05000458/FIN-2012004-04: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
Line 1: Line 1:
{{finding
{{finding
| title = Inadequate Verification Of Leading Edge Flow Meter Functionality
| title = Inadequate Verification of Leading Edge Flow Meter Functionality
| docket = 05000458
| docket = 05000458
| inspection report = IR 05000458/2012004
| inspection report = IR 05000458/2012004

Latest revision as of 19:46, 20 February 2018

04
Site: River Bend Entergy icon.png
Report IR 05000458/2012004 Section 1R19
Date counted Sep 30, 2012 (2012Q3)
Type: Finding: Green
cornerstone Initiating Events
Identified by: NRC identified
Inspection Procedure: IP 71111.19
Inspectors (proximate) G Guerra
P Elkmann
A Barrett
W Sifre
J Laughlin
R Hagar
M Young
G Larkin
G Apger
B Rice
C Steely
D Strickland
CCA H.5, Work Management
INPO aspect WP.1
'