{{IR-Nav| site = 05000277 | year = 2003 | report number = 010 | url = https://www.nrc.gov/reactors/operating/oversight/reports/pb_2003010.pdf }}
{{Adams
| number = ML031980604
| issue date = 07/16/2003
| title = IR 05000277-03-010, 05000278/03-010; on 06/02/03-06/05/03; Peach Bottom Atomic Power Station; Temporary Instruction 2515/148, Inspection of Nuclear Reactor Safeguards Interim Compensatory Measures
| author name = Lanning W
| author affiliation = NRC/RGN-I/DRS
| addressee name = Skolds J
| addressee affiliation = Exelon Generation Co, LLC
| docket = 05000277, 05000278
| license number = DPR-044, DPR-056
| contact person =
| document report number = IR-03-010
| document type = Inspection Report, Letter
| page count = 5
}}
 
{{IR-Nav| site = 05000277 | year = 2003 | report number = 010 }}
 
=Text=
{{#Wiki_filter:uly 16, 2003
 
==SUBJECT:==
INSPECTION OF NUCLEAR REACTOR SAFEGUARDS INTERIM COMPENSATORY MEASURES, TEMPORARY INSTRUCTION 2515/148, REVISION 2, INSPECTION REPORT NOS. 50-277/03-010, 50-278/03-010
 
==Dear Mr. Skolds:==
On June 5, 2003, the U.S. Nuclear Regulatory Commission (USNRC) completed a special inspection at the Peach Bottom Atomic Power Station, in accordance with Temporary Instruction 2515/148, Revision 2, Inspection of Nuclear Reactor Safeguards Interim Compensatory Measures. The enclosed report documents the inspection findings which were discussed on June 5, 2003, with Mr. John Stone, Plant Manager, Mr. Wayne Trump, Manager of Security, and other members of your staff.
 
This inspection examined activities conducted under your license as they relate to safety and to compliance with the Commissions rules and regulations, and with the conditions of your license. The specific purpose of this inspection was to verify that Exelon effectively implemented the interim compensatory measures (ICMs) at the Peach Bottom Atomic Power Station (Peach Bottom) imposed by the Order Modifying License issued February 25, 2002; and that the ICMs were successfully incorporated into your site physical protection strategy and security program. Additionally, the objective of the inspection was to ensure that relevant procedures were developed and implemented, and that interface agreements with offsite organizations were developed and coordinated, as required. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.
 
Based on the results of this inspection, no findings of significance were identified. The inspection team verified and confirmed that Exelon had effectively implemented the specifications of the Order Modifying License issued February 25, 2002 at the Peach Bottom Atomic Power Station (Peach Bottom).
 
Mr. John In accordance with 10 CFR 2.790 of the NRCs "Rules of Practice," a copy of this letter, without enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
 
Should you have any questions concerning this inspection, we will be pleased to discuss them with you.
 
Sincerely,
/RA by R. V. Crlenjak Acting for/
Wayne D. Lanning, Director Division of Reactor Safety Docket Nos. 50-277, 50-278 License Nos. DPR-44, DPR-56 Enclosure: NRC Inspection Report Nos. 50-277/03-010, 50-278/03-010 (CONTAINS (SGI))
cc w/o encl w/oSGI:
Senior Vice President, Mid-Atlantic Regional Operating Group President and CNO, Exelon Generation Company, LLC Senior Vice President, Operations Support Vice President, Mid-Atlantic Operations Support Senior Vice President, Nuclear Services Site Vice President, Peach Bottom Atomic Power Station Plant Manager, Peach Bottom Atomic Power Station Vice President - Licensing Director, Licensing, Mid-Atlantic Regional Operating Group Director, Nuclear Oversight Regulatory Assurance Manager - Exelon Generation Company, LLC Vice President and General Counsel D. Quinlan, Manager, Financial Control, PSEG R. McLean, Power Plant Siting, Nuclear Evaluations D. Levin, Acting Secretary of Harford County Council R. Ochs, Maryland Safe Energy Coalition Mr. & Mrs. Dennis Hiebert, Peach Bottom Alliance Mr. & Mrs. Kip Adams D. Allard, Director, Pennsylvania Bureau of Radiation Protection
 
Mr. John
}}

Revision as of 21:49, 21 March 2020

IR 05000277-03-010, 05000278/03-010; on 06/02/03-06/05/03; Peach Bottom Atomic Power Station; Temporary Instruction 2515/148, Inspection of Nuclear Reactor Safeguards Interim Compensatory Measures
ML031980604
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 07/16/2003
From: Lanning W
Division of Reactor Safety I
To: Skolds J
Exelon Generation Co
References
IR-03-010
Download: ML031980604 (5)


Text

uly 16, 2003

SUBJECT:

INSPECTION OF NUCLEAR REACTOR SAFEGUARDS INTERIM COMPENSATORY MEASURES, TEMPORARY INSTRUCTION 2515/148, REVISION 2, INSPECTION REPORT NOS. 50-277/03-010, 50-278/03-010

Dear Mr. Skolds:

On June 5, 2003, the U.S. Nuclear Regulatory Commission (USNRC) completed a special inspection at the Peach Bottom Atomic Power Station, in accordance with Temporary Instruction 2515/148, Revision 2, Inspection of Nuclear Reactor Safeguards Interim Compensatory Measures. The enclosed report documents the inspection findings which were discussed on June 5, 2003, with Mr. John Stone, Plant Manager, Mr. Wayne Trump, Manager of Security, and other members of your staff.

This inspection examined activities conducted under your license as they relate to safety and to compliance with the Commissions rules and regulations, and with the conditions of your license. The specific purpose of this inspection was to verify that Exelon effectively implemented the interim compensatory measures (ICMs) at the Peach Bottom Atomic Power Station (Peach Bottom) imposed by the Order Modifying License issued February 25, 2002; and that the ICMs were successfully incorporated into your site physical protection strategy and security program. Additionally, the objective of the inspection was to ensure that relevant procedures were developed and implemented, and that interface agreements with offsite organizations were developed and coordinated, as required. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.

Based on the results of this inspection, no findings of significance were identified. The inspection team verified and confirmed that Exelon had effectively implemented the specifications of the Order Modifying License issued February 25, 2002 at the Peach Bottom Atomic Power Station (Peach Bottom).

Mr. John In accordance with 10 CFR 2.790 of the NRCs "Rules of Practice," a copy of this letter, without enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Should you have any questions concerning this inspection, we will be pleased to discuss them with you.

Sincerely,

/RA by R. V. Crlenjak Acting for/

Wayne D. Lanning, Director Division of Reactor Safety Docket Nos. 50-277, 50-278 License Nos. DPR-44, DPR-56 Enclosure: NRC Inspection Report Nos. 50-277/03-010, 50-278/03-010 (CONTAINS (SGI))

cc w/o encl w/oSGI:

Senior Vice President, Mid-Atlantic Regional Operating Group President and CNO, Exelon Generation Company, LLC Senior Vice President, Operations Support Vice President, Mid-Atlantic Operations Support Senior Vice President, Nuclear Services Site Vice President, Peach Bottom Atomic Power Station Plant Manager, Peach Bottom Atomic Power Station Vice President - Licensing Director, Licensing, Mid-Atlantic Regional Operating Group Director, Nuclear Oversight Regulatory Assurance Manager - Exelon Generation Company, LLC Vice President and General Counsel D. Quinlan, Manager, Financial Control, PSEG R. McLean, Power Plant Siting, Nuclear Evaluations D. Levin, Acting Secretary of Harford County Council R. Ochs, Maryland Safe Energy Coalition Mr. & Mrs. Dennis Hiebert, Peach Bottom Alliance Mr. & Mrs. Kip Adams D. Allard, Director, Pennsylvania Bureau of Radiation Protection

Mr. John