IR 05000261/2018001: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
| Line 3: | Line 3: | ||
| issue date = 05/08/2018 | | issue date = 05/08/2018 | ||
| title = Nuclear Regulatory Commission Integrated Inspection Report 05000261/2018001 | | title = Nuclear Regulatory Commission Integrated Inspection Report 05000261/2018001 | ||
| author name = Musser R | | author name = Musser R | ||
| author affiliation = NRC/RGN-II/DRP/RPB3 | | author affiliation = NRC/RGN-II/DRP/RPB3 | ||
| addressee name = Kapopoulos E | | addressee name = Kapopoulos E | ||
| addressee affiliation = Duke Energy Progress, Inc | | addressee affiliation = Duke Energy Progress, Inc | ||
| docket = 05000261 | | docket = 05000261 | ||
Revision as of 07:25, 17 June 2019
| ML18128A296 | |
| Person / Time | |
|---|---|
| Site: | Robinson |
| Issue date: | 05/08/2018 |
| From: | Randy Musser NRC/RGN-II/DRP/RPB3 |
| To: | Kapopoulos E Duke Energy Progress |
| References | |
| IR 2018001 | |
| Download: ML18128A296 (17) | |
Text
/RA/
/RA/