IR 05000341/2010403: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| (2 intermediate revisions by the same user not shown) | |||
| Line 3: | Line 3: | ||
| issue date = 08/30/2010 | | issue date = 08/30/2010 | ||
| title = IR 05000341-10-403 (DRS) on 07/26/2010 - 07/30/2010 for Fermi Power Plant, Unit 2, Routine Security Baseline Inspection - Cover Letter | | title = IR 05000341-10-403 (DRS) on 07/26/2010 - 07/30/2010 for Fermi Power Plant, Unit 2, Routine Security Baseline Inspection - Cover Letter | ||
| author name = Duncan E | | author name = Duncan E | ||
| author affiliation = NRC/RGN-III/DRS/PSB | | author affiliation = NRC/RGN-III/DRS/PSB | ||
| addressee name = Davis J | | addressee name = Davis J | ||
| addressee affiliation = Detroit Edison | | addressee affiliation = Detroit Edison | ||
| docket = 05000341 | | docket = 05000341 | ||
| Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter | {{#Wiki_filter:August 30, 2010 | ||
==SUBJECT:== | |||
FERMI POWER PLANT, UNIT 2 NRC SECURITY BASELINE INSPECTION REPORT 05000341/2010403(DRS) | |||
==Dear Mr. Davis:== | |||
On July 30, 2010, the U. S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection of your Fermi Power Plant, Unit 2. The inspection covered one or more of the key attributes of the security cornerstone of the NRCs Reactor Oversight Process. | |||
The enclosed inspection report documents the inspection results, which were discussed on July 30, 2010, with Mr. T. Conner and other members of your staff. | |||
The inspection examined activities conducted under your licenses as they relate to security and compliance with the Commissions rules and regulations and with the conditions of your licenses. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel. | |||
Based on the results of this inspection, no findings were identified. | |||
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosures, and in accordance with 10 CFR 2.390, a copy of this letters enclosures will not be available for public inspection. | |||
Enclosure contains Sensitive Unclassified Non-Safeguards Information. When separated from enclosure, this transmittal document is decontrolled. Should you have any questions concerning this inspection, we will be pleased to discuss them with you. | |||
Sincerely, | |||
/RA/ | |||
Division of Reactor Safety | Eric Duncan, Chief Plant Support Branch Division of Reactor Safety | ||
Docket No. 50-341 License No. NPF-43 | Docket No. 50-341 License No. NPF-43 | ||
Nonpublic | Nonpublic Enclosure: Inspection Report 05000341/2010403(DRS) | ||
w/Attachment: Supplemental Information | |||
cc w/encl: | |||
S. Coker, NSIR/DSO/DDSO/ST C. Johnson, NSIR J. Trapp, Region I M. Ernstes, RII M. Shannon, RIV | |||
T. Strong, State Liaison Officer, State of Michigan | |||
cc w/o encl: Distribution via ListServ | cc w/o encl: | ||
Distribution via ListServ | |||
}} | }} | ||
Latest revision as of 03:08, 14 January 2025
| ML102440361 | |
| Person / Time | |
|---|---|
| Site: | Fermi |
| Issue date: | 08/30/2010 |
| From: | Eric Duncan Plant Support Branch II |
| To: | Jennifer Davis Detroit Edison |
| References | |
| IR-10-403 | |
| Download: ML102440361 (3) | |
Text
August 30, 2010
SUBJECT:
FERMI POWER PLANT, UNIT 2 NRC SECURITY BASELINE INSPECTION REPORT 05000341/2010403(DRS)
Dear Mr. Davis:
On July 30, 2010, the U. S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection of your Fermi Power Plant, Unit 2. The inspection covered one or more of the key attributes of the security cornerstone of the NRCs Reactor Oversight Process.
The enclosed inspection report documents the inspection results, which were discussed on July 30, 2010, with Mr. T. Conner and other members of your staff.
The inspection examined activities conducted under your licenses as they relate to security and compliance with the Commissions rules and regulations and with the conditions of your licenses. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.
Based on the results of this inspection, no findings were identified.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosures, and in accordance with 10 CFR 2.390, a copy of this letters enclosures will not be available for public inspection.
Enclosure contains Sensitive Unclassified Non-Safeguards Information. When separated from enclosure, this transmittal document is decontrolled. Should you have any questions concerning this inspection, we will be pleased to discuss them with you.
Sincerely,
/RA/
Eric Duncan, Chief Plant Support Branch Division of Reactor Safety
Docket No. 50-341 License No. NPF-43
Nonpublic Enclosure: Inspection Report 05000341/2010403(DRS)
w/Attachment: Supplemental Information
cc w/encl:
S. Coker, NSIR/DSO/DDSO/ST C. Johnson, NSIR J. Trapp, Region I M. Ernstes, RII M. Shannon, RIV
T. Strong, State Liaison Officer, State of Michigan
cc w/o encl:
Distribution via ListServ