| number = ML15188A369 | |||
| issue date = 06/29/2015 | |||
| title = License Amendment Request - Cyber Security Plan Implementation Schedule River Bend Station - Unit 1 | |||
| author name = Olson E W | |||
| author affiliation = Entergy Operations, Inc | |||
| addressee name = | |||
| addressee affiliation = NRC/Document Control Desk, NRC/NRR | |||
| docket = 05000458 | |||
| license number = NPF-047 | |||
| contact person = | |||
| case reference number = RBF1-15-0095, RBG-47580 | |||
| document type = Letter | |||
| page count = 7 | |||
| project = | |||
| stage = Other | |||
}} | |||
=Text= | |||
{{#Wiki_filter:vEntergy E ntergy Operations, Inc.River Bend Station 5485 U.S. Highway 61 N St. Francisville, LA 70775 Tel 225-381-4374 Eric W. Olson Site Vice President RBG-47580 RBF1-15-0095 June 29, 2015 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 | |||
==SUBJECT:== | |||
License Amendment Request -Cyber Security Plan Implementation Schedule River Bend Station -Unit 1 License No. NPF-47 Docket No. 50-458 | |||
==REFERENCES:== | |||
: 1. NRC Internal Memorandum to Barry Westreich from Russell Felts, Review Criteria for 10 CFR 73.54, Cyber Security Implementation Schedule Milestone 8 License Amendment Requests, dated October 24, 2013 (ADAMS Accession No. ML1 3295A467)2. NRC letter to Entergy, Issuance of Amendment Re: Approval of Cyber Security Plan, dated July 29, 2011 (RBC-50945) | |||
: 3. NRC letter to Entergy, Issuance of Amendment Re: Approval of Cyber Security Plan, dated December 12, 2014 (RBC-51271) (ADAMS Accession No. ML14304A181) | |||
: 4. NRC internal memorandum from the Director Cyber Security Directorate, Office of Nuclear Security and Incident Response, to the Region I through IV Directors of Reactor Safety, Enhanced Guidance for Licensee Near-Term Corrective Actions to Address Cyber Security Inspection Findings and Licensee Eligibility for "Good-Faith" Attempt Discretion, Enclosure 2, Milestone 4 Resolution Actions, dated July 1, 2013 | |||
==Dear Sir or Madam:== | |||
Pursuant to 10 CFR 50.4 and 10 CFR 50.90, Entergy Operations, Inc. (Entergy) hereby requests an amendment to the Renewed Facility Operating License for River Bend Station This letter contains Security-Related Information | |||
-Attachments 1 and 4 are withheld from public disclosure per 10 CFR 2.390.-so of ýN KL RBG-47580 Cyber Security Implementation Schedule License Amendment Request Page 2 of 3 (RBS). In accordance with the guidelines provided by Reference 1, this request proposes a change to the RBS Cyber Security Plan Milestone 8 full implementation date as set forth in the Cyber Security Plan Implementation Schedule approved by References 2 and 3.Attachment 1 provides an evaluation of the proposed change. Attachment 2 contains proposed marked-up operating license pages for the Physical Protection license condition for River Bend Station to reference the commitment change provided in this submittal. | |||
Attachment 3 contains the proposed revised operating license pages. Attachment 4 contains a change to the date of Implementation Milestone 8.The proposed changes have been evaluated in accordance with 10 CFR 50.91 (a)(1) using criteria in 10 CFR 50.92(c), and it has been determined that the changes involve no significant hazards consideration. | |||
The bases for these determinations are included in Attachment 1.Entergy requests this license amendment be effective as of its date of issuance. | |||
Although this request is neither exigent nor emergency, your review and approval is requested prior to June 30, 2016.The revised commitment contained in this submittal is summarized in Attachment | |||
: 5. Should you have any questions concerning this letter, or require additional information, please contact Mr. Joseph Clark at (225)381-4177. | |||
I declare under penalty of perjury that the foregoing is true and correct. Executed on June 29, 2015.Sincerely, EWO/TAE/JAC/tjb Attachments: | |||
: 1. Analysis of Proposed Operating License Change 2. Proposed RBS Operating License Change (mark-up).3. Revised RBS Operating License Page 4. Revised Cyber Security Plan Implementation Schedule 5. List of Regulatory Commitments This letter contains Security-Related Information | |||
-Attachments 1 and 4 are withheld from public disclosure per 10 CFR 2.390 RBG-47580 Cyber Security Implementation Schedule License Amendment Request Page 3 of 3 cc: Regional Administrator U. S. Nuclear Regulatory Commission Region IV 1600 East Lamar Boulevard Arlington, TX 76011-4511 NRC Senior Resident Inspector PO Box 1050 St. Francisville, LA 70775 U. S. Nuclear Regulatory Commission Attn: Mr. Alan B. Wang, Project Manager MS 0-8 BI One White Flint North 11555 Rockville Pike Rockville, MD 20852 Ji Young Wiley (w/o Attachments 1 and 4)Louisiana Department of Environmental Quality Office of Environmental Quality P. O. Box 4312 Baton Rouge, LA 70821-4312 Central Records Clerk (w/o Attachments 1 and 4)Public Utility Commission of Texas 1701 N. Congress Ave.Austin, TX 78711-3326 This letter contains Security-Related Information | |||
-Attachments 1 and 4 are withheld from public disclosure per 10 CFR 2.390 Attachment 2 RBG-47580 Proposed River Bend Station Operating License Change (mark-up) | |||
-7 D. The licensee shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification, and safeguards contingency plans including amendments made pursuant to the provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). | |||
The combined set of plans, which contain Safeguards Information protected under 10 CFR 73.21, is entitled: "Physical Security, Safeguards Contingency and Training & Qualification Plan," submitted by letter dated May 16, 2006.E. The licensee shall fully implement and maintain in effect all provisions of the Commission-approved cyber security plan (CSP), including changes made pursuant to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). | |||
The licensee's CSP was approved by License Amendment No. 171 as supplemented by changes approved by License Amendment Nos. 184, and xxx.F. Except as otherwise provided in the Technical Specifications or Environmental Protection Plan, EOI shall report any violations of the requirements contained in Section 2, Items C.(1); C.(3) through (9); and C.(11) through (16) of this license in the following manner: initial notification shall be made within 24 hours to the NRC Operations Center via the Emergency Notification System with written followup within 60 days in accordance with the procedures described in 10 CFR 50.73(b), (c) and (e).G. The licensee shall have and maintain financial protection of such type and in such amounts as the Commission shall require in accordance with Section 170 of the Atomic Energy Act of 1954, as amended, to cover public liability claims.H. This license is effective as of the date of issuance and shall expire at midnight on August 29, 2025.FOR THE NUCLEAR REGULATORY COMMISSION Harold R. Denton, Director Office of Nuclear Reactor Regulation | |||
==Enclosures:== | |||
: 1. Attachments 1-5 2. Appendix A -Technical Specifications (NUREG-1 172)3. Appendix B -Environmental Protection Plan 4. Appendix C -Antitrust Conditions Date of Issuance: | |||
November 20, 1985 Revised: December 16, 1993.Amendment No. 70 79 85 !1@ 135 171, 184, xxx Rovised by ,ettor dated ,ctobcr 28, 2004 Revised by letter dated November 10, 2004 Revised by letter dated Jan~uar; 24, 2007 Attachment 3 RBG-47580 Revised River Bend Station Operating License Page D. The licensee shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification, and safeguards contingency plans including amendments made pursuant to the provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). | |||
The combined set of plans, which contain Safeguards Information protected under 10 CFR 73.21, is entitled: "Physical Security, Safeguards Contingency and Training & Qualification Plan," submitted by letter dated May 16, 2006.E. The licensee shall fully implement and maintain in effect all provisions of the Commission-approved cyber security plan (CSP), including changes made pursuant to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). | |||
The licensee's CSP was approved by License Amendment No. 171 as supplemented by changes approved by License Amendment Nos. 184, and XXX.F. Except as otherwise provided in the Technical Specifications or Environmental Protection Plan, EOI shall report any violations of the requirements contained in Section 2, Items C.(1); C.(3) through (9); and C.(11) through (16) of this license in the following manner: initial notification shall be made within 24 hours to the NRC Operations Center via the Emergency Notification System with written followup within 60 days in accordance with the procedures described in 10 CFR 50.73(b), (c) and (e).G. The licensee shall have and maintain financial protection of such type and in such amounts as the Commission shall require in accordance with Section 170 of the Atomic Energy Act of 1954, as amended, to cover public liability claims.H. This license is effective as of the date of issuance and shall expire at midnight on August 29, 2025.FOR THE NUCLEAR REGULATORY COMMISSION Harold R. Denton, Director Office of Nuclear Reactor Regulation | |||
==Enclosures:== | |||
: 5. Attachments 1-5 6. Appendix A -Technical Specifications (NUREG-1 172)7. Appendix B -Environmental Protection Plan 8. Appendix C -Antitrust Conditions Date of Issuance: | |||
November 20, 1985 Revised: December 16, 1993 Amendment No. 70 79 85 119 135 171,184 Revised by letter dated 28, 2004 Revised by letter dated November 19, 2004 Revised by letter dated Januar,' 24, 2007}} | |||
Revision as of 02:55, 17 March 2019
| ML15188A369 | |
| Person / Time | |
|---|---|
| Site: | River Bend |
| Issue date: | 06/29/2015 |
| From: | Olson E W Entergy Operations |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| RBF1-15-0095, RBG-47580 | |
| Download: ML15188A369 (7) | |
Text
vEntergy E ntergy Operations, Inc.River Bend Station 5485 U.S. Highway 61 N St. Francisville, LA 70775 Tel 225-381-4374 Eric W. Olson Site Vice President RBG-47580 RBF1-15-0095 June 29, 2015 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555
SUBJECT:
License Amendment Request -Cyber Security Plan Implementation Schedule River Bend Station -Unit 1 License No. NPF-47 Docket No. 50-458
REFERENCES:
- 1. NRC Internal Memorandum to Barry Westreich from Russell Felts, Review Criteria for 10 CFR 73.54, Cyber Security Implementation Schedule Milestone 8 License Amendment Requests, dated October 24, 2013 (ADAMS Accession No. ML1 3295A467)2. NRC letter to Entergy, Issuance of Amendment Re: Approval of Cyber Security Plan, dated July 29, 2011 (RBC-50945)
- 3. NRC letter to Entergy, Issuance of Amendment Re: Approval of Cyber Security Plan, dated December 12, 2014 (RBC-51271) (ADAMS Accession No. ML14304A181)
- 4. NRC internal memorandum from the Director Cyber Security Directorate, Office of Nuclear Security and Incident Response, to the Region I through IV Directors of Reactor Safety, Enhanced Guidance for Licensee Near-Term Corrective Actions to Address Cyber Security Inspection Findings and Licensee Eligibility for "Good-Faith" Attempt Discretion, Enclosure 2, Milestone 4 Resolution Actions, dated July 1, 2013
Dear Sir or Madam:
Pursuant to 10 CFR 50.4 and 10 CFR 50.90, Entergy Operations, Inc. (Entergy) hereby requests an amendment to the Renewed Facility Operating License for River Bend Station This letter contains Security-Related Information
-Attachments 1 and 4 are withheld from public disclosure per 10 CFR 2.390.-so of ýN KL RBG-47580 Cyber Security Implementation Schedule License Amendment Request Page 2 of 3 (RBS). In accordance with the guidelines provided by Reference 1, this request proposes a change to the RBS Cyber Security Plan Milestone 8 full implementation date as set forth in the Cyber Security Plan Implementation Schedule approved by References 2 and 3.Attachment 1 provides an evaluation of the proposed change. Attachment 2 contains proposed marked-up operating license pages for the Physical Protection license condition for River Bend Station to reference the commitment change provided in this submittal.
Attachment 3 contains the proposed revised operating license pages. Attachment 4 contains a change to the date of Implementation Milestone 8.The proposed changes have been evaluated in accordance with 10 CFR 50.91 (a)(1) using criteria in 10 CFR 50.92(c), and it has been determined that the changes involve no significant hazards consideration.
The bases for these determinations are included in Attachment 1.Entergy requests this license amendment be effective as of its date of issuance.
Although this request is neither exigent nor emergency, your review and approval is requested prior to June 30, 2016.The revised commitment contained in this submittal is summarized in Attachment
- 5. Should you have any questions concerning this letter, or require additional information, please contact Mr. Joseph Clark at (225)381-4177.
I declare under penalty of perjury that the foregoing is true and correct. Executed on June 29, 2015.Sincerely, EWO/TAE/JAC/tjb Attachments:
- 1. Analysis of Proposed Operating License Change 2. Proposed RBS Operating License Change (mark-up).3. Revised RBS Operating License Page 4. Revised Cyber Security Plan Implementation Schedule 5. List of Regulatory Commitments This letter contains Security-Related Information
-Attachments 1 and 4 are withheld from public disclosure per 10 CFR 2.390 RBG-47580 Cyber Security Implementation Schedule License Amendment Request Page 3 of 3 cc: Regional Administrator U. S. Nuclear Regulatory Commission Region IV 1600 East Lamar Boulevard Arlington, TX 76011-4511 NRC Senior Resident Inspector PO Box 1050 St. Francisville, LA 70775 U. S. Nuclear Regulatory Commission Attn: Mr. Alan B. Wang, Project Manager MS 0-8 BI One White Flint North 11555 Rockville Pike Rockville, MD 20852 Ji Young Wiley (w/o Attachments 1 and 4)Louisiana Department of Environmental Quality Office of Environmental Quality P. O. Box 4312 Baton Rouge, LA 70821-4312 Central Records Clerk (w/o Attachments 1 and 4)Public Utility Commission of Texas 1701 N. Congress Ave.Austin, TX 78711-3326 This letter contains Security-Related Information
-Attachments 1 and 4 are withheld from public disclosure per 10 CFR 2.390 Attachment 2 RBG-47580 Proposed River Bend Station Operating License Change (mark-up)
-7 D. The licensee shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification, and safeguards contingency plans including amendments made pursuant to the provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and to the authority of 10 CFR 50.90 and 10 CFR 50.54(p).
The combined set of plans, which contain Safeguards Information protected under 10 CFR 73.21, is entitled: "Physical Security, Safeguards Contingency and Training & Qualification Plan," submitted by letter dated May 16, 2006.E. The licensee shall fully implement and maintain in effect all provisions of the Commission-approved cyber security plan (CSP), including changes made pursuant to the authority of 10 CFR 50.90 and 10 CFR 50.54(p).
The licensee's CSP was approved by License Amendment No. 171 as supplemented by changes approved by License Amendment Nos. 184, and xxx.F. Except as otherwise provided in the Technical Specifications or Environmental Protection Plan, EOI shall report any violations of the requirements contained in Section 2, Items C.(1); C.(3) through (9); and C.(11) through (16) of this license in the following manner: initial notification shall be made within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> to the NRC Operations Center via the Emergency Notification System with written followup within 60 days in accordance with the procedures described in 10 CFR 50.73(b), (c) and (e).G. The licensee shall have and maintain financial protection of such type and in such amounts as the Commission shall require in accordance with Section 170 of the Atomic Energy Act of 1954, as amended, to cover public liability claims.H. This license is effective as of the date of issuance and shall expire at midnight on August 29, 2025.FOR THE NUCLEAR REGULATORY COMMISSION Harold R. Denton, Director Office of Nuclear Reactor Regulation
Enclosures:
- 1. Attachments 1-5 2. Appendix A -Technical Specifications (NUREG-1 172)3. Appendix B -Environmental Protection Plan 4. Appendix C -Antitrust Conditions Date of Issuance:
November 20, 1985 Revised: December 16, 1993.Amendment No. 70 79 85 !1@ 135 171, 184, xxx Rovised by ,ettor dated ,ctobcr 28, 2004 Revised by letter dated November 10, 2004 Revised by letter dated Jan~uar; 24, 2007 Attachment 3 RBG-47580 Revised River Bend Station Operating License Page D. The licensee shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification, and safeguards contingency plans including amendments made pursuant to the provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and to the authority of 10 CFR 50.90 and 10 CFR 50.54(p).
The combined set of plans, which contain Safeguards Information protected under 10 CFR 73.21, is entitled: "Physical Security, Safeguards Contingency and Training & Qualification Plan," submitted by letter dated May 16, 2006.E. The licensee shall fully implement and maintain in effect all provisions of the Commission-approved cyber security plan (CSP), including changes made pursuant to the authority of 10 CFR 50.90 and 10 CFR 50.54(p).
The licensee's CSP was approved by License Amendment No. 171 as supplemented by changes approved by License Amendment Nos. 184, and XXX.F. Except as otherwise provided in the Technical Specifications or Environmental Protection Plan, EOI shall report any violations of the requirements contained in Section 2, Items C.(1); C.(3) through (9); and C.(11) through (16) of this license in the following manner: initial notification shall be made within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> to the NRC Operations Center via the Emergency Notification System with written followup within 60 days in accordance with the procedures described in 10 CFR 50.73(b), (c) and (e).G. The licensee shall have and maintain financial protection of such type and in such amounts as the Commission shall require in accordance with Section 170 of the Atomic Energy Act of 1954, as amended, to cover public liability claims.H. This license is effective as of the date of issuance and shall expire at midnight on August 29, 2025.FOR THE NUCLEAR REGULATORY COMMISSION Harold R. Denton, Director Office of Nuclear Reactor Regulation
Enclosures:
- 5. Attachments 1-5 6. Appendix A -Technical Specifications (NUREG-1 172)7. Appendix B -Environmental Protection Plan 8. Appendix C -Antitrust Conditions Date of Issuance:
November 20, 1985 Revised: December 16, 1993 Amendment No. 70 79 85 119 135 171,184 Revised by letter dated 28, 2004 Revised by letter dated November 19, 2004 Revised by letter dated Januar,' 24, 2007