ML12307A296: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(2 intermediate revisions by the same user not shown)
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 November 1, 2012 Mr. Mano Nazar Executive Vice President
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 November 1, 2012 Mr. Mano Nazar Executive Vice President and Chief Nuclear Officer Florida Power and Light Company P.O. Box 14000 Juno Beach, FL 33408-0420  
 
and Chief Nuclear Officer Florida Power and Light Company P.O. Box 14000 Juno Beach, FL 33408-0420  


==SUBJECT:==
==SUBJECT:==
Line 23: Line 21:


==Dear Mr. Nazar:==
==Dear Mr. Nazar:==
In a {{letter dated|date=July 12, 2012|text=letter dated July 12, 2012}}, your staff responded to Regulatory Issue Summary 2012-07 and requested we schedule initial license operator examinations for Plant St Lucie. Based on your letter and following discussions with your staff, we have scheduled the requested examinations as follows:
Plant / Station 2013 2014 Date Applicants Date Applicants St Lucie NR NR 12/1 15 NR - None Requested On-site validation of the examinations is typically scheduled to occur approximately three weeks before each examination. If you have a need to change the dates of your scheduled exam(s) from that (those) listed above, please inform us in writing of your request and the reason for the change. Due to the large number of examinations scheduled to be administered at Region II sites, requests to change examination dates will be considered on a case-by-case basis. We will confirm any change in examination schedule with a follow-up letter.
We understand that your staff will develop the proposed examinations. For examinations that have greater than nine applicants, each examination is scheduled for a minimum of two weeks.
If the number of applicants is reduced to less than ten (10) for any examination, please inform us as this will impact the examination schedule.
A supplementary letter will be sent to each stations training department director approximately 120 days prior to the initial examination. The letter will provide the director with the chief examiner=s name, an outline of examination security expectations, a list of the materials required by the NRC to conduct the examination, and it will reconfirm the examination dates. If you have any questions concerning this information, please contact Mr. Malcolm Widmann, Chief, Operations Branch I, at 404-997-4550 or Mr. Mark Franke, Chief, Operations Branch II at 404-997-4436.


In a letter dated July 12, 2012, your staff responded to Regulatory Issue Summary 2012-07 and requested we schedule initial license operator examinations for Plant St Lucie. Based on your letter and following discussions with your staff, we have scheduled the requested examinations as follows:
M. Nazar 2
Plant / Station 2013 2014 Date ApplicantsDate Applicants St Lucie NR NR 12/1 15 NR - None Requested On-site validation of the examinations is typically scheduled to occur approximately three weeks before each examination. If you have a need to change the dates of your scheduled exam(s) from that (those) listed above, please inform us in writing of your request and the reason for the change. Due to the large number of examinations scheduled to be administered at Region II sites, requests to change examination dates will be considered on a case-by-case basis. We will confirm any change in examination schedule with a follow-up letter.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page of the NRC=s public Web site at http://www.nrc.gov/reading-rm/adams.html.
We understand that your staff will develop the proposed examinations. For examinations that have greater than nine applicants, each examination is scheduled for a minimum of two weeks. If the number of applicants is reduced to less than ten (10) for any examination, please inform us as this will impact the examination schedule.
Sincerely,  
A supplementary letter will be sent to each station's training department director approximately 120 days prior to the initial examination. The letter will provide the director with the chief examiner=s name, an outline of examination security expectations, a list of the materials required by the NRC to conduct the examination, and it will reconfirm the examination dates. If you have any questions concerning this information, please contact Mr. Malcolm Widmann, Chief, Operations Branch I, at 404-997-4550 or Mr. Mark Franke, Chief, Operations Branch II at
/RA/
Terrence Reis, Director Division of Reactor Safety Docket Nos.: 50-335, 50-389 License Nos.: DPR-67, NPF-16 cc: (See page 3)


404-997-4436.
XG SUNSI REVIEW COMPLETE G FORM 665 ATTACHED OFFICE RII:DRS RII:DRS RII:DRS RII:DRS SIGNATURE RA RA RA RA NAME SCHAAF WIDMANN FRANKE CHRISTENSEN DATE 10/25/2012 11/1/2012 11/1/2012 11/1/2012 11/ /2012 11/ /2012 11/ /2012 E-MAIL COPY?
M. Nazar 2
YES NO YES NO YES NO YES NO YES NO YES NO YES NO


In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page of the NRC
M. Nazar 3
=s public Web site at http://www.nrc.gov/reading-rm/adams.html. Sincerely, 
cc:
/RA/  Terrence Reis, Director
Joseph Jensen Site Vice President St. Lucie Nuclear Plant Electronic Mail Distribution Paul Freeman Vice President Organizational Effectiveness Florida Power & Light Company Electronic Mail Distribution Peter Wells Vice President Outage Support CFAM Florida Power & Light Company Electronic Mail Distribution Robert J. Hughes Plant General Manager St. Lucie Nuclear Plant Electronic Mail Distribution Daniel D. DeBoer Operations Site Director St. Lucie Nuclear Plant Electronic Mail Distribution Eric Katzman Licensing Manager St. Lucie Nuclear Plant Electronic Mail Distribution Larry Nicholson Director Licensing Florida Power & Light Company Electronic Mail Distribution Alison Brown Nuclear Licensing Florida Power & Light Company Electronic Mail Distribution Mitch S. Ross Vice President and General Counsel Nuclear Florida Power & Light Company Electronic Mail Distribution Cynthia Becker (Acting) Chief Florida Bureau of Radiation Control Department of Health Electronic Mail Distribution Bryan Koon Director Florida Division of Emergency Management Electronic Mail Distribution Donna Calabrese Emergency Preparedness Manager St. Lucie Plant Electronic Mail Distribution J. Kammel Radiological Emergency Planning Administrator Department of Public Safety Electronic Mail Distribution Senior Resident Inspector St. Lucie Nuclear Plant U.S. Nuclear Regulatory Commission P.O. Box 6090 Jensen Beach, FL 34957-2010 Michael Baughman Training Manager St. Lucie Nuclear Plant Electronic Mail Distribution Faye Outlaw County Administrator St. Lucie County Electronic Mail Distribution Jack Southard Director Public Safety Department St. Lucie County Electronic Mail Distribution  
 
Division of Reactor Safety
 
Docket Nos.: 50-335, 50-389 License Nos.: DPR-67, NPF-16
 
cc:  (See page 3)
 
_________________________  X G SUNSI REVIEW COMPLETE G FORM 665 ATTACHED OFFICE RII:DRS RII:DRS RII:DRS RII:DRS    SIGNATURE RA RA RA RA    NAME SCHAAF WIDMANN FRANKE CHRISTENSEN    DATE 10/25/2012 11/1/2012 11/1/2012 11/1/2012 11/      /2012 11/      /2012 11/      /2012 E-MAIL COPY?    YES NO      YES NO      YES NO      YES NO      YES NO      YES NO      YES NO M. Nazar 3 cc: Joseph Jensen Site Vice President St. Lucie Nuclear Plant Electronic Mail Distribution  
 
Paul Freeman Vice President Organizational Effectiveness Florida Power & Light Company Electronic Mail Distribution  
 
Peter Wells Vice President Outage Support CFAM Florida Power & Light Company Electronic Mail Distribution  
 
Robert J. Hughes Plant General Manager St. Lucie Nuclear Plant Electronic Mail Distribution  
 
Daniel D. DeBoer  
 
Operations Site Director St. Lucie Nuclear Plant Electronic Mail Distribution  
 
Eric Katzman Licensing Manager St. Lucie Nuclear Plant Electronic Mail Distribution  
 
Larry Nicholson  
 
Director Licensing Florida Power & Light Company Electronic Mail Distribution  
 
Alison Brown Nuclear Licensing Florida Power & Light Company Electronic Mail Distribution  
 
Mitch S. Ross Vice President and General Counsel  
 
Nuclear Florida Power & Light Company Electronic Mail Distribution  
 
Cynthia Becker (Acting) Chief  
 
Florida Bureau of Radiation Control Department of Health Electronic Mail Distribution  
 
Bryan Koon  
 
Director Florida Division of Emergency Management Electronic Mail Distribution  
 
Donna Calabrese Emergency Preparedness Manager St. Lucie Plant Electronic Mail Distribution  
 
J. Kammel Radiological Emergency Planning  
 
Administrator Department of Public Safety Electronic Mail Distribution  
 
Senior Resident Inspector St. Lucie Nuclear Plant U.S. Nuclear Regulatory Commission P.O. Box 6090 Jensen Beach, FL   34957-2010  
 
Michael Baughman  
 
Training Manager St. Lucie Nuclear Plant Electronic Mail Distribution  
 
Faye Outlaw County Administrator  
 
St. Lucie County Electronic Mail Distribution  
 
Jack Southard  
 
Director Public Safety Department St. Lucie County Electronic Mail Distribution  


Letter to Mano Nazar from Terrence Reis dated November 1, 2012.  
Letter to Mano Nazar from Terrence Reis dated November 1, 2012.  


==SUBJECT:==
==SUBJECT:==
CONFIRMATION OF REQUESTED INITIAL OPERATOR LICENSE EXAMINATIONS FOR PLANT SAINT LUCIE  
CONFIRMATION OF REQUESTED INITIAL OPERATOR LICENSE EXAMINATIONS FOR PLANT SAINT LUCIE Distribution:
 
ORA, RII T. Reis H. Christensen M. Widmann M. Franke K. Schaaf J. Vincent J. Kirby D. Rich J. McHale RIDSNRRDIRSIRIB Resource Document Control Desk - Licensing RIDSNRRDIRS PUBLIC RidsNrrPMStLucie Resource}}
Distribution
: ORA, RII T. Reis H. Christensen M. Widmann M. Franke  
 
K. Schaaf J. Vincent J. Kirby D. Rich J. McHale RIDSNRRDIRSIRIB Resource Document Control Desk - Licensing RIDSNRRDIRS PUBLIC RidsNrrPMStLucie Resource}}

Latest revision as of 21:21, 11 January 2025

Confirmation of Requested Initial Operator License Examinations for Plant St. Lucie
ML12307A296
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 11/01/2012
From: Reis T
Division of Reactor Safety II
To: Nazar M
Florida Power & Light Co
References
Download: ML12307A296 (5)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 November 1, 2012 Mr. Mano Nazar Executive Vice President and Chief Nuclear Officer Florida Power and Light Company P.O. Box 14000 Juno Beach, FL 33408-0420

SUBJECT:

CONFIRMATION OF REQUESTED INITIAL OPERATOR LICENSE EXAMINATIONS FOR PLANT SAINT LUCIE

Dear Mr. Nazar:

In a letter dated July 12, 2012, your staff responded to Regulatory Issue Summary 2012-07 and requested we schedule initial license operator examinations for Plant St Lucie. Based on your letter and following discussions with your staff, we have scheduled the requested examinations as follows:

Plant / Station 2013 2014 Date Applicants Date Applicants St Lucie NR NR 12/1 15 NR - None Requested On-site validation of the examinations is typically scheduled to occur approximately three weeks before each examination. If you have a need to change the dates of your scheduled exam(s) from that (those) listed above, please inform us in writing of your request and the reason for the change. Due to the large number of examinations scheduled to be administered at Region II sites, requests to change examination dates will be considered on a case-by-case basis. We will confirm any change in examination schedule with a follow-up letter.

We understand that your staff will develop the proposed examinations. For examinations that have greater than nine applicants, each examination is scheduled for a minimum of two weeks.

If the number of applicants is reduced to less than ten (10) for any examination, please inform us as this will impact the examination schedule.

A supplementary letter will be sent to each stations training department director approximately 120 days prior to the initial examination. The letter will provide the director with the chief examiner=s name, an outline of examination security expectations, a list of the materials required by the NRC to conduct the examination, and it will reconfirm the examination dates. If you have any questions concerning this information, please contact Mr. Malcolm Widmann, Chief, Operations Branch I, at 404-997-4550 or Mr. Mark Franke, Chief, Operations Branch II at 404-997-4436.

M. Nazar 2

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page of the NRC=s public Web site at http://www.nrc.gov/reading-rm/adams.html.

Sincerely,

/RA/

Terrence Reis, Director Division of Reactor Safety Docket Nos.: 50-335, 50-389 License Nos.: DPR-67, NPF-16 cc: (See page 3)

XG SUNSI REVIEW COMPLETE G FORM 665 ATTACHED OFFICE RII:DRS RII:DRS RII:DRS RII:DRS SIGNATURE RA RA RA RA NAME SCHAAF WIDMANN FRANKE CHRISTENSEN DATE 10/25/2012 11/1/2012 11/1/2012 11/1/2012 11/ /2012 11/ /2012 11/ /2012 E-MAIL COPY?

YES NO YES NO YES NO YES NO YES NO YES NO YES NO

M. Nazar 3

cc:

Joseph Jensen Site Vice President St. Lucie Nuclear Plant Electronic Mail Distribution Paul Freeman Vice President Organizational Effectiveness Florida Power & Light Company Electronic Mail Distribution Peter Wells Vice President Outage Support CFAM Florida Power & Light Company Electronic Mail Distribution Robert J. Hughes Plant General Manager St. Lucie Nuclear Plant Electronic Mail Distribution Daniel D. DeBoer Operations Site Director St. Lucie Nuclear Plant Electronic Mail Distribution Eric Katzman Licensing Manager St. Lucie Nuclear Plant Electronic Mail Distribution Larry Nicholson Director Licensing Florida Power & Light Company Electronic Mail Distribution Alison Brown Nuclear Licensing Florida Power & Light Company Electronic Mail Distribution Mitch S. Ross Vice President and General Counsel Nuclear Florida Power & Light Company Electronic Mail Distribution Cynthia Becker (Acting) Chief Florida Bureau of Radiation Control Department of Health Electronic Mail Distribution Bryan Koon Director Florida Division of Emergency Management Electronic Mail Distribution Donna Calabrese Emergency Preparedness Manager St. Lucie Plant Electronic Mail Distribution J. Kammel Radiological Emergency Planning Administrator Department of Public Safety Electronic Mail Distribution Senior Resident Inspector St. Lucie Nuclear Plant U.S. Nuclear Regulatory Commission P.O. Box 6090 Jensen Beach, FL 34957-2010 Michael Baughman Training Manager St. Lucie Nuclear Plant Electronic Mail Distribution Faye Outlaw County Administrator St. Lucie County Electronic Mail Distribution Jack Southard Director Public Safety Department St. Lucie County Electronic Mail Distribution

Letter to Mano Nazar from Terrence Reis dated November 1, 2012.

SUBJECT:

CONFIRMATION OF REQUESTED INITIAL OPERATOR LICENSE EXAMINATIONS FOR PLANT SAINT LUCIE Distribution:

ORA, RII T. Reis H. Christensen M. Widmann M. Franke K. Schaaf J. Vincent J. Kirby D. Rich J. McHale RIDSNRRDIRSIRIB Resource Document Control Desk - Licensing RIDSNRRDIRS PUBLIC RidsNrrPMStLucie Resource