ML110910108: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 3: Line 3:
| issue date = 04/01/2011
| issue date = 04/01/2011
| title = 04/13/2011 Peach Bottom Annual Assessment Meeting Notice-REVISED-LOCATION Change
| title = 04/13/2011 Peach Bottom Annual Assessment Meeting Notice-REVISED-LOCATION Change
| author name = Krohn P G
| author name = Krohn P
| author affiliation = NRC/RGN-I/DRP/PB4
| author affiliation = NRC/RGN-I/DRP/PB4
| addressee name =  
| addressee name =  

Revision as of 21:04, 10 July 2019

04/13/2011 Peach Bottom Annual Assessment Meeting Notice-REVISED-LOCATION Change
ML110910108
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 04/01/2011
From: Paul Krohn
Reactor Projects Region 1 Branch 4
To:
KROHN, PG
References
11-004
Download: ML110910108 (3)


Text

LOCATION & TIME CHANGE MN No.11-004 U.S. NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF LICENSEE MEETING

April 1, 2011 Licensee: Exelon Generation Company, LLC Facilities: Peach Bottom Atomic Power Station, Units 2 and 3

Docket Nos: 50-277; 50-278

Date/ Time: April 13, 2011 at 6:00 p.m.

Location: Peach Bottom Inn 6085 Delta Road

Delta, PA 17314

Purpose: The NRC will meet with the public to discuss the NRC's assessment of safety performance of the Peach Bottom Atomic Power Station for 2010, as described in the Annual Assessment Letter dated March 4, 2011. The NRC will respond to questions on specific performance issues at the plant and our role in ensuring safe plant operations.

NRC Attendees: D. Roberts, Director, Division Reactor Projects P. Krohn, Chief, Division of Reactor Projects, Branch 4 F. Bower, Senior Resident Inspector, Peach Bottom

Public Participation: This is a Category 3 Meeting. The public will have the opportunity to communicate with the NRC staff fo llowing the discussion of the assessment of the safety performance of the Peach Bottom Atomic Power Station during 2010.

Meeting Contact: Paul G. Krohn, Chief, Projects Branch 4 610-337-5120

E-mail: paul.krohn@nrc.gov The NRC's annual assessment letter regarding Peach Bottom performance during 2010 can be found in ADAMS with Accession Number ML110620331

. ADAMS is accessible from the NRC website at: http://nrc.gov/reading-rm/adams.html. Additional information relative to the NRC's Annual Assessment process and the safety performance of Peach Bottom Atomic Power Station can be found on the NRC's website at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.

2 The NRC's Policy Statement, "Enhancing Public Participation in NRC Meetings," effective May 28, 2002, applies to this meeting. The policy statement may be found on the NRC website, http://www.nrc.gov/reading-rm/doc-collections/commission/policy/67fr36920.html , and contains information regarding visitors and security.

The NRC provides reasonable accommodation to indivi duals with disabilities where appropriate. If you need a reasonable accommodation to participate in this meeting, or need the meeting notice or other information from the meeting in another format (e.g., Braille, large print), please notify the NRC's meeting contact. Determinat ions on requests for reasonable accommodation will be made on a case-by-case basis. Persons requiring assistance to attend the meeting shall make their requests known to the NRC meeting contact no later than two business days prior to the meeting.

Attendance by other NRC personnel at this meeting should be made known by April 11, 2011, via telephone to the NRC meeting contact.

Because meetings are sometimes canceled or rescheduled as a result of unforeseen circumstances, please confirm the meeting schedule.

Approved by:

_____/RA/_

______________

Paul G. Krohn, Chief Projects Branch 4 Division of Reactor Projects cc: Distribution via ListServ

3 Agenda NRC's Annual Assessment Meeting Peach Bottom Atomic Power Station, Units 2 and 3 Peach Bottom Inn 6085 Delta Road Delta, PA 17314 April 13, 2011 6:00 pm Formal Meeting Introduction

Discuss Peach Bottom Atomic Power Station Performance in 2010 ................ (10 minutes)

Discuss US Plant Safe Operation In Light Of Japanese Event ....................... (10 minutes)

NRC to address public questions .................................................................... (as needed)

Closing Remarks ............................................................................................... (5 minutes)

2 The NRC's Policy Statement, "Enhancing Public Participation in NRC Meetings," effective May 28, 2002, applies to this meeting. The policy statement may be found on the NRC website, http://www.nrc.gov/reading-rm/doc-collections/commission/policy/67fr36920.html , and contains information regarding visitors and security.

The NRC provides reasonable accommodation to indivi duals with disabilities where appropriate. If you need a reasonable accommodation to participate in this meeting, or need the meeting notice or other information from the meeting in another format (e.g., Braille, large print), please notify the NRC's meeting contact. Determinat ions on requests for reasonable accommodation will be made on a case-by-case basis. Persons requiring assistance to attend the meeting shall make their requests known to the NRC meeting contact no later than two business days prior to

the meeting.

Attendance by other NRC personnel at this meeting should be made known by April 11, 2011, via telephone to the NRC meeting contact.

Because meetings are sometimes canceled or rescheduled as a result of unforeseen circumstances, please confirm the meeting schedule. . Approved by

_______/RA/____________

Paul G. Krohn, Chief Projects Branch 4 Division of Reactor ProjectsDistribution: (Via E-Mail): Executive Director for Operations, OEDO (RIDSEDOMAILCENTER) Deputy Executive Director for Reactor Programs, OEDO (RIDSEDOMAILCENTER)

Director, Office of Nuclear Reactor Regulation, NRR (RIDSNRROD) Deputy Director, Office of Nuclear Reactor Regulation, NRR (RIDSNRROD) Director, Division of Inspection and Regional Supprt, NRR/DIRS (RIDSNRRDIRS) Director, Division of Operating Reactor Licensing, NRR/DORL (RIDSNRRDORL) Asst. General Counsel Materials Litigation and Enforcement, OGC (RIDSOGCMAILCENTER)

W. Dean, RA D. Lews, DRA D. Roberts, DRP J. Clifford, DRP P. Wilson, DRS S. Kennedy, DRS P. Krohn, DRP A. Rosebrook, DRP E. Torres, DRP S. Ibarrola, DRP F. Bower, DRP, SRI A, Ziedonis, DRP RI S. Schmitt, DRP, OA D. Screnci, PAO N. Sheehan, PAO R. Barkley, ORA N. McNamara, SLO D. Tifft, SLO G. Matakas, ORA K. Heater, DRP D. Bearde, DRS T. Haverkamp, DNMS V. Lewis, RI Receptionist RidsNrrPMPeachBottomResource RidsNrrDorlLpl1-2Resource ROPreportsResource SUNSI Review Complete: AAR (Reviewer's Initials)

DOCUMENT NAME: G:\DRP\BRANCH4\Assessment (EOC, MC)\ROP 11\2010 EOC\AAM Notices\PBAPS 2010 AAMeeting Notice Revised.docx After declaring this document "An Official Agency Record" it will be released to the Public. To receive a copy of this document, indicate in the box:

" C" = Copy without attachment/enclosure " E" = Copy with attachment/enclosure " N" = No copy ML110910108 OFFICE lhp RI/DRP RI/DRP NAME ARosebrook/ AAR PKrohn/ PGK DATE 04/01/11 04/01/11 OFFICIAL RECORD COPY