{{#Wiki_filter:Davis-Besse Initial License Exam 2015 Admin JPM RO-A 1.1 Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM RO
{{#Wiki_filter:Davis-Besse Initial License Exam 2015 Admin JPM RO-A1.1
-A1.1 AG 1 of 10  Facility:             Davis-Besse   Task No: 002-003-02-0100   Task Title
 
:      Perform manual RCS Leakage Calculation K/A  
Appendix C                             Job Performance Measure                         Form ES-C-1 Worksheet Admin JPM RO-A1.1 AG Facility:         Davis-Besse                           Task No:       002-003-02-0100 Task Title:      Perform manual RCS Leakage Calculation K/A  


==Reference:==
==Reference:==
 
2.1.20 (4.6)         Job Performance Measure No:         RO-A1.1 (New)
2.1.20 (4.6) Job Performance Measure No
Examinee:
:     RO-A1.1 (New)   Examinee:           NRC Examiner:
NRC Examiner:                                                           Date:
Date:       Method of testing:
Method of testing:
Simulated Performance
Simulated Performance ___                       Actual Performance _X_
___   Actual Performance
Classroom _X_                     Simulator ___               Plant ___
_X_  Classroom
_X_   Simulator
___   Plant ___
Read to the examinee:
Read to the examinee:
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
When you complete the task successfully, the objective for this job performance measure w ill be satisfied.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions:
Initial Conditions:
The plant conditions are specified in the Initial Conditions and Initiating Cues.
The plant conditions are specified in the Initial Conditions and Initiating Cues.
Line 41: Line 38:
==References:==
==References:==


None Initiating Cue:
None Initiating Cue:
The plant conditions are specified in the Initial Conditions and Initiating Cues.
The plant conditions are specified in the Initial Conditions and Initiating Cues.
Time Critical Task:
Time Critical Task:
No   Alternate Path:
No Alternate Path:
No Validation Time:
No Validation Time: 35 minutes 1 of 10
35 minutes


Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM RO
Appendix C                           Job Performance Measure                     Form ES-C-1 Worksheet Admin JPM RO-A1.1 AG EXAMINER COPY INITIAL CONDITIONS:
-A1.1 AG 2 of 10  EXAMINER COPY INITIAL CONDITIONS
The Plant is at 100% Power Makeup Tank Pressure is 25 psig The Computer is unavailable INITIATION CUE:
The Plant is at 100% Power Makeup Tank Pressure is 25 psig
The Unit Supervisor has directed you to perform steps 4.2.2.a through 4.2.2.k of DB-SP-03357, RCS Water Inventory Balance, manually calculate RCS leak rate on Attachment 2, RCS/MU and Purification Leak Rate Calculation Sheet.
NOTE: DB-SP-03357, Attachment 2 has 4 pages (there is a page count error on Attachment 2 -
page 1 of 3, 2 of 3, 3 of 3 and 4 of 4)
(Hand Candidate a copy of the DB-SP-03357, RCS Water Inventory Balance Procedure and DB-PF-06703, Miscellaneous Curves CC 3.1 and CC 3.2a to CC3.2k.
2 of 10


The Computer is unavailable INITIATION CUE:
Appendix C                          Job Performance Measure                      Form ES-C-1 Worksheet Admin JPM RO-A1.1 AG CANDIDATE COPY INITIAL CONDITIONS:
The Unit Supervisor has directed you to perform ste p s 4.2.2.a through 4.2.2.k of DB-SP-03357, RCS Water Inventory Balance, manually calculate RCS l eak rate on Attachment 2, RCS/MU and Purification Leak Rate Calculation Sheet.
The Plant is at 100% Power Makeup Tank Pressure is 25 psig The Computer is unavailable INITIATION CUE:
NOTE: DB-SP-03357, Attachment 2 has 4 pages (there is a page count error on Attachment 2  
The Unit Supervisor has directed you to perform steps 4.2.2.a through 4.2.2.k of DB-SP-03357, RCS Water Inventory Balance, manually calculate RCS leak rate on Attachment 2, RCS/MU and Purification Leak Rate Calculation Sheet.
- page 1 of 3, 2 of 3, 3 of 3 and 4 of 4)
NOTE: DB-SP-03357, Attachment 2 has 4 pages (there is a page count error on Attachment 2 -
(Hand Candidate a copy of the DB-SP-0 3357 , RCS Water Inventory Balance Procedure and DB-PF-06703, Miscellaneous Curves CC 3.1 and CC 3.2a to CC3.2k
page 1 of 3, 2 of 3, 3 of 3 and 4 of 4) 3 of 10


Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM RO
Appendix C                               Job Performance Measure                             Form ES-C-1 Worksheet Admin JPM RO-A1.1 AG PERFORMANCE INFORMATION NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is NOT critical unless denoted in the "Comments".
-A1.1 AG  3 of 10  CANDIDATE COPY INITIAL CONDITIONS
START TIME: _______
:  The Plant is at 100% Power Makeup Tank Pressure is 25 psig The Computer is unavailable INITIATION CUE:
The Unit Supervisor has directed you to perform step s 4.2.2.a through 4.2.2.k of DB-SP-03357, RCS Water Inventory Balance, manually calculate RCS leak rate on Attachment 2, RCS/MU and Purification Leak Rate Calculation Sheet.
NOTE: DB-SP-03357, Attachment 2 has 4 pages (there is a page count error on Attachment 2
- page 1 of 3, 2 of 3, 3 of 3 and 4 of 4)
 
Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM RO
-A1.1 AG 4 of 10 PERFORMANCE INFORMATION NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is NOT critical unless denoted in the "Comments".
START TIME: _______
: 1. PERFORMANCE STEP: Performs step 4.2.2.a, Record Makeup Tank Water Density from Attachment 4
: 1. PERFORMANCE STEP: Performs step 4.2.2.a, Record Makeup Tank Water Density from Attachment 4
  ........C........
    ........C........
 
STANDARD:             Identifies that Makeup Tank initial and final temperature is 100 °F, locates Attachment 4 and determines the MU Tank Water Density is 62.0038 lbm/ft3 and records this on Attachment 2 step 4.2.2.a.
STANDARD: Identifies that Makeup Tank initial and final temperature is 100 °F, locates Attachment 4 and determines the MU Tank Water Density is 62.0038 lbm/ft 3 and records this on Attachment 2 step 4.2.2.a.
COMMENT:
COMMENT:   CUE: None       __________
CUE: None
SAT UNSAT
__________
: 2. PERFORMANCE STEP: Complete the Initial Makeup Tank Inventory equations step 4.2.2.b ........C........
SAT UNSAT
: 2. PERFORMANCE STEP: Complete the Initial Makeup Tank Inventory equations step 4.2.2.b
    ........C........
STANDARD: Water Inventory = (Tank level
STANDARD: Water Inventory = (Tank level
* 4.124 ft³/in
* 4.124 ft³/in
* Calibration Density) + (77.85 ft³
* Calibration Density) + (77.85 ft³
* Water Density)  
* Water Density)
        = (Tank level
                    = (Tank level
* 4.124 ft³/in
* 4.124 ft³/in
* 62.325lbm/ ft³) + (77.85 ft³
* 62.325lbm/ ft³) + (77.85 ft³
Line 86: Line 79:
Initial:
Initial:
( __67__ in.* 257 lbm/in ) + ( 77.85 ft³
( __67__ in.* 257 lbm/in ) + ( 77.85 ft³
* _62.0038   lbm/ft³) = _22046 (+/- 1 0)_ lbm   CUE: Another Operator will perform the Independent Verification of the calculation
* _62.0038       lbm/ft³) = _22046 (+/- 10)_ lbm CUE: Another Operator will perform the Independent Verification of the calculation
__________
__________
SAT UNSAT
SAT UNSAT 4 of 10
 
Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM RO
-A1.1 AG  5 of 10 3. PERFORMANCE STEP: Complete the Final Makeup Tank Inventory equations step 4.2.2.b  ........C........


Appendix C                                Job Performance Measure                            Form ES-C-1 Worksheet Admin JPM RO-A1.1 AG
: 3. PERFORMANCE STEP: Complete the Final Makeup Tank Inventory equations step 4.2.2.b
    ........C........
STANDARD: Water Inventory = (Tank level
STANDARD: Water Inventory = (Tank level
* 4.124 ft³/in
* 4.124 ft³/in
* Calibration Density) + (77.85 ft³
* Calibration Density) + (77.85 ft³
* Water Density)  
* Water Density)
        = (Tank level
                    = (Tank level
* 4.124 ft³/in
* 4.124 ft³/in
* 62.325lbm/ ft³) + (77.85 ft³
* 62.325lbm/ ft³) + (77.85 ft³
* Water Density)
* Water Density)
Final:     ( __6 4__ in.* 257 lbm/in ) + ( 77.85 ft³
Final:
* _62.0038   lbm/ft³) =
( __64__ in.* 257 lbm/in ) + ( 77.85 ft³
_21275 (+/- 10)_ lbm   CUE: Another Operator will perform the Independent Verification of the calculation
* _62.0038         lbm/ft³) = _21275 (+/- 10)_ lbm CUE: Another Operator will perform the Independent Verification of the calculation
__________
__________
SAT UNSAT
SAT UNSAT
: 4. PERFORMANCE STEP: Determine Pressurizer Inventory Water and Steam Density values using the initial and final values and Attachment 6, per step 4.2.2.c
: 4. PERFORMANCE STEP: Determine Pressurizer Inventory Water and Steam Density values using the initial and final values and Attachment 6, per step 4.2.2.c
  ........C....... STANDARD: Locates Attachment 6, uses initial RCS pressure value of 2156 psig and final RCS pressure value of 2161 psig to record Density values in step 4.2.2.c of Attachment 2 Pressurizer Inventory Density (from Attachment 6)
    ........C.......
Water Initial ___37.71________ lbm/ft³ Steam Initial ____6.02_________ lbm/ft³ Water Final ____37.68________ lbm/ft³ Steam Final ____6.04_________ lbm/ft³ CUE: None       __________
STANDARD:               Locates Attachment 6, uses initial RCS pressure value of 2156 psig and final RCS pressure value of 2161 psig to record Density values in step 4.2.2.c of Attachment 2 Pressurizer Inventory Density (from Attachment 6)
SAT UNSAT
Water Initial ___37.71________ lbm/ft³             Steam Initial ____6.02_________ lbm/ft³ Water Final ____37.68________ lbm/ft³             Steam Final ____6.04_________ lbm/ft³ CUE:       None
__________
SAT UNSAT
: 5. PERFORMANCE STEP: Complete the Initial Pressurizer Inventory equation for Water Inventory step 4.2.2.d
: 5. PERFORMANCE STEP: Complete the Initial Pressurizer Inventory equation for Water Inventory step 4.2.2.d
  ........C........
    ........C........
STANDARD: Water Inventory = (level
STANDARD:             Water Inventory = (level
* 3.173 ft³/in + 239.6 ft³)
* 3.173 ft³/in + 239.6 ft³)
* Water Density Water Initial:
* Water Density Water Initial:
[(_218_ in.
[(_218_ in.
* 3.173 ft³/in) + 239.6 ft³]
* 3.173 ft³/in) + 239.6 ft³]
* 37.71 lbm/ft³ = _35119.85 (+/- 250) lbm   CUE: None       __________
* 37.71 lbm/ft³ = _35119.85 (+/- 250) lbm CUE:       None
SAT UNSAT
__________
 
SAT UNSAT 5 of 10
Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM RO
-A1.1 AG  6 of 10 6. PERFORMANCE STEP: Complete the Final Pressurizer Inventory equation for Water Inventory step 4.2.2.d
  ........C........


STANDARD: Water Inventory = (level
Appendix C                            Job Performance Measure                            Form ES-C-1 Worksheet Admin JPM RO-A1.1 AG
: 6. PERFORMANCE STEP: Complete the Final Pressurizer Inventory equation for Water Inventory step 4.2.2.d
    ........C........
STANDARD:         Water Inventory = (level
* 3.173 ft³/in + 239.6 ft³)
* 3.173 ft³/in + 239.6 ft³)
* Water Density Water Final
* Water Density Water Final:
[(_2 22_ in.
[(_222_ in.
* 3.173 ft³/in) + 239.6 ft³]
* 3.173 ft³/in) + 239.6 ft³]
* 37.68 lbm/ft³ = _
* 37.68 lbm/ft³ = _35570.146 (+/- 250 ) lbm CUE:       None
35 570.146 (+/- 250 ) lbm   CUE: None       __________
__________
SAT UNSAT
SAT UNSAT
: 7. PERFORMANCE STEP: Complete the Initial Pressurizer Inventory equation for Steam Inventory step 4.2.2.d
: 7. PERFORMANCE STEP: Complete the Initial Pressurizer Inventory equation for Steam Inventory step 4.2.2.d
  ........C........
    ........C........
STANDARD: Steam Inventory =[((320  
STANDARD:         Steam Inventory =[((320 - level)
- level)
* 3.173 ft³/in) + 242.2 ft³]
* 3.173 ft³/in) + 242.2 ft³]
* Steam Density Steam Initial:   [((320 - 218 in)
* Steam Density Steam Initial:
[((320 - 218 in)
* 3.173 ft³/in) + 242.2 ft³]
* 3.173 ft³/in) + 242.2 ft³]
* 6.02 lbm/ft³) = _3406.393 (+/
* 6.02 lbm/ft³) = _3406.393 (+/-50) lbm CUE:       None
-5 0) lbm CUE: None       __________
__________
SAT UNSAT
SAT UNSAT
: 8. PERFORMANCE STEP: Complete the Final Pressurizer Inventory equation for Steam Inventory step 4.2.2.d
: 8. PERFORMANCE STEP: Complete the Final Pressurizer Inventory equation for Steam Inventory step 4.2.2.d
  ........C........
    ........C........
 
STANDARD:         Steam Inventory =[((320 - level)
STANDARD: Steam Inventory =[((320  
- level)
* 3.173 ft³/in) + 242.2 ft³]
* 3.173 ft³/in) + 242.2 ft³]
* Steam Density Steam Final:   [((320 - 2 22 in)
* Steam Density Steam Final:
[((320 - 222 in)
* 3.173 ft³/in) + 242.2 ft³]
* 3.173 ft³/in) + 242.2 ft³]
* 6.0 4 lbm/ft³) = _
* 6.04  lbm/ft³) = _3341.05 (+/-50) lbm CUE:       None
3341.05 (+/-5 0) lbm   CUE: None       __________
__________
SAT UNSAT
SAT UNSAT 6 of 10


Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM RO
Appendix C                                 Job Performance Measure                     Form ES-C-1 Worksheet Admin JPM RO-A1.1 AG
-A1.1 AG 7 of 10  9. PERFORMANCE STEP: Input the Power Correction Factor data on Attachment 2 step 4.2.2.e ........C........
: 9. PERFORMANCE STEP: Input the Power Correction Factor data on Attachment 2 step 4.2.2.e
    ........C........
STANDARD:              Power is 100% from initial conditions, refers to DB-PF-06703 Curve CC3.1 to obtain the Power Correction Factors 4.2.2.e        Power Correction Factor Initial __135_(+/ 5) _ lbm Final    135 (+/-5) lbm CUE:      None
__________
SAT UNSAT
: 10. PERFORMANCE STEP: Input the Temperature Correction Factor data on Attachment 2 step 4.2.2.f
    ........C........
STANDARD:              Initial Temperature is 581.8 °F and Final Temperature is 582.3 °F from Attachment 2, refers to DB-PF-06703 Curve CC3.1 to obtain the Power Correction Factors 4.2.2.f        Temperature Correction Factor (Tave 528 °F)
Initial __-35200 (+/- 50) _ lbm Final    -35600 (+/- 50) lbm CUE:      None
__________
SAT UNSAT
: 11. PERFORMANCE STEP: If Tave is less than 528 °F, then complete Temperature Factor Equation per step 4.2.2.g STANDARD:              Determines step 4.2.2.g is N/A since temperature is greater than 528 °F CUE:      None
__________
SAT UNSAT 7 of 10


STANDARD: Power is 100% from initial conditions, refers to DB
Appendix C                                Job Performance Measure                        Form ES-C-1 Worksheet Admin JPM RO-A1.1 AG
-PF-06703 Curve CC3.1 to obtain the Power Correction Factors
: 12. PERFORMANCE STEP: Complete the RCS Inventory Table to determine Initial and Final total RCS Inventory per step 4.2.2.h
    ........C........
STANDARD:             Transfers data calculated to the RCS Inventory Table and calculates the Initial and Final RCS Water Inventory MU Tank              Pzr Steam        Pzr Water        Power         Temperature          Water Inventory        + Inventory        + Inventory    + Correction  +    Correction  =    Inventory (lbm)              (lbm)              (lbm)          (lbm)            (lbm)            (lbm)
Initial:
22046                3406.393          35119.85        135            -35200            25507.243
(+/- 250) lbm +              lbm +            lbm +          lbm +              lbm =            lbm Final:
21275                3341.05          35570.146      135            -35600            24721.196
(+/- 250) lbm +              lbm +            lbm +          lbm +              lbm =            lbm CUE:      None
__________
SAT UNSAT
: 13. PERFORMANCE STEP: Calculates the Change in RCS Inventory
    ........C........
STANDARD:            Completes step 4.2.2.i to determine RCS Inventory Change Change = Initial inventory - Final inventory Change = 25507.243 lbm - 24721.196_ lbm = 786.047 (+/- 80)_ lbm CUE: Another Operator will perform the Independent Verification of the calculation
__________
SAT UNSAT 8 of 10


4.2.2.e Power Correction Factor Initial __135_(+/ 5)  _ lbm Final      135  (+/-5)  lbm CUE: None      __________
Appendix C                           Job Performance Measure                         Form ES-C-1 Worksheet Admin JPM RO-A1.1 AG
SAT  UNSAT
: 14. PERFORMANCE STEP: Calculates the Time Period
 
    .......C.........
1 0. PERFORMANCE STEP: Input the Temperature Correction Factor data on Attachment 2 step  4.2.2.f
STANDARD:         Completes step 4.2.2.j by subtracting Initial Time from the Final Time Period = Final time - Initial time Period = [(23 hr x 60) + ( 11 min)] - [(_19 hr x 60) + (5 min)] = _246__ min CUE: Another Operator will perform the Independent Verification of the calculation
  ........C........
 
STANDARD: Initial Temperature is 581.8
°F and Final Temperature is 582.3
°F from Attachment 2, refers to DB
-PF-06703 Curve CC3.1 to obtain the Power Correction Factors 4.2.2.f Temperature Correction Factor (Tave  °F)  Initial __-35 200 (+/- 5 0) _ lbm Final      -35 6 00 (+/- 5 0)  lbm CUE: None      __________
SAT  UNSAT
: 11. PERFORMANCE STEP: If Tave is less than 528 °F, then complete Temperature Factor Equation per step 4.2.2.g STANDARD: Determines step 4.2.2.g is N/A since temperature is greater than 528
°F  CUE: None      __________
SAT  UNSAT
 
Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM RO
-A1.1 AG 8 of 10  1 2. PERFORMANCE STEP: Complete the RCS Inventory Table to determine Initial and Final total RCS Inventory per step 4.2.2.h
  ........C........
STANDARD: Transfers data calculated to the RCS Inventor y Table and calculate s the Initial and Final RCS Water Inventory MU Tank Inventory (lbm) + Pzr Steam Inventory (lbm) + Pzr Water Inventory (lbm) + Power Correction (lbm) + Temperature Correction (lbm) = Water Inventory (lbm) Initial:  22046  lbm +  3406.393  lbm +  35119.85  lbm +  135  lbm +  -352 00  lbm =  25507.243  (+/- 250) lbm Final: 21275  lbm +  3341.05  lbm +  35570.146  lbm +  135  lbm +  -356 00  lbm =  2 4721.196  (+/- 250) lbm    CUE: None      __________
SAT  UNSAT 1 3. PERFORMANCE STEP: Calculates the Change in RCS Inventory
  ........C........
STANDARD: Completes step 4.2.2.i to determine RCS Inventory Change Change  = Initial inventory
- Final inventory Change = 25507.243  lbm - 2 4721.196_ lbm = 7 86.0 47 (+/- 8 0)_ lbm    CUE: Another Operator will perform the Independent Verification of the calculation
__________
__________
SAT UNSAT
SAT UNSAT
 
: 15. PERFORMANCE STEP: Calculates the Total RCS Leak Rate per step 4.2.2.k
Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM RO
    .......C.........
-A1.1 AG  9 of 10  1 4. PERFORMANCE STEP: Calculates the Time Period  .......C......... STANDARD: Completes step 4.2.2.
STANDARD:         Completes step 4.2.2.k by subtracting Initial Time from the Final Time Change in RCS Inventory        7.481 gallons        ft 3 Leakrate =                               x                x time                     ft 3        62.32 lbm Leakrate = (       786.047        lbm) ÷ (       246    min) x (0.120 gal/lbm)
j by subtracting Initial Time from the Final Time Period  = Final time  
Leakrate =        0.383 (+/- 0.05)         gpm CUE: Another Operator will perform the Independent Verification of the calculation
- Initial time Period = [(23 hr x 60) + ( 11  min)] - [(_19 hr x 60) + (5  min)]  = _
246__ min  CUE: Another Operator will perform the Independent Verification of the calculation
__________
__________
SAT UNSAT 1 5. PERFORMANCE STEP: Calculates the Total RCS Leak Rate per step 4.2.2.k
SAT UNSAT TERMINATING CUES: This JPM is complete (Terminated by the examiner)
  .......C.........
 
STANDARD: Completes step 4.2.2.k by subtracting Initial Time from the Final Time lbm 62.32 ft  x  ftgallons 7.481  x  timeInventory  RCSin  Change    Leakrate 3 3    Leakrate =  ( 7 86.0 47 lbm) ÷ (  246 min) x  (0.120 gal/lbm)
Leakrate =
0.3 8 3 (+/- 0.05)  gpm CUE: Another Operator will perform the Independent Verification of the calculation
__________
__________
SAT  UNSAT TERMINATING CUES:  This JPM is complete (Terminated by the examine r)        __________
END TIME 9 of 10
END TIME


Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM RO
Appendix C                       Job Performance Measure           Form ES-C-1 Worksheet Admin JPM RO-A1.1 AG Verification of Completion Job Performance Measure No.
-A1.1 AG 10 of 10  Verification of Completion Job Performance Measure No.
Examinees Name:
Examinee's Name:
Examiners Name:
Examiner's Name:
Date Performed:
Date Performed:
Facility Evaluator:
Facility Evaluator:
Number of Attempts:
Number of Attempts:
Time to Complete:  
Time to Complete:
 
Question Documentation:
Question Documentation:  
 
Question:_____________________________________________________________
Question:_____________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
________________________________________________________________
________________________________________________________________
Response:_____________________________________________________________
Response:_____________________________________________________________
___________________________________________
___________________________
______________________________________________________________________
______________________________________________________________________
______________________________________________________________________
______________________________________________________________________
Result: Satisfactory/Unsatisfactory Examiner's signature and date:
______________________________________________________________________
_______________________________________
Result: Satisfactory/Unsatisfactory Examiners signature and date: _______________________________________
10 of 10


20   Revision   ATTACHMENT 2:
20 Revision ATTACHMENT 2:           RCS/MU AND PURIFICATION LEAK RATE CALCULATION SHEET Page 1 of 3 Note: For parameters which utilize averaging of redundant channels, eliminate inoperable channels from the average and reduce the denominator accordingly.
RCS/MU AND PURIFICATION LEAK RATE CALCULATION SHEET Page 1 of 3 Note: For parameters which utilize averaging of redundant channels, eliminate inoperable channels from the average and reduce the denominator accordingly.
If a Th or Tc point is unavailable, eliminate it and the opposing point (Tc or Th) from the same loop, and reduce the denominator by 2.
If a Th or Tc point is unavailable, eliminate it and the opposing point (Tc or Th) from the same loop, and reduce the denominator by 2.
ITEM PARAMETER SOURCE UNITS INITIAL VALUE FINAL  VALUE 1 Time Control Room clock or computer hr:min Step 4.1.4 Step 4.1.10 1905 2311 2 Makeup Tank Temp T769 or TI MU8 °F 100 100 3 Makeup Tank Level (2 channel ave)
INITIAL            FINAL ITEM       PARAMETER                   SOURCE                   UNITS VALUE             VALUE Control Room clock                               Step 4.1.4       Step 4.1.10 1          Time                                                  hr:min or computer                                        1905               2311 Makeup 2           Tank Temp         T769 or TI MU8                       °F             100               100 Makeup Tank
[L761+L763] 2, or LR MU16  in. 67 64 4 RCS Pressure (4 ch ave)
[L761+L763]÷2, 3          Level                                                  in.             67                 64 or LR MU16 (2 channel ave)
[P721+P722+P729+P730] 4, PRS RC2A2, or PRS RC2B (1) ps i 2156 2161  5 Pressurizer Level LRS RC14 or L768  in. 218 222 6 Ave Power [R795+R804+R814+R820] 4,C913, or NR NI6 % 100 100 7 Tave  (8 ch ave)
RCS Pressure      [P721+P722+P729+P730]÷4, 4          (4 ch ave)                                              psi          2156              2161 PRSRC2A2, or PRSRC2B (1)
TI RC7, or: [T719+T720+T728+T729+
Pressurizer       LRS RC14 or 5                                                                  in.           218               222 Level            L768
T780+T800+T820+T840] 8 (2) °F 581.8 582.3  (1) If less than 1700 psig RCS Pressure use the average of P725 and P732 (loop 1 and loop 2 WR Pressure).
[R795+R804+R814+R820]÷4, 6          Ave Power                                              %
(2) If less than 520°F RCS Temperature then average T753 and T782 (loop 1 and loop 2 WR Temperature).  
C913, or NR NI6                                     100               100 TI RC7, or:
 
7          Tave                                                    °F
[T719+T720+T728+T729+
(8 ch ave)                                                            581.8              582.3 T780+T800+T820+T840]÷8 (2)
(1)
If less than 1700 psig RCS Pressure use the average of P725 and P732 (loop 1 and loop 2 WR Pressure).
(2)
If less than 520°F RCS Temperature then average T753 and T782 (loop 1 and loop 2 WR Temperature).
4.2.2.a Makeup Tank Water Density (from Attachment 4)
4.2.2.a Makeup Tank Water Density (from Attachment 4)
Initial ____62.0038______ lbm/ft³ Final   ___ 62.0038______ lbm/ft³ 4.2.2.b Makeup Tank Inventory Note: 77.85 ft³ accounts for water volume below the level indicating range.
Initial ____62.0038______ lbm/ft³ Final ___ 62.0038______ lbm/ft³ 4.2.2.b Makeup Tank Inventory Note: 77.85 ft³ accounts for water volume below the level indicating range.
Water Inventory = (Tank level
Water Inventory = (Tank level
* 4.124 ft³/in
* 4.124 ft³/in
* Calibration Density) + (77.85 ft³
* Calibration Density) + (77.85 ft³
* Water Density)  
* Water Density)
        = (Tank level
                            = (Tank level
* 4.124 ft³/in
* 4.124 ft³/in
* 62.325lbm/ ft³) + (77.85 ft³
* 62.325lbm/ ft³) + (77.85 ft³
Line 248: Line 241:
Initial:
Initial:
( ___67______ in.* 257 lbm/in ) + ( 77.85 ft³
( ___67______ in.* 257 lbm/in ) + ( 77.85 ft³
* _62.0038   lbm/ft³) =
* _62.0038 lbm/ft³) = _22046_ lbm
_22046_ lbm ________ IV Final:     (___64______ in.* 257 lbm/in ) + ( 77.85 ft³
________
* _62.0038   lbm/ft³) =
IV Final:
_2 1275_ lbm  ________ IV 21   Revision   ATTACHMENT 2:
(___64______ in.* 257 lbm/in ) + ( 77.85 ft³
RCS/MU AND PURIFICATION LEAK RATE CALCULATION SHEET Page 2 of 3 4.2.2.c Pressurizer Inventory Density (from Attachment 6)
* _62.0038 lbm/ft³) = _21275_ lbm
Water Initial ___37.71________ lbm/ft³ Steam Initial ____6.02_________ lbm/ft³ Water Final ____37.68________ lbm/ft³ Steam Final ____6.04_________ lbm/ft³ 4.2.2.d Pressurizer Inventory Note: 239.6 ft³ accounts for water volume below the level indicating range.
________
IV
 
21 Revision ATTACHMENT 2:             RCS/MU AND PURIFICATION LEAK RATE CALCULATION SHEET Page 2 of 3 4.2.2.c Pressurizer Inventory Density (from Attachment 6)
Water Initial ___37.71________ lbm/ft³           Steam Initial ____6.02_________ lbm/ft³ Water Final ____37.68________ lbm/ft³           Steam Final ____6.04_________ lbm/ft³ 4.2.2.d Pressurizer Inventory Note: 239.6 ft³ accounts for water volume below the level indicating range.
242.2 ft³ accounts for steam volume above the level indicating range.
242.2 ft³ accounts for steam volume above the level indicating range.
Water Inventory = (level
Water Inventory = (level
Line 260: Line 257:
[(___218_____ in.
[(___218_____ in.
* 3.173 ft³/in) + 239.6 ft³]
* 3.173 ft³/in) + 239.6 ft³]
* 37.71 lbm/ft³ = _
* 37.71             lbm/ft³ = _35119.85     lbm
35119.85 lbm ________ IV Water Final:
________
IV Water Final:
[(___222_____ in.
[(___222_____ in.
* 3.173 ft³/in) + 239.6 ft³]
* 3.173 ft³/in) + 239.6 ft³]
* 3 7.68   lbm/ft³ = _
* 37.68             lbm/ft³ = _35570.146 lbm
35 570.146 lbm ________ IV Steam Inventory =[((320  
________
- level)
IV Steam Inventory =[((320 - level)
* 3.173 ft³/in) + 242.2 ft³]
* 3.173 ft³/in) + 242.2 ft³]
* Steam Density Steam Initial:
* Steam Density Steam Initial:
[((320 - _218__in)
[((320 - _218__in)
* 3.173 ft³/in) + 242.2 ft³]
* 3.173 ft³/in) + 242.2 ft³]
* 6.02 lbm/ft³) = _3406.393________ lbm
* 6.02   lbm/ft³) = _3406.393________ lbm
________ IV Steam Final:
________
IV Steam Final:
[((320 - __222__in)
[((320 - __222__in)
* 3.173 ft³/in) + 242.2 ft³]
* 3.173 ft³/in) + 242.2 ft³]
* 6.04   lbm/ft³) = _
* 6.04   lbm/ft³) = _3341.05        __ lbm
3 341.05        __ lbm ________ IV 4.2.2.e Power Correction Factor Initial _____
________
135_____________ lbm Final   _____
IV 4.2.2.e Power Correction Factor Initial _____135_____________ lbm Final _____135____________ lbm 4.2.2.f Temperature Correction Factor (Tave >528°)
135____________ lbm 4.2.2.f Temperature Correction Factor (Tave >528°)   Initial ______
Initial ______-35200___________ lbm Final _____-35600___________ lbm
-35 2 00___________ lbm Final   _____
-35 6 00___________ lbm
 
22    Revision  ATTACHMENT 2:
RCS/MU AND PURIFICATION LEAK RATE CALCULATION SHEET Page 3 of 3 4.2.2.g Temperature Correction Factor (Tave <528&deg;)  Reactor Coolant System Density (from Attachment 5)
N/A  At initial Tave ___________________ lbm/ft&#xb3;
 
At final Tave ___________________ lbm/ft&#xb3; Temperature Correction Factor (TCF)


22 Revision ATTACHMENT 2:              RCS/MU AND PURIFICATION LEAK RATE CALCULATION SHEET Page 3 of 3 4.2.2.g Temperature Correction Factor (Tave <528&deg;)
Reactor Coolant System Density (from Attachment 5)
N/A At initial Tave  ___________________ lbm/ft&#xb3; At final Tave    ___________________ lbm/ft&#xb3; Temperature Correction Factor (TCF)
TCF = [(10,277 + (0.24828
TCF = [(10,277 + (0.24828
* Tave))
* Tave))
* Reactor Coolant System Density]  
* Reactor Coolant System Density] - 498,800 Initial: [(10,277 ft&#xb3; + (0.24828 ft&#xb3;/&deg;F* _______&deg;F))
- 498,800 Initial: [(10,277 ft&#xb3; + (0.24828 ft&#xb3;/&deg;F* _______&deg;F))
* _______ lbm/ft&#xb3;] - 498,800 lbm = _______ lbm
* _______ lbm/ft&#xb3;]  
________
- 498,800 lbm = _______ lbm
IV Final: [(10,277 ft&#xb3; + (0.24828 ft&#xb3;/&deg;F* _______&deg;F))
________ IV Final: [(10,277 ft&#xb3; + (0.24828 ft&#xb3;/&deg;F* _______&deg;F))
* _______ lbm/ft&#xb3;] - 498,800 lbm = _______ lbm
* _______ lbm/ft&#xb3;]  
________
- 498,800 lbm = _______ lbm
IV 4.2.2.h     RCS Inventory MU Tank             Pzr Steam        Pzr Water        Power      Temperature          Water Inventory      +  Inventory    +  Inventory    + Correction +    Correction =      Inventory (lbm)               (lbm)           (lbm)           (lbm)           (lbm)             (lbm)
________ IV 4.2.2.h RCS Inventory MU Tank Inventory (lbm) + Pzr Steam Inventory (lbm) + Pzr Water Inventory (lbm) + Power Correction (lbm) + Temperature Correction (lbm) = Water Inventory (lbm) Initial: 22046 lbm +  3406.393 lbm +  35119.85 lbm +   135  lbm +   -35 2 00  lbm =   25507.243  lbm Final: 21275 lbm +  3341.05 lbm +  35570.146 lbm +   135  lbm +   -35 6 00  lbm =   24721.196  lbm 4.2.2.i Change in RCS Inventory Change = Initial inventory  
Initial:
- Final inventory Change = 25507.243_ lbm - 24721.196 lbm = 786.047_ lbm ________ IV 23    Revision  ATTACHMENT 2:
22046               3406.393         35119.85         135          -35200            25507.243 lbm +              lbm +           lbm +          lbm +             lbm =             lbm Final:
RCS/MU AND PURIFICATION LEAK RATE CALCULATION SHEET Page 4 of 4  4.2.2.j Time period Period  = Final time
21275               3341.05         35570.146       135          -35600            24721.196 lbm +             lbm +            lbm +          lbm +             lbm =             lbm 4.2.2.i     Change in RCS Inventory Change = Initial inventory - Final inventory Change = 25507.243_ lbm - 24721.196 lbm = 786.047_ lbm
- Initial time Period = [(_
________
23___ hr x 60) + (  11      min)] - [(__19__ hr x 60) + ( 5    min)]  =  _
IV
246____ min ________ IV 4.2.2.k  Total RCS Leak Rate    lbm 62.32 ft  x  ftgallons 7.481  x  timeInventory  RCSin  Change    Leakrate 3 3    Leakrate =  ( 7 86.047  lbm) &#xf7; (  246 min) x  (0.120 gal/lbm)
Leakrate =
.3 8 3  gpm  ________ IV Independent Verification Completed by _________________________________ Date ______


24    Revision   ATTACHMENT 3:
23 Revision ATTACHMENT 2:       RCS/MU AND PURIFICATION LEAK RATE CALCULATION SHEET Page 4 of 4 4.2.2.j   Time period Period = Final time - Initial time Period = [(_23___ hr x 60) + ( 11  min)] - [(__19__ hr x 60) + ( 5    min)] = _246____ min
UNIDENTIFIED RCS LEAKAGE CALCULATION SHEET Page 1 of 1 4.2.1.f RCP Seals Leak Rate from computer printout,  or from Attachment
________
: 1. (4.2.1.e)    __________ gpm 4.2.1.j Quench Tank In-Leakage Rate from computer printout,  or from Attachment 1. (4.2.1.i). Only record Positive values  (exclude negative values by entering 0.000).
IV 4.2.2.k    Total RCS Leak Rate Change in RCS Inventory      7.481 gallons          ft 3 Leakrate =                            x                x time                  ft 3       62.32 lbm Leakrate = (       786.047              lbm) &#xf7; (       246      min) x (0.120 gal/lbm)
__________ gpm 4.2.2.l RCS Total Leak Rate from computer printout,  or from Attachment
Leakrate = .383    gpm
: 2. ___.383___ gpm  4.2.3.a Primary to Secondary Tube Leakage from computer printout, or from most recent entry in RCS Leakage Log, RO Log, or as determined by Chemistry.
________
__________ gpm (0.104 allowed) 4.2.3.b Other Identified Leakage, or from RCS Leakage Log.
IV Independent Verification Completed by _________________________________ Date ______
__________ gpm 4.2.3.c Total Identified Leak Rate from computer printout,  or from; RCP Seals + Quench Tk + Pri to Sec + Other                                          ( 4.2.1.e  +  4.2.1.i [positive values only] +  4.2.3.a  +  4.2.3.b ). ________      IV __________ gpm (10 gpm allowed) 4.2.3.d Unidentified Leak Rate from computer printout,  or from; Total Leak Rate
- Total Identified Leak Rate
( 4.2.2.k  -  4.2.3.c ) ________      IV __________ gpm (1 gpm allowed) 4.2.3.e Reactor Coolant Pressure Boundary Leakage
__________ gpm (0 gpm allowed)


24 Revision ATTACHMENT 3:            UNIDENTIFIED RCS LEAKAGE CALCULATION SHEET Page 1 of 1 RCP Seals Leak Rate from computer printout, 4.2.1.f or from Attachment 1. (4.2.1.e)                                  __________ gpm Quench Tank In-Leakage Rate from computer printout, 4.2.1.j    or from Attachment 1. (4.2.1.i). Only record Positive values      __________ gpm (exclude negative values by entering 0.000).
RCS Total Leak Rate from computer printout, 4.2.2.l or from Attachment 2.                                            ___.383___ gpm Primary to Secondary Tube Leakage from computer printout,
__________ gpm 4.2.3.a    or from most recent entry in RCS Leakage Log, RO Log, or as (0.104 allowed) determined by Chemistry.
Other Identified Leakage, 4.2.3.b                                                                      __________ gpm or from RCS Leakage Log.
Total Identified Leak Rate from computer printout, or from; RCP Seals + Quench Tk + Pri to Sec + Other
( 4.2.1.e + 4.2.1.i [positive values only] + 4.2.3.a + 4.2.3.b ). __________ gpm 4.2.3.c (10 gpm allowed)
________
IV Unidentified Leak Rate from computer printout, or from; Total Leak Rate - Total Identified Leak Rate
( 4.2.2.k - 4.2.3.c )                                            __________ gpm 4.2.3.d (1 gpm allowed)
________
IV
__________ gpm 4.2.3.e    Reactor Coolant Pressure Boundary Leakage (0 gpm allowed)
Independent Verification Completed by _________________________________ Date ______
Independent Verification Completed by _________________________________ Date ______
Performed by:
Performed by:                                             Date:
Date:
 
Davis-Besse Initial License Exam 2015 Admin JPM RO-A 1.2 Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM RO-A 1.2 AG 1 of 6  Facility:             Davis-Besse   Task No: 119-002-03-0100   Task Title
Davis-Besse Initial License Exam 2015 Admin JPM RO-A1.2
:      Determine Maintenance of Active License Status K/A  
 
Appendix C                             Job Performance Measure                         Form ES-C-1 Worksheet Admin JPM RO-A1.2 AG Facility:         Davis-Besse                           Task No:       119-002-03-0100 Task Title:      Determine Maintenance of Active License Status K/A  


==Reference:==
==Reference:==
 
2.1.4 (3.3)         Job Performance Measure No:         RO-A1.2 (JPM New)
2.1.4 (3.3) Job Performance Measure No
Examinee:
:     RO-A1.2 (JPM New)   Examinee:           NRC Examiner:
NRC Examiner:                                                           Date:
Date:       Method of testing:
Method of testing:
Simulated Performance
Simulated Performance ___                       Actual Performance _X_
___   Actual Performance
Classroom _X_                     Simulator ___               Plant ___
_X_  Classroom
_X_   Simulator
___   Plant ___
Read to the examinee:
Read to the examinee:
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
Line 338: Line 335:
Initial Conditions:
Initial Conditions:
The plant conditions are specified in the Initial Conditions and Initiating Cues.
The plant conditions are specified in the Initial Conditions and Initiating Cues.
Task Standard: Determine active license status is not maintained, evaluate whether each shift meets the requirements.
Task Standard:
 
Determine active license status is not maintained, evaluate whether each shift meets the requirements.
Required Materials:
Required Materials:
DBBP-TRAN-0014, License Requirements for Licensed Individuals NT-OT-07001, Training and Qualification of Operations Personnel General  
DBBP-TRAN-0014, License Requirements for Licensed Individuals NT-OT-07001, Training and Qualification of Operations Personnel General  


==References:==
==References:==


None Initiating Cue:
None Initiating Cue:
The plant conditions are specified in the Initial Conditions and Initiating Cues.
The plant conditions are specified in the Initial Conditions and Initiating Cues.
Time Critical Task:
Time Critical Task:
No   Alternate Path:
No Alternate Path:
No Validation Time:
No Validation Time:
20 minutes
20 minutes 1 of 6


Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM RO-A 1.2 AG 2 of 6  EXAMINER COPY INITIAL CONDITIONS
Appendix C                         Job Performance Measure                         Form ES-C-1 Worksheet Admin JPM RO-A1.2 AG EXAMINER COPY INITIAL CONDITIONS:
Today is 7/1/15. You are a Reactor Operator.
Today is 7/1/15. You are a Reactor Operator. You are scheduled to stand a Reactor Operator ATC watch tomorrow. Your work history for the previous quarter is as follows:
You are scheduled to stand a Reactor Operator ATC watch tomorrow.
4/12/15 Worked 12 hours as BOP in Mode 1 (day shift). Took turnover at the beginning of shift and gave turnover at end of shift.
Your work history for the previous quarter is as follows
4/13/15 Worked 8 hours as BOP in Mode 1 (day shift). Took turnover at beginning of shift and did NOT give turnover at end of shift.
4/12/1 5 Worked 12 hours as BOP in Mode 1 (day shift). Took turnover at the beginning of shift and gave turnover at end of shift.
4/14/15 Worked 6 hours in Mode 1 as ATC and 6 hours ATC doing Crew JIT training on Simulator (day shift). Took turnover at beginning and gave turnover at end of both of these assignments.
 
4/13/15 Worked 8 hours as BOP in Mode 1 (day shift). Took turnover at beginning of shift and did NOT give turnover at end of shift
. 4/14/15 Worked 6 hours in Mode 1 as ATC and 6 hours ATC doing Crew JIT training on Simulator (day shift). Took turnover at beginning and gave turnover at end of both of these assignments.
5/19/15 Worked 12 hours in Mode 5 as BOP (night shift). Took turnover at beginning of shift and gave turnover at end of shift.
5/19/15 Worked 12 hours in Mode 5 as BOP (night shift). Took turnover at beginning of shift and gave turnover at end of shift.
5/20/15 Worked 12 hours in Mode 5 as ATC (night shift). Took turnover at beginning of shift an d gave turnover at end of shift 5/21/15 Worked 12 hours in Mode 3 as BOP (night shift). Took turnover at beginning of shift and did gave turnover at end of shift.
5/20/15 Worked 12 hours in Mode 5 as ATC (night shift). Took turnover at beginning of shift and gave turnover at end of shift 5/21/15 Worked 12 hours in Mode 3 as BOP (night shift). Took turnover at beginning of shift and did gave turnover at end of shift.
6/27/15 Worked 12 hours I Mode 1 as the 3rd RO in the Control Room (day shift). Took turnover at beginning of shift and gave turnover at end of shift.
6/27/15 Worked 12 hours I Mode 1 as the 3rd RO in the Control Room (day shift). Took turnover at beginning of shift and gave turnover at end of shift.
INITIATION CUE:
INITIATION CUE:
Determine if your license status is active or inactive based on the previous quarters work history and document as ACTIVE or INACTIVE on this page. Report whether each shift meets the watch credit or not.
Determine if your license status is active or inactive based on the previous quarters work history and document as ACTIVE or INACTIVE on this page. Report whether each shift meets the watch credit or not.
(Provide copy of DBBP
(Provide copy of DBBP-TRAN-0014, License Requirements for Licensed Individuals and NT-OT-07001, Training and Qualification of Operations Personnel)
-TRAN-0014, License Requirements for Licensed Individuals and NT-OT-07001, Training and Qualification of Operations Personnel)
RESULTS:
RESULTS:
Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM RO-A 1.2 AG 3 of 6  CANDIDATE COPY INITIAL CONDITIONS
2 of 6
Today is 7/1/15. You are a Reactor Operator.
 
You are scheduled to stand a Reactor Operator ATC watch tomorrow.
Appendix C                         Job Performance Measure                         Form ES-C-1 Worksheet Admin JPM RO-A1.2 AG CANDIDATE COPY INITIAL CONDITIONS:
Your work history for the previous quarter is as follows
Today is 7/1/15. You are a Reactor Operator. You are scheduled to stand a Reactor Operator ATC watch tomorrow. Your work history for the previous quarter is as follows:
4/12/1 5 Worked 12 hours as BOP in Mode 1 (day shift). Took turnover at the beginning of shift and gave turnover at end of shift.
4/12/15 Worked 12 hours as BOP in Mode 1 (day shift). Took turnover at the beginning of shift and gave turnover at end of shift.
4/13/15 Worked 8 hours as BOP in Mode 1 (day shift). Took turnover at beginning of shift and did NOT give turnover at end of shift.
4/13/15 Worked 8 hours as BOP in Mode 1 (day shift). Took turnover at beginning of shift and did NOT give turnover at end of shift.
4/14/15 Worked 6 hours in Mode 1 as ATC and 6 hours ATC doing Crew JIT training on Simulator (day shift). Took turnover at beginning and gave turnover at end of both of these assignments.
4/14/15 Worked 6 hours in Mode 1 as ATC and 6 hours ATC doing Crew JIT training on Simulator (day shift). Took turnover at beginning and gave turnover at end of both of these assignments.
5/19/15 Worked 12 hours in Mode 5 as BOP (night shift). Took turnover at beginning of shift and gave turnover at end of shift.
5/19/15 Worked 12 hours in Mode 5 as BOP (night shift). Took turnover at beginning of shift and gave turnover at end of shift.
5/20/15 Worked 12 hours in Mode 5 as ATC (night shift). Took turnover at beginning of shift an d gave turnover at end of shift 5/21/15 Worked 12 hours in Mode 3 as BOP (night shift). Took turnover at beginning of shift and did gave turnover at end of shift.
5/20/15 Worked 12 hours in Mode 5 as ATC (night shift). Took turnover at beginning of shift and gave turnover at end of shift 5/21/15 Worked 12 hours in Mode 3 as BOP (night shift). Took turnover at beginning of shift and did gave turnover at end of shift.
 
6/27/15 Worked 12 hours I Mode 1 as the 3rd RO in the Control Room (day shift). Took turnover at beginning of shift and gave turnover at end of shift.
6/27/15 Worked 12 hours I Mode 1 as the 3rd RO in the Control Room (day shift). Took turnover at beginning of shift and gave turnover at end of shift.
INITIATION CUE:
INITIATION CUE:
Determine if your license status is active or inactive based on the previous quarters work history and document as ACTIVE or INACTIVE on this page. Report whether each shift meets t he watch credit or not. RESULTS:
Determine if your license status is active or inactive based on the previous quarters work history and document as ACTIVE or INACTIVE on this page. Report whether each shift meets the watch credit or not.
Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM RO-A 1.2 AG 4 of 6 PERFORMANCE INFORMATION NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is NOT critical unless denoted in the "Comments".
RESULTS:
START TIME: _______
3 of 6
 
Appendix C                             Job Performance Measure                           Form ES-C-1 Worksheet Admin JPM RO-A1.2 AG PERFORMANCE INFORMATION NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is NOT critical unless denoted in the "Comments".
START TIME: _______
: 1. PERFORMANCE STEP: Evaluate 4/12/15 work period
: 1. PERFORMANCE STEP: Evaluate 4/12/15 work period
  ........C........
    ........C........
STANDARD: Reviews DBBP-TRAN-0014, License Requirements for Licensed Individuals and determines requirement for credit is met
STANDARD: Reviews DBBP-TRAN-0014, License Requirements for Licensed Individuals and determines requirement for credit is met.
. CUE: None       __________
CUE: None
SAT UNSAT
__________
SAT UNSAT
: 2. PERFORMANCE STEP: Evaluate 4/13/15 work period
: 2. PERFORMANCE STEP: Evaluate 4/13/15 work period
  ........C........
    ........C........
STANDARD: Reviews DBBP-TRAN-0014, License Requirements for Licensed Individuals and determines requirement for credit is not met. Did not stand complete watch   CUE: None       __________
STANDARD: Reviews DBBP-TRAN-0014, License Requirements for Licensed Individuals and determines requirement for credit is not met. Did not stand complete watch CUE: None
SAT UNSAT
__________
SAT UNSAT
: 3. PERFORMANCE STEP: Evaluate 4/14/15 work period
: 3. PERFORMANCE STEP: Evaluate 4/14/15 work period
  ........C........
    ........C........
STANDARD: Reviews DBBP-TRAN-0014, License Requirements for Licensed Individuals and determines requirement for credit is not met. No credit is given for Simulator time CUE: None       __________
STANDARD: Reviews DBBP-TRAN-0014, License Requirements for Licensed Individuals and determines requirement for credit is not met. No credit is given for Simulator time CUE: None
SAT UNSAT
__________
: 4. PERFORMANCE STEP: Evaluate 5/19/15 work period
SAT UNSAT
  ........C........
: 4.       PERFORMANCE STEP: Evaluate 5/19/15 work period
STANDARD: Reviews DBBP-TRAN-0014, License Requirements for Licensed Individuals and determines requirement for credit is not met. Credit for BOP is not given in Mode 5. CUE: None       __________
    ........C........
SAT UNSAT
STANDARD: Reviews DBBP-TRAN-0014, License Requirements for Licensed Individuals and determines requirement for credit is not met. Credit for BOP is not given in Mode 5.
CUE: None
__________
SAT UNSAT 4 of 6


Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM RO-A 1.2 AG 5 of 6  5. PERFORMANCE STEP: Evaluate 5/20/15 work period
Appendix C                           Job Performance Measure                           Form ES-C-1 Worksheet Admin JPM RO-A1.2 AG
  ........C........
: 5. PERFORMANCE STEP: Evaluate 5/20/15 work period
    ........C........
STANDARD: Reviews DBBP-TRAN-0014, License Requirements for Licensed Individuals and determines requirement for credit is met.
STANDARD: Reviews DBBP-TRAN-0014, License Requirements for Licensed Individuals and determines requirement for credit is met.
CUE: None       __________
CUE: None
SAT UNSAT
__________
SAT UNSAT
: 6. PERFORMANCE STEP: Evaluate 5/21/15 work period
: 6. PERFORMANCE STEP: Evaluate 5/21/15 work period
  ........C........
    ........C........
STANDARD: Reviews DBBP-TRAN-0014, License Requirements for Licensed Individuals and determines requirement for credit is met CUE: None       __________
STANDARD: Reviews DBBP-TRAN-0014, License Requirements for Licensed Individuals and determines requirement for credit is met CUE: None
SAT UNSAT
__________
SAT UNSAT
: 7. PERFORMANCE STEP: Evaluate 6/27/15 work period
: 7. PERFORMANCE STEP: Evaluate 6/27/15 work period
  ........C........
    ........C........
STANDARD: Reviews DBBP-TRAN-0014, License Requirements for Licensed Individuals and determines requirement for credit is not met. No credit is given for 3 rd Reactor Operator CUE: None       __________
STANDARD: Reviews DBBP-TRAN-0014, License Requirements for Licensed Individuals and determines requirement for credit is not met. No credit is given for 3rd Reactor Operator CUE: None
SAT UNSAT
__________
SAT UNSAT
: 8. PERFORMANCE STEP: Evaluates credited time versus required time
: 8. PERFORMANCE STEP: Evaluates credited time versus required time
  ........C........
    ........C........
STANDARD: Determines there are only three 12 hour shifts that can be credited and therefore minimum requirements to maintain active Reactor Operator license are not met.
STANDARD: Determines there are only three 12 hour shifts that can be credited and therefore minimum requirements to maintain active Reactor Operator license are not met.
CUE:      None
__________
SAT UNSAT TERMINATING CUES: This JPM is complete (Terminated by the examiner)
__________
END TIME 5 of 6


CUE: None      __________
Appendix C                       Job Performance Measure           Form ES-C-1 Worksheet Admin JPM RO-A1.2 AG Verification of Completion Job Performance Measure No.
SAT  UNSAT TERMINATING CUES:  This JPM is complete (Terminated by the examine r)        __________
Examinees Name:
END TIME Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM RO-A 1.2 AG 6 of 6  Verification of Completion Job Performance Measure No.
Examiners Name:
Examinee's Name:
Examiner's Name:
Date Performed:
Date Performed:
Facility Evaluator:
Facility Evaluator:
Number of Attempts:
Number of Attempts:
Time to Complete:  
Time to Complete:
 
Question Documentation:
Question Documentation:  
 
Question:_____________________________________________________________
Question:_____________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
________________________________________________________________
________________________________________________________________
Response:_____________________________________________________________
Response:_____________________________________________________________
___________________________________________
___________________________
______________________________________________________________________
______________________________________________________________________
______________________________________________________________________
______________________________________________________________________
Result: Satisfactory/Unsatisfactory Examiner's signature and date:
______________________________________________________________________
____________
Result: Satisfactory/Unsatisfactory Examiners signature and date: _______________________________________
___________________________
6 of 6
 
Davis-Besse Initial License Exam 2015 Admin JPM RO-A2


Davis-Besse Initial License Exam 2015 Admin JPM RO-A2 Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM RO-A 2 AG 1 of 7  Facility:             Davis-Besse   Task No:   119-035-0100   Task Title
Appendix C                             Job Performance Measure                         Form ES-C-1 Worksheet Admin JPM RO-A2 AG Facility:         Davis-Besse                           Task No:       119-035-0100 Task Title: Determine isolation boundary and effect on plant equipment K/A  
: Determine isolation boundary and effect on plant equipment K/A  


==Reference:==
==Reference:==
 
2.2.41 (3.5)         Job Performance Measure No:         RO-A2 (NEW)
2.2.41 (3.5) Job Performance Measure No
Examinee:
:     RO-A 2 (NEW)   Examinee:           NRC Examiner:
NRC Examiner:                                                           Date:
Date:       Method of testing:
Method of testing:
Simulated Performance
Simulated Performance ___                       Actual Performance _X_
___   Actual Performance
Classroom _X_                     Simulator ___               Plant ___
_X_  Classroom
_X_   Simulator
___   Plant ___
Read to the examinee:
Read to the examinee:
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
Line 465: Line 461:
Initial Conditions:
Initial Conditions:
The plant conditions are specified in the Initial Conditions and Initiating Cues.
The plant conditions are specified in the Initial Conditions and Initiating Cues.
Task Standard: Identify boundary for leaking Turbine Plant Cooling Water Valve and determine isolation will  
Task Standard:
 
Identify boundary for leaking Turbine Plant Cooling Water Valve and determine isolation will result in loss of cooling to bearing lube oil for both Main Feedwater Pumps Required Materials:
result in loss of cooling to bearing lube oil for both Main Feedwater Pump s
OS-022, Turbine Plant Cooling Water System General  
Required Materials:
OS-022, Turbine Plant Cooling Water System
 
General  


==References:==
==References:==


11x17 Copy of Operation al Schematics Initiating Cue:
11x17 Copy of Operational Schematics Initiating Cue:
The plant conditions are specified in the Initial Conditions and Initiating Cues.
The plant conditions are specified in the Initial Conditions and Initiating Cues.
Time Critical Task:
Time Critical Task: No Alternate Path: No Validation Time: 15 minutes 1 of 7
No Alternate Path:
No Validation Time:
15 minutes


Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM RO-A 2 AG 2 of 7  EXAMINER COPY INITIAL CONDITIONS
Appendix C                           Job Performance Measure                       Form ES-C-1 Worksheet Admin JPM RO-A2 AG EXAMINER COPY INITIAL CONDITIONS:
The Plant is at 100% Power
The Plant is at 100% Power CW112, MFPT LUBE OIL COOLER 1-2-2 INLET ISOLATION is spraying water from a leak in the valve body. The valve has been closed and is still leaking.
INITIATION CUE:
The Shift Manager directs you to determine how CW112 can be isolated and what equipment will be affected. List isolation boundaries and equipment impacts on this page below.
(Hand Candidate 11x17 Copy of Operational Schematics) 2 of 7


CW112 , MFPT LUBE OIL COOLER 1-2-2 INLET ISOLATION is spraying water from a leak in the valve body. The valve has been closed and is still leaking.
Appendix C                           Job Performance Measure                       Form ES-C-1 Worksheet Admin JPM RO-A2 AG CANDIDATE COPY INITIAL CONDITIONS:
INITIATION CUE:
The Plant is at 100% Power CW112, MFPT LUBE OIL COOLER 1-2-2 INLET ISOLATION is spraying water from a leak in the valve body. The valve has been closed and is still leaking.
The Shift Manager directs you to determine how CW112 can be isolated and what equipment will be affected. List isolation boundaries and equipment impacts on this page below.  (Hand Candidate 11x17  Copy of Operational Schematics
)
Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM RO-A 2 AG 3 of 7  CANDIDATE COPY INITIAL CONDITIONS
The Plant is at 100% Power CW112 , MFPT LUBE OIL COOLER 1-2-2 INLET ISOLATION is spraying water from a leak in the valve body. The valve has been closed and is still leaking.
INITIATION CUE:
INITIATION CUE:
The Shift Manager directs you to determine how CW112 can be isolated and what equipment will be affected. List isolation boundaries and equipment impacts on this page below.
The Shift Manager directs you to determine how CW112 can be isolated and what equipment will be affected. List isolation boundaries and equipment impacts on this page below.
Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM RO-A 2 AG 4 of 7 PERFORMANCE INFORMATION NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is NOT critical unless denoted in the "Comments".
3 of 7
START TIME: _______
 
Appendix C                             Job Performance Measure                   Form ES-C-1 Worksheet Admin JPM RO-A2 AG PERFORMANCE INFORMATION NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is NOT critical unless denoted in the "Comments".
START TIME: _______
NOTE: STEPS CAN BE PERFORMED IN ANY SEQUENCE
NOTE: STEPS CAN BE PERFORMED IN ANY SEQUENCE
: 1. PERFORMANCE STEP: Locates plant drawing OS
: 1. PERFORMANCE STEP: Locates plant drawing OS-022 Turbine Plant Cooling Water System STANDARD: References drawing index, identifies and locates drawing OS-022 or equivalent drawing COMMENT: Once drawing is located, provide a copy for markup.
-022 Turbine Plant Cooling Water System   STANDARD: References drawing index, identifies and locates drawing OS
CUE:         None
-022 or equivalent drawing
__________
 
SAT UNSAT
COMMENT: Once drawing is located, provide a copy for markup.
CUE: None       __________
SAT UNSAT
: 2. PERFORMANCE STEP: Determines that valve CW-106 must be closed
: 2. PERFORMANCE STEP: Determines that valve CW-106 must be closed
  ........C........
    ........C........
STANDARD: Identifies CW
STANDARD: Identifies CW-106 supply side isolation valve will be closed CUE:       None
-106 supply side isolation valve will be closed CUE: None       __________
__________
SAT UNSAT
SAT UNSAT
: 3. PERFORMANCE STEP: Determines that valve CW
: 3. PERFORMANCE STEP: Determines that valve CW-107 must be closed
-107 must be closed
    ........C........
  ........C........
STANDARD: Identifies CW-107 supply side isolation valve will be closed, due to cross connected piping CUE:       None
STANDARD: Identifies CW
__________
-107 supply side isolation valve will be closed, due to cross connected piping CUE: None       __________
SAT UNSAT 4 of 7
SAT UNSAT


Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM RO-A 2 AG 5 of 7  4. PERFORMANCE STEP: Determines that either valve CW
Appendix C                             Job Performance Measure                         Form ES-C-1 Worksheet Admin JPM RO-A2 AG
-114 OR CW-1254B must be closed ........C........
: 4. PERFORMANCE STEP: Determines that either valve CW-114 OR CW-1254B must be closed
    ........C........
STANDARD: Identifies CW-114 OR CW-1254B downstream isolation side valve will be closed COMMENT: Either valve will provide downstream isolation.
CUE:      None
__________
SAT UNSAT
: 5. PERFORMANCE STEP: Determines that valve CW-113 must be closed
    ........C........
STANDARD: Identifies CW-113 supply side valve to MFPT Lube Oil Cooler 1-2-1 will be closed COMMENT: Another downstream valve will accomplish this isolation, if another valve is selected evaluate the isolation point as an alternative.
CUE:      None
__________
SAT UNSAT
: 6. PERFORMANCE STEP: Determines that valve CW-125 must be closed
    ........C........
STANDARD: Identifies CW-125 supply side valve supply valve to MFPT Lube Oil Cooler 1-1-1 will be closed COMMENT: Another downstream valve will accomplish this isolation, if another valve is selected evaluate the isolation point as an alternative.
CUE:      None
__________
SAT UNSAT 5 of 7


STANDARD: Identifies CW
Appendix C                            Job Performance Measure                          Form ES-C-1 Worksheet Admin JPM RO-A2 AG
-114 OR CW-1254B downstream isolation side valve will be closed COMMENT: Either valve will provide downstream isolation.
: 7. PERFORMANCE STEP: Determines that valve CW-124 must be closed
CUE: None       __________
    ........C........
SAT UNSAT
STANDARD: Identifies CW-124 supply side valve supply valve to MFPT Lube Oil Cooler 1-1-2 will be closed COMMENT: Another downstream isolation valve will accomplish this isolation, if another valve is selected evaluate the isolation point as an alternative.
: 5. PERFORMANCE STEP: Determines that valve CW
CUE:       None
-113 must be closed ........C........
__________
SAT UNSAT
: 8. PERFORMANCE STEP: Determines that valve CW-196 must remain closed
    ........C........
STANDARD: Identifies CW-196 cooler bypass valve will remain closed COMMENT: This valve is normally shut.
CUE:      None
__________
SAT UNSAT
: 9. PERFORMANCE STEP: Identifies the effect of isolating CW-112 will have on plant equipment
    ........C........
STANDARD: Determines that stopping the water leak on valve CW-112 will isolate all cooling water flow to the MFP Lube Oil Coolers for both MFPs CUE:      None
__________
SAT UNSAT TERMINATING CUES: This JPM is complete (Terminated by the examinee)
__________
END TIME 6 of 7


STANDARD: Identifies CW
Appendix C                       Job Performance Measure             Form ES-C-1 Worksheet Admin JPM RO-A2 AG Verification of Completion Job Performance Measure No.
-113 supply side valve to MFPT Lube Oil Cooler 1 1 will be closed  COMMENT:  Another downstream valve will accomplish this isolation, if another valve is selected evaluate the isolation point as an alternative. CUE: None      __________
Examinees Name:
SAT  UNSAT
Examiners Name:
: 6. PERFORMANCE STEP: Determines that valve CW
-125 must be closed
  ........C........
STANDARD: Identifies CW
-1 25 supply side valve supply valve to MFPT Lube Oil Cooler 1 1 will be closed COMMENT:  Another downstream valve will accomplish this isolation, if another valve is selected evaluate the isolation point as an alternative.
 
CUE: None      __________
SAT  UNSAT
 
Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM RO-A 2 AG  6 of 7  7. PERFORMANCE STEP: Determines that valve CW
-1 24 must be closed
  ........C........
STANDARD: Identifies CW
-124 supply side valve supply valve to MFPT Lube Oil Cooler 1 2 will be closed COMMENT:  Another downstream isolation valve will accomplish this isolation, if another valve is selected evaluate the isolation point as an alternative.
CUE: None      __________
SAT  UNSAT
: 8. PERFORMANCE STEP: Determines that valve CW
-1 96 must remain closed  ........C........
STANDARD: Identifies CW
-1 96 cooler bypass valve will remain closed  COMMENT:  This valve is normally shut
. CUE: None      __________
SAT  UNSAT
: 9. PERFORMANCE STEP: Identif ies the effect of isolating CW
-112 will have on plant equipment  ........C........
STANDARD: Determines that stopping the water leak on valve CW-112 will isolate all cooling water flow to the MFP Lube Oil Coolers for both MFPs CUE: None      __________
SAT  UNSAT TERMINATING CUES:  This JPM is complete (Terminated by the examine e)        __________
END TIME Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM RO-A 2 AG 7 of 7  Verification of Completion Job Performance Measure No.
Examinee's Name:
Examiner's Name:
Date Performed:
Date Performed:
Facility Evaluator:
Facility Evaluator:
Number of Attempts:
Number of Attempts:
Time to Complete:  
Time to Complete:
 
Question Documentation:
Question Documentation:  
 
Question:_____________________________________________________________
Question:_____________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
________________________________________________________________
________________________________________________________________
Response:__________________________________
Response:_____________________________________________________________
___________________________
______________________________________________________________________
______________________________________________________________________
______________________________________________________________________
______________________________________________________________________
______________________________________________________________________
______________________________________________________________________
Result: Satisfactory/Unsatisfactory Examiner's signature and date:
Result: Satisfactory/Unsatisfactory Examiners signature and date: _______________________________________
_______________________________________
7 of 7


ANSWER KEY
ANSWER KEY Davis-Besse Initial License Exam 2015 Admin JPM RO-A4


Davis-Besse Initial License Exam 2015 Admin JPM RO-A 4 Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM RO-A 4 AG   Page 1 of 7  Facility:             Davis-Besse   Task No: 085-002-01-0100   Task Title
Appendix C                             Job Performance Measure                         Form ES-C-1 Worksheet Admin JPM RO-A4 AG Facility:         Davis-Besse                           Task No:       085-002-01-0100 Task Title:      Emergency Plan Notification of Off-Site Agencies K/A  
:      Emergency Plan Notification of Off
-Site Agencies K/A  


==Reference:==
==Reference:==
 
2.4.43 (3.2)         Job Performance Measure No:         RO-A4 (JPM 241)
2.4.43 (3.2) Job Performance Measure No
Examinee:
:     RO-A 4 (JPM 241)   Examinee:           NRC Examiner:
NRC Examiner:                                                           Date:
Date:       Method of testing:
Method of testing:
Simulated Performance
Simulated Performance ___                       Actual Performance _X_
___   Actual Performance
Classroom _X_                     Simulator _X_               Plant ___
_X_  Classroom
_X_   Simulator
_X_   Plant ___
Read to the examinee:
Read to the examinee:
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
Line 598: Line 576:
Initial Conditions:
Initial Conditions:
The plant conditions are specified in the Initial Conditions and Initiating Cues.
The plant conditions are specified in the Initial Conditions and Initiating Cues.
Task Standard: Emergency notification of Ottawa and Lucas County within 15 minutes and Emergency notification of State of Ohio.
Task Standard:
 
Emergency notification of Ottawa and Lucas County within 15 minutes and Emergency notification of State of Ohio.
Required Materials:
Required Materials:
Form DBEP-010 Form DBEP-012 (General References listed below required if performing in classroom)
Form DBEP-010 Form DBEP-012 (General References listed below required if performing in classroom)
Line 609: Line 587:
RA-EP-02110, Emergency Notification Davis-Besse Emergency Plan Telephone Directory Initiating Cue:
RA-EP-02110, Emergency Notification Davis-Besse Emergency Plan Telephone Directory Initiating Cue:
The plant conditions are specified in the Initial Conditions and Initiating Cues.
The plant conditions are specified in the Initial Conditions and Initiating Cues.
Time Critical Task:
Time Critical Task: Yes Alternate Path: No Validation Time: 15 minutes Page 1 of 7
Yes   Alternate Path:
No Validation Time:
15 minutes
 
Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM RO-A 4 AG  Page 2 of 7   EXAMINER COPY INITIAL CONDITIONS
:  You are a third Reactor Operator in the Control Room.


Appendix C                        Job Performance Measure                          Form ES-C-1 Worksheet Admin JPM RO-A4 AG EXAMINER COPY INITIAL CONDITIONS:
You are a third Reactor Operator in the Control Room.
The plant is being shut down due to Reactor Coolant System leak calculated to be 35 gpm.
The plant is being shut down due to Reactor Coolant System leak calculated to be 35 gpm.
5 minutes ago the Shift Manager declared an Unusual Event based on the leakage INITIATING CUES:
You are to locate and review RA-EP-02110, Emergency Notifications Procedure while the Shift Manager completes the Initial Notification form. Be prepared to start the notifications of the Offsite Agencies in 5 minutes.
CUE: This is a time critical JPM.
NOTES TO EVALUATOR Write the current time minus 5 minutes in the declaration time (item 3a) on the Initial Notification form Five minutes after reading the Initiating Cues hand the Initial Notification forms to the candidate.
Page 2 of 7


5 minutes ago the Shift Manager declared an Unusual Event based on the leakage INITIATING CUES
Appendix C                         Job Performance Measure                           Form ES-C-1 Worksheet Admin JPM RO-A4 AG CANDIDATE COPY INITIAL CONDITIONS:
:
You are a third Reactor Operator in the Control Room.
You are to locate and review RA
-EP-02110, Emergency Notifications Procedure while the Shift Manager completes the Initial Notification form. Be prepared to start the notifications of the Offsite Agencies in 5 minutes.
 
CUE:  This is a time critical JPM.
NOTES TO EVALUATOR Write the current time minus 5 minutes in the declaration time (item 3a) on the Initial Notification form Five minutes after reading the Initiating Cues hand the Initial Notification form s to the candidate.
Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM RO-A 4 AG   Page 3 of 7  CANDIDATE COPY INITIAL CONDITIONS
You are a third Reactor Operator in the Control Room.
The plant is being shut down due to Reactor Coolant System leak calculated to be 35 gpm.
The plant is being shut down due to Reactor Coolant System leak calculated to be 35 gpm.
5 minutes ago the Shift Manager declared an Unusual Event based on the leakage
5 minutes ago the Shift Manager declared an Unusual Event based on the leakage INITIATING CUES:
 
You are to locate and review RA-EP-02110, Emergency Notifications Procedure while the Shift Manager completes the Initial Notification form. Be prepared to start the notifications of the Offsite Agencies in 5 minutes.
INITIATING CUES
CUE: This is a time critical JPM. The clock starts now, the form will be available in five minutes.
:    You are to locate and review RA
Page 3 of 7
-EP-02110, Emergency Notifications Procedure while the Shift Manager completes the Initial Notification form. Be prepared to start the notifications of the Offsite Agencies in 5 minutes.
 
CUE: This is a time critical JPM. The clock starts now, the form will be available in five minutes.      


Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM RO-A 4 AG   Page 4 of 7 PERFORMANCE INFORMATION NOTE: Critical steps denoted with a "C".
Appendix C                               Job Performance Measure                         Form ES-C-1 Worksheet Admin JPM RO-A4 AG PERFORMANCE INFORMATION NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is NOT critical unless denoted in the "Comments".
Failure to meet any one of these standards for this item constitutes failure. Sequence is NOT critical unless denoted in the "Comments".
START TIME: _______
START TIME: _______
: 1. PERFORMANCE STEP: Locate the correct procedure for emergency notification.
: 1. PERFORMANCE STEP: Locate the correct procedure for emergency notification.
STANDARD: Obtains RA-EP-02110, Emergency Notification. CUE: When located hand candidate copy of RA-EP-02110, Emergency Notification (5 minutes after providing the initiating cue) hand Initial Notification forms to Candidate and state: "Shift Manager directs you to notify Ottawa and Lucas Counties and the State of Ohio of the emergency in accordance with RA
STANDARD: Obtains RA-EP-02110, Emergency Notification.
-EP-02110, Emergency Notifications"
CUE: When located hand candidate copy of RA-EP-02110, Emergency Notification (5 minutes after providing the initiating cue) hand Initial Notification forms to Candidate and state: Shift Manager directs you to notify Ottawa and Lucas Counties and the State of Ohio of the emergency in accordance with RA-EP-02110, Emergency Notifications
__________
__________
SAT UNSAT
SAT UNSAT
: 2. PERFORMANCE STEP: Make Initial Notification using the 4
: 2. PERFORMANCE STEP: Make Initial Notification using the 4-Way Ring-Down Circuit
-Way Ring-Down Circuit
    ........C........
  ........C........
STANDARD: Picks up the 4-Way Ring-Down phone in the Control Room. When the two parties answer, reads the Initial Notification information. Documents the time notified on the Davis-Besse Notification Cover Sheet (DBEP-012).
STANDARD: Picks up the 4-Way Ring-Down phone in the Control Room. When the two parties answer, reads the Initial Notification information. Documents the time notified on the Davis
COMMENT:         Notification must be made within 15 minutes of the event declaration time; Record the time the first Sheriffs Dispatcher answers the phone. This stops the critical time clock.
-Besse Notification Cover Sheet (DBEP
CUE:       Ottawa Country Sheriff's Dispatcher and the Lucas County Sheriffs Dispatcher answer the phone.
-012).
NOTE: Ohio State Highway Patrol Dispatcher does NOT answer.
COMMENT: Notification must be made within 15 minutes of the event declaration time; Record the time the first Sheriff's Dispatcher answers the phone. This stops the "critical time" clock.
Repeat back the information as it is communicated.
CUE: "Ottawa Country Sheriff's Dispatcher and the Lucas County Sheriff's Dispatcher answer the phone."
NOTE: Ohio State Highway Patrol Dispatcher does NOT answer.       Repeat back the information as it is communicated.
Time: __________
Time: __________
__________
__________
SAT UNSAT
SAT UNSAT Page 4 of 7


Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM RO-A 4 AG   Page 5 of 7 3. PERFORMANCE STEP: Notify Shift Manager that the Ohio State Highway Patrol Dispatcher was not notified.
Appendix C                             Job Performance Measure                         Form ES-C-1 Worksheet Admin JPM RO-A4 AG
STANDARD: Informs Shift Manager that the Ohio State Highway Patrol Dispatcher did not answer the 4
: 3. PERFORMANCE STEP: Notify Shift Manager that the Ohio State Highway Patrol Dispatcher was not notified.
-Way Ring-Down Circuit.
STANDARD: Informs Shift Manager that the Ohio State Highway Patrol Dispatcher did not answer the 4-Way Ring-Down Circuit.
COMMENT: This step may not be needed if operator proceeds to use alternate notification methods without being prompted.
COMMENT: This step may not be needed if operator proceeds to use alternate notification methods without being prompted.
CUE: If notified, tell the operator to continue with notifications as directed by procedure RA
CUE:       If notified, tell the operator to continue with notifications as directed by procedure RA-EP-02110, Emergency Notification.
-EP-02110, Emergency Notification.
 
__________
__________
SAT UNSAT
SAT UNSAT
: 4. PERFORMANCE STEP: Contact Ohio State Highway Patrol Dispatcher.
: 4. PERFORMANCE STEP: Contact Ohio State Highway Patrol Dispatcher.
  ........C........
    ........C........
STANDARD: Locates the Ohio State Highway Patrol Dispatcher or Administrative Office telephone number.
STANDARD: Locates the Ohio State Highway Patrol Dispatcher or Administrative Office telephone number.
COMMENT: The phone numbers are located in the Immediate Notification Numbers tab of the Davis-Besse Emergency Plan Telephone Directory. Have the examinee point out and then dial one of the correct numbers.
COMMENT: The phone numbers are located in the Immediate Notification Numbers tab of the Davis-Besse Emergency Plan Telephone Directory. Have the examinee point out and then dial one of the correct numbers.
(614) 4 6 6-2660 OR (614) 644
(614) 466-2660 OR (614) 644-7622 CUE:       Answer the phone as either the Ohio Highway Patrol Dispatcher or the Administrative Office depending on who was dialed.
-7622     CUE: Answer the phone as either the Ohio Highway Patrol Dispatcher or the Administrative Office depending on who was dialed.
__________
__________
SAT UNSAT
SAT UNSAT
: 4. PERFORMANCE STEP: Make Initial Notification to the Ohio State Highway Patrol.
: 4. PERFORMANCE STEP: Make Initial Notification to the Ohio State Highway Patrol.
  ........C........     STANDARD: Reads Initial Notification information to the Ohio State Highway Patrol Dispatcher or Administrative Office staffer. Documents the time notified on the Davis-Besse Notification Cover Sheet (DBEP
    ........C........
-012). Examinee should also request a call back from the person receiving the information.
STANDARD: Reads Initial Notification information to the Ohio State Highway Patrol Dispatcher or Administrative Office staffer. Documents the time notified on the Davis-Besse Notification Cover Sheet (DBEP-012). Examinee should also request a call back from the person receiving the information.
COMMENT: Requesting callback is not critical CUE: Repeat back information as it is communicated. Provide your name as requested by the caller.
COMMENT: Requesting callback is not critical CUE:       Repeat back information as it is communicated. Provide your name as requested by the caller.
__________
__________
SAT UNSAT
SAT UNSAT Page 5 of 7


Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM RO-A 4 AG   Page 6 of 7 5. PERFORMANCE STEP: Notify Shift Manager that the Ohio State Highway Patrol or Administrative Office was notified.
Appendix C                         Job Performance Measure                         Form ES-C-1 Worksheet Admin JPM RO-A4 AG
STANDARD: Informs the Shift Manager that all notifications have all been completed. This notification may be done after step 7. CUE: Acknowledge the report.
: 5. PERFORMANCE STEP: Notify Shift Manager that the Ohio State Highway Patrol or Administrative Office was notified.
STANDARD: Informs the Shift Manager that all notifications have all been completed.
This notification may be done after step 7.
CUE: Acknowledge the report.
__________
__________
SAT UNSAT
SAT UNSAT
: 6. PERFORMANCE STEP: Receive call back from State of Ohio representative.
: 6. PERFORMANCE STEP: Receive call back from State of Ohio representative.
STANDARD: Answers the phone and acknowledges the Ohio State Highway Patrol or Administrative Office call back to verify the information came from Davis
STANDARD: Answers the phone and acknowledges the Ohio State Highway Patrol or Administrative Office call back to verify the information came from Davis-Besse. Documents the time of the call and the name of the caller on the Davis-Besse Notification Cover Sheet (DBEP-012).
-Besse. Documents the time of the call and the name of the caller on the Davis-Besse Notification Cover Sheet (DBEP
CUE:   Call the simulator Control Room phone and indicate you are calling back to verify the notification of the emergency is real and came from Davis-Besse.
-012). CUE: Call the simulator Control Room phone and indicate you are calling back to verify the notification of the emergency is real and came from Davis
If needed, prompt the operator to answer the phone.
-Besse.       If needed, prompt the operator to answer the phone.
 
__________
__________
SAT UNSAT
SAT UNSAT
: 7. PERFORMANCE STEP: Complete form DBEP
: 7. PERFORMANCE STEP: Complete form DBEP-0012.
-0012. STANDARD: Signs form DBEP
STANDARD: Signs form DBEP-0012 and checks Control Room. Returns form to Shift Manager.
-0012 and checks Control Room. Returns form to Shift Manager. CUE: If required, tell the examinee not to fax form DBEP
CUE: If required, tell the examinee not to fax form DBEP-0010 to the EOF.
-0010 to the EOF.
__________
__________
SAT UNSAT TERMINATING CUES: This JPM is complete (Terminated by the examine r)
SAT UNSAT TERMINATING CUES: This JPM is complete (Terminated by the examiner)
__________
__________
END TIME Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM RO-A 4 AG  Page 7 of 7   Verification of Completion Job Performance Measure No.
END TIME Page 6 of 7


Examinee's Name:
Appendix C                        Job Performance Measure            Form ES-C-1 Worksheet Admin JPM RO-A4 AG Verification of Completion Job Performance Measure No.
Examiner's Name:
Examinees Name:
Examiners Name:
Date Performed:
Date Performed:
Facility Evaluator:
Facility Evaluator:
Number of Attempts:
Number of Attempts:
Time to Complete:  
Time to Complete:
 
Question Documentation:
Question Documentation:  
 
Question:_____________________________________________________________
Question:_____________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
________________________________________________________________
________________________________________________________________
Response:__________________________________
Response:_____________________________________________________________
___________________________
______________________________________________________________________
______________________________________________________________________
______________________________________________________________________
______________________________________________________________________
______________________________________________________________________
______________________________________________________________________
Result: Satisfactory/Unsatisfactory Examiner's signature and date:
Result: Satisfactory/Unsatisfactory Examiners signature and date: _______________________________________
_______________________________________
Page 7 of 7


FENOC NUCLEAR POWER PLANT INITIAL NOTIFICATION FORM Davis Besse DBEP-010-10  USE FOR: INITIAL CLASSIFICATIONS, CHANGES IN CLASSIFICATIONS,   CHANGES IN PROTECTIVE ACTION RECOMMENDATIONS.
FENOC NUCLEAR POWER                   USE FOR:                                                   STATE / COUNTY USE ONLY INITIAL CLASSIFICATIONS, PLANT INITIAL NOTIFICATION              CHANGES IN CLASSIFICATIONS,                           DATE:            TIME:
EVENT TERMINATION STATE / COUNTY USE ONLY DATE:  TIME:  MESSAGE NO:
FORM                                    CHANGES IN PROTECTIVE ACTION Davis Besse                              RECOMMENDATIONS.                                             MESSAGE NO:
____________
DBEP-010-10                            EVENT TERMINATION                                          ____________
: 1. This is the:
: 1. This is the:   Davis-Besse Nuclear Power Station
Davis-Besse Nuclear Power Station
: 2. This is:           An Actual Emergency               A Drill
: 2. This is:   An Actual Emergency A Drill   3. a. A(n) GENERAL EMERGENCY SITE AREA EMERGENCY ALERT UNUSUAL EVENT was declared at:
: 3. a. A(n)       GENERAL EMERGENCY               SITE AREA EMERGENCY                   ALERT         UNUSUAL EVENT was declared at:   ______       on       _Today     based on EAL:     __SU7__
______ on _Today based on EAL:
(TIME)                 (DATE)
__SU7__    (TIME) (DATE)     b. The Emergency situation has been terminated at:
: b. The Emergency situation has been terminated at:           ______     on       ______
______ on ______     (TIME) (DATE)     c. The Protective Action Recommendation is being changed at:
(TIME)             (DATE)
______ on ______   (TIME) (DATE) 4. Brief non-technical description of event:
: c. The Protective Action Recommendation is being changed at:               ______         on   ______
Reactor Coolant System leak of 35 gallons per minute       5. The radiological conditions are:
(TIME)             (DATE)
: 4. Brief non-technical description of event:     Reactor Coolant System leak of 35 gallons per minute
: 5. The radiological conditions are:
: a. A non-routine release of radioactive material, as a result of this event, is in progress
: a. A non-routine release of radioactive material, as a result of this event, is in progress
: b. The release of radioactive material associated with this event has been terminated.
: b. The release of radioactive material associated with this event has been terminated.
: c. NO Radiological Release in progress as a result of this event.
: c. NO Radiological Release in progress as a result of this event.
: 6. Utility Protective Action Recommendations (PAR's):
: 6. Utility Protective Action Recommendations (PARs):
: a. Evacuation:
: a. Evacuation:
(check applicable subareas) 1       2      3       4       5      6       7       8       9       10      11       12 AND that potassium iodide (KI) be administered to the general public in accordance with State procedures. The general public in unaffected areas should be advised to go indoors and monitor EAS broadcasts.
(check applicable subareas) 1       2      3       4       5      6         7       8     9         10      11       12 AND that potassium iodide (KI) be administered to the general public in accordance with State procedures. The general public in unaffected areas should be advised to go indoors and monitor EAS broadcasts.
: b. Sheltering:
: b. Sheltering:
(check applicable subareas) 1       2      3       4       5      6       7       8       9 11 AND that potassium iodide (KI) be administered to the general public in accordance with State procedures. The general public in unaffected areas should be advised to go indoors and monitor EAS broadcasts.
(check applicable subareas) 1       2      3       4       5      6         7       8     9                   11 AND that potassium iodide (KI) be administered to the general public in accordance with State procedures. The general public in unaffected areas should be advised to go indoors and monitor EAS broadcasts.
: c. None           For Utility Use Only Approved:
: c. None For Utility Use Only Approved: _     __________________
_   __________________      


DAVIS-BESSE EMERGENCY NOTIFICATION COVER SHEET DBEP-012-09   INITIAL NOTIFICATION ACTUAL EMERGENCY USE FOR: INITIAL CLASSIFICATIONS, CHANGES IN CLASSIFICATION,   CHANGES IN PROTECTIVE ACTION RECOMMENDATIONS.
DAVIS-BESSE EMERGENCY NOTIFICATION COVER SHEET DBEP-012-09 INITIAL NOTIFICATION                                                                       ACTUAL EMERGENCY USE FOR:                                                                                 (Check Actual INITIAL CLASSIFICATIONS, Emergency only if a real CHANGES IN CLASSIFICATION, CHANGES IN PROTECTIVE ACTION RECOMMENDATIONS.                                           plant emergency exists)
(Check Actual Emergency only if a real plant emergency exists)
PERIODIC UPDATE                                                                           DRILL USE ONLY FOR UPDATING STATUS OF CURRENT CLASSIFICATION.
PERIODIC UPDATE DRILL USE ONLY FOR UPDATING STATUS OF CURRENT CLASSIFICATION.
DO NOT USE FOR CHANGING CLASSIFICATIONS OR CHANGING PROTECTIVE ACTION RECOMMENDATIONS.
DO NOT USE FOR CHANGING CLASSIFICATIONS OR CHANGING PROTECTIVE ACTION RECOMMENDATIONS
Initial Notification Form / Periodic Update Form completed by:     Joe Shift Manager Initial Notification Form / Periodic Update Form accuracy verified by:   John Shift Technical Advisor Communicator:
. Initial Notification Form
/ Periodic Update Form completed by:
Joe Shift Manager Initial Notification Form / Periodic Update Form accuracy verified by:
John Shift Technical Advisor Communicator:
: 1. Ensure the Emergency Director has signed the Initial Notification Form / Periodic Update Form.
: 1. Ensure the Emergency Director has signed the Initial Notification Form / Periodic Update Form.
: 2. Initiate the 4
: 2. Initiate the 4-Way Ringdown.
-Way Ringdown.
: 3. As parties answer, identify yourself and your facility.
: 3. As parties answer, identify yourself and your facility.
: 4. Obtain and fill in information below:
: 4. Obtain and fill in information below:
TIME INITIAL CONTACT MADE  COMPLETION TIME OF CALL 4-WAY RINGDOWN USED? YES          NO TIME OF CALLBACK (IF 4-WAY NOT USED) INDIVIDUAL CALLING BACK (IF 4-WAY NOT USED)
4-WAY      TIME OF TIME     COMPLETION      RINGDOWN    CALLBACK                INDIVIDUAL INITIAL       TIME OF         USED?     (IF 4-WAY           CALLING BACK CONTACT          CALL        YES      NO  NOT USED)         (IF 4-WAY NOT USED)
OTTAWA COUNTY
MADE OTTAWA COUNTY LUCAS COUNTY STATE OF OHIO
 
LUCAS COUNTY
 
STATE OF OHIO
: 5. Initial Notification Form: Read information on the attached Initial Notification Form over the phone, document above the time lines 1 through 6 have been communicated, and then fax the form to Ottawa Co, Lucas Co, and the State of Ohio.
: 5. Initial Notification Form: Read information on the attached Initial Notification Form over the phone, document above the time lines 1 through 6 have been communicated, and then fax the form to Ottawa Co, Lucas Co, and the State of Ohio.
OR Periodic Update Form: Fax the attached Periodic Update Form to Ottawa Co, Lucas Co, and the State of Ohio, and then verify the information over the phone.
OR Periodic Update Form: Fax the attached Periodic Update Form to Ottawa Co, Lucas Co, and the State of Ohio, and then verify the information over the phone.
NOTE: This coversheet should NOT be FAXED offsite. Control Room Emergency Operations Facility Signature of Communicator transmitting information
NOTE: This coversheet should NOT be FAXED offsite.
Control Room Emergency Operations Facility Signature of Communicator transmitting information


ANSWER KEY DO NOT GIVE TO CANDIDATE DAVIS-BESSE EMERGENCY NOTIFICATION COVER SHEET DBEP-012-09   INITIAL NOTIFICATION ACTUAL EMERGENCY USE FOR: INITIAL CLASSIFICATIONS, CHANGES IN CLASSIFICATION,   CHANGES IN PROTECTIVE ACTION RECOMMENDATIONS.
ANSWER KEY DO NOT GIVE TO CANDIDATE DAVIS-BESSE EMERGENCY NOTIFICATION COVER SHEET DBEP-012-09 INITIAL NOTIFICATION                                                                       ACTUAL EMERGENCY USE FOR:                                                                                 (Check Actual INITIAL CLASSIFICATIONS, Emergency only if a real CHANGES IN CLASSIFICATION, CHANGES IN PROTECTIVE ACTION RECOMMENDATIONS.                                           plant emergency exists)
(Check Actual Emergency only if a real plant emergency exists)
PERIODIC UPDATE                                                                           DRILL USE ONLY FOR UPDATING STATUS OF CURRENT CLASSIFICATION.
PERIODIC UPDATE DRILL USE ONLY FOR UPDATING STATUS OF CURRENT CLASSIFICATION.
DO NOT USE FOR CHANGING CLASSIFICATIONS OR CHANGING PROTECTIVE ACTION RECOMMENDATIONS.
DO NOT USE FOR CHANGING CLASSIFICATIONS OR CHANGING PROTECTIVE ACTION RECOMMENDATIONS.
Initial Notification Form
Initial Notification Form / Periodic Update Form completed by:     Joe Shift Manager Initial Notification Form / Periodic Update Form accuracy verified by:   John Shift Technical Advisor Communicator:
/ Periodic Update Form completed by:
Joe Shift Manager Initial Notification Form / Periodic Update Form accuracy verified by:
John Shift Technical Advisor Communicator:
: 1. Ensure the Emergency Director has signed the Initial Notification Form / Periodic Update Form.
: 1. Ensure the Emergency Director has signed the Initial Notification Form / Periodic Update Form.
: 2. Initiate the 4
: 2. Initiate the 4-Way Ringdown.
-Way Ringdown.
: 3. As parties answer, identify yourself and your facility.
: 3. As parties answer, identify yourself and your facility.
: 4. Obtain and fill in information below:
: 4. Obtain and fill in information below:
TIME INITIAL CONTACT MADE  COMPLETION TIME OF CALL 4-WAY RINGDOWN USED? YES          NO TIME OF CALLBACK (IF 4-WAY NOT USED) INDIVIDUAL CALLING BACK (IF 4-WAY NOT USED)
4-WAY      TIME OF TIME      COMPLETION      RINGDOWN    CALLBACK                INDIVIDUAL INITIAL       TIME OF         USED?     (IF 4-WAY           CALLING BACK CONTACT          CALL        YES      NO  NOT USED)         (IF 4-WAY NOT USED)
OTTAWA COUNTY
MADE OTTAWA COUNTY         < 15 min         Time LUCAS COUNTY         < 15 min         Time STATE OF OHIO                         Time                       Time                   Name
  < 15 min T ime LUCAS COUNTY
: 5. Initial Notification Form: Read information on the attached Initial Notification Form over the phone, document above the time lines 1 through 6 have been communicated, and then fax the form to Ottawa Co, Lucas Co, and the State of Ohio.
  < 15 min Time STATE OF OHIO Time Time Name   5. Initial Notification Form: Read information on the attached Initial Notification Form over the phone, document above the time lines 1 through 6 have been communicated, and then fax the form to Ottawa Co, Lucas Co, and the State of Ohio.
OR Periodic Update Form: Fax the attached Periodic Update Form to Ottawa Co, Lucas Co, and the State of Ohio, and then verify the information over the phone.
OR Periodic Update Form: Fax the attached Periodic Update Form to Ottawa Co, Lucas Co, and the State of Ohio, and then verify the information over the phone.
NOTE: This coversheet should NOT be FAXED offsite.
NOTE: This coversheet should NOT be FAXED offsite.
Control Room Signature of Communicator                                                             Emergency Operations Facility Signature of Communicator transmitting information
Signature of Communicator Control Room Emergency Operations Facility Signature of Communicator transmitting information
 
Davis-Besse Initial License Exam 2015 Admin JPM SRO-A1.1


Davis-Besse Initial License Exam 2015 Admin JPM SRO-A 1.1 Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM SRO-A1.1 AG Page 2 of 8  Facility:             Davis-Besse   Task No: 332-004-02-0300   Task Title
Appendix C                             Job Performance Measure                         Form ES-C-1 Worksheet Admin JPM SRO-A1.1 AG Facility:         Davis-Besse                           Task No:       332-004-02-0300 Task Title:      Review manual RCS Leakage Calculation K/A  
:      Review manual RCS Leakage Calculation K/A  


==Reference:==
==Reference:==
 
2.1.20 (4.6)         Job Performance Measure No:         SRO-A1.1 (New)
2.1.20 (4.6) Job Performance Measure No
Examinee:
:     SRO-A1.1 (New)   Examinee:           NRC Examiner:
NRC Examiner:                                                           Date:
Date:       Method of testing:
Method of testing:
Simulated Performance
Simulated Performance ___                       Actual Performance _X_
___   Actual Performance
Classroom _X_                     Simulator ___               Plant ___
_X_  Classroom
_X_   Simulator
___   Plant ___
Read to the examinee:
Read to the examinee:
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
When you complete the task successfully, the objective for this job performance measure w ill be satisfied.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions:
Initial Conditions:
The plant conditions are specified in the Initial Conditions and Initiating Cues.
The plant conditions are specified in the Initial Conditions and Initiating Cues.
Line 818: Line 762:
The plant conditions are specified in the Initial Conditions and Initiating Cues.
The plant conditions are specified in the Initial Conditions and Initiating Cues.
Time Critical Task:
Time Critical Task:
No   Alternate Path:
No Alternate Path:
No Validation Time:
No Validation Time: 50 minutes Page 2 of 8
50 minutes


Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM SRO-A1.1 AG Page 3 of 8  EXAMINER COPY INITIAL CONDITIONS
Appendix C                           Job Performance Measure                       Form ES-C-1 Worksheet Admin JPM SRO-A1.1 AG EXAMINER COPY INITIAL CONDITIONS:
The Plant is at 100% Power Makeup Tank Pressure is 25 psig
The Plant is at 100% Power Makeup Tank Pressure is 25 psig The Computer is unavailable INITIATION CUE:
A Reactor Operator has performed a Manual Calculation of Leakage Rates per step 4.2.2 of DB SP-03357, RCS Water Inventory Balance.
DB SP-03357 Section 4.1, Data Acquisition section data was verified correct and transferred to  from another procedure.
Review the completed calculations for correctness. Correct any errors, if necessary, and determine if there are any Technical Specifications implications NOTE: DB-SP-03357, Attachment 2 has 4 pages (there is a page count error on Attachment 2 -
page 1 of 3, 2 of 3, 3 of 3 and 4 of 4)
DOCUMENT THE RESULTS OF YOUR REVIEW ON THIS CUE SHEET (Hand Candidate the following:
DB-SP-03357, RCS Water Inventory Balance with step 4.2.2 and Attachment 2 completed DB-PF-06703, Miscellaneous Curves CC 3.1 and CC 3.2a to CC3.2k)
Page 3 of 8


The Computer is unavailable INITIATION CUE:
Appendix C                           Job Performance Measure                       Form ES-C-1 Worksheet Admin JPM SRO-A1.1 AG CANDIDATE COPY INITIAL CONDITIONS:
A Reactor Operator has performed a Manual Calculation of Leakage Rates per step 4.2.2 of DB SP-03357, RCS Water Inventory Balance
The Plant is at 100% Power Makeup Tank Pressure is 25 psig The Computer is unavailable INITIATION CUE:
. DB SP-03357 Section 4.1, Data Acquisition section data was verified correct and transferred to Attachment 3 from another procedure.
Review the completed calculation s for correctness. Correct any errors, if necessary, and determine if there are any Technical Specifications implications NOTE: DB-SP-03357, Attachment 2 has 4 pages (there is a page count error on Attachment 2
- page 1 of 3, 2 of 3, 3 of 3 and 4 of 4)  DOCUMENT THE RESULTS OF YOU R REVIEW ON THIS CUE SHEET  (Hand Candidate the following:
DB-SP-0 3357 , RCS Water Inventory Balance with step 4.2.2 and Attachment 2 completed DB-PF-06703, Miscellaneous Curves CC 3.1 and CC 3.2a to CC3.2k
)
Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM SRO-A1.1 AG Page 4 of 8  CANDIDATE COPY INITIAL CONDITIONS
The Plant is at 100% Power Makeup Tank Pressure is 25 psig The Computer is unavailable INITIATION CUE:
A Reactor Operator has performed a Manual Calculation of Leakage Rates per step 4.2.2 of DB SP-03357, RCS Water Inventory Balance.
A Reactor Operator has performed a Manual Calculation of Leakage Rates per step 4.2.2 of DB SP-03357, RCS Water Inventory Balance.
DB SP-03357 Section 4.1, Data Acquisition section data was verified correct and transferred to Attachment 3 from another procedure.
DB SP-03357 Section 4.1, Data Acquisition section data was verified correct and transferred to from another procedure.
Review the completed calculations for correctness. Correct any errors, if necessary, and determine if there are any Technical Specifications implications
Review the completed calculations for correctness. Correct any errors, if necessary, and determine if there are any Technical Specifications implications NOTE: DB-SP-03357, Attachment 2 has 4 pages (there is a page count error on Attachment 2 -
page 1 of 3, 2 of 3, 3 of 3 and 4 of 4)
DOCUMENT THE RESULTS OF YOUR REVIEW ON THIS CUE SHEET Page 4 of 8


NOTE: DB-SP-03357, Attachment 2 has 4 pages (there is a page count error on Attachment 2
Appendix C                               Job Performance Measure                           Form ES-C-1 Worksheet Admin JPM SRO-A1.1 AG PERFORMANCE INFORMATION NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is NOT critical unless denoted in the "Comments".
- page 1 of 3, 2 of 3, 3 of 3 and 4 of 4)
START TIME: _______
DOCUMENT THE RESULTS OF YOU R REVIEW ON THIS C UE SHEET Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM SRO-A1.1 AG Page 5 of 8 PERFORMANCE INFORMATION NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is NOT critical unless denoted in the "Comments".
START TIME: _______
: 1. PERFORMANCE STEP: Reviews the Initial Makeup Tank Inventory equations step 4.2.2.b
: 1. PERFORMANCE STEP: Reviews the Initial Makeup Tank Inventory equations step 4.2.2.b
  ........C........
    ........C........
STANDARD: Recognize 67 inches was used versus 71 and corrects calculation:
STANDARD: Recognize 67 inches was used versus 71 and corrects calculation:
Water Inventory = (Tank level
Water Inventory = (Tank level
* 4.124 ft&#xb3;/in
* 4.124 ft&#xb3;/in
* Calibration Density) + (77.85 ft&#xb3;
* Calibration Density) + (77.85 ft&#xb3;
* Water Density)  
* Water Density)
        = (Tank level
                    = (Tank level
* 4.124 ft&#xb3;/in
* 4.124 ft&#xb3;/in
* 62.325lbm/ ft&#xb3;) + (77.85 ft&#xb3;
* 62.325lbm/ ft&#xb3;) + (77.85 ft&#xb3;
Line 856: Line 798:
Initial:
Initial:
( __71__ in.* 257 lbm/in ) + ( 77.85 ft&#xb3;
( __71__ in.* 257 lbm/in ) + ( 77.85 ft&#xb3;
* _62.0038   lbm/ft&#xb3;) =
* _62.0038       lbm/ft&#xb3;) = _23074 (+/- 10)_ lbm CUE:         None
_2 3074 (+/- 10)_ lbm   CUE: None       __________
__________
SAT UNSAT
SAT UNSAT
: 2. PERFORMANCE STEP: Reviews the Temperature Correction Factor data on Attachment 2 step 4.2.2.f
: 2. PERFORMANCE STEP: Reviews the Temperature Correction Factor data on Attachment 2 step 4.2.2.f
  ........C........
    ........C........
STANDARD:            Recognize curve was read incorrectly and corrects:
Temperature Correction Factor (Tave 528 &deg;F)
Initial __-34350_(+/-50) _ lbm Final    -35600 (+/-50) lbm COMMENT: Error results from reading curve at 581.8 instead of 580.8 CUE:      None
__________
SAT UNSAT Page 5 of 8


STANDARD: Recognize curve was read incorrectly and corrects:
Appendix C                                 Job Performance Measure                       Form ES-C-1 Worksheet Admin JPM SRO-A1.1 AG
Temperature Correction Factor (Tave  &deg;F) Initial __-34350_(+/-5 0)  _ lbm Final      -35 6 00  (+/-5 0)    lbm COMMENT: Error results from reading curve at 581.8 instead of 580.8 CUE: None      __________
: 3. PERFORMANCE STEP: Reviews the RCS Inventory Table to determine Initial and Final total RCS Inventory per step 4.2.2.h
SAT  UNSAT
      ........C........
 
STANDARD:             Corrects data entered in the RCS Inventory Table and calculates the Initial and Final RCS Water Inventory MU Tank             Pzr Steam        Pzr Water        Power          Temperature          Water Inventory        + Inventory        + Inventory    + Correction  +    Correction  =    Inventory (lbm)               (lbm)             (lbm)         (lbm)             (lbm)             (lbm)
Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM SRO-A1.1 AG Page 6 of 8  3. PERFORMANCE STEP: Reviews the RCS Inventory Table to determine Initial and Final total RCS Inventory per step 4.2.2.h
Initial:
  ........C........
23074                 3406.393         35119.85       135             -34350             27385.243
 
(+/- 250) lbm +              lbm +            lbm +          lbm +              lbm =            lbm Final:
STANDARD: Corrects data entered in the RCS Inventor y Table and calculate s the Initial and Final RCS Water Inventory MU Tank Inventory (lbm) + Pzr Steam Inventory (lbm) + Pzr Water Inventory (lbm) + Power Correction (lbm) + Temperature Correction (lbm) = Water Inventory (lbm) Initial: 23074 lbm +  3406.393 lbm +
21275                 3341.05           35570.146     135             -35600            24721.196
35119.85 lbm +  135 lbm +  -34350 lbm =  27385.2 43 (+/- 250) lbm Final: 21275 lbm +  3341.05 lbm +  35570.146 lbm +  135 lbm +  -35 6 00  lbm =  24721.1 96 (+/- 250) lbm CUE: None       __________
(+/- 250) lbm +              lbm +            lbm +          lbm +              lbm =            lbm CUE:       None
SAT UNSAT
__________
SAT UNSAT
: 4. PERFORMANCE STEP: Reviews Change in RCS Inventory calculation
: 4. PERFORMANCE STEP: Reviews Change in RCS Inventory calculation
  .......C.........
      .......C.........
STANDARD: Recognizes error and corrects step 4.2.2.i to determine RCS Inventory Change Change = Initial inventory  
STANDARD:             Recognizes error and corrects step 4.2.2.i to determine RCS Inventory Change Change = Initial inventory - Final inventory Change = 27385.243_ lbm - _24721.196 lbm 2664.047 (+/- 40)_ lbm CUE: None
- Final inventory Change = 27385.243_ lbm - _24721.196 lbm 2664.0 47 (+/- 40)_ lbm   CUE: None       __________
__________
SAT UNSAT
SAT UNSAT Page 6 of 8


Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM SRO-A1.1 AG Page 7 of 8  5. PERFORMANCE STEP: Verifies the Total RCS Leak Rate calculation per step 4.2.2.k
Appendix C                                 Job Performance Measure                         Form ES-C-1 Worksheet Admin JPM SRO-A1.1 AG
  .......C.........
: 5. PERFORMANCE STEP: Verifies the Total RCS Leak Rate calculation per step 4.2.2.k
STANDARD: Corrects step 4.2.2.k error to determine correct Leak Rate lbm 62.32 ft x ftgallons 7.481  x timeInventory  RCSin  Change    Leakrate 3 3    Leakrate = ( 2664.047 lbm) &#xf7; ( 246 min) x (0.120 gal/lbm)     Leakrate =
    .......C.........
1.299 (+/- 0.02) gpm   CUE: None       __________
STANDARD:             Corrects step 4.2.2.k error to determine correct Leak Rate Change in RCS Inventory        7.481 gallons        ft 3 Leakrate =                                  x                 x time                    ft 3       62.32 lbm Leakrate = (             2664.047       lbm) &#xf7; (       246     min) x (0.120 gal/lbm)
SAT UNSAT
Leakrate =               1.299 (+/- 0.02)       gpm CUE: None
__________
SAT UNSAT
: 6. PERFORMANCE STEP: Determines Unidentified Leakage
: 6. PERFORMANCE STEP: Determines Unidentified Leakage
  .......C.........
    .......C.........
STANDARD: Determines Unidentified Leakage is 1.288 (+/- .2) gpm 1.299 gpm (Total Leak Rate from Attachment 2)
STANDARD: Determines Unidentified Leakage is 1.288 (+/- .2) gpm 1.299 gpm (Total Leak Rate from Attachment 2)
    - Identified leakage 0.011 gpm (Given) = 1.288 gpm   CUE: None       __________
                      - Identified leakage 0.011 gpm (Given) = 1.288 gpm CUE: None
SAT UNSAT
__________
SAT UNSAT
: 7. PERFORMANCE STEP: Reviews Technical Specification applicability
: 7. PERFORMANCE STEP: Reviews Technical Specification applicability
  .......C.........
    .......C.........
STANDARD: Determines Technical Specification 3.4.13 RCS Operational Leakage applies   for LCO 3.4.13 b. Condition A should be entered for unidentified leakage greater than 1.0 GPM     CUE: None       __________
STANDARD: Determines Technical Specification 3.4.13 RCS Operational Leakage applies for LCO 3.4.13 b. Condition A should be entered for unidentified leakage greater than 1.0 GPM CUE: None
SAT UNSAT TERMINATING CUES: This JPM is complete (Terminated by the examine r)       __________
__________
END TIME Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM SRO-A1.1 AG  Page 8 of 8 Verification of Completion Job Performance Measure No.
SAT UNSAT TERMINATING CUES: This JPM is complete (Terminated by the examiner)
Examinee's Name:
__________
END TIME Page 7 of 8


Examiner's Name:
Appendix C                        Job Performance Measure              Form ES-C-1 Worksheet Admin JPM SRO-A1.1 AG Verification of Completion Job Performance Measure No.
Examinees Name:
Examiners Name:
Date Performed:
Date Performed:
Facility Evaluator:
Facility Evaluator:
Number of Attempts:
Number of Attempts:
Time to Complete:  
Time to Complete:
 
Question Documentation:
Question Documentation:  
 
Question:_____________________________________________________________
Question:_____________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
 
________________________________________________________________
_________________________________________________________
Response:_____________________________________________________________
_______  Response:_____________________________________________________________
______________________________________________________________________
______________________________________________________________________
______________________________________________________________________
______________________________________________________________________
______________________________________________________________________
__________________________________
Result: Satisfactory/Unsatisfactory Examiners signature and date: _______________________________________
____________________________________
Page 8 of 8
Result: Satisfactory/Unsatisfactory


Examiner's signature and date:
20 Revision ATTACHMENT 2:           RCS/MU AND PURIFICATION LEAK RATE CALCULATION SHEET Page 1 of 3 Note: For parameters which utilize averaging of redundant channels, eliminate inoperable channels from the average and reduce the denominator accordingly.
_______________________________________
 
20   Revision   ATTACHMENT 2:
RCS/MU AND PURIFICATION LEAK RATE CALCULATION SHEET Page 1 of 3 Note: For parameters which utilize averaging of redundant channels, eliminate inoperable channels from the average and reduce the denominator accordingly.
If a Th or Tc point is unavailable, eliminate it and the opposing point (Tc or Th) from the same loop, and reduce the denominator by 2.
If a Th or Tc point is unavailable, eliminate it and the opposing point (Tc or Th) from the same loop, and reduce the denominator by 2.
ITEM PARAMETER SOURCE UNITS INITIAL VALUE FINAL  VALUE 1 Time Control Room clock or computer hr:min Step 4.1.4 Step 4.1.10 1905 2311 2 Makeup Tank Temp T769 or TI MU8 &deg;F 100 100 3 Makeup Tank Level (2 channel ave)
INITIAL            FINAL ITEM       PARAMETER                   SOURCE                   UNITS VALUE             VALUE Control Room clock                               Step 4.1.4       Step 4.1.10 1          Time                                                  hr:min or computer                                        1905               2311 Makeup 2           Tank Temp         T769 or TI MU8                       &deg;F             100               100 Makeup Tank
[L761+L763] 2, or LR MU16  in. 71 64 4 RCS Pressure (4 ch ave)
[L761+L763]&#xf7;2, 3          Level                                                  in.             71                 64 or LR MU16 (2 channel ave)
[P721+P722+P729+P730] 4, PRS RC2A2, or PRS RC2B (1) psi 2156 2161  5 Pressurizer Level LRS RC14 or L768  in. 218 222 6 Ave Power [R795+R804+R814+R820] 4,C913, or NR NI6 % 100 100 7 Tave  (8 ch ave)
RCS Pressure      [P721+P722+P729+P730]&#xf7;4, 4          (4 ch ave)                                              psi          2156              2161 PRSRC2A2, or PRSRC2B (1)
TI RC7, or: [T719+T720+T728+T729+
Pressurizer       LRS RC14 or 5                                                                  in.           218               222 Level            L768
T780+T800+T820+T840] 8 (2) &deg;F 58 0.8 582.3  (1) If less than 1700 psig RCS Pressure use the average of P725 and P732 (loop 1 and loop 2 WR Pressure).
[R795+R804+R814+R820]&#xf7;4, 6          Ave Power                                              %
(2) If less than 520&deg;F RCS Temperature then average T753 and T782 (loop 1 and loop 2 WR Temperature).  
C913, or NR NI6                                     100               100 TI RC7, or:
 
7          Tave                                                    &deg;F
[T719+T720+T728+T729+
(8 ch ave)                                                            580.8              582.3 T780+T800+T820+T840]&#xf7;8 (2)
(1)
If less than 1700 psig RCS Pressure use the average of P725 and P732 (loop 1 and loop 2 WR Pressure).
(2)
If less than 520&deg;F RCS Temperature then average T753 and T782 (loop 1 and loop 2 WR Temperature).
4.2.2.a Makeup Tank Water Density (from Attachment 4)
4.2.2.a Makeup Tank Water Density (from Attachment 4)
Initial ____62.0038______ lbm/ft&#xb3; Final   ___ 62.0038______ lbm/ft&#xb3; 4.2.2.b Makeup Tank Inventory Note: 77.85 ft&#xb3; accounts for water volume below the level indicating range.
Initial ____62.0038______ lbm/ft&#xb3; Final ___ 62.0038______ lbm/ft&#xb3; 4.2.2.b Makeup Tank Inventory Note: 77.85 ft&#xb3; accounts for water volume below the level indicating range.
Water Inventory = (Tank level
Water Inventory = (Tank level
* 4.124 ft&#xb3;/in
* 4.124 ft&#xb3;/in
* Calibration Density) + (77.85 ft&#xb3;
* Calibration Density) + (77.85 ft&#xb3;
* Water Density)  
* Water Density)
        = (Tank level
                            = (Tank level
* 4.124 ft&#xb3;/in
* 4.124 ft&#xb3;/in
* 62.325lbm/ ft&#xb3;) + (77.85 ft&#xb3;
* 62.325lbm/ ft&#xb3;) + (77.85 ft&#xb3;
Line 940: Line 892:
Initial:
Initial:
( ___67______ in.* 257 lbm/in ) + ( 77.85 ft&#xb3;
( ___67______ in.* 257 lbm/in ) + ( 77.85 ft&#xb3;
* _62.0038   lbm/ft&#xb3;) = _22046_ lbm __mlk__ IV Final:     (___64______
* _62.0038 lbm/ft&#xb3;) = _22046_ lbm
in.* 257 lbm/in ) + ( 77.85 ft&#xb3;
__mlk__
* _62.0038   lbm/ft&#xb3;) = _21275_ lbm __mlk__ IV 21   Revision   ATTACHMENT 2:
IV Final:
RCS/MU AND PURIFICATION LEAK RATE CALCULATION SHEET Page 2 of 3 4.2.2.c Pressurizer Inventory Density (from Attachment 6)
(___64______ in.* 257 lbm/in ) + ( 77.85 ft&#xb3;
Water Initial ___37.71________ lbm/ft&#xb3; Steam Initial ____6.02_________ lbm/ft&#xb3; Water Final ____37.68________ lbm/ft&#xb3; Steam Final ____6.04_________ lbm/ft&#xb3; 4.2.2.d Pressurizer Inventory Note: 239.6 ft&#xb3; accounts for water volume below the level indicating range.
* _62.0038 lbm/ft&#xb3;) = _21275_ lbm
__mlk__
IV
 
21 Revision ATTACHMENT 2:             RCS/MU AND PURIFICATION LEAK RATE CALCULATION SHEET Page 2 of 3 4.2.2.c Pressurizer Inventory Density (from Attachment 6)
Water Initial ___37.71________ lbm/ft&#xb3;           Steam Initial ____6.02_________ lbm/ft&#xb3; Water Final ____37.68________ lbm/ft&#xb3;           Steam Final ____6.04_________ lbm/ft&#xb3; 4.2.2.d Pressurizer Inventory Note: 239.6 ft&#xb3; accounts for water volume below the level indicating range.
242.2 ft&#xb3; accounts for steam volume above the level indicating range.
242.2 ft&#xb3; accounts for steam volume above the level indicating range.
Water Inventory = (level
Water Inventory = (level
* 3.173 ft&#xb3;/in + 239.6 ft&#xb3;)
* 3.173 ft&#xb3;/in + 239.6 ft&#xb3;)
* Water Density Water Initial:   [(___218_____ in.
* Water Density Water Initial:
[(___218_____ in.
* 3.173 ft&#xb3;/in) + 239.6 ft&#xb3;]
* 3.173 ft&#xb3;/in) + 239.6 ft&#xb3;]
* 37.71 lbm/ft&#xb3; = _35119.85 lbm __mlk__ IV Water Final:
* 37.71             lbm/ft&#xb3; = _35119.85     lbm
__mlk__
IV Water Final:
[(___222_____ in.
[(___222_____ in.
* 3.173 ft&#xb3;/in) + 239.6 ft&#xb3;]
* 3.173 ft&#xb3;/in) + 239.6 ft&#xb3;]
* 37.68   lbm/ft&#xb3; = _35570.146 lbm __mlk__ IV Steam Inventory =[((320  
* 37.68             lbm/ft&#xb3; = _35570.146 lbm
- level)
__mlk__
IV Steam Inventory =[((320 - level)
* 3.173 ft&#xb3;/in) + 242.2 ft&#xb3;]
* 3.173 ft&#xb3;/in) + 242.2 ft&#xb3;]
* Steam Density Steam Initial:
* Steam Density Steam Initial:
[((320 - _218__in)
[((320 - _218__in)
* 3.173 ft&#xb3;/in) + 242.2 ft&#xb3;]
* 3.173 ft&#xb3;/in) + 242.2 ft&#xb3;]
* 6.02 lbm/ft&#xb3;) = _3406.393________ lbm
* 6.02   lbm/ft&#xb3;) = _3406.393________ lbm
__mlk__ IV Steam Final:
__mlk__
IV Steam Final:
[((320 - __222__in)
[((320 - __222__in)
* 3.173 ft&#xb3;/in) + 242.2 ft&#xb3;]
* 3.173 ft&#xb3;/in) + 242.2 ft&#xb3;]
* 6.04   lbm/ft&#xb3;) = _3341.05
* 6.04   lbm/ft&#xb3;) = _3341.05         __ lbm
__ lbm __mlk__ IV 4.2.2.e Power Correction Factor Initial _____
__mlk__
135____________ lbm Final   _____
IV 4.2.2.e Power Correction Factor Initial _____135____________ lbm Final _____135____________ lbm 4.2.2.f Temperature Correction Factor (Tave >528&deg;)
135____________ lbm 4.2.2.f Temperature Correction Factor (Tave >528&deg;)   Initial ______-35 2 00________ lbm Final   _____
Initial ______-35200________ lbm Final _____-35600_________ lbm
-356 00_________ lbm


22   Revision   ATTACHMENT 2:
22 Revision ATTACHMENT 2:               RCS/MU AND PURIFICATION LEAK RATE CALCULATION SHEET Page 3 of 3 4.2.2.g Temperature Correction Factor (Tave <528&deg;)
RCS/MU AND PURIFICATION LEAK RATE CALCULATION SHEET Page 3 of 3 4.2.2.g Temperature Correction Factor (Tave <528&deg;) Reactor Coolant System Density (from Attachment 5)
Reactor Coolant System Density (from Attachment 5)
N/A  At initial Tave ___________________ lbm/ft&#xb3;
N/A At initial Tave   ___________________ lbm/ft&#xb3; At final Tave     ___________________ lbm/ft&#xb3; Temperature Correction Factor (TCF)
TCF = [(10,277 + (0.24828
* Tave))
* Reactor Coolant System Density] - 498,800 Initial: [(10,277 ft&#xb3; + (0.24828 ft&#xb3;/&deg;F* _______&deg;F))
* _______ lbm/ft&#xb3;] - 498,800 lbm = _______ lbm
________
IV Final: [(10,277 ft&#xb3; + (0.24828 ft&#xb3;/&deg;F* _______&deg;F))
* _______ lbm/ft&#xb3;] - 498,800 lbm = _______ lbm
________
IV 4.2.2.h      RCS Inventory MU Tank            Pzr Steam        Pzr Water        Power      Temperature          Water Inventory      +  Inventory    +  Inventory    + Correction +    Correction =      Inventory (lbm)              (lbm)            (lbm)          (lbm)          (lbm)            (lbm)
Initial:
22046                3406.393        35119.85        135          -35200            25507.243 lbm +              lbm +            lbm +          lbm +            lbm =            lbm Final:
21275                3341.05          35570.146        135          -35600            24721.196 lbm +              lbm +            lbm +          lbm +            lbm =            lbm 4.2.2.i      Change in RCS Inventory Change = Initial inventory - Final inventory Change = 25507.243_ lbm - 24721.196 lbm = 786.047_ lbm
__mlk__
IV


At final Tave ___________________ lbm/ft&#xb3; Temperature Correction Factor (TCF)
23 Revision ATTACHMENT 2:        RCS/MU AND PURIFICATION LEAK RATE CALCULATION SHEET Page 4 of 4 4.2.2.j    Time period Period = Final time - Initial time Period = [(_23___ hr x 60) + ( 11  min)] - [(__19__ hr x 60) + ( 5    min)] = _246____ min
__mlk__
IV 4.2.2.k    Total RCS Leak Rate Change in RCS Inventory      7.481 gallons          ft 3 Leakrate =                            x                x time                  ft 3        62.32 lbm Leakrate = (        786.047              lbm) &#xf7; (       246      min) x (0.120 gal/lbm)
Leakrate = .383    gpm
__mlk__
IV Independent Verification Completed by ___  MLKlein__________________________ Date        Today


TCF = [(10,277 + (0.24828
24 Revision ATTACHMENT 3:             UNIDENTIFIED RCS LEAKAGE CALCULATION SHEET Page 1 of 1 RCP Seals Leak Rate from computer printout, 4.2.1.f or from Attachment 1. (4.2.1.e)                                   ___.011___ gpm Quench Tank In-Leakage Rate from computer printout, 4.2.1.j    or from Attachment 1. (4.2.1.i). Only record Positive values     _____.0___ gpm (exclude negative values by entering 0.000).
* Tave))
RCS Total Leak Rate from computer printout, 4.2.2.l or from Attachment 2.                                             ___.383___ gpm Primary to Secondary Tube Leakage from computer printout,
* Reactor Coolant System Density]
_____.0___ gpm 4.2.3.a    or from most recent entry in RCS Leakage Log, RO Log, or as (0.104 allowed) determined by Chemistry.
- 498,800  Initial: [(10,277 ft&#xb3;
Other Identified Leakage, 4.2.3.b                                                                     _____.0___ gpm or from RCS Leakage Log.
+ (0.24828 ft&#xb3;/&deg;F* _______&deg;F))
Total Identified Leak Rate from computer printout, or from; RCP Seals + Quench Tk + Pri to Sec + Other
* _______ lbm/ft&#xb3;]
( 4.2.1.e + 4.2.1.i [positive values only] + 4.2.3.a + 4.2.3.b ). ____.011__ gpm 4.2.3.c (10 gpm allowed)
- 498,800 lbm = _______ lbm
___mlk___
________ IV Final: [(10,277 ft&#xb3; + (0.24828 ft&#xb3;/&deg;F* _______&deg;F))
IV Unidentified Leak Rate from computer printout, or from; Total Leak Rate - Total Identified Leak Rate
* _______ lbm/ft&#xb3;]
( 4.2.2.k - 4.2.3.c )                                             ____.382__ gpm 4.2.3.d (1 gpm allowed)
- 498,800 lbm = _______ lbm
___mlk____
________ IV 4.2.2.h RCS Inventory  MU Tank Inventory (lbm) + Pzr Steam Inventory (lbm) + Pzr Water Inventory (lbm) + Power Correction (lbm) + Temperature Correction (lbm) = Water Inventory (lbm) Initial:  22046  lbm +  3406.393  lbm +  35119.85  lbm +  135  lbm +  -352 00  lbm =  25507.243  lbm Final:
IV
21275  lbm +  3341.05  lbm +  35570.146  lbm +  135  lbm +  -356 00  lbm =  24721.196  lbm  4.2.2.i  Change in RCS Inventory Change  = Initial inventory
_____.0___ gpm 4.2.3.e   Reactor Coolant Pressure Boundary Leakage (0 gpm allowed)
- Final inventory Change = 25507.243_ lbm - 24721.196 lbm =  786.047_ lbm  __mlk__ IV 23    Revision  ATTACHMENT 2:
Independent Verification Completed by ___    MLKlein________Date        Today Performed by:              Rx Operator                            Date:  Today
RCS/MU AND PURIFICATION LEAK RATE CALCULATION SHEET Page 4 of 4 4.2.2.j Time period Period  = Final time
- Initial time Period = [(_
23___ hr x 60)
+ (  11      min)] - [(__19__ hr x 60) + ( 5    min)]  =  _
246____ min __mlk__ IV 4.2.2.k  Total RCS Leak Rate lbm 62.32 ft  x  ftgallons 7.481  x  timeInventory  RCSin  Change    Leakrate 3 3    Leakrate =  ( 7 86.047  lbm) &#xf7; (  246 min) x  (0.120 gal/lbm)
Leakrate =
.3 8 3  gpm  __mlk__ IV Independent Verification Completed by ___MLKlein__________________________ Date  Today 24   Revision   ATTACHMENT 3:
UNIDENTIFIED RCS LEAKAGE CALCULATION SHEET Page 1 of 1 4.2.1.f RCP Seals Leak Rate from computer printout, or from Attachment
: 1. (4.2.1.e)   ___.011___ gpm   4.2.1.j Quench Tank In
-Leakage Rate from computer printout, or from Attachment 1. (4.2.1.i). Only record Positive values (exclude negative values by entering 0.000).
_____.0___ gpm 4.2.2.l RCS Total Leak Rate from computer printout, or from Attachment
: 2. ___.383___ gpm   4.2.3.a Primary to Secondary Tube Leakage from computer printout, or from most recent entry in RCS Leakage Log, RO Log, or as determined by Chemistry.
_____.0___ gpm (0.104 allowed) 4.2.3.b Other Identified Leakage, or from RCS Leakage Log.
_____.0___ gpm  4.2.3.c Total Identified Leak Rate from computer printout, or from; RCP Seals + Quench Tk + Pri to Sec + Other                                           ( 4.2.1.e + 4.2.1.i [positive values only] +   4.2.3.a + 4.2.3.b ). ___mlk___      IV ____.011__ gpm   (10 gpm allowed) 4.2.3.d Unidentified Leak Rate from computer printout, or from; Total Leak Rate  
- Total Identified Leak Rate                                       ( 4.2.2.k - 4.2.3.c ) ___mlk____      IV ____.382__ gpm   (1 gpm allowed) 4.2.3.e Reactor Coolant Pressure Boundary Leakage
_____.0___ gpm (0 gpm allowed)


Independent Verification Completed by
20 Revision ATTACHMENT 2:           RCS/MU AND PURIFICATION LEAK RATE CALCULATION SHEET Page 1 of 3 Note: For parameters which utilize averaging of redundant channels, eliminate inoperable channels from the average and reduce the denominator accordingly.
___MLKlein________Date    Toda y  Performed by:
Rx Operator Date:    Today 20   Revision   ATTACHMENT 2:
RCS/MU AND PURIFICATION LEAK RATE CALCULATION SHEET Page 1 of 3 Note: For parameters which utilize averaging of redundant channels, eliminate inoperable channels from the average and reduce the denominator accordingly.
If a Th or Tc point is unavailable, eliminate it and the opposing point (Tc or Th) from the same loop, and reduce the denominator by 2.
If a Th or Tc point is unavailable, eliminate it and the opposing point (Tc or Th) from the same loop, and reduce the denominator by 2.
ITEM PARAMETER SOURCE UNITS INITIAL VALUE FINAL  VALUE 1 Time Control Room clock or computer hr:min Step 4.1.4 Step 4.1.10 1905 2311 2 Makeup Tank Temp T769 or TI MU8 &deg;F 100 100 3 Makeup Tank Level (2 channel ave)
INITIAL            FINAL ITEM       PARAMETER                   SOURCE                   UNITS VALUE             VALUE Control Room clock                               Step 4.1.4       Step 4.1.10 1          Time                                                  hr:min or computer                                        1905               2311 Makeup 2           Tank Temp         T769 or TI MU8                       &deg;F             100               100 Makeup Tank
[L761+L763] 2, or LR MU16  in. 71 64 4 RCS Pressure (4 ch ave)
[L761+L763]&#xf7;2, 3          Level                                                  in.             71                 64 or LR MU16 (2 channel ave)
[P721+P722+P729+P730] 4, PRS RC2A2, or PRS RC2B (1) psi 2156 2161  5 Pressurizer Level LRS RC14 or L768  in. 218 222 6 Ave Power [R795+R804+R814+R820] 4,C913, or NR NI6 % 100 100 7 Tave  (8 ch ave)
RCS Pressure      [P721+P722+P729+P730]&#xf7;4, 4          (4 ch ave)                                              psi          2156              2161 PRSRC2A2, or PRSRC2B (1)
TI RC7, or: [T719+T720+T728+T729+
Pressurizer       LRS RC14 or 5                                                                  in.           218               222 Level            L768
T780+T800+T820+T840] 8 (2) &deg;F 58 0.8 582.3  (1) If less than 1700 psig RCS Pressure use the average of P725 and P732 (loop 1 and loop 2 WR Pressure).
[R795+R804+R814+R820]&#xf7;4, 6          Ave Power                                              %
(2) If less than 520&deg;F RCS Temperature then average T753 and T782 (loop 1 and loop 2 WR Temperature).  
C913, or NR NI6                                     100               100 TI RC7, or:
 
7          Tave                                                    &deg;F
[T719+T720+T728+T729+
(8 ch ave)                                                            580.8              582.3 T780+T800+T820+T840]&#xf7;8 (2)
(1)
If less than 1700 psig RCS Pressure use the average of P725 and P732 (loop 1 and loop 2 WR Pressure).
(2)
If less than 520&deg;F RCS Temperature then average T753 and T782 (loop 1 and loop 2 WR Temperature).
4.2.2.a Makeup Tank Water Density (from Attachment 4)
4.2.2.a Makeup Tank Water Density (from Attachment 4)
Initial ____62.0038______ lbm/ft&#xb3; Final   ___ 62.0038______ lbm/ft&#xb3; 4.2.2.b Makeup Tank Inventory Note: 77.85 ft&#xb3; accounts for water volume below the level indicating range.
Initial ____62.0038______ lbm/ft&#xb3; Final ___ 62.0038______ lbm/ft&#xb3; 4.2.2.b Makeup Tank Inventory Note: 77.85 ft&#xb3; accounts for water volume below the level indicating range.
Water Inventory = (Tank level
Water Inventory = (Tank level
* 4.124 ft&#xb3;/in
* 4.124 ft&#xb3;/in
* Calibration Density) + (77.85 ft&#xb3;
* Calibration Density) + (77.85 ft&#xb3;
* Water Density)  
* Water Density)
        = (Tank level
                            = (Tank level
* 4.124 ft&#xb3;/in
* 4.124 ft&#xb3;/in
* 62.325lbm/ ft&#xb3;) + (77.85 ft&#xb3;
* 62.325lbm/ ft&#xb3;) + (77.85 ft&#xb3;
Line 1,029: Line 996:
Initial:
Initial:
( ___71______ in.* 257 lbm/in ) + ( 77.85 ft&#xb3;
( ___71______ in.* 257 lbm/in ) + ( 77.85 ft&#xb3;
* _62.0038   lbm/ft&#xb3;) = _23074_ lbm __mlk__ IV Final:     (___64______
* _62.0038 lbm/ft&#xb3;) = _23074_ lbm
in.* 257 lbm/in ) + ( 77.85 ft&#xb3;
__mlk__
* _62.0038   lbm/ft&#xb3;) = _21275_ lbm __mlk__ IV 21   Revision   ATTACHMENT 2:
IV Final:
RCS/MU AND PURIFICATION LEAK RATE CALCULATION SHEET Page 2 of 3 4.2.2.c Pressurizer Inventory Density (from Attachment 6)
(___64______ in.* 257 lbm/in ) + ( 77.85 ft&#xb3;
Water Initial ___37.71________ lbm/ft&#xb3; Steam Initial ____6.02_________ lbm/ft&#xb3; Water Final ____37.68________ lbm/ft&#xb3; Steam Final ____6.04_________ lbm/ft&#xb3; 4.2.2.d Pressurizer Inventory Note: 239.6 ft&#xb3; accounts for water volume below the level indicating range.
* _62.0038 lbm/ft&#xb3;) = _21275_ lbm
__mlk__
IV
 
21 Revision ATTACHMENT 2:             RCS/MU AND PURIFICATION LEAK RATE CALCULATION SHEET Page 2 of 3 4.2.2.c Pressurizer Inventory Density (from Attachment 6)
Water Initial ___37.71________ lbm/ft&#xb3;           Steam Initial ____6.02_________ lbm/ft&#xb3; Water Final ____37.68________ lbm/ft&#xb3;           Steam Final ____6.04_________ lbm/ft&#xb3; 4.2.2.d Pressurizer Inventory Note: 239.6 ft&#xb3; accounts for water volume below the level indicating range.
242.2 ft&#xb3; accounts for steam volume above the level indicating range.
242.2 ft&#xb3; accounts for steam volume above the level indicating range.
Water Inventory = (level
Water Inventory = (level
* 3.173 ft&#xb3;/in + 239.6 ft&#xb3;)
* 3.173 ft&#xb3;/in + 239.6 ft&#xb3;)
* Water Density Water Initial:   [(___218_____ in.
* Water Density Water Initial:
[(___218_____ in.
* 3.173 ft&#xb3;/in) + 239.6 ft&#xb3;]
* 3.173 ft&#xb3;/in) + 239.6 ft&#xb3;]
* 37.71 lbm/ft&#xb3; = _35119.85 lbm ___mlk__ IV Water Final:
* 37.71             lbm/ft&#xb3; = _35119.85     lbm
___mlk__
IV Water Final:
[(___222_____ in.
[(___222_____ in.
* 3.173 ft&#xb3;/in) + 239.6 ft&#xb3;]
* 3.173 ft&#xb3;/in) + 239.6 ft&#xb3;]
* 37.68   lbm/ft&#xb3; = _35570.146 lbm __mlk__ IV Steam Inventory =[((320  
* 37.68             lbm/ft&#xb3; = _35570.146 lbm
- level)
__mlk__
IV Steam Inventory =[((320 - level)
* 3.173 ft&#xb3;/in) + 242.2 ft&#xb3;]
* 3.173 ft&#xb3;/in) + 242.2 ft&#xb3;]
* Steam Density Steam Initial:
* Steam Density Steam Initial:
[((320 - _218__in)
[((320 - _218__in)
* 3.173 ft&#xb3;/in) + 242.2 ft&#xb3;]
* 3.173 ft&#xb3;/in) + 242.2 ft&#xb3;]
* 6.02 lbm/ft&#xb3;) = _3406.393________ lbm
* 6.02   lbm/ft&#xb3;) = _3406.393________ lbm
__mlk__ IV Steam Final:
__mlk__
IV Steam Final:
[((320 - __222__in)
[((320 - __222__in)
* 3.173 ft&#xb3;/in) + 242.2 ft&#xb3;]
* 3.173 ft&#xb3;/in) + 242.2 ft&#xb3;]
* 6.04   lbm/ft&#xb3;) = _3341.05
* 6.04   lbm/ft&#xb3;) = _3341.05         __ lbm
__ lbm __mlk__ IV 4.2.2.e Power Correction Factor Initial _____
__mlk__
135_____________ lbm Final   _____
IV 4.2.2.e Power Correction Factor Initial _____135_____________ lbm Final _____135____________ lbm 4.2.2.f Temperature Correction Factor (Tave >528&deg;)
135____________ lbm 4.2.2.f Temperature Correction Factor (Tave >528&deg;)   Initial ______
Initial ______-34350___________ lbm Final _____-35600___________ lbm
-3 4350___________ lbm Final   _____
-35 6 00___________ lbm


22   Revision   ATTACHMENT 2:
22 Revision ATTACHMENT 2:               RCS/MU AND PURIFICATION LEAK RATE CALCULATION SHEET Page 3 of 3 4.2.2.g Temperature Correction Factor (Tave <528&deg;)
RCS/MU AND PURIFICATION LEAK RATE CALCULATION SHEET Page 3 of 3 4.2.2.g Temperature Correction Factor (Tave <528&deg;) Reactor Coolant System Density (from Attachment 5)
Reactor Coolant System Density (from Attachment 5)
N/A  At initial Tave ___________________ lbm/ft&#xb3;
N/A At initial Tave   ___________________ lbm/ft&#xb3; At final Tave     ___________________ lbm/ft&#xb3; Temperature Correction Factor (TCF)
TCF = [(10,277 + (0.24828
* Tave))
* Reactor Coolant System Density] - 498,800 Initial: [(10,277 ft&#xb3; + (0.24828 ft&#xb3;/&deg;F* _______&deg;F))
* _______ lbm/ft&#xb3;] - 498,800 lbm = _______ lbm
________
IV Final: [(10,277 ft&#xb3; + (0.24828 ft&#xb3;/&deg;F* _______&deg;F))
* _______ lbm/ft&#xb3;] - 498,800 lbm = _______ lbm
________
IV 4.2.2.h      RCS Inventory MU Tank            Pzr Steam        Pzr Water        Power      Temperature          Water Inventory      +  Inventory    +  Inventory    + Correction +    Correction =      Inventory (lbm)              (lbm)            (lbm)          (lbm)          (lbm)            (lbm)
Initial:                                                        +
23074                3406.393        35119.85        135          -34350            27385.243 lbm +              lbm +            lbm +          lbm              lbm =            lbm Final:
21275                3341.05          35570.146        135          -35600            24721.196 lbm +              lbm +            lbm +          lbm +            lbm =            lbm 4.2.2.i      Change in RCS Inventory Change = Initial inventory - Final inventory Change = 27385.243_ lbm - 24721.196 lbm = 2664.047_ lbm
__mlk__
IV


At final Tave ___________________ lbm/ft&#xb3; Temperature Correction Factor (TCF)
23 Revision ATTACHMENT 2:        RCS/MU AND PURIFICATION LEAK RATE CALCULATION SHEET Page 4 of 4 4.2.2.j    Time period Period = Final time - Initial time Period = [(_23___ hr x 60) + ( 11  min)] - [(__19__ hr x 60) + ( 5    min)] = _246____ min
__mlk__
IV 4.2.2.k    Total RCS Leak Rate Change in RCS Inventory      7.481 gallons          ft 3 Leakrate =                            x                x time                  ft 3        62.32 lbm Leakrate = (        2664.047            lbm) &#xf7; (       246      min) x (0.120 gal/lbm)
Leakrate = 1.299    gpm
__mlk__
IV Independent Verification Completed by  MLKlein__________________________ Date          Today


TCF = [(10,277 + (0.24828
24 Revision ATTACHMENT 3:             UNIDENTIFIED RCS LEAKAGE CALCULATION SHEET Page 1 of 1 RCP Seals Leak Rate from computer printout, 4.2.1.f or from Attachment 1. (4.2.1.e)                                   _____.011_ gpm Quench Tank In-Leakage Rate from computer printout, 4.2.1.j    or from Attachment 1. (4.2.1.i). Only record Positive values     _____.0___ gpm (exclude negative values by entering 0.000).
* Tave))
RCS Total Leak Rate from computer printout,                       ___1.299__ gpm 4.2.2.l or from Attachment 2.
* Reactor Coolant System Density]
Primary to Secondary Tube Leakage from computer printout,
- 498,800  Initial: [(10,277 ft&#xb3; + (0.24828 ft&#xb3;/&deg;F* _______&deg;F))
____.0 ___ gpm 4.2.3.a    or from most recent entry in RCS Leakage Log, RO Log, or as (0.104 allowed) determined by Chemistry.
* _______ lbm/ft&#xb3;]
Other Identified Leakage, 4.2.3.b                                                                     ____.0____ gpm or from RCS Leakage Log.
- 498,800 lbm = _______ lbm
Total Identified Leak Rate from computer printout, or from; RCP Seals + Quench Tk + Pri to Sec + Other
________ IV Final: [(10,277 ft&#xb3; + (0.24828 ft&#xb3;/&deg;F* _______&deg;F))
( 4.2.1.e + 4.2.1.i [positive values only] + 4.2.3.a + 4.2.3.b ). _____.011_ gpm 4.2.3.c (10 gpm allowed)
* _______ lbm/ft&#xb3;]
__mlk__
- 498,800 lbm = _______ lbm
IV Unidentified Leak Rate from computer printout, or from; Total Leak Rate - Total Identified Leak Rate
________ IV 4.2.2.h RCS Inventory MU Tank Inventory (lbm) + Pzr Steam Inventory (lbm) + Pzr Water Inventory (lbm) + Power Correction (lbm) + Temperature Correction (lbm) = Water Inventory (lbm) Initial:  23074  lbm +  3406.393  lbm +  35119.85  lbm +  135  lbm +  -34350  lbm =  2 7 385.243  lbm Final:
( 4.2.2.k - 4.2.3.c )                                             ___1.288__ gpm 4.2.3.d (1 gpm allowed)
21275  lbm +  3341.05  lbm +  35570.146  lbm +  135  lbm +  -356 00  lbm =  24721.196  lbm  4.2.2.i  Change in RCS Inventory Change  = Initial inventory
__mlk__
- Final inventory Change = 27385.243_ lbm - 24721.196 lbm =  2664.047_ lbm  __mlk__ IV 23    Revision  ATTACHMENT 2:
IV
RCS/MU AND PURIFICATION LEAK RATE CALCULATION SHEET Page 4 of 4 4.2.2.j Time period Period  = Final time
____.0 ____ gpm 4.2.3.e   Reactor Coolant Pressure Boundary Leakage (0 gpm allowed)
- Initial time Period = [
Independent Verification Completed by ___    MLKlein________Date        Today Performed by:              Rx Operator                            Date:  Today
(_23___ hr x 60) + (  11      min)] - [(__19__ hr x 60) + ( 5    min)]  =  _
 
246____ min __mlk__ IV 4.2.2.k  Total RCS Leak Rate lbm 62.32 ft  x  ftgallons 7.481  x  timeInventory  RCSin  Change    Leakrate 3 3    Leakrate =  ( 2664.047  lbm) &#xf7; (  246 min) x  (0.120 gal/lb m)    Leakrate =
Davis-Besse Initial License Exam 2015 Admin JPM SRO-A1.2
1.299  gpm  __mlk__ IV Independent Verification Completed by MLKlein__________________________ Date  Today 24   Revision   ATTACHMENT 3:
UNIDENTIFIED RCS LEAKAGE CALCULATION SHEET Page 1 of 1 4.2.1.f RCP Seals Leak Rate from computer printout, or from Attachment
: 1. (4.2.1.e)   _____.011_ gpm   4.2.1.j Quench Tank In
-Leakage Rate from computer printout, or from Attachment 1. (4.2.1.i). Only record Positive values (exclude negative values by entering 0.000).
_____.0___ gpm 4.2.2.l RCS Total Leak Rate from computer printout, or from Attachment
: 2. ___1.299__ gpm   4.2.3.a Primary to Secondary Tube Leakage from computer printout, or from most recent entry in RCS Leakage Log, RO Log, or as determined by Chemistry.
____.0 ___ gpm (0.104 allowed) 4.2.3.b Other Identified Leakage,  or from RCS Leakage Log.
____.0____ gpm 4.2.3.c Total Identified Leak Rate from computer printout, or from; RCP Seals + Quench Tk + Pri to Sec + Other                                           ( 4.2.1.e + 4.2.1.i [positive values only] +   4.2.3.a + 4.2.3.b ). __mlk__      IV _____.011_ gpm   (10 gpm allowed) 4.2.3.d Unidentified Leak Rate from computer printout, or from; Total Leak Rate  
- Total Identified Leak Rate                                       ( 4.2.2.k - 4.2.3.c ) __mlk__      IV ___1.288__ gpm   (1 gpm allowed) 4.2.3.e Reactor Coolant Pressure Boundary Leakage
____.0 ____ gpm (0 gpm allowed)


Independent Verification Completed by
Appendix C                             Job Performance Measure                         Form ES-C-1 Worksheet Admin JPM SRO-A1.2 AG Facility:         Davis-Besse                           Task No:       336-004-03-0300 Task Title:      Determine Maintenance of Active License Status K/A  
___MLKlein________Date Toda y  Performed by:
Rx Operator Date:    Today Davis-Besse Initial License Exam 2015 Admin JPM SRO-A 1.2 Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM SRO-A 1.2 AG 1 of 6  Facility:             Davis-Besse   Task No: 336-004-03-0300   Task Title
:      Determine Maintenance of Active License Status K/A  


==Reference:==
==Reference:==
 
2.1.4 (3.8)         Job Performance Measure No: SRO-A1.2 (JPM New)
2.1.4 (3.8) Job Performance Measure No
Examinee:
:   SRO-A 1.2 (JPM New)     Examinee:           NRC Examiner:
NRC Examiner:                                                           Date:
Date:       Method of testing:
Method of testing:
Simulated Performance
Simulated Performance ___                       Actual Performance _X_
___   Actual Performance
Classroom _X_                     Simulator ___               Plant ___
_X_  Classroom
_X_   Simulator
___   Plant ___
Read to the examinee:
Read to the examinee:
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
Line 1,112: Line 1,090:
Initial Conditions:
Initial Conditions:
The plant conditions are specified in the Initial Conditions and Initiating Cues.
The plant conditions are specified in the Initial Conditions and Initiating Cues.
Task Standard: Determine SRO 1 and SRO 3 are Inactive. Determine SRO 2 and SRO 4 are Active.
Task Standard:
Determine SRO 1 and SRO 3 are Inactive. Determine SRO 2 and SRO 4 are Active.
Required Materials:
Required Materials:
DBBP-TRAN-0014, License Requirements for Licensed Individuals NT-OT-07001, Training and Qualification of Operations Personnel General  
DBBP-TRAN-0014, License Requirements for Licensed Individuals NT-OT-07001, Training and Qualification of Operations Personnel General  
Line 1,118: Line 1,097:
==References:==
==References:==


None Initiating Cue:
None Initiating Cue:
The plant conditions are specified in the Initial Conditions and Initiating Cues.
The plant conditions are specified in the Initial Conditions and Initiating Cues.
Time Critical Task:
Time Critical Task:
No   Alternate Path:
No Alternate Path:
No Validation Time:
No Validation Time:
15 minutes
15 minutes 1 of 6


Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM SRO-A 1.2 AG 2 of 6  EXAMINER COPY INITIAL CONDITIONS
Appendix C                           Job Performance Measure                                   Form ES-C-1 Worksheet Admin JPM SRO-A1.2 AG EXAMINER COPY INITIAL CONDITIONS:
It is 7/1/15. Four Senior Reactor Operators have the following work history for the second quarter of 2015 (Plant was in Mode 1 the entire quarter)
It is 7/1/15. Four Senior Reactor Operators have the following work history for the second quarter of 2015 (Plant was in Mode 1 the entire quarter):
SRO 1 Entered second quarter with active license 4/01/2015 Worked 0700
SRO 1               Entered second quarter with active license 4/01/2015         Worked 0700-1900 as Command SRO 4/02/2015         Worked 0700-1900 as Command SRO 4/03/2015         Worked 0700-1900 as Command SRO 4/07/2015         Worked 0700-1900 as Command SRO. Was relieved for 3 hours to obtain required biennial License Physical at the Health Center 4/08/2015         Worked 0700-1900 as Command SRO SRO 2               Entered second quarter with inactive license Completed all requirements for license reactivation 4/15/15 through 4/20/15 4/23/15           Worked 0700-1900 as Command SRO 4/24/15           Worked 0700-1900 as Command SRO 4/28/15           Worked 0700-1900 as Shift Technical Advisor SRO 3               Entered second quarter with active license 4/10/15           Worked 0700-1900 as Shift Manager 4/11/15           Worked 0700-1900 as Shift Manager 4/18/15           Worked 0700-1900 as Shift Manager 4/19/15           Worked 0700-1900 as Shift Technical Advisor 4/20/15           Worked 0700-1900 as Shift Manager SRO 4               License issued at the beginning of the second quarter 5/1/15           Worked 0700-1900 as Command SRO 5/2/15           Worked 0700-1900 as Command SRO 5/3/15           Worked 0700-1900 as Command SRO 5/9/15           Worked 0700-1900 as Command SRO 5/10/15           Worked 0700-1900 as Shift Technical Advisor INITIATION CUE:
-1900 as Command SRO 4/02/2015 Worked 0700
Based on the previous quarters work history determine the license status as of today, 7/1/15, for each Senior Reactor Operator and document as ACTIVE or INACTIVE on this page.
-1900 as Command SRO 4/03/2015 Worked 0700
(Provide copy of DBBP-TRAN-0014, License Requirements for Licensed Individuals and NT-OT-07001, Training and Qualification of Operations Personnel) 2 of 6
-1900 as Command SRO 4/07/2015 Worked 0700
-1900 as Command SRO. Was relieved for 3 hours to obtain required biennial License Physical at the Health Center 4/08/2015 Worked 0700
-1900 as Command SRO SRO 2 Entered second quarter with inactive license Complete d all requirements for license reactivation 4/15/15 through 4/20/15 4/23/15 Worked 0700
-1900 as Command SRO 4/24/15 Worked 0700
-1900 as Command SRO 4/28/15 Worked 0700
-1900 as Shift Technical Advisor SRO 3 Entered second quarter with active license 4/10/15 Worked 0700
-1900 as Shift Manager 4/11/15 Worked 0700
-1900 as Shift Manager 4/18/15 Worked 0700
-1900 as Shift Manager 4/19/15 Worked 0700
-1900 as Shift Technical Advisor 4/20/15 Worked 0700
-1900 as Shift Manager SRO 4 License issued at the beginning of the second quarter 5/1/15 Worked 0700
-1900 as Command SRO 5/2/15 Worked 0700
-1900 as Command SRO 5/3/15 Worked 0700
-1900 as Command SRO 5/9/15 Worked 0700
-1900 as Command SRO 5/10/15 Worked 0700
-1900 as Shift Technical Advisor INITIATION CUE:


Based on the previous quarters work history determine the license status as of today, 7/1/15 , for each Senior Reactor Operator and document as ACTIVE or INACTIVE on this page. (Provide copy of DBBP
Appendix C                            Job Performance Measure                                    Form ES-C-1 Worksheet Admin JPM SRO-A1.2 AG CANDIDATE COPY INITIAL CONDITIONS:
-TRAN-0014, License Requirements for Licensed Individuals and NT-OT-07001, Training and Qualification of Operations Personnel)
It is 7/1/15. Four Senior Reactor Operators have the following work history for the second quarter of 2015 (Plant was in Mode 1 the entire quarter):
SRO 1                Entered second quarter with active license 4/01/2015        Worked 0700-1900 as Command SRO 4/02/2015        Worked 0700-1900 as Command SRO 4/03/2015        Worked 0700-1900 as Command SRO 4/07/2015        Worked 0700-1900 as Command SRO. Was relieved for 3 hours to obtain required biennial License Physical at the Health Center 4/08/2015        Worked 0700-1900 as Command SRO SRO 2                Entered second quarter with inactive license Completed all requirements for license reactivation 4/15/15 through 4/20/15 4/23/15          Worked 0700-1900 as Command SRO 4/24/15          Worked 0700-1900 as Command SRO 4/28/15          Worked 0700-1900 as Shift Technical Advisor SRO 3                Entered second quarter with active license 4/10/15          Worked 0700-1900 as Shift Manager 4/11/15          Worked 0700-1900 as Shift Manager 4/18/15          Worked 0700-1900 as Shift Manager 4/19/15          Worked 0700-1900 as Shift Technical Advisor 4/20/15          Worked 0700-1900 as Shift Manager SRO 4                License issued at the beginning of the second quarter 5/1/15            Worked 0700-1900 as Command SRO 5/2/15            Worked 0700-1900 as Command SRO 5/3/15            Worked 0700-1900 as Command SRO 5/9/15            Worked 0700-1900 as Command SRO 5/10/15          Worked 0700-1900 as Shift Technical Advisor INITIATION CUE:
Based on the previous quarters work history determine the license status as of today, 7/1/15, for each Senior Reactor Operator and document as ACTIVE or INACTIVE on this page.
3 of 6


Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM SRO-A 1.2 AG 3 of 6  CANDIDATE COPY INITIAL CONDITIONS
Appendix C                           Job Performance Measure                     Form ES-C-1 Worksheet Admin JPM SRO-A1.2 AG PERFORMANCE INFORMATION NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is NOT critical unless denoted in the "Comments".
:  It is 7/1/15. Four Senior Reactor Operators have the following work history for the second quarter of 2015 (Plant was in Mode 1 the entire quarter):
START TIME: _______
SRO 1 Entered second quarter with active license 4/01/2015 Worked 0700
: 1. PERFORMANCE STEP: Evaluate SRO 1 work history
-1900 as Command SRO 4/02/2015 Worked 0700
    ........C........
-1900 as Command SRO 4/03/2015 Worked 0700
STANDARD: Reviews DBBP-TRAN-0014, License Requirements for Licensed Individuals and determines license is Inactive.
-1900 as Command SRO 4/07/2015 Worked 0700
COMMENT: Credit not received for complete watch due to absence to Health Center CUE: None
-1900 as Command SRO. Was relieved for 3 hours to obtain required biennial License Physical at the Health Center 4/08/2015 Worked 0700
__________
-1900 as Command SRO SRO 2 Entered second quarter with inactive license Complete d all requirements for license reactivation 4/15/15 through 4/20/15 4/23/15 Worked 0700
SAT UNSAT
-1900 as Command SRO 4/24/15 Worked 0700
-1900 as Command SRO 4/28/15 Worked 0700
-1900 as Shift Technical Advisor SRO 3 Entered second quarter with active license 4/10/15 Worked 0700
-1900 as Shift Manager 4/11/15 Worked 0700
-1900 as Shift Manager 4/18/15 Worked 0700
-1900 as Shift Manager 4/19/15 Worked 0700
-1900 as Shift Technical Advisor 4/20/15 Worked 0700
-1900 as Shift Manager SRO 4 License issued at the beginning of the second quarter 5/1/15 Worked 0700
-1900 as Command SRO 5/2/15 Worked 0700
-1900 as Command SRO 5/3/15 Worked 0700-1900 as Command SRO 5/9/15 Worked 0700
-1900 as Command SRO 5/10/15 Worked 0700
-1900 as Shift Technical Advisor INITIATION CUE:
Based on the previous quarters work history determine the license status as of today, 7/1/15, for each Senior Reactor Operator and document as ACTIVE or INACTIVE on this page
.
Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM SRO-A 1.2 AG  4 of 6 PERFORMANCE INFORMATION NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is NOT critical unless denoted in the "Comments".
START TIME: _______
: 1. PERFORMANCE STEP: Evaluate SRO 1 work history  
  ........C........
STANDARD: Reviews DBBP-TRAN-0014, License Requirements for Licensed Individuals and determines license is Inactive
.
COMMENT: Credit not received for complete watch due to absence to Health Center CUE: None       __________
SAT UNSAT
: 2. PERFORMANCE STEP: Evaluate SRO 2 work History
: 2. PERFORMANCE STEP: Evaluate SRO 2 work History
  ........C........
    ........C........
STANDARD: Reviews DBBP-TRAN-0014, License Requirements for Licensed Individuals and determines license is Active COMMENT: Reactivation meets proficiency requirements for the quarter CUE: None       __________
STANDARD: Reviews DBBP-TRAN-0014, License Requirements for Licensed Individuals and determines license is Active COMMENT: Reactivation meets proficiency requirements for the quarter CUE: None
SAT UNSAT
__________
SAT UNSAT
: 3. PERFORMANCE STEP: Evaluate SRO 3 work history
: 3. PERFORMANCE STEP: Evaluate SRO 3 work history
  ........C........
    ........C........
STANDARD: Reviews DBBP-TRAN-0014, License Requirements for Licensed Individuals and determines license is Inactive COMMENT: No credit given for Shift Technical position CUE: None       __________
STANDARD: Reviews DBBP-TRAN-0014, License Requirements for Licensed Individuals and determines license is Inactive COMMENT: No credit given for Shift Technical position CUE: None
SAT UNSAT
__________
SAT UNSAT 4 of 6
 
Appendix C                            Job Performance Measure                        Form ES-C-1 Worksheet Admin JPM SRO-A1.2 AG
: 4.      PERFORMANCE STEP: Evaluate SRO 4 work history
    ........C........
STANDARD: Reviews DBBP-TRAN-0014, License Requirements and NT-OT-01007, Training and Qualification of Operations Personnel for Licensed Individuals and determines license is Active.
COMMENT: A newly issued license meets the proficiency requirement for the quarter in which it was issued CUE: None
__________
SAT UNSAT TERMINATING CUES: This JPM is complete (Terminated by the examiner)
__________
END TIME 5 of 6


Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM SRO-A 1.2 AG  5 of 6  4. PERFORMANCE STEP: Evaluate SRO 4 work history
Appendix C                       Job Performance Measure             Form ES-C-1 Worksheet Admin JPM SRO-A1.2 AG Verification of Completion Job Performance Measure No.
  ........C........
Examinees Name:
STANDARD: Reviews DBBP-TRAN-0014, License Requirements and NT-OT-01007 , Training and Qualification of Operations Personnel for Licensed Individuals and determines license is Active.
Examiners Name:
COMMENT: A newly issued license meets the proficiency requirement for the quarter in which it was issued CUE: None        __________
SAT  UNSAT TERMINATING CUES:  This JPM is complete (Terminated by the examine r)        __________
END TIME Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM SRO-A 1.2 AG 6 of 6  Verification of Completion Job Performance Measure No.
Examinee's Name:
Examiner's Name:
Date Performed:
Date Performed:
Facility Evaluator:
Facility Evaluator:
Number of Attempts:
Number of Attempts:
Time to Complete:  
Time to Complete:
 
Question Documentation:
Question Documentation:  
 
Question:_____________________________________________________________
Question:_____________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
________________________________________________________________
________________________________________________________________
Response:___________________________________________
Response:_____________________________________________________________
__________________
______________________________________________________________________
______________________________________________________________________
______________________________________________________________________
______________________________________________________________________
______________________________________________________________________
______________________________________________________________________
Result: Satisfactory/Unsatisfactory Examiner's signature and date:
Result: Satisfactory/Unsatisfactory Examiners signature and date: _______________________________________
_______________________________________
6 of 6


Davis-Besse Initial License Exam 2015 Admin JPM SRO-A 2 Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM S RO-A2 AG 1 of 6  Facility:             Davis-Besse   Task No: 331-041-02-0300   Task Title
Davis-Besse Initial License Exam 2015 Admin JPM SRO-A2
:      Perform Risk Assessment K/A  
 
Appendix C                             Job Performance Measure                         Form ES-C-1 Worksheet Admin JPM SRO-A2 AG Facility:         Davis-Besse                           Task No:       331-041-02-0300 Task Title:      Perform Risk Assessment K/A  


==Reference:==
==Reference:==
 
2.2.17 (3.8)         Job Performance Measure No:         SRO-A2 (JPM New)
2.2.17 (3.8) Job Performance Measure No
Examinee:
:     SRO-A 2 (JPM New)   Examinee:           NRC Examiner:       Date:       Method of testing:
NRC Examiner:                                                           Date:
Simulated Performance
Method of testing:
___   Actual Performance
Simulated Performance ___                       Actual Performance _X_
_X_  Classroom
Classroom _X_                     Simulator ___               Plant ___
_X_   Simulator
___   Plant ___
Read to the examinee:
Read to the examinee:
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions:
Initial Conditions:
The plant conditions are specified in the Initial Conditions and Initiating Cues.
The plant conditions are specified in the Initial Conditions and Initiating Cues.
Task Standard:
Task Standard:
Evaluate Generation Risk as Orange. Determine Director of Site Operations approval with documentation in Unit Log is required Determine Supervisor continuous job site coverage is required Required Materials:
Evaluate Generation Risk as Orange.
Determine Director of Site Operations approval with documentation in Unit Log is required Determine Supervisor continuous job site coverage is required Required Materials:
NOP-OP-1007, Risk Management DB-OP-06011, High Pressure Injection System, section 4.1 General  
NOP-OP-1007, Risk Management DB-OP-06011, High Pressure Injection System, section 4.1 General  


Line 1,242: Line 1,188:
Technical Specifications Initiating Cue:
Technical Specifications Initiating Cue:
The plant conditions are specified in the Initial Conditions and Initiating Cues.
The plant conditions are specified in the Initial Conditions and Initiating Cues.
Time Critical Task:
Time Critical Task: No Alternate Path: No Validation Time: 25 minutes 1 of 6
No Alternate Path:
No Validation Time:
25 minutes


Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM S RO-A2 AG 2 of 6  EXAMINER COPY INITIAL CONDITIONS
Appendix C                         Job Performance Measure                       Form ES-C-1 Worksheet Admin JPM SRO-A2 AG EXAMINER COPY INITIAL CONDITIONS:
The Plant is at 100% Power. All systems normal.
The Plant is at 100% Power. All systems normal.
INITIATION CUE:
INITIATION CUE:
Engineering has discovered a design question potentially affecting long term Operability of High Pressure Injection Pump (HPI) 1. Engineering requests HPI Pump 1 be placed on recirculation through the flow test line per DB
Engineering has discovered a design question potentially affecting long term Operability of High Pressure Injection Pump (HPI) 1. Engineering requests HPI Pump 1 be placed on recirculation through the flow test line per DB-OP-06011, High Pressure Injection System, section 4.1 for 48 hours to gather data.
-OP-06011, High Pressure Injection System, section 4.1 for 48 hours to gather data.
The Shift Manager directs you to perform a Risk Assessment for the Non-Emergent work per DB-OP-1007, Risk Assessment to determine the following only:
The Shift Manager directs you to perform a Risk Assessment for the Non
: 1. Risk Level
-Emergent work per DB-OP-1007, Risk Assessment to determine the following only: 1. Risk Level
: 2. Permission required and documentation method
: 2. Permission required and documentation method 3. Level of Supervision required Document your results on this page (Provide a copy of DB-OP-06011, Section 4.1 and NOP
: 3. Level of Supervision required Document your results on this page (Provide a copy of DB-OP-06011, Section 4.1 and NOP-OP-1007. Make Technical Specifications available) 2 of 6
-OP-1007. Make Technical Specifications available
)


Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM S RO-A2 AG 3 of 6  CANDIDATE COPY INITIAL CONDITIONS
Appendix C                         Job Performance Measure                       Form ES-C-1 Worksheet Admin JPM SRO-A2 AG CANDIDATE COPY INITIAL CONDITIONS:
The Plant is at 100% Power. All systems normal. INITIATION CUE:
The Plant is at 100% Power. All systems normal.
Engineering has discovered a design question potentially affecting long term Operability of High Pressure Injection Pump (HPI) 1. Engineering requests HPI Pump 1 be placed on recirculation through the flow test line per DB
INITIATION CUE:
-OP-06011, High Pressure Injection System, section 4.1 for 48 hours to gather data.
Engineering has discovered a design question potentially affecting long term Operability of High Pressure Injection Pump (HPI) 1. Engineering requests HPI Pump 1 be placed on recirculation through the flow test line per DB-OP-06011, High Pressure Injection System, section 4.1 for 48 hours to gather data.
The Shift Manager directs you to perform a Risk Assessment for the N on-Emergent work per DB-OP-1007, Risk Assessment to determine the following only: 1. Risk Level
The Shift Manager directs you to perform a Risk Assessment for the Non-Emergent work per DB-OP-1007, Risk Assessment to determine the following only:
: 1. Risk Level
: 2. Permission required and documentation method
: 2. Permission required and documentation method
: 3. Level of Supervision required Document your results on this page
: 3. Level of Supervision required Document your results on this page 3 of 6


Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM S RO-A2 AG 4 of 6 PERFORMANCE INFORMATION NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is NOT critical unless denoted in the "Comments".
Appendix C                               Job Performance Measure                       Form ES-C-1 Worksheet Admin JPM SRO-A2 AG PERFORMANCE INFORMATION NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is NOT critical unless denoted in the "Comments".
START TIME: _______
START TIME: _______
NOTE: STEPS CAN BE PERFORMED IN ANY SEQUENCE
NOTE: STEPS CAN BE PERFORMED IN ANY SEQUENCE
: 1. PERFORMANCE STEP: Evaluate effect on HPI Train 1 STANDARD: Reviews DB
: 1. PERFORMANCE STEP: Evaluate effect on HPI Train 1 STANDARD: Reviews DB-OP-06011, section 4.1 and determines HPI 1 will be Inoperable while lined up through the flow test line CUE: None
-OP-06011, section 4.1 and determines HPI 1 will be Inoperable while line d up through the flow test line
__________
 
SAT UNSAT
CUE: None       __________
: 2. PERFORMANCE STEP: Reviews Technical Specification 3.5.2 for HPI Pump 1 STANDARD: Determines 72 hour action statement will be entered CUE:       None
SAT UNSAT
__________
: 2. PERFORMANCE STEP: Reviews Technical Specification 3.5.2 for HPI Pump 1 STANDARD: Determines 72 hour action statement will be entered
SAT UNSAT
 
CUE: None       __________
SAT UNSAT
: 3. PERFORMANCE STEP: Determines Risk Level
: 3. PERFORMANCE STEP: Determines Risk Level
  ........C........
    ........C........
STANDARD: Refers to Attachment 2 and/or 3 of NOP-OP-1007, Risk Assessment and identifies Risk level will be Orange COMMENT: Greater than 50% of a shutdown LCO action time (for less than 14 day LCO) requires Orange Risk. HPI 1 will be Inoperable for 48 hours which is greater than 50% of the 72 hour shutdown LCO.
STANDARD: Refers to Attachment 2 and/or 3 of NOP-OP-1007, Risk Assessment and identifies Risk level will be Orange COMMENT: Greater than 50% of a shutdown LCO action time (for less than 14 day LCO) requires Orange Risk. HPI 1 will be Inoperable for 48 hours which is greater than 50% of the 72 hour shutdown LCO.
CUE: None
CUE: None
__________
__________
SAT UNSAT
SAT UNSAT 4 of 6


Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM S RO-A2 AG 5 of 6  4. PERFORMANCE STEP: Determines Approval required and method of documentation
Appendix C                           Job Performance Measure                       Form ES-C-1 Worksheet Admin JPM SRO-A2 AG
  ........C........
: 4. PERFORMANCE STEP: Determines Approval required and method of documentation
    ........C........
STANDARD: Reviews Attachment 2 and/or step 4.3.3.3 of NOP-OP-1007, Risk Assessment and determines the Director of Site Operations (or designee) approval is required and documented in the Work Implementation Schedule.
STANDARD: Reviews Attachment 2 and/or step 4.3.3.3 of NOP-OP-1007, Risk Assessment and determines the Director of Site Operations (or designee) approval is required and documented in the Work Implementation Schedule.
CUE: None       __________
CUE: None
SAT UNSAT
__________
SAT UNSAT
: 5. PERFORMANCE STEP: Determines level of Supervision required
: 5. PERFORMANCE STEP: Determines level of Supervision required
  ........C........
    ........C........
STANDARD: Reviews Attachment 2 and/or step 4.3.3.3 of NOP-OP-1007, Risk Assessment and determines Supervisor continuous job site coverage is required   CUE: None       __________
STANDARD: Reviews Attachment 2 and/or step 4.3.3.3 of NOP-OP-1007, Risk Assessment and determines Supervisor continuous job site coverage is required CUE: None
SAT  UNSAT TERMINATING CUES:  This JPM is complete (Terminated by the examine r)
__________
__________
END TIME Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM S RO-A2 AG 6 of 6  Verification of Completion Job Performance Measure No.
SAT UNSAT TERMINATING CUES: This JPM is complete (Terminated by the examiner)
Examinee's Name:
__________
Examiner's Name:
END TIME 5 of 6
 
Appendix C                       Job Performance Measure           Form ES-C-1 Worksheet Admin JPM SRO-A2 AG Verification of Completion Job Performance Measure No.
Examinees Name:
Examiners Name:
Date Performed:
Date Performed:
Facility Evaluator:
Facility Evaluator:
Number of Attempts:
Number of Attempts:
Time to Complete:  
Time to Complete:
 
Question Documentation:
Question Documentation:  
 
Question:_____________________________________________________________
Question:_____________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
________________________________________________________________
________________________________________________________________
Response:__________________________________
Response:_____________________________________________________________
___________________________
______________________________________________________________________
______________________________________________________________________
______________________________________________________________________
______________________________________________________________________
______________________________________________________________________
______________________________________________________________________
Result: Satisfactory/Unsatisfactory Examiner's signature and date:
Result: Satisfactory/Unsatisfactory Examiners signature and date: _______________________________________
_______________________________________
6 of 6


Davis-Besse Initial License Exam 2015 Admin JPM S RO-A 3 Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM SRO
Davis-Besse Initial License Exam 2015 Admin JPM SRO-A3
-A3 AG 1 of 6  Facility:             Davis-Besse   Task No: 334-005-05-0300   Task Title
 
:      Emergency Dose Authorization K/A  
Appendix C                             Job Performance Measure                         Form ES-C-1 Worksheet Admin JPM SRO-A3 AG Facility:         Davis-Besse                           Task No:       334-005-05-0300 Task Title:      Emergency Dose Authorization K/A  


==Reference:==
==Reference:==
 
2.3.4 (3.7)         Job Performance Measure No:         SRO-A3 (JPM New)
2.3.4 (3.7) Job Performance Measure No
Examinee:
:     S RO-A 3 (JPM New)   Examinee:           NRC Examiner:       Date:       Method of testing:
NRC Examiner:                                                           Date:
Simulated Performance
Method of testing:
___   Actual Performance
Simulated Performance ___                       Actual Performance _X_
_X_  Classroom
Classroom _X_                     Simulator ___               Plant ___
_X_   Simulator
___   Plant ___
Read to the examinee:
Read to the examinee:
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions:
Initial Conditions:
The plant conditions are specified in the Initial Conditions and Initiating Cues.
The plant conditions are specified in the Initial Conditions and Initiating Cues.
Task Standard:
Task Standard:
 
Select the two mechanic method and authorize Emergency dose for mechanic 2 and 4 only Required Materials:
Select the two mechanic method and authorize Emergency dose for mechanic 2 and 4 only
RA-EP-02620, Emergency Dose Control and Potassium Iodide Distribution Emergency Dose Authorization form for each mechanic Calculator General  
 
Required Materials:
RA-EP-02620 , Emergency Dose Control and Potassium Iodide Distribution Emergency Dose Authorization form for each mechanic Calculator General  


==References:==
==References:==


None Initiating Cue:
None Initiating Cue:
The plant conditions are specified in the Initial Conditions and Initiating Cues.
The plant conditions are specified in the Initial Conditions and Initiating Cues.
Time Critical Task:
Time Critical Task: No Alternate Path: No Validation Time: 25 minutes 1 of 6
No Alternate Path:
No Validation Time:
25 minutes
 
Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM SRO
-A3 AG  2 of 6   EXAMINER COPY INITIAL CONDITIONS
:  The Plant has experienced a Loss of Coolant Accident and fuel damage. Emergency Core Cooling Train (ECCS) 1 is in operation at full flow. Low Pressure Injection Pump (LPI) 2 is out of service for maintenance. Just before the accident it was determined LPI Pump 1 was losing oil through a loose bearing housing. Plans were being made to tighten the housing and add oil. It is determined that this task is required to be performed immediately to prevent pump failure.


Appendix C                          Job Performance Measure                        Form ES-C-1 Worksheet Admin JPM SRO-A3 AG EXAMINER COPY INITIAL CONDITIONS:
The Plant has experienced a Loss of Coolant Accident and fuel damage. Emergency Core Cooling Train (ECCS) 1 is in operation at full flow. Low Pressure Injection Pump (LPI) 2 is out of service for maintenance. Just before the accident it was determined LPI Pump 1 was losing oil through a loose bearing housing. Plans were being made to tighten the housing and add oil. It is determined that this task is required to be performed immediately to prevent pump failure.
INITIATION CUE:
INITIATION CUE:
You are an extra SRO on shift. The ERO is not yet activated. The Shift Manager acting as the Emergency Director in the Control Room has directed you to prepare an Emergency Dose Authorization, using the following information.
You are an extra SRO on shift. The ERO is not yet activated. The Shift Manager acting as the Emergency Director in the Control Room has directed you to prepare an Emergency Dose Authorization, using the following information.
Radiation levels in ECCS Room 1 are indicating 50 Rem/hr These two tasks (tighten the housing and add oil) can be performed by the mechanic(s) working in series or two mechanics working in parallel.
Radiation levels in ECCS Room 1 are indicating 50 Rem/hr These two tasks (tighten the housing and add oil) can be performed by the mechanic(s) working in series or two mechanics working in parallel.
One mechanic would obtain 48 minutes of exposure Two mechanics simultaneously would obtain 24 minutes of exposure each Three mechanics in rotation would obtain 18 minutes of exposure each Four mechanics in rotation would obtain 12 minutes of exposure each Four Mechanics have volunteered to perform this work:
* Mechanic 1 is a 52 year old male with 2 Rem lifetime dose and no dose for current year.
This individual also received a 28 Rem dose during a lifesaving rescue 10 years ago at another plant
* Mechanic 2 is a 27 year old male with 600 mrem lifetime dose and 5 mrem for current year
* Mechanic 3 is a 34 year old female, who has a declared pregnancy, with 125 mrem lifetime dose and no dose for current year
* Mechanic 4 is a 37 year old male with 4.2 mrem lifetime and 700 mrem for the current year Select the method desired and mechanic(s) to perform this task and document (up to the review and approval signatures) on the attached Emergency Dose Authorization Forms. The remainder of each form will be completed if necessary when the Emergency RP Manager has been contacted.
(Hand Candidate a copy of RA-EP-02620, Emergency Dose Control and Potassium Iodide Distribution and the four recommended Emergency Dose Authorization Forms) 2 of 6


One mechanic would obtain 48 minutes of exposure Two mechanics simultaneously would obtain 24 minutes of exposure each Three mechanics in rotation would obtain 18 minutes of exposure each Four mechanics in rotation would obtain 12 minutes of exposure each
Appendix C                         Job Performance Measure                       Form ES-C-1 Worksheet Admin JPM SRO-A3 AG CANDIDATE COPY INITIAL CONDITIONS:
 
The Plant has experienced a Loss of Coolant Accident and fuel damage. Emergency Core Cooling Train (ECCS) 1 is in operation at full flow. Low Pressure Injection Pump (LPI) 2 is out of service for maintenance. Just before the accident it was determined LPI Pump 1 was losing oil through a loose bearing housing. Plans were being made to tighten the housing and add oil. It is determined that this task is required to be performed immediately to prevent pump failure.
Four Mechanics have volunteered to perform this work:
Mechanic 1 is a 52 year old male with 2 Rem lifetime dose and no dose for current year. This individual also received a 28 Rem dose during a lifesaving rescue 10 years ago at another plant Mechanic 2 is a 27 year old male with 600 mrem lifetime dose and 5 mrem for current year Mechanic 3 is a 34 year old female, who has a declared pregnancy, with 125 mrem lifetime dose and no dose for current yea r    Mechanic 4 is a 37 year old male with 4.2 mrem lifetime and 700 mrem for the current year
 
Select the method desired and mechanic(s) to perform this task and document (up to the review and approval signatures) on the attached Emergency Dose Authorization Forms
. The remainder of each form will be completed if necessary when the Emergency RP Manager has been contacted.
(Hand Candidate a copy of RA-EP-02620, Emergency Dose Control and Potassium Iodide Distribution and the four recommended Emergency Dose Authorization Forms)
 
Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM SRO
-A3 AG 3 of 6  CANDIDATE COPY INITIAL CONDITIONS
The Plant has experienced a Loss of Coolant Accident and fuel damage. Emergency Core Cooling Train (ECCS) 1 is in operation at full flow. Low Pressure Injection Pump (LPI) 2 is out of service for maintenance. Just before the accident it was determined LPI Pump 1 was losing oil through a loose bearing housing. Plans were being made to tighten the housing and add oil. It is determined that this task is required to be performed immediately to prevent pump failure.
INITIATION CUE:
INITIATION CUE:
You are acting as the Emergency Director in the Control Room and the ERO is not yet activated.
You are acting as the Emergency Director in the Control Room and the ERO is not yet activated.
Radiation levels in ECCS Room 1 are indicating 50 Rem/hr These two tasks (tighten the housing and add oil) can be performed by the mechanic(s) working in series or two mechanics working in parallel.
Radiation levels in ECCS Room 1 are indicating 50 Rem/hr These two tasks (tighten the housing and add oil) can be performed by the mechanic(s) working in series or two mechanics working in parallel.
One mechanic would obtain 48 minutes of exposure Two mechanics simultaneously would obtain 24 minutes of exposure each Three mechanics in rotation would obtain 18 minutes of exposure each Four mechanics in rotation would obtain 12 minutes of exposure each Four Mechanics have volunteered to perform this work:
One mechanic would obtain 48 minutes of exposure Two mechanics simultaneously would obtain 24 minutes of exposure each Three mechanics in rotation would obtain 18 minutes of exposure each Four mechanics in rotation would obtain 12 minutes of exposure each Four Mechanics have volunteered to perform this work:
Mechanic 1 is a 52 year old male with 2 Rem lifetime dose and no dose for current year. This individual also received a 28 Rem dose during a lifesaving rescue 10 years ago at another plant Mechanic 2 is a 27 year old male with 600 mrem lifetime dose and 5 mrem for current year Mechanic 3 is a 34 year old female, who has a declared pregnancy, with 125 mrem lifetime dose and no dose for current yea r    Mechanic 4 is a 37 year old male with 4.2 mrem lifetime and 700 mrem for the current year Select the method desired and mechanic(s) to perform this task and document on this form. Authorize Emergency Dose if necessary per RA
* Mechanic 1 is a 52 year old male with 2 Rem lifetime dose and no dose for current year.
-EP-02620, Emergency Dose Control and Potassium Iodide Distribution by signing for Emergency Director Approval on the appropriate Emergency Dose Authorization Forms. The remainder of each form will be completed if necessary when the Emergency RP Manager has been contacted.
This individual also received a 28 Rem dose during a lifesaving rescue 10 years ago at another plant
 
* Mechanic 2 is a 27 year old male with 600 mrem lifetime dose and 5 mrem for current year
Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM SRO
* Mechanic 3 is a 34 year old female, who has a declared pregnancy, with 125 mrem lifetime dose and no dose for current year
-A3 AG  4 of 6 PERFORMANCE INFORMATION NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is NOT critical unless denoted in the "Comments".
* Mechanic 4 is a 37 year old male with 4.2 mrem lifetime and 700 mrem for the current year Select the method desired and mechanic(s) to perform this task and document on this form.
START TIME:  _______
Authorize Emergency Dose if necessary per RA-EP-02620, Emergency Dose Control and Potassium Iodide Distribution by signing for Emergency Director Approval on the appropriate Emergency Dose Authorization Forms. The remainder of each form will be completed if necessary when the Emergency RP Manager has been contacted.
: 1. PERFORMANCE STEP: Evaluate the dose that would be received for each method
3 of 6
 
STANDARD: One mechanic would obtain 40 Rem    Two mechanics simultaneously would obtain 20 Rem each Three mechanics in rotation would obtain 15 Rem each Four mechanics in rotation would obtain 10 Rem each
 
COMMENT: JPM step sequence not critical. May evaluate mechanics and select method first in which case only the method selected will need dose evaluated CUE: None      __________
SAT  UNSAT
: 2. PERFORMANCE STEP: Evaluate Mechanic 1 acceptability for receiving Emergency Dose STANDARD:. Determines Mechanic 1 should not be authorized to receive emergency dose
 
CUE: If asked - "received 2 8 Rem 10 years ago at previous place of employment during a lifesaving rescue"


Appendix C                          Job Performance Measure                        Form ES-C-1 Worksheet Admin JPM SRO-A3 AG PERFORMANCE INFORMATION NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is NOT critical unless denoted in the "Comments".
START TIME: _______
: 1. PERFORMANCE STEP: Evaluate the dose that would be received for each method STANDARD: One mechanic would obtain 40 Rem Two mechanics simultaneously would obtain 20 Rem each Three mechanics in rotation would obtain 15 Rem each Four mechanics in rotation would obtain 10 Rem each COMMENT: JPM step sequence not critical. May evaluate mechanics and select method first in which case only the method selected will need dose evaluated CUE: None
__________
SAT UNSAT
: 2. PERFORMANCE STEP: Evaluate Mechanic 1 acceptability for receiving Emergency Dose STANDARD:. Determines Mechanic 1 should not be authorized to receive emergency dose CUE:    If asked - received 28 Rem 10 years ago at previous place of employment during a lifesaving rescue
__________
__________
SAT UNSAT
SAT UNSAT
: 3. PERFORMANCE STEP: Evaluate Mechanic 2 acceptability for receiving Emergency Dose STANDARD: Determines Mechanic 2 can be authorized for Emergency Dose CUE: If asked - "have never received emergency dose"
: 3. PERFORMANCE STEP: Evaluate Mechanic 2 acceptability for receiving Emergency Dose STANDARD: Determines Mechanic 2 can be authorized for Emergency Dose CUE: If asked - have never received emergency dose
__________
__________
SAT UNSAT
SAT UNSAT 4 of 6


Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM SRO
Appendix C                           Job Performance Measure                       Form ES-C-1 Worksheet Admin JPM SRO-A3 AG
-A3 AG 5 of 6  4. PERFORMANCE STEP: Evaluate Mechanic 3 acceptability for receiving Emergency Dose STANDARD: Determines Mechanic 3 SHALL NOT be authorized to receive emergency dose. Since mechanic is female, and is a declared pregnant worker       CUE: If asked - "have never received emergency dose" If asked - "have just found out is pregnant"
: 4. PERFORMANCE STEP: Evaluate Mechanic 3 acceptability for receiving Emergency Dose STANDARD: Determines Mechanic 3 SHALL NOT be authorized to receive emergency dose. Since mechanic is female, and is a declared pregnant worker CUE: If asked - have never received emergency dose If asked - have just found out is pregnant
__________
SAT UNSAT
: 5. PERFORMANCE STEP: Evaluate Mechanic 4 acceptability for receiving Emergency Dose STANDARD: Determines Mechanic 4 can be authorized for Emergency Dose CUE: If asked - have never received emergency dose
__________
__________
SAT UNSAT
SAT UNSAT
: 5. PERFORMANCE STEP: Evaluate Mechanic 4 acceptability for receiving Emergency Dose
 
STANDARD:  Determines Mechanic 4 can be authorized for Emergency Dose CUE: If asked - "have never received emergency dose"      __________
SAT  UNSAT
: 6. PERFORMANCE STEP: Determine method for repair
: 6. PERFORMANCE STEP: Determine method for repair
  ........C........
    ........C........
STANDARD: Determines 2 mechanics in parallel is proper method due to condition in RA
STANDARD: Determines 2 mechanics in parallel is proper method due to condition in RA-EP-02620, step 6.1.3.b 25,000 mrem TEDE CUE:       None
-EP-02620, step 6.1.3.b 25,000 mrem TEDE CUE: None       __________       SAT UNSAT
__________
SAT UNSAT
: 7. PERFORMANCE STEP: Select Mechanic 2 and Mechanic 4 to perform work
: 7. PERFORMANCE STEP: Select Mechanic 2 and Mechanic 4 to perform work
  ........C........
    ........C........
STANDARD: Recommend Emergency Dose for Mechanic 2 and Mechanic 4 CUE: None       __________
STANDARD: Recommend Emergency Dose for Mechanic 2 and Mechanic 4 CUE:       None
SAT UNSAT TERMINATING CUES: This JPM is complete (Terminated by the examine r)
__________
SAT UNSAT TERMINATING CUES: This JPM is complete (Terminated by the examiner)
__________
__________
END TIME Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM SRO
END TIME 5 of 6
-A3 AG 6 of 6  Verification of Completion Job Performance Measure No.
 
Examinee's Name:
Appendix C                       Job Performance Measure           Form ES-C-1 Worksheet Admin JPM SRO-A3 AG Verification of Completion Job Performance Measure No.
Examiner's Name:
Examinees Name:
Examiners Name:
Date Performed:
Date Performed:
Facility Evaluator:
Facility Evaluator:
Number of Attempts:
Number of Attempts:
Time to Complete:  
Time to Complete:
 
Question Documentation:
Question Documentation:  
 
Question:_____________________________________________________________
Question:_____________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
_____________________________
________________________________________________________________
___________________________________
Response:_____________________________________________________________
Response:_____________________________________________________________
______________________________________________________________________
______________________________________________________________________
______________________________________________________________________
______________________________________________________________________
______________________________________________________________________
______________________________________________________________________
Result: Satisfactory/Unsatisfactory Examiner's signature and date:
Result: Satisfactory/Unsatisfactory Examiners signature and date: _______________________________________
_______________________________________
6 of 6


EMERGENCY DOSE AUTHORIZATION DBEP-204-01   INDIVIDUAL (Last, First, Middle)
EMERGENCY DOSE AUTHORIZATION DBEP-204-01 INDIVIDUAL (Last, First, Middle)
Mechanic 1 SOCIAL SECURITY NUMBER 111-11-1111 DATE Today TLD NO. 1 EMPLOYER FENOC BRIEF DESCRIPTION OF TASK RECOMMENDED EMERGENCY DOSE AUTHORIZATION YES   NO RECOMMENDED EMERGENCY DOSE LIMIT REM { TOTAL EFFECTIVE DOSE EQUIVALENT (TEDE)
Mechanic 1 SOCIAL SECURITY NUMBER 111-11-1111 DATE                                 TLD NO.                             EMPLOYER Today                                1                                   FENOC BRIEF DESCRIPTION OF TASK RECOMMENDED EMERGENCY DOSE AUTHORIZATION                 YES         NO RECOMMENDED EMERGENCY DOSE LIMIT                     REM { TOTAL EFFECTIVE DOSE EQUIVALENT (TEDE) }
} COMMENTS         EMERGENCY RP MANAGER RECOMMENDATION (Signature)
COMMENTS EMERGENCY RP MANAGER RECOMMENDATION (Signature)
EMERGENCY DIRECTOR APPROVAL (Signature)
EMERGENCY DIRECTOR APPROVAL (Signature)
AUTHORIZATION DATE AUTHORIZATION LIMIT REM { TEDE } I have been briefed on the radiological consequences and hazards associated with the authorized emergency dose and I have volunteered to perform the above described task.
AUTHORIZATION DATE                                   AUTHORIZATION LIMIT REM { TEDE }
INDIVIDUAL (Signature)
I have been briefed on the radiological consequences and hazards associated with the authorized emergency dose and I have volunteered to perform the above described task.
DATE       BRIEFED BY (Signature)
INDIVIDUAL (Signature)                                                   DATE BRIEFED BY (Signature)                                                   DATE (TOTAL DOSE - TEDE) =               (EXTERNAL - DDE)               PLUS (INTERNAL - CEDE)
DATE       (TOTAL DOSE  
RADIOBIOASSAY RESULTS EMERGENCY RP MANAGER REVIEW (Signature)                                   DATE EMERGENCY DIRECTOR REVIEW (Signature)                                     DATE
- TEDE) =       (EXTERNAL  
 
- DDE)       PLUS (INTERNAL  
EMERGENCY DOSE AUTHORIZATION DBEP-204-01 INDIVIDUAL (Last, First, Middle)
- CEDE)       RADIOBIOASSAY RESULTS EMERGENCY RP MANAGER REVIEW (Signature)
Mechanic 2 SOCIAL SECURITY NUMBER 222-22-2222 DATE                                 TLD NO.                             EMPLOYER Today                                2                                   FENOC BRIEF DESCRIPTION OF TASK RECOMMENDED EMERGENCY DOSE AUTHORIZATION                 YES         NO RECOMMENDED EMERGENCY DOSE LIMIT                     REM { TOTAL EFFECTIVE DOSE EQUIVALENT (TEDE) }
DATE       EMERGENCY DIRECTOR REVIEW (Signature)
COMMENTS EMERGENCY RP MANAGER RECOMMENDATION (Signature)
DATE EMERGENCY DOSE AUTHORIZATION DBEP-204-01   INDIVIDUAL (Last, First, Middle)
Mechanic 2 SOCIAL SECURITY NUMBER 222-22-2222 DATE Today TLD NO. 2 EMPLOYER FENOC BRIEF DESCRIPTION OF TASK RECOMMENDED EMERGENCY DOSE AUTHORIZATION YES   NO RECOMMENDED EMERGENCY DOSE LIMIT REM { TOTAL EFFECTIVE DOSE EQUIVALENT (TEDE)
} COMMENTS             EMERGENCY RP MANAGER RECOMMENDATION (Signature)
EMERGENCY DIRECTOR APPROVAL (Signature)
EMERGENCY DIRECTOR APPROVAL (Signature)
AUTHORIZATION DATE AUTHORIZATION LIMIT REM { TEDE } I have been briefed on the radiological consequences and hazards associated with the authorized emergency dose and I have volunteered to perform the above described task.
AUTHORIZATION DATE                                   AUTHORIZATION LIMIT REM { TEDE }
INDIVIDUAL (Signature)
I have been briefed on the radiological consequences and hazards associated with the authorized emergency dose and I have volunteered to perform the above described task.
DATE       BRIEFED BY (Signature)
INDIVIDUAL (Signature)                                                   DATE BRIEFED BY (Signature)                                                   DATE (TOTAL DOSE - TEDE) =               (EXTERNAL - DDE)               PLUS (INTERNAL - CEDE)
DATE       (TOTAL DOSE  
RADIOBIOASSAY RESULTS EMERGENCY RP MANAGER REVIEW (Signature)                                   DATE EMERGENCY DIRECTOR REVIEW (Signature)                                     DATE
- TEDE) =       (EXTERNAL  
 
- DDE)       PLUS (INTERNAL  
EMERGENCY DOSE AUTHORIZATION DBEP-204-01 INDIVIDUAL (Last, First, Middle)
- CEDE)       RADIOBIOASSAY RESULTS EMERGENCY RP MANAGER REVIEW (Signature)
Mechanic 3 SOCIAL SECURITY NUMBER 333-33-3333 DATE                                 TLD NO.                             EMPLOYER Today                                3                                   FENOC BRIEF DESCRIPTION OF TASK RECOMMENDED EMERGENCY DOSE AUTHORIZATION                 YES         NO RECOMMENDED EMERGENCY DOSE LIMIT                     REM { TOTAL EFFECTIVE DOSE EQUIVALENT (TEDE) }
DATE       EMERGENCY DIRECTOR REVIEW (Signature)
COMMENTS EMERGENCY RP MANAGER RECOMMENDATION (Signature)
DATE EMERGENCY DOSE AUTHORIZATION DBEP-204-01   INDIVIDUAL (Last, First, Middle)
Mechanic 3 SOCIAL SECURITY NUMBER 333-33-3333 DATE Today TLD NO. 3 EMPLOYER FENOC BRIEF DESCRIPTION OF TASK RECOMMENDED EMERGENCY DOSE AUTHORIZATION YES   NO RECOMMENDED EMERGENCY DOSE LIMIT REM { TOTAL EFFECTIVE DOSE EQUIVALENT (TEDE)
} COMMENTS             EMERGENCY RP MANAGER RECOMMENDATION (Signature)
EMERGENCY DIRECTOR APPROVAL (Signature)
EMERGENCY DIRECTOR APPROVAL (Signature)
AUTHORIZATION DATE AUTHORIZATION LIMIT REM { TEDE } I have been briefed on the radiological consequences and hazards associated with the authorized emergency dose and I have volunteered to perform the above described task.
AUTHORIZATION DATE                                   AUTHORIZATION LIMIT REM { TEDE }
INDIVIDUAL (Signature)
I have been briefed on the radiological consequences and hazards associated with the authorized emergency dose and I have volunteered to perform the above described task.
DATE       BRIEFED BY (Signature)
INDIVIDUAL (Signature)                                                   DATE BRIEFED BY (Signature)                                                   DATE (TOTAL DOSE - TEDE) =               (EXTERNAL - DDE)               PLUS (INTERNAL - CEDE)
DATE       (TOTAL DOSE  
RADIOBIOASSAY RESULTS EMERGENCY RP MANAGER REVIEW (Signature)                                   DATE EMERGENCY DIRECTOR REVIEW (Signature)                                     DATE
- TEDE) =       (EXTERNAL  
 
- DDE)       PLUS (INTERNAL  
EMERGENCY DOSE AUTHORIZATION DBEP-204-01 INDIVIDUAL (Last, First, Middle)
- CEDE)       RADIOBIOASSAY RESULTS EMERGENCY RP MANAGER REVIEW (Signature)
Mechanic 4 SOCIAL SECURITY NUMBER 444-44-4444 DATE                                 TLD NO.                             EMPLOYER Today                                4                                   FENOC BRIEF DESCRIPTION OF TASK RECOMMENDED EMERGENCY DOSE AUTHORIZATION                 YES         NO RECOMMENDED EMERGENCY DOSE LIMIT                     REM { TOTAL EFFECTIVE DOSE EQUIVALENT (TEDE) }
DATE       EMERGENCY DIRECTOR REVIEW (Signature)
COMMENTS EMERGENCY RP MANAGER RECOMMENDATION (Signature)
DATE EMERGENCY DOSE AUTHORIZATION DBEP-204-01   INDIVIDUAL (Last, First, Middle)
Mechanic 4 SOCIAL SECURITY NUMBER 444-44-4444 DATE Today TLD NO. 4 EMPLOYER FENOC BRIEF DESCRIPTION OF TASK RECOMMENDED EMERGENCY DOSE AUTHORIZATION YES   NO RECOMMENDED EMERGENCY DOSE LIMIT REM { TOTAL EFFECTIVE DOSE EQUIVALENT (TEDE)
} COMMENTS             EMERGENCY RP MANAGER RECOMMENDATION (Signature)
EMERGENCY DIRECTOR APPROVAL (Signature)
EMERGENCY DIRECTOR APPROVAL (Signature)
AUTHORIZATION DATE AUTHORIZATION LIMIT REM { TEDE } I have been briefed on the radiological consequences and hazards associated with the authorized emergency dose and I have volunteered to perform the above described task.
AUTHORIZATION DATE                                   AUTHORIZATION LIMIT REM { TEDE }
INDIVIDUAL (Signature)
I have been briefed on the radiological consequences and hazards associated with the authorized emergency dose and I have volunteered to perform the above described task.
DATE       BRIEFED BY (Signature)
INDIVIDUAL (Signature)                                                   DATE BRIEFED BY (Signature)                                                   DATE (TOTAL DOSE - TEDE) =               (EXTERNAL - DDE)               PLUS (INTERNAL - CEDE)
DATE       (TOTAL DOSE  
RADIOBIOASSAY RESULTS EMERGENCY RP MANAGER REVIEW (Signature)                                   DATE EMERGENCY DIRECTOR REVIEW (Signature)                                     DATE
- TEDE) =       (EXTERNAL  
 
- DDE)       PLUS (INTERNAL  
Davis-Besse Initial License Exam 2015 Admin JPM SRO-A4
- CEDE)       RADIOBIOASSAY RESULTS EMERGENCY RP MANAGER REVIEW (Signature)
 
DATE       EMERGENCY DIRECTOR REVIEW (Signature)
Appendix C                             Job Performance Measure                         Form ES-C-1 Worksheet Admin JPM SRO-A4 AG Facility:         Davis-Besse                           Task No:       334-004-05-0300 Task Title: Emergency Response Organization Notification K/A  
DATE Davis-Besse Initial License Exam 2015 Admin JPM S RO-A 4 Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM S RO-A 4 AG 1 of 8  Facility:             Davis-Besse   Task No: 334-004-05-0300   Task Title
:   Emergency Response Organization Notification K/A  


==Reference:==
==Reference:==
 
2.4.43 (3.8)         Job Performance Measure No:         SRO-A4 (JPM 253)
2.4.43 (3.8
Examinee:
) Job Performance Measure No
NRC Examiner:                                                           Date:
:     S RO-A 4 (JPM 253)   Examinee:           NRC Examiner:
Method of testing:
Date:       Method of testing:
Simulated Performance ___                       Actual Performance _X_
Simulated Performance
Classroom ___                     Simulator _X_               Plant ___
___   Actual Performance
_X_  Classroom
___ Simulator
_X_   Plant ___
Read to the examinee:
Read to the examinee:
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions:
Initial Conditions:
The plant conditions are specified in the Initial Conditions and Initiating Cues.
The plant conditions are specified in the Initial Conditions and Initiating Cues.
Line 1,513: Line 1,420:
Initiating Cue:
Initiating Cue:
The plant conditions are specified in the Initial Conditions and Initiating Cues.
The plant conditions are specified in the Initial Conditions and Initiating Cues.
Time Critical Task:
Time Critical Task:
No   Alternate Path:
No Alternate Path:
No Validation Time:
No Validation Time: 10 minutes 1 of 8
10 minutes


Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM S RO-A 4 AG 2 of 8  EXAMINER COPY INITIAL CONDITIONS:
Appendix C                         Job Performance Measure                     Form ES-C-1 Worksheet Admin JPM SRO-A4 AG EXAMINER COPY INITIAL CONDITIONS:
You are an extra Senior Reactor Operator in the Control Room.
You are an extra Senior Reactor Operator in the Control Room.
The plant is in Mode 1 operating at 100% power.
The plant is in Mode 1 operating at 100% power.
The Shift Manager has declared an Alert on EAL HA3 due to an Operating Basis Earthquake being detected at the plant and he has assumed the Emergency Director position.
The Shift Manager has declared an Alert on EAL HA3 due to an Operating Basis Earthquake being detected at the plant and he has assumed the Emergency Director position.
The Unit Supervisor is directing plant responses in accordance with RA-EP-02820, Earthquake.
INITIATING CUES:
Due to performing plant walk-downs and responding to other issues associated with response to the earthquake, Security personnel are not available to make any emergency notifications.
The Emergency Director directs you to notify the Emergency Response Organization in accordance with RA-EP-02110.
(Provide RA-EP-2110 and the Emergency Plan Telephone Directory) 2 of 8


The Unit Supervisor is directing plant responses in accordance with RA
Appendix C                         Job Performance Measure                     Form ES-C-1 Worksheet Admin JPM SRO-A4 AG CANDIDATE COPY INITIAL CONDITIONS:
-EP-02820, Earthquake.
INITIATING CUES:
Due to performing plant walk
-downs and responding to other issues associated with response to the earthquake, Security personnel are not available to make any emergency notifications. The Emergency Director directs you to notify the Emergency Response Organization in accordance with RA
-EP-02110.  (Provide RA
-EP-2110 and the Emergency Plan Telep hone Directory)
Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM S RO-A 4 AG 3 of 8  CANDIDATE COPY INITIAL CONDITIONS:
You are an extra Senior Reactor Operator in the Control Room.
You are an extra Senior Reactor Operator in the Control Room.
The plant is in Mode 1 operating at 100% power.
The plant is in Mode 1 operating at 100% power.
The Shift Manager has declared an Alert on EAL HA3 due to an Operating Basis Earthquake being detected at the plant and he has assumed the Emergency Director position.
The Shift Manager has declared an Alert on EAL HA3 due to an Operating Basis Earthquake being detected at the plant and he has assumed the Emergency Director position.
 
The Unit Supervisor is directing plant responses in accordance with RA-EP-02820, Earthquake.
The Unit Supervisor is directing plant responses in accordance with RA
-EP-02820, Earthquake.
INITIATING CUES:
INITIATING CUES:
Due to performing plant walk
Due to performing plant walk-downs and responding to other issues associated with response to the earthquake, Security personnel are not available to make any emergency notifications.
-downs and responding to other issues associated with response to the earthquake, Security personnel are not available to make any emergency notifications.
The Emergency Director directs you to notify the Emergency Response Organization in accordance with RA-EP-02110.
The Emergency Director directs you to notify the Emergency Response Organization in accordance with RA
3 of 8
-EP-02110.  
 
Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM S RO-A 4 AG  4 of 8 PERFORMANCE INFORMATION NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is NOT critical unless denoted in the "Comments".
  . START TIME:  _______
: 1. PERFORMANCE STEP
:  Reviews the procedure.
STANDARD:  Reviews RA-EP-02110, Emergency Notification, for notifying the Emergency Response Organization and off
-site agencies.
CUE:  If asked, a security event is NOT in progress.


Appendix C                          Job Performance Measure                      Form ES-C-1 Worksheet Admin JPM SRO-A4 AG PERFORMANCE INFORMATION NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is NOT critical unless denoted in the "Comments".
.                                                                        START TIME: _______
: 1. PERFORMANCE STEP: Reviews the procedure.
STANDARD: Reviews RA-EP-02110, Emergency Notification, for notifying the Emergency Response Organization and off-site agencies.
CUE: If asked, a security event is NOT in progress.
__________
SAT UNSAT
: 2. PERFORMANCE STEP: Obtain CANS access numbers from Davis-Besse Emergency Plan Telephone Directory and dial them.
STANDARD: Locates the ERO Notification Flow Chart behind the Immediate Notification Numbers tab in the Davis-Besse Emergency Plan Telephone Directory.
CUE: Provide a copy of the Emergency Plan Telephone directory only if the JPM is NOT performed in the simulator.
__________
__________
SAT UNSAT
SAT UNSAT
: 2. PERFORMANCE STEP:   Obtain CANS access numbers from Davis
: 3. PERFORMANCE STEP: Dial the primary CANS access number.
-Besse Emergency Plan Telephone Directory and dial them.
STANDARD: Locates a touch tone phone and correctly dials the primary CANS number.
STANDARD: Locate s the ERO Notification Flow Chart behind the Immediate Notification Numbers tab in the Davis-Besse Emergency Plan Telephone Directory. CUE:   Provide a copy of the Emergency Plan Telephone directory only if the JPM is NOT performed in the simulator.
COMMENT: The primary CANS number is 9-1-877-686-7612.
IF the incorrect number is dialed, THEN say, The phone continues to ring.
CUE: Say, You hear a busy signal.
__________
__________
SAT UNSAT
SAT UNSAT 4 of 8
: 3. PERFORMANCE STEP:  Dial the primary CANS access number.
STANDARD:  Locate s a touch tone phone and correctly dials the primary CANS number.
COMMENT: The primary CANS number is 9 877-686-7612.      IF the incorrect number is dialed,    THEN say, "The phone continues to ring."


CUE: Say, "You hear a "busy" signal."
Appendix C                          Job Performance Measure                        Form ES-C-1 Worksheet Admin JPM SRO-A4 AG
: 4. PERFORMANCE STEP: Dial the backup CANS access number.
STANDARD: Locates a touch tone phone and correctly dials the backup CANS number.
COMMENT: The CANS backup number is 9-1-866-334-6556.
CUE: The phone continues to ring.                                      __________
SAT UNSAT
: 5. PERFORMANCE STEP: Determine the need to activate a group page.
STANDARD: Locates the ERO Numeric Group Page instructions in the ERO Notification Flow Chart behind the Immediate Notification Numbers tab in the Davis-Besse Emergency Plan Telephone Directory.
COMMENT: The Group Pager number is 9-1-800-405-4758.
CUE: None.                                                                  __________
SAT UNSAT
: 6. PERFORMANCE STEP: Contact the Group Pager system.
  ........C........
STANDARD: Locates a touch tone phone and correctly dials 9-1-800-405-4758.
CUE: IF the correct number is dialed, THEN say, This is the Remote Activation Module. Please enter a pager number.
IF any other number is dialed, THEN say, The number you have dialed is no longer in service. Please check the number and try again
__________
SAT UNSAT
: 7. PERFORMANCE STEP: Enter the pager number.
  ........C........
STANDARD: Enters pager number 2533024.
CUE: IF pager number 2533024 is entered, THEN say, Please enter the event code followed by the pound key.
IF the wrong pager number is entered, THEN say, The number you entered is not valid, please check the number and try again.
__________
__________
SAT UNSAT
SAT UNSAT 5 of 8
 
Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM S RO-A 4 AG  5 of 8 4. PERFORMANCE STEP:  Dial the backup CANS access number.
STANDARD:  Locate s a touch tone phone and correctly dials the backup CANS number.


COMMENT: The CANS backup number is 9 866-334-6556. CUE: "The phone continues to ring."
Appendix C                            Job Performance Measure                            Form ES-C-1 Worksheet Admin JPM SRO-A4 AG
__________
: 8. PERFORMANCE STEP: Enter the event code.
SAT  UNSAT
    ........C........
: 5. PERFORMANCE STEP:  Determine the need to activate a group page.
STANDARD: Enters 2222#.
STANDARD:  Locates the ERO Numeric Group Page instructions in the ERO Notification Flow Chart behind the Immediate Notification Numbers tab in the Davis-Besse Emergency Plan Telephone Directory
CUE: IF the # is not entered, THEN say, Your input is not valid, Please enter the event code followed by the pound key.
. COMMENT:  The Group Pager number is 9 800-405-4758. CUE:  None.                  __________
SAT  UNSAT
: 6. PERFORMANCE STEP: Contact the Group Pager system.                                                  
........C........
STANDARD: Locate s a touch tone phone and correctly dials 9-1-800-405-4758. CUE: IF the correct number is dialed, THEN say, "This is the Remote Activation Module. Please enter a pager number."  IF any other number is dialed,  THEN say, "The number you have dialed is no longer in service. Please check the number and try again"
__________
__________
SAT UNSAT
SAT UNSAT
: 7. PERFORMANCE STEP: Enter the pager number.                                                    
: 9. PERFORMANCE STEP: Terminate the call.
........C........
STANDARD: Hangs up the telephone.
STANDARD: Enters pager number "2533024."
COMMENT: The E-Plant Telephone Directory step directs the operator to Send the page two times. The second page actions are not critical if the first page was SAT.
CUE: IF pager number 2533024 is entered, THEN say , "Please enter the event code followed by the pound key."
CUE: None.                                                                       __________
IF the wrong pager number is entered, THEN say, "The number you entered is not valid,  please check the number and try again."
SAT UNSAT
: 10. PERFORMANCE STEP: Contact the pager system.
STANDARD: Locates a touch tone phone and correctly dials 9-1-800-405-4758.
CUE: IF the correct number is dialed, THEN say, This is the Remote Activation Module. Please enter a pager number.
IF any other number is dialed, THEN say, The number you have dialed is no longer in service. Please check the number and try again
__________
__________
SAT UNSAT
SAT UNSAT
 
: 11. PERFORMANCE STEP: Enter the pager number.
Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM S RO-A 4 AG  6 of 8  8. PERFORMANCE STEP: Enter the event code.                                         
STANDARD: Enters pager number 2533024.
........C........
CUE: IF pager number 2533024 is entered, THEN say, Please enter the event code followed by the pound key.
STANDARD: Enters 2222#.
IF the wrong pager number is entered, THEN say, The number you entered is not valid, please check the number and try again.
CUE:   IF the # is not entered, THEN say, "Your input is not valid, Please enter the event code followed by the pound key."
__________
__________
SAT UNSAT
SAT UNSAT 6 of 8
: 9. PERFORMANCE STEP:  Terminate the call.                                                     


STANDARD:  Hangs up the telephone.
Appendix C                      Job Performance Measure                Form ES-C-1 Worksheet Admin JPM SRO-A4 AG 12 PERFORMANCE STEP: Enter the event code.
COMMENT:  The E-Plant Telephone Directory step directs the operator to "Send the page two times."  The second page actions are not critical if the first page was SAT.
STANDARD: Enters 2222#.
CUE:  None.                  __________
CUE: IF the # is not entered, THEN say, Your input is not valid, Please enter the event code followed by the pound key.
SAT  UNSAT
: 10. PERFORMANCE STEP: Contact the pager system.
STANDARD: Locate s a touch tone phone and correctly dials 9-1-800-405-4758. CUE: IF the correct number is dialed, THEN say, "This is the Remote Activation Module. Please enter a pager number."  IF any other number is dialed,  THEN say, "The number you have dialed is no longer in service. Please check the number and try again"
__________
__________
SAT UNSAT
SAT UNSAT 13 PERFORMANCE STEP: Terminate the call.
: 11. PERFORMANCE STEP: Enter the pager number.
STANDARD: Hangs up the telephone.
STANDARD: Enters pager number "2533024."
CUE: None.
CUE: IF pager number 2533024 is entered,  THEN say , "Please enter the event code followed by the pound key."
IF the wrong pager number is entered,  THEN say, "The number you entered is not valid,  please check the number and try again."
__________
__________
SAT UNSAT
SAT UNSAT TERMINATING CUES: This JPM is complete (Terminated by Evaluator)
 
Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM S RO-A 4 AG  7 of 8  12  PERFORMANCE STEP:  Enter the event code.                                         
 
STANDARD:  Enters 2222#.
CUE:  IF the # is not entered, THEN say, "Your input is not valid, Please enter the event code followed by the pound key."
__________
__________
SAT  UNSAT 13  PERFORMANCE STEP:  Terminate the call.                                                     
END TIME 7 of 8


STANDARD:  Hangs up the telephone.
Appendix C                       Job Performance Measure           Form ES-C-1 Worksheet Admin JPM SRO-A4 AG Verification of Completion Job Performance Measure No.
CUE:  None.        __________
Examinees Name:
SAT  UNSAT TERMINATING CUES:  This JPM is complete (Terminated by Evaluator)
Examiners Name:
__________
END TIME Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM S RO-A 4 AG 8 of 8  Verification of Completion Job Performance Measure No.
Examinee's Name:
Examiner's Name:
Date Performed:
Date Performed:
Facility Evaluator:
Facility Evaluator:
Number of Attempts:
Number of Attempts:
Time to Complete:  
Time to Complete:
 
Question Documentation:
Question Documentation:  
 
Question:_____________________________________________________________
Question:_____________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
Line 1,640: Line 1,540:
Response:_____________________________________________________________
Response:_____________________________________________________________
______________________________________________________________________
______________________________________________________________________
______________________________________________________________________
______________________________________________________________________
____________________________________________________
______________________________________________________________________
__________________
Result: Satisfactory/Unsatisfactory Examiners signature and date: _______________________________________
Result: Satisfactory/Unsatisfactory Examiner's signature and date:
8 of 8}}
_______________________________________}}

Revision as of 07:02, 31 October 2019

2015 Davis-Besse Nuclear Power Station Initial License Examination As-Administered RO-SRO Admin JPMs
ML15245A271
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 06/22/2015
From:
Division of Reactor Safety III
To:
FirstEnergy Nuclear Operating Co
Reeser, D W
Shared Package
ML15217A121 List:
References
Download: ML15245A271 (95)


Text

Davis-Besse Initial License Exam 2015 Admin JPM RO-A1.1

Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM RO-A1.1 AG Facility: Davis-Besse Task No: 002-003-02-0100 Task Title: Perform manual RCS Leakage Calculation K/A

Reference:

2.1.20 (4.6) Job Performance Measure No: RO-A1.1 (New)

Examinee:

NRC Examiner: Date:

Method of testing:

Simulated Performance ___ Actual Performance _X_

Classroom _X_ Simulator ___ Plant ___

Read to the examinee:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

The plant conditions are specified in the Initial Conditions and Initiating Cues.

Task Standard:

Perform manual RCS Leakage calculation and determine RCS Leakage within 0.5 gpm Required Materials:

DB-SP-03357, RCS Water Inventory Balance with Attachment 2 table values documented Curves CC 3.1 and CC 3.2a to CC3.2k from DB-PF-06703, Miscellaneous Curves Straight edge Calculator General

References:

None Initiating Cue:

The plant conditions are specified in the Initial Conditions and Initiating Cues.

Time Critical Task:

No Alternate Path:

No Validation Time: 35 minutes 1 of 10

Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM RO-A1.1 AG EXAMINER COPY INITIAL CONDITIONS:

The Plant is at 100% Power Makeup Tank Pressure is 25 psig The Computer is unavailable INITIATION CUE:

The Unit Supervisor has directed you to perform steps 4.2.2.a through 4.2.2.k of DB-SP-03357, RCS Water Inventory Balance, manually calculate RCS leak rate on Attachment 2, RCS/MU and Purification Leak Rate Calculation Sheet.

NOTE: DB-SP-03357, Attachment 2 has 4 pages (there is a page count error on Attachment 2 -

page 1 of 3, 2 of 3, 3 of 3 and 4 of 4)

(Hand Candidate a copy of the DB-SP-03357, RCS Water Inventory Balance Procedure and DB-PF-06703, Miscellaneous Curves CC 3.1 and CC 3.2a to CC3.2k.

2 of 10

Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM RO-A1.1 AG CANDIDATE COPY INITIAL CONDITIONS:

The Plant is at 100% Power Makeup Tank Pressure is 25 psig The Computer is unavailable INITIATION CUE:

The Unit Supervisor has directed you to perform steps 4.2.2.a through 4.2.2.k of DB-SP-03357, RCS Water Inventory Balance, manually calculate RCS leak rate on Attachment 2, RCS/MU and Purification Leak Rate Calculation Sheet.

NOTE: DB-SP-03357, Attachment 2 has 4 pages (there is a page count error on Attachment 2 -

page 1 of 3, 2 of 3, 3 of 3 and 4 of 4) 3 of 10

Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM RO-A1.1 AG PERFORMANCE INFORMATION NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is NOT critical unless denoted in the "Comments".

START TIME: _______

1. PERFORMANCE STEP: Performs step 4.2.2.a, Record Makeup Tank Water Density from Attachment 4

........C........

STANDARD: Identifies that Makeup Tank initial and final temperature is 100 °F, locates Attachment 4 and determines the MU Tank Water Density is 62.0038 lbm/ft3 and records this on Attachment 2 step 4.2.2.a.

COMMENT:

CUE: None

__________

SAT UNSAT

2. PERFORMANCE STEP: Complete the Initial Makeup Tank Inventory equations step 4.2.2.b

........C........

STANDARD: Water Inventory = (Tank level

  • 4.124 ft³/in
  • Calibration Density) + (77.85 ft³
  • Water Density)

= (Tank level

  • 4.124 ft³/in
  • 62.325lbm/ ft³) + (77.85 ft³
  • Water Density)

Initial:

( __67__ in.* 257 lbm/in ) + ( 77.85 ft³

  • _62.0038 lbm/ft³) = _22046 (+/- 10)_ lbm CUE: Another Operator will perform the Independent Verification of the calculation

__________

SAT UNSAT 4 of 10

Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM RO-A1.1 AG

3. PERFORMANCE STEP: Complete the Final Makeup Tank Inventory equations step 4.2.2.b

........C........

STANDARD: Water Inventory = (Tank level

  • 4.124 ft³/in
  • Calibration Density) + (77.85 ft³
  • Water Density)

= (Tank level

  • 4.124 ft³/in
  • 62.325lbm/ ft³) + (77.85 ft³
  • Water Density)

Final:

( __64__ in.* 257 lbm/in ) + ( 77.85 ft³

  • _62.0038 lbm/ft³) = _21275 (+/- 10)_ lbm CUE: Another Operator will perform the Independent Verification of the calculation

__________

SAT UNSAT

4. PERFORMANCE STEP: Determine Pressurizer Inventory Water and Steam Density values using the initial and final values and Attachment 6, per step 4.2.2.c

........C.......

STANDARD: Locates Attachment 6, uses initial RCS pressure value of 2156 psig and final RCS pressure value of 2161 psig to record Density values in step 4.2.2.c of Attachment 2 Pressurizer Inventory Density (from Attachment 6)

Water Initial ___37.71________ lbm/ft³ Steam Initial ____6.02_________ lbm/ft³ Water Final ____37.68________ lbm/ft³ Steam Final ____6.04_________ lbm/ft³ CUE: None

__________

SAT UNSAT

5. PERFORMANCE STEP: Complete the Initial Pressurizer Inventory equation for Water Inventory step 4.2.2.d

........C........

STANDARD: Water Inventory = (level

  • 3.173 ft³/in + 239.6 ft³)
  • Water Density Water Initial:

[(_218_ in.

  • 3.173 ft³/in) + 239.6 ft³]
  • 37.71 lbm/ft³ = _35119.85 (+/- 250) lbm CUE: None

__________

SAT UNSAT 5 of 10

Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM RO-A1.1 AG

6. PERFORMANCE STEP: Complete the Final Pressurizer Inventory equation for Water Inventory step 4.2.2.d

........C........

STANDARD: Water Inventory = (level

  • 3.173 ft³/in + 239.6 ft³)
  • Water Density Water Final:

[(_222_ in.

  • 3.173 ft³/in) + 239.6 ft³]
  • 37.68 lbm/ft³ = _35570.146 (+/- 250 ) lbm CUE: None

__________

SAT UNSAT

7. PERFORMANCE STEP: Complete the Initial Pressurizer Inventory equation for Steam Inventory step 4.2.2.d

........C........

STANDARD: Steam Inventory =[((320 - level)

  • 3.173 ft³/in) + 242.2 ft³]
  • Steam Density Steam Initial:

[((320 - 218 in)

  • 3.173 ft³/in) + 242.2 ft³]
  • 6.02 lbm/ft³) = _3406.393 (+/-50) lbm CUE: None

__________

SAT UNSAT

8. PERFORMANCE STEP: Complete the Final Pressurizer Inventory equation for Steam Inventory step 4.2.2.d

........C........

STANDARD: Steam Inventory =[((320 - level)

  • 3.173 ft³/in) + 242.2 ft³]
  • Steam Density Steam Final:

[((320 - 222 in)

  • 3.173 ft³/in) + 242.2 ft³]
  • 6.04 lbm/ft³) = _3341.05 (+/-50) lbm CUE: None

__________

SAT UNSAT 6 of 10

Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM RO-A1.1 AG

9. PERFORMANCE STEP: Input the Power Correction Factor data on Attachment 2 step 4.2.2.e

........C........

STANDARD: Power is 100% from initial conditions, refers to DB-PF-06703 Curve CC3.1 to obtain the Power Correction Factors 4.2.2.e Power Correction Factor Initial __135_(+/ 5) _ lbm Final 135 (+/-5) lbm CUE: None

__________

SAT UNSAT

10. PERFORMANCE STEP: Input the Temperature Correction Factor data on Attachment 2 step 4.2.2.f

........C........

STANDARD: Initial Temperature is 581.8 °F and Final Temperature is 582.3 °F from Attachment 2, refers to DB-PF-06703 Curve CC3.1 to obtain the Power Correction Factors 4.2.2.f Temperature Correction Factor (Tave 528 °F)

Initial __-35200 (+/- 50) _ lbm Final -35600 (+/- 50) lbm CUE: None

__________

SAT UNSAT

11. PERFORMANCE STEP: If Tave is less than 528 °F, then complete Temperature Factor Equation per step 4.2.2.g STANDARD: Determines step 4.2.2.g is N/A since temperature is greater than 528 °F CUE: None

__________

SAT UNSAT 7 of 10

Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM RO-A1.1 AG

12. PERFORMANCE STEP: Complete the RCS Inventory Table to determine Initial and Final total RCS Inventory per step 4.2.2.h

........C........

STANDARD: Transfers data calculated to the RCS Inventory Table and calculates the Initial and Final RCS Water Inventory MU Tank Pzr Steam Pzr Water Power Temperature Water Inventory + Inventory + Inventory + Correction + Correction = Inventory (lbm) (lbm) (lbm) (lbm) (lbm) (lbm)

Initial:

22046 3406.393 35119.85 135 -35200 25507.243

(+/- 250) lbm + lbm + lbm + lbm + lbm = lbm Final:

21275 3341.05 35570.146 135 -35600 24721.196

(+/- 250) lbm + lbm + lbm + lbm + lbm = lbm CUE: None

__________

SAT UNSAT

13. PERFORMANCE STEP: Calculates the Change in RCS Inventory

........C........

STANDARD: Completes step 4.2.2.i to determine RCS Inventory Change Change = Initial inventory - Final inventory Change = 25507.243 lbm - 24721.196_ lbm = 786.047 (+/- 80)_ lbm CUE: Another Operator will perform the Independent Verification of the calculation

__________

SAT UNSAT 8 of 10

Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM RO-A1.1 AG

14. PERFORMANCE STEP: Calculates the Time Period

.......C.........

STANDARD: Completes step 4.2.2.j by subtracting Initial Time from the Final Time Period = Final time - Initial time Period = [(23 hr x 60) + ( 11 min)] - [(_19 hr x 60) + (5 min)] = _246__ min CUE: Another Operator will perform the Independent Verification of the calculation

__________

SAT UNSAT

15. PERFORMANCE STEP: Calculates the Total RCS Leak Rate per step 4.2.2.k

.......C.........

STANDARD: Completes step 4.2.2.k by subtracting Initial Time from the Final Time Change in RCS Inventory 7.481 gallons ft 3 Leakrate = x x time ft 3 62.32 lbm Leakrate = ( 786.047 lbm) ÷ ( 246 min) x (0.120 gal/lbm)

Leakrate = 0.383 (+/- 0.05) gpm CUE: Another Operator will perform the Independent Verification of the calculation

__________

SAT UNSAT TERMINATING CUES: This JPM is complete (Terminated by the examiner)

__________

END TIME 9 of 10

Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM RO-A1.1 AG Verification of Completion Job Performance Measure No.

Examinees Name:

Examiners Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:_____________________________________________________________

____________________________________________________________________________

________________________________________________________________

Response:_____________________________________________________________

______________________________________________________________________

______________________________________________________________________

______________________________________________________________________

Result: Satisfactory/Unsatisfactory Examiners signature and date: _______________________________________

10 of 10

20 Revision ATTACHMENT 2: RCS/MU AND PURIFICATION LEAK RATE CALCULATION SHEET Page 1 of 3 Note: For parameters which utilize averaging of redundant channels, eliminate inoperable channels from the average and reduce the denominator accordingly.

If a Th or Tc point is unavailable, eliminate it and the opposing point (Tc or Th) from the same loop, and reduce the denominator by 2.

INITIAL FINAL ITEM PARAMETER SOURCE UNITS VALUE VALUE Control Room clock Step 4.1.4 Step 4.1.10 1 Time hr:min or computer 1905 2311 Makeup 2 Tank Temp T769 or TI MU8 °F 100 100 Makeup Tank

[L761+L763]÷2, 3 Level in. 67 64 or LR MU16 (2 channel ave)

RCS Pressure [P721+P722+P729+P730]÷4, 4 (4 ch ave) psi 2156 2161 PRSRC2A2, or PRSRC2B (1)

Pressurizer LRS RC14 or 5 in. 218 222 Level L768

[R795+R804+R814+R820]÷4, 6 Ave Power  %

C913, or NR NI6 100 100 TI RC7, or:

7 Tave °F

[T719+T720+T728+T729+

(8 ch ave) 581.8 582.3 T780+T800+T820+T840]÷8 (2)

(1)

If less than 1700 psig RCS Pressure use the average of P725 and P732 (loop 1 and loop 2 WR Pressure).

(2)

If less than 520°F RCS Temperature then average T753 and T782 (loop 1 and loop 2 WR Temperature).

4.2.2.a Makeup Tank Water Density (from Attachment 4)

Initial ____62.0038______ lbm/ft³ Final ___ 62.0038______ lbm/ft³ 4.2.2.b Makeup Tank Inventory Note: 77.85 ft³ accounts for water volume below the level indicating range.

Water Inventory = (Tank level

  • 4.124 ft³/in
  • Calibration Density) + (77.85 ft³
  • Water Density)

= (Tank level

  • 4.124 ft³/in
  • 62.325lbm/ ft³) + (77.85 ft³
  • Water Density)

Initial:

( ___67______ in.* 257 lbm/in ) + ( 77.85 ft³

  • _62.0038 lbm/ft³) = _22046_ lbm

________

IV Final:

(___64______ in.* 257 lbm/in ) + ( 77.85 ft³

  • _62.0038 lbm/ft³) = _21275_ lbm

________

IV

21 Revision ATTACHMENT 2: RCS/MU AND PURIFICATION LEAK RATE CALCULATION SHEET Page 2 of 3 4.2.2.c Pressurizer Inventory Density (from Attachment 6)

Water Initial ___37.71________ lbm/ft³ Steam Initial ____6.02_________ lbm/ft³ Water Final ____37.68________ lbm/ft³ Steam Final ____6.04_________ lbm/ft³ 4.2.2.d Pressurizer Inventory Note: 239.6 ft³ accounts for water volume below the level indicating range.

242.2 ft³ accounts for steam volume above the level indicating range.

Water Inventory = (level

  • 3.173 ft³/in + 239.6 ft³)
  • Water Density Water Initial:

[(___218_____ in.

  • 3.173 ft³/in) + 239.6 ft³]
  • 37.71 lbm/ft³ = _35119.85 lbm

________

IV Water Final:

[(___222_____ in.

  • 3.173 ft³/in) + 239.6 ft³]
  • 37.68 lbm/ft³ = _35570.146 lbm

________

IV Steam Inventory =[((320 - level)

  • 3.173 ft³/in) + 242.2 ft³]
  • Steam Density Steam Initial:

[((320 - _218__in)

  • 3.173 ft³/in) + 242.2 ft³]
  • 6.02 lbm/ft³) = _3406.393________ lbm

________

IV Steam Final:

[((320 - __222__in)

  • 3.173 ft³/in) + 242.2 ft³]
  • 6.04 lbm/ft³) = _3341.05 __ lbm

________

IV 4.2.2.e Power Correction Factor Initial _____135_____________ lbm Final _____135____________ lbm 4.2.2.f Temperature Correction Factor (Tave >528°)

Initial ______-35200___________ lbm Final _____-35600___________ lbm

22 Revision ATTACHMENT 2: RCS/MU AND PURIFICATION LEAK RATE CALCULATION SHEET Page 3 of 3 4.2.2.g Temperature Correction Factor (Tave <528°)

Reactor Coolant System Density (from Attachment 5)

N/A At initial Tave ___________________ lbm/ft³ At final Tave ___________________ lbm/ft³ Temperature Correction Factor (TCF)

TCF = [(10,277 + (0.24828

  • Tave))
  • _______ lbm/ft³] - 498,800 lbm = _______ lbm

________

IV Final: [(10,277 ft³ + (0.24828 ft³/°F* _______°F))

  • _______ lbm/ft³] - 498,800 lbm = _______ lbm

________

IV 4.2.2.h RCS Inventory MU Tank Pzr Steam Pzr Water Power Temperature Water Inventory + Inventory + Inventory + Correction + Correction = Inventory (lbm) (lbm) (lbm) (lbm) (lbm) (lbm)

Initial:

22046 3406.393 35119.85 135 -35200 25507.243 lbm + lbm + lbm + lbm + lbm = lbm Final:

21275 3341.05 35570.146 135 -35600 24721.196 lbm + lbm + lbm + lbm + lbm = lbm 4.2.2.i Change in RCS Inventory Change = Initial inventory - Final inventory Change = 25507.243_ lbm - 24721.196 lbm = 786.047_ lbm

________

IV

23 Revision ATTACHMENT 2: RCS/MU AND PURIFICATION LEAK RATE CALCULATION SHEET Page 4 of 4 4.2.2.j Time period Period = Final time - Initial time Period = [(_23___ hr x 60) + ( 11 min)] - [(__19__ hr x 60) + ( 5 min)] = _246____ min

________

IV 4.2.2.k Total RCS Leak Rate Change in RCS Inventory 7.481 gallons ft 3 Leakrate = x x time ft 3 62.32 lbm Leakrate = ( 786.047 lbm) ÷ ( 246 min) x (0.120 gal/lbm)

Leakrate = .383 gpm

________

IV Independent Verification Completed by _________________________________ Date ______

24 Revision ATTACHMENT 3: UNIDENTIFIED RCS LEAKAGE CALCULATION SHEET Page 1 of 1 RCP Seals Leak Rate from computer printout, 4.2.1.f or from Attachment 1. (4.2.1.e) __________ gpm Quench Tank In-Leakage Rate from computer printout, 4.2.1.j or from Attachment 1. (4.2.1.i). Only record Positive values __________ gpm (exclude negative values by entering 0.000).

RCS Total Leak Rate from computer printout, 4.2.2.l or from Attachment 2. ___.383___ gpm Primary to Secondary Tube Leakage from computer printout,

__________ gpm 4.2.3.a or from most recent entry in RCS Leakage Log, RO Log, or as (0.104 allowed) determined by Chemistry.

Other Identified Leakage, 4.2.3.b __________ gpm or from RCS Leakage Log.

Total Identified Leak Rate from computer printout, or from; RCP Seals + Quench Tk + Pri to Sec + Other

( 4.2.1.e + 4.2.1.i [positive values only] + 4.2.3.a + 4.2.3.b ). __________ gpm 4.2.3.c (10 gpm allowed)

________

IV Unidentified Leak Rate from computer printout, or from; Total Leak Rate - Total Identified Leak Rate

( 4.2.2.k - 4.2.3.c ) __________ gpm 4.2.3.d (1 gpm allowed)

________

IV

__________ gpm 4.2.3.e Reactor Coolant Pressure Boundary Leakage (0 gpm allowed)

Independent Verification Completed by _________________________________ Date ______

Performed by: Date:

Davis-Besse Initial License Exam 2015 Admin JPM RO-A1.2

Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM RO-A1.2 AG Facility: Davis-Besse Task No: 119-002-03-0100 Task Title: Determine Maintenance of Active License Status K/A

Reference:

2.1.4 (3.3) Job Performance Measure No: RO-A1.2 (JPM New)

Examinee:

NRC Examiner: Date:

Method of testing:

Simulated Performance ___ Actual Performance _X_

Classroom _X_ Simulator ___ Plant ___

Read to the examinee:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

The plant conditions are specified in the Initial Conditions and Initiating Cues.

Task Standard:

Determine active license status is not maintained, evaluate whether each shift meets the requirements.

Required Materials:

DBBP-TRAN-0014, License Requirements for Licensed Individuals NT-OT-07001, Training and Qualification of Operations Personnel General

References:

None Initiating Cue:

The plant conditions are specified in the Initial Conditions and Initiating Cues.

Time Critical Task:

No Alternate Path:

No Validation Time:

20 minutes 1 of 6

Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM RO-A1.2 AG EXAMINER COPY INITIAL CONDITIONS:

Today is 7/1/15. You are a Reactor Operator. You are scheduled to stand a Reactor Operator ATC watch tomorrow. Your work history for the previous quarter is as follows:

4/12/15 Worked 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> as BOP in Mode 1 (day shift). Took turnover at the beginning of shift and gave turnover at end of shift.

4/13/15 Worked 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> as BOP in Mode 1 (day shift). Took turnover at beginning of shift and did NOT give turnover at end of shift.

4/14/15 Worked 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> in Mode 1 as ATC and 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> ATC doing Crew JIT training on Simulator (day shift). Took turnover at beginning and gave turnover at end of both of these assignments.

5/19/15 Worked 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> in Mode 5 as BOP (night shift). Took turnover at beginning of shift and gave turnover at end of shift.

5/20/15 Worked 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> in Mode 5 as ATC (night shift). Took turnover at beginning of shift and gave turnover at end of shift 5/21/15 Worked 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> in Mode 3 as BOP (night shift). Took turnover at beginning of shift and did gave turnover at end of shift.

6/27/15 Worked 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> I Mode 1 as the 3rd RO in the Control Room (day shift). Took turnover at beginning of shift and gave turnover at end of shift.

INITIATION CUE:

Determine if your license status is active or inactive based on the previous quarters work history and document as ACTIVE or INACTIVE on this page. Report whether each shift meets the watch credit or not.

(Provide copy of DBBP-TRAN-0014, License Requirements for Licensed Individuals and NT-OT-07001, Training and Qualification of Operations Personnel)

RESULTS:

2 of 6

Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM RO-A1.2 AG CANDIDATE COPY INITIAL CONDITIONS:

Today is 7/1/15. You are a Reactor Operator. You are scheduled to stand a Reactor Operator ATC watch tomorrow. Your work history for the previous quarter is as follows:

4/12/15 Worked 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> as BOP in Mode 1 (day shift). Took turnover at the beginning of shift and gave turnover at end of shift.

4/13/15 Worked 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> as BOP in Mode 1 (day shift). Took turnover at beginning of shift and did NOT give turnover at end of shift.

4/14/15 Worked 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> in Mode 1 as ATC and 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> ATC doing Crew JIT training on Simulator (day shift). Took turnover at beginning and gave turnover at end of both of these assignments.

5/19/15 Worked 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> in Mode 5 as BOP (night shift). Took turnover at beginning of shift and gave turnover at end of shift.

5/20/15 Worked 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> in Mode 5 as ATC (night shift). Took turnover at beginning of shift and gave turnover at end of shift 5/21/15 Worked 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> in Mode 3 as BOP (night shift). Took turnover at beginning of shift and did gave turnover at end of shift.

6/27/15 Worked 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> I Mode 1 as the 3rd RO in the Control Room (day shift). Took turnover at beginning of shift and gave turnover at end of shift.

INITIATION CUE:

Determine if your license status is active or inactive based on the previous quarters work history and document as ACTIVE or INACTIVE on this page. Report whether each shift meets the watch credit or not.

RESULTS:

3 of 6

Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM RO-A1.2 AG PERFORMANCE INFORMATION NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is NOT critical unless denoted in the "Comments".

START TIME: _______

1. PERFORMANCE STEP: Evaluate 4/12/15 work period

........C........

STANDARD: Reviews DBBP-TRAN-0014, License Requirements for Licensed Individuals and determines requirement for credit is met.

CUE: None

__________

SAT UNSAT

2. PERFORMANCE STEP: Evaluate 4/13/15 work period

........C........

STANDARD: Reviews DBBP-TRAN-0014, License Requirements for Licensed Individuals and determines requirement for credit is not met. Did not stand complete watch CUE: None

__________

SAT UNSAT

3. PERFORMANCE STEP: Evaluate 4/14/15 work period

........C........

STANDARD: Reviews DBBP-TRAN-0014, License Requirements for Licensed Individuals and determines requirement for credit is not met. No credit is given for Simulator time CUE: None

__________

SAT UNSAT

4. PERFORMANCE STEP: Evaluate 5/19/15 work period

........C........

STANDARD: Reviews DBBP-TRAN-0014, License Requirements for Licensed Individuals and determines requirement for credit is not met. Credit for BOP is not given in Mode 5.

CUE: None

__________

SAT UNSAT 4 of 6

Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM RO-A1.2 AG

5. PERFORMANCE STEP: Evaluate 5/20/15 work period

........C........

STANDARD: Reviews DBBP-TRAN-0014, License Requirements for Licensed Individuals and determines requirement for credit is met.

CUE: None

__________

SAT UNSAT

6. PERFORMANCE STEP: Evaluate 5/21/15 work period

........C........

STANDARD: Reviews DBBP-TRAN-0014, License Requirements for Licensed Individuals and determines requirement for credit is met CUE: None

__________

SAT UNSAT

7. PERFORMANCE STEP: Evaluate 6/27/15 work period

........C........

STANDARD: Reviews DBBP-TRAN-0014, License Requirements for Licensed Individuals and determines requirement for credit is not met. No credit is given for 3rd Reactor Operator CUE: None

__________

SAT UNSAT

8. PERFORMANCE STEP: Evaluates credited time versus required time

........C........

STANDARD: Determines there are only three 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> shifts that can be credited and therefore minimum requirements to maintain active Reactor Operator license are not met.

CUE: None

__________

SAT UNSAT TERMINATING CUES: This JPM is complete (Terminated by the examiner)

__________

END TIME 5 of 6

Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM RO-A1.2 AG Verification of Completion Job Performance Measure No.

Examinees Name:

Examiners Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:_____________________________________________________________

____________________________________________________________________________

________________________________________________________________

Response:_____________________________________________________________

______________________________________________________________________

______________________________________________________________________

______________________________________________________________________

Result: Satisfactory/Unsatisfactory Examiners signature and date: _______________________________________

6 of 6

Davis-Besse Initial License Exam 2015 Admin JPM RO-A2

Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM RO-A2 AG Facility: Davis-Besse Task No: 119-035-0100 Task Title: Determine isolation boundary and effect on plant equipment K/A

Reference:

2.2.41 (3.5) Job Performance Measure No: RO-A2 (NEW)

Examinee:

NRC Examiner: Date:

Method of testing:

Simulated Performance ___ Actual Performance _X_

Classroom _X_ Simulator ___ Plant ___

Read to the examinee:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

The plant conditions are specified in the Initial Conditions and Initiating Cues.

Task Standard:

Identify boundary for leaking Turbine Plant Cooling Water Valve and determine isolation will result in loss of cooling to bearing lube oil for both Main Feedwater Pumps Required Materials:

OS-022, Turbine Plant Cooling Water System General

References:

11x17 Copy of Operational Schematics Initiating Cue:

The plant conditions are specified in the Initial Conditions and Initiating Cues.

Time Critical Task: No Alternate Path: No Validation Time: 15 minutes 1 of 7

Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM RO-A2 AG EXAMINER COPY INITIAL CONDITIONS:

The Plant is at 100% Power CW112, MFPT LUBE OIL COOLER 1-2-2 INLET ISOLATION is spraying water from a leak in the valve body. The valve has been closed and is still leaking.

INITIATION CUE:

The Shift Manager directs you to determine how CW112 can be isolated and what equipment will be affected. List isolation boundaries and equipment impacts on this page below.

(Hand Candidate 11x17 Copy of Operational Schematics) 2 of 7

Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM RO-A2 AG CANDIDATE COPY INITIAL CONDITIONS:

The Plant is at 100% Power CW112, MFPT LUBE OIL COOLER 1-2-2 INLET ISOLATION is spraying water from a leak in the valve body. The valve has been closed and is still leaking.

INITIATION CUE:

The Shift Manager directs you to determine how CW112 can be isolated and what equipment will be affected. List isolation boundaries and equipment impacts on this page below.

3 of 7

Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM RO-A2 AG PERFORMANCE INFORMATION NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is NOT critical unless denoted in the "Comments".

START TIME: _______

NOTE: STEPS CAN BE PERFORMED IN ANY SEQUENCE

1. PERFORMANCE STEP: Locates plant drawing OS-022 Turbine Plant Cooling Water System STANDARD: References drawing index, identifies and locates drawing OS-022 or equivalent drawing COMMENT: Once drawing is located, provide a copy for markup.

CUE: None

__________

SAT UNSAT

2. PERFORMANCE STEP: Determines that valve CW-106 must be closed

........C........

STANDARD: Identifies CW-106 supply side isolation valve will be closed CUE: None

__________

SAT UNSAT

3. PERFORMANCE STEP: Determines that valve CW-107 must be closed

........C........

STANDARD: Identifies CW-107 supply side isolation valve will be closed, due to cross connected piping CUE: None

__________

SAT UNSAT 4 of 7

Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM RO-A2 AG

4. PERFORMANCE STEP: Determines that either valve CW-114 OR CW-1254B must be closed

........C........

STANDARD: Identifies CW-114 OR CW-1254B downstream isolation side valve will be closed COMMENT: Either valve will provide downstream isolation.

CUE: None

__________

SAT UNSAT

5. PERFORMANCE STEP: Determines that valve CW-113 must be closed

........C........

STANDARD: Identifies CW-113 supply side valve to MFPT Lube Oil Cooler 1-2-1 will be closed COMMENT: Another downstream valve will accomplish this isolation, if another valve is selected evaluate the isolation point as an alternative.

CUE: None

__________

SAT UNSAT

6. PERFORMANCE STEP: Determines that valve CW-125 must be closed

........C........

STANDARD: Identifies CW-125 supply side valve supply valve to MFPT Lube Oil Cooler 1-1-1 will be closed COMMENT: Another downstream valve will accomplish this isolation, if another valve is selected evaluate the isolation point as an alternative.

CUE: None

__________

SAT UNSAT 5 of 7

Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM RO-A2 AG

7. PERFORMANCE STEP: Determines that valve CW-124 must be closed

........C........

STANDARD: Identifies CW-124 supply side valve supply valve to MFPT Lube Oil Cooler 1-1-2 will be closed COMMENT: Another downstream isolation valve will accomplish this isolation, if another valve is selected evaluate the isolation point as an alternative.

CUE: None

__________

SAT UNSAT

8. PERFORMANCE STEP: Determines that valve CW-196 must remain closed

........C........

STANDARD: Identifies CW-196 cooler bypass valve will remain closed COMMENT: This valve is normally shut.

CUE: None

__________

SAT UNSAT

9. PERFORMANCE STEP: Identifies the effect of isolating CW-112 will have on plant equipment

........C........

STANDARD: Determines that stopping the water leak on valve CW-112 will isolate all cooling water flow to the MFP Lube Oil Coolers for both MFPs CUE: None

__________

SAT UNSAT TERMINATING CUES: This JPM is complete (Terminated by the examinee)

__________

END TIME 6 of 7

Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM RO-A2 AG Verification of Completion Job Performance Measure No.

Examinees Name:

Examiners Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:_____________________________________________________________

____________________________________________________________________________

________________________________________________________________

Response:_____________________________________________________________

______________________________________________________________________

______________________________________________________________________

______________________________________________________________________

Result: Satisfactory/Unsatisfactory Examiners signature and date: _______________________________________

7 of 7

ANSWER KEY Davis-Besse Initial License Exam 2015 Admin JPM RO-A4

Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM RO-A4 AG Facility: Davis-Besse Task No: 085-002-01-0100 Task Title: Emergency Plan Notification of Off-Site Agencies K/A

Reference:

2.4.43 (3.2) Job Performance Measure No: RO-A4 (JPM 241)

Examinee:

NRC Examiner: Date:

Method of testing:

Simulated Performance ___ Actual Performance _X_

Classroom _X_ Simulator _X_ Plant ___

Read to the examinee:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

The plant conditions are specified in the Initial Conditions and Initiating Cues.

Task Standard:

Emergency notification of Ottawa and Lucas County within 15 minutes and Emergency notification of State of Ohio.

Required Materials:

Form DBEP-010 Form DBEP-012 (General References listed below required if performing in classroom)

(Phone for simulation required if performing in classroom)

General

References:

RA-EP-02110, Emergency Notification Davis-Besse Emergency Plan Telephone Directory Initiating Cue:

The plant conditions are specified in the Initial Conditions and Initiating Cues.

Time Critical Task: Yes Alternate Path: No Validation Time: 15 minutes Page 1 of 7

Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM RO-A4 AG EXAMINER COPY INITIAL CONDITIONS:

You are a third Reactor Operator in the Control Room.

The plant is being shut down due to Reactor Coolant System leak calculated to be 35 gpm.

5 minutes ago the Shift Manager declared an Unusual Event based on the leakage INITIATING CUES:

You are to locate and review RA-EP-02110, Emergency Notifications Procedure while the Shift Manager completes the Initial Notification form. Be prepared to start the notifications of the Offsite Agencies in 5 minutes.

CUE: This is a time critical JPM.

NOTES TO EVALUATOR Write the current time minus 5 minutes in the declaration time (item 3a) on the Initial Notification form Five minutes after reading the Initiating Cues hand the Initial Notification forms to the candidate.

Page 2 of 7

Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM RO-A4 AG CANDIDATE COPY INITIAL CONDITIONS:

You are a third Reactor Operator in the Control Room.

The plant is being shut down due to Reactor Coolant System leak calculated to be 35 gpm.

5 minutes ago the Shift Manager declared an Unusual Event based on the leakage INITIATING CUES:

You are to locate and review RA-EP-02110, Emergency Notifications Procedure while the Shift Manager completes the Initial Notification form. Be prepared to start the notifications of the Offsite Agencies in 5 minutes.

CUE: This is a time critical JPM. The clock starts now, the form will be available in five minutes.

Page 3 of 7

Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM RO-A4 AG PERFORMANCE INFORMATION NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is NOT critical unless denoted in the "Comments".

START TIME: _______

1. PERFORMANCE STEP: Locate the correct procedure for emergency notification.

STANDARD: Obtains RA-EP-02110, Emergency Notification.

CUE: When located hand candidate copy of RA-EP-02110, Emergency Notification (5 minutes after providing the initiating cue) hand Initial Notification forms to Candidate and state: Shift Manager directs you to notify Ottawa and Lucas Counties and the State of Ohio of the emergency in accordance with RA-EP-02110, Emergency Notifications

__________

SAT UNSAT

2. PERFORMANCE STEP: Make Initial Notification using the 4-Way Ring-Down Circuit

........C........

STANDARD: Picks up the 4-Way Ring-Down phone in the Control Room. When the two parties answer, reads the Initial Notification information. Documents the time notified on the Davis-Besse Notification Cover Sheet (DBEP-012).

COMMENT: Notification must be made within 15 minutes of the event declaration time; Record the time the first Sheriffs Dispatcher answers the phone. This stops the critical time clock.

CUE: Ottawa Country Sheriff's Dispatcher and the Lucas County Sheriffs Dispatcher answer the phone.

NOTE: Ohio State Highway Patrol Dispatcher does NOT answer.

Repeat back the information as it is communicated.

Time: __________

__________

SAT UNSAT Page 4 of 7

Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM RO-A4 AG

3. PERFORMANCE STEP: Notify Shift Manager that the Ohio State Highway Patrol Dispatcher was not notified.

STANDARD: Informs Shift Manager that the Ohio State Highway Patrol Dispatcher did not answer the 4-Way Ring-Down Circuit.

COMMENT: This step may not be needed if operator proceeds to use alternate notification methods without being prompted.

CUE: If notified, tell the operator to continue with notifications as directed by procedure RA-EP-02110, Emergency Notification.

__________

SAT UNSAT

4. PERFORMANCE STEP: Contact Ohio State Highway Patrol Dispatcher.

........C........

STANDARD: Locates the Ohio State Highway Patrol Dispatcher or Administrative Office telephone number.

COMMENT: The phone numbers are located in the Immediate Notification Numbers tab of the Davis-Besse Emergency Plan Telephone Directory. Have the examinee point out and then dial one of the correct numbers.

(614) 466-2660 OR (614) 644-7622 CUE: Answer the phone as either the Ohio Highway Patrol Dispatcher or the Administrative Office depending on who was dialed.

__________

SAT UNSAT

4. PERFORMANCE STEP: Make Initial Notification to the Ohio State Highway Patrol.

........C........

STANDARD: Reads Initial Notification information to the Ohio State Highway Patrol Dispatcher or Administrative Office staffer. Documents the time notified on the Davis-Besse Notification Cover Sheet (DBEP-012). Examinee should also request a call back from the person receiving the information.

COMMENT: Requesting callback is not critical CUE: Repeat back information as it is communicated. Provide your name as requested by the caller.

__________

SAT UNSAT Page 5 of 7

Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM RO-A4 AG

5. PERFORMANCE STEP: Notify Shift Manager that the Ohio State Highway Patrol or Administrative Office was notified.

STANDARD: Informs the Shift Manager that all notifications have all been completed.

This notification may be done after step 7.

CUE: Acknowledge the report.

__________

SAT UNSAT

6. PERFORMANCE STEP: Receive call back from State of Ohio representative.

STANDARD: Answers the phone and acknowledges the Ohio State Highway Patrol or Administrative Office call back to verify the information came from Davis-Besse. Documents the time of the call and the name of the caller on the Davis-Besse Notification Cover Sheet (DBEP-012).

CUE: Call the simulator Control Room phone and indicate you are calling back to verify the notification of the emergency is real and came from Davis-Besse.

If needed, prompt the operator to answer the phone.

__________

SAT UNSAT

7. PERFORMANCE STEP: Complete form DBEP-0012.

STANDARD: Signs form DBEP-0012 and checks Control Room. Returns form to Shift Manager.

CUE: If required, tell the examinee not to fax form DBEP-0010 to the EOF.

__________

SAT UNSAT TERMINATING CUES: This JPM is complete (Terminated by the examiner)

__________

END TIME Page 6 of 7

Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM RO-A4 AG Verification of Completion Job Performance Measure No.

Examinees Name:

Examiners Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:_____________________________________________________________

____________________________________________________________________________

________________________________________________________________

Response:_____________________________________________________________

______________________________________________________________________

______________________________________________________________________

______________________________________________________________________

Result: Satisfactory/Unsatisfactory Examiners signature and date: _______________________________________

Page 7 of 7

FENOC NUCLEAR POWER USE FOR: STATE / COUNTY USE ONLY INITIAL CLASSIFICATIONS, PLANT INITIAL NOTIFICATION CHANGES IN CLASSIFICATIONS, DATE: TIME:

FORM CHANGES IN PROTECTIVE ACTION Davis Besse RECOMMENDATIONS. MESSAGE NO:

DBEP-010-10 EVENT TERMINATION ____________

1. This is the: Davis-Besse Nuclear Power Station
2. This is: An Actual Emergency A Drill
3. a. A(n) GENERAL EMERGENCY SITE AREA EMERGENCY ALERT UNUSUAL EVENT was declared at: ______ on _Today based on EAL: __SU7__

(TIME) (DATE)

b. The Emergency situation has been terminated at: ______ on ______

(TIME) (DATE)

c. The Protective Action Recommendation is being changed at: ______ on ______

(TIME) (DATE)

4. Brief non-technical description of event: Reactor Coolant System leak of 35 gallons per minute
5. The radiological conditions are:
a. A non-routine release of radioactive material, as a result of this event, is in progress
b. The release of radioactive material associated with this event has been terminated.
c. NO Radiological Release in progress as a result of this event.
6. Utility Protective Action Recommendations (PARs):
a. Evacuation:

(check applicable subareas) 1 2 3 4 5 6 7 8 9 10 11 12 AND that potassium iodide (KI) be administered to the general public in accordance with State procedures. The general public in unaffected areas should be advised to go indoors and monitor EAS broadcasts.

b. Sheltering:

(check applicable subareas) 1 2 3 4 5 6 7 8 9 11 AND that potassium iodide (KI) be administered to the general public in accordance with State procedures. The general public in unaffected areas should be advised to go indoors and monitor EAS broadcasts.

c. None For Utility Use Only Approved: _ __________________

DAVIS-BESSE EMERGENCY NOTIFICATION COVER SHEET DBEP-012-09 INITIAL NOTIFICATION ACTUAL EMERGENCY USE FOR: (Check Actual INITIAL CLASSIFICATIONS, Emergency only if a real CHANGES IN CLASSIFICATION, CHANGES IN PROTECTIVE ACTION RECOMMENDATIONS. plant emergency exists)

PERIODIC UPDATE DRILL USE ONLY FOR UPDATING STATUS OF CURRENT CLASSIFICATION.

DO NOT USE FOR CHANGING CLASSIFICATIONS OR CHANGING PROTECTIVE ACTION RECOMMENDATIONS.

Initial Notification Form / Periodic Update Form completed by: Joe Shift Manager Initial Notification Form / Periodic Update Form accuracy verified by: John Shift Technical Advisor Communicator:

1. Ensure the Emergency Director has signed the Initial Notification Form / Periodic Update Form.
2. Initiate the 4-Way Ringdown.
3. As parties answer, identify yourself and your facility.
4. Obtain and fill in information below:

4-WAY TIME OF TIME COMPLETION RINGDOWN CALLBACK INDIVIDUAL INITIAL TIME OF USED? (IF 4-WAY CALLING BACK CONTACT CALL YES NO NOT USED) (IF 4-WAY NOT USED)

MADE OTTAWA COUNTY LUCAS COUNTY STATE OF OHIO

5. Initial Notification Form: Read information on the attached Initial Notification Form over the phone, document above the time lines 1 through 6 have been communicated, and then fax the form to Ottawa Co, Lucas Co, and the State of Ohio.

OR Periodic Update Form: Fax the attached Periodic Update Form to Ottawa Co, Lucas Co, and the State of Ohio, and then verify the information over the phone.

NOTE: This coversheet should NOT be FAXED offsite.

Control Room Emergency Operations Facility Signature of Communicator transmitting information

ANSWER KEY DO NOT GIVE TO CANDIDATE DAVIS-BESSE EMERGENCY NOTIFICATION COVER SHEET DBEP-012-09 INITIAL NOTIFICATION ACTUAL EMERGENCY USE FOR: (Check Actual INITIAL CLASSIFICATIONS, Emergency only if a real CHANGES IN CLASSIFICATION, CHANGES IN PROTECTIVE ACTION RECOMMENDATIONS. plant emergency exists)

PERIODIC UPDATE DRILL USE ONLY FOR UPDATING STATUS OF CURRENT CLASSIFICATION.

DO NOT USE FOR CHANGING CLASSIFICATIONS OR CHANGING PROTECTIVE ACTION RECOMMENDATIONS.

Initial Notification Form / Periodic Update Form completed by: Joe Shift Manager Initial Notification Form / Periodic Update Form accuracy verified by: John Shift Technical Advisor Communicator:

1. Ensure the Emergency Director has signed the Initial Notification Form / Periodic Update Form.
2. Initiate the 4-Way Ringdown.
3. As parties answer, identify yourself and your facility.
4. Obtain and fill in information below:

4-WAY TIME OF TIME COMPLETION RINGDOWN CALLBACK INDIVIDUAL INITIAL TIME OF USED? (IF 4-WAY CALLING BACK CONTACT CALL YES NO NOT USED) (IF 4-WAY NOT USED)

MADE OTTAWA COUNTY < 15 min Time LUCAS COUNTY < 15 min Time STATE OF OHIO Time Time Name

5. Initial Notification Form: Read information on the attached Initial Notification Form over the phone, document above the time lines 1 through 6 have been communicated, and then fax the form to Ottawa Co, Lucas Co, and the State of Ohio.

OR Periodic Update Form: Fax the attached Periodic Update Form to Ottawa Co, Lucas Co, and the State of Ohio, and then verify the information over the phone.

NOTE: This coversheet should NOT be FAXED offsite.

Control Room Signature of Communicator Emergency Operations Facility Signature of Communicator transmitting information

Davis-Besse Initial License Exam 2015 Admin JPM SRO-A1.1

Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM SRO-A1.1 AG Facility: Davis-Besse Task No: 332-004-02-0300 Task Title: Review manual RCS Leakage Calculation K/A

Reference:

2.1.20 (4.6) Job Performance Measure No: SRO-A1.1 (New)

Examinee:

NRC Examiner: Date:

Method of testing:

Simulated Performance ___ Actual Performance _X_

Classroom _X_ Simulator ___ Plant ___

Read to the examinee:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

The plant conditions are specified in the Initial Conditions and Initiating Cues.

Task Standard:

Perform manual RCS Leakage calculation and determine RCS Leakage within 0.5 gpm Required Materials:

DB-SP-03357, RCS Water Inventory Balance with step 4.2.2 and Attachment 2 completed Curves CC 3.1 and CC 3.2a to CC3.2k from DB-PF-06703, Miscellaneous Curves Straight edge Calculator General

References:

Technical Specifications Initiating Cue:

The plant conditions are specified in the Initial Conditions and Initiating Cues.

Time Critical Task:

No Alternate Path:

No Validation Time: 50 minutes Page 2 of 8

Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM SRO-A1.1 AG EXAMINER COPY INITIAL CONDITIONS:

The Plant is at 100% Power Makeup Tank Pressure is 25 psig The Computer is unavailable INITIATION CUE:

A Reactor Operator has performed a Manual Calculation of Leakage Rates per step 4.2.2 of DB SP-03357, RCS Water Inventory Balance.

DB SP-03357 Section 4.1, Data Acquisition section data was verified correct and transferred to from another procedure.

Review the completed calculations for correctness. Correct any errors, if necessary, and determine if there are any Technical Specifications implications NOTE: DB-SP-03357, Attachment 2 has 4 pages (there is a page count error on Attachment 2 -

page 1 of 3, 2 of 3, 3 of 3 and 4 of 4)

DOCUMENT THE RESULTS OF YOUR REVIEW ON THIS CUE SHEET (Hand Candidate the following:

DB-SP-03357, RCS Water Inventory Balance with step 4.2.2 and Attachment 2 completed DB-PF-06703, Miscellaneous Curves CC 3.1 and CC 3.2a to CC3.2k)

Page 3 of 8

Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM SRO-A1.1 AG CANDIDATE COPY INITIAL CONDITIONS:

The Plant is at 100% Power Makeup Tank Pressure is 25 psig The Computer is unavailable INITIATION CUE:

A Reactor Operator has performed a Manual Calculation of Leakage Rates per step 4.2.2 of DB SP-03357, RCS Water Inventory Balance.

DB SP-03357 Section 4.1, Data Acquisition section data was verified correct and transferred to from another procedure.

Review the completed calculations for correctness. Correct any errors, if necessary, and determine if there are any Technical Specifications implications NOTE: DB-SP-03357, Attachment 2 has 4 pages (there is a page count error on Attachment 2 -

page 1 of 3, 2 of 3, 3 of 3 and 4 of 4)

DOCUMENT THE RESULTS OF YOUR REVIEW ON THIS CUE SHEET Page 4 of 8

Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM SRO-A1.1 AG PERFORMANCE INFORMATION NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is NOT critical unless denoted in the "Comments".

START TIME: _______

1. PERFORMANCE STEP: Reviews the Initial Makeup Tank Inventory equations step 4.2.2.b

........C........

STANDARD: Recognize 67 inches was used versus 71 and corrects calculation:

Water Inventory = (Tank level

  • 4.124 ft³/in
  • Calibration Density) + (77.85 ft³
  • Water Density)

= (Tank level

  • 4.124 ft³/in
  • 62.325lbm/ ft³) + (77.85 ft³
  • Water Density)

Initial:

( __71__ in.* 257 lbm/in ) + ( 77.85 ft³

  • _62.0038 lbm/ft³) = _23074 (+/- 10)_ lbm CUE: None

__________

SAT UNSAT

2. PERFORMANCE STEP: Reviews the Temperature Correction Factor data on Attachment 2 step 4.2.2.f

........C........

STANDARD: Recognize curve was read incorrectly and corrects:

Temperature Correction Factor (Tave 528 °F)

Initial __-34350_(+/-50) _ lbm Final -35600 (+/-50) lbm COMMENT: Error results from reading curve at 581.8 instead of 580.8 CUE: None

__________

SAT UNSAT Page 5 of 8

Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM SRO-A1.1 AG

3. PERFORMANCE STEP: Reviews the RCS Inventory Table to determine Initial and Final total RCS Inventory per step 4.2.2.h

........C........

STANDARD: Corrects data entered in the RCS Inventory Table and calculates the Initial and Final RCS Water Inventory MU Tank Pzr Steam Pzr Water Power Temperature Water Inventory + Inventory + Inventory + Correction + Correction = Inventory (lbm) (lbm) (lbm) (lbm) (lbm) (lbm)

Initial:

23074 3406.393 35119.85 135 -34350 27385.243

(+/- 250) lbm + lbm + lbm + lbm + lbm = lbm Final:

21275 3341.05 35570.146 135 -35600 24721.196

(+/- 250) lbm + lbm + lbm + lbm + lbm = lbm CUE: None

__________

SAT UNSAT

4. PERFORMANCE STEP: Reviews Change in RCS Inventory calculation

.......C.........

STANDARD: Recognizes error and corrects step 4.2.2.i to determine RCS Inventory Change Change = Initial inventory - Final inventory Change = 27385.243_ lbm - _24721.196 lbm 2664.047 (+/- 40)_ lbm CUE: None

__________

SAT UNSAT Page 6 of 8

Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM SRO-A1.1 AG

5. PERFORMANCE STEP: Verifies the Total RCS Leak Rate calculation per step 4.2.2.k

.......C.........

STANDARD: Corrects step 4.2.2.k error to determine correct Leak Rate Change in RCS Inventory 7.481 gallons ft 3 Leakrate = x x time ft 3 62.32 lbm Leakrate = ( 2664.047 lbm) ÷ ( 246 min) x (0.120 gal/lbm)

Leakrate = 1.299 (+/- 0.02) gpm CUE: None

__________

SAT UNSAT

6. PERFORMANCE STEP: Determines Unidentified Leakage

.......C.........

STANDARD: Determines Unidentified Leakage is 1.288 (+/- .2) gpm 1.299 gpm (Total Leak Rate from Attachment 2)

- Identified leakage 0.011 gpm (Given) = 1.288 gpm CUE: None

__________

SAT UNSAT

7. PERFORMANCE STEP: Reviews Technical Specification applicability

.......C.........

STANDARD: Determines Technical Specification 3.4.13 RCS Operational Leakage applies for LCO 3.4.13 b. Condition A should be entered for unidentified leakage greater than 1.0 GPM CUE: None

__________

SAT UNSAT TERMINATING CUES: This JPM is complete (Terminated by the examiner)

__________

END TIME Page 7 of 8

Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM SRO-A1.1 AG Verification of Completion Job Performance Measure No.

Examinees Name:

Examiners Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:_____________________________________________________________

____________________________________________________________________________

________________________________________________________________

Response:_____________________________________________________________

______________________________________________________________________

______________________________________________________________________

______________________________________________________________________

Result: Satisfactory/Unsatisfactory Examiners signature and date: _______________________________________

Page 8 of 8

20 Revision ATTACHMENT 2: RCS/MU AND PURIFICATION LEAK RATE CALCULATION SHEET Page 1 of 3 Note: For parameters which utilize averaging of redundant channels, eliminate inoperable channels from the average and reduce the denominator accordingly.

If a Th or Tc point is unavailable, eliminate it and the opposing point (Tc or Th) from the same loop, and reduce the denominator by 2.

INITIAL FINAL ITEM PARAMETER SOURCE UNITS VALUE VALUE Control Room clock Step 4.1.4 Step 4.1.10 1 Time hr:min or computer 1905 2311 Makeup 2 Tank Temp T769 or TI MU8 °F 100 100 Makeup Tank

[L761+L763]÷2, 3 Level in. 71 64 or LR MU16 (2 channel ave)

RCS Pressure [P721+P722+P729+P730]÷4, 4 (4 ch ave) psi 2156 2161 PRSRC2A2, or PRSRC2B (1)

Pressurizer LRS RC14 or 5 in. 218 222 Level L768

[R795+R804+R814+R820]÷4, 6 Ave Power  %

C913, or NR NI6 100 100 TI RC7, or:

7 Tave °F

[T719+T720+T728+T729+

(8 ch ave) 580.8 582.3 T780+T800+T820+T840]÷8 (2)

(1)

If less than 1700 psig RCS Pressure use the average of P725 and P732 (loop 1 and loop 2 WR Pressure).

(2)

If less than 520°F RCS Temperature then average T753 and T782 (loop 1 and loop 2 WR Temperature).

4.2.2.a Makeup Tank Water Density (from Attachment 4)

Initial ____62.0038______ lbm/ft³ Final ___ 62.0038______ lbm/ft³ 4.2.2.b Makeup Tank Inventory Note: 77.85 ft³ accounts for water volume below the level indicating range.

Water Inventory = (Tank level

  • 4.124 ft³/in
  • Calibration Density) + (77.85 ft³
  • Water Density)

= (Tank level

  • 4.124 ft³/in
  • 62.325lbm/ ft³) + (77.85 ft³
  • Water Density)

Initial:

( ___67______ in.* 257 lbm/in ) + ( 77.85 ft³

  • _62.0038 lbm/ft³) = _22046_ lbm

__mlk__

IV Final:

(___64______ in.* 257 lbm/in ) + ( 77.85 ft³

  • _62.0038 lbm/ft³) = _21275_ lbm

__mlk__

IV

21 Revision ATTACHMENT 2: RCS/MU AND PURIFICATION LEAK RATE CALCULATION SHEET Page 2 of 3 4.2.2.c Pressurizer Inventory Density (from Attachment 6)

Water Initial ___37.71________ lbm/ft³ Steam Initial ____6.02_________ lbm/ft³ Water Final ____37.68________ lbm/ft³ Steam Final ____6.04_________ lbm/ft³ 4.2.2.d Pressurizer Inventory Note: 239.6 ft³ accounts for water volume below the level indicating range.

242.2 ft³ accounts for steam volume above the level indicating range.

Water Inventory = (level

  • 3.173 ft³/in + 239.6 ft³)
  • Water Density Water Initial:

[(___218_____ in.

  • 3.173 ft³/in) + 239.6 ft³]
  • 37.71 lbm/ft³ = _35119.85 lbm

__mlk__

IV Water Final:

[(___222_____ in.

  • 3.173 ft³/in) + 239.6 ft³]
  • 37.68 lbm/ft³ = _35570.146 lbm

__mlk__

IV Steam Inventory =[((320 - level)

  • 3.173 ft³/in) + 242.2 ft³]
  • Steam Density Steam Initial:

[((320 - _218__in)

  • 3.173 ft³/in) + 242.2 ft³]
  • 6.02 lbm/ft³) = _3406.393________ lbm

__mlk__

IV Steam Final:

[((320 - __222__in)

  • 3.173 ft³/in) + 242.2 ft³]
  • 6.04 lbm/ft³) = _3341.05 __ lbm

__mlk__

IV 4.2.2.e Power Correction Factor Initial _____135____________ lbm Final _____135____________ lbm 4.2.2.f Temperature Correction Factor (Tave >528°)

Initial ______-35200________ lbm Final _____-35600_________ lbm

22 Revision ATTACHMENT 2: RCS/MU AND PURIFICATION LEAK RATE CALCULATION SHEET Page 3 of 3 4.2.2.g Temperature Correction Factor (Tave <528°)

Reactor Coolant System Density (from Attachment 5)

N/A At initial Tave ___________________ lbm/ft³ At final Tave ___________________ lbm/ft³ Temperature Correction Factor (TCF)

TCF = [(10,277 + (0.24828

  • Tave))
  • _______ lbm/ft³] - 498,800 lbm = _______ lbm

________

IV Final: [(10,277 ft³ + (0.24828 ft³/°F* _______°F))

  • _______ lbm/ft³] - 498,800 lbm = _______ lbm

________

IV 4.2.2.h RCS Inventory MU Tank Pzr Steam Pzr Water Power Temperature Water Inventory + Inventory + Inventory + Correction + Correction = Inventory (lbm) (lbm) (lbm) (lbm) (lbm) (lbm)

Initial:

22046 3406.393 35119.85 135 -35200 25507.243 lbm + lbm + lbm + lbm + lbm = lbm Final:

21275 3341.05 35570.146 135 -35600 24721.196 lbm + lbm + lbm + lbm + lbm = lbm 4.2.2.i Change in RCS Inventory Change = Initial inventory - Final inventory Change = 25507.243_ lbm - 24721.196 lbm = 786.047_ lbm

__mlk__

IV

23 Revision ATTACHMENT 2: RCS/MU AND PURIFICATION LEAK RATE CALCULATION SHEET Page 4 of 4 4.2.2.j Time period Period = Final time - Initial time Period = [(_23___ hr x 60) + ( 11 min)] - [(__19__ hr x 60) + ( 5 min)] = _246____ min

__mlk__

IV 4.2.2.k Total RCS Leak Rate Change in RCS Inventory 7.481 gallons ft 3 Leakrate = x x time ft 3 62.32 lbm Leakrate = ( 786.047 lbm) ÷ ( 246 min) x (0.120 gal/lbm)

Leakrate = .383 gpm

__mlk__

IV Independent Verification Completed by ___ MLKlein__________________________ Date Today

24 Revision ATTACHMENT 3: UNIDENTIFIED RCS LEAKAGE CALCULATION SHEET Page 1 of 1 RCP Seals Leak Rate from computer printout, 4.2.1.f or from Attachment 1. (4.2.1.e) ___.011___ gpm Quench Tank In-Leakage Rate from computer printout, 4.2.1.j or from Attachment 1. (4.2.1.i). Only record Positive values _____.0___ gpm (exclude negative values by entering 0.000).

RCS Total Leak Rate from computer printout, 4.2.2.l or from Attachment 2. ___.383___ gpm Primary to Secondary Tube Leakage from computer printout,

_____.0___ gpm 4.2.3.a or from most recent entry in RCS Leakage Log, RO Log, or as (0.104 allowed) determined by Chemistry.

Other Identified Leakage, 4.2.3.b _____.0___ gpm or from RCS Leakage Log.

Total Identified Leak Rate from computer printout, or from; RCP Seals + Quench Tk + Pri to Sec + Other

( 4.2.1.e + 4.2.1.i [positive values only] + 4.2.3.a + 4.2.3.b ). ____.011__ gpm 4.2.3.c (10 gpm allowed)

___mlk___

IV Unidentified Leak Rate from computer printout, or from; Total Leak Rate - Total Identified Leak Rate

( 4.2.2.k - 4.2.3.c ) ____.382__ gpm 4.2.3.d (1 gpm allowed)

___mlk____

IV

_____.0___ gpm 4.2.3.e Reactor Coolant Pressure Boundary Leakage (0 gpm allowed)

Independent Verification Completed by ___ MLKlein________Date Today Performed by: Rx Operator Date: Today

20 Revision ATTACHMENT 2: RCS/MU AND PURIFICATION LEAK RATE CALCULATION SHEET Page 1 of 3 Note: For parameters which utilize averaging of redundant channels, eliminate inoperable channels from the average and reduce the denominator accordingly.

If a Th or Tc point is unavailable, eliminate it and the opposing point (Tc or Th) from the same loop, and reduce the denominator by 2.

INITIAL FINAL ITEM PARAMETER SOURCE UNITS VALUE VALUE Control Room clock Step 4.1.4 Step 4.1.10 1 Time hr:min or computer 1905 2311 Makeup 2 Tank Temp T769 or TI MU8 °F 100 100 Makeup Tank

[L761+L763]÷2, 3 Level in. 71 64 or LR MU16 (2 channel ave)

RCS Pressure [P721+P722+P729+P730]÷4, 4 (4 ch ave) psi 2156 2161 PRSRC2A2, or PRSRC2B (1)

Pressurizer LRS RC14 or 5 in. 218 222 Level L768

[R795+R804+R814+R820]÷4, 6 Ave Power  %

C913, or NR NI6 100 100 TI RC7, or:

7 Tave °F

[T719+T720+T728+T729+

(8 ch ave) 580.8 582.3 T780+T800+T820+T840]÷8 (2)

(1)

If less than 1700 psig RCS Pressure use the average of P725 and P732 (loop 1 and loop 2 WR Pressure).

(2)

If less than 520°F RCS Temperature then average T753 and T782 (loop 1 and loop 2 WR Temperature).

4.2.2.a Makeup Tank Water Density (from Attachment 4)

Initial ____62.0038______ lbm/ft³ Final ___ 62.0038______ lbm/ft³ 4.2.2.b Makeup Tank Inventory Note: 77.85 ft³ accounts for water volume below the level indicating range.

Water Inventory = (Tank level

  • 4.124 ft³/in
  • Calibration Density) + (77.85 ft³
  • Water Density)

= (Tank level

  • 4.124 ft³/in
  • 62.325lbm/ ft³) + (77.85 ft³
  • Water Density)

Initial:

( ___71______ in.* 257 lbm/in ) + ( 77.85 ft³

  • _62.0038 lbm/ft³) = _23074_ lbm

__mlk__

IV Final:

(___64______ in.* 257 lbm/in ) + ( 77.85 ft³

  • _62.0038 lbm/ft³) = _21275_ lbm

__mlk__

IV

21 Revision ATTACHMENT 2: RCS/MU AND PURIFICATION LEAK RATE CALCULATION SHEET Page 2 of 3 4.2.2.c Pressurizer Inventory Density (from Attachment 6)

Water Initial ___37.71________ lbm/ft³ Steam Initial ____6.02_________ lbm/ft³ Water Final ____37.68________ lbm/ft³ Steam Final ____6.04_________ lbm/ft³ 4.2.2.d Pressurizer Inventory Note: 239.6 ft³ accounts for water volume below the level indicating range.

242.2 ft³ accounts for steam volume above the level indicating range.

Water Inventory = (level

  • 3.173 ft³/in + 239.6 ft³)
  • Water Density Water Initial:

[(___218_____ in.

  • 3.173 ft³/in) + 239.6 ft³]
  • 37.71 lbm/ft³ = _35119.85 lbm

___mlk__

IV Water Final:

[(___222_____ in.

  • 3.173 ft³/in) + 239.6 ft³]
  • 37.68 lbm/ft³ = _35570.146 lbm

__mlk__

IV Steam Inventory =[((320 - level)

  • 3.173 ft³/in) + 242.2 ft³]
  • Steam Density Steam Initial:

[((320 - _218__in)

  • 3.173 ft³/in) + 242.2 ft³]
  • 6.02 lbm/ft³) = _3406.393________ lbm

__mlk__

IV Steam Final:

[((320 - __222__in)

  • 3.173 ft³/in) + 242.2 ft³]
  • 6.04 lbm/ft³) = _3341.05 __ lbm

__mlk__

IV 4.2.2.e Power Correction Factor Initial _____135_____________ lbm Final _____135____________ lbm 4.2.2.f Temperature Correction Factor (Tave >528°)

Initial ______-34350___________ lbm Final _____-35600___________ lbm

22 Revision ATTACHMENT 2: RCS/MU AND PURIFICATION LEAK RATE CALCULATION SHEET Page 3 of 3 4.2.2.g Temperature Correction Factor (Tave <528°)

Reactor Coolant System Density (from Attachment 5)

N/A At initial Tave ___________________ lbm/ft³ At final Tave ___________________ lbm/ft³ Temperature Correction Factor (TCF)

TCF = [(10,277 + (0.24828

  • Tave))
  • _______ lbm/ft³] - 498,800 lbm = _______ lbm

________

IV Final: [(10,277 ft³ + (0.24828 ft³/°F* _______°F))

  • _______ lbm/ft³] - 498,800 lbm = _______ lbm

________

IV 4.2.2.h RCS Inventory MU Tank Pzr Steam Pzr Water Power Temperature Water Inventory + Inventory + Inventory + Correction + Correction = Inventory (lbm) (lbm) (lbm) (lbm) (lbm) (lbm)

Initial: +

23074 3406.393 35119.85 135 -34350 27385.243 lbm + lbm + lbm + lbm lbm = lbm Final:

21275 3341.05 35570.146 135 -35600 24721.196 lbm + lbm + lbm + lbm + lbm = lbm 4.2.2.i Change in RCS Inventory Change = Initial inventory - Final inventory Change = 27385.243_ lbm - 24721.196 lbm = 2664.047_ lbm

__mlk__

IV

23 Revision ATTACHMENT 2: RCS/MU AND PURIFICATION LEAK RATE CALCULATION SHEET Page 4 of 4 4.2.2.j Time period Period = Final time - Initial time Period = [(_23___ hr x 60) + ( 11 min)] - [(__19__ hr x 60) + ( 5 min)] = _246____ min

__mlk__

IV 4.2.2.k Total RCS Leak Rate Change in RCS Inventory 7.481 gallons ft 3 Leakrate = x x time ft 3 62.32 lbm Leakrate = ( 2664.047 lbm) ÷ ( 246 min) x (0.120 gal/lbm)

Leakrate = 1.299 gpm

__mlk__

IV Independent Verification Completed by MLKlein__________________________ Date Today

24 Revision ATTACHMENT 3: UNIDENTIFIED RCS LEAKAGE CALCULATION SHEET Page 1 of 1 RCP Seals Leak Rate from computer printout, 4.2.1.f or from Attachment 1. (4.2.1.e) _____.011_ gpm Quench Tank In-Leakage Rate from computer printout, 4.2.1.j or from Attachment 1. (4.2.1.i). Only record Positive values _____.0___ gpm (exclude negative values by entering 0.000).

RCS Total Leak Rate from computer printout, ___1.299__ gpm 4.2.2.l or from Attachment 2.

Primary to Secondary Tube Leakage from computer printout,

____.0 ___ gpm 4.2.3.a or from most recent entry in RCS Leakage Log, RO Log, or as (0.104 allowed) determined by Chemistry.

Other Identified Leakage, 4.2.3.b ____.0____ gpm or from RCS Leakage Log.

Total Identified Leak Rate from computer printout, or from; RCP Seals + Quench Tk + Pri to Sec + Other

( 4.2.1.e + 4.2.1.i [positive values only] + 4.2.3.a + 4.2.3.b ). _____.011_ gpm 4.2.3.c (10 gpm allowed)

__mlk__

IV Unidentified Leak Rate from computer printout, or from; Total Leak Rate - Total Identified Leak Rate

( 4.2.2.k - 4.2.3.c ) ___1.288__ gpm 4.2.3.d (1 gpm allowed)

__mlk__

IV

____.0 ____ gpm 4.2.3.e Reactor Coolant Pressure Boundary Leakage (0 gpm allowed)

Independent Verification Completed by ___ MLKlein________Date Today Performed by: Rx Operator Date: Today

Davis-Besse Initial License Exam 2015 Admin JPM SRO-A1.2

Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM SRO-A1.2 AG Facility: Davis-Besse Task No: 336-004-03-0300 Task Title: Determine Maintenance of Active License Status K/A

Reference:

2.1.4 (3.8) Job Performance Measure No: SRO-A1.2 (JPM New)

Examinee:

NRC Examiner: Date:

Method of testing:

Simulated Performance ___ Actual Performance _X_

Classroom _X_ Simulator ___ Plant ___

Read to the examinee:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

The plant conditions are specified in the Initial Conditions and Initiating Cues.

Task Standard:

Determine SRO 1 and SRO 3 are Inactive. Determine SRO 2 and SRO 4 are Active.

Required Materials:

DBBP-TRAN-0014, License Requirements for Licensed Individuals NT-OT-07001, Training and Qualification of Operations Personnel General

References:

None Initiating Cue:

The plant conditions are specified in the Initial Conditions and Initiating Cues.

Time Critical Task:

No Alternate Path:

No Validation Time:

15 minutes 1 of 6

Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM SRO-A1.2 AG EXAMINER COPY INITIAL CONDITIONS:

It is 7/1/15. Four Senior Reactor Operators have the following work history for the second quarter of 2015 (Plant was in Mode 1 the entire quarter):

SRO 1 Entered second quarter with active license 4/01/2015 Worked 0700-1900 as Command SRO 4/02/2015 Worked 0700-1900 as Command SRO 4/03/2015 Worked 0700-1900 as Command SRO 4/07/2015 Worked 0700-1900 as Command SRO. Was relieved for 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> to obtain required biennial License Physical at the Health Center 4/08/2015 Worked 0700-1900 as Command SRO SRO 2 Entered second quarter with inactive license Completed all requirements for license reactivation 4/15/15 through 4/20/15 4/23/15 Worked 0700-1900 as Command SRO 4/24/15 Worked 0700-1900 as Command SRO 4/28/15 Worked 0700-1900 as Shift Technical Advisor SRO 3 Entered second quarter with active license 4/10/15 Worked 0700-1900 as Shift Manager 4/11/15 Worked 0700-1900 as Shift Manager 4/18/15 Worked 0700-1900 as Shift Manager 4/19/15 Worked 0700-1900 as Shift Technical Advisor 4/20/15 Worked 0700-1900 as Shift Manager SRO 4 License issued at the beginning of the second quarter 5/1/15 Worked 0700-1900 as Command SRO 5/2/15 Worked 0700-1900 as Command SRO 5/3/15 Worked 0700-1900 as Command SRO 5/9/15 Worked 0700-1900 as Command SRO 5/10/15 Worked 0700-1900 as Shift Technical Advisor INITIATION CUE:

Based on the previous quarters work history determine the license status as of today, 7/1/15, for each Senior Reactor Operator and document as ACTIVE or INACTIVE on this page.

(Provide copy of DBBP-TRAN-0014, License Requirements for Licensed Individuals and NT-OT-07001, Training and Qualification of Operations Personnel) 2 of 6

Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM SRO-A1.2 AG CANDIDATE COPY INITIAL CONDITIONS:

It is 7/1/15. Four Senior Reactor Operators have the following work history for the second quarter of 2015 (Plant was in Mode 1 the entire quarter):

SRO 1 Entered second quarter with active license 4/01/2015 Worked 0700-1900 as Command SRO 4/02/2015 Worked 0700-1900 as Command SRO 4/03/2015 Worked 0700-1900 as Command SRO 4/07/2015 Worked 0700-1900 as Command SRO. Was relieved for 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> to obtain required biennial License Physical at the Health Center 4/08/2015 Worked 0700-1900 as Command SRO SRO 2 Entered second quarter with inactive license Completed all requirements for license reactivation 4/15/15 through 4/20/15 4/23/15 Worked 0700-1900 as Command SRO 4/24/15 Worked 0700-1900 as Command SRO 4/28/15 Worked 0700-1900 as Shift Technical Advisor SRO 3 Entered second quarter with active license 4/10/15 Worked 0700-1900 as Shift Manager 4/11/15 Worked 0700-1900 as Shift Manager 4/18/15 Worked 0700-1900 as Shift Manager 4/19/15 Worked 0700-1900 as Shift Technical Advisor 4/20/15 Worked 0700-1900 as Shift Manager SRO 4 License issued at the beginning of the second quarter 5/1/15 Worked 0700-1900 as Command SRO 5/2/15 Worked 0700-1900 as Command SRO 5/3/15 Worked 0700-1900 as Command SRO 5/9/15 Worked 0700-1900 as Command SRO 5/10/15 Worked 0700-1900 as Shift Technical Advisor INITIATION CUE:

Based on the previous quarters work history determine the license status as of today, 7/1/15, for each Senior Reactor Operator and document as ACTIVE or INACTIVE on this page.

3 of 6

Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM SRO-A1.2 AG PERFORMANCE INFORMATION NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is NOT critical unless denoted in the "Comments".

START TIME: _______

1. PERFORMANCE STEP: Evaluate SRO 1 work history

........C........

STANDARD: Reviews DBBP-TRAN-0014, License Requirements for Licensed Individuals and determines license is Inactive.

COMMENT: Credit not received for complete watch due to absence to Health Center CUE: None

__________

SAT UNSAT

2. PERFORMANCE STEP: Evaluate SRO 2 work History

........C........

STANDARD: Reviews DBBP-TRAN-0014, License Requirements for Licensed Individuals and determines license is Active COMMENT: Reactivation meets proficiency requirements for the quarter CUE: None

__________

SAT UNSAT

3. PERFORMANCE STEP: Evaluate SRO 3 work history

........C........

STANDARD: Reviews DBBP-TRAN-0014, License Requirements for Licensed Individuals and determines license is Inactive COMMENT: No credit given for Shift Technical position CUE: None

__________

SAT UNSAT 4 of 6

Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM SRO-A1.2 AG

4. PERFORMANCE STEP: Evaluate SRO 4 work history

........C........

STANDARD: Reviews DBBP-TRAN-0014, License Requirements and NT-OT-01007, Training and Qualification of Operations Personnel for Licensed Individuals and determines license is Active.

COMMENT: A newly issued license meets the proficiency requirement for the quarter in which it was issued CUE: None

__________

SAT UNSAT TERMINATING CUES: This JPM is complete (Terminated by the examiner)

__________

END TIME 5 of 6

Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM SRO-A1.2 AG Verification of Completion Job Performance Measure No.

Examinees Name:

Examiners Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:_____________________________________________________________

____________________________________________________________________________

________________________________________________________________

Response:_____________________________________________________________

______________________________________________________________________

______________________________________________________________________

______________________________________________________________________

Result: Satisfactory/Unsatisfactory Examiners signature and date: _______________________________________

6 of 6

Davis-Besse Initial License Exam 2015 Admin JPM SRO-A2

Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM SRO-A2 AG Facility: Davis-Besse Task No: 331-041-02-0300 Task Title: Perform Risk Assessment K/A

Reference:

2.2.17 (3.8) Job Performance Measure No: SRO-A2 (JPM New)

Examinee:

NRC Examiner: Date:

Method of testing:

Simulated Performance ___ Actual Performance _X_

Classroom _X_ Simulator ___ Plant ___

Read to the examinee:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

The plant conditions are specified in the Initial Conditions and Initiating Cues.

Task Standard:

Evaluate Generation Risk as Orange.

Determine Director of Site Operations approval with documentation in Unit Log is required Determine Supervisor continuous job site coverage is required Required Materials:

NOP-OP-1007, Risk Management DB-OP-06011, High Pressure Injection System, section 4.1 General

References:

Technical Specifications Initiating Cue:

The plant conditions are specified in the Initial Conditions and Initiating Cues.

Time Critical Task: No Alternate Path: No Validation Time: 25 minutes 1 of 6

Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM SRO-A2 AG EXAMINER COPY INITIAL CONDITIONS:

The Plant is at 100% Power. All systems normal.

INITIATION CUE:

Engineering has discovered a design question potentially affecting long term Operability of High Pressure Injection Pump (HPI) 1. Engineering requests HPI Pump 1 be placed on recirculation through the flow test line per DB-OP-06011, High Pressure Injection System, section 4.1 for 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> to gather data.

The Shift Manager directs you to perform a Risk Assessment for the Non-Emergent work per DB-OP-1007, Risk Assessment to determine the following only:

1. Risk Level
2. Permission required and documentation method
3. Level of Supervision required Document your results on this page (Provide a copy of DB-OP-06011, Section 4.1 and NOP-OP-1007. Make Technical Specifications available) 2 of 6

Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM SRO-A2 AG CANDIDATE COPY INITIAL CONDITIONS:

The Plant is at 100% Power. All systems normal.

INITIATION CUE:

Engineering has discovered a design question potentially affecting long term Operability of High Pressure Injection Pump (HPI) 1. Engineering requests HPI Pump 1 be placed on recirculation through the flow test line per DB-OP-06011, High Pressure Injection System, section 4.1 for 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> to gather data.

The Shift Manager directs you to perform a Risk Assessment for the Non-Emergent work per DB-OP-1007, Risk Assessment to determine the following only:

1. Risk Level
2. Permission required and documentation method
3. Level of Supervision required Document your results on this page 3 of 6

Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM SRO-A2 AG PERFORMANCE INFORMATION NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is NOT critical unless denoted in the "Comments".

START TIME: _______

NOTE: STEPS CAN BE PERFORMED IN ANY SEQUENCE

1. PERFORMANCE STEP: Evaluate effect on HPI Train 1 STANDARD: Reviews DB-OP-06011, section 4.1 and determines HPI 1 will be Inoperable while lined up through the flow test line CUE: None

__________

SAT UNSAT

2. PERFORMANCE STEP: Reviews Technical Specification 3.5.2 for HPI Pump 1 STANDARD: Determines 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> action statement will be entered CUE: None

__________

SAT UNSAT

3. PERFORMANCE STEP: Determines Risk Level

........C........

STANDARD: Refers to Attachment 2 and/or 3 of NOP-OP-1007, Risk Assessment and identifies Risk level will be Orange COMMENT: Greater than 50% of a shutdown LCO action time (for less than 14 day LCO) requires Orange Risk. HPI 1 will be Inoperable for 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> which is greater than 50% of the 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> shutdown LCO.

CUE: None

__________

SAT UNSAT 4 of 6

Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM SRO-A2 AG

4. PERFORMANCE STEP: Determines Approval required and method of documentation

........C........

STANDARD: Reviews Attachment 2 and/or step 4.3.3.3 of NOP-OP-1007, Risk Assessment and determines the Director of Site Operations (or designee) approval is required and documented in the Work Implementation Schedule.

CUE: None

__________

SAT UNSAT

5. PERFORMANCE STEP: Determines level of Supervision required

........C........

STANDARD: Reviews Attachment 2 and/or step 4.3.3.3 of NOP-OP-1007, Risk Assessment and determines Supervisor continuous job site coverage is required CUE: None

__________

SAT UNSAT TERMINATING CUES: This JPM is complete (Terminated by the examiner)

__________

END TIME 5 of 6

Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM SRO-A2 AG Verification of Completion Job Performance Measure No.

Examinees Name:

Examiners Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:_____________________________________________________________

____________________________________________________________________________

________________________________________________________________

Response:_____________________________________________________________

______________________________________________________________________

______________________________________________________________________

______________________________________________________________________

Result: Satisfactory/Unsatisfactory Examiners signature and date: _______________________________________

6 of 6

Davis-Besse Initial License Exam 2015 Admin JPM SRO-A3

Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM SRO-A3 AG Facility: Davis-Besse Task No: 334-005-05-0300 Task Title: Emergency Dose Authorization K/A

Reference:

2.3.4 (3.7) Job Performance Measure No: SRO-A3 (JPM New)

Examinee:

NRC Examiner: Date:

Method of testing:

Simulated Performance ___ Actual Performance _X_

Classroom _X_ Simulator ___ Plant ___

Read to the examinee:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

The plant conditions are specified in the Initial Conditions and Initiating Cues.

Task Standard:

Select the two mechanic method and authorize Emergency dose for mechanic 2 and 4 only Required Materials:

RA-EP-02620, Emergency Dose Control and Potassium Iodide Distribution Emergency Dose Authorization form for each mechanic Calculator General

References:

None Initiating Cue:

The plant conditions are specified in the Initial Conditions and Initiating Cues.

Time Critical Task: No Alternate Path: No Validation Time: 25 minutes 1 of 6

Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM SRO-A3 AG EXAMINER COPY INITIAL CONDITIONS:

The Plant has experienced a Loss of Coolant Accident and fuel damage. Emergency Core Cooling Train (ECCS) 1 is in operation at full flow. Low Pressure Injection Pump (LPI) 2 is out of service for maintenance. Just before the accident it was determined LPI Pump 1 was losing oil through a loose bearing housing. Plans were being made to tighten the housing and add oil. It is determined that this task is required to be performed immediately to prevent pump failure.

INITIATION CUE:

You are an extra SRO on shift. The ERO is not yet activated. The Shift Manager acting as the Emergency Director in the Control Room has directed you to prepare an Emergency Dose Authorization, using the following information.

Radiation levels in ECCS Room 1 are indicating 50 Rem/hr These two tasks (tighten the housing and add oil) can be performed by the mechanic(s) working in series or two mechanics working in parallel.

One mechanic would obtain 48 minutes of exposure Two mechanics simultaneously would obtain 24 minutes of exposure each Three mechanics in rotation would obtain 18 minutes of exposure each Four mechanics in rotation would obtain 12 minutes of exposure each Four Mechanics have volunteered to perform this work:

  • Mechanic 1 is a 52 year old male with 2 Rem lifetime dose and no dose for current year.

This individual also received a 28 Rem dose during a lifesaving rescue 10 years ago at another plant

  • Mechanic 2 is a 27 year old male with 600 mrem lifetime dose and 5 mrem for current year
  • Mechanic 3 is a 34 year old female, who has a declared pregnancy, with 125 mrem lifetime dose and no dose for current year
  • Mechanic 4 is a 37 year old male with 4.2 mrem lifetime and 700 mrem for the current year Select the method desired and mechanic(s) to perform this task and document (up to the review and approval signatures) on the attached Emergency Dose Authorization Forms. The remainder of each form will be completed if necessary when the Emergency RP Manager has been contacted.

(Hand Candidate a copy of RA-EP-02620, Emergency Dose Control and Potassium Iodide Distribution and the four recommended Emergency Dose Authorization Forms) 2 of 6

Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM SRO-A3 AG CANDIDATE COPY INITIAL CONDITIONS:

The Plant has experienced a Loss of Coolant Accident and fuel damage. Emergency Core Cooling Train (ECCS) 1 is in operation at full flow. Low Pressure Injection Pump (LPI) 2 is out of service for maintenance. Just before the accident it was determined LPI Pump 1 was losing oil through a loose bearing housing. Plans were being made to tighten the housing and add oil. It is determined that this task is required to be performed immediately to prevent pump failure.

INITIATION CUE:

You are acting as the Emergency Director in the Control Room and the ERO is not yet activated.

Radiation levels in ECCS Room 1 are indicating 50 Rem/hr These two tasks (tighten the housing and add oil) can be performed by the mechanic(s) working in series or two mechanics working in parallel.

One mechanic would obtain 48 minutes of exposure Two mechanics simultaneously would obtain 24 minutes of exposure each Three mechanics in rotation would obtain 18 minutes of exposure each Four mechanics in rotation would obtain 12 minutes of exposure each Four Mechanics have volunteered to perform this work:

  • Mechanic 1 is a 52 year old male with 2 Rem lifetime dose and no dose for current year.

This individual also received a 28 Rem dose during a lifesaving rescue 10 years ago at another plant

  • Mechanic 2 is a 27 year old male with 600 mrem lifetime dose and 5 mrem for current year
  • Mechanic 3 is a 34 year old female, who has a declared pregnancy, with 125 mrem lifetime dose and no dose for current year
  • Mechanic 4 is a 37 year old male with 4.2 mrem lifetime and 700 mrem for the current year Select the method desired and mechanic(s) to perform this task and document on this form.

Authorize Emergency Dose if necessary per RA-EP-02620, Emergency Dose Control and Potassium Iodide Distribution by signing for Emergency Director Approval on the appropriate Emergency Dose Authorization Forms. The remainder of each form will be completed if necessary when the Emergency RP Manager has been contacted.

3 of 6

Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM SRO-A3 AG PERFORMANCE INFORMATION NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is NOT critical unless denoted in the "Comments".

START TIME: _______

1. PERFORMANCE STEP: Evaluate the dose that would be received for each method STANDARD: One mechanic would obtain 40 Rem Two mechanics simultaneously would obtain 20 Rem each Three mechanics in rotation would obtain 15 Rem each Four mechanics in rotation would obtain 10 Rem each COMMENT: JPM step sequence not critical. May evaluate mechanics and select method first in which case only the method selected will need dose evaluated CUE: None

__________

SAT UNSAT

2. PERFORMANCE STEP: Evaluate Mechanic 1 acceptability for receiving Emergency Dose STANDARD:. Determines Mechanic 1 should not be authorized to receive emergency dose CUE: If asked - received 28 Rem 10 years ago at previous place of employment during a lifesaving rescue

__________

SAT UNSAT

3. PERFORMANCE STEP: Evaluate Mechanic 2 acceptability for receiving Emergency Dose STANDARD: Determines Mechanic 2 can be authorized for Emergency Dose CUE: If asked - have never received emergency dose

__________

SAT UNSAT 4 of 6

Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM SRO-A3 AG

4. PERFORMANCE STEP: Evaluate Mechanic 3 acceptability for receiving Emergency Dose STANDARD: Determines Mechanic 3 SHALL NOT be authorized to receive emergency dose. Since mechanic is female, and is a declared pregnant worker CUE: If asked - have never received emergency dose If asked - have just found out is pregnant

__________

SAT UNSAT

5. PERFORMANCE STEP: Evaluate Mechanic 4 acceptability for receiving Emergency Dose STANDARD: Determines Mechanic 4 can be authorized for Emergency Dose CUE: If asked - have never received emergency dose

__________

SAT UNSAT

6. PERFORMANCE STEP: Determine method for repair

........C........

STANDARD: Determines 2 mechanics in parallel is proper method due to condition in RA-EP-02620, step 6.1.3.b 25,000 mrem TEDE CUE: None

__________

SAT UNSAT

7. PERFORMANCE STEP: Select Mechanic 2 and Mechanic 4 to perform work

........C........

STANDARD: Recommend Emergency Dose for Mechanic 2 and Mechanic 4 CUE: None

__________

SAT UNSAT TERMINATING CUES: This JPM is complete (Terminated by the examiner)

__________

END TIME 5 of 6

Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM SRO-A3 AG Verification of Completion Job Performance Measure No.

Examinees Name:

Examiners Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:_____________________________________________________________

____________________________________________________________________________

________________________________________________________________

Response:_____________________________________________________________

______________________________________________________________________

______________________________________________________________________

______________________________________________________________________

Result: Satisfactory/Unsatisfactory Examiners signature and date: _______________________________________

6 of 6

EMERGENCY DOSE AUTHORIZATION DBEP-204-01 INDIVIDUAL (Last, First, Middle)

Mechanic 1 SOCIAL SECURITY NUMBER 111-11-1111 DATE TLD NO. EMPLOYER Today 1 FENOC BRIEF DESCRIPTION OF TASK RECOMMENDED EMERGENCY DOSE AUTHORIZATION YES NO RECOMMENDED EMERGENCY DOSE LIMIT REM { TOTAL EFFECTIVE DOSE EQUIVALENT (TEDE) }

COMMENTS EMERGENCY RP MANAGER RECOMMENDATION (Signature)

EMERGENCY DIRECTOR APPROVAL (Signature)

AUTHORIZATION DATE AUTHORIZATION LIMIT REM { TEDE }

I have been briefed on the radiological consequences and hazards associated with the authorized emergency dose and I have volunteered to perform the above described task.

INDIVIDUAL (Signature) DATE BRIEFED BY (Signature) DATE (TOTAL DOSE - TEDE) = (EXTERNAL - DDE) PLUS (INTERNAL - CEDE)

RADIOBIOASSAY RESULTS EMERGENCY RP MANAGER REVIEW (Signature) DATE EMERGENCY DIRECTOR REVIEW (Signature) DATE

EMERGENCY DOSE AUTHORIZATION DBEP-204-01 INDIVIDUAL (Last, First, Middle)

Mechanic 2 SOCIAL SECURITY NUMBER 222-22-2222 DATE TLD NO. EMPLOYER Today 2 FENOC BRIEF DESCRIPTION OF TASK RECOMMENDED EMERGENCY DOSE AUTHORIZATION YES NO RECOMMENDED EMERGENCY DOSE LIMIT REM { TOTAL EFFECTIVE DOSE EQUIVALENT (TEDE) }

COMMENTS EMERGENCY RP MANAGER RECOMMENDATION (Signature)

EMERGENCY DIRECTOR APPROVAL (Signature)

AUTHORIZATION DATE AUTHORIZATION LIMIT REM { TEDE }

I have been briefed on the radiological consequences and hazards associated with the authorized emergency dose and I have volunteered to perform the above described task.

INDIVIDUAL (Signature) DATE BRIEFED BY (Signature) DATE (TOTAL DOSE - TEDE) = (EXTERNAL - DDE) PLUS (INTERNAL - CEDE)

RADIOBIOASSAY RESULTS EMERGENCY RP MANAGER REVIEW (Signature) DATE EMERGENCY DIRECTOR REVIEW (Signature) DATE

EMERGENCY DOSE AUTHORIZATION DBEP-204-01 INDIVIDUAL (Last, First, Middle)

Mechanic 3 SOCIAL SECURITY NUMBER 333-33-3333 DATE TLD NO. EMPLOYER Today 3 FENOC BRIEF DESCRIPTION OF TASK RECOMMENDED EMERGENCY DOSE AUTHORIZATION YES NO RECOMMENDED EMERGENCY DOSE LIMIT REM { TOTAL EFFECTIVE DOSE EQUIVALENT (TEDE) }

COMMENTS EMERGENCY RP MANAGER RECOMMENDATION (Signature)

EMERGENCY DIRECTOR APPROVAL (Signature)

AUTHORIZATION DATE AUTHORIZATION LIMIT REM { TEDE }

I have been briefed on the radiological consequences and hazards associated with the authorized emergency dose and I have volunteered to perform the above described task.

INDIVIDUAL (Signature) DATE BRIEFED BY (Signature) DATE (TOTAL DOSE - TEDE) = (EXTERNAL - DDE) PLUS (INTERNAL - CEDE)

RADIOBIOASSAY RESULTS EMERGENCY RP MANAGER REVIEW (Signature) DATE EMERGENCY DIRECTOR REVIEW (Signature) DATE

EMERGENCY DOSE AUTHORIZATION DBEP-204-01 INDIVIDUAL (Last, First, Middle)

Mechanic 4 SOCIAL SECURITY NUMBER 444-44-4444 DATE TLD NO. EMPLOYER Today 4 FENOC BRIEF DESCRIPTION OF TASK RECOMMENDED EMERGENCY DOSE AUTHORIZATION YES NO RECOMMENDED EMERGENCY DOSE LIMIT REM { TOTAL EFFECTIVE DOSE EQUIVALENT (TEDE) }

COMMENTS EMERGENCY RP MANAGER RECOMMENDATION (Signature)

EMERGENCY DIRECTOR APPROVAL (Signature)

AUTHORIZATION DATE AUTHORIZATION LIMIT REM { TEDE }

I have been briefed on the radiological consequences and hazards associated with the authorized emergency dose and I have volunteered to perform the above described task.

INDIVIDUAL (Signature) DATE BRIEFED BY (Signature) DATE (TOTAL DOSE - TEDE) = (EXTERNAL - DDE) PLUS (INTERNAL - CEDE)

RADIOBIOASSAY RESULTS EMERGENCY RP MANAGER REVIEW (Signature) DATE EMERGENCY DIRECTOR REVIEW (Signature) DATE

Davis-Besse Initial License Exam 2015 Admin JPM SRO-A4

Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM SRO-A4 AG Facility: Davis-Besse Task No: 334-004-05-0300 Task Title: Emergency Response Organization Notification K/A

Reference:

2.4.43 (3.8) Job Performance Measure No: SRO-A4 (JPM 253)

Examinee:

NRC Examiner: Date:

Method of testing:

Simulated Performance ___ Actual Performance _X_

Classroom ___ Simulator _X_ Plant ___

Read to the examinee:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

The plant conditions are specified in the Initial Conditions and Initiating Cues.

Task Standard:

Activate the ERO Numeric Group Page Required Materials:

RA-EP-01700, Alert RA-EP-02110, Emergency Notification Davis- Besse Emergency Plan Telephone Directory Phone General

References:

Initiating Cue:

The plant conditions are specified in the Initial Conditions and Initiating Cues.

Time Critical Task:

No Alternate Path:

No Validation Time: 10 minutes 1 of 8

Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM SRO-A4 AG EXAMINER COPY INITIAL CONDITIONS:

You are an extra Senior Reactor Operator in the Control Room.

The plant is in Mode 1 operating at 100% power.

The Shift Manager has declared an Alert on EAL HA3 due to an Operating Basis Earthquake being detected at the plant and he has assumed the Emergency Director position.

The Unit Supervisor is directing plant responses in accordance with RA-EP-02820, Earthquake.

INITIATING CUES:

Due to performing plant walk-downs and responding to other issues associated with response to the earthquake, Security personnel are not available to make any emergency notifications.

The Emergency Director directs you to notify the Emergency Response Organization in accordance with RA-EP-02110.

(Provide RA-EP-2110 and the Emergency Plan Telephone Directory) 2 of 8

Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM SRO-A4 AG CANDIDATE COPY INITIAL CONDITIONS:

You are an extra Senior Reactor Operator in the Control Room.

The plant is in Mode 1 operating at 100% power.

The Shift Manager has declared an Alert on EAL HA3 due to an Operating Basis Earthquake being detected at the plant and he has assumed the Emergency Director position.

The Unit Supervisor is directing plant responses in accordance with RA-EP-02820, Earthquake.

INITIATING CUES:

Due to performing plant walk-downs and responding to other issues associated with response to the earthquake, Security personnel are not available to make any emergency notifications.

The Emergency Director directs you to notify the Emergency Response Organization in accordance with RA-EP-02110.

3 of 8

Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM SRO-A4 AG PERFORMANCE INFORMATION NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is NOT critical unless denoted in the "Comments".

. START TIME: _______

1. PERFORMANCE STEP: Reviews the procedure.

STANDARD: Reviews RA-EP-02110, Emergency Notification, for notifying the Emergency Response Organization and off-site agencies.

CUE: If asked, a security event is NOT in progress.

__________

SAT UNSAT

2. PERFORMANCE STEP: Obtain CANS access numbers from Davis-Besse Emergency Plan Telephone Directory and dial them.

STANDARD: Locates the ERO Notification Flow Chart behind the Immediate Notification Numbers tab in the Davis-Besse Emergency Plan Telephone Directory.

CUE: Provide a copy of the Emergency Plan Telephone directory only if the JPM is NOT performed in the simulator.

__________

SAT UNSAT

3. PERFORMANCE STEP: Dial the primary CANS access number.

STANDARD: Locates a touch tone phone and correctly dials the primary CANS number.

COMMENT: The primary CANS number is 9-1-877-686-7612.

IF the incorrect number is dialed, THEN say, The phone continues to ring.

CUE: Say, You hear a busy signal.

__________

SAT UNSAT 4 of 8

Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM SRO-A4 AG

4. PERFORMANCE STEP: Dial the backup CANS access number.

STANDARD: Locates a touch tone phone and correctly dials the backup CANS number.

COMMENT: The CANS backup number is 9-1-866-334-6556.

CUE: The phone continues to ring. __________

SAT UNSAT

5. PERFORMANCE STEP: Determine the need to activate a group page.

STANDARD: Locates the ERO Numeric Group Page instructions in the ERO Notification Flow Chart behind the Immediate Notification Numbers tab in the Davis-Besse Emergency Plan Telephone Directory.

COMMENT: The Group Pager number is 9-1-800-405-4758.

CUE: None. __________

SAT UNSAT

6. PERFORMANCE STEP: Contact the Group Pager system.

........C........

STANDARD: Locates a touch tone phone and correctly dials 9-1-800-405-4758.

CUE: IF the correct number is dialed, THEN say, This is the Remote Activation Module. Please enter a pager number.

IF any other number is dialed, THEN say, The number you have dialed is no longer in service. Please check the number and try again

__________

SAT UNSAT

7. PERFORMANCE STEP: Enter the pager number.

........C........

STANDARD: Enters pager number 2533024.

CUE: IF pager number 2533024 is entered, THEN say, Please enter the event code followed by the pound key.

IF the wrong pager number is entered, THEN say, The number you entered is not valid, please check the number and try again.

__________

SAT UNSAT 5 of 8

Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM SRO-A4 AG

8. PERFORMANCE STEP: Enter the event code.

........C........

STANDARD: Enters 2222#.

CUE: IF the # is not entered, THEN say, Your input is not valid, Please enter the event code followed by the pound key.

__________

SAT UNSAT

9. PERFORMANCE STEP: Terminate the call.

STANDARD: Hangs up the telephone.

COMMENT: The E-Plant Telephone Directory step directs the operator to Send the page two times. The second page actions are not critical if the first page was SAT.

CUE: None. __________

SAT UNSAT

10. PERFORMANCE STEP: Contact the pager system.

STANDARD: Locates a touch tone phone and correctly dials 9-1-800-405-4758.

CUE: IF the correct number is dialed, THEN say, This is the Remote Activation Module. Please enter a pager number.

IF any other number is dialed, THEN say, The number you have dialed is no longer in service. Please check the number and try again

__________

SAT UNSAT

11. PERFORMANCE STEP: Enter the pager number.

STANDARD: Enters pager number 2533024.

CUE: IF pager number 2533024 is entered, THEN say, Please enter the event code followed by the pound key.

IF the wrong pager number is entered, THEN say, The number you entered is not valid, please check the number and try again.

__________

SAT UNSAT 6 of 8

Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM SRO-A4 AG 12 PERFORMANCE STEP: Enter the event code.

STANDARD: Enters 2222#.

CUE: IF the # is not entered, THEN say, Your input is not valid, Please enter the event code followed by the pound key.

__________

SAT UNSAT 13 PERFORMANCE STEP: Terminate the call.

STANDARD: Hangs up the telephone.

CUE: None.

__________

SAT UNSAT TERMINATING CUES: This JPM is complete (Terminated by Evaluator)

__________

END TIME 7 of 8

Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM SRO-A4 AG Verification of Completion Job Performance Measure No.

Examinees Name:

Examiners Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:_____________________________________________________________

____________________________________________________________________________

________________________________________________________________

Response:_____________________________________________________________

______________________________________________________________________

______________________________________________________________________

______________________________________________________________________

Result: Satisfactory/Unsatisfactory Examiners signature and date: _______________________________________

8 of 8