ML082910130: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(StriderTol Bot change)
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 10/17/2008
| issue date = 10/17/2008
| title = IR 05000338-09-301, IR 05000339-09-301, on 02/10/2009, North Anna Power Station, Reactor and Senior Reactor Operator Initial Retake Examination
| title = IR 05000338-09-301, IR 05000339-09-301, on 02/10/2009, North Anna Power Station, Reactor and Senior Reactor Operator Initial Retake Examination
| author name = Widmann M T
| author name = Widmann M
| author affiliation = NRC/RGN-II/DRS/OLB
| author affiliation = NRC/RGN-II/DRS/OLB
| addressee name = Christian D A
| addressee name = Christian D
| addressee affiliation = Virginia Electric & Power Co (VEPCO)
| addressee affiliation = Virginia Electric & Power Co (VEPCO)
| docket = 05000338, 05000339
| docket = 05000338, 05000339
Line 14: Line 14:
| page count = 8
| page count = 8
}}
}}
See also: [[followed by::IR 05000338/2009301]]
See also: [[see also::IR 05000338/2009301]]


=Text=
=Text=
{{#Wiki_filter:VEPCO 3    
{{#Wiki_filter:VEPCO  
  October 17, 2008  
3  
   
October 17, 2008  
   
   
   
   
Line 27: Line 33:
5000 Dominion Boulevard  
5000 Dominion Boulevard  
Glen Allen, VA 23060-6711  
Glen Allen, VA 23060-6711  
   
   
SUBJECT: REACTOR AND SENIOR REACTOR OPERATOR INITIAL RETAKE EXAMINATION NORTH ANNA POWER STATION - 05000338/2009301 AND  
SUBJECT:  
REACTOR AND SENIOR REACTOR OPERATOR INITIAL RETAKE  
EXAMINATION NORTH ANNA POWER STATION - 05000338/2009301 AND  
05000339/2009301  
05000339/2009301  
   
   
Dear Mr. Christian:  
Dear Mr. Christian:  
   
   
In a telephone conversation on August 21, 2008, between Mr. Walt Shura, Supervisor Nuclear  
In a telephone conversation on August 21, 2008, between Mr. Walt Shura, Supervisor Nuclear  
Training (Initial Operations), and Mr. Phillip
Training (Initial Operations), and Mr. Phillip G. Capehart, Operations Examiner, arrangements  
G. Capehart, Operations Exami
were made for the administration of a licensing retake written examination scheduled to be given  
ner, arrangements were made for the administration of a licensing retake written examination scheduled to be given  
on February 10, 2009, at the North Anna Power Station.  
on February 10, 2009, at the North Anna Power Station.  
   
   
As agreed during the telephone conversation, your staff will prepare the written examination based on the guidelines in Revision 9, Supplement 1, of NUREG-1021, "Operator Licensing  
As agreed during the telephone conversation, your staff will prepare the written examination  
based on the guidelines in Revision 9, Supplement 1, of NUREG-1021, "Operator Licensing  
Examination Standards for Power Reactors."  
Examination Standards for Power Reactors."  
   
   
To meet the above schedule, Mr. Phillip Capehart provided a written examination outline to your staff on August 13, 2008.  The written examination and the supporting reference materials  
To meet the above schedule, Mr. Phillip Capehart provided a written examination outline to your  
identified in Attachment 3 to ES-201 will be due by December 19, 2008.  Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized  
staff on August 13, 2008.  The written examination and the supporting reference materials  
representative of the facility licensee shall approve the examinations before they are submitted to the NRC for review and approval.  All materials shall be complete and ready-to-use.  Your  
identified in Attachment 3 to ES-201 will be due by December 19, 2008.  Pursuant to Title 10,  
Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized  
representative of the facility licensee shall approve the examinations before they are submitted  
to the NRC for review and approval.  All materials shall be complete and ready-to-use.  Your  
staff has also agreed to make copies of all examination materials that are necessary for  
staff has also agreed to make copies of all examination materials that are necessary for  
administering the examination.  
administering the examination.  
   
   
We request that any personal, proprietary, sensitive unclassified, or safeguards information in  
We request that any personal, proprietary, sensitive unclassified, or safeguards information in  
Line 56: Line 63:
receiving the required examination and reference materials, or the submittal of inadequate or  
receiving the required examination and reference materials, or the submittal of inadequate or  
incomplete materials, may cause the examinations to be rescheduled.  
incomplete materials, may cause the examinations to be rescheduled.  
   
   
In order to conduct the requested written examinations and  
In order to conduct the requested written examinations and operating tests, it will be necessary  
operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and  
for your staff to provide adequate space and accommodations in accordance with ES-402, and  
to make the simulation facility available on the dates noted above.  In accordance with ES-302, your staff should retain the original simulator performance data (e.g., system pressures,  
to make the simulation facility available on the dates noted above.  In accordance with ES-302,  
your staff should retain the original simulator performance data (e.g., system pressures,  
temperatures, and levels) generated during the dynamic operating tests until the examination  
temperatures, and levels) generated during the dynamic operating tests until the examination  
results are final.  
results are final.  
Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in
effect while the written examinations is being administered.


VEPCO
2
   
   
Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations is being administered. 
VEPCO    2
 
   
   
To permit timely NRC review and evaluation, your staff should submit preliminary reactor  
To permit timely NRC review and evaluation, your staff should submit preliminary reactor  
Line 76: Line 90:
date, a postponement may be necessary.  Signed applications certifying that all training has  
date, a postponement may be necessary.  Signed applications certifying that all training has  
been completed should be submitted at least 14 days before the first examination date.  
been completed should be submitted at least 14 days before the first examination date.  
   
   
This letter contains information collections that are subject to the Paperwork Reduction Act of  
This letter contains information collections that are subject to the Paperwork Reduction Act of  
1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under approval number 3150-0018, which expires on June 30, 2009.  The public reporting burden for  
1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under  
approval number 3150-0018, which expires on June 30, 2009.  The public reporting burden for  
this collection of information is estimated to average 500 hours per response, including the time  
this collection of information is estimated to average 500 hours per response, including the time  
for reviewing instructions, gathering and maintaining the data needed, writing the examinations,  
for reviewing instructions, gathering and maintaining the data needed, writing the examinations,  
Line 88: Line 102:
and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-
and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-
0018), Office of Management and Budget, Washington, DC 20503.  
0018), Office of Management and Budget, Washington, DC 20503.  
   
   
The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of  
The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of  
information unless it displays a currently valid OMB control number.  
information unless it displays a currently valid OMB control number.  
   
   
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the  
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be  
Publicly Available Records (PARS) component of the NRC's document system (ADAMS).   
available electronically for public inspection in the NRC Public Document Room or from the  
ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm.adams.html (the Public Electronic Reading Room).  
Publicly Available Records (PARS) component of the NRCs document system (ADAMS).   
 
ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm.adams.html (the  
Public Electronic Reading Room).  
   
   
Thank you for your cooperation in this matter.  Mr. Walt Shura has been advised of the policies  
Thank you for your cooperation in this matter.  Mr. Walt Shura has been advised of the policies  
and guidelines referenced in this letter.  If you have any questions regarding the NRC's  
and guidelines referenced in this letter.  If you have any questions regarding the NRC's  
examination pr
examination procedures and guidelines, please contact Mr. Phillip G. Capehart at (404) 562-
ocedures and guidelines, please contact Mr. Phillip  
4483, (Internet E-mail: Phillip.Capehart@nrc.gov), or me at (404) 562-4550, (Internet E-mail:  
G. Capehart at (404) 562-
Malcolm.Widmann@nrc.gov).  
4483, (Internet  
E-mail: Phillip.Capehart@nrc.gov), or me at (404) 562-4550, (Int
Sincerely,  
ernet E-mail: Malcolm.Widmann@nrc.gov).  
 
Sincerely,       /RA/  Malcolm T. Widmann, Chief  
/RA/  
   
Malcolm T. Widmann, Chief  
Operator Licensing Branch  
Operator Licensing Branch  
Division of Reactor Safety  
Division of Reactor Safety  
Line 114: Line 134:
Docket No.:  50-338, 50-339  
Docket No.:  50-338, 50-339  
License No.:  NPF-4, NPF-7  
License No.:  NPF-4, NPF-7  
   
   
(cc: w/encl - See Page 3)  
(cc: w/encl - See Page 3)  


 
VEPCO
VEPCO 3   cc w/encl:  
3  
cc w/encl:  
Daniel G. Stoddard  
Daniel G. Stoddard  
Site Vice President  
Site Vice President  
Virginia Electric and Power Company  
Virginia Electric and Power Company  
Electronic Mail Distribution  
Electronic Mail Distribution  
   
   
Eric Hendrixson  
Eric Hendrixson  
Line 130: Line 152:
Virginia Electric and Power Company  
Virginia Electric and Power Company  
Electronic Mail Distribution  
Electronic Mail Distribution  
   
   
Chris L. Funderburk  
Chris L. Funderburk  
Line 137: Line 158:
Virginia Electric and Power Company  
Virginia Electric and Power Company  
Electronic Mail Distribution  
Electronic Mail Distribution  
   
   
Lillian M. Cuoco, Esq.  
Lillian M. Cuoco, Esq.  
Line 143: Line 163:
Dominion Resources Services, Inc.  
Dominion Resources Services, Inc.  
Electronic Mail Distribution  
Electronic Mail Distribution  
   
   
Executive Vice President  
Executive Vice President  
Old Dominion Electric Cooperative  
Old Dominion Electric Cooperative  
Electronic Mail Distribution  
Electronic Mail Distribution  
   
   
Attorney General  
Attorney General  
Supreme Court Building  
Supreme Court Building  
900 East Main Street  
900 East Main Street  
  Senior Resident Inspector  
   
Senior Resident Inspector  
North Anna Power Station  
North Anna Power Station  
U.S. Nuclear Regulatory Commission  
U.S. Nuclear Regulatory Commission  
P.O. Box 490  
P.O. Box 490  
Mineral, VA  23117  
Mineral, VA  23117  
   
   
County Administrator  
County Administrator  
Line 164: Line 182:
P.O. Box 160  
P.O. Box 160  
Louisa, VA  23093  
Louisa, VA  23093  
   
   
Michael M. Cline  
Michael M. Cline  
Line 171: Line 188:
   Emergency Services Management  
   Emergency Services Management  
Electronic Mail Distribution  
Electronic Mail Distribution  
   
   
Ginger L. Alligood   
Ginger L. Alligood   
   (NORTH ANNA EXAM   
   (NORTH ANNA EXAM   
   REPORTS ONLY)  
   REPORTS ONLY)  
   
   
Virginia Electric and Power Company  
Virginia Electric and Power Company  
Line 184: Line 199:
P.O. Box 402  
P.O. Box 402  
Mineral, VA  23117  
Mineral, VA  23117  
Richmond, VA  23219


Richmond, VA  23219
  October 17, 2008
   
   
 
October 17, 2008
Mr. David A. Christian  
Mr. David A. Christian  
Senior Vice President and Chief Nuclear Officer  
Senior Vice President and Chief Nuclear Officer  
Line 195: Line 214:
5000 Dominion Boulevard  
5000 Dominion Boulevard  
Glen Allen, VA 23060  
Glen Allen, VA 23060  
   
   
SUBJECT: REACTOR AND SENIOR REACTOR OPERATOR INITIAL RETAKE EXAMINATION NORTH ANNA POWER STATION - 05000338/2009301 AND  
SUBJECT:  
REACTOR AND SENIOR REACTOR OPERATOR INITIAL RETAKE  
EXAMINATION NORTH ANNA POWER STATION - 05000338/2009301 AND  
05000339/2009301  
05000339/2009301  
   
   
Dear Mr. Christian:  
Dear Mr. Christian:  
   
   
In a telephone conversation on August 21, 2008, between Mr. Walt Shura, Supervisor Nuclear  
In a telephone conversation on August 21, 2008, between Mr. Walt Shura, Supervisor Nuclear  
Training (Initial Operations), and Mr. Phillip
Training (Initial Operations), and Mr. Phillip G. Capehart, Operations Examiner, arrangements  
G. Capehart, Operations Exami
were made for the administration of a licensing retake written examination scheduled to be given  
ner, arrangements were made for the administration of a licensing retake written examination scheduled to be given  
on February 10, 2009, at the North Anna Power Station.  
on February 10, 2009, at the North Anna Power Station.  
   
   
As agreed during the telephone conversation, your staff will prepare the written examination based on the guidelines in Revision 9, Supplement 1, of NUREG-1021, "Operator Licensing  
As agreed during the telephone conversation, your staff will prepare the written examination  
based on the guidelines in Revision 9, Supplement 1, of NUREG-1021, "Operator Licensing  
Examination Standards for Power Reactors."  
Examination Standards for Power Reactors."  
   
   
To meet the above schedule, Mr. Phillip Capehart provided a written examination outline to your staff on August 13, 2008.  The written examination and the supporting reference materials  
To meet the above schedule, Mr. Phillip Capehart provided a written examination outline to your  
identified in Attachment 3 to ES-201 will be due by December 19, 2008.  Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized  
staff on August 13, 2008.  The written examination and the supporting reference materials  
representative of the facility licensee shall approve the examinations before they are submitted to the NRC for review and approval.  All materials shall be complete and ready-to-use.  Your  
identified in Attachment 3 to ES-201 will be due by December 19, 2008.  Pursuant to Title 10,  
Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized  
representative of the facility licensee shall approve the examinations before they are submitted  
to the NRC for review and approval.  All materials shall be complete and ready-to-use.  Your  
staff has also agreed to make copies of all examination materials that are necessary for  
staff has also agreed to make copies of all examination materials that are necessary for  
administering the examination.  
administering the examination.  
   
   
We request that any personal, proprietary, sensitive unclassified, or safeguards information in  
We request that any personal, proprietary, sensitive unclassified, or safeguards information in  
Line 224: Line 244:
receiving the required examination and reference materials, or the submittal of inadequate or  
receiving the required examination and reference materials, or the submittal of inadequate or  
incomplete materials, may cause the examinations to be rescheduled.  
incomplete materials, may cause the examinations to be rescheduled.  
   
   
In order to conduct the requested written examinations and  
In order to conduct the requested written examinations and operating tests, it will be necessary  
operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and  
for your staff to provide adequate space and accommodations in accordance with ES-402, and  
to make the simulation facility available on the dates noted above.  In accordance with ES-302, your staff should retain the original simulator performance data (e.g., system pressures,  
to make the simulation facility available on the dates noted above.  In accordance with ES-302,  
your staff should retain the original simulator performance data (e.g., system pressures,  
temperatures, and levels) generated during the dynamic operating tests until the examination  
temperatures, and levels) generated during the dynamic operating tests until the examination  
results are final.  
results are final.  
Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in
effect while the written examinations is being administered.


_________________________
   
   
Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations is being administered.
XG  SUNSI REVIEW COMPLETE
OFFICE
RII:DRS
RIII:DRS
RIII:DRP
SIGNATURE
/RA/
/RA/
/RA/
NAME
PCapehart
MWidmann
J. Dodson
DATE
10/16/2008
10/17/2008
10/17/2008
10/      /2008
10/      /2008
10/      /2008
E-MAIL COPY?
    YES
NO  YES
NO  YES
NO  YES
NO  YES
NO  YES
NO  YES
NO


_________________________ X
VEPCO
G  SUNSI REVIEW COMPLETE OFFICE RII:DRS RIII:DRS RIII:DRP    SIGNATURE /RA/ /RA/ /RA/    NAME PCapehart MWidmann J. Dodson    DATE 10/16/2008 10/17/2008 10/17/2008 10/      /2008 10/      /2008 10/      /2008 E-MAIL COPY?    YES NO  YES NO  YES NO  YES NO  YES NO  YES NO  YES NO  
   
VEPCO    3  
   
  Letter to: David A. Christian from Malcolm T. Widmann Dated October 17, 2008  
   
3  
   
Letter to: David A. Christian from Malcolm T. Widmann Dated October 17, 2008  
   
   
SUBJECT:    REACTOR AND SENIOR REACTOR OPERATOR INITIAL RETAKE EXAMINATION NORTH ANNA POWER STATION - 05000338/2009301 AND  
SUBJECT:    REACTOR AND SENIOR REACTOR OPERATOR INITIAL RETAKE  
EXAMINATION NORTH ANNA POWER STATION - 05000338/2009301 AND  
05000339/2009301  
05000339/2009301  
   
   
Distribution w/encl:
Distribution w/encl:  
RIDSNRRDIRS  
RIDSNRRDIRS  
PUBLIC  
PUBLIC  
S. P. Lingam, NRR  
S. P. Lingam, NRR  
Richard Jervey, NRR
Richard Jervey, NRR
}}
}}

Latest revision as of 14:43, 14 January 2025

IR 05000338-09-301, IR 05000339-09-301, on 02/10/2009, North Anna Power Station, Reactor and Senior Reactor Operator Initial Retake Examination
ML082910130
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 10/17/2008
From: Widmann M
NRC/RGN-II/DRS/OLB
To: Christian D
Virginia Electric & Power Co (VEPCO)
References
IR-09-301
Download: ML082910130 (8)


See also: IR 05000338/2009301

Text

VEPCO

3

October 17, 2008

Mr. David A. Christian

President and Chief Nuclear Officer

Virginia Electric and Power Company

Innsbrook Technical Center

5000 Dominion Boulevard

Glen Allen, VA 23060-6711

SUBJECT:

REACTOR AND SENIOR REACTOR OPERATOR INITIAL RETAKE

EXAMINATION NORTH ANNA POWER STATION - 05000338/2009301 AND

05000339/2009301

Dear Mr. Christian:

In a telephone conversation on August 21, 2008, between Mr. Walt Shura, Supervisor Nuclear

Training (Initial Operations), and Mr. Phillip G. Capehart, Operations Examiner, arrangements

were made for the administration of a licensing retake written examination scheduled to be given

on February 10, 2009, at the North Anna Power Station.

As agreed during the telephone conversation, your staff will prepare the written examination

based on the guidelines in Revision 9, Supplement 1, of NUREG-1021, "Operator Licensing

Examination Standards for Power Reactors."

To meet the above schedule, Mr. Phillip Capehart provided a written examination outline to your

staff on August 13, 2008. The written examination and the supporting reference materials

identified in Attachment 3 to ES-201 will be due by December 19, 2008. Pursuant to Title 10,

Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized

representative of the facility licensee shall approve the examinations before they are submitted

to the NRC for review and approval. All materials shall be complete and ready-to-use. Your

staff has also agreed to make copies of all examination materials that are necessary for

administering the examination.

We request that any personal, proprietary, sensitive unclassified, or safeguards information in

your response be contained in a separate enclosure and appropriately marked. Any delay in

receiving the required examination and reference materials, or the submittal of inadequate or

incomplete materials, may cause the examinations to be rescheduled.

In order to conduct the requested written examinations and operating tests, it will be necessary

for your staff to provide adequate space and accommodations in accordance with ES-402, and

to make the simulation facility available on the dates noted above. In accordance with ES-302,

your staff should retain the original simulator performance data (e.g., system pressures,

temperatures, and levels) generated during the dynamic operating tests until the examination

results are final.

Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in

effect while the written examinations is being administered.

VEPCO

2

To permit timely NRC review and evaluation, your staff should submit preliminary reactor

operator and senior reactor operator license applications (Office of Management and Budget

(OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024),

and waiver requests (if any)(OMB approval number 3150-0090) at least 30 days before the first

examination date. If the applications are not received at least 30 days before the examination

date, a postponement may be necessary. Signed applications certifying that all training has

been completed should be submitted at least 14 days before the first examination date.

This letter contains information collections that are subject to the Paperwork Reduction Act of

1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under

approval number 3150-0018, which expires on June 30, 2009. The public reporting burden for

this collection of information is estimated to average 500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> per response, including the time

for reviewing instructions, gathering and maintaining the data needed, writing the examinations,

and completing and reviewing the collection of information. Send comments on any aspect of

this collection of information, including suggestions for reducing the burden, to the Information

and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission,

Washington, DC 20555-0001, or by Internet electronic mail at infocollectsresource@nrc.gov;

and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-

0018), Office of Management and Budget, Washington, DC 20503.

The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of

information unless it displays a currently valid OMB control number.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be

available electronically for public inspection in the NRC Public Document Room or from the

Publicly Available Records (PARS) component of the NRCs document system (ADAMS).

ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm.adams.html (the

Public Electronic Reading Room).

Thank you for your cooperation in this matter. Mr. Walt Shura has been advised of the policies

and guidelines referenced in this letter. If you have any questions regarding the NRC's

examination procedures and guidelines, please contact Mr. Phillip G. Capehart at (404) 562-

4483, (Internet E-mail: Phillip.Capehart@nrc.gov), or me at (404) 562-4550, (Internet E-mail:

Malcolm.Widmann@nrc.gov).

Sincerely,

/RA/

Malcolm T. Widmann, Chief

Operator Licensing Branch

Division of Reactor Safety

Docket No.: 50-338, 50-339

License No.: NPF-4, NPF-7

(cc: w/encl - See Page 3)

VEPCO

3

cc w/encl:

Daniel G. Stoddard

Site Vice President

Virginia Electric and Power Company

Electronic Mail Distribution

Eric Hendrixson

Director, Nuclear Safety and Licensing

Virginia Electric and Power Company

Electronic Mail Distribution

Chris L. Funderburk

Director, Nuclear Licensing & Operations

Support

Virginia Electric and Power Company

Electronic Mail Distribution

Lillian M. Cuoco, Esq.

Senior Counsel

Dominion Resources Services, Inc.

Electronic Mail Distribution

Executive Vice President

Old Dominion Electric Cooperative

Electronic Mail Distribution

Attorney General

Supreme Court Building

900 East Main Street

Senior Resident Inspector

North Anna Power Station

U.S. Nuclear Regulatory Commission

P.O. Box 490

Mineral, VA 23117

County Administrator

Louisa County

P.O. Box 160

Louisa, VA 23093

Michael M. Cline

Director

Virginia Department of

Emergency Services Management

Electronic Mail Distribution

Ginger L. Alligood

(NORTH ANNA EXAM

REPORTS ONLY)

Virginia Electric and Power Company

ATTN: Mr. Christopher A. McClain

Manager Nuclear Training

North Anna Power Station

P.O. Box 402

Mineral, VA 23117

Richmond, VA 23219

October 17, 2008

Mr. David A. Christian

Senior Vice President and Chief Nuclear Officer

Virginia Electric and Power Company

Innsbrook Technical Center

5000 Dominion Boulevard

Glen Allen, VA 23060

SUBJECT:

REACTOR AND SENIOR REACTOR OPERATOR INITIAL RETAKE

EXAMINATION NORTH ANNA POWER STATION - 05000338/2009301 AND

05000339/2009301

Dear Mr. Christian:

In a telephone conversation on August 21, 2008, between Mr. Walt Shura, Supervisor Nuclear

Training (Initial Operations), and Mr. Phillip G. Capehart, Operations Examiner, arrangements

were made for the administration of a licensing retake written examination scheduled to be given

on February 10, 2009, at the North Anna Power Station.

As agreed during the telephone conversation, your staff will prepare the written examination

based on the guidelines in Revision 9, Supplement 1, of NUREG-1021, "Operator Licensing

Examination Standards for Power Reactors."

To meet the above schedule, Mr. Phillip Capehart provided a written examination outline to your

staff on August 13, 2008. The written examination and the supporting reference materials

identified in Attachment 3 to ES-201 will be due by December 19, 2008. Pursuant to Title 10,

Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized

representative of the facility licensee shall approve the examinations before they are submitted

to the NRC for review and approval. All materials shall be complete and ready-to-use. Your

staff has also agreed to make copies of all examination materials that are necessary for

administering the examination.

We request that any personal, proprietary, sensitive unclassified, or safeguards information in

your response be contained in a separate enclosure and appropriately marked. Any delay in

receiving the required examination and reference materials, or the submittal of inadequate or

incomplete materials, may cause the examinations to be rescheduled.

In order to conduct the requested written examinations and operating tests, it will be necessary

for your staff to provide adequate space and accommodations in accordance with ES-402, and

to make the simulation facility available on the dates noted above. In accordance with ES-302,

your staff should retain the original simulator performance data (e.g., system pressures,

temperatures, and levels) generated during the dynamic operating tests until the examination

results are final.

Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in

effect while the written examinations is being administered.

_________________________

XG SUNSI REVIEW COMPLETE

OFFICE

RII:DRS

RIII:DRS

RIII:DRP

SIGNATURE

/RA/

/RA/

/RA/

NAME

PCapehart

MWidmann

J. Dodson

DATE

10/16/2008

10/17/2008

10/17/2008

10/ /2008

10/ /2008

10/ /2008

E-MAIL COPY?

YES

NO YES

NO YES

NO YES

NO YES

NO YES

NO YES

NO

VEPCO

3

Letter to: David A. Christian from Malcolm T. Widmann Dated October 17, 2008

SUBJECT: REACTOR AND SENIOR REACTOR OPERATOR INITIAL RETAKE

EXAMINATION NORTH ANNA POWER STATION - 05000338/2009301 AND

05000339/2009301

Distribution w/encl:

RIDSNRRDIRS

PUBLIC

S. P. Lingam, NRR

Richard Jervey, NRR