ML12018A403: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| (3 intermediate revisions by the same user not shown) | |||
| Line 2: | Line 2: | ||
| number = ML12018A403 | | number = ML12018A403 | ||
| issue date = 01/03/2012 | | issue date = 01/03/2012 | ||
| title = | | title = OL - NRC PM Open Items List 01-04-12.docx | ||
| author name = | | author name = | ||
| author affiliation = - No Known Affiliation | | author affiliation = - No Known Affiliation | ||
| Line 15: | Line 15: | ||
=Text= | =Text= | ||
{{#Wiki_filter:1 WBN2Public Resource From: Boyd, Desiree L [dlboyd@tva.gov] | {{#Wiki_filter:1 WBN2Public Resource From: | ||
Sent: Tuesday, January 03, 2012 9:56 AM To: Poole, Justin; Milano, Patrick; Campbell, Stephen; Epperson, Dan Cc: Arent, Gordon; Smith, James D; Bryan, | Boyd, Desiree L [dlboyd@tva.gov] | ||
Sent: | |||
Tuesday, January 03, 2012 9:56 AM To: | |||
Poole, Justin; Milano, Patrick; Campbell, Stephen; Epperson, Dan Cc: | |||
Arent, Gordon; Smith, James D; Bryan, Robert H Jr; Smith, James D; Boyd, Desiree L; Crouch, William D | |||
==Subject:== | ==Subject:== | ||
NRC PM Open Items List 01-04-12.docx Attachments: | NRC PM Open Items List 01-04-12.docx Attachments: | ||
NRC PM Open Items List 01-04-12.docx For next phone call. | NRC PM Open Items List 01-04-12.docx For next phone call. | ||
Thank You, | |||
~*~*~*~*~*~*~*~*~*~*~ | |||
Désireé L. Boyd WBN Unit 2 Licensing dlboyd@tva.gov 423-365-8764 | |||
Hearing Identifier: | |||
Watts_Bar_2_Operating_LA_Public Email Number: | |||
618 Mail Envelope Properties (7AB41F650F76BD44B5BCAB7C0CCABFAF26FACDB9) | |||
==Subject:== | ==Subject:== | ||
NRC PM Open Items List 01-04-12.docx | NRC PM Open Items List 01-04-12.docx Sent Date: | ||
Tracking Status: None | 1/3/2012 9:55:38 AM Received Date: | ||
Tracking Status: None | 1/3/2012 9:55:49 AM From: | ||
Tracking Status: None | Boyd, Desiree L Created By: | ||
Tracking Status: None | dlboyd@tva.gov Recipients: | ||
"Arent, Gordon" <garent@tva.gov> | |||
Post Office: | Tracking Status: None "Smith, James D" <jdsmith@tva.gov> | ||
Tracking Status: None "Bryan, Robert H Jr" <rhbryan@tva.gov> | |||
Tracking Status: None "Smith, James D" <smith1jd@westinghouse.com> | |||
Tracking Status: None "Boyd, Desiree L" <dlboyd@tva.gov> | |||
Tracking Status: None "Crouch, William D" <wdcrouch@tva.gov> | |||
Tracking Status: None "Poole, Justin" <Justin.Poole@nrc.gov> | |||
Tracking Status: None "Milano, Patrick" <Patrick.Milano@nrc.gov> | |||
Tracking Status: None "Campbell, Stephen" <Stephen.Campbell@nrc.gov> | |||
Tracking Status: None "Epperson, Dan" <Dan.Epperson@nrc.gov> | |||
Tracking Status: None Post Office: | |||
TVANUCXVS2.main.tva.gov Files Size Date & Time MESSAGE 227 1/3/2012 9:55:49 AM NRC PM Open Items List 01-04-12.docx 35566 Options Priority: | |||
Standard Return Notification: | |||
No Reply Requested: | |||
No Sensitivity: | |||
Normal Expiration Date: | |||
Recipients Received: | |||
NRC PM Open Items List 01/04/2012 (423) 751-7777 ID 4233658764# | NRC PM Open Items List 01/04/2012 (423) 751-7777 ID 4233658764# | ||
1 l | 1 l P a g e No. | ||
Description Status Additional Comments Resp Org/Person | |||
Inspection | : 1. | ||
Cyber Security Plan/Controls and Implementation NRC Table Top/Pilot Feb/Mar 2012 Inspection 4th Qtr 2012 Heinrich/Snyder (Bryan) | |||
: 2. | |||
Instrumentation RAI List (Knuettel) | |||
: 1. Submit I&C update letter | : 1. Submit I&C update letter | ||
: 1. 1/19/12 a. 1/19/12 b. 1/19/12 c. 1/19/12 | : 1. 1/19/12 | ||
: a. 04038903-1SP | : a. 1/19/12 | ||
: b. 04038903-2SP | : b. 1/19/12 | ||
: c. 04038903-4SP Requires Civil Calculation | : c. 1/19/12 | ||
: d. Responses to 11/18/11 RAI for OI 80, 81 | : d. Cmplt | ||
: e. Revise Common Q Compliance Matrix | : e. TBD | ||
: 2) Jan. I&C submittal update | : 2. 1/19/12 | ||
: a. Revise IEEE-603 analysis | : a. 1/15/12 | ||
: b. TR-1136 NP & withholding affidavit | : b. 1/13/12 | ||
: c. U2 BISI Calculation | : c. 1/13/12 | ||
: d. 1/15/12 | |||
: 3. TBD | |||
: a. TBD | |||
: b. TBD | |||
: 4. Cmplt | |||
: 1. Next I&C submittal update | |||
: a. 04038903-1SP | |||
: b. 04038903-2SP | |||
: c. 04038903-4SP Requires Civil Calculation | |||
: d. Responses to 11/18/11 RAI for OI 80, 81 | |||
: e. Revise Common Q Compliance Matrix | |||
: 2) Jan. I&C submittal update | |||
: a. Revise IEEE-603 analysis | |||
: b. TR-1136 NP & withholding affidavit | |||
: c. U2 BISI Calculation | |||
: d. Responses to 11/18/11 RAI for OI 94, 105, 108 | : d. Responses to 11/18/11 RAI for OI 94, 105, 108 | ||
: 3) WINCISE qualification testing write-up | : 3) WINCISE qualification testing write-up | ||
: a. Composite summary | : a. Composite summary | ||
: b. Sketch of all cable segments | : b. Sketch of all cable segments | ||
: 4) Revise TVA response to SSER OI 127 Eng/Hilmes (Bryan) | : 4) Revise TVA response to SSER OI 127 Eng/Hilmes (Bryan) | ||
NRC PM Open Items List 01/04/2012 (423) 751-7777 ID 4233658764# | NRC PM Open Items List 01/04/2012 (423) 751-7777 ID 4233658764# | ||
2 l | 2 l P a g e No. | ||
Pump Relocation 5/30/12 | Description Status Additional Comments Resp Org/Person | ||
: 3. | |||
Complete Implementation (Hemmer) | |||
Pump Relocation 5/30/12 Bldg Plan Mar 2012 Inspection - | |||
Oct 2012 Substantial building - preliminary planning in process, (Fukushima NTTF item 4.2) | Oct 2012 Substantial building - preliminary planning in process, (Fukushima NTTF item 4.2) | ||
Provide document of mitigating equipment and location for unit 2. Hemmer | Provide document of mitigating equipment and location for unit 2. | ||
: 1. mid-Feb 2. TBD | Hemmer | ||
: 2. Meet with Staff following submittal ENG/Hilmes (Arent) 5. Tech Spec Revisions from latest T/S markup and NRC Review comments | : 4. | ||
: 1. TBD 2. TBD 3. 1/27/12 | Fire Protection Report | ||
: 4. TBD 1. CSST A & B | : 1. mid-Feb | ||
: 2. I-131 DEI | : 2. TBD | ||
: 3. Diesel Generator Frequency | : 1. Submit Revised FPR per 12-21 Meeting, include commitment update | ||
: 4. AST FHA Licensing/Elton (Bryan) 6. ACRS 04/10/12 | : 2. Meet with Staff following submittal ENG/Hilmes (Arent) | ||
: 5. | |||
Tech Spec Revisions from latest T/S markup and NRC Review comments | |||
Koontz 7. ACRS June 2012 | : 1. TBD | ||
: 2. TBD | |||
: 3. 1/27/12 | |||
: 4. TBD | |||
: 1. CSST A & B | |||
: 2. I-131 DEI | |||
: 3. Diesel Generator Frequency | |||
: 4. AST FHA Licensing/Elton (Bryan) | |||
: 6. | |||
ACRS 04/10/12 Cyber Security - Implementation Attachment HH items (#59 - Sump, #61 -PAD, | |||
#63/93 - Eagle 21, #91 - GDC 5, #132 - Boron Dil) | |||
Arent/Hilmes/ | |||
Koontz | |||
: 7. | |||
ACRS June 2012 Fire Protection Attachment HH item - #133/134 - Hydrology Arent | |||
: 8. | |||
SSER 22/23/24/25 Open Items | |||
===Response=== | |||
As needed The expanded HH list and status is covered periodically. | |||
Licensing | |||
: 9. | |||
Transient Analysis issues Boron dilution RAI response 1/13/12 Question on RG revision and modes 3, 4, & 5. TVA to provide write-up explaining NRC acceptance (CLB) of unit 1 for modes 3, 4, & 5. See SSER OI 132. | |||
ENG/Koontz WEC/Morgan | |||
: 10. | |||
FSAR A108 Feb. 2012 Lic/Stockton | |||
: 11. | |||
Develop list of planned License Conditions, Exemptions and Relief Requests (Arent) | |||
: 1. 1/20/12 | |||
: 2. TBD | |||
: 3. TBD | |||
: 1. | |||
Review Unit 1 SER for exemptions. Sand baskets, cyber security, physical security, PAD 4.0 | |||
: 2. | |||
NRR to review current exemptions | |||
: 3. | |||
Verify required notifications made NRR/TVA (Bryan) | |||
NRC PM Open Items List 01/04/2012 (423) 751-7777 ID 4233658764# | NRC PM Open Items List 01/04/2012 (423) 751-7777 ID 4233658764# | ||
3 l | 3 l P a g e No. | ||
Lic/Bryan 13. Issue two Unit Offsite Dose Calculation Manual | Description Status Additional Comments Resp Org/Person | ||
3/16/12 | : 12. | ||
Woods (Bryan) 14. TMI action items 7/1/12 TVA to provide letter when TMI actions are field complete. | Submit TS version G (includes bases and TRM) 1/27/12 Include remaining changes resulting from U1 and Setpoint Reviews. | ||
Licensing (Gordon) 15. EP Drill Open Items | Lic/Bryan | ||
: a. Duty Specialist | : 13. | ||
: b. Commercial Dose Assessment TBD Determine NPG Schedule for Changes - Update | Issue two Unit Offsite Dose Calculation Manual - | ||
EP - Detchemendy | 3/16/12 Chemistry/ | ||
NRC Follow-up Items ASME N-801 & N-802 code cases TBD NRC response to relief request submitted 9/1/11. NRR Exemption to 10CFR50.49 for some Category II cables? | Woods (Bryan) | ||
: 14. | |||
TMI action items 7/1/12 TVA to provide letter when TMI actions are field complete. | |||
Licensing (Gordon) | |||
: 15. | |||
EP Drill Open Items | |||
: a. Duty Specialist | |||
: b. Commercial Dose Assessment TBD Determine NPG Schedule for Changes - Update AS-Built E-Plan. | |||
EP - | |||
Detchemendy | |||
: 16. | |||
Extend Construction Permit 4/27/12 Lic (Arent) | |||
NRC Follow-up Items ASME N-801 & N-802 code cases TBD NRC response to relief request submitted 9/1/11. | |||
NRR Exemption to 10CFR50.49 for some Category II cables? | |||
1/20/12 Determine if exemption required. NRC may need to establish a license condition. | 1/20/12 Determine if exemption required. NRC may need to establish a license condition. | ||
Hilmes (Stockton) | Hilmes (Stockton) | ||
Post ETC Updates Issue Unit 2 Completion Letter TBD | Post ETC Updates Issue Unit 2 Completion Letter TBD Licensing/Arent Submit final as-constructed FSAR figures TBD Licensing/ | ||
Letter to terminate Part 30/40 License after receipt of Part 50 License TBD | Stockton Special Nuclear Materials License Licensing (Arent) | ||
TBD | Letter to terminate Part 30/40 License after receipt of Part 50 License TBD Licensing (Arent) | ||
Combined U1/U2 FSAR (Stockton) | |||
TBD Licensing ASME Section III N-3 report TBD Eng/Crouch Letter to notify NRC when Vital Area Boundary returned to original location TBD Security Plan Update - Boundary to be restored. | |||
Lic/Arent}} | |||
Latest revision as of 21:00, 12 January 2025
| ML12018A403 | |
| Person / Time | |
|---|---|
| Site: | Watts Bar |
| Issue date: | 01/03/2012 |
| From: | - No Known Affiliation |
| To: | Division of Operating Reactor Licensing |
| References | |
| Download: ML12018A403 (5) | |
Text
1 WBN2Public Resource From:
Boyd, Desiree L [dlboyd@tva.gov]
Sent:
Tuesday, January 03, 2012 9:56 AM To:
Poole, Justin; Milano, Patrick; Campbell, Stephen; Epperson, Dan Cc:
Arent, Gordon; Smith, James D; Bryan, Robert H Jr; Smith, James D; Boyd, Desiree L; Crouch, William D
Subject:
NRC PM Open Items List 01-04-12.docx Attachments:
NRC PM Open Items List 01-04-12.docx For next phone call.
Thank You,
~*~*~*~*~*~*~*~*~*~*~
Désireé L. Boyd WBN Unit 2 Licensing dlboyd@tva.gov 423-365-8764
Hearing Identifier:
Watts_Bar_2_Operating_LA_Public Email Number:
618 Mail Envelope Properties (7AB41F650F76BD44B5BCAB7C0CCABFAF26FACDB9)
Subject:
NRC PM Open Items List 01-04-12.docx Sent Date:
1/3/2012 9:55:38 AM Received Date:
1/3/2012 9:55:49 AM From:
Boyd, Desiree L Created By:
dlboyd@tva.gov Recipients:
"Arent, Gordon" <garent@tva.gov>
Tracking Status: None "Smith, James D" <jdsmith@tva.gov>
Tracking Status: None "Bryan, Robert H Jr" <rhbryan@tva.gov>
Tracking Status: None "Smith, James D" <smith1jd@westinghouse.com>
Tracking Status: None "Boyd, Desiree L" <dlboyd@tva.gov>
Tracking Status: None "Crouch, William D" <wdcrouch@tva.gov>
Tracking Status: None "Poole, Justin" <Justin.Poole@nrc.gov>
Tracking Status: None "Milano, Patrick" <Patrick.Milano@nrc.gov>
Tracking Status: None "Campbell, Stephen" <Stephen.Campbell@nrc.gov>
Tracking Status: None "Epperson, Dan" <Dan.Epperson@nrc.gov>
Tracking Status: None Post Office:
TVANUCXVS2.main.tva.gov Files Size Date & Time MESSAGE 227 1/3/2012 9:55:49 AM NRC PM Open Items List 01-04-12.docx 35566 Options Priority:
Standard Return Notification:
No Reply Requested:
No Sensitivity:
Normal Expiration Date:
Recipients Received:
NRC PM Open Items List 01/04/2012 (423) 751-7777 ID 4233658764#
1 l P a g e No.
Description Status Additional Comments Resp Org/Person
- 1.
Cyber Security Plan/Controls and Implementation NRC Table Top/Pilot Feb/Mar 2012 Inspection 4th Qtr 2012 Heinrich/Snyder (Bryan)
- 2.
Instrumentation RAI List (Knuettel)
- 1. Submit I&C update letter
- 1. 1/19/12
- a. 1/19/12
- b. 1/19/12
- c. 1/19/12
- d. Cmplt
- e. TBD
- 2. 1/19/12
- a. 1/15/12
- b. 1/13/12
- c. 1/13/12
- d. 1/15/12
- 3. TBD
- a. TBD
- b. TBD
- 4. Cmplt
- 1. Next I&C submittal update
- a. 04038903-1SP
- b. 04038903-2SP
- c. 04038903-4SP Requires Civil Calculation
- e. Revise Common Q Compliance Matrix
- 2) Jan. I&C submittal update
- a. Revise IEEE-603 analysis
- b. TR-1136 NP & withholding affidavit
- c. U2 BISI Calculation
- 3) WINCISE qualification testing write-up
- a. Composite summary
- b. Sketch of all cable segments
NRC PM Open Items List 01/04/2012 (423) 751-7777 ID 4233658764#
2 l P a g e No.
Description Status Additional Comments Resp Org/Person
- 3.
Complete Implementation (Hemmer)
Pump Relocation 5/30/12 Bldg Plan Mar 2012 Inspection -
Oct 2012 Substantial building - preliminary planning in process, (Fukushima NTTF item 4.2)
Provide document of mitigating equipment and location for unit 2.
Hemmer
- 4.
Fire Protection Report
- 1. mid-Feb
- 2. TBD
- 1. Submit Revised FPR per 12-21 Meeting, include commitment update
- 2. Meet with Staff following submittal ENG/Hilmes (Arent)
- 5.
Tech Spec Revisions from latest T/S markup and NRC Review comments
- 1. TBD
- 2. TBD
- 3. 1/27/12
- 4. TBD
- 1. CSST A & B
- 2. I-131 DEI
- 3. Diesel Generator Frequency
- 6.
ACRS 04/10/12 Cyber Security - Implementation Attachment HH items (#59 - Sump, #61 -PAD,
Arent/Hilmes/
Koontz
- 7.
ACRS June 2012 Fire Protection Attachment HH item - #133/134 - Hydrology Arent
- 8.
SSER 22/23/24/25 Open Items
Response
As needed The expanded HH list and status is covered periodically.
Licensing
- 9.
Transient Analysis issues Boron dilution RAI response 1/13/12 Question on RG revision and modes 3, 4, & 5. TVA to provide write-up explaining NRC acceptance (CLB) of unit 1 for modes 3, 4, & 5. See SSER OI 132.
ENG/Koontz WEC/Morgan
- 10.
FSAR A108 Feb. 2012 Lic/Stockton
- 11.
Develop list of planned License Conditions, Exemptions and Relief Requests (Arent)
- 1. 1/20/12
- 2. TBD
- 3. TBD
- 1.
Review Unit 1 SER for exemptions. Sand baskets, cyber security, physical security, PAD 4.0
- 2.
NRR to review current exemptions
- 3.
Verify required notifications made NRR/TVA (Bryan)
NRC PM Open Items List 01/04/2012 (423) 751-7777 ID 4233658764#
3 l P a g e No.
Description Status Additional Comments Resp Org/Person
- 12.
Submit TS version G (includes bases and TRM) 1/27/12 Include remaining changes resulting from U1 and Setpoint Reviews.
Lic/Bryan
- 13.
Issue two Unit Offsite Dose Calculation Manual -
3/16/12 Chemistry/
Woods (Bryan)
- 14.
TMI action items 7/1/12 TVA to provide letter when TMI actions are field complete.
Licensing (Gordon)
- 15.
EP Drill Open Items
- a. Duty Specialist
EP -
Detchemendy
- 16.
Extend Construction Permit 4/27/12 Lic (Arent)
NRC Follow-up Items ASME N-801 & N-802 code cases TBD NRC response to relief request submitted 9/1/11.
NRR Exemption to 10CFR50.49 for some Category II cables?
1/20/12 Determine if exemption required. NRC may need to establish a license condition.
Hilmes (Stockton)
Post ETC Updates Issue Unit 2 Completion Letter TBD Licensing/Arent Submit final as-constructed FSAR figures TBD Licensing/
Stockton Special Nuclear Materials License Licensing (Arent)
Letter to terminate Part 30/40 License after receipt of Part 50 License TBD Licensing (Arent)
Combined U1/U2 FSAR (Stockton)
TBD Licensing ASME Section III N-3 report TBD Eng/Crouch Letter to notify NRC when Vital Area Boundary returned to original location TBD Security Plan Update - Boundary to be restored.
Lic/Arent