ML082960512: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(StriderTol Bot change)
 
(2 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML082960512
| number = ML082960512
| issue date = 10/22/2008
| issue date = 10/22/2008
| title = 2008/10/22 Indian Point Lr Hearing - Telecon Summary of September 8, 2008 Re Operating Experience and LRA Section 3.5.2.2
| title = Lr Hearing - Telecon Summary of September 8, 2008 Re Operating Experience and LRA Section 3.5.2.2
| author name =  
| author name =  
| author affiliation = - No Known Affiliation
| author affiliation = - No Known Affiliation
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:1 IPRenewal NPEmails From: Tyner, Donna [dtyner@entergy.com]
{{#Wiki_filter:1 IPRenewal NPEmails From:
Sent: Wednesday, October 22, 2008 12:41 PM To: Kimberly Green
Tyner, Donna [dtyner@entergy.com]
Sent:
Wednesday, October 22, 2008 12:41 PM To:
Kimberly Green


==Subject:==
==Subject:==
RE: Telecon Summary of September 8, 2008 re Operating Experience and LRA Section 3.5.2.2IPEC Engineering has reviewed the summary and have no comments.
RE: Telecon Summary of September 8, 2008 re Operating Experience and LRA Section 3.5.2.2 IPEC Engineering has reviewed the summary and have no comments.
Thanks, Donna From: Kimberly Green [mailto:Kimberly.Green@nrc.gov]
: Thanks, Donna From: Kimberly Green [mailto:Kimberly.Green@nrc.gov]
Sent: Friday, October 17, 2008 12:23 PM To: STROUD, MICHAEL D; Tyner, Donna Cc: IPRenewal NPEmails  
Sent: Friday, October 17, 2008 12:23 PM To: STROUD, MICHAEL D; Tyner, Donna Cc: IPRenewal NPEmails  


==Subject:==
==Subject:==
Telecon Summary of September 8, 2008 re Operating Experience and LRA Section 3.5.2.2 Mike and Donna,  
Telecon Summary of September 8, 2008 re Operating Experience and LRA Section 3.5.2.2 Mike and Donna, Attached is the draft telecon summary from the call on September 8, 2008 regarding operating experience and LRA Section 3.5.2.2. Please review and let me know if any corrections are needed.
KimberlyGreen SafetyPM (301)4151627 kimberly.green@nrc.gov


Attached is the draft telecon summary from the call on September 8, 2008 regarding operating experience and LRA Section 3.5.2.2. Please review and let me know if any corrections are needed.
Hearing Identifier:
KimberlyGreenSafetyPM(301)4151627kimberly.green@nrc.gov Hearing Identifier: IndianPointUnits2and3NonPublic_EX Email Number: 797   Mail Envelope Properties   (3934ABBB09976D4286276A97F3ECA098045ECFA0)
IndianPointUnits2and3NonPublic_EX Email Number:
797 Mail Envelope Properties (3934ABBB09976D4286276A97F3ECA098045ECFA0)  


==Subject:==
==Subject:==
RE: Telecon Summary of September 8, 2008 re Operating Experience and LRA Section 3.5.2.2 Sent Date:   10/22/2008 12:41:20 PM Received Date: 10/22/2008 12:41:26 PM From:   Tyner, Donna Created By:   dtyner@entergy.com Recipients:     "Kimberly Green" <Kimberly.Green@nrc.gov> Tracking Status: None  
RE: Telecon Summary of September 8, 2008 re Operating Experience and LRA Section 3.5.2.2 Sent Date:
 
10/22/2008 12:41:20 PM Received Date:
Post Office:   IPCEXETSP001.etrsouth.corp.entergy.com Files     Size     Date & Time MESSAGE   710     10/22/2008 12:41:26 PM Options Priority:     Standard   Return Notification:   No   Reply Requested:   No   Sensitivity:     Normal Expiration Date:     Recipients Received:}}
10/22/2008 12:41:26 PM From:
Tyner, Donna Created By:
dtyner@entergy.com Recipients:  
"Kimberly Green" <Kimberly.Green@nrc.gov>
Tracking Status: None Post Office:
IPCEXETSP001.etrsouth.corp.entergy.com Files Size Date & Time MESSAGE 710 10/22/2008 12:41:26 PM Options Priority:
Standard Return Notification:
No Reply Requested:
No Sensitivity:
Normal Expiration Date:
Recipients Received:}}

Latest revision as of 14:40, 14 January 2025

Lr Hearing - Telecon Summary of September 8, 2008 Re Operating Experience and LRA Section 3.5.2.2
ML082960512
Person / Time
Site: Indian Point  Entergy icon.png
Issue date: 10/22/2008
From:
- No Known Affiliation
To:
Division of License Renewal
References
Download: ML082960512 (2)


Text

1 IPRenewal NPEmails From:

Tyner, Donna [dtyner@entergy.com]

Sent:

Wednesday, October 22, 2008 12:41 PM To:

Kimberly Green

Subject:

RE: Telecon Summary of September 8, 2008 re Operating Experience and LRA Section 3.5.2.2 IPEC Engineering has reviewed the summary and have no comments.

Thanks, Donna From: Kimberly Green [1]

Sent: Friday, October 17, 2008 12:23 PM To: STROUD, MICHAEL D; Tyner, Donna Cc: IPRenewal NPEmails

Subject:

Telecon Summary of September 8, 2008 re Operating Experience and LRA Section 3.5.2.2 Mike and Donna, Attached is the draft telecon summary from the call on September 8, 2008 regarding operating experience and LRA Section 3.5.2.2. Please review and let me know if any corrections are needed.

KimberlyGreen SafetyPM (301)4151627 kimberly.green@nrc.gov

Hearing Identifier:

IndianPointUnits2and3NonPublic_EX Email Number:

797 Mail Envelope Properties (3934ABBB09976D4286276A97F3ECA098045ECFA0)

Subject:

RE: Telecon Summary of September 8, 2008 re Operating Experience and LRA Section 3.5.2.2 Sent Date:

10/22/2008 12:41:20 PM Received Date:

10/22/2008 12:41:26 PM From:

Tyner, Donna Created By:

dtyner@entergy.com Recipients:

"Kimberly Green" <Kimberly.Green@nrc.gov>

Tracking Status: None Post Office:

IPCEXETSP001.etrsouth.corp.entergy.com Files Size Date & Time MESSAGE 710 10/22/2008 12:41:26 PM Options Priority:

Standard Return Notification:

No Reply Requested:

No Sensitivity:

Normal Expiration Date:

Recipients Received: