| issue date = 03/30/2010
| issue date = 03/30/2010
| title = IR 05000413-10-501 and 05000414-10-501; 03/08/2010 - 03/12/2010; Catawba Nuclear Station, Units 1 and 2; Baseline Inspection
| title = IR 05000413-10-501 and 05000414-10-501; 03/08/2010 - 03/12/2010; Catawba Nuclear Station, Units 1 and 2; Baseline Inspection
| author name = Bonser B R
| author name = Bonser B
| author affiliation = NRC/RGN-II/DRS/PSB1
| author affiliation = NRC/RGN-II/DRS/PSB1
| addressee name = Morris J R
| addressee name = Morris J
| addressee affiliation = Duke Energy Carolinas, LLC
| addressee affiliation = Duke Energy Carolinas, LLC
| docket = 05000413, 05000414
| docket = 05000413, 05000414
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II SAM NUNN ATLANTA FEDERAL CENTER 61 FORSYTH STREET, SW, SUITE 23T85 ATLANTA, GEORGIA 30303-8931 March 30, 2010 Mr. J. Site Vice President Duke Energy Carolinas, LLC Catawba Nuclear Station 4800 Concord Road York, SC 29745-9635
{{#Wiki_filter:March 30, 2010


SUBJECT: CATAWBA NUCLEAR STATION - NRC EMERGENCY PREPAREDNESS INSPECTION REPORT 05000413/2010-501 AND 05000414/2010-501
==SUBJECT:==
CATAWBA NUCLEAR STATION - NRC EMERGENCY PREPAREDNESS INSPECTION REPORT 05000413/2010-501 AND 05000414/2010-501


==Dear Mr. Morris:==
==Dear Mr. Morris:==
On March 12, 2010, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Catawba Nuclear Station, Units 1 and 2. The enclosed inspection report documents the inspection results, which were discussed on March 12, 2010, with you and other members of your staff.
On March 12, 2010, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Catawba Nuclear Station, Units 1 and 2. The enclosed inspection report documents the inspection results, which were discussed on March 12, 2010, with you and other members of your staff.


The inspection examined activities conducted under your license as they relate to safety and compliance with the Commission's rules and regulations and with the conditions of your license. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.
The inspection examined activities conducted under your license as they relate to safety and compliance with the Commissions rules and regulations and with the conditions of your license.
 
The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.


Based on the results of this inspection, no findings of significance were identified.
Based on the results of this inspection, no findings of significance were identified.
Line 31: Line 34:
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter, its enclosure, and your response, if any, will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter, its enclosure, and your response, if any, will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).


Sincerely,/RA/
Sincerely,
Brian Bonser, Chief Plant Support Branch 1 Division of Reactor Safety Docket No.: 50-413, 50-414 License No.: NPF-35, NPF-52  
/RA/  
 
Brian Bonser, Chief Plant Support Branch 1 Division of Reactor Safety  
 
Docket No.: 50-413, 50-414 License No.: NPF-35, NPF-52  


===Enclosure:===
===Enclosure:===
Inspection Report 05000413/2010-501 and 05000414/2010-501  
Inspection Report 05000413/2010-501 and 05000414/2010-501  


===w/Attachment:===
w/Attachment: Supplemental Information  
Supplemental Information  
 
cc w/encl.: (See page 2)
 
_________________________
G SUNSI REVIEW COMPLETE OFFICE RII:DRS RII:DRS RII:DRP SIGNATURE LRM /RA/ JLB /RA/ Via email NAME LMiller JBeavers RCureton DATE 03/30/2010 03/30/2010 03/30/2010 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO DEC 2 cc w/encl:
Randy D. Hart Regulatory Compliance Manager Duke Energy Carolinas, LLC Electronic Mail Distribution
 
R. L. Gill, Jr. Manager Nuclear Regulatory Issues & Industry Affairs Duke Energy Carolinas, LLC Electronic Mail Distribution
 
Dhiaa M. Jamil Group Executive and Chief Nuclear Officer Duke Energy Carolinas, LLC Electronic Mail Distribution Kathryn B. Nolan Senior Counsel Duke Energy Corporation 526 South Church Street-EC07H Charlotte, NC 28202
 
Lisa F. Vaughn Associate General Counsel Duke Energy Corporation 526 South Church Street-EC07H Charlotte, NC 28202
 
David A. Repka Winston Strawn LLP Electronic Mail Distribution
 
North Carolina MPA-1 Suite 600 P.O. Box 29513 Raleigh, NC 27525-0513
 
Susan E. Jenkins Director, Division of Waste Management Bureau of Land and Waste Management S.C. Department of Health and Environmental Control Electronic Mail Distribution
 
R. Mike Gandy Division of Radioactive Waste Mgmt. S.C. Department of Health and Environmental Control Electronic Mail Distribution
 
W. Lee Cox, III Section Chief Radiation Protection Section N.C. Department of Environmental Commerce & Natural Resources Electronic Mail Distribution
 
Vanessa Quinn Federal Emergency Management Agency 500 C Street, SW Room 840 Washington, DC 20472 Steve Weatherman, Operations Analyst North Carolina Electric Membership Corporation Electronic Mail Distribution
 
County Manager of York County York County Courthouse York, SC 29745 Piedmont Municipal Power Agency Electronic Mail Distribution Peggy Force Assistant Attorney General State of North Carolina P.O. Box 629 Raleigh, NC 27602


DEC 3 Letter to J. from Brian Bonser dated March 30, 2010
REGION II==
Docket Nos.:
05000413, 05000414


SUBJECT: CATAWBA NUCLEAR STATION - NRC EMERGENCY PREPAREDNESS INSPECTION REPORT 05000413/2010-501 AND 05000414/2010-501 Distribution w/encl
License Nos.:
: C. Evans, RII L. Slack, RII OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMCatawba Resource
NPF-35, NPF-52


Enclosure U.S. NUCLEAR REGULATORY COMMISSION REGION II
Report No.:
05000413/2010-501 and 05000414/2010-501


Docket Nos.: 05000413, 05000414
Licensee:
Duke Power Company LLC.


License Nos.: NPF-35, NPF-52
Facility:
Catawba Nuclear Station, Units 1 and 2


Report No.: 05000413/2010-501 and 05000414/2010-501
Location:
York, SC


Licensee: Duke Power Company LLC.
Dates:
March 8, 2010 through March 12, 2010


Facility: Catawba Nuclear Station, Units 1 and 2
Inspectors:
Lee Miller, Senior Emergency Preparedness Inspector


Location: York, SC
Jim Beavers, Emergency Preparedness Inspector


Dates: March 8, 2010 through March 12, 2010
Ron Cureton, Resident Inspector


Inspectors: Lee Miller, Senior Emergency Preparedness Inspector Jim Beavers, Emergency Preparedness Inspector Ron Cureton, Resident Inspector
Approved by:  


Approved by: Brian Bonser, Chief Plant Support Branch 1 Division of Reactor Safety  
Brian Bonser, Chief Plant Support Branch 1 Division of Reactor Safety  


Enclosure  
Enclosure  
Line 98: Line 86:
Station, Units 1 and 2; Baseline Inspection  
Station, Units 1 and 2; Baseline Inspection  


The report covered an announced inspection by two emergency preparedness inspectors and one resident inspector. The NRC
The report covered an announced inspection by two emergency preparedness inspectors and one resident inspector. The NRC=s program for overseeing the safe operation of commercial nuclear power reactors is described in NUREG-1649, AReactor Oversight Process.@
=s program for overseeing the safe operation of commercial nuclear power reactors is described in NUREG-1649, AReactor Oversight Process.


===NRC-Identified and Self-Revealing Findings===
 
No findings of significance were identified.
===A. NRC-Identified and Self-Revealing Findings===


No findings of significance were identified.
===Licensee-Identified Violations===
.  


===B. Licensee-Identified Violations===
.
None
None


Line 114: Line 99:


==REACTOR SAFETY==
==REACTOR SAFETY==
 
===Cornerstone: Emergency Preparedness===
===Cornerstone:===
Emergency Preparedness
 
1EP1 Exercise Evaluation
1EP1 Exercise Evaluation


====a. Inspection Scope====
====a. Inspection Scope====
Prior to the inspection activity, the inspectors conducted an in-office review of the exercise objectives and scenario submitted to the NRC to determine if the exercise would test major elements of the emergency plan as required by 10 CFR 50.47(b)(14). This inspection activity represents one sample on a biennial cycle.
Prior to the inspection activity, the inspectors conducted an in-office review of the exercise objectives and scenario submitted to the NRC to determine if the exercise would test major elements of the emergency plan as required by 10 CFR 50.47(b)(14).
 
This inspection activity represents one sample on a biennial cycle.


The onsite inspection consisted of the following review and assessment:  
The onsite inspection consisted of the following review and assessment:  
$ The adequacy of the licensee's performance in the biennial exercise conducted on March 9, 2010, was reviewed and assessed regarding the implementation of the Risk Significant Planning Standards (RSPSs) in 10 CFR 50.47 (b)(4), (5), (9), and (10), which address emergency classification, offsite notification, radiological assessment, and protective action recommendations, respectively.


$ The overall adequacy of the licensee
$ The adequacy of the licensees performance in the biennial exercise conducted on March 9, 2010, was reviewed and assessed regarding the implementation of the Risk Significant Planning Standards (RSPSs) in 10 CFR 50.47 (b)(4), (5), (9), and (10), which address emergency classification, offsite notification, radiological assessment, and protective action recommendations, respectively.
=s emergency response facilities with regard to NUREG-0696, "Functional Criteria for Emergency Response Facilities
 
@ and Emergency Plan commitments. The facilities assessed were the Control Room simulator, Technical Support Center (TSC), Operations Support Center (OSC) and Emergency Operations Facility (EOF).
$ The overall adequacy of the licensee=s emergency response facilities with regard to NUREG-0696, Functional Criteria for Emergency Response Facilities@ and Emergency Plan commitments. The facilities assessed were the Control Room simulator, Technical Support Center (TSC), Operations Support Center (OSC) and Emergency Operations Facility (EOF).


$ Other performance areas, such as: the emergency response organization's (ERO) recognition of abnormal plant conditions; command and control, intra- and inter-facility communications; prioritization of mitigation activities; utilization of repair and field monitoring teams; interface with offsite agencies; and the overall implementation of the emergency plan and its implementing procedures.
$ Other performance areas, such as: the emergency response organizations (ERO)recognition of abnormal plant conditions; command and control, intra-and inter-facility communications; prioritization of mitigation activities; utilization of repair and field monitoring teams; interface with offsite agencies; and the overall implementation of the emergency plan and its implementing procedures.


$ Past performance issues from NRC inspection reports and Federal Emergency Management Agency (FEMA)/Department of Homeland Security (DHS) exercise reports to determine the effectiveness of corrective actions as demonstrated during this exercise to ensure compliance with 10 CFR 50.47(b)(14).
$ Past performance issues from NRC inspection reports and Federal Emergency Management Agency (FEMA)/Department of Homeland Security (DHS) exercise reports to determine the effectiveness of corrective actions as demonstrated during this exercise to ensure compliance with 10 CFR 50.47(b)(14).


$ The post-exercise critique process and the presentation to the licensee's senior management conducted on March 11, 2010, to evaluate the licensee
$ The post-exercise critique process and the presentation to the licensee's senior management conducted on March 11, 2010, to evaluate the licensee=s self-assessment of its ERO performance during the exercise and to ensure compliance with 10 CFR 50 Appendix E.IV.F.2.g.
=s self-assessment of its ERO performance during the exercise and to ensure compliance with 10 CFR 50 Appendix E.IV.F.2.g.


The inspector reviewed various documents which are listed in the Attachment.
The inspector reviewed various documents which are listed in the Attachment.
Line 145: Line 127:


====a. Inspection Scope====
====a. Inspection Scope====
Since the last NRC inspection of this program area, no change has been implemented to Revision 09-1 of the Catawba Emergency Plan. The inspectors conducted a sampling review of the implementing procedure changes made between June 1, 2009 and February 28, 2010 to evaluate for potential decreases in effectiveness of the Plan. However, this review was not documented in a Safety Evaluation Report and does not constitute formal NRC approval of the changes. Therefore, these changes remain subject to future NRC inspection in their entirety.
Since the last NRC inspection of this program area, no change has been implemented to Revision 09-1 of the Catawba Emergency Plan. The inspectors conducted a sampling review of the implementing procedure changes made between June 1, 2009 and February 28, 2010 to evaluate for potential decreases in effectiveness of the Plan.


The inspection was conducted in accordance with NRC Inspection Procedure 71114, Attachment 04, "Emergency Action Level and Emergency Plan Changes.The applicable planning standard (PS), 10 CFR 50.47(b)(4) and its related 10 CFR 50, Appendix E requirements were used as reference criteria.
However, this review was not documented in a Safety Evaluation Report and does not constitute formal NRC approval of the changes. Therefore, these changes remain subject to future NRC inspection in their entirety.
 
The inspection was conducted in accordance with NRC Inspection Procedure 71114, 04, Emergency Action Level and Emergency Plan Changes. The applicable planning standard (PS), 10 CFR 50.47(b)(4) and its related 10 CFR 50, Appendix E requirements were used as reference criteria.


The inspector reviewed various documents which are listed in the Attachment. This inspection activity satisfied one inspection sample for the emergency action level and emergency plan changes on an annual basis.
The inspector reviewed various documents which are listed in the Attachment. This inspection activity satisfied one inspection sample for the emergency action level and emergency plan changes on an annual basis.
Line 156: Line 140:
==OTHER ACTIVITIES==
==OTHER ACTIVITIES==
{{a|4OA1}}
{{a|4OA1}}
==4OA1 Performance Indicator Verification==
==4OA1 Performance Indicator Verification==
====a. Inspection Scope====
====a. Inspection Scope====
The inspector sampled licensee submittals relative to the PIs listed below for the period January 1, 2009 through Dec 31, 2009. To verify the accuracy of the PI data reported during that period, PI definitions and guidance contained in NEI 99-02, "Regulatory Assessment Performance Indicator Guideline", Revision 6, was used to confirm the reporting basis for each data element.
The inspector sampled licensee submittals relative to the PIs listed below for the period January 1, 2009 through Dec 31, 2009. To verify the accuracy of the PI data reported during that period, PI definitions and guidance contained in NEI 99-02, Regulatory Assessment Performance Indicator Guideline, Revision 6, was used to confirm the reporting basis for each data element.


Emergency Preparedness Cornerstone
Emergency Preparedness Cornerstone
Line 165: Line 149:
* Emergency Response Organization Readiness (ERO)
* Emergency Response Organization Readiness (ERO)
* Alert and Notification System Reliability (ANS)
* Alert and Notification System Reliability (ANS)
For the specified review period, the inspector examined data reported to the NRC, procedural guidance for reporting PI information, and records used by the licensee to identify potential PI occurrences. The inspector verified the accuracy of the DEP through review of a sample of drill and event records. The inspector reviewed selected training records to verify the accuracy of the ERO PI for personnel assigned to key positions in the ERO. The inspector verified the accuracy of the PI for ANS reliability through review of a sample of the licensee's records of periodic system tests. Licensee procedures, records, and other documents reviewed within this inspection area are listed in the Attachment to this report.
For the specified review period, the inspector examined data reported to the NRC, procedural guidance for reporting PI information, and records used by the licensee to identify potential PI occurrences. The inspector verified the accuracy of the DEP through review of a sample of drill and event records. The inspector reviewed selected training records to verify the accuracy of the ERO PI for personnel assigned to key positions in the ERO. The inspector verified the accuracy of the PI for ANS reliability through review of a sample of the licensees records of periodic system tests. Licensee procedures, records, and other documents reviewed within this inspection area are listed in the Attachment to this report.


====b. Findings====
====b. Findings====
No findings of significance were identified.
No findings of significance were identified.


{{a|4OA6}}
{{a|4OA6}}
 
==4OA6 Meetings, Including Exit==
==4OA6 Meetings, Including Exit==
On March 12, 2010, the lead inspector presented the inspection results to Mr. J. Morris and other members of your staff. The inspector confirmed that proprietary information was provided and returned to your staff during the inspection.
On March 12, 2010, the lead inspector presented the inspection results to Mr. J. Morris and other members of your staff. The inspector confirmed that proprietary information was provided and returned to your staff during the inspection.


ATTACHMENT:
ATTACHMENT:  


=SUPPLEMENTAL INFORMATION=
=SUPPLEMENTAL INFORMATION=


==KEY POINTS OF CONTACT==
==KEY POINTS OF CONTACT==
===Licensee personnel===
===Licensee personnel===
: [[contact::J. Morris]], Site Vice President  
: [[contact::J. Morris]], Site Vice President  
Line 191: Line 174:


==ITEMS OPENED, CLOSED, AND DISCUSSED==
==ITEMS OPENED, CLOSED, AND DISCUSSED==
NONE


NONE 
==LIST OF DOCUMENTS REVIEWED==
==LIST OF DOCUMENTS REVIEWED==
1EP1 Exercise Evaluation
===Procedures===
: Catawba Nuclear Station Emergency Plan, Rev. 09-1 RP/0/A/5000/001, Classification of Emergency, Rev. 20
: RP/0/A/5000/003, Alert, Rev. 42 RP/0/A/5000/004, Site Area Emergency, Rev. 44 RP/0/A/5000/005, General Emergency, Rev. 45
: RP/0/A/5000/006A, Notification to States and Counties from the Control Room, Rev. 23 RP/0/A/5000/006B, Notification to States and Counties from the Technical Support Center, Rev.
: 25 RP/0/A/5000/010, Conducting a Site Assembly or Preparing the Site for an Evacuation, Rev. 22 RP/0/B/5000/013, NRC Notification Requirements, Rev. 30
: RP/0/A/5000/015, Core Damage Assessment, Rev. 7 RP/0/A/5000/018, Emergency Worker Dose Extension, Rev. 2 RP/0/A/5000/020, Technical Support Center (TSC) Activation Procedure, Rev. 24 RP/0/A/5000/024, Operations Support Center (OSC) Activation Procedure, Rev. 22 SH/0/B/2005/001, Emergency Response Offsite Dose Projections, Rev. 6
: SH/0/B/2005/003, Distribution of Potassium Iodide Tablets in the Event of a Radioiodine Release, Rev. 1 SR/0/B/2000/003, Activation of the Emergency Operations Facility, Rev. 19 SR/0/B/2000/004, Notification to States and Counties from the Emergency Operations Facility, Rev. 14
: Records and Data Control Room, Technical Support Center, Operations Support Center, Joint Information Center - Documentation packages (logs, event notification forms, Protective Action Recommendations, Media releases, and Radiological Dose Assessments)
: Attachment Problem Investigation Process
: C-10-01445, Annulus Ventilation System scenario was unrealistic C-10-01482, Raddose V program for dose assessment failed to include zone A-2 when required C-10-01492, March 9, 2010 graded exercise RSPS items
: C-10-01504, Drill player dismissed from drill due to having a side discussion with an observer C-10-01517, Crew evaluation for March 9, 2010, graded exercise C-10-01523, Repeat of 2008 exercise corrective actions C-10-01520, Insufficient Potassium Iodine issue identified during the graded exercise C-10-01521, Improvement items related to simulator crew involvement as members of ERO
: C-10-01522, Field Monitoring Coordination issues during 03/09/10 CNS graded exercise
==Section 1EP4: Emergency Action Level and Emergency Plan Changes==
: Change packages for Plans and Procedures
: RP/0/A/5000/007, Natural Disaster and Earthquake, Rev. 30 HP/0/B/1009/009, Guidelines for Accident and Emergency Response, Rev. 44
==Section 4OA1: Performance Indicator Verification==


===Procedures===
: Emergency Planning Functional Area Manual (EPFAM), Rev. 16
: Records and Data
: DEP opportunities documentation for 1st, 2nd, 3rd, and 4th Quarters 2009 Drill and exercise participation records of ERO personnel 1st, 2nd, 3rd, and 4th Quarters 2009 Siren test data 1st, 2nd, 3rd, and 4th Quarters 2009
: Various ERO Personnel Qualification and Participation records
==LIST OF ACRONYMS==
: [[ANS]] [[Alert and Notification System Reliability]]
: [[DEP]] [[Emergency Response Organization Drill/Exercise Performance]]
: [[DHS]] [[Department of Homeland Security]]
: [[EAL]] [[Emergency Action Level]]
: [[EOF]] [[Emergency Operations Facility]]
: [[ERO]] [[Emergency Response Organization Readiness]]
: [[FEMA]] [[Federal Emergency Management Agency]]
: [[OSC]] [[Operations Support Center]]
: [[PI]] [[Performance Indicator]]
: [[PS]] [[Planning Standard]]
: [[RSPS]] [[Risk Significant Planning Standards]]
: [[TI]] [[Temporary Instruction TSC  Technical Support Center]]
}}
}}

Latest revision as of 05:49, 14 January 2025

IR 05000413-10-501 and 05000414-10-501; 03/08/2010 - 03/12/2010; Catawba Nuclear Station, Units 1 and 2; Baseline Inspection
ML100900421
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 03/30/2010
From: Brian Bonser
NRC/RGN-II/DRS/PSB1
To: Morris J
Duke Energy Carolinas
References
IR-10-501
Download: ML100900421 (11)


Text

March 30, 2010

SUBJECT:

CATAWBA NUCLEAR STATION - NRC EMERGENCY PREPAREDNESS INSPECTION REPORT 05000413/2010-501 AND 05000414/2010-501

Dear Mr. Morris:

On March 12, 2010, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Catawba Nuclear Station, Units 1 and 2. The enclosed inspection report documents the inspection results, which were discussed on March 12, 2010, with you and other members of your staff.

The inspection examined activities conducted under your license as they relate to safety and compliance with the Commissions rules and regulations and with the conditions of your license.

The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.

Based on the results of this inspection, no findings of significance were identified.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter, its enclosure, and your response, if any, will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Brian Bonser, Chief Plant Support Branch 1 Division of Reactor Safety

Docket No.: 50-413, 50-414 License No.: NPF-35, NPF-52

Enclosure:

Inspection Report 05000413/2010-501 and 05000414/2010-501

w/Attachment: Supplemental Information

REGION II==

Docket Nos.:

05000413, 05000414

License Nos.:

NPF-35, NPF-52

Report No.:

05000413/2010-501 and 05000414/2010-501

Licensee:

Duke Power Company LLC.

Facility:

Catawba Nuclear Station, Units 1 and 2

Location:

York, SC

Dates:

March 8, 2010 through March 12, 2010

Inspectors:

Lee Miller, Senior Emergency Preparedness Inspector

Jim Beavers, Emergency Preparedness Inspector

Ron Cureton, Resident Inspector

Approved by:

Brian Bonser, Chief Plant Support Branch 1 Division of Reactor Safety

Enclosure

SUMMARY OF FINDINGS

IR 05000413/2010-501 and 05000414/2010-501; 03/08/2010 - 03/12/2010; Catawba Nuclear

Station, Units 1 and 2; Baseline Inspection

The report covered an announced inspection by two emergency preparedness inspectors and one resident inspector. The NRC=s program for overseeing the safe operation of commercial nuclear power reactors is described in NUREG-1649, AReactor Oversight Process.@

NRC-Identified and Self-Revealing Findings

No findings of significance were identified.

Licensee-Identified Violations

.

None

REPORT DETAILS

REACTOR SAFETY

Cornerstone: Emergency Preparedness

1EP1 Exercise Evaluation

a. Inspection Scope

Prior to the inspection activity, the inspectors conducted an in-office review of the exercise objectives and scenario submitted to the NRC to determine if the exercise would test major elements of the emergency plan as required by 10 CFR 50.47(b)(14).

This inspection activity represents one sample on a biennial cycle.

The onsite inspection consisted of the following review and assessment:

$ The adequacy of the licensees performance in the biennial exercise conducted on March 9, 2010, was reviewed and assessed regarding the implementation of the Risk Significant Planning Standards (RSPSs) in 10 CFR 50.47 (b)(4), (5), (9), and (10), which address emergency classification, offsite notification, radiological assessment, and protective action recommendations, respectively.

$ The overall adequacy of the licensee=s emergency response facilities with regard to NUREG-0696, Functional Criteria for Emergency Response Facilities@ and Emergency Plan commitments. The facilities assessed were the Control Room simulator, Technical Support Center (TSC), Operations Support Center (OSC) and Emergency Operations Facility (EOF).

$ Other performance areas, such as: the emergency response organizations (ERO)recognition of abnormal plant conditions; command and control, intra-and inter-facility communications; prioritization of mitigation activities; utilization of repair and field monitoring teams; interface with offsite agencies; and the overall implementation of the emergency plan and its implementing procedures.

$ Past performance issues from NRC inspection reports and Federal Emergency Management Agency (FEMA)/Department of Homeland Security (DHS) exercise reports to determine the effectiveness of corrective actions as demonstrated during this exercise to ensure compliance with 10 CFR 50.47(b)(14).

$ The post-exercise critique process and the presentation to the licensee's senior management conducted on March 11, 2010, to evaluate the licensee=s self-assessment of its ERO performance during the exercise and to ensure compliance with 10 CFR 50 Appendix E.IV.F.2.g.

The inspector reviewed various documents which are listed in the Attachment.

b. Findings

No findings of significance were identified.

1EP4 Emergency Action Level and Emergency Plan Changes

a. Inspection Scope

Since the last NRC inspection of this program area, no change has been implemented to Revision 09-1 of the Catawba Emergency Plan. The inspectors conducted a sampling review of the implementing procedure changes made between June 1, 2009 and February 28, 2010 to evaluate for potential decreases in effectiveness of the Plan.

However, this review was not documented in a Safety Evaluation Report and does not constitute formal NRC approval of the changes. Therefore, these changes remain subject to future NRC inspection in their entirety.

The inspection was conducted in accordance with NRC Inspection Procedure 71114, 04, Emergency Action Level and Emergency Plan Changes. The applicable planning standard (PS), 10 CFR 50.47(b)(4) and its related 10 CFR 50, Appendix E requirements were used as reference criteria.

The inspector reviewed various documents which are listed in the Attachment. This inspection activity satisfied one inspection sample for the emergency action level and emergency plan changes on an annual basis.

b. Findings

No findings of significance were identified.

OTHER ACTIVITIES

4OA1 Performance Indicator Verification

a. Inspection Scope

The inspector sampled licensee submittals relative to the PIs listed below for the period January 1, 2009 through Dec 31, 2009. To verify the accuracy of the PI data reported during that period, PI definitions and guidance contained in NEI 99-02, Regulatory Assessment Performance Indicator Guideline, Revision 6, was used to confirm the reporting basis for each data element.

Emergency Preparedness Cornerstone

  • Emergency Response Organization Drill/Exercise Performance (DEP)
  • Emergency Response Organization Readiness (ERO)
  • Alert and Notification System Reliability (ANS)

For the specified review period, the inspector examined data reported to the NRC, procedural guidance for reporting PI information, and records used by the licensee to identify potential PI occurrences. The inspector verified the accuracy of the DEP through review of a sample of drill and event records. The inspector reviewed selected training records to verify the accuracy of the ERO PI for personnel assigned to key positions in the ERO. The inspector verified the accuracy of the PI for ANS reliability through review of a sample of the licensees records of periodic system tests. Licensee procedures, records, and other documents reviewed within this inspection area are listed in the Attachment to this report.

b. Findings

No findings of significance were identified.

4OA6 Meetings, Including Exit

On March 12, 2010, the lead inspector presented the inspection results to Mr. J. Morris and other members of your staff. The inspector confirmed that proprietary information was provided and returned to your staff during the inspection.

ATTACHMENT:

SUPPLEMENTAL INFORMATION

KEY POINTS OF CONTACT

Licensee personnel

J. Morris, Site Vice President
G. Hamrick, Station Manager
T. Arlow, Emergency Planning Manager
M. Austin, Fleet Emergency Preparedness Manager
G. Mitchell, Emergency Planner
K. Phillips, Safety Assurance Manager
R. Smith, Emergency Planner

ITEMS OPENED, CLOSED, AND DISCUSSED

NONE

LIST OF DOCUMENTS REVIEWED