ULNRC-05879, Ameren Missouri 120-Day Response to NRC Request for Information Pursuant to 10 CFR 50.54(F) Regarding the Seismic Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
| Line 3: | Line 3: | ||
| issue date = 07/09/2012 | | issue date = 07/09/2012 | ||
| title = Ameren Missouri 120-Day Response to NRC Request for Information Pursuant to 10 CFR 50.54(F) Regarding the Seismic Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights | | title = Ameren Missouri 120-Day Response to NRC Request for Information Pursuant to 10 CFR 50.54(F) Regarding the Seismic Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights | ||
| author name = Reasoner C | | author name = Reasoner C | ||
| author affiliation = Ameren Missouri | | author affiliation = Ameren Missouri | ||
| addressee name = | | addressee name = | ||
Revision as of 15:51, 28 June 2019
| ML12192A616 | |
| Person / Time | |
|---|---|
| Site: | Callaway |
| Issue date: | 07/09/2012 |
| From: | Reasoner C Ameren Missouri |
| To: | Office of Nuclear Reactor Regulation, Document Control Desk |
| References | |
| ULNRC-05879 | |
| Download: ML12192A616 (4) | |
Text
WAmeren MISSOURI Callaway Plant :::::::::::::::::::::::::::::::::::::::::::::::::::::
July 9, 2012 ULNRC-05879 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 Ladies and Gentlemen:
10 CFR 50.54(f) DOCKET NUMBER 50-483 CALLA WAY PLANT UNIT 1 UNION ELECTRIC CO. FACILITY OPERATING LICENSE NPF-30 AMEREN MISSOURI 120-DAY RESPONSE TO NRC REQUEST FOR INFORMATION PURSUANT TO 10 CFR 50.54(f) REGARDING THE SEISMIC ASPECTS OF RECOMMENDATION 2.3 OF THE NEAR-TERM TASK FORCE REVIEW OF INSIGHTS FROM THE FUKUSHIMA DAI-ICHI ACCIDENT
References:
- 1. NRC letter, "Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3, ofthe Near-Term Task Force Review of Insights from the Fukushima Dai-Ichi Accident," dated March 12, 2012 2. NRC letter, "Endorsement of Electric Power Research Institute (EPRI) Draft Report 1025286, 'Seismic Walkdown Guidance,"'
dated May 31, 2012 On March 12, 2012, the Nuclear Regulatory Commission (NRC) issued Reference 1 to Ameren Missouri.
Enclosure 3 of Reference 1 contains specific Requested Actions, Requested Information, and Required Responses associated with Recommendation 2.3 for Seismic. This letter provides Ameren Missouri's 120-day response to Reference 1 for Seismic Recommendation 2.3 for Callaway Plant. For Seismic Recommendation 2.3 (walkdowns), Enclosure 3 of Reference 1 states that each licensee will confirm that they intend to use the NRC-endorsed seismic walkdown procedure or provide to the PO Box 620 Fulton, MD 65251 AmerenMissouri.com ULNRC-05879 July 9, 2012 Page 2 of4 NRC a description of the process that will be used to conduct the walkdowns and to develop the needed information.
By this letter, Ameren Missouri confirms that it will use the seismic walkdown guidance, EPRI 1025286, "Seismic Walkdown Guidance:
For Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic," as endorsed by Reference 2, to conduct the walkdowns and develop the needed information at Callaway Plant. This letter does not contain new regulatory commitments.
If you have any questions concerning the content ofthis letter, please contact Scott Maglio, Regulatory Affairs Manager, at 573-676-8719.
I declare under penalty of perjury that the foregoing is true and correct. Executed on: 7 I or / J z_
SJM/nls Sincerely, Cleveland
- 0. Reasoner Vice President, Engineering ULNRC-05879 July 9, 2012 Page 3 of4 cc: Mr. Elmo E. Collins Regional Administrator U.S. Nuclear Regulatory Commission Region IV 1600 East Lamar Boulevard Arlington, TX 76011-4511 Senior Resident Inspector Callaway Resident Office U.S. Nuclear Regulatory Commission 8201 NRC Road Steedman, MO 65077 Mr. Andrew Hon Senior Project Manager, Callaway Plant Office ofNuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop 0-8G 14 Washington, DC 20555-2738 Mr. Eric J. Leeds Director, Office ofNuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop 0-13H16M Washington, DC 20555-0001 ULNRC-05879 July 9, 2012 Page 4 of4 Index and send hardcopy to QA File A160.0761 Hardcopy:
Certrec Corporation 4150 International Plaza Suite 820 Fort Worth, TX 76109 (Certrec receives ALL attachments as long as they are non-safeguards and may be publicly disclosed.)
Electronic distribution for the following can be made via Responses and Reports ULNRC Distribution:
A. C. Heflin F. M. Diya C. 0. Reasoner III D. W. Neterer L. H. Graessle J. T. Patterson S.M. Maglio T. B. Elwood S. J. Meyer J. L. Fortman R. Holmes-Bobo NSRB Secretary Mr. Paul Parmenter, Director (SEMA) Mr. Thomas Mohr, Senior REP Planner (SEMA) Mr. Tom Masso, REP Planner (SEMA) Mr. Bill Muilenburg (WCNOC) Mr. Tim Hope (Luminant Power) Mr. Ron Barnes (APS) Mr. Tom Baldwin (PG&E) Mr. Mike Murray (STPNOC) Ms. Linda Conklin (SCE) Mr. John O'Neill (Pillsbury Winthrop Shaw Pittman LLP) Mr. Dru Buntin (DNR)