IR 05000456/2008010: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| (2 intermediate revisions by the same user not shown) | |||
| Line 5: | Line 5: | ||
| author name = Peterson H | | author name = Peterson H | ||
| author affiliation = NRC/RGN-III/DRS | | author affiliation = NRC/RGN-III/DRS | ||
| addressee name = Pardee C | | addressee name = Pardee C | ||
| addressee affiliation = AmerGen Energy Co, LLC, Exelon Nuclear | | addressee affiliation = AmerGen Energy Co, LLC, Exelon Nuclear | ||
| docket = 05000456, 05000457 | | docket = 05000456, 05000457 | ||
| Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter | {{#Wiki_filter:November 2, 2008 | ||
==SUBJECT:== | |||
BRAIDWOOD STATION, UNITS 1 AND 2 TI 2515/171 UNRESOLVED ITEM RESOLUTION REPORT NO. 05000456/2008010(DRS); 5000457/2008010(DRS) | |||
SUBJECT: BRAIDWOOD STATION, UNITS 1 AND 2 TI 2515/171 UNRESOLVED ITEM RESOLUTION REPORT NO. 05000456/2008010(DRS); 5000457/2008010(DRS) | |||
==Dear Mr. Pardee:== | ==Dear Mr. Pardee:== | ||
On October 17, 2008, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Braidwood Station, Units 1 and 2. This report documents the actions taken to review an Unresolved Item (URI) [URI 05000456/2008006-03; URI 05000457/2008006-03], from Inspection Report Nos. 05000456/2008006(DRS); 5000457/2008006(DRS) at your Braidwood Station, associated with the inspection performed per TI 2515/171, | On October 17, 2008, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Braidwood Station, Units 1 and 2. This report documents the actions taken to review an Unresolved Item (URI) [URI 05000456/2008006-03; URI 05000457/2008006-03], from Inspection Report Nos. 05000456/2008006(DRS); 5000457/2008006(DRS) at your Braidwood Station, associated with the inspection performed per TI 2515/171, Verification of Site Specific Implementation of B.5.b Phase 2 and 3 Mitigating Strategies. The enclosed report documents the results of the inspection, which were discussed on October 17, 2008, with Mr. D. Gullott of your staff. | ||
The inspection examined activities conducted under your license as they relate to the implementation of B.5.b Phase 2 and 3 mitigating strategies, your compliance with the Commission | The inspection examined activities conducted under your license as they relate to the implementation of B.5.b Phase 2 and 3 mitigating strategies, your compliance with the Commission=s rules and regulations, and with the conditions of your operating licenses. Within these areas, the inspection involved examination of selected procedures and representative records. | ||
=s rules and regulations, and with the conditions of your operating licenses. Within these areas, the inspection involved examination of selected procedures and representative records. | |||
Based on the results of this inspection, no findings of significance were identified. | Based on the results of this inspection, no findings of significance were identified. | ||
| Line 35: | Line 32: | ||
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). | In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). | ||
Enclosure transmitted herewith contains Sensitive Unclassified Non-Safeguards Information. When separated from enclosure, this transmittal document is decontrolled. However, because of the sensitive information contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this | Enclosure transmitted herewith contains Sensitive Unclassified Non-Safeguards Information. When separated from enclosure, this transmittal document is decontrolled. However, because of the sensitive information contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letters enclosure will not be available for public inspection. | ||
Sincerely, | |||
/RA/ | |||
Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-456; 50-457 License Nos. NPF-72; NPF-77 | |||
Nonpublic Enclosure: Inspection Report 05000456/2008010(DRS); | |||
05000457/2008010(DRS) | |||
w/Attachment: Supplemental Information | |||
cc w/encl: | |||
D. Nelson, NRR/DPR/PSPB | |||
E. Bowman, NRR/DPR/PSPB | |||
J. Klinger, State Liaison Officer | |||
cc w/o encl: | |||
Site Vice President - Braidwood Station | |||
Plant Manager - Braidwood Station | |||
Regulatory Assurance Manager - Braidwood Station | |||
Chief Operating Officer and Senior Vice President | |||
Senior Vice President - Midwest Operations | |||
Senior Vice President - Operations Support | |||
Vice President - Licensing and Regulatory Affairs | |||
Director - Licensing and Regulatory Affairs | |||
Manager Licensing - Braidwood, Byron and LaSalle | |||
Associate General Counsel | |||
Document Control Desk - Licensing | |||
Assistant Attorney General | |||
J. Klinger, State Liaison Officer, | |||
Illinois Emergency Management Agency | |||
Chairman, Illinois Commerce Commission | |||
}} | }} | ||
Latest revision as of 14:25, 14 January 2025
| ML083120439 | |
| Person / Time | |
|---|---|
| Site: | Braidwood |
| Issue date: | 11/02/2008 |
| From: | Hironori Peterson Division of Reactor Safety III |
| To: | Pardee C AmerGen Energy Co, Exelon Nuclear |
| References | |
| IR-08-010 | |
| Download: ML083120439 (4) | |
Text
November 2, 2008
SUBJECT:
BRAIDWOOD STATION, UNITS 1 AND 2 TI 2515/171 UNRESOLVED ITEM RESOLUTION REPORT NO. 05000456/2008010(DRS); 5000457/2008010(DRS)
Dear Mr. Pardee:
On October 17, 2008, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Braidwood Station, Units 1 and 2. This report documents the actions taken to review an Unresolved Item (URI) [URI 05000456/2008006-03; URI 05000457/2008006-03], from Inspection Report Nos. 05000456/2008006(DRS); 5000457/2008006(DRS) at your Braidwood Station, associated with the inspection performed per TI 2515/171, Verification of Site Specific Implementation of B.5.b Phase 2 and 3 Mitigating Strategies. The enclosed report documents the results of the inspection, which were discussed on October 17, 2008, with Mr. D. Gullott of your staff.
The inspection examined activities conducted under your license as they relate to the implementation of B.5.b Phase 2 and 3 mitigating strategies, your compliance with the Commission=s rules and regulations, and with the conditions of your operating licenses. Within these areas, the inspection involved examination of selected procedures and representative records.
Based on the results of this inspection, no findings of significance were identified.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Enclosure transmitted herewith contains Sensitive Unclassified Non-Safeguards Information. When separated from enclosure, this transmittal document is decontrolled. However, because of the sensitive information contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letters enclosure will not be available for public inspection.
Sincerely,
/RA/
Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-456; 50-457 License Nos. NPF-72; NPF-77
Nonpublic Enclosure: Inspection Report 05000456/2008010(DRS);
w/Attachment: Supplemental Information
cc w/encl:
D. Nelson, NRR/DPR/PSPB
E. Bowman, NRR/DPR/PSPB
J. Klinger, State Liaison Officer
cc w/o encl:
Site Vice President - Braidwood Station
Plant Manager - Braidwood Station
Regulatory Assurance Manager - Braidwood Station
Chief Operating Officer and Senior Vice President
Senior Vice President - Midwest Operations
Senior Vice President - Operations Support
Vice President - Licensing and Regulatory Affairs
Director - Licensing and Regulatory Affairs
Manager Licensing - Braidwood, Byron and LaSalle
Associate General Counsel
Document Control Desk - Licensing
Assistant Attorney General
J. Klinger, State Liaison Officer,
Illinois Emergency Management Agency
Chairman, Illinois Commerce Commission