IR 05000373/2012402: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(3 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 04/03/2012
| issue date = 04/03/2012
| title = IR 05000373-12-402 & 05000374-12-402, 03/16/2012, LaSalle County Station, Units 1 and 2, Routine Security Baseline Inspection Cover Letter Only
| title = IR 05000373-12-402 & 05000374-12-402, 03/16/2012, LaSalle County Station, Units 1 and 2, Routine Security Baseline Inspection Cover Letter Only
| author name = Skokowski R A
| author name = Skokowski R
| author affiliation = NRC/RGN-III/DRS/PSB
| author affiliation = NRC/RGN-III/DRS/PSB
| addressee name = Pacilio M J
| addressee name = Pacilio M
| addressee affiliation = Exelon Generation Co, LLC
| addressee affiliation = Exelon Generation Co, LLC
| docket = 05000373, 05000374
| docket = 05000373, 05000374
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532
{{#Wiki_filter:April 3, 2012
-4352 April 3, 2012 Mr. Michael Senior Vice President, Exelon Generation Company, LLC President and Chief Nuclear Officer (CNO), Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555


SUBJECT: LASALLE COUNTY STATION, UNITS 1 AND 2 NRC SECURITY BASELINE INSPECTION REPORT 05000373/2012402(DRS); 05000374/2012402(DRS)
==SUBJECT:==
LASALLE COUNTY STATION, UNITS 1 AND 2  
 
NRC SECURITY BASELINE INSPECTION REPORT 05000373/2012402(DRS);
05000374/2012402(DRS)


==Dear Mr. Pacilio:==
==Dear Mr. Pacilio:==
On March 16, 2012, the U. S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your LaSalle County Station. The inspection covered one or more of the key attributes of the security cornerstone of the NRC's Reactor Oversight Process. The enclosed inspection report documents the inspection results, which were discussed on March 16, 2012, with Mr. P. Karaba and other members of your staff.
On March 16, 2012, the U. S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your LaSalle County Station. The inspection covered one or more of the key attributes of the security cornerstone of the NRCs Reactor Oversight Process.
 
The enclosed inspection report documents the inspection results, which were discussed on March 16, 2012, with Mr. P. Karaba and other members of your staff.
 
The inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations and with the conditions of your license.
 
The inspector reviewed selected procedures and records, observed activities, and interviewed personnel.
 
This report documents one NRC-identified finding of very low security significance (i.e., Green as determined by the Physical Protection Significance Determination Process) and associated violation of NRC requirements. The deficiency was promptly corrected or compensated for, and the plant was in compliance with applicable physical protection and security requirements within the scope of this inspection before the inspectors left the site. The finding had a cross-cutting aspect in the area of Human Performance, Resources [H.1(b)], because the licensee failed to use conservative assumptions in decision making and adopt a requirement to demonstrate that the proposed action is secure in order to proceed rather than a requirement to demonstrate that it is not secure in order to disapprove the action. The NRC is treating this violation as a non-cited violation (NCV) consistent with Section 2.3.2 of the NRC Enforcement Policy because of the very low security significance of the violation and because it was entered into your corrective action program.
 
If you contest the subject or severity of a NCV, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U. S. Nuclear


The inspection examined activities conducted under your license as they relate to security and compliance with the Commission's rules and regulations and with the conditions of your license. The inspector reviewed selected procedures and records, observed activities, and interviewed personnel.
Enclosure contains Sensitive Unclassified Non-Safeguards Information. When separated from enclosure, this transmittal document is decontrolled. Regulatory Commission, ATTN: Document Control Desk, Washington DC 20555-0001, with a copy to the Regional Administrator, U. S. Nuclear Regulatory Commission - Region III, 2443 Warrenville Road, Suite 210, Lisle, IL 60532-4352; the Director, Office of Enforcement, U. S. Nuclear Regulatory Commission, Washington, DC 20555- 0001; and the Resident Inspector Office at the LaSalle County Station.


This report documents one NRC-identified finding of very low security significance (i.e., Green as determined by the Physical Protection Significance Determination Process)
In addition, if you disagree with the cross-cutting aspect assigned to the finding in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the Regional Administrator, Region III, and the NRC Resident Inspector at the LaSalle County Station.
and associated violation of NRC requirements. The deficiency was promptly corrected or compensated for, and the plant was in compliance with applicable physical protection and security requirements within the scope of this inspection before the inspectors left the site. The finding had a cross
-cutting aspect in the area of Human Performance, Resources [H.1 (b)], because the licensee failed to use conservative assumptions in decision making and adopt a requirement to demonstrate that the proposed action is secure in order to proceed rather than a requirement to demonstrate that it is not secure in order to disapprove the action
. The NRC is treating this violation as a non
-cited violation (NCV) consistent with Section 2.3.2 of the NRC Enforcement Policy because of the very low security significance of the violation and because it was entered into your corrective action program.


If you contest the subject or severity of a NCV, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U. S. Nuclear Enclosure contains Sensitive Unclassified Non-Safeguards Information. When separated from enclosure, this transmittal document is decontrolled. Regulatory Commission, ATTN: Document Control Desk, Washington DC 20555
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's document system, ADAMS.
-0001, with a copy to the Regional Administrator, U.


S. Nuclear Regulatory Commission
ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letters enclosure will not be available for public inspection.
- Region III, 2443 Warrenville Road, Suite 210, Lisle, IL 60532
-4352; the Director, Office of Enforcement, U. S. Nuclear Regulatory Commission, Washington, DC 20555
- 0001; and the Resident Inspector Office at the LaSalle County Station
. In addition, if you disagree with the cross
-cutting aspect assigned to the finding in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the Regional Administrator, Region III, and the NRC Resident Inspector at the LaSalle County Station
.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's document system, ADAMS. ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading
-rm/adams.html (the Public Electronic Reading Room). However, because of the security
-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter's enclosure will not be available for public inspection.


In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRC's document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response "Security
In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRCs document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response Security-Related Information-Withhold Under 10 CFR 2.390 and follow the instructions for withholding in 10 CFR 2.390(b)(1).
-Related Information
-Withhold Under 10 CFR 2.390" and follow the instructions for withholding in 10 CFR 2.390(b)(1).


Should you have any questions concerning this inspection, we will be pleased to discuss them with you.
Should you have any questions concerning this inspection, we will be pleased to discuss them with you.


Sincerely,/RA/ By Don Funk Acting For/
Sincerely,
Richard A. Skokowski, Chief Plant Support Branch Division of Reactor Safety Docket Nos. 50
/RA/ By Don Funk Acting For/  
-373; 50-374 License Nos. NPF
 
-11; NPF-18 Nonpublic  
Richard A. Skokowski, Chief Plant Support Branch Division of Reactor Safety  
 
Docket Nos. 50-373; 50-374 License Nos. NPF-11; NPF-18  
 
Nonpublic Enclosure: Inspection Report 05000373/2012402(DRS);


===Enclosure:===
05000374/2012402(DRS)  
Inspection Report 05000373/2012402(DRS);
 
05000374/2012402(DRS)
w/Attachment: Supplemental Information


===w/Attachment:===
DISTRIBUTION:
Supplemental Information DISTRIBUTION
See next page Letter to Mr. Michael
: See next page Letter to Mr. Michael
}}
}}

Latest revision as of 02:51, 12 January 2025

IR 05000373-12-402 & 05000374-12-402, 03/16/2012, LaSalle County Station, Units 1 and 2, Routine Security Baseline Inspection Cover Letter Only
ML12096A037
Person / Time
Site: LaSalle  Constellation icon.png
Issue date: 04/03/2012
From: Richard Skokowski
Plant Support Branch II
To: Pacilio M
Exelon Generation Co
References
IR-12-402
Download: ML12096A037 (5)


Text

April 3, 2012

SUBJECT:

LASALLE COUNTY STATION, UNITS 1 AND 2

NRC SECURITY BASELINE INSPECTION REPORT 05000373/2012402(DRS);

05000374/2012402(DRS)

Dear Mr. Pacilio:

On March 16, 2012, the U. S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your LaSalle County Station. The inspection covered one or more of the key attributes of the security cornerstone of the NRCs Reactor Oversight Process.

The enclosed inspection report documents the inspection results, which were discussed on March 16, 2012, with Mr. P. Karaba and other members of your staff.

The inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations and with the conditions of your license.

The inspector reviewed selected procedures and records, observed activities, and interviewed personnel.

This report documents one NRC-identified finding of very low security significance (i.e., Green as determined by the Physical Protection Significance Determination Process) and associated violation of NRC requirements. The deficiency was promptly corrected or compensated for, and the plant was in compliance with applicable physical protection and security requirements within the scope of this inspection before the inspectors left the site. The finding had a cross-cutting aspect in the area of Human Performance, Resources H.1(b), because the licensee failed to use conservative assumptions in decision making and adopt a requirement to demonstrate that the proposed action is secure in order to proceed rather than a requirement to demonstrate that it is not secure in order to disapprove the action. The NRC is treating this violation as a non-cited violation (NCV) consistent with Section 2.3.2 of the NRC Enforcement Policy because of the very low security significance of the violation and because it was entered into your corrective action program.

If you contest the subject or severity of a NCV, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U. S. Nuclear

Enclosure contains Sensitive Unclassified Non-Safeguards Information. When separated from enclosure, this transmittal document is decontrolled. Regulatory Commission, ATTN: Document Control Desk, Washington DC 20555-0001, with a copy to the Regional Administrator, U. S. Nuclear Regulatory Commission - Region III, 2443 Warrenville Road, Suite 210, Lisle, IL 60532-4352; the Director, Office of Enforcement, U. S. Nuclear Regulatory Commission, Washington, DC 20555- 0001; and the Resident Inspector Office at the LaSalle County Station.

In addition, if you disagree with the cross-cutting aspect assigned to the finding in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the Regional Administrator, Region III, and the NRC Resident Inspector at the LaSalle County Station.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's document system, ADAMS.

ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letters enclosure will not be available for public inspection.

In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRCs document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response Security-Related Information-Withhold Under 10 CFR 2.390 and follow the instructions for withholding in 10 CFR 2.390(b)(1).

Should you have any questions concerning this inspection, we will be pleased to discuss them with you.

Sincerely,

/RA/ By Don Funk Acting For/

Richard A. Skokowski, Chief Plant Support Branch Division of Reactor Safety

Docket Nos. 50-373; 50-374 License Nos. NPF-11; NPF-18

Nonpublic Enclosure: Inspection Report 05000373/2012402(DRS);

05000374/2012402(DRS)

w/Attachment: Supplemental Information

DISTRIBUTION:

See next page Letter to Mr. Michael