{{#Wiki_filter:1 WBN2Public Resource From: Boyd, Desiree L [dlboyd@tva.gov]
{{#Wiki_filter:WBN2Public Resource From:                 Boyd, Desiree L [dlboyd@tva.gov]
Sent: Tuesday, January 03, 2012 9:56 AM To: Poole, Justin; Milano, Patrick; Campbell, Stephen; Epperson, Dan Cc: Arent, Gordon; Smith, James D; Bryan, Rober t H Jr; Smith, James D; Boyd, Desiree L; Crouch, William D
Sent:                 Tuesday, January 03, 2012 9:56 AM To:                   Poole, Justin; Milano, Patrick; Campbell, Stephen; Epperson, Dan Cc:                   Arent, Gordon; Smith, James D; Bryan, Robert H Jr; Smith, James D; Boyd, Desiree L; Crouch, William D


==Subject:==
==Subject:==
NRC PM Open Items List 01-04-12.docx Attachments:
NRC PM Open Items List 01-04-12.docx Attachments:         NRC PM Open Items List 01-04-12.docx For next phone call.
NRC PM Open Items List 01-04-12.docx For next phone call.  
Thank You,
~*~*~*~*~*~*~*~*~*~*~
Désireé L. Boyd WBN Unit 2 Licensing dlboyd@tva.gov 423-365-8764 1


Thank You,
Hearing Identifier:     Watts_Bar_2_Operating_LA_Public Email Number:           618 Mail Envelope Properties       (7AB41F650F76BD44B5BCAB7C0CCABFAF26FACDB9)
    ~*~*~*~*~*~*~*~*~*~*~
Désireé L. Boyd WBN Unit 2 Licensing dlboyd@tva.gov 423-365-8764 Hearing Identifier: Watts_Bar_2_Operating_LA_Public Email Number: 618   Mail Envelope Properties   (7AB41F650F76BD44B5BCAB7C0CCABFAF26FACDB9)


==Subject:==
==Subject:==
NRC PM Open Items List 01-04-12.docx Sent Date:   1/3/2012 9:55:38 AM Received Date: 1/3/2012 9:55:49 AM From:   Boyd, Desiree L Created By:   dlboyd@tva.gov Recipients:     "Arent, Gordon" <garent@tva.gov>
NRC PM Open Items List 01-04-12.docx Sent Date:               1/3/2012 9:55:38 AM Received Date:           1/3/2012 9:55:49 AM From:                   Boyd, Desiree L Created By:             dlboyd@tva.gov Recipients:
Tracking Status: None "Smith, James D" <jdsmith@tva.gov>
"Arent, Gordon" <garent@tva.gov>
Tracking Status: None "Bryan, Robert H Jr" <rhbryan@tva.gov> Tracking Status: None "Smith, James D" <smith1jd@westinghouse.com> Tracking Status: None "Boyd, Desiree L" <dlboyd@tva.gov>
Tracking Status: None "Smith, James D" <jdsmith@tva.gov>
Tracking Status: None "Crouch, William D" <wdcrouch@tva.gov> Tracking Status: None "Poole, Justin" <Justin.Poole@nrc.gov> Tracking Status: None "Milano, Patrick" <Patrick.Milano@nrc.gov>
Tracking Status: None "Bryan, Robert H Jr" <rhbryan@tva.gov>
Tracking Status: None "Campbell, Stephen" <Stephen.Campbell@nrc.gov> Tracking Status: None "Epperson, Dan" <Dan.Epperson@nrc.gov> Tracking Status: None  
Tracking Status: None "Smith, James D" <smith1jd@westinghouse.com>
Tracking Status: None "Boyd, Desiree L" <dlboyd@tva.gov>
Tracking Status: None "Crouch, William D" <wdcrouch@tva.gov>
Tracking Status: None "Poole, Justin" <Justin.Poole@nrc.gov>
Tracking Status: None "Milano, Patrick" <Patrick.Milano@nrc.gov>
Tracking Status: None "Campbell, Stephen" <Stephen.Campbell@nrc.gov>
Tracking Status: None "Epperson, Dan" <Dan.Epperson@nrc.gov>
Tracking Status: None Post Office:            TVANUCXVS2.main.tva.gov Files                            Size                  Date & Time MESSAGE                          227                    1/3/2012 9:55:49 AM NRC PM Open Items List 01-04-12.docx                          35566 Options Priority:                        Standard Return Notification:            No Reply Requested:                No Sensitivity:                    Normal Expiration Date:
Recipients Received:


Post Office:   TVANUCXVS2.main.tva.gov Files     Size      Date & Time MESSAGE    227      1/3/2012 9:55:49 AM  NRC PM Open Items List 01-04-12.docx    35566 
NRC PM Open Items List 01/04/2012 (423) 751-7777 ID 4233658764#
No.              Description                Status                  Additional Comments                        Resp Org/Person
: 1. Cyber Security Plan/Controls and    NRC Table                                                            Heinrich/Snyder Implementation                      Top/Pilot                                                            (Bryan)
Feb/Mar 2012 Inspection 4th Qtr 2012
: 2. Instrumentation RAI List (Knuettel) 1. 1/19/12     1. Next I&C submittal update                          Eng/Hilmes
: 1. Submit I&C update letter          a. 1/19/12        a. 04038903-1SP                                  (Bryan)
: b. 1/19/12        b. 04038903-2SP
: c. 1/19/12        c. 04038903-4SP Requires Civil Calculation
: d. Cmplt          d. Responses to 11/18/11 RAI for OI 80, 81
: e. TBD            e. Revise Common Q Compliance Matrix
: 2. 1/19/12      2) Jan. I&C submittal update
: a. 1/15/12        a. Revise IEEE-603 analysis
: b. 1/13/12        b. TR-1136 NP & withholding affidavit
: c. 1/13/12        c. U2 BISI Calculation
: d. 1/15/12       d. Responses to 11/18/11 RAI for OI 94, 105, 108
: 3. TBD          3) WINCISE qualification testing write-up
: a. TBD            a. Composite summary
: b. TBD            b. Sketch of all cable segments
: 4. Cmplt        4) Revise TVA response to SSER OI 127 1lPage


Options  Priority:    Standard  Return Notification:    No  Reply Requested:    No  Sensitivity:    Normal  Expiration Date:      Recipients Received:
NRC PM Open Items List 01/04/2012 (423) 751-7777 ID 4233658764#
NRC PM Open Items List 01/04/2012 (423) 751-7777 ID 4233658764#
1 l Page  No. Description Status Additional Comments Resp Org/Person 1. Cyber Security Plan/Controls and Implementation NRC Table Top/Pilot Feb/Mar 2012
No.               Description               Status                       Additional Comments                         Resp Org/Person
: 3. Complete Implementation (Hemmer)    Pump          Substantial building - preliminary planning in process, Hemmer Relocation      (Fukushima NTTF item 4.2) 5/30/12 Provide document of mitigating equipment and Bldg Plan Mar  location for unit 2.
2012 Inspection -
Oct 2012
: 4. Fire Protection Report              1. mid-Feb      1. Submit Revised FPR per 12-21 Meeting, include        ENG/Hilmes
: 2. TBD            commitment update                                    (Arent)
: 2. Meet with Staff following submittal
: 5. Tech Spec Revisions from latest T/S 1. TBD          1. CSST A & B                                          Licensing/Elton markup and NRC Review comments      2. TBD          2. I-131 DEI                                            (Bryan)
: 3. 1/27/12      3. Diesel Generator Frequency
: 4. TBD          4. AST FHA
: 6. ACRS                                04/10/12
* Cyber Security - Implementation                    Arent/Hilmes/
* Attachment HH items (#59 - Sump, #61 -PAD,        Koontz
                                                            #63/93 - Eagle 21, #91 - GDC 5, #132 - Boron Dil)
: 7. ACRS                                June 2012
* Fire Protection                                      Arent
* Attachment HH item - #133/134 - Hydrology
: 8. SSER 22/23/24/25 Open Items        As needed      The expanded HH list and status is covered              Licensing Response                                            periodically.
: 9. Transient Analysis issues          1/13/12        Question on RG revision and modes 3, 4, & 5. TVA to ENG/Koontz provide write-up explaining NRC acceptance (CLB) of WEC/Morgan Boron dilution RAI response                        unit 1 for modes 3, 4, & 5. See SSER OI 132.
: 10. FSAR A108                          Feb. 2012                                                              Lic/Stockton
: 11. Develop list of planned License      1. 1/20/12      1.      Review Unit 1 SER for exemptions. Sand        NRR/TVA Conditions, Exemptions and Relief    2. TBD        baskets, cyber security, physical security, PAD 4.0    (Bryan)
Requests (Arent)                    3. TBD          2.      NRR to review current exemptions
: 3.      Verify required notifications made 2lPage


Inspection
4 th Qtr 2012  Heinrich/Snyder (Bryan) 2. Instrumentation RAI List (Knuettel)
: 1. Submit I&C update letter
: 1. 1/19/12 a. 1/19/12 b. 1/19/12 c. 1/19/12  d. Cmplt e. TBD  2. 1/19/12 a. 1/15/12 b. 1/13/12 c. 1/13/12 d. 1/15/12  3. TBD a. TBD b. TBD  4. Cmplt 1. Next I&C submittal update
: a. 04038903-1SP
: b. 04038903-2SP
: c. 04038903-4SP Requires Civil Calculation
: d. Responses to 11/18/11 RAI for OI 80, 81
: e. Revise Common Q Compliance Matrix
: 2) Jan. I&C submittal update
: a. Revise IEEE-603 analysis
: b. TR-1136 NP & withholding affidavit
: c. U2 BISI Calculation
: d. Responses to 11/18/11 RAI for OI 94, 105, 108
: 3) WINCISE qualification testing write-up
: a. Composite summary
: b. Sketch of all cable segments
: 4) Revise TVA response to SSER OI 127 Eng/Hilmes (Bryan)
NRC PM Open Items List 01/04/2012 (423) 751-7777 ID 4233658764#
2 l Page  No. Description Status Additional Comments Resp Org/Person 3. Complete Implementation (Hemmer)
Pump Relocation 5/30/12  Bldg Plan Mar 2012  Inspection -
Oct 2012 Substantial building - preliminary planning in process, (Fukushima NTTF item 4.2)
Provide document of mitigating equipment and location for unit 2. Hemmer  4. Fire Protection Report
: 1. mid-Feb 2. TBD  1. Submit Revised FPR per 12-21 Meeting, include commitment update
: 2. Meet with Staff following submittal ENG/Hilmes (Arent) 5. Tech Spec Revisions from latest T/S markup and NRC Review comments
: 1. TBD 2. TBD 3. 1/27/12
: 4. TBD 1. CSST A & B
: 2. I-131 DEI
: 3. Diesel Generator Frequency
: 4. AST FHA Licensing/Elton (Bryan) 6. ACRS 04/10/12
* Cyber Security - Implementation
* Attachment HH items  (#59 - Sump, #61 -PAD, #63/93 - Eagle 21, #91 - GDC 5, #132 - Boron Dil) Arent/Hilmes/
Koontz 7. ACRS June 2012
* Fire Protection
* Attachment HH item - #133/134 - Hydrology Arent 8. SSER 22/23/24/25 Open Items Response As needed The expanded HH list and status is covered periodically. Licensing 9. Transient Analysis issues Boron dilution RAI response 1/13/12 Question on RG revision and modes 3, 4, & 5. TVA to provide write-up explaining NRC acceptance (CLB) of unit 1 for modes 3, 4, & 5. See SSER OI 132. ENG/Koontz WEC/Morgan 10. FSAR A108 Feb. 2012  Lic/Stockton 11. Develop list of planned License Conditions, Exemptions and Relief Requests (Arent) 1. 1/20/12 2. TBD 3. TBD 1. Review Unit 1 SER for exemptions. Sand baskets, cyber security, physical security, PAD 4.0 2. NRR to review current exemptions 3. Verify required notifications made NRR/TVA (Bryan)
NRC PM Open Items List 01/04/2012 (423) 751-7777 ID 4233658764#
NRC PM Open Items List 01/04/2012 (423) 751-7777 ID 4233658764#
3 l Page  No. Description Status Additional Comments Resp Org/Person 12. Submit TS version "G" (includes bases and TRM)  1/27/12 Include remaining changes resulting from U1 and Setpoint Reviews.
No.               Description                 Status                     Additional Comments                   Resp Org/Person
Lic/Bryan 13. Issue two Unit Offsite Dose Calculation Manual  -
: 12. Submit TS version G (includes bases   1/27/12       Include remaining changes resulting from U1 and Lic/Bryan and TRM)                                              Setpoint Reviews.
3/16/12 Chemistry/
: 13. Issue two Unit Offsite Dose Calculation 3/16/12                                                         Chemistry/
Woods (Bryan) 14. TMI action items 7/1/12 TVA to provide letter when TMI actions are field complete.
Manual -                                                                                                Woods (Bryan)
Licensing (Gordon) 15. EP Drill Open Items
: 14. TMI action items                       7/1/12         TVA to provide letter when TMI actions are field Licensing complete.                                       (Gordon)
: a. Duty Specialist
: 15. EP Drill Open Items                     TBD           Determine NPG Schedule for Changes - Update AS- EP -
: b. Commercial Dose Assessment TBD Determine NPG Schedule for Changes - Update "AS-Built" E-Plan.
: a. Duty Specialist                                  Built E-Plan.                                   Detchemendy
EP - Detchemendy  16. Extend Construction Permit 4/27/12 Lic (Arent)
: b. Commercial Dose Assessment
NRC Follow-up Items ASME N-801 & N-802 code cases TBD NRC response to relief request submitted 9/1/11. NRR Exemption to 10CFR50.49 for some Category II cables?
: 16. Extend Construction Permit             4/27/12                                                         Lic (Arent)
1/20/12 Determine if exemption required. NRC may need to establish a license condition.
NRC Follow-up Items ASME N-801 & N-802 code cases           TBD           NRC response to relief request submitted 9/1/11. NRR Exemption to 10CFR50.49 for some       1/20/12       Determine if exemption required. NRC may need to Hilmes Category II cables?                                    establish a license condition.                   (Stockton)
Hilmes (Stockton)
Post ETC Updates Issue Unit 2 Completion Letter         TBD                                                             Licensing/Arent Submit final as-constructed FSAR       TBD                                                             Licensing/
Post ETC Updates Issue Unit 2 Completion Letter TBD Licensing/Arent Submit final as-constructed FSAR figures TBD Licensing/ Stockton Special Nuclear Materials License Licensing (Arent)
figures                                                                                                Stockton Special Nuclear Materials License                                                                       Licensing (Arent)
Letter to terminate Part 30/40 License after receipt of Part 50 License TBD  Licensing (Arent) Combined U1/U2 FSAR (Stockton)
Letter to terminate Part 30/40 License TBD                                                            Licensing after receipt of Part 50 License                                                                       (Arent)
TBD Licensing ASME Section III N-3 report TBD Eng/Crouch Letter to notify NRC when Vital Area Boundary returned to original location TBD Security Plan Update - Boundary to be restored. Lic/Arent}}
Combined U1/U2 FSAR (Stockton)         TBD                                                             Licensing ASME Section III N-3 report             TBD                                                             Eng/Crouch Letter to notify NRC when Vital Area   TBD           Security Plan Update - Boundary to be restored. Lic/Arent Boundary returned to original location 3lPage}}

Revision as of 09:35, 12 November 2019

2012/01/03 Watts Bar 2 OL - NRC PM Open Items List 01-04-12.docx
ML12018A403
Person / Time
Site: Watts Bar Tennessee Valley Authority icon.png
Issue date: 01/03/2012
From:
- No Known Affiliation
To:
Division of Operating Reactor Licensing
References
Download: ML12018A403 (5)


Text

WBN2Public Resource From: Boyd, Desiree L [dlboyd@tva.gov]

Sent: Tuesday, January 03, 2012 9:56 AM To: Poole, Justin; Milano, Patrick; Campbell, Stephen; Epperson, Dan Cc: Arent, Gordon; Smith, James D; Bryan, Robert H Jr; Smith, James D; Boyd, Desiree L; Crouch, William D

Subject:

NRC PM Open Items List 01-04-12.docx Attachments: NRC PM Open Items List 01-04-12.docx For next phone call.

Thank You,

~*~*~*~*~*~*~*~*~*~*~

Désireé L. Boyd WBN Unit 2 Licensing dlboyd@tva.gov 423-365-8764 1

Hearing Identifier: Watts_Bar_2_Operating_LA_Public Email Number: 618 Mail Envelope Properties (7AB41F650F76BD44B5BCAB7C0CCABFAF26FACDB9)

Subject:

NRC PM Open Items List 01-04-12.docx Sent Date: 1/3/2012 9:55:38 AM Received Date: 1/3/2012 9:55:49 AM From: Boyd, Desiree L Created By: dlboyd@tva.gov Recipients:

"Arent, Gordon" <garent@tva.gov>

Tracking Status: None "Smith, James D" <jdsmith@tva.gov>

Tracking Status: None "Bryan, Robert H Jr" <rhbryan@tva.gov>

Tracking Status: None "Smith, James D" <smith1jd@westinghouse.com>

Tracking Status: None "Boyd, Desiree L" <dlboyd@tva.gov>

Tracking Status: None "Crouch, William D" <wdcrouch@tva.gov>

Tracking Status: None "Poole, Justin" <Justin.Poole@nrc.gov>

Tracking Status: None "Milano, Patrick" <Patrick.Milano@nrc.gov>

Tracking Status: None "Campbell, Stephen" <Stephen.Campbell@nrc.gov>

Tracking Status: None "Epperson, Dan" <Dan.Epperson@nrc.gov>

Tracking Status: None Post Office: TVANUCXVS2.main.tva.gov Files Size Date & Time MESSAGE 227 1/3/2012 9:55:49 AM NRC PM Open Items List 01-04-12.docx 35566 Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received:

NRC PM Open Items List 01/04/2012 (423) 751-7777 ID 4233658764#

No. Description Status Additional Comments Resp Org/Person

1. Cyber Security Plan/Controls and NRC Table Heinrich/Snyder Implementation Top/Pilot (Bryan)

Feb/Mar 2012 Inspection 4th Qtr 2012

2. Instrumentation RAI List (Knuettel) 1. 1/19/12 1. Next I&C submittal update Eng/Hilmes
1. Submit I&C update letter a. 1/19/12 a. 04038903-1SP (Bryan)
b. 1/19/12 b. 04038903-2SP
c. 1/19/12 c. 04038903-4SP Requires Civil Calculation
d. Cmplt d. Responses to 11/18/11 RAI for OI 80, 81
e. TBD e. Revise Common Q Compliance Matrix
2. 1/19/12 2) Jan. I&C submittal update
a. 1/15/12 a. Revise IEEE-603 analysis
b. 1/13/12 b. TR-1136 NP & withholding affidavit
c. 1/13/12 c. U2 BISI Calculation
d. 1/15/12 d. Responses to 11/18/11 RAI for OI 94, 105, 108
3. TBD 3) WINCISE qualification testing write-up
a. TBD a. Composite summary
b. TBD b. Sketch of all cable segments
4. Cmplt 4) Revise TVA response to SSER OI 127 1lPage

NRC PM Open Items List 01/04/2012 (423) 751-7777 ID 4233658764#

No. Description Status Additional Comments Resp Org/Person

3. Complete Implementation (Hemmer) Pump Substantial building - preliminary planning in process, Hemmer Relocation (Fukushima NTTF item 4.2) 5/30/12 Provide document of mitigating equipment and Bldg Plan Mar location for unit 2.

2012 Inspection -

Oct 2012

4. Fire Protection Report 1. mid-Feb 1. Submit Revised FPR per 12-21 Meeting, include ENG/Hilmes
2. TBD commitment update (Arent)
2. Meet with Staff following submittal
5. Tech Spec Revisions from latest T/S 1. TBD 1. CSST A & B Licensing/Elton markup and NRC Review comments 2. TBD 2. I-131 DEI (Bryan)
3. 1/27/12 3. Diesel Generator Frequency
4. TBD 4. AST FHA
6. ACRS 04/10/12
  • Attachment HH items (#59 - Sump, #61 -PAD, Koontz
  1. 63/93 - Eagle 21, #91 - GDC 5, #132 - Boron Dil)
7. ACRS June 2012
  • Fire Protection Arent
  • Attachment HH item - #133/134 - Hydrology
8. SSER 22/23/24/25 Open Items As needed The expanded HH list and status is covered Licensing Response periodically.
9. Transient Analysis issues 1/13/12 Question on RG revision and modes 3, 4, & 5. TVA to ENG/Koontz provide write-up explaining NRC acceptance (CLB) of WEC/Morgan Boron dilution RAI response unit 1 for modes 3, 4, & 5. See SSER OI 132.
10. FSAR A108 Feb. 2012 Lic/Stockton
11. Develop list of planned License 1. 1/20/12 1. Review Unit 1 SER for exemptions. Sand NRR/TVA Conditions, Exemptions and Relief 2. TBD baskets, cyber security, physical security, PAD 4.0 (Bryan)

Requests (Arent) 3. TBD 2. NRR to review current exemptions

3. Verify required notifications made 2lPage

NRC PM Open Items List 01/04/2012 (423) 751-7777 ID 4233658764#

No. Description Status Additional Comments Resp Org/Person

12. Submit TS version G (includes bases 1/27/12 Include remaining changes resulting from U1 and Lic/Bryan and TRM) Setpoint Reviews.
13. Issue two Unit Offsite Dose Calculation 3/16/12 Chemistry/

Manual - Woods (Bryan)

14. TMI action items 7/1/12 TVA to provide letter when TMI actions are field Licensing complete. (Gordon)
15. EP Drill Open Items TBD Determine NPG Schedule for Changes - Update AS- EP -
a. Duty Specialist Built E-Plan. Detchemendy
b. Commercial Dose Assessment
16. Extend Construction Permit 4/27/12 Lic (Arent)

NRC Follow-up Items ASME N-801 & N-802 code cases TBD NRC response to relief request submitted 9/1/11. NRR Exemption to 10CFR50.49 for some 1/20/12 Determine if exemption required. NRC may need to Hilmes Category II cables? establish a license condition. (Stockton)

Post ETC Updates Issue Unit 2 Completion Letter TBD Licensing/Arent Submit final as-constructed FSAR TBD Licensing/

figures Stockton Special Nuclear Materials License Licensing (Arent)

Letter to terminate Part 30/40 License TBD Licensing after receipt of Part 50 License (Arent)

Combined U1/U2 FSAR (Stockton) TBD Licensing ASME Section III N-3 report TBD Eng/Crouch Letter to notify NRC when Vital Area TBD Security Plan Update - Boundary to be restored. Lic/Arent Boundary returned to original location 3lPage