IR 05000346/2005018: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 1: Line 1:
{{IR-Nav| site = 05000346 | year = 2005 | report number = 018 | url = https://www.nrc.gov/reactors/operating/oversight/reports/davi_2005018.pdf }}
{{Adams
| number = ML053400088
| issue date = 12/05/2005
| title = IR 05000346-05-018, on 10/17/2005 - 10/21/2005; Davis-Besse Nuclear Power Station; Supplemental Inspection; IP 95001, Inspection for One or Two White Inputs in a Strategic Performance Area.
| author name = Pederson C
| author affiliation = NRC/RGN-III/DRS
| addressee name = Bezilla M
| addressee affiliation = FirstEnergy Nuclear Operating Co
| docket = 05000346
| license number = NPF-003
| contact person =
| case reference number = EA-04-231, EA-04-232
| document report number = IR-05-018
| document type = Inspection Report, Letter
| page count = 26
}}
 
{{IR-Nav| site = 05000346 | year = 2005 | report number = 018 }}
 
=Text=
{{#Wiki_filter:
}}

Revision as of 00:05, 8 December 2019

IR 05000346-05-018, on 10/17/2005 - 10/21/2005; Davis-Besse Nuclear Power Station; Supplemental Inspection; IP 95001, Inspection for One or Two White Inputs in a Strategic Performance Area.
ML053400088
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 12/05/2005
From: Pederson C
Division of Reactor Safety III
To: Bezilla M
FirstEnergy Nuclear Operating Co
References
EA-04-231, EA-04-232 IR-05-018
Download: ML053400088 (26)


Text