ENS 41362: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by Mark Hawes) |
StriderTol (talk | contribs) (Created page by program invented by Mark Hawes) |
(No difference)
| |
Latest revision as of 17:41, 24 September 2017
| Where | |
|---|---|
| Crystal River Florida (NRC Region 2) | |
| Reporting | |
| 10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition | |
| LER: | 05000254/LER-2005-001 Re 4160 Volt Relaying and Metering Single Failure Vulnerability |
| Time - Person (Reporting Time:+-2.3 h-0.0958 days <br />-0.0137 weeks <br />-0.00315 months <br />) | |
| Opened: | Guy Mccallum 21:12 Jan 27, 2005 |
| NRC Officer: | John Mackinnon |
| Last Updated: | Jan 28, 2005 |
| 41362 - NRC Website
| |