Regulatory Guide 3.15: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 1: Line 1:
{{Adams
{{Adams
| number = ML13038A431
| number = ML003740254
| issue date = 10/31/1973
| issue date = 04/30/1983
| title = Standard Format and Content of License Applications for Storage Only of Unirradiated Reactor Fuel and Associated Radioactive Material
| title = Standard Format & Content of License Applications for Storage Only of Unirradiated Power Reactor Fuel & Associated Radioactive Material
| author name =  
| author name =  
| author affiliation = US Atomic Energy Commission (AEC)
| author affiliation = NRC/RES
| addressee name =  
| addressee name =  
| addressee affiliation =  
| addressee affiliation =  
Line 10: Line 10:
| license number =  
| license number =  
| contact person =  
| contact person =  
| document report number = RG-3.015
| document report number = RG-3.15 Rev 1
| document type = Regulatory Guide
| document type = Regulatory Guide
| page count = 3
| page count = 11
}}
}}
{{#Wiki_filter:October 1973 U.S. ATOMIC ENERGY COMMISSION
{{#Wiki_filter:U.S. NUCLEAR REGULATORY
REGULATORY
COMMISSION
GUIDE DIRECTORATE
Revision 1 April 1983 OREGULATORY
OF REGULATORY  
GUIDE "OFFICE OF NUCLEAR REGULATORY  
STANDARDS REGULATORY  
RESEARCH REGULATORY  
GUIDE 3.15 STANDARD FORMAT AND CONTENT OF LICENSE APPLICATIONS  
GUIDE 3.15 (Task CE 2194) STANDARD FORMAT AND CONTENT OF LICENSE APPLICATIONS  
FOR STORAGE ONLY OF UNIRRADIATED
FOR STORAGE ONLY OF UNIRRADIATED  
REACTOR FUEL AND ASSOCIATED  
POWER REACTOR FUEL AND ASSOCIATED  
RADIOACTIVE  
RADIOACTIVE  
MATERIA
MATERIAL USNRC REGULATORY
GUIDES Regulatory Guides are Issued to describe and make available to the public methods acceptable to the NRC staff of implementing s.pecific parts of the Commission's regulatIons, to delineate tech niques used by the staff In evaluating specific problems or postu lated accidents or to provide guidance to applicants.


==L. INTRODUCTION==
Reguiatory Guides are not substitutes for regulations, and compliance with them is not required.
Section 70.3, "License Requirements," of 10 CFR Part 70, "Special Nuclear Material," requires that an AEC license be obtained to receive and possess special nuclear material.


The required content of a license application is described in general terms in Section 70.22 of 10 CFR Part 70. This guide presents a format and a description of content of an application for a license to authorize the receipt, possession, and storage of unirradiated fuel assemblies and associated radioactive materials for eventual use in a nuclear reactor that are acceptable to the AEC Regulatory staff.STANDARD FORMAT AND CONTENT PREFACE This Standard Format and Content of License Applications for Storage Only of Unirradiated Reactor Fuel and Associated Radioactive Materials has been prepared by the AEC Regulatory staff to encourage a uniformity in such license applications and to provide detailed guidance as to the information that is to be provided in the applications.
Methods and solutions different from those set I out In the guides will be acceptable If they provide a basis for the findings requisite to the issuance or continuance of a permit or license by the Commission.


The information provided in the license application must be sufficient to permit a determination to be made of whether the applicant's proposed activities can be conducted without undue risk to the health and safety of the public and the common defense and security.The Standard Format identifies the principal detailed information that the Regulatory staff needs for its evaluation of the application.
This guide was Issued after consideration of comments received from the public. Comments and suggestions for Improvements in these guides are encouraged at all times, and guides will be revised, as appropriate, to accommodate comments and to reflect new Informa tion or experience.


In providing the information described in the Standard Format a narrative form of presentation should be used.Information contained in previous communications filed with the Commission by the applicant or the fuel supplier, including any information submitted in connection with the construction permit or operating license application, may be incorporated into the application by reference, provided such references are clear and specific and the applicability of the referenced material is demonstrated.
Comments should be sent to the Secretary of the Commlssion.


An application that is self-contained with respect to technical data can usually be processed more expeditiously than one requiring substantial referrals to other documents.
U.S. Nuclear Re:ulatory Commission Washington, D.C. 20555, Attention:
Docket ing and Service Branch.  The guides are Issued In the following ten broad divisions:
1. Power Reactors 6. Products 2. Research and Test Reactors


The application must provide the information required by § § 70.22 and 70.24 (b) of Part 70. The applicant may request exemption from the requirements of § 70.24 as provided in § 70.24(d).Eight copies of the application in letter form should be submitted.
===7. Transportation ===
3. Fuels and Materials Facilities
8. Occupational Health 4. Environmental and Siting 9. Antitrust and Financial Review 5. Materials and Plant Protection
10. General Copies of Issued guides may be purchased at thecurrent Government Printing Office price. A subscription service for future guides In spe cific divisions is available through the Government Printing Office.  Information on the subscription service and current GPO prices may be obtained by writing the U.S. Nuclear Regulatory Commission.


The application should be signed by a corporate officer but need not be notarized.
Washington, D.C. 20555, Attention:
Publications Sales Manager.
 
INTRODUCTION
Section 70.3, "License Requirements," of 10 CFR Part 70, "Domestic Licens ing of Special Nuclear Material," states that no person subject to the regula tions in Part 70 may receive title to, own, acquire, deliver, receive, possess, use, or transfer special nuclear material, except as authorized in a license issued by the Commission.
 
The required content of an application for such license is described in general terms in § 70.22 of 10 CFR Part 70. This guide describes the detailed information that is needed by the NRC staff in its review of an application for a license to authorize the receipt, possession, and storage of unirradiated fuel assemblies and associated radioactive materials for eventual use in a nuclear power reactor and suggests a format for its presentation.
 
Any guidance in this document related to information collection activities has been cleared under OMB Clearance No. 3150-0009.
 
Purpose and Use This Standard Format and Content has been prepared to encourage a uniformity In these license applications and to provide detailed guidance on the information that should be provided in the applications.
 
The information provided In the license application must be sufficient to permit a determination to be made of whether the applicant's proposed activities can be conducted without undue risk to the health and safety of the public and the common defense and security.
 
The information identified herein represents the minimum that should be provided.
 
Additional information may be requested if needed for the NRC staff review.  The Standard Format identifies the principal detailed information that the NRC staff needs for its evaluation of the application.
 
In providing the informa tion described in the Standard Format, the applicant should use a narrative form of presentation.
 
The application must provide the information required by 6 70.22 of Part 70.  Applicants may request exemption from the requirements of S 70.24* as provided in paragraph
70.24(d). 
Proprietary Information Proprietary information should be submitted separately.
 
When submitted, this information should be clearly identified and accompanied by the applicant's detailed reasons and justifications for requesting its being withheld from public disclosure, as specified by § 2.790, "Public Inspections, Exemptions, Requests for Withholding," of 10 CFR Part 2, "Rules of Practice for Domestic Licensing Proceedings." Style and Composition The applicant should strive for clear, concise presentation of the informa tion provided in the license application.
 
MApplicants for a license for a nuclear power plant are exempt from the requirements of paragraph
70.24(b) in accordance with paragraph
70.24(c).3.15-1 References, including author, date, and page number, should be cited within the text if this is important to the meaning of the statement.
 
Other references used should appear either as footnotes on the page where referenced or at the end of each chapter.
 
Where numerical values are stated, the number of significant figures given should reflect the accuracy or precision to which the number is known. Where appropriate, estimated limits of error or uncertainty should be given.  Abbreviations should be consistent throughout-the license application and should be consistent with generally accepted usage. Any abbreviations, symbols, or special terms not in general usage or unique to the proposed installation should be defined when they first appear in the license application.
 
NUREG-0544, "A Handbook of Acronyms and Inittallsms,I1*
may be useful.  Graphic presentations such as drawings, maps, diagrams, sketches, and tables should be employed if the information may be presented more adequately or conveniently by such means. Due concern should be taken to ensure that all information so presented is legible, that symbols are defined, and that draw ings are not reduced to the extent that visual aids are necessary to interpret pertinent items of information.
 
These graphic presentations should be located with the section in which they are primarily referenced.
 
The license application should provide the information needed to satisfy the requirements of the NRC regulations, which are codified in Title 10, Chapter I, of the Code of Federal Regulations.
 
As the-sections of the application are developed by the applicant, the applicable regulatory requirements that are being satisfied should be identified.
 
This procedure will contribute to a more timely review of the presented information.
 
Physical Specifications
1. Paper Size Text pages: 8-1/2 x 11 inches.  Drawings and graphics:
8-1/2.x 11 inches preferred;
however, a larger size is acceptable provided the finished copy when folded does not exceed 8-1/2 x 11 inches.  2. Paper Stock and Ink. Suitable quality in substance, paper color, and ink density for handling and reproduction by microfilming or image-copying equipment.
 
3. Page Margins. A margin of no less than 1 inch should be maintained on the top, bottom, and binding side of all pages submitted.
 
Copies may be obtained at current prices from the National Technical Informa tion Service, Springfield, Virginia 22161.3.15-2
4. Printing Composition:
text pages should be single spaced.  Type face and style: should be suitable for reproduction by microfilming or image-copying equipment.
 
Reproduction:
may be mechanically or photographically reproduced.


There is no license fee for a license issued for storage only of fuel to be used in a reactor for which a construction permit has been issued.1.0 GENERAL INFORMATION
All pages of text should be printed on both sides with image printed head to head. 5. Binding. Pages should be punched for standard 3-hole loose-leaf binders.
1.1 Reactor and Fuel This section should provide information regarding the reactor and the fuel.1. Identify the reactor, its geographic location, and the docket and construction permit numbers.2. Describe the fuel assemblies, including materials of construction and dimensions.


3. State enrichment of uranium, maximum amounts of U-235, U-233, Pu, normal uranium, depleted uranium, and thorium per assembly, and the total weight of the assembly.4. State the total number of fuel assemblies for which a license is requested and the. total weight of U-235, U-233, Pu, normal uranium, depleted uranium, and thorium contained therei
Procedures for Updating or Revising Pages Data and text should be updated or revised by replacing pages. "Pen and ink" or "cut and paste" changes should not be used.  The changed or revised portion of each page should be highlighted by a "change indicator" mark consisting of a bold vertical line drawn in the margin opposite the binding margin. The line should be of the same length as the portion actually changed.


====n. USAEC REGULATORY ====
All pages submitted to update, revise, or add pages to the application should show the date of change and a change or amendment number in the lower righthand corner. A guide page listing the pages to be inserted and the pages to be removed should accompany the revised pages.  Material Incorporated by Reference The application should contain all the information in sufficient detail to permit an independent health and safety evaluation of the proposed activities.
GUIDES Copies of publId pulU. n" be obtined by requem Incdloting tie divlejom cthired to tf U.S. Atonic EneW Cmmlf-W, .hVWnWon.


DO. 20M6.Reguletory Guidu am Isued to demrelbe end nuke rsulleble to the public At enomIo: Director of Reulatory Stasuobde.
Information contained in previous communications filed with the Commission by the applicant or the fuel supplier, including any information submitted in connection with the construction permit or operating license application, may be incorporated into the application by reference (applicable portions of the Final Safety Analysis Report (FSAR) should be attached), provided such references are clear and specific and the applicability of the referenced material is demonstrated.


Comnnt end mueeltong for nilhocls ecmpuble to the AEC Regulatory sta of iO ifew tine eef fic perts of Il Op efm Ins in thdam e id erems@rd rOd should be sent to 0t Secretary the Conmmision's reiultmelons.
References that are not available in the Public Document Room should be provided with the application.


to deilingte tochnique used by we staff In of tin US. AtoU n EnerW Comnaielon.
An application that is self-contained with respect to technical data can usually be processed more expeditiously than one requiring many referrals to other documents.


Wshlngton, D.C. 20545, evolueing specific proobe or 0astulatd eockclents.
Distribution Eight copies of the application in letter form should be submitted.


or to provide guldN- to Attention:
The application should be signed by a corporate officer but need not be notarized.
Chief, Pubc Prmoenpe St"ff.limnss. Reguletory Gukd ate not substitum for repulelon end wO ilenr with thern is not required.


Methode and solutiom dfWernt from tdoo Ut t!nt In Thi puidl am impted In the following tos bIoed *ltlvOns: t"a guices will be *ecofible If they provIde a Ieels for the findl5q tequlito to tim imuene or continueno of a permit or clmnee by the Commlen. 1. POvW et 6. Produmc 2. 0a ndTt Reectors
Copies should be filed with the Director of Nuclear Material Safety and Safeguards, U.S. Nuclear Regulatory Commission, Washington, D.C. 20555. Sub sequent correspondence should reference the 10 CFR Part 70 docket number.  Fees There is no license fee for a license issued for storage only of fuel to be used in a reactor for which a construction permit has been issued.3.15-3 Chapter 1 GENERAL INFORMATION
1.1 Reactor and Fuel This section should provide information regarding the reactor and the fuel. 1. Identify the reactor, all parties (utilities)
to the licensing action, its geographic location, and the docket and construction permit numbers.


===7. TrenWorttion===
2. Describe the fuel assemblies, including materials of construction;
3. Feleid M.et Fcilitie S. IOo eiloul Health Published gIdcs wall be revsed perlodinclly.
number of fuel rods; diameter of fuel pellets; cladding thickness and outside diameter;
rod pitch; the number and location of instrument, water, or gas channels in the assemblies;
and other appurtenances such as control rod guide tubes, spacer rods, and burnable poisons.


at aprorIaCtM, to0acontodem
3. State the maximum enrichment (pin values) of uranium; maximum quan tities (kg) of U-235, U-233, plutonium, natural uranium, depleted uranium, and thorium per assembly;
4. ErMimenwe en Shtlr 9. Antitrust RevIew comnnts and to reflect new infornttlon or experlene.
and the total weight of the assembly.


5. Mwerld Plent ProtectIon
4. State the total number of fuel assemblies for which a license is requested and the total weight of U-235, U-233, plutonium, natural uranium, depleted uranium, and thorium contained therein.
1


===0. General ===
1.2 Storage Conditions This section should provide information regarding the storage conditions.
1.2 Storage Conditions This section should provide information regarding the storage conditions.


1. Provide scale drawings showing the areas where fuel assemblies will be stored and, if appropriate, inspected and channeled.
1. Provide scale drawings showing the areas where fuel assemblies will be stored and, if appropriate, inspected and channeled.


2. Describe the nature of activities conducted in adjacent areas and potential effects of such activities on the safety of storage.3. Describe the storage facility structures, components, equipment, and systems (racks, cranes, inspection stands, etc.) and provide the design criteria used to assure structural integrity.
2. Describe the storage environment.
 
3. Describe the nature of the activities conducted in all adjacent areas and the potential effects of these activities on the safety of storage.
 
4. Describe the storage facility structures, components, equipment, and systems (e.g., racks, cranes, inspection stands) and provide the design crite ria used to ensure structural integrity.
 
5. Describe the fire alarm and fire control systems.
 
6. Describe the controls for preventing unauthorized access to areas where special nuclear material is stored.  1.3 Physical Protection If the quantity of U-235, U-233, or plutonium to be possessed under the license is equal to or greater than the quantity specified in paragraph
73.1(b)3.15-4 of 10 CFR Part 73, "Physical Protection of-Plants and Materials," the licensee must comply with the requirements of that regulation.
 
Specific guidance for applicants regarding physical protection will be provided by the Commission.
 
1.4 Transfer of Special Nuclear Material This section should provide the required information regarding the transfer, control, and accounting of special nuclear material.
 
1. If the fuel fabricator or other organization is responsible for the shipment of fuel to the applicant, identify the responsible shipper.
 
2. If the applicant is responsible for the packaging of fuel for delivery to a carrier for transport, information concerning the packaging and transfer should be provided in accordance with the provisions of 10 CFR Part 71, "Packaging of Radioactive Material for Transport and Transportation of Radioactive Material Under Certain Conditions." 3. Describe the special nuclear material control and accounting prac tices to be implemented to comply with the applicable provisions of 10 CFR Part 70.  1.5 Financial Protection and Indemnity Requirements for financial protection to be provided by licensees are set forth in 10 CFR Part 140, "Financial Protection Requirements and Indemnity Agreements." This section should provide the required information regarding financial protection.
 
1. Persons subject to Subpart B (private organizations)
should furnish proof of financial protection (see § 140.15) in the amount required by § 140.13.  2. Persons subject to Subpart C (Federal agencies as defined in para graph 140.3(c))
are not required to furnish financial protection (see §§ 140.51 and 140.52). 
3. Persons subject to Subpart D (nonprofit educational institutions)
are not required to furnish financial protection (see §§ 140.71 and 140.72). The applicant should submit a statement certifying that the applicant is a nonprofit educational institution and that the license for which application is made will be used in connection with the conduct of educational activities.
 
Note: With respect to each category of licensee in Section 1.5, the Commission will execute and issue agreements of indemnity pursuant to the regulations in 10 CFR Part 140.3.15-5 Chapter 2 HEALTH AND SAFETY 2.1 Radiation Control This section should provide information regarding the radiation control program.
 
1. State the minimum qualifications for the key positions having radiation safety responsibilities.
 
2. Describe the responsibilities for the key radiation safety personnel.
 
3. Indicate the training and experience of the person or persons respon sible for radiation safety.  4. Describe the procedures and equipment for checking for contamination and the steps that will be taken if contamination is detected.
 
5. State the frequency and methods for calibrating and testing radio logical protection instruments.
 
6. Describe the procedures and equipment to be used to meet applicable sections of 10 CFR Part 20, "Standards for Protection Against Radiation." 7. Describe the provisions for disposal of any radioactive wastes that are generated.
 
2.2 Nuclear Criticality Safety This section should provide the required information regarding nuclear criticality safety.  1. State the minimum qualifications for the key positions having nuclear criticality safety and fuel handling responsibilities.
 
2. Describe the responsibilities for the key personnel responsible for nuclear criticality safety and fuel handling.
 
3. If fuel elements will be stored in shipping containers, describe the containers, the storage array, and the basis for nuclear criticality safety of the container storage array.  4. If elements will not be stored in their shipping containers, provide a nuclear safety analysis of the alternative storage, including a description of the physical means for maintaining safe spacing of the elements (e.g., stor age racks) and controls to be exercised over placing the elements in the stor age location.
 
In situations in which nuclear safety depends on proper spacing, the integrity of storage fixtures should be analyzed from the standpoint of possible failure due to such factors as loading, shock, fire, or corrosion.
 
Provide drawings or sketches of racks and provide the spacing between elements and between elements and floors or walls.3.15-6
5. If nuclear criticality safety is based on other than the maximum enrichment of the fuel, identify and justify the nominal enrichment used in the safety analysis.
 
S6. If nuclear criticality safety is based on the reactivity effects of neutron absorber materials in the racks, describe the chemical and physical properties of the materials.
 
Drawings or sketches showing the dimensions and locations of the neutron absorber materials should be provided.


4. Describe the fire alarm and fire control systems.5. Describe the controls for prevention of unauthorized access to areas where special nuclear material is stored.1.3 Physical Protection If the quantity of U-235 (contained in uranium enriched to 20% or more in the U-235 isotope), U-233, or plutonium to be possessed under the license is equal to or greater than the quantity specified in § 73.1 (b) of 10 CFR Part 73, "Physical Protection of Plants and Materials," the licensee must comply with the requirements of that regulation.
Describe quality assurance activities to ensure the continued presence and effectiveness of the neutron absorber materials.


Specific guidance for applicants regarding pysical protection will be provided by the Commission.
7. If nuclear safety is based on moderation control, sources of water that go into dry storage (e.g., sprinkler systems) and the probability of flooding the storage area should be taken into account in the analysis.


1.4 Transfer of Special Nuclear Material This section should provide the required information regarding the transfer of special nuclear material.1. If the fuel fabricator or other organization is responsible for the shipment of fuel to the applicant, so state and identify the responsible shipper.2. If the applicant is responsible for the packaging of fuel for delivery to a carrier for transport, information concerning the packaging and transfer should be provided in accordance with the provisions of 10 CFR Part 71, "Packaging of Radioactive Materials for Transport and Transportation of Radioactive Material Under Certain Conditions." 1.5 Financial Protection and Indemnity Requirements for financial
The nuclear safety analysis should demonstrate that fuel will be stored in such a manner that if the fuel were flooded and then drained, water could not be retained around or within an assembly;
'protection to be provided by licensees are set forth in 10 CFR Part 140, "Financial Protection.
however, if water retention is possible, its results should be evaluated.


Requirements and Indemnity Agreements." This section should provide the required information regarding financial protection.
The analysis should also evaluate the effects of low-density moderators (e.g., mist) or show that such densities are not credible.


1. Persons subject to Subpart B (private organizations)
8. Describe the validation of the calculational method for nuclear crit icality safety. For guidance on validation of calculational methods, see Regu latory Guides 3.4, "Nuclear Criticality Safety in Operations with Fissionable Materials Outside Reactors," and 3.41, "Validation of Calculational Methods for Nuclear Criticality Safety." 9. If elements will be removed from storage (e.g., for inspection pur poses), describe in detail the activities to be performed and the controls to be exercised over removing and replacing the elements.
should furnish proof of financial protection (see§. 140.15) in the amount required by § 140.13.2. Persons subject to Subpart C (Federal agencies as defined in § 1 4 0.3(c)) are not required to furnish financial protection (see § § 140.51 and 140.52).3. Persons subject to Subpart D (nonprofit educational institutions)
are not required to furnish financial protection (see §§ 140.71 and 140.72). A statement should be submitted which certifies that the applicant is a nonprofit educational institution and that the license for which application is made will be used in connection with the conduct of educational activities.


Note: With respect to each category of licensee in Section 1.5 above, the Commission will execute and issue agreements of indemnity pursuant to the regu-lations in 10 CFR Part 140.2.0 HEALTH AND SAFETY 2.1 Radiation Control This section should provide information regarding the radiation control program.1. Indicate the training and experience of person or persons responsible for radiation safety.2. Describe the procedures and equipment for checking for contamination and the steps that will be taken if contamination is detected.3. State the frequency and methods for calibration and testing of instruments.
The maximum number of fuel assemblies that will be out of approved shipping containers or approved storage racks at any one time should be stated; this number should be justified, preferably on the basis that it is less than the minimum number required to achieve criticality under optimum conditions of spacing, moderation, and reflection.


2.2 Nudear Criticality Safety This section should provide the required information regarding nuclear criticality safety.1. If fuel elements will be stored in shipping containers, so state and describe containers.
As an alternative, the applicant may justify the safety of a large number of assemblies on the basis of a nuclear safety analysis that includes the considerations in paragraphs
4 and 7 of this section.


2. If elements will not be stored in their shipping containers, provide a nuclear safety analysis of the alternative storage method including a description of the physical means for maintaining safe-spacing of the elements (e.g., storage racks) and controls to be exercised over placing the elemelits in the storage location.
10. If an exemption from the requirements of § 70.24 is not requested or has been disapproved, describe the plans for compliance with the requirements of § 7 0.2 4 ,* including instrumentation, location of detectors, and emergency procedures and drills.  2.3 Accident Analysis This section should identify and evaluate potential accidents that could affect the safety of storage, such as dropping fuel assemblies or other objects over the storage area or dropping fuel assemblies at other places, and the emergency plan of action if such events should occur.  Applicants for a license for a nuclear power plant are exempt from the require ments of paragraph
70.24(b) in accordance with paragraph
70.24(c).3.15-7 Chapter 3 OTHER MATERIALS
REQUIRING
NRC LICENSE If source or special nuclear materials other than those contained in fuel assemblies or if byproduct materials are to be possessed at the storage site (e.g., fission chambers, calibration sources, or startup sources), the follow ing information should be provided:
1. Identify the type and amount of material andconditions of storage.


In situations where nuclear safety depends on proper spacing, the integrity of storage fixtures should be analyzed from the standpoint of possible failure due to such factors as loading, shock, fire, corrosion, etc.3. If nuclear safety is based on moderation control, sources of water (e.g., sprinkler systems) and the probability of flooding the storage area should be taken into account in the analysis.
2. Describe the use if other than storage.


The nuclear safety analysis should demonstrate that fuel will be stored in such a manner that if the fuel were flooded and then drained, the fuel packaging would be such that water could not be retained around or within an assembly, or the results of water retention should be evaluated.
3. Describe radiation protection provisions.


4. If elements will be removed from storage (e.g., for inspection purposes), describe in detail the activities to be performed and the controls to be exercised over removing and replacing the elements.
4. Describe the control and accounting procedures for other special nuclear material.3.15-8 VALUE/IMPACT
STATEMENT The original version of Regulatory Guide 3.15 was issued in October 1973. Many of the applications by utilities for "Storage Only" licenses are incomplete, particularly regarding the information required to perform an independent nuclear criticality safety analysis of the fuel storage arrangements.


The maximum number of fuel assemblies that will be out of approved shipping containers or approved storage racks at any one time should be stated, and this number justified, preferably on the basis that it is less than the minimum number required to achieve criticality under optimum conditions of spacing, moderation, and reflection.
The revised guide should assist the applicant in preparing a more complete applica tion and reduce the amount of additional information the NRC must request of the applicant.


As an 3.15-2 alternative the applicant may justify the safety of a large number of assemblies on the basis of a nuclear safety analysis which includes the considerations in paragraphs
The revised guide also updates the physical protection requirements.
2 and 3 of this section.5. If an exemption is not requested from the requirements of §70.24 as provided in § 70.24(d), the applicant should describe his plans for compliance with the requirements of §70.24 including instrumentation, location of detectors, and emergency procedures and drills.2.3 Accident Analysis This section should identify and evaluate potential accidents that could affect the safety of storage such as dropping fuel assemblies or other objects over the storage area or dropping fuel assemblies at other places and the emergency plan of action if such events should occur.3.0 OTHER MATERIALS
REQUIRING AEC LICENSE If source or special nuclear materials other than those contained in fuel assemblies or if byproduct materials are to be possessed at the storage site (e.g., fission chambers, startup sources, etc.), the following information should be provided.1. Identify type and amount of material and conditions of storage.2. Describe use if other than storage.3. Describe radiation protection provisions.


REFERENCES
3.15-9 UNITED STATES NUCLEAR REGULATORY
10 CFR Part 20 Standards for Protection Against Radiation 10 CFR Part 30 Rules of General Applicability to Licensing of Byproduct Material 10 CFR Part 40 Licensing of Source Material 10 CFR Part 70 Special Nuclear Material 10 CFR Part 71 Packaging of Radioactive Material for Transport and Transportation of Radioactive Material Under Certain Conditions
COMMISSION
10 CFR Part 73 Physical Protection of Plants and Materials 10 CFR Part 140 Financial Protection Requiremenos and Indemnity Agreements
WASHINGTON, D.C. 20555 OFFICIAL BUSINESS PENALTY FOR PRIVATE USE. $300 I IRST CLASS MAIL POSTAGE & FEESPAIO USNRC WASH 3 C RMIT loo GSLj K}}
3.15-3}}


{{RG-Nav}}
{{RG-Nav}}

Revision as of 02:31, 21 September 2018

Standard Format & Content of License Applications for Storage Only of Unirradiated Power Reactor Fuel & Associated Radioactive Material
ML003740254
Person / Time
Issue date: 04/30/1983
From:
Office of Nuclear Regulatory Research
To:
References
RG-3.15 Rev 1
Download: ML003740254 (11)


U.S. NUCLEAR REGULATORY

COMMISSION

Revision 1 April 1983 OREGULATORY

GUIDE "OFFICE OF NUCLEAR REGULATORY

RESEARCH REGULATORY

GUIDE 3.15 (Task CE 2194) STANDARD FORMAT AND CONTENT OF LICENSE APPLICATIONS

FOR STORAGE ONLY OF UNIRRADIATED

POWER REACTOR FUEL AND ASSOCIATED

RADIOACTIVE

MATERIAL USNRC REGULATORY

GUIDES Regulatory Guides are Issued to describe and make available to the public methods acceptable to the NRC staff of implementing s.pecific parts of the Commission's regulatIons, to delineate tech niques used by the staff In evaluating specific problems or postu lated accidents or to provide guidance to applicants.

Reguiatory Guides are not substitutes for regulations, and compliance with them is not required.

Methods and solutions different from those set I out In the guides will be acceptable If they provide a basis for the findings requisite to the issuance or continuance of a permit or license by the Commission.

This guide was Issued after consideration of comments received from the public. Comments and suggestions for Improvements in these guides are encouraged at all times, and guides will be revised, as appropriate, to accommodate comments and to reflect new Informa tion or experience.

Comments should be sent to the Secretary of the Commlssion.

U.S. Nuclear Re:ulatory Commission Washington, D.C. 20555, Attention:

Docket ing and Service Branch. The guides are Issued In the following ten broad divisions:

1. Power Reactors 6. Products 2. Research and Test Reactors

7. Transportation

3. Fuels and Materials Facilities

8. Occupational Health 4. Environmental and Siting 9. Antitrust and Financial Review 5. Materials and Plant Protection

10. General Copies of Issued guides may be purchased at thecurrent Government Printing Office price. A subscription service for future guides In spe cific divisions is available through the Government Printing Office. Information on the subscription service and current GPO prices may be obtained by writing the U.S. Nuclear Regulatory Commission.

Washington, D.C. 20555, Attention:

Publications Sales Manager.

INTRODUCTION

Section 70.3, "License Requirements," of 10 CFR Part 70, "Domestic Licens ing of Special Nuclear Material," states that no person subject to the regula tions in Part 70 may receive title to, own, acquire, deliver, receive, possess, use, or transfer special nuclear material, except as authorized in a license issued by the Commission.

The required content of an application for such license is described in general terms in § 70.22 of 10 CFR Part 70. This guide describes the detailed information that is needed by the NRC staff in its review of an application for a license to authorize the receipt, possession, and storage of unirradiated fuel assemblies and associated radioactive materials for eventual use in a nuclear power reactor and suggests a format for its presentation.

Any guidance in this document related to information collection activities has been cleared under OMB Clearance No. 3150-0009.

Purpose and Use This Standard Format and Content has been prepared to encourage a uniformity In these license applications and to provide detailed guidance on the information that should be provided in the applications.

The information provided In the license application must be sufficient to permit a determination to be made of whether the applicant's proposed activities can be conducted without undue risk to the health and safety of the public and the common defense and security.

The information identified herein represents the minimum that should be provided.

Additional information may be requested if needed for the NRC staff review. The Standard Format identifies the principal detailed information that the NRC staff needs for its evaluation of the application.

In providing the informa tion described in the Standard Format, the applicant should use a narrative form of presentation.

The application must provide the information required by 6 70.22 of Part 70. Applicants may request exemption from the requirements of S 70.24* as provided in paragraph

70.24(d).

Proprietary Information Proprietary information should be submitted separately.

When submitted, this information should be clearly identified and accompanied by the applicant's detailed reasons and justifications for requesting its being withheld from public disclosure, as specified by § 2.790, "Public Inspections, Exemptions, Requests for Withholding," of 10 CFR Part 2, "Rules of Practice for Domestic Licensing Proceedings." Style and Composition The applicant should strive for clear, concise presentation of the informa tion provided in the license application.

MApplicants for a license for a nuclear power plant are exempt from the requirements of paragraph

70.24(b) in accordance with paragraph

70.24(c).3.15-1 References, including author, date, and page number, should be cited within the text if this is important to the meaning of the statement.

Other references used should appear either as footnotes on the page where referenced or at the end of each chapter.

Where numerical values are stated, the number of significant figures given should reflect the accuracy or precision to which the number is known. Where appropriate, estimated limits of error or uncertainty should be given. Abbreviations should be consistent throughout-the license application and should be consistent with generally accepted usage. Any abbreviations, symbols, or special terms not in general usage or unique to the proposed installation should be defined when they first appear in the license application.

NUREG-0544, "A Handbook of Acronyms and Inittallsms,I1*

may be useful. Graphic presentations such as drawings, maps, diagrams, sketches, and tables should be employed if the information may be presented more adequately or conveniently by such means. Due concern should be taken to ensure that all information so presented is legible, that symbols are defined, and that draw ings are not reduced to the extent that visual aids are necessary to interpret pertinent items of information.

These graphic presentations should be located with the section in which they are primarily referenced.

The license application should provide the information needed to satisfy the requirements of the NRC regulations, which are codified in Title 10, Chapter I, of the Code of Federal Regulations.

As the-sections of the application are developed by the applicant, the applicable regulatory requirements that are being satisfied should be identified.

This procedure will contribute to a more timely review of the presented information.

Physical Specifications

1. Paper Size Text pages: 8-1/2 x 11 inches. Drawings and graphics:

8-1/2.x 11 inches preferred;

however, a larger size is acceptable provided the finished copy when folded does not exceed 8-1/2 x 11 inches. 2. Paper Stock and Ink. Suitable quality in substance, paper color, and ink density for handling and reproduction by microfilming or image-copying equipment.

3. Page Margins. A margin of no less than 1 inch should be maintained on the top, bottom, and binding side of all pages submitted.

Copies may be obtained at current prices from the National Technical Informa tion Service, Springfield, Virginia 22161.3.15-2

4. Printing Composition:

text pages should be single spaced. Type face and style: should be suitable for reproduction by microfilming or image-copying equipment.

Reproduction:

may be mechanically or photographically reproduced.

All pages of text should be printed on both sides with image printed head to head. 5. Binding. Pages should be punched for standard 3-hole loose-leaf binders.

Procedures for Updating or Revising Pages Data and text should be updated or revised by replacing pages. "Pen and ink" or "cut and paste" changes should not be used. The changed or revised portion of each page should be highlighted by a "change indicator" mark consisting of a bold vertical line drawn in the margin opposite the binding margin. The line should be of the same length as the portion actually changed.

All pages submitted to update, revise, or add pages to the application should show the date of change and a change or amendment number in the lower righthand corner. A guide page listing the pages to be inserted and the pages to be removed should accompany the revised pages. Material Incorporated by Reference The application should contain all the information in sufficient detail to permit an independent health and safety evaluation of the proposed activities.

Information contained in previous communications filed with the Commission by the applicant or the fuel supplier, including any information submitted in connection with the construction permit or operating license application, may be incorporated into the application by reference (applicable portions of the Final Safety Analysis Report (FSAR) should be attached), provided such references are clear and specific and the applicability of the referenced material is demonstrated.

References that are not available in the Public Document Room should be provided with the application.

An application that is self-contained with respect to technical data can usually be processed more expeditiously than one requiring many referrals to other documents.

Distribution Eight copies of the application in letter form should be submitted.

The application should be signed by a corporate officer but need not be notarized.

Copies should be filed with the Director of Nuclear Material Safety and Safeguards, U.S. Nuclear Regulatory Commission, Washington, D.C. 20555. Sub sequent correspondence should reference the 10 CFR Part 70 docket number. Fees There is no license fee for a license issued for storage only of fuel to be used in a reactor for which a construction permit has been issued.3.15-3 Chapter 1 GENERAL INFORMATION

1.1 Reactor and Fuel This section should provide information regarding the reactor and the fuel. 1. Identify the reactor, all parties (utilities)

to the licensing action, its geographic location, and the docket and construction permit numbers.

2. Describe the fuel assemblies, including materials of construction;

number of fuel rods; diameter of fuel pellets; cladding thickness and outside diameter;

rod pitch; the number and location of instrument, water, or gas channels in the assemblies;

and other appurtenances such as control rod guide tubes, spacer rods, and burnable poisons.

3. State the maximum enrichment (pin values) of uranium; maximum quan tities (kg) of U-235, U-233, plutonium, natural uranium, depleted uranium, and thorium per assembly;

and the total weight of the assembly.

4. State the total number of fuel assemblies for which a license is requested and the total weight of U-235, U-233, plutonium, natural uranium, depleted uranium, and thorium contained therein.

1.2 Storage Conditions This section should provide information regarding the storage conditions.

1. Provide scale drawings showing the areas where fuel assemblies will be stored and, if appropriate, inspected and channeled.

2. Describe the storage environment.

3. Describe the nature of the activities conducted in all adjacent areas and the potential effects of these activities on the safety of storage.

4. Describe the storage facility structures, components, equipment, and systems (e.g., racks, cranes, inspection stands) and provide the design crite ria used to ensure structural integrity.

5. Describe the fire alarm and fire control systems.

6. Describe the controls for preventing unauthorized access to areas where special nuclear material is stored. 1.3 Physical Protection If the quantity of U-235, U-233, or plutonium to be possessed under the license is equal to or greater than the quantity specified in paragraph

73.1(b)3.15-4 of 10 CFR Part 73, "Physical Protection of-Plants and Materials," the licensee must comply with the requirements of that regulation.

Specific guidance for applicants regarding physical protection will be provided by the Commission.

1.4 Transfer of Special Nuclear Material This section should provide the required information regarding the transfer, control, and accounting of special nuclear material.

1. If the fuel fabricator or other organization is responsible for the shipment of fuel to the applicant, identify the responsible shipper.

2. If the applicant is responsible for the packaging of fuel for delivery to a carrier for transport, information concerning the packaging and transfer should be provided in accordance with the provisions of 10 CFR Part 71, "Packaging of Radioactive Material for Transport and Transportation of Radioactive Material Under Certain Conditions." 3. Describe the special nuclear material control and accounting prac tices to be implemented to comply with the applicable provisions of 10 CFR Part 70. 1.5 Financial Protection and Indemnity Requirements for financial protection to be provided by licensees are set forth in 10 CFR Part 140, "Financial Protection Requirements and Indemnity Agreements." This section should provide the required information regarding financial protection.

1. Persons subject to Subpart B (private organizations)

should furnish proof of financial protection (see § 140.15) in the amount required by § 140.13. 2. Persons subject to Subpart C (Federal agencies as defined in para graph 140.3(c))

are not required to furnish financial protection (see §§ 140.51 and 140.52).

3. Persons subject to Subpart D (nonprofit educational institutions)

are not required to furnish financial protection (see §§ 140.71 and 140.72). The applicant should submit a statement certifying that the applicant is a nonprofit educational institution and that the license for which application is made will be used in connection with the conduct of educational activities.

Note: With respect to each category of licensee in Section 1.5, the Commission will execute and issue agreements of indemnity pursuant to the regulations in 10 CFR Part 140.3.15-5 Chapter 2 HEALTH AND SAFETY 2.1 Radiation Control This section should provide information regarding the radiation control program.

1. State the minimum qualifications for the key positions having radiation safety responsibilities.

2. Describe the responsibilities for the key radiation safety personnel.

3. Indicate the training and experience of the person or persons respon sible for radiation safety. 4. Describe the procedures and equipment for checking for contamination and the steps that will be taken if contamination is detected.

5. State the frequency and methods for calibrating and testing radio logical protection instruments.

6. Describe the procedures and equipment to be used to meet applicable sections of 10 CFR Part 20, "Standards for Protection Against Radiation." 7. Describe the provisions for disposal of any radioactive wastes that are generated.

2.2 Nuclear Criticality Safety This section should provide the required information regarding nuclear criticality safety. 1. State the minimum qualifications for the key positions having nuclear criticality safety and fuel handling responsibilities.

2. Describe the responsibilities for the key personnel responsible for nuclear criticality safety and fuel handling.

3. If fuel elements will be stored in shipping containers, describe the containers, the storage array, and the basis for nuclear criticality safety of the container storage array. 4. If elements will not be stored in their shipping containers, provide a nuclear safety analysis of the alternative storage, including a description of the physical means for maintaining safe spacing of the elements (e.g., stor age racks) and controls to be exercised over placing the elements in the stor age location.

In situations in which nuclear safety depends on proper spacing, the integrity of storage fixtures should be analyzed from the standpoint of possible failure due to such factors as loading, shock, fire, or corrosion.

Provide drawings or sketches of racks and provide the spacing between elements and between elements and floors or walls.3.15-6

5. If nuclear criticality safety is based on other than the maximum enrichment of the fuel, identify and justify the nominal enrichment used in the safety analysis.

S6. If nuclear criticality safety is based on the reactivity effects of neutron absorber materials in the racks, describe the chemical and physical properties of the materials.

Drawings or sketches showing the dimensions and locations of the neutron absorber materials should be provided.

Describe quality assurance activities to ensure the continued presence and effectiveness of the neutron absorber materials.

7. If nuclear safety is based on moderation control, sources of water that go into dry storage (e.g., sprinkler systems) and the probability of flooding the storage area should be taken into account in the analysis.

The nuclear safety analysis should demonstrate that fuel will be stored in such a manner that if the fuel were flooded and then drained, water could not be retained around or within an assembly;

however, if water retention is possible, its results should be evaluated.

The analysis should also evaluate the effects of low-density moderators (e.g., mist) or show that such densities are not credible.

8. Describe the validation of the calculational method for nuclear crit icality safety. For guidance on validation of calculational methods, see Regu latory Guides 3.4, "Nuclear Criticality Safety in Operations with Fissionable Materials Outside Reactors," and 3.41, "Validation of Calculational Methods for Nuclear Criticality Safety." 9. If elements will be removed from storage (e.g., for inspection pur poses), describe in detail the activities to be performed and the controls to be exercised over removing and replacing the elements.

The maximum number of fuel assemblies that will be out of approved shipping containers or approved storage racks at any one time should be stated; this number should be justified, preferably on the basis that it is less than the minimum number required to achieve criticality under optimum conditions of spacing, moderation, and reflection.

As an alternative, the applicant may justify the safety of a large number of assemblies on the basis of a nuclear safety analysis that includes the considerations in paragraphs

4 and 7 of this section.

10. If an exemption from the requirements of § 70.24 is not requested or has been disapproved, describe the plans for compliance with the requirements of § 7 0.2 4 ,* including instrumentation, location of detectors, and emergency procedures and drills. 2.3 Accident Analysis This section should identify and evaluate potential accidents that could affect the safety of storage, such as dropping fuel assemblies or other objects over the storage area or dropping fuel assemblies at other places, and the emergency plan of action if such events should occur. Applicants for a license for a nuclear power plant are exempt from the require ments of paragraph

70.24(b) in accordance with paragraph

70.24(c).3.15-7 Chapter 3 OTHER MATERIALS

REQUIRING

NRC LICENSE If source or special nuclear materials other than those contained in fuel assemblies or if byproduct materials are to be possessed at the storage site (e.g., fission chambers, calibration sources, or startup sources), the follow ing information should be provided:

1. Identify the type and amount of material andconditions of storage.

2. Describe the use if other than storage.

3. Describe radiation protection provisions.

4. Describe the control and accounting procedures for other special nuclear material.3.15-8 VALUE/IMPACT

STATEMENT The original version of Regulatory Guide 3.15 was issued in October 1973. Many of the applications by utilities for "Storage Only" licenses are incomplete, particularly regarding the information required to perform an independent nuclear criticality safety analysis of the fuel storage arrangements.

The revised guide should assist the applicant in preparing a more complete applica tion and reduce the amount of additional information the NRC must request of the applicant.

The revised guide also updates the physical protection requirements.

3.15-9 UNITED STATES NUCLEAR REGULATORY

COMMISSION

WASHINGTON, D.C. 20555 OFFICIAL BUSINESS PENALTY FOR PRIVATE USE. $300 I IRST CLASS MAIL POSTAGE & FEESPAIO USNRC WASH 3 C RMIT loo GSLj K