld length

++PSR 1.109 I+*

180400 32-WD-174-D B"J Code Case N-524 Pipe Long Scam B9.12 + *PER-1 . 109 1 ~ ~

3 X

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 130 REVISION: 0 ZNSERVZCE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS tor Recirculation Suction NUMBER: 32. 0 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEOY NDE -OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 **CALIBRATIONBLOCK*~

3.0" Suction 15S (REF. DWO. NO. 7) 150600 32-WD-175-FB B-6-2 VT-1 Examine in place, when Decon Flange Bolting BI 50

~ removed or when 3 X disassembled. *~N/A**

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE 131 REVISZON: 0 ZNSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTZON XZ SCHEDULED COMPONENTS r Clean Up NUMBER: 33. 0 INSPECTION INTERVAL PLAN STATUS PRESERVZCE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE ZNSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 *~CALIBRATION BLOCK**

6.0" Line (REF. DWG. NO. 20) 181900 33 01R VBY B-M-2 VT"3 V07, Onlc when Valve 33-01R Znterior B12.50 disassenbled, one valve X of valves.

Suriace among group

~~N/A~~

182300 33-03-VB B-G-2 V13, Limited to valve Valvo 33-03 Bolting B7.70 sclcctcd under B-M-2.

3 X <<*N/A~~

182400 33"03-VBY B-M"2 VT-3 V13, Only when Valve 33-03 Interior B12.50 disassembled, onc valve X

Surface among group of valves.

eaN/Aea 00 33"03-WD-001 B-K PT Code Case N-509, Examine Valve 33-03 Integral ~ B10. 40 100% of wold length Attachment X +~N/A*+

183700 33-WD" 001 B"J PT Examine 100% of weld Branch Connection B9.32 length. **N/A~*

3 X 183800 33-WD-002 B J UT Terminal End, High Pipe-to-Valve 33-02 B9.11 PT Stress Weld, Limitation 3

duo to fitting configuration 62% CRV, Examine 100% of weld length. **LATER**

184000 33-WD-003 Terminal End, High Valve 33-02R-to-Pipe B9.11 PT Stress Weld, Limitation 3

duc to fitting configuration 62% CRV, Examine 100% of wold length. *~LATER*~

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 132 REVZSION: 0 INSERVICE INSPECTION TEN YEAR PLAN CLASS 1 SECTION XI SCHEDULED COMPONENTS or Clean Up NUMBER: 33. 0 INSPECTION INTERVAL PZAN STATUS PRESERVICE YEAR ASME PIRST SECOND THIRD SEC. XZ PERZOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ~*CALIBRATION BLOCK*~

184300 33-WD-004 GL-D Pipe-to-Pipe Bend 88-01 3 X X 184900 33-WD-014 GL-G VT-2 Inaccessible, inside Pen Pipe-to-Pipe 88-01 X"9, Visual VT-2 each X - - - X X - - X outage for evidence of leakage. +~N/A++

185100 33-WD" 015 GL-A Znaccossible inside Pen Pipe-to-Valve 33"04 88-01 X-9. Visual VT-2 each 3 X - - - X X " - X outage for cvidcnce of leakage. i~N/A~i 185500 33-WD-035 VT-2 Znaccossible located Valvo 33-03-to-Pipe 88-01 inside pen X-154, VT-2 X - - - X X - - X Each Rcfucling Outage for evidence of leakage

~*N/A~~

185700 33"WD-036 GL-G Inaccessible located Pipe-to-Elbow 88-01 inside pcn X-154, VT-2 X - - - X X - - X Each Rcfucling Outage for evidcncc of leakage

~~N/A*+

185900 33"WD-046 B-J Bimettalic weld, Examine Pipe-to-Pipe B9. 11 100% of weld length.

3 X ++IATER+*

186000 33 "WD-046 GL-D UT Bimettalic weld Pipe-to-Pipe 88-01 ~~LATER~+

3 X X 186300 33-WD-047C1 B-J Examine 100% of weld Pipe-to-Valve 33-01R1 B9.11 length *~PER-.432-2~~

3 X

DATE: 10/15/99 NINE MILE POZNT NUCLEAR PLANT UNIT 1 PAGE: 133 REVISION: 0 INSERVZCE INSPECTION TEN-YEAR PIAN CLASS 1 SECTION XI SCHEDULED COMPONENTS or Clean Up NUMBER: 33. 0 INSPECTION INTERVAL PLAN STATUS PRESERVZCE YEAR ASME FIRST SECOND THIRD SEC. XI PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER ZDENTIFZCATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ++CALIBRATION BLOCK*+

186700 33-WD-048C1 B J UT ~*PSR-.432-2~*

Valve 33"01R to Pipe B9.11 PT 3

186900 33-WD"049 B-J BiMattalic weld, Limited Pipe-to-Elbow B9. 11 duc to pcrmn't hanger 3 X attach. 90% CRV, 90%

CRA. Exam 100% of weld length. **IATER**

1S7000 33-WD-049 GL D UT +~LATER~+

Pipe-to-Elbow 88 01 3 X X 187500 33-WD-054 B J UT Examine 100% of weld Pipe-to-Tcc B9. 11 length +*LATER**

3 X 187600 33-WD-055 B-J Examine 100% of weld Tee-to-Reducer B9. 11 length **LATER**

3 X 4.0" Line (REF. DWG. NO. 20) 187700 33-WD-056 B J UT Examine 100% of weld Reducer-to-Pipe B9. 11 PT length. **LATER~~

3 X 6.0" Line (REF. DWG. NO. 20) 188200 33-WD-061 B-J UT Examine 100% of weld Tcc-to-Reducer B9. 11 PT length ~+IATER~~

3 X 4.0" Linc (REF. DWG. NO. 20) 188700 33-WD"066 B-J UT Examino 100% of weld Pipe-to-Reducer B9. 11 PT length '

~LATER~~

3 - - - - X

DATE: 10/15/99 NZNE MILE POINT NUCLEAR PIANT UNIT 1 PAGE: 134 REVISION: 0 INSERVZCE ZNSPECTZON TEN-YEAR PIAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS or Clean Up NUMBER: 33.0 INSPECTION INTERVAL PIAN STATUS PRESERVICE YEAR ASME FIRST SECOND THIRD SEC. XI PERZOD PERIOD PERZOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ++CALIBRATION BLOCK~~

6.0" Lino (REF. DWG. NO. 20) 189900 33.2-6-R5 F-A Code Case N 491 1, 4 Seismic Restraint F1.10 Lugs **N/A~+

3 X 190000 33.2-6-R5-WD-001 B K PT Code Case N-509, Examine Integral Attachment B10 20

~ 100% of wold length X *ON/A4*

190100 33.2-6"R5-WD-004 B-K Code Caso N-509, Examine Integral Attachment B10.20 100% of wold length 3 X **N/A~*

6.0" Line Outside CZV (REF. DWG. NO. C26852-1) 00 33-FW-22 GL-E UT Outside CIV, 10% each Pipe-to-SS Nozzle 88-01 refueling, weld overlay/

3 X - - - X Examine once cvcry 2 RFO's. ~~SK"JAF-88-006**

190300 33-FW-22"R GL-G UT Outside CZV, 10% each Pipe-to-SS Nozzle 88-01 rcfucling, weld overlay 3 X X ~~8K-JAF-88-006+*

190800 33-FW-35 GL S UT Terminal End, Outside Elbow-to-Nozzle 88 01 CIV, 10% each refueling 3 X - - - X X ~~PSR-.432"2**

190900 33-FW-36 GL-8 UT Terminal End, Outside Nozzle" to-Elbow 88 01 CIV, 10% each rcfucling X - - - X X - - X ~~PSR-.432-2*~

191000 33-FW" 37 GL-S UT Terminal End, Outside Elbow-to-Nozzle 88 "01 CZV, 10% each refueling 3 X - - - X X ~~PSR-.432-2'~*

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 135 REVISION: 0 ZNSERVICE INSPECTION TEN YEAR PLAN CIASS 1 SECTION XI SCHEDULED COMPONENTS tor Clean Up NUMBER: 33. 2 INSPECTION INTERVAL PLAN STATUS PRESERVZCE YEAR ASME FIRST SECOND THIRD SEC. XI PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER ZDENTZFZCATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ~~CALIBRATION BLOCK~~

6.0" Line (REF. DWG. NO. 20) 195100 33-32 F-A VT 3 Code Case N-491 ++N/A+~

Pipe Stanchion F1. 10 3 X

DATE: 10/15/99 NINE MILE POINT NUCLEAR PIANT UNIT 1 PAGE: 136 REVISION: 0 INSERVICE INSPECTION TEN YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS or Instrumentation NUMBER: 36. 0 PRESERVICE YEAR INSPECTION INTERVAL PLAN STATUS ASME FIRST SECOND THIRD SEC. XI PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTZFZCATZON ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 >><<CALIBRATION BLOCK>><<

2.0" Linc (REF. DWG. NO. 28) 195200 36-WD-1073 B-D UT Group R31, *>>ZATER>>*

N7L Closure B3.90 3 X Head-to-Nozzle 195300 36-WD-1073-IR B-D UT Group R31, **ZATER*>>

N7L Closure Head B3.100 3 X Nozzle Inner Radiu 195400 36-WD-1074 B"F UT Group R31>>*LATER*>>

N7L Closure Head B5. 10 PT 3 X Nozzle-to-Flange 500 36 "WD"1074 SZL UT Group R31, Znconel 182 N7L Closure Head 455R1S1 butter expansion from 3 X nozzlo side of weld.

Nozzle'-to-Flange

>> <<LATER>> '>>

2.0" Linc (REF. DWG. NO. 8) 195800 36-R12-A F-A VT-3 Code Case N-491-1 Spring Hanger Fl. 10 >>*N/A>>>>

3 X 196000 36-WD 003 B-F Group R42, Examine 100%

Nozzle N13A-to-Safe B5.20 of weld length. *<<N/A<<>>

3 End 196050 36-WD-003 SIL PT Group R42, Examine 100%

Nozzle N13A-to-Safe 571 of weld length. <<>>N/A>>>>

3 X End 196100 36 WD 004 B J Terminal End, Examine Safe End-to-Coupling B9.21 100% of weld length.

3 X **N/A**

DATE: 10/15/99 NINE MILE POINT NUCLEAR PIANT UNIT 1 PAGE: 137 REVISION: 0 INSERVZCE ZNSPECTZON TEN-YEAR PLAN CLASS 1 SECTION XI SCHEDULED COMPONENTS or Instrumentation NUMBER: 36.0 PRESERVZCE YEAR INSPECTION INTERVAL PLAN STATUS ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ++CALIBRATION BLOCK++

2.0" Linc (REF. DWG. NO. SC) 196500 36-WD-924 Group R43, iiN/A++

N16A Nozzle-to-Safe BS. 20 X

End 196600 36-WD-924 SZL Group R43, Determine if N16A Nozzle-to-Safe 571 PT Aug. Sur/Vol on nozzle 3 X End and safe cnd is required, SIL 571 ?

s*N/Aaa 196700 36-WD-925 B-J Terminal End Nozzle Safe End-to-Coupling B9. 21 N16A, Examine 100% of 3 weld length +~N/Ai*

00 36-WD-932 B-J Examine 100% of weld Elbow-to<<Coupling " B9.40 length **N/A**

3 X

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 138 REVISION: ZNSERVZCE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XI SCHEDULED COMPONENTS or Drain NUMBER: 37. 0 PRESERVICE YEAR INSPECTION INTERVAL PLAN STATUS ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ~ +CALIBRATION BLOCK~*

2.0" Line (REF. DWG. NO. 9) 197600 37-WD-030 B-J PT Examine 100% of weld Pipe-to-Elbow B9. 21 length ++N/A+~

3 - - X

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 139 REVISION: 0 INSERVZCE ZNSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS or Head Vent NUMBER: 37.0 INSPECTION ZNTERVAL PLAN STATUS PRESERVZCE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ~ ~CALIBRATION BLOCK**

2.0" Line (REF. DWG. NO. 9) 197800 37-01-VB B-G-2 VT-1 ~~N/A~~

Valve 37-01 Bolting B7.70 3 X 197900 37-02-VB B G-2 4 lN/A**

Valve 37-02 Bolting B7.70 3 X 198000 37-06-VB B G-2 VT 1 t tN/At1 Valve 37-06 Bolting B7. 70 3 X 198200 37-R11 F-A Code Case N"491-1 Spring Hanger Fl. 10 **N/A+*

3 X 0 37-R12 F A VT-3 Code Case N-491-1 Spring Hanger Fl . 10 ktN/Atf 3 X 4.0" Zine (REF. DWG. NO. 9) 199100 37-WD-001 B D UT Group R39, ~*LATER~~

NS Nozzle-to-Head B3.90 3 X 199200 37-WD-001-ZR B-D UT Group R39, ~ +LATER**

N8 Nozzle Znner Radius 3 X Section 199300 37-WD-002 B-F UT Group R39, Examine 100%

Nozzle N8-to-Flange BS. 10 PT of weld length ++IATER++

3 X 199400 37-WD-002 SZL UT Inconel 182 Butter Nozzle NS-to-Flango 455R1S1 Expansion from Nozzle 3

side. ~ ~IATER~ +

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 140 REVISZON: 0 INSERVICE INSPECTION TEN YEAR PIAN CLASS 1 SECTION XI SCHEDULED COMPONENTS or Head Vent NUMBER: 37.0 INSPECTION INTERVAL PLAN STATUS PRESERVZCE YEAR ASME FIRST SECOND THIRD SEC. XZ PERZOD PERZOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 >>>>CALIBRATION BLOCK<<>>

199500 37-WD-002-FB B-G-2 Examine in place, when Flange Bolting B7.50 removed, or when 3 X >>*N/A*>>

disassembled.

199700 37-WD-003 GL-D UT <<>>4-A396-.337>>>>

Flange-to-Rcduccr 88-01 3 X X 199710 37-WD-003 N/A VT-2 each outage for Flange-to-Rcduccr N/A cvidcncc of leakage 3 X - " - X X - - X >>>>4-A396-.337>>>>

2.0" Linc (REF. DWG. NO. 9) 199800 37-WD-004 B-J Examine 100% of weld Rcduccr to Pipe B9.40 length <<<<N/A<<>>

3 X 200000 37-WD-006 B-J Examino 100% of weld Elbow-to-Pipe B9. 21 length >>>>N/A>>>>

3 X 200100 37-WD-007 B-J Examine 100% of weld Pipe-to-Flange B9.40 length >>*N/A**

3 X 200200 37-WD-007-FB B-G-2 VT-1 Examine in place, when Refueling Platform B7.50 removed, or when 3 X Flange Bolting disassembled >>>>N/A>>>>

200500 37-WD-010 B-J Examine 100% of weld Tcc to Pipo B9. 21 length **N/A*>>

3 X 201000 37-WD-015 B-J Terminal End, High Pipe-to-Valvo 37-01 B9.40 Stress Weld, Examine 3 X 100% of weld length

    • N/A**

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 141 REVISION: 0 ZNSERVZCE ZNSPECTZON TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS tor Head Vent E NUMBER: 37.0 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE, OUTAGE INSTRUCTIONS NUMBER ZDENTIPZCATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 **CALIBRATIONBLOCK~*

201300 37-WD-018 B"J Examine 100% oi'eld Tee-to-Pipe B9.21 length. ~+N/A~+

X 201700 37-WD-022 B J Examine 100% of weld Elbow-to-Pipe B9.21 length *~N/A*~

3 X 202200 37-WD-027 B J Terminal End, High Pipe-to-Valve 37-02 B9.40 Stress Wclds, Examine X

100% of wold length arN/Aaa

DATE: 10/15/99 NINE MILE POINT NUCLEAR PIANT UNZT 1 PAGE: 142 REVISION: 0 INSERVICE INSPECTION TEN YEAR PLAN CLASS 1 SECTION XI SCHEDULED COMPONENTS or Drain NUMBER: 37. 1 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR ASME FIRST SECOND THZRD SEC. XI PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER ZDENTZFICATZON ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ~~CALIBRATION BLOCK~~

2.0" Linc (REF. DWG. NO. 9) 202700 37-Hl F-A VT-3 Code Case N-491-1 Spring Hanger Fl . 10 ++N/A+*

3 X 203100 37-SC-2 Code Casa N-491-1 Box Restraint Fl . 10 **N/A**

3 X 203300 37. 1 "07R-VB B-G-2 VT-1 Examine in place, when Valve 37-07R Bolting disassembled or when X +*N/A~+

removed.

203400 37.1-37-08R-VB B G 2 Examine in place, when Valve 37-08R Bolting B7 ~ 70 removed, or when 3

disassembled. ++N/A~~

203500 37. 1-37-10-VB B-G-2 VT 1 Examine in place, when Valve 37-10 Bolting B7.70 removed, or when 3 X disassembled +*N/A**

203600 37. 1-37-11-VB B-G-2 VT-1 Examine in place, when Valve 37-11 Bolting B7.70 removed or when 3 X disassembled. **N/A*+

203900 37.1-WD-003 B J Terminal End, High Pipe-to-Valve 37-10 B9.40 Stress Weld, Examine 3 X 100% of weld length

~*N/A**

204500 37.1-WD-009 B J Terminal End, High PiPc to-Valve 37 07R B9. 40 Stress Weld, Examine 3 X 100% of wold length

~~N/A~~

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 143 REVISION: 0 ZNSERVZCE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS or Drain NUMBER: 37.1 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERZOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ~'iCALIBRATION BLOCK~~

204900 37. 1-WD-013 B-J Examine 100% of weld Pipe-to-Coupling B9.40 length +iN/Aii 3 X 205100 37. 1-WD-015 B-J Terminal End, High Pipe-to-Valve 37-11 B9.40 Stress Weld, Examine X

100% of wold length.

~~N/A~~

205300 37. 1-WD-017 B-J Terminal End, High Pipe-to-Valve 37-OSR B9.40 Stress Weld, Examine 3 X 100% of wold length.

ikN/A%0

DATE: 10/15/99 NZNE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 144 REVISION: 0 INSERVICE INSPECTION TEN YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS or Shutdown Cooling NUMBER: 38. 0 INSPECTION INTERVAL PIAN STATUS PRESERV ICE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAHINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO HETH 1 2 3 4 1 2 3 4 1 2 3 4 **CALIBRATIONBLOCK~ ~

14.0" SDC Line (REF. DWG. NO. 10) 205600 38-01-VB B G-2 VT-1 V07, Limited to valve Valve 38-01 Bolting B7.70 selcctcd under B-M-2 3 ++N/A++

205700 38-01-VBY B"H-2 VT-3 V07, Only when Valve 38-01 Interior B12.50 disassembled, One valve 3 X Surf aco among a group of valves.

~~N/A~~

1 206100 38-12-FLG B-G-1 VT 1 Vlo, When connection is Valve 38-12 Flange B6.220 disasscmblcd, Examine Surface X 1.0" annular surface of flange surrounding each stud. ~~N/A~~

206200 38-12-NBW B G-1 VT 1 V10 ( ~ <<N/A>> ~

Valve 38-12 Nuts, B6.230 3 X Bushing, Washers 206300 38-12-VB B-G-1 UT V10, 16 studs, Examine Valve 38-12 Bolting B6.210 inplacc, when 3 X disasscmblcd, or when removed.

+ ~NM1-2 . 50-Bl 6-1 ~ +

206400 38 "12-VBY B-H-2 VT-3 V10, Only when Valve 38-12 Zntcrior B12.50 disassembled, Onc valve Surface X among a group of valves tfN/At*

206500 38-12-WD-003 B K Code Case N-509 ~~N/A~+

Valve 38-12 Integral B10.40 3 X Attachment

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 145 REVISION: 0 ZNSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XI SCHEDULED COMPONENTS or Shutdown Cooling NUMBER: 38. 0 PRESERVICE YEAR ZNSPECTZON INTERVAL PLAN STATUS ASME FIRST SECOND THIRD SEC. XI PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ~~CALIBRATION BLOCX~~

207300 38-H1 F-A Code Case N-491-1 Spring Hanger Fl . 10 1 fN/Afi 3 - - - - - - - - X 208100 38-WD-001 GL-D UT Requires 38-H-1 Clamp to Valve 38-01-to-Pipe 88-01 be removed. ~~PSR-.760~~

3 - - - X - - - X 208200 38-WD-001 B-J UT Support 38-Hl support Valve 38-01-to-Pipe B9. 11 PT clamp is required to bc 3 X removed prior to pcrformanco. ~*LATER**

208300 38"WD-002 B-J UT Examine 100% of weld Pipe-to-Elbow B9. 11 PT length ~*LATER~+

3 X 00 38-WD-002 GL D UT **LATER**

Pipe" to-Elbow 88-01 3 X X 208500 38-WD-002-Dl B-J UT Code Case N-524 Elbow-hong Seams OR B9.12 ~~LATER++

3 X 208600 38-WD-002-D2 B-J UT Code Case N-524 Elbow-Long Seams IR B9 12

~ PT **IATER++

208800 38-WD-003 GL D UT *~LATER~~

Elbow-to-Elbow 88-01 3 X X 209400 38-WD"004 GL-D UT +~IATER~+

Elbow-to-Pipe 88-01 3 X X 209900 38-WD-005 GL D UT **PSR-.760**

Pipe-to-Elbow 88 "01 X X

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 146 REVISION: 0 ZNSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS r Shutdown Cooling NUMBER: 38.0 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR ASME FIRST SECOND THIRD SEC. XI PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 *<<CALIBRATION BLOCK<<<<

210400 38-WD-006 GL-D UT *<<PSR-.760<<<<

Elbow-to-Pipe 88-01 3 X X 210900 38-WD-007 GL-G Inaccessible inside pen.

Pipe-to-Pipe 88 01 X-S, Examine area each 3 X - - - X X - - X outage for evidence of leakage. **N/A**

211200 38-WD-008 GL-G VT-2 Inaccessible inside Pipe-to-Valve 38-02 88-01 pcnctration X-8, Examine 3 X - - - X X - X each outage for evidence of leakage. **N/A*<<

211400 38-WD-087 GL-G Inaccessible inside pen.

Valve 38-12-to-Pipe 88-01 X-7. Examine area each X - " - X X - - X outage for cvidcncc of leakage. <<<<N/A**

211500 38 WD-088 GL G Inaccessible inside pen.

Pipe-to-Pipe 88-01 X-7. Examine area each X - - - X X - - X outage for evidence of leakage. <<*N/A<<<<

211700 38-WD-089 B J Examine 100% of weld Pipe-to-Elbow B9.11 length *<<LATER<<<<

3 X

'

211800 38-WD-089 GL-D UT <<<<LATER<<<<

Pipe-to-Elbow 88-01 3 X X 212200 38-WD-090 GL D UT '

  • LATER<<<<

Elbow-to" Pipe 88-01 X X

DATE: 10/15/99 NINE HILE POZNT NUCLEAR PLANT UNIT 1 PAGE: 147 REVISION: 0 ZNSERVICE ZNSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS or Shutdown Cooling NUMBER: 38. 0 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR ASME FIRST SECOND THIRD SEC. XI PERIOD PERIOD PERIOD SUMHARY EXAHINATION AREA CATE GY NDE OUTAGE INSTRUCTIONS NUHBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ~+CALIBRATION BLOCK~~

212700 38 "WD-091 GL-D UT ~~PBR-.760~*

Pipe- to-Pipe 88-01 3 X 212800 38-WD-092 GL"D UT +*P8R-.760~*

Pipe-to-Pipe 88-01 3 X X 213100 38-WD-093 GL-D UT **LATER**

Pi pe-to-Elbow 88-01 3 X X 213500 38-WD-094 GL-D UT +*PBR .760+*

Elbow-to-Valve 38-13 88-01 3 X X

DATE: 10/15/99 NINE HZLE POINT NUCLEAR PZANT UNIT 1 PAGE: 148 REVISION: 0 ZNSERVICE INSPECTION TEN YEAR PLAN CLASS 1 SECTION XI SCHEDULED COHPONENTS cncy Condenser Return HUHBER: 39.0 PRESERVZCE YEAR INSPECTION INTERVAL PLAN STATUS ASHE FIRST SECOND THIRD SEC. XI PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE ZNSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 *+CALIBRATIONBLOCK*

10.0" ECC I ine (REF. DWG. NO. 11A) 213800 39-01R-VB B G-2 V15, Limited to valve Valve 39-01 Bolting B7.70 selected under B-M-2 X ~~N/A+~

213900 39-01R-VBY BH2 V15, Only when Valve 39-01 Interior B12.50 3 X disassembled, One valve Surface among a group of valves.

1tN/Af*

214200 39-03-VB B-G-2 VT-1 V12, Limited to valve Valve 39-03 Bolting B7. 70 selected under B-H-2.

3 X ++N/A**

0 39-03-VBY B-H-2 VT-3 V12, Only when Valve 39-03 Interior B12.50 di.assembled,, One valve 3 X Surface among a group of valves.

    • N/A0f 214600 39-05 "VB B-G-2 VT-1 V09, Limited to valvo Valve 39-05 Bolting B7.70 selected under B-M-2 3 X  %*N/A**

214700 39-05-VBY B-M-2 VT 3 V09, Only when Valve 39-05 Interior B12. 50 disassembled, Onc valve 3 X Surface among a group of valves.

esN/Aaa 215200 39-A2 F-A Code Case N-491-1 Anchor Fl. 10 tiN/Aft 3 X

DATE: 10/15/99 NZNE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 149 REVISION: 0 INSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XI SCHEDULED COMPONENTS ency Condenser Return NUMBER: 39.0 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER ZDENTZFZCATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ~ +CALIBRATION BLOCK**

215300 39-A2-WD-001 B-K Code Case N-509 **N/Ai~

Anchor Integral B10. 20 3 X Attachment 215400 39-A2-WD-002 B-K PT Code Case N-509 +*N/A**

Anchor Integral B10. 20 3 X Attachment 215900 39-H16 VT-3 Code Case N-491-1.

Spring Hanger Fl . 10 *AN/Af*

3 X 217200 39-H9 VT-3 Code Case N-4 91-1 .

Spring Hanger Fl . 10 e*N/A+a 3 X 0 39-WD-194 GL-G Examine each outage for Valvo 39-05-to-Pipe . 88-01 evidence of leakage.

X - - X X *~N/A~~

218000 39-WD-194A GL-G Inaccessible inside Pipe-to-Pipe 88-01 penetration X-5B, 3 X - - - X X - - X Examine each outage for evidence of leakage

  • 0 N/Al*

218400 39-WD-195 GL-D UT +*NMP-10 XX1 SS*+

Pipe-to-Elbow 88 01 3 X X 218800 39-WD-196 GL-D UT Removal of pipe support Elbow-to-Pipe 88-01 clamp 39-HS-12 6 16 3 X - - X required.

++NMP 10 XX1-SS**

DATE: 10/15/99 NINE MILE POINT NUCLEAR PZANT UNIT 1 PAGE: 150 REVZSZON: 0 INSERVICE INSPECTION TEN-YEAR PIAN CIASS 1 SECTION XZ SCHEDULED COMPONENTS eney Condenser Return NUMBER: 39.0 INSPECTION ZNTERVAL PLAN STATUS PRESERVICE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 +~CALIBRATION BLOCK+~

219200 39-WD-197 GL D Remove Clamps on Pipe-to-Elbow 88-01 39-HS-12 6 16.

3 X X ~ ~NMP-10-XXI-SS**

219600 39-WD-198 GL-D UT ~ ~NMP-10-XX1-SS**

Elbow-to-Pipe 88"01 3 - - - - X X 220000 39-WD-199 GL-D UT **NMP-10-XX1 SS**

Pipe-to-Elbow 88-01 3 X X

<<

220400 39-WD-200 GL-D UT UT exams every 2 RFO's.

Elbow-to-Pipe 88-01 *+NMP 10-XX1-SS++

3 X X 0 39-WD-201 GL-D UT UT cxams cvcry 2 RFQ'.

Pipe-to-Elbow 88-01 3 X X 221100 39-WD "202 GL-D UT UT cxams cvry 2 RFO '

Elbow-to-Pipe 88 01 +*LATER++

X - - - - X 221600 39 "WD-203R GL-D UT ++NMP-10 XX1-SS**

Pipe-to-Elbow 88 01 3 X X 222000 39-WD-204A GL-D UT Sensitized, UT exams Pipe-to-Pipe 88-01 cvcry 2 RFO's, 3 X - - - X ~ <<NMP-10-XXI-SS>> ~

222400 39-WD-204R GL-D UT Sensitized, UT cxams Elbow-to-Pipe 88-01 every 2 RFO's 3 X X

~+NMP-10-XXI-SS"

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 151 REVISION: 0 ZNSERVZCE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS cncy Condenser Return NUMBER: 39.0 ZNSPECTZON ZNTERVAL PZAN STATUS PRESERVICE YEAR ASHE FIRST SECOND THIRD SEC. XZ PERIOD PERZOD PERIOD

SUMMARY

NUMBER EXAMINATION AREA IDENTIFICATION CATEGY ITEM NO NDE METH


OUTAGE------ INSTRUCTIONS 1 2 3 4 1 2 3 4 1 2 3 4 +~CALIBRATION BLOCK**

223200 39-WD-226 GL G VT-2 exam each RFO for Valve 39-06-to-Pipe 88 01 evidence of leakage 3 X 4 1N/At*

223400 39-WD-226A GL-G Inaccessible inside pen.

Pipe-to-Pipe 88-01 X-SA, VT-2 exam each RFO 3 X - - - X X - - X for evidence of leakage.

++N/A+*

223900 39-WD-226B GL-D UT UT exam every 2 RFO's Pipe-to-Pipe 88-01 *+ LATER**

3 X - - - - X 224300 39-WD-227 GL D UT UT exam every 2 RFO's Pipe-to-Elbow 88-01 **NMP-10-XX1-SS**

3 X X 224500 39-WD-228 GL-D UT UT exam cvcry 2 RFO's Pipe-to-Elbow 88 01 + +ZATER*+

3 X X 225000 39-WD-229 GL-D UT UT exam every 2 RFO's, Pipe-to-Elbow 88 01 Rcmove clamps on support 3 X X 39-H9, HS-9 and 10.

    • NMP-10-XX1-SS**

225300 39-WD-230 GL-D UT UT exam every 2 RFO's Elbow-to-Pipo 88-01 **NHP-10-XX1-SS**

3 X 225800 39-WD-231 GL D UT UT exam every 2 RFO's Pipe-to-Pipe 88-01 IfLATER* t 3 X X 226200 39-WD"232 GL-D UT UT exam every 2 RFO's Pipe-to-Elbow 88-01 +*NHP-10-XX1-SS+*

3 X X

DATE: 10/15/99 NZNE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 152 REVISION: 0 INSERVZCE INSPECTION TEN YEAR PIAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS cney Condenser Return NUMBER: 39.0 INSPECTION ZNTERVAL PLAN STATUS PRESERVZCE YEAR ASHE FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAHZNATZON AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER ZDENTZFZCATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 + +CALIBRATION BLOCX+ +

226500 39-WD-233 GL D UT UT cx~ every 2 RFO's Elbow-to-Pipe 88-01 **NHP-10-XXZ-SS~~

3 X 226900 39-WD-233A GL-D UT Sensitized, UT exalts Pipe-to-Elbow 88 01 every 2 RFO's 3 X X **NHP-10-XX1-SS**

227300 39-WD-234A GL-D UT Sensitized Pipe- to-Elbow 88" 01 +'~NHP 10 XX1 SS++

3 X 227800 39-WD-235R GL D Sensitized Elbow-to-Pipe 88-01 ~+NMP-10-XX1-SS**

3 X X

DATE: 10/15/99 NINE HYLE POINT NUCLEAR PIANT UNIT 1 PAGE: 153 REVISZON: 0 ZNSERVZCE INSPECTZON TEN YEAR PLAN CLASS 1 SECTION XI SCHEDULED COMPONENTS cncy Condenser Supply NUMBER: 39.0 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

NUHBER EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 **CALIBRATIONBLOCK>> t 10.0" ECC Line (REF. DWG. NO. 11) 229800 39-07R-VB B-G-2 VT 1 V16, Limited to valve Valve 39-07R Bolting B7.70 selected under B-H-2 3

t*N/A**

229900 39-07R-VBY B-M-2 VT 3 V16, Only when Valve 39-07R Interior B12.50 disassembled, one valve 3 X Surface among a group of valves.

    • N/Att 230500 39-09R-WD-001 GL-G VT-2 VT-2 exam each RFO for Valve 39-09R 88-01 cvidcncc of leakage Body-to-Extension Weld 3 X - - - X X - - X ~ >>N/Att 0 39 "10R-WD-001 GL-G VT 2 VT-2 exam each RFO for Valve 39-10R 88-01 cvidcnce of leakage Body-to-Extension 3 X - - - X X t>>N/A>>*

18.0" ECC Nozzlcs (REF. DWG. NO. 11) 231000 39-WD-001 B-D UT Group R17, 65% CRV N5A Nozzle-to-Vessel B3.90 Limitation duc to 3 X ad)accnt nozzle and bioshield t >>LATER**

231100 39-WD-001-ZR B D UT Group R17, 55% CRV NSA Nozzle Incr Radius B3.100 limitation due to Section 3 X ad)accnt nozzle and bioshicld **ZATER>>t 231200 39-WD-002 GL-A UT Group R17, t*ZATER>>>>

NSA Nozzle-to-Safe End 88-01 3 X

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 154 REVISION: 0 ZNSERVICE INSPECTION TEN-YEAR PZAN CLASS 1 SECTION XI SCHEDULED COMPONENTS ency Condenser Supply NUMBER: 39.0 ZNSPECTZON INTERVAL PZAN STATUS PRESERVZCE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 4*CALIBRATION BLOCK~~

10.0" ECC Nozzlcs (REF. DWG. NO. 11) 231300 39-WD-002 B-F PT Group R17, +~LATER~~

N5A Nozzle-to-Safe End B5.10 UT 3 X 231400 39-WD-002 SZL UT Znconel 182 Butter NSA Nozzle-to-Safe End 455R1S1 Expansion from nozzle side of weld. ++IATER++

10.0" ECC Line (REF. DWG. NO. 11) 231500 39-WD-003 B J UT Terminal End, High Nozzle N5A Safe B9. 11 PT Stress Weld +~LATER~~

End-to-Pipe 3 X 00 39-WD-003 GL-A UT +*LATER**

Nozzle NSA Safe 88-01 3 X End-to-Pipe

~~

231900 39-WD-006 GL-A UT ~*ZATER*~

Pipe-to-Pipe 88-01 3 X 232700 39-WD-008 GL-A UT ~~LATER~*

Pipe-to-Pipe 88 01 3 X 233100 39 WD-009 GL-A VT-2 Inaccessible inside Pipe-to-Valve 39-09R 88-01 penetration X-3A, VT-2 3 X - - - X X - - X exam each RFO for evidence of leakage,

    • N/A**

233500 . 39-WD-011 B J UT Terminal End, High Valve B9. 11 PT Stress Weld, Examine 3 X 39-07R-to-Reducer 100% of weld length

    • ZATER**

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 155 REVISION: = 0 ZNSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS cncy Condenser Supply NUMBER: 39.0 INSPECTION INTERVAL PLAN STATUS ZRESERVICE YEAR ASME FIRST SECOND THIRD SEC. XI PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATE GY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 <<<<CALIBRATION BLOCK**

18.0" ECC Nozzles (REF. DWG. NO. 11) 233800 39-WD-089 B-D UT Group R18, 73% CRV NSB Nozzle-to-Vessel B3.90 Limitation due to ad)acent nozzle and bioshield **LATER*<<

233900 39-WD-089-IR B-D Group R18, 75% CRV N5B Nozzle Inner B3.100 Limitation duc to 3 X Radius Section ad)accnt nozzle and bioshield *<<ZATER**

10.0" ECC Nozzles (REF. DWG. NO. 11) 234000 39-WD-090 B F UT Group R18, 91.02% CRV NSB Nozzle-to-Safe End B5.10 PT *<<LATER<<<<

3 X 2 4100 39-WD-090 GL-D UT Group R18, 91.02% CRV NSB Nozzle-to-Safe End 88-01 <<<<LATER<<<<

3 - - - - X - - - X 234200 39-WD-090 SIL Group R18, Znconcl 182 NSB Nozzle-to-Safe End 455R1S1 Butter Expansion from 3 X nozzle side of weld

<<<<LATER<<<<

10.0" ECC Linc (REF. DWG. NO. 11) 234300 39-WD"091 B-J UT Terminal End, High Nozzle N5B Safe B9. 11 PT Stress Weld, Examine 3 X End-to-Pipe 100% of weld length

<<*LATER<<<<

235500 39-WD-096 B-J Examine 100% of weld Elbow-to-Pipe B9.11 length *<<ZATER<<*

3 X

DATE: 10/15/99 NINE MILE POZNT NUCLEAR PLANT UNIT 1 PAGE: 156 REVISZON: 0 ZNSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS ency Condenser Supply NUMBER: 39. 0 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 **CALIBRATIONBLOCK**

235900 39-WD-097 GL-A VT-2 exam each RFO for PiPe-to-Valve 39-10R 88-01 evidence of leakage X - - - X X - - X iiN/At1 236300 39-WD-099 B-J Terminal End, High Valve B9.11 Stress Weld, Examine 3 X 39-OSR-to-Reducer 100% of weld length

    • LATER*~

DATE: 10/15/99 NINE MILE POINT NUCLEAR PIANT UNIT 1 PAGE: 157 REVISION: 0 ZNSERVZCE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS or Core Spray NUMBER: 40.0 IRESERVZCE YEAR INSPECTION INTERVAL PLAN STATUS ASME FIRST SECOND THIRD SEC. XI PERIOD PERIOD PERIOD

SUMMARY

EXAMZNATZON AREA CATEGY NDE - ~

OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 t tCAI.IBRATION BLOCKt t

12. 0" CSA (REF. DWG. NO. 12) 236700 40-01"VB B-G-2 VT-1 V14, Limited to valve Valve 40-01 Bolting B7.70 sclectcd under B-M-2 3 X *tN/A**

236SOO 40-01-VBY B-M"2 VT-3 V14, Only when Valvo 40-01 Interior B12.50 disasscmblcd, onc valve 3 X Surface among group of valves t*N/Att 237100 40-03-FLG B-G-1 VT"1 Vll, Examine 1.0" Valve 40-03 Flange B6.220 annular surface of 3 X Surface flange surrounding each stud **N/At*

00 40 03 NBB B-G-1 VT-1 Vll, Only when Valve 40-03 Bushings ~ B6. 230 disassembled t*N/A**

3 X 237300 40-03-NBN B G 1 VT 1 Vl1, Examine inplacc, Valve 40-03 Nuts B6.230 when removed or 3 X disassembled **N/A**

237400 40-03-NBW B-G-l VT-1 Vll, Examino inplaco, Valve 40-03 Washers B6.230 when rcmovcd or 3 X disassembled ttN/A*t 237500 40-03-VB B-G-1 UT Vll, Limited to valve Valve 40-03 Bolting B6.210 sclcctcd under B-M-2 3 X ttLATERtt

DATE: 10/15/99 NZNE MILE POINT NUCLEAR PLANT UNZT 1 PAGE: 158 REVISION: 0 INSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XI SCHEDULED COMPONENTS or Core Spray NUMBER: 40.0 ZNSPECTZON INTERVAL PLAN STATUS PRESERVZCE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 *+CALIBRATIONBLOCK~*

237600 40-03-VBY B-M-2 Vll, Only when Valve 40-03 Interior B12.50 disassembled, one valve Surface 3 X among group of valves

+*N/A*+

2. 0" CSB (REF. DWG. NO. 12) 239500 40"20-VB B-G-2 Examine in place, when Valve 40-20 Bolting B7.70 removed or when X

disassembled. **N/A~~

12. 0" CSA (REF. DWG. NO. 12) 239600 40-Al F-A VT-3 Code Case N-491-1 Anchor Fl . 10 ++N/A++

3 X 12.0" CSB (REF. DWG. NO. 12) 240200 40-H17 F-A Code Case N-491-1 Spring Hanger Fl . 10 ~~N/Ai~

3 X 240600 40-H21-A F-A VT-3 Code Case N-491-1 Constant Spring Hanger F1.10 **N/A~~

3 X 240700 40"H21-A-WD-001 B"K Code Case N-509 ++N/A~~

Integral Attachment B10.20 3 X 240800 40-H21-A-WD-004 PT Code Case N-509 **N/A**

Integral Attachment B10. 20 3 X 240900 40-H21-A-WD-007 B-K PT Code Case N-509 +~N/A+a Integral Attachment B10.20 3 X

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 159 REVZSION: 0 INSERVZCE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS J

or Cora Spray E NUMBER: 40.0 PRESERVICE YEAR INSPECTION ZNTERVAL PLAN STATUS ASME FIRST SECOND THIRD SEC. XI PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATE GY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ++CALIBRATION BLOCK**

241000 40 "H21-A-WD-010 B K PT Code Case N-509 **N/A*~

Integral Attachment B10. 20 3

241100 40-H21-B F A VT 3 Code Case N-491-1 Constant Spring Hangar F1.10 N/Aff 3 X

12. 0" CSA (REF. DWG. NO. 12) 241700 40-H54 F-A VT 3 Code Case N-491-1 Spring Support Fl . 10 **N/At%

3 X 243100 40-H57-B F-A Code Case N-491-1 Constant Weight hanger F1.10 **N/A+~

X 00 40-WD-001 GL-D UT UT exams every 2 RFO '

Valve 40-03-to-Pipe 88-01 *~NMP-12-XXI-SS~~

3 X

2. 0" CSA (REF. DWG. NO. 12) 245900 40-WD 002 B-J Examine 100% of weld Branch Connection B9.32 length *~N/A~*

3 X

6. 0" CSA (REF. DWG. NO. 12) 246100 40-WD-003 GL D UT UT exams every 2 RFO's.

Branch Connection 88-01 **PSR-1. 5-2~ ~

3 - - - - X 246300 40-WD-004 GL"D UT UT exams cvcry 2 RFO's.

Pi pc- to-Elbow 88-01 **PSR-.42-2~~

3 X X 246500 40-WD-005 GL-D UT UT exams cvcry 2 RFO's Elbow-to-Pipe 88-01 to the extent practical 3 X X **PSR".432-2i~

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 160 REVZSZON: 0 ZNSERVICE INSPECTION TEN-YEAR PLAN CIASS 1 SECTION XZ SCHEDULED COMPONENTS or Core Spray NUMBER: 40.0 INSPECTION INTERVAL PLAN STATUS PRESERVZCE YEAR ASME FIRST SECOND THIRD SEC. XI PERIOD PERIOD PERIOD

SUMMARY

NUHBER EXAHINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS IDENTIFICATION ITEM NO HETH 1 2 3 4 1 2 3 4 1 2 3 4 **CALIBRATIONBLOCK'>>~

246510 40-WD-005 N/A VT 2 VT-2 each outage, for Elbow-to-Pipe N/A evidence of leakage 3 X X X - - X **PSR-.432-2i~

246700 40-WD-006 GL-D UT UT cxams every 2 RFO's.

Pipe-to-Pipe 88-01 **LATER++

3 X X 246710 40-WD-006 N/A VT-2 VT-2 exam each outage Pipo-to-Pipe N/A for evidence of leakage 3 X - - - X X 246900 40-WD-007 GI -D UT UT cxams every 2 RFO's.

Pipe-to-Valve 40-05 88-01 *~PSR-.432-2**

3 X X

12. 0" CSA (REF. DWG. NO. 12) 247100 40 WD-008 GL-D UT UT exams every 2 RFO's.

Pipe-to-Elbow 88-01 +*NMP-12-XX1-SS**

3 X X 247300 40-WD-009 GL"D UT UT exams cvcry 2 RFO's Elbow-to-Valve 40-02 88-01 **NMP-12-XXI-SS++

3 X X 247700 40-WD-010A GL-G VT 2 Inaccessible inside pen.

Valve 40-02-to-Pipe 88-01 X-13A, VT-2 exam each X - X X RFO for evidence of leakage. **N/A~i 248000 40-WD-011 GL-D UT UT exams cvcry 2 RFO's.

Pipe-to-Elbow 88-01 *~NHP-12-XX1-SS**

3 X X 248010 40-WD-011 N/A VT-2 each outage for Pipe- to-Elbow N/A evidence of leakage 3 X - - - X X X

~~NHP-12-XX1-SS~ ~

DATE: 10/15/99 NINE HYLE POINT NUCLEAR PIANT UNIT 1 PAGE: 161 REVISION: 0 INSERVICE INSPECTION TEN-.YEAR PIAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS tor Core Spray E NUMBER: 40.0 INSPECTZON INTERVAL PRESERVZCE YEAR PLAN STATUS ASHE FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD SUHMARY EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO HETH 1 2 3 4 1 2 3 4 1 2 3 4 *+CALIBRATION BLOCK~~

248300 40-WD-012 GL-D UT cxams every 2 RFO's.

Elbow-to-Pipe 88-01 ++NHP-12 XX1-SS**

3 - - - - X 248600 40"WD"013 GL D UT UT exam every 2 RFO's.

Pipe-to-Pipe 88 "01 **NMP-12-XXI-SS'~+

3 - - - - X 249000 40-WD-014 GL D UT UT exams every 2 RFO's.

Pipe-to-Pipe 88-01 ++NMP-12 XX1 SS**

3 - - - - X X 249400 40 WD-015 GL-D UT UT cxams every 2 RFO's.

Pipe-to-Elbow 88-01 '~ ~NMP-12-XX1-SS~ ~

3 X X 9700 40-WD-016 GL-D UT cxams every 2 RFO's.

Elbow-to-Pipe 88-01 **NMP-12-XXI-SS+~

X 249900 40-WD-017 GL-D UT UT exams every 2 RFO's.

Pipe-to-Elbow 88-01 +*NMP-12-XX1-SS**

X - - - X 250000 40-WD-018 GL D UT UT exam every 2 RFO's.

Elbow-to-Pipo 88-01 ~ ~NMP-12-XXI-SS~ ~

3 - - - - X X 250400 40-WD-020 GL D UT UT exams every 2 RFO's.

Pipe to Tcc 88-01 + +NMP-12-XX1-SS*+

3 X X 250600 40 WD-021 GL-D UT UT exam every 2 RFO~s.

Tcc-to-Pipe 88-01 **NHP-12-XXZ-SS**

X - - - X 250900 40-WD-022 GL D UT UT cxams every 2 RFO's.

Pipe-to-Elbow 88 01 *+NMP 12 XX1 SS+*

X

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 162 REVISION: 0 INSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XI SCHEDULED COMPONENTS tor Core Spray NUMBER: 40.0 ZNSPECTION INTERVAZ PLAN STATUS PRESERVICE YEAR FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ~~CALIBRATION BLOCK~"

251200 40-WD-023 GL-D UT exams every 2 RFO's.

Elbow-to-Pipe 88-01 ++NMP 12 XXZ-SS+*

3 X X 251500 40-WD-024 GL-D UT UT exams every 2 RFO's.

Pipe-to-Valve 40-09 88-01 ~ ~NMP-12-XXl-SS~*

3 X 251800 40-WD"025 GL D UT UT exams cvcry 2 RFO's.

Valve 40-09-to-Elbow 88-01 ~~NMP"12-XX1-SS**

X X 252000 40-WD-026 GL-D UT UT exams every 2 RFO'st Elbow-to-Pipe 88 01 ~+NMP-12-XXI-SS**

3 X X 2 2200 40-WD-027 GL-D UT UT every 2 RFO's Pipe-to-Tee 88-01 ~~NMP-12-XX1-SS~~

3 X X 252500 40-WD-028 GL D UT UT exams cvcry 2 RFO's.

Tcc-to-Valve 40-01 88-01 **NMP-12-XXI-SS~~

3 X X 252800 40-WD-029 GL"D UT UT cxams cvcry 2 RFO's.

Valve 40-01-to-Pipe 88-01 ~~NMP-12-XXZ-SS**

3 X X 253100 40-WD-030 GL-D UT UT exams every 2 RFO's.

Pipe-to- Tec 88 01 ~ ~NMP-12-XX1-SS*~

3 X X 253400 40-WD-031 GL-D UT UT exams every 2 RFO's.

Tec-to-Pipe 88 "01 **NMP-12-XX1-SS*~

3 X 253800 40-WD-032 GL-D UT UT cvcry 2 RFO's Pipe- to-Elbow 88-01 ~ ~NMP-12-XX1-SS**

3 X X

DATE: 10/15/99 NINE MZLE POINT NUCLEAR PLANT UNIT 1 PAGE: 163 REVISION: 0 ZNSERVICE ZNSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS or Core Spray NUMBER: 40.0 INSPECTION INTERVAL PIAN STATUS PRESERVICE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERZOD SUHHARY EXAHINATION AREA CATEGY NDE OUTAGE ZNSTRUCTZONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ++CALIBRATION BLOCK*~

254100 40-WD-033 GL D UT exams every 2 RFO's.

Elbow-to-Elbow 88-01 ~~NHP-12-XXZ-SS~~

3 X X 254300 40"WD"034 GL-D UT UT cxams avery 2 RFO's.

Pipe- to-Elbow 88 01 **NMP-12-XX1-SS~~

3 X X 254400 40-WD"035 GL-D UT UT exams cvcry 2 RFO's.

Elbow-to-Reducer 88-01 *~NHP-12-XX1-SS~ ~

3 X X 6.0" CSA (REF. DWG. NO. 12) 254600 40-WD"036 B-J UT Examine 100% of weld Reducer-to-Pipe B9. 11 PT length ~*LATER*~

3 X 0 40-WD-036 GL-D UT UT exams every 2 RFO ',

Rcducor-to-Pipo 88-01 **PSR-.432-2*~

3 X X 254800 40-WD-038 GL-D UT UT exam every, 2 RFO's Nozzle N6A Outcr Safe 88-01 **PSR-.75-3~*

3 X End-to-Elbow 254900 40-WD-038 B J PT Terminal End, Nozzlo N6A Outcr Safe B9.11 UT **PSR-.75-3**

3 X End-to-Elbow 255000 40-WD-038A B"J UT Examine 100% of weld Nozzle N6A Znnor Safe B9.11 PT length ~*IATER**

3 X End-to-Outcr Safe 255100 40-WD-038A GL-D UT UT cxams evory 2 RFO's.

Nozzle N6A, Inner Safe 88-01 ~~LATER*~

3 X X End-to-Outcr Safe

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 164 REVISION: 0 INSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS or Core Spray NUMBER: 40.0 PRESERVICE YEAR INSPECTION INTERVAL PLAN STATUS ASME FIRST SECOND THIRD SEC. XI PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE -OUTAGE INSTRUCTIONS NVMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ~ +CALIBRATION BLOCK*~

255200 40-WD-039 B F Group R19, UT 28.4% CRV Nozzle N6A-to-Inner BS. 10 **LATER**

3 X Safe End 255300 40-WD-039 SZL UT Znconel 182 Butter Nozzle N6A-to-Inner 455R181 Expansion from nozzle Safe End side of weld ~~N/A+~

255400 40-WD-039 GL D UT UT exams every 2 RFO's.

Nozzle N6A-to-Inner 88-01 etN/Aee 3 - - - - X X Safe End 255500 40-WD-040 B-D VT Group R19, 66% CRV N6A Nozzle-to-Vessel B3.90 ,Limitation duc to X ad)accnt nozzle and bioshiold **IATER+s 255600 40-WD-040-ZR B-D UT Group R19, 66% CRV N6A Nozzle Inner B3.100 ,Limitation duc to 3 X ad)accnt nozzle and Radius Section bioshicld ~~LATER~~

12. 0" CSB (REF. DWG. NO. 12) 255800 40-WD-041 GL-D VT UT exams every 2 RFO's Valve 40-13-to-Pipe 88-01 ~ +LATER~ ~

3 X - - - - X

6. 0" CSB (REF. DWG. NO. 12) 256200 40-WD"043 GL-D UT UT exam every 2 RFO's.

Branch Connection 88-01 ~+LATER~~

3 X X 256400 40-WD-043A GL D UT UT exam cvcry 2 RFO's Pipe-to-BR Stub Nozzle 88-01 ++LATER*+

X - - X

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNZT 1 PAGE: 165 REVISION: 0 ZNSERVZCE INSPECTION TEN-YEAR PLAN CIASS 1 SECTZON XI SCHEDULED COMPONENTS or Core Spray NUMBER: 40.0 PRESERVICE YEAR INSPECTION ZNTERVAL PLAN STATUS ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER ZDENTZFZCATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 >>>>CALIBRATION BLOCK>>>>

256600 40-WD-044 GL-D UT cxams every 2 RFO's.

Pipe-to-Elbow 88 01 **LATER>>>>

3 X X 256800 40 WD 045 GL-D UT UT cxams every 2 RFO's.

Elbow-to-Pipe 88-01 >>>>LATER>>*

3 X X

12. 0" CSB (REF. DWG. NO. 12) 257100 40-WD-047 GL D UT UT cxams every 2 RFO's.

Pipe-to-Valve 40-06 88-01 >>>>LATER>>>>

X - - - - X 257300 40-WD-048 GL-D UT UT cxams every 2 RFO's Pipe-to-Elbow 88 01 **LATER**

3 X X 0 40-WD-049 GL D UT UT cxams every 2 RFO's Elbow-to-Valve 40-12 88-01 >>>>LATER>>>>

3 X X 257900 40-WD-050A GL G VT-2 VT-2 exam each RFO for Valve 40-12-to-Pipe 88-01 cvidcnco of leakage.

X - - - X X - - X >>>>N/A>> ~

258100 40-WD-051 GL-D UT UT cxams cvcry 2 RFO's Pipe-to-Elbow 88-01 >>>>LATER>>>>

X X 258110 40-WD-051 N/A VT-2 VT-2 each outage for Pipe-to-Elbow N/A evidence of leakage 3 X - - - X X - - X >>>>IATER>>>>

258500 40 WD 052 GL-D UT UT cxams every 2 RFO's.

Elbow-to-Pipe 88-01 **LATER>>>>

3 X X

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNZT 1 PAGE: 166 REVISION: 0 INSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS or Core Spray NVMBER: 40.0 INSPECTZON INTERVAL PLAN STATUS PRESERVICE YEAR ASME FIRST SECOND THIRD SEC. XZ PERZOD PERIOD PERIOD

SUMMARY

EXAMZ NATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NVMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 *>>CALIBRATION BLOCK>> t 258800 40-WD-053 GL-D UT cxams every 2 RFO's.

Pipe-to-Elbow 88-01 **LATER**

3 X - - X 259100 40-WD-054 GL-D UT UT exams every 2 RFO's.

Elbow-to-Pipe 88-01 t >>LATER>>t X X 259300 40-WD-055 GL D VT UT exam every 2 RFO's Pipe-to-Elbow 88-01 t*ZATER**

3 X X 259700 40-WD-056 GL-D UT UT cxams every 2 RFO's.

Elbow-to-Pipe 88-01 <<*LATER>>>>

3 X X 2 200 40-WD-058 GL-D UT UT exams every 2 RFO'.

Pipe-to-Tcc 88-01 t t LATER>> t 3 X X 260500 40-WD-059 GL-D VT UT cxams every 2 RFO's.

Tcc-to-Valve 40-10 88-01 t>>IATER>>t X X 260900 40-WD-060 GL-D UT UT exams every 2 RFO's.

Valve 40-10-to-Pipe 88-01 t>>LATER>>t 3 X X 261200 40-WD-061 GL-D UT UT cvcry 2 RFO's.

Pipe- to-Elbow 88-01 t>>LATER>>t X X 261400 40-WD-062 GL"D VT VT every 2 RFO's.

Elbow-to-Pipe 88-01 t<<LATER>>t X X 261800 40-WD-063 GL-D VT UT exams cvcry 2 RFO's.

Pipe-to-Elbow 88-01 **LATER>>t 3 X X

DATE: 10/15/99 NINE MILE POINT NUCLEAR PIANT UNZT 1 PAGE: 167 REVISION: 0 INSERVZCE ZNSPECTION TEN YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS or Core Spray E NUMBER: 40.0 PRESERVZCE YEAR INSPECTION INTERVAL PZAN STATUS ASME FIRST SECOND THIRD SEC. XI PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ~ ~CALIBRATION BLOCK~ ~

262200 40-WD-064 GL-D UT exams every 2 RFO's.

~ '~ IATER~ ~

Elbow-to-Pipe 88 01 3 X X 262500 40-WD-065 GL D UT UT exams every 2 RFO's.

Pipe-to-Elbow 88-01 **ZATER**

3 X X 263000 40-WD-066 GL-D UT UT cxams every 2 RFO's.

Elbow-to-Pipe 88-01 ~~LATER~~

X X 263400 40-WD-067 GL-D UT UT cvcry 2 RFO's Pipe-to-Tce 88"01 ~*LATER**

3 X X 600 40-WD 068 GL-D UT UT exams every 2 RFO's.

Tce to-Pipe 88-01 **IATER1*

3 X X 264000 40-WD-069 GL-D UT UT exams every 2 RFO's.

Pipe-to-Valve 40-11 88-01 ~~LATER**

X - - - - X 264300 40-WD-070 GL-D UT UT exams every 2 RFO>s.

88-01 ~ ~ZATER~ ~

Valve 40-11-to-Pipe 3 X X 264600 40-WD"072 GL-D UT UT exams every 2 RFO's.

Elbow-to-Pipe 88-01 ~+IATER++

3 X X 265000 40"WD-073 GL-D UT UT cxams every 2 RFO's.

Pipe-to-Tcc 88-01 **IATER**

X - - - - X 265400 40-WD"074 GL-D UT UT every 2 RFO's.

Tec-to-Pipe 88-01 ~~ZATER~~

3 X X

DATE: 10/15/99 NINE MZI E POINT NUCLEAR PLANT UNIT 1 PAGE: 168 REVISION: 0 INSERVZCE INSPECTION TEN-YEAR PLAN CIASS 1 SECTION XZ SCHEDULED COHPONENTS or Core Spray NUHBER: 40.0 PRESERVICE YEAR ZNSPECTION INTERVAL PLAN STATUS ASME FIRST SECOND THIRD SEC. XZ PERZOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEH NO HETH 1 2 3 4 1 2 3 4 1 2 3 4 +~CALIBRATION BLOCK*+

265800 40"WD-075 GL-D UT exams every 2 RFO's.

Pipe-to-Pipe 88 01 ~ ~LATER*~

3 X - - - - X 266100 40-WD-076 GL-D VT UT axams every 2 RFO's.

Pipe-to-Reducer 88-01 **LATER++

3 X - - - " X (12'x6")

266400 40-WD-077 GL D UT UT exams every 2 RFO's.

Reducer 88-01 ~ + ZATER+ +

3 X - - - - X (12" x6" ) to Pipe 266500 40-WD-077 B"J VT Examine 100% of weld Reducer B9.11 PT length ~+LATER~~

3 X (12" x6" ) -to-Pipe

6. 0" CSB (REF. DWG. NO. 12) 266600 40-WD-079 B-J UT Terminal End ~*LATER~+

Nozzle N6B Outer Safe B9.11 PT 3 X End-to-Elbow 266700 40-WD-079 GL-D VT Terminal End, UT exam Nozzle N6B Outcr Safe 88-01 every 2 RFO's. ~*LATER~*

End-to-Elbow 3 X - - - - X 266800 40-WD-079A GL-D UT UT exam every 2 RFO's Nozzle N6B Inner Safe 88-01 ~~IATER+*

3 X X End-to-Outcr Safe 266900 40-WD"079A B-J VT Examine 100% of weld Nozzle N6B Znncr Safe B9.11 length **ZATER~~

3 X End-to-Outer Safe

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 169 REVISION: 0 ZNSERVZCE INSPECTION TEN YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS or Core Spray NUMBER: 40.0 INSPECTION INTERVAL PLAN STATUS PRESERVZCE YEAR ASME FIRST SECOND THIRD SEC. XI PERIOD PERZOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE -OUTAGE INSTRUCTIONS NUMBER ZDENTZFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 **CALIBRATIONBLOCK+*

267000 40-WD-080 B-F Group R20, Examine 100%

Nozzle N6B-to-Inner B5. 10 of weld length **LATER**

X Safe End 267100 40-WD-080 SIL 182 Butter Expansion No" zlc N6B-to-Inner 455R1S1 from nozzle sido of 3 X Safe End weld. aaLATER+a 267200 40-WD-080 GL-D UT exams cvcry 2 RFO's Nozzle N6B-to-Inner 88-01 **LATER+*

3 X X Safe End 267300 40-WD-081 B-D Group R20, 56% CRV N6B Nozzle-to-Vcsscl B3. 90 ,Limitation due to 3 X ad)acent nozzle and bioshield

~~NMPI-GE-7.875~~

267400 40-WD-081-ZR B-D Group R20, 54% CRV N6B Nozzle Znner B3. 100 ,Limitation duc to 3 X Radius Section ad)accnt nozzle and bioshicld

+*NMP1 GE 7.875++

2.0" CSS (REF. DWG. NO. 12) 267500 40-23"VB B-G-2 Examine in place, when Valve 40-23 Bolting B7.70 removed or when 3 X disasscmblcd *~N/A~*

267600 40-24-VB B-G-2 Examine in place, when Valve 40-24 Bolting B7.70 removed or when X

disassembled ~~N/A~*

DATE: 10/15/99 NZNE MZLE POINT NUCLEAR PIANT UNIT 1 PAGE: 170 REVISION: 0 ZNSERVZCE ZNSPECTION TEN YEAR PLAN CIASS 1 SECTION XZ SCHEDULED COMPONENTS or Core Spray NUMBER: 40. 1 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR ASME FIRST SECOND THIRD SEC. XI PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATE GY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ++CALIBRATION BLOCK**

267700 40. 1-25-VB B-G-2 Removed Crom schedule as Valve 40-25 B7.70 Class 2, and less than 2.0~ diameter. *~N/A~*

267800 40. 1-WD-001 B J *AN/Al0 Sock-0-let -to-Pipe B9. 21 3 X 267900 40. 1-WD-002 B-J Terminal End, +*N/A++

Pipe-to-Valve 40-19 B9.21 X

268600 40.1-WD"009 B-J Terminal End <<*N/A*>>

Valve 40-22-to-Pipe B9. 21 3 X 0 40. 1-WD-011 B-J ~+N/A~*

Tce-to-Pipe B9. 21 3 X 268900 40. 1-WD-012 B-J Terminal End iiN/A++

Pipe-to-Valve 40-23 B9.21 3 X 270300 40.1-WD-026 B-J f*N/A%1 Tec-to-Pipe B9.21 3 X 270400 40.1-WD-027 B-J +*N/A**

Pipe<<to-Elbov B9. 21 3 X 271200 40. 1-WD-035 B-J Tcrmnal End **N/A~~

Pipe-to-Valve 40-20 B9.21 3 X

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 171 REVISION: 0 ZNSERVICE INSPECTION TEN YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS or Core Spray NUMBER: 40.1 INSPECTION INTERVAL PIAN STATUS PRESERVZCE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 **CALIBRATIONBLOCK**

1 . 0" CSS (REF. DWG. NO. 12) 271400 40.1 WD 037 B-J PT Terminal End *~N/A~~

Pipe-to-Valve 40-24 B9. 21 3

271500 40. 1-WD-038 B-J PT Terminal End ~~N/Ai~

Valve 40-24 -to-Pipe B9. 21 3 X

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 172 REVISION: 0 INSERVICE INSPECTION TEN-YEAR PZAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS d Poison NUMBER: 42. 1 ZNSPECTZON INTERVAL PLAN STATUS PRESERVZCE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 >>*CALIBRATION BLOCK>>>>

1.5" Liquid Poison Line (REF. DWG. NO. 14) 271700 42. 1-02-VB B-G-2 VT-1 >>>>N/A>>>>

Valve 42. 1-02 Bolting B7. 70 3 X 271800 42. 1-03-VB B-G-2 VT-1 **'N/A>>*

Valve 42.1-02 Bolting B7.70 3 X 271900 42. 1-R1-A VT 3 Code Caso N-491-1 Spring Hanger Fl. 10 >>>>N/A>>>>

3 X 272800 42. 1-WD-005 B-J Examine 100% of weld Pipe- to-Elbow B9. 21 length **N/A**

3 X 0 42. 1-WD-006 B"J PT Examine 100% of wold Elbow-to-Pipe B9. 21 length **N/A>>>>

3 X 273500 42.1-WD-017 B-J PT Terminal End >>>>N/A>>>>

Valve B9. 21 3 X 42.1-02-to-Reducer 273800 42.1-WD-026 B-J PT Terminal End, Examine Valve 42.1-01-to-Pipe B9.21 100% of weld length 3 X

>>>>N/A>>>>

274100 42.1-WD-029 B-J PT Examino 100% of weld Pipe-to-Elbow B9. 21 length >>>>N/A>>>>

3 X 274600 42. 1-WD-034 SZL Augmcnetd UT and PT to Safe End-to-Nozzle N12 571 dotermincd>>>>IATER>>>>

3 X

DATE: 10/15/99 NINE MILE POZNT NUCLEAR PLANT UNIT 1 PAGE: 173 REVZSZON: 0 INSERVICE INSPECTION TEN YEAR PLAN I CLASS 1 SECTION XZ SCHEDULED COMPONENTS d Poison NUMBER: 42. 1 INSPECTION INTERVAL PLAN STATUS PRESERVZCE YEAR ASME FIRST SECOND THIRD SEC. XZ PERZOD PERIOD PERIOD

SUMMARY

NUMBER EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ++CALIBRATION BLOCK~~

274700 42. I-WD-034 B-F Group R41, Terminal End Safe End-to-Nozzle N12 B5.20 Examine 100% of weld 3 X length ~~N/A**

274800 X-131 Penetration F-A VT-3 Code Casa N-491-1 System Anchor Point F1.10 1 tN/A1*

3 X

DATE: 10/15/99 NINE MILE POZNT NUCLEAR PIANT UNIT 1 PAGE: 174 REVISION: 0 INSERVZCE INSPECTION TEN-YEAR PZAN CZASS 1 SECTION XI SCHEDULED COMPONENTS ol Rod Drive NUMBER: 44. 1 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR ASME FIRST SECOND THIRD SEC. XI PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE ZNSTRUCTZONS NUMBER IDENTIFICATION ZTEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 **CALIBRATIONBLOCK**

3.0" Control Rod Drive Line (REF. DWG. NO. 18) 275000 44.1-H1 F-A VT-3 Code Case N-491-1 Spring Hanger Fl. 10 +*N/A+*

3 X 275300 44. 1-SC-1 F-A VT-3 Code Casa N-491-1 Pipe Clamp F1.10 1tN/Ait 3 X 275500 44.1-WD-001 B"J Terminal End, Examine Valve 44-189 -to-Pipe B9 21

~ 100% of wold length 3 X

    • N/A+*

275600 44.1-WD-002 B-J PT Examine 100% of weld Pipe-to-Elbow B9. 21 length ~*N/A**

3 X 00 44. 1-WD-003 B-J Examine 100% of weld Elbow-to-Pipe B9. 21 length. ~~N/A**

3 X 275900 44.1-WD-005 B-J Examino 100% of wold Elbow-to-Pipe B9. 21 length. **N/A**

3 X 276900 44.1-WD-015 B-J Examine 100% of weld Pipe-to-Elbow B9.21 length ~+N/A*~

3 X 277000 44.1-WD-016 B-J PT Terminal End ++N/A++

Elbow-to-Safe End (N9) B9.21 X

277100 44. 1-WD-017 B-F PT Group R40, Examine 100%

N9 Safe End -to-Nozrlc B5 20

~ of weld length ~*N/A**

3 X 277200 44.1-WD-017 Group R40 ~+ZATER*~

N9 Safe End -to-No""lc 0619 3 X

DATE: 10/15/99 NINE MZLE POINT NUCLEAR PLANT UNIT 1 PAGE: 175 REVISION: 0 ZNSERVICE INSPECTION TEN-YEAR PLAN CZASS 1 SECTION XZ SCHEDULED COMPONENTS ol Rod Drive NUMBER: 44. 1 INSPECTION INTERVAL PLAN STATUS PRESERVZCE YEAR ASME PIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER ZDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 +~CALIBRATION BLOCK*~

277300 44. 1-WD-017 SZL Group R40, Inconel 182 N9 Safe End -to-Noz lc 455R1S1 Butter Expansion from 3 X nozzle side of weld.

    • LATER**

277400 44.1-WD-018 B-D UT Group R40, 63% CRV N9 Nozzle-to-Vcssol B3.90 Limitation duc to 3 X bioshicld ~+LATER*~

277500 44 . 1 "WD-018-IR NUREG UT Group R40, ~iIATERii N9 Nozzle-to-Vessel 0619 RUT X

277600 44. 1-WD-018-ZR B-D Group R40, 48% CRV, N9 Nozzle Inner Radius B3.100 I imitation due to 3 X Section bioshicld ~iLATERi+

3.0" Control Rod Drive Line (REF. DWG. NO. 19) 277800 44.3-12-VB B-G-2 VT 1 10 Studs 20 Nuts, Valvo 44-3-12 Bolting B7.70 Examine in place, when removed or when disassembled **N/A**

277900 44.3-13-VB B-G-2 VT-1 Examine in place, when Valve 44-3-13 Bolting B7. 70 removed or when 3 X disasscmblcd. ~*N/A~~

278000 44.3-189-VB B G-2 VT-1 Examine 10 studs and 20 Valve 44-189 Bolting B7.70 nuts, in place, when 3 X removed or when disassembled ~~N/A++

278100 44. 3-WD-093 B-J Terminal End ~~N/Ai~

Pipe-to-Valve 44-3-12 B9 21

~

3 X

DATE: 10/15/99 NINE MZLE POINT NUCLEAR PLANT UNIT 1 PAGE: 176 REVISION: 0 INSERVICE INSPECTION TEN YEAR PIAN CIASS 1 SECTION XI SCHEDULED COMPONENTS ol Rod Drive NUMBER: 44. 3 PRESERVICE YEAR INSPECTION ZNTERVAL PLAN STATUS ASME FIRST SECOND THIRD SEC. XI PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE ZNSTRUCTIONS NUMBER ZDENTIFICATZON ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ~~CALIBRATION BLOCK~*

278200 44.3-WD"094 B-K PT Code Case N-509 ~~N/A'~

Valve 44.3-12 Integral B10 40~

3 X AttachrN:nt 278500 44.3-WD-111 B J Examfne 100% of weld Valve 44.3-13 -to-Pipe B9.21 length ~~N/A~+

X

NINE MILE POINT NMP1-ISI-003-10 Y NIAGARA NUCLEAR POWER STATION N U MOHAWK THIRD INSERVICE INSPECTION INTERVAL Rev. 0 TEN-YEAR INSERVICE INSPECTION Date: October 15, 1999 PLAN AND SCHEDULE 5.0 CLASS 2 INSERVICE INSPECTION PLAN TABLES This section contains the Long Term Ten-Year Inservice Inspection Examination Tables for nondestructive examinations of selected systems and components for the Second Inservice Inspection Interval.

02.0 Main Steam System 177 thru 179 03.0 Main Steam System .. 180thru181 39.0 Emergency Condenser System .. 182 thru 196 44.2 Control Rod Drive System .. 197 thru198 80.0 Reactor Containment Spray System .. 199 thru 210 81.0 Reactor Core Spray System ~ 211 thru 222 93.0 Reactor Containment Spray System 223 thru 225 File: NMP1ISIPL.wpd

f, DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 177 REVISION: 0 ZNSERVICE INSPECTION TEN-YEAR PLAN CLASS 2 SECTION XZ SCHEDULED COMPONENTS Steam System NUMBER: 02. 0 INSPECTION INTERVAL PLAN STATUS PRESERVZCE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

NUMBER EXAMZNATZON AREA CATE GY NDE OUTAGE INSTRUCTIONS ZDENTZFZCATZON ZTEM NO METH 1 2 3 3 4 1 2 4 1 2 3 4 4*CALIBRATION BLOCK~*

18. 0" MSA (REF. DWG. NO. 3) 284000 02-MS-H10 F-A VT-3 Code Case N-491-1 Spring Hanger Fl. 20 ++N/A~*

3 X 284100 02-MS-Hll VT 3 Code Case N-491-1 Spring Hanger Fl . 20 41N/AI4 3 X

24. 0" MSB (REF. DWG. NO. 3) 286400 02-SR-1A F-A VT-3 Code Case N-491-1 Seismic Restraint Fl . 20 ~~N/A~*

3 X 286500 02 "SR-1A-WD-001. 1 C C 1-1/4"x 14xl'-4" Lug ,

Integral Attachment C3. 20 Code Case N-509 **N/A**

3 X 286600 02-SR-1A-WD-001. 11 C-C Code Case N-509 **N/A**

Integral Attachment C3.20 3 X 286700 02-SR-1A-WD-001 . 13 C-C Code Case N-509 +AN/Aee Integral Attachment C3.20 3 X 286800 02-SR-1A-WD-001.15 C-C MT Code case N-509 ~~N/A~~

Integral Attachment C3. 20 3 X 286900 02-SR-1A-WD-001.3 C C MT Code Case N-509 +~N/A~~

Integral Attachment C3. 20 3 X 287000 02-SR-1A-WD-001.5 C-C MT Code Case N-509 ~+N/A++

Integral Attachment C3. 20 3 X

DATE: 10/15/99 NINE HZLE POZNT NUCLEAR PLANT UNIT 1 PAGE: 178 REVISION: 0 INSERVZCE INSPECTION TEN-YEAR PLAN CLASS 2 SECTION XI SCHEDULED COMPONENTS Steam System NUHBER: 02. 0 INSPECTION INTERVAL PLAN STATUS PRESERVZCE YEAR ASHE FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUHBER IDENTIFICATION ZTEH NO METH 3 4 4CALZBRATION BLOCK~ ~

1 2 4 1 2 3 4 1 2 3 4 287100 02-SR-1A-WD-001. 7 C-C HT Code Case N-509 ++N/Ai+

Integral Attachment C3.20 3 X 287200 02-SR-1A-WD-001. 9 C C MT Code Case N-509 **N/A**

Zntegral Attachment C3.20 3 X

24. 0" HSA (REF. DWG. NO. 3) 290800 02"WD-041 C-F-2 PT **N/A%*

Branch Connection C5. 81 3 X (24 "x18" Header)

24. 0" HSB (REF. DWG. NO. 3) 02-WD-073 C-F-2 UT **NMP1-24-080-CS*~

Tcc-to-Pipe C5.51 HT 3 X 293400 02"WD-078 C-F-2 UT ~'~NMP1-24-080-CS~*

Pipe-to-Elbow C5.51 3 X

18. 0" MSA (REF. DWG. NO. 3) 294000 02-WD-182 C" F-2 UT ~~NMPI-18-. 937-CS-106*~

Rct-to-Pipe C5. 51 3 X 294100 02-WD-190 C-F-2 UT ++NHP1-18-.937-CS-106**

Pipe-to-180 dcg Ret C5.51 HT 3

294500 02-WD-329 CF2UT Terminal End Pipe-to-Turbine Stop C5 ~ 51 PT ~+NHP1-18-.937-CS-106**

3 X Valve

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 179 REVISION: 0 INSERVICE INSPECTION TEN-YEAR PLAN CLASS 2 SECTION XZ SCHEDULED COMPONENTS Steam System NUMBER: 02'.0 INSPECTION INTERVAL PLAN STATUS PRE SERVICE YEAR ASME FIRST SECOND THIRD SEC. XI PERIOD PERIOD PERIOD

SUMMARY

NUMBER EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 **CALIBRATIONBLOCK*'~

294600 02-WD-330 C-F-2 Terminal End Pipe-to-Turbine Stop C5. 51 ~ ~NMP1-18". 937-CS-106**

3 X Valve

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 180 REVISION: 0 INSERVZCE INSPECTION TEN-YEAR PLAN CLASS 2 SECTION XZ SCHEDULED COMPONENTS Stcam NUMBER: 03. 0 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER ZDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ++CALIBRATION BLOCK~*

16. 0" MSS (REF. DWG. NO. 4) 294900 03-H1 VT 3 Code Case N-491-1 Pipe Anchor Fl . 20 *+N/A+'

3 X 295000 03-Hl-WD-001. 1 C-C Code Case N-509 *~N/A+*

Integrally Welded C3.20 3 X Attachment 295100 03-Hl WD-001.2 C C Code Caso N-509 ~~N/A~~

Integrally Welded C3. 20 3 X Attachment 295200 03-H1-WD-001.3 C C Code Case N-509 ~~N/A~~

Integrally Welded C3.20 3 X Attachment 295300 03-Hl-WD-001. 4 C-C Coda Case N-509 ++N/A++

Integrally Welded C3.20 3 X Attachment 295700 03-H3 F-A Coda Case N-491-1 Rod Hanger F1.20 ftN/Att 3 X 297800 03-WD-001 CF2UT Examine 100% of weld Tec-to-Pipe C5.51 MT length ~ *PZR-I . 24-1 ~ ~

3 X 299400 03-WD-020 C-F-2 UT Examine 100% of weld Pipe-to-Elbow C5.51 MT length * ~ PZR-1 . 24-1**

3 X

DATE: 10/15/99 NINE HZLE POINT NUCLEAR PIANT UNIT 1 PAGE: 181 REVISION: 0 ZNSERVICE INSPECTION TEN YEAR PLAN CLASS 2 SECTION XZ SCHEDULED COMPONENTS Steam NUMBER: 03. 0 INSPECTION INTERVAL PIAN STATUS PRESERVZCE YEAR ASHE FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

NUMBER EXAHINATION AREA IDENTIFICATION CATEGY ZTEH NO NDE METH


OUTAGE------ ZNSTRUCTIONS 1 2 3 4 1 2 3 4 1 2 3 4 ++CALIBRATION BLOCK*~

299700 03-ND-023 C-F-2 MT Terminal End, Examine Tee-to-Valve Hanifold C5 ~ 51 UT 100% of weld length 3 X **NMP ISW 1020 CSiPIR-1.

24-1**

300800 Valve Manifold 03-1 F-A VT-3 Tuxbine By-Pass Valve Hanifold 03-1 F1.40 Hanifold, Code Case X N-491-1 ~~N/A~i

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 182 REVISION: 0 ZNSERVZCE INSPECTION TEN"YEAR PLAN CLASS 2 SECTION XZ SCHEDULED COMPONENTS ency Condenser Heat Exchanger 122 NUMBER: 39.0 INSPECTION INTERVAL PLAN STATUS PRESERVZCE YEAR ASME FIRST SECOND THIRD SEC. XI PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 + +CALIBRATION BLOCK*~

EC Heat Exchanger 60-42 (REF. DWG. NO. 11) 303300 60-42-WD-001 N/A UT This weld was replaced Hx 60-42 N/A PT by 60-42-WD-001 Nozzle-to-Inlet Head **LATER**

303400 60-42-WD-001C1 C-B **IATER**

Hx 60-42 C2.21 3 X Nozzle-to-Inlet Head 303600 60"42"WD-002C1 C-A ~~LATER~~

Hx 60-42 Inlet C1.30 3 X Head-to Tube Shcct 800 60-42-WD-005C1 C-A Hx 60-42 Tube C1. 30 X

Sheet-to-Outlet Head 303900 60-42-WD-006C1 C-B UT ~~LATER~~

Hx 60-42 Outlet C2.21 PT 3 X Head-Nozzle

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 183 REVISION: 0 ZNSERVICE INSPECTION TEN YEAR PLAN CLASS 2 SECTION XZ SCHEDULED COMPONENTS cncy Condenser Return NUMBER: 39.0 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR ASME FIRST SECOND THIRD SEC. XI PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE -OUTAGE INSTRUCTZONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ++CALIBRATION BLOCK++

10.0" ECC Line (REF. DWG. NO. 11A) 305500 39"H2 F A VT-3 Code Case N-491-1 Spring Support Fl . 20 i 0 N/Al0 3 X 305600 39-H2-WD"001C1 C-C Code Case N-509 **N/A~~

Integral Attachment C3.20 3 X 305700 39-H2-WD-003C1 C C Code Case N-509 ~*N/A*~

Integral Attachment C3.20 3 X 305800 39-H2"WD-005C1 C-C Code Case N-509 +*N/A++

Integral Attachment C3.20 3 X 0 39-H2-WD-007C1 C C Code Case N-509.~*N/A~i Integral Attachment C3.20 3 X 306000 39-H27 F A VT-3 Code Case N-491-1 Spring Hanger F1. 20 ++N/A+*

3 X 307300 39-H4 Code Case N-491-1 Spring Hanger F1.20 ~~N/A~~

3 X 307400 39-H4-WD-001C1 C-C Code Case N-509 +~N/Ai~

Integral Attachment C3.20 3 X 307500 39-H4-WD-004C1 C"C Code Case N-509 ++N/A++

Integral Attachment C3.20 3 X 307600 39-H4-WD-007C1 C C PT Code Case N-509 **N/A**

Integral Attachment C3. 20 3 X

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 184 REVISION: 0 INSERVICE INSPECTION TEN-YEAR PIAN CLASS 2 SECTION XZ SCHEDULED COMPONENTS ancy Condenser Return NUMBER: 39. 0 INSPECTION INTERVAL PLAN STATUS FRESERVICE YEAR ASME FIRST SECOND THZRD SEC. XI PERIOD PERIOD PERIOD

SUMMARY

NVMBER EXAMINATION AREA IDENTIFICATION CATEOY ITEM NO NDE METH


OUTAOE------ INSTRUCTIONS 1 2 3 4 1 2 3 4 1 2 3 4 ~+CALIBRATION BLOCK~*

307700 39-H4-WD-010C1 C-C Code Case N-509 ~*N/A~*

Integral Attachment C3.20 3 X 313500 39-WD-178-D C-F-1 Code Casa N-524 Pipe-Long Seam C5. 12 **ZATER*~

3 X 313600 39-WD-178C1 C-F-1 UT Examine 100% of weld Hx 60-46 Outlet C5. 11 pT length ~~ZATER~+

3 X Nozzle-to-Pipe 313800 39"WD-179-D C-F 1 VT Code Casa N-524 Elbow-Long Scam (60 C5.12 pT +~ZATER*~

3 X dcg. LR) 0 39-WD-179-U CF1 Code Casa N-524 Pipe-Long Seam C5. 12 ~*LATER~+

3 X 314000 39-WD-179C1 C-F 1 +~LATER*~

Pipe-to-Elbow C5. 11 3 X 314500 39-WD-181 C-F-1 VT Examine 100% of weld Pipe-to-Tcc C5. 11 PT length ~~ZATER~~

3 X 314600 39-WD-181-D C-F-1 Coda Case N-524 Pipe>>Long Seam C5. 12 **IATER**

3 X 314700 39-WD-181-U C-F-1 VT Code Case N-524 Teo-Long Seam C5.12 pT *+LATER+'~

3 X 315200 39-WD-183-D C-F-1 UT Code Case N-524 Pipe-Long Seam C5. 12 pT *~LATER~~

3 X

0 DATE: 10/15/99 NINE MIIE POINT NUCLEAR PLANT UNIT 1 PAGE: 185 REVISION: 0 ZNSERVICE INSPECTION TEN-YEAR PLAN CLASS 2 SECTION XZ SCHEDULED COMPONENTS gency Condenser Return E NUMBER: 39.0 INSPECTION INTERVAL PRESERVZCE YEAR PLAN STATUS ASME FIRST SECOND THIRD SEC. XI PERIOD PERIOD PERZOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFZCATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ++CALIBRATION BLOCK*+

315300 39-WD-183-U C-F-1 Code Case N-524 Elbow-Long Seam (60 C5.12 *~LATER~*

X deg LR) 315400 39-WD-183C1 C-F" 1 UT Examine 100% of weld Elbow-to-Pipe CS. 11 PT length +~LATER+~

3 - - - - X 315700 39-WD-184-D C-F-1 Code Case N-524 1 t LATER' Elbow-Long Seam (60deg CS. 12 3 X LR) 315800 39-WD-184-U C-F-1 UT Code Case N-524 Pipe-Long Seam CS. 12 PT **IATER~~

3 X 900 39-WD-184C1 C-F-1 Examine 100% of weld Pipe-to-Elbow CS. 11 length ~~ZOSTER~*

3 X 316100 39-WD 185 D C F 1 Code Caso N-524 Pipe-Long Weld C5.12 **LATER**

3 X 316200 39-WD-185C1 C-F-1 UT Examine 100% of weld Hx 60-45 Nozrlc C5. 11 PT length **LATER**

3 X Outlet-to-Pipe 319300 39-WD-211C1 GL-A UT Examined 100% of weld Pipe-to-Elbow (60dcg 88-01 length ~~LATER**

X LR) 319900 39-WD-213 C-F-1 UT Examine 100% of weld Pipe-to- Tec CS. 11 PT length *~LATER~*

3 X

DATE: 10/15/99 NINE MZLE POINT NUCLEAR PIANT UNZT 1 PAGE: 186 REVZSZON: 0 ZNSERVICE INSPECTION TEN YEAR PLAN CIASS 2 SECTION XZ SCHEDULED COMPONENTS cncy Condcnscr Return INSPECTION INTERVAL PIAN STATUS PRESERVZCE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ++CALIBRATION BLOCK~+

320000 39-WD-213-D C F1 Coda Casa N-524 Tcc-Long Seam C5.12 ~+IATER++

3 X 320100 39-WD-213-U CF1 Code Casa N-524 Pipe-Long Scam C5. 12 111ATERA*

3 X 321400 39-WD-217-D C-F-1 UT Codo Casa N-524 Pipe-Long Scam C5. 12 PT ~~LATER**

3 X 321500 39-WD-217C1 C-F-1 Examine 100% of weld Hx 60-42 No@tie C5.11 length ~+IATERi~

3 X Outlet-to-Pipe 0 39-WD-224-D C-F-1 UT Code Case N-524 Pipe-Long Seam C5. 12 PT **LATER**

3 X 323600 39-WD-224-U C-F 1 Code Case N-524 Pipe-Long Seam C5. 12 *~LATER~~

3 X

DATE: 10/15/99 NINE MILE POINT NUCLEAR PIANT UNIT 1 PAGE: 187 REVISION: 0 INSERVZCE INSPECTION TEN YEAR PLAN CLASS 2 SECTION XZ SCHEDULED COMPONENTS cncy Condenser Supply NUMBER: 39.0 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD SVMMARY EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTZFICATZON ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 *~CALIBRATION BLOCK~ ~

12.0" ECC Linc (REF. DWG. NO. 11) 323900 39-WD-012 CF1UT Examine 100% of weld Reducer-to-Pipe CS. 11 PT length **IATER**

3 X 324400 39-WD-014 GL-D VT **IATER~*

Pipe-to-Pipe 88-01 3 X - - - - X 324700 39"WD-016 GL-D VT <<~IATER**

Pipe-to-Pipe 88 01 3 X X 325100 39-WD-017 GL-D UT UT exam every 2 RFO's.

Pipe-to-Pipe 88-01 i~ZATER~~

X X 0 39 WD-020 GL D UT UT exam cvcry 2 RFOis.

Pipe-to-Pipe 88-01 +~IATER*~

3 X X 325900 39-WD-021 C-F 1 VT Examine 100% of weld Pipe-to-Tee C5.11 PT length ~~LATER*~

3 X 326000 39-WD-021 GL-D UT UT exam avery 2 RFO's Pipe-to-Tee 88-01 ~*NMP-12-XXI-SS**

3 X X 326100 39-WD-021-D C-F-1 UT Code Case N-524 Tcc-Long Scam C5.12 ++IATER~~

3 X 326200 39-WD-021-U C-F-1 VT Code Case N-524 Pipe-Long Seam C5.12 PT **IATER**

3 X 326300 39-WD-022 C-F-1 Examine 100% of wold Tcc-to-Pipe CS. 11 PT length **IATER**

3 X

0 DATE: 10/15/99 NINE MIZE POINT NUCLEAR PLANT UNIT 1 PAGE: 188 REVZSZON: 0 INSERVICE INSPECTION TEN-YEAR PLAN CLASS 2 SECTION XZ SCHEDULED COMPONENTS gcncy Condenser Supply NUMBER: 39.0 INSPECTION INTERVAL PLAN STATUS PRESERVZCE YEAR ASME FIRST SECOND THIRD SEC. XI PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE ZNSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 **CALIBRATIONBLOCK**

326400 39-WD-022 GL-D UT exam every 2 RFO's Tcc-to-Pipe 88-01 ++LATER++

X X 326500 39-WD-022-D C-F-1 UT Code Case N-524 Pipe-Long Seam C5.12 PT **LATER*l 3 X 326600 39-WD-022-U C-F-1 Code Case N-524 Tcc-Long Seam C5.12 **IATER++

3 X 326700 39-WD-024 C-F-1 Examine 100% of weld Tcc-to-Pipe C5. 11 length ~~LATER~~

3 X 326800 39-WD-024 GL-D UT UT exam every 2 RFO's Tcc-to-Pipe 88-01 **LATER**

3 X X 326900 39-WD-024-U C-F-1 Code Case N-524 Tcc-Long Seam C5. 12 **ZATER**

3 X 327000 39"WD-025 GL-D UT UT exam every 2 RFO~s Elbow-to-Pipe 88-01 ~~LATER~~

3 X - - - X 327100 39-WD-025 C-F-1 Examine 100% of weld Elbow-to-Pipe C5. 11 length ~+ZATER~~

3 X 327200 39-WD-025-D C-F-1 Code Case N-524 Pipe-Long Seam C5.12 **LATER**

3 X 327400 39-WD-026 GL-D UT UT exam every 2 RFO's Pipe-to-Pipe 88-01 + + LATER~ +

3 X X

NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 189 DATE: 10/15/99 REVISION: 0 ZNSERVICE INSPECTION TEN-YEAR PLAN CLASS 2 SECTION XI SCHEDULED COMPONENTS cncy Condenser Supply E NUMBER: 39.0 PRESERVZCE YEAR INSPECTION ZNTERVAL PZAN STATUS ASME FIRST SECOND THZRD PERIOD PERIOD PERIOD SEC. XZ

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE ZNSTRUCTZONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ~*CALIBRATION BLOCK**

327800 39-WD-027 GL D UT UT exam cvcry 2 RFO's 88-01 +~LATER~~

Pipe-to-Pipe 3 X X 328300 39-WD"029-D C-F-1 UT Code Case N-524 Elbow-Long Seam C5. 12 PT ~*LATER**

3 X 328400 39-WD-029-U C-F-1 Code Case N-524 C5. 12 ++LATER*+

Pipe-Long Seam 3 X 328500 39-WD-029C1 C F1 Examine 100% of weld Pipe-to-Elbow C5.11 length ~~LATER~*

3 X 800 39-WD-030 GL-D UT UT exam every 2 RFO's Elbow-to-Pipe 88-01 **LATER*~

3 X X 329200 39-WD-033 N/A UT every 2 RFO's, This Pipe-to 60-46 EC Hx N/A weld no longer exists, 3 X X Thcrcforc ZGSCC Category Nozzle Znlct D no longer applicable.

  • +LATER**

329700 39-WD-034 GL-D UT Examine cvcry 2 RFO's

~ ~ZATER~ ~

Pipe-to-Pipe 88 01 3 X X 330000 39-WD-035 GI-D UT UT exam every 2 RFO's Pipe-to-Pipe 88-01 +~LATER+*

3 X X 330500 39"WD-037 N/A UT exam cvcry 2 RFO's, Pipe-to-Elbow N/A This weld no longer 3 X - - - - X exists *~LATER**

DATE: 10/15/99 NZNE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 190 REVISION: 0 INSERVICE INSPECTION TEN YEAR PLAN CLASS 2 SECTION XI SCHEDULED COMPONENTS cncy Condenser Supply NUMBER: 39.0 INSPECTION INTERVAL PLAN STATUS PRESERVZCE YEAR ASME FIRST SECOND THIRD SEC. XI PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 **CALIBRATIONBLOCK>>>>

330600 39-WD-037-D C-F-1 Code Case N-524 Elbow-Long Seam CS. 12 >>>>LATER>>>>

3 X 330700 39-WD-037-U C-F 1 UT Coda Case N-524 Pipe-Long Scam C5. 12 PT >>*LATER>>>>

3 X 330800 39-WD-037C1 CF1UT Examine 100% of weld Pipe-to-Elbow C5. 11 length >>*IATER*>>

3 X 330900 39-WD-037C1 GL-A UT **LATER>>>>

Pipe-to-Elbow 88-01 3 X 3 000 39-WD-038 C-F-1 UT Examine 100% of weld Elbow- to-Pipe C5. 11 PT length >>>>LATER>>>>

3 X 331100 39-WD-038 GL-D UT UT exam every 2 RFO's Elbow-to-Pipe 88-01 >>*LATER**

3 X - - - - X 331300 39-WD-038-U C" F-1 UT Code Case N-524 Elbow-Long Scam C5. 12 PT >>>>LATER>>>>

3 X 331400 39-WD-041 N/A UT exam cvcry 2 RFO's, Pipe-to-Hx 60-45 N/A This weld was cut out, 3

Nozzle Inlet X X ZGSCC Cat. D no longer applies **LATER>>>>

331500 39-WD-041 N/A This weld was cut out, Pipe-to-Hx 60 45 N/A Replaced by 39-WD-041C1 3

Nozzle Inlet X *>>LATER>>>>

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 191 REVISION: 0 ZNSERVICE INSPECTION TEN-YEAR PIAN CLASS 2 SECTION XZ SCHEDULED COMPONENTS ency Condenser Supply E NUMBER: 39.0 INSPECTION INTERVAL PRESERVZCE YEAR PLAN STATUS ASME FIRST SECOND THIRD PERIOD PERIOD PERIOD XI

SUMMARY

EXAMINATION AREA SEC.

CATEGY ITEM NO NDE METH


OUTAGE------ INSTRUCTIONS

>><<CALIBRATION BLOCK>>>>

NUMBER IDENTIFICATION 1 2 3 4 1 2 3 4 1 2 3 4 331700 39-WD-041C1 C F-1 Examine 100% of weld Pipe-to-Hx 60-45 CS. 11 length >>*LATER**

3 X Nozzle Inlet 331800 39-WD-041C1 GL-A UT **LATER>><<

Pipe-to-Hx 60-45 88-01 3 X Nozzle Inlet 331900 39-WD-100 C-F-1 Examine 100% of weld Reducer to-Pipe C5. 11 length >>>>ZATER>>>>

3 X 332000 39-WD-100 GL A UT **LATER>>>>

Reducer-to-Pipe 88-01 3 X 00 39-WD-102 GL-D UT VT exam every 2 RFO's Pipe-to-Pipe 88-01 >>*LATER**

3 X X 332800 39-WD" 104 GL D VT VT cvcry 2 RFO's Pipe-to-Pipe 88-01 >>>>LATER>><<

3 X X 333200 39-WD-105 GL-D UT UT exam every 2 RFO's Pipe-to-Pipe 88-01 **LATER**

3 X X 333600 39 "WD-108 GL-D UT UT exam cvcry 2 RFO's Pipe-to-Pipe 88-01 **LATER>>>>

3 X X 334000 39-WD-109 GL-D UT VT exam every 2 RFO's Pipe-to-Tec 88-01 >>>>LATER>><<

3 X X 334300 39"WD-110 C-F-1 Examine 100% of weld Tce-to-Pipe C5. 11 length >>>>LATER>>>>

3 X

DATE: 10/15/99 NINE MILE POZNT NUCLEAR PLANT UNIT 1 PAGE: 192 REVISION: 0 ZNSERVZCE INSPECTION TEN-YEAR PLAN CZASS 2 SECTION XI SCHEDULED COMPONENTS cncy Condenser Supply E NUMBER: 39.0 PRESERVICE YEAR ZNSPECTION INTERVAL PZAN STATUS ASME FIRST SECOND THIRD SEC. XI PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE ZNSTRUCI'ZONS NUMBER IDENTIFZCATZON ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ~*CALIBRATION BLOCK~~

334400 39-WD-110 GL-D UT UT exam every 2 RFO's Tcc-to-Pipe 88"01 ~+LATER~+

3 X X 334500 39-WD-110-D C-F-1 Coda Case N-524 Pipe-Long Seam C5. 12 ~~ZATER~~

3 X 334600 39-WD-110-U C-F-1 Code Case N-524 Tco-Long Scam C5.12 4*IATERt*

3 X 334800 39"WD"112 GL D UT UT exam cvcry 2 RFO's Tec-to-Elbow 88-01 *OIATER**

3 X X 100 39-WD-113 C-F-1 Examine 100% of weld Elbow-to-Pipe C5. 11 length ~~LATER**

X 335200 39-WD-113 GL-D UT UT exam every 2 RFO's Elbow-to-Pipe 88-01 ~ ~ZATER~ ~

3 X X 335300 39-WD-113-D C F-1 Code Case N-524 Pipe-Long Scam C5. 12 **ZATER*~

3 X 335400 39-WD-113-U C F-1 Code Case N-524 Elbow-Long Scam C5. 12 ~~LATER~~

3 X 335600 39-WD-114 GL-D UT UT exam every 2 RFO's Pipe-to-Pipe 88-01 **ZATER*+

3 X X 336000 39-WD-115 GL-D UT UT exam cvcry 2 RFO's Pipe-to-Elbow 88-01 **LATER+*

3 X X

DATE: 10/15/99 NINE MILE POINT NUCLEAR PZANT UNIT 1 PAGE: 193 REVISION: 0 ZNSERVICE ZNSPECTION TEN YEAR PLAN CIASS 2 SECTION XI SCHEDULED COMPONENTS ency Condcnscr Supply NUMBER: 39.0 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR FIRST SECOND THIRD SEC. XZ, PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 +~CALIBRATION BLOCK+~

336300 39-WD-117 N/A This weld was cut out, Pipe"to-Elbow N/A Replaced by 39-WD-117C1 3 X **ZATER**

336400 39-WD-117 N/A VT exam every 2 RFO's.

Pipe-to-Elbow N/A This weld no longer 3 X X exists, ZGSCC Cat. D no longer applies **LATER~*

336500 39-WD-117-D C-F-1 UT Code Case N-524 Elbow-Long Scam C5. 12 PT ~~LATER*i 3 X 336600 39-WD-117-U CF1 Code Case N-524 Pipe-Long Seam C5. 12 ~+IATER++

3 X 336700 39-WD-117C1 C F-1 ++LATER+*

Pipe- to-Elbow C5. 11 3 X 336800 39-WD-117C1 GL-A VT ~*LATER**

Pipo-to-Elbow 88-01 3 X 337000 39-WD-118 GL"D VT VT every 2 RFO's Elbow-to-Pipe 88-01 4 PLATER**

3 X - - - - X 337500 39-WD-121-U C-F"1 UT Coda Case N-524 Pipe-Long Seam C5. 12 *+IATER**

3 337600 39-WD-121C1 C F-1 VT Examine 100% of weld Pipe-to Hx 60-42 C5. 11 PT length i+LATER~i 3

Nozzle Inlet X

NINE MILE POINT NUCLEAR PIANT UNIT 1 PAGE: 194 DATE: 10/15/99 REVISION: 0 INSERVICE INSPECTION TEN YEAR PLAN CLASS 2 SECTION XI SCHEDULED COMPONENTS cncy Condensor Supply NUMBER: 39. 0 PRESERVICE YEAR INSPECTION INTERVAL PIAN STATUS ASME FIRST SECOND THIRD PERIOD PERIOD PERIOD SEC. XI

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTZONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 *~CALIBRATION BLOCK~~

GL-A ~+LATER*~

337700 39-WD-121C1 Pipo-to-Hx 60-42 88-01 3 X Nozzle Inlet 337800 39-WD-122 C-F-1 UT Examine 100% of weld Pipe- to-Elbow C5. 11 PT length +'~LATER+*

3 - - - - - - - - X 39-WD-122 GL-D UT UT exam every 2 RFO's 337900 88-01 ~ ~ LATER**

Pipe- to-Elbow 3 X X 338300 39-WD" 123 GL-D UT UT exam every 2 RFO's Pipe-to-Pipe 88-01 **LATER~+

3 X - - - - X 0 39-WD-124 GL-D UT UT exams every 2 RFO's 88-01 ~ ~IATER*+

Pipe-to-Elbow 3 X X 339000 39-WD-125 C-F-1 Examine 100% of weld Elbow-to-Pipe C5.11 length ~+LATER~+

3 X 339100 39-WD-125 GL-D UT UT every 2 RFO's Elbow-to" Pipe 88 01 PT ~~NMP-12-XX1-SS**

3 - - - - X X 339200 39-WD 125-D C-F-1 Coda Case N-524 Pipe-Long Seam C5.12 ~~LATER~~

3 X 339300 39-WD-125"U CF1 Codo Case N-524 Elbow-hong Scam CS. 12 ~~LATER*+

3 X 339600 39-WD-127-D C-F-1 Code Case N-524 Elbow-Long Scam C5. 12 ~~IATER~~

3 X

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 1 95 REVISION: 0 ZNSERVICE INSPECTION TEN YEAR PLAN CIASS 2 SECTION XZ SCHEDULED COMPONENTS gcncy Condenser Supply NUMBER: 39.0 INSPECTION INTERVAL PZAN STATUS PRESERVICE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

NUMBFR EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 **CALIBRATIONBLOCK~*

339700 39-WD" 127-U C-F"1 Coda Case N-524 Elbow-Long Seam C5.12 *~LATER*~

X 339800 39-WD-127C1 C-F 1 Examine 100% of weld Pipe-to-Elbow CS. 11 length ~~ZATER~~

3 X 340100 39-WD-128 GL-D UT UT cvcry 2 RFO's Elbow-to-Pipe 88 "01 +*IATER++

3 X X 340500 39-WD-129 GL-D UT UT exam every 2 RFO's Pipe-to-Pipe 88-01 **LATER*4 3 X X

12. 0" ECC Linc (REF. DWG. NO. 11A) 0 39-H21 F-A VT-3 Codo Case N-491-1 Spring Hanger Pl. 20 *AN/A4*

3 X 341800 39 "H22 F-A VT-3 Coda Case N-491-1, 4 Spring Hanger F1. 20 Lugs ~~N/A~*

3 X 341900 39-H22-WD-001 C-C Code Case N-509 +~N/A**

Integral Attachment C3.20 3 X 342000 39-H22-WD-004 C-C Coda Casa N-509 **N/A**

Integral Attachment C3.20 3 X 342100 39-H22-WD-007 C C Code Case N-509 ++N/A**

Integral Attachment C3. 20 3 X 342200 39-H22-WD-010 C-C Code Case N-509 **N/A~~

Integral Attachment C3.20 3 X

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 196 REVISION: 0 INSERVICE INSPECTION TEN-YEAR PLAN CLASS 2 SECTION XI SCHEDULED COMPONENTS ency Condenser Supply NUMBER: 39.0 INSPECTZON INTERVAL PLAN STATUS PRESERVZCE YEAR FIRST SECOND THIRD SEC. XI PERIOD PERZOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE ZNSTRUCTIONS NUMBER IDENTZFZCATZON ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 e eCALIBRATION BLOCK*a 342300 39-H25 F A VT 3 Code Case N 491 1 Spring Hanger F1.20 l 4N/A1

  • 3 X

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 197 REVISION: 0 INSERVICE INSPECTION TEN-YEAR PLAN CLASS 2 SECTION XI SCHEDULED COMPONENTS ol Rod Drive NUMBER: 44 . 2 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR ASME FIRST SECOND THIRD SEC. XI PERIOD PERIOD PERIOD

SUMMARY

NUMBER EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ++CALIBRATION BLOCK~*

10.0" CRD Line (REF. DWG. NO. 17) 346400 44.2-H2 F-A VT-3 Code Case N-491-1 Sway Brace Fl. 20 *ON/A**

3 X 347000 44.2-H9 Code case N-491-1 Spring Hanger Fl ~ 20 t 1N/A1 t 3 X 350200 44.2-SB-1 Code Case N-491-1 Sway Brace F1.20 **N/A*+

3 X 350700 44.2-SB-6 F-A Code Casa N 491-1 Sway Brace Fl . 20 *+N/A+~

3 X 6.0" CRD Line (REF. DWG. NO. 17) 352500 44.2-WD-045 C-F-2 UT Examine 100% of weld Pipe-to<<Cap C5. 51 PT length **IATER~~

3 X 10.0" CRD Zinc (REF. DWG. NO. 17) 353000 44.2-WD-085 C-F-2 MT Examine 100% of weld Elbow-to-Reducer C5.51 UT length 3

353100 44.2-WD-086 C-F-2 UT Examine 100% of weld Pipe-to-Elbow C5.51 PT length **LATER~~

3 X 353600 44.2-WD-092 C-F-2 MT Examine 100% of weld Pipe-to-Tcc CS. 51 UT length 3

~+NMP-1SW 1020 CS, P1R-. 6 00-1~*

DATE: 10/15/99 NINE HZLE POINT NUCLEAR PIANT UNIT 1 PAGE: 198 REVISION: 0 ZNSERVICE INSPECTION TEN YEAR PLAN CLASS 2 SECTION XI SCHEDULED COMPONENTS ol Rod Drive NUHBER: 44.2 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR ASME FIRST SECOND THIRD SEC. XI PERIOD PERIOD PERIOD SUHHARY NUMBER EXAMINATION AREA IDENTIFICATION CATEGY ITEM NO NDE METH


OUTAGE------ ZNSTRUCTIONS 1 2 3 4 1 2 3 4 1 2 3 4 *+CALIBRATIONBLOCK~+

8.0" CRD Line (REF. DWG. NO. 17) 353900 44.2-WD-096 C-F-2 UT Examine 100% of weld Reducer-to-Elbow C5.51 PT length **LATER**

3 X 8.0" CRD Line (REF. DWG. NO. 17A) 357500 44.2-WD"432 C-F-2 UT Examine 100% of weld Pipe-to-Elbow C5.51 PT length ~~LATER~~

3 X

DATE: 10/15/99 NINE MILE POZNT NUCLEAR PLANT UNZT 1 PAGE: 199 REVISION: 0 INSERVZCE INSPECTION TEN-YEAR PLAN CLASS 2 SECTION XZ SCHEDULED COMPONENTS or Containment Spray NUMBER: 80.0 INSPECTION INTERVAL PLAN STATUS PRESERVZCE YEAR ASME FIRST SECOND THZRD SEC. XZ PERZOD PERZOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 +*CALIBRATION BLOCK+ +

16.0" RCS Line (REF. DWG. NO. 15) 358000 80-09 ZEB VT-3 Examine strainer for CTMT. Spray Suction 96-03 debris every outage.

Strainer 3 X - - - X X *+N/A+*

12.0" RCS Line (REF. DWG. NO. 15) 358600 80-H12 F A VT-3 Code Case N-491-1 Seismic Restraint Fl . 20 *+N/A++

3 X 358700 80-H12-WD-001 C-C MT Code Case N-509 ~*N/A**

Integral Attachment C3. 20 3 X 80-H12-WD-004 C C MT Code Case N-509 ~~N/A~~

Integral Attachment C3.20 3 X 358900 80-H12-WD-007 C-C MT Code Case N-509 **N/A~~

Integral Attachment C3.20 3 X 359000 80-H12-WD-010 C-C Code Case N-509 ~~N/A~~

Integral Attachment C3 ~ 20 3 X 359100 80-H14 F-A 4 Lugs, Code Casa Spring Hanger F1.20 N-491-1 *+N/A+~

3 X 359200 80-H14-WD-001 C-C Code Case N-509 ~~N/A+~

Integral Attachment C3.20 3 X 359300 80-H14-WD"004 C-C Code Case N-509 ~*N/A~*

Zntegral Attachment C3.20 3 X

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 200 REVISION: 0 ZNSERVZCE INSPECTION TEN-YEAR PLAN CLASS 2 SECTION XZ SCHEDULED COMPONENTS tor Containment Spray NUMBER: 80. 0 ZNSPECTZON INTERVAL PLAN STATUS PRESERVICE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ~~CALIBRATION BLOCK**

359400 80-H14-WD-007 C-C MT Code Case N-509 +~N/Aii Integral Attachment C3.20 3 X 359500 80-H14-WD-010 C-C Code Case N-509 ~*N/A+*

Integral Attachment C3.20 3 X 359900 80-H20 F A Code Case N-491-1 Rod Hanger F1.20 f%N/A**

3 X 360500 80-H46 F-A Code Case N-491-1 Rod Hanger Fl. 20 ++N/A+~

3 X 360600 80-H46-WD-001 C-C Code Case N-509 **N/A**

Integral Attachment C3. 20 3 X 362800 80-SC-14 VT-3 Code Case N-491-1 Seismic Restraint F1.20 1*N/A*4 3 X 362900 80-SC-14-WD-001 C-C Code Case N-509 ~~N/A~~

Integrally Welded Lug C3 20

~

3 X 363000 80-SC-14-WD-002 C-C Code Case N-509 ~~N/A~~

Integrally Wcldcd Lug C3.20 3 X 363100 80-SC-14-WD-003 C-C Code Case N-509 ~~N/A*~

Integrally Welded Lug C3.20 3 X 363200 80-SC-14-WD-004 C-C Code Case N-509 ~~N/A**

Integrally Welded Lug C3.20 3 X

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 201 REVISION: 0 INSERVZCE INSPECTION TEN-YEAR PLAN CLASS 2 SECTION XZ SCHEDULED COMPONENTS tor Containment Spray NUMBER: 80. 0 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ++CALIBRATION BLOCK*~

363300 80-SC-14-WD-005 C-C Code Case N-509 ~~N/A~~

Integrally Welded Lug C3. 20 3 X 363400 80-SC-14-WD-006 C-C Code Case N-509 ~iN/A++

Integrally Welded Lug C3.20 3 X 363500 80-SC-14-WD-007 C-C Code Case N-509 *+N/A*+

Integrally Welded Lug C3.20 3 X 363600 80-SC-14-WD-008 C C Code Case N-509 ++N/A+<

Integrally Welded Lug C3. 20 3 X 80 SR 47 Code Case N-491-1 Seismic Pipe Restraint F1.20 0 1M/A1 1 3 X 367100 80-88-1 VT-3 Code Case N-491-1 Sway Strut F1.20 ~~N/A~~

3 X 367200 80-SS-2 VT-3 Code Case N-491-1 Sway Strut F1.20 t*N/A*I 3 X 367800 80-WD-008 C-F"2 Examine 100% of weld Flange-to-Pipe C5.51 length ~*LATER~~

3 X 368300 80-WD-017 C-F 2 UT Examine 100% of weld Pipe-to-Elhow C5. 51 MT length ~~LATER~~

3 X 368400 80-WD-019 C-F-2 Examine 100% of weld Pipe-to-Flange C5.51 length ~~IATER~*

3 X

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 202 REVISION: 0 INSERVZCE INSPECTION TEN-YEAR PLAN CLASS 2 SECTION XZ SCHEDULED COMPONENTS tor Containment Spray NUMBER: 80.0 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ~ ~CALIBRATION BLOCK~ '~

369000 80-WD-026 C-F-2 Examine 100% of weld Pipe- to-Elbow C5. 51 length **LATER**

3 X 370800 80-WD-046 C-F-2 Examine 100% of weld FE-to-Pipe C5. 51 length +~ZATER~~

3 X 372200 80-WD-062 C-F-2 UT Examine 100% of weld Reducer-to-Nozrle C5. 51 MT length ~~LATER~~

3 X 373700 80-WD-082 C-F-2 Examine 100% of weld Pipe-to-Elbow C5.51 length 1tLATERt1 3 X 16.0" RCS Linc (REF. DWG. NO. 15A)

II oo 80-30 CTMT. Spray Suction IEB 96-03 VT-3 Examine strainer outage for debris each Strainer 3 X - - - X X - - X t*N/A*4 12.0" RCS Linc (REF. DWG. NO. 15A) 374900 80-H30 Code Case N-491-1 Spring Support Fl. 20 **N/A*~

3 X 375000 80-H30-WD-001 C-C Code Case N-509 +~N/A~*

Integral Attachment C3.20 3 X 375100 80 H30 WD-004 C-C Code Case N-509 +iN/A+i Integral Attachment C3.20 3 X 375200 80-H30-WD-007 C-C Code Case N-509 +AN/Ate Integral Attachment C3.20 3 X

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 203 REVISION: 0 INSERVZCE INSPECTION TEN-YEAR PLAN CLASS 2 SECTION XZ SCHEDULED COMPONENTS tor Containmcnt Spray NUMBER: 80.0 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ~~CALIBRATION BLOCK'~~

375300 80-H30-WD-010 C-C MT Code Case N-509 +~N/Aii Integral Attachment C3. 20 X

375600 80-H34 Code Case N 491 1 Spring Hanger F1.20 *~N/A+*

3 X 375700 80-H34-WD-001 C-C MT Code Case N-509 *~N/A~*

Integral Attachment C3.20 3 X 375800 80-H34-WD-004 C-C MT Code Case N-509 **N/A*t Integral Attachment C3. 20 3 X 80-H34-WD-007 C-C MT Code Case N-509 *wN/A+~

Integral Attachment C3. 20 3 X 376000 80-H34-WD-010 C-C MT Code Case N-509 ~+N/A~~

Integral Attachment C3. 20 3 X 376100 80-H36 F A Code Case N 491 1 Spring Hanger F1. 20 ktN/A4t 3 X 376200 80-H36-WD-001 C-C Code Case N-509 *~N/A*~

Integral Attachment C3.20 3 X (West Side) 376300 80-H36-WD-002 C-C Code Case N-509 ~~N/A~~

Zntegral Attachment C3.20 3 X (East Side) 376800 80-H59 F-A VT 3 Code Case N-491-1 Spring Hanger Fl . 20 1 *N/A1*

3 X

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 204 REVISION: 0 INSERVICE INSPECTION TEN YEAR PLAN CLASS 2 SECTION XI SCHEDULED COMPONENTS tor Containment Spray NUMBER: 80.0 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTZFZCATZON ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ~~CALIBRATION BLOCK++

376900 80-H59-WD-001 C C MT Code Case N-509 +~N/A~~

Integral Attachment C3. 20 3 X 377000 80-H60 F-A VT 3 Code Case N-491-1 Spring Hanger Fl . 20 ~~N/A~~

3 X 377100 80-H60-WD-001 C C Code Case N-509 **N/A**

Integral Attachment C3.20 3 X 388900 80-WD-144 C-F-2 UT Examine 100% of weld Pipe-to-Rcduccr C5.51 MT length **P1R-.375-2' 3 X 391100 80-WD-169 C-F"2 Terminal End, Examine Valve 80-31 C5.51 100% of weld length 3

-to-Reducer ~ ~NMP-ISW-1020-CS

)

PIR-.375-ae 391300 80-WD-171 C-F-2 MT Terminal End, located No""le-to-Reducer C5.51 UT inside floor grating, 3 X Examine 100% of weld length

"~NMP-ISW-1020-CS,NMP2-2 0 5%*

391400 80-WD-172 C-F-2 UT located inside floor Reducer-to-Pipe C5.51 MT grating Examine 100% of X

weld length

~~PZR-.375-2++

391800 80-WD-176 C-F-2 Examine 100% of weld Pipe-to-Tcc C5.51 length 3 X ~~NMP-ZSW-1020-CS)

P1R .375-~i

DATE: 10/15/99 NINE MILE POINT NUCLEAR PIANT UNIT 1 PAGE: 205 REVISION: 0 ZNSERVZCE INSPECTION TEN-YEAR PLAN CLASS 2 SECTION XI SCHEDULED COHPONENTS tor Containmcnt Spray NUMBER: 80.0 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR ASME FIRST SECOND THIRD SEC. XI PERIOD PERIOD PERIOD

SUMMARY

EXAHZNATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUHBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 +*CALIBRATION BLOCK*'~

392000 80-WD-178 C-F 2 Examine 100% of weld Pipe-to-Elbow C5.51 MT length ~~PZR-.375-2, NHP-ZSW-1020-C~~

393100 80-WD-194 C-F-2 Examine 100% of weld Elbow-to-Pipe C5.51 length ~~PZR-.375-2~~

3 X 16.0" RCS Linc (REF. DWG. NO. 15B) 393300 80-10 ZEB VT-3 Examine strainer each CTHT. Spray Suction 96-03 outage for debris Strainer 3 X - - - X X - - X r*N/A+a 12.0" RCS Linc (REF. DWG. NO. 15B) 00 SO-SC-20 F-A VT-3 2 Lugs , Coda Case Seismic Box Restraint Fl ~ 20 N-491-1 ~+N/A~~

3 X 400200 80-SC-20-WD-001 C C Code Case N-509 ~~N/A+*

Integral Attachment, C3. 20 3 X 400300 80-SC-20-WD-004 C"C Coda Caso N-509 ~~N/A~~

Integral Attachment C3.20 3 X 400400 80-SC-20-WD-007 C-C MT Coda Caso N-509 ~~N/A~i Integral Attachment C3.20 3 X 400500 80 SC-20-WD-011 C C MT Code Case N-509 ~~N/Ai~

Integral Attachment C3. 20 3 X 400600 80-SC"20-WD-015 C-C MT Code Case N-509 *~N/A*+

Integral Attachment C3. 20 3 X

DATE: 10/15/99 NINE MILE POINT NUCLZAR PLANT UNIT 1 PAGE: 206 REVZSZON: 0 ZNSERVZCE ZNSPECTION TEN YEAR PIAN CLASS 2 SECTION XZ SCHEDULED COHPONENTS tor Containment Spray NUMBER: 80. 0 INSPECTZON INTERVAL PLAN STATUS PRESERVICE YEAR AS ME FIRST SECOND THIRD SEC. XZ PERI OD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ~ ~CALIBRATION BLOCK~ ~

405200 80-SR-50 F-A VT-3 Code Case N-491-1 Seismic Pipe Restraint F1.20 a aN/PP t X

406500 80-WD-233 C-F-2 Examine 100% of weld Elbow-to-Pipe C5.51 length ~~PIR-.375-2~*

3 X 407500 80-WD-245 C-F-2 UT Examine 100% of weld Elbow-to-Pipe C5. 51 HT length ~~PIR-.375-2~~

3 X 408100 80-WD-251 C-F-2 Examine 100% of weld Pipe-to-Reducer C5.51 length ~~PIR-.375-2~~

3 X 80-WD-281 C-F-2 UT Examine 100% of weld Pipe-to-Tce C5. 51 HT length ~~PIR-.375-2~~

X 411400 80-WD-287 C-F 2 Examine 100% of weld Tcc-to-Pipe C5.51 length ++PIR-.375-2++

3 X 6.0" RCS Linc (REF. DWG. NO. 15B) 411500 80 "WD-290-A C F-2 MT Examine 100% of wold 6.0~ Branch Connection C5.81 length ~~N/A~~

3 X 16.0" RCS Linc (REF. DWG. NO. 15C)

'412700 80-29 IEB Examine strainer Each CTMT. Spray Suction 96-03

- - - - - outage for debris Strainer X X X X eeN/Aea

DATE: 10/15/99 NINE HYLE POINT NUCLEAR PLANT UNIT 1 PAGE: 207 REVISION: 0 INSERVICE INSPECTION TEN-YEAR PLAN CLASS 2 SECTION XZ SCHEDULED COMPONENTS tor Containment Spray NUMBER: 80.0 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR ASHE FIRST SECOND THIRD SEC. XI PERIOD PERIOD PERIOD SUHHARY EXAHZNATZON AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ~~CALIBRATION BLOCKi i 12.0" RCS Line (REF. DWG. NO. 15C) 413200 80-H28 VT-3 4 Lugs, Code Case Spring Support Fl. 20 N-491-1 ++N/A**

3 X 413300 80-H28-WD-001 C-C Code Case N-509 ~~N/A~*

Integral Attachment C3.20 3 X 413400 80-H28-WD-004 C-C Code Case N-509 +~N/Ai+

Integral Attachment C3.20 3 X 413500 80-H28-WD-007 C-C MT Code Case N-509 ~*N/A~i Integral Attachment C3. 20 3 X 00 80-H28-WD-010 C-C MT Code Case N-509 i~N/A~~

Integral Attachment C3.20 3 X 419400 80 SS 3 F-A VT"3 Code Case N-491-1 Sway Strut Fl . 20 t*N/Atf 3 X A

419900 80 WD"338 C-F-2 Examine 100% of wold Pipe-to-Flange C5. 51 length ~~PIR-.375-2**

3 X 422100 8()-WD-363 C-F-2 Examine 100% of weld Pipe-to-Elbow C5.51 length **PZR-.375-2*i 3 X 12.0" RCS Line (REF. DWG. NO. 15D) 427600 80-H88 F A VT 3 Code Caso N-491-1 Spring Support Fl . 20 *+N/A++

3 X

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 208 REVISION: INSERVICE INSPECTION TEN-YEAR PLAN CLASS 2 SECTION XI SCHEDULED COHPONENTS tor Containmcnt Spray NUMBER: 80.0 INSPECTION INTERVAL PLAN STATUS PRESERVZCE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ZTEH NO METH 1 2 3 4 1 2 3 4 1 2 3 4 '~ +CALIBRATION BLOCK*'~

6.0" RCS Line (REF. DWG. NO. 15D) 433400 80-SS-15 F-A Code Case N-491-1 Sway Strut F1.20 +*N/A**

3 X 433600 80-88-6 Code Case N-491-1 Sway Strut F1.20 lkN/Aft 3 X 433700 80-88-7 Code Case N-491-1 Sway Strut F1. 20 eeN/Aea 3 X

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 209 REVZSION: 0 INSERVZCE INSPECTION TEN-YEAR PLAN CLASS 2 SECTZON XZ SCHEDULED COMPONENTS tor Containment Spray Heat Exchanger 122

~ NUMBER: 80.0 INSPECTION ZNTERVAL PLAN STATUS PRESERVZCE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 *4CALIBRATION BLOCK**

RCSHE 80-13 (REF. DWG. NO. 15A) 438500 80-13 F A VT 3 Coda Casa N-491-1 Hx Support F1. 40 *+N/A++

3 X 438600 80-13-WD-001 C-B MT H02 ++N/A++

Hx 80-13 C2. 11 3

Nozzle-to-Vessel 438700 80-13-WD"002 C-C MT H02, Coda Casa N-509 Hx 80-13 Integral C3.10 +*N/A*+

3 X Attachment Inlet 80-13-WD-004 C-B MT H02 s+N/A+a Hx 80-13 C2.11 3 X Vessel-to-Noz le 439000 80-13-WD-005 C-A UT H02 **NMP2-24-.500-CS*i Hx 80-13 C1.30 3 X Tubcshcct-to-Shell Inlet 439100 80-13-WD-006 C-A UT H02 ~~NMP2-24-.500"CS~+

Hx 80-13 C1. 30 3 X Tubcshcct-to-Shell Outlet

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 210 REVISION: 0 INSERVICE INSPECTION TEN-YEAR PLAN CLASS 2 SECTION XI SCHEDULED COMPONENTS tor Containment Spray Pump 121 NUMBER: 80. 0 INSPECTION ZNTERVAL PLAN STATUS PRESERVICE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ~ ~CALIBRATION BLOCK~ ~

RCSP 80-03 (REF. DWG. NO. 15) 442600 80-03 F-A VT-3 Code Case N-491-1 Pump Support F1. 40 1tN/At%

3 X 442900 80-03-WD-003 C-F-2 MT Terminal End ~~N/A~~

Pipe-to-Casing CS. 81 3 X 443100 80-03-WD-005 C-G PT 0 lN/A**

Upper Head-to-Shaft C6.10 3 X Channel 443200 80-03-WD-006 **N/A*t t

Shaf Channel-to-Shaf t C6.10 3 X Guide 443300 80-03-WD-007 C"G P03 ~*N/A~~

Upper Casing-to-Head C6.10 X

443400 80-03-WD-008 C-G P03 +~N/A**

Upper Casing-to-Flange C6.10 3 X 443900 80-03-WD-013 C-G P03 atN/Aas Upper Casing Long Weld C6.10 3 X

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 211 REVISION: 0 ZNSERVZCE INSPECTION TEN-YEAR PLAN CLASS 2 SECTION XZ SCHEDULED COHPONENTS tor Core Spray NUMBER: 81 . 0 INSPECTION INTERVAL'SME PLAN STATUS PRESERVICE YEAR FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD SUMHARY NUMBER EXAMINATION AREA IDENTIFICATION CATEGY ITEH NO NDE METH


OUTAGE------ INSTRUCTIONS 1 2 3 4 1 2 3 4 1 2 3 4 +~CALIBRATION BLOCK**

12.0" CS Line (REF. DWG. NO. 13) 446000 58-SC-1 F A Code Case N-491-1 Pipe Restraint Fl. 20 aaN/Ant 3 X 446100 58-SC-1-WD-001 C C MT Code Case N-509 ~~N/Ai~

Integral Attachment C3.20 3 X 446200 58-SC-1-WD-002 C-C MT Code Case N-509 ~~N/A~~

Integral Attachment C3. 20 3 X 446300 58 SC-1-WD-003 C C MT Code Case N-509 ~~N/A+*

Integral Attachment C3. 20 3 X 00 58-SC-1-WD-004 C-C Code Case N-509 ~~N/A~+

Integral Attachment C3. 20 3 X 16.0" CS Line (REF. DWG. NO. 13) 447000 81-05 IEB VT-3 Examine strainer each Suction Strainer 96-03 outage for debris X X X X i IN/AIi 447100 81-06 ZEB VT-3 Examine strainer each Suction Strainer 96-03

- - - - -

outage for debris X X X X 1 0 'N/AP +

447200 81"24 ZEB VT 3 Examine strainer each Suction Strainer 96-03

- - - outage for debris X X X X ++N/A++

447300 81-25 IEB VT-3 Examine strainer each Suction Strainer 96-03

- - - - - outage for debris 3 X X X X i~N/A~~

DATE: 10/15/99 NINE MZLE POINT NUCLEAR PIANT UNIT 1 PAGE: 212 REVISION: 0 INSERVZCE INSPECTION TEN-YEAR PLAN CIASS 2 SECTION XZ SCHEDULED COMPONENTS tor Core Spray NUMBER: 81. 0 INSPECTION INTERVAL PLAN STATUS PRESERVZCE YEAR ASME FIRST SECOND THIRD SEC. XI PERZOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE ZNSTRUCTZONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 *>>CALIBRATION BLOCK>>>>

12.0" CS Li.nc (REF. DWG. NO. 13) 453900 81-H10 F-A VT-3 Coda Case N-491-1 Spring Hanger Fl . 20 *>>N/A**

3 X 454000 81-H10-WD-001 C-C MT Coda Case N-509 >>>>N/A>>>>

Spring Hanger Integral C3.20 3 X Attachment 454300 81-H12 F-A Code Case N-491-1 Pipe Stanchion F1.20 **N/A**

3 X 454400 81-H12-WD-001 C-C Coda Casa N-509 >>>>N/A>>>>

Pipe Stanchion C3.20 3 X 00 81 H14 Code Case N 491-1 Rod Hanger F1.20 **N/A>>>>

3 X 454800 81-H15 VT 3 Code Caso N-491-1 Rod Hanger Fl. 20 **N/A*>>

3 X 455000 81-H15-WD-001 C-C Coda Case N-509 >>>>N/A>>>>

Rod Hangar Integral C3.20 3 X Attachment 455100 81-H15 "WD-002 C-C Code Case N-509 >>>>N/A>>>>

Rod Hanger Zntcgral C3.20 3 X Attachment 455200 81-H15-WD-003 C-C Code Case N-509 >>>>N/A>>>>

Rod Hanger Integral C3.20 3 X Attachment

DATE: 10/15/99 NZNE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 213 REVISION: 0 ZNSERVICE INSPECTION TEN-YEAR PLAN CLASS 2 SECTION XZ SCHEDULED COMPONENTS tor Cora Spray NUMBER: 81 . 0 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR ASME FIRST SECOND THIRD SEC. XI PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 >>>>CALIBRATION BLOCK>>>>

455300 81-H15-WD-004 C-C MT Code Case N-509 >>>>N/A**

Rod Hanger Integral C3.20 3 X Attachment 455400 81-H15-WD 005 C-C MT Code Case N-509 >>>>N/A*>>

Rod Hanger Integral C3.20 3 X Attachment 455500 81-H15-WD-006 C C MT Code Case N-509 >>>>N/A>> ~

Rod Hanger Zntegral C3.20 3 X Attachment 456200 81-H34 F"A Code Case N-491-1 Pipe Stanchion F1.20 >>*N/A**

3 X 456700 81-H34-WD-001 C-C MT Code Case N-509 >>>>N/A>>>>

Pipe Stanchion C3.20 3 X 458700 81"H37 VT-3 Code Case N-491-1 Spring Hanger Fl . 20 >>>>N/A>>>>

3 X 458800 81-H37-WD-001 C-C Code Case N-509 >>>>N/A>>>>

Integral Attachment C3.20 3 X 458900 81-H38 F A CoCk Case N-491-1 Spring Hanger Fl. 20 >>>>'N/A>>>>

3 X 459000 81-H38-WD-001 C-C Code Case N-509 >>>>N/A>>>>

Integral Attachment C3.20 3 X

DATE: 10/15/99 NZNE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 214 REVISION: 0 INSERVICE INSPECTION TEN-YEAR PLAN CLASS 2 SECTION XZ SCHEDULED COMPONENTS tor Core Spray NUMBER: 81 . 0 INSPECTION INTERVAL PLAN STATUS PRESERVZCE YEAR FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER ZDENTZFZCATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 +*CALIBRATION BLOCK++

460100 81-H5 F-A Code Case N-491-1 Pipe Stanchion Fl . 20 ~~N/A~~

3 X 460600 81-H5-WD-001 C-C MT Code Case N-509 +iN/A+~

Pipe Stanchion C3.20 3 X 6.0" CS I.ine (REF. DWG. NO. 13) 460700 81-H50 F"A VT-3 Code Case N-491-1 Rod Hanger F1.20 **N/A*~

3 X 12.0" CS Line (REF. DWG. NO. 13) 461600 81-Hj F-A VT-3 Code Case N-491-1 Spring Hanger Fl. 20 +AN/Ass 3 X 1700 81-H7-WD-001 C-C Code Case N-509 +*N/A~+

Spring Hanger Integral C3.20 3 X Attachment 461800 81-H7-WD-002 C-C Coda Case N-509 ~~N/A++

Spring Hanger Integral C3.20 3 X Attachment 461900 81-H7-WD-003 C-C Code Case N-509 ~*N/A**

Spring Hanger Integral C3.20 3 X Attachment 462000 81-H7-WD-004 C C Code Case N-509 ++N/A++

Spring Hanger Zntegral C3.20 3 X Attachment

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 215 REVISZON: 0 ZNSERVZCE INSPECTION TEN-YEAR PIAN CLASS 2 SECTION XZ SCHEDULED COMPONENTS tor Core Spray NUMBER: 81 . 0 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 +~CALIBRATION BLOCK~~

462100 81-H7-WD-005 C-C MT Code Case N-509 **N/A~*

Spring Hanger Integral C3.20 3 X Attachment 462200 81 H7-WD-006 C-C Code Case N-509 ~~N/A~~

Spring Hanger Integral C3.20 3 X Attachment 462300 81-H7-WD-007 C-C MT Code Case N-509 ~~N/A++

Spring Hanger Integral C3.20 3 X Attachment 462500 81-HB VT"3 Code Case N-491-1 Spring Hanger Fl. 20 **N/Ak*

3 X 462600 81-HB-WD-001 C-C MT Code Case N-509 ~+N/A~i Zntegral Attachment C3.20 3 X 471300 81 "SC-21 VT-3 Code Case N-491-1 S~ay Brace F1.20 ~*N/A~~

3 X 6.0" CS Line (REF. DWG. NO. 13) 483200 81-SC-45 F-A VT 3 Code Case N-491-1 Seismic Restraint F1. 20 esN/Aas 3 X 483300 81-SC-46 Code Case N-491-1 Seismic Restraint F1.20 **N/A+*

3 X 483400 81-SC-47 F-A VT 3 Code Casa N-491-1 Seismic Restraint F1.20 l4N/Af4 3 X

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 216 REVISION: 0 INSERVZCE INSPECTION TEN YEAR PLAN CLASS 2 SECTION XI SCHEDULED COMPONENTS tor Core Spray NUMBER: 81.0 INSPECTION INTERVAL PLAN STATUS PRESERVZCE YEAR ASME FIRST SECOND THIRD SEC. XI PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATZON ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 **CALIBRATIONBLOCK~~

12.0" CS Linc (REF. DWG. NO. 13) 484700 81 SC-51 F-A Code Case N-491-1 Seismic Restraint F1.20 **N/A~~

3 X 6.0" CS Linc (REF. DWG. NO. 13) 486100 81-SR-4 Code Case N-491-1 Seismic Restraint F1.20 **N/A++

3 X 14.0" CS Line (REF. DWG. NO. 13) 487300 81-88-1 F-A Code Case N-491-1 Sway Strut F1.20 saN/Ate 3 X 487400 81-SS-1-WD-001 C C Code Case N-509 aeN/Ass Sway Strut Integral C3.20 3 X Attachment 487700 81-88-11 Code Case N-491-1 Sway Strut F1.20 1*N/A4*

3 X 6.0" CS Lino (REF. DWG. NO. 13) 487900 81"88-13 F-A VT 3 Code Case N-491-1 Sway Strut F1.20 f 1N/A*t 3 X 14.0" CS Linc (REF. DWG. NO. 13) 490400 81-SS 8 F-A Code Case N-491-1 Sway Strut F1.20 tf N/A*%

3 X 490500 81-SS-8 "WD-001 C-C Code Case N-509 ~~N/A~*

Sway Strut Integral C3.20 3 X Attachment

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 217 A

REVISION: 0 ZNSERVZCE INSPECTION TEN YEAR PIAN CIASS 2 SECTION XI SCHEDUZED COMPONENTS tor Core Spray NUMBER: 81 . 0 ZNSPECTZON INTERVAL PLAN STATUS PRESERVICE YEAR ASME FIRST SECOND THIRD SEC. XI PERIOD PERIOD PERIOD

SUMMARY

EXAHZNATZON AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER ZDENTIFZCATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ~ ~CALIBRATION BLOCK~ ~

4 91300 81-WD-006 C-F-2 UT Terminal End, Examine Valve 81-01-to-Pipe C5. 51 HT 100% of weld length 3 X + ~ NHP-1 SW-1 020-CS ~ ~

492000 81-WD-013 C-F 2 Examine 100% of weld Pipe-to-Elbow C5. 51 length 3 X ~ *NMP-1SW-1020-CS~ ~

492200 81-WD-016 C-F-2 Examine 100% of wold Pipe-to-Rcduccr C5.51 HT length 3 X (14x12") ~*NMP-1SW-1020-CS**

12.0~ CS Linc (REF. DWG. NO. 13) 493000 81-WD-024 C-F" 2 UT Examine 100% of weld Elbow-to-Pipe C5.51 length

    • NMP-1SW 1020"CS**

16.0" CS I inc (REF. DWG. NO. 13) 493300 81-WD-028 C-F-2 UT Examine 100% of weld 81-05 C5. 51 HT length 3 X STRT-to-Reducer(12"x16 +*NMP-ISW-1020-CS+~

12.0" CS Linc (REF. DWG. NO. 13) 494000 81 WD 035 C-F-2 UT Examine 100% of weld Pipe-to-Reducer C5.51 MT length (12" x10") X ~ ~NMP-1SW-1020-CS*~

494500 81-WD-040 C-F-2 UT Examine 100% of weld Pipe-to-Rcduccr C5.51 HT length (12" x14") **NMP-1SW-1020-CS*+

DATE: 10/15/99 NZNE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 218 REVISION: 0 INSERVZCE INSPECTION TEN-YEAR PIAN CLASS 2 SECTION XI SCHEDULED COMPONENTS

.tor Core Spray NUMBER: 81 . 0 INSPECTION INTERVAL PLAN STATUS PRESERVZCE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ~~CALZBRATION BLOCK*~

14.0" CS Linc (REF. DWG. NO. 13) 494900 81 WD 044 C-F-2 UT Examine 100% of weld Pipe-to-Elbow C5.51 MT length 3 X ~ +NMP-ISW-1020 "CS~ ~

12.0" CS Linc (REF. DWG. NO. 13) 4 96200 81-WD-058 C-F-2 UT Terminal End, Examine Pipe-to-Valve 81-37 C5. 51 100% of weld length 3 X **NMP-ISW-1020-CS*~

496600 81-WD-065 C-F-2 Examine 100% of weld Tcc-to-Flange C5.51 MT length eeNMP 1SW 1020 CS*e 00 81-WD-125 C-F-2 Examine 100% of weld Reducer-to-Flange CS. 51 length 3 X (14'x12") **NMP-1SW-1020-CS~~

501200 81-WD-136 C-F-2 UT Examine 100% of weld Pipe-to-Reducer C5.51 length 3 X (12"x16~) ~ ~NMP-1SW-1020-CS~*

502400 81-WD-149 CF2 Examine 100% of weld Pipe-to-Elbow C5.51 length 3 X

    • NMP-1SW 1020 CS++

502600 81 WD 151 C-F-2 UT Terminal End, Examine Reducer-to-Pump 81-50 C5.51 MT 100% of weld length 3 X ~~NMP-ISW-1020-CS**

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 219 REVISION: 0 ZNSERVZCE ZNSPECTION TEN-YEAR PIAN CLASS 2 SECTION XZ SCHEDULED COMPONENTS tor Core Spray NUMBER: 81 . 0 INSPECTION INTERVAL PIAN STATUS PRESERVICE YEAR ASHE FIRST SECOND THIRD SEC. XI PERZOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATZON ITEH NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ~ ~CALIBRATION BLOCK*>>

14.0" CS Zine (REF. DWG. NO. 13) 504200 81-WD-167 C-F-2 UT Examine 100% of weld Elbow-to-Pipe CS. 51 HT length 3 - - - - X ~~NMP 1SW 1020-CS~~

12.0" CS Linc (REF. DWG. NO. 13) 504600 81 WD 172 C-F-2 UT Examine 100% of weld Tee-to-Pipe CS. 51 HT length 3 X

~~NMP-ISW-1020-CS~*

506000 81 WD-189 C-F-2 UT Examine 100% of weld Pipe-to-Reducer C5.51 length 3 ~ ~NMP-1 SW-1020-CS**

DATE: 10/15/99 NINE MZLE POINT NUCLEAR PLANT UNIT 1 PAGE: 220 L

REVISION: 0 INSERVZCE INSPECTION TEN-YEAR PLAN CLASS 2 SECTION XZ SCHEDULED COMPONENTS tor Core Spray Pump 121 NUMBER: 81 . 0 INSPECTION INTERVAL PIAN STATUS PRESERVICE YEAR ASME FIRST SECOND THZRD SEC. XI PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ++CALIBRATION BLOCK~~

CSP 81-03 (REF. DWG. NO. 13) 511200 81-03-WD-005 C-G P03 **N/A**

Upper Head-to-Shaf t C6.10 3 X Channel 511300 81-03-WD-006 C-G P03 **N/A**

Shaft Channel-to-Shaf t C6.10 3 X Guide 511500 81 03 WD"008 C-G P03 ~*N/A+~

Upper Casing-to-Flange C6. 10 3 X 512000 81-03-WD-013 C-G P03 +'~N/A++

Lower Casing Long Weld C6.10

DATE: 10/15/99 NINE MILE POZNT NUCLEAR PIANT UNIT 1 PAGE: 221

~ REVISION: INSERVICE INSPECTION TEN-YEAR PLAN CIASS 2 SECTION XZ SCHEDULED COMPONENTS tor Core Spray Topping Pump 111 NUMBER: 81. 0 INSPECTION INTERVAL PLAN STATUS PRESERVZCE YEAR ASME FIRST SECOND THIRD SEC. XI PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 *+CALIBRATION BLOCK+ ~

CSTP 81-50 (REF. DNG. NO. 13) 514100 81-50 F-A Code Case N-491-1 Purap Support F1.40 +AN/Ant 3 X

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 222 REVISION: 0 ZNSERVICE INSPECTION TEN-YEAR PLAN CLASS 2 SECTION XI SCHEDULED COMPONENTS tor Core Spray NUMBER: 81. 1 INSPECTION INTERVAL PLAN STATUS PRE SERVICE YEAR AS ME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEH NO HETH 1 2 3 4 1 2 3 4 1 2 3 4 ~~CALIBRATION BLOCK*~

12.0" CS Linc (REF. DWG. NO. 13) 516200 81. 1-WD-023 C-F-2 UT Examine 100$ of weld Pipe-to-Flange C5. 51 HT length 3

517000 81.1-WD-031 C F-2 Examine 100$ of weld Elbow-to Pipe C5. 51 length 3 X *~ NHP-1 SW-1020-CS ~ i 518400 81. 1-WD-047 C-F-2 MT Terminal End, Examine Tee-to-Valve 81-30 C5. 51 UT 100$ of weld length X ~ ~NHP-1SW-1020-CS**

519400 81.1 WD-059 C-F 2 Examine 100$ of weld Pipe-to-Tcc CS. 51 length 3 X *~NHP-ISW-1020-CS~~

0 0

DATE: 10/15/99 NINE MIZE POINT NUCLEAR PLANT UNIT 1 PAGE: 223 REVISION: 0 ZNSERVICE INSPECTION TEN YEAR PZAN CLASS 2 SECTION XZ SCHEDULED COMPONENTS tor Containment Spray NUMBER: 93.0 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR ASME FIRST SECOND THIRD SEC. XI PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 **CALIBRATIONBLOCK+ +

12.0" Raw Water Line (REF. DWG. NO. 16) 521400 93-R23-A VT-3 Code Case N-491-1 Rod Hanger Fl. 20 ~~N/A~+

X 521800 93-R23-E F-A Code Case N 491-1 Rod Hanger Fl . 20 **N/A**

3 X 522000 93-R24-A F-A VT 3 Code Case N-491-1 Anchor Fl . 20 eaN/A@a 3 X 529600 93"R27"F F-A Code Case N-491-1 Dead Weight Support F1.20 ~~N/A**

3 X 00 93"R30 Code Case N-491-1 Rod Hanger Fl. 20 t 1N/A1k X

533400 93-SCR-9E F A Code Case N-491-1 Seismic Box Restraint Fl 20

~ ++N/A++

3 X 533500 93-SCR-9E-WD-001 C-C Coda Case N-509 +iN/A~+

Integral Attachment C3.20 3 X 533600 93-SCR-9E-WD-002 C C Code Case N-509 +*N/A++

Integral Attachment C3. 20 3 X 533700 93-SCR-9E-WD-003 C-C Code Case N-509 *~N/A*t Integral Attachment C3.20 3 X 533800 93-SCR-9E-WD-004 C-C MT Coda Case N-509 **N/A~*

Integral Attachment C3.20 3 X

0 0

DATE: 10/15/99 NINE HII E POINT NUCLEAR PLANT UNIT 1 PAGE: 224 REVISION: 0 INSERVZCE INSPECTION TEN-YEAR PLAN CLASS 2 SECTION XZ SCHEDULED COMPONENTS tor Containment Spray NUMBER: 93.0 INSPECTION ZNTERVAL PIAN STATUS PRESERVZCE YEAR ASHE FIRST SECOND THIRD SEC. XI PERIOD PERIOD PERIOD SUHMARY EXAHINATZON AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER ZDENTIFZCATION ITEH NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ~+CALIBRATION BLOCK' ~

533900 93-SCR-9E-WD-005 C-C HT Code Case N-509 **N/A~*

Integral Attachment C3.20 3 X 534000 93-SCR-9E-WD"006 C C HT Code Case N-509 *~N/A~*

Integral Attachment C3. 20 3 X 534100 93-SCR-9E-WD-007 C-C HT Code Case N-509 <<N/A4~

Integral Attachment C3. 20 3 X 534200 93"SCR"9E-WD-008 C-C Code Case N-509 ~+N/Art Integral Attachment C3.20 3 X 535200 93-SCR-9G VT 3 Code Case N-491-1 Seismic Box Restraint F1.20 a+N/Ate 3 X 535300 93-SCR-9G-WD-001 C-C Code Case N-509 *~N/A~~

Integral Attachment C3.20 3 X 535400 93-SCR-9G-WD-002 C-C Code case N-509 ++N/A%a Integral Attachment C3.20 3 X 535500 93-SCR-9G-WD-003 C-C Code Case N-509 ~~N/A~*

Integral Attachment C3.20 3 X 535600 93 SCR 9G-WD-004 C-C Code Case N-509 <<~N/A**

Integral Attachment C3.20 3 X 535700 93-SCR-9G"WD-005 C-C Code Case N-509 ~~N/A~*

Integral Attachment C3.20 3 X

DATE: 10/15/99 NINE MILE POZNT NUCLEAR PIANT UNZT 1 PAGE: 225 REVISION: 0 INSERVICE INSPECTION TEN-YEAR PIAN CLASS 2 SECTION XI SCHEDULED COMPONENTS tor Containmcnt Spray NUMBER: 93.0 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD SUMHARY EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ~ ~CALIBRATION BLOCK~ ~

535800 93-SCR-9G-WD-006 C-C MT Code Case N-509 *~N/A~~

Integral Attachment C3.20 3 X 535900 93-SCR-9G-WD"007 C C MT Code Case N-509 ~*N/A~i Integral Attachment C3. 20 3 X 536000 93-SCR-9G-WD"008 C-C Code Case N-509 ~*N/A~*

Integral Attachment C3.20 3 X 542200 93-WD-055 C-F-2 UT Examine 100% of weld Valve 93-72 -to-Pipe C5.51 HT length 3 X

    • NHP 1SW 1020-CS++

~00 93. 1-WD-005 C-F-2 ExamLnc 100% of weld Elbow-to-Pipe CS. 51 length i~PZRP.375-2**

3 543900 93.1-WD-012 C-F-2 UT Examine 100% of weld Pipe-to-Elbow C5.51 MT length 3 + ~NMP-ISW-1020-CS*~

544700 93.1-WD-020 C-F-2 Examine 100% of weld Pipe-to-Elbow C5.51 length ~*PZR-.375-2, 3 X 94-6007+~

544900 93. 1-WD-022 C-F-2 HT Pipe restraint Elbow-to-Valve 93-52 CS. 51 interfercncc, scan in 3 X both directions to achieve 100% CRV.

  • ~94-6007iPZR-.375-2~*

545200 93.1-WD-028 CF2UT Examine 100% of weld Pipe-to-Valve 93-71 C5.51 HT length *~PZR-.375-2*~

3 X

NINE MILE POINT NMP1-ISI-003-10 EI T NIAGARA NUCLEAR POWER STATION H kJ MOHAWK THIRD INSERVICEINSPECTIONINTERVAL Rev. 0 TEN-YEAR INSERVICE INSPECTION Date: October 15, 1999 PLAN AND SCHEDULE 6.0 CLASS 3 INSERVICE INSPECTION PLAN TABLES This section contains the Long Term Ten-Year Inservice Inspection Examination Tables for nondestructive examinations of selected systems and components for the Second Inservice Inspection Interval.

38.0 Shutdown Cooling Water System 226 thru 226 39.0 Emergency Condenser System 227 thru 227 54.0 Spent Fuel Pool Cooling System 228 thru 235 57.0 Spent Fuel Pool Cooling System 236 thru 236 70.0 Reactor Building Closed Loop Cooling System 237 thru 242 72.0 Emergency Service Water System 243 thru 244 93.0 Reactor Containment Spray System 245 thru 248 File: NMP1ISIPL.wpd

0 DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNZT 1 PAGE: 226 REVISION: 0 INSERVICE INSPECTION TEN YEAR PLAN CLASS 3 SECTION XZ SCHEDULED COMPONENTS down Cooling Water Heat Exchanger 11 NUMBER: 38.0 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR ASME FIRST SECOND THIRD SEC. XZ PERZOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ++CALIBRATION BLOCK'~+

SDCW HX 38-129 (REF. DWG. NO. C-26855-C7) 548000 38-129-WD-001 D-A VT-1 Code Case N-509, Examine SDC Hx Front Support D1.10 100% of weld length 3 X ~~N/A+~

548100 38-129-WD-002 D-A Code case N<<509, Examine SDC Hx Roar Support D1. 10 100% of weld'ength X ttN/Ail SDCW HX 38-135 (REF. DWG. NO. C-26855-C7) 548200 38-SDC-HX-11 Code Case N-491-1 SDC Heat Exchanger F1.40 +~N/A~~

3 X Support

DATE: 10/15/99 NINE MILE POZNT NUCLEAR PLANT UNIT 1 PAGE: 227 REVISION: 0 INSERVICE INSPECTION TEN-YEAR PLAN CLASS 3 SECTION XI SCHEDULED COMPONENTS gency Condenser Heat Exchanger 122 NUMBER: 39.0 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 i*CALIBRATIONBLOCK**

ECHE 60-42 (REF. DWG. NO. 11A) 550100 60-42-WD-007 VT 1 Code Case N-509 ~~N/A~~

North Saddle-to-Shell Dl. 10 3 X Weld 550200 60-42-WD-008 D-A Code Case N-509 ~~N/A+*

Center Saddle-to-Shell D1.10 3 X Weld 550300 60-42-WD-009 D-A VT-1 Code Case N-509 **N/A**

South Saddle-to-Shell Dl . 10 3 X Weld 550400 HX-60-42 Code Case N-491"1 Heat Exchanger Support Fl 40 ~ **N/A*~

X

DATE: 10/15/99 NINE MILE POZNT NUCLEAR PLANT UNIT 1 PAGE: 228 REVISION: 0 ZNSERVICE INSPECTION TEN-YEAR PLAN CLASS 3 SECTION XI SCHEDULED COMPONENTS t Fuel Pool Cooling NUMBER: 54 . 0 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR FIRST SECOND THIRD SEC. XI PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ~~CALIBRATION BLOCK~ ~

6.0" Spent Fuel Pool Cooling Line (REF. DWG. NO. C-27171-C) 551200 54-R1-B F A Code Case N-491-1 Rod Hanger F1. 30 iON/Afk 3 X 551600 54-R1"D F-A VT 3 Code Case N-491-1 Rod Hanger F1.30 +~N/A++

3 X 552000 54-R1-H F A VT-3 Code Case N-491-1 Rod Hanger Fl . 30 *AN/A*~

3 X 552900 54-Rll-A F-A Includes U-Bolt and Pipe Stanchion Fl. 30 protection saddle, Code Case N-491-1 ~~N/A+~

00 54 R13-A Code Case N-491-1 Spring Hanger F1. 30 ~~N/A~+

3 X 555000 54-R2-BA F-A VT-3 Code Case N-491-1 Rod Hanger F1.30 %AN/A**

3 X 55S100 54-SCR-1E VT-3 Code Case N-491-1 Seismic Box Restraint F1.30 ~~N/A~+

3 X 558200 54-SCR" 1E"WD-001 D-A Code Case N-509 **N/A**

Integrally Welded Lug Dl 20

~

3 X 1

55S300 54-SCR-1E-WD-002 Code Case N-509 **N/A~~

Integrally Welded Lug D1.20 3 X 2

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 229 REVISION: 0 ZNSERVICE INSPECTION TEN-YEAR PLAN CLASS 3 SECTION XZ SCHEDULED COMPONENTS t Fuel Pool Cooling NUMBER: 54 . 0 INSPECTION INTERVAL PLAN STATUS PRESERVZCE YEAR ASME FIRST SECOND THIRD SEC. XI PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ~ ~CALIBRATION BLOCK~*

558400 54 SCR 1E-WD-003 D-A Code Case N-509 ~*N/A*~

Zntdgrally Welded Lug D1.20 3 X 3

558500 54-SCR-1E-WD-004 D-A VT-1 Code Case N-509 **N/A~*

Integrally Wcldcd Lug Dl. 20 3 X 8.0" Spent Fuel Pool Cooling Line (REF. DWG. NO. C-27171-C) 563700 54-SCR-1N Code Case N-491-1 Seismic Box Restraint Fl ~ 30 eaN/Ass 3 X 563800 54-SCR-1N-WD-001 D-A Code Case N 509 ~+N/A++

Integrally Welded I.ug D1.20 3 X 1

563900 54-SCR-1N-WD-002 D-A VT-1 Code Case N-509 +iN/Aii Integrally Welded Lug D1.20 3 X 2

564000 54"SCR-1N-WD-003 D-A Code Casa N-509 ~~N/Ai~

Integrally Welded Lug D1.20 3 X 3

564100 54"SCR-1N-WD-004 D-A VT-1 Code Case N-509 ~~N/Ai~

Integrally Welded Lug Dl 20

~

3 X 4

DATE: 10/15/99 NINE HYLE POINT NUCLEAR PLANT UNIT 1 PAGE: 230 REVISION: 0 INSERVZCE INSPECTION TEN-YEAR PLAN CLASS 3 SECTION XI SCHEDULED COHPONENTS t Fuel Pool Cooling NUMBER: 54 . 0 INSPECTION ZNTERVAL PLAN STATUS PRESERVZCE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD SUHHARY EXAHZNATZON AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEH NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ~ ~CALIBRATION BLOCK~ ~

6.0" Spent Fuel Pool Cooling Line (REF. DWG. NO. C-27171-C) 567100 54-SCR-3BA F-A Code Case N-491-1 Seismic Box Restraint F1.30 ktN/A%4 3 X 567200 54-SCR-3BA-WD-001 Code Case N-509 ++N/A~~

Integrally Welded Lug D1.20 3 X 1

567300 54-SCR-3BA-WD-002 VT 1 Code Case N-509 +*N/A**

Integrally Welded I.ug Dl. 20 3 X 2

567400 54-SCR" 3BA-WD-003 D A Code Case N 509 *+N/A++

Integrally Welded Lug D1.20 3 X 3

567500 54-SCR-3BA WD 004 D-A Code Case N-509 **N/A~*

Integrally Woldcd Lug D1.20 3 X 4

567600 54-SCR-3BA-WD-005 D-A VT-1 Code Case N-509 *~N/A~~

Integrally Welded Lug D1.20 3 X 5

567700 54"SCR-3BA-WD-006 D-A VT"1 Code Case N-509 ++N/A++

Integrally Welded Lug D1.20 3 X 6

567800 54-SCR-3BA-WD-007 VT 1 Code Case N-509 ++N/Ai+

Integrally Welded Lug D1.20 3 X 7

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 231 REVISION: 0 ZNSERVICE INSPECTION TEN-YEAR PLAN CLASS 3 SECTION XI SCHEDULED COMPONENTS t Fuel Pool Cooling NUMBER: 54 . 0 INSPECTION INTERVAL PLAN STATUS PRESERV ICE YEAR ASME FIRST SECOND THIRD SEC. XI PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 +~CALIBRATION BLOCK~~

567900 54-SCR-3BA-WD-008 D-A Code Case N-509 <<*N/A~~

Integrally Welded Lug Dl. 20 3 X 8

8.0" Spent Fuel Pool Cooling Line (REF. DWG. NO. C-27171-C) 571500 54-SCR-5F F"A Code Case N-491-1 Seismic Box Restraint F1.30 **N/A**

3 X 571600 54-SCR-5F-WD-001 D-A Code Case N-509 ~~N/A~~

Integrally Welded Lug D1.20 3 X 1

571700 54-SCR-5F-WD-002 D-A Code Case N-509 ~~N/A~~

Integrally Wcldcd Lug D1.20 X

2 571800 54-SCR-5F-WD-003 D-A Code Case N-509 ~*N/A~i Integrally welded Lug D1.20 3 X 3

571900 54-SCR-5F-WD-004 D-A Code Case N-509 ~~N/A*~

Integrally Welded Lug D1.20 3 X 4

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 232 REVISION: 0 INSERVICE INSPECTION TEN-YEAR PLAN CLASS 3 SECTION XI SCHEDULED COMPONENTS t Fuel Pool Cooling Filter 11 NUMBER: 54 . 0 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ~~CALIBRATION BLOCK~>

SFPCF 54-03 (REF. DWG. NO. C-27171-C) 574800 FP-54-03 F A VT-3 Coda Case N-491-1 FP Filter 11 Support F1.40 +~N/A~~

3 X

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 233 REVISION: 0 INSERVZCE INSPECTION TEN-YEAR PLAN CLASS 3 SECTION XI SCHEDULED COMPONENTS t Fuel Pool Cooling Heat Exchanger 12 NUMBER: 54 . 0 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR ASME FIRST SECOND THIRD SEC. XI PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 t +CALIBRATION BLOCK**

SFPCHE 54-04 (REF. DWG. NO. C-27171-C) 575300 FP 54-04 Code Case N-491-1 FP Hx 12 Support Fl . 40 e*N/Ase 3 X 575400 FP-54-04-WD-001 D A Code Case N-509 **N/A~*

FP Hx 12 Front D1. 10 3 X Integral Attachment 575500 FP-54-04-WD-002 Code Case N-509 **N/A*~

FP Hx 12 Roar Integral D1.10 3 X Attachment

E DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 234 REVISION: 0 ZNSERVICE INSPECTION TEN-YEAR PLAN CLASS 3 SECTION XI SCHEDULED COMPONENTS t Fuel Pool Cooling Pump 11 NUMBER: 54 . 0 INSPECTION INTERVAL PLAN STATUS PRESERVZCE YEAR ASME FIRST SECOND THIRD SEC. XI PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ~~CALIBRATZON BLOCK**

SFPCCP 54-01 (REF. DWG. NO. C-27171-C) 575600 FP-54-01 Code Case N-491-1 Pump Support F1.40 ~+N/A~~

3 X

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 235 REVISION: 0 ZNSERVICE INSPECTION TEN-YEAR PLAN CLASS 3 SECTION XZ SCHEDULED COMPONENTS t Fuel Pool Cooling Surge Tank NUMBER: 54 . 0 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR ASME FIRST SECOND THIRD SEC. XZ PERZOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 +*CALIBRATION BLOCK**

SFPCST 54 68 (REF. DWG. NO. C-27171 C) 575800 TK-54-68 VT 3 Code Casa N-491-1 Surge TK Support F1.40 aaN/Awe 3 X

DATE: 10/15/99 NINE MILE POINT NUCLEAR PZANT UNIT 1 PAGE: 236 REVISION: INSERVZCE INSPECTION TEN-YEAR PLAN CLASS 3 SECTION XZ SCHEDULED COMPONENTS t Fuel Pool Cooling System NUMBER: 57. 0 INSPECTION INTERVAL PIAN STATUS PRESERVICE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMINATZON AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ZTEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 **CALIBRATIONBLOCK~*

Spent Fuel Pool Cooling Linc (REF. DWG. NO. C-27172-C) 576000 57-R3-C VT 3 U Bolt, Code Case Pipe Stanchion Fl. 30 N 491 1 ~~N/A++

X

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 237 REVISION: 0 ZNSERVICE INSPECTION TEN-YEAR PLAN CLASS 3 SECTION XI SCHEDULED COMPONENTS tor Building Closed Loop Cooling NUMBER: 70.0 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR ASME FIRST SECOND THIRD SEC. XI PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 11CALZBRATZON BLOCK11 RBCLC Line (REF. DWG. NO. C-26855-C) 582900 70-R17-D F-A VT-3 Code Case N-491-1 Rod Hanger F1.30 11N/A11 3 X 583200 70-R17-I VT-3 Code Case N-491-1 Rod Hanger Fl . 30 **N/A1*

3 X 583700 70-Rl 7-N F-A VT-3 Code Case N-491-1 Rod Hanger Fl. 30 11N/A11 3 X 584000 70-R19-A F-A Code Case N-491-1 Pipe Stanchion Fl . 30 1 1N/A1 1 3 X 00 70-R19-B F-A Code Case N-491-1 Pipe Stanchion F1.30 *1N/A*1 3 X 584200 70-R19-C F-A Code Case N-491-1 Pipe Stanchion F1.30 11N/A11 3 X 588400 70 R7 G F-A Code Case N-491-1 Rod Hanger Fl. 30 11N/A1 1 3 X 588500 70-Rj-H F-A Code Case N-491-1 Rod Hanger Fl . 30 11'N/A1*

3 X 588600 70-R7-I Code Case N-491-1 Rod Hanger Fl . 30 11N/A11 3 X 590700 70 R9 A F-A Code Case N-491-1 Pipe Stanchion F1. 30 1 1N/A1 1 3 X

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 238 REVZSZON: 0 ZNSERVZCE ZNSPECTZON TEN-YEAR PLAN CLASS 3 SECTION XZ SCHEDULED COMPONENTS tor Buf.lding Closed Loop Cooling NUMBER: 70. 0 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR ASME FIRST SECOND THIRD SEC. XI PERIOD PERIOD PERIOD

SUMMARY

EXAMINATZON AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER ZDENTZFZCATZON ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ~ ~CALIBRATION BLOCK**

590800 70 R9 A WD 001 D A VT-1 Code Case N 509 ++N/A~~

Pipe Stanchion D1.20 3 X 591700 70-R9-F F-A VT-3 Code Case N-491-1 Pipe Stanchion F1.30 ++N/A++

3 X 591800 70-R9-F-WD-001 D-A VT-1 Code Case N-509 a*N/Ass Pipe Stanchion D1.20 3 X 592300 70-83 F"A Code Case N-491-1 Pipe Stanchion Fl. 30 ssN/A*a 3 X 70 "S3-WD-001 VT"1 Code Case N-509 +~N/A~+

Pipe Stanchion Dl. 20 3 X 594500 70-SC-3 VT 3 Code Case N-491-1 Seismic Box Restraint F1.30 aaN/Att 3 X 597200 70-SC-8 F A Code Case N-491-1 Seismic Box Restraint F1.30 ~~N/A**

3 X 597300 70-SC-9 F-A Code Case N-491-1 Seismic Pipe Restraint F1.30 aaN/Aea 3 X 599900 70 SCR-SA F A Code Case N-491-1 Box Restraint F1.30 **N/A**

3 X 600000 70 SCR SA WD 001 D-A Code Case N-509 +~N/A++

Integral Attachment D1.20 3 X

DATE: 10/15/99 NINE HZLE POINT NUCLEAR PLANT UNIT 1 PAGE: 239 REVISION: 0 INSERVICE INSPECTION TEN-YEAR PLAN CLASS 3 SECTION XI SCHEDULED COHPONENTS tor Building Closed Loop Cooling NUMBER: 70. 0 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR ASME FIRST SECOND THIRD SEC. XI PERZOD PERIOD PERZOD SUHMARY EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 '1 2 3 4 1 2 3 4 ~ ~CALIBRATION BLOCK~*

600100 70-SCR-BA-WD-002 D-A VT 1 Code Case N-509 ++N/A++

Integral Attachment D1.20 3 X 600200 70-SCR-BA-WD-003 D A Code Case N-509 i~N/A~~

Integral Attachment D1.20 3 X 600300 70-SCR-BA-WD-004 D-A Coda Case N-509 *~N/A*~

Integral Attachment Dl. 20 3 X A ~

601800 70-SR-23 Code Case N-491-1 Seismic Box Restraint F1.30 *I'N/At*

3 X 70-SR-24 VT-3 Code Case N-491-1 Seismic Box Restraint F1.30 +AN/Ate 3

602200 70-SR-27 VT 3 Codo Case N-491-1 Seismic Box Restraint F1.30 /AP a 3 X

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 240 REVISION: 0 ZNSERVICE INSPECTION TEN-YEAR PLAN CIASS 3 SECTION XI SCHEDULED COMPONENTS tor Building Closed Loop Cooling Heat Exchange NUMBER: 70. 0 INSPECTION INTERVAL PLAN STATUS PRESERVZCE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 *+CALIBRATION BLOCK~~

RBCLCHE 70-13R (REF. DWG. NO. C-26855-C) 603400 70-13R F-A VT-3 Code Case N-491-1 RBCLCHE Support Fl. 40 ~~N/A~~

3 X 603500 70 13R-WD-001 D-A Code Case N-509 ~~N/A~~

RBCLCHE Front Integral D1.10 3 X Attachment 603600 70-13R-WD-002 Code Case N-509 ++N/A~~

RBCLCHE Rear Integral D1.10 3 X Attachment

DATE: 10/15/99 NINE MILE POZNT NUCLEAR PLANT UNIT 1 PAGE: 241 REVISZON: 0 INSERVICE INSPECTION TEN-YEAR PLAN CLASS 3 SECTION XZ SCHEDULED COMPONENTS tor Building Closed Loop Cooling MU Tank NUMBER: 70.0 INSPECTION INTERVAL PLAN STATUS PRESERVZCE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ~~CALIBRATION BLOCK*~

RBCLC M.U. Tank 71-126 (REF. DNG. NO. C-26855-C) 604300 71-126 F-A VT-3 Code Case N-491-1 CLC M.U. Tank Fi . 40 1 4N/A1 4 3 X

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 242 REVZSZON: 0 INSERVICE INSPECTION TEN-YEAR PLAN CLASS 3 SECTION XZ SCHEDULED COMPONENTS tor Building Closed Loop Cooling Pump NUMBER: 70 . 0 INSPECTION INTERVAL PLAN STATUS PRESERVZCE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 '~

~CALIBRATION BLOCK*+

RBCLCP 70-01 (REF. DWG. NO. C-26855-C) 604400 70-01 Coda Case N-491-1 RBCLC Pump Support F1.40 eeN/Ate 3 X

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 243 REVISION: 0 INSERVZCE INSPECTION TEN-YEAR PLAN CLASS 3 SECTION XZ SCHEDULED COMPONENTS gency Service Water NUMBER: 72.0 ZNSPECTION ZNTERVAL PLAN STATUS PRESERVZCE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ~~CALIBRATION BLOCK~~

ESW Line (REF. DWG. NO. F-45235-C) 604700 72-Al F-A Code Case N-491-1 Pipe Stanchion F1.30 ++N/A++

3 X 604800 72-Al-WD-001 D-A Code Case N-509 **N/A**

Pipe Stanchion D1.20 3

604900 72-A2 F-A Code Case N-491-1 Pipe Stanchion F1.30 ++N/A++

3 X 605000 72-A2-WD-001 D-A VT 1 Code Case N-509 ~~N/A++

Pipe Stanchion D1.20 3 X 00 72-H159 VT-3 Code Case N-491-1 Rod Hanger F1.30 @AN/Aea 3 X 607600 72-H162 VT-3 Code Case N-491-1 Rod Hanger F1.30 +~N/A++

3 X 607700 72-H163 Code Case N-491-1 Rod Hanger Fl. 30 *~N/A~*

3 X 608700 72-SC-4 F-A Code Case N-491-1 Seismic Restraint F1.30 i*N/Aff 3 X

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 244 REVISION: 0 INSERVZCE INSPECTION TEN-YEAR PLAN CLASS 3 SECTION XI SCHEDULED COMPONENTS gcncy Service Water Pump 11 INSPECTION ZNTERVAI PLAN STATUS PRESERVZCE YEAR ASME FIRST SECOND THIRD SEC. XI PERIOD PERIOD PERZOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 +~CALIBRATION BLOCK~~

ESWP 72-04 (REF. DWG. NO. F-45235-C) 613300 72-04 Code Casa N-491-1 Pump Support F1. 40 %AN/APk 3

1

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 245 REVISION: 0 INSERVZCE INSPECTION TEN-YEAR PLAN CLASS 3 SECTION XZ SCHEDULED COMPONENTS tor Containment Spray NUMBER: 93.0 PRESERVZCE YEAR INSPECTION ZNTERVAL PLAN STATUS ASME FIRST SECOND THIRD SEC. XI PERIOD PERIOD PERIOD

SUMMARY

EXAMZNATZON AREA CATEGY NDE OUTAGE INSTRUCTZONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 >>>>CALIBRATION BLOCK>>>>

12.0" Raw Water Linc (REF. DWG. NO. 16) 613700 93-H3 F A VT-3 Code Case N-491-1 Gravity Support Fl . 30 I *>>N/A>>>>

3 X 613900 93-HS F A VT 3 Code Case N-491-1 Gravity Support F1.30 **N/A>>*

3 X 614100 93-H7 Code Case N-491-1 Gravity Support F1.30 **N/A*>>

3 X 615100 93-R10-A VT 3 Code Case N-491-1 Rod Hanger Fl . 30 **N/A>>*

3 X 00 93 Rll A2 VT-3 Code Case N-491-1 Rod Hanger F1.30 >>>>N/A>>>>

3 X 616400 93-R13-B F-A VT 3 Code Case N-491-1 Rod Hanger F1.30 >>>>N/A>>>>

3 X 617500 93-R16-A F-A Code Case N-491-1 Pipe Stanchion Fl. 30 >>>>N/A>>>>

3 X 617600 93-R16-A-WD-001 D-A VT-1 Code Case N-509 **N/A>>>>

Pipe Stanchion Dl . 20 3 X 617700 93-R16-B F-A Code Case N-491-1 Pipe Stanchion F1.30 >>>>'N/A>>>>

3 X 617900 93-R16-C F-A VT-3 Code Case N-491-1 Pipe Stanchion F1.30 **N/A**

3 X

DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 246 REVISION: 0 ZNSERVICE ZNSPECTION TEN-YEAR PLAN CLASS 3 SECTION XI SCHEDULED COMPONENTS tor Containment Spray NUMBER: 93.0 INSPECTION ZNTERVAZ PLAN STATUS PRESERVICE YEAR FIRST SECOND THIRD SEC. XI PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA CATE GY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 saCALIBRATION BLOCK+ t 618000 93 R16-C-WD-001 D-A Code Case N-509 ~*N/A*~

Pipe Stanchion Dl. 20 3 X 621000 93-R2-C F-A Code Case N-491-1 Spring Hanger F1.30 4 fN/A4 1 3 X 621100 93-R2-C"WD-001 D-A Code Case N-509 ~~N/A~~

Integral Attachment Dl. 20 3 X 628300 93-SCR-10A F-A Code Case N-491-1 Seismic Restraint F1.30 *~N/A~~

3 X 93-SCR 10B F-A Code Case N-491-1 Seismic Restraint F1.30 **N/A**

3 X 637000 93-SCR-4A F"A VT-3 Code Case N-491-1 Seismic Box Restraint F1.30 **N/Aff 3 X 637100 93-SCR-4A-WD-001 D-A VT-1 Code Case N-509 ~*N/A~~

Integral Attachment D1.20 3 X 637200 93-SCR-4A-WD-002 Code Case N-509 +~N/A~~

Integral Attachment D1.20 3 X 637300 93-SCR-4A-WD-003 D-A VT-1 Code Case N-509 ~*N/A~*

Zntcgral Attachment D1.20 3 X 637400 93-SCR-4A-WD-004 D-A VT 1 Code Case N-509 +*N/A~~

Zntegral Attachment D1.20 3 X

DATE: 10/15/99 NINE HII E POINT NUCLEAR PLANT UNIT 1 PAGE: 247 REVISION: 0 INSERVICE ZNSPECTION TEN YEAR PLAN CLASS 3 SECTION XZ SCHEDULED COMPONENTS tor Containment Spray NUHBER: 93.0 INSPECTION INTERVAI PLAN STATUS PRESERVICE YEAR ASME FIRST SECOND THIRD SEC. XI PERIOD PERIOD PERIOD SUHHARY EXAHI NATION AREA CATEGY NDE OUTAGE ZNSTRUCTZONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 +*CALIBRATION BLOCK+*

642000 93-SCR-7A1 F A VT-3 Code Case N-491-1 Seismic Box Restraint F1.30 +*N/A*~

3 X 642100 93-SCR-7A1-WD-001 Code Case N 509 *+N/A*+

Integral Attachment Dl. 20 3 X 642200 93-SCR-7A1-WD-002 D-A Code Case N-509 ++N/A++

Integral Attachment D1.20 3 X 642300 93 SCR 7A1-WD-003 VT 1 Code Case N-509 ~~N/A~~

Integral Attachment D1.20 3 X 93-SCR-7A1 "WD-004 D A VT-1 Code Case N-509 4wN/Aiw Integral Attachment D1.20 3 X 648000 93-SCR-9A Code Case N-491-1 Seismic Box Restraint F1.30 ~+N/A+~

3 X 648100 93-SCR-9A-WD-001 D-A Code Case N-509 ~~N/A~+

Integral Attachment Dl. 20 3 X 648200 93-SCR-9A"WD-002 VT-1 Code Case N-509 +~N/A++

Integral Attachment D1. 20 3 X 648300 93-SCR-9A-WD-003 D-A Code Case N-509 ~*N/A**

Integral Attachment D1.20 3 X 648400 93 SCR-9A-WD-004 VT-1 Code Case N-509 ++N/A~+

Integral Attachment D1.20 3 X

4 DATE: 10/15/99 NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 248 REVISION: 0 INSERVICE INSPECTION TEN-YEAR PZAN CZASS 3 SECTION XZ SCHEDULED COMPONENTS tor Containment Spray Raw Water Pump 111 NUMBER: 93. 0 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR ASME FIRST SECOND THIRD SEC. XZ PERIOD PERIOD PERZOD

SUMMARY

EXAMINATION AREA CATEGY NDE OUTAGE INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 ~*CALIBRATION BLOCK~ ~

RCSRWP 111 (REF. DWG. NO. 16) 649500 RWP-111 F-A VT-3 Code Case N-491-1 Pump Support F1.40 ~~N/A~+

X

NINE MILE POINT NMP1-ISI-003-1 0 V NlAGARA NUCLEAR POWER STATION N U MOHAWK THIRD INSERVICE INSPECTION INTERVAL Rev. 0 TEN-YEAR INSERVICE INSPECTION Date: October 15, 1999 PLAN AND SCHEDULE APPENDIXA ACCEPTANCE CRITERIA Indications detected by inservice examinations, shall be compared against the acceptance criteria of Section XI as defined in Tables A-1 through A-4.).

'ABLEA-1 CLASS::1:ACCEPTANCE STANDARDS EXAMINATION:

" ,, COMPONENT;.,OR PART EXAMINED",- ,,-:,j-;gg '"ACCEPTANCE STANDARD CATEGORY 8-A Welds In Reactor Vessels IW84510 B-B Welds in Other Vessels IW84510 8-D Vessel Nozzle Wolds IW84512 8-E Partial Penetration welds In Vessels IW84522 B-F, 84 Dissimilar and Similar Metal Welds In Pl !n IW84514 8-G-1 Boltln > 2" dia. IW8451 5/3517 8-G-2 Boltin < 2" dla. IW84517 B-H, 8-K-1 Into ralAttachmentsforPI in, Valves Pum s & Vessels IW84516 B-L-1, 8-M-1 Welds In Pum s & Valves IW84518 B-L-2, 8-M-2 Pum Casln s & Valvo Bodies IW8<519 8-N-1 8-N-2 Interior Surfaces & Internal Components of Reactor Vessels IW84520.1 8-N4 IW84520.2 B-O Control Rod Drive Housln Welds IW84523 8-P Pressure Rotainin Bounda IW84522 8-0 Steam Generator Tubln IW84521 File: NMP1ISIPL.wpd

NINE MILE POINT NMP1-ISI-003-1 0 V NIAGARA NUCLEAR POWER STATION N UmomwK THIRD INSERVICE INSPECTION INTERVAL Rev. 0 TEN-YEAR INSERVICE INSPECTION Date: October 15, 1999 PLAN AND SCHEDULE TABLE A-2 CLASS 2 ACCEPTANCE STANDARDS EXAMINATION ACCEPTANCE COMPONENT OR PART EXAMINED CATEGORY STANDARD C-A Welds In Pressure Vessels IWC4510 C-B Nozzle Welds In Vessels IWC4511 C-C Inte raIAttachmentsfor Vessels Pi In Pum sand Valves IWC4512 C-D Boltln IWC4513 C-F-1, C-F-2 Weids in Pi in IWC4514 Welds In Pum s and Valves IWC4515 C-H Pressure Retainln Com onents IWC4516 TABLE AN CLASS 3 ACCEPTANCE STANDARDS EXAMINATION COMPONENT OR PART EXAMINED ACCEPTANCE CATEGORY STANDARD D-A Pressure Boundary (VT-2) "No Leakage 'Mfg. Code &

Inte ral Attachments VTQ llcablo Standards D-B Pressure Boundary (VT-2) "No Leakage 'Mfg. Codo &

Inte ralAttachments VTQ llcablo Standards D-C Pressure Boundary (VT-2) IWA-5250 'Mfg. Code &

Into ral Attachments VTN A Ilcablo Standards ASME Section XI Acceptanco Standard in course of preparation.

Defined as no leakago from the pressure boundary, in excess of that which is expected and determined to bo within acceptablo limits, l.e., at valve packing, bolted connections, pump seals, etc.

TABLE A-4 COMPONENT SUPPORT ACCEPTANCE STANDARDS EXAMINATION COMPONENT OR PART EXAMINED ACCEPTANCE CATEGORY , STANDARD F-A Su rts IWF-3410 File: NMP1ISIPL.wpd

NINE MILE POINT NMP1-ISI-003-1 0 El Y NIAGARA NUCLEAR POWER STATION H kl MOHAWK THIRD INSERVICE INSPECTION INTERVAL Rev. 0 TEN-YEAR INSERVICE INSPECTION Date: October 15, 1999 PLAN AND SCHEDULE APPENDIX B NONDESTRUCTIVE EXAMINATIONPROCEDURE LISTING NDEP REVISION TITLE VT 2.01 Note 1 "ASME XI Visual Examination Procedure" PT 3.00 Note 1 "Li uid Penetrant Examination Procedure" MT 4.00 Note 1 "Ma netic Particle Examination Procedure" RT 5.00 Note 1 "Radio ra hic Examination" UT 6.01 Note 1 "Ultrasonic Linearit Verification" UT 6.04 Note 1 "Ultrasonic Examination of Bolts, Studs, Nuts and Cylindrical Com onents" UT 6.05 Note 1 "Ultrasonic Thickness Measurement" UT 6.06 Note 1 "Ultrasonic IGSCC Sizin Procedure" Manual UT 6.07 Note 1 "Ultrasonic Examination of Nozzle Inner Radii" UT 6.09 Note 1 "Ultrasonic Examination Procedure for RPV Flange Weld and Stud Hole Threads in the RPV Flan e" UT 6.10 Note 1 "S stem Performance Checks" UT 6.13 Note 1 "Ultrasonic Examination of Bi-Metallic Pi in Welds" UT 6.15 Note 1 "Ultrasonic Examination to Determine Water Level" UT 6.16 Note 1 "Ultrasonic Thickness Measurement Utilizin Di ital E ui ment" UT 6.19 Note 1 "Freeze Seal Ultrasonic Examination Procedure for Ferritic Pipe and Fittin s" UT 6.20 Note 1 "Ultrasonic Examination of Reactor CRD Housin s" UT 6.21 Note 1 "Ultrasonic Examination Procedure for Vessel Welds 2" Thick or Less and Associated Nozzle Inner Radius Areas" UT 6.23 Note 1 "Ultrasonic Examination of Ferritic Pi e Welds" UT 6.24 Note 1 "Ultrasonic Examination of Austenitic Pi e Welds" UT 6.25 Note 1 "Strai ht Beam Ultrasonic Examination of Bolts and Studs" File: NMP1ISIPL.wpd

NINE MILE POINT NMP1-ISI-003-10 LI V NIAGARA NUCLEAR POWER STATION a U MOHAWK THIRD INSERVICE INSPECTION INTERVAL Rev. 0 TEN-YEAR INSERVICE INSPECTION Date: October 15, 1999 PLAN AND SCHEDULE

.." ';,",',: AP.P...END)X-:B

.';-.".';

': NONDESTRUCTIV.E'.EXAMlNATlON;PROCEDU,RE L'ISTING REVlSfON

'P 7.00 Note 1 "Standard Method for Etchin Metals and Allo s" SP 7.01 Note 1 "Hardness Testin of Metals" SP 7.02 Note 1 "Visual Examination of Weldin 0 erations" SP 7.03 Note 1 "Visual Examination of Brazed Joints" SP 7.04 Note 1 "Measurin Coatin Thickness b Use of Edd Current" SP 7.05 Note 1 "Weld Detection b Use of Edd Currents" ET 8.00 Note 1 "Eddy Current Examination of Nonferromagnetic Heat Exchange Tubing" See controlled copy of NDE Procedures for latest approved revision.

File: NMP1ISIPL.wpd

NINE MILE POINT NMP1-ISI-003-10 hl Y NIAGARA NUCLEAR POWER STATION H U MOHAWK THIRD INSERVICE INSPECTION INTERVAL Rev. 0 TEN-YEAR INSERVICE INSPECTION Date: October 15, 1999 PLAN AND SCHEDULE

-APPENDIX C '.'-

' ': 'ULTRASONIC.'CALIBRATIONBL'GCKS':,'. '. ";;,

  • " '.", BL'OCK.; '
    ::"'.""':: ':- .THICKNESS:

";-" ITEMNUMBER,.:,-,

1-2 NMP1-29-SE-1 1.655/1.1501.151.11 1-3 NMP1-28-2.00-SS 2.055 1-4 NMP-28-1.200-SS 1.109 1-6 NMP1-24-SE-1 1.475 1-7 NMP1-24-080-CS 1.219 1-8 NMP.1-20-1.500-CS 1.63 1-12 NMP1-18-1.375-CS 1.375 1-13 NMP1-18-1.156-CS 1.156 1-14 NMP1-18-.937-CS-106 .937 1-16 NMP-18-120-CS 1.375 1-17 NMP-18-100-CS 1.156 1-21 NMP1-16-120-CS 1.24 1-22 NMP-16-100-CS 1.031 1-23 NMP1-16-.375-CS-106 .375 1-25 NMP1-14-120-CS 1.219 1-28 NMP1-14-XX2-SS .935 1-29 NMP-14-XX1-SS .760 1-30 NMP-14-STD-CS .375 1-32 NMP1-12-1.44-CS-105 1.44 1-33 NMP1-12-.688-SS .688 1-36 NMP1-12-XX2-SS .855 1-37 NMP-12-XX1-SS .720 1-38 NMP-12-STD-CS .375 File: NMP1ISIPL.wpd

NINE MILE POINT NMP1-ISI-003-1 0 El Y NIAGARA NUCLEAR POWER STATION H U MOHAWK THIRD INSERVICE INSPECTION INTERVAL Rev. 0 TEN-YEAR INSERVICE INSPECTION Date: October 15, 1999 PLAN AND SCHEDULE

'PPENDIX C

"- 'ULFRASONIC:CALIBRATIONBLot:-KS-: "-'- '- .- --:-:--:

v ITEM NUMBER B LO Q Kg <~~<i< c~,.

"'-40 NMP1-10-.594-CS .700 1-42 NMP1-10-.522-SS-F2 ~ 522 1-43 NMP1-10-.500-SS-403 .500 1-44 NMP1-10-160-SS 1.141 1-47 NMP1-10-100-CS .75 1-49 NMP1-10-80-CS .600 1-50 NMP-10-XX1-SS .727 1-51 NMP1-10-XX1-SS-358 .591 1-52 NMP1-1 0-SE-1 .900 1-55 NMP1-8-120-CS .720 1-56 NMP1-8-80-CS .495 1-61 NMP1-6.25-RPV-STUD 2.72 1-62 NMP1-6-.596-SS .596 1-64 NMP1-6-160-CS .720 1-65 NMP1-6-80-SS .432 1-66 NMP-6-080-CS .432 1-68 NMP1-6-80-SS-312 .432 1-69 NMP1-6-SE-2 1.5 1-70 NMP1-6-SE-1 .75 1-77 NMP1-4-80-CS .337 1-81 NMP1-2.75-RCP-STUD 1-82 NM1-2.50-B16-1 1-83 NM1-2.50-B16-2 1-84 NM1-2.25-B16 File: NMP1ISIPL.wpd

NINE MILE POINT NMP1-ISI-003-10 Y NIAGARA NUCLEAR POWER STATION kL MOHAWK THIRD INSERVICE INSPECTION INTERVAL Rev. 0 TEN-YEAR INSERVICE INSPECTION Date: October 15, 1999 PLAN AND SCHEDULE APPENDIX C Uk.TRASONlt CALIBRATIONBLOCKS ITEM NUMBER BLOCK THICKNESS.

1-92 NMP1-FW-1.50-CS-516 1-94 FWMU-N1-P3-8.1-RV 1-96 NMP1-IR-9 1-97 NMP1-IR-7.5 1-98 NMP1-IR-5.5 1-99 NMP1-IR-3.3 1-1 00 NMP1-IR-1.7 1.7 1-108 NMP-80XI-N278-ALT-BL1 10.75 NMP1-SW-1020-CS .1-3.00 1-113 NMP1-SW-304-SS .1-3.00 1-114 NMP1-SW-600-IN .1-1.0 1-128 P8R-1.260 1.260 1-130 P8R-.75-1 .75 1-133 P8R-.3-1 1-137 PIS-6.25 2.72 1-138 PIS-2.5 16.7 1-140 P IR-1.5-1 1.5 1-143 PIN-6.25 1.62 1-146 PIF-1.5C 1.5 1-158 NMP1-RPV-4 27.0 1-159 NMP1-RPV-1 4.60 1-165 NMP-EPRI-CS 1-166 NMP-EPRI-SS 2-1 NMP2-48-3.50-CS 3.50 File: NMP1ISIPL.wpd

NINE MILE POINT NMP1-ISI-003-1 0 V NIAGARA NUCLEAR POWER STATION 4 MOHAWK THIRD INSERVICE INSPECTION INTERVAL Rev. 0 TEN-YEAR INSERVICE INSPECTION Date: October 15, 1999 PLAN AND SCHEDULE APPENDlX C ULTRASONlC CAL1BRATION BLOCKS lTEM NUMBER BLOCK THlCKNESS 2-2 NMP2-30-2.90-CS 2.90 2-3 NMP2-28-2.60-CS 2.60 2-4 NMP2-28-1.34-CS 1.34 2-5 NMP2-27-1.57-CS 1.57 2-6 NMP2-26-1.26-CS 1.26 2-7 NMP2-25-1 .84-NOZ 1.84 2-8 NMP2-24-2.469-CS 2.469 2-9 NMP2-24-2.06-CS 2.06 2-10 NMP2-24-1.317-SS 1.317 2-11 NMP2-24-1.234-SS 1.234 2-12 NMP2-24-1.219-CS 1.219 2-13 NMP2-24-1.002-SS 1.002 2-14 NMP2-24-.500-SS .500 2-15 NMP2-24-.500-CS .500 2-16 NMP2-24-.375-CS .375 2-17 NMP2-20-1.031-SS 1.031 2-18 NMP2-20-1.031-CS 1.031 2-19 NMP2-20-.84-SS .84 2-20 NMP2-20-.812-CS .812 2-21 NMP2-20-.594-CS .594 2-22 NMP2-20-.500-CS .500 2-23 NMP2-20-.375-CS .375 2-24 NMP2-20-.375-SS .375 2-25 NMP2-18-.938-CS .938 File: NMP1ISIPL.wpd

NINE MILE POINT NMP1-ISI-003-1 0 V NIAGARA NUCLEAR POWER STATION U MOHAWK THIRD INSERVICE INSPECTION INTERVAL Rev. 0 TEN-YEAR INSERVICE INSPECTION Date: October 15, 1999 PLAN AND SCHEDULE

-

APPEND)X C ULTRASONlC CALlBRATlQNBLOCKS 1TEM NUMBER BLOCK THlCKNESS 2-26 NMP2-18-.500-CS .500 2-27 NMP2-18-.375-CS .375 2-28 NMP2-18-.375-SS .375 2-29 NMP2-16-1.031-CS 1.031 2-30 NMP2-16-.822-SS .822 2-31 NMP2-16-.500-CS .500 2-32 NMP2-16-.375-SS .375 2-33 NMP2-16-.375-CS .375 2-34 NMP2-14-.375-CS .375 2-35 NMP2-12-1.00-SS 1.00 2-36 NMP2-12-.844-SS .844 2-37 NMP2-12-.844-CS .844 2-38 NMP2-12-.688-CS .688 2-39 NMP2-12-.688-SS .688 2-40 NMP2-12-.657-SS .657 2-41 NMP2-12-.375-SS .375 2-42 NMP2-12-.375-CS .375 2-43 NMP2-11.625-1.125-CS 1.125 2-44 NMP2-10-1.00-CS 1.00 2-45 NMP2-10-.719-CS .719 2-46 NMP2-10-.594-CS .594 2-47 NMP2-1 0-.365-CS .365 2-48 NMP2-9.3-1.77-CS 1.77 2-49 NMP2-8-.906-CS .906 File: NMP1ISIPL.wpd

NINE MILE POINT NMP1-ISI-003-1 0 V NIAGARA NUCLEAR POWER STATION U MOHAWK THIRD INSERVICE INSPECTION INTERVAL Rev. 0 TEN-YEAR INSERVICE INSPECTION Date: October 15, 1999 PLAN AND SCHEDULE

' "'>>', '>> 'w 'w '*",

PENDIX Q

,',',ULTR'A'SONIC CAL'IBRATION'BLOCKS.

':".'-,.'"'TEM NUMBER '; . -'.", "..'"".'-".""'":BLOCK 2-50 NMP2-8-.718-CS .718 2-51 NMP2-8-.594-CS .594 2-52 NMP2-8-.500-CS .500 2-53 NMP2-8-.322-SS .322 2-54 NMP2-8-.322-CS .322 2-55 NMP2-6.3-1.24-CS .562 2-57 NMP2-6-.432-CS .432 2-58 NMP2-6-.280-CS .280 2-59 NMP2-5.8-.365-SS .365 2-60 NMP2-5.25-.69-NOZ .69 2-61 NMP2-5-.78-CS .78 2-62 NMP2-4-.337-SS .337 2-63 NMP2-4-.337-SS-182 .337 2-64 NMP2-4-.337-CS .337 2-65 NMP2-4-.250-CS .250 2-66 NMP2-4-.250-SS .250 2-67 NMP2-3.25-23.5-STUD 23.5 2-68 NMP2-2.25-10-STUD 10.0 2-69 NMP2-IR-9-CS 9.0 2-70 NMP2-IR-7.5-CS 7.5 2-71 NMP2-IR-4-CS 4.0 2-72 NMP2-RHS-.75-CS .75 2-73 NMP2-RHS-IR-3.75-CS 3.75 2-74 NMP2-FLG-RPV 38.0 File: NMP1ISIPL.wpd

NINE MILE POINT NMP1-ISI-003-1 0 Y NIAGARA NUCLEAR POWER STATION N @MOHAWK THIRD INSERVICEINSPECTIONINTERVAL Rev. 0 TEN-YEAR INSERVICE INSPECTION Date: October 15, 1999 PLAN AND SCHEDULE

'," "APPENDIX:C;:; '; ',";,"',:~~," -;:. "."' ' ..."

"

".-. ':,,'

ULTRASONIC CALIBRATIONBLOCKS;::,':: '::

': ":i; BLOCK."". ".

",THICKNESS,'.69 2-75 NMP2-RPV-STUD-1 2-76 NMP2-RPV-NUT-1 7.125 2-77 NMP2-128-1-RPV 5.25 2-78 NMP2-127-1-RPV 3.18 2-79 NMP2-126-1-RPV 7.90 2-80 NMP2-1 25-1-RPV 6.80 2-81 NMP2-124-1-RPV 6.68 2-82 NMP2-123-1-RPV 8.11 2-900 GE795E254G3 2-84 NMP2-2.24-15.88-STUD 15.88 1-95 H JT-6-13-A .55 File: NMP1ISIPL.wpd

NINE MILE POINT NMP1-ISI-003-10 hl Y NIAGARA NUCLEAR POWER STATION H V MOHAWK THIRD INSERVICE INSPECTION INTERVAL Rev. 0 TEN-YEAR INSERVICE INSPECTION Date: October 15, 1999 PLAN AND SCHEDULE

,,APPENDIX D CL'ASS 1, 2 and 3 WELDlSUPPORT LOCATION QAPS-DRAWING NUMBER SYSTEM TITLE C-26830-C 01 Main Steam C-26831-C 02 Main Steam C-26832-C 03 Main Steam C-27165-C 05 Emergency Condenser Vent C-27165-C 05.1 Emergency Condenser Vent C-27165-C 05.2 Emergency Condenser Vent C-26839-C 31 High Pressure Reactor Feedwater C-26846-C 32 Reactor Recirculation C-26852-C 33 Reactor Clean UP C-26852-C 33.1 Reactor Clean UP C-26839-C 33.2 Reactor Clean UP C-26839-C 33.3 Reactor Clean UP C-26851-C 34 Reactor Head Spray F-45028-C 36 Reactor Instrumentation C-26852-C 37 Reactor Drain C-45060-C 37 Reactor Head Vent C-26852-C 37.1 Reactor Drain C-26847-C 38 Reactor Shutdown Cooling C-26843-C 39 Emergency Condenser C-26844-C 40 Reactor Core Spray C-35682-C 40.1 Reactor Core Spray C-27168-C 41 Liquid Poison C-27168-C 42 Liquid Poison File: NMP1ISIPL.wpd

0 NINE MILE POINT NMP1-ISI-003-10 El Y NIAGARA NUCLEAR POWER STATION H 4 MOHAWK THIRD INSERVICE INSPECTION INTERVAL Rev. 0 TEN-YEAR INSERVICE INSPECTION Date: October 15, 1999 PLAN AND SCHEDULE APPENDIX D CLASS 1, 2 and 3 VlELNSUPPORT LOCATION MAPS DRAY/ING NUMBER SYSTEM TITLE C-27168-C 42.1 Liquid Poison C-26849-C 44.1 Control Rod Drive Hydraulic C-34124-C 44.2 Control Rod Drive Hydraulic C-27171-C 54 Fuel Pool Cooling C-27178-C 66 Main Steam Line C-26855-C 70 Reactor Building Closed Loop Cooling C-39816-C 70 Closed Loop Cooling C-27179-C 72 Service Water System F-45236-C 72 Service Water System C-26848-C 80 Reactor Containment Spray C-27181-C 80.1 Reactor Containment Spray C-26845-C 81 Reactor Core Spray C-26845-C 81.1 Reactor Core Spray C-27183-C 93 Containment Spray Cooling Raw Water N/A Weld Map Index 01 Main Steam 2A 01 Main Steam 2B 01 Main Steam 02 Main Steam 3A 02 Main Steam 03 Main Steam Turbine By Pass to Condenser 31 Reactor Feedwater 5A Reactor Feedwater 34 Reactor Head Spray File: NMP1ISIPL.wpd

NINE MILE POINT NMP1-ISI-003-10 hl Y NIAGARA NUCLEAR POWER STATION H U MOHAWK THIRD INSERVICE INSPECTION INTERVAL Rev. 0 TEN-YEAR INSERVICE INSPECTION Date: October 15, 1999 PLAN AND SCHEDULE

-'- CLASS 1, 2 an'd,3 WELD/SUPPORT,L'OCATfON IIIIAPS;: -;

J F

.

DRAW!NG":NUMBER,- ;SY'TEM'=,"",-,.",

32 Reactor Recirculation 7A 32 Reactor Recirculation 7B 32 Reactor Recirculation Pump Discharge Instrumentation 7C 32 Reactor Recirculation Pump Instrumentation 7D 36 Reactor Recirculation Pump Seal Cavity Instrumentation 36 Reactor Instrumentation Level Protection System 8A 36 Reactor Instrumentation Level Control Range 8B 36 Reactor Instrumentation Level Control Range 8C 36 Reactor Instrumentation Level Protection System 8D 36 Reactor Instrumentation Wide Range Level 8E 36 Reactor Instrumentation Seal Leak Detection 8F 36 Reactor Instrumentation Level Triple Low 8G 36 Reactor Instrumentation Level Triple Low 8H 36 Reactor Instrumentation Emergency Condenser Steam 8J 36 Reactor Instrumentation Emergency Condenser Steam 37, 37.1 Reactor Head Vent and Drain 10 38 Reactor Shutdown Cooling 10A 38 Reactor Shutdown Cooling 39 Emergency Condenser Steam Supply 11A 39 Emergency Condenser Steam Return 11B 39 Emergency Condenser Drain and Overflow Lines 12 40, 40.1 Reactor Core Spray 12A 40,40.1 Reactor Core Spray 13 80,80.1 Reactor Core Spray File: NMP1ISIPL.wpd

NINE MILE POINT NMP1-ISI-003-1 0 V NlAGARA NUCLEAR POWER STATION N U MOHAWK THIRD INSERVICE INSPECTION INTERVAL Rev. 0 TEN-YEAR INSERVICE INSPECTION Date: October 15, 1999 PLAN AND SCHEDULE

'"" -:" ":;=';"""CLASS"1"2and 3 WELDtSUPPQRT,.:LOCATION MAPS""-"""'"':,"

DRAWING NUMBER, SYSTEM'-'0,80.1 13A Reactor Core Spray 13B 80,80.1 Reactor Core Spray 13C 80,80.1 Reactor Core Spray 14 42.1 Liquid Poison 15 80 Reactor Containment Spray 15A 80 Reactor Containment Spray 15B 80 Reactor Containment Spray 15C 80 Reactor Containment Spray 15D 80 Reactor Containment Spray 16 93,93.1 Reactor Containment Spray 16A 93,93.1 Reactor Containment Spray 16B 93,93.1 Reactor Containment Spray 16C 93,93.1 Reactor Containment Spray 17 44.2 Control Rod Drive 17A 44.2 Control Rod Drive 18 44.1 Control Rod Drive 19 44.3 Control Rod Drive 20 33332333 Reactor Clean Up 21 27 Reactor Head Spray 22 05,05.1,05.2 Emergency Condenser Vent 22A 05,05.1,05.2 Emergency Condenser Vent 23 23 Main Steam Line Drain 24 66 Main Steam Power Operated Relief Valve Discharge 24A 66 Main Steam Power Operated Relief Valve Discharge File: NMP1ISIPL.wpd

NINE MILE POINT NMP1-ISI-003-1 0 4Y NIAGARA NUCLEAR POWER STATION MOHAWK THIRD INSERVICE INSPECTION INTERVAL Rev. 0 TEN-YEAR INSERVICE INSPECTION Date: October 15, 1999 PLAN AND SCHEDULE

. ': ~';",- "'::, - ":-CLASSi1'2 and'3'-"~VfFL'DISUPPORT LQCATjON,MAPS:.:::,'; -";"':;i": ':::':--':,9!-"::.

'DRAWING NUMBER'SYSTEM,.,".;r",,%w TlTL'E:,'

- " ';, ',','i'i ',

z '<'P 'ill'qg~P~;, "'j;"l'P,",.;,ii," .i'~! .'""s ',~;> j;", '"~ ', '; ', .'...r.': ~":,.;"".".',

25 80.1 Reactor Containment Spray 25A 80.1 Reactor Containment Spray 26 41,42 Liquid Poison 28 00.0 Reactor Vessel 28A 00.0 Reactor Vessel File: NMP1ISIPL.wpd

NINE MILE POINT NMP1-ISI-003-1 0 Y NIAGARA NUCLEAR POWER STATION N U MOHAWK THIRD INSERVICE INSPECTION INTERVAL Rev. 0 TEN-YEAR INSERVICE INSPECTION Date: October 15, 1999 PLAN AND SCHEDULE APPENDIX E ASME CODE CASES The following ASME Code Cases have been reviewed for possible use during the Third Inservice Inspection Interval. Code Cases used during the inspection interval shall be identified with the specific component within the Inspection/ Examination Tables.

ASME CODE CASE LISTING CODE CASE TITLE RG 1.147 IMPLEMENTED NUMBER Revision IN PROGRAM N-236-1 Repair and Replacement of Class MC Vessels,Section XI, Rev. 12 No Division 1.

N-355 Calibration Block for Angle Beam Ultrasonic Examination of Rev. 12 Large Fittings in accordance with Appendix III-3410,Section XI, Division 1.

N-389-1 Alternative Rules for Repairs, Replacements, or Modifications, Rev. 12 No Section XI, Division 1 N-416-1 Alternative Pressure Test Requirement for Welded Repairs or Rev. 12 Yes Installation of Replacement Items by Welding, Class 1, 2 and 3,Section XI, Division 1.

N-432 Repair Welding Using Automatic or Machine Gas Tungsten-Arc Rev. 12 No Welding (GTAW) Temper Bead Technique,Section XI, Division 1.

N-457 Qualification Specimen Notch Location for Ultrasonic Rev. 12 Examination of Bolts and Studs,Section XI, Division 1.

N-458-1 Magnetic Particle Examination of Coated Materials,Section XI, None No Division 1.

N-460 Alternative Examination Coverage for Class 1 and Class 2 Rev. 12 Yes Welds,Section XI, Division 1 N-461 Alternative Rules For Piping Calibration Block Thickness, Section Rev. 12 No XI, Division 1 N-472 Use of Digital Readout and Digital Measurement Devises for Rev. 12 No performing Pump Vibration Testing,Section XI, Division 1.

N-485-1 Eddy Current Examination of Coated Ferritic Surfaces as an Rev. 12 No alternative to Surface Examination,Section XI, Division 1.

N-490-1 E, S t'I Alternative Vision Test Requirements for Nondestructive Division 1 Rev. 12 No File: NMP1ISIPL.wpd

NINE MILE POINT NMP1-ISI-003-10 V NlAGARA NUCLEAR POWER STATION U MOHAWK THIRD INSERVICE INSPECTION INTERVAL Rev. 0 TEN-YEAR INSERVICE INSPECTION Date: October 15, 1999 PLAN AND SCHEDULE ASME CODE CASE LISTING CODE CASE TITLE RG 1.147 IMPLEMENTED NUMBER Revision IN PROGRAM N-491-1 Alternative Rules for Examination of Class 1, 2, 3, and MC Rev. 12 Yes Component Supports,Section XI, Division N-496-1 Helical Coil Threaded Inserts,Section XI, Division 1 Rev. 12 N-498-1 Alternative Rules for 10-Year System Hydrostatic Testing for Rev. 12 Class 1, 2 and 3 Systems,Section XI, Division 1 N-504-1 Alternative Rules for Repair of Class 1, 2 and 3 Austenitic Rev. 12 No Stainless Steel Piping,Section XI, Division 1 N-509 Alternative Rules for the Selection and Examination of Class 1, 2 Rev. 12 Yes and 3 Integrally Welded Attachments,Section XI, Division 1 N-516 Underwater Welding,Section XI, Division 1 Rev. 12 No Pressure Testing of Containment Penetration Piping,Section XI, Division 1 N-523 Mechanical Clamping Devices for Class 2 and 3 piping, Section None No XI, Division 1.

N-524 Alternative Examination Requirements for Longitudinal Welds in Rev. 12 Yes Class 1 and Class 2 Piping,Section XI, Division 1 N-526 Alternative Requirements for Successive Inspection of Class 1 None Yes and 2 Vessels,Section XI, Division 1 N-532 Alternative Requirements to Repair and Replacement None Yes Documentation Requirements and Inservice Summary Report Preparation and Submission as required by IWA-4000 and IWA-6000,Section XI, Division 1.

N-534 Alternative Requirements for Pneumatic Pressure Testing, None No Section XI, Division 1 N-537 Location of Ultrasonic Depth Sizing Flaws,Section XI, Division 1. Rev. 12 No N-554 Alternative Requirements for Reconciliation of Replacement None No Items,Section XI, Division 1.

N-573 Transfer of Procedure Qualification Records Between Owners, None YesSection XI, Division 1.

File: NMP1ISIPL.wpd

NINE MILE POINT NMP1-ISI-003-1 0 V NIAG'AHA NUCLEAR POWER STATION U MOHAWK THIRD INSERVICE INSPECTION INTERVAL Rev. 0 TEN-YEAR INSERVICE INSPECTION Date: October 15, 1999 PLAN AND SCHEDULE END OF DOCUMENT File: NMP1ISIPL.wpd