| issue date = 09/15/2006
| issue date = 09/15/2006
| title = IR 05000171-06-013, on July 5-6, 2006, Peach Bottom Atomic Power Station, Exelon Generation Company, LLC Delta, Pennsylvania
| title = IR 05000171-06-013, on July 5-6, 2006, Peach Bottom Atomic Power Station, Exelon Generation Company, LLC Delta, Pennsylvania
| author name = Miller M T
| author name = Miller M
| author affiliation = NRC/RGN-I/DNMS/DB
| author affiliation = NRC/RGN-I/DNMS/DB
| addressee name = Braun R C
| addressee name = Braun R
| addressee affiliation = Exelon Generation Co, LLC
| addressee affiliation = Exelon Generation Co, LLC
| docket = 05000171
| docket = 05000171
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I475 ALLENDALE ROADKING OF PRUSSIA, PENNSYLVANIA 19406-1415 September 15, 2006Docket No.05000171License No.DPR-12 Robert C. BraunSite Vice President Peach Bottom Atomic Power Station Exelon Generation Company, LLC 1848 Lay Road Delta, PA 17314
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I475 ALLENDALE ROADKING OF PRUSSIA, PENNSYLVANIA 19406-1415 September 15, 2006Docket No.05000171License No.DPR-12 Robert C. BraunSite Vice President Peach Bottom Atomic Power Station Exelon Generation Company, LLC 1848 Lay Road Delta, PA 17314SUBJECT:INSPECTION 05000171/2006013, PEACH BOTTOM ATOMIC POWERSTATION, EXELON GENERATION COMPANY, LLC, DELTA, PENNSYLVANIA
 
SUBJECT: INSPECTION 05000171/2006013, PEACH BOTTOM ATOMIC POWERSTATION, EXELON GENERATION COMPANY, LLC, DELTA, PENNSYLVANIA


==Dear Mr. Braun:==
==Dear Mr. Braun:==
The NRC has completed an inspection at your Delta, PA facility, which covered an inspectionperiod that began on July 5, 2006, and concluded on August 07, 2006. The findings of theinspection were discussed with you and members of your staff upon the conclusion of the site inspection on July 6, 2006. Additional information regarding Unit 1 water sampling activities provided on August 4, 2006 was reviewed and a summary of the inspection findings for the entire inspection period was discussed with Mr. Foss of your staff during a telephone conversation on August 18, 2006. The enclosed report presents the results of that inspection.Your programs for management oversight of the Unit 1 Technical Specifications, correctiveactions, occupational exposure controls, radiological environmental monitoring, and radioactive effluent controls were inspected during this inspection period. The inspection consisted of selective examinations of procedures and representative records, interviews with personnel, and observations made by the inspector. The programs related to the Unit 1 Technical Specifications were appropriately implemented. Within the scope of this inspection, no violations were identified.In accordance with Section 2.390 of the NRC's "Rules and Practices," Part 2, Title 10, Code ofFederal Regulations, a copy of this letter and its enclosure will be placed in the NRC PublicDocument Room (PDR) and will be accessible from the NRC Web site athttp://www.nrc.gov/NRC/ADAMS/index.html. No reply to this letter is required.
The NRC has completed an inspection at your Delta, PA facility, which covered an inspectionperiod that began on July 5, 2006, and concluded on August 07, 2006. The findings of theinspection were discussed with you and members of your staff upon the conclusion of the site inspection on July 6, 2006. Additional information regarding Unit 1 water sampling activities provided on August 4, 2006 was reviewed and a summary of the inspection findings for the entire inspection period was discussed with Mr. Foss of your staff during a telephone conversation on August 18, 2006. The enclosed report presents the results of that inspection.Your programs for management oversight of the Unit 1 Technical Specifications, correctiveactions, occupational exposure controls, radiological environmental monitoring, and radioactive effluent controls were inspected during this inspection period. The inspection consisted of selective examinations of procedures and representative records, interviews with personnel, and observations made by the inspector. The programs related to the Unit 1 Technical Specifications were appropriately implemented. Within the scope of this inspection, no violations were identified.In accordance with Section 2.390 of the NRC's "Rules and Practices," Part 2, Title 10, Code ofFederal Regulations, a copy of this letter and its enclosure will be placed in the NRC PublicDocument Room (PDR) and will be accessible from the NRC Web site athttp://www.nrc.gov/NRC/ADAMS/index.html. No reply to this letter is required.


Sincerely,/RA/Marie Miller, Chief Decommissioning Branch Division of Nuclear Materials Safety
Sincerely,
 
/RA/Marie Miller, Chief Decommissioning Branch Division of Nuclear Materials SafetyEnclosure:Inspection Report No. 05000171/2006013
===Enclosure:===
Inspection Report No. 05000171/2006013
}}
}}

Revision as of 11:50, 13 July 2019

IR 05000171-06-013, on July 5-6, 2006, Peach Bottom Atomic Power Station, Exelon Generation Company, LLC Delta, Pennsylvania
ML062620486
Person / Time
Site: Peach Bottom Constellation icon.png
Issue date: 09/15/2006
From: Mark Miller
Decommissioning Branch I
To: Braun R
Exelon Generation Co
References
IR-06-013
Download: ML062620486 (10)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I475 ALLENDALE ROADKING OF PRUSSIA, PENNSYLVANIA 19406-1415 September 15, 2006Docket No.05000171License No.DPR-12 Robert C. BraunSite Vice President Peach Bottom Atomic Power Station Exelon Generation Company, LLC 1848 Lay Road Delta, PA 17314SUBJECT:INSPECTION 05000171/2006013, PEACH BOTTOM ATOMIC POWERSTATION, EXELON GENERATION COMPANY, LLC, DELTA, PENNSYLVANIA

Dear Mr. Braun:

The NRC has completed an inspection at your Delta, PA facility, which covered an inspectionperiod that began on July 5, 2006, and concluded on August 07, 2006. The findings of theinspection were discussed with you and members of your staff upon the conclusion of the site inspection on July 6, 2006. Additional information regarding Unit 1 water sampling activities provided on August 4, 2006 was reviewed and a summary of the inspection findings for the entire inspection period was discussed with Mr. Foss of your staff during a telephone conversation on August 18, 2006. The enclosed report presents the results of that inspection.Your programs for management oversight of the Unit 1 Technical Specifications, correctiveactions, occupational exposure controls, radiological environmental monitoring, and radioactive effluent controls were inspected during this inspection period. The inspection consisted of selective examinations of procedures and representative records, interviews with personnel, and observations made by the inspector. The programs related to the Unit 1 Technical Specifications were appropriately implemented. Within the scope of this inspection, no violations were identified.In accordance with Section 2.390 of the NRC's "Rules and Practices," Part 2, Title 10, Code ofFederal Regulations, a copy of this letter and its enclosure will be placed in the NRC PublicDocument Room (PDR) and will be accessible from the NRC Web site athttp://www.nrc.gov/NRC/ADAMS/index.html. No reply to this letter is required.

Sincerely,

/RA/Marie Miller, Chief Decommissioning Branch Division of Nuclear Materials SafetyEnclosure:Inspection Report No. 05000171/2006013