IR 05000260/2013405: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(StriderTol Bot change)
 
Line 1: Line 1:
#REDIRECT [[IR 05000259/2013405]]
{{Adams
| number = ML13150A110
| issue date = 05/30/2013
| title = IR 05000260-13-405 and 05000270-13-405 on 05/02/2013 for Oconee, Units 1, 2 and 3, Physical Security. Cover Letter
| author name = Desai B
| author affiliation = NRC/RGN-II/DRS/PSB2
| addressee name = Batson S
| addressee affiliation = Duke Energy Corp
| docket = 05000269, 05000270, 05000287
| license number = DPR-038, DPR-047, DPR-055
| contact person = Linda K. Gruhler 404-997-4633
| document report number = IR-13-405
| document type = Inspection Report Correspondence, Letter
| page count = 4
}}
 
{{IR-Nav| site = 05000260 | year = 2013 | report number = 405 }}
 
=Text=
{{#Wiki_filter:May 30, 2013
 
==SUBJECT:==
OCONEE NUCLEAR STATION - U.S. NUCLEAR REGULATORY COMMISSION PHYSICAL SECURITY INSPECTION REPORT 05000269/2013405, 05000270/2013405, AND 05000287/2013405
 
==Dear Mr. Batson:==
On May 2, 2013, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Oconee Nuclear Station. The inspection covered one or more of the key attributes of the security cornerstone of the NRCs Reactor Oversight Process. The enclosed Inspection Report documents the inspection results that were discussed on May 2, 2013, with Mr. Thomas Ray, Plant Manager, and other members of your staff.
 
The inspection examined activities conducted under your license as they related to security and compliance with the Commissions rules and regulations, and with the conditions of your license. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel. Portions of the inspection were completed at your Kings Mountain Support Facility during the week of March 25 - 29, 2013.
 
No findings were identified during this inspection.
 
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRC's
"Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room, or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
 
However, the material enclosed herein contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRCs ADAMS. If you choose to provide a response and Security-Related Information is necessary to provide an acceptable response, please mark your entire response Security-Related Information - Withhold from public disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.
 
Sincerely,
/RA/
 
Binoy Desai, Chief
 
Plant Support Branch 2
 
Division of Reactor Safety
 
Docket No. 50-269, 50-270, and 50-287 License No. DPR-38, DPR-47, and DPR-55
 
Enclosure:
Inspection Report 05000269/2013405, 05000270/2013405, 05000287/2013405 w/Attachment: Supplemental Info (OUO)
 
cc: (See page 3)
 
ML13150A110 X SUNSI REVIEW COMPLETE X FORM 665 ATTACHED OFFICE RII:DRS/PSB2 RII:DRS/PSB2 RII: DRS/PSB2 RII:DRP
 
SIGNATURE JHW2 ICH BBD JHB1
 
NAME J. Wallo I. Hall B. Desai J. Bartley
 
DATE 5/ 28 /2013 5/ 28 /2013 5/ 29 /2013 5/ 28 /2013
 
E-MAIL COPY YES NO YES NO YES NO YES NO 3 cc:
 
Robert H. Guy Organizational Effectiveness Manager Oconee Nuclear Station Duke Energy Corporation 7800 Rochester Highway Seneca, SC 29672
 
Terry L. Patterson Safety Assurance Manager Duke Energy Corporation Oconee Nuclear Station 7800 Rochester Highway Seneca, SC 29672
 
Kent Alter Regulatory Compliance Manager Oconee Nuclear Station Duke Energy Corporation ON03RC 7800 Rochester Highway Seneca, SC 29672
 
Terry W. King Security Manager Oconee Nuclear Station Duke Energy Corporation 7800 Rochester Highway Seneca, SC 29672
 
Daniel C. Durham Security Safeguards Administrator Oconee Nuclear Station
 
M. Christopher Nolan Director - Regulatory Affairs General Office Duke Energy Corporation P. O. Box 1006 526 S. Church Street Charlotte, NC 28201-1006
 
David G. Black Fleet Security Manager General Office Duke Energy Corporation P. O. Box 1006 526 S. Church Street Charlotte, NC 28201-1006
 
Timothy J. Wadsworth Security Specialist General Office Duke Energy Corporation P. O. Box 1006 526 S. Church St., EC05P Charlotte, NC 28201-1006
 
David A. Cummings Associate General Counsel General Office Duke Energy Corporation P.O. Box 1006 526 S. Church St., EC07H Charlotte, NC 28201-1006 Duke Energy Corporation 7800 Rochester Highway Seneca, SC 29672
}}

Latest revision as of 08:09, 11 January 2025

IR 05000260-13-405 and 05000270-13-405 on 05/02/2013 for Oconee, Units 1, 2 and 3, Physical Security. Cover Letter
ML13150A110
Person / Time
Site: Oconee, Browns Ferry  Duke Energy icon.png
Issue date: 05/30/2013
From: Binoy Desai
NRC/RGN-II/DRS/PSB2
To: Batson S
Duke Energy Corp
Linda K. Gruhler 404-997-4633
References
IR-13-405
Download: ML13150A110 (4)


Text

May 30, 2013

SUBJECT:

OCONEE NUCLEAR STATION - U.S. NUCLEAR REGULATORY COMMISSION PHYSICAL SECURITY INSPECTION REPORT 05000269/2013405, 05000270/2013405, AND 05000287/2013405

Dear Mr. Batson:

On May 2, 2013, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Oconee Nuclear Station. The inspection covered one or more of the key attributes of the security cornerstone of the NRCs Reactor Oversight Process. The enclosed Inspection Report documents the inspection results that were discussed on May 2, 2013, with Mr. Thomas Ray, Plant Manager, and other members of your staff.

The inspection examined activities conducted under your license as they related to security and compliance with the Commissions rules and regulations, and with the conditions of your license. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel. Portions of the inspection were completed at your Kings Mountain Support Facility during the week of March 25 - 29, 2013.

No findings were identified during this inspection.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRC's

"Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room, or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

However, the material enclosed herein contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRCs ADAMS. If you choose to provide a response and Security-Related Information is necessary to provide an acceptable response, please mark your entire response Security-Related Information - Withhold from public disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.

Sincerely,

/RA/

Binoy Desai, Chief

Plant Support Branch 2

Division of Reactor Safety

Docket No. 50-269, 50-270, and 50-287 License No. DPR-38, DPR-47, and DPR-55

Enclosure:

Inspection Report 05000269/2013405, 05000270/2013405, 05000287/2013405 w/Attachment: Supplemental Info (OUO)

cc: (See page 3)

ML13150A110 X SUNSI REVIEW COMPLETE X FORM 665 ATTACHED OFFICE RII:DRS/PSB2 RII:DRS/PSB2 RII: DRS/PSB2 RII:DRP

SIGNATURE JHW2 ICH BBD JHB1

NAME J. Wallo I. Hall B. Desai J. Bartley

DATE 5/ 28 /2013 5/ 28 /2013 5/ 29 /2013 5/ 28 /2013

E-MAIL COPY YES NO YES NO YES NO YES NO 3 cc:

Robert H. Guy Organizational Effectiveness Manager Oconee Nuclear Station Duke Energy Corporation 7800 Rochester Highway Seneca, SC 29672

Terry L. Patterson Safety Assurance Manager Duke Energy Corporation Oconee Nuclear Station 7800 Rochester Highway Seneca, SC 29672

Kent Alter Regulatory Compliance Manager Oconee Nuclear Station Duke Energy Corporation ON03RC 7800 Rochester Highway Seneca, SC 29672

Terry W. King Security Manager Oconee Nuclear Station Duke Energy Corporation 7800 Rochester Highway Seneca, SC 29672

Daniel C. Durham Security Safeguards Administrator Oconee Nuclear Station

M. Christopher Nolan Director - Regulatory Affairs General Office Duke Energy Corporation P. O. Box 1006 526 S. Church Street Charlotte, NC 28201-1006

David G. Black Fleet Security Manager General Office Duke Energy Corporation P. O. Box 1006 526 S. Church Street Charlotte, NC 28201-1006

Timothy J. Wadsworth Security Specialist General Office Duke Energy Corporation P. O. Box 1006 526 S. Church St., EC05P Charlotte, NC 28201-1006

David A. Cummings Associate General Counsel General Office Duke Energy Corporation P.O. Box 1006 526 S. Church St., EC07H Charlotte, NC 28201-1006 Duke Energy Corporation 7800 Rochester Highway Seneca, SC 29672