ML081710478: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(StriderTol Bot change)
 
Line 3: Line 3:
| issue date = 06/19/2008
| issue date = 06/19/2008
| title = Clarification of the 6/17/08 Letter to the NRC on Generic Letter 2004-02
| title = Clarification of the 6/17/08 Letter to the NRC on Generic Letter 2004-02
| author name = Lahti L A
| author name = Lahti L
| author affiliation = Entergy Nuclear Operations, Inc
| author affiliation = Entergy Nuclear Operations, Inc
| addressee name = Tam P S
| addressee name = Tam P
| addressee affiliation = NRC/NRR/ADRO/DORL/LPLIII-1
| addressee affiliation = NRC/NRR/ADRO/DORL/LPLIII-1
| docket = 05000255
| docket = 05000255
| license number = DPR-020
| license number = DPR-020
| contact person = Tam P S
| contact person = Tam P
| case reference number = GL-04-002, TAC MC4701
| case reference number = GL-04-002, TAC MC4701
| document type = E-Mail
| document type = E-Mail
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:Accession No. ML081710478  
{{#Wiki_filter:Accession No. ML081710478 From:
 
Lahti, Laurie A. [llahti@entergy.com]
From: Lahti, Laurie A. [llahti@entergy.com] Sent: Thursday, June 19, 2008 12:26 PM To: Peter Tam Cc: Kuemin, James L.  
Sent:
Thursday, June 19, 2008 12:26 PM To:
Peter Tam Cc:
Kuemin, James L.  


==Subject:==
==Subject:==
Additional information regarding GL 2004-02 Palisades Palisades Nuclear Plant Docket 50-255 License No. DPR-20 Response to Request for Additional Information for Extension of Completion Date for Corrective Actions Required by Generic Letter 2004-02, "Potential Impact of Debris Blockage on Emergency Recirculation during Design Basis Accidents at Pressurized-Water Reactors" On June 18, 2008, a conference call was held between the Nuclear Regulatory Commission (NRC) and Entergy Nuclear Operations, Inc (ENO) regarding ENO's letter, "Request for Extension of Completion Date for Corrective Actions Required by Generic Letter [GL] 2004-02, "Potential Impact of Debris Blockage on Emergency Recirculation during Design Basis Accidents at PressurizedWater Reactors,"" dated June 17, 2008. The NRC requested clarification on the completion of actions being proposed to resolve Generic Safety Issue-191. This e-mail provides the requested clarification. This e-mail may be placed on the Palisades Nuclear Plant docket.
Additional information regarding GL 2004-02 Palisades Palisades Nuclear Plant Docket 50-255 License No. DPR-20 Response to Request for Additional Information for Extension of Completion Date for Corrective Actions Required by Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation during Design Basis Accidents at Pressurized-Water Reactors On June 18, 2008, a conference call was held between the Nuclear Regulatory Commission (NRC) and Entergy Nuclear Operations, Inc (ENO) regarding ENOs letter, Request for Extension of Completion Date for Corrective Actions Required by Generic Letter [GL] 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation during Design Basis Accidents at PressurizedWater Reactors, dated June 17, 2008. The NRC requested clarification on the completion of actions being proposed to resolve Generic Safety Issue-191. This e-mail provides the requested clarification. This e-mail may be placed on the Palisades Nuclear Plant docket.
Currently, strainer head loss and chemical effects testing is scheduled to be reconvened at Alden Research Laboratory on September 15, 2008. The planned testing will reflect contingency modifications that are being developed in parallel. For example, ENO is considering modifications that include removing fiber (up to 100%), installing debris interceptors, and installing additional strainers. Incorporating modifications into the test parameters for the September testing is expected to avoid the need for future testing iterations and provides assurance that the GSI-191 issue will be addressed no later than restart from the 2009 refueling outage.
Currently, strainer head loss and chemical effects testing is scheduled to be reconvened at Alden Research Laboratory on September 15, 2008. The planned testing will reflect contingency modifications that are being developed in parallel. For example, ENO is considering modifications that include removing fiber (up to 100%), installing debris interceptors, and installing additional strainers. Incorporating modifications into the test parameters for the September testing is expected to avoid the need for future testing iterations and provides assurance that the GSI-191 issue will be addressed no later than restart from the 2009 refueling outage.
Another clarification was requested during the call regarding the replacement of trisodium phosphate as the containment sump buffering agent with sodium tetraborate. This is a permanent modification to the plant. The NRC approved the replacement of the containment sump buffer to sodium tetraborate in Amendment number 227 that was issued on October 2, 2007 (ML07250735).
Another clarification was requested during the call regarding the replacement of trisodium phosphate as the containment sump buffering agent with sodium tetraborate. This is a permanent modification to the plant. The NRC approved the replacement of the containment sump buffer to sodium tetraborate in Amendment number 227 that was issued on October 2, 2007 (ML07250735).
Laurie Lahti Palisades Licensing Manager
Laurie Lahti Palisades Licensing Manager  


(269) 764-2788 llahti@entergy.com E-mail Properties Mail Envelope Properties (AA2F01DC05956544BBFFD8ACB7C0A15801DC65BB)  
(269) 764-2788 llahti@entergy.com E-mail Properties Mail Envelope Properties (AA2F01DC05956544BBFFD8ACB7C0A15801DC65BB)  


==Subject:==
==Subject:==
Additional information regarding GL 2004-02 Palisades
Additional information regarding GL 2004-02 Palisades Sent Date: 06/19/2008 12:26:33 PM Received Date: 06/19/2008 12:26:33 PM From: Lahti, Laurie A.
 
Created By: llahti@entergy.com Recipients:
Sent Date:       06/19/2008 12:26:33 PM Received Date:       06/19/2008 12:26:33 PM From:               Lahti, Laurie A.  
 
Created By:         llahti@entergy.com  
 
Recipients:
Peter.Tam@nrc.gov (Peter Tam)
Peter.Tam@nrc.gov (Peter Tam)
Tracking Status: None jkuemin@entergy.com (Kuemin, James L.)
Tracking Status: None jkuemin@entergy.com (Kuemin, James L.)
Tracking Status: None  
Tracking Status: None Post Office:
 
IPCEXETSP001.etrsouth.corp.entergy.com Files Size Date & Time MESSAGE 12878 06/19/2008 Options Expiration Date:
Post Office:
Priority: olImportanceNormal ReplyRequested: False Return Notification: False Sensitivity: olNormal Recipients received:}}
IPCEXETSP001.etrsouth.corp.entergy.com  
 
Files               Size       Date & Time  
 
MESSAGE       12878       06/19/2008  
 
Options Expiration Date:
Priority:                       olImportanceNormal ReplyRequested:       False Return Notification:       False  
 
Sensitivity:         olNormal Recipients received:}}

Latest revision as of 16:19, 14 January 2025

Clarification of the 6/17/08 Letter to the NRC on Generic Letter 2004-02
ML081710478
Person / Time
Site: Palisades Entergy icon.png
Issue date: 06/19/2008
From: Lahti L
Entergy Nuclear Operations
To: Tam P
NRC/NRR/ADRO/DORL/LPLIII-1
Tam P
References
GL-04-002, TAC MC4701
Download: ML081710478 (3)


Text

Accession No. ML081710478 From:

Lahti, Laurie A. [llahti@entergy.com]

Sent:

Thursday, June 19, 2008 12:26 PM To:

Peter Tam Cc:

Kuemin, James L.

Subject:

Additional information regarding GL 2004-02 Palisades Palisades Nuclear Plant Docket 50-255 License No. DPR-20 Response to Request for Additional Information for Extension of Completion Date for Corrective Actions Required by Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation during Design Basis Accidents at Pressurized-Water Reactors On June 18, 2008, a conference call was held between the Nuclear Regulatory Commission (NRC) and Entergy Nuclear Operations, Inc (ENO) regarding ENOs letter, Request for Extension of Completion Date for Corrective Actions Required by Generic Letter [GL] 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation during Design Basis Accidents at PressurizedWater Reactors, dated June 17, 2008. The NRC requested clarification on the completion of actions being proposed to resolve Generic Safety Issue-191. This e-mail provides the requested clarification. This e-mail may be placed on the Palisades Nuclear Plant docket.

Currently, strainer head loss and chemical effects testing is scheduled to be reconvened at Alden Research Laboratory on September 15, 2008. The planned testing will reflect contingency modifications that are being developed in parallel. For example, ENO is considering modifications that include removing fiber (up to 100%), installing debris interceptors, and installing additional strainers. Incorporating modifications into the test parameters for the September testing is expected to avoid the need for future testing iterations and provides assurance that the GSI-191 issue will be addressed no later than restart from the 2009 refueling outage.

Another clarification was requested during the call regarding the replacement of trisodium phosphate as the containment sump buffering agent with sodium tetraborate. This is a permanent modification to the plant. The NRC approved the replacement of the containment sump buffer to sodium tetraborate in Amendment number 227 that was issued on October 2, 2007 (ML07250735).

Laurie Lahti Palisades Licensing Manager

(269) 764-2788 llahti@entergy.com E-mail Properties Mail Envelope Properties (AA2F01DC05956544BBFFD8ACB7C0A15801DC65BB)

Subject:

Additional information regarding GL 2004-02 Palisades Sent Date: 06/19/2008 12:26:33 PM Received Date: 06/19/2008 12:26:33 PM From: Lahti, Laurie A.

Created By: llahti@entergy.com Recipients:

Peter.Tam@nrc.gov (Peter Tam)

Tracking Status: None jkuemin@entergy.com (Kuemin, James L.)

Tracking Status: None Post Office:

IPCEXETSP001.etrsouth.corp.entergy.com Files Size Date & Time MESSAGE 12878 06/19/2008 Options Expiration Date:

Priority: olImportanceNormal ReplyRequested: False Return Notification: False Sensitivity: olNormal Recipients received: