{{#Wiki_filter:Appendix C Facility:
{{#Wiki_filter:Appendix C Appendix        C                                Job  Performance Measure Job Performance    Measure                      Form Form ES-C-1 ES-C-i Worksheet Worksheet Facility:
Task Title: KIA  
Facility:                    HB ROBINSON HB  ROBINSON                              Task No.:
Task  No.:    01001100302 01001100302 Task Title:
Task     Title:             Perform Rod Perform    Rod Cluster  Exercise lAW Cluster Exercise  lAW      JPM JPM No.:
No.:    2008 NRC 2008  NRC SIMSIM aa OST-Oll.
OST-011.
KIA    


==Reference:==
==Reference:==


Examinee:
K/A
 
==Reference:==
001 A2.11 001  A2.11 4.4/4.7 4.4/4.7 Examinee:                                                          NRC Examiner:
Facility Evaluator:
Facility Evaluator:
Method of testing: Job Performance Measure Worksheet HB ROBINSON Perform Rod Cluster Exercise lAW OST-011. 001 A2.11 4.4/4.7 Task No.: JPM No.: NRC Examiner:
Facility    Evaluator:                                              Date:
Date: Form ES-C-1 01001100302 2008 NRC SIM a Simulated Performance:
Date:
Actual Performance:
Method of testing:
x Classroom Simulator x Plant ---READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Simulated Performance:                                                     Performance:
Initial Conditions:
Actual Performance:           x Classroom       - - - Simulator x
* The plant is at 75% power.
X  Plant Plant READ TO THE EXAMINEE II will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
* OST-011, ROD CLUSTER CONTROL EXERCISE AND ROD POSITION INDICATION (Monthly) is being performed.
Initial Conditions:               ** The plant is at 75% power.
OST-Ol 1, ROD CLUSTER CONTROL EXERCISE AND ROD
* OST-011, POSITION INDICATION (Monthly) is being performed.
* The prerequisites of Section 4 have been completed.
* The prerequisites of Section 4 have been completed.
Task Standard:
Task Standard:                 Reactor has been manually tripped in response to a dropped rod.
Reactor has been manually tripped in response to a dropped rod. Required Materials:
Required Materials:             OST-Ol OST-011, 1, Rod Cluster Control Exercise and Rod Position Indication (Monthly)
OST-011, Rod Cluster Control Exercise and Rod Position Indication (Monthly)
General  
General  


==References:==
==References:==
OST-Ol OST-011, 1, Rod Cluster Control Exercise and Rod Position Indication (Monthly)
Handouts:
Handouts:                      OST -0111,, Section 8.1 OST-Ol                8.1 Initiating Initiating Cue:              You areare to perform  OST-0111 commencing with Section 8.1 perform OST-Ol                                    8.1 for Shutdown Bank A Bank  "An rods.
Time    Critical Task:
Time Critical      Task:      NO NO Validation Validation Time:Time:          18 18 minutes minutes 2008 2008 NRC NRC SIM SIM aa                                          NUREG    1021, Revision NUREG 1021,      Revision 9, 9, Supplement Supplement 11
Appendix C Appendix  C                            Job Performance Job  Performance Measure Measure                  Form Form ES-C-1 ES-C-i Worksheet Worksheet SIMULATOR SETUP SIMULATOR      SETUP 1.
: 1.      IC#6i8.
IC # 618.
: 2. SCN: 006_JPM_S8.
3.
: 3. When directed byby the Chief Chief Examiner, Examiner, insert insert IMF IMF CRF03A CRFO3A for Shutdown Bank Bank "A" A Rod Rod N-7 to drop into N-7        into the core during withdrawal.
: 4. OST-Oi 1 Prerequisites are signed off as complete.
OST-011 2008 NRC 2008 NRC SIM SIM aa                                      NUREG 1021, NUREG  1021, Revision Revision 9, 9, Supplement Supplement 11
Appendix C Appendix  C                                      Page 33 of Page    of 11 11                          Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE          INFORMATION (Denote Critical (Denote  Critical Steps Steps with with an an asterisk) asterisk)
START TIME: _ __
STARTTIME:
Performance Step:
Performance    Step: 11    Reviews procedure Reviews    procedure and and any any required required information.
information.
Standard:
Standard:                    OST-Ol OST  -011,1, Section Section 8.1 8.1 is      required procedure is the required  procedure to bebe performed.
performed.
Examiners Note:
Examiner's                  Candidate may wish to review  review the prerequisites in Section Section 4.
Comment:
Performance Step: 2        Record the initial Group Step counter height for Shutdown Bank A. (Step 8.1.1)
                                "An.
Standard:                  Candidate observes the proper group step counters and records 225 steps for Groups A and B.
Examiners Note:
Examiner's Comment:
2008 2008 NRC NRC SIM SIM aa                                          NUREG    1021, Revision NUREG 1021,      Revision 9, 9, Supplement Supplement 11
Appendix CC Appendix                                        Page 44 of Page          11 of 11                                  Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE            INFORMATION Performance Step:
Performance    Step: 33 IfIf necessary necessary to    verify performance to verify  performance of    of Shutdown Shutdown Bank  Bank AA Demand Demand Position Indication Position    Indication System System prior prior to to the the required required height height change change position of position  of the  test, THEN the test,  THEN PERFORM PERFORM the      the following:
following:
Position the Position    the ROD ROD BANK BANK SELECTOR SELECTOR switch  switch toto the the SBA SBA position position for Shutdown for  Shutdown BankBank "A".    (Step 8.1.2.1)
A. (Step    8.1.2.1)
Standard:
Standard:              Candidate places Candidate      places the the ROD ROD BANKBANK SELECTOR SELECTOR switch  switch to to the the SBA SBA position.
position.
Examiners Note:
Examiner's    Note:
Examiners Cue:
Examiner's              Performance of Shutdown Bank A Demand Position Indication System is required.
Comment:
Performance Step: 4                  IN-HOLD-OUT lever AND RTGB step counter Using the IN-HOLD-OUT indication, POSITION Shutdown Bank A              "A" rods in TWO steps.
(Step 8.1.2.2)
Standard:                Candidate uses the IN-HOLD-O IN-HOLD-OUT    UT lever and inserts Shutdown Bank A"A"  rods  from  225  steps  to 223 steps.
Examiners Examiner's Note:
Note:
Comment:
Comment:
2008 2008 NRC NRC SIM SIM aa                                        NUREG NUREG 1021, 1021, Revision Revision 9,  9, Supplement Supplement 11
Appendix CC Appendix                                      Page 55 of Page    of 11 ii                              Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE          INFORMATION Performance Step:
Performance    Step: 55  Using the Using  the IN-HOLD-OUT IN-HOLD-OUT lever,lever, RETURN RETURN rods rods to to the the initial initial height height as  indicated on as indicated    on the the operable operable step step counter(s) counter(s) for for Shutdown Shutdown Bank  Bank A.(Step 8.1.2.3)
                            "A".(Step  8.1 .2.3)
Standard:
Standard:              Candidate uses Candidate    uses the  IN-HOLD-OUT lever the IN-HOLD-OUT        lever and and withdraws withdraws Shutdown Bank Shutdown    Bank "A" A rods rods from from 223    steps to 223 steps      225 steps.
to 225  steps.
Examiners Note:
Examiner's    Note:
Comment:
Performance Step: 6    Check that Shutdown Bank "A"      A individual RPI indications on ERFIS have returned to their pre-test positions. (Step 8.1.2.4)    8.1 .2.4)
Standard:              Candidate checks that Shutdown Bank "A"        A RPI indications on ERFIS have returned to their pre-test positions.
Examiners Examiner's Note:
Comment:
2008  NRC SIM 2008 NRC    SIM aa                                      NUREG NUREG 1021,1021, Revision Revision 9, 9, Supplement Supplement 11


OST-011, Rod Cluster Control Exercise and Rod Position Indication (Monthly)
Appendix C Appendix C                                   Page 66 of Page    of 11 11                            Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE            INFORMATION Performance Step:
Handouts:
Performance   Step: 77 Record Initial Record   Initial Rod Rod Heights Heights fromfrom the RTGB (Steps),
OST -011 , Section 8.1 Initiating Cue: You are to perform OST-011 commencing with Section 8.1 for Shutdown Bank "An rods. Time Critical Task: NO Validation Time:
the RTGB      (Steps), Initial Initial Rod Rod Heights from Heights  from ERFIS    (Inches). (Step ERFIS (Inches).     (Step 8.1.3) 8.i .3)
18 minutes 2008 NRC SIM a NUREG 1021, Revision 9, Supplement 1
Standard:
Appendix C 1. IC # 618. Job Performance Measure Worksheet SIMULATOR SETUP Form ES-C-1 3. When directed by the Chief Examiner, insert IMF CRF03A for Shutdown Bank "A" Rod N-7 to drop into the core during withdrawal.
Standard:             Candidate records Candidate    records initial initial rod rod heights heights from from the the RTGB RTGB andand ERFIS.
: 4. OST-011 Prerequisites are signed off as complete.
ERFIS.
2008 NRC SIM a NUREG 1021, Revision 9, Supplement 1
Examiners Note:
Appendix C Page 3 of 11 PERFORMANCE INFORMATION Form ES-C-1 (Denote Critical Steps with an asterisk)
Examiner's Comment:
Performance Step: 1 Standard:
** Performance Step: 8   Determine the required change in rod height based on current 8.i .4) plant conditions. (Step 8.1.4)
Examiner's Note: Comment: Performance Step: 2 Standard:
Standard:              Plant is in Mode 11.. Rod height change is 19 steps.
Examiner's Note: Comment: 2008 NRC SIM a STARTTIME:
22519=206 225 - 19 = 206 steps.
__ _ Reviews procedure and any required information.
Examiners Note:
OST -011, Section 8.1 is the required procedure to be performed.
Examiner's Comment:
Candidate may wish to review the prerequisites in Section 4. Record the initial Group Step counter height for Shutdown Bank "An. (Step 8.1.1) Candidate observes the proper group step counters and records 225 steps for Groups A and B. NUREG 1021, Revision 9, Supplement 1
*
Appendix C Performance Step: 3 Standard:
* Performance Step: 9    Verify the ROD BANK SELECTOR switch in the SBA position for Shutdown Bank A.  "A". (Step 8.1   .5) 8.1.5)
Examiner's Note: Examiner's Cue: Comment: Performance Step: 4 Standard:
Standard:              Candidate re-positions switch to the SBA position.
Examiner's Note: Comment: 2008 NRC SIM a Page 4 of 11 PERFORMANCE INFORMATION Form ES-C-1 If necessary to verify performance of Shutdown Bank A Demand Position Indication System prior to the required height change position of the test, THEN PERFORM the following:
Examiners Examiner's Note:
Position the ROD BANK SELECTOR switch to the SBA position for Shutdown Bank "A". (Step 8.1.2.1) Candidate places the ROD BANK SELECTOR switch to the SBA position.
Note:
Performance of Shutdown Bank A Demand Position Indication System is required.
Comment:
Using the IN-HOLD-OUT lever AND RTGB step counter indication, POSITION Shutdown Bank "A" rods in TWO steps. (Step 8.1.2.2) Candidate uses the IN-HOLD-OUT lever and inserts Shutdown Bank "A" rods from 225 steps to 223 steps. NUREG 1021, Revision 9, Supplement 1
2008  NRC SIM 2008 NRC  SIM aa                                      NUREG NUREG 1021, 1021, Revision Revision 9,9, Supplement Supplement 11
Appendix C Performance Step: 5 Standard:
 
Examiner's Note: Comment: Performance Step: 6 Standard:
Appendix C Appendix  C                                  Page 77 of Page         ii of 11                               Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE          INFORMATION
Examiner's Note: Comment: 2008 NRC SIM a Page 5 of 11 PERFORMANCE INFORMATION Form ES-C-1 Using the IN-HOLD-OUT lever, RETURN rods to the initial height as indicated on the operable step counter(s) for Shutdown Bank "A".(Step 8.1.2.3) Candidate uses the IN-HOLD-OUT lever and withdraws Shutdown Bank "A" rods from 223 steps to 225 steps. Check that Shutdown Bank "A" individual RPI indications on ERFIS have returned to their pre-test positions. (Step 8.1.2.4) Candidate checks that Shutdown Bank "A" RPI indications on ERFIS have returned to their pre-test positions.
**  Performance Step:
NUREG 1021, Revision 9, Supplement 1
Performance   Step: 10 10 Using   the IN-HOLD-OUT Using the  IN-HOLD-OUT lever lever and  RTGB Step and RTGB     Step Counter Counter indication, position indication,   position Shutdown Shutdown Bank Bank "A" A rods rods to   the required to the  required number of number    of steps steps as dictated by as dictated      plant conditions.
Appendix C Performance Step: 7 Standard:
by plant conditions. (Step (Step 8.1.6) 8.1 .6)
Examiner's Note: Comment:
Standard:
* Performance Step: 8 Standard:
Standard:              Candidate positions Candidate    positions the the IN-HOLD-OUT IN-HOLD-OUT lever lever to to IN IN position position and and inserts Shutdown inserts Shutdown BankBank "A"   19 steps to 206 A 19            206 steps.
Examiner's Note: Comment:
steps.
* Performance Step: 9 Standard:
Examiners Note:
Examiner's Note: Comment: 2008 NRC SIM a Page 6 of 11 PERFORMANCE INFORMATION Form ES-C-1 Record Initial Rod Heights from the RTGB (Steps), Initial Rod Heights from ERFIS (Inches). (Step 8.1.3)
Examiner's             APP-005-F3, APP-005-06 APP-005-F3,      APP-005-D6 and  and APP-003-F4 will be received received during the rod during            insertion.
Candidate records initial rod heights from the RTGB and ERFIS. Determine the required change in rod height based on current plant conditions. (Step 8.1.4) Plant is in Mode 1 . Rod height change is 19 steps. 225 -19 = 206 steps. Verify the ROD BANK SELECTOR switch in the SBA position for Shutdown Bank "A". (Step 8.1.5) Candidate re-positions switch to the SBA position.
rod insertion.
NUREG 1021, Revision 9, Supplement 1
Comment:
Appendix C Page 7 of 11 PERFORMANCE INFORMATION Form ES-C-1
Performance Step: 11   Record tested Rod Heights from the RTGB (Steps) and tested Rod Heights from ERFIS (Inches). (Step 8.1.7)
* Performance Step: 10 Using the IN-HOLD-OUT lever and RTGB Step Counter indication, position Shutdown Bank "A" rods to the required number of steps as dictated by plant conditions. (Step 8.1.6) Standard:
Standard:             Candidate records Shutdown Bank "A"       A Rod Heights from RTGB (Steps) and Rod Heights from ERFIS (Inches).
Candidate positions the IN-HOLD-OUT lever to IN position and inserts Shutdown Bank "A" 19 steps to 206 steps. Examiner's Note: APP-005-F3, APP-005-06 and APP-003-F4 will be received during the rod insertion.
Examiners Note:
Comment: Performance Step: 11 Record tested Rod Heights from the RTGB (Steps) and tested Rod Heights from ERFIS (Inches). (Step 8.1.7) Standard:
Examiner's Comment:
Candidate records Shutdown Bank "A" Rod Heights from RTGB (Steps) and Rod Heights from ERFIS (Inches).
2008 NRC 2008 NRC SIM SIM aa                                      NUREG NUREG 1021,1021, Revision Revision 9, 9, Supplement Supplement 11
Examiner's Note: Comment: 2008 NRC SIM a NUREG 1021, Revision 9, Supplement 1
 
Appendix C Page 8 of 11 PERFORMANCE INFORMATION Form ES-C-1
Appendix C Appendix  C                                  Page 88 of Page   of 11 11                              Form ES-C-1 Form    ES-C-i PERFORMANCE INFORMATION PERFORMANCE          INFORMATION
* Performance Step: 12 Using the IN-HOLD-OUT lever, return rods to the Initial Height (Steps) as indicated by the step counters. (Step 8.1.8) Standard:
*Performance Step:
Candidate positions the IN-HOLD-OUT lever to the OUT position and begins withdrawing Shutdown Bank "A" rods. Examiner's Note: Withdrawal shall NOT be the continuous 19 steps per Precaution 5.5.5. Booth Operator:
Performance  Step: 12 12  Using the Using  the IN-HOLD-OUT IN-HOLD-OUT lever, lever, return return rods rods toto the the Initial Initial Height Height (Steps) as (Steps)       indicated by as indicated by the step step counters.
Insert malfunction IMF CRF03A to cause Rod N-7 to drop into the core AFTER the candidate starts the second withdrawal of the rods. Comment:
counters. (Step (Step 8.1.8) 8.1 .8)
* Performance Step: 13 Candidate diagnoses a dropped rod in Shutdown Bank "A". Standard:
Standard:                           positions the IN-HOLD-OUT Candidate positions       IN-HOLD-OUT lever to the OUT position and begins and  begins withdrawing Shutdown Shutdown BankBank "A" A rods.
Candidate determines a dropped rod has occurred in Shutdown Bank "A" by the following indications:
rods.
Examiners Note:
Examiner's             Withdrawal shall NOT be    be the continuous 19 steps per Precaution 5.5.5.
Precaution Booth Operator:       Insert malfunction IMF CRF03ACRFO3A to cause Rod N-7 to drop into the core AFTER the candidate starts the second withdrawal of the rods.
Comment:
*Performance Step: 13   Candidate diagnoses a dropped rod in Shutdown Bank "A".             A.
Standard:             Candidate determines a dropped rod has occurred in Shutdown A by the following indications:
Bank "A"
* Rod Bottom Light for Rod N-7
* Rod Bottom Light for Rod N-7
* Prompt drop in reactor power
* Prompt drop in reactor power
* APP-005-A3; PR DROPPED ROD
* APP-005-A3; PR DROPPED DROPPED ROD
* APP-005-C3; PR CHANNEL DEV
* APP-005-C3; PR CHANNEL DEV
* APP-005-F2; ROD BOTTOM ROD DROP Examiner's Note: Comment: 2008 NRC SIM a NUREG 1021, Revision 9, Supplement 1
* APP-005-F2; ROD BOTTOMBOTTOM ROD DROP Examiners Examiner's Note:
Appendix C Page 9 of 11 PERFORMANCE INFORMATION Form ES-C-1
Note:
* Performance Step: 14 Stop withdrawal of Shutdown Bank "An rods. Standard:
Comment:
Candidate releases IN-HOLD-OUT lever to the HOLD position.
Comment:
Examiner's Note: Comment:
2008 2008 NRC SIM aa NRC SIM                                        NUREG 1021, NUREG       1021, Revision Revision 9,9, Supplement Supplement i1
* Performance Step: 15 Informs CRSS of need to trip reactor and initiates a manual reactor trip. (Based on Caution at the beginning of Section 8.1 and Precaution 5.5.4). Standard:
 
Informs CRSS and depresses either reactor trip pushbutton.
Appendix C Appendix  C                                Page 99 of Page       11 of 11                         Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE          INFORMATION
Examiner's Note: Comment: Termination:
*Performance Step:
STOP TIME: 2008 NRC SIM a Candidate verifies that reactor is tripped by Reactor Trip and Bypass breaker indication, Rod Bottom Lights, RPI indication, and Nuclear Flux decreasing.
Performance        14 Step: 14 Stop withdrawal Stop withdrawal ofof Shutdown Shutdown Bank Bank "An A rods.
END OF TASK Reactor has been manually tripped due to a dropped rod while in Individual Bank select mode. NUREG 1021, Revision 9, Supplement 1
rods.
Appendix C Page 10 of 11 VERIFICATION OF COMPLETION Job Performance Measure No.: 2008 NRC SIM a Examinee's Name: Date Performed:
Standard:
Standard:              Candidate releases Candidate    releases IN-HOLD-OUT IN-HOLD-OUT lever lever to to the the HOLD HOLD position.
position.
Examiners Note:
Examiner's   Note:
Comment:
*Performance Step: 15   Informs CRSS of need to trip reactor and initiates a manual reactor trip. (Based on Caution at the beginning of Section 8.1 and Precaution 5.5.4).
Standard:             Informs CRSS and depresses either reactor trip pushbutton.
Candidate verifies that reactor is tripped by Reactor Trip and Bypass breaker indication, Rod Bottom Lights, RPI indication, and Nuclear Flux decreasing.
Examiners Note:
Examiner's Comment:
ENDOFTAS END OF TASK   K Termination:              Reactor has been manually tripped due to aa dropped rod while in Individual Bank select mode.
STOP STOP TIME:
2008 NRC 2008 NRC SIM SIM aa                                    NUREG NUREG 1021, 1021, Revision  9, Supplement Revision 9, Supplement 11
 
Appendix C Appendix  C                              Page 10 Page      of 11 10 of 11                    Form Form ES-C-1 ES-C-i VERIFICATION OF VERIFICATION  OF COMPLETION COMPLETION Job Performance Job  Performance Measure Measure No.:
No.:  2008 NRC 2008 NRC SIM SIM aa Examinees Name:
Examinee's   Name:
Date Performed:
Date   Performed:
Facility Evaluator:
Facility Evaluator:
Evaluator:
Number of Attempts:
Number of Attempts:
Time to Complete:
Time to Complete:
Question Documentation:
Question Documentation:
Question:
Question:
Response:
 
Result: SAT UNSAT Examiner's Signature:
===Response===
Date: -----------------------------
Result:                         SAT               UNSAT Examiners Signature:
Form ES-C-1 2008 NRC SIM a NUREG 1021, Revision 9, Supplement 1
Examiner's                                                   Date:
Appendix C INITIAL CONDITIONS:
                        -----------------------------
INITIATING CUE: 2008 NRC SIM a Page 11 of 11 JPM CUE SHEET
2008 2008 NRC NRC SIM SIM aa                                  NUREG 1021, Revision NUREG 1021,         9, Supplement Revision 9, Supplement 11
* The plant is at 75% power. Form ES-C-1
 
* OST-011, ROD CLUSTER CONTROL EXERCISE AND ROD POSITION INDICATION (Monthly) is being performed.
Appendix CC Appendix                                  Page 11 Page   11 of of 11 11                         Form Form ES-C-1 ES-C-i JPM CUE JPM           SHEET CUE SHEET INITIAL CONDITIONS:
* The prerequisites of Section 4 have been completed.
INITIAL  CONDITIONS:    The plant
You are to perform OST-011 commencing with Section 8.1 for Shutdown Bank "A" rods. NUREG 1021, Revision 9, Supplement 1
                    ** The plant isis at at 75%
Appendix C Facility:
75% power.
Task Title: KIA
power.
                    ** OST-011, OST-Ol 1, RODROD CLUSTER CLUSTER CONTROL CONTROL EXERCISE EXERCISE AND AND ROD ROD POSITION INDICATION POSITION     INDICATION (Monthly)
(Monthly) is is being performed.
being performed.
                    ** The The prerequisites prerequisites of   of Section Section 44 have have been been completed.
completed.
INITIATING CUE:
INITIATING              You are to perform perform OST-011 OST-Ol 1 commencing commencing with Section Section 8.1 for Bank "A" Shutdown Bank            rods.
A rods.
2008  NRC SIM 2008 NRC    SIM aa                                    NUREG    1021, Revision NUREG 1021,               9, Supplement Revision 9, Supplement 11
 
Appendix C Appendix        C                                    Job Job Performance Performance Measure Measure                  Form Form ES-C-1 ES-C-i Worksheet Worksheet Facility:
Facility:                    HB ROBINSON HB    ROBINSON                                      Task No.:
Task  No.:    01006100101 01006100101 Task Title:
Task     Title:             Fill aa Safety Fill    Safety Injection Injection Accumulator Accumulator lAW  lAW      JPM No.:
JPM  No.:    2008 NRC 2008 NRC SIMSIM bb OP-202.
OP-202.
K/A


==Reference:==
==Reference:==


Examinee:
KIA   
Facility Evaluator:
 
Method of testing: Job Performance Measure Worksheet HB ROBINSON Task No.: Fill a Safety Injection Accumulator lAW JPM No.: OP-202. 006 A4.01 4.1/3.9 006 A4.02 4.0/3.8 006 A 1.07 3.3/3.6 006 A1.13 3.5/3.7 NRC Examiner:
==Reference:==
Date: Form ES-C-1 01006100101 2008 NRC SIM b Simulated Performance:
006 A4.01 006    A4.0l 4.1/3.9 4.1/3.9 006 A4.02 006    A4.02 4.0/3.8 4.0/3.8 006 A   Al1.07
Actual Performance:
                                      .07 3.3/3.6 Al.13 3.5/3.7 006 A1.13 Examinee:                                                                  NRC Examiner:
_.:....:X_
Facility Evaluator:                                                          Date:
Plant x Classroom Simulator
Date:
---READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Method of testing:
Simulated Performance:                                                     Actual Performance:         xX Classroom
                                    - - - Simulator                X
_.:....:X_ Plant READ TO THE EXAMINEE II will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Initial Conditions:
Initial Conditions:
Task Standard:
* The plant is operating at 100% RTP.
Required Materials:
* SI ACCUM C HilLa  HI/LO LVL (APP-002-E4) alarm has been received and actions have been reviewed by the RO.
General
8.2.1 .1 Initial Conditions have been completed.
* OP-202, Section 8.2.1.1
* Refueling Water Purification is NOT in progress.
* You are the Licensed Dedicated Operator referred to in OP-202.
* Safety Injection Pump "A"      A has been walked down and pre-start checks are complete.
Task Standard:                     SI Accumulator C  "C" filled to reset the lowlow level alarm without exceeding specified limits.
Required Materials:             OP-202, OP-202, Revision 75,    75, Section 8.2.18.2.1 General General
 
==References:==


==References:==
==References:==
OP-202, Revision OP-202,    Revision 75,    Section 8.2.1 75, Section      8.2.1 2008 NRC 2008    NRC SIM SIM bb                                                    NUREG 1021, NUREG    1021, Revision Revision 9, 9, Supplement Supplement 11


2008 NRC SIM b
Appendix CC Appendix                                        Job Performance Job  Performance Measure Measure                          Form Form ES-C-1 ES-C-i Worksheet Worksheet Handouts:
* The plant is operating at 100% RTP.
Handouts:                    OP-202, Revision OP-202,     Revision 75, 75, Section Section 8.2.1 8.2.1 Initiating Cue:
* SI ACCUM C HilLa LVL (APP-002-E4) alarm has been received and actions have been reviewed by the RO.
Initiating   Cue:           The CRSS The   CRSS briefs briefs and has directed and has  directed you you to to fill fill SI SI Accumulator Accumulator "C" C to to reset reset the low the  low level level alarm alarm lAW lAW OP-202, OP-202, Section Section 8.2.1.
* OP-202, Section 8.2.1.1 Initial Conditions have been completed.
8.2.1.
* Refueling Water Purification is NOT in progress.
Time Critical Time    Critical Task:
* You are the Licensed Dedicated Operator referred to in OP-202.
Task:      NO NO Validation Time:
* Safety Injection Pump "A" has been walked down and pre-start checks are complete.
Validation    Time:        12 minutes 12  minutes SIMULATOR SETUP SIMULATOR
SI Accumulator "C" filled to reset the low level alarm without exceeding specified limits. OP-202, Revision 75, Section 8.2.1 OP-202, Revision 75, Section 8.2.1 NUREG 1021, Revision 9, Supplement 1
: 1.        IC-611.
Appendix C Handouts:
: 2.         NO SCN Required.
Initiating Cue: Time Critical Task: Validation Time: 1. IC-611. Job Performance Measure Worksheet OP-202, Revision 75, Section 8.2.1 Form ES-C-1 The CRSS briefs and has directed you to fill SI Accumulator "C" to reset the low level alarm lAW OP-202, Section 8.2.1. NO 12 minutes SIMULATOR SETUP 2. NO SCN Required.
: 3.           lC-61 1 not available, reset simulator to IC-13 If IC-611                                      IC-i 3 and drain SI Accumulator "C"     C to -61 6i %.
: 3. If IC-611 not available, reset simulator to IC-13 and drain SI Accumulator "C" to -61 %. 4. Ensure that Refueling Water Purification is NOT in progress.
: 4.         Ensure that Refueling Water Purification is NOT in progress.
: 5. Mark up OP-202, Section 8.2.1 with Initial Conditions Steps 8.2.1.1.a through 8.2.1.1.f.2 completed.
: 5.         Mark up OP-202, Section 8.2.1 with Initial Conditions Steps 8.2.1.1.a  8.2.1 .1 .a through 8.2.1.1.f.2 8.2.1 .1 .f.2 completed.
: 6. FREEZE the simulator until directed by the Chief Examiner to RUN. 2008 NRC SIM b NUREG 1021, Revision 9, Supplement 1
: 6.         FREEZE the simulator until directed by the Chief Examiner to RUN.
Appendix C Page 3 of 11 PERFORMANCE INFORMATION Form ES-C-1 (Denote Critical Steps with an asterisk)
2008 NRC 2008     NRC SIMb SIM b                                           NUREG NUREG 1021,1021, Revision Revision 9, 9, Supplement Supplement 11
 
Appendix CC Appendix                                          Page 33 of Page   of 11 ii                          Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE        INFORMATION (Denote Critical (Denote Critical Steps with an Steps with  an asterisk) asterisk)
START TIME: _ __
STARTTIME:
STARTTIME:
__ _ Examiner's Note: Performance Step: 1 Standard:
Examiners Note:
Examiner's     Note:         The candidate The    candidate may may use    ERFIS to use ERFIS    to monitor monitor SI  Accumulator "c" SI Accumulator    C level. (ERFIS:QP level.  (ERFIS:QP ACCUM ACCUM C)  C)
Performance Step:
Performance    Step: 11      Check open Check    open SI-856A, SI-856A, SI SI PUMP PUMP RECIRC RECIRC andand SI-8568, SI-856B, SISI PUMP PUMP RECI RC.
RECIRC.
Standard:                              Sl-856A and 8B checked OPEN.
Valves SI-856A Comment:
**  Performance Step: 2 Performance                  Verify the Control Power Defeat Switch for SI-869 is in the NORMAL position.
Standard:                    Locating NORMAL I/ DEFEAT key switch for SI-869    Sl-869 and placing the switch in the NORMAL position.
Examiners Examiner's Note:                  **  Key switch is located in the rear of the RTGB on the ECCS "ECCS VALVES CONTROL POWER DEFEAT PANEL."            PANEL.
* When the key switch is selected to NORMAL, amber light above the key switch will ILLUMINAT ILLUMINATE. E.
Comment:
Comment:
Comment:
* Performance Step: 2 Standard:
2008 2008 NRC NRC SIMb SIM b                                           NUREG NUREG 1021, 1021, Revision Revision 9, 9, Supplement Supplement 11
Examiner's Note: Comment: 2008 NRC SIM b The candidate may use ERFIS to monitor SI Accumulator "c" level. (ERFIS:QP ACCUM C) Check open SI-856A, SI PUMP RECIRC and SI-8568, SI PUMP RECIRC. Valves SI-856A and 8 checked OPEN. Verify the Control Power Defeat Switch for SI-869 is in the NORMAL position.
 
Locating NORMAL / DEFEAT key switch for SI-869 and placing the switch in the NORMAL position.
Appendix C Appendix  C                                  Page 44 of Page       of 11 ii                              Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE            INFORMATION Performance Step:
* Key switch is located in the rear of the RTGB on the "ECCS VALVES CONTROL POWER DEFEAT PANEL."
Performance  Step: 33 IfIf an an SI  actuation isis received SI actuation     received during filling, then during filling,  then immediately immediately close the close    the applicable applicable SI SI Accumulator makeup makeup valve valve and and perform perform Step 8.2.1.2.m Step     8.2.1 .2.m to restore restore the SI SI System System    lineup.
* When the key switch is selected to NORMAL, amber light above the key switch will ILLUMINATE.
lineup.
NUREG 1021, Revision 9, Supplement 1
Appendix C Performance Step: 3 Standard:
Examiner's Note: Comment:
* Performance Step: 4 Standard:
Examiner's Note: Comment: 2008 NRC SIM b Page 4 of 11 PERFORMANCE INFORMATION Form ES-C-1 If an SI actuation is received during filling, then immediately close the applicable SI Accumulator makeup valve and perform Step 8.2.1.2.m to restore the SI System lineup. Candidate acknowledges continuous action step in the event of an SI actuation.
Open SI-869, SI HOT LEG HDR. Valve SI-869 opened. NUREG 1021, Revision 9, Supplement 1
Appendix C
* Performance Step: 5 Standard:
Examiner's Note: Comment: Performance Step: 6 Standard:
Examiner's Note: Comment: 2008 NRC SIM b Page 5 of 11 PERFORMANCE INFORMATION Start SI Pump "A". SI Pump "A" started. Neither SI has been run in the last 15 days. Form ES-C-1 When an SI Pump is started, APP-002-C3, BIT HDR HI PRESS will be received due to the cold leg header being pressurized by the SI Pump. This is an expected alarm and the BOP should be directed to review the APP. Listed below are APP-002-C3 actions:
* Compare the indications on PI-943 and PI-934 to determine validity.
* If the header high pressure is due to SI System testing, then do NOT perform actions to clear the high pressure until testing is complete or the operating SI Pump discharge valve is closed. At least 1 SI Pump Area Cooling unit is operating (HVH-6A or 68 or both). HVH-6A and/or 68 verified operating.
NUREG 1021, Revision 9, Supplement 1
Appendix C Note prior to Step 8.2.1.2.h
* Performance Step: 7 Standard:
Examiner's Note: Comment: 2008 NRC SIM b Page 6 of 11 PERFORMANCE INFORMATION Form ES-C-1 NOTE: The following are pressure and level limits/alarms for the SI Accumulators:
* High Pressure Alarm 646 psig
* Normal Operating Pressure 630 psig
* High Level Alarm 75 percent
* Low Level Alarm 67 percent a. Open SI-851C, MAKEUP. b. Monitor the level and pressure of SI Accumulator "C". c. When desired level is obtained, then close SI-851 C. a. Valve SI-851C opened. b. Maintained>
614 psig and < 646 psig pressure limits as indicated on PI-929/931 and> 67% and < 75% level limits as indicated on U-928/930.
: c. Valve SI-851 C closed. ITS limits for SI Accumulators:
Pressure of 600 -660 psig. Level of 61.5 -80.4%. NUREG 1021, Revision 9, Supplement 1
Appendix C
* Performance Step: 8 Standard:
Examiner's Note: Comment: Performance Step: 9 Standard:
Examiner's Note: Comment: 2008 NRC SIM b Page 7 of 11 PERFORMANCE INFORMATION Stop the operating SI Pump Operating SI Pump stopped. Form ES-C-1 Verify both SI Pump Area Cooling units (HVH-6A and 68) are OFF Verifies HVH-6A and 68 are OFF. NUREG 1021, Revision 9, Supplement 1
Appendix C Page 8 of 11 PERFORMANCE INFORMATION Form ES-C-1
* Performance Step: 10 Close SI-869, 81 HOT LEG HDR Standard:
Valve SI-869 closed and independently verified closed. Examiner's Note: When an independent verification of Valve SI-869 is requested, inform the candidate that the valve has been independently verified closed. Comment:
* Performance Step: 11 Place the Control Power Defeat switch for SI-869 in the DEFEAT position.
Standard:
Standard:
Examiner's Cue: Examiner's Note: Comment: 2008 NRC SIM b Valve SI-869 control power switch has been positioned to DEFEAT. When an independent verification of SI-869 Control Power switch is requested, inform the candidate that the switch has been independently verified in the DEFEAT position.
Standard:            Candidate acknowledges Candidate      acknowledges continuous continuous action action step step in in the the event event of of an SI actuation.
When switch is positioned to DEFEAT position, amber light above the switch will extinguish.
Examiners Note:
NUREG 1021, Revision 9, Supplement 1
Examiner's Note:
Appendix C Page 9 of 11 PERFORMANCE INFORMATION Form ES-C-1 Performance Step: 12 IF the Refueling Water Purification Pump was stopped in Step B.2.1.1.f, THEN perform the following:
Comment:
Standard:
**  Performance Step: 4            Sl-869, SI HOT LEG HDR.
Examiner's Note: Comment: Terminating Cue: STOP TIME: 200B NRC SIM b
Open SI-869, Standard:            Valve SI-869 opened.
* Open SFPC-B05B, RWST RETURN.
Examiners Note:
* Start the Refueling Water Purification Pump. Candidate determines that the RWST purification was NOT in progress from the initial conditions and places Nt As in these steps. END OF TASK SI Accumulator "C" has been filled to clear the low level alarm. NUREG 1021, Revision 9, Supplement 1
Examiner's Comment:
Appendix C Page 10 of 11 VERIFICATION OF COMPLETION Job Performance Measure No.: 2008 NRC SIM b Examinee's Name: Date Performed:
2008 NRC 2008 NRC SIMb SIM b                                        NUREG    1021, Revision NUREG iO2i,      Revision 9,9, Supplement Supplement 11
 
Appendix C Appendix  C                                  Page 55 of Page    of 11 11                        Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE          INFORMATION
**  Performance Step:
Performance  Step: 55 Start SI Start      Pump "A".
SI Pump    A.
Standard:                  Pump "A" SI Pump    A started.
started.
Examiners Note:
Examiner's            Neither SI has been run in the last 15    15 days.
When an SI Pump Pump isis started, APP-002-C3, BIT HDR HI PRESS will be received due to the cold leg    leg header header being pressurized by the SI Pump. This is an expected alarm and the BOP should be directed to review the APP.
Listed below are APP-002-C3 actions:
* Compare the indications on PI-943 P1-943 and PI-934 P1-934 to determine validity.
* If the header high pressure is due to SI System testing, then do NOT perform actions to clear the high pressure until testing is complete or the operating SI Pump discharge valve is closed.
Comment:
Performance Step: 6    At least 11 SI Pump Area Cooling unit is operating (HVH-6A or 68  6B or both).
Standard:             HVH-6A and/or 6B  68 verified operating.
Examiners Examiner's Note:
Note:
Comment:
2008 NRC 2008      SIM bb NRC SIM                                          NUREG    1021, Revision NUREG 1021,    Revision 9, 9, Supplement Supplement 11
 
Appendix C Appendix  C                            Page 66 of Page    of 11 11                          Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE        INFORMATION NOTE: The NOTE:    The following following are  pressure and are pressure  and level level Note prior prior to Step        limits/alarms for limits/alarms  for the the SI Accumulators:
SI Accumulators:
Note          Step 8.2.1.2.h 8.2.1.2.h              **  High Pressure High  Pressure Alarm              646 646 psig psig
                          **  Normal Operating Pressure Normal                Pressure          psig 630 psig
                          **  High Level High  Level Alarm Alarm                  75 percent 75  percent
                          **  Low Level Alarm                    67 percent
**  Performance Step: 7              SI-851 C, MAKEUP.
: a. Open SI-851C,
: b. Monitor the level and pressure of SI Accumulator "C". C.
: c. When desired level is obtained, then close SI-851    C.
SI-851C.
Standard:                        Sl-851C opened.
: a. Valve SI-851C
: b. Maintained> 614 psig and <    < 646 psig pressure limits as P1-929/931 and>
indicated on PI-929/931  and > 67% and < <75%
75% level limits as indicated on U-928/930.
Ll-9281930.
Sl-851 C closed.
: c. Valve SI-851 Examiners Note:
Examiner's          ITS limits for SI Accumulators:
Pressure of 600 - 660 psig.
 
Level of 61.580.4%.
61.5 - 80.4%.
Comment:
2008 NRC 2008  NRC SIM SIM bb                              NUREG NUREG 1021, 1021, Revision Revision 9, 9, Supplement Supplement 11
 
Appendix C Appendix  C                                Page 77 of Page        11 of 11                      Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE        INFORMATION
**  Performance Step:
Performance  Step: 88      the operating Stop the Stop      operating SI SI Pump Pump Standard:
Standard:              Operating SI Operating  SI Pump Pump stopped.
stopped.
Examiners Note:
Examiner's  Note:
Comment:
Performance Step: 9    Verify both SI Pump Area Cooling units (HVH-6A and 68) 6B) are OFF Standard:              Verifies HVH-6A and 686B are OFF.
Examiners Note:
Examiner's Comment:
2008 NRC 2008 NRC SIM SIM bb                                  NUREG  1021, Revision NUREG 1021,          9, Supplement Revision 9, Supplement 11
 
Appendix C Appendix  C                                Page 88 of Page    of 11 11                          Form ES-C-1 Form ES-C-i PERFORMANCE INFORMATION PERFORMANCE        INFORMATION
**  Performance Step:
Performance  Step: 10 10 Close SI-869, Close  SI-869, 81 SI HOT  LEG HDR HOT LEG    HDR Standard:
Standard:              Valve SI-869 Valve  SI-869 closed closed and and independently independently verified verified closed.
closed.
Examiners Note:
Examiner's            When an independent verification of Valve SI-869  Sl-869 is candidate that the valve has been requested, inform the candidate independently verified closed.
independently Comment:
**  Performance Step: 11  Place the Control Power Defeat switch for SI-869 S1-869 in the DEFEAT position.
Standard:              Valve SI-869 control power switch has been positioned to DEFEAT.
Examiners Cue:
Examiner's            When an independent verification of SI-869 Control Power switch is requested, inform the candidate that the switch has been independently verified in the DEFEAT position.
Examiners Examiner's Note:      When switch is positioned to DEFEAT position, amber light above the switch will extinguish.
Comment:
2008 2008 NRC NRC SIM SIM bb                                  NUREG 1021, NUREG   1021, Revision Revision 9,9, Supplement Supplement 11
 
Appendix C Appendix C                                  Page 99 of Page   of 11 11                            Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE        INFORMATION Performance Step:
Performance   Step: 12 12  IF the IF the Refueling Refueling Water Water Purification Purification Pump Pump was was stopped stopped inin Step Step 8.2.1.1 .f, THEN B.2.1.1.f,         perform the THEN perform     the following:
following:
                              **   Open SFPC-B05B, Open    SFPC-805B, RWST RWST RETURN.
RETURN.
                              *Start the Start  the Refueling Refueling Water Water Purification Purification Pump.
Pump.
Standard:              Candidate determines that the RWST purification purification was NOT in places Nt progress from the initial conditions and places         As in these steps.
N/As Examiners Note:
Examiner's Comment:
END OF OFTASK TASK Terminating Cue:          SI Accumulator "C" has been filled to clear the low  low level alarm.
STOP STOP TIME:
TIME:
2008 200B NRC NRC SlMb SIM b                                      NUREG 1021, NUREG       1021, Revision Revision 9,9, Supplement Supplement 11
 
Appendix C Appendix    C                              Page 10 Page     of 11 10 of 11                   Form Form ES-C-1 ES-C-i VERIFICATION OF VERIFICATION       COMPLETION OF COMPLETION Job Performance Job  Performance Measure Measure No.:
No.: 2008 NRC 2008 NRC SIM SIM bb Examinees Name:
Examinee's     Name:
Date Performed:
Date   Performed:
Facility Evaluator:
Facility Evaluator:
Number of Attempts:
Facility Number of Attempts:
Time to Complete:
Time to Complete:
Question Documentation:
Question Documentation:
Question:
Question:
Response:
 
Result: SAT UNSAT Examiner's Signature:
===Response===
Date: -----------------------------
Result:                           SAT             UNSAT Examiners Examiner's Signature:                                       Date:
Form ES-C-1 2008 NRC SIM b NUREG 1021, Revision 9, Supplement 1
                        -----------------------------
Appendix C INITIAL CONDITIONS:
2008 NRC 2008    NRC SIM SIM bb                                NUREG NUREG 1021, 1021, Revision Revision 9, 9, Supplement Supplement 11
INITIATING CUE: 2008 NRC SIM b Page 11 of 11 JPM CUE SHEET
 
* The plant is operating at 100% RTP. Form ES-C-1
Appendix C Appendix  C                                Page 11 Page   1 1 of  11 of 11                             Form Form ES-C-1 ES-C-i JPM CUE JPM  CUE SHEET SHEET INITIAL CONDITIONS:
* SI ACCUM C HIILO LVL (APP-002-E4) alarm has been received and actions have been reviewed by the RO.
INITIAL  CONDITIONS:    The plant
* OP-202, Section 8.2.1.1 Initial Conditions have been completed.
                    ** The   plant isis operating operating atat 100%
* Refueling Water Purification is NOT in progress.
100% RTP.RTP.
* You are the Licensed Dedicated Operator referred to in OP-202.
                    ** SI SI ACCUM ACCUM C        HI/LO LVL C HIILO   LVL (APP-002-E4)
* Safety Injection Pump "A" has been walked down and pre-start checks are complete.
(APP-002-E4) alarm      has been alarm has   been received received and and actions have actions have been been reviewed reviewed by  by the the RO.
The CRSS briefs and has directed you to fill SI Accumulator "C" to reset the low level alarm lAW OP-202, Section 8.2.1. NUREG 1021, Revision 9, Supplement 1
RO.
Appendix C Facility:
                    ** OP-202, OP-202, Section Section 8.2.1.1 8.2.1 .1 Initial Initial Conditions Conditions have have been been completed.
Task Title: KIA
completed.
                    ** Refueling Refueling Water Purification Purification is is NOT NOT inin progress.
progress.
                    ** You are the Licensed Dedicated Dedicated Operator referred to in OP-202.
                    ** Safety Safety Injection Injection Pump Pump "A"     has been A has     been walked down down and and pre-start pre-start checks are complete.
INITIATING CUE:        The CRSS briefs and has directed you to fill SI Accumulator "C"         C to reset the low level alarm lAW OP-202, Section 8.2.1.
2008 2008 NRC NRC SIMb SIM b                                      NUREG NUREG 1021, 1021, Revision Revision 9, 9, Supplement Supplement 11
 
Appendix C   C                                  Job Performance Measure                        Form ES-C-i ES-C-1 Worksheet Facility:                   HB ROBINSON                                Task No.:    01000109605 Task Title:                 Isolate Ruptured S/G lAW PATH-2.            JPM No.:      2008 NRC SIM c K/A


==Reference:==
==Reference:==


Examinee:
KIA                        038 EK3.02   4.4/4.5 038 EA2.09   3.2/3.3 038 EA1.i1 EA 1.11   3.8/3.9 038 EA1.16 EA 1.16 4.4/4.3 038 EA1.18   4.0/3.9 Examinee:                                                           NRC Examiner:
Facility Evaluator:
Facility Evaluator:                                                Date:
Method of testing: Job Performance Measure Worksheet HB ROBINSON Isolate Ruptured S/G lAW PATH-2. 038 EK3.02 4.4/4.5 038 EA2.09 3.2/3.3 038 EA 1.11 3.8/3.9 038 EA 1.16 4.4/4.3 038 EA1.18 4.0/3.9 Task No.: JPM No.: NRC Examiner:
Method of testing:
Date: Form ES-C-1 01000109605 2008 NRC SIM c Simulated Performance:
Simulated Performance:                                             Actual Performance:           X Classroom       - - - Simulator          --X - Plant READ TO THE EXAMINEE II will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Actual Performance:
Initial Conditions:               ** The plant was operating at 100% RTP.
X Classroom Simulator X Plant ------READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
* RCS depressurization led to a Reactor Trip and Safety Injection.
Initial Conditions:
* S/G "A"A has been identified as ruptured.
Task Standard:
* Grid location 8-6B-6 (Maintain at least ONE S/G available for RCS Cooldown) of PATH-2 has just been reached.
Required Materials:
* Supplement G actions have NOT been completed.
Task Standard:                 S/G "A"A is isolated per PATH-2 and Supplement N.
Required Materials:           PATH-2, Revision 17 and Supplement N, Revision 35.
General  
General  


==References:==
==References:==
PATH-2, Revision 17 and Supplement N, Revision 35.
Handouts:                    None Initiating Cue:              The CRSS directs you to completely isolate S/G "A"    A starting at PATH-2 grid location 8-6B-6 (Ruptured S/G identified) in preparation for a rapid cooldown.
2008 NRC SIM c                                                    NUREG 1021, Revision 9, Supplement 11


Handouts:
Appendix C Appendix    C                              Job Performance Job Performance Measure Measure                   Form Form ES-C-1 ES-C-i Worksheet Worksheet Time Critical Time   Critical Task:
Initiating Cue: 2008 NRC SIM c
Task:      NO NO Validation Time:               minutes 20 minutes SIMULATOR SETUP
* The plant was operating at 100% RTP.
: 1. IC-614.
* RCS depressurization led to a Reactor Trip and Safety Injection.
: 1. 10-614.
* S/G "A" has been identified as ruptured.
: 2. SCN 006_JPM_S4.
* Grid location 8-6 (Maintain at least ONE S/G available for RCS Cooldown) of PATH-2 has just been reached.
lC-61 4 is not available, reset simulator to IC-13
* Supplement G actions have NOT been completed.
: 3. If IC-614                                        IC-i 3 and perform the following:
S/G "A" is isolated per PATH-2 and Supplement N. PATH-2, Revision 17 and Supplement N, Revision 35. PATH-2, Revision 17 and Supplement N, Revision 35. None The CRSS directs you to completely isolate S/G "A" starting at PATH-2 grid location 8-6 (Ruptured S/G identified) in preparation for a rapid cooldown.
Vi-3A to the OPEN position - IMF MSS03A
NUREG 1021, Revision 9, Supplement 1
: a. Override MSIV V1-3A                                MSSO3A f:FAIL_   TO_CLOSE.
Appendix C Job Performance Measure Worksheet Form ES-C-1 Time Critical Task: NO Validation Time: 20 minutes SIMULATOR SETUP 1. IC-614. 3. If IC-614 is not available, reset simulator to IC-13 and perform the following:
f:FAIL_TO_CLOSE.
: a. Override MSIV V1-3A to the OPEN position -IMF MSS03A f:FAIL_ TO_CLOSE.
: b. Override MSIV V1-3A Vi -3A OPEN /I CLOSED indication AS IS - lOR IOR doMSSDDOO49B f:OFF and lOR doMSSDD00498                  IOR doMSSDD0049C doMSSDDOO49C f:ON.
: b. Override MSIV V1-3A OPEN / CLOSED indication AS IS -lOR doMSSDD00498 f:OFF and lOR doMSSDD0049C f:ON. c. Insert 300 GPM tube rupture on S/G A -MFI SGN02A. d. Carry out actions of PATH-1 and PATH-2 until Step 8-6 is reached then FREEZE. 4. Ensure PATH-2 is marked up to Step 8-6. Have a copy of SUPPLEMENT N available for the operator to use and mark up. 2008 NRC SIM c NUREG 1021, Revision 9, Supplement 1
: c. Insert 300 GPM tube rupture on S/G       -    SGNO2A.
Appendix C Page 3 of 15 PERFORMANCE INFORMATION Form ES-C-1 (Denote Critical Steps with an asterisk)
SIG A - MFI SGN02A.
: d. Carry out actions of PATH-1 PATH-i and PATH-2 until Step 8-6 B-6 is reached then FREEZE.
: 4. Ensure PATH-2 is marked up to Step B-6. 8-6. Have a copy of SUPPLEMENT N        N available for the operator to use and mark up.
2008 NRC 2008  NRC SIM SIM cc                                        NUREG NUREG 1021, 1021, Revision  9, Supplement Revision 9, Supplement 11
 
Appendix CC Appendix                                          Page 33 of Page   of 15 15                          Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE          INFORMATION (Denote Critical (Denote Critical Steps Steps with with an an asterisk) asterisk)
START TIME: _ __
STARTTIME:
STARTTIME:
__ _ Performance Step: 1 Standard:
Performance Step:
Examiner's Note: Comment:
Performance     Step: 11    Maintain at Maintain     least one at least one S/G SIG available available for for RCS RCS cooldown.
* Performance Step: 2 Standard:
cooldown.
Examiner's Note: Comment: 2008 NRC SIM c Maintain at least one S/G available for RCS cooldown.
Standard:
Operator identifies S/Gs "B" and "c" are available for RCS cooldown.
Standard:                  Operator identifies Operator  identifies S/Gs     and "c" B and S/Gs "B"           are available C are  available for for RCS RCS cooldown.
Verify ruptured Steam Line PORV setpoint at 1035 psig using status board. Operator adjusts potentiometer to 3.36, steam line PORV setpoint at 1035 psig, by comparing Status Board setpoint for S/G "A" PORV with potentiometer setting for RV1-1. NUREG 1021, Revision 9, Supplement 1
cooldown.
Appendix C
Examiners Note:
* Performance Step: 3 Standard:
Examiner's    Note:
Examiner's Note: Comment: Performance Step: 4 Standard:
Comment:
Examiner's Note: Comment: 2008 NRC SIM c Page 4 of 15 PERFORMANCE INFORMATION Form ES-C-1 Verify RCS temp less than 547 of prior to MSIV closure. Operator dumps steam to lower RCS temperature below 547 of using Steam Line PORVs or Condenser Steam Dumps.
**  Performance Step: 2 Performance                Verify ruptured Steam Line PORV setpoint at 1035 psig using status board.
* Condenser Steam Dumps:
Standard:                  Operator adjusts potentiometer potentiometer to 3.36, steam line PORV setpoint at 1035 psig, by comparing Status Board setpoint for A PORV with potentiometer S/G "A"               potentiometer setting for RV1-1.
* Take PC-464B to MANUAL and adjust valve position using UP or DOWN pushbuttons.
RV1 -1.
* PC-464B in Automatic, adjust potentiometer to a lower setting to reduce RCS temperature.
Examiners Note:
Examiner's Comment:
2008 2008 NRC NRC SIM SIM cc                                        NUREG NUREG 1021, 1021, Revision Revision 9, 9, Supplement Supplement 11
 
Appendix CC Appendix                                    Page 44 of Page       of 15 15                          Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE          INFORMATION
**  Performance Step:
Performance    Step: 33 Verify RCS Verify       temp less RCS temp   less than than 547 547 of
                                                                &deg;F prior prior to to MSIV MSIV closure.
closure.
Standard:
Standard:                Operator dumps Operator  dumps steam steam to to lower lower RCS RCS temperature temperature below below 547547 of
                                                                                                    &deg;F using Steam using Steam Line Line PORVs PORVs or  or Condenser Condenser Steam Steam Dumps.
Dumps.
                              **  Condenser Steam Condenser     Steam Dumps:
Dumps:
                                  **       PC-464B to MANUAL Take PC-464B           MANUAL and adjust valvevalve position position using UP using  UP oror DOWN DOWN pushbuttons.
pushbuttons.
                                  ** PC-464B in PC-464B      in Automatic, Automatic, adjust adjust potentiometer potentiometer toto aa lower lower setting to reduce RCS temperature.
* Steam Line PORVs:
* Steam Line PORVs:
* Adjust Potentiometer to OPEN or CLOSE PORV. Close ruptured S/G MSIV AND MSIV bypass. After RCS temperature less than 547 of, Operator attempts to close MSIV. MSIV will NOT close. NUREG 1021, Revision 9, Supplement 1
* Adjust Potentiometer to OPEN or CLOSE PORV.
Appendix C Performance Step: 5 Standard:
Examiners Note:
Examiner's Note: Comment: Performance Step: 6 Standard:
Examiner's Comment:
Examiner's Note: Comment: 2008 NRC SIM c Page 5 of 15 PERFORMANCE INFORMATION Ruptured S/G MSIV AND MSIV Bypass Closed. Form ES-C-1 Operator responds NO, MSIV A will not close. Will transition to Supplement N to complete the isolation.
Performance Step: 4    Close ruptured S/G MSIV AND MSIV bypass.
The Operator will go to Supplement N to address the alternate method of isolating the ruptured S/G. Supplement N Actions Verify BOTH Turbine Stop Valves CLOSED. (Step 1) Operator verifies BOTH Turbine Stop Valves indicate CLOSED on the RTGB. Turbine Stop and Bypass Valves were closed when the plant tripped. NUREG 1021, Revision 9, Supplement 1
Standard:                After RCS temperature less than 547 &deg;F,    of, Operator attempts to close MSIV.
Appendix C
MSIV.
* Performance Step: 7 Standard:
Examiners Examiner's Note:
Examiner's Note: Comment: Performance Step: 8 Standard:
Note:    MSIV will NOT MSIV      NOT close.
Examiner's Note: Comment: 2008 NRC SIM c Page 6 of 15 PERFORMANCE INFORMATION Form ES-C-1 Verify ALL Condenser Steam Dump Valves CLOSED (Step 2) Operator closes the condenser dump isolation valves, and verifies that ALL valves indicate CLOSED (GREEN).
close.
* NE COND DUMP 1324A-1
Comment:
* NW COND DUMP 1324B-1
Comment:
2008 2008 NRC NRC SIMSIM cc                                      NUREG 1021, NUREG    1021, Revision Revision 9, 9, Supplement Supplement 11
 
Appendix C Appendix  C                              Page 55 of Page    of 15 15                              Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE        INFORMATION Performance Step:
Performance   Step: 55  Ruptured S/G Ruptured  SIG MSIV MSIV AND AND MSIV MSIV Bypass Bypass Closed.
Closed.
Standard:
Standard:              Operator responds Operator responds NO, NO, MSIV MSIV A A will will not not close.
close. Will Will transition transition to to Supplement N Supplement     to complete N to complete the the isolation.
isolation.
Examiners Note:
Examiner's  Note:    The Operator will go to Supplement N        N to address the method of isolating the ruptured S/G.
alternate method                                    SIG.
Comment:
Supplement N Actions Performance Step: 6  Verify BOTH Turbine Stop Valves CLOSED. (Step 1)
Standard:              Operator verifies BOTH Turbine Stop Valves indicate CLOSED on the RTGB.
Examiners Note:
Examiner's            Turbine Stop and Bypass Valves were closed when the plant tripped.
Comment:
2008 2008 NRC NRC SIMc SIM c                                  NUREG NUREG 1021, 1021, Revision   9, Supplement Revision 9,  Supplement 11
 
Appendix C Appendix  C                              Page 66 of Page       15 of 15                             Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE        INFORMATION
**  Performance Step: 7 Performance                  ALL Condenser Verify ALL   Condenser Steam Steam Dump Dump Valves CLOSED CLOSED (Step(Step 2) 2)
Standard:
Standard:            Operator closes Operator    closes the the condenser condenser dump     isolation valves, dump isolation    valves, and and indicate CLOSED verifies that ALL valves indicate   CLOSED (GREEN).
(GREEN).
                            **     NE COND DUMP NE          DUMP 1324A-1 1324A-1
                            **      NW   COND DUMP NW COND    DUMP 1324B-1 1324B-1
* SE COND DUMP 1324A-2
* SE COND DUMP 1324A-2
* W COND DUMP 1324B-3
                            **      W COND DUMPDUMP 1324B-3 1324B-3
* SW COND DUMP 1324B-2 Condenser steam dump valves can be closed by placing PC-4648 in MAN and closing ALL valves OR place the Steam Dump Control to OFF. Verify ALL MSR Purge Valves CLOSED (Step 3) Operator verifies valves MS-V1-6-1 A, MS-V1-6-1 B, MS-V1-6-2A and MS-V1-6-2B are closed at the RTGB by observing green lights illuminated the MSR Purge isolation valves. NUREG 1021, Revision 9, Supplement 1
* SW COND DUMP 1324B-2 Examiners Note:
Appendix C Performance Step: 9 Standard:
Examiner's          Condenser steam dump valves can be closed by placing PC-             PC 464B in MAN and closing ALL valves OR place the Steam 4648 Dump Control to OFF.
Examiner's Note: Comment:
Comment:
* Performance Step: 10 Standard:
Performance Step: B8 Verify ALL MSR Purge Valves CLOSED (Step 3)
Examiner's Note: Comment: 2008 NRC SIM c Page 7 of 15 PERFORMANCE INFORMATION Verify ALL MSR Shutoff Valves CLOSED (Step 4) Form ES-C-1 Operator verifies MS-V1-5-1 A, 1 B, 2A, & 2B valves are closed at the RTGB by observing green lights illuminated the MSR Shutoff isolation valves. Go To Step 6 to address the S/G "A" MSIV NOT closing. (Step 5) Verify the S/G "B" & "C" MSIVs CLOSED. (Step 6) Operator closes MSIVs V1-3B and V1-3C for S/Gs "B" & "C". NUREG 1021, Revision 9, Supplement 1
Standard:            Operator verifies valves MS-V1    i A, MS-Vi MS-V1-6-1             1 B, MS-V1 MS-V1-6-1       MS-V1-6-2A 2A and MS-V1   2B are closed at the RTGB by observing green MS-V1-6-2B lights illuminated illuminated the MSR Purge isolation valves.
Appendix C Page 8 of 15 PERFORMANCE INFORMATION Form ES-C-1
Examiners Examiner's Note:
* Performance Step: 11 Verify steam supply valve to SDAFW pump from S/G "A" CLOSED. (Step 7) Standard:
Note:
Operator CLOSES V1-8A, Steam Shutoff and Goes to Step 14. Examiner's Cue: Examiner's Note: Comment:
Comment:
* Performance Step: 12 Standard:
Comment:
Examiner's Note: Examiner's Cue: Comment: 2008 NRC SIM c Dispatch an Operator to perform the following: (Step 14) a) Check BOTH the Turbine Stop Valve Bypass valves MS-297 & 298 CLOSED. b) Close Gland Seal Steam Supply Inlet Valve, GS-31. c) Close ALL Condenser Steam Dump Trap Isolation valves
2008 NRC 2008      SIM cc NRC SIM                                       NUREG 1021, NUREG     1021, Revision Revision 9,9, Supplement Supplement 11
* MS-128, PRV-1324A-2, Trap T-67 Inlet
 
* MS-133, PRV-1324A-1, Trap T-66 Inlet
Appendix CC Appendix                                      Page 77 of Page         15 of 15                             Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE           INFORMATION Performance Step:
* MS-139, PRV-1324B-2, Trap T-69 Inlet
Performance   Step: 99 Verify ALL Verify  ALL MSR MSR Shutoff      Valves CLOSED Shutoff Valves    CLOSED (Step(Step 4) 4)
* MS-145, PRV-1324B-1, Trap T-68 Inlet
* MS-148, PRV-1324B-3, Trap T-70 Inlet Operator directs AO to close and / or verify the valves closed. When directed by operator, acknowledge request. Report that all valves are closed. NUREG 1021, Revision 9, Supplement 1
Appendix C Page 9 of 15 PERFORMANCE INFORMATION Form ES-C-1 Performance Step: 13 Check ALL actions of Supplement N complete. (Step 15) Standard:
Operator informs CRSS that ALL actions of Supplement N are complete.
Examiner's Note: This completes the actions of Supplement N, the Operator should now resume PATH-2 at Step 8-8. Comment: Performance Step: 14 Use intact Steam Line PORVs for steam dump. Standard:
Operator uses intact steam line PORVs for steam dump (S/G '8' and 'C' only). Examiner's Note: Comment: Performance Step: 15 Ruptured S/G isolated from at least one intact S/G. Standard:
Operator answers YES, Ruptured S/G is isolated from at least one S/G. Examiner's Note: Comment: 2008 NRC SIM c NUREG 1021, Revision 9, Supplement 1
Appendix C Performance Step: 16 Standard:
Examiner's Note: Comment: Page 10 of 15 PERFORMANCE INFORMATION Form ES-C-1 WHEN ruptured S/G press decreases below 1035 psig THEN verify ruptured steam line PORV closed. Operator verifies PORV RV1-1 closed when S/G 'A' pressure less than 1035 psig. Performance Step: 17 IF MDAFW pump is not available, THEN maintain at least one S/G supply to SDAFW pump. Standard:
Operator verifies both MDAFW pumps available.
Examiner's Note: Comment: Performance Step: 18 Close ruptured S/G steam shutoff to SDAFW pump. Standard:
Operator verifies MS-V1-8A closed. Examiner's Note: Comment: 2008 NRC SIM c NUREG 1021, Revision 9, Supplement 1
Appendix C Page 11 of 15 PERFORMANCE INFORMATION Form ES-C-1 Performance Step: 19 Verify S/G blowdown isolation and sample valves closed. Standard:
Operator verifies S/G 'A' blowdown isolation and sample valves closed (FCV-1930 A&B, FCV-1933 A&B) by Phase A panel status light illuminated on RTGB. Examiner's Note: Phase A panel status light illuminates when all of the blowdown and sample isolation valves for S/G A are closed. Comment:
* Performance Step: 20 Standard:
Booth Operator Note: Comment: 2008 NRC SIM c Candidate may use SPDS function for Containment to verify that all S/G Blowdown and Sample valves are closed. Locally close warmup steam supply from ruptured S/G to SDAFW pump. Operator dispatches an AO to locally close warmup steam supply from S/G 'A' to SDAFW pump. When directed by operator, acknowledge request. Close valve MS-20 by selecting Remote Function MSS047 (IRF MSS047 f:O). Report back that valve is closed. NUREG 1021, Revision 9, Supplement 1
Appendix C Page 12 of 15 PERFORMANCE INFORMATION Form ES-C-1 Performance Step: 21 Locally close MSIV above and below seat drains from ruptured S/G. Standard:
These are locked valves that are part of the CV Integrity boundary in the steam lines and do not require local action to verify the valves are shut. These valves are normally locked closed and a dedicated operator is provided to close them in the event that an accident takes place. It is expected that if a valve has been opened the CRSS would be aware of it. The Operator may dispatch an AO to close MSIV MS-V1-3A above and below seat drains from S/G 'A'. Booth Operator Note: If directed by operator, acknowledge request. Report back valves closed. Comment: Performance Step: 22 Isolate feed flow to any ruptured S/G that is faulted unless needed for RCS cooldown.
Standard:
Standard:
Operator determines that the S/G 'A' is not faulted. Examiner's Note: Comment:
Standard:                Operator verifies Operator    verifies MS-V1-5-1 MS-Vi i A,A, 11 B, 2A, && 2B B, 2A,    2B valves valves are are closed closed at at the  RTGB by the RTGB    by observing observing green green lights lights illuminated illuminated the the MSR MSR Shutoff Shutoff isolation valves.
* Performance Step: 23 When ruptured S/G level greater than 8% [18%] then isolate feed flow. Standard:
isolation  valves.
Operator checks level greater than 8% and isolates feed flow to S/G 'A' by closing V2-14A and V2-16A. Examiner's Note: Comment: 2008 NRC SIM c NUREG 1021, Revision 9, Supplement 1
Examiners Note:
Appendix C
Examiner's    Note:
* Performance Step: 24 Standard:
Comment:
Booth Operator Note: Comment: Terminating Cue: STOP TIME: 2008 NRC SIM c Page 13 of 15 PERFORMANCE INFORMATION Form ES-C-1 Open breakers for any V1-8, V2-14, and V2-16 valve closed to isolate ruptured S/G. Operator contacts AO to open breakers for V1-8A, V2-14A and V2-16A. IRF EPSMCC5_189 f:RACK_OUT IRF EPSMCC10_262 f:RACK_OUT IRF EPSMCC10_264 f:RACK_OUT IRF EPSMCC9_255 f:RACK_OUT Note: Valve V2-16A has 2 power supplies, Normal and Emergency.
* Performance Step: 10 Performance            Go To Step 6 to address the S/G  SIG "A"A MSIV NOT closing. (Step 5)
Ruptured SIG has been isolated lAW Supplement N. NUREG 1021, Revision 9, Supplement 1
Verify the S/G "B"B & "C" C MSIVs CLOSED. (Step 6)
Appendix C Page 14 of 15 VERIFICATION OF COMPLETION Job Performance Measure No.: 2008 NRC SIM c Examinee's Name: Date Performed:
Standard:              Operator closes MSIVs V1-3B Vi -3B and Vi      -3C for S/Gs V1-3C            B & "C".
S!Gs "B"    C.
Examiners Examiner's Note:
Comment:
2008 NRC 2008 NRC SIM SIM cc                                      NUREG NUREG 1021, 1021, Revision  9, Supplement Revision 9, Supplement 11
 
Appendix C Appendix  C                                Page      of 15 Page 88 of  15                        Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE        INFORMATION
**  Performance Step:
Performance  Step: 11 11 Verify  steam supply Verify steam  supply valve valve to to SDAFW SDAFW pump pump from from S/G SIG "A" A
CLOSED. (Step CLOSED.      (Step 7) 7)
Standard:
Standard:              Operator CLOSES Operator              Vi -8A, Steam CLOSES V1-8A,      Steam Shutoff Shutoff and and Goes Goes to to Step Step 14.
14.
Examiners Cue:
Examiner's Examiners Note:
Examiner's  Note:
Comment:
**  Performance Step: 12  Dispatch an Operator to perform the following: (Step 14) a) Check BOTH the Turbine Stop Valve Bypass valves MS-      MS 297 & 298 CLOSED.
b) Close Gland Seal Steam Supply Inlet Valve, GS-31.GS-3i.
c) Close ALL Condenser Steam Dump Trap Isolation valves
* MS-128, PRV-1324A-2, Trap T-67 Inlet PRV-i 324A-1, Trap T-66 Inlet MS-i 33, PRV-1324A-1,
* MS-133, PRV-i324B-2, Trap T-69 Inlet MS-i 39, PRV-1324B-2,
* MS-139,
* MS-145,    PRV-1324B-i, Trap T-68 Inlet MS-i45, PRV-1324B-1,
* MS-148, PRV-i324B-3, PRV-1324B-3, Trap T-70 Inlet Standard:              Operator directs AO to close and / or verify the valves closed.
Examiners Examiner's Note:
Examiners Examiner's Cue:
Cue:      When directed by by operator, operator, acknowledge request.
request. Report that all valves are closed.
Comment:
2008 2008 NRC NRC SIM SIM cc                                    NUREG NUREG 1021, 1021, Revision  9, Supplement Revision 9,  Supplement 11
 
Appendix CC Appendix                                      Page 99 of Page      of 15 15                          Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE          INFORMATION Performance Performance Step:
Step: 13 13  Check ALL Check        actions of ALL actions  of Supplement Supplement NN complete.
complete. (Step (Step 15) 15)
Standard:
Standard:                Operator informs Operator  informs CRSS CRSS that that ALL ALL actions actions of of Supplement Supplement N  N are are complete.
complete.
Examiner's Examiners Note:
Note:    This completes This  completes the      actions of the actions    of Supplement Supplement N,      the Operator N, the  Operator should now should  now resume resume PATH-2 PATH-2 atat Step Step 8-8.
B-8.
Comment:
Performance Step: 14    Use intact Steam Line PORVs for steam dump.
Standard:                Operator uses intact steam line PORVs for steam dump (S/G      (SIG '8' B
C only).
and 'C' Examiners Note:
Examiner's Comment:
Performance Step:
Performance    Step: 15 15 Ruptured S/G isolated isolated from at least one intact SIG.
S/G.
Standard:
Standard:                Operator Operator answers YES,YES, Ruptured Ruptured SIG S/G is is isolated isolated from atat least least one S/G.
S/G.
Examiners Examiner's Note:
Note:
Comment:
Comment:
2008 2008 NRC NRC SIMSIM cc                                      NUREG    1021, Revision NUREG 1021,    Revision 9,9, Supplement Supplement 11
 
Appendix C Appendix  C                                Page 10 Page    10 of of 15 15                        Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE          INFORMATION Performance Step:
Performance  Step: 16 16 WHEN ruptured WHEN      ruptured S/G    press decreases S/G press      decreases below below 1035 1035 psig psig THEN THEN verify  ruptured steam verify ruptured  steam line line PORV PORV closed.
closed.
Standard:
Standard:              Operator verifies Operator  verifies PORV PORV RV1-1RV1 -i closed closed when when S/G S!G 'A' A pressure pressure less  than 1035 less than  1035 psig.
psig.
Examiners Note:
Examiner's Comment:
Comment:
Performance Step: 1717 IF MDAFW pump is not available, THEN maintain at least one SIG supply to SDAFW pump.
S/G Standard:              Operator verifies both MDAFW pumps available.
Examiners Note:
Examiner's Comment:
Performance Step: 1818 Close ruptured SIGS/G steam shutoff to SDAFW pump.
Standard:              Operator verifies MS-V1 MS-V1-8A -8A closed.
Examiner's Note:
Examiners Comment:
2008 NRC 2008 NRC SIM SIM cc                                      NUREG 1021, NUREG    1021, Revision Revision 9, 9, Supplement Supplement 11
 
Appendix C Appendix  C                                  Page 11 Page        of 15 1 1 of  15                          Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE              INFORMATION Performance Performance Step:
Step: 19 19 Verify S/G Verify        blowdown isolation S/G blowdown        isolation and  sample valves and sample  valves closed.
closed.
Standard:
Standard:              Operator verifies Operator    verifies S/G SIG 'A'    blowdown isolation A blowdown    isolation and and sample sample valves valves closed (FCV-1930 closed    (FCV-1930 A&B,  A&B, FCV-1933 FCV-1933 A&B)
A&B) byby Phase Phase A panel A  panel status  light illuminated status light  illuminated on on RTGB.
RTGB.
Examiners Note:
Examiner's            Phase A panel status light Phase                          light illuminates illuminates when all of the blowdown and blowdown      and sample        isolation valves for S/G sample isolation                  SIG A are are closed.
closed.
Candidate may use SPDS function for Containment to verify SIG Blowdown and Sample valves are closed.
that all S/G Comment:
**  Performance Step: 20  Locally close warmup steam supply from ruptured S/G SDAFW pump.
SIG to Standard:              Operator dispatches an AO to locally close warmup steam supply from S/G A  'A' to SDAFW pump.
Booth Operator Note:  When directed by operator, acknowledge request. Close valve MS-20 by selecting Remote Function MSS047 (IRF MSSO47 MSS047 1:0).
f:O). Report back that valve is closed.
Comment:
2008 NRC 2008  NRC SIM SIM cc                                        NUREG NUREG 1021,1021, Revision Revision 9, 9, Supplement Supplement 11
 
Appendix CC Appendix                                        Page 12 Page    12 ofof 15 15                                Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE            INFORMATION Performance Step:
Performance    Step: 21 21  Locally close Locally    close MSIV    above and MSIV above        and below below seatseat drains drains fromfrom ruptured ruptured SIG.
S/G.
Standard:
Standard:                These are These          locked valves are locked    valves thatthat are are part part ofof the the CV CV Integrity Integrity boundary in boundary      in the the steam      lines and steam lines      and do do not not require require local local action action to  to verify the verify      valves are the valves    are shut.
shut. These These valves valves are      normally    locked are normally locked closed and closed    and aa dedicated dedicated operator operator is    provided to is provided    to close close them them in    in the the event that event    that an an accident accident takes takes place.
place. ItIt is is expected expected that that ifif aa valve valve has been has          opened the CRSS been opened            CRSS would be    be aware of  of it.
it. The Operator Operator may dispatch may    dispatch an an AO AO toto close close MSIV MSIV MS-V1-3A MS-V1 -3A aboveabove and and belowbelow seat drains seat  drains from from S/G SIG 'A'.
A.
Booth Operator Note:    If directed by operator, acknowledge request. Report back valves closed.
Comment:
Performance Step: 22    Isolate feed flow to any ruptured S/G      SIG that is faulted unless needed for RCS cooldown.
Standard:              Operator determines that the S/G 'A'         A is not faulted.
Examiners Note:
Examiner's Comment:
*
* Performance Performance Step: 23   When ruptured S/G    S/G level greater than 8% [18%] then isolate feed flow.
Standard:
Standard:              Operator checks level Operator              level greater greater than 8%   8% andand isolates isolates feed flow to       to SIG S/G A    by closing
                                  'A' by   closing V2-14A V2-14A and  and V2-16A.
V2-16A.
Examiners Examiner's Note:
Note:
Comment:
Comment:
2008 NRC 2008       SIM cc NRC SIM                                               NUREG NUREG 1021,1021, Revision Revision 9, 9, Supplement Supplement 11
 
Appendix CC Appendix                                    Page 13 Page   13 of of 15 15                          Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE          INFORMATION
**  Performance Step:
Performance          24 Step: 24  Open breakers Open    breakers for for any any V1-8, Vi -8, V2-14, V2-1 4, and and V2-16 V2-1 6 valve valve closed closed to to isolate ruptured isolate  ruptured S/G.
S/G.
Standard:
Standard:                Operator contacts Operator    contacts AO AO toto open open breakers breakers for for V1-8A, Vi -8A, V2-14A V2-1 4A and and V2-1 6A.
V2-16A.
Booth Operator Booth  Operator Note:
Note:  IRF EPSMCC5_189 IRF  EPSMCC5_189 f:RACK_OUT f:RACK_OUT IRF EPSMCC10_262 IRF  EPSMCC1O_262 f:RACK_OUT f:RACK_OUT IRF EPSMCC10_264 IRF  EPSMCC1O264 f:RACK_OUT f:RACK_OUT IRF EPSMCC9_255 IRF  EPSMCC9_255 f:RACK_OUT f:RACK_OUT Valve V2-16A Note: Valve   V2-i 6A has has 22 power power supplies, Normal and Emergency.
Emergency.
Comment:
Terminating Cue:            Ruptured SIG has been isolated lAW Supplement N.
STOP STOP TIME:
2008 NRC 2008  NRC SIM SIM cc                                      NUREG NUREG 1021, 1021, Revision Revision 9,9, Supplement Supplement 11
 
Appendix C Appendix  C                              Page   14 of Page 14  of 15 15                    Form Form ES-C-1 ES-C-i VERIFICATION OF VERIFICATION   OF COMPLETION COMPLETION Job Performance Job Performance Measure Measure No.:
No.:  2008 NRC 2008 NRC SIM SIM cc Examinees Name:
Examinee's   Name:
Date Performed:
Date   Performed:
Facility Evaluator:
Facility Evaluator:
Number of Attempts:
Number of Attempts:
Time to Complete:
Number Time to Complete:
Question Documentation:
Question Documentation:
Question:
Question:
Response:
 
Result: SAT UNSAT Examiner's Signature:
===Response===
Date: -----------------------------
Result:                         SAT             UNSAT Examiners Examiner's Signature:                                       Date:
Form ES-C-1 2008 NRC SIM c NUREG 1021, Revision 9, Supplement 1
                        -----------------------------
Appendix C INITIAL CONDITIONS:
2008 NRC 2008  NRC SIM SIM cc                                  NUREG  1021, Revision NUREG 1021,         9, Supplement Revision 9, Supplement 11
INITIATING CUE: 2008 NRC SIM c Page 15 of 15 JPM CUE SHEET
 
* The plant was operating at 100% RTP. Form ES-C-1
Appendix C Appendix C                            Page 15 Page       of 15 15 of 15                         Form Form ES-C-1 ES-C-i JPM CUE JPM          SHEET CUE SHEET INITIAL CONDITIONS:
* RCS depressurization led to a Reactor Trip and Safety Injection.
INITIAL CONDITIONS: ** The  plant was The plant was operating operating atat 100%
* S/G "A" has been identified as ruptured.
100% RTP.
* Grid location 8-6 (Maintain at least ONE S/G available for RCS Cooldown) of PATH-2 has just been reached.
RTP.
* Supplement G actions have NOT been completed.
                    ** RCS RCS depressurization depressurization led led to to aa Reactor Trip and Reactor Trip and Safety Safety Injection.
The CRSS directs you to completely isolate S/G "A" starting at grid location 8-6 (Maintain at least ONE S/G available for RCS Cooldown) of PATH-2 in preparation for a rapid cooldown.
Injection.
NUREG 1021, Revision 9, Supplement 1
                    ** S/G  A has S/G "A" has been been identified identified as as ruptured.
PERFORM SUPPLEMENT N FOR RUP.TURED S/G USE INTACT STEAM LINE PORVs FOR STEAM DUMP RUPTURED S/G ISOLATED FROM AT LEA,s-;.3I-O-si  
ruptured.
.... ONE INTACT S/G NO VERIFY RUPTURED STEAM RUPTURED S/G MSIV MSIV BYPASS CLOSED YES AT WHEN RUPTURED S/G PRESS DECREASES BELOW 1035 PSIG THEN VERIFY RUPTURED STEAM LINE PORV . LOSED CLOSE RUPTURED S/G STEAM SHUTOFF TO SDAF'I' PUMP LOCALL Y CLOSE WARMUP STEAM SUPPLY FROM RUPTURED S/G TO SDAFW PUMP LOCALL Y CLOSE MSIV ABOVE AND BELOW SEAT DRAINS FROM RUP1URED S/G ISOLATE FEED FLOW TO ANY RUPTURED S/G THAT IS FAULTED UNLESS NEEDED FOR RCS COO DOWN OPEN BREAKERS FOR ANY V1-B, V2-14 V2-16 VALVE CLOSED TO ISOLATE RUPTURED S/G YES YES ANY S/G WITH UNCONTROLLED LEVEL INCREASE NO ANY S/G SAMPLE WITH HIGH ACTIVITY NO NO R-31A, B, AND C NO RAD LEVELS NORMAL YES R-19A, B, C R-15 RAD LEVELS NORMAL YES SEARCH FOR AND ATTEMPT TO IDENTIFY RUPTURED S/G EPP-Supplements INSTRUCTIONS SUPPLEMENTS CONTINUOUS USE Supplement N Rev. Page RESPONSE NOT OBTAINED Isolation of a Ruptured SIG From Intact SIGs (Page 1 of 5) erify BOTH Turbine Stop Valves  
* Grid location 8-6 B-6 (Maintain at least least ONE S/G available for RCS Cooldown) of PATH-2 has just been reached.
-CLOSED 35 72 Local operation of the Steam Dump valves below is via reverse acting handwheels.
                    ** Supplement Supplement G   actions have G actions  have NOT NOT been been completed.
ALL Condenser Steam Dump -CLOSED Yf6
completed.
* NE COND DUMP (l324A-l)
INITIATING CUE:        The CRSS directs you to completely isolate S/G "A"   A starting at B-6 (Maintain at least ONE S/G available for RCS grid location 8-6 Cooldown) of PATH-2 in preparation for a rapid cooldown.
* NW COND DUMP (l324B-l)
2008 2008 NRC NRC SIM SIM cc                                  NUREG NUREG 1021,1021, Revision Revision 9, 9, Supplement Supplement 11
* SE COND DUMP (l324A -2) COND DUMP (l324B-3) COND DUMP (l324B-2)
 
ALL MSR PURGE Valves -* MS-Vl-6-1A
YES      ANY S/G WITH UNCONTROLLED LEVEL INCREASE NO ANY S/G VERIFY RUPTURED STEAM              YES SAMPLE WITH AT            HIGH ACTIVITY NO NO    R-31A, B, AND C RAD LEVELS NORMAL YES NO    R-19A, B, C ~
* MS-Vl-6-1B
NO                  RUPTURED S/G                        R-15 RAD MSIV ~ MSIV                      LEVELS NORMAL BYPASS CLOSED YES YES PERFORM SUPPLEMENT                                                                     SEARCH FOR AND N FOR RUP.TURED S/G                                                                 ATTEMPT TO IDENTIFY X4 WHEN RUPTURED S/G        oN          RUPTURED S/G PRESS DECREASES BELOW            I 1035 PSIG WE!+/- THEN VERIFY I    RUPTURED STEAM LINE PORV FLOSED
* MS-Vl-6-2A
                                                                  . LOSED USE INTACT STEAM LINE PORVs FOR STEAM DUMP                     41E        MDAJW F  UMP IS NON 1
* MS-Vl-6-2B of 89 EPP-Supplements INSTRUCTIONS SUPPLEMENTS CONTINUOUS USE Supplement N Rev. Page RESPONSE NOT OBTAINED Isolation of a Ruptured S/G From Intact S/Gs (Page 2 of 5) . . Verify ALL Valves -CLOSED
AVAJLABLE, ThEN MAJNTAJN AT LEAST ONE S/G
* MS-Vl-5-1A
                                          \PPLY TO ?DAFW PUM)
* MS-Vl-5-1B
RUPTURED S/G ISOLATED FROM AT LEA,s-;.3I-O-si....                 CLOSE RUPTURED ONE INTACT S/G                               S/C S/G STEAM SHUTOFF SDAFW PUMP TO SDAF'I'
* MS-Vl-5-2A
                                          /RIFY S/C BLOWDOWN ISOLATION              SAMPLE VALVES CLOSED (LOCALLY LOCALL Y CLOSECLOSE WAN  WARMUP I STEAM  STEAM SUPPLY SUPPLY FROM FROM RUPTURED S/C  S/G TO  SDAFW TO SDAFW PUMP   PUMP LOCALLY  LOCALL Y CLOSE CLOSE MSIV MSIV ABOVE AND BELOW BELOW      SEAT   ORAJNS DRAINS RUP1URED S/C FROM RUPTURED          S/G 4iSOLATE ISOLATE FEED FLOW    FLOW TO ANY ANY RUPTURED RUPTURED S/C  S/G THAT THAT I          IS IS FAULTED FAULTED UNLESS UNLESS NEEDED NEEDED FOR FOR RCSRCS COO COO DOWN DOWN fLbEN RUP URED S/\
* MS-Vl-5-2B This procedure is designed to handle ONLY one stuck open MSIV. Go To Appropriate Step From Following Table: STUCK MSIV !/sTEP -c..Yl-3A L :-/ Vl-3B Vl-3C The B & C
LEVEL GREATER THAN 8Z 118X], INEbI ISOLATE FEED FLOW
* MSIV Vl-3B 9 12 S/G MSIVs -MSIV Vl-3C . erify Steam Supply Valve To -SDAFW Pump From S/G "A"-CLOSED Vl-8A, STEAM SHUTOFF To Step 14 35 73 of 89 EPP-Supplements INSTRUCTIONS SUPPLEMENTS CONTINUOUS USE Supplement N Rev. Page RESPONSE NOT OBTAINED Isolation of a Ruptured S/G From Intact S/Gs (Page 3 of 5) 9. Verify The A & C S/G MSIVs -CLOSED
                                    ~ OPEN     OPEN BREAKERS BREAKERS FOR  FOR ANY ANY V1-8,V1-B, V2-4 V2-14 AN2 ~
I      V2-16 V2-16 VALVEVALVE CLOSED CLOSED TO TO
                                      \.ISOIATE ISOLATE RUPTURED RUPTURED S/S/G I
 
Rev.
Rev. 35 35 EPP-Supplements EPP-Supplements                            SUPPLEMENTS SUPPLEMENTS Page 72 72 of 89 89
-L1-t                    INSTRUCTIONS j
CONTINUOUS USE
[    RESPONSE NOT OBTAINED Supplement N N Isolation of a Ruptured SIG S!G From Intact SIGs S/Gs (Page 11 of 5) erify BOTH Turbine Stop Valves
  ~f---      - CLOSED
              -
NOTE Local operation of the Steam Dump valves below is via reverse acting handwheels.
erify ALL Condenser Steam Dump
  )_-Valve S - CLOSED Yf6
                      -
          **      NE COND DUMP (l324A-l)
(1324A-1)
            **     NW COND DUMP (l324B-l)
(1324B-1)
            **    SE COND DUMP (l324A - 2)
(1324A-2)
            .        COND DUMP (l324B- 3)
(1324B-3)
SW COND DUMP (l324B-2)
(1324B-2)
Verify ALL MSR PURGE Valves -       -
CLOSED y'f~
    -
          **     MS-Vl-6-1A MS-V1-6-1A
          **      MS-Vl-6-1B MS-V1-6-1B
          **       MS-Vl-6-2A MS-V1-6-2A
          **      MS-Vl-6-2B MS-V1-6-2B
 
Rev. 35 35 EPP-Supplements EPP-Supplements                              SUPPLEMENTS SUPPLEMENTS 73 of Page 73 of 89 89
-j-c                    INSTRUCTIONS INSTRUCTIONS I I CONTINUOUS USE RESPONSE NOT OBTAINED Supplement NN Isolation of a Ruptured Ruotured S/G S/C From Intact S/Gs S/Os
  ~
(Page 22 of 5)
    . .                 MSR SIUTOFF Valves -
Verify ALL MSR,~UTOFF                  -
CLOSED CLOSED             1~3
* MS-V1-5-1A MS-Vl-5-1A
* MS-V1-5-1B MS-Vl-5-1B
* MS-V1-5-2A MS-Vl-5-2A
* MS-V1-5-2B MS-Vl-5-2B NOTE This procedure is designed to handle ONLY one stuck open MSIV.
        /
Go      Go To Appropriate Step From Following Table:
Z/ -
STUCK MSIV c..Yl-3A p
L
                                    !/sTEP
                                    -TEP 6~
:-/
Vl-3B V1-3B              99 Vl- 3C V1-3C              12 12
  ~rifY I
  ~~OSED Verify The BB && CC S/C       S/G MSIVs -  -
Ye~
CLOSED
          **    MSIV V1-3B MSIV  Vl-3B MSIV V1-3C MSIV Vl-3C
  ~ -
      .
* erify Steam erify SDAFW Pump SDAFW    Pump From Supply Valve Steam Supply From S/C Vl-8A, STEAM V1-8A, Valve To S/G A-STEAM SHUTOFF SHUTOFF To "A"- CLOSED CLOSED
                                              )v't?~
To Step To Step 14 14
 
Rev. 35 EPP-Supplements                       SUPPLEMENTS Page 74 of 89
] STEP_H            INSTRUCTIONS CONTINUOUS USE RESPONSE NOT OBTAINED Supplement N Isolation of a Ruptured S/G From Intact S/Gs (Page 33 of 5)
: 9. Verify The AA &
                        & C C S/G MSIVs --
CLOSED
* Vl-3A MSIV Vl- 3A
* MSIV Vl-3C
: 10. Verify Steam Supply Valve To SDAFW Pump From S/G "B"-
B- CLOSED
* Vl-8B, V1-8B, STEAM SHUTOFF
: 11. Go To Step 14
: 12. Verify The AA &
                        & B  S!G MSIVs -
B S/G        -
CLOSED
* MSIV Vl-3A
* MSIV Vl-3A
* MSIV Vl-3C 10. Verify Steam Supply Valve To SDAFW Pump From S/G "B"-CLOSED
* V1-3B MSIV Vl-3B
* Vl-8B, STEAM SHUTOFF 11. Go To Step 14 12. Verify The A & B S/G MSIVs -CLOSED
: 13. Verify Steam Supply Valve To SDAFW Pump From 5/0  C- CLOSED S/G "C"-
* MSIV Vl-3A
* Vl-8C, STEAM SHUTOFF
* MSIV Vl-3B 13. Verify Steam Supply Valve To SDAFW Pump From S/G "C"-CLOSED
 
* Vl-8C, STEAM SHUTOFF 35 74 of 89 Rev. 35 EPP-Supplements SUPPLEMENTS Page 75 of 89 INSTRUCTIONS RESPONSE NOT OBTAINED CONTINUOUS USE Supplement N Isolation of a Ruptured SIG From Intact SIGs (Page 4 of 5)
Rev. 35 EPP-Supplements                           SUPPLEMENTS Page 75 of 89
Actions:
] STEP                  INSTRUCTIONS CONTINUOUS USE I      RESPONSE NOT OBTAINED Supplement N N Isolation of a Ruptured SIG S/G From Intact SIGs S/Gs
BOTH the TURBINE STOP BYPASS Valves -CLOSED
  ~                                      (Page 4 of 5)
* MS-297
  ~!~~~~~hT~: ~~~~~~~~gT~ocal ispatch An Operator To Perform The Following Local Actions:
* MS-298 Gland Seal Steam Supply GS-31, STEAM SUPPLY ALL Condenser Steam Trap Isolation Valves
4~eck
* MS-128, PRV-1324A-2 TRAP T-67 INLET
          /heck BOTH the TURBINE STOP
* MS-133, PRV-1324A-1 TRAP T-66 INLET
        ~ALVE VALVE BYPASS Valves - CLOSED   -
* MS -139, PRV-1324B-2 TRAP T-69 INLET
: a. Perform the following:
* MS-145, PRV-1324B-1 TRAP T-68 INLET MS-148, PRV-1324B-3 TRAP T-70 INLET Actions Supplement N -a. Perform the following:
: 1) Verify ALL Governor valves
: 1) Verify ALL Governor valves are closed. 2) Contact Plant Operations Staff to intiate action to fail the valves closed. WHEN ALL actions have been completed, THEN notify the CRSS that Supplement N is complete.
              **     MS-297                                   are closed.
IF an action can NOT be completed, THEN notify the CRSS of its status.
                **   MS-298 MS-298                               2) Contact Plant Operations Staff to intiate action to fail the valves closed.
EPP-Supplements INSTRUCTIONS SUPPLEMENTS CONTINUOUS USE Supplement N Rev. Page RESPONSE NOT OBTAINED Isolation of a Ruptured S/G From Intact S/Gs (Page 5 of 5) tify The CRSS That Supplement Is Complete -END -35 76 of 89 Appendix C Facility:
        ~ose Gland
Task Title: KIA
          *
        ~~lve,  Valve, Seal Steam Supply lose Gland Seal Steam Supply GS-31, STEAM SUPPLY GS-31, STEAM SUPPLY I ET
        ~::*
        ~~~p lose ALL Condenser Steam Dump  Trap Isolation Valves
                **    115-128, PRV-1324A-2 TRAP MS-128, T-67 INLET
              **     MS-133, PRV-1324A-1 TRAP T-66 INLET
              **     MS -139, PRV-1324B-2 TRAP 115-139, T-69 INLET
              **      MS-145, PRV-1324B-1 TRAP T-68 INLET
* MS-148, PRV-1324B-3 TRAP T-70 INLET ieck ALL Actions Supplement N    N --      WHEN ALL actions have been COMPLETE                                                  THEN notify the CRSS completed, THEN that Supplement NN is complete.
IF an action can NOT be completed, THEN notify the CRSS completed, status.
of its status.
 
Rev. 35 EPP-Supplements                     SUPPLEMENTS Page 76 of 89
 
STEP H            INSTRUCTIONS CONTINUOUS USE I    RESPONSE NOT OBTAINED I
Supplement NN Isolation of a Ruptured S/G S/C From Intact S/Gs S/Cs (Page 55 of 5) tify The CRSS That Supplement
          )tify Is Complete
                                        - END -
                                        -      -
 
Appendix C Appendix         C                                Job Performance Job  Perlormance MeasureMeasure                    Form Form ES-C-1 ES-C-i Worksheet Worksheet Facility:
Facility:                    HB ROBINSON HB  ROBINSON                                    Task No.:
Task  No.:    01026100101 01026100101 Task Title:
Task    Title:             Manually Initiate Manually  Initiate Containment Containment Spray Spray          JPM No.:
JPM  No.:    2008 NRC 2008  NRC SIM SIM dd lAW PATH-1.
lAW  PATH-i.
 
==Reference:==
 
K/A


==Reference:==
==Reference:==


Examinee:
KIA                          026 A3.01 026  A3.01 4.3/4.5 4.3/4.5 026 A4.01 026  A4.01 4.5/4.3 4.5/4.3 Examinee:
Examinee:                                                                NRC Examiner:
NRC    Examiner:
Facility Evaluator:
Facility Evaluator:
Method of testing: Job Performance Measure Worksheet HB ROBINSON Manually Initiate Containment Spray lAW PATH-1. 026 A3.01 4.3/4.5 026 A4.01 4.5/4.3 Task No.: JPM No.: NRC Examiner:
Facility    Evaluator:                                                    Date:
Date: Form ES-C-1 01026100101 2008 NRC SIM d Simulated Performance:
Date:
Actual Performance:
Method of Method      of testing:
_.:....:X_
testing:
Plant x Classroom Simulator
Simulated Performance:                                                   Actual Performance:         xX Classroom      ---
---READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Simulator          X
_.:....:X_ Plant READ TO THE EXAMINEE II will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Initial Conditions:
Initial Conditions:
* You are the RO.
Initial  Conditions:              ** You are the RO.
* The plant was operating at 100% RTP, 15 minutes ago an automatic Reactor Trip and Safety Injection was initiated.
* The plant was operating at 100% RTP, 15 minutes ago an automatic Reactor Trip and Safety Injection was initiated.
* PATH-1 has been implemented and is complete through grid location B-6, 'Restart Battery Chargers within 30 minutes of power loss using OP-601'.
* PATH-1 PATH-i has been implemented and is complete through grid location B-6, Restart
* Foldout "A" is in effect. Task Standard:
                                            'Restart Battery Chargers within 30 minutes of power loss using OP-60i.
Containment Spray is manually aligned lAW PATH-1. Required Materials:
OP-601'.
PATH-1, REACTOR TRIP AND SAFETY INJECTION, Rev. 18 General  
* Foldout A "A" is in effect.
Task Standard:                 Containment Spray is manually aligned lAW PATH-i.        PATH-1.
Required Materials:
Materials:    PATH-i, PATH-1, REACTOR REACTOR TRIP  TRIP AND AND SAFETY SAFETY INJECTION, INJECTION, Rev.Rev. 1818 General General  


==References:==
==References:==


PATH-1, REACTOR TRIP AND SAFETY INJECTION, Rev. 18 Handouts:
==References:==
PATH-1, REACTOR TRIP AND SAFETY INJECTION, Rev. 18 Initiating Cue: The CRSS has directed you to continue PATH-1 execution.
PATH-i, PATH-1, REACTOR REACTOR TRIP  TRIP AND AND SAFETY SAFETY INJECTION, INJECTION, Rev.Rev. 1818 Handouts:
Time Critical Task: NO Validation Time: 10 minutes 2008 NRC SIM d NUREG 1021, Revision 9, Supplement 1
Handouts:                      PATH-i, PATH-1, REACTOR REACTOR TRIP  TRIP AND AND SAFETY SAFETY INJECTION, INJECTION, Rev.Rev. 1818 Initiating Initiating Cue:
Appendix C 1. IC-61S. 2. SCN: 006_JPM_SS.
Cue:            The The CRSS CRSS has has directed directed you you to to continue continue PATH-i PATH-1 execution.
2008 NRC SIM d Job Performance Measure Worksheet SIMULATOR SETUP Form ES-C-1 NUREG 1021, Revision 9, Supplement 1
execution.
Appendix C Page 3 of 8 PERFORMANCE INFORMATION Form ES-C-1 (Denote Critical Steps with an asterisk)
Time Time Critical Critical Task:
* Performance Step: 1 Standard:
Task:    NO NO Validation Validation Time: Time:         10 10 minutes minutes 2008 2008 NRC NRC SIM  SIM dd                                                NUREG 1021, NUREG    1021, Revision Revision 9, 9, Supplement Supplement 11
Examiner's Note: Comment:
 
* Performance Step: 2 Standard:
Appendix CC Appendix                  Job Performance Measure Job Performance Measure                Form Form ES-C-1 ES-C-i Worksheet Worksheet SIMULATOR SETUP SIMULATOR    SETUP 1.
Examiner's Note: Comment: 2008 NRC SIM d CV pressure remained below 10 psig. Candidate checks CV pressure and determines it has NOT remained below 10 psig. Verify CV Spray initiated.
: 1.      IC-615.
Identifies CV Spray has NOT been initiated.
IC-61S.
NO CV Spray pumps are running, SI-880Al8/C/D are closed. The candidate may depress the CV Spray push buttons, but they will be unsuccessful.
2.
The candidate may also return to Foldout "A" to stop RCPs due to low subcooling.
: 2. SCN: 006_JPM_SS.
NUREG 1021, Revision 9, Supplement 1
SCN:  006_JPM_S5.
Appendix C
2008 NRC SIM 2008 NRC   SIM dd                      NUREG 1021, NUREG 1021, Revision Revision 9, 9, Supplement Supplement 11
* Performance Step: 3 Standard:
 
Examiner's Note: Comment: Performance Step: 4 Standard:
Appendix C Appendix  C                                    Page 33 of Page     of 88                        Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE        INFORMATION (Denote Critical (Denote  Critical Steps Steps with with an an asterisk) asterisk)
Examiner's Note: Comment: 2008 NRC SIM d Page 4 of 8 PERFORMANCE INFORMATION Form ES-C-1 Verify all CV Spray pumps running with valves properly aligned. Candidate attempts to start CV Spray Pumps "A" and "B", and open SI-845 and SI-880 valves. Candidate should recognize and report that CV Spray Pump "A" will NOT start. Acknowledge candidates report. Starting CV Spray Pump "8" and aligning "8" train valves satisfies the requirement of the JPM. Supplement 8 valves and required positions for CV Spray Train 8: SI-8448, PUMP 8 INLET -OPEN SI-8458, SAT DISCH -OPEN SI-845C, SAT THROTTLING  
*Performance Step:
-THROTTLED TO -12 GPM SI-880C, PUMP 8 DISCH -OPEN SI-880D, PUMP 8 DISCH -OPEN Note: Opening either SI-880C or SI-880D will provide CV Spray flow path to the CV. Verify approximately 12 GPM spray additive tank flow. Candidate observes FI-949 indicates  
Performance     Step: 11    CV pressure CV   pressure remained remained below below 10 10 psig.
-20 GPM and manually adjusts SI-845C until flow is -12 GPM. NUREG 1021, Revision 9, Supplement 1
psig.
Appendix C
Standard:
* Performance Step: 5 Standard:
Standard:                  Candidate checks Candidate   checks CV CV pressure and determines determines itit has has NOT NOT remained below 1010 psig.
Examiner's Note: Comment:
Examiners Note:
* Performance Step: 6 Standard:
Examiner's    Note:
Examiner's Note: Comment: 2008 NRC SIM d Page 5 of 8 PERFORMANCE INFORMATION Verify Phase B isolation valves closed. Form ES-C-1 Candidate shuts Phase B isolation valves CCW-716A OR 716B, CCW-730, CCW-626 OR 735 and CVC-381 using RTGB control switches.
Comment:
Only 1 of either CCW-716A or B is required for completion.
**  Performance Step: 2        Verify CV Spray initiated.
Only 1 of either CCW-626 or 735 is required for completion.
Standard:                  Identifies CV Spray has NOT been initiated.
Supplement B valves that will close on a Phase B signal: CVC-381, SEAL WTR RTRN ISO FCV-626, THERM BAR FLOW CONT CC-735, THERM BAR OUT ISO CC-716A, CCW TO RCP ISO CC-716B, CCW TO RCP ISO CC-730, BRG OUTLET ISO MSIV AND MSIV BYPs Stop all RCPs. Candidate places all RCP control switches to STOP. NUREG 1021, Revision 9, Supplement 1
Examiners Note:
Appendix C
Examiner's                  NO CV Spray pumps are running, SI-880Al8/C/D SI-880A/B/C/D are closed.
* Performance Step: 7 Standard:
The candidate may depress the CV Spray pushbuttons, push buttons, but they will be unsuccessful. The candidate may also return to Foldout A to stop RCPs due to low subcooling.
Examiner's Note: Comment: Performance Step: 8 Standard:
                                "A" Comment:
Examiner's Note: Comment: Termination:
2008 NRC 2008  NRC SIM SIM dd                                      NUREG   1021, Revision NUREG 1021,              9, Supplement Revision 9,  Supplement 11
STOP TIME: 2008 NRC SIM d Page 6 of 8 PERFORMANCE I N FORMATION Verify all MSIVs and MSIV Bypasses closed. Form ES-C-1 Candidate verifies all MSIVs and MSIV Bypasses closed by placing the control switches for the MSIVs to CLOSE. Locally open breaker for HVS-1 at MCC-5, CMPT 7 J within 60 minutes of SI initiation.
 
Candidate contacts AO to open breaker for HVS-1. JPM is complete when the candidate has established one Train of CV Spray and the Inside AO has been contacted to open the breaker for HVS-1. At least 1 train of CV Spray has been initiated.
Appendix C Appendix  C                                  Page 44 of Page    of 88                              Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE        INFORMATION
NUREG 1021, Revision 9, Supplement 1
*Performance Step:
Appendix C Page 7 of 8 VERIFICATION OF COMPLETION Job Performance Measure No.: 2008 NRC SIM d Examinee's Name: Date Performed:
Performance   Step: 33 Verify all Verify     CV Spray all CV Spray pumps pumps running running with with valves valves properly properly aligned.
Facility Evaluator:
aligned.
Standard:              Candidate attempts to start CV Spray Candidate                                    Pumps "A" Spray Pumps      A and and "B",
B, and open SI-845 and SI-880 valves. Candidate Candidate should recognize recognize and report that report  that CV CV Spray Spray Pump Pump "A" A will will NOT NOT start.
start.
Examiners Note:
Examiner's            Acknowledge candidates report. Starting CV Spray Pump B and aligning "8" "8"                 B train valves satisfies the requirement oftheJPM.
of the JPM.
Supplement 8   B valves and required positions for CV Spray B:
Train 8:
                              -    Sl-844B, PUMP 8B INLET - OPEN SI-8448,                     
                              -    SI-845B, SAT DISCH - OPEN SI-8458,                 
                              -    Sl-845C, SAT THROTTLING - THROTTLED TO -12 SI-845C,                          -
GPM
                              -    Sl-880C, PUMP 8B DISCH - OPEN SI-880C,                     
                              -    SI-880D, Sl-880D, PUMP 8   B DISCH - OPEN
 
Note: Opening either SI-880C or SI-880D   SI-8800 will provide CV Spray flow path to the CV.
Comment:
Performance Step: 4    Verify approximately 1212 GPM spray additive tank flow.
Standard:
Standard:              Candidate observes Fl-949 FI-949 indicates - 20 GPM and manually
 
adjusts Sl-845C SI-845C until flow is 12-12 GPM.
Examiners Examiner's Note:
Note:
Comment:
Comment:
2008 NRC 2008  NRC SIM SIM dd                                    NUREG NUREG 1021,1021, Revision Revision 9,9, Supplement Supplement 11
 
Appendix C Appendix  C                                Page 55 of Page      of 88                            Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE          INFORMATION
*Performance Step:
Performance   Step: 55 Verify Phase Verify Phase BB isolation isolation valves valves closed.
closed.
Standard:
Standard:              Candidate shuts Candidate   shuts Phase Phase BB isolation isolation valves valves CCW-716A CCW-71 6A OR  OR 716B, 71 6B, CCW-730, CCW-626 CCW-730,    CCW-626 OR    OR 735735 and and CVC-381 CVC-381 using using RTGB RTGB control control switches. Only switches. Only 11 of either CCW-716A of either  CCW-71 6A or BB is is required required for for either CCW-626 or 735 completion. Only 11 of either                   735   is required for completion.
Examiners Note:
Examiner's  Note:    Supplement B valves that will close on a Phase B signal:
                              -  CVC-381, SEAL WTR RTRN ISO
                              -  FCV-626, THERM BAR FLOW        FLOW CONT
                              -  CC-735, THERM BAR OUT ISO           ISO
                              -  CC-716A, CCW TO RCP ISO
                              -  CC-716B, CCW TO RCP ISO
                              -  CC-730, BRG OUTLET ISO
                              -  MSIV AND MSIV BYPs Comment:
**  Performance Step: 6    Stop all RCPs.
Standard:              Candidate places all RCP control switches to STOP.
Examiner's Note:
Examiners Comment:
2008 2008 NRC NRC SIM SIM dd                                      NUREG NUREG 1021, 1021, Revision Revision 9,9, Supplement Supplement 11
 
Appendix C Appendix  C                                  Page 66 of Page    of 88                          Form Form ES-C-1 ES-C-i PERFORMANCE IINFORMATION PERFORMANCE            N FORMATION
*Performance Step:
Performance   Step: 77 Verify all Verify all MSIVs MSIVs andand MSIV MSIV Bypasses Bypasses closed.
closed.
Standard:                          verifies all MSIVs Candidate verifies       MSIVs and MSIV MSIV Bypasses Bypasses closed by by placing the control switches for the MSIVs placing                                MSIVs to CLOSE.
CLOSE.
Examiners Note:
Examiner's Comment:
Performance Step: 8                                HVS-i at MCC-5, CMPT 77JJ within 60 Locally open breaker for HVS-1 minutes of SI initiation.
Standard:              Candidate contacts AO to open breaker for HVS-1.
HVS-i.
Examiners Note:
Examiner's            JPM is complete when the candidate has established one Train of CV Spray and the Inside AO has been contacted to open the breaker for HVS-1.
Comment:
Termination:              At At least   train of least 11 train of CV CV Spray Spray has been initiated.
has been  initiated.
STOP STOP TIME:
TIME:
2008 2008 NRC NRC SIM SIM dd                                    NUREG    1021, Revision NUREG 1021,   Revision 9,9, Supplement Supplement 11
 
Appendix C Appendix  C                                Page 77 of Page    of 88                    Form Form ES-C-1 ES-C-i VERIFICATION OF VERIFICATION OF COMPLETION COMPLETION Job  Performance Measure Job Performance     Measure No.:
No.:  2008 NRC 2008 NRC SIM SIM dd Examinees Name:
Examinee's   Name:
Performed:
Date Performed:
Date Facility Evaluator:
Number of Attempts:
Number of Attempts:
Time to Complete:
Time to Complete:
Documentation:
Question Documentation:
Question Documentation:
Question:
Question:
Response:
 
Result: SAT UNSAT Examiner's Signature:
===Response===
Date: -----------------------------
Result:                         SAT             UNSAT Examiners Signature:
Form ES-C-1 2008 NRC SIM d NUREG 1021, Revision 9, Supplement 1
Examiner's                                                 Date:
Appendix C INITIAL CONDITIONS:
                        -----------------------------
INITIATING CUE: 2008 NRC SIM d Page 8 of 8 JPM CUE SHEET
2008 2008 NRC NRC SIM SIM dd                                  NUREG NUREG 1021, 1021, Revision 9, Supplement Revision 9, Supplement i1
* You are the RO. Form ES-C-1
 
* The plant was operating at 100% RTP, 15 minutes ago an automatic Reactor Trip and Safety Injection was initiated.
Appendix C Appendix  C                                  Page 88 of Page    of 88                          Form Form ES-C-1 ES-C-i JPM CUE JPM    CUE SHEET SHEET INITIAL CONDITIONS:
* PATH-1 has been implemented and is complete through grid location B-6, 'Restart Battery Chargers within 30 minutes of power loss using OP-601 '.
INITIAL  CONDITIONS:     You are
* Foldout "A" is in effect. The CRSS has directed you to continue PATH-1 execution.
                    ** You   are the the RO.
NUREG 1021, Revision 9, Supplement 1
RO.
SUPPLEMENT M AUTOMATIC?
                    ** The plant plant was operating at 100%   100% RTP, RTP, 15   minutes ago 15 minutes  ago an an automatic automatic Reactor Trip and Safety Reactor                Safety Injection Injection was initiated.
STEAM LINE YES ISOLATION REQUIRED NO VERIFlf BOTH EDGs RUNNING )K ( RESTART CHARGERS WIT IN 30 MIN OF POWER LOSS USING OP-501 )K /' CV PRESS REMAINED BELOW 10 PSIG /' AUTOMATIC NO / STEAM LINE ISOLATION  
initiated.
/ INITIATED
* PATH-1 PATH-i has been implemented and is        is complete through grid location location B-6, 'Restart B-6,  Restart Battery Battery Chargers within 30 minutes of power power loss using using OP-601.'.
"-/' /' VERIFY ALL MSIVs AND '\
OP-601 Foldout "A"
CLOSED: LOCALLY OPEN BREAKER FOR HVS-1, AT MCC-5 CMPT 7J WITHIN 60 MIN ,OF SIINITIATION X RCS PRESS YES / GREATER THAN 1350 PSIG [1250 PSIGJ NO /"' 1 VERIFY CV SPRAY INITIATED I VERIFY ALL CV SPRAY PUMPS RUNNING WITH VALVES "'--PROPERLY ALIGNED , ( VERIFY APPROXIMATELY 12 GPM SPRAY ADDITIVE TANK FLOW ( VERIFY PHASE B ISOLATION VALVES CLOSED 'I' l STOP ALL RCPs EPP-Supplements SUPPLEMENTS CONTINUOUS USE Supplement B Phase BAnd CV Spray Component Alignment (Page 1 of 1) Rev. Page establish Phase B Containment Isolation, verify the following valves -CLOSED Cooling
* Foldout    A is in in effect.
* CVC-38l, SEAL WTR RTRN ISO
INITIATING CUE:        The CRSS has directed you to continue PATH-1   PATH-i execution.
* FCV-626, THERM BAR FLOW CONT
2008 2008 NRC NRC SIM SIM dd                                    NUREG NUREG 1021, 1021, Revision   9, Supplement Revision 9,  Supplement 11
* CC-735, THERM BAR OUT ISO
 
* CC-7l6A, CCW TO RCP ISO
~ SUPPLEMENT M SUPPLEMENT   M ~                    VERIF VERIFlf BOTH EDGs RUNNING UNNING
* CC-7l6B, CCW TO RCP ISO
                        )K (       RESTART ~BATTERY RESTART     BATTERY (CHARGERS CHARGERS WIT UN      IN 30 MIN OF   OF
* CC-730, BRG OUTLET ISO AND MSIV BYPs -CLOSED establish CV Spray, perform the following:
                            \WER_LOSS POWER LOSS USING OP-501 CV CV            ~      NO
valves positioned as follows:
                        )K   /'     PRESS REMAINED BELOW 10    10 PSIG
* SI PUMP A INLET OPEN
                                                            /'              /"'               I1 VERIFY CV VERIFY    CV SPRAY INITIATED SPRAY YE~                                ~                I C
* SI-844B, PUMP B INLET -OPEN
YES VERIFY ALL VERIFY    ALL CV SPRAY CV    SPRAY PUMPS PUMPS RUNNING RUNNING WITH        VALVES WITH VALVES PROPERLY, ALIGNED ALIGNED AUTOMATIC AUTOMATIC
* S! 8'lSA, gAT DIgCH -OPEN
                                                            ~              "'--
* SI-845B, SAT DISCH -OPEN 35 20
NO /
* SI-845C, SAT THROTTLING  
NO STEAM LINE STEAM      LINE ISOLATION ISOLATION INITIATED INITIATED      /               VERIFY
-THROTTLED TO APPROXIMATELY 12 GPM .. S!. 880A, PUMP A DIbCH OPEN
(    VERIFY APPROXIMATELYN APPROXIMATELY 12 CPM 12  GPM SPRAY SPRAY AUTOMATIC                                "-   /'                             ADDITIVE ADDITIVE TANK TANK FLOWFLOW AUTOMATIC?
* SI 88GB, PUHP 0 11 DISCH OPEN .
STEAM            YES                            YES I
* SI-880C, PUMP B DISCH -OPEN
STEAM LINE LINE ISOLATION ISOLATION YES I
* SI-880D, PUMP B DISCH -OPEN to procedure and step in effect. -END -of 89 Appendix C Facility:
REQUIRED REQUIRED
Task Title: KIA  
                                                ~                          (        VERIFY VERIFY PHASEPHASE B  B
                              / ' VERIFY VERIFY ALL ALL MSIVs MSIVs ANDAND ' \           ISOLATION GOLATION          VALVES VALVES      CLOSED CLOSE
                              ~MSIV 8YP~SES MSIV BYPASSES CLOSED CLOSED:
NO Cl NO LOCALLY LOCALLY OPENOPEN BREAKER BREAKER FOR FOR
                                                                      'I'            STOP STOP ALLALL RCPs RCPs HVS-1, HVS-1, AT AT MCC-5 MCC-5 CMPT CMPT 7J 7J WITHIN WITHIN 60 60 IlJN  OF SI MIN ,OF     INITIATION SIINITIATION X
RCS PRESS PRESS YES /             EATER THAN GREATER       THAN 1350 1350 PSIG PSIG 1250 PSIGI
[1250   PSIGJ OS
 
Rev. 35 35 EPP- Supplements EPP-Supplements                                   SUPPLEMENTS SUPPLEMENTS Page 20 20 of of 89 89 CONTINUOUS USE Supplement B     B B And CV Spray Component Alignment Phase BAnd (Page 11 of 1)
    ~o 1. o establish Phase           B B Containment Isolation, verify the following valves - CLOSED valves        -
          ~CP            Cooling
* CVC-381, SEAL WTR RTRN ISO CVC-38l,
* FCV-626, THERM BAR FLOW   PLOW CONT
* CC-735,   THERM BAR OUT ISO
* CC-716A, CCW TO RCP ISO CC-7l6A,
* CC-716B, CCW TO RCP ISO CC-7l6B,
* CC-730,   BRG ERG OUTLET ISO
        ~SIV
: b.        SIV  AND MSIV BYPs - CLOSED
                                            -
    ~~ 2. o establish         CV Spray, perform the following:
          ~erifY erify valves positioned as follows:
* SI-EiiA, SI  8~~A, PUMP A A INLET       -
OPEN
                **     SI-844B, PUMP BB INLET - OPEN -
                **     SI-5A,    gAT DISCH S! 8'lSA, SAT  DIgCH - OPEN
                                                  -
                  **     SI-845B, SAT DISCH - OPEN -
                **       SI-845C, SAT THROTTLING - THROTTLED TO APPROXIMATELY 12
                                                            -                    12 GPM
              ..         S!. 880A, PUMP A DIbCH             OPEN
                *-SI-22OE_        PUHP SI 88GB, PUMP    A0 DICTT 11   DISCH       OPEN   .
              **       SI-880C, PUMP SI-88OC,  PUMP BB DISCH DISCH - OPEN
                                                      -
              **       SI-880D, PUMP BB DISCH SI-88OD,              DISCH - OPEN
                                                      -    OPEN
          ~Return Return to procedure   procedure and and step step in  in effect.
effect.
                                                          - END
                                                          -  END -
                                                                  -
 
Appendix C Appendix       C                                 Job Job Performance Performance Measure Measure                    Form Form ES-C-1 ES-C-i Worksheet Worksheet Facility:
Facility:                  HB ROBINSON HB  ROBINSON                                Task No.:
Task No.:    01000102805 01000102805 Task Title:
Task    Title:             Perform aa Post Perform      Post LOCA LOCA Cooldown Cooldown and and      JPM No.:
JPM  No.:    2008 NRC 2008  NRC SIM SIM ee Depressurization lAW Depressurization    lAW EPP-8.
EPP-8.
KIA    


==Reference:==
==Reference:==


Examinee:
K/A
Facility Evaluator:
 
Method of testing: Job Performance Measure Worksheet HB ROBINSON Perform a Post LOCA Cooldown and Depressurization lAW EPP-8. 063 K3.02 3.5/3.7 002 K1.08 4.5/4.6 00009 EA 1 .13 4.4/4.4 00009 EA2.15 3.3/3.4 Task No.: JPM No.: NRC Examiner:
==Reference:==
Date: Form ES-C-1 01000102805 2008 NRC SIM e Simulated Performance:
K3.02 3.5/3.7 063 K3.02     3.5/3.7 002 K1.08 002  Ki.08 4.5/4.6 4.5/4.6 00009 EA EA11.13
Actual Performance:
                                        .13 4.4/4.4 00009 EA2.15 3.3/3.4 Examinee:                                                             NRC Examiner:
X Classroom X Plant -"-'--Simulator
Facility Evaluator:                                                  Date:
---READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Method of testing:
Simulated Performance:                                               Actual Performance:         X Classroom       - - - Simulator              X
                                                            -"-'--
Plant READ TO THE EXAMINEEEXAM INEE II will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Initial Conditions:
Initial Conditions:
* Plant was initially at 100% power.
* Plant was initially at 100% power.
* RCS depressurization resulted in a Reactor Trip and Safety Injection.
* RCS depressurization resulted in a Reactor Trip and Safety Injection.
* PATH-1 has directed the crew to EPP-8, POST LOCA COOLDOWN AND DEPRESSURIZATION.
PATH-i has directed the crew to EPP-8, POST LOCA COOLDOWN
* PATH-1 AND DEPRESSURIZATION.
* You are the Reactor Operator.
* You are the Reactor Operator.
* EPP-8 has been completed through Step 28.
* EPP-8 has been completed through Step 28.
* CV Pressure is at its maximum value reached during the transient.
* CV Pressure is at its maximum value reached during the transient.
Task Standard:
Task Standard:
SI Accumulators are either isolated or depressurized lAW EPP-8. Required Materials:
Task                          SI Accumulators are eithereither isolated or depressurized lAW EPP-8.
EPP-8, Revision 16, Post LOCA Cooldown and Depressurization.
Required Required Materials:
General  
Materials:      EPP-8, Revision EPP-8,             16, Post Revision 16, Post LOCA LOCA Cooldown    and Depressurization.
Cooldown and   Depressurization.
General General  


==References:==
==References:==


EPP-8, Revision 16, Post LOCA Cooldown and Depressurization.
==References:==
EPP-8, Revision EPP-8,    Revision 16, 16, Post Post LOCA LOCA Cooldown    and Depressurization.
Cooldown and   Depressurization.
Handouts:
Handouts:
EPP-8, Revision 16, Post LOCA Cooldown and Depressurization.
Handouts:                      EPP-8, EPP-8, Revision     16, Post Revision 16,  Post LOCA LOCA Cooldown    and Depressurization.
2008 NRC SIM e NUREG 1021, Revision 9, Supplement 1
Cooldown and   Depressurization.
Appendix C Initiating Cue: Time Critical Task: Validation Time: 1. IC # 612. Job Performance Measure Worksheet Form ES-C-1 The CRSS has directed you to continue with EPP-8 until the SI Accumulators have been isolated.
2008 2008 NRC NRC SIMSIM ee                                              NUREG 1021, NUREG     1021, Revision Revision 9, 9, Supplement Supplement 11
NO 17 minutes SIMULATOR SETUP 3. EPP-8 marked up as completed through Step 28. 2008 NRC SIM e NUREG 1021, Revision 9, Supplement 1
 
Appendix C Page 3 of 13 PERFORMANCE INFORMATION Form ES-C-1 (Denote Critical Steps with an asterisk)
Appendix C Appendix      C                          Job  Performance Measure Job Performance       Measure                       Form Form ES-C-1 ES-C-i Worksheet Worksheet Initiating Cue:
Performance Step: 1 Standard:
Initiating  Cue:        The CRSS The   CRSS has has directed directed you to continue you to  continue with with EPP-8 EPP-8 until until the the SI SI Accumulators Accumulators have been have been isolated.
Examiner's Note: Comment: Performance Step: 2 Standard:
isolated.
Examiner's Note: Comment: 2008 NRC SIM e STARTTIME:
Time Critical Time    Critical Task:
__ Determine if One SI Pump should be stopped: Check SI Pumps -Any Running (Step 29.a). Determines that 2 SI Pumps are running. Determine if One SI Pump should be stopped: Determine required RCS Subcooling from Table: Conditions: -3 Charging Pumps Running -NO RCPs running -2 SI Pumps Running Required RCS Subcooling is 70 [93] degrees F. Determines from table that required RCS Subcooling is 70 degrees F. NUREG 1021, Revision 9, Supplement 1
Task:  NO NO Validation Time:
Appendix C Performance Step: 3 Standard:
Validation    Time:      17 minutes 17 minutes SIMULATOR SETUP SIMULATOR        SETUP
Examiner's Note: Comment: Performance Step: 4 Standard:
: 1.        IC#612.
Examiner's Note: Comment:
IC # 612.
* Performance Step: 5 Standard:
: 2.        SCN: 006_JPM_S2.
Comment: 2008 NRC SIM e Page 4 of 13 PERFORMANCE INFORMATION Form ES-C-1 Check RCS Subcooling  
: 3.         EPP-8 marked up as completed through Step 28.
-Less than required subcooling.
2008 2008 NRC NRC SIM SIM ee                                        NUREG NUREG 1021, 1021, Revision Revision 9,  9, Supplement Supplement 11
Determines that RCS subcooling is -149 degrees F which is more than the required sUbQooling. ( ,-, 1 Go To Step 29.1 If, , Check PZR level-Greater than 24% [45%]. Determines that PZR level is greater than required level. PZR is full. Stop one SI Pump. Candidate stops either SI Pump "A" or "C". NUREG 1021, Revision 9, Supplement 1
 
Appendix C Performance Step: 6 Standard:
Appendix C Appendix  C                                      Page    of 13 Page 33 of 13                       Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE          INFORMATION (Denote Critical (Denote  Critical Steps Steps with an an asterisk) asterisk)
Examiner's Note: Examiner's Cue: Comment: Performance Step: 7 Standard:
START TIME: _ _
Examiner's Note: Comment: 2008 NRC SIM e Page 5 of 13 PERFORMANCE INFORMATION Check RCS pressure -Stable or Increasing.
STARTTIME:
Form ES-C-1 Determines that RCS pressure is decreasing due to stopping the SI Pump. Step 29.h RNO action will hold candidate until pressure is stable or increasing and then proceed back to Step 29.a. RCS pressure will stabilize at -1220 psig and should take -4 minutes to stabilize after the SI Pump is secured. After -1 minute has elapsed, inform the operator that RCS pressure is stable. Determine if One SI Pump should be stopped: Check SI Pumps -Any Running (Step 29.a) Determines that one SI Pump is running. NUREG 1021, Revision 9, Supplement 1
Performance Step:
Appendix C
Performance    Step: 11    Determine ifif One SI Pump Determine              Pump should bebe stopped:
* Performance Step: 8 Standard:
Check SI Check  SI Pumps Pumps - Any Any Running Running (Step (Step 29.a).
Examiner's Note: Comment:
29.a).
* Performance Step: 9 Standard:
Standard:                  Determines that 2 SI SI Pumps are running.
Examiner's Note: Comment: 2008 NRC SIM e Page 6 of 13 PERFORMANCE INFORMATION Determine if One SI Pump should be stopped: Determine required RCS Subcooling from Table: Conditions: -3 Charging Pumps Running -NO RCPs running -1 SI Pump Running Required RCS Subcooling is 165 [191] degrees F. Form ES-C-1 Determines from table that required RCS Subcooling is 165 degrees F. Check RCS Subcooling
running.
-Less than required subcooling.
Examiners Note:
Determines that RCS subcooling is -125 degrees F which is less than the required subcooling.
Examiner's Comment:
NUREG 1021, Revision 9, Supplement 1
Performance Step: 2        Determine if One SI Pump should be stopped:
Appendix C Page 7 of 13 PERFORMANCE INFORMATION Form ES-C-1
Determine required RCS Subcooling from Table:
* Performance Step: 10 Check RCS Hot Leg temperatures
Conditions: - 3 Charging Pumps Running
-Less than 320 [300] degrees F. Standard:
                                              -
Determines that RCS Hot Leg temperatures are -440 degrees F. Go To Step 32. ( M);) Examiner's Note: Comment: Performance Step: 11 Check SI Reinitiation Criteria as follows:
                                              - NO RCPs running
* Check RCS Subcooling
                                              -
-Greater than 35 [55] degrees F
                                              - 2 SI Pumps Running
* Check PZR Level-Greater than 10% [32%] Standard:
                                              -
Determines that both conditions are satisfied.
Required RCS Subcooling is 70 [93] degrees F.
Examiner's Note: RCS Subcooling is 125 degrees F and PZR level is 100%. Comment: 2008 NRC SIM e NUREG 1021, Revision 9, Supplement 1
Standard:                  Determines from table that required RCS Subcooling is 70 degrees F.
Appendix C Page 8 of 13 PERFORMANCE INFORMATION Form ES-C-1
Examiners Examiner's Note:
* Performance Step: 12 Determine if SI Accumulators should be isolated:
Note:
* Check RCS subcooling
Comment:
-Less than 35 [55] degrees F Standard:
2008 NRC 2008      SIM ee NRC SIM                                             NUREG NUREG 1021, 1021, Revision Revision 9, 9, Supplement Supplement 11
Determines that RCS subcooling is greater than specified.  
 
! Go To Step 33.d. l Examiner's Note: RCS Subcooling is 125 degrees F. Comment:
Appendix C Appendix  C                                Page 44 of Page    of 13   13                        Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE        INFORMATION Performance Step:
* Performance Step: 13 Check PZR Level-Greater than 10% [32%]. Standard:
Performance  Step: 33 Check RCS Check  RCS Subcooling Subcooling - Less  Less than required subcooling.
Determines that PZR Level is greater than specified limits. Examiner's Note: PZR level is 100%. Comment: 2008 NRC SIM e NUREG 1021, Revision 9, Supplement 1
than required  subcooling.
Appendix C Page 9 of 13 PERFORMANCE INFORMATION Form ES-C-1
Standard:
* Performance Step: 14 Isolate SI Accumulators as follows: Standard:
Standard:              Determines that RCS Determines        RCS subcooling is      is - 149 149 degrees FF which is is more than the required required sUbQooling.
Examiner's Note: Comment: Locally close the breakers for
subcooling.
* SI-865C, ACCUMULATOR C DISCHARGE (MCC-5 CMPT 9F)
Go Go To To Step Step 29.1 29.f    ( If,,-,      1
* SI-865A, ACCUMULATOR A DISCHARGE (MCC-5 CMPT 14F)
                                                              ,
* SI-8658, ACCUMULATOR 8 DISCHARGE (MCC-6 CMPT 10J) Contacts the Inside and Outside AOs to close the breakers for the SI Accumulator Discharge Valves on MCC-5 and 6. The Inside and Outside AOs will communicate back to the Reactor Operator that the breakers are closed as requested.
Examiners Note:
Examiner's Comment:
Performance Step: 4                  level Greater than 24% [45%].
Check PZR level-Standard:              Determines that PZR level is greater than required level.
Examiners Note:
Examiner's              PZR is full.
Comment:
*
* Performance Step: 55    Stop one SI Pump.
Standard:
Standard:              Candidate stops either SI Pump         "A" or C.
Pump A    "C".
Comment:
Comment:
2008 2008 NRC NRC SIM SIM ee                                      NUREG NUREG 1021, 1021, Revision 9, Supplement Revision 9, Supplement 11
 
Appendix CC Appendix                                      Page 55 of Page      of 13 13                              Form Form ES-C-1 ESC-1 PERFORMANCE INFORMATION PERFORMANCE            INFORMATION Performance Step:
Performance  Step: 66  Check RCS Check    RCS pressure pressure - Stable Stable oror Increasing.
Increasing.
Standard:
Standard:               Determines that Determines      that RCS RCS pressure pressure isis decreasing decreasing duedue to to stopping stopping the the SI Pump.
SI  Pump. Step Step 29.h 29.h RNO RNO action action will will hold hold candidate candidate until until pressure pressure is  stable or is stable or increasing increasing and and then then proceed proceed back back to to Step Step 29.a.
29.a.
Examiners Note:
Examiner's  Note:      RCS pressure RCS     pressure will will stabilize stabilize atat - 1220 1220 psig psig and and should should take take - 44 minutes to minutes    to stabilize stabilize after after the the SI   Pump is SI Pump    is secured.
secured.
Examiners Cue:
Examiner's                          minute has After - 11 minute      has elapsed, inform inform the operator operator that RCS RCS pressure is pressure    is stable.
Comment:
Performance Step: 7    Determine if One SI Pump should be stopped:
Check SI Pumps - Any Running (Step 29.a)
 
Standard:              Determines that one SI Pump is running.
Examiners Examiner's Note:
Comment:
2008 2008 NRC NRC SIM SIM ee                                        NUREG NUREG 1021, 1021, Revision Revision 9, 9, Supplement Supplement 11
 
Appendix CC Appendix                                      Page 66 of Page    of 13 13                          Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE            INFORMATION
*Performance Step:
Performance   Step: 88  Determine ifif One Determine        One SI SI Pump Pump should should be be stopped:
stopped:
Determine required Determine   required RCS RCS Subcooling Subcooling from from Table:
Table:
Conditions: - 33 Charging Conditions:    -    Charging Pumps Pumps Running Running
                                          - NO
                                            - NO RCPs RCPs running running
                                          - 11 SI
                                            -  SI Pump Pump Running Running Required RCS Required            Subcooling isis 165 RCS Subcooling          165 [191]   degrees F.
[1911 degrees    F.
Standard:
Standard:              Determines from Determines     from table that that required required RCS RCS Subcooling Subcooling is is 165 165 degrees F.
degrees  F.
Examiners Note:
Examiner's Comment:
Comment:
*
* Performance Step: 9 Performance            Check RCS Subcooling - Less than required subcooling.
 
Standard:             Determines that RCS subcooling is - 125      125 degrees FF which is less than less than the    required subcooling.
Examiners Examiner's Note:
Note:
Comment:
Comment:
2008 2008 NRC NRC SIM SIM ee                                      NUREG NUREG 1021, 1021, Revision Revision 9, 9, Supplement Supplement 11
 
Appendix C Appendix  C                                Page 77 of Page      13 of 13                          Form ES-C-1 Form  ES-C-i PERFORMANCE INFORMATION PERFORMANCE        INFORMATION
**  Performance Step:
Performance  Step: 10 10 Check RCS Check        Hot Leg RCS Hot    Leg temperatures temperatures - Less Less than than 320 320 [300]
[300]
degrees F.
degrees  F.
Standard:
Standard:              Determines that Determines  that RCS RCS Hot Hot Leg Leg temperatures temperatures are are - 440
                                                                              - 440 degrees degrees F.
F.
To Step Go To Go    Step 32.
: 32. (  M);)
Examiners Note:
Examiner's Comment:
Performance Step: 11  Check SI Reinitiation Criteria as follows:
* Check RCS Subcooling - Greater than 35 [55] degrees F
* Level Greater than 10% [32%]
Check PZR Level-Standard:             Determines that both conditions are satisfied.
Examiners Note:
Examiner's             RCS Subcooling is 125 degrees F and PZR level is 100%.
Comment:
2008 2008 NRC NRC SIM SIM ee                                  NUREG NUREG 1021, 1021, Revision Revision 9,9, Supplement Supplement 11
 
Appendix CC Appendix                                    Page 88 of Page    of 13 13                            Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE           INFORMATION
**  Performance Step:
Performance   Step: 12 12 Determine ifif SI Determine      SI Accumulators Accumulators should should be be isolated:
isolated:
                              *. Check RCS Check      RCS subcooling subcooling - Less Less than than 3535 [55]
[55] degrees degrees FF Standard:
Standard:              Determines that Determines  that RCS RCS subcooling subcooling isis greater greater than than specified.
specified.
Go To Go To Step  33.d. l!
Step 33.d.        i Examiners Note:
Examiner's  Note:    RCS Subcooling RCS  Subcooling is  is 125 125 degrees degrees F. F.
Comment:
Comment:
**  Performance Step: 13                Level Greater than 10% [32%].
Check PZR Level-Standard:
Standard:              Determines that PZR Level is greater than specified limits.
Examiners Examiner's Note:      PZR level is 100%.
100%.
Comment:
Comment:
2008 2008 NRC NRC SIM SIM ee                                    NUREG NUREG 1021, 1021, Revision Revision 9,9, Supplement Supplement 11
 
Appendix CC Appendix                                      Page 99 of Page    of 13 13                            Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE          INFORMATION
**  Performance Step:
Performance          14 Step: 14  Isolate SI Isolate      Accumulators as SI Accumulators          follows:
as follows:
Locally close Locally  close the the breakers breakers for for
                                **  SI-865C, ACCUMULATOR SI-865C,    ACCUMULATOR C        C DISCHARGE DISCHARGE (MCC-5 (MCC-5 CMPT9F)
CMPT    9F)
                                **  SI-865A, ACCUMULATOR SI-865A,    ACCUMULATOR AA DISCHARGE DISCHARGE (MCC-5 (MCC-5 CMPT 14F)
CMPT    14F)
                                **  SI-865B, ACCUMULATOR SI-8658,    ACCUMULATOR 8B DISCHARGEDISCHARGE (MCC-6(MCC-6 CMPT 10J)
CMPT    1OJ)
Standard:                Contacts the Inside andand Outside AOs to  to close the the breakers for the Discharge Valves on MCC-5 SI Accumulator Discharge                    MCC-5 and 6.
Examiners Note:
Examiner's              The Inside and Outside AOs will communicate back to the Reactor Operator that the breakers are closed as requested.
Valves SI-865A1B/C will have RED open indication on the RTGB.
Valves SI-865A1B/C will have RED open indication on the RTGB.
* Performance Step: 15 Verify all ACCUM DISCHs -CLOSED. SI-865A, SI-8658, SI-865C. Standard:
Comment:
Control switches are placed in the closed position.
*
Candidate should note that SI-865A and SI-8658 close but SI-865C has dual indication (RED and GREEN position lights ILLUMINATED)
* Performance Step: 15 15 Verify all ACCUM DISCHs - CLOSED.
Go To Step 34.b. RNO Examiner's Note: Comment: 2008 NRC SIM e NUREG 1021, Revision 9, Supplement 1
 
Appendix C Page 10 of 13 PERFORMANCE INFORMATION
Sl-865A, SI-865A, Sl-865B, SI-8658, Sl-865C.
* Performance Step: 16 Vent any unisolated accumulator as follows: Verify SI-855, ACC NITROGEN ISO, is closed. Standard:
SI-865C.
Candidate determines that valve SI-855 is closed. Examiner's Note: Comment: Form ES-C-1
Standard:
* Performance Step: 17 Open the appropriate ACCUM VENT valve: SI-853C. Standard:
Standard:              Control switches are placed in  in the closed position.
Candidate opens valve SI-853C to align SI Accumulator "c" to the vent path. Examiner's Note: Comment: 2008 NRC SIM e NUREG 1021, Revision 9, Supplement 1
position. Candidate should should note note that SI-865A SI-865A and Sl-865B SI-8658 close but Sl-865C SI-865C has has dual dual indication indication (RED   and GREEN position (RED and              position lights lights ILLUMINAT ILLUMINATED)ED)
Appendix C Page 11 of 13 PERFORMANCE INFORMATION Form ES-C-1
Go To Go  To Step  34.b. RNO Step 34.b. RNO Examiners Examiner's Note:
* Performance Step: 18 Open HIC-936, ACC VENT HDR FLOW. Standard:
Note:
Candidate opens HIC-936 by turning the valve potentiometer in the clockwise direction to open the valve and depressurize SI Accumulator "c" to the CV atmosphere.
Comment:
Examiner's Note: APP-002-F4, SI ACCUM C HI/LO PRESS, will clear and come back in as the accumulator is depressurized.
Comment:
Comment: Termination:
2008 NRC SIM 2008 NRC  SIM ee                                      NUREG NUREG 1021,1021, Revision Revision 9, 9, Supplement Supplement 11
STOP TIME: 2008 NRC SIM e APP-036-C9, CV N2 HDR HI/LO PRESS, will be received when HIC-936 is opened. Once candidate notes that SI Accumulator "C" pressure is decreasing, examiner can terminate the JPM at his discretion.
 
END OF TASK SI Accumulators are isolated andlor depressurizing.
Appendix CC Appendix                                    Page 10 Page   10 of of 13 13                            Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE          INFORMATION
NUREG 1021, Revision 9, Supplement 1
*Performance Step:
Appendix C Page 12 of 13 VERIFICATION OF COMPLETION Job Performance Measure No.: 2008 NRC SIM e Examinee's Name: Date Performed:
Performance    Step: 16 16 Vent any Vent  any unisolated unisolated accumulator accumulator as     follows:
as follows:
Verify SI-855, Verify SI-855, ACC ACC NITROGEN NITROGEN ISO,       is closed.
ISO, is  closed.
Standard:
Standard:              Candidate determines Candidate  determines that that valve valve SI-855 SI-855 isis closed.
closed.
Examiners Note:
Examiner's   Note:
Comment:
Comment:
*Performance Step: 17   Open the appropriate ACCUM VENT valve: SI-853C.
Standard:
Standard:              Candidate opens valve SI-853C to align SI Accumulator "c"     C to the vent path.
Examiners Note:
Examiner's Comment:
2008 NRC 2008  NRC SIM SIM ee                                    NUREG    1021, Revision NUREG 1021,       Revision 9,9, Supplement Supplement 11
 
Appendix C Appendix  C                                Page 11 Page        of 13 1 1 of  13                        Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE            INFORMATION
*Performance Step:
Performance  Step: 18 18 Open HIC-936, Open   HIC-936, ACC      VENT HDR ACC VENT       HDR FLOW.
FLOW.
Standard:
Standard:                                HIC-936 by Candidate opens HIC-936       by turning the valve potentiometer potentiometer in the clockwise direction clockwise  direction to to open open the valve and depressurize SI the  valve and depressurize SI Accumulator "c" C to the CV atmosphere.
Examiners Note:
Examiner's   Note:     APP-002-F4, SI ACCUM C HI/LO      HI/LO PRESS, PRESS, will clear and come in as the accumulator is back in                            is depressurized.
depressurized.
APP-036-C9, CV N2 HDR HI/LO PRESS, will be received when HIC-936 is opened.
Once candidate notes that SI Accumulator "C"         C pressure is decreasing, examiner can terminate the JPM at his discretion.
Comment:
END OF TASK Termination:              SI Accumulators are isolated and/or  andlor depressurizin depressurizing.g.
STOP TIME:
2008 NRC 2008      SIM ee NRC SIM                                          NUREG NUREG 1021,1021, Revision Revision 9, 9, Supplement Supplement 11
 
Appendix C Appendix    C                              Page 12 Page   12 of of 13 13                    Form Form ES-C-1 ES-C-i VERIFICATION OF VERIFICATION  OF COMPLETION COMPLETION Job Performance Job  Performance Measure Measure No.:
No.:  2008 NRC 2008 NRC SIM SIM ee Examinees Name:
Examinee's     Name:
Date Performed:
Date   Performed:
Facility Evaluator:
Facility Evaluator:
Number of Attempts:
Number of Attempts:
Line 560: Line 1,369:
Question Documentation:
Question Documentation:
Question:
Question:
Response:
 
Result: SAT UNSAT Examiner's Signature:
===Response===
Date: -----------------------------
Result:                           SAT             UNSAT Examiners Examiner's Signature:                                       Date:
Form ES-C-1 2008 NRC SIM e NUREG 1021, Revision 9, Supplement 1
                        -----------------------------
Appendix C INITIAL CONDITIONS:
2008 2008 NRCNRC SIM SIM ee                                NUREG NUREG 1021, 1021, Revision 9, Supplement Revision 9, Supplement 11
INITIATING CUE: 2008 NRC SIM e Page 13 of 13 JPM CUE SHEET
 
* Plant was initially at 100% power. Form ES-C-1
Appendix CC Appendix                                  Page 13 Page     13 of of 13 13                            Form Form ES-C-1 ES-C-i JPM CUE JPM     CUE SHEET SHEET INITIAL CONDITIONS:
* RCS depressurization resulted in a Reactor Trip and Safety Injection.
INITIAL  CONDITIONS:    Plant was
* PATH-1 has directed the crew to EPP-8, POST LOCA COOLDOWN AND DEPRESSURIZATION.
                    ** Plant       initially at was initially   at 100%
* You are the Reactor Operator.
100% power.
* EPP-8 has been completed through Step 28.
power.
* CV Pressure is at its maximum value reached during the transient.
                    ** RCS RCS depressurization depressurization resulted resulted inin aa Reactor Reactor Trip Trip and and Safety Safety Injection.
The CRSS has directed you to continue with EPP-8 until the SI Accumulators have been isolated.
Injection.
NUREG 1021, Revision 9, Supplement 1
                    ** PATH-1 PATH-i hashas directed directed thethe crew crew to to EPP-8, EPP-8, POST POST LOCA LOCA COOLDOWN COOLDOWN AND DEPRESSURIZATION.
Appendix C Facility:
AND  DEPRESSURIZATION.
Task Title: KIA  
                    ** You You are are the the Reactor Reactor Operator.
Operator.
                    ** EPP-8 EPP-8 has has been been completed completed through through Step Step 28.
28.
                    ** CV CV Pressure Pressure is is at at its its maximum maximum valuevalue reached reached during during the the transient.
transient.
INITIATING CUE:
INITIATING            The CRSS has directed you to continue with EPP-8 until the SI Accumulators Accumulators have been isolated.
2008  NRC SIM 2008 NRC  SIM ee                                      NUREG NUREG 1021, 1021, Revision Revision 9,9, Supplement Supplement 11
 
Appendix CC Appendix                                          Job Performance Job  Performance Measure Measure                    Form Form ES-C-1 ES-C-i Worksheet Worksheet Facility:
Facility:                    HB ROBINSON HB  ROBINSON                                Task Task No.:
No.:    01015100501 01015100501 Task Title:
Task    Title:              Remove N-44 Remove          from service N-44 from  service lAW lAW OWP-OWP-    JPM JPM No.:
No.:    2008 2008 NRC NRC SIM SIM f 011.
011.
KIA    


==Reference:==
==Reference:==


Examinee:
K/A
 
==Reference:==
015 A4.02 015  A4.02 3.9/3.9 3.9/3.9 015 A4.03 015  A4.03 3.8/3.9 3.8/3.9 Examinee:
Examinee:                                                            NRC NRC Examiner:
Examiner:
Facility Evaluator:
Facility Evaluator:
Method of testing: Job Performance Measure Worksheet HB ROBINSON Task No.: Remove N-44 from service lAW OWP-JPM No.: 011. 015 A4.02 3.9/3.9 015 A4.03 3.8/3.9 NRC Examiner:
Facility    Evaluator:                                              Date:
Date: Form ES-C-1 01015100501 2008 NRC SIM f Simulated Performance:
Date:
Actual Performance:
Method of testing:
X Classroom Simulator X Plant ------READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Method Simulated Performance:
Initial Conditions:
Simulated       Performance:                                         Actual Performance:
* The plant is operating at 100% RTP.
Performance:          X Classroom       - - - Simulator          -- X - Plant READ TO THE EXAMINEE II will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Initial Conditions:               ** The plant is operating at 100% RTP.
* No equipment is out of service.
* No equipment is out of service.
* I&C has requested a clearance on N-44 to replace the high voltage power supply.
l&C has requested a clearance on N-44 to replace the high voltage
* I&C power supply.
* This clearance and work scope will render the N-44 input to QPTR inoperable.
* This clearance and work scope will render the N-44 input to QPTR inoperable.
* You are the BOP operator.
* You are the BOP  BOP operator.
* The CRSS has completed the required pre-job briefing.
* The CRSS has completed the required pre-job briefing.
* QPTR meets the SR 3.2.4.2 requirement.
* QPTR meets the SR 3.2.4.2 requirement.
* Reactor Engineering has been contacted to perform a Flux Map. Task Standard:
* Reactor Reactor Engineering Engineering hashas been contacted contacted to perform aa Flux Flux Map.
Power Range Channel NI-44 removed from service lAW OWP-011, NI-4. Required Materials:
Map.
OWP-011, NI-4 ERFIS Computer General  
Task Task Standard:
Standard:                Power Power Range Range Channel Channel Nl-44 NI-44 removed removed from from service lAW OWP-0i service AW  OWP-011,  1, NI-4.
NI-4.
Required Required Materials:
Materials:    OWP-01 OWP-011, 1, Nl-4 NI-4 ERFIS ERFIS Computer Computer General General  


==References:==
==References:==


OWP-011, NI-4 2008 NRC SIM f NUREG 1021, Revision 9 Appendix C Handouts:
==References:==
Initiating Cue: Time Critical Task: Validation Time: 1.IC # 616. OWP-011, NI-4 Job Performance Measure Worksheet Form E8-C-1 You are directed by the CRSS to remove N-44 from service lAW OWP-011, NI-4. NO 10 minutes SIMULATOR SETUP 3. OP RO at RO ERFI8 terminal and OP BOP at BOP ERFI8 terminal.
OWP-01 OWP-011, 1, Nl-4 NI-4 2008 2008 NRC NRC SIM SIM If                                                              NUREG NUREG 1021,     Revision 99 1021, Revision
2008 NRC 81M f NUREG 1021, Revision 9 Appendix C Page 3 of 10 PERFORMANCE INFORMATION Form ES-C-1 (Denote Critical Steps with an asterisk)
 
Performance Step: 1 Standard:
Appendix CC Appendix                                      Job Performance Job    Performance Measure Measure                    Form Form E8-C-1 ES-C-i Worksheet Worksheet Handouts:
Examiner's Note: Comment: 2008 NRC SIM f STARTTIME:
Handouts:                   OWP-Oll, NI-4 OWP-011,    Nl-4 Initiating Cue:
__ Remove NI-44 from ERFIS scan: NIN0044A REMOVED NI-44 removed from ERFIS scan. Removal from scan can be performed by the following actions: Select F3 = MENU on the bottom of the ERFIS screen Select ADMIN (ADMINISTRATIVE FUNCTIONS MENU) Select DR (DEURES POINT FROMrrO SCAN OR ALARM) Select DELETE SCAN ENTER POINT ID Removal from scan can be performed by the following actions: If candidate knows the Turn On Code (TOC), he can type in DR and hit ENTER to go directly to the DR screen Select DELETE SCAN ENTER POINT ID APP-005-D6, Delta Flux Warning I Status will be received and a printout initiated for the CAOC Alarm Report. "CHANNEL #4 NOW OUT OF SERVICE with reading noted as 0000 ??" NUREG 1021, Revision 9 Appendix C
Initiating  Cue:          You are You are directed directed by    the CRSS by the CRSS to to remove remove N-44  from service N-44 from service lAW lAW OWP-011, OWP-01 1, NI-NI-4.
* Performance Step: 2 Standard:
4.
Examiner's Note: Comment: Performance Step: 3 Standard:
Time Critical Time    Critical Task:
Examiner's Note: Comment: 2008 NRC SIM f Page 4 of 10 PERFORMANCE INFORMATION DROPPED ROD MODE switch: BYPASS. Form ES-C-1 On NI-44 drawer, NI-44 DROPPED ROD MODE switch selected to BYPASS. APP-005-D4, NIS TRIP/DROP ROD BYPASS will alarm when a Dropped Rod Mode switch is placed in BYPASS. DROPPED ROD BYPASS on the NI-44 drawer front will ILLUMINATE.
Task:    NO NO Validation Time:
NIS ROD DROP BYPASS NI-44 Status Light: ILLUMINATED.
Validation    Time:          minutes 10 minutes 10 SIMULATOR SETUP SIMULATOR
The candidate observes the NIS ROD DROP BYPASS NI-44 status light on RTGB Section B is illuminated.
: 1. IC#616.
NUREG 1021, Revision 9 Appendix C
1.IC    # 616.
* Performance Step: 4 Standard:
: 2. SON: 006_JPM_S6.
Examiner's Note: Comment: Performance Step: 5 Standard:
: 3. OP RO at RO ERFI8   ERRS terminal and OP QP BOP at BOP ERFI8   ERFIS terminal.
Examiner's Note: Comment: 2008 NRC SIM f Page 5 of 10 PERFORMANCE INFORMATION Form ES-C-1 NI-44 OUT OF SERVICE TRIP SWITCH: TRIPPED. In the rear of NI-44 cabinet, the candidate positions the NI-44 OUT OF SERVICE TRIP SWITCH to the TRIPPED position. (Toggle switch in the UP position)
2008 NRC 2008    NRC SIM 81M ff                                                            NUREG 1021, NUREG      1021, Revision Revision 99
Operator determines that independent verification is not required due to the bistable status light is not illuminated prior to positioning the NI-44 OUT OF SERVICE TRIP SWITCH. This trips the 108% High Flux bistable for NI-44. Bistable light HI POW RANGE HI FLUX NC44R: ILLUMINATED.
 
The candidate determines that bistable light HI POW RANGE HI FLUX NC44R is illuminated on Bistable Status Panel B. APP-005-A4, PR SINGLE CH HI RANGE ALERT will be received when bistable is actuated.
Appendix C Appendix C                                     Page 33 of Page    of 10 10                      Form ES-C-1 Form  ES-C-i PERFORMANCE INFORMATION PERFORMANCE        INFORMATION (Denote Critical (Denote Critical Steps Steps with an an asterisk) asterisk)
OVERPOWER TRIP HIGH RANGE light on NI-44 drawer front will illuminate NUREG 1021, Revision 9 Appendix C
START TIME:____
* Performance Step: 6 Standard:
STARTTIME:     __
Examiner's Note: Comment:
Performance Step: 11 Performance                Remove NI-44 Remove     NI-44 from ERFIS ERFIS scan: NIN0044A NINOO44A REMOVED REMOVED Standard:                  Nl-44 removed from ERFIS scan.
* Performance Step: 7 Standard:
NI-44 Examiners Note:
Examiner's Note: Comment: 2008 NRC SIM f Page 6 of 10 PERFORMANCE INFORMATION ROD STOP BYASS switch: BYPASS PR 44. Form ES-C-1 On the Miscellaneous Control and Indication Panel, the candidate places the ROD STOP BYPASS switch to the BYPASS PR 44 position.
Examiner's    Note:        Removal from scan can be performed Removal                        performed by the following actions:
COMPARATOR CHANNEL DEFEAT switch: Select PR 44. On the Comparator and Rate drawer, the candidate places the COMPARATOR CHANNEL DEFEAT switch to select PR 44 position.
                                  -  Select F3   =MENU on the bottom of the ERFIS screen
COMPARATOR DEFEAT light illuminates on the drawer above the switch. NUREG 1021, Revision 9 Appendix C
                                                  =
* Performance Step: 8 Standard:
                                  -  Select ADMIN (ADMINISTRATIVE FUNCTIONS MENU)
Examiner's Note: Comment:
                                  -  Select DR (DEURES (DEL/RES POINT FROMrrO FROM/TO SCAN OR ALARM)
* Performance Step: 9 Standard:
                                  -  Select DELETE SCAN
Examiner's Note: Comment: 2008 NRC SIM f Page 7 of 10 PERFORMANCE INFORMATION DETECTOR CURRENT COMPARATOR Drawer: UPPER SECTION Switch: Select PR 44. Form ES-C-1 On the Detector Current Comparator drawer, the candidate selects PR 44 with the Upper Section switch. CHANNEL DEFEAT light for Upper Section illuminates when switch is selected out of NORMAL. DETECTOR CURRENT COMPARATOR Drawer: LOWER SECTION Switch: Select PR 44. On the Detector Current Comparator drawer, the candidate selects PR 44 with the Lower Section switch. CHANNEL DEFEAT light for Lower Section illuminates when switch is selected out of NORMAL. NUREG 1021, Revision 9 Appendix C Page 8 of 10 PERFORMANCE INFORMATION Form ES-C-1 Performance Step: 10 NI-44 INSTRUMENT POWER FUSES: REMOVED. Standard:
                                  -  ENTER POINT POINTID ID Removal from scan can be performed by the following actions:
Candidate determines that this step is not required and N/As. Examiner's Cue: If candidate asks, inform him that I&C personnel will deenergize the drawer after AS FOUND readings are taken. Examiner's Note: This action is NtA if power is > P-10 or the reactor is in Modes 3 through 6 (ITS Table 3.3.1-1).
                                  -  If candidate knows the Turn On Code (TOC), he can type in DR and hit ENTER to go directly to the DR screen
                                  -  Select DELETE SCAN
                                  -  ENTER POINTID POINT ID APP-005-D6, Delta Flux Warning I Status will be received and aa printout initiated for the CAOC Alarm Report.
CHANNEL "CHANNEL #4 NOW OUT OF SERVICE with reading noted as 0000 ??
                                      ??"
Comment:
Comment:
* Performance Step: 11 Bistable light LOW POW RANGE HI FLUX NC44P: ILLUMINATED.
2008 NRC 2008      SIM ff NRC SIM                                                          NUREG 1021, NUREG  1021, Revision Revision 99
 
Appendix C Appendix  C                                Page 44 of Page    of 10 10                        Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE        INFORMATION
*Performance Step:
Performance  Step: 22  DROPPED ROD DROPPED      ROD MODE MODE switch:
switch: BYPASS.
BYPASS.
Standard:
Standard:
Candidate determines that this step can be signed or N/A'd. Examiner's Cue: Examiner's Note: Comment: Terminating Cue: STOP TIME: 2008 NRC SIM f This bistable is normally in the tripped condition (ILLUMINATED) at this power level. The candidate may sign for the step or Nt A the step. N-44 has been removed from service lAW OWP-011, NI-4. NUREG 1021, Revision 9 Appendix C Page 9 of 10 VERIFICATION OF COMPLETION Job Performance Measure No.: 2008 NRC SIM f Examinee's Name: Date Performed:
Standard:              On  Nl-44 drawer, On NI-44  drawer, NI-44 NI-44 DROPPED DROPPED RODROD MODE MODE switch switch selected selected to BYPASS.
to BYPASS.
Examiners Note:
Examiner's            APP-005-D4, NIS TRIP/DROP ROD BYPASS will alarm when a Dropped Rod Mode switch is placed placed in BYPASS.
BYPASS.
DROPPED ROD DROPPED      ROD BYPASS BYPASS on the NI-44 NI-44 drawer front will ILLUMINATE.
Comment:
Performance Step: 3    NIS ROD DROP BYPASS NI-44    Nl-44 Status Light: ILLUMINATED.
Standard:              The candidate observes the NIS ROD DROP BYPASS NI-44 status light on RTGB Section B is illuminated.
Examiners Note:
Examiner's Comment:
2008 NRC 2008 NRC SIM SIM ff                                                  NUREG 1021, NUREG      1021, Revision Revision 99
 
Appendix CC Appendix                                          Page 55 of Page      of 10 10                                Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE            INFORMATION
**  Performance Step:
Performance    Step: 44  NI-44 OUT NI-44    OUT OF      SERVICE TRIP OF SERVICE        TRIP SWITCH:
SWITCH: TRIPPED.
TRIPPED.
Standard:
Standard:                In the In  the rear rear of  N 1-44 cabinet, of NI-44  cabinet, the the candidate candidate positions positions the the NI-44 N 1-44 OUT OUT OF SERVICE OF    SERVICE TRIP  TRIP SWITCH SWITCH to  to the the TRIPPED TRIPPED position.
position. (Toggle (Toggle switch in switch    in the the UP UP position) position)
Examiners Note:
Examiner's    Note:    Operator determines Operator        determines that that independent independent verification verification is  not required is not  required due to due    to the  bistable status the bistable    status light light is  not illuminated is not  illuminated prior prior to to positioning the NI-44 positioning            NI-44 OUT OUT OF SERVICE TRIP SWITCH.      SWITCH.
This trips the      108% High the 108%          Flux bistable for NI-44.
High Flux Comment:
Performance Step: 5      Bistable light HI POW RANGE HI FLUX NC44R: ILLUMINATED.          ILLUMINATED.
Standard:                The candidate determines that bistable light HI POW RANGE HI FLUX NC44R is illuminated on Bistable Status Panel B.
Examiners Examiner's Note:        APP-005-A4 APP-005-A4,, PR SINGLE CH HI RANGE ALERT will be received when bistable is actuated.
OVERPOWE OVERPOWER          R TRIP HIGH HIGH RANGE light on      on NI-44 NI-44 drawer front will illuminate illuminate Comment:
Comment:
2008 NRC 2008  NRC SIM SIM ff                                                                NUREG 1021, NUREG      1021, Revision Revision 99
 
Appendix CC Appendix                                      Page 66 of Page    of 10 10                            Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE        INFORMATION
**  Performance Step:
Performance    Step: 66  ROD STOP ROD    STOP BYASS BYASS switch:
switch: BYPASS BYPASS PR  PR 44.
44.
Standard:
Standard:                On  the Miscellaneous On the  Miscellaneous Control Control and and Indication Indication Panel, Panel, the the candidate candidate places  the ROD  STOP places the ROD STOP BYPASSBYPASS switch switch to to the the BYPASS BYPASS PR  PR 44 44 position.
position.
Examiners Note:
Examiner's    Note:
Comment:
Comment:
**  Performance Step: 7      COMPARATOR CHANNEL DEFEAT switch: Select PR 44.
COMPARATOR Standard:                On the Comparator and Rate drawer, the candidate places the COMPARATOR CHANNEL DEFEAT switch to select PR 44 COMPARATOR position.
COMPARAT COMPARATOR    OR DEFEAT light illuminates on the drawer above the switch.
Examiners Examiner's Note:
Comment:
Comment:
2008 2008 NRC  SIM ff NRC SIM                                                          NUREG NUREG 1021,1021, Revision Revision 99
 
Appendix CC Appendix                                    Page 77 of Page      of 10 10                          Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE          INFORMATION
**  Performance Step:
Performance    Step: 88 DETECTOR CURRENT DETECTOR      CURRENT COMPARATOR COMPARATOR Drawer: Drawer:
UPPER SECTION UPPER    SECTION Switch:
Switch: Select Select PR PR 44.
44.
Standard:
Standard:              On  the Detector On the  Detector Current Current Comparator Comparator drawer, drawer, the the candidate candidate selects selects PR 44  with the PR 44 with the Upper    Section Upper Section switch.
switch.
CHANNEL DEFEAT CHANNEL      DEFEAT light light for for Upper Upper Section Section illuminates illuminates when when switch is switch  is selected selected out out ofof NORMAL.
NORMAL.
Examiners Note:
Examiner's    Note:
Comment:
**  Performance Step: 9 Performance            DETECTOR CURRENT COMPARATOR  COMPARATOR Drawer:
LOWER SECTION Switch: Select PR 44.
Standard:              On the Detector Current Comparator drawer, the candidate selects PR 44 with the Lower Section switch.
CHANNEL DEFEAT light for Lower Section illuminates when switch is selected out of NORMAL.
Examiners Examiner's Note:
Comment:
Comment:
2008 NRC 2008  NRC SIMf SIM f                                                        NUREG 1021, NUREG      1021, Revision Revision 99
 
Appendix CC Appendix                                        Page 88 of Page        of 10 10                              Form ES-C-1 Form    ES-C-i PERFORMANCE INFORMATION PERFORMANCE            INFORMATION Performance Step:
Performance    Step: 10 10  NI-44 INSTRUMENT NI-44    INSTRUMENT POWER    POWER FUSES: FUSES: REMOVED.
REMOVED.
Standard:
Standard:                Candidate determines Candidate    determines that that this this step step isis not not required required and and N/As.
N/As.
Examiners Cue:
Examiner's    Cue:      IfIf candidate candidate asks, asks, inform inform him        that I&C him that    I&C personnel personnel will will deenergize the deenergize      the drawer      after AS drawer after      AS FOUND FOUND readings readings are are taken.
taken.
Examiners Note:
Examiner's    Note:    This    action is This action        N/A ifif power is NtA      power is  is>> P-10 P-b or or the the reactor reactor is is in in Modes 3 through 6 (ITS Table 3.3.1-1).
Modes Comment:
**  Performance Step: 11    Bistable light LOW POW RANGE HI FLUX NC44P:
ILLUMINATED.
ILLUMINATED.
Standard:                Candidate determines that this step can be signed or N/A'd.       N/Ad.
Examiners Examiner's Cue:
Examiners Examiner's Note:         This bistable is normally in the tripped condition (ILLUMINA (ILLUMINATED)  TED) at this power level. level. The candidate may sign for the step or N/A NtA  the   step.
Comment:
Terminating Terminating Cue:
Cue:          N-44 N-44 has    been removed has been     removed from  from service service lAW lAW OWP-01 OWP-011,     NI-4.
1, Nl-4.
STOP TIME:
STOP  TIME:
2008 2008 NRC  SIM ff NRC SIM                                                                    NUREG 1021, NUREG     1021, Revision Revision 99
 
Appendix C Appendix   C                               Page 99 of Page     of 10 10                Form ES-C-1 Form  ES-C1 VERIFICATION OF VERIFICATION   OF COMPLETION COMPLETION Job Performance Job  Performance Measure Measure No.:
No.: 2008 NRC 2008 NRC SIM SIM ff Examinees Name:
Examinee's   Name:
Date Performed:
Date   Performed:
Facility Evaluator:
Facility Evaluator:
Number of Attempts:
Number of Attempts:
Line 637: Line 1,588:
Question Documentation:
Question Documentation:
Question:
Question:
Response:
 
Result: SAT UNSAT Form ES-C-1 Examiner's Signature:
===Response===
Date: -----------------------------
Result:                         SAT               UNSAT Examiners Examiner's Signature:                                       Date:
2008 NRC SIM f NUREG 1021, Revision 9 Appendix C INITIAL CONDITIONS:
                        -----------------------------
INITIATING CUE: 2008 NRC SIM f Page 10 of 10 JPM CUE SHEET
2008 2008 NRC NRC SIM SIM ff                                              NUREG 1021, NUREG  1021, Revision Revision 99
* The plant is operating at 100% RTP.
 
* No equipment is out of service. Form ES-C-1
Appendix C Appendix C                               Page 10 Page   10 of of 10 10                        Form Form ES-C-1 ES-C-i CUE SHEET JPM CUE JPM          SHEET INITIAL CONDITIONS:
* I&C has requested a clearance on N-44 to replace the high voltage power supply.
INITIAL  CONDITIONS:    The plant
* This clearance and work scope will render the N-44 input to QPTR inoperable.
                    ** The   plant isis operating operating at at 100%
100% RTP.
RTP.
                    ** No No equipment is    is out of of service.
                    ** I&C I&C has has requested requested a clearance on N-44  N-44 to replace replace the high high voltage power voltage  power supply.
supply.
                    ** This This clearance clearance and work scope will render the   the N-44 N-44 input input to QPTR inoperable.
* You are the BOP operator.
* You are the BOP operator.
* The CRSS has completed the required pre-job briefing.
* The CRSS has completed the required  required pre-job briefing.
* QPTR meets the SR 3.2.4.2 requirement.
* QPTR meets the SR 3.2.4.2 requirement.
* Reactor Engineering has been contacted to perform a Flux Map. You are directed by the CRSS to remove N-44 from service lAW OWP-011, NI-4. NUREG 1021, Revision 9 Appendix C Facility:
* Reactor Engineering has been contacted to perform a Flux Map.
Task Title: KIA  
INITIATING CUE:        You are directed by the CRSS to remove N-44 from service lAW OWP-0ii, NI-4.
OWP-011, 2008 NRC 2008  NRC SIM SIM ff                                                      NUREG 1021, NUREG     1021, Revision Revision 99
 
Appendix CC Appendix                                             Job Performance Job  Per[ormance Measure Measure                      Form Form ES-C-1 ES-C-i Worksheet Worksheet Facility:
Facility:                    HB ROBINSON HB  ROBINSON                                    Task Task No.:
No.:    01000106705 01000106705 Task Title:
Task     Title:             Respond to Respond    to aa Loss Loss of of CCW CCW lAW lAW AOP-AOP-    JPM JPM No.:
No.:    2008 NRC 2008  NRC SIMSIM gg 014.
014.
KIA    


==Reference:==
==Reference:==


Examinee:
K/A
 
==Reference:==
008  K1 .02 008 K1.02      3.3/3.4 3.3/3.4 008 K3.03 008  K3.03      4.1/4.2 4.1/4.2 026 AK3.03 026  AK3.03 4.0/4.2 4.0/4.2 Examinee:
Examinee:                                                                NRC NRC Examiner:
Examiner:
Facility Evaluator:
Facility Evaluator:
Method of testing: Job Performance Measure Worksheet HB ROBINSON Task No.: Respond to a Loss of CCW lAW AOP-JPM No.: 014. 008 K1.02 3.3/3.4 008 K3.03 4.1/4.2 026 AK3.03 4.0/4.2 NRC Examiner:
Facility    Evaluator:                                                  Date:
Date: Form ES-C-1 01000106705 2008 NRC SIM g Simulated Performance:
Date:
Actual Performance:
Method of Method     of testing:
X Classroom Simulator X Plant ------READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
testing:
Performance:
Simulated Performance:                                                   Actual Performance:
Performance:            X Classroom       - - - Simulator            -- X - Plant READ TO THE EXAMINEE READ                  EXAM INEE II will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Initial Conditions:
Initial Conditions:
* The plant is operating at 100% power.
* The plant is operating at 100%  100% power.
* No equipment is out of service.
* No equipment is out of service.
* You are the Reactor operator.
* You are the Reactor operator.
Task Standard:
Task Task Standard:
AOP-014 actions taken to ensure the RCPs are not damaged. Required Materials:
Standard:            AOP-014 actions taken    taken to to ensure ensure the the RCPs RCPs areare not not damaged.
AOP-014, COMPONENT COOLING WATER SYSTEM MALFUNCTION, Revision 24 General  
damaged.
Required Required Materials:
Materials:    AOP-014, AOP-014, COMPONEN COMPONENT       T COOLING COOLING WATERWATER SYSTEM SYSTEM MALFUNCT MALFUNCTION, ION, Revision Revision 24  24 General General
 
==References:==


==References:==
==References:==
APP-OOi-A4 APP-001-A4 AOP-014, AOP-014, COMPONEN COMPONENT          COOLING WATER T COOLING      WATER SYSTEM SYSTEM MALFUNCT MALFUNCTION,  ION, Revision Revision 24  24 Handouts:
Handouts:                    None None Initiating Initiating Cue:
Cue:              The The CRSS CRSS isis involved involved with with aa security security situation situation and and has has told told you you to to take take the the necessary necessary actions actions for for any any alarm alarm conditions conditions that that might might arise.
arise.
Time Time Critical Critical Task:
Task:      NO NO 2008 2008 NRC NRC SIM SIM gg                                                NUREG 1021, NUREG      1021, Revision Revision 9,9, Supplement Supplement 11
Appendix CC Appendix                            Job  Performance Measure Job Performance    Measure                  Form Form ES-C-1 ES-C-i Worksheet Worksheet Validation Time:
Validation  Time:        minutes 15 minutes 15 SIMULATOR SETUP SIMULATOR      SETUP
: 1. IC
: 1. IC#6i7
            # 617
: 2. SCN:
: 2.        006_JPM_S7 SON: 006_JPM_S7
: 3. On cue from the Chief Examiner, insert
: 3.                                insert a 2000 GPM GPM CCW COW piping piping rupture inside inside the CV.
2008 2008 NRCNRC SIM SIM gg                                NUREG NUREG 1021, 1021, Revision Revision 9, 9, Supplement Supplement 11


APP-001-A4 AOP-014, COMPONENT COOLING WATER SYSTEM MALFUNCTION, Revision 24 Handouts:
Appendix CC Appendix                                        Page 33 of Page    of 13 13                          Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE          INFORMATION (Denote Critical (Denote Critical Steps Steps with with an an asterisk) asterisk)
None Initiating Cue: The CRSS is involved with a security situation and has told you to take the necessary actions for any alarm conditions that might arise. Time Critical Task: NO 2008 NRC SIM g NUREG 1021, Revision 9, Supplement 1
START TIME:
Appendix C Validation Time: 15 minutes 1. IC # 617 2. SCN: 006_JPM_S7 Job Performance Measure Worksheet SIMULATOR SETUP Form ES-C-1 3. On cue from the Chief Examiner, insert a 2000 GPM CCW piping rupture inside the CV. 2008 NRC SIM g NUREG 1021, Revision 9, Supplement 1
START    TIME: _ __
Appendix C Page 3 of 13 PERFORMANCE INFORMATION Form ES-C-1 (Denote Critical Steps with an asterisk)
Performance Step:
Performance Step: 1 Standard:
Performance    Step: 11    Candidate refers Candidate   refers to to APP-001-A4.
Examiner's Note: Comment: Performance Step: 2 Standard:
APP-OO1 -A4.
Examiner's Note: Comment: 2008 NRC SIM g START TIME: __ _ Candidate refers to APP-001-A4.
Standard:
Candidate observes rapidly lowering CCW Surge Tank level. Candidate takes recommended action from APP-001-A4 and enters AOP-014, CCW System Malfunction Implement The EALs. (Step 1) Candidate notifies supervision of EAL implementation.
Standard:                  Candidate observes Candidate   observes rapidly    lowering CCW rapidly lowering CCW Surge Surge Tank Tank level.
Candidate is not responsible for implementing EALs NUREG 1021, Revision 9, Supplement 1
level.
Appendix C Performance Step: 3 Standard:
recommended action from APP-001-A4 Candidate takes recommended                      APP-OO1 -A4 and enters AOP-014, CCW enters              CCW System System Malfunction Malfunction Examiners Note:
Examiner's Note: Comment:
Examiner's Comment:
* Performance Step: 4 Standard:
Performance Step: 2        Implement The EALs. (Step 1)   1)
Examiner's Note: Comment:
Standard:                  Candidate notifies supervision of EAL implementat implementation.
* Performance Step: 5 Standard:
ion.
Examiner's Note: Comment: 2008 NRC SIM g Page 4 of 13 PERFORMANCE INFORMATION Make PA Announcement For Procedure Entry. Form ES-C-1 Candidate makes announcement for AOP-014 entry using the PA system. Go To Appropriate Section For Indicated Malfunction. (Step 2) Candidate proceeds to Section A based on loss of CCW inventory.
Examiners Examiner's Note:
Determine if pump cavitation is occurring or imminent:
Note:        Candidate is Candidate      not responsible for implementin is not                    implementing g EAL5 EALs Comment:
* Check Surge Tank Level < 5%. OR
Comment:
* Check CCW Pump Discharge Pressure (Local) AND Flow -WIDE OSCILLATIONS.
2008  NRC SIM 2008 NRC    SIM gg                                        NUREG NUREG 1021, 1021, Revision  9, Supplement Revision 9, Supplement 11
Candidate determines that CCW Surge Tank is < 5% level and that pump cavitation is imminent.
 
NUREG 1021, Revision 9, Supplement 1
Appendix CC Appendix                                    Page 44 of Page    of 13 13                            Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE          INFORMATION Performance Step:
Appendix C Performance Step: 6 Standard:
Performance   Step: 33  Make PA Make   PA Announcement Announcement For  For Procedure Procedure Entry.
Examiner's Note: Comment:
Entry.
* Performance Step: 7 Standard:
Standard:
Examiner's Note: Comment:
Standard:                Candidate makes Candidate            announcement for makes announcement        for AOP-014 AOP-014 entry entry using using the the system.
* Performance Step: 8 Standard:
PA system.
Examiner's Note: Comment: 2008 NRC SIM g Page 5 of 13 PERFORMANCE INFORMATION Check Reactor CRITICAL. (Step 2) Candidate determines that the Reactor is critical.
PA Examiners Note:
Verify the Reactor is Tripped. (Step 3) Form ES-C-1 Candidate depresses the Reactor Trip pushbutton to trip the Reactor and verify the Reactor is tripped. Stop ALL RCPs. (Step 4) Candidate stops ALL Reactor Coolant Pumps using the Control switches on the RTGB. NUREG 1021, Revision 9, Supplement 1
Examiner's    Note:
Appendix C Performance Step: 9 Standard:
Comment:
Examiner's Cue: Comment:
Comment:
* Performance Step: 10 Standard:
**  Performance Step: 4 Performance            Go To Appropriate Section For Indicated Malfunction. (Step 2)
Examiner's Note: Comment: 2008 NRC SIM g Page 6 of 13 PERFORMANCE INFORMATION Form ES-C-1 Go To PATH-1 while continuing with this procedure. (Step 5) Candidate informs CRSS to enter PATH-1 while the Candidate continues in AOP-014. Cue or acknowledge the candidate that the CRSS and the BOP will continue in PATH-1 and the RO will continue in AOP-014. Lockout CCW Pumps:
Standard:              Candidate proceeds to Section A based on loss of CCW inventory.
Examiners Note:
Examiner's Comment:
*
* Performance Step:
Step: 55 Determine ifif pump pump cavitation isis occurring occurring or imminent:
* Check Check Surge Tank Level <5%.   < 5%.
OR OR
* Check   CCW Pump Check COW      Pump Discharge Discharge Pressure Pressure (Local)
(Local) AND AND Flow -WIDE Flow -WIDE OSCILLATI OSCILLATIONS.ONS.
Standard:
Standard:              Candidate determines Candidate                 that COW determines that           Surge Tank CCW Surge     Tank is     5% level is << 5%   level and and that pump cavitation that pump              is imminent.
cavitation is  imminent.
Examiners Examiner's Note:
Note:
Comment:
Comment:
2008 NRC 2008  NRC SIM SIM gg                                    NUREG    1021, Revision NUREG 1021,    Revision 9,9, Supplement Supplement 11
 
Appendix CC Appendix                                  Page 55 of Page         13 of 13                             Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE         INFORMATION Performance Step:
Performance  Step: 66 Check Reactor Check   Reactor CRITICAL.
CRITICAL. (Step (Step 2) 2)
Standard:
Standard:              Candidate determines Candidate   determines that that the the Reactor Reactor isis critical.
critical.
Examiners Note:
Examiner's  Note:
Comment:
Comment:
**  Performance Step: 7 Performance            Verify the Reactor is Tripped. (Step 3)
Standard:              Candidate depresses the Reactor Trip pushbutton to trip the Reactor and verify the Reactor is tripped.
Examiners Note:
Examiner's Comment:
*
* Performance Step: 88 Stop ALL RCPs. (Step 4) 4)
Standard:
Standard:              Candidate stops stops ALL Reactor Coolant Coolant Pumps Pumps using using the Control switches switches on the RTGB.
on the RTGB.
Examiners Examiner's Note:
Note:
Comment:
Comment:
2008 NRC 2008 NRC SIMg SIM g                                   NUREG    1021, Revision NUREG 1021,    Revision 9,  9, Supplement Supplement 11
 
Appendix CC Appendix                                    Page 66 of Page       13 of 13                             Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE          INFORMATION Performance Step:
Performance  Step: 99 Go To PATH-1 Go To  PATH-i while while continuing continuing with with this this procedure.
procedure. (Step (Step 5) 5)
Standard:
Standard:              Candidate informs Candidate   informs CRSS CRSS to to enter enter PATH-1 PATH-i while while the the Candidate Candidate continues in continues  in AOP-014.
AOP-0i4.
Examiners Cue:
Examiner's  Cue:      Cue  or acknowledge Cue or acknowledge the the candidate candidate that that the the CRSS CRSS andand the the BOP will BOP  will continue continue in    PATH-i and in PATH-1   and the the   RO will continue in RO   will continue   in AOP-01 4.
AOP-014.
Comment:
**  Performance Step: 10  Lockout CCW Pumps:
* Place AND hold all CCW Pump switches in STOP position.
* Place AND hold all CCW Pump switches in STOP position.
* Check APP-001-F5, CCW PMP LO PRESS, ILLUMINATED.
* Check APP-001-F5, APP-OOi -F5, CCW PMP LO PRESS, ILLUMINATED.
* Release CCW Pump Switches.
* Release CCW Pump Switches.
Candidate places ALL CCW pump switches to STOP and holds them while verifying APP-001-F5 is illuminated.
Standard:              Candidate places ALL CCW pump switches to STOP and holds them while verifying APP-OOi APP-001-F5-F5 is illuminated.
The Candidate may ask and receive assistance from the BOP to hold one of the CCW Pump switches.
Examiners Examiner's Note:      The Candidate may ask and receive assistance from the BOP to hold one of the CCW Pump switches. switches.
NUREG 1021, Revision 9, Supplement 1
Comment:
Appendix C Performance Step: 11 Standard:
2008 NRC 2008  NRC SIMg SIM g                                    NUREG NUREG 1021, 1021, Revision Revision 9,9, Supplement Supplement 11
Examiner's Note: Comment:
 
* Performance Step: 12 Standard:
Appendix CC Appendix                                    Page 77 of Page         13 of 13                           Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE            INFORMATION Performance Step:
Examiner's Note: Comment: 2008 NRC SIM g Page 7 of 13 PERFORMANCE INFORMATION Form ES-C-1 Dispatch Operator To Perform Attachment 3, CCW Leak Search, While Continuing With Procedure. (Step 11) Candidate contacts the AO to perform Attachment to identify the source of the leak. Check CV For CCW Break Using Control Room Indications. (Step 12.a) Candidate monitors ERFIS trends and CV WATER LEVEL (White Sump Lights) and determines that CV water level has increased.
Performance  Step: 11 11  Dispatch Operator Dispatch  Operator To To Perform Perform Attachment Attachment 3,  CCW Leak 3, CCW     Leak Search, Search, While Continuing While  Continuing With     Procedure. (Step With Procedure.    (Step 11) 11)
CV Water level increase from -4.00 inches to 8 inches and stabilize.
Standard:
Standard:              Candidate contacts Candidate    contacts the the AO   to perform AO to  perform Attachment Attachment toto identify identify the the source of source of the the leak.
leak.
Examiners Note:
Examiner's  Note:
Comment:
**  Performance Step: 12  Check CV For CCW Break Using Control Room Indications.
i2.a)
(Step 12.a)
Standard:              Candidate monitors ERFIS trends and CV WATER LEVEL (White Sump Lights) and determines that CV water level has increased.
Examiners Note:
Examiner's            CV Water level increase from - 4.00 inches to 8 inches and stabilize.
Bottom white lights for CV Keyway Sump are illuminated.
Bottom white lights for CV Keyway Sump are illuminated.
NUREG 1021, Revision 9, Supplement 1
Comment:
Appendix C Page 8 of 13 PERFORMANCE INFORMATION Form ES-C-1
2008 NRC 2008 NRC SIMg SIM g                                      NUREG     1021, Revision NUREG 1021,              9, Supplement Revision 9, Supplement 11
* Performance Step: 13 Check CV location of CCW break. (Step 12.b) Standard:
 
Candidate determines that CCW leak is in the CV. Examiner's Note: Comment: Performance Step: 14 Standard:
Appendix CC Appendix                                    Page 88 of Page     of 13 13                              Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE          INFORMATION
Examiner's Note: Comment: 2008 NRC SIM g Inform personnel performing leak search that the leak location is in the CV. (Step 12.c) Candidate informs AO performing leak search of leak in CV. NUREG 1021, Revision 9, Supplement 1
*Performance Step:
Appendix C Page 9 of 13 PERFORMANCE INFORMATION Form ES-C-1 Performance Step: 15 Determine RCP alarm status. (Step 13) Standard:
Performance    Step: 13 13  Check CV Check      location of CV location   of CCW CCW break.
Candidate recognizes that:
break. (Step (Step 12.b) 12.b)
* APP-001-B1, RCP BRG COOL WTR LO FLOW, is illuminated.
Standard:
* APP-001-B3, RCP A BEARING HI TEMP, is NOT illuminated.
Standard:                Candidate determines Candidate   determines that that CCW CCW leak leak isis in in the the CV.
* APP-001-D3, RCP B BEARING HI TEMP, is NOT illuminated.
CV.
* APP-001-F3, RCP C BEARING HI TEMP, is NOT illuminated.
Examiners Note:
Examiner's Note: Comment: Performance Step: 16 Check Reactor CRITICAL. (Step 14) Standard:
Examiner's   Note:
Candidate determines that the Reactor is NOT critical.
Comment:
Examiner's Note: Comment: 2008 NRC SIM g NUREG 1021, Revision 9, Supplement 1
Comment:
Appendix C Page 10 of 13 PERFORMANCE INFORMATION Form ES-C-1 Performance Step: 17 Verify Control Rods are Tripped. (Step 14.a RNO) Standard:
Performance Step: 14     Inform personnel performing leak search that the leak location is 1 2.c) in the CV. (Step 12.c)
Candidate verifies ALL Control Rods are inserted.
Standard:              Candidate informs AO performing leak search of leak in CV.
Examiner's Note: Comment: Performance Step: 18 Stop ALL RCPs. (Step 14.b RNO) Standard:
Examiners Note:
Candidate verifies that ALL Reactor Coolant Pumps are stopped. Examiner's Note: Comment: 2008 NRC SIM g NUREG 1021, Revision 9, Supplement 1
Examiner's Comment:
Appendix C
2008 NRC 2008  NRC SIM SIM gg                                    NUREG    1021, Revision NUREG 1021,       Revision 9, 9, Supplement Supplement 11
* Performance Step: 19 Standard:
 
Examiner's Cue: Comment: Termination:
Appendix C Appendix  C                                Page 99 of Page    of 13 13                            Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE        INFORMATION Performance Step:
STOP TIME: 2008 NRC SIM g Page 11 of 13 PERFORMANCE INFORMATION Form ES-C-1 Close The Following Valves To Isolate CCW To The RCPs: (Step 18)
Performance        15 Step: 15    Determine RCP Determine RCP alarm alarm status.
* CC-716A, CCW TO RCP ISO
status. (Step (Step 13) 13)
* CC-716B, CCW TO RCP ISO
Standard:
Standard:              Candidate Candidate recognizes recognizes that:
that:
                          **   APP-OO1-B1, RCP APP-001-B1, RCP BRG BRG COOL    WTR LO COOL WTR   LO FLOW, FLOW, isis illuminated.
illuminated.
                          **   APP-OOi-B3, RCP APP-001-B3, RCP A BEARING BEARING HIHI TEMP, TEMP, isis NOT NOT illuminated.
illuminated.
                          **   APP-OOi-D3, RCP APP-001-D3, RCP BB BEARING BEARING HIHI TEMP, isis NOT NOT illuminated.
illuminated.
                          **   APP-OO1-F3, RCP C APP-001-F3,         BEARING HI C BEARING   HI TEMP, is NOT NOT illuminated.
Examiners Note:
Examiner's Comment:
Performance Step: 16 Check Reactor CRITICAL. (Step 14)
Standard:             Candidate determines that the Reactor is NOT critical.
Examiners Note:
Examiner's Comment:
2008 NRC SIM 2008 NRC  SIM gg                                  NUREG     1021, Revision NUREG 1021,              9, Supplement Revision 9,    Supplement 11
 
Appendix C Appendix C                              Page 10 Page     of 13 10 of 13                         Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE        INFORMATION Performance Step:
Performance   Step: 17 17 Verify Control Verify Control Rods Rods are Tripped. (Step are Tripped.  (Step 14.a i4a RNO)
RNO)
Standard:             Candidate verifies ALL Control Candidate              Control Rods Rods are inserted.
inserted.
Examiners Note:
Examiner's Comment:
Performance Step: 18   Stop ALL RCPs. (Step 14.b RNO)
Standard:             Candidate verifies that ALL Reactor Coolant Pumps are stopped.
Examiners Note:
Examiner's Comment:
2008 NRC 2008 NRC SIM SIM gg                                  NUREG NUREG 1021, 1021, Revision Revision 9, 9, Supplement Supplement 11
 
Appendix C Appendix  C                              Page  1 1 of Page 11   of 13 13                            Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE          INFORMATION
**  Performance Step:
Performance  Step: 19 19 Close The Close   The Following 18)
(Step 18)
Following Valves Valves To To Isolate Isolate CCW COW To To The The RCPs:
RCPs:
(Step
                              ** CC-716A, CC-71 6A, CCW CCW TO  TO RCP RCP ISOISO
                              ** CC-716B, CC-716B, CCW CCW TO  TO RCP RCP ISOISO
                              ** CC-730, 00-730, BRG BRG OUTLET OUTLET ISO  ISO
                              ** CC-735,    THERM BAR CC-735, THERM        BAR OUT OUT ISO ISO
                              ** FCV-626, FCV-626, THERM BAR    BAR FLOW FLOW CO  CONTNT Standard:            Candidate uses Candidate  uses RTGB switches switches to close close the the following valves:
valves:
                              **  00-71 6A, CCW TO RCP CC-716A,              RCP ISO ISO
* CC-7i6B, CC-716B, CCW     TO RCP     ISO
* CC-730, BRG OUTLET ISO
* CC-730, BRG OUTLET ISO
* CC-735, THERM BAR OUT ISO
* 00-735, THERM BAR OUT ISO CC-735,
* FCV-626, THERM BAR FLOW CO NT Candidate uses RTGB switches to close the following valves:
* FCV-626, THERM BAR FLOW CONT Examiners Cue:
* CC-716A, CCW TO RCP ISO
Examiner's Comment:
* CC-716B, CCW TO RCP ISO
Termination:              CCW valves are CCW          are closed to isolate       CCW piping rupture in CV.
* CC-730, BRG OUTLET ISO
isolate CCW STOP STOP TIME:
* CC-735, THERM BAR OUT ISO
TIME:
* FCV-626, THERM BAR FLOW CONT CCW valves are closed to isolate CCW piping rupture in CV. NUREG 1021, Revision 9, Supplement 1
2008  NRC SIMg 2008 NRC  SIM g                                    NUREG NUREG 1021, 1021, Revision   9, Supplement Revision 9,  Supplement 11
Appendix C Page 12 of 13 VERIFICATION OF COMPLETION Job Performance Measure No.: 2008 NRC SIM 9 Examinee's Name: Date Performed:
 
Appendix C Appendix    C                              Page 12 Page   12 of of 13 13                    Form Form ES-C-1 ES-C1 VERIFICATION OF VERIFICATION  OF COMPLETION COMPLETION Job Performance Job  Performance Measure Measure No.:
No.:  2008 NRC 2008 NRC SIM SIM 9g Examinees Name:
Examinee's   Name:
Date Performed:
Date   Performed:
Facility Evaluator:
Facility Evaluator:
Number of Attempts:
Facility Number of Attempts:
Time to Complete:
Time to Complete:
Question Documentation:
Question Documentation:
Question:
Question:
Response:
 
Result: SAT UNSAT Examiner's Signature:
===Response===
Date: -----------------------------
Result:                         SAT               UNSAT Examiners Signature:
Form ES-C-1 2008 NRC SIM g NUREG 1021, Revision 9, Supplement 1
Examiner's                                                   Date:
Appendix C INITIAL CONDITIONS:
                        -----------------------------
INITIATING CUE: 2008 NRC SIM g Page 13 of 13 JPM CUE SHEET
2008 2008 NRC NRC SIMg SIM g                                   NUREG  1021, Revision NUREG 1021, Revision 9, 9, Supplement Supplement 11
* The plant is operating at 100% power.
 
* No equipment is out of service.
Appendix C Appendix  C                                  Page 13 Page     of 13 13 of 13                       Form Form ES-C-1 ESC-1 CUE SHEET JPM CUE JPM        SHEET INITIAL CONDITIONS:
* You are the Reactor operator.
INITIAL  CONDITIONS: ** The   plant isis operating The plant        operating atat 100%
Form ES-C-1 The CRSS is involved with a security situation and has told you to take the necessary actions for any alarm conditions that might arise. NUREG 1021, Revision 9, Supplement 1
100% power.
Appendix C Facility:
power.
Task Title: KIA  
                    ** No No equipment equipment isis outout of of service.
service.
                    ** You   are the You are  the Reactor Reactor operator.
operator.
INITIATING CUE:
INITIATING  CUE:        The CRSS is    is involved involved with a security situation and has has told you to take the necessary actions for any alarm conditions that might arise.
2008 NRC 2008  NRC SIMg SIM g                                      NUREG NUREG 1021, 1021, Revision Revision 9, 9, Supplement Supplement 11
 
Appendix C Appendix        C                                  Job Job Performance Performance Measure Measure                    Form Form ES-C-1 ES-C-i Worksheet Worksheet Facility:
Facility:                  HB ROBINSON HB  ROBINSON                                  Task No.:
Task No.:    01000101405 01000101405 Task Title:
Task    Title:              Limit Radiation Limit  Radiation Exposure Exposure in in Response Response        JPM No.:
JPM  No.:    2008 NRC 2008  NRC SIM SIM hh Radiation Alarm lAW to Radiation          lAW AOP-005.
AOP-005.
KIA  


==Reference:==
==Reference:==


Examinee:
K/A
 
==Reference:==
072 A 072        .01 3.4/3.6 Al1.01  3.4/3.6 Examinee:                                                              NRC Examiner:
Facility Evaluator:
Facility Evaluator:
Method of testing: Job Performance Measure Worksheet HB ROBINSON Limit Radiation Exposure in Response to Radiation Alarm lAW AOP-005. 072 A 1.01 3.4/3.6 Task No.: JPM No.: NRC Examiner:
Facility    Evaluator:                                                  Date:
Date: Form ES-C-1 01000101405 2008 NRC SIM h Simulated Performance:
Date:
Actual Performance:
Method of testing:
_.:...:X_
Simulated Performance:                                                 Actual Performance:         xX Classroom        ---
Plant x Classroom Simulator
Simulator          X
---READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
_.:...:X_ Plant READ TO THE EXAMINEE II will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Initial Conditions:
Initial Conditions:
Task Standard:
* The plant is at 100% power.
Required Materials:
AOP-0i6, EXCESSIVE PRIMARY PLANT LEAKAGE, is being
General  
* AOP-016, performed.
* An unscheduled Containment entry is in progress to determine the leak location.
* APP-036-L5, CV PERSONNEL HATCH DOOR OPEN, is ILLUMINATED.
Task Standard:                 Actions of AOP-005, Attachment 12,      12, have been completed satisfactorily.
Required Materials:             APP-036-D8, Revision 62 AOP-005, Revision 27 General
 
==References:==
 
General    


==References:==
==References:==
APP-036-D8, Revision 62      62 AOP-005, AOP-005, Revision Revision 27 27 Handouts:
Handouts:                      AOP-005, Revision AOP-005,      Revision 27 27 Initiating Initiating Cue:
Cue:              You are You    are the the Control Control Room Room Operator.
Operator. Respond Respond to to plant plant conditions.
conditions.
2008 NRC 2008      NRC SIMSIM hh                                                NUREG iO2i, NUREG    1021, Revision Revision 9,9, Supplement Supplement i1
Appendix C Appendix    C                            Job Performance Job  Performance Measure Measure                    Form Form ES-C-1 ES-C-i Worksheet Worksheet Time Critical Time  Critical Task:
Task:      NO NO Validation Time:          12 minutes 12 minutes SIMULATOR SETUP i.
: 1.      IC#6i3.
IC # 613.
: 2.      SCN: 006_JPM_S3.
: 3.                      R-i 1/12 selector switch is in the CV position.
Verify that the R-11/12 2008 2008 NRC NRC SIM SIM hh                                        NUREG 1021, NUREG    1021, Revision 9, Supplement Revision 9, Supplement 11
Appendix CC Appendix                                          Page 33 of Page      of 14 14                              Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE            INFORMATION (Denote Critical (Denote  Critical Steps with an Steps with an asterisk) asterisk)
START TIME:
START    TIME: _ __
Performance Step:
Performance    Step: 11    Locates proper Locates  proper procedure procedure and        required information.
and required    information.
Standard:
Standard:                    Locates APP-036-D8, Locates  APP-036-D8, PROCESSPROCESS MONITOR  MONITOR HI  HI RAD.
PAD.
Examiners Note:
Examiner's    Note:          PR-i Point RR-1  Point #11
                                              #11 (R-12)
(R-i 2) is is in in alarm.
alarm.
Comment:
Performance Step: 2        Determine process channel in alarm condition.
Standard:                  Determines alarming channel is R-12,      R-i2, CV AIR AND PLANT RADIOACTIVE GAS.
VENT RADIOACTIVE Examiners Note:
Examiner's Comment:
Performance Performance Step: 3        IF IF the cause of the alarm alarm is known to be the movement of radioactive material material or is    an expected alarm is an                      due to actions under alarm due              under operator control, control, THEN THEN no  no further actions for this APP APP are are required. (Step (Step 1)1) (NO)
(NO)
Standard:
Standard:                  The cause The          for the cause for        alarm is the alarm    is not not known    and personnel inside known and                inside the the CV are CV  are currently currently searching searching for  for the  leak source.
the leak  source.
Examiners Examiner's Note:
Note:
Comment:
Comment:
2008 NRC 2008  NRC SIM SIM hh                                            NUREG NUREG 1021,  1021, Revision  9, Supplement Revision 9,  Supplement 11
Appendix CC Appendix                                        Page 44 of Page      of 14 14                              Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE              INFORMATION Performance Step:
Performance    Step: 44  Observe affected Observe      affected radiation radiation monitor monitor for for radiation radiation levels levels and and evidence of evidence      of short short term term spiking.
spiking. (Step (Step 2)
: 2) (NO)
(NO)
Standard:
Standard:                R-i2 isis in R-12        in high high alarm  and no alarm and    no appearance appearance of  of short short term term spiking spiking isis noted.
noted.
Examiners Note:
Examiner's    Note:
Comment:
Performance Step: 5    IF short term spiking is evidenced, THEN allow the indicated level to decrease prior to performing Step 4. (Step 3)
Standard:              No short term spiking is observed.
Examiners Note:
Examiner's Comment:
*
* Performance Performance Step:
Step: 66 Determine ifif the alarm alarm is is valid by momentarily depressing the ALARM/RESET ALARM/RESET pushbutton pushbutton for R-12 R-12 monitor monitor (Step (Step 4.4).
4.4).
Standard:
Standard:              Candidate      depresses the Candidate depresses          the RED    ALARM/RESET pushbutton RED ALARM/RESET            pushbutton Examiners Examiner's Note:
Note:    This action This  action will      cause the will cause    the RED RED light light and    APP-036-DB to and APP-036-DB        to extinguish.
extinguish.
Comment:
Comment:
2008 2008 NRC NRC SIM SIM hh                                          NUREG 1021, NUREG      1021, Revision Revision 9,9, Supplement Supplement 11
Appendix CC Appendix                                      Page 55 of Page      of 14 14                              Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE            INFORMATION Performance Step:
Performance    Step: 77 IF  the alarm IF the  alarm returns, returns, THEN THEN refer refer to to AOP-005 AOP-005 (Step(Step 4.5).
4.5).
Standard:
Standard:                APP-036-D8 and APP-036-DB        and the the RED RED ALARM/RESET ALARM/RESET module  module onon R-12 R-12 monitor returns, monitor    returns, thus thus the the alarm alarm is is valid.
valid.
Examiners Note:
Examiner's    Note:
Comment:
Performance Step: 8                  announcement for procedure entry into AOP-005 due Make PA announcement to an R-12 alarm.
Standard:              Candidate makes PA announcement announcement for AOP-005 entry due to R-i2 alarm.
R-12 Examiners Examiner's Note:
Comment:
Performance Performance Step:
Step: 99 Use non-perform non-performed ed attachments listed below for Radiation Monitors Monitors in in alarm.
alarm.
Standard:
Standard:              Candidate Candidate selects selects Attachment Attachment 12 12 due due toto R-1 R-12  in alarm.
2 in alarm.
Examiners Examiner's Note:
Note:
Comment:
Comment:
2008 NRC SIM 200B NRC    SIM hh                                        NUREG NUREG 1021, 1021, Revision Revision 9,9, Supplement Supplement 11
Appendix CC Appendix                                      Page 66 of Page    of 14 14                              Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE            INFORMATION Performance Step:
Performance    Step: 10 10  Check R-11/12 Check    R-1 1/12 selector selector switch switch - SELECTED SELECTED TO    TO CVCV (Step (Step 1).
1).
Standard:
Standard:                Candidate locates Candidate    locates selector selector switch switch onon the the Radiation Radiation Monitoring Monitoring Panel and Panel        checks that and checks    that the the switch switch isis selected selected to to the the CV CV position.
position.
Examiners Note:
Examiner's    Note:    There is There    is an  illuminated white light an illuminated            light above above the switch switch that that is is labeled as labeled        CV.
as CV.
Comment:
Comment:
Performance Step: 11    Check RCS temperature - Greater than 200 degrees F.
Standard:              Unit is at 100% power. RCS Tavg is 575.9 degrees F.
Examiners Note:
Examiner's Comment:
Performance Performance Step:
Step: 12 12 Check EOP network Check          network procedures          IMPLEMENTED.
procedures -IMPLEMENTED.
Standard:
Standard:              Candidate determines Candidate    determines that    EOP procedures that EOP    procedures havehave NOT NOT been been implemented implemented and  and proceeds proceeds to to Step Step 5.5.
Examiners Examiner's Note:
Note:
Comment:
Comment:
2008 NRC 2008  NRC SIM SIM hh                                      NUREG NUREG 1021, 1021, Revision    9, Supplement Revision 9,  Supplement 11
Appendix CC Appendix                                    Page 77 of Page    of 14 14                            Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE        INFORMATION Performance Step:
Performance    Step: 13 13 Check personnel-IN Check  personnel IN CV.
CV. (Step (Step 5) 5)
Standard:
Standard:                Determines that Determines  that personnel personnel are are presently presently in in CV CV from from the the initial initial conditions.
conditions.
Examiners Note:
Examiner's    Note:    APP-036-L5, CVCV PERSONNEL PERSONNEL HATCH HATCH DOOR DOOR OPEN, OPEN, is  is illuminated.
Comment:
**  Performance Step: 14    Place VLC switch to EMERG position. (Step 6)
Standard:              VLC switch placed in the EMERG position.
Examiners Examiner's Note:
Comment:
2008 2008 NRC  SIM hh NRC SIM                                        NUREG NUREG 1021, 1021, Revision Revision 9,9, Supplement Supplement 11
Appendix CC Appendix                                  Page 88 of Page    of 14 14                        Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE        INFORMATION
**  Performance Step:
Performance    Step: 15 15 Depress and Depress  and Hold Hold CV CV Evacuation Evacuation Horn Horn pushbutton pushbutton for for 15 15 seconds. (Step seconds.  (Step 7) 7)
Standard:
Standard:              Depresses and Depresses  and holds holds CV CV evacuation evacuation horn horn pushbutton pushbutton for for 15 15 seconds seconds Examiners Note:
Examiner's    Note:
Comment:
**  Performance Step: 16    Announce the following over Plant PA System:
ATTENTION ALL PERSONNEL. ATTENTION ALL PERSONNEL. A HIGH RADIATION ALARM HAS BEEN RECEIVED ON CV VENT PROCESS MONITOR R-12. ALL NON-ESSENTIAL PERSONNEL EVACUATE CV UNTIL FURTHER NOTICE. (Step 8)
Standard:              Announces condition requiring CV evacuation, stating that alarm is on R-12.
Examiners Examiner's Note:
Comment:
2008 NRC 2008  NRC SIM SIM hh                                  NUREG NUREG 1021, 1021, Revision Revision 9, 9, Supplement Supplement 11
Appendix CC Appendix                                  Page 99 of Page        14 of 14                      Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE        INFORMATION Performance Step:
Performance    Step: 17 17 Repeat CV Repeat  CV Evacuation Evacuation announcement announcement over over PA PA System.
System. (Step (Step 9) 9)
Standard:
Standard:              Candidate repeats Candidate  repeats announcement.
announcement.
Examiners Note:
Examiner's    Note:
Comment:
Comment:
Performance Step: 18    Place VLC switch to NORM position. (Step 10)
Standard:              Returns VLC switch to NORM position.
Examiners Note:
Examiner's Comment:
2008 NRC 2008  NRC SIM SIM hh                                  NUREG  1021, Revision NUREG 1021,          9, Supplement Revision 9, Supplement 11


Handouts:
Appendix CC Appendix                                      Page 10 Page    10 of of 14 14                            Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE            INFORMATION Performance Step:
Initiating Cue: 2008 NRC SIM h
Performance    Step: 19 19  Check Containment Check    Containment Ventilation Ventilation Isolation Isolation valves valves closed.
* The plant is at 100% power.
closed. (Step (Step 11) ii)
* AOP-016, EXCESSIVE PRIMARY PLANT LEAKAGE, is being performed.
Standard:
* An unscheduled Containment entry is in progress to determine the leak location.
Standard:                Determines Containment Determines    Containment Ventilation Ventilation Isolation Isolation valves valves closed closed byby valve position valve  position indication indication and/or and/or status status lights.
* APP-036-L5, CV PERSONNEL HATCH DOOR OPEN, is ILLUMINATED.
lights.
Actions of AOP-005, Attachment 12, have been completed satisfactorily.
Examiners Note:
APP-036-D8, Revision 62 AOP-005, Revision 27 APP-036-D8, Revision 62 AOP-005, Revision 27 AOP-005, Revision 27 You are the Control Room Operator.
Examiner's    Note:    Containment Ventilation Containment       Ventilation Isolation Isolation Panel Panel Status Status Lights Lights will will be be pink  with valves pink with  valves in  in the proper position.
Respond to plant conditions.
the proper    position.
NUREG 1021, Revision 9, Supplement 1
Individual valves Individual  valves can can be  observed on be observed      on the the RTGB RTGB for for position position indication.
Appendix C Time Critical Task: NO Validation Time: 12 minutes 1. IC # 613. 2. SCN: 006_JPM_S3.
indication.
Job Performance Measure Worksheet SIMULATOR SETUP Form ES-C-1 3. Verify that the R-11/12 selector switch is in the CV position.
Amber lights lit  lit for for the CV Ventilation Isolation Isolation Signal Relay Relay V-1  and V-2 on V-i and        on the bottom bottom of of the Radiation Radiation Monitoring Monitoring Panel.
2008 NRC SIM h NUREG 1021, Revision 9, Supplement 1
Purge valves V12-6, V12-7, V12-8, V12-9 CV Purge CV Pressure Reliefs V12-10, V12-11    Vi 2-11 CV Vacuum Reliefs V12-12, V12-13    Vi 2-13 Comment:
Appendix C Page 3 of 14 PERFORMANCE INFORMATION Form ES-C-1 (Denote Critical Steps with an asterisk)
*
Performance Step: 1 Standard:
* Performance Step: 20    Place the following CV IODINE REMOVAL FAN control switches to PREPURGE position: HVE-3 and HVE-4. (Step 12)
Examiner's Note: Comment: Performance Step: 2 Standard:
Standard:               Places switches for HVE-3 and HVE-4 to PREPURGE position and verifies proper operation by fan and damper indication.
Examiner's Note: Comment: Performance Step: 3 Standard:
Examiners Examiner's Note:        RTGB indications indications for [IVE-3 HVE-3 and 4: Fans Fans ON by  by RED RED lights lights illuminated illuminated and and PREPURGE PREPURGE alignedaligned by by YELLOW lightslights illuminated.
Examiner's Note: Comment: 2008 NRC SIM h START TIME: __ _ Locates proper procedure and required information.
illuminated.
Locates APP-036-D8, PROCESS MONITOR HI RAD. RR-1 Point #11 (R-12) is in alarm. Determine process channel in alarm condition.
Comment:
Determines alarming channel is R-12, CV AIR AND PLANT VENT RADIOACTIVE GAS. I F the cause of the alarm is known to be the movement of radioactive material or is an expected alarm due to actions under operator control, THEN no further actions for this APP are required. (Step 1) (NO) The cause for the alarm is not known and personnel inside the CV are currently searching for the leak source. NUREG 1021, Revision 9, Supplement 1
Comment:
Appendix C Performance Step: 4 Standard:
2008 NRC 2008 NRC SIM SIM hh                                      NUREG NUREG 1021,1021, Revision Revision 9,9, Supplement Supplement 11
Examiner's Note: Comment: Performance Step: 5 Standard:
 
Examiner's Note: Comment:
Appendix CC Appendix                                      Page 11 Page   11 of of 14 14                              Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE            INFORMATION Performance Step:
* Performance Step: 6 Standard:
Performance   Step: 21 21  Request RC Request    RC to to perform perform aa background background radiation radiation check check atat Radiation Monitors Radiation    Monitors R-11 R-1i and and R-12.
Examiner's Note: Comment: 2008 NRC SIM h Page 4 of 14 PERFORMANCE INFORMATION Form ES-C-1 Observe affected radiation monitor for radiation levels and evidence of short term spiking. (Step 2) (NO) R-12 is in high alarm and no appearance of short term spiking is noted. IF short term spiking is evidenced, THEN allow the indicated level to decrease prior to performing Step 4. (Step 3) No short term spiking is observed.
R-12. (Step (Step 13) 13)
Determine if the alarm is valid by momentarily depressing the ALARM/RESET pushbutton for R-12 monitor (Step 4.4). Candidate depresses the RED ALARM/RESET pushbutton This action will cause the RED light and APP-036-DB to extinguish.
Standard:
NUREG 1021, Revision 9, Supplement 1
Standard:               Contacts RC Contacts    RC personnel personnel to to perform perform background background checks checks atat the the radiation monitors.
Appendix C Performance Step: 7 Standard:
radiation  monitors.
Examiner's Note: Comment: Performance Step: 8 Standard:
Examiners Cue:
Examiner's Note: Comment: Performance Step: 9 Standard:
Examiner's   Cue:       RC personnel RC  personnel willwill perform perform background background radiation radiation checks checks at at R-11 and R-11         R-12.
Examiner's Note: Comment: 200B NRC SIM h Page 5 of 14 PERFORMANCE INFORMATION Form ES-C-1 IF the alarm returns, THEN refer to AOP-005 (Step 4.5). APP-036-DB and the RED ALARM/RESET module on R-12 monitor returns, thus the alarm is valid. Make PA announcement for procedure entry into AOP-005 due to an R-12 alarm. Candidate makes PA announcement for AOP-005 entry due to R-12 alarm. Use non-performed attachments listed below for Radiation Monitors in alarm. Candidate selects Attachment 12 due to R-12 in alarm. NUREG 1021, Revision 9, Supplement 1
and R-12.
Appendix C Page 6 of 14 PERFORMANCE INFORMATION Form ES-C-1 Performance Step: 10 Check R-11/12 selector switch -SELECTED TO CV (Step 1). Standard:
Comment:
Candidate locates selector switch on the Radiation Monitoring Panel and checks that the switch is selected to the CV position.
Comment:
Examiner's Note: There is an illuminated white light above the switch that is labeled as CV. Comment: Performance Step: 11 Check RCS temperature
Performance Step: 22    Determine if Primary System leakage is occurring. (Step 14)
-Greater than 200 degrees F. Standard:
Standard:
Unit is at 100% power. RCS Tavg is 575.9 degrees F. Examiner's Note: Comment: Performance Step: 12 Check EOP network procedures -IMPLEMENTED.
Standard:               Determines that leakage is occurring.
Examiners Note:
Examiner's             Initial conditions stated entry had been made into AOP-016 to determine the location of the RCS leakage.
Comment:
Performance Performance Step:
Step: 23 23  Go Go ToTo the the Main Main Body,    Step 11b, Body, Step        of this b, of   this procedure.
procedure. (Step (Step 16) 16)
Standard:
Standard:              Proceeds Proceeds to to Main Main Body, Body, Step Step 11b, b, of of AOP-005.
AOP-OOS.
Examiners Examiner's Note:
Note:
Comment:
Comment:
2008  NRC SIM 2008 NRC   SIM hh                                      NUREG NUREG 1021,         Revision 9,9, Supplement 1021, Revision        Supplement 11
 
Appendix CC Appendix                                    Page 12 Page 12 of  14 of 14                             Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE          INFORMATION Performance Step:
Performance   Step: 24 24  Use non-performed Use    non-performed attachments attachments listed listed below below for for radiation radiation monitors inin alarm monitors      alarm - NONE NONE to  to be addressed.
be addressed.
Standard:
Standard:
Candidate determines that EOP procedures have NOT been implemented and proceeds to Step 5. Examiner's Note: Comment: 2008 NRC SIM h NUREG 1021, Revision 9, Supplement 1
Standard:              R-1 2 attachment R-12  attachment hashas already already been been addressed addressed and and there there are are no no other Radiation other  Radiation monitors monitors inin alarm, alarm, thus thus none none are are remaining remaining toto be be addressed.
Appendix C Page 7 of 14 PERFORMANCE INFORMATION Performance Step: 13 Check personnel-IN CV. (Step 5) Form ES-C-1 Standard:
addressed.
Determines that personnel are presently in CV from the initial conditions.
Examiners Note:
Examiner's Note: APP-036-L5, CV PERSONNEL HATCH DOOR OPEN, is illuminated.
Examiner's   Note:
Comment:
Comment:
Comment:
* Performance Step: 14 Place VLC switch to EMERG position. (Step 6) Standard:
Performance Step: 25  Implement the EALs. (Main Body, Step 2)
VLC switch placed in the EMERG position.
Examiner's Note: Comment: 2008 NRC SIM h NUREG 1021, Revision 9, Supplement 1
Appendix C Page 8 of 14 PERFORMANCE INFORMATION Form ES-C-1
* Performance Step: 15 Depress and Hold CV Evacuation Horn pushbutton for 15 seconds. (Step 7) Standard:
Depresses and holds CV evacuation horn pushbutton for 15 seconds Examiner's Note: Comment:
* Performance Step: 16 Announce the following over Plant PA System: ATTENTION ALL PERSONNEL.
ATTENTION ALL PERSONNEL.
A HIGH RADIATION ALARM HAS BEEN RECEIVED ON CV VENT PROCESS MONITOR R-12. ALL NON-ESSENTIAL PERSONNEL EVACUATE CV UNTIL FURTHER NOTICE. (Step 8) Standard:
Announces condition requiring CV evacuation, stating that alarm is on R-12. Examiner's Note: Comment: 2008 NRC SIM h NUREG 1021, Revision 9, Supplement 1
Appendix C Page 9 of 14 PERFORMANCE INFORMATION Form ES-C-1 Performance Step: 17 Repeat CV Evacuation announcement over PA System. (Step 9) Standard:
Candidate repeats announcement.
Examiner's Note: Comment: Performance Step: 18 Place VLC switch to NORM position. (Step 10) Standard:
Returns VLC switch to NORM position.
Examiner's Note: Comment: 2008 NRC SIM h NUREG 1021, Revision 9, Supplement 1
Appendix C Page 10 of 14 PERFORMANCE INFORMATION Form ES-C-1 Performance Step: 19 Check Containment Ventilation Isolation valves closed. (Step 11) Standard:
Determines Containment Ventilation Isolation valves closed by valve position indication and/or status lights. Examiner's Note: Containment Ventilation Isolation Panel Status Lights will be pink with valves in the proper position.
Comment: Individual valves can be observed on the RTGB for position indication.
Amber lights lit for the CV Ventilation Isolation Signal Relay V-1 and V-2 on the bottom of the Radiation Monitoring Panel. CV Purge valves V12-6, V12-7, V12-8, V12-9 CV Pressure Reliefs V12-10, V12-11 CV Vacuum Reliefs V12-12, V12-13
* Performance Step: 20 Place the following CV IODINE REMOVAL FAN control switches to PREPURGE position:
HVE-3 and HVE-4. (Step 12) Standard:
Places switches for HVE-3 and HVE-4 to PREPURGE position and verifies proper operation by fan and damper indication.
Examiner's Note: RTGB indications for HVE-3 and 4: Fans ON by RED lights illuminated and PREPURGE aligned by YELLOW lights illuminated.
Comment: 2008 NRC SIM h NUREG 1021, Revision 9, Supplement 1
Appendix C Page 11 of 14 PERFORMANCE INFORMATION Form ES-C-1 Performance Step: 21 Request RC to perform a background radiation check at Radiation Monitors R-11 and R-12. (Step 13) Standard:
Contacts RC personnel to perform background checks at the radiation monitors.
Examiner's Cue: RC personnel will perform background radiation checks at R-11 and R-12. Comment: Performance Step: 22 Determine if Primary System leakage is occurring. (Step 14) Standard:
Determines that leakage is occurring.
Examiner's Note: Initial conditions stated entry had been made into AOP-016 to determine the location of the RCS leakage. Comment: Performance Step: 23 Go To the Main Body, Step 1 b, of this procedure. (Step 16) Standard:
Proceeds to Main Body, Step 1 b, of AOP-OOS. Examiner's Note: Comment: 2008 NRC SIM h NUREG 1021, Revision 9, Supplement 1
Appendix C Page 12 of 14 PERFORMANCE INFORMATION Form ES-C-1 Performance Step: 24 Use non-performed attachments listed below for radiation monitors in alarm -NONE to be addressed.
Standard:
Standard:
R-12 attachment has already been addressed and there are no other Radiation monitors in alarm, thus none are remaining to be addressed.
Standard:             Informs the SSO of the need to implement the EALs.
Examiner's Note: Comment: Performance Step: 25 Implement the EALs. (Main Body, Step 2) Standard:
Examiners Note:
Informs the SSO of the need to implement the EALs. Examiner's Note: SSO acknowledges the information provided.
Examiner's                   acknowledges the information provided.
Comment: END OF TASK Termination:
SSO acknowledges Comment:
AOP-005 actions for an R-12 alarm have been completed.
END END OFTASK OF TASK Termination:               AOP-005 actions actions for   an R-12 for an  R-12 alarm havehave been been completed completed.
STOP TIME: 2008 NRC SIM h NUREG 1021, Revision 9, Supplement 1
STOP STOP TIME:
Appendix C Page 13 of 14 VERIFICATION OF COMPLETION Job Performance Measure No.: 2008 NRC SIM h Examinee's Name: Date Performed:
TIME:
2008 2008 NRC NRC SIM SIM hh                                      NUREG NUREG 1021, 1021, Revision Revision 9,9, Supplement Supplement 11
 
Appendix C Appendix    C                              Page 13 Page   13 of of 14 14                    Form Form ES-C-1 ES-C-i VERIFICATION OF VERIFICATION   OF COMPLETION COMPLETION Job Performance Job Performance Measure Measure No.:
No.:  2008 NRC 2008 NRC SIM SIM hh Examinees Name:
Examinee's   Name:
Date Performed:
Date   Performed:
Facility Evaluator:
Facility Evaluator:
Number of Attempts:
Number of Attempts:
Line 867: Line 2,167:
Question Documentation:
Question Documentation:
Question:
Question:
Response:
 
Result: SAT UNSAT Examiner's Signature:
===Response===
Date: -----------------------------
Result:                         SAT               UNSAT Examiners Examiner's Signature:                                         Date:
Form ES-C-1 2008 NRC SIM h NUREG 1021, Revision 9, Supplement 1
                        -----------------------------
Appendix C INITIAL CONDITIONS:
2008  NRC SIM 2008 NRC     SIM hh                                        1021, Revision NUREG 1021, NUREG        Revision 9, 9, Supplement Supplement 11
INITIATING CUE: 2008 NRC SIM h Page 14 of 14 JPM CUE SHEET
 
* The plant is at 100% power. Form ES-C-1
Appendix CC Appendix                                    Page 14 Page 14 of 14 of 14                           Form Form ES-C-1 ES-C-i JPM CUE JPM   CUE SHEET SHEET INITIAL CONDITIONS:
* AOP-016, EXCESSIVE PRIMARY PLANT LEAKAGE, is being performed.
INITIAL  CONDITIONS:    The plant
* An unscheduled Containment entry is in progress to determine the leak location.
                      ** The   plant isis at at 100%
* APP-036-LS, CV PERSONNEL HATCH DOOR OPEN, is ILLUMINATED.
100% power.
You are the Control Room Operator.
power.
Respond to plant conditions.
                      ** AOP-016, AOP-016, EXCESSIVE EXCESSIVE PRIMARY PRIMARY PLANT PLANT LEAKAGE, LEAKAGE, isis being being performed.
NUREG 1021, Revision 9, Supplement 1
performed.
Appendix C Facility:
                      ** An An unscheduled unscheduled Containment Containment entry  is in entry is   in progress progress to to determine determine the the leak location.
Task Title: KIA
leak  location.
                      ** APP-036-LS, APP-036-L5, CV  CV PERSONNEL PERSONNEL HATCH HATCH DOOR DOOR OPEN, OPEN, is is ILLUMINATED.
ILLUMINATED.
INITIATING CUE:        You are the Control Room Operator. Respond to plant conditions.
2008 2008 NRC NRC SIM SIM hh                                    NUREG   1021, Revision NUREG 1021,      Revision 9, 9, Supplement Supplement 11
 
Appendix C Appendix        C                                    Job Performance Job  Performance Measure Measure                          Form Form ES-C-1 ES-C-i Worksheet Worksheet Facility:
Facility:                    HB ROBINSON HB    ROBINSON                                    Task No.:
Task  No.:      01311100906 01311100906 Task Title:
Task     Title:             Trip  the Reactor Trip the    Reactor from from the the Rod  Drive MG Rod Drive  MG    JPM No.:
JPM    No.:      2008 2008 NRCNRC In-Plant In-Plant ii Room Set Room Set K/A


==Reference:==
==Reference:==


Examinee:
KIA   
 
==Reference:==
029 EA 029  EA1.li      3.9/4.1 1.11 3.9/4.1 029 EA1.12 029  EA1.12 4.1/4.0 4.1/4.0 Examinee:
Examinee:                                                                NRC Examiner:
NRC    Examiner:
Facility Evaluator:
Facility Evaluator:
Method of testing: Job Performance Measure Worksheet HB ROBINSON Task No.: Trip the Reactor from the Rod Drive MG JPM No.: Set Room 029 EA 1.11 3.9/4.1 029 EA1.12 4.1/4.0 NRC Examiner:
Facility    Evaluator:                                                    Date:
Date: Form ES-C-1 01311100906 2008 NRC In-Plant i Simulated Performance:
Date:
x Actual Performance:
Method of testing:
Classroom
Method Simulated Performance:
___ Simulator Plant ---x READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Simulated      Performance:           xX                                Actual Performance:
Initial Conditions:
Actual Performance:
Task Standard:
Classroom       _ _ _ Simulator
                                                                - - - Plant                xX READ TO THE EXAMINEE READ II will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Initial Conditions:                 **    You are the Inside AO.
* Plant is operating at 100% RTP.
* The Reactor cannot be tripped from the Control Room.
* FRP-S.1, RESPONSE TO NUCLEAR POWER GENERATION/ATWS, is being implemented implemented..
Task Standard:                 BOTH Rod Drive Motor Generator Circuit Breakers A          "A" and B "B" are opened locally.
Required Materials:
Required Materials:
Materials:        FRP-S.1, FRP-S.1, RESPONSE TO        TO NUCLEAR NUCLEAR POWER POWER GENERATION/ATWS, GENERATION/ATWS, Rev.        Rev. 17.
17.
General  
General  


==References:==
==References:==


Initiating Cue: Time Critical Task: Validation Time: 2008 NRC IP i
General     
* You are the Inside AO.
 
* Plant is operating at 100% RTP.
==References:==
* The Reactor cannot be tripped from the Control Room.
FRP-S.i, FRP-S.1, RESPONSE TO       TO NUCLEAR NUCLEAR POWER POWER GENERATION/ATWS, GENERATION/ATWS, Rev.        Rev. 17.
* FRP-S.1, RESPONSE TO NUCLEAR POWER GENERATION/ATWS, is being implemented.
17.
BOTH Rod Drive Motor Generator Circuit Breakers "A" and "B" are opened locally. FRP-S.1, RESPONSE TO NUCLEAR POWER GENERATION/ATWS, Rev. 17. FRP-S.1, RESPONSE TO NUCLEAR POWER GENERATION/ATWS, Rev. 17. The CRSS directs you to the Rod Drive MG Set Room to trip the following breakers:
Initiating Initiating Cue:
Reactor Trip Breakers "A" and "B" and Rod Drive Motor Generator "A" and "B" Circuit Breakers.
Cue:              The The CRSS CRSS directs    you to directs you to the Rod Drive the Rod  Drive MG MG Set Set Room Room to  to trip trip the the following following breakers:
YES 5 minutes NUREG 1021, Revision 9, Supplement 1
breakers: Reactor     Trip Breakers Reactor Trip            "A" and Breakers A  and B "B" and and Rod     Drive Motor Rod Drive      Motor Generator Generator A "A"
Appendix C Page 2 of 8 PERFORMANCE INFORMATION Form ES-C-1 (Denote Critical Steps with an asterisk)
and and B    Circuit Breakers.
EXAMINER'S NOTE: FRP-S.1, Steps 1 and 2 are immediate action steps and the AOs would be expected to execute these steps from memory without procedure in hand. START TIME: ___ _ Performance Step: 1 Standard:
                                      "B" Circuit   Breakers.
Examiner's Note: Examiner's Cue: Comment: 2008 NRC IP i These immediate action steps are represented by Steps 1, 2, 3 and 4 of this JPM, thus Steps 1 through 4 are time critical steps. TIME CRITICAL START TIME: ____ _ Trip Reactor Trip Breaker "A". Simulates tripping Reactor Trip Breaker "A" by depressing the trip button in the center of the breaker. As Found position of the breaker is CLOSED with RED CLOSED flag in the breaker status window. After the candidate locates and describes I simulates how the breaker would be tripped open, inform the candidate the breaker trip pushbutton in the center of the cubicle door has been pressed and the breaker RED CLOSED flag remains in the breaker's status window. NUREG 1021, Revision 9, Supplement 1
Time    Critical Task:
Appendix C Performance Step: 2 Standard:
Time Critical      Task:      YES YES Validation Validation Time:Time:          55 minutes minutes 2008 NRC 2008    NRC IP  IP i i                                                NUREG 1021, NUREG      1021, Revision Revision 9, 9, Supplement Supplement 11
Examiner's Note: Examiner's Cue: Comment: 2008 NRC IP i Page 3 of 8 PERFORMANCE INFORMATION Trip Reactor Trip Breaker "B". Form ES-C-1 Simulates tripping Reactor Trip Breaker "B" by depressing the trip button in the center of the breaker. As Found position of the breaker is CLOSED with RED CLOSED flag in the breaker status window. After the candidate locates and describes I simulates how the breaker would be tripped open, inform the candidate the breaker trip pushbutton in the center of the cubicle door has been pressed and the breaker RED CLOSED flag remains in the breaker's status window. NUREG 1021, Revision 9, Supplement 1
 
Appendix C
Appendix CC Appendix                                            Page 22 of Page     of 88                          Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE          INFORMATION (Denote Critical (Denote  Critical Steps with an Steps with an asterisk) asterisk)
* Performance Step: 3 Standard:
EXAMINERS NOTE:
Examiner's Note: Examiner's Cue: Comment: 2008 NRC IP i Page 4 of 8 PERFORMANCE INFORMATION Trip Motor Generator "A" Circuit Breaker. Form ES-C-1 Simulates tripping Motor Generator "A" Circuit Breaker. As Found position of the breaker is CLOSED with RED CLOSED flag in the breaker status window or indication on the MG Set panel has the RED light illuminated and the GREEN light extinguished.
EXAMINER'S           NOTE:       FRP-S.1, Steps FRP-S.1,      Steps 11 and and 22 areare immediate immediate action action steps and steps     and the the AOs AOs wouldwould be be expected expected to  to execute these steps execute                steps from memory memory without without procedure in procedure        in hand.
BOTH Motor Generator Circuit Breakers "A" and "B" must be tripped locally for a success path in this JPM. After the candidate locates and describes I simulates how the breaker would be tripped open, inform the candidate the breaker trip pushbutton in the center of the cubicle door has been pressed and the breaker OPEN GREEN flag has appeared in the breaker's status window. Noise was heard as the breaker re-positioned.
hand.
These immediate These       immediate action steps are represented  represented by Steps 1,    1,2,3 2, 3 and 4 of this JPM, thus Steps       Steps 11 through 4 are time critical steps.
START TIME: _ _ __              TIME CRITICAL START TIME: _ _ _ __
Performance Step: 1    1    Trip Reactor Trip Breaker "A". A.
Standard:                    Simulates tripping Reactor Trip Breaker "A" A by depressing the trip button in the center of the breaker.
Examiners Note:
Examiner's                  As Found position of the breaker is CLOSED with RED CLOSED flag in the breaker status window.
Examiners Examiner's Cue:              After the candidate candidate locates and describes I simulates simulates how the breaker breaker would be tripped open,  open, inform inform the candidate candidate the breaker breaker trip pushbutton pushbutton in  in the center of of the cubicle door door has has been been pressed pressed and and the breaker breaker RED RED CLOSED CLOSED flag remains in   in the breakers the breaker's status status window.
window.
Comment:
Comment:
2008 2008 NRC NRC lP IP i i                                          NUREG NUREG 1021, 1021, Revision Revision 9, 9, Supplement Supplement 11
 
Appendix C Appendix  C                                Page 33 of Page    of 88                          Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE        INFORMATION Performance Step:
Performance  Step: 22  Trip Reactor Trip Reactor Trip Trip Breaker Breaker "B".
B.
Standard:
Standard:                                  Reactor Trip Breaker Simulates tripping Reactor           Breaker "B" B by by depressing depressing the trip button in the center of the breaker.
breaker.
Examiners Note:
Examiner's            As Found position of the breaker is CLOSED with RED CLOSED flag in the breaker status window.
Examiners Cue:
Examiner's            After the candidate locates and describes I simulates how the breaker would be tripped open, inform the candidate the breaker trip pushbutton in the center of the cubicle door has been pressed and the breaker RED CLOSED flag remains in breakers status window.
the breaker's Comment:
2008 NRC 2008 NRC lPIP Ii                                    NUREG NUREG 1021,1021, Revision 9, Supplement Revision 9, Supplement 11
 
Appendix C Appendix  C                                Page 44 of Page    of 88                          Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE        INFORMATION
*Performance Step:
Performance  Step: 33 Trip  Motor Generator Trip Motor   Generator "A" A Circuit Circuit Breaker.
Breaker.
Standard:
Standard:              Simulates tripping Simulates   tripping Motor Motor Generator Generator "A" A Circuit Circuit Breaker.
Breaker.
Examiners Note:
Examiner's            As Found position of the breaker is CLOSED with RED CLOSED  CLOSED flag in the breaker status window or indication on the MG MG Set Set panel has the RED light illuminated and and the GREEN GREEN light extinguished.
extinguished.
BOTH Motor Generator Circuit Breakers "A"     A and "B" B must be tripped locally for a success path in this JPM.
Examiners Cue:
Examiner's            After the candidate locates and describes I simulates how the breaker would be tripped open, inform the candidate the breaker trip pushbutton in the center of the cubicle door has been pressed and the breaker OPEN GREEN flag has breakers status window. Noise was heard appeared in the breaker's as the breaker re-positioned.
OR The operator may choose to trip the breaker with the pistol grip switch on the MG Set panel. After locating and describing how the breaker would be tripped using the pistol grip switch, inform the candidate that the pistol grip switch has been taken to the TRIP position and the RED light is extinguished and the GREEN light is illuminated.
OR The operator may choose to trip the breaker with the pistol grip switch on the MG Set panel. After locating and describing how the breaker would be tripped using the pistol grip switch, inform the candidate that the pistol grip switch has been taken to the TRIP position and the RED light is extinguished and the GREEN light is illuminated.
Noise was heard as the breaker re-positioned.
Noise was heard as the breaker re-positioned.
NUREG 1021, Revision 9, Supplement 1
Comment:
Appendix C
2008 2008 NRC NRC IPIP ii                                    NUREG NUREG 1021,1021, Revision Revision 9, 9, Supplement Supplement 11
* Performance Step: 4 Standard:
 
Examiner's Note: Examiner's Cue: Comment: 2008 NRC IP i Page 5 of 8 PERFORMANCE INFORMATION Trip Motor Generator "B" Circuit Breaker. Form ES-C-1 Simulates tripping Motor Generator "B" Circuit Breaker. As Found position of the breaker is CLOSED with RED CLOSED flag in the breaker status window or indication on the MG Set panel has the RED light illuminated and the GREEN light extinguished.
Appendix CC Appendix                                        Page 55 of Page      of 88                            Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE            INFORMATION
BOTH Motor Generator Circuit Breakers "A" and "B" must be tripped locally for a success path in this JPM. After the candidate locates and describes I simulates how the breaker would be tripped open, inform the candidate the breaker trip pushbutton in the center of the cubicle door has been pressed and the breaker OPEN GREEN flag has appeared in the breaker's status window. Noise was heard as the breaker re-positioned.
*Performance Step:
Performance    Step: 44  Trip Motor Trip          Generator "B" Motor Generator      B Circuit Circuit Breaker.
Breaker.
Standard:
Standard:                Simulates tripping Simulates     tripping Motor Motor Generator Generator "B"B Circuit Circuit Breaker.
Breaker.
Examiners Note:
Examiner's    Note:    As  Found position As Found     position ofof the the breaker breaker isis CLOSED CLOSED withwith RED RED CLOSED CLOSED flag in flag in the breaker status the breaker    status window window or    indication on or indication   on the the MG MG Set Set panel has panel        the RED has the        light illuminated RED light    illuminated and and the the GREEN GREEN light light extinguished.
extinguished.
BOTH Motor BOTH     Motor Generator Circuit Breakers Breakers "A"A and "B" B must bebe locally for aa success tripped locally         success path in this JPM. JPM.
Examiners Cue:
Examiner's              After the candidate locates and describes II simulates how the breaker would be tripped open, inform the candidate the breaker trip pushbutton in the center of the cubicle door has been pressed and the breaker OPEN GREEN flag has breakers status window. Noise was heard appeared in the breaker's re-positioned.
as the breaker re-positioned.
OR The operator may choose to trip the breaker with the pistol grip switch on the MG Set panel. After locating and describing how the breaker would be tripped using the pistol grip switch, inform the candidate that the pistol grip switch has been taken to the TRIP position and the RED light is extinguished and the GREEN light is illuminated.
OR The operator may choose to trip the breaker with the pistol grip switch on the MG Set panel. After locating and describing how the breaker would be tripped using the pistol grip switch, inform the candidate that the pistol grip switch has been taken to the TRIP position and the RED light is extinguished and the GREEN light is illuminated.
Noise was heard as the breaker re-positioned.
Noise was heard as the breaker re-positionedre-positioned..
TIME CRITICAL STOP TIME: ____ _ NUREG 1021, Revision 9, Supplement 1
Comment:
Appendix C Performance Step: 5 Standard:
TIME TIME CRITICAL CRITICAL STOPSTOP TIME:
Examiner's Cue: Examiner's Note: Comment: Page 6 of 8 PERFORMANCE INFORMATION Form ES-C-1 Inform the Control Room that Motor Generator "A" and "B" Circuit Breakers have been tripped open and that Reactor Trip Breakers "A" and "B" would NOT open. Contacts the Control Room and reports that Motor Generator "A" and "8" Circuit Breakers have been tripped open and that Reactor Trip Breakers "A" and "B" would NOT open. As the CRSS, acknowledge the candidate's report. END OF TASK Termination:
TIME: _ _ _ __
Rod Drive MG Set Circuit Breakers "A" and "B" are tripped open. STOP TIME: 2008 NRC IP i NUREG 1021, Revision 9, Supplement 1
2008  NRC IP 2008 NRC    IP i i                                        NUREG NUREG 1021, 1021, Revision Revision 9,9, Supplement Supplement 11
Appendix C Page 7 of 8 VERIFICATION OF COMPLETION Job Performance Measure No.: 2008 NRC IP i Examinee's Name: Examiner's Name: Date Performed:
 
Appendix CC Appendix                                          Page 66 of Page     of 88                          Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE        INFORMATION Performance Step:
Performance    Step: 55    Inform the Inform  the Control Control Room Room thatthat Motor Motor Generator Generator "A" A and and "B" B Circuit Circuit Breakers have Breakers    have been been tripped tripped open open and and that that Reactor Reactor Trip Trip Breakers Breakers A and "A" and "B" would NOT B would   NOT open.
open.
Standard:
Standard:                  Contacts the Contacts   the Control Control Room Room and and reports reports that that Motor Motor Generator Generator "A" A
and "8" and  B Circuit Circuit Breakers Breakers have have been been tripped tripped open open and and that that Reactor Trip Reactor    Trip Breakers Breakers "A" A and and "B" B would would NOT NOT open.
open.
Examiners Cue:
Examiner's    Cue:        As the As   the CRSS, CRSS, acknowledge acknowledge the  the candidate's candidates report.
report.
Examiners Note:
Examiner's    Note:
Comment:
END OFOFTASK TASK Termination: Rod Drive Drive MG Set Circuit Breakers A MG Set                      "A" and "B" are are tripped open.
open.
STOP TIME:
STOP   TIME:
2008 NRC lP 2008 NRC    IP I i                                         NUREG NUREG 1021,1021, Revision Revision 9, 9, Supplement Supplement 11
 
Appendix CC Appendix                                      Page 77 of Page     of 88                    Form Form ES-C-1 ES-C-i VERIFICATION OF VERIFICATION     OF COMPLETION COMPLETION Job Performance Job  Performance Measure Measure No.:
No.:  2008 NRC 2008 NRC IP IP ii Examinees Name:
Examinee's     Name:
Examiners Name:
Examiner's   Name:
Date Performed:
Date   Performed:
Facility Evaluator:
Facility Evaluator:
Facility  Evaluator:
Number of Attempts:
Number of Attempts:
Time to Complete:
Time to Complete:
Documentation:
Question Documentation:
Question Documentation:
Question:
Question:
Response:
 
Result: SAT UNSAT Examiner's Signature:
===Response===
Date: -----------------------------
Result:                           SAT               UNSAT Examiners Examiner's Signature:
Form ES-C-1 2008 NRC IP i NUREG 1021, Revision 9, Supplement 1
Signature:                                      Date:
Appendix C INITIAL CONDITIONS:
                        -----------------------------
INITIATING CUE: 2008 NRC IP i Page 8 of 8 JPM CUE SHEET
2008 2008 NRCNRC IP IP i i                                    NUREG 1021, Revision NUREG 1021, Revision 9, 9, Supplement Supplement 11
* You are the Inside AO.
 
* Plant is operating at 100% RTP. Form ES-C-1
Appendix CC Appendix                                      Page 88 of Page      of 88                              Form Form ES-C-1 ES-C1 JPM CUE JPM    CUE SHEET SHEET INITIAL CONDITIONS:
* The Reactor cannot be tripped from the Control Room.
INITIAL  CONDITIONS: *You are You  are thethe Inside Inside AO.
* FRP-S.1, RESPONSE TO NUCLEAR POWER GENERATION/ATWS, is being implemented.
AO.
The CRSS directs you to the Rod Drive MG Set Room to trip the following breakers:
                      **    Plant isis operating Plant      operating atat 100%
Reactor Trip Breakers "A" and "B" and Rod Drive Motor Generator "A" and "B" Circuit Breakers.
100% RTP.
NUREG 1021, Revision 9, Supplement 1
RTP.
Appendix C Facility:
                      **  The  Reactor cannot The Reactor       cannot be be tripped tripped from from the the Control Control Room.
Task Title: KIA
Room.
                      *FRP-S.1, RESPONSE FRP-S.1,      RESPONSE TO    TO NUCLEAR NUCLEAR POWERPOWER GENERATION/ATWS, isis being GENERATION/ATWS,                  being implemented.
implemented.
INITIATING CUE:
INITIATING  CUE:    The CRSS The   CRSS directs directs you you to  the Rod to the       Drive MG Rod Drive MG SetSet Room Room toto trip trip the the following breakers:
following  breakers: Reactor Reactor Trip Trip Breakers Breakers "A" A and and "B" B and and Rod Rod Drive Drive Motor Generator "A"       and "B" A and  B Circuit Breakers.
Breakers.
2008 2008 NRC    IP i i NRC IP                                            NUREG 1021, NUREG        1021, Revision Revision 9,9, Supplement Supplement 11
 
Appendix C Appendix        C                                    Job  Performance Measure Job Performance        Measure                      Form Form ES-C-1 ES-C-i Worksheet Worksheet Facility:
Facility:                    HB ROBINSON HB  ROBINSON                                        Task No.:
Task  No.:      04010100101 04010100101 Task    Title:
Task Title:               Energize PZR Energize    PZR Heaters Heaters from from Emergency Emergency        JPM No.:
JPM  No.:      2008 2008 NRC NRC In-Plant In-Plant j Busses  (Turbine Building Busses (Turbine      Building Actions)
Actions) lAW lAW EPP-21.
EPP-21.
K/A


==Reference:==
==Reference:==


Examinee:
KIA   
Facility Evaluator:
 
Method of testing: Job Performance Measure Worksheet HB ROBINSON Task No.: Energize PZR Heaters from Emergency JPM No.: Busses (Turbine Building Actions) lAW EPP-21. 027 AA 1.05 3.3/3.2 056 AA 1.21 3.3/3.3 NRC Examiner:
==Reference:==
Date: Form ES-C-1 04010100101 2008 NRC In-Plant j Simulated Performance:
027 AA 027  AA11.05      3.3/3.2
x Actual Performance:
                                      .05 3.3/3.2 AA11.21 056 AA 056        .21 3.3/3.3 3.3/3.3 Examinee:
Classroom Simulator Plant x ------READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Examinee:                                                                          Examiner:
NRC Examiner:
NRC Facility Evaluator:
Facility    Evaluator:                                                      Date:
Date:
Method of testing:
Method Performance:
Simulated Performance:                xX                                          Performance:
Actual Performance:
Classroom       - - - Simulator              - - - Plant                xX READ TO THE EXAMINEE READ II will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Initial Conditions:
Initial Conditions:
Task Standard:
* The plant has experienced a loss of offsite AC power.
Required Materials:
* implemented.
General  
EOP Network has been implemented.
* EPP-4, REACTOR TRIP RESPONSE,  RESPONSE, has directed the implementation implementation of EPP-21, ENERGIZING PRESSURIZ  PRESSURIZER ER HEATERS FROM EMERGENCY BUSSES.
* You are the Outside AO.
* Emergency Bus E-1 is powered by EDG A.      "A".
* You have have been given Key # 69, PZR  "PZR Heater Breaker Arm Switch Switch" and aa set of large fuse pullers.
* The The breakers breakers listed listed in in Step # 33 cannot bebe verified verified 6pen open from the RTGB.
Task Task Standard:
Standard:            Align breakers Align  breakers in  in preparation preparation forfor energizing energizing PZR PZR Backup Backup Heater Heater Group Group AA lAW lAW EPP-21.
EPP-21.
Required Required Materials:
Materials:       EPP-21, EPP-21, ENERGIZING ENERGIZING PRESSURIZ PRESSURIZER    ER HEATERS HEATERS FROM FROM EMERGENCY EMERGENCY BUSSES, BUSSES, Rev. Rev. 15.
15.
Key Key ## 6969 Large    Fuse Pullers Large Fuse      Pullers General
 
==References:==
 
General    


==References:==
==References:==
EPP-21, EPP-21, ENERGIZING ENERGIZING PRESSURIZ PRESSURIZER    ER HEATERS HEATERS FROM FROM EMERGENCY EMERGENCY BUSSES, BUSSES, Rev. Rev. 15.
15.
2008 2008 NRC  NRC IPjIP j                                                      NUREG    1021, Revision NUREG 1021,                  9, Supplement Revision 9,  Supplement 11


2008 NRC IP j
Appendix C Appendix      C                          Job  PerFormance Measure Job Performance        Measure                        Form Form ES-C-1 ES-C-i Worksheet Worksheet Initiating Cue:
* The plant has experienced a loss of offsite AC power.
Initiating  Cue:      The CRSS The CRSS has has directed directed you you to to perform perform the the Turbine    Building actions Turbine Building    actions required required to to energize PZR energize  PZR Heaters Heaters from from the the emergency emergency busbus inin accordance accordance with with EPP-21, EPP-2i, Steps 33 through Steps    through 6.
* EOP Network has been implemented.
6.
* EPP-4, REACTOR TRIP RESPONSE, has directed the implementation of EPP-21, ENERGIZING PRESSURIZER HEATERS FROM EMERGENCY BUSSES.
Time Critical Time     Critical Task:
* You are the Outside AO.
Task: NO NO Validation Time:
* Emergency Bus E-1 is powered by EDG "A".
Validation    Time:      minutes 20 minutes 20 2008 2008 NRC NRC IP IP jj                                        NUREG 1021, NUREG      1021, Revision Revision 9, 9, Supplement Supplement 11
* You have been given Key # 69, "PZR Heater Breaker Arm Switch" and a set of large fuse pullers.
 
* The breakers listed in Step # 3 cannot be verified open from the RTGB. Align breakers in preparation for energizing PZR Backup Heater Group A lAW EPP-21. EPP-21, ENERGIZING PRESSURIZER HEATERS FROM EMERGENCY BUSSES, Rev. 15. Key # 69 Large Fuse Pullers EPP-21, ENERGIZING PRESSURIZER HEATERS FROM EMERGENCY BUSSES, Rev. 15. NUREG 1021, Revision 9, Supplement 1
Appendix CC Appendix                                          Page 33 of Page      of 10 10                              Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE            INFORMATION (Denote Critical (Denote  Critical Steps Steps with with an an asterisk) asterisk)
Appendix C Initiating Cue: Time Critical Task: Validation Time: 2008 NRC IP j Job Performance Measure Worksheet Form ES-C-1 The CRSS has directed you to perform the Turbine Building actions required to energize PZR Heaters from the emergency bus in accordance with EPP-21, Steps 3 through 6. NO 20 minutes NUREG 1021, Revision 9, Supplement 1
START TIME:
Appendix C Page 3 of 10 PERFORMANCE INFORMATION Form ES-C-1 (Denote Critical Steps with an asterisk)
START    TIME: _ __
START TIME: __ _ Performance Step: 1 Standard:
Performance Step:
Examiner's Note: Examiner's Cue: Comment:
Performance     Step: 11    Obtain aa copy Obtain     copy ofof the the appropriate appropriate procedure.
* Performance Step: 2 Standard:
procedure.
Examiner's Note: Examiner's Cue: Comment: 2008 NRC IP j Obtain a copy of the appropriate procedure.
Standard:
Candidate obtains copy of EPP-21 from the lAO office, WCC, Control Room or other valid location.
Standard:                    Candidate obtains Candidate      obtains copy copy ofof EPP-21 EPP-21 from from the the lAO lAO office, office, WCC, WCC, Control Room Control   Room or  or other other valid valid location.
When candidate states they need to obtain a copy of EPP-21, ask him where to locate one. If correct, provide him with a copy of EPP-21. Verify OPEN SST-2A TO 480V SYSTEM BKR 52/1 B. (Step 3, First Bullet) Breaker 52/1 B opened by depressing the trip pushbutton in the center of the breaker cubicle door. As Found position of the breaker is CLOSED with RED CLOSED flag in the breaker status window. After the candidate locates and describes I simulates how the breaker would be tripped open, inform the candidate the breaker trip pushbutton in the center of the cubicle door has been pressed and the breaker OPEN GREEN flag has appeared in the breaker's status window. Noise was heard as the breaker re-positioned.
location.
NUREG 1021, Revision 9, Supplement 1
Examiners Note:
Appendix C Performance Step: 3 Standard:
Examiner's    Note:
Examiner's Note: Examiner's Cue: Comment: Performance Step: 4 Standard:
Examiners Cue:
Examiner's Note: Examiner's Cue: Comment: 2008 NRC IP j Page 4 of 10 PERFORMANCE INFORMATION Form ES-C-1 Verify OPEN 480V BUS 1 MAIN BKR 52/2B. (Step 3, Second Bullet) Breaker 52/2B opened by depressing the trip pushbutton in the center of the breaker cubicle door. As Found position of the breaker is OPEN with GREEN OPEN flag in the breaker status window. Breaker indicates OPEN with GREEN flag in breaker status window. Verify OPEN 480V BUS 1-2A TIE BKR 52/5B. (Step 3, Third Bullet) Breaker 52/5B opened by depressing the trip pushbutton in the center of the breaker cubicle door. As Found position of the breaker is OPEN with GREEN OPEN flag in the breaker status window. Breaker indicates OPEN with GREEN flag in breaker status window. NUREG 1021, Revision 9, Supplement 1
Examiner's    Cue:                  candidate states When candidate         states they need need toto obtain obtain aa copy copy of of EPP-EPP 21, ask him where to locate one. If correct, provide him with a copy of EPP-21.
Appendix C Performance Step: 5 Standard:
Comment:
Examiner's Note: Examiner's Cue: Comment: Performance Step: 6 Standard:
**  Performance Step: 2 Performance                Verify OPEN SST-2A TO 480V SYSTEM BKR 52/1                 52/i B. (Step 3, First Bullet)
Examiner's Note: Examiner's Cue: Comment: Page 5 of 10 PERFORMANCE INFORMATION Form ES-C-1 Verify OPEN 480V BUS E1 MAIN BKR 52/18B. (Step 3, Fourth Bullet) Breaker 52/18B opened by depressing the trip pushbutton located in the center of the breaker cubicle door. As Found position of the breaker is OPEN with GREEN OPEN flag in the breaker status window. Breaker indicates OPEN with GREEN flag in breaker status window. Obtain the following: (Step 4)
Standard:                  Breaker 52/i 52/1 B opened by depressing the trip pushbutton in the center of the breaker cubicle door.
* Key # 69 to PZR HEATER BKR ARM SWITCH
Examiners Examiner's Note:            As Found position of the breaker is CLOSED with RED CLOSED flag in the breaker status window.
* Large Fuse Pullers Obtain the key and large fuse pullers. Key and large fuse pullers were obtained during the initial conditions.
Examiners Examiner's Cue:
Ensure that the candidate is clear that the initial conditions provided the necessary materials.
Cue:          After the the candidate candidate locates and    and describes describes I simulates simulates howhow the breaker the breaker would would be  be tripped   open, inform tripped open,    inform thethe candidate candidate the the breaker   trip pushbutton breaker trip    pushbutton in    in the the center center ofof the the cubicle cubicle door door has has been been pressed pressed and and thethe breaker breaker OPEN      GREEN flag OPEN GREEN         flag has has appeared appeared in      the breakers in the breaker's status status window.
NOTE: 4160V Breaker 52113 is locally opened by rotating the switch counterclockwise to the TRIP position and then pulled out to lock. 2008 NRC IP j NUREG 1021, Revision 9, Supplement 1
window. NoiseNoise was was heard heard as  the breaker as the   breaker re-positioned re-positioned..
Appendix C
Comment:
* Performance Step: 7 Standard:
Comment:
Examiner's Note: Examiner's Cue: Comment: 2008 NRC IP j Page 6 of 10 PERFORMANCE INFORMATION Form ES-C-1 Locally open and Pull-To-Lock STATION SERVICE TRANSFORMER 2A and 2F BKR 52/13 (4160V Bus 2, CMPT-13). (Step 5) Breaker 52/13 opened by turning the breaker control switch counterclockwise to the TRIP position and placed in Pull-To-Lock (Located on 4160V Bus 2, CMPT -13). As Found position of the breaker is CLOSED with RED CLOSED indicator light illuminated on the breaker cubicle door. If candidate decides to look at the breaker by opening the cubicle door, the as found position of the breaker is CLOSED with RED CLOSED flag on the breaker status window. After the candidate locates and describes I simulates how the breaker would be tripped open, inform the candidate the breaker control switch has been rotated counterclockwise and the RED CLOSED indicator has extinguished and the GREEN OPEN indicator has illuminated.
2008 2008 NRC NRC IPj IP j                                              NUREG      1021, Revision NUREG 1021,      Revision 9,9, Supplement Supplement 11
Noise was heard as the breaker re-positioned.
 
NUREG 1021, Revision 9, Supplement 1
Appendix CC Appendix                                          Page 44 of Page    of 10 10                            Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE            INFORMATION Performance Step:
Appendix C
Performance    Step: 33  Verify OPEN Verify    OPEN 480V480V BUS BUS 11 MAIN MAIN BKR BKR 52/2B.
* Performance Step: 8 Standard:
52/2B. (Step (Step 3, 3, Second Second Bullet)
Examiner's Note: 2008 NRC IP j Page 7 of 10 PERFORMANCE INFORMATION Perform the following: (Step 6) Form ES-C-1 a. Locally verify the following breakers at 480V Bus 1 -OPEN
Bullet)
* Pressurizer Heater Backup Group A (CMPT-2C)
Standard:
* Feed to MCC-1 (CMPT-3A)
Standard:                Breaker 52/2B Breaker      52/2B opened opened by    depressing the by depressing    the trip trip pushbutton pushbutton in in the the center of center    of the  breaker cubicle the breaker  cubicle door.
* CV Polar Crane Power Supply (CMPT-3B)
door.
* Feed to PP-63 (CMPT -3C)
Examiners Note:
* Construction Facilities Main Disconnect (CMPT-4B)
Examiner's    Note:      As Found As    Found position position of of the the breaker breaker is is OPEN OPEN with with GREEN GREEN OPENOPEN flag  in the  breaker status flag in the breaker     status window.
* Spent Fuel Pit Cooling Pump B (CMPT-4C)
window.
Examiners Cue:
Examiner's              Breaker indicates OPEN with GREEN flag in breaker status window.
Comment:
Performance Step: 4      Verify OPEN 480V BUS 1-2A      i-2A TIE BKR 5215B.
52/5B. (Step 3, Third Bullet)
Standard:                Breaker 5215B 52/5B opened by  by depressing depressing the trip pushbutton in  in the center of the breaker cubicle door.
Examiners Examiner's Note:        As Found Found position of the breaker is OPEN with GREEN     GREEN OPENOPEN flag in in the breaker status window.
Examiners Examiner's Cue:Cue:      Breaker Breaker indicates indicates OPEN OPEN withwith GREEN GREEN flagflag inin breaker breaker status status window.
window.
Comment:
Comment:
2008 NRC 2008 NRC IP IP j j                                        NUREG    1021, Revision NUREG 1021,       Revision 9, 9, Supplement Supplement 11
 
Appendix C Appendix  C                                          Page 55 of Page    of 10 10                          Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE            INFORMATION Performance Step:
Performance   Step: 55      Verify OPEN Verify   OPEN 480V480V BUS BUS E1 El MAIN MAIN BKR BKR 52/18B.
52/i8B. (Step (Step 3, 3, Fourth Fourth Bullet)
Bullet)
Standard:
Standard:                    Breaker 52/18B Breaker      52/i 8B opened opened by by depressing depressing the the trip trip pushbutton pushbutton located in located    in the center of the center          breaker cubicle of the breaker   cubicle door.
Examiners Note:
Examiner's  Note:              Found position of the breaker is OPEN with GREEN OPEN As Found flag inin the the breaker breaker status window.
Examiners Cue:
Examiner's                  Breaker indicates OPEN with GREEN flag in breaker status window.
Comment:
Performance Step: 6        Obtain the following: (Step 4)
* Key ##6969 to PZR HEATER BKR ARM SWITCH
* Large Fuse Pullers Standard:                  Obtain the key and large fuse pullers.
Examiners Examiner's Note:            Key and large fuse pullers were obtained during the initial conditions.
Examiners Examiner's Cue:            Ensure that the candidate is clear that the initial conditions provided the necessary materials.
Comment:
NOTE: 4160V NOTE:  4160V Breaker   52113 is Breaker 52/13  is locally locally opened opened by by rotating rotating the the switch switch counterclock counterclockwisewise to the TRIP position the TRIP          and then position and  then pulled pulled out     to lock.
out to  lock.
2008 2008 NRC NRC lPj IP j                                               NUREG    1021, Revision NUREG 1021,     Revision 9,9, Supplement Supplement 11
 
Appendix CC Appendix                                          Page 66 of Page      of 10 10                            Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE            INFORMATION
**  Performance Step:
Performance    Step: 77  Locally open Locally    open andand Pull-To-Lock Pull-To-Lock STATION STATION SERVICE SERVICE TRANSFORMER 2A TRANSFORMER              2A and and 2F   BKR 52/13 2F BKR      52/13 (4160V (41 60V Bus Bus 2, 2, CMPT-CMPT 13). (Step 13).   (Step 5) 5)
Standard:
Standard:                Breaker 52/13 Breaker     52/13 opened opened by    turning the by turning   the breaker breaker control control switch switch counterclockwise to counterclockwise        to the the TRIP TRIP position position and and placed placed inin Pull-To-Lock Pull-To-Lock (Located on (Located          4160V Bus on 4160V     Bus 2,2, CMPT CMPT-13).
                                                                        -13).
Examiners Note:
Examiner's    Note:    As Found As    Found position position of   the breaker of the  breaker is    CLOSED with is CLOSED   with RED RED CLOSED CLOSED indicator  light illuminated indicator light     illuminated on the breaker cubicle door.
IfIf candidate candidate decides decides to looklook at at the breaker breaker by by opening opening the cubicle cubicle door, the as found position of the breaker is CLOSED with           with RED RED CLOSED flag on the breaker status window.
Examiners Cue:
Examiner's              After the candidate locates and describes I simulates how the breaker would be tripped open, inform the candidate the breaker control switch has been rotated counterclockwisecounterclockwise and the RED CLOSED indicator has extinguished and the GREEN OPEN indicator has illuminated. Noise was heard as the breaker re-positioned.
re-positioned.
Comment:
2008 2008 NRC NRC IPIP j j                                          NUREG NUREG 1021,1021, Revision   9, Supplement Revision 9,  Supplement 11
 
Appendix CC Appendix                                    Page 77 of Page      of 10 10                            Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE            INFORMATION
** Performance Step:
Performance  Step: 88  Perform the Perform   the following:
following: (Step (Step 6)6)
: a. Locally verify
: a. Locally   verify the the following following breakers breakers at at 480V 480V BusBus 11 -
OPEN OPEN
                                      **    Pressurizer Heater Pressurizer     Heater Backup Backup Group Group AA (CMPT-2C)
(CMPT-2C)
                                      **    Feed to Feed  to MCC-1 MCC-i (CMPT-3A)
(CMPT-3A)
                                      *CV   Polar Crane CV Polar    Crane Power Power Supply Supply (CMPT-3B)
(CMPT-3B)
                                      **    Feed to Feed  to PP-63 PP-63 (CMPT (CMPT-3C)
                                                                        -3C)
                                      **    Construction Facilities Construction      Facilities Main Main Disconnect Disconnect (CMPT-(CMPT 4B)
                                      **    Spent Fuel Spent    Fuel Pit Pit Cooling Cooling Pump Pump B B (CMPT-4C)
(CMPT-4C)
* Condenser Vacuum Pump A (CMPT-5C)
* Condenser Vacuum Pump A (CMPT-5C)
: b. Remove breaker control power fuses from Condenser Vacuum Pump A. (CMPT-5C)
: b. Remove breaker control power fuses from Condenser Vacuum Pump A. (CMPT-5C)
: a. All 480V Bus 1 breakers verified OPEN by checking for GREEN OPEN indication or by depressing the TRIP pushbutton in the center of the breaker cubicle door to place the breaker in the OPEN position.
Standard:                 a. All 480V Bus 11 breakers verified OPEN by checking for GREEN OPEN indication or by depressing the TRIP pushbutton in the center of the breaker cubicle door to place the breaker in the OPEN position.
: b. Breaker door is opened and control power fuses are removed from Condenser Vacuum Pump A. (CMPT-5C)
: b. Breaker door is opened and control power fuses are removed from Condenser Vacuum Pump A. (CMPT-5C)
As Found position of the following breakers is CLOSED with RED CLOSED indicator light illuminated on the breaker cubicle door: Feed to MCC-1 (CMPT-2C)
Examiners Examiner's Note:      As Found position of the following breakers is CLOSED with RED CLOSED indicator light illuminated illuminated on the breaker cubicle cubicle door:
Feed to PP-63 (CMPT-3C)
door:
Construction Facilities Main Disconnect (CMPT 4B) The remaining breaker positions may be OPEN or CLOSED, depending on whether they were operating for plant needs at the time of the loss of power. NUREG 1021, Revision 9, Supplement 1
                              -    Feed Feed toto MCC-i MCC-1 (CMPT-2C)
Appendix C Examiner's Cue: Comment: Performance Step: 9 Standard:
                              -    Feed Feed toto PP-63 PP-63 (CMPT-3C)
Examiner's Note: Examiner's Cue: Comment: Page 8 of 10 PERFORMANCE INFORMATION Form ES-C-1 a. When the breakers are located, and the candidate has simulated pushing the TRIP pushbutton, inform the candidate that GREEN OPEN indication is visible. b. Once the candidate has determined and identified the proper 480V breaker cubicle to remove the control power fuses, present him with the breaker cubicle picture and allow him to identify the fuses and the removal process. When the fuses are identified, inform the candidate that they are removed. Inform the CRSS that the Turbine Building actions of EPP-21 , Steps 3 through 6 have been completed as directed.
(CMPT-3C)
Candidate contacts the Control Room and informs the CRSS that the Turbine Building portions of EPP-21 have been completed as directed.
                              -    Construction Construction Facilities Facilities Main Main Disconnect Disconnect (CMPT (CMPT 4B)4B)
CRSS acknowledges the report. END OF TASK Termination:
The The remaining remaining breaker breaker positions positions may may be be OPEN OPEN or or CLOSED, CLOSED, depending depending on on whether whether they they were were operating operating for for plant plant needs needs at at the the time  of time of the the loss  of power.
EPP-21 Steps 3 through 6 have been completed as directed.
loss of power.
STOP TIME: 2008 NRC IP j NUREG 1021, Revision 9, Supplement 1
2008 2008 NRC NRC IPj IP j                                        NUREG 1021, NUREG       1021, Revision Revision 9,9, Supplement Supplement 11
Appendix C Page 9 of 10 VERIFICATION OF COMPLETION Job Performance Measure No.: 2008 NRC IP i Examinee's Name: Examiner's Name: Date Performed:
 
Facility Evaluator:
Appendix CC Appendix                                          Page 88 of Page      of 10 10                            Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE          INFORMATION Examiners Cue:
Examiner's     Cue:               a. When
: a. When the the breakers breakers areare located, located, and and the the candidate candidate hashas simulated  pushing the simulated pushing       the TRIP TRIP pushbutton, pushbutton, informinform the the candidate that candidate    that GREEN GREEN OPENOPEN indication indication is  is visible.
visible.
: b. Once
: b. Once the the candidate candidate has has determined determined andand identified identified the the proper  480V  breaker proper 480V breaker cubiclecubicle to to remove remove the the control control power fuses, power    fuses, present present himhim with with the the breaker breaker cubicle cubicle picture and picture  and allow allow him him to to identify identify the the fuses fuses and and the the removal process.
removal    process. When When thethe fuses fuses are are identified, identified, inform the inform  the candidate candidate that that they they are are removed.
removed.
Comment:
Comment:
Performance Step:
Performance    Step: 9      Inform the CRSS that the Turbine Building Inform                                  Building actions of EPP-21 EPP-21,,
Steps 3 through 6 have been completed as directed.
Standard:
Standard:                  Candidate contacts the Control Room and informs the CRSS that the Turbine Building portions of EPP-21 have been completed as directed.
Examiners Note:
Examiner's    Note:
Examiners Examiner's Cue:            CRSS acknowledge acknowledges   s the report.
Comment:
Comment:
END END OFTASK OF TASK Termination:
Termination: EPP-21 EPP-21 Steps Steps 33 through      have been through 66 have   been completed completed as   as directed.
directed.
STOP STOP TIME:
TIME:
2008 2008 NRC NRC IPIPj j                                           NUREG NUREG 1021,1021, Revision Revision 9,9, Supplement Supplement 11
 
Appendix CC Appendix                                    Page 99 of Page       10 of 10                     Form Form ES-C-1 ES-C-i VERIFICATION OF VERIFICATION    OF COMPLETION COMPLETION Job   Performance Measure Job Performance    Measure No.:
No.: 2008 NRC 2008      IP ij NRC IP Examinees Name:
Examinee's     Name:
Examiners Name:
Examiner's   Name:
Performed:
Date Performed:
Date Facility Evaluator:
Facility Evaluator:
Number of Attempts:
Number of Attempts:
Time to Complete:
Time to Complete:
Documentation:
Question Documentation:
Question Documentation:
Question:
Question:
Response:
 
Result: SAT UNSAT Examiner's Signature:
===Response===
Date: -----------------------------
Result:                           SAT               UNSAT Examiners Examiner's Signature:
Form ES-C-1 2008 NRC IP j NUREG 1021, Revision 9, Supplement 1
Signature:                                      Date:
Appendix C INITIAL CONDITIONS:
Date:
INITIATING CUE: 2008 NRC IP j Page 10 of 10 JPM CUE SHEET Form ES-C-1
                        -----------------------------
* The plant has experienced a loss of offsite AC power.
2008 NRC 2008    NRC IPj IP j                                   NUREG 1021, Revision NUREG 1021, Revision 9, 9, Supplement Supplement 11
* EOP Network has been implemented.
 
* EPP-4, REACTOR TRIP RESPONSE, has directed the implementation of EPP-21, ENERGIZING PRESSURIZER HEATERS FROM EMERGENCY BUSSES.
Appendix CC Appendix                              Page 10 Page   10 of of 10 10                            Form Form ES-C-1 ES-C-i JPM CUE JPM  CUE SHEET SHEET INITIAL CONDITIONS:
* You are the Outside AO.
INITIAL  CONDITIONS: **  The plant The   plant has has experienced experienced aa loss loss of of offsite offsite AC AC power.
* Emergency Bus E-1 is powered by EDG "A".
power.
* You have been given Key # 69, "PZR Heater Breaker Arm Switch" and a set of large fuse pullers.
                    *EOP Network EOP    Network has has been been implemented.
* The breakers listed in Step # 3 cannot be verified open from the RTGB. The CRSS has directed you to perform the Turbine Building actions required to energize PZR Heaters from the emergency bus in accordance with EPP-21 , Steps 3 through 6. NUREG 1021, Revision 9, Supplement 1
implemented.
Appendix C Facility:
                    **  EPP-4, REACTOR EPP-4,   REACTOR TRIP  TRIP RESPONSE, RESPONSE, has    has directed directed the the implementati implementation     of EPP-21, on of EPP-21, ENERGIZING ENERGIZING PRESSURIZER PRESSURIZER HEATERS FROM HEATERS      FROM EMERGENCY EMERGENCY BUSSES. BUSSES.
Task Title: KIA  
                    **   You are You      the Outside are the  Outside AO.
AD.
                    **   Emergency Bus Emergency     Bus E-1 E-i is is powered powered by by EDG EDG "A".
A.
                    *You have You  have been been given given Key Key ## 69,  PZR Heater 69, "PZR     Heater Breaker Breaker Arm Arm Switch and Switch"   and aa set set of of large large fuse fuse pullers.
pullers.
* The breakers listed in Step # 3 cannot be verified open    open from RTGB.
the RTGB.
INITIATING CUE:
INITIATING          The CRSS has directed you to perform the Turbine Building actions required to energize PZR Heaters from the emergency EPP-21,, Steps 3 through 6.
bus in accordance with EPP-21 2008  NRC lPj 2008 NRC    IP j                                NUREG NUREG 1021, 1021, Revision Revision 9, 9, Supplement Supplement 11
 
Appendix C Appendix        C                                  Job Performance Job  Performance Measure Measure                        Form Form ES-C-1 ES-C-i Worksheet Worksheet Facility:
Facility:                    HB ROBINSON HB  ROBINSON                                  Task No.:
Task  No.:      04064100901 04064100901 Task Title:
Task     Title:             Manually Start Manually    Start EDG EDG Using  Air Start Using Air Start      JPM No.:
JPM    No.:      2008 2008 NRC NRC In-Plant In-Plant kk Solenoids Solenoids KIA    


==Reference:==
==Reference:==


Examinee:
K/A
Facility Evaluator:
 
Method of testing: Job Performance Measure Worksheet HB ROBINSON Manually Start EDG Using Air Start Solenoids 064 A3.01 4.1/4.0 056 AK3.02 4.4/4.7 056 AA2.14 4.4/4.6 Task No.: JPM No.: NRC Examiner:
==Reference:==
Date: Form ES-C-1 04064100901 2008 NRC In-Plant k Simulated Performance:
064 A3.01 064  A3.01 4.1/4.0 4.1/4.0 056  AK3.02 4.4/4.7 056 AK3.02     4.4/4.7 056 AA2.14 4.4/4.6 056 AA2.14    4.4/4.6 Examinee:
x Actual Performance:
Examinee:                                                                    Examiner:
Classroom Simulator Plant X ---READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
NRC Examiner:
NRC Facility Evaluator:
Facility    Evaluator:                                                  Date:
Date:
Method of Method      of testing:
testing:
Simulated Performance:
Simulated       Performance:          xX                                      Performance:
Actual Performance:
Simulator Classroom     - - - Simulator                     Plant           X READ TO THE EXAMINEE II will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Initial Conditions:
Initial Conditions:
* You are the Inside AO.
* You are the Inside AO.
* The unit has experienced a total loss of onsite and offsite power.
* The unit has experienced a total loss of onsite and offsite power.
* EPP-1, LOSS OF ALL AC POWER, has been implemented.
* EPP-1, LOSS OF ALL AC POWER, has been implemented. implemented.
* Emergency Diesel Generator "B" is out of service for scheduled maintenance to replace the fuel oil filters.
* Emergency Diesel Generator B "B" is out of service for scheduled maintenance to replace the fuel oil filters.
* Emergency Diesel Generator "A" failed to start. Task Standard:
* Emergency Diesel Generator A "A" failed to start.
Start EDG "A" locally and energize 480V Bus E-1 Required Materials:
Task Standard:                 Start EDG EDG A    locally and energize 480V "A" locally               480V BusBus E-1 Required Required Materials:
EPP-1, Revision 38 General  
Materials:    EPP-i, EPP-1, Revision 38    38 General  


==References:==
==References:==


EPP-1, Revision 38 Initiating Cue: The CRSS has dispatched you to perform EPP-1, starting at Step 10.b. RNO. Time Critical Task: NO Validation Time: 12 minutes 2008 NRC IP k NUREG 1021, Revision 9, Supplement 1
General     
Appendix C Page 2 of 8 PERFORMANCE INFORMATION Form ES-C-1 (Denote Critical Steps with an asterisk)
 
* Performance Step: 1 Standard:
==References:==
Examiner's Cue: Comment:
EPP-1, EPP-1, Revision Revision 38 38 Initiating Initiating Cue:
* Performance Step: 2 Standard:
Cue:            The The CRSS CRSS has  has dispatched dispatched you you to to perform perform EPP-i, EPP-1, starting starting at at Step Step 110.b.
Examiner's Cue: Comment: 2008 NRC IP k STARTTIME:
0.b.
__ Place the EDG Control Switch in the LOCAL position.
RNO.
Candidate locates and simulates placing the EDG "A" LOCAL / REMOTE CONTROL switch in the LOCAL position.
RNO.
EDG "A" LOCAL I REMOTE CONTROL switch is rotated to the LOCAL position and the Local Control WHITE light is ILLUMINATED.
Time Critical Time    Critical Task:
Depress the Local Engine START pushbutton.
Task:     NO NO Validation Validation Time: Time:        12 12 minutes minutes 2008 2008 NRC NRC IP   IP kk                                              NUREG 1021, NUREG     1021, Revision Revision 9, 9, Supplement Supplement 11
Candidate simulates depressing the Local Engine START pushbutton on the EDG "A" Engine Control Panel. EDG "A" does NOT start. NUREG 1021, Revision 9, Supplement 1
 
Appendix C
Appendix CC Appendix                                          Page 22 of Page     of 88                            Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE          INFORMATION (Denote Critical (Denote Critical Steps with an Steps with an asterisk) asterisk)
* Performance Step: 3 Standard:
START TIME: _ _
Examiner's Cue: Comment:
STARTTIME:
* Performance Step: 4 Standard:
*Performance Step:
Examiner's Cue: Comment: 2008 NRC IP k Page 3 of 8 PERFORMANCE INFORMATION Form ES-C-1 If the affected EDG did NOT start from the Engine Control Panel, Then perform the following at the EDG Hand Start valves: Remove the locking pin from the Hand Start valves Lock Bar and remove the Lock Bar. Candidate simulates removing the locking pin from the Hand Start valves Lock Bar and removing the Lock Bar from valves DA-41 and DA-42. Locking pin from the Hand Start valves Lock Bar is removed and the Lock Bar from valves DA-41 and DA-42 is removed. If the affected EDG did NOT start from the Engine Control Panel, Then perform the following at the EDG Hand Start valves: Pull down and hold either of the EDG Hand Start valves until the EDG starts:
Performance    Step: 11    Place the Place   the EDG EDG Control Control Switch Switch inin the the LOCAL LOCAL position.
* DA-41
position.
* DA-42 Candidate selects one of the Hand Start valves and simulates pulling down on the handle until the EDG starts. EDG "A" has started and is running at 900 RPM. NUREG 1021, Revision 9, Supplement 1
Standard:
Appendix C Performance Step: 5 Standard:
Standard:                  Candidate locates Candidate   locates and  simulates placing and simulates     placing the the EDG EDG "A"A LOCAL LOCAL /I REMOTE CONTROL REMOTE     CONTROL switch switch in in the   LOCAL position.
Examiner's Note: Comment: Performance Step: 6 Standard:
the LOCAL    position.
Examiner's Cue: Comment: 2008 NRC IP k Page 4 of 8 PERFORMANCE INFORMATION If either EDG has started, Then Go To Step 11. Form ES-C-1 EDG "A" started and candidate proceeds to Step 11 . Check either Emergency Bus E-1 or E-2 -ENERGIZED.
Examiners Cue:
Candidate observes indication on the EDG "A" Generator Control Panel and notes that 480V Bus E-1 is NOT energized.
Examiner's                  EDG "A" EDG    A LOCAL LOCAL II REMOTE REMOTE CONTROL CONTROL switch is     is rotated rotated to the LOCAL position position and the Local Local Control WHITE light  light is is ILLUMINATED.
GENERATOR AC VOLTS indicates 480 Volts. EMERGENCY BUS AC VOLTS indicates 0 Volts. NORMAL BUS AC VOLTS INDICATES 0 Volts. GENERATOR HERTZ indicates 60 Hz. If candidate requests information from the Control Room, inform him that neither Emergency Bus is energized.
ILLUMINATED.
NUREG 1021, Revision 9, Supplement 1
Comment:
Appendix C
**  Performance Step: 2        Depress the Local Engine START pushbutton.
* Performance Step: 7 Standard:
Standard:                  Candidate simulates depressing the Local Engine START pushbutton on the EDG "A"   A Engine Control Panel.
Examiner's Cue: Comment: 2008 NRC IP k Page 5 of 8 PERFORMANCE INFORMATION Verify the following for any running EDG: Form ES-C-1
Examiners Cue:
* EMERG GEN VOLTS -APPROXIMATELY 480 VOLTS. AND
Examiner's                  EDO A EDG   "A" does NOT start.
* BRKR 52/17B, EMERG DG A TO BUS E1 -CLOSED. Candidate observes that EDG "A" GENERATOR AC VOLTS indicates  
Comment:
-480 Volts. Candidate closes EDG "A" Output breaker at the EDG Generator Control Panel by placing EDG OUTPUT BKR 52/17B control switch to the CLOSE position.
2008 2008 NRC NRC IPIP kk                                          NUREG NUREG 1021,1021, Revision Revision 9, 9, Supplement Supplement i1
Indications on the EDG Generator Control panel include Generator AC Volts, Emergency Bus AC Volts and Normal Bus AC Volts. Inform candidate that EDG Generator AC Volts is 480 Volts. Inform candidate that breaker 52117B indication has the GREEN OPEN light illuminated and the RED CLOSED light extinguished when the breaker control switch is located. Inform candidate that breaker 52117B indication has the RED CLOSED light illuminated and the GREEN OPEN light extinguished when the breaker control switch is placed in the closed position.
 
Generator AC KW indicates 400 KW. NUREG 1021, Revision 9, Supplement 1
Appendix CC Appendix                                            Page 33 of Page      of 88                              Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE            INFORMATION
Appendix C Performance Step: 8 Standard:
** Performance Step:
Examiner's Cue: Comment: Page 6 of 8 PERFORMANCE INFORMATION Form ES-C-1 If either Emergency Bus is energized, Then Go To Step 12. 480V Bus E-1 is energized at 480 Volts with EDG "A" supplying the bus. Inform the candidate that EMERGENCY BUS AC VOLTS indicates 480 Volts and that Emergency Bus E-1 is energized.
Performance   Step: 33      the affected IfIf the   affected EDG      did NOT EDG did           start from NOT start     from the the Engine Engine Control Control Panel, Panel, Then        perform the Then perform         the following following atat the the EDG EDG Hand Hand Start Start valves:
END OF TASK Termination:
valves:
EDG "A" started and 480V Bus E-1 energized.
Remove the Remove        the locking locking pin pin from   the Hand from the    Hand Start Start valves valves Lock Lock Bar Bar and and remove the remove       the Lock Lock Bar.
STOP TIME: 2008 NRC IP k NUREG 1021, Revision 9, Supplement 1
Bar.
Appendix C Page 7 of 8 VERIFICATION OF COMPLETION Job Performance Measure No.: 2008 NRC IP k Examinee's Name: Examiner's Name: Date Performed:
Standard:
Standard:                Candidate simulates Candidate       simulates removing removing the the locking locking pin pin from from the the Hand Hand Start valves Start     valves Lock Lock BarBar and and removing removing the the Lock Lock Bar Bar from from valves valves DA-41 and DA-41       and DA-42.
DA-42.
Examiners Cue:
Examiner's              Locking pin from the Hand Start valves Lock Bar is removed Locking and the Lock Bar from valves DA-41 and DA-42 is removed.               removed.
Comment:
**  Performance Step: 4    If the affected EDG did NOT start from the Engine Control Panel, Then perform the following at the EDG Hand Start valves:
Pull down and hold either of the EDG Hand Start valves until the EDG starts:
* DA-4i DA-41
* DA-42 Standard:
Standard:              Candidate selectsselects oneone of the Hand Hand Start Start valves valves and and simulates pulling down down on the handle until  until the EDG starts.
Examiners Examiner's Cue:
Cue:      EDG EDG A    "A" has   started and has started    and is is running running at at 900 900 RPM.
RPM.
Comment:
Comment:
2008 NRC 2008  NRC IP IP kk                                            NUREG NUREG iO2i,  1021, Revision Revision 9, 9, Supplement Supplement 11
 
Appendix C                                 Page 4 of 8                             ES-C-i Form ES-C-1 PERFORMANCE INFORMATION PERFORMANCE       INFORMATION Performance Step: 5 IfIf either EDG has started, Then Go To Step 11.ii.
Standard:          EDG "A" A started and candidate proceeds to Step 11 ii..
Examiners Note:
Examiner's Comment:
Performance Step: 6 Check either Emergency Bus E-1   E-i or E ENERGIZED.
 
Standard:          Candidate observes indication on the EDG "A" A Generator Control Panel and notes that 480V Bus E-1 is NOT energized.
Examiners Cue:
Examiner's          GENERATOR AC VOLTS indicates 480 Volts.
EMERGENCY BUS AC VOLTS indicates 0 Volts.
NORMAL BUS AC VOLTS INDICATES 0 Volts.
GENERATOR HERTZ indicates 60 Hz.
If candidate requests information from the Control Room, inform him that neither Emergency Bus is energized.
Comment:
2008 NRC IP k                                    NUREG 1021, 1021, Revision 9, Supplement 1a1!
 
Appendix C C                              Page 55 of 88                        Form ES-C-i ES-C-1 PERFORMANCE INFORMATION INFORMATION
*
* Performance Step: 7 Verify the following for any running EDG:
* EMERG GEN VOLTS - APPROXIMATELY 480 VOLTS.
                                                      -
AND
* BRKR 52/17B, EMERG DG A TO BUS El        E1 - CLOSED.
 
Standard:          Candidate observes that EDG A      GENERATOR AC VOLTS "A" GENERATOR indicates - 480 Volts.
Candidate closes EDG "A" Output breaker at the EDG Generator Control Panel by placing EDG OUTPUT BKR 52Ii7B  52/17B control switch to the CLOSE position.
Indications on the EDG Generator Control panel include Generator AC Volts, Emergency Bus AC Volts and Normal Bus AC Volts.
Inform candidate that EDG Generator AC Volts is 480 Volts.
Inform candidate that breaker 52117B indication has the GREEN OPEN light illuminated and the RED CLOSED light extinguished when the breaker control switch is located.
Inform candidate that breaker 52117B indication has the RED CLOSED light illuminated and the GREEN OPEN light extinguished when the breaker control switch is placed in the closed position.
Generator AC KW indicates 400 KW.
Examiner's Examiners Cue:
Comment:
2008 NRC IP k                                    NUREG 1021, Revision 9, Supplement 11
 
Appendix CC Appendix                                          Page 66 of Page     of 88                            Form ES-C-i Form   ES-C-1 PERFORMA PERFORMANCE  NCE INFORMAT INFORMATION    ION Performance Step:
Performance    Step: 88                Emergency Bus either Emergency IfIf either              Bus is   energized, Then is energized,            To Step Go To Then Go      Step 12.
12.
Standard:
Standard:                480V Bus 480V           E-1 is Bus E-1     energized at is energized     at ~ 480 Volts with 480 Volts     EDG A with EDG   "A" supplying supplying the bus.
the     bus.
Examiner's Cue:
Examiners    Cue:        Inform the Inform         candidate that the candidate   that EMERGENC EMERGENCY   Y BUS BUS ACAC VOLTS VOLTS indicates 480 indicates      480 Volts and and that    Emergency Bus that Emergency         E-1 is Bus E-1   is energized.
energized.
Comment:
ENDOFTAS END OF TASK   K A started and 480V Bus E-1 energized.
Termination: EDG "A" STOP TIME:
2008 2008 NRC NRC IPIP kk                                          NUREG 1021, NUREG             Revision 9, 1021, Revision     Supplement 11 9, Supplement
 
Appendix C Appendix   C                               Page 77 of Page    of 88                    Form ES-C-1 Form ES-C-1 VERIFICATION OF VERIFICATION   OF COMPLETION COMPLETION Job Performance Job Performance Measure Measure No.:
No.: 2008 2008 NRC NRC IP IP kk Examinee's Name:
Examinees    Name:
Examiner's Name:
Examiners  Name:
Date Performed:
Facility Evaluator:
Facility Evaluator:
Number of Attempts:
Number of Attempts:
Line 1,104: Line 2,749:
Question Documentation:
Question Documentation:
Question:
Question:
Response:
 
Result: SAT UNSAT Examiner's Signature:
===Response===
Date: -----------------------------
Result:                         SAT             UNSAT Examiner's Examiners Signature:                                     Date:
Form ES-C-1 2008 NRC IP k NUREG 1021, Revision 9, Supplement 1
                        -----------------------------
Appendix C INITIAL CONDITIONS:
2008 2008 NRC NRC IPIP kk                                  NUREG NUREG 1021, Revision 9, 1021, Revision    Supplement 11 9, Supplement
INITIATING CUE: 2008 NRC IP k Page 8 of 8 JPM CUE SHEET
 
* You are the Inside AO. Form ES-C-1
Appendix CC Appendix                                    Page Page 88ofof88                                      Form ES-C-i Form    ES-C-1 JPM CUE JPM    CUE SHEET SHEET INITIAL CONDITION INITIAL  CONDITIONS:S: *You are You  are the   Inside AO.
* The unit has experienced a total loss of onsite and offsite power.
the Inside  AO.
* EPP-1, LOSS OF ALL AC POWER, has been implemented.
                      *The unit The              experienced aa total has experienced unit has                            loss of total loss     of onsite         offsite power.
* Emergency Diesel Generator "8" is out of service for scheduled maintenance to replace the fuel oil filters.
and offsite onsite and            power.
* Emergency Diesel Generator "A" failed to start. The CRSS has dispatched you to perform EPP-1, starting at Step 10.b. RNa. NUREG 1021, Revision 9, Supplement 1
                      *EPP-1,   LOSS OF EPP-1, LOSS          ALL AC   POWER,         has   been OF ALL AC POWER, has been implemented. implemented   .
Appendix C Facility:
                      *Emergency             Generator B Diesel Generator Emergency Diesel                              out of "8" isis out   of service  for scheduled service for   scheduled maintenance maintenance    to to replace replace the the fuel fuel oil oil filters.
Task Title: KJA  
filters.
                      **   Emergency             Generator A Diesel Generator Emergency Diesel                          failed to "A" failed     to start.
start.
INITIATING CUE:
INITIATING    CUE:    The CRSS The              dispatched you has dispatched CRSS has                  you to   perform EPP-i, to perform                  starting at EPP-1, starting         Step iO.b.
at Step 10.b.
RNa.
RNO.
2008 NRC 2008  NRC IPIP kk                                      NUREG 1021, NUREG        1021, Revision             Supplement11 Revision 9,9, Supplement
 
Appendix CC Appendix                                          Job Performance Job  Performance Measure Measure                        Form Form ES-C-i ES-C-1 Worksheet Worksheet Facility:
Facility:                  HB ROBINSON HB  ROBINSON                                  Task No.:
Task   No.:    04064100901 04064100901 Task Title:
Task    Title:             Manually Start Manually                Using Air EDG Using Start EDG        Air Start Start        JPM No.:
JPM    No.:    2008  NRC In-Plant 2008 NRC    In-Plant kk Solenoids Solenoids KJA  


==Reference:==
==Reference:==


Examinee:
K/A   
 
==Reference:==
A3.01 4.1/4.0 064 A3.0i 064          4.1/4.0 056  AK3.02 4.4/4.7 056 AK3.02    4.4/4.7 056 AA2.14 056  AA2.14 4.4/4.6 4.4/4.6 Examinee:
Examinee:                                                              NRC Examiner:
NRC  Examiner:
Facility Evaluator:
Facility Evaluator:
Method of testing: Job Performance Measure Worksheet HB ROBINSON Manually Start EDG Using Air Start Solenoids 064 A3.01 4.1/4.0 056 AK3.02 4.4/4.7 056 AA2.14 4.4/4.6 Task No.: JPM No.: NRC Examiner:
Facility    Evaluator:                                                Date:
Date: Form ES-C-1 04064100901 2008 NRC In-Plant k Simulated Performance:
Date:
x Actual Performance:
Method of Method     of testing:
Classroom Simulator Plant x ------READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
testing:
Initial Conditions:
Performance::
* You are the Inside AO.
Simulated Performance                 x X                                      Performance::
Actual Performance Classroom     - - - Simulator            ---       Plant          x X
READ TO THE EXAMINEE II will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Initial Conditions:                 **   You are the Inside AO.
* The unit has experienced a total loss of onsite and offsite power.
* The unit has experienced a total loss of onsite and offsite power.
* EPP-1, LOSS OF ALL AC POWER, has been implemented.
* EPP-1, LOSS OF ALL AC POWER, has been implemented. implemented.
* Emergency Diesel Generator "B" is out of service for scheduled maintenance to replace the fuel oil filters.
* Emergency Diesel Generator "B" B is out of service for scheduled maintenance to replace the fuel oil filters.
* Emergency Diesel Generator "A" failed to start. Task Standard:
* Emergency Diesel Generator "A" A failed to start.
Start EDG "An locally and energize 480V Bus E-1 Required Materials:
Task Task Standard:                 Start EDG EDG "AnA locally locally and energize 480V Bus        E-1 Bus E-1 Required Required Materials:
EPP-1, Revision 38 General  
Materials:    EPP-1, EPP-i, Revision 38 General General
 
==References:==


==References:==
==References:==
EPP-1, EPP-1, Revision Revision 3838 Initiating nitiating Cue:Cue:          The The CRSS CRSS hashas dispatched dispatched you you to to perform perform EPP-1, EPP-1, starting    at Step starting at        lOb.
Step 10.b.
RNO.
RNO.
Time Time Critical Critical Task:
Task:    NO NO Validation Validation Time:Time:        12 12 minutes minutes 2008 2008 NRCNRC IP  IP kk                                            NUREG NUREG 1021,        Revision 9, 1021, Revision        Supplement 1I 9, Supplement


EPP-1, Revision 38 Initiating Cue: The CRSS has dispatched you to perform EPP-1, starting at Step 10.b. RNO. Time Critical Task: NO Validation Time: 12 minutes 2008 NRC IP k NUREG 1021, Revision 9, Supplement 1
Appendix CC Appendix                                          Page 22 of Page     of 88                              Form Form ES-C-i ES-C-1 PERFORMANCE PERFORMA      NCE INFORMAT INFORMATION    ION (Denote Critical (Denote  Critical Steps Steps with an asterisk) with an asterisk)
Appendix C Page 2 of 8 PERFORMANCE INFORMATION Form ES-C-1 (Denote Critical Steps with an asterisk)
START TIME:
* Performance Step: 1 Standard:
START    TIME: _ _
Examiner's Cue: Comment:
*Performance Step:
* Performance Step: 2 Standard:
Performance      Step: I1    Place the Place       EDG Control the EDG           Switch inin the Control Switch           LOCAL position.
Examiner's Cue: Comment: 2008 NRC IP k START TIME: __ Place the EDG Control Switch in the LOCAL position.
the LOCAL   position.
Candidate locates and simulates placing the EDG "A" LOCAL / REMOTE CONTROL switch in the LOCAL position.
Standard:
EDG "A" LOCAL I REMOTE CONTROL switch is rotated to the LOCAL position and the Local Control WHITE light is ILLUMINATED.
Standard:                    Candidate locates Candidate                simulates placing and simulates locates and                        the EDG placing the EDG A      LOCAL //
Depress the Local Engine START pushbutton.
                                                                                            "A" LOCAL CONTROL switch REMOTE CONTROL REMOTE                          in the switch in       LOCAL position.
Candidate simulates depressing the Local Engine START pushbutton on the EDG "A" Engine Control Panel. EDG "A" does NOT start. NUREG 1021, Revision 9, Supplement 1
the LOCAL   position.
Appendix C
Examiner's Cue:
* Performance Step: 3 Standard:
Examiners                    EDG A EDG                 REMOTE CONTROL switch "A" LOCAL I REMOTE                       switch isis rotated to the LOCAL the LOCAL      position position and and   the the Local Local    Control WHITE WHITE     light is light is ILLUMINATED.
Examiner's Cue: Comment:
ILLUMINAT    ED.
* Performance Step: 4 Standard:
Comment:
Examiner's Cue: Comment: 2008 NRC IP k Page 3 of 8 PERFORMANCE INFORMATION Form ES-C-1 If the affected EDG did NOT start from the Engine Control Panel, Then perform the following at the EDG Hand Start valves: Remove the locking pin from the Hand Start valves Lock Bar and remove the Lock Bar. Candidate simulates removing the locking pin from the Hand Start valves Lock Bar and removing the Lock Bar from valves DA-41 and DA-42. Locking pin from the Hand Start valves Lock Bar is removed and the Lock Bar from valves DA-41 and DA-42 is removed. If the affected EDG did NOT start from the Engine Control Panel, Then perform the following at the EDG Hand Start valves: Pull down and hold either of the EDG Hand Start valves until the EDG starts:
**  Performance Step: 2          Depress the Local Engine START pushbutton.
Standard:                    Candidate simulates depressing the Local Engine START pushbutton on the EDG "A" A Engine Control Panel.
Examiner's Examiners Cue:              EDG "A"         NOT start.
A does NOT Comment:
Comment:
2008 2008 NRC NRC IP IP kk                                          NUREG 1021, NUREG      1021, Revision        Supplement 11 Revision 9,9, Supplement
 
Appendix CC Appendix                                           Page 33 of Page      of 88                                Form ES-C-i Form    ES-C-1 PERFORMANCE INFORMATION PERFORMANCE              INFORMATION
*Performance Step:
Performance   Step: 33 IfIf the the affected   EDG did affected EDG                        from the start from NOT start did NOT                    the Engine    Control Panel, Engine Control     Panel, Then perform Then                      following at the following perform the                at the EDG Hand the EDG            Start valves:
Hand Start    valves:
Remove the Remove         the locking    pin from locking pin           the Hand from the   Hand Start    valves Lock Start valves           Bar and Lock Bar and remove the remove            Lock Bar.
the Lock    Bar.
Standard:
Standard:                                simulates removing Candidate simulates Candidate                      removing the      locking pin the locking       from the pin from   the Hand Hand Start Start     valves valves  Lock Lock  Bar Bar  and and  removing removing     the the Lock Lock  Bar Bar  from from  valves valves DA-41 and DA-41       and DA-42.
DA-42.
Examiner's Cue:
Examiners              Locking pin    pin from thethe Hand             valves Lock Bar Start valves Hand Start                      Bar is is removed and the and      the Lock Lock BarBar from valves        DA-41 and valves DA-41             DA-42 is and DA-42     is removed.
Comment:
**  Performance Step: 4    If the affected EDG did NOT start from the Engine Control Panel, Then perform the following at the EDG Hand Start valves:
Pull down and hold either of the EDG Hand Start valves until the EDG starts:
* DA-41
* DA-41
* DA-42 Candidate selects one of the Hand Start valves and simulates pulling down on the handle until the EDG starts. EDG "A" has started and is running at 900 RPM. NUREG 1021, Revision 9, Supplement 1
* DA-42 Standard:              Candidate selects one of the Hand Start valves and simulates pulling down on the handle until the EDG starts.
Appendix C Performance Step: 5 Standard:
Examiner's Examiners Cue:
Examiner's Note: Comment: Performance Step: 6 Standard:
Cue:      EDG EDG "A"   A has has started and is         running at 900 is running              RPM.
Examiner's Cue: Comment: 2008 NRC IP k Page 4 of 8 PERFORMANCE INFORMATION If either EDG has started, Then Go To Step 11. Form ES-C-1 EDG "A" started and candidate proceeds to Step 11. Check either Emergency Bus E-1 or E-2 -ENERGIZED.
900 RPM.
Candidate observes indication on the EDG "A" Generator Control Panel and notes that 480V Bus E-1 is NOT energized.
Comment:
GENERATOR AC VOLTS indicates 480 Volts. EMERGENCY BUS AC VOLTS indicates 0 Volts. NORMAL BUS AC VOLTS INDICATES 0 Volts. GENERATOR HERTZ indicates 60 Hz. If candidate requests information from the Control Room, inform him that neither Emergency Bus is energized.
Comment:
NUREG 1021, Revision 9, Supplement 1
2008 2008 NRC NRC IPlP kk                                              NUREG 1021, NUREG                Revision 9, 1021, Revision         Supplement 11 9, Supplement
Appendix C
 
* Performance Step: 7 Standard:
Appendix CC Appendix                                       Page    of 88 Page 44 of                            Form ES-C-i Form  ES-C-1 PERFORMANCE PERFORMA    NCE INFORMAT INFORMATION ION Performance Step:
Examiner's Cue: Comment: 2008 NRC IP k Page 5 of 8 PERFORMANCE INFORMATION Verify the following for any running EDG: Form ES-C-1
Performance     Step: 55      either EDG IfIf either EDG has   started, Then has started,      Go To Then Go    Step 11.
* EMERG GEN VOLTS -APPROXIMATELY 480 VOLTS. AND
To Step  11.
* BRKR 52/17B, EMERG DG A TO BUS E1 -CLOSED. Candidate observes that EDG "A" GENERATOR AC VOLTS indicates  
Standard:
-480 Volts. Candidate closes EDG "A" Output breaker at the EDG Generator Control Panel by placing EDG OUTPUT BKR 52/17B control switch to the CLOSE position.
Standard:                EDG A EDG     "A" started                 proceeds to candidate proceeds and candidate started and                          Step 11.
Indications on the EDG Generator Control panel include Generator AC Volts, Emergency Bus AC Volts and Normal Bus AC Volts. Inform candidate that EDG Generator AC Volts is 480 Volts. Inform candidate that breaker 52/17B indication has the GREEN OPEN light illuminated and the RED CLOSED light extinguished when the breaker control switch is located. Inform candidate that breaker 52/17B indication has the RED CLOSED light illuminated and the GREEN OPEN light extinguished when the breaker control switch is placed in the closed position.
to Step 11.
Generator AC KW indicates 400 KW. NUREG 1021, Revision 9, Supplement 1
Examiner's Note:
Appendix C Performance Step: 8 Standard:
Examiners    Note:
Examiner's Cue: Comment: Page 6 of 8 PERFORMANCE INFORMATION Form ES-C-1 If either Emergency Bus is energized, Then Go To Step 12. 480V Bus E-1 is energized at -480 Volts with EDG "A" supplying the bus. Inform the candidate that EMERGENCY BUS AC VOLTS indicates 480 Volts and that Emergency Bus E-1 is energized.
Comment:
END OF TASK Termination:
Comment:
EDG "A" started and 480V Bus E-1 energized.
Performance Step: 66    Check either Emergency Bus E-i                  ENERGIZED..
STOP TIME: 2008 NRC IP k NUREG 1021, Revision 9, Supplement 1
E-1 or E ENERGIZED Standard:                Candidate observes indication on the EDG A    "A" Generator Control Panel and notes that 480V Bus E-1 is NOT energized.
Appendix C Page 7 of 8 VERIFICATION OF COMPLETION Job Performance Measure No.: 2008 NRC IP k Examinee's Name: Examiner's Name: Date Performed:
Examiner's Examiners Cue:          GENERATOR AC VOLTS indicates 480 Volts.
GENERATOR EMERGENCY BUS AC VOLTS indicates 0 Volts.
EMERGENCY NORMAL BUS AC VOLTS INDICATES 0 Volts.
GENERATOR HERTZ indicates 60 Hz.
GENERATOR If candidate requests information from the Control Room, inform him that neither Emergency Bus is energized.
Comment:
2008 2008 NRC NRC IP IP kk                                        NUREG   1021, Revision NUREG 1021,                  Supplement 11 Revision 9,9, Supplement
 
Appendix CC Appendix                                       Page 55of Page      of88                            Form ES-C-i Form    ES-C-1 PERFORMANCE PERFORMA      NCE INFORMAT INFORMATION  ION
*
* Performance Step:
Performance    Step: 77 Verify the Verify       following for the following   for any   running EDG:
any running  EDG:
                                **   EMERG GEN EMERG            VOLTS - APPROXIM GEN VOLTS      -              ATELY 480 APPROXIMATELY         480 VOLTS.
VOLTS.
AND AND
                                **   BRKR               EMERG DG 52/17B, EMERG BRKR 52117B,                            BUS El TO BUS DG AA TO         E1 - CLOSED.
 
CLOSED.
Standard:
Standard:                Candidate observes Candidate                      EDG A that EDG observes that          "A" GENERATO GENERATOR       AC VOLTS R AC   VOLTS indicates - 480 indicates    480 Volts.
Volts.
Candidate closes Candidate                    "A" Output EDG A closes EDG                          at the breaker at Output breaker          EDG Generator the EDG     Generator Control Panel Control  Panel  by by placing placing  EDG EDG   OUTPUT OUTPUT     BKR BKR  52117B 52/17B   control control switch to switch          CLOSE position.
the CLOSE to the            position.
Indications on Indications        the EDG on the         Generator Control EDG Generator                 panel include Control panel     include Generator Generator    AC AC Volts,   Emergency Emergency     Bus Bus AC AC Volts Volts  and and    Normal Normal Bus AC Volts.
Inform candidate that EDG Generator AC Volts is 480 Volts.
Inform candidate that breaker 52117B    52/17B indication has the GREEN OPEN light illuminated and the RED CLOSED light extinguished when the breaker control switch is located.
Inform candidate that breaker 52/17B   521178 indication has the RED    RED CLOSED light illuminated and the GREEN OPEN light extinguished when the breaker control switch is placed in                in the closed position.
Generator AC KW indicates 400 KW.
Examiner's Examiners Cue:
Cue:
Comment:
Comment:
2008 2008 NRC NRC IPIP kk                                        NUREG 1021, NUREG      1021, Revision      Supplement 11 Revision 9,9, Supplement
 
Appendix C Appendix C                                     Page 66 of Page   of 88                          Form ES-C-i Form   ES-C-1 PERFORMA PERFORMANCE  NCE INFORMAT INFORMATION  ION Step: 88 Performance Step:                    Emergency Bus either Emergency IfIf either              Bus is   energized, Then is energized,      Go To Step Then Go      Step 12.
12.
Standard:
Standard:              480V Bus E-i                                                "A" supplying 480 Volts with EDG A E-1 is energized at - 480 the bus.bus.
Examiner's Cue:
Examiners              Inform the candidate that EMERGENC EMERGENCY   Y BUS AC VOLTS indicates 480 Volts and that Emergency Bus E-1 is energized.
Comment:
END OF TASK Termination: EDG "A" A started and 480V Bus E-1 energized.
STOP TIME:
2008 2008 NRC NRC IPP kk                                        NUREG 1021, NUREG            Revision 9, i021, Revision   Supplement 11 9, Supplement
 
Appendix C Appendix   C                               Page 77 of Page    of 88                    Form ES-C-I Form  ES-C-1 VERIFICATION OF VERIFICATION   OF COMPLETION COMPLETION Job Performance Job  Performance Measure Measure No.:
No.:  2008 NRC IP 2008 NRC IP kk Examinee's Name:
Examinees  Name:
Examiner's Name:
Examiners  Name:
Date Performed:
Facility Evaluator:
Facility Evaluator:
Number of Attempts:
Number of Attempts:
Line 1,179: Line 2,925:
Question Documentation:
Question Documentation:
Question:
Question:
Response:
 
Result: SAT UNSAT Examiner's Signature:
===Response===
Date: -----------------------------
Result:                         SAT             UNSAT Examiner's Examiners Signature:
Form ES-C-1 2008 NRC IP k NUREG 1021, Revision 9, Supplement 1
Signature:                                      Date:
Appendix C INITIAL CONDITIONS:
Date:
INITIATING CUE: 2008 NRC IP k Page 8 of 8 JPM CUE SHEET
                        -----------------------------
* You are the Inside AO. Form ES-C-1
2008 2008 NRC NRC IPP kk                                    NUREG NUREG 1021, Revision 9, 1021, Revision    Supplement 11 9, Supplement
* The unit has experienced a total loss of onsite and offsite power.
 
* EPP-1, LOSS OF ALL AC POWER, has been implemented.
AppendixCC Appendix                                   Page88ofof88 Page                                                Form ES-C-i Form      ES-C-1 JPM CUE JPM    CUESHEET SHEET INITIAL CONDITION INITIAL  CONDITIONS:
* Emergency Diesel Generator "8" is out of service for scheduled maintenance to replace the fuel oil filters.
S: **  You  arethe You are       InsideAO.
* Emergency Diesel Generator "A" failed to start. The CRSS has dispatched you to perform EPP-1, starting at Step 10.b. RNa. NUREG 1021, Revision 9, Supplement 1}}
the Inside   AO.
                      ** The unit The unit has   experienced aatotal has experienced              loss of total loss     ofonsite        offsite power.
and offsite onsite and             power.
                      **          LOSS OF EPP-1, LOSS EPP-1,          OF ALL ALL AC    POWER, has AC POWER,                 been implemented has been     implemented.
                      **   Emergency Diesel Emergency              GeneratorB Diesel Generator     "8" isis out  ofservice out of           for scheduled servicefor    scheduled maintenance to maintenance    to replace  the fuel replace the         oil filters.
fuel oil   filters.
                      **                        Generator A Diesel Generator Emergency Diesel Emergency                                failed to "A" failed     to start.
start.
INITIATING CUE:
CUE:      The CRSS The  CRSS has                 you to dispatched you has dispatched          to perform       EPP-1, starting perform EPP-1,                      Step lOb.
at Step starting at        10.b.
INITIATING RNa.
RNO.
2008                                                NUREG NUREG 1021,                             Supplement1i Revision9,9, Supplement 1021, Revision 2008NRC NRCIPIPkk}}

Revision as of 16:04, 13 November 2019

Initial Exam 2008-301 Final Sim/In - Plant Job Performance Measure Worksheet
ML101970310
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 06/28/2010
From:
NRC/RGN-II
To:
Carolina Power & Light Co
References
50-261/08-301
Download: ML101970310 (137)


Text

Appendix C Appendix C Job Performance Measure Job Performance Measure Form Form ES-C-1 ES-C-i Worksheet Worksheet Facility:

Facility: HB ROBINSON HB ROBINSON Task No.:

Task No.: 01001100302 01001100302 Task Title:

Task Title: Perform Rod Perform Rod Cluster Exercise lAW Cluster Exercise lAW JPM JPM No.:

No.: 2008 NRC 2008 NRC SIMSIM aa OST-Oll.

OST-011.

KIA

Reference:

K/A

Reference:

001 A2.11 001 A2.11 4.4/4.7 4.4/4.7 Examinee: NRC Examiner:

Facility Evaluator:

Facility Evaluator: Date:

Date:

Method of testing:

Simulated Performance: Performance:

Actual Performance: x Classroom - - - Simulator x

X Plant Plant READ TO THE EXAMINEE II will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions: ** The plant is at 75% power.

OST-Ol 1, ROD CLUSTER CONTROL EXERCISE AND ROD

  • OST-011, POSITION INDICATION (Monthly) is being performed.
  • The prerequisites of Section 4 have been completed.

Task Standard: Reactor has been manually tripped in response to a dropped rod.

Required Materials: OST-Ol OST-011, 1, Rod Cluster Control Exercise and Rod Position Indication (Monthly)

General

References:

OST-Ol OST-011, 1, Rod Cluster Control Exercise and Rod Position Indication (Monthly)

Handouts:

Handouts: OST -0111,, Section 8.1 OST-Ol 8.1 Initiating Initiating Cue: You areare to perform OST-0111 commencing with Section 8.1 perform OST-Ol 8.1 for Shutdown Bank A Bank "An rods.

Time Critical Task:

Time Critical Task: NO NO Validation Validation Time:Time: 18 18 minutes minutes 2008 2008 NRC NRC SIM SIM aa NUREG 1021, Revision NUREG 1021, Revision 9, 9, Supplement Supplement 11

Appendix C Appendix C Job Performance Job Performance Measure Measure Form Form ES-C-1 ES-C-i Worksheet Worksheet SIMULATOR SETUP SIMULATOR SETUP 1.

1. IC#6i8.

IC # 618.

2. SCN: 006_JPM_S8.

3.

3. When directed byby the Chief Chief Examiner, Examiner, insert insert IMF IMF CRF03A CRFO3A for Shutdown Bank Bank "A" A Rod Rod N-7 to drop into N-7 into the core during withdrawal.
4. OST-Oi 1 Prerequisites are signed off as complete.

OST-011 2008 NRC 2008 NRC SIM SIM aa NUREG 1021, NUREG 1021, Revision Revision 9, 9, Supplement Supplement 11

Appendix C Appendix C Page 33 of Page of 11 11 Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE INFORMATION (Denote Critical (Denote Critical Steps Steps with with an an asterisk) asterisk)

START TIME: _ __

STARTTIME:

Performance Step:

Performance Step: 11 Reviews procedure Reviews procedure and and any any required required information.

information.

Standard:

Standard: OST-Ol OST -011,1, Section Section 8.1 8.1 is required procedure is the required procedure to bebe performed.

performed.

Examiners Note:

Examiner's Candidate may wish to review review the prerequisites in Section Section 4.

Comment:

Performance Step: 2 Record the initial Group Step counter height for Shutdown Bank A. (Step 8.1.1)

"An.

Standard: Candidate observes the proper group step counters and records 225 steps for Groups A and B.

Examiners Note:

Examiner's Comment:

2008 2008 NRC NRC SIM SIM aa NUREG 1021, Revision NUREG 1021, Revision 9, 9, Supplement Supplement 11

Appendix CC Appendix Page 44 of Page 11 of 11 Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE INFORMATION Performance Step:

Performance Step: 33 IfIf necessary necessary to verify performance to verify performance of of Shutdown Shutdown Bank Bank AA Demand Demand Position Indication Position Indication System System prior prior to to the the required required height height change change position of position of the test, THEN the test, THEN PERFORM PERFORM the the following:

following:

Position the Position the ROD ROD BANK BANK SELECTOR SELECTOR switch switch toto the the SBA SBA position position for Shutdown for Shutdown BankBank "A". (Step 8.1.2.1)

A. (Step 8.1.2.1)

Standard:

Standard: Candidate places Candidate places the the ROD ROD BANKBANK SELECTOR SELECTOR switch switch to to the the SBA SBA position.

position.

Examiners Note:

Examiner's Note:

Examiners Cue:

Examiner's Performance of Shutdown Bank A Demand Position Indication System is required.

Comment:

Performance Step: 4 IN-HOLD-OUT lever AND RTGB step counter Using the IN-HOLD-OUT indication, POSITION Shutdown Bank A "A" rods in TWO steps.

(Step 8.1.2.2)

Standard: Candidate uses the IN-HOLD-O IN-HOLD-OUT UT lever and inserts Shutdown Bank A"A" rods from 225 steps to 223 steps.

Examiners Examiner's Note:

Note:

Comment:

Comment:

2008 2008 NRC NRC SIM SIM aa NUREG NUREG 1021, 1021, Revision Revision 9, 9, Supplement Supplement 11

Appendix CC Appendix Page 55 of Page of 11 ii Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE INFORMATION Performance Step:

Performance Step: 55 Using the Using the IN-HOLD-OUT IN-HOLD-OUT lever,lever, RETURN RETURN rods rods to to the the initial initial height height as indicated on as indicated on the the operable operable step step counter(s) counter(s) for for Shutdown Shutdown Bank Bank A.(Step 8.1.2.3)

"A".(Step 8.1 .2.3)

Standard:

Standard: Candidate uses Candidate uses the IN-HOLD-OUT lever the IN-HOLD-OUT lever and and withdraws withdraws Shutdown Bank Shutdown Bank "A" A rods rods from from 223 steps to 223 steps 225 steps.

to 225 steps.

Examiners Note:

Examiner's Note:

Comment:

Performance Step: 6 Check that Shutdown Bank "A" A individual RPI indications on ERFIS have returned to their pre-test positions. (Step 8.1.2.4) 8.1 .2.4)

Standard: Candidate checks that Shutdown Bank "A" A RPI indications on ERFIS have returned to their pre-test positions.

Examiners Examiner's Note:

Comment:

2008 NRC SIM 2008 NRC SIM aa NUREG NUREG 1021,1021, Revision Revision 9, 9, Supplement Supplement 11

Appendix C Appendix C Page 66 of Page of 11 11 Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE INFORMATION Performance Step:

Performance Step: 77 Record Initial Record Initial Rod Rod Heights Heights fromfrom the RTGB (Steps),

the RTGB (Steps), Initial Initial Rod Rod Heights from Heights from ERFIS (Inches). (Step ERFIS (Inches). (Step 8.1.3) 8.i .3)

Standard:

Standard: Candidate records Candidate records initial initial rod rod heights heights from from the the RTGB RTGB andand ERFIS.

ERFIS.

Examiners Note:

Examiner's Comment:

    • Performance Step: 8 Determine the required change in rod height based on current 8.i .4) plant conditions. (Step 8.1.4)

Standard: Plant is in Mode 11.. Rod height change is 19 steps.

22519=206 225 - 19 = 206 steps.

Examiners Note:

Examiner's Comment:

  • Performance Step: 9 Verify the ROD BANK SELECTOR switch in the SBA position for Shutdown Bank A. "A". (Step 8.1 .5) 8.1.5)

Standard: Candidate re-positions switch to the SBA position.

Examiners Examiner's Note:

Note:

Comment:

2008 NRC SIM 2008 NRC SIM aa NUREG NUREG 1021, 1021, Revision Revision 9,9, Supplement Supplement 11

Appendix C Appendix C Page 77 of Page ii of 11 Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE INFORMATION

    • Performance Step:

Performance Step: 10 10 Using the IN-HOLD-OUT Using the IN-HOLD-OUT lever lever and RTGB Step and RTGB Step Counter Counter indication, position indication, position Shutdown Shutdown Bank Bank "A" A rods rods to the required to the required number of number of steps steps as dictated by as dictated plant conditions.

by plant conditions. (Step (Step 8.1.6) 8.1 .6)

Standard:

Standard: Candidate positions Candidate positions the the IN-HOLD-OUT IN-HOLD-OUT lever lever to to IN IN position position and and inserts Shutdown inserts Shutdown BankBank "A" 19 steps to 206 A 19 206 steps.

steps.

Examiners Note:

Examiner's APP-005-F3, APP-005-06 APP-005-F3, APP-005-D6 and and APP-003-F4 will be received received during the rod during insertion.

rod insertion.

Comment:

Performance Step: 11 Record tested Rod Heights from the RTGB (Steps) and tested Rod Heights from ERFIS (Inches). (Step 8.1.7)

Standard: Candidate records Shutdown Bank "A" A Rod Heights from RTGB (Steps) and Rod Heights from ERFIS (Inches).

Examiners Note:

Examiner's Comment:

2008 NRC 2008 NRC SIM SIM aa NUREG NUREG 1021,1021, Revision Revision 9, 9, Supplement Supplement 11

Appendix C Appendix C Page 88 of Page of 11 11 Form ES-C-1 Form ES-C-i PERFORMANCE INFORMATION PERFORMANCE INFORMATION

    • Performance Step:

Performance Step: 12 12 Using the Using the IN-HOLD-OUT IN-HOLD-OUT lever, lever, return return rods rods toto the the Initial Initial Height Height (Steps) as (Steps) indicated by as indicated by the step step counters.

counters. (Step (Step 8.1.8) 8.1 .8)

Standard: positions the IN-HOLD-OUT Candidate positions IN-HOLD-OUT lever to the OUT position and begins and begins withdrawing Shutdown Shutdown BankBank "A" A rods.

rods.

Examiners Note:

Examiner's Withdrawal shall NOT be be the continuous 19 steps per Precaution 5.5.5.

Precaution Booth Operator: Insert malfunction IMF CRF03ACRFO3A to cause Rod N-7 to drop into the core AFTER the candidate starts the second withdrawal of the rods.

Comment:

    • Performance Step: 13 Candidate diagnoses a dropped rod in Shutdown Bank "A". A.

Standard: Candidate determines a dropped rod has occurred in Shutdown A by the following indications:

Bank "A"

  • Rod Bottom Light for Rod N-7
  • Prompt drop in reactor power
  • APP-005-A3; PR DROPPED DROPPED ROD
  • APP-005-C3; PR CHANNEL DEV
  • APP-005-F2; ROD BOTTOMBOTTOM ROD DROP Examiners Examiner's Note:

Note:

Comment:

Comment:

2008 2008 NRC SIM aa NRC SIM NUREG 1021, NUREG 1021, Revision Revision 9,9, Supplement Supplement i1

Appendix C Appendix C Page 99 of Page 11 of 11 Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE INFORMATION

    • Performance Step:

Performance 14 Step: 14 Stop withdrawal Stop withdrawal ofof Shutdown Shutdown Bank Bank "An A rods.

rods.

Standard:

Standard: Candidate releases Candidate releases IN-HOLD-OUT IN-HOLD-OUT lever lever to to the the HOLD HOLD position.

position.

Examiners Note:

Examiner's Note:

Comment:

    • Performance Step: 15 Informs CRSS of need to trip reactor and initiates a manual reactor trip. (Based on Caution at the beginning of Section 8.1 and Precaution 5.5.4).

Standard: Informs CRSS and depresses either reactor trip pushbutton.

Candidate verifies that reactor is tripped by Reactor Trip and Bypass breaker indication, Rod Bottom Lights, RPI indication, and Nuclear Flux decreasing.

Examiners Note:

Examiner's Comment:

ENDOFTAS END OF TASK K Termination: Reactor has been manually tripped due to aa dropped rod while in Individual Bank select mode.

STOP STOP TIME:

2008 NRC 2008 NRC SIM SIM aa NUREG NUREG 1021, 1021, Revision 9, Supplement Revision 9, Supplement 11

Appendix C Appendix C Page 10 Page of 11 10 of 11 Form Form ES-C-1 ES-C-i VERIFICATION OF VERIFICATION OF COMPLETION COMPLETION Job Performance Job Performance Measure Measure No.:

No.: 2008 NRC 2008 NRC SIM SIM aa Examinees Name:

Examinee's Name:

Date Performed:

Date Performed:

Facility Evaluator:

Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

Response

Result: SAT UNSAT Examiners Signature:

Examiner's Date:


2008 2008 NRC NRC SIM SIM aa NUREG 1021, Revision NUREG 1021, 9, Supplement Revision 9, Supplement 11

Appendix CC Appendix Page 11 Page 11 of of 11 11 Form Form ES-C-1 ES-C-i JPM CUE JPM SHEET CUE SHEET INITIAL CONDITIONS:

INITIAL CONDITIONS: The plant

    • The plant isis at at 75%

75% power.

power.

    • OST-011, OST-Ol 1, RODROD CLUSTER CLUSTER CONTROL CONTROL EXERCISE EXERCISE AND AND ROD ROD POSITION INDICATION POSITION INDICATION (Monthly)

(Monthly) is is being performed.

being performed.

    • The The prerequisites prerequisites of of Section Section 44 have have been been completed.

completed.

INITIATING CUE:

INITIATING You are to perform perform OST-011 OST-Ol 1 commencing commencing with Section Section 8.1 for Bank "A" Shutdown Bank rods.

A rods.

2008 NRC SIM 2008 NRC SIM aa NUREG 1021, Revision NUREG 1021, 9, Supplement Revision 9, Supplement 11

Appendix C Appendix C Job Job Performance Performance Measure Measure Form Form ES-C-1 ES-C-i Worksheet Worksheet Facility:

Facility: HB ROBINSON HB ROBINSON Task No.:

Task No.: 01006100101 01006100101 Task Title:

Task Title: Fill aa Safety Fill Safety Injection Injection Accumulator Accumulator lAW lAW JPM No.:

JPM No.: 2008 NRC 2008 NRC SIMSIM bb OP-202.

OP-202.

K/A

Reference:

KIA

Reference:

006 A4.01 006 A4.0l 4.1/3.9 4.1/3.9 006 A4.02 006 A4.02 4.0/3.8 4.0/3.8 006 A Al1.07

.07 3.3/3.6 Al.13 3.5/3.7 006 A1.13 Examinee: NRC Examiner:

Facility Evaluator: Date:

Date:

Method of testing:

Simulated Performance: Actual Performance: xX Classroom

- - - Simulator X

_.:....:X_ Plant READ TO THE EXAMINEE II will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions:

  • The plant is operating at 100% RTP.
  • SI ACCUM C HilLa HI/LO LVL (APP-002-E4) alarm has been received and actions have been reviewed by the RO.

8.2.1 .1 Initial Conditions have been completed.

  • Refueling Water Purification is NOT in progress.
  • You are the Licensed Dedicated Operator referred to in OP-202.
  • Safety Injection Pump "A" A has been walked down and pre-start checks are complete.

Task Standard: SI Accumulator C "C" filled to reset the lowlow level alarm without exceeding specified limits.

Required Materials: OP-202, OP-202, Revision 75, 75, Section 8.2.18.2.1 General General

References:

References:

OP-202, Revision OP-202, Revision 75, Section 8.2.1 75, Section 8.2.1 2008 NRC 2008 NRC SIM SIM bb NUREG 1021, NUREG 1021, Revision Revision 9, 9, Supplement Supplement 11

Appendix CC Appendix Job Performance Job Performance Measure Measure Form Form ES-C-1 ES-C-i Worksheet Worksheet Handouts:

Handouts: OP-202, Revision OP-202, Revision 75, 75, Section Section 8.2.1 8.2.1 Initiating Cue:

Initiating Cue: The CRSS The CRSS briefs briefs and has directed and has directed you you to to fill fill SI SI Accumulator Accumulator "C" C to to reset reset the low the low level level alarm alarm lAW lAW OP-202, OP-202, Section Section 8.2.1.

8.2.1.

Time Critical Time Critical Task:

Task: NO NO Validation Time:

Validation Time: 12 minutes 12 minutes SIMULATOR SETUP SIMULATOR

1. IC-611.
2. NO SCN Required.
3. lC-61 1 not available, reset simulator to IC-13 If IC-611 IC-i 3 and drain SI Accumulator "C" C to -61 6i %.
4. Ensure that Refueling Water Purification is NOT in progress.
5. Mark up OP-202, Section 8.2.1 with Initial Conditions Steps 8.2.1.1.a 8.2.1 .1 .a through 8.2.1.1.f.2 8.2.1 .1 .f.2 completed.
6. FREEZE the simulator until directed by the Chief Examiner to RUN.

2008 NRC 2008 NRC SIMb SIM b NUREG NUREG 1021,1021, Revision Revision 9, 9, Supplement Supplement 11

Appendix CC Appendix Page 33 of Page of 11 ii Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE INFORMATION (Denote Critical (Denote Critical Steps with an Steps with an asterisk) asterisk)

START TIME: _ __

STARTTIME:

Examiners Note:

Examiner's Note: The candidate The candidate may may use ERFIS to use ERFIS to monitor monitor SI Accumulator "c" SI Accumulator C level. (ERFIS:QP level. (ERFIS:QP ACCUM ACCUM C) C)

Performance Step:

Performance Step: 11 Check open Check open SI-856A, SI-856A, SI SI PUMP PUMP RECIRC RECIRC andand SI-8568, SI-856B, SISI PUMP PUMP RECI RC.

RECIRC.

Standard: Sl-856A and 8B checked OPEN.

Valves SI-856A Comment:

    • Performance Step: 2 Performance Verify the Control Power Defeat Switch for SI-869 is in the NORMAL position.

Standard: Locating NORMAL I/ DEFEAT key switch for SI-869 Sl-869 and placing the switch in the NORMAL position.

Examiners Examiner's Note: ** Key switch is located in the rear of the RTGB on the ECCS "ECCS VALVES CONTROL POWER DEFEAT PANEL." PANEL.

  • When the key switch is selected to NORMAL, amber light above the key switch will ILLUMINAT ILLUMINATE. E.

Comment:

Comment:

2008 2008 NRC NRC SIMb SIM b NUREG NUREG 1021, 1021, Revision Revision 9, 9, Supplement Supplement 11

Appendix C Appendix C Page 44 of Page of 11 ii Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE INFORMATION Performance Step:

Performance Step: 33 IfIf an an SI actuation isis received SI actuation received during filling, then during filling, then immediately immediately close the close the applicable applicable SI SI Accumulator makeup makeup valve valve and and perform perform Step 8.2.1.2.m Step 8.2.1 .2.m to restore restore the SI SI System System lineup.

lineup.

Standard:

Standard: Candidate acknowledges Candidate acknowledges continuous continuous action action step step in in the the event event of of an SI actuation.

Examiners Note:

Examiner's Note:

Comment:

    • Performance Step: 4 Sl-869, SI HOT LEG HDR.

Open SI-869, Standard: Valve SI-869 opened.

Examiners Note:

Examiner's Comment:

2008 NRC 2008 NRC SIMb SIM b NUREG 1021, Revision NUREG iO2i, Revision 9,9, Supplement Supplement 11

Appendix C Appendix C Page 55 of Page of 11 11 Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE INFORMATION

    • Performance Step:

Performance Step: 55 Start SI Start Pump "A".

SI Pump A.

Standard: Pump "A" SI Pump A started.

started.

Examiners Note:

Examiner's Neither SI has been run in the last 15 15 days.

When an SI Pump Pump isis started, APP-002-C3, BIT HDR HI PRESS will be received due to the cold leg leg header header being pressurized by the SI Pump. This is an expected alarm and the BOP should be directed to review the APP.

Listed below are APP-002-C3 actions:

  • Compare the indications on PI-943 P1-943 and PI-934 P1-934 to determine validity.
  • If the header high pressure is due to SI System testing, then do NOT perform actions to clear the high pressure until testing is complete or the operating SI Pump discharge valve is closed.

Comment:

Performance Step: 6 At least 11 SI Pump Area Cooling unit is operating (HVH-6A or 68 6B or both).

Standard: HVH-6A and/or 6B 68 verified operating.

Examiners Examiner's Note:

Note:

Comment:

2008 NRC 2008 SIM bb NRC SIM NUREG 1021, Revision NUREG 1021, Revision 9, 9, Supplement Supplement 11

Appendix C Appendix C Page 66 of Page of 11 11 Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE INFORMATION NOTE: The NOTE: The following following are pressure and are pressure and level level Note prior prior to Step limits/alarms for limits/alarms for the the SI Accumulators:

SI Accumulators:

Note Step 8.2.1.2.h 8.2.1.2.h ** High Pressure High Pressure Alarm 646 646 psig psig

    • Normal Operating Pressure Normal Pressure psig 630 psig
    • High Level High Level Alarm Alarm 75 percent 75 percent
    • Low Level Alarm 67 percent
    • Performance Step: 7 SI-851 C, MAKEUP.
a. Open SI-851C,
b. Monitor the level and pressure of SI Accumulator "C". C.
c. When desired level is obtained, then close SI-851 C.

SI-851C.

Standard: Sl-851C opened.

a. Valve SI-851C
b. Maintained> 614 psig and < < 646 psig pressure limits as P1-929/931 and>

indicated on PI-929/931 and > 67% and < <75%

75% level limits as indicated on U-928/930.

Ll-9281930.

Sl-851 C closed.

c. Valve SI-851 Examiners Note:

Examiner's ITS limits for SI Accumulators:

Pressure of 600 - 660 psig.

Level of 61.580.4%.

61.5 - 80.4%.

Comment:

2008 NRC 2008 NRC SIM SIM bb NUREG NUREG 1021, 1021, Revision Revision 9, 9, Supplement Supplement 11

Appendix C Appendix C Page 77 of Page 11 of 11 Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE INFORMATION

    • Performance Step:

Performance Step: 88 the operating Stop the Stop operating SI SI Pump Pump Standard:

Standard: Operating SI Operating SI Pump Pump stopped.

stopped.

Examiners Note:

Examiner's Note:

Comment:

Performance Step: 9 Verify both SI Pump Area Cooling units (HVH-6A and 68) 6B) are OFF Standard: Verifies HVH-6A and 686B are OFF.

Examiners Note:

Examiner's Comment:

2008 NRC 2008 NRC SIM SIM bb NUREG 1021, Revision NUREG 1021, 9, Supplement Revision 9, Supplement 11

Appendix C Appendix C Page 88 of Page of 11 11 Form ES-C-1 Form ES-C-i PERFORMANCE INFORMATION PERFORMANCE INFORMATION

    • Performance Step:

Performance Step: 10 10 Close SI-869, Close SI-869, 81 SI HOT LEG HDR HOT LEG HDR Standard:

Standard: Valve SI-869 Valve SI-869 closed closed and and independently independently verified verified closed.

closed.

Examiners Note:

Examiner's When an independent verification of Valve SI-869 Sl-869 is candidate that the valve has been requested, inform the candidate independently verified closed.

independently Comment:

    • Performance Step: 11 Place the Control Power Defeat switch for SI-869 S1-869 in the DEFEAT position.

Standard: Valve SI-869 control power switch has been positioned to DEFEAT.

Examiners Cue:

Examiner's When an independent verification of SI-869 Control Power switch is requested, inform the candidate that the switch has been independently verified in the DEFEAT position.

Examiners Examiner's Note: When switch is positioned to DEFEAT position, amber light above the switch will extinguish.

Comment:

2008 2008 NRC NRC SIM SIM bb NUREG 1021, NUREG 1021, Revision Revision 9,9, Supplement Supplement 11

Appendix C Appendix C Page 99 of Page of 11 11 Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE INFORMATION Performance Step:

Performance Step: 12 12 IF the IF the Refueling Refueling Water Water Purification Purification Pump Pump was was stopped stopped inin Step Step 8.2.1.1 .f, THEN B.2.1.1.f, perform the THEN perform the following:

following:

    • Open SFPC-B05B, Open SFPC-805B, RWST RWST RETURN.

RETURN.

    • Start the Start the Refueling Refueling Water Water Purification Purification Pump.

Pump.

Standard: Candidate determines that the RWST purification purification was NOT in places Nt progress from the initial conditions and places As in these steps.

N/As Examiners Note:

Examiner's Comment:

END OF OFTASK TASK Terminating Cue: SI Accumulator C "C" has been filled to clear the low low level alarm.

STOP STOP TIME:

TIME:

2008 200B NRC NRC SlMb SIM b NUREG 1021, NUREG 1021, Revision Revision 9,9, Supplement Supplement 11

Appendix C Appendix C Page 10 Page of 11 10 of 11 Form Form ES-C-1 ES-C-i VERIFICATION OF VERIFICATION COMPLETION OF COMPLETION Job Performance Job Performance Measure Measure No.:

No.: 2008 NRC 2008 NRC SIM SIM bb Examinees Name:

Examinee's Name:

Date Performed:

Date Performed:

Facility Evaluator:

Facility Number of Attempts:

Time to Complete:

Question Documentation:

Question:

Response

Result: SAT UNSAT Examiners Examiner's Signature: Date:


2008 NRC 2008 NRC SIM SIM bb NUREG NUREG 1021, 1021, Revision Revision 9, 9, Supplement Supplement 11

Appendix C Appendix C Page 11 Page 1 1 of 11 of 11 Form Form ES-C-1 ES-C-i JPM CUE JPM CUE SHEET SHEET INITIAL CONDITIONS:

INITIAL CONDITIONS: The plant

    • The plant isis operating operating atat 100%

100% RTP.RTP.

    • SI SI ACCUM ACCUM C HI/LO LVL C HIILO LVL (APP-002-E4)

(APP-002-E4) alarm has been alarm has been received received and and actions have actions have been been reviewed reviewed by by the the RO.

RO.

    • OP-202, OP-202, Section Section 8.2.1.1 8.2.1 .1 Initial Initial Conditions Conditions have have been been completed.

completed.

    • Refueling Refueling Water Purification Purification is is NOT NOT inin progress.

progress.

    • You are the Licensed Dedicated Dedicated Operator referred to in OP-202.
    • Safety Safety Injection Injection Pump Pump "A" has been A has been walked down down and and pre-start pre-start checks are complete.

INITIATING CUE: The CRSS briefs and has directed you to fill SI Accumulator "C" C to reset the low level alarm lAW OP-202, Section 8.2.1.

2008 2008 NRC NRC SIMb SIM b NUREG NUREG 1021, 1021, Revision Revision 9, 9, Supplement Supplement 11

Appendix C C Job Performance Measure Form ES-C-i ES-C-1 Worksheet Facility: HB ROBINSON Task No.: 01000109605 Task Title: Isolate Ruptured S/G lAW PATH-2. JPM No.: 2008 NRC SIM c K/A

Reference:

KIA 038 EK3.02 4.4/4.5 038 EA2.09 3.2/3.3 038 EA1.i1 EA 1.11 3.8/3.9 038 EA1.16 EA 1.16 4.4/4.3 038 EA1.18 4.0/3.9 Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testing:

Simulated Performance: Actual Performance: X Classroom - - - Simulator --X - Plant READ TO THE EXAMINEE II will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions: ** The plant was operating at 100% RTP.

  • S/G "A"A has been identified as ruptured.
  • Grid location 8-6B-6 (Maintain at least ONE S/G available for RCS Cooldown) of PATH-2 has just been reached.
  • Supplement G actions have NOT been completed.

Task Standard: S/G "A"A is isolated per PATH-2 and Supplement N.

Required Materials: PATH-2, Revision 17 and Supplement N, Revision 35.

General

References:

PATH-2, Revision 17 and Supplement N, Revision 35.

Handouts: None Initiating Cue: The CRSS directs you to completely isolate S/G "A" A starting at PATH-2 grid location 8-6B-6 (Ruptured S/G identified) in preparation for a rapid cooldown.

2008 NRC SIM c NUREG 1021, Revision 9, Supplement 11

Appendix C Appendix C Job Performance Job Performance Measure Measure Form Form ES-C-1 ES-C-i Worksheet Worksheet Time Critical Time Critical Task:

Task: NO NO Validation Time: minutes 20 minutes SIMULATOR SETUP

1. IC-614.
1.10-614.
2. SCN 006_JPM_S4.

lC-61 4 is not available, reset simulator to IC-13

3. If IC-614 IC-i 3 and perform the following:

Vi-3A to the OPEN position - IMF MSS03A

a. Override MSIV V1-3A MSSO3A f:FAIL_ TO_CLOSE.

f:FAIL_TO_CLOSE.

b. Override MSIV V1-3A Vi -3A OPEN /I CLOSED indication AS IS - lOR IOR doMSSDDOO49B f:OFF and lOR doMSSDD00498 IOR doMSSDD0049C doMSSDDOO49C f:ON.
c. Insert 300 GPM tube rupture on S/G - SGNO2A.

SIG A - MFI SGN02A.

d. Carry out actions of PATH-1 PATH-i and PATH-2 until Step 8-6 B-6 is reached then FREEZE.
4. Ensure PATH-2 is marked up to Step B-6. 8-6. Have a copy of SUPPLEMENT N N available for the operator to use and mark up.

2008 NRC 2008 NRC SIM SIM cc NUREG NUREG 1021, 1021, Revision 9, Supplement Revision 9, Supplement 11

Appendix CC Appendix Page 33 of Page of 15 15 Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE INFORMATION (Denote Critical (Denote Critical Steps Steps with with an an asterisk) asterisk)

START TIME: _ __

STARTTIME:

Performance Step:

Performance Step: 11 Maintain at Maintain least one at least one S/G SIG available available for for RCS RCS cooldown.

cooldown.

Standard:

Standard: Operator identifies Operator identifies S/Gs and "c" B and S/Gs "B" are available C are available for for RCS RCS cooldown.

cooldown.

Examiners Note:

Examiner's Note:

Comment:

    • Performance Step: 2 Performance Verify ruptured Steam Line PORV setpoint at 1035 psig using status board.

Standard: Operator adjusts potentiometer potentiometer to 3.36, steam line PORV setpoint at 1035 psig, by comparing Status Board setpoint for A PORV with potentiometer S/G "A" potentiometer setting for RV1-1.

RV1 -1.

Examiners Note:

Examiner's Comment:

2008 2008 NRC NRC SIM SIM cc NUREG NUREG 1021, 1021, Revision Revision 9, 9, Supplement Supplement 11

Appendix CC Appendix Page 44 of Page of 15 15 Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE INFORMATION

    • Performance Step:

Performance Step: 33 Verify RCS Verify temp less RCS temp less than than 547 547 of

°F prior prior to to MSIV MSIV closure.

closure.

Standard:

Standard: Operator dumps Operator dumps steam steam to to lower lower RCS RCS temperature temperature below below 547547 of

°F using Steam using Steam Line Line PORVs PORVs or or Condenser Condenser Steam Steam Dumps.

Dumps.

    • Condenser Steam Condenser Steam Dumps:

Dumps:

    • PC-464B to MANUAL Take PC-464B MANUAL and adjust valvevalve position position using UP using UP oror DOWN DOWN pushbuttons.

pushbuttons.

    • PC-464B in PC-464B in Automatic, Automatic, adjust adjust potentiometer potentiometer toto aa lower lower setting to reduce RCS temperature.

Examiners Note:

Examiner's Comment:

Performance Step: 4 Close ruptured S/G MSIV AND MSIV bypass.

Standard: After RCS temperature less than 547 °F, of, Operator attempts to close MSIV.

MSIV.

Examiners Examiner's Note:

Note: MSIV will NOT MSIV NOT close.

close.

Comment:

Comment:

2008 2008 NRC NRC SIMSIM cc NUREG 1021, NUREG 1021, Revision Revision 9, 9, Supplement Supplement 11

Appendix C Appendix C Page 55 of Page of 15 15 Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE INFORMATION Performance Step:

Performance Step: 55 Ruptured S/G Ruptured SIG MSIV MSIV AND AND MSIV MSIV Bypass Bypass Closed.

Closed.

Standard:

Standard: Operator responds Operator responds NO, NO, MSIV MSIV A A will will not not close.

close. Will Will transition transition to to Supplement N Supplement to complete N to complete the the isolation.

isolation.

Examiners Note:

Examiner's Note: The Operator will go to Supplement N N to address the method of isolating the ruptured S/G.

alternate method SIG.

Comment:

Supplement N Actions Performance Step: 6 Verify BOTH Turbine Stop Valves CLOSED. (Step 1)

Standard: Operator verifies BOTH Turbine Stop Valves indicate CLOSED on the RTGB.

Examiners Note:

Examiner's Turbine Stop and Bypass Valves were closed when the plant tripped.

Comment:

2008 2008 NRC NRC SIMc SIM c NUREG NUREG 1021, 1021, Revision 9, Supplement Revision 9, Supplement 11

Appendix C Appendix C Page 66 of Page 15 of 15 Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE INFORMATION

    • Performance Step: 7 Performance ALL Condenser Verify ALL Condenser Steam Steam Dump Dump Valves CLOSED CLOSED (Step(Step 2) 2)

Standard:

Standard: Operator closes Operator closes the the condenser condenser dump isolation valves, dump isolation valves, and and indicate CLOSED verifies that ALL valves indicate CLOSED (GREEN).

(GREEN).

    • NE COND DUMP NE DUMP 1324A-1 1324A-1
    • NW COND DUMP NW COND DUMP 1324B-1 1324B-1
  • SE COND DUMP 1324A-2
    • W COND DUMPDUMP 1324B-3 1324B-3
  • SW COND DUMP 1324B-2 Examiners Note:

Examiner's Condenser steam dump valves can be closed by placing PC- PC 464B in MAN and closing ALL valves OR place the Steam 4648 Dump Control to OFF.

Comment:

Performance Step: B8 Verify ALL MSR Purge Valves CLOSED (Step 3)

Standard: Operator verifies valves MS-V1 i A, MS-Vi MS-V1-6-1 1 B, MS-V1 MS-V1-6-1 MS-V1-6-2A 2A and MS-V1 2B are closed at the RTGB by observing green MS-V1-6-2B lights illuminated illuminated the MSR Purge isolation valves.

Examiners Examiner's Note:

Note:

Comment:

Comment:

2008 NRC 2008 SIM cc NRC SIM NUREG 1021, NUREG 1021, Revision Revision 9,9, Supplement Supplement 11

Appendix CC Appendix Page 77 of Page 15 of 15 Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE INFORMATION Performance Step:

Performance Step: 99 Verify ALL Verify ALL MSR MSR Shutoff Valves CLOSED Shutoff Valves CLOSED (Step(Step 4) 4)

Standard:

Standard: Operator verifies Operator verifies MS-V1-5-1 MS-Vi i A,A, 11 B, 2A, && 2B B, 2A, 2B valves valves are are closed closed at at the RTGB by the RTGB by observing observing green green lights lights illuminated illuminated the the MSR MSR Shutoff Shutoff isolation valves.

isolation valves.

Examiners Note:

Examiner's Note:

Comment:

  • Performance Step: 10 Performance Go To Step 6 to address the S/G SIG "A"A MSIV NOT closing. (Step 5)

Verify the S/G "B"B & "C" C MSIVs CLOSED. (Step 6)

Standard: Operator closes MSIVs V1-3B Vi -3B and Vi -3C for S/Gs V1-3C B & "C".

S!Gs "B" C.

Examiners Examiner's Note:

Comment:

2008 NRC 2008 NRC SIM SIM cc NUREG NUREG 1021, 1021, Revision 9, Supplement Revision 9, Supplement 11

Appendix C Appendix C Page of 15 Page 88 of 15 Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE INFORMATION

    • Performance Step:

Performance Step: 11 11 Verify steam supply Verify steam supply valve valve to to SDAFW SDAFW pump pump from from S/G SIG "A" A

CLOSED. (Step CLOSED. (Step 7) 7)

Standard:

Standard: Operator CLOSES Operator Vi -8A, Steam CLOSES V1-8A, Steam Shutoff Shutoff and and Goes Goes to to Step Step 14.

14.

Examiners Cue:

Examiner's Examiners Note:

Examiner's Note:

Comment:

    • Performance Step: 12 Dispatch an Operator to perform the following: (Step 14) a) Check BOTH the Turbine Stop Valve Bypass valves MS- MS 297 & 298 CLOSED.

b) Close Gland Seal Steam Supply Inlet Valve, GS-31.GS-3i.

c) Close ALL Condenser Steam Dump Trap Isolation valves

  • MS-128, PRV-1324A-2, Trap T-67 Inlet PRV-i 324A-1, Trap T-66 Inlet MS-i 33, PRV-1324A-1,
  • MS-133, PRV-i324B-2, Trap T-69 Inlet MS-i 39, PRV-1324B-2,
  • MS-139,
  • MS-145, PRV-1324B-i, Trap T-68 Inlet MS-i45, PRV-1324B-1,
  • MS-148, PRV-i324B-3, PRV-1324B-3, Trap T-70 Inlet Standard: Operator directs AO to close and / or verify the valves closed.

Examiners Examiner's Note:

Examiners Examiner's Cue:

Cue: When directed by by operator, operator, acknowledge request.

request. Report that all valves are closed.

Comment:

2008 2008 NRC NRC SIM SIM cc NUREG NUREG 1021, 1021, Revision 9, Supplement Revision 9, Supplement 11

Appendix CC Appendix Page 99 of Page of 15 15 Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE INFORMATION Performance Performance Step:

Step: 13 13 Check ALL Check actions of ALL actions of Supplement Supplement NN complete.

complete. (Step (Step 15) 15)

Standard:

Standard: Operator informs Operator informs CRSS CRSS that that ALL ALL actions actions of of Supplement Supplement N N are are complete.

complete.

Examiner's Examiners Note:

Note: This completes This completes the actions of the actions of Supplement Supplement N, the Operator N, the Operator should now should now resume resume PATH-2 PATH-2 atat Step Step 8-8.

B-8.

Comment:

Performance Step: 14 Use intact Steam Line PORVs for steam dump.

Standard: Operator uses intact steam line PORVs for steam dump (S/G (SIG '8' B

C only).

and 'C' Examiners Note:

Examiner's Comment:

Performance Step:

Performance Step: 15 15 Ruptured S/G isolated isolated from at least one intact SIG.

S/G.

Standard:

Standard: Operator Operator answers YES,YES, Ruptured Ruptured SIG S/G is is isolated isolated from atat least least one S/G.

S/G.

Examiners Examiner's Note:

Note:

Comment:

Comment:

2008 2008 NRC NRC SIMSIM cc NUREG 1021, Revision NUREG 1021, Revision 9,9, Supplement Supplement 11

Appendix C Appendix C Page 10 Page 10 of of 15 15 Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE INFORMATION Performance Step:

Performance Step: 16 16 WHEN ruptured WHEN ruptured S/G press decreases S/G press decreases below below 1035 1035 psig psig THEN THEN verify ruptured steam verify ruptured steam line line PORV PORV closed.

closed.

Standard:

Standard: Operator verifies Operator verifies PORV PORV RV1-1RV1 -i closed closed when when S/G S!G 'A' A pressure pressure less than 1035 less than 1035 psig.

psig.

Examiners Note:

Examiner's Comment:

Comment:

Performance Step: 1717 IF MDAFW pump is not available, THEN maintain at least one SIG supply to SDAFW pump.

S/G Standard: Operator verifies both MDAFW pumps available.

Examiners Note:

Examiner's Comment:

Performance Step: 1818 Close ruptured SIGS/G steam shutoff to SDAFW pump.

Standard: Operator verifies MS-V1 MS-V1-8A -8A closed.

Examiner's Note:

Examiners Comment:

2008 NRC 2008 NRC SIM SIM cc NUREG 1021, NUREG 1021, Revision Revision 9, 9, Supplement Supplement 11

Appendix C Appendix C Page 11 Page of 15 1 1 of 15 Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE INFORMATION Performance Performance Step:

Step: 19 19 Verify S/G Verify blowdown isolation S/G blowdown isolation and sample valves and sample valves closed.

closed.

Standard:

Standard: Operator verifies Operator verifies S/G SIG 'A' blowdown isolation A blowdown isolation and and sample sample valves valves closed (FCV-1930 closed (FCV-1930 A&B, A&B, FCV-1933 FCV-1933 A&B)

A&B) byby Phase Phase A panel A panel status light illuminated status light illuminated on on RTGB.

RTGB.

Examiners Note:

Examiner's Phase A panel status light Phase light illuminates illuminates when all of the blowdown and blowdown and sample isolation valves for S/G sample isolation SIG A are are closed.

closed.

Candidate may use SPDS function for Containment to verify SIG Blowdown and Sample valves are closed.

that all S/G Comment:

    • Performance Step: 20 Locally close warmup steam supply from ruptured S/G SDAFW pump.

SIG to Standard: Operator dispatches an AO to locally close warmup steam supply from S/G A 'A' to SDAFW pump.

Booth Operator Note: When directed by operator, acknowledge request. Close valve MS-20 by selecting Remote Function MSS047 (IRF MSSO47 MSS047 1:0).

f:O). Report back that valve is closed.

Comment:

2008 NRC 2008 NRC SIM SIM cc NUREG NUREG 1021,1021, Revision Revision 9, 9, Supplement Supplement 11

Appendix CC Appendix Page 12 Page 12 ofof 15 15 Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE INFORMATION Performance Step:

Performance Step: 21 21 Locally close Locally close MSIV above and MSIV above and below below seatseat drains drains fromfrom ruptured ruptured SIG.

S/G.

Standard:

Standard: These are These locked valves are locked valves thatthat are are part part ofof the the CV CV Integrity Integrity boundary in boundary in the the steam lines and steam lines and do do not not require require local local action action to to verify the verify valves are the valves are shut.

shut. These These valves valves are normally locked are normally locked closed and closed and aa dedicated dedicated operator operator is provided to is provided to close close them them in in the the event that event that an an accident accident takes takes place.

place. ItIt is is expected expected that that ifif aa valve valve has been has opened the CRSS been opened CRSS would be be aware of of it.

it. The Operator Operator may dispatch may dispatch an an AO AO toto close close MSIV MSIV MS-V1-3A MS-V1 -3A aboveabove and and belowbelow seat drains seat drains from from S/G SIG 'A'.

A.

Booth Operator Note: If directed by operator, acknowledge request. Report back valves closed.

Comment:

Performance Step: 22 Isolate feed flow to any ruptured S/G SIG that is faulted unless needed for RCS cooldown.

Standard: Operator determines that the S/G 'A' A is not faulted.

Examiners Note:

Examiner's Comment:

  • Performance Performance Step: 23 When ruptured S/G S/G level greater than 8% [18%] then isolate feed flow.

Standard:

Standard: Operator checks level Operator level greater greater than 8% 8% andand isolates isolates feed flow to to SIG S/G A by closing

'A' by closing V2-14A V2-14A and and V2-16A.

V2-16A.

Examiners Examiner's Note:

Note:

Comment:

Comment:

2008 NRC 2008 SIM cc NRC SIM NUREG NUREG 1021,1021, Revision Revision 9, 9, Supplement Supplement 11

Appendix CC Appendix Page 13 Page 13 of of 15 15 Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE INFORMATION

    • Performance Step:

Performance 24 Step: 24 Open breakers Open breakers for for any any V1-8, Vi -8, V2-14, V2-1 4, and and V2-16 V2-1 6 valve valve closed closed to to isolate ruptured isolate ruptured S/G.

S/G.

Standard:

Standard: Operator contacts Operator contacts AO AO toto open open breakers breakers for for V1-8A, Vi -8A, V2-14A V2-1 4A and and V2-1 6A.

V2-16A.

Booth Operator Booth Operator Note:

Note: IRF EPSMCC5_189 IRF EPSMCC5_189 f:RACK_OUT f:RACK_OUT IRF EPSMCC10_262 IRF EPSMCC1O_262 f:RACK_OUT f:RACK_OUT IRF EPSMCC10_264 IRF EPSMCC1O264 f:RACK_OUT f:RACK_OUT IRF EPSMCC9_255 IRF EPSMCC9_255 f:RACK_OUT f:RACK_OUT Valve V2-16A Note: Valve V2-i 6A has has 22 power power supplies, Normal and Emergency.

Emergency.

Comment:

Terminating Cue: Ruptured SIG has been isolated lAW Supplement N.

STOP STOP TIME:

2008 NRC 2008 NRC SIM SIM cc NUREG NUREG 1021, 1021, Revision Revision 9,9, Supplement Supplement 11

Appendix C Appendix C Page 14 of Page 14 of 15 15 Form Form ES-C-1 ES-C-i VERIFICATION OF VERIFICATION OF COMPLETION COMPLETION Job Performance Job Performance Measure Measure No.:

No.: 2008 NRC 2008 NRC SIM SIM cc Examinees Name:

Examinee's Name:

Date Performed:

Date Performed:

Facility Evaluator:

Number of Attempts:

Number Time to Complete:

Question Documentation:

Question:

Response

Result: SAT UNSAT Examiners Examiner's Signature: Date:


2008 NRC 2008 NRC SIM SIM cc NUREG 1021, Revision NUREG 1021, 9, Supplement Revision 9, Supplement 11

Appendix C Appendix C Page 15 Page of 15 15 of 15 Form Form ES-C-1 ES-C-i JPM CUE JPM SHEET CUE SHEET INITIAL CONDITIONS:

INITIAL CONDITIONS: ** The plant was The plant was operating operating atat 100%

100% RTP.

RTP.

Injection.

    • S/G A has S/G "A" has been been identified identified as as ruptured.

ruptured.

  • Grid location 8-6 B-6 (Maintain at least least ONE S/G available for RCS Cooldown) of PATH-2 has just been reached.
    • Supplement Supplement G actions have G actions have NOT NOT been been completed.

completed.

INITIATING CUE: The CRSS directs you to completely isolate S/G "A" A starting at B-6 (Maintain at least ONE S/G available for RCS grid location 8-6 Cooldown) of PATH-2 in preparation for a rapid cooldown.

2008 2008 NRC NRC SIM SIM cc NUREG NUREG 1021,1021, Revision Revision 9, 9, Supplement Supplement 11

YES ANY S/G WITH UNCONTROLLED LEVEL INCREASE NO ANY S/G VERIFY RUPTURED STEAM YES SAMPLE WITH AT HIGH ACTIVITY NO NO R-31A, B, AND C RAD LEVELS NORMAL YES NO R-19A, B, C ~

NO RUPTURED S/G R-15 RAD MSIV ~ MSIV LEVELS NORMAL BYPASS CLOSED YES YES PERFORM SUPPLEMENT SEARCH FOR AND N FOR RUP.TURED S/G ATTEMPT TO IDENTIFY X4 WHEN RUPTURED S/G oN RUPTURED S/G PRESS DECREASES BELOW I 1035 PSIG WE!+/- THEN VERIFY I RUPTURED STEAM LINE PORV FLOSED

. LOSED USE INTACT STEAM LINE PORVs FOR STEAM DUMP 41E MDAJW F UMP IS NON 1

AVAJLABLE, ThEN MAJNTAJN AT LEAST ONE S/G

\PPLY TO ?DAFW PUM)

RUPTURED S/G ISOLATED FROM AT LEA,s-;.3I-O-si.... CLOSE RUPTURED ONE INTACT S/G S/C S/G STEAM SHUTOFF SDAFW PUMP TO SDAF'I'

/RIFY S/C BLOWDOWN ISOLATION SAMPLE VALVES CLOSED (LOCALLY LOCALL Y CLOSECLOSE WAN WARMUP I STEAM STEAM SUPPLY SUPPLY FROM FROM RUPTURED S/C S/G TO SDAFW TO SDAFW PUMP PUMP LOCALLY LOCALL Y CLOSE CLOSE MSIV MSIV ABOVE AND BELOW BELOW SEAT ORAJNS DRAINS RUP1URED S/C FROM RUPTURED S/G 4iSOLATE ISOLATE FEED FLOW FLOW TO ANY ANY RUPTURED RUPTURED S/C S/G THAT THAT I IS IS FAULTED FAULTED UNLESS UNLESS NEEDED NEEDED FOR FOR RCSRCS COO COO DOWN DOWN fLbEN RUP URED S/\

LEVEL GREATER THAN 8Z 118X], INEbI ISOLATE FEED FLOW

~ OPEN OPEN BREAKERS BREAKERS FOR FOR ANY ANY V1-8,V1-B, V2-4 V2-14 AN2 ~

I V2-16 V2-16 VALVEVALVE CLOSED CLOSED TO TO

\.ISOIATE ISOLATE RUPTURED RUPTURED S/C S/G I

Rev.

Rev. 35 35 EPP-Supplements EPP-Supplements SUPPLEMENTS SUPPLEMENTS Page 72 72 of 89 89

-L1-t INSTRUCTIONS j

CONTINUOUS USE

[ RESPONSE NOT OBTAINED Supplement N N Isolation of a Ruptured SIG S!G From Intact SIGs S/Gs (Page 11 of 5) erify BOTH Turbine Stop Valves

~f--- - CLOSED

-

NOTE Local operation of the Steam Dump valves below is via reverse acting handwheels.

erify ALL Condenser Steam Dump

)_-Valve S - CLOSED Yf6

-

(1324A-1)

(1324B-1)

    • SE COND DUMP (l324A - 2)

(1324A-2)

. COND DUMP (l324B- 3)

(1324B-3)

SW COND DUMP (l324B-2)

(1324B-2)

Verify ALL MSR PURGE Valves - -

CLOSED y'f~

-

    • MS-Vl-6-1A MS-V1-6-1A
    • MS-Vl-6-1B MS-V1-6-1B
    • MS-Vl-6-2A MS-V1-6-2A
    • MS-Vl-6-2B MS-V1-6-2B

Rev. 35 35 EPP-Supplements EPP-Supplements SUPPLEMENTS SUPPLEMENTS 73 of Page 73 of 89 89

-j-c INSTRUCTIONS INSTRUCTIONS I I CONTINUOUS USE RESPONSE NOT OBTAINED Supplement NN Isolation of a Ruptured Ruotured S/G S/C From Intact S/Gs S/Os

~

(Page 22 of 5)

. . MSR SIUTOFF Valves -

Verify ALL MSR,~UTOFF -

CLOSED CLOSED 1~3

  • MS-V1-5-1A MS-Vl-5-1A
  • MS-V1-5-1B MS-Vl-5-1B
  • MS-V1-5-2A MS-Vl-5-2A
  • MS-V1-5-2B MS-Vl-5-2B NOTE This procedure is designed to handle ONLY one stuck open MSIV.

/

Go Go To Appropriate Step From Following Table:

Z/ -

STUCK MSIV c..Yl-3A p

L

!/sTEP

-TEP 6~

-/

Vl-3B V1-3B 99 Vl- 3C V1-3C 12 12

~rifY I

~~OSED Verify The BB && CC S/C S/G MSIVs - -

Ye~

CLOSED

~ -

.

  • erify Steam erify SDAFW Pump SDAFW Pump From Supply Valve Steam Supply From S/C Vl-8A, STEAM V1-8A, Valve To S/G A-STEAM SHUTOFF SHUTOFF To "A"- CLOSED CLOSED

)v't?~

To Step To Step 14 14

Rev. 35 EPP-Supplements SUPPLEMENTS Page 74 of 89

] STEP_H INSTRUCTIONS CONTINUOUS USE I RESPONSE NOT OBTAINED Supplement N Isolation of a Ruptured S/G From Intact S/Gs (Page 33 of 5)

9. Verify The AA &

& C C S/G MSIVs --

CLOSED

10. Verify Steam Supply Valve To SDAFW Pump From S/G "B"-

B- CLOSED

  • Vl-8B, V1-8B, STEAM SHUTOFF
11. Go To Step 14
12. Verify The AA &

& B S!G MSIVs -

B S/G -

CLOSED

13. Verify Steam Supply Valve To SDAFW Pump From 5/0 C- CLOSED S/G "C"-
  • Vl-8C, STEAM SHUTOFF

Rev. 35 EPP-Supplements SUPPLEMENTS Page 75 of 89

] STEP INSTRUCTIONS CONTINUOUS USE I RESPONSE NOT OBTAINED Supplement N N Isolation of a Ruptured SIG S/G From Intact SIGs S/Gs

~ (Page 4 of 5)

~!~~~~~hT~: ~~~~~~~~gT~ocal ispatch An Operator To Perform The Following Local Actions:

4~eck

/heck BOTH the TURBINE STOP

~ALVE VALVE BYPASS Valves - CLOSED -

a. Perform the following:
1) Verify ALL Governor valves
    • MS-297 are closed.
    • MS-298 MS-298 2) Contact Plant Operations Staff to intiate action to fail the valves closed.

~ose Gland

~~lve, Valve, Seal Steam Supply lose Gland Seal Steam Supply GS-31, STEAM SUPPLY GS-31, STEAM SUPPLY I ET

~::*

~~~p lose ALL Condenser Steam Dump Trap Isolation Valves

    • 115-128, PRV-1324A-2 TRAP MS-128, T-67 INLET
    • MS-133, PRV-1324A-1 TRAP T-66 INLET
    • MS -139, PRV-1324B-2 TRAP 115-139, T-69 INLET
    • MS-145, PRV-1324B-1 TRAP T-68 INLET
  • MS-148, PRV-1324B-3 TRAP T-70 INLET ieck ALL Actions Supplement N N -- WHEN ALL actions have been COMPLETE THEN notify the CRSS completed, THEN that Supplement NN is complete.

IF an action can NOT be completed, THEN notify the CRSS completed, status.

of its status.

Rev. 35 EPP-Supplements SUPPLEMENTS Page 76 of 89

STEP H INSTRUCTIONS CONTINUOUS USE I RESPONSE NOT OBTAINED I

Supplement NN Isolation of a Ruptured S/G S/C From Intact S/Gs S/Cs (Page 55 of 5) tify The CRSS That Supplement

)tify Is Complete

- END -

- -

Appendix C Appendix C Job Performance Job Perlormance MeasureMeasure Form Form ES-C-1 ES-C-i Worksheet Worksheet Facility:

Facility: HB ROBINSON HB ROBINSON Task No.:

Task No.: 01026100101 01026100101 Task Title:

Task Title: Manually Initiate Manually Initiate Containment Containment Spray Spray JPM No.:

JPM No.: 2008 NRC 2008 NRC SIM SIM dd lAW PATH-1.

lAW PATH-i.

Reference:

K/A

Reference:

KIA 026 A3.01 026 A3.01 4.3/4.5 4.3/4.5 026 A4.01 026 A4.01 4.5/4.3 4.5/4.3 Examinee:

Examinee: NRC Examiner:

NRC Examiner:

Facility Evaluator:

Facility Evaluator: Date:

Date:

Method of Method of testing:

testing:

Simulated Performance: Actual Performance: xX Classroom ---

Simulator X

_.:....:X_ Plant READ TO THE EXAMINEE II will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions:

Initial Conditions: ** You are the RO.

  • PATH-1 PATH-i has been implemented and is complete through grid location B-6, Restart

'Restart Battery Chargers within 30 minutes of power loss using OP-60i.

OP-601'.

  • Foldout A "A" is in effect.

Task Standard: Containment Spray is manually aligned lAW PATH-i. PATH-1.

Required Materials:

Materials: PATH-i, PATH-1, REACTOR REACTOR TRIP TRIP AND AND SAFETY SAFETY INJECTION, INJECTION, Rev.Rev. 1818 General General

References:

References:

PATH-i, PATH-1, REACTOR REACTOR TRIP TRIP AND AND SAFETY SAFETY INJECTION, INJECTION, Rev.Rev. 1818 Handouts:

Handouts: PATH-i, PATH-1, REACTOR REACTOR TRIP TRIP AND AND SAFETY SAFETY INJECTION, INJECTION, Rev.Rev. 1818 Initiating Initiating Cue:

Cue: The The CRSS CRSS has has directed directed you you to to continue continue PATH-i PATH-1 execution.

execution.

Time Time Critical Critical Task:

Task: NO NO Validation Validation Time: Time: 10 10 minutes minutes 2008 2008 NRC NRC SIM SIM dd NUREG 1021, NUREG 1021, Revision Revision 9, 9, Supplement Supplement 11

Appendix CC Appendix Job Performance Measure Job Performance Measure Form Form ES-C-1 ES-C-i Worksheet Worksheet SIMULATOR SETUP SIMULATOR SETUP 1.

1. IC-615.

IC-61S.

2.

2. SCN: 006_JPM_SS.

SCN: 006_JPM_S5.

2008 NRC SIM 2008 NRC SIM dd NUREG 1021, NUREG 1021, Revision Revision 9, 9, Supplement Supplement 11

Appendix C Appendix C Page 33 of Page of 88 Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE INFORMATION (Denote Critical (Denote Critical Steps Steps with with an an asterisk) asterisk)

    • Performance Step:

Performance Step: 11 CV pressure CV pressure remained remained below below 10 10 psig.

psig.

Standard:

Standard: Candidate checks Candidate checks CV CV pressure and determines determines itit has has NOT NOT remained below 1010 psig.

Examiners Note:

Examiner's Note:

Comment:

    • Performance Step: 2 Verify CV Spray initiated.

Standard: Identifies CV Spray has NOT been initiated.

Examiners Note:

Examiner's NO CV Spray pumps are running, SI-880Al8/C/D SI-880A/B/C/D are closed.

The candidate may depress the CV Spray pushbuttons, push buttons, but they will be unsuccessful. The candidate may also return to Foldout A to stop RCPs due to low subcooling.

"A" Comment:

2008 NRC 2008 NRC SIM SIM dd NUREG 1021, Revision NUREG 1021, 9, Supplement Revision 9, Supplement 11

Appendix C Appendix C Page 44 of Page of 88 Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE INFORMATION

    • Performance Step:

Performance Step: 33 Verify all Verify CV Spray all CV Spray pumps pumps running running with with valves valves properly properly aligned.

aligned.

Standard: Candidate attempts to start CV Spray Candidate Pumps "A" Spray Pumps A and and "B",

B, and open SI-845 and SI-880 valves. Candidate Candidate should recognize recognize and report that report that CV CV Spray Spray Pump Pump "A" A will will NOT NOT start.

start.

Examiners Note:

Examiner's Acknowledge candidates report. Starting CV Spray Pump B and aligning "8" "8" B train valves satisfies the requirement oftheJPM.

of the JPM.

Supplement 8 B valves and required positions for CV Spray B:

Train 8:

- Sl-844B, PUMP 8B INLET - OPEN SI-8448,

- SI-845B, SAT DISCH - OPEN SI-8458,

- Sl-845C, SAT THROTTLING - THROTTLED TO -12 SI-845C, -

GPM

- Sl-880C, PUMP 8B DISCH - OPEN SI-880C,

- SI-880D, Sl-880D, PUMP 8 B DISCH - OPEN

Note: Opening either SI-880C or SI-880D SI-8800 will provide CV Spray flow path to the CV.

Comment:

Performance Step: 4 Verify approximately 1212 GPM spray additive tank flow.

Standard:

Standard: Candidate observes Fl-949 FI-949 indicates - 20 GPM and manually

adjusts Sl-845C SI-845C until flow is 12-12 GPM.

Examiners Examiner's Note:

Note:

Comment:

Comment:

2008 NRC 2008 NRC SIM SIM dd NUREG NUREG 1021,1021, Revision Revision 9,9, Supplement Supplement 11

Appendix C Appendix C Page 55 of Page of 88 Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE INFORMATION

    • Performance Step:

Performance Step: 55 Verify Phase Verify Phase BB isolation isolation valves valves closed.

closed.

Standard:

Standard: Candidate shuts Candidate shuts Phase Phase BB isolation isolation valves valves CCW-716A CCW-71 6A OR OR 716B, 71 6B, CCW-730, CCW-626 CCW-730, CCW-626 OR OR 735735 and and CVC-381 CVC-381 using using RTGB RTGB control control switches. Only switches. Only 11 of either CCW-716A of either CCW-71 6A or BB is is required required for for either CCW-626 or 735 completion. Only 11 of either 735 is required for completion.

Examiners Note:

Examiner's Note: Supplement B valves that will close on a Phase B signal:

- CVC-381, SEAL WTR RTRN ISO

- FCV-626, THERM BAR FLOW FLOW CONT

- CC-735, THERM BAR OUT ISO ISO

- CC-716A, CCW TO RCP ISO

- CC-716B, CCW TO RCP ISO

- CC-730, BRG OUTLET ISO

- MSIV AND MSIV BYPs Comment:

    • Performance Step: 6 Stop all RCPs.

Standard: Candidate places all RCP control switches to STOP.

Examiner's Note:

Examiners Comment:

2008 2008 NRC NRC SIM SIM dd NUREG NUREG 1021, 1021, Revision Revision 9,9, Supplement Supplement 11

Appendix C Appendix C Page 66 of Page of 88 Form Form ES-C-1 ES-C-i PERFORMANCE IINFORMATION PERFORMANCE N FORMATION

    • Performance Step:

Performance Step: 77 Verify all Verify all MSIVs MSIVs andand MSIV MSIV Bypasses Bypasses closed.

closed.

Standard: verifies all MSIVs Candidate verifies MSIVs and MSIV MSIV Bypasses Bypasses closed by by placing the control switches for the MSIVs placing MSIVs to CLOSE.

CLOSE.

Examiners Note:

Examiner's Comment:

Performance Step: 8 HVS-i at MCC-5, CMPT 77JJ within 60 Locally open breaker for HVS-1 minutes of SI initiation.

Standard: Candidate contacts AO to open breaker for HVS-1.

HVS-i.

Examiners Note:

Examiner's JPM is complete when the candidate has established one Train of CV Spray and the Inside AO has been contacted to open the breaker for HVS-1.

Comment:

Termination: At At least train of least 11 train of CV CV Spray Spray has been initiated.

has been initiated.

STOP STOP TIME:

TIME:

2008 2008 NRC NRC SIM SIM dd NUREG 1021, Revision NUREG 1021, Revision 9,9, Supplement Supplement 11

Appendix C Appendix C Page 77 of Page of 88 Form Form ES-C-1 ES-C-i VERIFICATION OF VERIFICATION OF COMPLETION COMPLETION Job Performance Measure Job Performance Measure No.:

No.: 2008 NRC 2008 NRC SIM SIM dd Examinees Name:

Examinee's Name:

Performed:

Date Performed:

Date Facility Evaluator:

Number of Attempts:

Time to Complete:

Documentation:

Question Documentation:

Question:

Response

Result: SAT UNSAT Examiners Signature:

Examiner's Date:


2008 2008 NRC NRC SIM SIM dd NUREG NUREG 1021, 1021, Revision 9, Supplement Revision 9, Supplement i1

Appendix C Appendix C Page 88 of Page of 88 Form Form ES-C-1 ES-C-i JPM CUE JPM CUE SHEET SHEET INITIAL CONDITIONS:

INITIAL CONDITIONS: You are

    • You are the the RO.

RO.

    • The plant plant was operating at 100% 100% RTP, RTP, 15 minutes ago 15 minutes ago an an automatic automatic Reactor Trip and Safety Reactor Safety Injection Injection was initiated.

initiated.

  • PATH-1 PATH-i has been implemented and is is complete through grid location location B-6, 'Restart B-6, Restart Battery Battery Chargers within 30 minutes of power power loss using using OP-601.'.

OP-601 Foldout "A"

  • Foldout A is in in effect.

INITIATING CUE: The CRSS has directed you to continue PATH-1 PATH-i execution.

2008 2008 NRC NRC SIM SIM dd NUREG NUREG 1021, 1021, Revision 9, Supplement Revision 9, Supplement 11

~ SUPPLEMENT M SUPPLEMENT M ~ VERIF VERIFlf BOTH EDGs RUNNING UNNING

)K ( RESTART ~BATTERY RESTART BATTERY (CHARGERS CHARGERS WIT UN IN 30 MIN OF OF

\WER_LOSS POWER LOSS USING OP-501 CV CV ~ NO

)K /' PRESS REMAINED BELOW 10 10 PSIG

/' /"' I1 VERIFY CV VERIFY CV SPRAY INITIATED SPRAY YE~ ~ I C

YES VERIFY ALL VERIFY ALL CV SPRAY CV SPRAY PUMPS PUMPS RUNNING RUNNING WITH VALVES WITH VALVES PROPERLY, ALIGNED ALIGNED AUTOMATIC AUTOMATIC

~ "'--

NO /

NO STEAM LINE STEAM LINE ISOLATION ISOLATION INITIATED INITIATED / VERIFY

( VERIFY APPROXIMATELYN APPROXIMATELY 12 CPM 12 GPM SPRAY SPRAY AUTOMATIC "- /' ADDITIVE ADDITIVE TANK TANK FLOWFLOW AUTOMATIC?

STEAM YES YES I

STEAM LINE LINE ISOLATION ISOLATION YES I

REQUIRED REQUIRED

~ ( VERIFY VERIFY PHASEPHASE B B

/ ' VERIFY VERIFY ALL ALL MSIVs MSIVs ANDAND ' \ ISOLATION GOLATION VALVES VALVES CLOSED CLOSE

~MSIV 8YP~SES MSIV BYPASSES CLOSED CLOSED:

NO Cl NO LOCALLY LOCALLY OPENOPEN BREAKER BREAKER FOR FOR

'I' STOP STOP ALLALL RCPs RCPs HVS-1, HVS-1, AT AT MCC-5 MCC-5 CMPT CMPT 7J 7J WITHIN WITHIN 60 60 IlJN OF SI MIN ,OF INITIATION SIINITIATION X

RCS PRESS PRESS YES / EATER THAN GREATER THAN 1350 1350 PSIG PSIG 1250 PSIGI

[1250 PSIGJ OS

Rev. 35 35 EPP- Supplements EPP-Supplements SUPPLEMENTS SUPPLEMENTS Page 20 20 of of 89 89 CONTINUOUS USE Supplement B B B And CV Spray Component Alignment Phase BAnd (Page 11 of 1)

~o 1. o establish Phase B B Containment Isolation, verify the following valves - CLOSED valves -

~CP Cooling

  • CVC-381, SEAL WTR RTRN ISO CVC-38l,
  • FCV-626, THERM BAR FLOW PLOW CONT

~SIV

b. SIV AND MSIV BYPs - CLOSED

-

~~ 2. o establish CV Spray, perform the following:

~erifY erify valves positioned as follows:

  • SI-EiiA, SI 8~~A, PUMP A A INLET -

OPEN

    • SI-844B, PUMP BB INLET - OPEN -
    • SI-5A, gAT DISCH S! 8'lSA, SAT DIgCH - OPEN

-

    • SI-845B, SAT DISCH - OPEN -
    • SI-845C, SAT THROTTLING - THROTTLED TO APPROXIMATELY 12

- 12 GPM

.. S!. 880A, PUMP A DIbCH OPEN

  • -SI-22OE_ PUHP SI 88GB, PUMP A0 DICTT 11 DISCH OPEN .
    • SI-880C, PUMP SI-88OC, PUMP BB DISCH DISCH - OPEN

-

    • SI-880D, PUMP BB DISCH SI-88OD, DISCH - OPEN

- OPEN

~Return Return to procedure procedure and and step step in in effect.

effect.

- END

- END -

-

Appendix C Appendix C Job Job Performance Performance Measure Measure Form Form ES-C-1 ES-C-i Worksheet Worksheet Facility:

Facility: HB ROBINSON HB ROBINSON Task No.:

Task No.: 01000102805 01000102805 Task Title:

Task Title: Perform aa Post Perform Post LOCA LOCA Cooldown Cooldown and and JPM No.:

JPM No.: 2008 NRC 2008 NRC SIM SIM ee Depressurization lAW Depressurization lAW EPP-8.

EPP-8.

KIA

Reference:

K/A

Reference:

K3.02 3.5/3.7 063 K3.02 3.5/3.7 002 K1.08 002 Ki.08 4.5/4.6 4.5/4.6 00009 EA EA11.13

.13 4.4/4.4 00009 EA2.15 3.3/3.4 Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testing:

Simulated Performance: Actual Performance: X Classroom - - - Simulator X

-"-'--

Plant READ TO THE EXAMINEEEXAM INEE II will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions:

  • Plant was initially at 100% power.

PATH-i has directed the crew to EPP-8, POST LOCA COOLDOWN

  • PATH-1 AND DEPRESSURIZATION.
  • You are the Reactor Operator.
  • EPP-8 has been completed through Step 28.
  • CV Pressure is at its maximum value reached during the transient.

Task Standard:

Task SI Accumulators are eithereither isolated or depressurized lAW EPP-8.

Required Required Materials:

Materials: EPP-8, Revision EPP-8, 16, Post Revision 16, Post LOCA LOCA Cooldown and Depressurization.

Cooldown and Depressurization.

General General

References:

References:

EPP-8, Revision EPP-8, Revision 16, 16, Post Post LOCA LOCA Cooldown and Depressurization.

Cooldown and Depressurization.

Handouts:

Handouts: EPP-8, EPP-8, Revision 16, Post Revision 16, Post LOCA LOCA Cooldown and Depressurization.

Cooldown and Depressurization.

2008 2008 NRC NRC SIMSIM ee NUREG 1021, NUREG 1021, Revision Revision 9, 9, Supplement Supplement 11

Appendix C Appendix C Job Performance Measure Job Performance Measure Form Form ES-C-1 ES-C-i Worksheet Worksheet Initiating Cue:

Initiating Cue: The CRSS The CRSS has has directed directed you to continue you to continue with with EPP-8 EPP-8 until until the the SI SI Accumulators Accumulators have been have been isolated.

isolated.

Time Critical Time Critical Task:

Task: NO NO Validation Time:

Validation Time: 17 minutes 17 minutes SIMULATOR SETUP SIMULATOR SETUP

1. IC#612.

IC # 612.

2. SCN: 006_JPM_S2.
3. EPP-8 marked up as completed through Step 28.

2008 2008 NRC NRC SIM SIM ee NUREG NUREG 1021, 1021, Revision Revision 9, 9, Supplement Supplement 11

Appendix C Appendix C Page of 13 Page 33 of 13 Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE INFORMATION (Denote Critical (Denote Critical Steps Steps with an an asterisk) asterisk)

START TIME: _ _

STARTTIME:

Performance Step:

Performance Step: 11 Determine ifif One SI Pump Determine Pump should bebe stopped:

Check SI Check SI Pumps Pumps - Any Any Running Running (Step (Step 29.a).

29.a).

Standard: Determines that 2 SI SI Pumps are running.

running.

Examiners Note:

Examiner's Comment:

Performance Step: 2 Determine if One SI Pump should be stopped:

Determine required RCS Subcooling from Table:

Conditions: - 3 Charging Pumps Running

-

- NO RCPs running

-

- 2 SI Pumps Running

-

Required RCS Subcooling is 70 [93] degrees F.

Standard: Determines from table that required RCS Subcooling is 70 degrees F.

Examiners Examiner's Note:

Note:

Comment:

2008 NRC 2008 SIM ee NRC SIM NUREG NUREG 1021, 1021, Revision Revision 9, 9, Supplement Supplement 11

Appendix C Appendix C Page 44 of Page of 13 13 Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE INFORMATION Performance Step:

Performance Step: 33 Check RCS Check RCS Subcooling Subcooling - Less Less than required subcooling.

than required subcooling.

Standard:

Standard: Determines that RCS Determines RCS subcooling is is - 149 149 degrees FF which is is more than the required required sUbQooling.

subcooling.

Go Go To To Step Step 29.1 29.f ( If,,-, 1

,

Examiners Note:

Examiner's Comment:

Performance Step: 4 level Greater than 24% [45%].

Check PZR level-Standard: Determines that PZR level is greater than required level.

Examiners Note:

Examiner's PZR is full.

Comment:

  • Performance Step: 55 Stop one SI Pump.

Standard:

Standard: Candidate stops either SI Pump "A" or C.

Pump A "C".

Comment:

Comment:

2008 2008 NRC NRC SIM SIM ee NUREG NUREG 1021, 1021, Revision 9, Supplement Revision 9, Supplement 11

Appendix CC Appendix Page 55 of Page of 13 13 Form Form ES-C-1 ESC-1 PERFORMANCE INFORMATION PERFORMANCE INFORMATION Performance Step:

Performance Step: 66 Check RCS Check RCS pressure pressure - Stable Stable oror Increasing.

Increasing.

Standard:

Standard: Determines that Determines that RCS RCS pressure pressure isis decreasing decreasing duedue to to stopping stopping the the SI Pump.

SI Pump. Step Step 29.h 29.h RNO RNO action action will will hold hold candidate candidate until until pressure pressure is stable or is stable or increasing increasing and and then then proceed proceed back back to to Step Step 29.a.

29.a.

Examiners Note:

Examiner's Note: RCS pressure RCS pressure will will stabilize stabilize atat - 1220 1220 psig psig and and should should take take - 44 minutes to minutes to stabilize stabilize after after the the SI Pump is SI Pump is secured.

secured.

Examiners Cue:

Examiner's minute has After - 11 minute has elapsed, inform inform the operator operator that RCS RCS pressure is pressure is stable.

Comment:

Performance Step: 7 Determine if One SI Pump should be stopped:

Check SI Pumps - Any Running (Step 29.a)

Standard: Determines that one SI Pump is running.

Examiners Examiner's Note:

Comment:

2008 2008 NRC NRC SIM SIM ee NUREG NUREG 1021, 1021, Revision Revision 9, 9, Supplement Supplement 11

Appendix CC Appendix Page 66 of Page of 13 13 Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE INFORMATION

    • Performance Step:

Performance Step: 88 Determine ifif One Determine One SI SI Pump Pump should should be be stopped:

stopped:

Determine required Determine required RCS RCS Subcooling Subcooling from from Table:

Table:

Conditions: - 33 Charging Conditions: - Charging Pumps Pumps Running Running

- NO

- NO RCPs RCPs running running

- 11 SI

- SI Pump Pump Running Running Required RCS Required Subcooling isis 165 RCS Subcooling 165 [191] degrees F.

[1911 degrees F.

Standard:

Standard: Determines from Determines from table that that required required RCS RCS Subcooling Subcooling is is 165 165 degrees F.

degrees F.

Examiners Note:

Examiner's Comment:

Comment:

  • Performance Step: 9 Performance Check RCS Subcooling - Less than required subcooling.

Standard: Determines that RCS subcooling is - 125 125 degrees FF which is less than less than the required subcooling.

Examiners Examiner's Note:

Note:

Comment:

Comment:

2008 2008 NRC NRC SIM SIM ee NUREG NUREG 1021, 1021, Revision Revision 9, 9, Supplement Supplement 11

Appendix C Appendix C Page 77 of Page 13 of 13 Form ES-C-1 Form ES-C-i PERFORMANCE INFORMATION PERFORMANCE INFORMATION

    • Performance Step:

Performance Step: 10 10 Check RCS Check Hot Leg RCS Hot Leg temperatures temperatures - Less Less than than 320 320 [300]

[300]

degrees F.

degrees F.

Standard:

Standard: Determines that Determines that RCS RCS Hot Hot Leg Leg temperatures temperatures are are - 440

- 440 degrees degrees F.

F.

To Step Go To Go Step 32.

32. ( M);)

Examiners Note:

Examiner's Comment:

Performance Step: 11 Check SI Reinitiation Criteria as follows:

  • Check RCS Subcooling - Greater than 35 [55] degrees F
  • Level Greater than 10% [32%]

Check PZR Level-Standard: Determines that both conditions are satisfied.

Examiners Note:

Examiner's RCS Subcooling is 125 degrees F and PZR level is 100%.

Comment:

2008 2008 NRC NRC SIM SIM ee NUREG NUREG 1021, 1021, Revision Revision 9,9, Supplement Supplement 11

Appendix CC Appendix Page 88 of Page of 13 13 Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE INFORMATION

    • Performance Step:

Performance Step: 12 12 Determine ifif SI Determine SI Accumulators Accumulators should should be be isolated:

isolated:

  • . Check RCS Check RCS subcooling subcooling - Less Less than than 3535 [55]

[55] degrees degrees FF Standard:

Standard: Determines that Determines that RCS RCS subcooling subcooling isis greater greater than than specified.

specified.

Go To Go To Step 33.d. l!

Step 33.d. i Examiners Note:

Examiner's Note: RCS Subcooling RCS Subcooling is is 125 125 degrees degrees F. F.

Comment:

Comment:

    • Performance Step: 13 Level Greater than 10% [32%].

Check PZR Level-Standard:

Standard: Determines that PZR Level is greater than specified limits.

Examiners Examiner's Note: PZR level is 100%.

100%.

Comment:

Comment:

2008 2008 NRC NRC SIM SIM ee NUREG NUREG 1021, 1021, Revision Revision 9,9, Supplement Supplement 11

Appendix CC Appendix Page 99 of Page of 13 13 Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE INFORMATION

    • Performance Step:

Performance 14 Step: 14 Isolate SI Isolate Accumulators as SI Accumulators follows:

as follows:

Locally close Locally close the the breakers breakers for for

CMPT 9F)

CMPT 14F)

CMPT 1OJ)

Standard: Contacts the Inside andand Outside AOs to to close the the breakers for the Discharge Valves on MCC-5 SI Accumulator Discharge MCC-5 and 6.

Examiners Note:

Examiner's The Inside and Outside AOs will communicate back to the Reactor Operator that the breakers are closed as requested.

Valves SI-865A1B/C will have RED open indication on the RTGB.

Comment:

  • Performance Step: 15 15 Verify all ACCUM DISCHs - CLOSED.

Sl-865A, SI-865A, Sl-865B, SI-8658, Sl-865C.

SI-865C.

Standard:

Standard: Control switches are placed in in the closed position.

position. Candidate should should note note that SI-865A SI-865A and Sl-865B SI-8658 close but Sl-865C SI-865C has has dual dual indication indication (RED and GREEN position (RED and position lights lights ILLUMINAT ILLUMINATED)ED)

Go To Go To Step 34.b. RNO Step 34.b. RNO Examiners Examiner's Note:

Note:

Comment:

Comment:

2008 NRC SIM 2008 NRC SIM ee NUREG NUREG 1021,1021, Revision Revision 9, 9, Supplement Supplement 11

Appendix CC Appendix Page 10 Page 10 of of 13 13 Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE INFORMATION

    • Performance Step:

Performance Step: 16 16 Vent any Vent any unisolated unisolated accumulator accumulator as follows:

as follows:

Verify SI-855, Verify SI-855, ACC ACC NITROGEN NITROGEN ISO, is closed.

ISO, is closed.

Standard:

Standard: Candidate determines Candidate determines that that valve valve SI-855 SI-855 isis closed.

closed.

Examiners Note:

Examiner's Note:

Comment:

Comment:

    • Performance Step: 17 Open the appropriate ACCUM VENT valve: SI-853C.

Standard:

Standard: Candidate opens valve SI-853C to align SI Accumulator "c" C to the vent path.

Examiners Note:

Examiner's Comment:

2008 NRC 2008 NRC SIM SIM ee NUREG 1021, Revision NUREG 1021, Revision 9,9, Supplement Supplement 11

Appendix C Appendix C Page 11 Page of 13 1 1 of 13 Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE INFORMATION

    • Performance Step:

Performance Step: 18 18 Open HIC-936, Open HIC-936, ACC VENT HDR ACC VENT HDR FLOW.

FLOW.

Standard:

Standard: HIC-936 by Candidate opens HIC-936 by turning the valve potentiometer potentiometer in the clockwise direction clockwise direction to to open open the valve and depressurize SI the valve and depressurize SI Accumulator "c" C to the CV atmosphere.

Examiners Note:

Examiner's Note: APP-002-F4, SI ACCUM C HI/LO HI/LO PRESS, PRESS, will clear and come in as the accumulator is back in is depressurized.

depressurized.

APP-036-C9, CV N2 HDR HI/LO PRESS, will be received when HIC-936 is opened.

Once candidate notes that SI Accumulator "C" C pressure is decreasing, examiner can terminate the JPM at his discretion.

Comment:

END OF TASK Termination: SI Accumulators are isolated and/or andlor depressurizin depressurizing.g.

STOP TIME:

2008 NRC 2008 SIM ee NRC SIM NUREG NUREG 1021,1021, Revision Revision 9, 9, Supplement Supplement 11

Appendix C Appendix C Page 12 Page 12 of of 13 13 Form Form ES-C-1 ES-C-i VERIFICATION OF VERIFICATION OF COMPLETION COMPLETION Job Performance Job Performance Measure Measure No.:

No.: 2008 NRC 2008 NRC SIM SIM ee Examinees Name:

Examinee's Name:

Date Performed:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

Response

Result: SAT UNSAT Examiners Examiner's Signature: Date:


2008 2008 NRCNRC SIM SIM ee NUREG NUREG 1021, 1021, Revision 9, Supplement Revision 9, Supplement 11

Appendix CC Appendix Page 13 Page 13 of of 13 13 Form Form ES-C-1 ES-C-i JPM CUE JPM CUE SHEET SHEET INITIAL CONDITIONS:

INITIAL CONDITIONS: Plant was

    • Plant initially at was initially at 100%

100% power.

power.

    • RCS RCS depressurization depressurization resulted resulted inin aa Reactor Reactor Trip Trip and and Safety Safety Injection.

Injection.

    • PATH-1 PATH-i hashas directed directed thethe crew crew to to EPP-8, EPP-8, POST POST LOCA LOCA COOLDOWN COOLDOWN AND DEPRESSURIZATION.

AND DEPRESSURIZATION.

    • You You are are the the Reactor Reactor Operator.

Operator.

    • EPP-8 EPP-8 has has been been completed completed through through Step Step 28.

28.

    • CV CV Pressure Pressure is is at at its its maximum maximum valuevalue reached reached during during the the transient.

transient.

INITIATING CUE:

INITIATING The CRSS has directed you to continue with EPP-8 until the SI Accumulators Accumulators have been isolated.

2008 NRC SIM 2008 NRC SIM ee NUREG NUREG 1021, 1021, Revision Revision 9,9, Supplement Supplement 11

Appendix CC Appendix Job Performance Job Performance Measure Measure Form Form ES-C-1 ES-C-i Worksheet Worksheet Facility:

Facility: HB ROBINSON HB ROBINSON Task Task No.:

No.: 01015100501 01015100501 Task Title:

Task Title: Remove N-44 Remove from service N-44 from service lAW lAW OWP-OWP- JPM JPM No.:

No.: 2008 2008 NRC NRC SIM SIM f 011.

011.

KIA

Reference:

K/A

Reference:

015 A4.02 015 A4.02 3.9/3.9 3.9/3.9 015 A4.03 015 A4.03 3.8/3.9 3.8/3.9 Examinee:

Examinee: NRC NRC Examiner:

Examiner:

Facility Evaluator:

Facility Evaluator: Date:

Date:

Method of testing:

Method Simulated Performance:

Simulated Performance: Actual Performance:

Performance: X Classroom - - - Simulator -- X - Plant READ TO THE EXAMINEE II will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions: ** The plant is operating at 100% RTP.

  • No equipment is out of service.

l&C has requested a clearance on N-44 to replace the high voltage

  • I&C power supply.
  • This clearance and work scope will render the N-44 input to QPTR inoperable.
  • The CRSS has completed the required pre-job briefing.
  • Reactor Reactor Engineering Engineering hashas been contacted contacted to perform aa Flux Flux Map.

Map.

Task Task Standard:

Standard: Power Power Range Range Channel Channel Nl-44 NI-44 removed removed from from service lAW OWP-0i service AW OWP-011, 1, NI-4.

NI-4.

Required Required Materials:

Materials: OWP-01 OWP-011, 1, Nl-4 NI-4 ERFIS ERFIS Computer Computer General General

References:

References:

OWP-01 OWP-011, 1, Nl-4 NI-4 2008 2008 NRC NRC SIM SIM If NUREG NUREG 1021, Revision 99 1021, Revision

Appendix CC Appendix Job Performance Job Performance Measure Measure Form Form E8-C-1 ES-C-i Worksheet Worksheet Handouts:

Handouts: OWP-Oll, NI-4 OWP-011, Nl-4 Initiating Cue:

Initiating Cue: You are You are directed directed by the CRSS by the CRSS to to remove remove N-44 from service N-44 from service lAW lAW OWP-011, OWP-01 1, NI-NI-4.

4.

Time Critical Time Critical Task:

Task: NO NO Validation Time:

Validation Time: minutes 10 minutes 10 SIMULATOR SETUP SIMULATOR

1. IC#616.

1.IC # 616.

2. SON: 006_JPM_S6.
3. OP RO at RO ERFI8 ERRS terminal and OP QP BOP at BOP ERFI8 ERFIS terminal.

2008 NRC 2008 NRC SIM 81M ff NUREG 1021, NUREG 1021, Revision Revision 99

Appendix C Appendix C Page 33 of Page of 10 10 Form ES-C-1 Form ES-C-i PERFORMANCE INFORMATION PERFORMANCE INFORMATION (Denote Critical (Denote Critical Steps Steps with an an asterisk) asterisk)

START TIME:____

STARTTIME: __

Performance Step: 11 Performance Remove NI-44 Remove NI-44 from ERFIS ERFIS scan: NIN0044A NINOO44A REMOVED REMOVED Standard: Nl-44 removed from ERFIS scan.

NI-44 Examiners Note:

Examiner's Note: Removal from scan can be performed Removal performed by the following actions:

- Select F3 =MENU on the bottom of the ERFIS screen

=

- Select ADMIN (ADMINISTRATIVE FUNCTIONS MENU)

- Select DR (DEURES (DEL/RES POINT FROMrrO FROM/TO SCAN OR ALARM)

- Select DELETE SCAN

- ENTER POINT POINTID ID Removal from scan can be performed by the following actions:

- If candidate knows the Turn On Code (TOC), he can type in DR and hit ENTER to go directly to the DR screen

- Select DELETE SCAN

- ENTER POINTID POINT ID APP-005-D6, Delta Flux Warning I Status will be received and aa printout initiated for the CAOC Alarm Report.

CHANNEL "CHANNEL #4 NOW OUT OF SERVICE with reading noted as 0000 ??

??"

Comment:

2008 NRC 2008 SIM ff NRC SIM NUREG 1021, NUREG 1021, Revision Revision 99

Appendix C Appendix C Page 44 of Page of 10 10 Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE INFORMATION

    • Performance Step:

Performance Step: 22 DROPPED ROD DROPPED ROD MODE MODE switch:

switch: BYPASS.

BYPASS.

Standard:

Standard: On Nl-44 drawer, On NI-44 drawer, NI-44 NI-44 DROPPED DROPPED RODROD MODE MODE switch switch selected selected to BYPASS.

to BYPASS.

Examiners Note:

Examiner's APP-005-D4, NIS TRIP/DROP ROD BYPASS will alarm when a Dropped Rod Mode switch is placed placed in BYPASS.

BYPASS.

DROPPED ROD DROPPED ROD BYPASS BYPASS on the NI-44 NI-44 drawer front will ILLUMINATE.

Comment:

Performance Step: 3 NIS ROD DROP BYPASS NI-44 Nl-44 Status Light: ILLUMINATED.

Standard: The candidate observes the NIS ROD DROP BYPASS NI-44 status light on RTGB Section B is illuminated.

Examiners Note:

Examiner's Comment:

2008 NRC 2008 NRC SIM SIM ff NUREG 1021, NUREG 1021, Revision Revision 99

Appendix CC Appendix Page 55 of Page of 10 10 Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE INFORMATION

    • Performance Step:

Performance Step: 44 NI-44 OUT NI-44 OUT OF SERVICE TRIP OF SERVICE TRIP SWITCH:

SWITCH: TRIPPED.

TRIPPED.

Standard:

Standard: In the In the rear rear of N 1-44 cabinet, of NI-44 cabinet, the the candidate candidate positions positions the the NI-44 N 1-44 OUT OUT OF SERVICE OF SERVICE TRIP TRIP SWITCH SWITCH to to the the TRIPPED TRIPPED position.

position. (Toggle (Toggle switch in switch in the the UP UP position) position)

Examiners Note:

Examiner's Note: Operator determines Operator determines that that independent independent verification verification is not required is not required due to due to the bistable status the bistable status light light is not illuminated is not illuminated prior prior to to positioning the NI-44 positioning NI-44 OUT OUT OF SERVICE TRIP SWITCH. SWITCH.

This trips the 108% High the 108% Flux bistable for NI-44.

High Flux Comment:

Performance Step: 5 Bistable light HI POW RANGE HI FLUX NC44R: ILLUMINATED. ILLUMINATED.

Standard: The candidate determines that bistable light HI POW RANGE HI FLUX NC44R is illuminated on Bistable Status Panel B.

Examiners Examiner's Note: APP-005-A4 APP-005-A4,, PR SINGLE CH HI RANGE ALERT will be received when bistable is actuated.

OVERPOWE OVERPOWER R TRIP HIGH HIGH RANGE light on on NI-44 NI-44 drawer front will illuminate illuminate Comment:

Comment:

2008 NRC 2008 NRC SIM SIM ff NUREG 1021, NUREG 1021, Revision Revision 99

Appendix CC Appendix Page 66 of Page of 10 10 Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE INFORMATION

    • Performance Step:

Performance Step: 66 ROD STOP ROD STOP BYASS BYASS switch:

switch: BYPASS BYPASS PR PR 44.

44.

Standard:

Standard: On the Miscellaneous On the Miscellaneous Control Control and and Indication Indication Panel, Panel, the the candidate candidate places the ROD STOP places the ROD STOP BYPASSBYPASS switch switch to to the the BYPASS BYPASS PR PR 44 44 position.

position.

Examiners Note:

Examiner's Note:

Comment:

Comment:

    • Performance Step: 7 COMPARATOR CHANNEL DEFEAT switch: Select PR 44.

COMPARATOR Standard: On the Comparator and Rate drawer, the candidate places the COMPARATOR CHANNEL DEFEAT switch to select PR 44 COMPARATOR position.

COMPARAT COMPARATOR OR DEFEAT light illuminates on the drawer above the switch.

Examiners Examiner's Note:

Comment:

Comment:

2008 2008 NRC SIM ff NRC SIM NUREG NUREG 1021,1021, Revision Revision 99

Appendix CC Appendix Page 77 of Page of 10 10 Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE INFORMATION

    • Performance Step:

Performance Step: 88 DETECTOR CURRENT DETECTOR CURRENT COMPARATOR COMPARATOR Drawer: Drawer:

UPPER SECTION UPPER SECTION Switch:

Switch: Select Select PR PR 44.

44.

Standard:

Standard: On the Detector On the Detector Current Current Comparator Comparator drawer, drawer, the the candidate candidate selects selects PR 44 with the PR 44 with the Upper Section Upper Section switch.

switch.

CHANNEL DEFEAT CHANNEL DEFEAT light light for for Upper Upper Section Section illuminates illuminates when when switch is switch is selected selected out out ofof NORMAL.

NORMAL.

Examiners Note:

Examiner's Note:

Comment:

    • Performance Step: 9 Performance DETECTOR CURRENT COMPARATOR COMPARATOR Drawer:

LOWER SECTION Switch: Select PR 44.

Standard: On the Detector Current Comparator drawer, the candidate selects PR 44 with the Lower Section switch.

CHANNEL DEFEAT light for Lower Section illuminates when switch is selected out of NORMAL.

Examiners Examiner's Note:

Comment:

Comment:

2008 NRC 2008 NRC SIMf SIM f NUREG 1021, NUREG 1021, Revision Revision 99

Appendix CC Appendix Page 88 of Page of 10 10 Form ES-C-1 Form ES-C-i PERFORMANCE INFORMATION PERFORMANCE INFORMATION Performance Step:

Performance Step: 10 10 NI-44 INSTRUMENT NI-44 INSTRUMENT POWER POWER FUSES: FUSES: REMOVED.

REMOVED.

Standard:

Standard: Candidate determines Candidate determines that that this this step step isis not not required required and and N/As.

N/As.

Examiners Cue:

Examiner's Cue: IfIf candidate candidate asks, asks, inform inform him that I&C him that I&C personnel personnel will will deenergize the deenergize the drawer after AS drawer after AS FOUND FOUND readings readings are are taken.

taken.

Examiners Note:

Examiner's Note: This action is This action N/A ifif power is NtA power is is>> P-10 P-b or or the the reactor reactor is is in in Modes 3 through 6 (ITS Table 3.3.1-1).

Modes Comment:

    • Performance Step: 11 Bistable light LOW POW RANGE HI FLUX NC44P:

ILLUMINATED.

ILLUMINATED.

Standard: Candidate determines that this step can be signed or N/A'd. N/Ad.

Examiners Examiner's Cue:

Examiners Examiner's Note: This bistable is normally in the tripped condition (ILLUMINA (ILLUMINATED) TED) at this power level. level. The candidate may sign for the step or N/A NtA the step.

Comment:

Terminating Terminating Cue:

Cue: N-44 N-44 has been removed has been removed from from service service lAW lAW OWP-01 OWP-011, NI-4.

1, Nl-4.

STOP TIME:

STOP TIME:

2008 2008 NRC SIM ff NRC SIM NUREG 1021, NUREG 1021, Revision Revision 99

Appendix C Appendix C Page 99 of Page of 10 10 Form ES-C-1 Form ES-C1 VERIFICATION OF VERIFICATION OF COMPLETION COMPLETION Job Performance Job Performance Measure Measure No.:

No.: 2008 NRC 2008 NRC SIM SIM ff Examinees Name:

Examinee's Name:

Date Performed:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

Response

Result: SAT UNSAT Examiners Examiner's Signature: Date:


2008 2008 NRC NRC SIM SIM ff NUREG 1021, NUREG 1021, Revision Revision 99

Appendix C Appendix C Page 10 Page 10 of of 10 10 Form Form ES-C-1 ES-C-i CUE SHEET JPM CUE JPM SHEET INITIAL CONDITIONS:

INITIAL CONDITIONS: The plant

    • The plant isis operating operating at at 100%

100% RTP.

RTP.

    • No No equipment is is out of of service.
    • I&C I&C has has requested requested a clearance on N-44 N-44 to replace replace the high high voltage power voltage power supply.

supply.

    • This This clearance clearance and work scope will render the the N-44 N-44 input input to QPTR inoperable.
  • You are the BOP operator.
  • The CRSS has completed the required required pre-job briefing.
  • Reactor Engineering has been contacted to perform a Flux Map.

INITIATING CUE: You are directed by the CRSS to remove N-44 from service lAW OWP-0ii, NI-4.

OWP-011, 2008 NRC 2008 NRC SIM SIM ff NUREG 1021, NUREG 1021, Revision Revision 99

Appendix CC Appendix Job Performance Job Per[ormance Measure Measure Form Form ES-C-1 ES-C-i Worksheet Worksheet Facility:

Facility: HB ROBINSON HB ROBINSON Task Task No.:

No.: 01000106705 01000106705 Task Title:

Task Title: Respond to Respond to aa Loss Loss of of CCW CCW lAW lAW AOP-AOP- JPM JPM No.:

No.: 2008 NRC 2008 NRC SIMSIM gg 014.

014.

KIA

Reference:

K/A

Reference:

008 K1 .02 008 K1.02 3.3/3.4 3.3/3.4 008 K3.03 008 K3.03 4.1/4.2 4.1/4.2 026 AK3.03 026 AK3.03 4.0/4.2 4.0/4.2 Examinee:

Examinee: NRC NRC Examiner:

Examiner:

Facility Evaluator:

Facility Evaluator: Date:

Date:

Method of Method of testing:

testing:

Performance:

Simulated Performance: Actual Performance:

Performance: X Classroom - - - Simulator -- X - Plant READ TO THE EXAMINEE READ EXAM INEE II will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions:

  • The plant is operating at 100% 100% power.
  • No equipment is out of service.
  • You are the Reactor operator.

Task Task Standard:

Standard: AOP-014 actions taken taken to to ensure ensure the the RCPs RCPs areare not not damaged.

damaged.

Required Required Materials:

Materials: AOP-014, AOP-014, COMPONEN COMPONENT T COOLING COOLING WATERWATER SYSTEM SYSTEM MALFUNCT MALFUNCTION, ION, Revision Revision 24 24 General General

References:

References:

APP-OOi-A4 APP-001-A4 AOP-014, AOP-014, COMPONEN COMPONENT COOLING WATER T COOLING WATER SYSTEM SYSTEM MALFUNCT MALFUNCTION, ION, Revision Revision 24 24 Handouts:

Handouts: None None Initiating Initiating Cue:

Cue: The The CRSS CRSS isis involved involved with with aa security security situation situation and and has has told told you you to to take take the the necessary necessary actions actions for for any any alarm alarm conditions conditions that that might might arise.

arise.

Time Time Critical Critical Task:

Task: NO NO 2008 2008 NRC NRC SIM SIM gg NUREG 1021, NUREG 1021, Revision Revision 9,9, Supplement Supplement 11

Appendix CC Appendix Job Performance Measure Job Performance Measure Form Form ES-C-1 ES-C-i Worksheet Worksheet Validation Time:

Validation Time: minutes 15 minutes 15 SIMULATOR SETUP SIMULATOR SETUP

1. IC
1. IC#6i7
  1. 617
2. SCN:
2. 006_JPM_S7 SON: 006_JPM_S7
3. On cue from the Chief Examiner, insert
3. insert a 2000 GPM GPM CCW COW piping piping rupture inside inside the CV.

2008 2008 NRCNRC SIM SIM gg NUREG NUREG 1021, 1021, Revision Revision 9, 9, Supplement Supplement 11

Appendix CC Appendix Page 33 of Page of 13 13 Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE INFORMATION (Denote Critical (Denote Critical Steps Steps with with an an asterisk) asterisk)

START TIME:

START TIME: _ __

Performance Step:

Performance Step: 11 Candidate refers Candidate refers to to APP-001-A4.

APP-OO1 -A4.

Standard:

Standard: Candidate observes Candidate observes rapidly lowering CCW rapidly lowering CCW Surge Surge Tank Tank level.

level.

recommended action from APP-001-A4 Candidate takes recommended APP-OO1 -A4 and enters AOP-014, CCW enters CCW System System Malfunction Malfunction Examiners Note:

Examiner's Comment:

Performance Step: 2 Implement The EALs. (Step 1) 1)

Standard: Candidate notifies supervision of EAL implementat implementation.

ion.

Examiners Examiner's Note:

Note: Candidate is Candidate not responsible for implementin is not implementing g EAL5 EALs Comment:

Comment:

2008 NRC SIM 2008 NRC SIM gg NUREG NUREG 1021, 1021, Revision 9, Supplement Revision 9, Supplement 11

Appendix CC Appendix Page 44 of Page of 13 13 Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE INFORMATION Performance Step:

Performance Step: 33 Make PA Make PA Announcement Announcement For For Procedure Procedure Entry.

Entry.

Standard:

Standard: Candidate makes Candidate announcement for makes announcement for AOP-014 AOP-014 entry entry using using the the system.

PA system.

PA Examiners Note:

Examiner's Note:

Comment:

Comment:

    • Performance Step: 4 Performance Go To Appropriate Section For Indicated Malfunction. (Step 2)

Standard: Candidate proceeds to Section A based on loss of CCW inventory.

Examiners Note:

Examiner's Comment:

  • Performance Step:

Step: 55 Determine ifif pump pump cavitation isis occurring occurring or imminent:

  • Check Check Surge Tank Level <5%. < 5%.

OR OR

  • Check CCW Pump Check COW Pump Discharge Discharge Pressure Pressure (Local)

(Local) AND AND Flow -WIDE Flow -WIDE OSCILLATI OSCILLATIONS.ONS.

Standard:

Standard: Candidate determines Candidate that COW determines that Surge Tank CCW Surge Tank is 5% level is << 5% level and and that pump cavitation that pump is imminent.

cavitation is imminent.

Examiners Examiner's Note:

Note:

Comment:

Comment:

2008 NRC 2008 NRC SIM SIM gg NUREG 1021, Revision NUREG 1021, Revision 9,9, Supplement Supplement 11

Appendix CC Appendix Page 55 of Page 13 of 13 Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE INFORMATION Performance Step:

Performance Step: 66 Check Reactor Check Reactor CRITICAL.

CRITICAL. (Step (Step 2) 2)

Standard:

Standard: Candidate determines Candidate determines that that the the Reactor Reactor isis critical.

critical.

Examiners Note:

Examiner's Note:

Comment:

Comment:

    • Performance Step: 7 Performance Verify the Reactor is Tripped. (Step 3)

Standard: Candidate depresses the Reactor Trip pushbutton to trip the Reactor and verify the Reactor is tripped.

Examiners Note:

Examiner's Comment:

  • Performance Step: 88 Stop ALL RCPs. (Step 4) 4)

Standard:

Standard: Candidate stops stops ALL Reactor Coolant Coolant Pumps Pumps using using the Control switches switches on the RTGB.

on the RTGB.

Examiners Examiner's Note:

Note:

Comment:

Comment:

2008 NRC 2008 NRC SIMg SIM g NUREG 1021, Revision NUREG 1021, Revision 9, 9, Supplement Supplement 11

Appendix CC Appendix Page 66 of Page 13 of 13 Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE INFORMATION Performance Step:

Performance Step: 99 Go To PATH-1 Go To PATH-i while while continuing continuing with with this this procedure.

procedure. (Step (Step 5) 5)

Standard:

Standard: Candidate informs Candidate informs CRSS CRSS to to enter enter PATH-1 PATH-i while while the the Candidate Candidate continues in continues in AOP-014.

AOP-0i4.

Examiners Cue:

Examiner's Cue: Cue or acknowledge Cue or acknowledge the the candidate candidate that that the the CRSS CRSS andand the the BOP will BOP will continue continue in PATH-i and in PATH-1 and the the RO will continue in RO will continue in AOP-01 4.

AOP-014.

Comment:

    • Performance Step: 10 Lockout CCW Pumps:
  • Place AND hold all CCW Pump switches in STOP position.
  • Check APP-001-F5, APP-OOi -F5, CCW PMP LO PRESS, ILLUMINATED.
  • Release CCW Pump Switches.

Standard: Candidate places ALL CCW pump switches to STOP and holds them while verifying APP-OOi APP-001-F5-F5 is illuminated.

Examiners Examiner's Note: The Candidate may ask and receive assistance from the BOP to hold one of the CCW Pump switches. switches.

Comment:

2008 NRC 2008 NRC SIMg SIM g NUREG NUREG 1021, 1021, Revision Revision 9,9, Supplement Supplement 11

Appendix CC Appendix Page 77 of Page 13 of 13 Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE INFORMATION Performance Step:

Performance Step: 11 11 Dispatch Operator Dispatch Operator To To Perform Perform Attachment Attachment 3, CCW Leak 3, CCW Leak Search, Search, While Continuing While Continuing With Procedure. (Step With Procedure. (Step 11) 11)

Standard:

Standard: Candidate contacts Candidate contacts the the AO to perform AO to perform Attachment Attachment toto identify identify the the source of source of the the leak.

leak.

Examiners Note:

Examiner's Note:

Comment:

    • Performance Step: 12 Check CV For CCW Break Using Control Room Indications.

i2.a)

(Step 12.a)

Standard: Candidate monitors ERFIS trends and CV WATER LEVEL (White Sump Lights) and determines that CV water level has increased.

Examiners Note:

Examiner's CV Water level increase from - 4.00 inches to 8 inches and stabilize.

Bottom white lights for CV Keyway Sump are illuminated.

Comment:

2008 NRC 2008 NRC SIMg SIM g NUREG 1021, Revision NUREG 1021, 9, Supplement Revision 9, Supplement 11

Appendix CC Appendix Page 88 of Page of 13 13 Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE INFORMATION

    • Performance Step:

Performance Step: 13 13 Check CV Check location of CV location of CCW CCW break.

break. (Step (Step 12.b) 12.b)

Standard:

Standard: Candidate determines Candidate determines that that CCW CCW leak leak isis in in the the CV.

CV.

Examiners Note:

Examiner's Note:

Comment:

Comment:

Performance Step: 14 Inform personnel performing leak search that the leak location is 1 2.c) in the CV. (Step 12.c)

Standard: Candidate informs AO performing leak search of leak in CV.

Examiners Note:

Examiner's Comment:

2008 NRC 2008 NRC SIM SIM gg NUREG 1021, Revision NUREG 1021, Revision 9, 9, Supplement Supplement 11

Appendix C Appendix C Page 99 of Page of 13 13 Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE INFORMATION Performance Step:

Performance 15 Step: 15 Determine RCP Determine RCP alarm alarm status.

status. (Step (Step 13) 13)

Standard:

Standard: Candidate Candidate recognizes recognizes that:

that:

    • APP-OO1-B1, RCP APP-001-B1, RCP BRG BRG COOL WTR LO COOL WTR LO FLOW, FLOW, isis illuminated.

illuminated.

    • APP-OOi-B3, RCP APP-001-B3, RCP A BEARING BEARING HIHI TEMP, TEMP, isis NOT NOT illuminated.

illuminated.

    • APP-OOi-D3, RCP APP-001-D3, RCP BB BEARING BEARING HIHI TEMP, isis NOT NOT illuminated.

illuminated.

    • APP-OO1-F3, RCP C APP-001-F3, BEARING HI C BEARING HI TEMP, is NOT NOT illuminated.

Examiners Note:

Examiner's Comment:

Performance Step: 16 Check Reactor CRITICAL. (Step 14)

Standard: Candidate determines that the Reactor is NOT critical.

Examiners Note:

Examiner's Comment:

2008 NRC SIM 2008 NRC SIM gg NUREG 1021, Revision NUREG 1021, 9, Supplement Revision 9, Supplement 11

Appendix C Appendix C Page 10 Page of 13 10 of 13 Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE INFORMATION Performance Step:

Performance Step: 17 17 Verify Control Verify Control Rods Rods are Tripped. (Step are Tripped. (Step 14.a i4a RNO)

RNO)

Standard: Candidate verifies ALL Control Candidate Control Rods Rods are inserted.

inserted.

Examiners Note:

Examiner's Comment:

Performance Step: 18 Stop ALL RCPs. (Step 14.b RNO)

Standard: Candidate verifies that ALL Reactor Coolant Pumps are stopped.

Examiners Note:

Examiner's Comment:

2008 NRC 2008 NRC SIM SIM gg NUREG NUREG 1021, 1021, Revision Revision 9, 9, Supplement Supplement 11

Appendix C Appendix C Page 1 1 of Page 11 of 13 13 Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE INFORMATION

    • Performance Step:

Performance Step: 19 19 Close The Close The Following 18)

(Step 18)

Following Valves Valves To To Isolate Isolate CCW COW To To The The RCPs:

RCPs:

(Step

    • CC-716A, CC-71 6A, CCW CCW TO TO RCP RCP ISOISO
    • CC-716B, CC-716B, CCW CCW TO TO RCP RCP ISOISO
    • CC-735, THERM BAR CC-735, THERM BAR OUT OUT ISO ISO
    • FCV-626, FCV-626, THERM BAR BAR FLOW FLOW CO CONTNT Standard: Candidate uses Candidate uses RTGB switches switches to close close the the following valves:

valves:

  • 00-735, THERM BAR OUT ISO CC-735,
  • FCV-626, THERM BAR FLOW CONT Examiners Cue:

Examiner's Comment:

Termination: CCW valves are CCW are closed to isolate CCW piping rupture in CV.

isolate CCW STOP STOP TIME:

TIME:

2008 NRC SIMg 2008 NRC SIM g NUREG NUREG 1021, 1021, Revision 9, Supplement Revision 9, Supplement 11

Appendix C Appendix C Page 12 Page 12 of of 13 13 Form Form ES-C-1 ES-C1 VERIFICATION OF VERIFICATION OF COMPLETION COMPLETION Job Performance Job Performance Measure Measure No.:

No.: 2008 NRC 2008 NRC SIM SIM 9g Examinees Name:

Examinee's Name:

Date Performed:

Date Performed:

Facility Evaluator:

Facility Number of Attempts:

Time to Complete:

Question Documentation:

Question:

Response

Result: SAT UNSAT Examiners Signature:

Examiner's Date:


2008 2008 NRC NRC SIMg SIM g NUREG 1021, Revision NUREG 1021, Revision 9, 9, Supplement Supplement 11

Appendix C Appendix C Page 13 Page of 13 13 of 13 Form Form ES-C-1 ESC-1 CUE SHEET JPM CUE JPM SHEET INITIAL CONDITIONS:

INITIAL CONDITIONS: ** The plant isis operating The plant operating atat 100%

100% power.

power.

    • No No equipment equipment isis outout of of service.

service.

    • You are the You are the Reactor Reactor operator.

operator.

INITIATING CUE:

INITIATING CUE: The CRSS is is involved involved with a security situation and has has told you to take the necessary actions for any alarm conditions that might arise.

2008 NRC 2008 NRC SIMg SIM g NUREG NUREG 1021, 1021, Revision Revision 9, 9, Supplement Supplement 11

Appendix C Appendix C Job Job Performance Performance Measure Measure Form Form ES-C-1 ES-C-i Worksheet Worksheet Facility:

Facility: HB ROBINSON HB ROBINSON Task No.:

Task No.: 01000101405 01000101405 Task Title:

Task Title: Limit Radiation Limit Radiation Exposure Exposure in in Response Response JPM No.:

JPM No.: 2008 NRC 2008 NRC SIM SIM hh Radiation Alarm lAW to Radiation lAW AOP-005.

AOP-005.

KIA

Reference:

K/A

Reference:

072 A 072 .01 3.4/3.6 Al1.01 3.4/3.6 Examinee: NRC Examiner:

Facility Evaluator:

Facility Evaluator: Date:

Date:

Method of testing:

Simulated Performance: Actual Performance: xX Classroom ---

Simulator X

_.:...:X_ Plant READ TO THE EXAMINEE II will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions:

  • The plant is at 100% power.

AOP-0i6, EXCESSIVE PRIMARY PLANT LEAKAGE, is being

  • An unscheduled Containment entry is in progress to determine the leak location.
  • APP-036-L5, CV PERSONNEL HATCH DOOR OPEN, is ILLUMINATED.

Task Standard: Actions of AOP-005, Attachment 12, 12, have been completed satisfactorily.

Required Materials: APP-036-D8, Revision 62 AOP-005, Revision 27 General

References:

General

References:

APP-036-D8, Revision 62 62 AOP-005, AOP-005, Revision Revision 27 27 Handouts:

Handouts: AOP-005, Revision AOP-005, Revision 27 27 Initiating Initiating Cue:

Cue: You are You are the the Control Control Room Room Operator.

Operator. Respond Respond to to plant plant conditions.

conditions.

2008 NRC 2008 NRC SIMSIM hh NUREG iO2i, NUREG 1021, Revision Revision 9,9, Supplement Supplement i1

Appendix C Appendix C Job Performance Job Performance Measure Measure Form Form ES-C-1 ES-C-i Worksheet Worksheet Time Critical Time Critical Task:

Task: NO NO Validation Time: 12 minutes 12 minutes SIMULATOR SETUP i.

1. IC#6i3.

IC # 613.

2. SCN: 006_JPM_S3.
3. R-i 1/12 selector switch is in the CV position.

Verify that the R-11/12 2008 2008 NRC NRC SIM SIM hh NUREG 1021, NUREG 1021, Revision 9, Supplement Revision 9, Supplement 11

Appendix CC Appendix Page 33 of Page of 14 14 Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE INFORMATION (Denote Critical (Denote Critical Steps with an Steps with an asterisk) asterisk)

START TIME:

START TIME: _ __

Performance Step:

Performance Step: 11 Locates proper Locates proper procedure procedure and required information.

and required information.

Standard:

Standard: Locates APP-036-D8, Locates APP-036-D8, PROCESSPROCESS MONITOR MONITOR HI HI RAD.

PAD.

Examiners Note:

Examiner's Note: PR-i Point RR-1 Point #11

  1. 11 (R-12)

(R-i 2) is is in in alarm.

alarm.

Comment:

Performance Step: 2 Determine process channel in alarm condition.

Standard: Determines alarming channel is R-12, R-i2, CV AIR AND PLANT RADIOACTIVE GAS.

VENT RADIOACTIVE Examiners Note:

Examiner's Comment:

Performance Performance Step: 3 IF IF the cause of the alarm alarm is known to be the movement of radioactive material material or is an expected alarm is an due to actions under alarm due under operator control, control, THEN THEN no no further actions for this APP APP are are required. (Step (Step 1)1) (NO)

(NO)

Standard:

Standard: The cause The for the cause for alarm is the alarm is not not known and personnel inside known and inside the the CV are CV are currently currently searching searching for for the leak source.

the leak source.

Examiners Examiner's Note:

Note:

Comment:

Comment:

2008 NRC 2008 NRC SIM SIM hh NUREG NUREG 1021, 1021, Revision 9, Supplement Revision 9, Supplement 11

Appendix CC Appendix Page 44 of Page of 14 14 Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE INFORMATION Performance Step:

Performance Step: 44 Observe affected Observe affected radiation radiation monitor monitor for for radiation radiation levels levels and and evidence of evidence of short short term term spiking.

spiking. (Step (Step 2)

2) (NO)

(NO)

Standard:

Standard: R-i2 isis in R-12 in high high alarm and no alarm and no appearance appearance of of short short term term spiking spiking isis noted.

noted.

Examiners Note:

Examiner's Note:

Comment:

Performance Step: 5 IF short term spiking is evidenced, THEN allow the indicated level to decrease prior to performing Step 4. (Step 3)

Standard: No short term spiking is observed.

Examiners Note:

Examiner's Comment:

  • Performance Performance Step:

Step: 66 Determine ifif the alarm alarm is is valid by momentarily depressing the ALARM/RESET ALARM/RESET pushbutton pushbutton for R-12 R-12 monitor monitor (Step (Step 4.4).

4.4).

Standard:

Standard: Candidate depresses the Candidate depresses the RED ALARM/RESET pushbutton RED ALARM/RESET pushbutton Examiners Examiner's Note:

Note: This action This action will cause the will cause the RED RED light light and APP-036-DB to and APP-036-DB to extinguish.

extinguish.

Comment:

Comment:

2008 2008 NRC NRC SIM SIM hh NUREG 1021, NUREG 1021, Revision Revision 9,9, Supplement Supplement 11

Appendix CC Appendix Page 55 of Page of 14 14 Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE INFORMATION Performance Step:

Performance Step: 77 IF the alarm IF the alarm returns, returns, THEN THEN refer refer to to AOP-005 AOP-005 (Step(Step 4.5).

4.5).

Standard:

Standard: APP-036-D8 and APP-036-DB and the the RED RED ALARM/RESET ALARM/RESET module module onon R-12 R-12 monitor returns, monitor returns, thus thus the the alarm alarm is is valid.

valid.

Examiners Note:

Examiner's Note:

Comment:

Performance Step: 8 announcement for procedure entry into AOP-005 due Make PA announcement to an R-12 alarm.

Standard: Candidate makes PA announcement announcement for AOP-005 entry due to R-i2 alarm.

R-12 Examiners Examiner's Note:

Comment:

Performance Performance Step:

Step: 99 Use non-perform non-performed ed attachments listed below for Radiation Monitors Monitors in in alarm.

alarm.

Standard:

Standard: Candidate Candidate selects selects Attachment Attachment 12 12 due due toto R-1 R-12 in alarm.

2 in alarm.

Examiners Examiner's Note:

Note:

Comment:

Comment:

2008 NRC SIM 200B NRC SIM hh NUREG NUREG 1021, 1021, Revision Revision 9,9, Supplement Supplement 11

Appendix CC Appendix Page 66 of Page of 14 14 Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE INFORMATION Performance Step:

Performance Step: 10 10 Check R-11/12 Check R-1 1/12 selector selector switch switch - SELECTED SELECTED TO TO CVCV (Step (Step 1).

1).

Standard:

Standard: Candidate locates Candidate locates selector selector switch switch onon the the Radiation Radiation Monitoring Monitoring Panel and Panel checks that and checks that the the switch switch isis selected selected to to the the CV CV position.

position.

Examiners Note:

Examiner's Note: There is There is an illuminated white light an illuminated light above above the switch switch that that is is labeled as labeled CV.

as CV.

Comment:

Comment:

Performance Step: 11 Check RCS temperature - Greater than 200 degrees F.

Standard: Unit is at 100% power. RCS Tavg is 575.9 degrees F.

Examiners Note:

Examiner's Comment:

Performance Performance Step:

Step: 12 12 Check EOP network Check network procedures IMPLEMENTED.

procedures -IMPLEMENTED.

Standard:

Standard: Candidate determines Candidate determines that EOP procedures that EOP procedures havehave NOT NOT been been implemented implemented and and proceeds proceeds to to Step Step 5.5.

Examiners Examiner's Note:

Note:

Comment:

Comment:

2008 NRC 2008 NRC SIM SIM hh NUREG NUREG 1021, 1021, Revision 9, Supplement Revision 9, Supplement 11

Appendix CC Appendix Page 77 of Page of 14 14 Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE INFORMATION Performance Step:

Performance Step: 13 13 Check personnel-IN Check personnel IN CV.

CV. (Step (Step 5) 5)

Standard:

Standard: Determines that Determines that personnel personnel are are presently presently in in CV CV from from the the initial initial conditions.

conditions.

Examiners Note:

Examiner's Note: APP-036-L5, CVCV PERSONNEL PERSONNEL HATCH HATCH DOOR DOOR OPEN, OPEN, is is illuminated.

Comment:

    • Performance Step: 14 Place VLC switch to EMERG position. (Step 6)

Standard: VLC switch placed in the EMERG position.

Examiners Examiner's Note:

Comment:

2008 2008 NRC SIM hh NRC SIM NUREG NUREG 1021, 1021, Revision Revision 9,9, Supplement Supplement 11

Appendix CC Appendix Page 88 of Page of 14 14 Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE INFORMATION

    • Performance Step:

Performance Step: 15 15 Depress and Depress and Hold Hold CV CV Evacuation Evacuation Horn Horn pushbutton pushbutton for for 15 15 seconds. (Step seconds. (Step 7) 7)

Standard:

Standard: Depresses and Depresses and holds holds CV CV evacuation evacuation horn horn pushbutton pushbutton for for 15 15 seconds seconds Examiners Note:

Examiner's Note:

Comment:

    • Performance Step: 16 Announce the following over Plant PA System:

ATTENTION ALL PERSONNEL. ATTENTION ALL PERSONNEL. A HIGH RADIATION ALARM HAS BEEN RECEIVED ON CV VENT PROCESS MONITOR R-12. ALL NON-ESSENTIAL PERSONNEL EVACUATE CV UNTIL FURTHER NOTICE. (Step 8)

Standard: Announces condition requiring CV evacuation, stating that alarm is on R-12.

Examiners Examiner's Note:

Comment:

2008 NRC 2008 NRC SIM SIM hh NUREG NUREG 1021, 1021, Revision Revision 9, 9, Supplement Supplement 11

Appendix CC Appendix Page 99 of Page 14 of 14 Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE INFORMATION Performance Step:

Performance Step: 17 17 Repeat CV Repeat CV Evacuation Evacuation announcement announcement over over PA PA System.

System. (Step (Step 9) 9)

Standard:

Standard: Candidate repeats Candidate repeats announcement.

announcement.

Examiners Note:

Examiner's Note:

Comment:

Comment:

Performance Step: 18 Place VLC switch to NORM position. (Step 10)

Standard: Returns VLC switch to NORM position.

Examiners Note:

Examiner's Comment:

2008 NRC 2008 NRC SIM SIM hh NUREG 1021, Revision NUREG 1021, 9, Supplement Revision 9, Supplement 11

Appendix CC Appendix Page 10 Page 10 of of 14 14 Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE INFORMATION Performance Step:

Performance Step: 19 19 Check Containment Check Containment Ventilation Ventilation Isolation Isolation valves valves closed.

closed. (Step (Step 11) ii)

Standard:

Standard: Determines Containment Determines Containment Ventilation Ventilation Isolation Isolation valves valves closed closed byby valve position valve position indication indication and/or and/or status status lights.

lights.

Examiners Note:

Examiner's Note: Containment Ventilation Containment Ventilation Isolation Isolation Panel Panel Status Status Lights Lights will will be be pink with valves pink with valves in in the proper position.

the proper position.

Individual valves Individual valves can can be observed on be observed on the the RTGB RTGB for for position position indication.

indication.

Amber lights lit lit for for the CV Ventilation Isolation Isolation Signal Relay Relay V-1 and V-2 on V-i and on the bottom bottom of of the Radiation Radiation Monitoring Monitoring Panel.

Purge valves V12-6, V12-7, V12-8, V12-9 CV Purge CV Pressure Reliefs V12-10, V12-11 Vi 2-11 CV Vacuum Reliefs V12-12, V12-13 Vi 2-13 Comment:

  • Performance Step: 20 Place the following CV IODINE REMOVAL FAN control switches to PREPURGE position: HVE-3 and HVE-4. (Step 12)

Standard: Places switches for HVE-3 and HVE-4 to PREPURGE position and verifies proper operation by fan and damper indication.

Examiners Examiner's Note: RTGB indications indications for [IVE-3 HVE-3 and 4: Fans Fans ON by by RED RED lights lights illuminated illuminated and and PREPURGE PREPURGE alignedaligned by by YELLOW lightslights illuminated.

illuminated.

Comment:

Comment:

2008 NRC 2008 NRC SIM SIM hh NUREG NUREG 1021,1021, Revision Revision 9,9, Supplement Supplement 11

Appendix CC Appendix Page 11 Page 11 of of 14 14 Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE INFORMATION Performance Step:

Performance Step: 21 21 Request RC Request RC to to perform perform aa background background radiation radiation check check atat Radiation Monitors Radiation Monitors R-11 R-1i and and R-12.

R-12. (Step (Step 13) 13)

Standard:

Standard: Contacts RC Contacts RC personnel personnel to to perform perform background background checks checks atat the the radiation monitors.

radiation monitors.

Examiners Cue:

Examiner's Cue: RC personnel RC personnel willwill perform perform background background radiation radiation checks checks at at R-11 and R-11 R-12.

and R-12.

Comment:

Comment:

Performance Step: 22 Determine if Primary System leakage is occurring. (Step 14)

Standard:

Standard: Determines that leakage is occurring.

Examiners Note:

Examiner's Initial conditions stated entry had been made into AOP-016 to determine the location of the RCS leakage.

Comment:

Performance Performance Step:

Step: 23 23 Go Go ToTo the the Main Main Body, Step 11b, Body, Step of this b, of this procedure.

procedure. (Step (Step 16) 16)

Standard:

Standard: Proceeds Proceeds to to Main Main Body, Body, Step Step 11b, b, of of AOP-005.

AOP-OOS.

Examiners Examiner's Note:

Note:

Comment:

Comment:

2008 NRC SIM 2008 NRC SIM hh NUREG NUREG 1021, Revision 9,9, Supplement 1021, Revision Supplement 11

Appendix CC Appendix Page 12 Page 12 of 14 of 14 Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE INFORMATION Performance Step:

Performance Step: 24 24 Use non-performed Use non-performed attachments attachments listed listed below below for for radiation radiation monitors inin alarm monitors alarm - NONE NONE to to be addressed.

be addressed.

Standard:

Standard: R-1 2 attachment R-12 attachment hashas already already been been addressed addressed and and there there are are no no other Radiation other Radiation monitors monitors inin alarm, alarm, thus thus none none are are remaining remaining toto be be addressed.

addressed.

Examiners Note:

Examiner's Note:

Comment:

Comment:

Performance Step: 25 Implement the EALs. (Main Body, Step 2)

Standard:

Standard: Informs the SSO of the need to implement the EALs.

Examiners Note:

Examiner's acknowledges the information provided.

SSO acknowledges Comment:

END END OFTASK OF TASK Termination: AOP-005 actions actions for an R-12 for an R-12 alarm havehave been been completed completed.

STOP STOP TIME:

TIME:

2008 2008 NRC NRC SIM SIM hh NUREG NUREG 1021, 1021, Revision Revision 9,9, Supplement Supplement 11

Appendix C Appendix C Page 13 Page 13 of of 14 14 Form Form ES-C-1 ES-C-i VERIFICATION OF VERIFICATION OF COMPLETION COMPLETION Job Performance Job Performance Measure Measure No.:

No.: 2008 NRC 2008 NRC SIM SIM hh Examinees Name:

Examinee's Name:

Date Performed:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

Response

Result: SAT UNSAT Examiners Examiner's Signature: Date:


2008 NRC SIM 2008 NRC SIM hh 1021, Revision NUREG 1021, NUREG Revision 9, 9, Supplement Supplement 11

Appendix CC Appendix Page 14 Page 14 of 14 of 14 Form Form ES-C-1 ES-C-i JPM CUE JPM CUE SHEET SHEET INITIAL CONDITIONS:

INITIAL CONDITIONS: The plant

    • The plant isis at at 100%

100% power.

power.

    • AOP-016, AOP-016, EXCESSIVE EXCESSIVE PRIMARY PRIMARY PLANT PLANT LEAKAGE, LEAKAGE, isis being being performed.

performed.

    • An An unscheduled unscheduled Containment Containment entry is in entry is in progress progress to to determine determine the the leak location.

leak location.

    • APP-036-LS, APP-036-L5, CV CV PERSONNEL PERSONNEL HATCH HATCH DOOR DOOR OPEN, OPEN, is is ILLUMINATED.

ILLUMINATED.

INITIATING CUE: You are the Control Room Operator. Respond to plant conditions.

2008 2008 NRC NRC SIM SIM hh NUREG 1021, Revision NUREG 1021, Revision 9, 9, Supplement Supplement 11

Appendix C Appendix C Job Performance Job Performance Measure Measure Form Form ES-C-1 ES-C-i Worksheet Worksheet Facility:

Facility: HB ROBINSON HB ROBINSON Task No.:

Task No.: 01311100906 01311100906 Task Title:

Task Title: Trip the Reactor Trip the Reactor from from the the Rod Drive MG Rod Drive MG JPM No.:

JPM No.: 2008 2008 NRCNRC In-Plant In-Plant ii Room Set Room Set K/A

Reference:

KIA

Reference:

029 EA 029 EA1.li 3.9/4.1 1.11 3.9/4.1 029 EA1.12 029 EA1.12 4.1/4.0 4.1/4.0 Examinee:

Examinee: NRC Examiner:

NRC Examiner:

Facility Evaluator:

Facility Evaluator: Date:

Date:

Method of testing:

Method Simulated Performance:

Simulated Performance: xX Actual Performance:

Actual Performance:

Classroom _ _ _ Simulator

- - - Plant xX READ TO THE EXAMINEE READ II will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions: ** You are the Inside AO.

  • Plant is operating at 100% RTP.
  • The Reactor cannot be tripped from the Control Room.
  • FRP-S.1, RESPONSE TO NUCLEAR POWER GENERATION/ATWS, is being implemented implemented..

Task Standard: BOTH Rod Drive Motor Generator Circuit Breakers A "A" and B "B" are opened locally.

Required Materials:

Materials: FRP-S.1, FRP-S.1, RESPONSE TO TO NUCLEAR NUCLEAR POWER POWER GENERATION/ATWS, GENERATION/ATWS, Rev. Rev. 17.

17.

General

References:

General

References:

FRP-S.i, FRP-S.1, RESPONSE TO TO NUCLEAR NUCLEAR POWER POWER GENERATION/ATWS, GENERATION/ATWS, Rev. Rev. 17.

17.

Initiating Initiating Cue:

Cue: The The CRSS CRSS directs you to directs you to the Rod Drive the Rod Drive MG MG Set Set Room Room to to trip trip the the following following breakers:

breakers: Reactor Trip Breakers Reactor Trip "A" and Breakers A and B "B" and and Rod Drive Motor Rod Drive Motor Generator Generator A "A"

and and B Circuit Breakers.

"B" Circuit Breakers.

Time Critical Task:

Time Critical Task: YES YES Validation Validation Time:Time: 55 minutes minutes 2008 NRC 2008 NRC IP IP i i NUREG 1021, NUREG 1021, Revision Revision 9, 9, Supplement Supplement 11

Appendix CC Appendix Page 22 of Page of 88 Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE INFORMATION (Denote Critical (Denote Critical Steps with an Steps with an asterisk) asterisk)

EXAMINERS NOTE:

EXAMINER'S NOTE: FRP-S.1, Steps FRP-S.1, Steps 11 and and 22 areare immediate immediate action action steps and steps and the the AOs AOs wouldwould be be expected expected to to execute these steps execute steps from memory memory without without procedure in procedure in hand.

hand.

These immediate These immediate action steps are represented represented by Steps 1, 1,2,3 2, 3 and 4 of this JPM, thus Steps Steps 11 through 4 are time critical steps.

START TIME: _ _ __ TIME CRITICAL START TIME: _ _ _ __

Performance Step: 1 1 Trip Reactor Trip Breaker "A". A.

Standard: Simulates tripping Reactor Trip Breaker "A" A by depressing the trip button in the center of the breaker.

Examiners Note:

Examiner's As Found position of the breaker is CLOSED with RED CLOSED flag in the breaker status window.

Examiners Examiner's Cue: After the candidate candidate locates and describes I simulates simulates how the breaker breaker would be tripped open, open, inform inform the candidate candidate the breaker breaker trip pushbutton pushbutton in in the center of of the cubicle door door has has been been pressed pressed and and the breaker breaker RED RED CLOSED CLOSED flag remains in in the breakers the breaker's status status window.

window.

Comment:

Comment:

2008 2008 NRC NRC lP IP i i NUREG NUREG 1021, 1021, Revision Revision 9, 9, Supplement Supplement 11

Appendix C Appendix C Page 33 of Page of 88 Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE INFORMATION Performance Step:

Performance Step: 22 Trip Reactor Trip Reactor Trip Trip Breaker Breaker "B".

B.

Standard:

Standard: Reactor Trip Breaker Simulates tripping Reactor Breaker "B" B by by depressing depressing the trip button in the center of the breaker.

breaker.

Examiners Note:

Examiner's As Found position of the breaker is CLOSED with RED CLOSED flag in the breaker status window.

Examiners Cue:

Examiner's After the candidate locates and describes I simulates how the breaker would be tripped open, inform the candidate the breaker trip pushbutton in the center of the cubicle door has been pressed and the breaker RED CLOSED flag remains in breakers status window.

the breaker's Comment:

2008 NRC 2008 NRC lPIP Ii NUREG NUREG 1021,1021, Revision 9, Supplement Revision 9, Supplement 11

Appendix C Appendix C Page 44 of Page of 88 Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE INFORMATION

    • Performance Step:

Performance Step: 33 Trip Motor Generator Trip Motor Generator "A" A Circuit Circuit Breaker.

Breaker.

Standard:

Standard: Simulates tripping Simulates tripping Motor Motor Generator Generator "A" A Circuit Circuit Breaker.

Breaker.

Examiners Note:

Examiner's As Found position of the breaker is CLOSED with RED CLOSED CLOSED flag in the breaker status window or indication on the MG MG Set Set panel has the RED light illuminated and and the GREEN GREEN light extinguished.

extinguished.

BOTH Motor Generator Circuit Breakers "A" A and "B" B must be tripped locally for a success path in this JPM.

Examiners Cue:

Examiner's After the candidate locates and describes I simulates how the breaker would be tripped open, inform the candidate the breaker trip pushbutton in the center of the cubicle door has been pressed and the breaker OPEN GREEN flag has breakers status window. Noise was heard appeared in the breaker's as the breaker re-positioned.

OR The operator may choose to trip the breaker with the pistol grip switch on the MG Set panel. After locating and describing how the breaker would be tripped using the pistol grip switch, inform the candidate that the pistol grip switch has been taken to the TRIP position and the RED light is extinguished and the GREEN light is illuminated.

Noise was heard as the breaker re-positioned.

Comment:

2008 2008 NRC NRC IPIP ii NUREG NUREG 1021,1021, Revision Revision 9, 9, Supplement Supplement 11

Appendix CC Appendix Page 55 of Page of 88 Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE INFORMATION

    • Performance Step:

Performance Step: 44 Trip Motor Trip Generator "B" Motor Generator B Circuit Circuit Breaker.

Breaker.

Standard:

Standard: Simulates tripping Simulates tripping Motor Motor Generator Generator "B"B Circuit Circuit Breaker.

Breaker.

Examiners Note:

Examiner's Note: As Found position As Found position ofof the the breaker breaker isis CLOSED CLOSED withwith RED RED CLOSED CLOSED flag in flag in the breaker status the breaker status window window or indication on or indication on the the MG MG Set Set panel has panel the RED has the light illuminated RED light illuminated and and the the GREEN GREEN light light extinguished.

extinguished.

BOTH Motor BOTH Motor Generator Circuit Breakers Breakers "A"A and "B" B must bebe locally for aa success tripped locally success path in this JPM. JPM.

Examiners Cue:

Examiner's After the candidate locates and describes II simulates how the breaker would be tripped open, inform the candidate the breaker trip pushbutton in the center of the cubicle door has been pressed and the breaker OPEN GREEN flag has breakers status window. Noise was heard appeared in the breaker's re-positioned.

as the breaker re-positioned.

OR The operator may choose to trip the breaker with the pistol grip switch on the MG Set panel. After locating and describing how the breaker would be tripped using the pistol grip switch, inform the candidate that the pistol grip switch has been taken to the TRIP position and the RED light is extinguished and the GREEN light is illuminated.

Noise was heard as the breaker re-positionedre-positioned..

Comment:

TIME TIME CRITICAL CRITICAL STOPSTOP TIME:

TIME: _ _ _ __

2008 NRC IP 2008 NRC IP i i NUREG NUREG 1021, 1021, Revision Revision 9,9, Supplement Supplement 11

Appendix CC Appendix Page 66 of Page of 88 Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE INFORMATION Performance Step:

Performance Step: 55 Inform the Inform the Control Control Room Room thatthat Motor Motor Generator Generator "A" A and and "B" B Circuit Circuit Breakers have Breakers have been been tripped tripped open open and and that that Reactor Reactor Trip Trip Breakers Breakers A and "A" and "B" would NOT B would NOT open.

open.

Standard:

Standard: Contacts the Contacts the Control Control Room Room and and reports reports that that Motor Motor Generator Generator "A" A

and "8" and B Circuit Circuit Breakers Breakers have have been been tripped tripped open open and and that that Reactor Trip Reactor Trip Breakers Breakers "A" A and and "B" B would would NOT NOT open.

open.

Examiners Cue:

Examiner's Cue: As the As the CRSS, CRSS, acknowledge acknowledge the the candidate's candidates report.

report.

Examiners Note:

Examiner's Note:

Comment:

END OFOFTASK TASK Termination: Rod Drive Drive MG Set Circuit Breakers A MG Set "A" and B "B" are are tripped open.

open.

STOP TIME:

STOP TIME:

2008 NRC lP 2008 NRC IP I i NUREG NUREG 1021,1021, Revision Revision 9, 9, Supplement Supplement 11

Appendix CC Appendix Page 77 of Page of 88 Form Form ES-C-1 ES-C-i VERIFICATION OF VERIFICATION OF COMPLETION COMPLETION Job Performance Job Performance Measure Measure No.:

No.: 2008 NRC 2008 NRC IP IP ii Examinees Name:

Examinee's Name:

Examiners Name:

Examiner's Name:

Date Performed:

Date Performed:

Facility Evaluator:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Documentation:

Question Documentation:

Question:

Response

Result: SAT UNSAT Examiners Examiner's Signature:

Signature: Date:


2008 2008 NRCNRC IP IP i i NUREG 1021, Revision NUREG 1021, Revision 9, 9, Supplement Supplement 11

Appendix CC Appendix Page 88 of Page of 88 Form Form ES-C-1 ES-C1 JPM CUE JPM CUE SHEET SHEET INITIAL CONDITIONS:

INITIAL CONDITIONS: ** You are You are thethe Inside Inside AO.

AO.

    • Plant isis operating Plant operating atat 100%

100% RTP.

RTP.

    • The Reactor cannot The Reactor cannot be be tripped tripped from from the the Control Control Room.

Room.

    • FRP-S.1, RESPONSE FRP-S.1, RESPONSE TO TO NUCLEAR NUCLEAR POWERPOWER GENERATION/ATWS, isis being GENERATION/ATWS, being implemented.

implemented.

INITIATING CUE:

INITIATING CUE: The CRSS The CRSS directs directs you you to the Rod to the Drive MG Rod Drive MG SetSet Room Room toto trip trip the the following breakers:

following breakers: Reactor Reactor Trip Trip Breakers Breakers "A" A and and "B" B and and Rod Rod Drive Drive Motor Generator "A" and "B" A and B Circuit Breakers.

Breakers.

2008 2008 NRC IP i i NRC IP NUREG 1021, NUREG 1021, Revision Revision 9,9, Supplement Supplement 11

Appendix C Appendix C Job Performance Measure Job Performance Measure Form Form ES-C-1 ES-C-i Worksheet Worksheet Facility:

Facility: HB ROBINSON HB ROBINSON Task No.:

Task No.: 04010100101 04010100101 Task Title:

Task Title: Energize PZR Energize PZR Heaters Heaters from from Emergency Emergency JPM No.:

JPM No.: 2008 2008 NRC NRC In-Plant In-Plant j Busses (Turbine Building Busses (Turbine Building Actions)

Actions) lAW lAW EPP-21.

EPP-21.

K/A

Reference:

KIA

Reference:

027 AA 027 AA11.05 3.3/3.2

.05 3.3/3.2 AA11.21 056 AA 056 .21 3.3/3.3 3.3/3.3 Examinee:

Examinee: Examiner:

NRC Examiner:

NRC Facility Evaluator:

Facility Evaluator: Date:

Date:

Method of testing:

Method Performance:

Simulated Performance: xX Performance:

Actual Performance:

Classroom - - - Simulator - - - Plant xX READ TO THE EXAMINEE READ II will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions:

  • The plant has experienced a loss of offsite AC power.
  • implemented.

EOP Network has been implemented.

  • EPP-4, REACTOR TRIP RESPONSE, RESPONSE, has directed the implementation implementation of EPP-21, ENERGIZING PRESSURIZ PRESSURIZER ER HEATERS FROM EMERGENCY BUSSES.
  • You are the Outside AO.
  • Emergency Bus E-1 is powered by EDG A. "A".
  • You have have been given Key # 69, PZR "PZR Heater Breaker Arm Switch Switch" and aa set of large fuse pullers.
  • The The breakers breakers listed listed in in Step # 33 cannot bebe verified verified 6pen open from the RTGB.

Task Task Standard:

Standard: Align breakers Align breakers in in preparation preparation forfor energizing energizing PZR PZR Backup Backup Heater Heater Group Group AA lAW lAW EPP-21.

EPP-21.

Required Required Materials:

Materials: EPP-21, EPP-21, ENERGIZING ENERGIZING PRESSURIZ PRESSURIZER ER HEATERS HEATERS FROM FROM EMERGENCY EMERGENCY BUSSES, BUSSES, Rev. Rev. 15.

15.

Key Key ## 6969 Large Fuse Pullers Large Fuse Pullers General

References:

General

References:

EPP-21, EPP-21, ENERGIZING ENERGIZING PRESSURIZ PRESSURIZER ER HEATERS HEATERS FROM FROM EMERGENCY EMERGENCY BUSSES, BUSSES, Rev. Rev. 15.

15.

2008 2008 NRC NRC IPjIP j NUREG 1021, Revision NUREG 1021, 9, Supplement Revision 9, Supplement 11

Appendix C Appendix C Job PerFormance Measure Job Performance Measure Form Form ES-C-1 ES-C-i Worksheet Worksheet Initiating Cue:

Initiating Cue: The CRSS The CRSS has has directed directed you you to to perform perform the the Turbine Building actions Turbine Building actions required required to to energize PZR energize PZR Heaters Heaters from from the the emergency emergency busbus inin accordance accordance with with EPP-21, EPP-2i, Steps 33 through Steps through 6.

6.

Time Critical Time Critical Task:

Task: NO NO Validation Time:

Validation Time: minutes 20 minutes 20 2008 2008 NRC NRC IP IP jj NUREG 1021, NUREG 1021, Revision Revision 9, 9, Supplement Supplement 11

Appendix CC Appendix Page 33 of Page of 10 10 Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE INFORMATION (Denote Critical (Denote Critical Steps Steps with with an an asterisk) asterisk)

START TIME:

START TIME: _ __

Performance Step:

Performance Step: 11 Obtain aa copy Obtain copy ofof the the appropriate appropriate procedure.

procedure.

Standard:

Standard: Candidate obtains Candidate obtains copy copy ofof EPP-21 EPP-21 from from the the lAO lAO office, office, WCC, WCC, Control Room Control Room or or other other valid valid location.

location.

Examiners Note:

Examiner's Note:

Examiners Cue:

Examiner's Cue: candidate states When candidate states they need need toto obtain obtain aa copy copy of of EPP-EPP 21, ask him where to locate one. If correct, provide him with a copy of EPP-21.

Comment:

    • Performance Step: 2 Performance Verify OPEN SST-2A TO 480V SYSTEM BKR 52/1 52/i B. (Step 3, First Bullet)

Standard: Breaker 52/i 52/1 B opened by depressing the trip pushbutton in the center of the breaker cubicle door.

Examiners Examiner's Note: As Found position of the breaker is CLOSED with RED CLOSED flag in the breaker status window.

Examiners Examiner's Cue:

Cue: After the the candidate candidate locates and and describes describes I simulates simulates howhow the breaker the breaker would would be be tripped open, inform tripped open, inform thethe candidate candidate the the breaker trip pushbutton breaker trip pushbutton in in the the center center ofof the the cubicle cubicle door door has has been been pressed pressed and and thethe breaker breaker OPEN GREEN flag OPEN GREEN flag has has appeared appeared in the breakers in the breaker's status status window.

window. NoiseNoise was was heard heard as the breaker as the breaker re-positioned re-positioned..

Comment:

Comment:

2008 2008 NRC NRC IPj IP j NUREG 1021, Revision NUREG 1021, Revision 9,9, Supplement Supplement 11

Appendix CC Appendix Page 44 of Page of 10 10 Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE INFORMATION Performance Step:

Performance Step: 33 Verify OPEN Verify OPEN 480V480V BUS BUS 11 MAIN MAIN BKR BKR 52/2B.

52/2B. (Step (Step 3, 3, Second Second Bullet)

Bullet)

Standard:

Standard: Breaker 52/2B Breaker 52/2B opened opened by depressing the by depressing the trip trip pushbutton pushbutton in in the the center of center of the breaker cubicle the breaker cubicle door.

door.

Examiners Note:

Examiner's Note: As Found As Found position position of of the the breaker breaker is is OPEN OPEN with with GREEN GREEN OPENOPEN flag in the breaker status flag in the breaker status window.

window.

Examiners Cue:

Examiner's Breaker indicates OPEN with GREEN flag in breaker status window.

Comment:

Performance Step: 4 Verify OPEN 480V BUS 1-2A i-2A TIE BKR 5215B.

52/5B. (Step 3, Third Bullet)

Standard: Breaker 5215B 52/5B opened by by depressing depressing the trip pushbutton in in the center of the breaker cubicle door.

Examiners Examiner's Note: As Found Found position of the breaker is OPEN with GREEN GREEN OPENOPEN flag in in the breaker status window.

Examiners Examiner's Cue:Cue: Breaker Breaker indicates indicates OPEN OPEN withwith GREEN GREEN flagflag inin breaker breaker status status window.

window.

Comment:

Comment:

2008 NRC 2008 NRC IP IP j j NUREG 1021, Revision NUREG 1021, Revision 9, 9, Supplement Supplement 11

Appendix C Appendix C Page 55 of Page of 10 10 Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE INFORMATION Performance Step:

Performance Step: 55 Verify OPEN Verify OPEN 480V480V BUS BUS E1 El MAIN MAIN BKR BKR 52/18B.

52/i8B. (Step (Step 3, 3, Fourth Fourth Bullet)

Bullet)

Standard:

Standard: Breaker 52/18B Breaker 52/i 8B opened opened by by depressing depressing the the trip trip pushbutton pushbutton located in located in the center of the center breaker cubicle of the breaker cubicle door.

Examiners Note:

Examiner's Note: Found position of the breaker is OPEN with GREEN OPEN As Found flag inin the the breaker breaker status window.

Examiners Cue:

Examiner's Breaker indicates OPEN with GREEN flag in breaker status window.

Comment:

Performance Step: 6 Obtain the following: (Step 4)

  • Key ##6969 to PZR HEATER BKR ARM SWITCH
  • Large Fuse Pullers Standard: Obtain the key and large fuse pullers.

Examiners Examiner's Note: Key and large fuse pullers were obtained during the initial conditions.

Examiners Examiner's Cue: Ensure that the candidate is clear that the initial conditions provided the necessary materials.

Comment:

NOTE: 4160V NOTE: 4160V Breaker 52113 is Breaker 52/13 is locally locally opened opened by by rotating rotating the the switch switch counterclock counterclockwisewise to the TRIP position the TRIP and then position and then pulled pulled out to lock.

out to lock.

2008 2008 NRC NRC lPj IP j NUREG 1021, Revision NUREG 1021, Revision 9,9, Supplement Supplement 11

Appendix CC Appendix Page 66 of Page of 10 10 Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE INFORMATION

    • Performance Step:

Performance Step: 77 Locally open Locally open andand Pull-To-Lock Pull-To-Lock STATION STATION SERVICE SERVICE TRANSFORMER 2A TRANSFORMER 2A and and 2F BKR 52/13 2F BKR 52/13 (4160V (41 60V Bus Bus 2, 2, CMPT-CMPT 13). (Step 13). (Step 5) 5)

Standard:

Standard: Breaker 52/13 Breaker 52/13 opened opened by turning the by turning the breaker breaker control control switch switch counterclockwise to counterclockwise to the the TRIP TRIP position position and and placed placed inin Pull-To-Lock Pull-To-Lock (Located on (Located 4160V Bus on 4160V Bus 2,2, CMPT CMPT-13).

-13).

Examiners Note:

Examiner's Note: As Found As Found position position of the breaker of the breaker is CLOSED with is CLOSED with RED RED CLOSED CLOSED indicator light illuminated indicator light illuminated on the breaker cubicle door.

IfIf candidate candidate decides decides to looklook at at the breaker breaker by by opening opening the cubicle cubicle door, the as found position of the breaker is CLOSED with with RED RED CLOSED flag on the breaker status window.

Examiners Cue:

Examiner's After the candidate locates and describes I simulates how the breaker would be tripped open, inform the candidate the breaker control switch has been rotated counterclockwisecounterclockwise and the RED CLOSED indicator has extinguished and the GREEN OPEN indicator has illuminated. Noise was heard as the breaker re-positioned.

re-positioned.

Comment:

2008 2008 NRC NRC IPIP j j NUREG NUREG 1021,1021, Revision 9, Supplement Revision 9, Supplement 11

Appendix CC Appendix Page 77 of Page of 10 10 Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE INFORMATION

    • Performance Step:

Performance Step: 88 Perform the Perform the following:

following: (Step (Step 6)6)

a. Locally verify
a. Locally verify the the following following breakers breakers at at 480V 480V BusBus 11 -

OPEN OPEN

    • Pressurizer Heater Pressurizer Heater Backup Backup Group Group AA (CMPT-2C)

(CMPT-2C)

    • Feed to Feed to MCC-1 MCC-i (CMPT-3A)

(CMPT-3A)

    • CV Polar Crane CV Polar Crane Power Power Supply Supply (CMPT-3B)

(CMPT-3B)

    • Feed to Feed to PP-63 PP-63 (CMPT (CMPT-3C)

-3C)

    • Construction Facilities Construction Facilities Main Main Disconnect Disconnect (CMPT-(CMPT 4B)
    • Spent Fuel Spent Fuel Pit Pit Cooling Cooling Pump Pump B B (CMPT-4C)

(CMPT-4C)

  • Condenser Vacuum Pump A (CMPT-5C)
b. Remove breaker control power fuses from Condenser Vacuum Pump A. (CMPT-5C)

Standard: a. All 480V Bus 11 breakers verified OPEN by checking for GREEN OPEN indication or by depressing the TRIP pushbutton in the center of the breaker cubicle door to place the breaker in the OPEN position.

b. Breaker door is opened and control power fuses are removed from Condenser Vacuum Pump A. (CMPT-5C)

Examiners Examiner's Note: As Found position of the following breakers is CLOSED with RED CLOSED indicator light illuminated illuminated on the breaker cubicle cubicle door:

door:

- Feed Feed toto MCC-i MCC-1 (CMPT-2C)

- Feed Feed toto PP-63 PP-63 (CMPT-3C)

(CMPT-3C)

- Construction Construction Facilities Facilities Main Main Disconnect Disconnect (CMPT (CMPT 4B)4B)

The The remaining remaining breaker breaker positions positions may may be be OPEN OPEN or or CLOSED, CLOSED, depending depending on on whether whether they they were were operating operating for for plant plant needs needs at at the the time of time of the the loss of power.

loss of power.

2008 2008 NRC NRC IPj IP j NUREG 1021, NUREG 1021, Revision Revision 9,9, Supplement Supplement 11

Appendix CC Appendix Page 88 of Page of 10 10 Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE INFORMATION Examiners Cue:

Examiner's Cue: a. When

a. When the the breakers breakers areare located, located, and and the the candidate candidate hashas simulated pushing the simulated pushing the TRIP TRIP pushbutton, pushbutton, informinform the the candidate that candidate that GREEN GREEN OPENOPEN indication indication is is visible.

visible.

b. Once
b. Once the the candidate candidate has has determined determined andand identified identified the the proper 480V breaker proper 480V breaker cubiclecubicle to to remove remove the the control control power fuses, power fuses, present present himhim with with the the breaker breaker cubicle cubicle picture and picture and allow allow him him to to identify identify the the fuses fuses and and the the removal process.

removal process. When When thethe fuses fuses are are identified, identified, inform the inform the candidate candidate that that they they are are removed.

removed.

Comment:

Comment:

Performance Step:

Performance Step: 9 Inform the CRSS that the Turbine Building Inform Building actions of EPP-21 EPP-21,,

Steps 3 through 6 have been completed as directed.

Standard:

Standard: Candidate contacts the Control Room and informs the CRSS that the Turbine Building portions of EPP-21 have been completed as directed.

Examiners Note:

Examiner's Note:

Examiners Examiner's Cue: CRSS acknowledge acknowledges s the report.

Comment:

Comment:

END END OFTASK OF TASK Termination:

Termination: EPP-21 EPP-21 Steps Steps 33 through have been through 66 have been completed completed as as directed.

directed.

STOP STOP TIME:

TIME:

2008 2008 NRC NRC IPIPj j NUREG NUREG 1021,1021, Revision Revision 9,9, Supplement Supplement 11

Appendix CC Appendix Page 99 of Page 10 of 10 Form Form ES-C-1 ES-C-i VERIFICATION OF VERIFICATION OF COMPLETION COMPLETION Job Performance Measure Job Performance Measure No.:

No.: 2008 NRC 2008 IP ij NRC IP Examinees Name:

Examinee's Name:

Examiners Name:

Examiner's Name:

Performed:

Date Performed:

Date Facility Evaluator:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Documentation:

Question Documentation:

Question:

Response

Result: SAT UNSAT Examiners Examiner's Signature:

Signature: Date:

Date:


2008 NRC 2008 NRC IPj IP j NUREG 1021, Revision NUREG 1021, Revision 9, 9, Supplement Supplement 11

Appendix CC Appendix Page 10 Page 10 of of 10 10 Form Form ES-C-1 ES-C-i JPM CUE JPM CUE SHEET SHEET INITIAL CONDITIONS:

INITIAL CONDITIONS: ** The plant The plant has has experienced experienced aa loss loss of of offsite offsite AC AC power.

power.

    • EOP Network EOP Network has has been been implemented.

implemented.

    • EPP-4, REACTOR EPP-4, REACTOR TRIP TRIP RESPONSE, RESPONSE, has has directed directed the the implementati implementation of EPP-21, on of EPP-21, ENERGIZING ENERGIZING PRESSURIZER PRESSURIZER HEATERS FROM HEATERS FROM EMERGENCY EMERGENCY BUSSES. BUSSES.
    • You are You the Outside are the Outside AO.

AD.

    • Emergency Bus Emergency Bus E-1 E-i is is powered powered by by EDG EDG "A".

A.

    • You have You have been been given given Key Key ## 69, PZR Heater 69, "PZR Heater Breaker Breaker Arm Arm Switch and Switch" and aa set set of of large large fuse fuse pullers.

pullers.

  • The breakers listed in Step # 3 cannot be verified open open from RTGB.

the RTGB.

INITIATING CUE:

INITIATING The CRSS has directed you to perform the Turbine Building actions required to energize PZR Heaters from the emergency EPP-21,, Steps 3 through 6.

bus in accordance with EPP-21 2008 NRC lPj 2008 NRC IP j NUREG NUREG 1021, 1021, Revision Revision 9, 9, Supplement Supplement 11

Appendix C Appendix C Job Performance Job Performance Measure Measure Form Form ES-C-1 ES-C-i Worksheet Worksheet Facility:

Facility: HB ROBINSON HB ROBINSON Task No.:

Task No.: 04064100901 04064100901 Task Title:

Task Title: Manually Start Manually Start EDG EDG Using Air Start Using Air Start JPM No.:

JPM No.: 2008 2008 NRC NRC In-Plant In-Plant kk Solenoids Solenoids KIA

Reference:

K/A

Reference:

064 A3.01 064 A3.01 4.1/4.0 4.1/4.0 056 AK3.02 4.4/4.7 056 AK3.02 4.4/4.7 056 AA2.14 4.4/4.6 056 AA2.14 4.4/4.6 Examinee:

Examinee: Examiner:

NRC Examiner:

NRC Facility Evaluator:

Facility Evaluator: Date:

Date:

Method of Method of testing:

testing:

Simulated Performance:

Simulated Performance: xX Performance:

Actual Performance:

Simulator Classroom - - - Simulator Plant X READ TO THE EXAMINEE II will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions:

  • You are the Inside AO.
  • The unit has experienced a total loss of onsite and offsite power.
  • EPP-1, LOSS OF ALL AC POWER, has been implemented. implemented.

Task Standard: Start EDG EDG A locally and energize 480V "A" locally 480V BusBus E-1 Required Required Materials:

Materials: EPP-i, EPP-1, Revision 38 38 General

References:

General

References:

EPP-1, EPP-1, Revision Revision 38 38 Initiating Initiating Cue:

Cue: The The CRSS CRSS has has dispatched dispatched you you to to perform perform EPP-i, EPP-1, starting starting at at Step Step 110.b.

0.b.

RNO.

RNO.

Time Critical Time Critical Task:

Task: NO NO Validation Validation Time: Time: 12 12 minutes minutes 2008 2008 NRC NRC IP IP kk NUREG 1021, NUREG 1021, Revision Revision 9, 9, Supplement Supplement 11

Appendix CC Appendix Page 22 of Page of 88 Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE INFORMATION (Denote Critical (Denote Critical Steps with an Steps with an asterisk) asterisk)

START TIME: _ _

STARTTIME:

    • Performance Step:

Performance Step: 11 Place the Place the EDG EDG Control Control Switch Switch inin the the LOCAL LOCAL position.

position.

Standard:

Standard: Candidate locates Candidate locates and simulates placing and simulates placing the the EDG EDG "A"A LOCAL LOCAL /I REMOTE CONTROL REMOTE CONTROL switch switch in in the LOCAL position.

the LOCAL position.

Examiners Cue:

Examiner's EDG "A" EDG A LOCAL LOCAL II REMOTE REMOTE CONTROL CONTROL switch is is rotated rotated to the LOCAL position position and the Local Local Control WHITE light light is is ILLUMINATED.

ILLUMINATED.

Comment:

    • Performance Step: 2 Depress the Local Engine START pushbutton.

Standard: Candidate simulates depressing the Local Engine START pushbutton on the EDG "A" A Engine Control Panel.

Examiners Cue:

Examiner's EDO A EDG "A" does NOT start.

Comment:

2008 2008 NRC NRC IPIP kk NUREG NUREG 1021,1021, Revision Revision 9, 9, Supplement Supplement i1

Appendix CC Appendix Page 33 of Page of 88 Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE INFORMATION

    • Performance Step:

Performance Step: 33 the affected IfIf the affected EDG did NOT EDG did start from NOT start from the the Engine Engine Control Control Panel, Panel, Then perform the Then perform the following following atat the the EDG EDG Hand Hand Start Start valves:

valves:

Remove the Remove the locking locking pin pin from the Hand from the Hand Start Start valves valves Lock Lock Bar Bar and and remove the remove the Lock Lock Bar.

Bar.

Standard:

Standard: Candidate simulates Candidate simulates removing removing the the locking locking pin pin from from the the Hand Hand Start valves Start valves Lock Lock BarBar and and removing removing the the Lock Lock Bar Bar from from valves valves DA-41 and DA-41 and DA-42.

DA-42.

Examiners Cue:

Examiner's Locking pin from the Hand Start valves Lock Bar is removed Locking and the Lock Bar from valves DA-41 and DA-42 is removed. removed.

Comment:

    • Performance Step: 4 If the affected EDG did NOT start from the Engine Control Panel, Then perform the following at the EDG Hand Start valves:

Pull down and hold either of the EDG Hand Start valves until the EDG starts:

  • DA-4i DA-41
  • DA-42 Standard:

Standard: Candidate selectsselects oneone of the Hand Hand Start Start valves valves and and simulates pulling down down on the handle until until the EDG starts.

Examiners Examiner's Cue:

Cue: EDG EDG A "A" has started and has started and is is running running at at 900 900 RPM.

RPM.

Comment:

Comment:

2008 NRC 2008 NRC IP IP kk NUREG NUREG iO2i, 1021, Revision Revision 9, 9, Supplement Supplement 11

Appendix C Page 4 of 8 ES-C-i Form ES-C-1 PERFORMANCE INFORMATION PERFORMANCE INFORMATION Performance Step: 5 IfIf either EDG has started, Then Go To Step 11.ii.

Standard: EDG "A" A started and candidate proceeds to Step 11 ii..

Examiners Note:

Examiner's Comment:

Performance Step: 6 Check either Emergency Bus E-1 E-i or E ENERGIZED.

Standard: Candidate observes indication on the EDG "A" A Generator Control Panel and notes that 480V Bus E-1 is NOT energized.

Examiners Cue:

Examiner's GENERATOR AC VOLTS indicates 480 Volts.

EMERGENCY BUS AC VOLTS indicates 0 Volts.

NORMAL BUS AC VOLTS INDICATES 0 Volts.

GENERATOR HERTZ indicates 60 Hz.

If candidate requests information from the Control Room, inform him that neither Emergency Bus is energized.

Comment:

2008 NRC IP k NUREG 1021, 1021, Revision 9, Supplement 1a1!

Appendix C C Page 55 of 88 Form ES-C-i ES-C-1 PERFORMANCE INFORMATION INFORMATION

  • Performance Step: 7 Verify the following for any running EDG:
  • EMERG GEN VOLTS - APPROXIMATELY 480 VOLTS.

-

AND

  • BRKR 52/17B, EMERG DG A TO BUS El E1 - CLOSED.

Standard: Candidate observes that EDG A GENERATOR AC VOLTS "A" GENERATOR indicates - 480 Volts.

Candidate closes EDG A "A" Output breaker at the EDG Generator Control Panel by placing EDG OUTPUT BKR 52Ii7B 52/17B control switch to the CLOSE position.

Indications on the EDG Generator Control panel include Generator AC Volts, Emergency Bus AC Volts and Normal Bus AC Volts.

Inform candidate that EDG Generator AC Volts is 480 Volts.

Inform candidate that breaker 52117B indication has the GREEN OPEN light illuminated and the RED CLOSED light extinguished when the breaker control switch is located.

Inform candidate that breaker 52117B indication has the RED CLOSED light illuminated and the GREEN OPEN light extinguished when the breaker control switch is placed in the closed position.

Generator AC KW indicates 400 KW.

Examiner's Examiners Cue:

Comment:

2008 NRC IP k NUREG 1021, Revision 9, Supplement 11

Appendix CC Appendix Page 66 of Page of 88 Form ES-C-i Form ES-C-1 PERFORMA PERFORMANCE NCE INFORMAT INFORMATION ION Performance Step:

Performance Step: 88 Emergency Bus either Emergency IfIf either Bus is energized, Then is energized, To Step Go To Then Go Step 12.

12.

Standard:

Standard: 480V Bus 480V E-1 is Bus E-1 energized at is energized at ~ 480 Volts with 480 Volts EDG A with EDG "A" supplying supplying the bus.

the bus.

Examiner's Cue:

Examiners Cue: Inform the Inform candidate that the candidate that EMERGENC EMERGENCY Y BUS BUS ACAC VOLTS VOLTS indicates 480 indicates 480 Volts and and that Emergency Bus that Emergency E-1 is Bus E-1 is energized.

energized.

Comment:

ENDOFTAS END OF TASK K A started and 480V Bus E-1 energized.

Termination: EDG "A" STOP TIME:

2008 2008 NRC NRC IPIP kk NUREG 1021, NUREG Revision 9, 1021, Revision Supplement 11 9, Supplement

Appendix C Appendix C Page 77 of Page of 88 Form ES-C-1 Form ES-C-1 VERIFICATION OF VERIFICATION OF COMPLETION COMPLETION Job Performance Job Performance Measure Measure No.:

No.: 2008 2008 NRC NRC IP IP kk Examinee's Name:

Examinees Name:

Examiner's Name:

Examiners Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

Response

Result: SAT UNSAT Examiner's Examiners Signature: Date:


2008 2008 NRC NRC IPIP kk NUREG NUREG 1021, Revision 9, 1021, Revision Supplement 11 9, Supplement

Appendix CC Appendix Page Page 88ofof88 Form ES-C-i Form ES-C-1 JPM CUE JPM CUE SHEET SHEET INITIAL CONDITION INITIAL CONDITIONS:S: ** You are You are the Inside AO.

the Inside AO.

    • The unit The experienced aa total has experienced unit has loss of total loss of onsite offsite power.

and offsite onsite and power.

    • EPP-1, LOSS OF EPP-1, LOSS ALL AC POWER, has been OF ALL AC POWER, has been implemented. implemented .
    • Emergency Generator B Diesel Generator Emergency Diesel out of "8" isis out of service for scheduled service for scheduled maintenance maintenance to to replace replace the the fuel fuel oil oil filters.

filters.

    • Emergency Generator A Diesel Generator Emergency Diesel failed to "A" failed to start.

start.

INITIATING CUE:

INITIATING CUE: The CRSS The dispatched you has dispatched CRSS has you to perform EPP-i, to perform starting at EPP-1, starting Step iO.b.

at Step 10.b.

RNa.

RNO.

2008 NRC 2008 NRC IPIP kk NUREG 1021, NUREG 1021, Revision Supplement11 Revision 9,9, Supplement

Appendix CC Appendix Job Performance Job Performance Measure Measure Form Form ES-C-i ES-C-1 Worksheet Worksheet Facility:

Facility: HB ROBINSON HB ROBINSON Task No.:

Task No.: 04064100901 04064100901 Task Title:

Task Title: Manually Start Manually Using Air EDG Using Start EDG Air Start Start JPM No.:

JPM No.: 2008 NRC In-Plant 2008 NRC In-Plant kk Solenoids Solenoids KJA

Reference:

K/A

Reference:

A3.01 4.1/4.0 064 A3.0i 064 4.1/4.0 056 AK3.02 4.4/4.7 056 AK3.02 4.4/4.7 056 AA2.14 056 AA2.14 4.4/4.6 4.4/4.6 Examinee:

Examinee: NRC Examiner:

NRC Examiner:

Facility Evaluator:

Facility Evaluator: Date:

Date:

Method of Method of testing:

testing:

Performance::

Simulated Performance x X Performance::

Actual Performance Classroom - - - Simulator --- Plant x X

READ TO THE EXAMINEE II will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions: ** You are the Inside AO.

  • The unit has experienced a total loss of onsite and offsite power.
  • EPP-1, LOSS OF ALL AC POWER, has been implemented. implemented.

Task Task Standard: Start EDG EDG "AnA locally locally and energize 480V Bus E-1 Bus E-1 Required Required Materials:

Materials: EPP-1, EPP-i, Revision 38 General General

References:

References:

EPP-1, EPP-1, Revision Revision 3838 Initiating nitiating Cue:Cue: The The CRSS CRSS hashas dispatched dispatched you you to to perform perform EPP-1, EPP-1, starting at Step starting at lOb.

Step 10.b.

RNO.

RNO.

Time Time Critical Critical Task:

Task: NO NO Validation Validation Time:Time: 12 12 minutes minutes 2008 2008 NRCNRC IP IP kk NUREG NUREG 1021, Revision 9, 1021, Revision Supplement 1I 9, Supplement

Appendix CC Appendix Page 22 of Page of 88 Form Form ES-C-i ES-C-1 PERFORMANCE PERFORMA NCE INFORMAT INFORMATION ION (Denote Critical (Denote Critical Steps Steps with an asterisk) with an asterisk)

START TIME:

START TIME: _ _

    • Performance Step:

Performance Step: I1 Place the Place EDG Control the EDG Switch inin the Control Switch LOCAL position.

the LOCAL position.

Standard:

Standard: Candidate locates Candidate simulates placing and simulates locates and the EDG placing the EDG A LOCAL //

"A" LOCAL CONTROL switch REMOTE CONTROL REMOTE in the switch in LOCAL position.

the LOCAL position.

Examiner's Cue:

Examiners EDG A EDG REMOTE CONTROL switch "A" LOCAL I REMOTE switch isis rotated to the LOCAL the LOCAL position position and and the the Local Local Control WHITE WHITE light is light is ILLUMINATED.

ILLUMINAT ED.

Comment:

    • Performance Step: 2 Depress the Local Engine START pushbutton.

Standard: Candidate simulates depressing the Local Engine START pushbutton on the EDG "A" A Engine Control Panel.

Examiner's Examiners Cue: EDG "A" NOT start.

A does NOT Comment:

Comment:

2008 2008 NRC NRC IP IP kk NUREG 1021, NUREG 1021, Revision Supplement 11 Revision 9,9, Supplement

Appendix CC Appendix Page 33 of Page of 88 Form ES-C-i Form ES-C-1 PERFORMANCE INFORMATION PERFORMANCE INFORMATION

    • Performance Step:

Performance Step: 33 IfIf the the affected EDG did affected EDG from the start from NOT start did NOT the Engine Control Panel, Engine Control Panel, Then perform Then following at the following perform the at the EDG Hand the EDG Start valves:

Hand Start valves:

Remove the Remove the locking pin from locking pin the Hand from the Hand Start valves Lock Start valves Bar and Lock Bar and remove the remove Lock Bar.

the Lock Bar.

Standard:

Standard: simulates removing Candidate simulates Candidate removing the locking pin the locking from the pin from the Hand Hand Start Start valves valves Lock Lock Bar Bar and and removing removing the the Lock Lock Bar Bar from from valves valves DA-41 and DA-41 and DA-42.

DA-42.

Examiner's Cue:

Examiners Locking pin pin from thethe Hand valves Lock Bar Start valves Hand Start Bar is is removed and the and the Lock Lock BarBar from valves DA-41 and valves DA-41 DA-42 is and DA-42 is removed.

Comment:

    • Performance Step: 4 If the affected EDG did NOT start from the Engine Control Panel, Then perform the following at the EDG Hand Start valves:

Pull down and hold either of the EDG Hand Start valves until the EDG starts:

  • DA-41
  • DA-42 Standard: Candidate selects one of the Hand Start valves and simulates pulling down on the handle until the EDG starts.

Examiner's Examiners Cue:

Cue: EDG EDG "A" A has has started and is running at 900 is running RPM.

900 RPM.

Comment:

Comment:

2008 2008 NRC NRC IPlP kk NUREG 1021, NUREG Revision 9, 1021, Revision Supplement 11 9, Supplement

Appendix CC Appendix Page of 88 Page 44 of Form ES-C-i Form ES-C-1 PERFORMANCE PERFORMA NCE INFORMAT INFORMATION ION Performance Step:

Performance Step: 55 either EDG IfIf either EDG has started, Then has started, Go To Then Go Step 11.

To Step 11.

Standard:

Standard: EDG A EDG "A" started proceeds to candidate proceeds and candidate started and Step 11.

to Step 11.

Examiner's Note:

Examiners Note:

Comment:

Comment:

Performance Step: 66 Check either Emergency Bus E-i ENERGIZED..

E-1 or E ENERGIZED Standard: Candidate observes indication on the EDG A "A" Generator Control Panel and notes that 480V Bus E-1 is NOT energized.

Examiner's Examiners Cue: GENERATOR AC VOLTS indicates 480 Volts.

GENERATOR EMERGENCY BUS AC VOLTS indicates 0 Volts.

EMERGENCY NORMAL BUS AC VOLTS INDICATES 0 Volts.

GENERATOR HERTZ indicates 60 Hz.

GENERATOR If candidate requests information from the Control Room, inform him that neither Emergency Bus is energized.

Comment:

2008 2008 NRC NRC IP IP kk NUREG 1021, Revision NUREG 1021, Supplement 11 Revision 9,9, Supplement

Appendix CC Appendix Page 55of Page of88 Form ES-C-i Form ES-C-1 PERFORMANCE PERFORMA NCE INFORMAT INFORMATION ION

  • Performance Step:

Performance Step: 77 Verify the Verify following for the following for any running EDG:

any running EDG:

    • EMERG GEN EMERG VOLTS - APPROXIM GEN VOLTS - ATELY 480 APPROXIMATELY 480 VOLTS.

VOLTS.

AND AND

    • BRKR EMERG DG 52/17B, EMERG BRKR 52117B, BUS El TO BUS DG AA TO E1 - CLOSED.

CLOSED.

Standard:

Standard: Candidate observes Candidate EDG A that EDG observes that "A" GENERATO GENERATOR AC VOLTS R AC VOLTS indicates - 480 indicates 480 Volts.

Volts.

Candidate closes Candidate "A" Output EDG A closes EDG at the breaker at Output breaker EDG Generator the EDG Generator Control Panel Control Panel by by placing placing EDG EDG OUTPUT OUTPUT BKR BKR 52117B 52/17B control control switch to switch CLOSE position.

the CLOSE to the position.

Indications on Indications the EDG on the Generator Control EDG Generator panel include Control panel include Generator Generator AC AC Volts, Emergency Emergency Bus Bus AC AC Volts Volts and and Normal Normal Bus AC Volts.

Inform candidate that EDG Generator AC Volts is 480 Volts.

Inform candidate that breaker 52117B 52/17B indication has the GREEN OPEN light illuminated and the RED CLOSED light extinguished when the breaker control switch is located.

Inform candidate that breaker 52/17B 521178 indication has the RED RED CLOSED light illuminated and the GREEN OPEN light extinguished when the breaker control switch is placed in in the closed position.

Generator AC KW indicates 400 KW.

Examiner's Examiners Cue:

Cue:

Comment:

Comment:

2008 2008 NRC NRC IPIP kk NUREG 1021, NUREG 1021, Revision Supplement 11 Revision 9,9, Supplement

Appendix C Appendix C Page 66 of Page of 88 Form ES-C-i Form ES-C-1 PERFORMA PERFORMANCE NCE INFORMAT INFORMATION ION Step: 88 Performance Step: Emergency Bus either Emergency IfIf either Bus is energized, Then is energized, Go To Step Then Go Step 12.

12.

Standard:

Standard: 480V Bus E-i "A" supplying 480 Volts with EDG A E-1 is energized at - 480 the bus.bus.

Examiner's Cue:

Examiners Inform the candidate that EMERGENC EMERGENCY Y BUS AC VOLTS indicates 480 Volts and that Emergency Bus E-1 is energized.

Comment:

END OF TASK Termination: EDG "A" A started and 480V Bus E-1 energized.

STOP TIME:

2008 2008 NRC NRC IPP kk NUREG 1021, NUREG Revision 9, i021, Revision Supplement 11 9, Supplement

Appendix C Appendix C Page 77 of Page of 88 Form ES-C-I Form ES-C-1 VERIFICATION OF VERIFICATION OF COMPLETION COMPLETION Job Performance Job Performance Measure Measure No.:

No.: 2008 NRC IP 2008 NRC IP kk Examinee's Name:

Examinees Name:

Examiner's Name:

Examiners Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

Response

Result: SAT UNSAT Examiner's Examiners Signature:

Signature: Date:

Date:


2008 2008 NRC NRC IPP kk NUREG NUREG 1021, Revision 9, 1021, Revision Supplement 11 9, Supplement

AppendixCC Appendix Page88ofof88 Page Form ES-C-i Form ES-C-1 JPM CUE JPM CUESHEET SHEET INITIAL CONDITION INITIAL CONDITIONS:

S: ** You arethe You are InsideAO.

the Inside AO.

    • The unit The unit has experienced aatotal has experienced loss of total loss ofonsite offsite power.

and offsite onsite and power.

    • LOSS OF EPP-1, LOSS EPP-1, OF ALL ALL AC POWER, has AC POWER, been implemented has been implemented. .
    • Emergency Diesel Emergency GeneratorB Diesel Generator "8" isis out ofservice out of for scheduled servicefor scheduled maintenance to maintenance to replace the fuel replace the oil filters.

fuel oil filters.

    • Generator A Diesel Generator Emergency Diesel Emergency failed to "A" failed to start.

start.

INITIATING CUE:

CUE: The CRSS The CRSS has you to dispatched you has dispatched to perform EPP-1, starting perform EPP-1, Step lOb.

at Step starting at 10.b.

INITIATING RNa.

RNO.

2008 NUREG NUREG 1021, Supplement1i Revision9,9, Supplement 1021, Revision 2008NRC NRCIPIPkk