ML17362A074: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 January 4, 2018  
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 January 4, 2018 MEMORANDUM TO:                 Tony Brown, Acting Chief Beyond Design Basis Project Engineering Branch Division of Licensing Projects Office of Nuclear Reactor Regulation FROM:                           Joylynn Quinones-Navarro, Reactor Engineer         /RA/
 
Beyond Design Basis Project Engineering Branch Division of Licensing Projects Office of Nuclear Reactor Regulation
MEMORANDUM TO:   Tony Brown, Acting Chief Beyond Design Basis Project Engineering Branch Division of Licensing Projects Office of Nuclear Reactor Regulation  
 
FROM:   Joylynn Quinones-Navarro, Reactor Engineer /RA/ Beyond Design Basis Project Engineering Branch Division of Licensing Projects Office of Nuclear Reactor Regulation  


==SUBJECT:==
==SUBJECT:==
Line 25: Line 22:
==SUMMARY==
==SUMMARY==
OF DECEMBER 7, 2017, PUBLIC MEETING WITH THE NUCLEAR ENERGY INSTITUTE (NEI) TO DISCUSS DRAFT DOCUMENT THAT REQUESTS THE USE OF FLEXIBLE SCHEDULING PROVISIONS OF 10 CFR 50.155(h)(2)
OF DECEMBER 7, 2017, PUBLIC MEETING WITH THE NUCLEAR ENERGY INSTITUTE (NEI) TO DISCUSS DRAFT DOCUMENT THAT REQUESTS THE USE OF FLEXIBLE SCHEDULING PROVISIONS OF 10 CFR 50.155(h)(2)
On December 7, 2017 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML17338A930), a Category 2 public meeting was held between the U. S. Nuclear Regulatory Commission (NRC) staff and representatives from the Nuclear Energy Institute (NEI) to discuss their draft document that requests the Use of Flexible Scheduling Provisions of Title 10 of the Code of Federal Regulations (10 CFR) Section 50.155(h)(2) to establish an alternative date for compliance with reevaluated seismic hazard mitigation requirements of 10 CFR 50.155(b)(2) (ADAMS Accession No. ML17321B023).
On December 7, 2017 (Agencywide Documents Access and Management System (ADAMS)
Accession No. ML17338A930), a Category 2 public meeting was held between the U. S.
Nuclear Regulatory Commission (NRC) staff and representatives from the Nuclear Energy Institute (NEI) to discuss their draft document that requests the Use of Flexible Scheduling Provisions of Title 10 of the Code of Federal Regulations (10 CFR) Section 50.155(h)(2) to establish an alternative date for compliance with reevaluated seismic hazard mitigation requirements of 10 CFR 50.155(b)(2) (ADAMS Accession No. ML17321B023).
The NEI gave a presentation to discuss the details of its draft document (ADAMS Accession No.
The NEI gave a presentation to discuss the details of its draft document (ADAMS Accession No.
ML17338A818) and addressed comments and questions from the NRC staff.  
ML17338A818) and addressed comments and questions from the NRC staff.
 
Members of the public attended the meeting in person and through the bridge line. At designated points during the meeting, members of the public were invited to provide any comments on the presentations.
Members of the public attended the meeting in person and through the bridge line. At designated points during the meeting, members of the public were invited to provide any comments on the presentations.  


==Enclosure:==
==Enclosure:==


Lists of Attendees  
Lists of Attendees CONTACT:         Joylynn Quinones-Navarro, NRR/DLP/PBEB 404-997-4469
 
CONTACT: Joylynn Quinones-Navarro, NRR/DLP/PBEB 404-997-4469  


ML17362A074     *via e-mail OFFICE NRR/DLP/PBEB* NRR/DLP/LA NRR/DLP/PBEB/BC (A) NRR/DLP/PBEB* NAME JQuinones SLent TBrown JQuinones DATE 12/28/2017 12/28/2017 1/2/2018 1/4/2018 Enclosure PUBLIC MEETING WITH NUCLEAR ENERGY INSTITUTE  TO DISCUSS DRAFT DOCUMENT THAT REQUESTS THE USE OF FLEXIBLE SCHEDULING PROVISIONS OF 10 CFR50.155(h)(2)
ML17362A074                                   *via e-mail OFFICE NRR/DLP/PBEB* NRR/DLP/LA         NRR/DLP/PBEB/BC (A)     NRR/DLP/PBEB*
December 7, 2017
NAME     JQuinones       SLent         TBrown                 JQuinones DATE     12/28/2017       12/28/2017     1/2/2018               1/4/2018


List of Attendees Name Organization Brenda Kovarik American Electric Power John Edgorf Nuclear Energy Institute Paul Guill Duke Energy Eric Bowman NRC (U.S. Nuclear Regulatory Commission) Tony Brown NRC Joylynn Quinones NRC Brett Titus NRC Milton Valentin NRC}}
PUBLIC MEETING WITH NUCLEAR ENERGY INSTITUTE TO DISCUSS DRAFT DOCUMENT THAT REQUESTS THE USE OF FLEXIBLE SCHEDULING PROVISIONS OF 10 CFR50.155(h)(2)
December 7, 2017 List of Attendees Name                                       Organization Brenda Kovarik                             American Electric Power John Edgorf                                 Nuclear Energy Institute Paul Guill                                 Duke Energy Eric Bowman                                 NRC (U.S. Nuclear Regulatory Commission)
Tony Brown                                 NRC Joylynn Quinones                           NRC Brett Titus                                 NRC Milton Valentin                             NRC Enclosure}}

Revision as of 06:44, 22 October 2019

12/07/2017 Summary of Meeting with the Nuclear Energy Institute to Discuss Draft Document That Requests the Use of Flexible Scheduling Provisions of 10 CFR 50.155(H)(2)
ML17362A074
Person / Time
Issue date: 01/04/2018
From: Joylynn Quinones-Navarro
Beyond-Design-Basis Engineering Branch
To: Tony Brown
Beyond-Design-Basis Engineering Branch
Quinones-Navarro J
References
Download: ML17362A074 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 January 4, 2018 MEMORANDUM TO: Tony Brown, Acting Chief Beyond Design Basis Project Engineering Branch Division of Licensing Projects Office of Nuclear Reactor Regulation FROM: Joylynn Quinones-Navarro, Reactor Engineer /RA/

Beyond Design Basis Project Engineering Branch Division of Licensing Projects Office of Nuclear Reactor Regulation

SUBJECT:

SUMMARY

OF DECEMBER 7, 2017, PUBLIC MEETING WITH THE NUCLEAR ENERGY INSTITUTE (NEI) TO DISCUSS DRAFT DOCUMENT THAT REQUESTS THE USE OF FLEXIBLE SCHEDULING PROVISIONS OF 10 CFR 50.155(h)(2)

On December 7, 2017 (Agencywide Documents Access and Management System (ADAMS)

Accession No. ML17338A930), a Category 2 public meeting was held between the U. S.

Nuclear Regulatory Commission (NRC) staff and representatives from the Nuclear Energy Institute (NEI) to discuss their draft document that requests the Use of Flexible Scheduling Provisions of Title 10 of the Code of Federal Regulations (10 CFR) Section 50.155(h)(2) to establish an alternative date for compliance with reevaluated seismic hazard mitigation requirements of 10 CFR 50.155(b)(2) (ADAMS Accession No. ML17321B023).

The NEI gave a presentation to discuss the details of its draft document (ADAMS Accession No.

ML17338A818) and addressed comments and questions from the NRC staff.

Members of the public attended the meeting in person and through the bridge line. At designated points during the meeting, members of the public were invited to provide any comments on the presentations.

Enclosure:

Lists of Attendees CONTACT: Joylynn Quinones-Navarro, NRR/DLP/PBEB 404-997-4469

ML17362A074 *via e-mail OFFICE NRR/DLP/PBEB* NRR/DLP/LA NRR/DLP/PBEB/BC (A) NRR/DLP/PBEB*

NAME JQuinones SLent TBrown JQuinones DATE 12/28/2017 12/28/2017 1/2/2018 1/4/2018

PUBLIC MEETING WITH NUCLEAR ENERGY INSTITUTE TO DISCUSS DRAFT DOCUMENT THAT REQUESTS THE USE OF FLEXIBLE SCHEDULING PROVISIONS OF 10 CFR50.155(h)(2)

December 7, 2017 List of Attendees Name Organization Brenda Kovarik American Electric Power John Edgorf Nuclear Energy Institute Paul Guill Duke Energy Eric Bowman NRC (U.S. Nuclear Regulatory Commission)

Tony Brown NRC Joylynn Quinones NRC Brett Titus NRC Milton Valentin NRC Enclosure