{{#Wiki_filter:Examinee's Cue Sheet JOB PERFORMANCE MEASURE  
{{#Wiki_filter:Examinees Cue Sheet JOB PERFORMANCE MEASURE TASK CONDITIONS:
: 1.
You are an extra NLO.
: 2.
Both Units are at 100% power.
: 3.
Maintenance has recently been performed on 2PR09J CC HX Outlet Radiation Monitor.
: 4.
An attempt was made to start 2PR09J from the Control Room and failed.
: 5.
Further discussion/investigation determined that there might be a problem with the alignment of the monitor.
INITIATING CUES:
The US has directed you to start the 2PR09J locally per BOP AR/PR-1. The US has verified the Monitor Data Base as correct for 2PR09J.


TASK CONDITIONS:
Examinees Cue Sheet JOB PERFORMANCE MEASURE TASK CONDITIONS:
: 1. You are an extra NLO. 2. Both Units are at 100% power. 3. Maintenance has recently been perform ed on 2PR09J CC HX Outlet Radiation Monitor. 4. An attempt was made to start 2PR 09J from the Control Room and failed. 5. Further discussion/investigation dete rmined that there might be a problem with the alignment of the monitor.
: 2.
INITIATING CUES:
You are an extra NLO.
 
: 2.
The US has directed you to start the 2PR09J locally per BOP AR/PR-1. The US has verified the Monitor Data Ba se as correct for 2PR09J.
Both Units are at 100% power.
 
: 6.
Examinee's Cue Sheet JOB PERFORMANCE MEASURE  
Maintenance has recently been performed on 2PR09J CC HX Outlet Radiation Monitor.
 
: 7.
TASK CONDITIONS:  
An attempt was made to start 2PR09J from the Control Room and failed.
: 2. You are an extra NLO. 2. Both Units are at 100% power. 6. Maintenance has recently been perform ed on 2PR09J CC HX Outlet Radiation Monitor. 7. An attempt was made to start 2PR 09J from the Control Room and failed. 8. Further discussion/investigation dete rmined that there might be a problem with the alignment of the monitor.
: 8.
INITIATING CUES:  
Further discussion/investigation determined that there might be a problem with the alignment of the monitor.
 
INITIATING CUES:
The US has directed you to start the 2PR09J locally per BOP AR/PR-1. The US has verified the Monitor Data Ba se as correct for 2PR09J.
The US has directed you to start the 2PR09J locally per BOP AR/PR-1. The US has verified the Monitor Data Base as correct for 2PR09J.  
Page 3 of 6 JOB PERFORMANCE MEASURE              Rev. 1, 6/01/2006 TASK TITLE: Perform Local Star t of CC HX Outlet Radiation Monitor (2PR09J)
JPM No.: N-116 TPO No: 4C.AR-03 K&A No.: (A) 2.1.30 K&A IMP: 3.9 EXAMINEE:_______________________________ DATE:  ___/___/___
The Examinee: PASSED_________  this JPM TIME STARTED: ________
FAILED __________ TIME FINISHED: ________
EVALUATION METHOD: PERFORM______ SIMULATE_______


Page 3 of 6 JOB PERFORMANCE MEASURE Rev. 1, 6/01/2006 TASK TITLE:
Perform Local Start of CC HX Outlet Radiation Monitor (2PR09J)
JPM No.: N-116 TPO No: 4C.AR-03 K&A No.: (A) 2.1.30 K&A IMP: 3.9 EXAMINEE:_______________________________
DATE: ___/___/___
The Examinee:
PASSED_________ this JPM TIME STARTED: ________
FAILED __________
TIME FINISHED: ________
EVALUATION METHOD:
PERFORM______
SIMULATE_______
LOCATION:
LOCATION:
IN PLANT __
IN PLANT __x___
x___  MATERIALS:  
MATERIALS:
: 1. Copy of BOP AR/PR-1.  
: 1. Copy of BOP AR/PR-1.
: 2. Key CAT60 or a picture of the RM-80 'Motherboard' GENERAL  
: 2. Key CAT60 or a picture of the RM-80 Motherboard GENERAL  


==REFERENCES:==
==REFERENCES:==
: 1. BOP AR/PR-1, Rev. 14, Startup of Skid Mounted Process Radiation Monitors.  
: 1.
 
BOP AR/PR-1, Rev. 14, Startup of Skid Mounted Process Radiation Monitors.
TASK STANDARDS: 1. Locally startup 2PR09J per BOP AR/PR-1. 2. Demonstrates the use of good Core Work Practices (CWP).
TASK STANDARDS:
TASK CONDITIONS:  
: 1.
: 1. You are an extra NLO.  
Locally startup 2PR09J per BOP AR/PR-1.
: 2. Both Units are at 100% power.  
: 2.
: 3. Maintenance has recently been perform ed on 2PR09J CC HX Outlet Radiation Monitor. 4. An attempt was made to start 2PR 09J from the Control Room and failed. 5. Further discussion/investigation dete rmined that there might be a problem with the alignment of the monitor.
Demonstrates the use of good Core Work Practices (CWP).
INITIATING CUES:  
TASK CONDITIONS:
 
: 1.
The US has directed you to start the 2PR09J locally per BOP AR/PR-1. The US has verified the Monitor Data Ba se as correct for 2PR09J.
You are an extra NLO.
CRITICAL ELEMENTS: (*) 3 & 5 APPROXIMATE COMPLETION TIME: 15 minutes PERFORMANCE CHECKLIST STANDARDS  SAT  UNSAT  N/A Page 4 of 6 RECORD START TIME ______
: 2.
: 1.      Refer to BOP AR/PR-1 and determine step F.3.a is the
Both Units are at 100% power.
 
: 3.
appropriate step for startup of
Maintenance has recently been performed on 2PR09J CC HX Outlet Radiation Monitor.
 
: 4.
2PR09J. NOTE: Step 1 may be performed at any time. Cue:  (if asked) The 'M' line-ups are complete. Locate and Open, BOP AR/PR-1 and
An attempt was made to start 2PR09J from the Control Room and failed.
 
: 5.
determine step F.3.a
Further discussion/investigation determined that there might be a problem with the alignment of the monitor.
 
INITIATING CUES:
is the appropriate
The US has directed you to start the 2PR09J locally per BOP AR/PR-1. The US has verified the Monitor Data Base as correct for 2PR09J.
 
CRITICAL ELEMENTS: (*) 3 & 5 APPROXIMATE COMPLETION TIME: 15 minutes  
step.        2. Verify the Hand/Off/Auto switch is in the Off position.
Cue:  Hand/Off/Auto switch is in the
'OFF' position.
At _2PR09J:  VERIFY/PLACE the HAND/OFF/AUTO
 
switch in the OFF
 
position.        *3. Place the local main power disconnect switch in the ON
 
position.
Cue:  Disconnect switch is in the
'DOWN' position Cue: (after the disconnect is on)
Disconnect switch is in the 'UP'
 
position At 2PR09J:  PLACE the LOCAL MAIN POWER
 
DISCONNECT Switch in
 
the ON position.      4. Check the status of the circuits inside the RM-80 cabinets.
 
Cue: The Green GO LED is flashing.


PERFORMANCE CHECKLIST STANDARDS SAT UNSAT N/A Page 4 of 6 RECORD START TIME ______
: 1. Refer to BOP AR/PR-1 and determine step F.3.a is the appropriate step for startup of 2PR09J.
NOTE: Step 1 may be performed at any time.
Cue: (if asked) The M line-ups are complete.
° Locate and Open, BOP AR/PR-1 and determine step F.3.a is the appropriate step.
R R
R
: 2.
Verify the Hand/Off/Auto switch is in the Off position.
Cue: Hand/Off/Auto switch is in the OFF position.
At _2PR09J:
° VERIFY/PLACE the HAND/OFF/AUTO switch in the OFF position.
R R
R
*3.
Place the local main power disconnect switch in the ON position.
Cue: Disconnect switch is in the DOWN position Cue: (after the disconnect is on)
Disconnect switch is in the UP position At 2PR09J:
PLACE the LOCAL MAIN POWER DISCONNECT Switch in the ON position.
R R
R
: 4. Check the status of the circuits inside the RM-80 cabinets.
Cue: The Green GO LED is flashing.
Cue: The Red NO GO LED is off.
Cue: The Red NO GO LED is off.
Cue: The Red LOSS OF COUNTS LED is off.
Cue: The Red LOSS OF COUNTS LED is off.
At 2PR09J, Inside the RM-80 cabinet: GREEN 'GO' LED is FLASHING. RED 'NO GO' LED is OFF. RED 'LOSS OF COUNTS' LED is OFF.
At 2PR09J, Inside the RM-80 cabinet:  
PERFORMANCE CHECKLIST STANDARDS  SAT  UNSAT  N/A Page 5 of 6 *5. Place the sample pump control switch in the Auto position.
° GREEN GO LED is FLASHING.  
Cue:  HAND/OFF/AUTO switch for the sample pump is in AUTO
° RED NO GO LED is OFF.  
 
° RED LOSS OF COUNTS LED is OFF.
position.
R R
At 2PR09J:  VERIFY/PLACE the HAND/OFF/AUTO switch
R
 
for the Sample Pump in
 
the AUTO position.        6. Check if Sample Pump is running. Note:    If the Sample pump is running use actual indications


on the PR skid.
PERFORMANCE CHECKLIST STANDARDS SAT UNSAT N/A Page 5 of 6
*5.
Place the sample pump control switch in the Auto position.
Cue: HAND/OFF/AUTO switch for the sample pump is in AUTO position.
At 2PR09J:
* VERIFY/PLACE the HAND/OFF/AUTO switch for the Sample Pump in the AUTO position.
R R
R
: 6.
Check if Sample Pump is running.
Note: If the Sample pump is running use actual indications on the PR skid.
Cue: (if the skid is running)
Cue: (if the skid is running)
Indications are as you see  
Indications are as you see them at the skid.
 
Cue: (if the skid is NOT running) The GREEN light above the switch is lit and there is ~5 gpm flow indicated.
them at the skid.
Cue: (if the skid is NOT running) The GREEN light above the switch  
 
is lit and there is ~5 gpm flow  
 
indicated.
Cue: (If asked) U-2 NSO, report flow light is lit on 2PR09J.
Cue: (If asked) U-2 NSO, report flow light is lit on 2PR09J.
At 2PR09J: Check if the sample pump is running Determines step F.3.a.6) is not required         7. Check instrument available light is on at the RM-80 door.
At 2PR09J:  
Cue: Instrument available light is lit.
° Check if the sample pump is running  
At 2PR09J, On the door of the RM-80: Check the INSTRUMENT  
° Determines step F.3.a.6) is not required R
 
R R
AVAILABLE light is ON         8. Check that the monitor status is normal operating condition.
: 7. Check instrument available light is on at the RM-80 door.
Cue: As U-2 NSO, report that the 2PR09J is operating properly. CHECK that the Monitor Status is NORMAL  
Cue: Instrument available light is lit.
 
At 2PR09J, On the door of the RM-80:  
OPERATING
° Check the INSTRUMENT AVAILABLE light is ON R
R R
: 8.
Check that the monitor status is normal operating condition.
Cue: As U-2 NSO, report that the 2PR09J is operating properly.  
° CHECK that the Monitor Status is NORMAL OPERATING CONDITION R
R R


CONDITION PERFORMANCE CHECKLIST STANDARDS SAT   UNSAT   N/A Page 6 of 6  
PERFORMANCE CHECKLIST STANDARDS SAT UNSAT N/A Page 6 of 6
: 9. Complete the Electrical lineup per BOP AR/PR-E_.
: 9. Complete the Electrical lineup per BOP AR/PR-E_.
Cue: Electrical lineup is being completed by another  
Cue: Electrical lineup is being completed by another operator.
 
Cue: (if required) This JPM is completed  
operator. Cue: (if required) This JPM is completed Compelte the electrical line up per BOP AR/PR-
° Compelte the electrical line up per BOP AR/PR-E4/E5/E6.
R R
R RECORD STOP TIME_________
COMMENTS:


E4/E5/E6. RECORD STOP TIME_________      COMMENTS:
Examinees Cue Sheet JOB PERFORMANCE MEASURE TASK CONDITIONS:
Examinee's Cue Sheet JOB PERFORMANCE MEASURE TASK CONDITIONS:  
: 1.
: 1. You are the Unit 1 NLO.  
You are the Unit 1 NLO.
: 2. Unit 1 has experienced a large break LOCA.  
: 2.
: 3. Unit 1 containment hydrogen concentration is 3.0%.  
Unit 1 has experienced a large break LOCA.
: 4. Unit 1 containment temperature is 220°F and pressure is 21 psia.
: 3.
INITIATING CUES:  
Unit 1 containment hydrogen concentration is 3.0%.
: 1. The Shift Manager directs you to startup the 0A Hydrogen Recombiner and align it to Unit 1 using Division 12 powered valves according to BOP OG-10, Startup of a Hydrogen Recombiner.  
: 4.
Unit 1 containment temperature is 220°F and pressure is 21 psia.
INITIATING CUES:
: 1. The Shift Manager directs you to startup the 0A Hydrogen Recombiner and align it to Unit 1 using Division 12 powered valves according to BOP OG-10, Startup of a Hydrogen Recombiner.
: 2. Unit 2 NLO is standing by to assist as required.  
: 2. Unit 2 NLO is standing by to assist as required.  


Page 2 of 7JOB PERFORMANCE MEASURE TASK CONDITIONS:  
Page 2 of 7 JOB PERFORMANCE MEASURE TASK CONDITIONS:
: 1. You are the Unit 1 NLO.  
: 1.
: 2. Unit 1 has experienced a large break LOCA.  
You are the Unit 1 NLO.
: 3. Unit 1 containment hydrogen concentration is 3.0%.  
: 2.
: 4. Unit 1 containment temperature is 220°F and pressure is 21 psia.
Unit 1 has experienced a large break LOCA.
INITIATING CUES:  
: 3.
: 1. The Shift Manager directs you to startup the 0A Hydrogen Recombiner and align it to Unit 1 using Division 12 powered valves according to BOP OG-10, Startup of a Hydrogen Recombiner.  
Unit 1 containment hydrogen concentration is 3.0%.
: 2. Unit 2 NLO is standing by to assist as required.  
: 4.
Unit 1 containment temperature is 220°F and pressure is 21 psia.
INITIATING CUES:
: 1.
The Shift Manager directs you to startup the 0A Hydrogen Recombiner and align it to Unit 1 using Division 12 powered valves according to BOP OG-10, Startup of a Hydrogen Recombiner.
: 2.
Unit 2 NLO is standing by to assist as required.  


Page 3 of 7JOB PERFORMANCE MEASURE             Rev. 3, 4/28/2006 TASK TITLE: Startup of a Hydrogen Recombiner JPM No.: In-Plant JPM j TPO No: 4D.EP-03 K&A No.: 028A4.01 K&A IMP. 4.0/4.0 EXAMINEE: _______________________________ DATE:   ___/___/___ The Examinee: PASSED_________ this JPM TIME STARTED: ________ FAILED __________ TIME FINISHED: ________ EVALUATION METHOD: PERFORM______ SIMULATE_______ LOCATION: IN PLANT ____X
Page 3 of 7 JOB PERFORMANCE MEASURE Rev. 3, 4/28/2006 TASK TITLE:
____      MATERIALS:  
Startup of a Hydrogen Recombiner JPM No.: In-Plant JPM j TPO No: 4D.EP-03 K&A No.: 028A4.01 K&A IMP. 4.0/4.0 EXAMINEE: _______________________________
: 1. Key #491 for the hydrogen recombiner. 2. Copy of BOP OG-10. 3. Picture of Recombiner control panels (if required)
DATE: ___/___/___
The Examinee:
PASSED_________ this JPM TIME STARTED: ________
FAILED __________
TIME FINISHED: ________
EVALUATION METHOD:
PERFORM______
SIMULATE_______
LOCATION:
IN PLANT ____X____
MATERIALS:
: 1.
Key #491 for the hydrogen recombiner.
: 2.
Copy of BOP OG-10.
: 3.
Picture of Recombiner control panels (if required)
GENERAL  
GENERAL  


==REFERENCES:==
==REFERENCES:==
BOP OG-10, Startup of a Hydrogen Recombiner (Rev. 8)
BOP OG-10, Startup of a Hydrogen Recombiner (Rev. 8)
TASK STANDARDS:
TASK STANDARDS:
Perform the required operator actions of BOP OG-10, Startup of a Hydrogen Recombiner.
Perform the required operator actions of BOP OG-10, Startup of a Hydrogen Recombiner.
TASK CONDITIONS:  
TASK CONDITIONS:
: 1. You are the Unit 1 NLO. 2. Unit 1 has experienced a large break LOCA.  
: 1.
: 3. Unit 1 containment hydrogen concentration is 3.0%. 4. Unit 1 containment temperature is 220°F and pressure is 21 psia.
You are the Unit 1 NLO.
INITIATING CUES:  
: 2.
: 1. The Shift Manager directs you to startup the 0A Hydrogen Recombiner and align it to Unit 1 using Division 12 powered valves according to BOP OG-10, Startup of a Hydrogen Recombiner. 2. Unit 2 NLO is standing by to assist as required.  
Unit 1 has experienced a large break LOCA.
: 3.
Unit 1 containment hydrogen concentration is 3.0%.
: 4.
Unit 1 containment temperature is 220°F and pressure is 21 psia.
INITIATING CUES:
: 1. The Shift Manager directs you to startup the 0A Hydrogen Recombiner and align it to Unit 1 using Division 12 powered valves according to BOP OG-10, Startup of a Hydrogen Recombiner.
: 2. Unit 2 NLO is standing by to assist as required.
CRITICAL ELEMENTS: (*) 7, 9, 11, 12, 13, & 15 APPROXIMATE COMPLETION TIME: 15 minutes


CRITICAL ELEMENTS: (*) 7, 9, 11, 12, 13, & 15 APPROXIMATE COMPLETION TIME: 15 minutes PERFORMANCE CHECKLIST STANDARDS SAT   UNSAT   N/A Page 4 of 7RECORD START TIME ______  
PERFORMANCE CHECKLIST STANDARDS SAT UNSAT N/A Page 4 of 7 RECORD START TIME ______
: 1. Refer to BOP OG-10, Startup of a Hydrogen Recombiner Note: Step 1 may be performed at any time. Cue: Prerequisites 1 through 4 are met LOCATE and OPEN BOP OG-10         *2. Obtain key #491 to unlock the panel door and key #207 to operate the start switch PROCEED to the WEC office and OBTAIN keys for 0OG04J         3. Locate 0A hydrogen recombiner control cabinet 0OG04J Note: 401' AB, P13 LOCATE 0OG04J UNLOCK using key #491       NOTE For the rest of this JPM, use cues only when plant equipment is not available to provide this information.  
: 1. Refer to BOP OG-10, Startup of a Hydrogen Recombiner Note: Step 1 may be performed at any time.
: 4. Set temperature controls Cue: 0TIC-0GO47 is set at 1325 °F Cue: 0TSH-0GO45 is set at 1325°F  
Cue: Prerequisites 1 through 4 are met  
° LOCATE and OPEN BOP OG-10 R
R R
*2. Obtain key #491 to unlock the panel door and key #207 to operate the start switch  
° PROCEED to the WEC office and OBTAIN keys for 0OG04J R
R R
: 3. Locate 0A hydrogen recombiner control cabinet 0OG04J Note: 401 AB, P13  
° LOCATE 0OG04J  
° UNLOCK using key #491 R
R R
NOTE For the rest of this JPM, use cues only when plant equipment is not available to provide this information.
: 4. Set temperature controls Cue: 0TIC-0GO47 is set at 1325 °F Cue: 0TSH-0GO45 is set at 1325°F Cue: 0TSH-0GO51 is set at 150°F At 0OG04J, SET:
° 0TIC-0GO47 at 1325 °F
° 0TSH-0GO45 at 1325 °F
° 0TSH-0GO51 at 150 °F R
R R


Cue: 0TSH-0GO51 is set at 150°F At 0OG04J, SET:  0TIC-0GO47 at 1325  F  0TSH-0GO45 at 1325  F  0TSH-0GO51 at 150  F PERFORMANCE CHECKLIST STANDARDS SAT   UNSAT   N/A Page 5 of 7*5. Align breakers Cue: CB-1 is closed Cue: CB-2 is closed Cue: CB-3 is closed Cue: CB-4 is closed Cue: CB-5 is closed At 0OG04J, CLOSE: CB-1 CB-2 CB-3 CB-4 CB-5   *6. Lineup the hydrogen recombiner Cue: HS-1 is in the STOP position Cue: KS-1 is set at 2 hours Cue: JS-1 is in AUTO Cue: JS-2 is in AUTO At 0OG04J: VERIFY/PLACE HS-1 in STOP SET KS-1 to 2 hours VERIFY in AUTO: JS-1 JS-2         *7. Line up Division 12 powered valves Cue: Unit 2 Assist NSO reports that 1OG080 is OPEN Cue: Unit 2 Assist NSO reports that 1OG084 is OPEN Cue: Unit 2 Assist NSO reports that 1OG082 is OPEN Cue: Unit 2 Assist NSO reports that 1OG079 is OPEN DIRECT Unit 2 Assist NSO to OPEN: 1OG080 1OG084 1OG082 1OG079     Formatted: Bullets and Numbering PERFORMANCE CHECKLIST STANDARDS  SAT  UNSAT  N/A  Page 6 of 78. Locate local control panel 0OG09J Note: Unit 2 lower cable spreading room, 439' Q25 LOCATE 0OG09J      *9. Hydrogen recombiner "A" discharge valve Cue:  0OG060 indicates OPEN At 0OG09J:  VERIFY/OPEN 0OG060  10. Locate local control panel 0OG08J Note: 401' AB, P13 LOCATE 0OG08J      *11. Hydrogen recombiner "A" suction valve Cue:  0OG059 'RED' light is LIT At 0OG08J:  VERIFY/OPEN 0OG059      *12. Start the hydrogen recombiner Cue: HS-1 is in the START position At 0OG04J:  Using key #207, PLACE key-lock switch HS-1 in START  *13. Establish flow rate Cue: 1FI-0OG041 indicates 80 SCFM  THOTTLE 0OG059 to obtain > 70 SCFM as indicated on 1FI-0OG041 PERFORMANCE CHECKLIST STANDARDS  SAT  UNSAT  N/A  Page 7 of 714. Locate the hydrogen analyzer 0OG05J Note: 401' AB, P13 LOCATE 0OG05J      *15. Place hydrogen analyzer in operation Cue: HS-12 is in the BLOWER  OUTLET position Cue: CB-1 is in the ON position Cue: HS-10 is in the OPERATE position Cue: This JPM is completed At 0OG05J PLACE:  HS-12 in BLOWER OUTLET  CB-1 in ON  HS-10 in OPERATE        RECORD STOP TIME_________      COMMENTS:
PERFORMANCE CHECKLIST STANDARDS SAT UNSAT N/A Page 5 of 7
Examinee's Cue Sheet JOB PERFORMANCE MEASURE TASK CONDITIONS:
*5. Align breakers Cue: CB-1 is closed Cue: CB-2 is closed Cue: CB-3 is closed Cue: CB-4 is closed Cue: CB-5 is closed At 0OG04J, CLOSE:  
: 1. You are a Non-Licensed Operator.
° CB-1  
: 2. The unit has just tripped in conjunction with an electrical fire in the unit's Remote Shutdown Panel.
° CB-2  
: 3. The 2A AF pump is OOS for main tenance and the 2B AF pump did not    automatically start, and will not manually start with the MCR switch.
° CB-3  
° CB-4  
° CB-5 R
R R
*6.
Lineup the hydrogen recombiner Cue: HS-1 is in the STOP position Cue: KS-1 is set at 2 hours Cue: JS-1 is in AUTO Cue: JS-2 is in AUTO At 0OG04J:  
° VERIFY/PLACE HS-1 in STOP  
° SET KS-1 to 2 hours VERIFY in AUTO:  
° JS-1  
° JS-2 R
R R
*7. Line up Division 12 powered valves Cue: Unit 2 Assist NSO reports that 1OG080 is OPEN Cue: Unit 2 Assist NSO reports that 1OG084 is OPEN Cue: Unit 2 Assist NSO reports that 1OG082 is OPEN Cue: Unit 2 Assist NSO reports that 1OG079 is OPEN DIRECT Unit 2 Assist NSO to OPEN:
1OG080 1OG084 1OG082 1OG079 R
R R
Formatted: Bullets and Numbering


INITIATING CUES:  
PERFORMANCE CHECKLIST STANDARDS SAT UNSAT N/A Page 6 of 7
: 8. Locate local control panel 0OG09J Note: Unit 2 lower cable spreading room, 439 Q25
° LOCATE 0OG09J R
R R
*9. Hydrogen recombiner A discharge valve Cue: 0OG060 indicates OPEN At 0OG09J:
VERIFY/OPEN 0OG060 R
R R
: 10. Locate local control panel 0OG08J Note: 401 AB, P13
° LOCATE 0OG08J R
R R
*11. Hydrogen recombiner A suction valve Cue: 0OG059 RED light is LIT At 0OG08J:
VERIFY/OPEN 0OG059 R
R R
*12. Start the hydrogen recombiner Cue: HS-1 is in the START position At 0OG04J:
Using key #207, PLACE key-lock switch HS-1 in START R
R R
*13. Establish flow rate Cue: 1FI-0OG041 indicates 80 SCFM THOTTLE 0OG059 to obtain > 70 SCFM as indicated on 1FI-0OG041 R
R R


The Shift Manager has just directed you to init iate a local emergency start of the 2B AF pump using 2BOA ELEC-5, Attachment D.  
PERFORMANCE CHECKLIST STANDARDS SAT UNSAT N/A Page 7 of 7
: 14. Locate the hydrogen analyzer 0OG05J Note: 401 AB, P13
° LOCATE 0OG05J R
R R
*15. Place hydrogen analyzer in operation Cue: HS-12 is in the BLOWER OUTLET position Cue: CB-1 is in the ON position Cue: HS-10 is in the OPERATE position Cue: This JPM is completed At 0OG05J PLACE:
HS-12 in BLOWER OUTLET CB-1 in ON HS-10 in OPERATE R
R R
RECORD STOP TIME_________
COMMENTS:


Page 2 of 6JOB PERFORMANCE MEASURE TASK CONDITIONS:  
Examinees Cue Sheet JOB PERFORMANCE MEASURE TASK CONDITIONS:
: 2. You are a Non-Licensed Operator.  
: 1.
: 2. The unit has just tripped in conjunction with an electrical fire in the unit's Remote Shutdown Panel.  
You are a Non-Licensed Operator.
: 3. The 2A AF pump is OOS for main tenance and the 2B AF pump did not   automatically start, and will not manually start with the MCR switch.  
: 2.
The unit has just tripped in conjunction with an electrical fire in the units Remote Shutdown Panel.
: 3.
The 2A AF pump is OOS for maintenance and the 2B AF pump did not automatically start, and will not manually start with the MCR switch.
INITIATING CUES:
The Shift Manager has just directed you to initiate a local emergency start of the 2B AF pump using 2BOA ELEC-5, Attachment D.  


INITIATING CUES:  
Page 2 of 6 JOB PERFORMANCE MEASURE TASK CONDITIONS:
: 2.
You are a Non-Licensed Operator.
: 2.
The unit has just tripped in conjunction with an electrical fire in the units Remote Shutdown Panel.
: 3.
The 2A AF pump is OOS for maintenance and the 2B AF pump did not automatically start, and will not manually start with the MCR switch.
INITIATING CUES:
The Shift Manager has just directed you to initiate a local emergency start of the 2B AF pump using 2BOA ELEC-5, Attachment D.


The Shift Manager has just directed you to init iate a local emergency start of the 2B AF pump using 2BOA ELEC-5, Attachment D.
Page 3 of 5 JOB PERFORMANCE MEASURE Rev. 4, 5/19/2006 TASK TITLE:
 
Local Emergency Start of 2B AFW Pump (364)
Page 3 of 5 JOB PERFORMANCE MEASURE Rev. 4, 5/19/2006 TASK TITLE: Local Emergency Start of 2B AFW Pump (364') JPM No.: N-56a TPO No: 4D.OA-35 K&A No.: 2.1.30 K&A IMP. 3.9 / 3.4 EXAMINEE: _______________________________ DATE:   ___/___/___
JPM No.: N-56a TPO No: 4D.OA-35 K&A No.: 2.1.30 K&A IMP. 3.9 / 3.4 EXAMINEE: _______________________________
The Examinee: PASSED_________ this JPM TIME STARTED: ________ FAILED __________ TIME FINISHED: ________
DATE: ___/___/___
EVALUATION METHOD: PERFORM______ SIMULATE_______
The Examinee:
LOCATION: IN PLANT___X
PASSED_________ this JPM TIME STARTED: ________
___  MATERIALS:  
FAILED __________
 
TIME FINISHED: ________
Copy of 2BOA ELEC-5, Attachment D, AF Pump  
EVALUATION METHOD:
 
PERFORM______
GENERAL  
SIMULATE_______
LOCATION:
IN PLANT___X___
MATERIALS:
Copy of 2BOA ELEC-5, Attachment D, AF Pump GENERAL  


==REFERENCES:==
==REFERENCES:==
: 1. 2BOA ELEC-5, Local Emergency Contro l Of Safe Shutdown Equipment (Rev.
: 1.
100) 2. 2BOA ELEC-5, Attachment D, Diesel Driven Auxiliary Feedwater Pump Local Start. (Rev. 100)  
2BOA ELEC-5, Local Emergency Control Of Safe Shutdown Equipment (Rev.
100)
: 2.
2BOA ELEC-5, Attachment D, Diesel Driven Auxiliary Feedwater Pump Local Start. (Rev. 100)
TASK STANDARDS:
Correctly perform the actions required for 2B AF Pump Local Emergency Start.
TASK CONDITIONS:
: 1.
You are a Non-Licensed Operator.
: 2.
The unit has just tripped in conjunction with an electrical fire in the units Remote Shutdown Panel.
: 3.
The 2A AF pump is OOS for maintenance and the 2B AF pump did not automatically start, and will not manually start with the MCR switch.
INITIATING CUES:
The Shift Manager has just directed you to initiate a local emergency start of the 2B AF pump using BOA ELEC-5, Attachment D.
CRITICAL ELEMENTS: (*) 9 & 10 APPROXIMATE COMPLETION TIME: 10 minutes


TASK STANDARDS:
PERFORMANCE CHECKLIST STANDARDS SAT UNSAT N/A Page 4 of 6 RECORD START TIME ________
 
: 1.
Correctly perform the actions required for 2B AF Pump Local Emergency Start.
Locate the 2B AF pump.
 
TASK CONDITIONS:
: 1. You are a Non-Licensed Operator. 2. The unit has just tripped in conjunction with an electrical fire in the unit's Remote Shutdown Panel.
: 3. The 2A AF pump is OOS for main tenance and the 2B AF pump did not    automatically start, and will not manually start with the MCR switch.
 
INITIATING CUES:
 
The Shift Manager has just directed you to init iate a local emergency start of the 2B AF pump using BOA ELEC-5, Attachment D.
 
CRITICAL ELEMENTS: (*) 9 & 10
 
APPROXIMATE COMPLETION TIME: 10 minutes PERFORMANCE CHECKLIST
 
STANDARDS
 
SAT UNSAT N/A Page 4 of 6 RECORD START TIME ________
: 1. Locate the 2B AF pump.
Note: Provide the Candidate with a copy of 2BOA ELEC-5, Attachment D.
Note: Provide the Candidate with a copy of 2BOA ELEC-5, Attachment D.
On 383' Aux Bldg:   LOCATE 2B AF pump.         NOTE JPM steps 2 and 3 may be performed in any order
On 383 Aux Bldg:
: 2. Verify/Start associated Aux Lube Oil Pump.
LOCATE 2B AF pump.
Cue: Aux Lube Oil Pump CS is in the 'START' position.
R R
VERIFY/START 2B Aux Lube Oil Pump.     3. Verify/Start Gearbox Lube Oil Pump. Cue: Gearbox Lube Oil Pump CS is in the 'START' position.
R NOTE JPM steps 2 and 3 may be performed in any order
VERIFY/START Gearbox Lube Oil Pump.         4. Place ENGINE START Switch to MAN. Cue: ENGINE START Switch is in MAN. At 2AF01J:   PLACE ENGINE START Switch to MAN.         5. Check Air Box Tripped annunciator NOT LIT.
: 2.
Cue: Air Box Trip Annunciator is NOT LIT. At 2AF01J:   CHECK Diesel Air Box Trip reset.
Verify/Start associated Aux Lube Oil Pump.
PERFORMANCE CHECKLIST
Cue: Aux Lube Oil Pump CS is in the START position.
VERIFY/START 2B Aux Lube Oil Pump.
R R
R
: 3.
Verify/Start Gearbox Lube Oil Pump.
Cue: Gearbox Lube Oil Pump CS is in the START position.
VERIFY/START Gearbox Lube Oil Pump.
R R
R
: 4.
Place ENGINE START Switch to MAN.
Cue: ENGINE START Switch is in MAN.
At 2AF01J:
PLACE ENGINE START Switch to MAN.
R R
R
: 5.
Check Air Box Tripped annunciator NOT LIT.
Cue: Air Box Trip Annunciator is NOT LIT.
At 2AF01J:
CHECK Diesel Air Box Trip reset.
R R
R


STANDARDS
PERFORMANCE CHECKLIST STANDARDS SAT UNSAT N/A Page 5 of 6
 
: 6.
SAT UNSAT N/A Page 5 of 66. Momentarily depress the RESET button. Cue: The RESET button was depressed and released.
Momentarily depress the RESET button.
At 2AF01J:   DEPRESS and RELEASE the Reset button.         NOTE Alternate path initiated in the following step.
Cue: The RESET button was depressed and released.
At 2AF01J:
DEPRESS and RELEASE the Reset button.
R R
R NOTE Alternate path initiated in the following step.
: 7. Depress the 2B AF Pump START pushbutton.
: 7. Depress the 2B AF Pump START pushbutton.
Cue: The engine does NOT crank.
Cue: The engine does NOT crank.
At 2AF01J:   DEPRESS the Start button. VERIFY the engine starts.     8. Try to start t he 2B AF pump with the other battery bank. Cue: The 'other' battery bank is selected (A or B depending on  
At 2AF01J:
 
DEPRESS the Start button.
current selection)
VERIFY the engine starts.
R R
R
: 8. Try to start the 2B AF pump with the other battery bank.
Cue: The other battery bank is selected (A or B depending on current selection)
NOTE: Located on 2AF01J Cue: The Reset pushbutton has been depressed and released.
NOTE: Located on 2AF01J Cue: The Reset pushbutton has been depressed and released.
Cue: The Engine does NOT start.
Cue: The Engine does NOT start.
SELECT other battery bank   DEPRESS and RELEASE the Reset button. DEPRESS the Start button.         *9. Place Engine Start switch to AUTO. Cue: Engine Start switch is in AUTO. At 2AF01J:   PLACE Engine Start switch to AUTO.
SELECT other battery bank DEPRESS and RELEASE the Reset button.
PERFORMANCE CHECKLIST
DEPRESS the Start button.
 
R R
STANDARDS
R
 
*9. Place Engine Start switch to AUTO.
SAT UNSAT N/A  Page 6 of 6*10. Start the 2B AF pump at Emergency Control panel 2AF03J.NOTE: U2 - 364 M18, by the U0 CC pump Cue: The Remote Emergency Start switch is in START Cue: The Run light is LIT LOCATE panel 2AF03J PLACE Remote Emergency Start switch in START  VERIFY Run light LIT        11. Monitor 2B AF pump operation. Cue:  AF-7T1 will be completed by another NLO who will monitor
Cue: Engine Start switch is in AUTO.
At 2AF01J:
PLACE Engine Start switch to AUTO.
R R
R


the pump. PERFORM BOP AF-7T1         Cue: This JPM is complete.     RECORD STOP TIME ________
PERFORMANCE CHECKLIST STANDARDS SAT UNSAT N/A Page 6 of 6
*10. Start the 2B AF pump at Emergency Control panel 2AF03J.
NOTE: U2 - 364 M18, by the U0 CC pump Cue: The Remote Emergency Start switch is in START Cue: The Run light is LIT LOCATE panel 2AF03J PLACE Remote Emergency Start switch in START VERIFY Run light LIT R
R R
: 11. Monitor 2B AF pump operation.
Cue: AF-7T1 will be completed by another NLO who will monitor the pump.
PERFORM BOP AF-7T1 R
R R
Cue: This JPM is complete.
RECORD STOP TIME ________
COMMENTS:}}
COMMENTS:}}

Latest revision as of 10:12, 14 January 2025

2008 Byron Station Initial License Examination Proposed In-Plant JPMs
ML092180124
Person / Time
Site: Byron  Constellation icon.png
Issue date: 05/19/2008
From:
NRC/RGN-III/DNMS/MLB
To:
Exelon Generation Co, Exelon Nuclear
References
Download: ML092180124 (19)


Text

Examinees Cue Sheet JOB PERFORMANCE MEASURE TASK CONDITIONS:

1.

You are an extra NLO.

2.

Both Units are at 100% power.

3.

Maintenance has recently been performed on 2PR09J CC HX Outlet Radiation Monitor.

4.

An attempt was made to start 2PR09J from the Control Room and failed.

5.

Further discussion/investigation determined that there might be a problem with the alignment of the monitor.

INITIATING CUES:

The US has directed you to start the 2PR09J locally per BOP AR/PR-1. The US has verified the Monitor Data Base as correct for 2PR09J.

Examinees Cue Sheet JOB PERFORMANCE MEASURE TASK CONDITIONS:

2.

You are an extra NLO.

2.

Both Units are at 100% power.

6.

Maintenance has recently been performed on 2PR09J CC HX Outlet Radiation Monitor.

7.

An attempt was made to start 2PR09J from the Control Room and failed.

8.

Further discussion/investigation determined that there might be a problem with the alignment of the monitor.

INITIATING CUES:

The US has directed you to start the 2PR09J locally per BOP AR/PR-1. The US has verified the Monitor Data Base as correct for 2PR09J.

Page 3 of 6 JOB PERFORMANCE MEASURE Rev. 1, 6/01/2006 TASK TITLE:

Perform Local Start of CC HX Outlet Radiation Monitor (2PR09J)

JPM No.: N-116 TPO No: 4C.AR-03 K&A No.: (A) 2.1.30 K&A IMP: 3.9 EXAMINEE:_______________________________

DATE: ___/___/___

The Examinee:

PASSED_________ this JPM TIME STARTED: ________

FAILED __________

TIME FINISHED: ________

EVALUATION METHOD:

PERFORM______

SIMULATE_______

LOCATION:

IN PLANT __x___

MATERIALS:

1. Copy of BOP AR/PR-1.
2. Key CAT60 or a picture of the RM-80 Motherboard GENERAL

REFERENCES:

1.

BOP AR/PR-1, Rev. 14, Startup of Skid Mounted Process Radiation Monitors.

TASK STANDARDS:

1.

Locally startup 2PR09J per BOP AR/PR-1.

2.

Demonstrates the use of good Core Work Practices (CWP).

TASK CONDITIONS:

1.

You are an extra NLO.

2.

Both Units are at 100% power.

3.

Maintenance has recently been performed on 2PR09J CC HX Outlet Radiation Monitor.

4.

An attempt was made to start 2PR09J from the Control Room and failed.

5.

Further discussion/investigation determined that there might be a problem with the alignment of the monitor.

INITIATING CUES:

The US has directed you to start the 2PR09J locally per BOP AR/PR-1. The US has verified the Monitor Data Base as correct for 2PR09J.

CRITICAL ELEMENTS: (*) 3 & 5 APPROXIMATE COMPLETION TIME: 15 minutes

PERFORMANCE CHECKLIST STANDARDS SAT UNSAT N/A Page 4 of 6 RECORD START TIME ______

1. Refer to BOP AR/PR-1 and determine step F.3.a is the appropriate step for startup of 2PR09J.

NOTE: Step 1 may be performed at any time.

Cue: (if asked) The M line-ups are complete.

° Locate and Open, BOP AR/PR-1 and determine step F.3.a is the appropriate step.

R R

R

2.

Verify the Hand/Off/Auto switch is in the Off position.

Cue: Hand/Off/Auto switch is in the OFF position.

At _2PR09J:

° VERIFY/PLACE the HAND/OFF/AUTO switch in the OFF position.

R R

R

  • 3.

Place the local main power disconnect switch in the ON position.

Cue: Disconnect switch is in the DOWN position Cue: (after the disconnect is on)

Disconnect switch is in the UP position At 2PR09J:

PLACE the LOCAL MAIN POWER DISCONNECT Switch in the ON position.

R R

R

4. Check the status of the circuits inside the RM-80 cabinets.

Cue: The Green GO LED is flashing.

Cue: The Red NO GO LED is off.

Cue: The Red LOSS OF COUNTS LED is off.

At 2PR09J, Inside the RM-80 cabinet:

° GREEN GO LED is FLASHING.

° RED NO GO LED is OFF.

° RED LOSS OF COUNTS LED is OFF.

R R

R

PERFORMANCE CHECKLIST STANDARDS SAT UNSAT N/A Page 5 of 6

  • 5.

Place the sample pump control switch in the Auto position.

Cue: HAND/OFF/AUTO switch for the sample pump is in AUTO position.

At 2PR09J:

  • VERIFY/PLACE the HAND/OFF/AUTO switch for the Sample Pump in the AUTO position.

R R

R

6.

Check if Sample Pump is running.

Note: If the Sample pump is running use actual indications on the PR skid.

Cue: (if the skid is running)

Indications are as you see them at the skid.

Cue: (if the skid is NOT running) The GREEN light above the switch is lit and there is ~5 gpm flow indicated.

Cue: (If asked) U-2 NSO, report flow light is lit on 2PR09J.

At 2PR09J:

° Check if the sample pump is running

° Determines step F.3.a.6) is not required R

R R

7. Check instrument available light is on at the RM-80 door.

Cue: Instrument available light is lit.

At 2PR09J, On the door of the RM-80:

° Check the INSTRUMENT AVAILABLE light is ON R

R R

8.

Check that the monitor status is normal operating condition.

Cue: As U-2 NSO, report that the 2PR09J is operating properly.

° CHECK that the Monitor Status is NORMAL OPERATING CONDITION R

R R

PERFORMANCE CHECKLIST STANDARDS SAT UNSAT N/A Page 6 of 6

9. Complete the Electrical lineup per BOP AR/PR-E_.

Cue: Electrical lineup is being completed by another operator.

Cue: (if required) This JPM is completed

° Compelte the electrical line up per BOP AR/PR-E4/E5/E6.

R R

R RECORD STOP TIME_________

COMMENTS:

Examinees Cue Sheet JOB PERFORMANCE MEASURE TASK CONDITIONS:

1.

You are the Unit 1 NLO.

2.

Unit 1 has experienced a large break LOCA.

3.

Unit 1 containment hydrogen concentration is 3.0%.

4.

Unit 1 containment temperature is 220°F and pressure is 21 psia.

INITIATING CUES:

1. The Shift Manager directs you to startup the 0A Hydrogen Recombiner and align it to Unit 1 using Division 12 powered valves according to BOP OG-10, Startup of a Hydrogen Recombiner.
2. Unit 2 NLO is standing by to assist as required.

Page 2 of 7 JOB PERFORMANCE MEASURE TASK CONDITIONS:

1.

You are the Unit 1 NLO.

2.

Unit 1 has experienced a large break LOCA.

3.

Unit 1 containment hydrogen concentration is 3.0%.

4.

Unit 1 containment temperature is 220°F and pressure is 21 psia.

INITIATING CUES:

1.

The Shift Manager directs you to startup the 0A Hydrogen Recombiner and align it to Unit 1 using Division 12 powered valves according to BOP OG-10, Startup of a Hydrogen Recombiner.

2.

Unit 2 NLO is standing by to assist as required.

Page 3 of 7 JOB PERFORMANCE MEASURE Rev. 3, 4/28/2006 TASK TITLE:

Startup of a Hydrogen Recombiner JPM No.: In-Plant JPM j TPO No: 4D.EP-03 K&A No.: 028A4.01 K&A IMP. 4.0/4.0 EXAMINEE: _______________________________

DATE: ___/___/___

The Examinee:

PASSED_________ this JPM TIME STARTED: ________

FAILED __________

TIME FINISHED: ________

EVALUATION METHOD:

PERFORM______

SIMULATE_______

LOCATION:

IN PLANT ____X____

MATERIALS:

1.

Key #491 for the hydrogen recombiner.

2.

Copy of BOP OG-10.

3.

Picture of Recombiner control panels (if required)

GENERAL

REFERENCES:

BOP OG-10, Startup of a Hydrogen Recombiner (Rev. 8)

TASK STANDARDS:

Perform the required operator actions of BOP OG-10, Startup of a Hydrogen Recombiner.

TASK CONDITIONS:

1.

You are the Unit 1 NLO.

2.

Unit 1 has experienced a large break LOCA.

3.

Unit 1 containment hydrogen concentration is 3.0%.

4.

Unit 1 containment temperature is 220°F and pressure is 21 psia.

INITIATING CUES:

1. The Shift Manager directs you to startup the 0A Hydrogen Recombiner and align it to Unit 1 using Division 12 powered valves according to BOP OG-10, Startup of a Hydrogen Recombiner.
2. Unit 2 NLO is standing by to assist as required.

CRITICAL ELEMENTS: (*) 7, 9, 11, 12, 13, & 15 APPROXIMATE COMPLETION TIME: 15 minutes

PERFORMANCE CHECKLIST STANDARDS SAT UNSAT N/A Page 4 of 7 RECORD START TIME ______

1. Refer to BOP OG-10, Startup of a Hydrogen Recombiner Note: Step 1 may be performed at any time.

Cue: Prerequisites 1 through 4 are met

° LOCATE and OPEN BOP OG-10 R

R R

  • 2. Obtain key #491 to unlock the panel door and key #207 to operate the start switch

° PROCEED to the WEC office and OBTAIN keys for 0OG04J R

R R

3. Locate 0A hydrogen recombiner control cabinet 0OG04J Note: 401 AB, P13

° LOCATE 0OG04J

° UNLOCK using key #491 R

R R

NOTE For the rest of this JPM, use cues only when plant equipment is not available to provide this information.

4. Set temperature controls Cue: 0TIC-0GO47 is set at 1325 °F Cue: 0TSH-0GO45 is set at 1325°F Cue: 0TSH-0GO51 is set at 150°F At 0OG04J, SET:

° 0TIC-0GO47 at 1325 °F

° 0TSH-0GO45 at 1325 °F

° 0TSH-0GO51 at 150 °F R

R R

PERFORMANCE CHECKLIST STANDARDS SAT UNSAT N/A Page 5 of 7

  • 5. Align breakers Cue: CB-1 is closed Cue: CB-2 is closed Cue: CB-3 is closed Cue: CB-4 is closed Cue: CB-5 is closed At 0OG04J, CLOSE:

° CB-1

° CB-2

° CB-3

° CB-4

° CB-5 R

R R

  • 6.

Lineup the hydrogen recombiner Cue: HS-1 is in the STOP position Cue: KS-1 is set at 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> Cue: JS-1 is in AUTO Cue: JS-2 is in AUTO At 0OG04J:

° VERIFY/PLACE HS-1 in STOP

° SET KS-1 to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> VERIFY in AUTO:

° JS-1

° JS-2 R

R R

  • 7. Line up Division 12 powered valves Cue: Unit 2 Assist NSO reports that 1OG080 is OPEN Cue: Unit 2 Assist NSO reports that 1OG084 is OPEN Cue: Unit 2 Assist NSO reports that 1OG082 is OPEN Cue: Unit 2 Assist NSO reports that 1OG079 is OPEN DIRECT Unit 2 Assist NSO to OPEN:

1OG080 1OG084 1OG082 1OG079 R

R R

Formatted: Bullets and Numbering

PERFORMANCE CHECKLIST STANDARDS SAT UNSAT N/A Page 6 of 7

8. Locate local control panel 0OG09J Note: Unit 2 lower cable spreading room, 439 Q25

° LOCATE 0OG09J R

R R

  • 9. Hydrogen recombiner A discharge valve Cue: 0OG060 indicates OPEN At 0OG09J:

VERIFY/OPEN 0OG060 R

R R

10. Locate local control panel 0OG08J Note: 401 AB, P13

° LOCATE 0OG08J R

R R

  • 11. Hydrogen recombiner A suction valve Cue: 0OG059 RED light is LIT At 0OG08J:

VERIFY/OPEN 0OG059 R

R R

  • 12. Start the hydrogen recombiner Cue: HS-1 is in the START position At 0OG04J:

Using key #207, PLACE key-lock switch HS-1 in START R

R R

R R

PERFORMANCE CHECKLIST STANDARDS SAT UNSAT N/A Page 7 of 7

14. Locate the hydrogen analyzer 0OG05J Note: 401 AB, P13

° LOCATE 0OG05J R

R R

  • 15. Place hydrogen analyzer in operation Cue: HS-12 is in the BLOWER OUTLET position Cue: CB-1 is in the ON position Cue: HS-10 is in the OPERATE position Cue: This JPM is completed At 0OG05J PLACE:

HS-12 in BLOWER OUTLET CB-1 in ON HS-10 in OPERATE R

R R

RECORD STOP TIME_________

COMMENTS:

Examinees Cue Sheet JOB PERFORMANCE MEASURE TASK CONDITIONS:

1.

You are a Non-Licensed Operator.

2.

The unit has just tripped in conjunction with an electrical fire in the units Remote Shutdown Panel.

3.

The 2A AF pump is OOS for maintenance and the 2B AF pump did not automatically start, and will not manually start with the MCR switch.

INITIATING CUES:

The Shift Manager has just directed you to initiate a local emergency start of the 2B AF pump using 2BOA ELEC-5, Attachment D.

Page 2 of 6 JOB PERFORMANCE MEASURE TASK CONDITIONS:

2.

You are a Non-Licensed Operator.

2.

The unit has just tripped in conjunction with an electrical fire in the units Remote Shutdown Panel.

3.

The 2A AF pump is OOS for maintenance and the 2B AF pump did not automatically start, and will not manually start with the MCR switch.

INITIATING CUES:

The Shift Manager has just directed you to initiate a local emergency start of the 2B AF pump using 2BOA ELEC-5, Attachment D.

Page 3 of 5 JOB PERFORMANCE MEASURE Rev. 4, 5/19/2006 TASK TITLE:

Local Emergency Start of 2B AFW Pump (364)

JPM No.: N-56a TPO No: 4D.OA-35 K&A No.: 2.1.30 K&A IMP. 3.9 / 3.4 EXAMINEE: _______________________________

DATE: ___/___/___

The Examinee:

PASSED_________ this JPM TIME STARTED: ________

FAILED __________

TIME FINISHED: ________

EVALUATION METHOD:

PERFORM______

SIMULATE_______

LOCATION:

IN PLANT___X___

MATERIALS:

Copy of 2BOA ELEC-5, Attachment D, AF Pump GENERAL

REFERENCES:

1.

2BOA ELEC-5, Local Emergency Control Of Safe Shutdown Equipment (Rev.

100)

2.

2BOA ELEC-5, Attachment D, Diesel Driven Auxiliary Feedwater Pump Local Start. (Rev. 100)

TASK STANDARDS:

Correctly perform the actions required for 2B AF Pump Local Emergency Start.

TASK CONDITIONS:

1.

You are a Non-Licensed Operator.

2.

The unit has just tripped in conjunction with an electrical fire in the units Remote Shutdown Panel.

3.

The 2A AF pump is OOS for maintenance and the 2B AF pump did not automatically start, and will not manually start with the MCR switch.

INITIATING CUES:

The Shift Manager has just directed you to initiate a local emergency start of the 2B AF pump using BOA ELEC-5, Attachment D.

CRITICAL ELEMENTS: (*) 9 & 10 APPROXIMATE COMPLETION TIME: 10 minutes

PERFORMANCE CHECKLIST STANDARDS SAT UNSAT N/A Page 4 of 6 RECORD START TIME ________

1.

Locate the 2B AF pump.

Note: Provide the Candidate with a copy of 2BOA ELEC-5, Attachment D.

On 383 Aux Bldg:

LOCATE 2B AF pump.

R R

R NOTE JPM steps 2 and 3 may be performed in any order

2.

Verify/Start associated Aux Lube Oil Pump.

Cue: Aux Lube Oil Pump CS is in the START position.

VERIFY/START 2B Aux Lube Oil Pump.

R R

R

3.

Verify/Start Gearbox Lube Oil Pump.

Cue: Gearbox Lube Oil Pump CS is in the START position.

VERIFY/START Gearbox Lube Oil Pump.

R R

R

4.

Place ENGINE START Switch to MAN.

Cue: ENGINE START Switch is in MAN.

At 2AF01J:

PLACE ENGINE START Switch to MAN.

R R

R

5.

Check Air Box Tripped annunciator NOT LIT.

Cue: Air Box Trip Annunciator is NOT LIT.

At 2AF01J:

CHECK Diesel Air Box Trip reset.

R R

R

PERFORMANCE CHECKLIST STANDARDS SAT UNSAT N/A Page 5 of 6

6.

Momentarily depress the RESET button.

Cue: The RESET button was depressed and released.

At 2AF01J:

DEPRESS and RELEASE the Reset button.

R R

R NOTE Alternate path initiated in the following step.

7. Depress the 2B AF Pump START pushbutton.

Cue: The engine does NOT crank.

At 2AF01J:

DEPRESS the Start button.

VERIFY the engine starts.

R R

R

8. Try to start the 2B AF pump with the other battery bank.

Cue: The other battery bank is selected (A or B depending on current selection)

NOTE: Located on 2AF01J Cue: The Reset pushbutton has been depressed and released.

Cue: The Engine does NOT start.

SELECT other battery bank DEPRESS and RELEASE the Reset button.

DEPRESS the Start button.

R R

R

  • 9. Place Engine Start switch to AUTO.

Cue: Engine Start switch is in AUTO.

At 2AF01J:

PLACE Engine Start switch to AUTO.

R R

R

PERFORMANCE CHECKLIST STANDARDS SAT UNSAT N/A Page 6 of 6

  • 10. Start the 2B AF pump at Emergency Control panel 2AF03J.

NOTE: U2 - 364 M18, by the U0 CC pump Cue: The Remote Emergency Start switch is in START Cue: The Run light is LIT LOCATE panel 2AF03J PLACE Remote Emergency Start switch in START VERIFY Run light LIT R

R R

11. Monitor 2B AF pump operation.

Cue: AF-7T1 will be completed by another NLO who will monitor the pump.

PERFORM BOP AF-7T1 R

R R

Cue: This JPM is complete.

RECORD STOP TIME ________