IR 05000254/2009005: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 01/29/2010
| issue date = 01/29/2010
| title = Errata for Quad Cities Nuclear Power Station, Units 1 & 2, NRC Integrated Inspection Report 05000254-09-005; 05000265-09-005
| title = Errata for Quad Cities Nuclear Power Station, Units 1 & 2, NRC Integrated Inspection Report 05000254-09-005; 05000265-09-005
| author name = Ring M A
| author name = Ring M
| author affiliation = NRC/RGN-III/DRP/B1
| author affiliation = NRC/RGN-III/DRP/B1
| addressee name = Pardee C G
| addressee name = Pardee C
| addressee affiliation = Exelon Generation Co, LLC, Exelon Nuclear
| addressee affiliation = Exelon Generation Co, LLC, Exelon Nuclear
| docket = 05000254, 05000265
| docket = 05000254, 05000265
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 January 29, 2010  
{{#Wiki_filter:January 29, 2010


Mr. Charles Senior Vice President, Exelon Generation Company, LLC President and Chief Nuclear Officer (CNO), Exelon Nuclear
==SUBJECT:==
ERRATA FOR QUAD CITIES NUCLEAR POWER STATION, UNITS 1 AND 2 NRC INTEGRATED INSPECTION REPORT 05000254/2009005; 05000265/2009005


4300 Winfield Road
==Dear Mr. Pardee:==
On January 27, 2010, the U.S. Nuclear Regulatory Commission (NRC) issued Integrated Inspection Report 05000254/2009005; 05000265/2009005 (ML100271264). An inspection sample was inadvertently omitted from the Integrated Inspection Report. Please insert the attached errata where appropriate into Integrated Inspection Report 05000254/2009005; 05000265/2009005.


Warrenville, IL 60555
We apologize for any inconvenience to you and your staff.


SUBJECT: ERRATA FOR QUAD CITIES NUCLEAR POWER STATION, UNITS 1 AND 2 NRC INTEGRATED INSPECTION REPORT 05000254/2009005;
Sincerely,
 
/RA/  
05000265/2009005
 
==Dear Mr. Pardee:==
On January 27, 2010, the U.S. Nuclear Regulatory Commission (NRC) issued Integrated Inspection Report 05000254/2009005; 05000265/2009005 (ML100271264). An inspection sample was inadvertently omitted from the Integrated Inspection Report. Please insert the attached errata where appropriate into Integrated Inspection Report 05000254/2009005;


05000265/2009005.
Mark A. Ring, Chief


We apologize for any inconvenience to you and your staff.
Branch 1


Sincerely,/RA/
Division of Reactor Projects  
Mark A. Ring, Chief Branch 1 Division of Reactor Projects  


Docket Nos. 50-254; 50-265 License Nos. DPR-29; DPR-30  
Docket Nos. 50-254; 50-265 License Nos. DPR-29; DPR-30  
Line 45: Line 42:
Errata for Inspection Report 05000254/2009005; 05000265/2009005  
Errata for Inspection Report 05000254/2009005; 05000265/2009005  


cc w/encl: Distribution via ListServ 1 Enclosure Errata for Inspection Report 05000254/2009005; 05000265/2009005 4OA2 Identification and Resolution of Problems (71152) Cornerstones: Initiating Events, Mitigating Systems, Barrier Integrity, Emergency Preparedness, Public Radiation Safety, Occupational Radiation Safety, and Physical Protection .6 Semi-Annual Trend Review a. Inspection Scope The inspectors performed a review of the licensee's Corrective Action Program (CAP) and associated documents to identify trends that could indicate the existence of a more significant safety issue. The inspectors' review was focused on repetitive equipment issues, but also considered the results of daily inspector CAP item screening discussed in Section 4OA2.2 above, licensee trending efforts, and licensee human performance results. Of particular focus were equipment and performance issues where procedure use and adherence were a cause or a contributing causal factor. The inspectors' review nominally considered the six-month period of June 1, 2009, through November 30, 2009, although some examples expanded beyond those dates where the scope of the trend
REGION III==
 
2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352
warranted. The review also included issues documented outside the normal CAP in repetitive and/or rework maintenance lists, departmental pr oblem/challenges lists, quality assurance audit/surveillance reports, self-assessm ent reports, and management performance management tools. The review was performed as an independent review of the root cause evaluation contained in IR 950871, "Procedure Use and Adherence Issues Identified in Common Cause Assessment for 2009." The inspectors compared and contrasted their results with the results contained in the licensee's CAP trending reports.
 
Corrective actions associated with a sample of the issues identified in the licensee's trending reports were reviewed for adequacy. This review constituted a single semi-annual trend inspection sample as defined in Inspection Procedure 71152-05. b. Findings No findings of significance were identified.
 
2 Enclosure LIST OF DOCUMENTS REVIEWED The following is a list of documents reviewed during the inspection. Inclusion on this list does not imply that the NRC inspectors reviewed the documents in their entirety, but rather, that selected sections of portions of the documents were evaluated as part of the overall inspection effort. Inclusion of a document on this list does not imply NRC acceptance of the document or any part of it, unless this is stated in the body of the inspection report.
 
Section 4OA2
- Root Cause Report (IR 950871); Procedure Use and Adherence Issues Identified in Common Cause Assessment for 2009.


UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 January 29, 2010  
January 29, 2010  


Mr. Charles
Mr. Charles
}}
}}

Latest revision as of 06:53, 14 January 2025

Errata for Quad Cities Nuclear Power Station, Units 1 & 2, NRC Integrated Inspection Report 05000254-09-005; 05000265-09-005
ML100290454
Person / Time
Site: Quad Cities  Constellation icon.png
Issue date: 01/29/2010
From: Ring M
NRC/RGN-III/DRP/B1
To: Pardee C
Exelon Generation Co, Exelon Nuclear
References
IR-09-005
Download: ML100290454 (5)


Text

January 29, 2010

SUBJECT:

ERRATA FOR QUAD CITIES NUCLEAR POWER STATION, UNITS 1 AND 2 NRC INTEGRATED INSPECTION REPORT 05000254/2009005; 05000265/2009005

Dear Mr. Pardee:

On January 27, 2010, the U.S. Nuclear Regulatory Commission (NRC) issued Integrated Inspection Report 05000254/2009005; 05000265/2009005 (ML100271264). An inspection sample was inadvertently omitted from the Integrated Inspection Report. Please insert the attached errata where appropriate into Integrated Inspection Report 05000254/2009005; 05000265/2009005.

We apologize for any inconvenience to you and your staff.

Sincerely,

/RA/

Mark A. Ring, Chief

Branch 1

Division of Reactor Projects

Docket Nos. 50-254; 50-265 License Nos. DPR-29; DPR-30

Enclosure:

Errata for Inspection Report 05000254/2009005; 05000265/2009005

REGION III==

2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352

January 29, 2010

Mr. Charles