IR 05000461/2018004: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 2: Line 2:
| number = ML19043A826
| number = ML19043A826
| issue date = 02/12/2019
| issue date = 02/12/2019
| title = Clinton Power Station - NRC Integrated Inspection Report 05000461/2018004; 07201046/2018001
| title = NRC Integrated Inspection Report 05000461/2018004; 07201046/2018001
| author name = Riemer K
| author name = Riemer K
| author affiliation = NRC/RGN-III/DRP/B1
| author affiliation = NRC/RGN-III/DRP/B1

Revision as of 13:51, 31 March 2019

NRC Integrated Inspection Report 05000461/2018004; 07201046/2018001
ML19043A826
Person / Time
Site: Clinton  Constellation icon.png
Issue date: 02/12/2019
From: Kenneth Riemer
NRC/RGN-III/DRP/B1
To: Bryan Hanson
Exelon Generation Co, Exelon Nuclear
References
IR 2018001, IR2018004
Download: ML19043A826 (31)


Text

/RA/

OFFICIAL RECORD COPY