IR 05000266/2018412: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 2: Line 2:
| number = ML18277A353
| number = ML18277A353
| issue date = 10/04/2018
| issue date = 10/04/2018
| title = Point Beach Nuclear Plant, Units 1 and 2 - NRC Material Control and Accounting Program Inspection Report 05000266/2018412 and 05000301/2018412
| title = NRC Material Control and Accounting Program Inspection Report 05000266/2018412 and 05000301/2018412
| author name = Cameron J
| author name = Cameron J
| author affiliation = NRC/RGN-III/DRP/B4
| author affiliation = NRC/RGN-III/DRP/B4

Revision as of 22:32, 30 January 2019

NRC Material Control and Accounting Program Inspection Report 05000266/2018412 and 05000301/2018412
ML18277A353
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 10/04/2018
From: Jamnes Cameron
Reactor Projects Region 3 Branch 4
To: Craven R
Point Beach
References
IR 2018412
Download: ML18277A353 (3)


Text

/RA Karla Stoedter Acting for/

,

OFFICIAL RECORD COPY