ML060230097: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
| Line 3: | Line 3: | ||
| issue date = 01/20/2006 | | issue date = 01/20/2006 | ||
| title = Notification of Inspection and Request for Information | | title = Notification of Inspection and Request for Information | ||
| author name = Lesser M | | author name = Lesser M | ||
| author affiliation = NRC/RGN-II/DRS/EB3 | | author affiliation = NRC/RGN-II/DRS/EB3 | ||
| addressee name = Scarola J | | addressee name = Scarola J | ||
Revision as of 00:28, 14 July 2019
| ML060230097 | |
| Person / Time | |
|---|---|
| Site: | Brunswick |
| Issue date: | 01/20/2006 |
| From: | Lesser M NRC/RGN-II/DRS/EB3 |
| To: | Scarola J Carolina Power & Light Co |
| References | |
| Download: ML060230097 (7) | |
Text
January 20, 2006Carolina Power and Light CompanyATTN:Mr. J. ScarolaVice PresidentBrunswick Steam Electric Plant P. O. Box 10429 Southport, NC 28461
SUBJECT:
BRUNSWICK STEAM ELECTRIC PLANT, UNIT 1 - NOTIFICATION OFINSPECTION AND REQUEST FOR INFORMATION
Dear Mr. Scarola:
On March 6, 2006, the NRC will begin the baseline inservice inspection (NRC InspectionProcedure 71111.08) at Brunswick Steam Electric Plant Unit 1. Experience has shown that this inspection will be resource intensive both for the NRCinspectors and your staff. In order to minimize the impact to your on-site resources and to ensure a productive inspection for both sides, we have enclosed a request for documents needed for this inspection. These documents have been divided into two groups. The first group (Group A) identifies information necessary to ensure that the inspector is adequately prepared. The second group (Group B) identifies information the inspector will need uponarrival at the site. It is important that all of these documents are up to date and complete, inorder to minimize the number of additional documents requested during the preparation and/orthe onsite portion of the inspection.We have discussed the schedule for these inspection activities with your staff and understandthat our regulatory contact for this inspection will be William Murray, of your licensingorganization. If there are any questions about this inspection or the material requested, please contact the assigned inspector Tomy Nazario at (404) 562-4710.In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter andits enclosure will be available electronically for public inspection in the NRC PublicDocument Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic ReadingRoom).Sincerely,/RA/Mark S. Lesser, Chief Engineering Branch 3 Division of Reactor Safety Docket No. 50-325License No. DPR-71
Enclosure:
See next page 2CP&L
Enclosure:
INSERVICE INSPECTION DOCUMENT REQUESTcc w/encl:T. P. Cleary, Director Site Operations Brunswick Steam Electric Plant Progress Energy Carolinas, Inc.
Electronic Mail DistributionBenjamin C. WaldrepPlant Manager Brunswick Steam Electric Plant Carolina Power & Light Company Electronic Mail DistributionJames W. Holt, ManagerPerformance Evaluation and Regulatory Affairs PEB 7 Carolina Power & Light Company Electronic Mail DistributionEdward T. O'Neil, ManagerSupport Services Carolina Power & Light Company Brunswick Steam Electric Plant Electronic Mail DistributionGarry D. Miller, M anagerLicense Renewal Progress Energy Electronic Mail DistributionLenny Beller, SupervisorLicensing/Regulatory Programs Carolina Power and Light Company Electronic Mail DistributionDavid T. ConleyAssociate General Counsel - Legal Dept.
Progress Energy Service Company, LLC Electronic Mail DistributionJames RossNuclear Energy Institute Electronic Mail DistributionJohn H. O'Neill, Jr.Shaw, Pittman, Potts & Trowbridge 2300 N. Street, NW Washington, DC 20037-1128Beverly Hall, Acting DirectorDivision of Radiation Protection N. C. Department of Environment and Natural Resources Electronic Mail Distribution Peggy ForceAssistant Attorney General State of North Carolina Electronic Mail Distribution(cc w/encl: See next page) 3CP&Lcc w/encl cont'd:Chairman of the North Carolina Utilities Commission c/o Sam Watson, Staff Attorney Electronic Mail DistributionRobert P. GruberExecutive Director Public Staff NCUC 4326 Mail Service Center Raleigh, NC 27699-4326Public Service CommissionState of South Carolina P. O. Box 11649 Columbia, SC 29211David R. SandiferBrunswick County Board of Commissioners
P. O. Box 249 Bolivia, NC 28422Warren LeeEmergency Management Director New Hanover County Department of Emergency Management P. O. Box 1525 Wilmington, NC 28402-1525
_________________________OFFICERII:DRSRII:DRSRII:DRPSIGNATURE/RA//RA//RA/NAMETNazarioMLesserPFredricksonDATE1/19/061/19/061/20/06 E-MAIL COPY? YESNO YESNO YESNO YESNO YESNO YESNO YESNO INSERVICE INSPECTION DOCUMENT REQUESTInspection Dates:March 6, 2006 through March 10, 2006Inspection Procedures:IP 7111108 "Inservice Inspection Activities" Inspector:Tomy Nazario (404) 562-4710A.Information Requested for the In-Office Preparation WeekThe following information should be sent to the Region II office in hard copy (orelectronic format CD - preferred), in care of Mr. Nazario by February 20, 2006, tofacilitate the selection of specific items that will be reviewed during the onsite inspectionweek. The inspector will select specific items from the information requested below andrequest a list from your staff of additional documents needed on-site. We request that the specific items selected from the lists be available and ready for review on the first day of inspection. All information requests relate to Unit 1 unless otherwise stated. If you have any questions regarding this information, please call the inspector as soon as possible.1)A detailed schedule of nondestructive examinations (NDE) planned for Class 1 & 2systems and containment, performed as part of your ASME Code ISI Program duringthe upcoming outage. Please include FAC exams. 2)A copy of the NDE procedures used to perform the examinations identified in A.1(including calibration and flaw characterization/sizing procedures). A copy of your NDE written practice and welding program. For ultrasonic examination procedures qualified in accordance with Appendix VIII, of Section XI of the ASME Code, providedocumentation supporting the procedure qualification (e.g., the EPRI performance demonstration qualification summary sheets). Also, include documentation of the specific equipment to be used (e.g., ultrasonic unit, cables, and transducers includingserial numbers). If these documents are not available in electronic format, thenplease provide during the inspection week.3)A copy of ASME Section XI, Code Relief Requests applicable to the examinationsidentified in A.14)A list identifying NDE reports (ultrasonic, radiography, magnetic particle, dye penetrant,visual (VT-1, VT-2, VT-3)) which have identified recordable indications on Code Class 1
& 2 systems since the beginning of the last refueling outage. 5)List with short description of the welds in Code Class 1 and 2 systems whic h have beenfabricated due to component repair/replacement activities since the beginning of the last refueling outage or that are planned for the current outage, and identify t he system,weld number and reference applicable documentation.6)A detailed description of the welds to be examined and the extent of the plannedexamination, if reactor vessel weld examinations required by the ASME Code are 2scheduled to occur during the inspection period. Also a list of any BWRVIP exams thatare to be performed this outage.7)List with description of ISI related issues (e.g. list based upon data base searches usingkey words related to piping, ASME Code, cracks, wear, thinning, leakage, rust, corrosion,BWRVIP, welding, etc.) entered into your corrective action system since the beginning ofthe last refueling outage (both Units).8)Copies of any 10 CFR Part 21 reports applicable to your structures systems orcomponents within the scope of Section XI of the ASME Code, that have been identifiedsince the beginning of the last refueling outage.9)A copy of your most current revision of the ISI Program Manual and Plan for thisInterval. If these documents are not available in electronic format, then pleaseprovide during the inspection week.
10)List of any temporary non-code repairs in service.
11)List of known locations that have pin-hole leaks, ASME Class 1, 2, 3.
12)Documentation that demonstrates how you are meeting all BWRVIP guidancedocuments or documentation that supports deviation from guidelines.13)Names and numbers for the following program leads:ISI contacts (Examination, planning)Containment Exams Snubbers and Supports Repair and Replacement program manager Site Welding Engineer Licensing contacts BWRVIPB.Information to be provided on-site to the inspector at the entrance meeting (March 6, 2006):1)For welds selected by the inspector from A.5 above, copies of the following documents:a)Document of the weld number and location (e.g., system, train, branch);b)Document with a detail of the weld construction; c)Applicable Code Edition and Addenda for weldment; d)Applicable Code Edition and Addenda for welding procedures; e)Applicable weld procedures (WPS) used to fabricate the welds; f)Copies of procedure qualification records (PQRs) supporting the WPS onselected welds;g)Copies of mechanical test reports identified in the PQRs above; h)Copies of the nonconformance reports for the selected welds; 3i)Radiographs of the selected welds and access to equipment to allow viewingradiographs; andj)Copies of the preservice examination records for the selected welds.2)A copy of the corrective actions and supporting documentation for the ISI relatedcorrective action issues selected by the inspector from A.7 above.3)A copy of the examination records and associated corrective action documents for thenondestructive examination reports with relevant indications on Code Class 1 & 2 systems selected by the inspector from A.4 above.4)Updated schedules for item A.1 (including schedule showing contingency repair plans ifavailable).5)Ready access to the Editions of the ASME Code (Sections III, V, IX and XI) applicableto the inservice inspection program and the repair/replacement program. (e.g. copies provided to the inspector to use for the duration of the inspection at the on-site inspection location).Inspector Contact Information:Tomy A. NazarioReactor Inspector (404) 562-4710 E-mail: txn1@nrc.govMailing AddressU.S. Nuclear Regulatory Commission-Region IISam Nunn Atlanta Federal Center, 23 T85 Attn: Tomy Nazario Atlanta, GA 30303-8931