| number = ML13226A368 | | number = ML13226A368 | ||
| issue date = 07/17/2013 | | issue date = 07/17/2013 | ||
| title = | | title = NRR E-mail Capture - Clarification of Examination History of Weld SW-12 | ||
| author name = Whalen M | | author name = Whalen M | ||
| author affiliation = Dominion Generation | | author affiliation = Dominion Generation | ||
| addressee name = Sreenivas V | | addressee name = Sreenivas V | ||
| Line 15: | Line 15: | ||
=Text= | =Text= | ||
{{#Wiki_filter:1 NRR-PMDAPEm Resource From: MP Whalen (Generation - 3) [mp.whalen@dom.com] | {{#Wiki_filter:1 NRR-PMDAPEm Resource From: | ||
Sent: Wednesday, July 17, 2013 3:22 PM To: Sreenivas, V | MP Whalen (Generation - 3) [mp.whalen@dom.com] | ||
Sent: | |||
Wednesday, July 17, 2013 3:22 PM To: | |||
Sreenivas, V | |||
==Subject:== | ==Subject:== | ||
Clarification of | Clarification of examination history of Weld SW-12 V, here is the clarification that the Ali Rezai requested. Let me know if you have any questions. | ||
Clarification of Dominions response regarding the previous examination history of Weld SW-12 on Line 32"-SHP-58. This weld had been examined three previous times and root geometry was documented for two of those examinations. To comply with the ASME Section XI requirements to compare the examination results with the previous examination, Dominion provides examination history to the examination personnel. If geometry has been documented previously, and the examiner determines that there are no changes in the indication the indication is not required to be recorded again. | Clarification of Dominions response regarding the previous examination history of Weld SW-12 on Line 32"-SHP-58. This weld had been examined three previous times and root geometry was documented for two of those examinations. To comply with the ASME Section XI requirements to compare the examination results with the previous examination, Dominion provides examination history to the examination personnel. If geometry has been documented previously, and the examiner determines that there are no changes in the indication the indication is not required to be recorded again. | ||
Michael P. Whalen Dominion Generation Station Licensing North Anna Power Station 1022 Haley Drive Mineral, VA 23117 Phone: 540-894-2572 Fax: 540-894-2830 Pager: 804-273-3030, Pager 3164 Email: MP.Whalen@dom.com CONFIDENTIALITY NOTICE: This electronic message contains information which may be legally confidential and/or privileged and does not in any case represent a firm ENERGY COMMODITY bid or offer relating thereto which binds the sender without an additional express written confirmation to that effect. The information is intended solely for the individual or entity named above and access by anyone else is unauthorized. If you are not the intended recipient, any disclosure, copying, distribution, or use of the contents of this information is prohibited and may be unlawful. If you have received this electronic transmission in error, please reply immediately to the sender that you have received the message in error, and delete it. Thank you. | |||
Hearing Identifier: | |||
NRR_PMDA Email Number: | |||
805 Mail Envelope Properties (0A47EA17EBFBBD4E984EBCC0A92E221CD63B) | |||
Hearing Identifier: | |||
==Subject:== | ==Subject:== | ||
Clarification of examination history of Weld SW-12 | Clarification of examination history of Weld SW-12 Sent Date: | ||
Created By: | 7/17/2013 3:22:15 PM Received Date: | ||
Tracking Status: None | 7/17/2013 3:22:21 PM From: | ||
MP Whalen (Generation - 3) | |||
Post Office: | Created By: | ||
mp.whalen@dom.com Recipients: | |||
Options | "Sreenivas, V" <V.Sreenivas@nrc.gov> | ||
Tracking Status: None Post Office: | |||
INBE10W803.mbu.ad.dominionnet.com Files Size Date & Time MESSAGE 1710 7/17/2013 3:22:21 PM Options Priority: | |||
Standard Return Notification: | |||
No Reply Requested: | |||
No Sensitivity: | |||
Normal Expiration Date: | |||
Recipients Received:}} | |||
Latest revision as of 06:02, 11 January 2025
| ML13226A368 | |
| Person / Time | |
|---|---|
| Site: | North Anna |
| Issue date: | 07/17/2013 |
| From: | Whalen M Dominion Generation |
| To: | V Sreenivas Division of Operating Reactor Licensing |
| References | |
| Download: ML13226A368 (2) | |
Text
1 NRR-PMDAPEm Resource From:
MP Whalen (Generation - 3) [mp.whalen@dom.com]
Sent:
Wednesday, July 17, 2013 3:22 PM To:
Sreenivas, V
Subject:
Clarification of examination history of Weld SW-12 V, here is the clarification that the Ali Rezai requested. Let me know if you have any questions.
Clarification of Dominions response regarding the previous examination history of Weld SW-12 on Line 32"-SHP-58. This weld had been examined three previous times and root geometry was documented for two of those examinations. To comply with the ASME Section XI requirements to compare the examination results with the previous examination, Dominion provides examination history to the examination personnel. If geometry has been documented previously, and the examiner determines that there are no changes in the indication the indication is not required to be recorded again.
Michael P. Whalen Dominion Generation Station Licensing North Anna Power Station 1022 Haley Drive Mineral, VA 23117 Phone: 540-894-2572 Fax: 540-894-2830 Pager: 804-273-3030, Pager 3164 Email: MP.Whalen@dom.com CONFIDENTIALITY NOTICE: This electronic message contains information which may be legally confidential and/or privileged and does not in any case represent a firm ENERGY COMMODITY bid or offer relating thereto which binds the sender without an additional express written confirmation to that effect. The information is intended solely for the individual or entity named above and access by anyone else is unauthorized. If you are not the intended recipient, any disclosure, copying, distribution, or use of the contents of this information is prohibited and may be unlawful. If you have received this electronic transmission in error, please reply immediately to the sender that you have received the message in error, and delete it. Thank you.
Hearing Identifier:
NRR_PMDA Email Number:
805 Mail Envelope Properties (0A47EA17EBFBBD4E984EBCC0A92E221CD63B)
Subject:
Clarification of examination history of Weld SW-12 Sent Date:
7/17/2013 3:22:15 PM Received Date:
7/17/2013 3:22:21 PM From:
MP Whalen (Generation - 3)
Created By:
mp.whalen@dom.com Recipients:
"Sreenivas, V" <V.Sreenivas@nrc.gov>
Tracking Status: None Post Office:
INBE10W803.mbu.ad.dominionnet.com Files Size Date & Time MESSAGE 1710 7/17/2013 3:22:21 PM Options Priority:
Standard Return Notification:
No Reply Requested:
No Sensitivity:
Normal Expiration Date:
Recipients Received: