{{#Wiki_filter:Inspection No. Docket No. License No. Licensee:
{{#Wiki_filter:Inspection N Docket N License N Licensee:
Address: U.S. NUCLEAR REGULATORY COMMISSION REGION I INSPECTION REPORT 05000320/2011008 05000320 DPR-73 GPU Nuclear, Inc. 341 White Pond Drive Akron, OH 44320 Locations Inspected:
Address:
Three Mile Island Station, Unit 2 Middletown, PA 17057-0791 Inspection Dates: Inspectors:
U.S. NUCLEAR REGULATORY COMMISSION  
Approved By: July 25-28, 2011 Laurie A. Kauffman Health Physicist Decommissioning Branch Division of Nuclear Materials Safety Kathy Modes Senior Health Physicist Decommissioning Branch Division of Nuclear Materials Safety Judith A. Joustra, Chief Decommissioning Branch Division of Nuclear Materials Safety Document Name: G:\WordDocs\Current\lnsp Report\RDPR-73 2011 OOB.docx EXECUTIVE


=SUMMARY=
==REGION I==
GPU Nuclear, Inc. NRC Inspection
INSPECTION REPORT 05000320/2011008 05000320 DPR-73 GPU Nuclear, In White Pond Drive Akron, OH 44320 Locations Inspected:
Three Mile Island Station, Unit 2 Middletown, PA 17057-0791 Inspection Dates:
Inspectors:
Approved By:
July 25-28, 2011 Laurie A. Kauffman Health Physicist Decommissioning Branch Division of Nuclear Materials Safety Kathy Modes Senior Health Physicist Decommissioning Branch Division of Nuclear Materials Safety Judith A. Joustra, Chief Decommissioning Branch Division of Nuclear Materials Safety Document Name: G:\\WordDocs\\Current\\lnsp Report\\RDPR-73 2011 OOB.docx


Report No. 05000320/2011008 A routine announced safety inspection was conducted on July 25-28, 2011, at the Three Mile Island Station, Unit 2 (TMI-2) by two Region I inspectors.
=EXECUTIVE SUMMARY=
GPU Nuclear, Inc.


The NRC's program for overseeing the safe operation of a shut-down nuclear power reactor is described in Inspection Manual Chapter (IMC) 2561, "Decommissioning Power Reactor Inspection Program." The inspection included a review of operations and management oversight, maintenance, corrective action program implementation, and plant support activities while in Post Defueling Monitored Storage (PDMS) status. Within the scope of this inspection, no safety concerns or violations were identified.
NRC Inspection Report No. 05000320/2011008 A routine announced safety inspection was conducted on July 25-28, 2011, at the Three Mile Island Station, Unit 2 (TMI-2) by two Region I inspectors. The NRC's program for overseeing the safe operation of a shut-down nuclear power reactor is described in Inspection Manual Chapter (IMC) 2561, "Decommissioning Power Reactor Inspection Program." The inspection included a review of operations and management oversight, maintenance, corrective action program implementation, and plant support activities while in Post Defueling Monitored Storage (PDMS) status. Within the scope of this inspection, no safety concerns or violations were identified. The conclusions from each inspection area are presented below.


The conclusions from each inspection area are presented below. Organization, Management  
Organization, Management & Cost Control The licensee has process controls, and an organization to effectively implement license requirements.
& Cost Control The licensee has process controls, and an organization to effectively implement license requirements.


Safety Reviews, Design Changes, and Modifications The licensee implemented a safety review program to maintain decommissioning safety and the facility configuration as described in their licensing basis. Self-Assessment, Auditing, and Corrective Action Programs The licensee's self-assessment, auditing, and corrective action programs were effective at identifying, resolving, and preventing problems.
Safety Reviews, Design Changes, and Modifications The licensee implemented a safety review program to maintain decommissioning safety and the facility configuration as described in their licensing basis.


Action reports were properly prioritized and corrective actions were tracked in accordance with approved procedures.
Self-Assessment, Auditing, and Corrective Action Programs The licensee's self-assessment, auditing, and corrective action programs were effective at identifying, resolving, and preventing problems. Action reports were properly prioritized and corrective actions were tracked in accordance with approved procedures.


Decommissioning Performance and Status Reviews at Permanently Shutdown Reactors (PSRs) There has been no dismantlement or decommissioning activities performed since the previous inspection.
Decommissioning Performance and Status Reviews at Permanently Shutdown Reactors (PSRs)
There has been no dismantlement or decommissioning activities performed since the previous inspection.


Maintenance and Surveillance The licensee effectively implemented the preventive maintenance and surveillance program and associated procedures.
Maintenance and Surveillance The licensee effectively implemented the preventive maintenance and surveillance program and associated procedures.


Occupational Radiation Exposure The licensee effectively implemented the occupational exposure control program associated with the TMI-2 PDMS activities.
Occupational Radiation Exposure The licensee effectively implemented the occupational exposure control program associated with the TMI-2 PDMS activities. The licensee maintained occupational radiation exposures as low as reasonably achievable (ALARA).


The licensee maintained occupational radiation exposures as low as reasonably achievable (ALARA). Effluent and Environmental Monitoring The licensee effectively implemented and maintained the radioactive effluent controls program and the radiological environmental monitoring program. ii Inspection Report No. 05000320/2011008 G:\WordDocs\Current\lnsp Report\RDPR-73 2011 OOS.docx
Effluent and Environmental Monitoring The licensee effectively implemented and maintained the radioactive effluent controls program and the radiological environmental monitoring program.
 
ii Inspection Report No. 05000320/2011008 G:\\WordDocs\\Current\\lnsp Report\\RDPR-73 2011 OOS.docx


=REPORT DETAILS=
=REPORT DETAILS=
1.0 . Background Information In December 1993, TMI-2 received a license from the NRC to enter Post Defueling Monitored Storage (PDMS). TMI-2 today is in long-term monitored storage. No further use of the nuclear part of the plant is anticipated.


Ventilation and rainwater systems continue to be monitored.
1.0
. Background Information In December 1993, TMI-2 received a license from the NRC to enter Post Defueling Monitored Storage (PDMS). TMI-2 today is in long-term monitored storage. No further use of the nuclear part of the plant is anticipated. Ventilation and rainwater systems continue to be monitored.


Equipment necessary to keep the plant in safe long-term storage continued to be maintained.
Equipment necessary to keep the plant in safe long-term storage continued to be maintained.
Line 54: Line 60:
The licensee plans to actively decommission TMI-2 in parallel with the decommissioning of the Three Mile Island, Unit 1 (TMI-1) after unit has been permanently shutdown.
The licensee plans to actively decommission TMI-2 in parallel with the decommissioning of the Three Mile Island, Unit 1 (TMI-1) after unit has been permanently shutdown.


2.0 Organization, Management  
2.0 Organization, Management & Cost Controls
& Cost Controls


====a. Inspection Scope====
====a. Inspection Scope====
(Inspection Procedures (lP) 36801) The inspectors evaluated any recent organization, management and staffing changes with respect to the PDMS Quality Assurance (QA) program outlined in the PDMS QA Plan. The inspectors reviewed Action Reports, interviewed Employee Concerns Program personnel, and reviewed Company Nuclear Review Board meeting minutes.
(Inspection Procedures (lP) 36801)
The inspectors evaluated any recent organization, management and staffing changes with respect to the PDMS Quality Assurance (QA) program outlined in the PDMS QA Plan. The inspectors reviewed Action Reports, interviewed Employee Concerns Program personnel, and reviewed Company Nuclear Review Board meeting minutes.


====b. Observations and Findings====
====b. Observations and Findings====
In early 2010, Exelon appointed a new PDMS Manager and PDMS Senior Specialist who have over 20 years of experience working at TMI. The inspectors determined that these individuals were cognizant of the TMI-2 process controls and license requirements.
In early 2010, Exelon appointed a new PDMS Manager and PDMS Senior Specialist who have over 20 years of experience working at TMI. The inspectors determined that these individuals were cognizant of the TMI-2 process controls and license requirements. With a change in personnel, the licensee continued to maintain important records and history of the plant needed to support future decommissioning of TMI-2.
 
Action Report No. 01100971, "TMI-2 FENOC and EXELON Employee Concerns Program (ECP) Enhancements" describes the licensee's continued commitment to safety culture. ECP personnel provided details about the licensee commitment to maintain a high level of awareness to safety. The Company Nuclear Review Board (CNRB) meeting minutes demonstrated that the CNRB was attentive to the ECP.


With a change in personnel, the licensee continued to maintain important records and history of the plant needed to support future decommissioning of TMI-2. Action Report No. 01100971, "TMI-2 FENOC and EXELON Employee Concerns Program (ECP) Enhancements" describes the licensee's continued commitment to safety culture. ECP personnel provided details about the licensee commitment to maintain a high level of awareness to safety. The Company Nuclear Review Board (CNRB) meeting minutes demonstrated that the CNRB was attentive to the ECP. Personnel from electrical, radiation protection, operations, radioactive waste, chemistry, security, maintenance, housekeeping, and quality assurance enter TMI-2 through the course of their normal work duties. Even though the facility is in a PDMS status, there are adequate resources available to ensure the licensee is meeting their licensing basis.
Personnel from electrical, radiation protection, operations, radioactive waste, chemistry, security, maintenance, housekeeping, and quality assurance enter TMI-2 through the course of their normal work duties. Even though the facility is in a PDMS status, there are adequate resources available to ensure the licensee is meeting their licensing basis.


====c. Conclusions====
====c. Conclusions====
The licensee has process controls, and an organization to effectively implement license requirements.
The licensee has process controls, and an organization to effectively implement license requirements. No findings of safety significance were identified.


No findings of safety significance were identified.
Inspection Report No. 05000320/2011008 G:\\WordDocs\\Current\\lnsp Report\\RDPR-73 2011 OOB.docx


1 Inspection Report No. 05000320/2011008 G:\WordDocs\Current\lnsp Report\RDPR-73 2011 OOB.docx 3.0 Safety Reviews, Design Changes, and Modifications
3.0 Safety Reviews, Design Changes, and Modifications


====a. Inspection Scope====
====a. Inspection Scope====
(lP 37801) The inspectors reviewed a random sample of PDMS procedures to verify the licensee implements a safety review program that effectively maintains decommissioning safety and the facility configuration as described in their licensing basis.
(lP 37801)
The inspectors reviewed a random sample of PDMS procedures to verify the licensee implements a safety review program that effectively maintains decommissioning safety and the facility configuration as described in their licensing basis.


====b. Observations and Findings====
====b. Observations and Findings====
The licensee updated their PDMS procedures to reflect current plant configuration and administrative processes, and to make some editorial changes. The typical categories of procedures that were changed were administrative, ventilation, electrical distribution, radioactive waste processing, fire protection, compressed air, and Technical Specification surveillance.
The licensee updated their PDMS procedures to reflect current plant configuration and administrative processes, and to make some editorial changes. The typical categories of procedures that were changed were administrative, ventilation, electrical distribution, radioactive waste processing, fire protection, compressed air, and Technical Specification surveillance. Due to the non-operating and defueled status of TMI-2 during PDMS, there are no structures, systems, or components (SSC) that are required to meet the safety-related criteria. Therefore, there are no SSC classified as safety-related at TMI-2. All procedure changes and facility modifications at TMI-2 are made using the Exelon 10 CFR 50.59 Review Process, which provides a screening process to determine if the change requires a written evaluation.
 
Due to the non-operating and defueled status of TMI-2 during PDMS, there are no structures, systems, or components (SSC) that are required to meet the safety-related criteria.
 
Therefore, there are no SSC classified as safety-related at TMI-2. All procedure changes and facility modifications at TMI-2 are made using the Exelon 10 CFR 50.59 Review Process, which provides a screening process to determine if the change requires a written evaluation.


====c. Conclusions====
====c. Conclusions====
Line 88: Line 93:


====a. Inspection Scope====
====a. Inspection Scope====
(lP 40801) The inspectors reviewed the licensee's program for identifying, resolving, and preventing issues that could impact safety or the quality of future decommissioning activities.
(lP 40801)
 
The inspectors reviewed the licensee's program for identifying, resolving, and preventing issues that could impact safety or the quality of future decommissioning activities. The inspectors reviewed the procedures describing the corrective action program and reviewed several issue reports (IRs), action reports (ARs), and the associated corrective actions. The inspectors discussed with cognizant personnel the tracking, current status, and closure of the selected IRs and ARs. The inspectors reviewed the August 2010 Nuclear Oversight (NOS) audit report and the April 2011 Fleet Oversight Audit Report (TMI-C-11-04-28).
The inspectors reviewed the procedures describing the corrective action program and reviewed several issue reports (IRs), action reports (ARs) , and the associated corrective actions. The inspectors discussed with cognizant personnel the tracking, current status, and closure of the selected IRs and ARs. The inspectors reviewed the August 2010 Nuclear Oversight (NOS) audit report and the April 2011 Fleet Oversight Audit Report (TMI-C-11-04-28).


====b. Observations and Findings====
====b. Observations and Findings====
The inspectors noted that there were approximately 178 ARs generated for TMI-2 and only 26 remained open at the time of the inspection.
The inspectors noted that there were approximately 178 ARs generated for TMI-2 and only 26 remained open at the time of the inspection. There were 61 ARs dealing with administrative issues, 17 that needed procedure changes, and 100 work orders generated. ARs were generated to address revision of plant procedures, effectiveness of fire brigades, lack of sample flow for the weekly tritium check, roof leaks, a radiation monitor out-of-service, and cork seam pump problems. The inspectors noted that there Inspection Report No. 05000320/2011008 G:\\WordDocs\\Current\\lnsp Report\\RDPR-73 2011 OOB.docx  
 
There were 61 ARs dealing with administrative issues, 17 that needed procedure changes, and 100 work orders generated.
 
ARs were generated to address revision of plant procedures, effectiveness of fire brigades, lack of sample flow for the weekly tritium check, roof leaks, a radiation monitor out-of-service, and cork seam pump problems.
 
The inspectors noted that there 2 Inspection Report No. 05000320/2011008 G:\WordDocs\Current\lnsp Report\RDPR-73 2011 OOB.docx has been a good questioning attitude among licensee staff and a desire for continuous improvement.


The Nuclear Oversight audit conducted last year (July 26 -August 13, 2010) was very detailed and comprehensive.
has been a good questioning attitude among licensee staff and a desire for continuous improvement.


The licensee also conducted a review of all of their internal procedures associated with TMI-2. The licensee reviewed procedures for radiation protection, emergency preparedness, security, maintenance, environmental, chemistry, and operations.
The Nuclear Oversight audit conducted last year (July 26 - August 13, 2010) was very detailed and comprehensive. The licensee also conducted a review of all of their internal procedures associated with TMI-2. The licensee reviewed procedures for radiation protection, emergency preparedness, security, maintenance, environmental, chemistry, and operations. Procedures were up-to-date and adequate for PDMS.


Procedures were up-to-date and adequate for PDMS. Another ongoing effort is an initiative by Emergency Preparedness to ensure that personnel working in TMI-2 will be able to hear personnel announcements in the event of an emergency.
Another ongoing effort is an initiative by Emergency Preparedness to ensure that personnel working in TMI-2 will be able to hear personnel announcements in the event of an emergency.


====c. Conclusions====
====c. Conclusions====
The licensee's self-assessment, auditing, and corrective action programs were effective at identifying, resolving, and preventing problems.
The licensee's self-assessment, auditing, and corrective action programs were effective at identifying, resolving, and preventing problems. ARs were properly prioritized and corrective actions were tracked in accordance with approved procedures. No findings of safety significance were identified.
 
ARs were properly prioritized and corrective actions were tracked in accordance with approved procedures.
 
No findings of safety significance were identified.


5.0 Decommissioning Performance and Status Review
5.0 Decommissioning Performance and Status Review


====a. Inspection Scope====
====a. Inspection Scope====
(IP 71801) The inspectors reviewed the licensee's current decommissioning status with respect to the TMI-2 PDMS QA Plan.
(IP 71801)
The inspectors reviewed the licensee's current decommissioning status with respect to the TMI-2 PDMS QA Plan.


====b. Observations and Findings====
====b. Observations and Findings====
The total special nuclear material inventory is less than 1,086 kilograms.
The total special nuclear material inventory is less than 1,086 kilograms. The three locations with the highest activities are: the reactor vessel with approximately 925 kilograms, the reactor coolant bleed tank room with 3.5 kilograms, and the "A" spent fuel pool with 3.8 kilograms of special nuclear material.
 
The three locations with the highest activities are: the reactor vessel with approximately 925 kilograms, the reactor coolant bleed tank room with 3.5 kilograms, and the "A" spent fuel pool with 3.8 kilograms of special nuclear material.
 
The licensee plans to actively decommission TMI-2 in parallel with the decommissioning of TMI-1 after that unit has been permanently shutdown.


Since TMI-1 's license was recently renewed for an additional 20 years of operation, the licensee is in discussions with the NRC staff to extend the expiration date of the TMI-2 NRC license. The TMI-2 license currently expires in 2014.
The licensee plans to actively decommission TMI-2 in parallel with the decommissioning of TMI-1 after that unit has been permanently shutdown. Since TMI-1 's license was recently renewed for an additional 20 years of operation, the licensee is in discussions with the NRC staff to extend the expiration date of the TMI-2 NRC license. The TMI-2 license currently expires in 2014.


====c. Conclusions====
====c. Conclusions====
There has been no dismantlement or decommissioning activities performed since the previous inspection.
There has been no dismantlement or decommissioning activities performed since the previous inspection. No findings of safety significance were identified.


No findings of safety significance were identified.
Inspection Report No. 05000320/2011008 G:\\WordDocs\\Current\\lnsp Report\\RDPR-73 2011 OOS.docx


3 Inspection Report No. 05000320/2011008 G:\WordDocs\Current\lnsp Report\RDPR-73 2011 OOS.docx 6.0 Maintenance and Surveillance at PSRs
6.0 Maintenance and Surveillance at PSRs


====a. Inspection Scope====
====a. Inspection Scope====
(lP 62801) The inspectors reviewed the licensee's preventive maintenance (PM) and surveillance test (ST) program for structures, systems, and components important for maintaining the safe storage of radioactive material and the implementation of primary containment isolation requirements, TS 3/4.1, Containment Systems. Specifically, the inspectors evaluated the licensee's implementation of the maintenance program associated with the containment isolation.
(lP 62801)
 
The inspectors reviewed the licensee's preventive maintenance (PM) and surveillance test (ST) program for structures, systems, and components important for maintaining the safe storage of radioactive material and the implementation of primary containment isolation requirements, TS 3/4.1, Containment Systems. Specifically, the inspectors evaluated the licensee's implementation of the maintenance program associated with the containment isolation. The inspectors toured the containment isolation system and the reactor building atmospheric breather system. The inspectors observed the licensee perform select STs associated with the cork seam and ventilation system. The inspectors reviewed selected STs, toured plant areas, and discussed aspects of the STs with individuals cognizant of the performance of the above systems and components.
The inspectors toured the containment isolation system and the reactor building atmospheric breather system. The inspectors observed the licensee perform select STs associated with the cork seam and ventilation system. The inspectors reviewed selected STs, toured plant areas, and discussed aspects of the STs with individuals cognizant of the performance of the above systems and components.


====b. Observations and Findings====
====b. Observations and Findings====
Line 145: Line 135:
During a tour of TMI-2, the inspectors observed new fire protection equipment (including acquisition of fire extinguishers and the installation of a fire resistance wire known as Protectowire thermal detection systems) throughout the plant and noted that housekeeping has eliminated combustibles.
During a tour of TMI-2, the inspectors observed new fire protection equipment (including acquisition of fire extinguishers and the installation of a fire resistance wire known as Protectowire thermal detection systems) throughout the plant and noted that housekeeping has eliminated combustibles.


Operations personnel demonstrated how they conduct their containment isolation surveillance.
Operations personnel demonstrated how they conduct their containment isolation surveillance. The inspectors verified the containment isolation valves were properly tagged and locked. There are approximately 200 containment isolation valves, 15 containment isolation flanges, three pipe caps, and two personnel hatches that make up the containment isolation system. Every five years on an annual staggered test basis, the licensee visually inspected the bolted or welded blind flanges which form a containment isolation boundary and the equipment hatch for signs of degradation and/or leakage. The licensee monitored the four open Reactor Breather isolation valves for releases.
 
The inspectors verified the containment isolation valves were properly tagged and locked. There are approximately 200 containment isolation valves, 15 containment isolation flanges, three pipe caps, and two personnel hatches that make up the containment isolation system. Every five years on an annual staggered test basis, the licensee visually inspected the bolted or welded blind flanges which form a containment isolation boundary and the equipment hatch for signs of degradation and/or leakage. The licensee monitored the four open Reactor Breather isolation valves for releases.


On two separate occasions during the inspection, Operations personnel demonstrated how they remove water from a cork seam and how they record the pressure difference for the filters associated with the Auxiliary and Fuel Handling*buildings exhaust heating and ventilation system. In each case, licensee personnel used the correct procedure, followed the procedure, documented their measurements, and successfully demonstrated their ability to perform the task correctly.
On two separate occasions during the inspection, Operations personnel demonstrated how they remove water from a cork seam and how they record the pressure difference for the filters associated with the Auxiliary and Fuel Handling*buildings exhaust heating and ventilation system. In each case, licensee personnel used the correct procedure, followed the procedure, documented their measurements, and successfully demonstrated their ability to perform the task correctly.


====c. Conclusions====
====c. Conclusions====
The licensee effectively implemented the preventive maintenance and surveillance program and associated procedures.
The licensee effectively implemented the preventive maintenance and surveillance program and associated procedures. No findings of safety significance were identified.


No findings of safety significance were identified.
Inspection Report No. 05000320/2011008 G:\\WordDocs\\Current\\lnsp Report\\RDPR-73 2011008.docx


4 Inspection Report No. 05000320/2011008 G:\WordDocs\Current\lnsp Report\RDPR-73 2011008.docx 7.0 Occupational Radiation Exposure
7.0 Occupational Radiation Exposure


====a. Inspection Scope====
====a. Inspection Scope====
(IP 83750) The inspectors evaluated the implementation of the occupational exposure control program associated with the TMI-2 PDMS activities.
(IP 83750)
 
The inspectors evaluated the implementation of the occupational exposure control program associated with the TMI-2 PDMS activities. The inspectors reviewed occupational exposure reports for calendar year 2010 and the most current data for 2011. The inspectors reviewed the key control process for locked high and very high radiation areas with Radiation Protection personnel. The inspection consisted of interviews with responsible individuals and observations of radiological postings and signs in radiologically controlled areas.
The inspectors reviewed occupational exposure reports for calendar year 2010 and the most current data for 2011. The inspectors reviewed the key control process for locked high and very high radiation areas with Radiation Protection personnel.
 
The inspection consisted of interviews with responsible individuals and observations of radiological postings and signs in radiologically controlled areas.


====b. Observations and Findings====
====b. Observations and Findings====
In calendar year 2010, the collective exposure was 364 mrem. As of June 30, 2011, the collective exposure was 267 mrem. The largest contribution was obtained in April, during the annual reactor building containment entry. In 2010, this entry accounted for 266 of the 364 mrem exposure.
In calendar year 2010, the collective exposure was 364 mrem. As of June 30, 2011, the collective exposure was 267 mrem. The largest contribution was obtained in April, during the annual reactor building containment entry. In 2010, this entry accounted for 266 of the 364 mrem exposure. In 2011, the collective exposure for this entry was 181 mrem. The licensee informed the inspectors that they are reconsidering an annual entry based on ALARA and that the data obtained from the previous entries has shown little change or degradation of the integrity of the reactor building.
 
In 2011, the collective exposure for this entry was 181 mrem. The licensee informed the inspectors that they are reconsidering an annual entry based on ALARA and that the data obtained from the previous entries has shown little change or degradation of the integrity of the reactor building.
 
On April 20, 2011, 15 individuals entered the reactor building containment, which is posted as Grave Danger Very High Radiation Area. The ALARA post-job review noted that they received 0.171 person-rem.
 
This was slightly more than the 0.149 person-rem estimated, but within the regulatory dose limits. The licensee showed the inspectors the photographs that were taken during the last reactor containment entry in April 2011, which clearly demonstrated the continued use of shielding and appropriate labeling of radiological control areas. The licensee used a check form to verify that all locked high and very high radiation areas keys were maintained and secured. The licensee maintained strict control of the Very High Radiation Area keys and the Locked High Radiation Area keys. Radiation Protection personnel informed the inspectors that they vigorously challenge the latching mechanism in order to ensure that the actual locked conditions exist. Radiation Protection personnel also verified that there were effective barriers in place to prevent unauthorized entry into these areas as well as proper postings.


The licensee is currently replacing their caution radiation postings with newly acquired postings.
On April 20, 2011, 15 individuals entered the reactor building containment, which is posted as Grave Danger Very High Radiation Area. The ALARA post-job review noted that they received 0.171 person-rem. This was slightly more than the 0.149 person-rem estimated, but within the regulatory dose limits. The licensee showed the inspectors the photographs that were taken during the last reactor containment entry in April 2011, which clearly demonstrated the continued use of shielding and appropriate labeling of radiological control areas.


This will be accomplished by September 2011.
The licensee used a check form to verify that all locked high and very high radiation areas keys were maintained and secured. The licensee maintained strict control of the Very High Radiation Area keys and the Locked High Radiation Area keys. Radiation Protection personnel informed the inspectors that they vigorously challenge the latching mechanism in order to ensure that the actual locked conditions exist. Radiation Protection personnel also verified that there were effective barriers in place to prevent unauthorized entry into these areas as well as proper postings. The licensee is currently replacing their caution radiation postings with newly acquired postings. This will be accomplished by September 2011.


====c. Conclusions====
====c. Conclusions====
The licensee effectively implemented the occupational exposure control program associated with the TMI-2 PDMS activities.
The licensee effectively implemented the occupational exposure control program associated with the TMI-2 PDMS activities. The licensee maintained occupational radiation exposures ALARA. No findings of safety significance were identified.


The licensee maintained occupational radiation exposures ALARA. No findings of safety significance were identified.
Inspection Report No. 05000320/2011008 G:\\WordDocs\\Current\\lnsp Report\\RDPR-73 2011 OOB.docx


5 Inspection Report No. 05000320/2011008 G:\WordDocs\Current\lnsp Report\RDPR-73 2011 OOB.docx 8.0 Effluent and Environmental Monitoring
8.0 Effluent and Environmental Monitoring


====a. Inspection Scope====
====a. Inspection Scope====
(lP 84750) The inspectors reviewed the radioactive effluent control program and the site radiological environmental monitoring program. The evaluation included a review of the annual radioactive effluent release report for 2010, the annual radiological environmental operating report for 2010, and the associated analytical results for each.
(lP 84750)
The inspectors reviewed the radioactive effluent control program and the site radiological environmental monitoring program. The evaluation included a review of the annual radioactive effluent release report for 2010, the annual radiological environmental operating report for 2010, and the associated analytical results for each.


====b. Observations and Findings====
====b. Observations and Findings====
The licensee analyzed liquid and gaseous effluent releases, as well as fish, sediment, and cow milk samples to compile their radiological environmental monitoring and operating reports. The Off-Site Dose Calculation Manual used to arrive at their conclusion was revised on December 14, 2010 as part of the licensee's initiative to maintain up-to-date procedures using the latest guidance available.
The licensee analyzed liquid and gaseous effluent releases, as well as fish, sediment, and cow milk samples to compile their radiological environmental monitoring and operating reports. The Off-Site Dose Calculation Manual used to arrive at their conclusion was revised on December 14, 2010 as part of the licensee's initiative to maintain up-to-date procedures using the latest guidance available. The licensee's annual effluent and environmental monitoring reports demonstrated that all calculated doses were well below regulatory dose criteria of 10 CFR 50, Appendix I.
 
The licensee's annual effluent and environmental monitoring reports demonstrated that all calculated doses were well below regulatory dose criteria of 10 CFR 50, Appendix I.


====c. Conclusions====
====c. Conclusions====
Line 197: Line 175:


===Exit Meeting Summary===
===Exit Meeting Summary===
On July 28, 2011, the inspectors presented the inspection results to Mr. Michael Casey, Responsible Engineer, FirstEnergy/GPU Nuclear and other members of your organization, and members of the Exelon management and staff. The inspectors confirmed that proprietary information was not removed from the site. 6 Inspection Report No. 05000320/2011008 G:\WordDocs\Current\lnsp Report\RDPR-73 2011 OOS.docx PARTIAL LIST OF PERSONS CONTACTED LICENSEE STATE NRC R. Libra M. Ford J. Francis Boyd M. Casey B. Carn J. Flora D. Knaby R. Freeman L. Weber D.Neff K. Oster D. Windle T. Haaf J. Grove M. Fitzwater E. Schmeichel T. Van Wynn T. Geyer K. Pedersen D. Dykman D. Werkheiser J. Buckley Plant Manager PDMS Manager PDMS Sr. Specialist FENOC engineer/Senior Consultant Radiation Protection Radiation Protection Radiation Protection Chemistry Environmental chemist Emergency Preparedness Operations Operations Operations Regulatory Assurance Regulatory Assurance NOS Lead /Acting Manager Training Employee Concerns Program Site Representative Employee Concerns Investigator with Exelon Corporate Commonwealth of Pennsylvania Senior Resident Inspector NRC HO, Project Manager for TMI-2  
On July 28, 2011, the inspectors presented the inspection results to Mr. Michael Casey, Responsible Engineer, FirstEnergy/GPU Nuclear and other members of your organization, and members of the Exelon management and staff. The inspectors confirmed that proprietary information was not removed from the site.
 
Inspection Report No. 05000320/2011008 G:\\WordDocs\\Current\\lnsp Report\\RDPR-73 2011 OOS.docx  
 
PARTIAL LIST OF PERSONS CONTACTED LICENSEE STATE NRC R. Libra M. Ford J. Francis Boyd M. Casey B. Carn J. Flora D. Knaby R. Freeman L. Weber D.Neff K. Oster D. Windle T. Haaf J. Grove M. Fitzwater E. Schmeichel T. Van Wynn T. Geyer K. Pedersen D. Dykman D. Werkheiser J. Buckley Plant Manager PDMS Manager PDMS Sr. Specialist FENOC engineer/Senior Consultant Radiation Protection Radiation Protection Radiation Protection Chemistry Environmental chemist Emergency Preparedness Operations Operations Operations Regulatory Assurance Regulatory Assurance NOS Lead /Acting Manager Training Employee Concerns Program Site Representative Employee Concerns Investigator with Exelon Corporate Commonwealth of Pennsylvania Senior Resident Inspector NRC HO, Project Manager for TMI-2  


=SUPPLEMENTAL
=SUPPLEMENTAL INFORMATION=
INFORMATION=


None. INSPECTION
None.
PROCEDURES
INSPECTION PROCEDURES USED
USED 36801 Organization, Management, and Cost Controls at Permanently
36801 Organization, Management, and Cost Controls at Permanently Shutdown Reactors
Shutdown Reactors 37801 Safety Reviews, Design Changes, and Modifications
37801 Safety Reviews, Design Changes, and Modifications at PSRs
at PSRs 40801 Self Assessment
40801 Self Assessment and Corrective Action at PSRs
and Corrective
2801 Maintenance and Surveillance at PSRs
Action at PSRs 62801 Maintenance
71801 Decommissioning Performance and Status Reviews at PSRs
and Surveillance
83750 Occupational Radiation Exposure
at PSRs 71801 Decommissioning
84750 Radioactive Waste Treatment and Effluent and Environmental Monitoring
Performance
Inspection Report No. 05000320/2011008
and Status Reviews at PSRs 83750 Occupational
G:\\WordDocs\\Current\\lnsp Report\\RDPR-73 2011 OOB.docx
Radiation
Exposure 84750 Radioactive
Waste Treatment
and Effluent and Environmental
Monitoring
Inspection
Report No. 05000320/2011008
G:\WordDocs\Current\lnsp
Report\RDPR-73
2011 OOB.docx
ITEMS OPEN. CLOSED. AND DISCUSSED
ITEMS OPEN. CLOSED. AND DISCUSSED
Opened, Closed and Discussed  
Opened, Closed and Discussed - None.
-None. LIST OF DOCUMENTS
LIST OF DOCUMENTS REVIEWED
REVIEWED Electric Insurance
Electric Insurance Limited Property Loss Control Comprehensive Evaluation Report April 2011
Limited Property Loss Control Comprehensive
TMI Unit 2 collective exposure for 2010 and 2011
Evaluation
ALARA Post-Job Review for Unit -2 Reactor Bldg Annual PDMS Survey and Unit-2
Report April 2011 TMI Unit 2 collective
Management Inspection dated April 26, 2011
exposure for 2010 and 2011 ALARA Post-Job Review for Unit -2 Reactor Bldg Annual PDMS Survey and Unit-2 Management
Biennial 10 CFR 50.59 and PDMS SAR Report dated February 15, 2010
Inspection
Technical Specifications for PDMS - Amendment 63 for License 50-320 issued May 1,2009
dated April 26, 2011 Biennial 10 CFR 50.59 and PDMS SAR Report dated February 15, 2010 Technical
Locked High Radiation Area Control Check Form dated December 19, 2009
Specifications
Fleet Oversight Audit Report: TMI-C-11-04-28 dated April 2011
for PDMS -Amendment
Releasing Radioactive Gaseous Effluents - TMI-2 Reactor Building - Radiological Controls
for License 50-320 issued May 1,2009 Locked High Radiation
Procedure 661 0-ADM-4250.14 Revision 5 effective dated April 14, 2010
Area Control Check Form dated December 19, 2009 Fleet Oversight
Combined 2010 Annual Radioactive Effluent Release Report dated April 27, 2010
Audit Report: TMI-C-11-04-28
Various surveillance tests from April 22, 2010 - July 27, 2011 such as:
dated April 2011 Releasing
RMS Calibrations - Surveillance Test Procedure No. 2303-4.15E dated: 7/23/10,8/3/10,
Radioactive
9/2/10,1/15/11,3/10111,5/11/11, and 6/4111
Gaseous Effluents  
Actual surveillance test conducted on 5/11/2011 for Flow Alarm Check of TMI-2
-TMI-2 Reactor Building -Radiological
Atmospheric RMS monitors procedure 2303-4.15E revision 5, dated 11/11/10
Controls Procedure
Actual surveillance test conducted on 614/11 for PDMS RMS (Victoreen) Functional test
661 0-ADM-4250.14
procedure no. 2303-4.15A Revision 12, dated 10105/10
Revision 5 effective
Actual surveillance test conducted on 3/10/11 for Flow and Vacuum Calibrations for TMI
dated April 14, 2010 Combined 2010 Annual Radioactive
Atmospheric Effluent Radiation Monitors Procedure No. 1302-3.40, Revision 4
Effluent Release Report dated April 27, 2010 Various surveillance
Actual surveillance test conducted on 7/23/10, 8/3/10, 9/2/10 and 1/15/11 for Calibration
tests from April 22, 2010 -July 27, 2011 such as: RMS Calibrations  
of TMI-2 RMS Particulate Channels Procedure No. MA-2TM-2662-201 Revision 0
-Surveillance
Actual surveillance test conducted on 6/2/10 for Reactor Building Purge Exhaust Filter
Test Procedure
InspectlDOP test; Surveillance test procedure No. 2303-11.14 Revision 5, dated
No. 2303-4.15E
11/01/02
dated: 7/23/10,8/3/10, 9/2/10,1/15/11,3/10111,5/11/11, and 6/4111 Actual surveillance
Test conducted on 5/18/2010 and 4/18/11 for Reactor Building Breather Filter Analysis
test conducted
Inspection Report No. 05000320/2011008
on 5/11/2011
G:\\WordDocs\\Current\\lnsp Report\\RDPR-73 2011 OOB.docx
for Flow Alarm Check of TMI-2 Atmospheric
Surveillance test Procedure No. 2301-4.70, Revision 8, dated 3/27/09
RMS monitors procedure
Test conducted on 4/20/11 for Reactor Building Survey Surveillance test procedure No.
2303-4.15E
2301-4.3 Revision 5
revision 5, dated 11/11/10 Actual surveillance
Test conducted on 4/19/11 for reactor Building Purge Exhaust Filter Operations Check
test conducted
procedure no. 2303-5.10 Revision 6, dated 9/24/02
on 614/11 for PDMS RMS (Victoreen)
Tests conducted 6/7110, 1216/10, and 6113/11 for Aux bldg Ventilation Air Cleanup
Functional
Operational Check procedure no. OP-2TM-2829-201 Revision 0
test procedure
Test conducted 6/13/11 for Fuel Handling Bldg Air Cleanup Operational Check
no. 2303-4.15A
procedure no. 2303-5.9 Revision 10
Revision 12, dated 10105/10 Actual surveillance
Test conducted on 4/30/11 for Operability Check of the TMI-2 Equipment Hatch
test conducted
Personnel Airlock Doors, procedure No. 2303-11.20A Revision 5 dated 10/13/08
on 3/10/11 for Flow and Vacuum Calibrations
Test conducted on 4/30/11 for Operability Check of the TMI-2 Ante Room Personnel
for TMI Atmospheric
Airlock Doors, procedure No. 2303-11.20B Revision 5 dated 10/13/08
Effluent Radiation
Test conducted on 7/10/10 for Ventilation Filter DOP & Halide Testing, Procedure
Monitors Procedure
No. U-36 Revision 14A
No. 1302-3.40, Revision 4 Actual surveillance
Test conducted on 7/10/10 for TMI-2 Soiled Exhaust Filter Train Efficiency Test,
test conducted
procedure No. 2303-11.57, Revision 0 dated 9/19/02
on 7/23/10, 8/3/10, 9/2/10 and 1/15/11 for Calibration
Tests conducted on 6/14/10 and 6/13/11 for TMI-2 Soiled Exhaust Filter Train
of TMI-2 RMS Particulate
Operational Check, procedure No. 2303-5.11, Revision 0 dated 9/12/02
Channels Procedure
Test conducted on 1/18/11 for TMI-2 Auxiliary and Fuel Handling Building POMS
No. MA-2TM-2662-201
Radiological Surveys, procedure No. 2301-4.2, Revision 8, dated 5/12/04
Revision 0 Actual surveillance
Test conducted on 7/21/10 for POMS - Remote Area Inspection Procedure
test conducted
No. 20PS-S020, Revision 2, dated 7/27/04
on 6/2/10 for Reactor Building Purge Exhaust Filter InspectlDOP
POMS TMI-2 Daily Checks Procedure No. 2301-1 Revision 21 dated 1/15/11,2/14/11,
test; Surveillance
3/15/11, 4/15/11, 6/15/11, and 7/13/11
test procedure
TMI-2 vent sampling weekly and monthly composite reports dated 12/31/10, 2112111,
No. 2303-11.14
5/14/11, and 7/9111 TMI-2 Vent Sampling Procedure No. 2301-4.7 Revision 18, dated
Revision 5, dated 11/01/02 Test conducted
10/11/06
on 5/18/2010
Tests conducted on 7/21/10,10113/10,1/19/11, and 4/20/11 for Verification ofTMI-2
and 4/18/11 for Reactor Building Breather Filter Analysis 8 Inspection
Containment Isolation, procedure No. OP-2TM-2244-201, Revision 0
Report No. 05000320/2011008
Issue Report Nos. 01088266 and 01088266
G:\WordDocs\Current\lnsp
Inspection Report No. 05000320/2011008
Report\RDPR-73
G:\\WordDocs\\Current\\lnsp Report\\RDPR-73 2011 OOB.docx
2011 OOB.docx
Action Reports Nos.
Surveillance
AR 01062052
test Procedure
AR 01121145
No. 2301-4.70, Revision 8, dated 3/27/09 Test conducted
AR 01111195
on 4/20/11 for Reactor Building Survey Surveillance
AR 01100971
test procedure
AR 01101025
No. 2301-4.3 Revision 5 Test conducted
AR 01177620
on 4/19/11 for reactor Building Purge Exhaust Filter Operations
AR 01101009
Check procedure
AR 01080691
no. 2303-5.10
AR 01210935
Revision 6, dated 9/24/02 Tests conducted
AR 01101015
6/7110, 1216/10, and 6113/11 for Aux bldg Ventilation
AR 01092576
Air Cleanup Operational
AR 01244013
Check procedure
LIST OF ACRONYMS USED
no. OP-2TM-2829-201
ALARA
Revision 0 Test conducted
AR
6/13/11 for Fuel Handling Bldg Air Cleanup Operational
CNRB
Check procedure
DOP
no. 2303-5.9 Revision 10 Test conducted
ECP
on 4/30/11 for Operability
FENOC
Check of the TMI-2 Equipment
GPUN
Hatch Personnel
IMC
Airlock Doors, procedure
IP
No. 2303-11.20A
IR
Revision 5 dated 10/13/08 Test conducted
NOS
on 4/30/11 for Operability
NRC
Check of the TMI-2 Ante Room Personnel
NRCHQ
Airlock Doors, procedure
PDMS
No. 2303-11.20B
PDMS Plan
Revision 5 dated 10/13/08 Test conducted
PM
on 7/10/10 for Ventilation
PSR
Filter DOP & Halide Testing, Procedure
QA
No. U-36 Revision 14A Test conducted
RMS
on 7/10/10 for TMI-2 Soiled Exhaust Filter Train Efficiency
SAR
Test, procedure
SSC
No. 2303-11.57, Revision 0 dated 9/19/02 Tests conducted
ST
on 6/14/10 and 6/13/11 for TMI-2 Soiled Exhaust Filter Train Operational
TMI
Check, procedure
TMI-1
No. 2303-5.11, Revision 0 dated 9/12/02 Test conducted
TMI-2
on 1/18/11 for TMI-2 Auxiliary
TS
and Fuel Handling Building POMS Radiological
as low as reasonably achievable
Surveys, procedure
action report
No. 2301-4.2, Revision 8, dated 5/12/04 Test conducted
Company Nuclear Review Board
on 7/21/10 for POMS -Remote Area Inspection
dioctyl phthalate
Procedure
employee concerns program
No. 20PS-S020, Revision 2, dated 7/27/04 POMS TMI-2 Daily Checks Procedure
FirstEnergy Nuclear Operating Company
No. 2301-1 Revision 21 dated 1/15/11,2/14/11, 3/15/11, 4/15/11, 6/15/11, and 7/13/11 TMI-2 vent sampling weekly and monthly composite
GPU Nuclear, Inc.
reports dated 12/31/10, 2112111, 5/14/11, and 7/9111 TMI-2 Vent Sampling Procedure
Inspection Manual Chapter
No. 2301-4.7 Revision 18, dated 10/11/06 Tests conducted
Inspection Procedure
on 7/21/10,10113/10,1/19/11, and 4/20/11 for Verification
issue report
ofTMI-2 Containment
Nuclear Oversight
Isolation, procedure
Nuclear Regulatory Commission
No. OP-2TM-2244-201, Revision 0 Issue Report Nos. 01088266 and 01088266 9 Inspection
Nuclear Regulatory Commission headquarters
Report No. 05000320/2011008
Post-Defueling Monitored Storage
G:\WordDocs\Current\lnsp
PDMS Quality Assurance (QA) Plan
Report\RDPR-73
preventive maintenance
2011 OOB.docx
Permanently Shutdown Reactor
Action Reports Nos. AR 01062052 AR 01121145 AR 01111195 AR 01100971 AR 01101025 AR 01177620 AR 01101009 AR 01080691 AR 01210935 AR 01101015 AR 01092576 AR 01244013 LIST OF ACRONYMS USED ALARA AR CNRB DOP ECP FENOC GPUN IMC IP
quality assurance
IR NOS NRC NRCHQ PDMS PDMS Plan PM PSR QA RMS SAR SSC ST TMI
TMI-1 TMI-2 TS as low as reasonably
achievable
action report Company Nuclear Review Board dioctyl phthalate
employee concerns program FirstEnergy
Nuclear Operating
Company GPU Nuclear, Inc. Inspection
Manual Chapter Inspection
Procedure
issue report Nuclear Oversight
Nuclear Regulatory
Commission
Nuclear Regulatory
Commission
headquarters
Post-Defueling
Monitored
Storage PDMS Quality Assurance (QA) Plan preventive
maintenance
Permanently
Shutdown Reactor quality assurance
radiation monitoring system
radiation monitoring system
Safety Analysis Report structures, systems, or components
Safety Analysis Report
surveillance
structures, systems, or components
test Three Mile Island Station Three Mile Island Station, Unit 1 Three Mile Island Station, Unit 2 technical
surveillance test
specification
Three Mile Island Station
Inspection
Three Mile Island Station, Unit 1
Report No. 05000320/2011008
Three Mile Island Station, Unit 2
G:\WordDocs\Current\lnsp
technical specification
Report\RDPR-73
Inspection Report No. 05000320/2011008
2011 OOB.docx
G:\\WordDocs\\Current\\lnsp Report\\RDPR-73 2011 OOB.docx
}}
}}

Latest revision as of 02:23, 13 January 2025

IR 05000320-11-008, on 07/28/11, Gpu Nuclear, Inc., Three Mile Island Station, Unit 2, Middletown, PA
ML112370120
Person / Time
Site: Crane Constellation icon.png
Issue date: 08/25/2011
From:
Division of Nuclear Materials Safety I
To:
References
IR-11-008
Download: ML112370120 (12)


Text

Inspection N Docket N License N Licensee:

Address:

U.S. NUCLEAR REGULATORY COMMISSION

REGION I

INSPECTION REPORT 05000320/2011008 05000320 DPR-73 GPU Nuclear, In White Pond Drive Akron, OH 44320 Locations Inspected:

Three Mile Island Station, Unit 2 Middletown, PA 17057-0791 Inspection Dates:

Inspectors:

Approved By:

July 25-28, 2011 Laurie A. Kauffman Health Physicist Decommissioning Branch Division of Nuclear Materials Safety Kathy Modes Senior Health Physicist Decommissioning Branch Division of Nuclear Materials Safety Judith A. Joustra, Chief Decommissioning Branch Division of Nuclear Materials Safety Document Name: G:\\WordDocs\\Current\\lnsp Report\\RDPR-73 2011 OOB.docx

EXECUTIVE SUMMARY

GPU Nuclear, Inc.

NRC Inspection Report No. 05000320/2011008 A routine announced safety inspection was conducted on July 25-28, 2011, at the Three Mile Island Station, Unit 2 (TMI-2) by two Region I inspectors. The NRC's program for overseeing the safe operation of a shut-down nuclear power reactor is described in Inspection Manual Chapter (IMC) 2561, "Decommissioning Power Reactor Inspection Program." The inspection included a review of operations and management oversight, maintenance, corrective action program implementation, and plant support activities while in Post Defueling Monitored Storage (PDMS) status. Within the scope of this inspection, no safety concerns or violations were identified. The conclusions from each inspection area are presented below.

Organization, Management & Cost Control The licensee has process controls, and an organization to effectively implement license requirements.

Safety Reviews, Design Changes, and Modifications The licensee implemented a safety review program to maintain decommissioning safety and the facility configuration as described in their licensing basis.

Self-Assessment, Auditing, and Corrective Action Programs The licensee's self-assessment, auditing, and corrective action programs were effective at identifying, resolving, and preventing problems. Action reports were properly prioritized and corrective actions were tracked in accordance with approved procedures.

Decommissioning Performance and Status Reviews at Permanently Shutdown Reactors (PSRs)

There has been no dismantlement or decommissioning activities performed since the previous inspection.

Maintenance and Surveillance The licensee effectively implemented the preventive maintenance and surveillance program and associated procedures.

Occupational Radiation Exposure The licensee effectively implemented the occupational exposure control program associated with the TMI-2 PDMS activities. The licensee maintained occupational radiation exposures as low as reasonably achievable (ALARA).

Effluent and Environmental Monitoring The licensee effectively implemented and maintained the radioactive effluent controls program and the radiological environmental monitoring program.

ii Inspection Report No. 05000320/2011008 G:\\WordDocs\\Current\\lnsp Report\\RDPR-73 2011 OOS.docx

REPORT DETAILS

1.0

. Background Information In December 1993, TMI-2 received a license from the NRC to enter Post Defueling Monitored Storage (PDMS). TMI-2 today is in long-term monitored storage. No further use of the nuclear part of the plant is anticipated. Ventilation and rainwater systems continue to be monitored.

Equipment necessary to keep the plant in safe long-term storage continued to be maintained.

The licensee plans to actively decommission TMI-2 in parallel with the decommissioning of the Three Mile Island, Unit 1 (TMI-1) after unit has been permanently shutdown.

2.0 Organization, Management & Cost Controls

a. Inspection Scope

(Inspection Procedures (lP) 36801)

The inspectors evaluated any recent organization, management and staffing changes with respect to the PDMS Quality Assurance (QA) program outlined in the PDMS QA Plan. The inspectors reviewed Action Reports, interviewed Employee Concerns Program personnel, and reviewed Company Nuclear Review Board meeting minutes.

b. Observations and Findings

In early 2010, Exelon appointed a new PDMS Manager and PDMS Senior Specialist who have over 20 years of experience working at TMI. The inspectors determined that these individuals were cognizant of the TMI-2 process controls and license requirements. With a change in personnel, the licensee continued to maintain important records and history of the plant needed to support future decommissioning of TMI-2.

Action Report No. 01100971, "TMI-2 FENOC and EXELON Employee Concerns Program (ECP) Enhancements" describes the licensee's continued commitment to safety culture. ECP personnel provided details about the licensee commitment to maintain a high level of awareness to safety. The Company Nuclear Review Board (CNRB) meeting minutes demonstrated that the CNRB was attentive to the ECP.

Personnel from electrical, radiation protection, operations, radioactive waste, chemistry, security, maintenance, housekeeping, and quality assurance enter TMI-2 through the course of their normal work duties. Even though the facility is in a PDMS status, there are adequate resources available to ensure the licensee is meeting their licensing basis.

c. Conclusions

The licensee has process controls, and an organization to effectively implement license requirements. No findings of safety significance were identified.

Inspection Report No. 05000320/2011008 G:\\WordDocs\\Current\\lnsp Report\\RDPR-73 2011 OOB.docx

3.0 Safety Reviews, Design Changes, and Modifications

a. Inspection Scope

(lP 37801)

The inspectors reviewed a random sample of PDMS procedures to verify the licensee implements a safety review program that effectively maintains decommissioning safety and the facility configuration as described in their licensing basis.

b. Observations and Findings

The licensee updated their PDMS procedures to reflect current plant configuration and administrative processes, and to make some editorial changes. The typical categories of procedures that were changed were administrative, ventilation, electrical distribution, radioactive waste processing, fire protection, compressed air, and Technical Specification surveillance. Due to the non-operating and defueled status of TMI-2 during PDMS, there are no structures, systems, or components (SSC) that are required to meet the safety-related criteria. Therefore, there are no SSC classified as safety-related at TMI-2. All procedure changes and facility modifications at TMI-2 are made using the Exelon 10 CFR 50.59 Review Process, which provides a screening process to determine if the change requires a written evaluation.

c. Conclusions

The licensee implemented a safety review program to maintain decommissioning safety and the facility configuration as described in their licensing basis. No findings of safety significance were identified.

4.0 Self-Assessment, Auditing, and Corrective Action

a. Inspection Scope

(lP 40801)

The inspectors reviewed the licensee's program for identifying, resolving, and preventing issues that could impact safety or the quality of future decommissioning activities. The inspectors reviewed the procedures describing the corrective action program and reviewed several issue reports (IRs), action reports (ARs), and the associated corrective actions. The inspectors discussed with cognizant personnel the tracking, current status, and closure of the selected IRs and ARs. The inspectors reviewed the August 2010 Nuclear Oversight (NOS) audit report and the April 2011 Fleet Oversight Audit Report (TMI-C-11-04-28).

b. Observations and Findings

The inspectors noted that there were approximately 178 ARs generated for TMI-2 and only 26 remained open at the time of the inspection. There were 61 ARs dealing with administrative issues, 17 that needed procedure changes, and 100 work orders generated. ARs were generated to address revision of plant procedures, effectiveness of fire brigades, lack of sample flow for the weekly tritium check, roof leaks, a radiation monitor out-of-service, and cork seam pump problems. The inspectors noted that there Inspection Report No. 05000320/2011008 G:\\WordDocs\\Current\\lnsp Report\\RDPR-73 2011 OOB.docx

has been a good questioning attitude among licensee staff and a desire for continuous improvement.

The Nuclear Oversight audit conducted last year (July 26 - August 13, 2010) was very detailed and comprehensive. The licensee also conducted a review of all of their internal procedures associated with TMI-2. The licensee reviewed procedures for radiation protection, emergency preparedness, security, maintenance, environmental, chemistry, and operations. Procedures were up-to-date and adequate for PDMS.

Another ongoing effort is an initiative by Emergency Preparedness to ensure that personnel working in TMI-2 will be able to hear personnel announcements in the event of an emergency.

c. Conclusions

The licensee's self-assessment, auditing, and corrective action programs were effective at identifying, resolving, and preventing problems. ARs were properly prioritized and corrective actions were tracked in accordance with approved procedures. No findings of safety significance were identified.

5.0 Decommissioning Performance and Status Review

a. Inspection Scope

(IP 71801)

The inspectors reviewed the licensee's current decommissioning status with respect to the TMI-2 PDMS QA Plan.

b. Observations and Findings

The total special nuclear material inventory is less than 1,086 kilograms. The three locations with the highest activities are: the reactor vessel with approximately 925 kilograms, the reactor coolant bleed tank room with 3.5 kilograms, and the "A" spent fuel pool with 3.8 kilograms of special nuclear material.

The licensee plans to actively decommission TMI-2 in parallel with the decommissioning of TMI-1 after that unit has been permanently shutdown. Since TMI-1 's license was recently renewed for an additional 20 years of operation, the licensee is in discussions with the NRC staff to extend the expiration date of the TMI-2 NRC license. The TMI-2 license currently expires in 2014.

c. Conclusions

There has been no dismantlement or decommissioning activities performed since the previous inspection. No findings of safety significance were identified.

Inspection Report No. 05000320/2011008 G:\\WordDocs\\Current\\lnsp Report\\RDPR-73 2011 OOS.docx

6.0 Maintenance and Surveillance at PSRs

a. Inspection Scope

(lP 62801)

The inspectors reviewed the licensee's preventive maintenance (PM) and surveillance test (ST) program for structures, systems, and components important for maintaining the safe storage of radioactive material and the implementation of primary containment isolation requirements, TS 3/4.1, Containment Systems. Specifically, the inspectors evaluated the licensee's implementation of the maintenance program associated with the containment isolation. The inspectors toured the containment isolation system and the reactor building atmospheric breather system. The inspectors observed the licensee perform select STs associated with the cork seam and ventilation system. The inspectors reviewed selected STs, toured plant areas, and discussed aspects of the STs with individuals cognizant of the performance of the above systems and components.

b. Observations and Findings

The inspectors determined that the licensee increased their attention to fire protection.

During a tour of TMI-2, the inspectors observed new fire protection equipment (including acquisition of fire extinguishers and the installation of a fire resistance wire known as Protectowire thermal detection systems) throughout the plant and noted that housekeeping has eliminated combustibles.

Operations personnel demonstrated how they conduct their containment isolation surveillance. The inspectors verified the containment isolation valves were properly tagged and locked. There are approximately 200 containment isolation valves, 15 containment isolation flanges, three pipe caps, and two personnel hatches that make up the containment isolation system. Every five years on an annual staggered test basis, the licensee visually inspected the bolted or welded blind flanges which form a containment isolation boundary and the equipment hatch for signs of degradation and/or leakage. The licensee monitored the four open Reactor Breather isolation valves for releases.

On two separate occasions during the inspection, Operations personnel demonstrated how they remove water from a cork seam and how they record the pressure difference for the filters associated with the Auxiliary and Fuel Handling*buildings exhaust heating and ventilation system. In each case, licensee personnel used the correct procedure, followed the procedure, documented their measurements, and successfully demonstrated their ability to perform the task correctly.

c. Conclusions

The licensee effectively implemented the preventive maintenance and surveillance program and associated procedures. No findings of safety significance were identified.

Inspection Report No. 05000320/2011008 G:\\WordDocs\\Current\\lnsp Report\\RDPR-73 2011008.docx

7.0 Occupational Radiation Exposure

a. Inspection Scope

(IP 83750)

The inspectors evaluated the implementation of the occupational exposure control program associated with the TMI-2 PDMS activities. The inspectors reviewed occupational exposure reports for calendar year 2010 and the most current data for 2011. The inspectors reviewed the key control process for locked high and very high radiation areas with Radiation Protection personnel. The inspection consisted of interviews with responsible individuals and observations of radiological postings and signs in radiologically controlled areas.

b. Observations and Findings

In calendar year 2010, the collective exposure was 364 mrem. As of June 30, 2011, the collective exposure was 267 mrem. The largest contribution was obtained in April, during the annual reactor building containment entry. In 2010, this entry accounted for 266 of the 364 mrem exposure. In 2011, the collective exposure for this entry was 181 mrem. The licensee informed the inspectors that they are reconsidering an annual entry based on ALARA and that the data obtained from the previous entries has shown little change or degradation of the integrity of the reactor building.

On April 20, 2011, 15 individuals entered the reactor building containment, which is posted as Grave Danger Very High Radiation Area. The ALARA post-job review noted that they received 0.171 person-rem. This was slightly more than the 0.149 person-rem estimated, but within the regulatory dose limits. The licensee showed the inspectors the photographs that were taken during the last reactor containment entry in April 2011, which clearly demonstrated the continued use of shielding and appropriate labeling of radiological control areas.

The licensee used a check form to verify that all locked high and very high radiation areas keys were maintained and secured. The licensee maintained strict control of the Very High Radiation Area keys and the Locked High Radiation Area keys. Radiation Protection personnel informed the inspectors that they vigorously challenge the latching mechanism in order to ensure that the actual locked conditions exist. Radiation Protection personnel also verified that there were effective barriers in place to prevent unauthorized entry into these areas as well as proper postings. The licensee is currently replacing their caution radiation postings with newly acquired postings. This will be accomplished by September 2011.

c. Conclusions

The licensee effectively implemented the occupational exposure control program associated with the TMI-2 PDMS activities. The licensee maintained occupational radiation exposures ALARA. No findings of safety significance were identified.

Inspection Report No. 05000320/2011008 G:\\WordDocs\\Current\\lnsp Report\\RDPR-73 2011 OOB.docx

8.0 Effluent and Environmental Monitoring

a. Inspection Scope

(lP 84750)

The inspectors reviewed the radioactive effluent control program and the site radiological environmental monitoring program. The evaluation included a review of the annual radioactive effluent release report for 2010, the annual radiological environmental operating report for 2010, and the associated analytical results for each.

b. Observations and Findings

The licensee analyzed liquid and gaseous effluent releases, as well as fish, sediment, and cow milk samples to compile their radiological environmental monitoring and operating reports. The Off-Site Dose Calculation Manual used to arrive at their conclusion was revised on December 14, 2010 as part of the licensee's initiative to maintain up-to-date procedures using the latest guidance available. The licensee's annual effluent and environmental monitoring reports demonstrated that all calculated doses were well below regulatory dose criteria of 10 CFR 50, Appendix I.

c. Conclusions

The licensee effectively implemented and maintained the radioactive effluent controls program and the radiological environmental monitoring program. No findings of safety significance were identified.

Exit Meeting Summary

On July 28, 2011, the inspectors presented the inspection results to Mr. Michael Casey, Responsible Engineer, FirstEnergy/GPU Nuclear and other members of your organization, and members of the Exelon management and staff. The inspectors confirmed that proprietary information was not removed from the site.

Inspection Report No. 05000320/2011008 G:\\WordDocs\\Current\\lnsp Report\\RDPR-73 2011 OOS.docx

PARTIAL LIST OF PERSONS CONTACTED LICENSEE STATE NRC R. Libra M. Ford J. Francis Boyd M. Casey B. Carn J. Flora D. Knaby R. Freeman L. Weber D.Neff K. Oster D. Windle T. Haaf J. Grove M. Fitzwater E. Schmeichel T. Van Wynn T. Geyer K. Pedersen D. Dykman D. Werkheiser J. Buckley Plant Manager PDMS Manager PDMS Sr. Specialist FENOC engineer/Senior Consultant Radiation Protection Radiation Protection Radiation Protection Chemistry Environmental chemist Emergency Preparedness Operations Operations Operations Regulatory Assurance Regulatory Assurance NOS Lead /Acting Manager Training Employee Concerns Program Site Representative Employee Concerns Investigator with Exelon Corporate Commonwealth of Pennsylvania Senior Resident Inspector NRC HO, Project Manager for TMI-2

SUPPLEMENTAL INFORMATION

None.

INSPECTION PROCEDURES USED

36801 Organization, Management, and Cost Controls at Permanently Shutdown Reactors

37801 Safety Reviews, Design Changes, and Modifications at PSRs

40801 Self Assessment and Corrective Action at PSRs

2801 Maintenance and Surveillance at PSRs

71801 Decommissioning Performance and Status Reviews at PSRs

83750 Occupational Radiation Exposure

84750 Radioactive Waste Treatment and Effluent and Environmental Monitoring

Inspection Report No. 05000320/2011008

G:\\WordDocs\\Current\\lnsp Report\\RDPR-73 2011 OOB.docx

ITEMS OPEN. CLOSED. AND DISCUSSED

Opened, Closed and Discussed - None.

LIST OF DOCUMENTS REVIEWED

Electric Insurance Limited Property Loss Control Comprehensive Evaluation Report April 2011

TMI Unit 2 collective exposure for 2010 and 2011

ALARA Post-Job Review for Unit -2 Reactor Bldg Annual PDMS Survey and Unit-2

Management Inspection dated April 26, 2011

Biennial 10 CFR 50.59 and PDMS SAR Report dated February 15, 2010

Technical Specifications for PDMS - Amendment 63 for License 50-320 issued May 1,2009

Locked High Radiation Area Control Check Form dated December 19, 2009

Fleet Oversight Audit Report: TMI-C-11-04-28 dated April 2011

Releasing Radioactive Gaseous Effluents - TMI-2 Reactor Building - Radiological Controls

Procedure 661 0-ADM-4250.14 Revision 5 effective dated April 14, 2010

Combined 2010 Annual Radioactive Effluent Release Report dated April 27, 2010

Various surveillance tests from April 22, 2010 - July 27, 2011 such as:

RMS Calibrations - Surveillance Test Procedure No. 2303-4.15E dated: 7/23/10,8/3/10,

9/2/10,1/15/11,3/10111,5/11/11, and 6/4111

Actual surveillance test conducted on 5/11/2011 for Flow Alarm Check of TMI-2

Atmospheric RMS monitors procedure 2303-4.15E revision 5, dated 11/11/10

Actual surveillance test conducted on 614/11 for PDMS RMS (Victoreen) Functional test

procedure no. 2303-4.15A Revision 12, dated 10105/10

Actual surveillance test conducted on 3/10/11 for Flow and Vacuum Calibrations for TMI

Atmospheric Effluent Radiation Monitors Procedure No. 1302-3.40, Revision 4

Actual surveillance test conducted on 7/23/10, 8/3/10, 9/2/10 and 1/15/11 for Calibration

of TMI-2 RMS Particulate Channels Procedure No. MA-2TM-2662-201 Revision 0

Actual surveillance test conducted on 6/2/10 for Reactor Building Purge Exhaust Filter

InspectlDOP test; Surveillance test procedure No. 2303-11.14 Revision 5, dated

11/01/02

Test conducted on 5/18/2010 and 4/18/11 for Reactor Building Breather Filter Analysis

Inspection Report No. 05000320/2011008

G:\\WordDocs\\Current\\lnsp Report\\RDPR-73 2011 OOB.docx

Surveillance test Procedure No. 2301-4.70, Revision 8, dated 3/27/09

Test conducted on 4/20/11 for Reactor Building Survey Surveillance test procedure No.

2301-4.3 Revision 5

Test conducted on 4/19/11 for reactor Building Purge Exhaust Filter Operations Check

procedure no. 2303-5.10 Revision 6, dated 9/24/02

Tests conducted 6/7110, 1216/10, and 6113/11 for Aux bldg Ventilation Air Cleanup

Operational Check procedure no. OP-2TM-2829-201 Revision 0

Test conducted 6/13/11 for Fuel Handling Bldg Air Cleanup Operational Check

procedure no. 2303-5.9 Revision 10

Test conducted on 4/30/11 for Operability Check of the TMI-2 Equipment Hatch

Personnel Airlock Doors, procedure No. 2303-11.20A Revision 5 dated 10/13/08

Test conducted on 4/30/11 for Operability Check of the TMI-2 Ante Room Personnel

Airlock Doors, procedure No. 2303-11.20B Revision 5 dated 10/13/08

Test conducted on 7/10/10 for Ventilation Filter DOP & Halide Testing, Procedure

No. U-36 Revision 14A

Test conducted on 7/10/10 for TMI-2 Soiled Exhaust Filter Train Efficiency Test,

procedure No. 2303-11.57, Revision 0 dated 9/19/02

Tests conducted on 6/14/10 and 6/13/11 for TMI-2 Soiled Exhaust Filter Train

Operational Check, procedure No. 2303-5.11, Revision 0 dated 9/12/02

Test conducted on 1/18/11 for TMI-2 Auxiliary and Fuel Handling Building POMS

Radiological Surveys, procedure No. 2301-4.2, Revision 8, dated 5/12/04

Test conducted on 7/21/10 for POMS - Remote Area Inspection Procedure

No. 20PS-S020, Revision 2, dated 7/27/04

POMS TMI-2 Daily Checks Procedure No. 2301-1 Revision 21 dated 1/15/11,2/14/11,

3/15/11, 4/15/11, 6/15/11, and 7/13/11

TMI-2 vent sampling weekly and monthly composite reports dated 12/31/10, 2112111,

5/14/11, and 7/9111 TMI-2 Vent Sampling Procedure No. 2301-4.7 Revision 18, dated

10/11/06

Tests conducted on 7/21/10,10113/10,1/19/11, and 4/20/11 for Verification ofTMI-2

Containment Isolation, procedure No. OP-2TM-2244-201, Revision 0

Issue Report Nos. 01088266 and 01088266

Inspection Report No. 05000320/2011008

G:\\WordDocs\\Current\\lnsp Report\\RDPR-73 2011 OOB.docx

Action Reports Nos.

AR 01062052

AR 01121145

AR 01111195

AR 01100971

AR 01101025

AR 01177620

AR 01101009

AR 01080691

AR 01210935

AR 01101015

AR 01092576

AR 01244013

LIST OF ACRONYMS USED

ALARA

AR

CNRB

DOP

ECP

FENOC

GPUN

IMC

IP

IR

NOS

NRC

NRCHQ

PDMS

PDMS Plan

PM

PSR

QA

RMS

SAR

SSC

ST

TMI

TMI-1

TMI-2

TS

as low as reasonably achievable

action report

Company Nuclear Review Board

dioctyl phthalate

employee concerns program

FirstEnergy Nuclear Operating Company

GPU Nuclear, Inc.

Inspection Manual Chapter

Inspection Procedure

issue report

Nuclear Oversight

Nuclear Regulatory Commission

Nuclear Regulatory Commission headquarters

Post-Defueling Monitored Storage

PDMS Quality Assurance (QA) Plan

preventive maintenance

Permanently Shutdown Reactor

quality assurance

radiation monitoring system

Safety Analysis Report

structures, systems, or components

surveillance test

Three Mile Island Station

Three Mile Island Station, Unit 1

Three Mile Island Station, Unit 2

technical specification

Inspection Report No. 05000320/2011008

G:\\WordDocs\\Current\\lnsp Report\\RDPR-73 2011 OOB.docx