| issue date = 10/17/2006 | | issue date = 10/17/2006 | ||
| title = IR 05000333-06-009, James A. FitzPatrick Nuclear Generating Station; Ti 2515/168 | | title = IR 05000333-06-009, James A. FitzPatrick Nuclear Generating Station; Ti 2515/168 | ||
| author name = Cobey E | | author name = Cobey E | ||
| author affiliation = NRC/RGN-I/DRP/PB2 | | author affiliation = NRC/RGN-I/DRP/PB2 | ||
| addressee name = Dietrich P | | addressee name = Dietrich P | ||
| addressee affiliation = Entergy Nuclear Northeast | | addressee affiliation = Entergy Nuclear Northeast | ||
| docket = 05000333 | | docket = 05000333 | ||
| Line 20: | Line 20: | ||
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I475 ALLENDALE ROADKING OF PRUSSIA, PENNSYLVANIA 19406-1415 October 17, 2006Enclosure Contains SafeguardsInformation. When Separated fromenclosure, this document is notSAFEGUARDS InformationMr. Peter T. DietrichSite Vice President Entergy Nuclear Northeast James A. FitzPatrick Nuclear Power Plant Post Office Box 110 Lycoming, NY 13093 | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I475 ALLENDALE ROADKING OF PRUSSIA, PENNSYLVANIA 19406-1415 October 17, 2006Enclosure Contains SafeguardsInformation. When Separated fromenclosure, this document is notSAFEGUARDS InformationMr. Peter T. DietrichSite Vice President Entergy Nuclear Northeast James A. FitzPatrick Nuclear Power Plant Post Office Box 110 Lycoming, NY 13093 | ||
SUBJECT: JAMES A. FITZPATRICK NUCLEAR POWER PLANT - NRC INSPECTIONREPORT 05000333/2006009 | SUBJECT:JAMES A. FITZPATRICK NUCLEAR POWER PLANT - NRC INSPECTIONREPORT 05000333/2006009 | ||
==Dear Mr. Dietrich:== | ==Dear Mr. Dietrich:== | ||
| Line 29: | Line 29: | ||
In accordance with 10 CFR 2.390 and the NRC's "Rules of Practice," a copy of this letter will beavailable electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system, ADAMS. ADAMSis accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (The PublicElectronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter's enclosure will not beavailable for public inspection. WARNING: Violation of Section 147, "SafeguardsInformation," of the Atomic Agency Act is subjectto civil and criminal penalties.Safeguards information determination made by:Name/Title Barry C.Westreich, Chief Organization NSIR/DNS/SOS Basis 2/25/02 NRC Order Signature /RA/ Date 5/12/06 P. Dietrich-2-In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements foryour response, if any. This practice will ensure that your response will not be made availableelectronically for public inspection in the NRC Public Document Room or from the NRC's document system, ADAMS. If Safeguards Information is necessary to provide an acceptableresponse, please provide the level of protection described in 10 CFR 73.21. | In accordance with 10 CFR 2.390 and the NRC's "Rules of Practice," a copy of this letter will beavailable electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system, ADAMS. ADAMSis accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (The PublicElectronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter's enclosure will not beavailable for public inspection. WARNING: Violation of Section 147, "SafeguardsInformation," of the Atomic Agency Act is subjectto civil and criminal penalties.Safeguards information determination made by:Name/Title Barry C.Westreich, Chief Organization NSIR/DNS/SOS Basis 2/25/02 NRC Order Signature /RA/ Date 5/12/06 P. Dietrich-2-In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements foryour response, if any. This practice will ensure that your response will not be made availableelectronically for public inspection in the NRC Public Document Room or from the NRC's document system, ADAMS. If Safeguards Information is necessary to provide an acceptableresponse, please provide the level of protection described in 10 CFR 73.21. | ||
Sincerely,/RA/Eugene Cobey, ChiefProjects Branch 2 Division of Reactor ProjectsDocket No.50-333License No.DPR- | Sincerely, | ||
/RA/Eugene Cobey, ChiefProjects Branch 2 Division of Reactor ProjectsDocket No.50-333License No.DPR-59Enclosure: NRC Inspection Report 05000333/2006009 ( )cc w/o encl:K. Mulligan, General Manager, Plant Operations J. Costedio, Manager Regulatory Compliancecc w/encl; w/SGI:J. LaPlante, Site Security Manager, FitzPatrick Station J. Spath, State Liaison Officer to the NRC, State of New York F. Tabert, Homeland Security Advisor, State of New York | |||
NRC Inspection Report 05000333/2006009 ( )cc w/o encl:K. Mulligan, General Manager, Plant Operations J. Costedio, Manager Regulatory Compliancecc w/encl; w/SGI:J. LaPlante, Site Security Manager, FitzPatrick Station J. Spath, State Liaison Officer to the NRC, State of New York F. Tabert, Homeland Security Advisor, State of New York | |||
}} | }} | ||
Revision as of 10:14, 13 July 2019
| ML062900532 | |
| Person / Time | |
|---|---|
| Site: | FitzPatrick |
| Issue date: | 10/17/2006 |
| From: | Cobey E Reactor Projects Branch 2 |
| To: | Peter Dietrich Entergy Nuclear Northeast |
| References | |
| IR-06-009 | |
| Download: ML062900532 (3) | |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I475 ALLENDALE ROADKING OF PRUSSIA, PENNSYLVANIA 19406-1415 October 17, 2006Enclosure Contains SafeguardsInformation. When Separated fromenclosure, this document is notSAFEGUARDS InformationMr. Peter T. DietrichSite Vice President Entergy Nuclear Northeast James A. FitzPatrick Nuclear Power Plant Post Office Box 110 Lycoming, NY 13093
SUBJECT:JAMES A. FITZPATRICK NUCLEAR POWER PLANT - NRC INSPECTIONREPORT 05000333/2006009
Dear Mr. Dietrich:
On August 18, 2006, the U.S. Nuclear Regulatory Commission (NRC) completed an inspectionat your James A. Fitzpatrick Nuclear Power Plant. The enclosed inspection report documents the inspection results, which were discussed on September 19, 2006, with you and other members of your staff.The inspection examined activities conducted under your license as they relate to security andcompliance with the Commission's rules and regulations and with the conditions of your license.
The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.No findings of significance were identified.
In accordance with 10 CFR 2.390 and the NRC's "Rules of Practice," a copy of this letter will beavailable electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system, ADAMS. ADAMSis accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (The PublicElectronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter's enclosure will not beavailable for public inspection. WARNING: Violation of Section 147, "SafeguardsInformation," of the Atomic Agency Act is subjectto civil and criminal penalties.Safeguards information determination made by:Name/Title Barry C.Westreich, Chief Organization NSIR/DNS/SOS Basis 2/25/02 NRC Order Signature /RA/ Date 5/12/06 P. Dietrich-2-In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements foryour response, if any. This practice will ensure that your response will not be made availableelectronically for public inspection in the NRC Public Document Room or from the NRC's document system, ADAMS. If Safeguards Information is necessary to provide an acceptableresponse, please provide the level of protection described in 10 CFR 73.21.
Sincerely,
/RA/Eugene Cobey, ChiefProjects Branch 2 Division of Reactor ProjectsDocket No.50-333License No.DPR-59Enclosure: NRC Inspection Report 05000333/2006009 ( )cc w/o encl:K. Mulligan, General Manager, Plant Operations J. Costedio, Manager Regulatory Compliancecc w/encl; w/SGI:J. LaPlante, Site Security Manager, FitzPatrick Station J. Spath, State Liaison Officer to the NRC, State of New York F. Tabert, Homeland Security Advisor, State of New York